Agenda Document Pack - Planning and Placemaking Committee - 12/02/2025

Perth and Kinross Council · 12 February 2025
Back to Planning and Placemaking Committee — 12 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequalities 
Council Building
2 High Street
Perth
PH1 5PH 
03/02/2025 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chambers (Hybrid) on Wednesday, 12 February 2025 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Bailie Claire McLaren
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 126

Page 2

Page 2 of 126

Page 3

Planning and Placemaking Committee 
Wednesday, 12 February 2025 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 8 JANUARY 2025 FOR
APPROVAL
(copy herewith) 
5 - 14 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  MAJOR APPLICATIONS   
5(1)(i)  24/00435/FLM - ERECTION OF SPA AND LEISURE FACILITY,
25 HOLIDAY ACCOMMODATION UNITS, FORMATION OF
VEHICULAR ACCESS, PARKING AREAS, LANDSCAPING,
DRAINAGE AND ASSOCIATED WORKS, MURRAYSHALL
HOUSE HOTEL, MURRAYSHALL, PERTH, PH2 7PH
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 25/29) 
15 - 48 
5(1)(ii)  24/01303/AMM - CONSTRUCTION OF BERTHA PARK LINK
ROAD BETWEEN PHASE 1 AT BERTHA PARK HIGH
SCHOOL AND PHASE 2 NEW A9 WEST ROUNDABOUT AND
ASSOCIATED WORKS (APPROVAL OF MATTERS SPECIFIED
IN CONDITIONS 18/01800/IPM), LAND AT BERTHA PARK,
PERTH
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 25/30) 
49 - 72
Page 3 of 126

Page 4

5(2)  LOCAL APPLICATIONS   
5(2)(i)  23/01742/FLL - ERECTION OF A BREWERY, TAP ROOM,
STORAGE, FORMATION OF VEHICLE ACCESS, PARKING
AREA, INSTALLATION OF EV CHARGING POINT,
FORMATION OF OUTDOOR SEATING AREA, LANDSCAPING
AND ASSOCIATED WORKS, LAND 50 METRES SOUTH OF
COUNCIL COTTAGES, FERRY ROAD, PITLOCHRY
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 25/31) 
73 - 110 
5(2)(ii)  24/01440/FLL - CHANGE OF USE OF FLAT TO SHORT-TERM
LET ACCOMMODATION IN RETROSPECT, FLAT 3, 7 BRAE
STREET, DUNKELD, PH8 0BA
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 25/32) 
111 - 126 
Page 4 of 126

Page 5

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 8 January 2025 at 9.30am. 
Present: Councillors I Massie (up to and including Item 5(1)(i)), G Stewart, K Allan,
B Brawn, D Cuthbert, K Harvey, D Illingworth, I James, Bailie C McLaren, R Watters,
and Bailie M Williamson. 
In Attendance: S Merone, L MacLean, C Morilly, L Reid, K Smith, and P Williamson
(all Economy, Development and Planning); A Brown, G Fogg, S Dockerill,
M Pasternak and R Ramsay (all Legal and Governance). 
Apologies: Councillor R Watters. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted
apologies as above.   
2. Declarations of Interest 
The were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The Minute of Meeting of Planning and Placemaking Committee of
13 November 2024 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
23/01941/AMM 5(1)(i) 
5. Applications for Determination 
(1) Local Application 
(i) 24/01297/FLL – Alterations and extension to outbuilding to
form dwellinghouse and garage/workshop, land 35 metres
north west of Gentian, Fortingall, Aberfeldy, PH15 2LH
(Report No. 25/1) 
3
Page 5 of 126

Page 6

Ms A Brown read out a statement on behalf of Glenlyon and
Loch Tay Community Council, objectors to the application and
Mr R Taylor, on behalf of the applicant, addressed the
committee, and answered Members questions. 
Motion (Councillor B Brawn and Bailie M Williamson) 
Approve, in accordance with Report 25/1 with the
additional/amended conditions to:
(i) augment the proposed conditions in relation to private
water supply; and
(ii) make additional provision in relation to specimen in the
replating programme. 
Amendment (Councillors R Watters and D Cuthbert) 
Approve, in accordance with Report 25/1 with the
additional/amended conditions to:
(i) augment the proposed conditions in relation to private
water supply; 
(ii) make additional provision in relation to specimen in the
replating programme; and
(iii) make additional provision in terms of a conditions to
ensure delivery of low carbon technologies. 
In terms of Standing Order 21.5 a roll call vote was taken. 
7 members voted for the Motion as follows:
Councillors K Allan, B Brawn, D Illingworth, I James, I Massie,
Bailie C McLaren and Bailie M Williamson. 
4 members voted for the Amendment as follows:
Councillors D Cuthbert, K Harvey, G Stewart and R Watters. 
Resolved:
Grant, subject to the following terms, amended conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Page 6 of 126

Page 7

Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
4. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of:
• the height and slopes of any mounding or
recontouring of the site;
• full details of all hard landscaping proposals including
materials and installation methods; 
• compensatory planting including the inclusion of
specimen tree species, as mitigation for the loss of
specimen trees;
• tree protection strictly in accordance with BS 5837
2012: Trees in Relation to Design, Demolition and
Construction, including in relation to potential impact
on hedging in adjacent property; and, 
• species, height, size and density of trees and shrubs
to be planted (with a suggested inclusion of hornbeam
at a minimum height of 60cm). 
The scheme as subsequently approved shall be carried
out and completed within the first available planting
season (October to March) after the completion or
bringing into use of the development, whichever is the
earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the
Council as Planning Authority within 7 days of that date. 
The scheme as agreed and implemented shall thereafter
be maintained to the satisfaction of the Council as
Planning Authority.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
5. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
Page 7 of 126

Page 8

6. No windows or other openings shall be formed in the
southeast gable elevation of the dwellinghouse hereby
approved.
Reason - In the interests of residential amenity; in order
to safeguard the privacy and amenity of the residents of
the neighbouring dwellinghouse(s).
7. Prior to the commencement of the development hereby
approved, details of the proposed boundary treatments
for the site shall be submitted to and agreed by the
Council as Planning Authority.  The scheme as
subsequently agreed shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
8. Prior to the development hereby approved being
completed or brought into use, the vehicular access
junction with the C448 shall be surfaced in accordance
with Perth & Kinross Council's Road Development Guide,
using the Construction Type B from the Construction
Details for Access Types, C, D and E.  The Type B Road
construction detail shall continue into the entrance for a
minimum distance of 5 metres from the boundary of the
public road surface.
Reason - In the interests of road safety
9. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility which accords
with Sustainable Urban Drainage System principles shall
be implemented for the site and maintained for the
duration of the approved development works.  The
temporary surface water treatment facility shall remain in
place until the permanent surface water drainage scheme
is implemented.
Reason - To ensure the appropriate management of
construction surface water run-off to minimise flooding
and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the
interests of residential and environmental amenity.
10. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
Page 8 of 126

Page 9

operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
11. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  This should
also include a report detailing how existing and proposed
supplies shall be maintained/achieved specifically in
respect of : qualitatively and quantitively, catchments,
abstraction points and connections, and to record and
substantiate how these will not be adversely affected. 
The report should address both existing demand on the
private water supply and the projected demand of the
development hereby approved.  The subsequently
agreed protective or replacement measures shall be put
in place prior to the commencement of the development
being brought into use and shall thereafter be so
maintained insofar as it relates to the development
hereby approved.
Reason - To ensure the new development has an
adequate and consistently wholesome supply of water
and to maintain water quality and supply in the interests
of residential amenity and ensure the private water supply
or septic drainage systems of neighbours of the
development remain accessible for future maintenance.
12. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 07 Bat Survey Report Bird and
Protected Species Assessment 16 July 2024 and
document 08 Ecology Survey and Ecological Impact
Assessment 14 August 2024 relates) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
13. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Page 9 of 126

Page 10

Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
14. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, six nesting
bricks/boxes shall be provided on the completed buildings
in accordance with the recommendations in the
supporting biodiversity survey submitted and hereby
approved.  Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
15. Prior to works commencing, a Construction Method
Statement must be provided outlining the measures to
protect the watercourse from the impact of pollution and
sediment to ensure no adverse effects on the River Tay
SAC.  Thereafter the CMS as agreed shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In order to ensure the development does not
impact negatively on the nearby Special Area of
Conservation. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
Page 10 of 126

Page 11

3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
5. A private wastewater treatment plant and septic tank
should be provided with an access for desludging.  The
desludging tanker should be provided with access to a
working area that:
• will provide a clear route for the suction hose from
the tanker to the tank, and
• is not more than 25m from the tank where it is not
more than 4m higher than the invert level of the
tank, and
• is sufficient to support a vehicle axle load of 14
tonnes.
6. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
investigation and possible action by Environmental Health
under the Environmental Protection Act 1990.
7. The Air Source Heat Pump shall be certificated in
accordance with Microgeneration Certification Scheme
007 and installed by an installation company certificated
in accordance with Microgeneration Installation Standard
3005 and in compliance with the calculation procedure
contained in Table 2 of Microgeneration Certification
Scheme Planning Standards (MCS 020), confirming that
the permitted development noise limit of 42 dB LAeq, 5
mins will be met.  In addition, the Air Source Heat Pump
shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating
35 between 0700 and 2300 hours daily, or Noise Rating
25 between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and
plotted on a rating curve chart.
8. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply
or septic drainage infrastructure in the development area
Page 11 of 126

Page 12

are honoured throughout and after completion of the
development.
9. The applicant shall ensure the private water supply for
the dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted
to Perth and Kinross Council Environmental Health in line
with the above Act and Regulations.
10.  The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
11. The proposed demolition and/or building works likely to
cause harm to bats should not commence until the
applicant has obtained the relevant licence issued by
NatureScot pursuant to Regulation 53 of The
Conservation of Habitats and Species Regulations 2010
authorising the specified activity/development to go
ahead.
12. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
13. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk. 
14. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
15. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. 
Further information can be found at:
https://www.pkc.gov.uk/binrequests. 
16. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
Page 12 of 126

Page 13

and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to include flood risk
and drainage information. 
(Councillor I Massie left the meeting at this point and Councillor G Stewart took the
chair.) 
6. Proposal of Application Notices (PAN) 
(i) 24/00013/PAN - Formation of a 49.9MW battery storage system
and associated works, land 380 metres north east of St Annes,
Monorgan, Longforgan, DD2 5HT (Report No. 25/2) 
Mr P Williamson provided a short verbal update.  Paragraph 4 of
Report 25/2 refers to an event being held on 14 December 2024, this
did not take place.  Alternative dates for this event have been arranged
for 8 and 22 January 2025, both 1pm – 7pm at Longforgan Bowling
Club. 
Councillor D Illingworth requested due consideration be given to
screening and the route of the cabling connection to the substation to
try and avoid the digging up of roads. 
Councillor I James requested due consideration be given to potential
noise hazards of the facility and appropriate noise mitigation
measures. 
Councillor K Harvey requested due consideration be given to traffic
management due to narrow access routes and existing road issues in
the area. 
Bailie M Williamson requested due consideration be given to
necessary ecological surveys, including the potential for badgers
undermining the site. 
The contents of the Report by the Strategic Lead – Economy,
Development and Planning, were noted. 
Page 13 of 126

Page 14

Page 14 of 126

Page 15

Perth and Kinross Council 
Planning and Placemaking Committee – 12 February 2025 
Report of Handling by Strategic Lead - Economy, Development and Planning
(Report No. 25/29) 
PROPOSAL: Erection of spa and leisure facility, 25 holiday accommodation
units, formation of vehicular access, parking areas, landscaping,
drainage and associated works 
LOCATION: Murrayshall House Hotel, Murrayshall, Perth, PH2 7PH 
Ref. No: 24/00435/FLM
Ward No: P2- Strathmore 
Summary 
This report recommends approval of the application for planning permission for the
erection of spa and leisure facility, 25 holiday accommodation units, formation of
vehicular access, parking areas, landscaping, drainage and associated works. A
Section 75 Legal Agreement or other suitable mechanism will be required to obtain
contributions to transport infrastructure. 
Background and Description of Proposal 
1 Full planning permission is sought for the erection of a spa and leisure facility, 25
holiday accommodation units and associated vehicular access, parking areas
and landscaping works within the wider Murrayshall Estate. 
2 The existing estate comprises a country house hotel, two golf courses, a driving
range, self-catering lodges, existing residential housing and staff
accommodation. The hotel sits within a rural landscape setting and is
characterised by primarily a mixture of landscaped golf course and woodland
groups. The topography of the site falls away from the south east of the site
(Murrayshall Hill) to the northern boundary (Murrayshall Road). 
3 The application site is situated to the west of the wider Murrayshall Estate and to
the south of the Murrayshall House Hotel and the existing golf courses. South of
the site is the existing golf driving range and open fields, to the west is the
proposed driving range site and there are residential properties on the south-
eastern extent. The topography of the site falls away from the south east of the
site to the northern boundary.
5(1)(i)
Page 15 of 126

Page 16

4 The site is currently part of the Lynedoch golf course that has been reconfigured
with holes decommissioned to reduce it to a 10-hole course. 
5 The spa and leisure facility is stated as a key economic driver for the overall
estate masterplan. Internally, the building will include pools, saunas, steam
rooms, a gym, changing rooms and cafes. The surrounding external terraces will
have a range of outdoor uses to supplement the interior provision, including
outdoor treatments, relaxation areas and other hospitality offerings. 
6 The building will be of a geometric square shape, with a height of approximately
5.5 metres. It will be clad with a unified material palette of natural timber cladding
and a glazed wall system to optimise the use of natural light. The building will be
placed on a circular terrace with cut and fill being utilised to achieve a lower lying
structure and to minimise visual impact. The building will include fabric first
approaches to achieving high thermal performance and will also incorporate solar
PV, air source heat pumps and sedum roofs. 
7 The 25 holiday lodges will be located to the east of the spa and will comprise a
mix of two, three and four-bedroom units comprised as follows: 
• 10 x two-bedroom (four-person) two-storey lodges (Type A);
• 8 x two-bedroom (six-person) single-storey lodges (Type B);
• 4 x three-bedroom (six-person) single-storey lodges (Type C); and
• 3 x four-bedroom (eight-person) two-storey lodges (Type D). 
8 The lodges will be finished in elements of horizontal and vertical timber cladding,
metal standing seam roofs, dark grey metal windows and doors and glazed
balustrades to balconies and terraces. Solar PV panels will be installed on the
roofs and air source heat pumps will be installed where required. 
9 Connectivity has been prioritised, with the aim of creating accessible pedestrian
networks that connect to existing paths around the estate. The lodges have been
sited to take advantage of views, aided by the topography of the site and will
incorporate a landscape framework to help embed the buildings into the site
whilst utilising the existing landscape and trees as a natural backdrop. 
10 It should be noted that the current application is for the provision of 25 holiday
lodges only. Extensive reference to a second phase of lodge development on the
eastern end of the application site is made within the supporting material to this
application. However that does not form part of the application currently being
considered. Conversely, the landscape buffer on the eastern side bounding the
indicative phase 2 area and shown on the Landscaping Plan (Drawing 30) does
from part of the consideration of this application. 
Page 16 of 126

Page 17

Site History 
11 07/00283/OUT was Refused On 11 September 2007 for Erection of 12
dwellinghouses (plot F) (in outline). 
12 07/00284/OUT was Approved On 11 September 2007 for Replacement of
existing indoor driving school with 1no dwellinghouse (plot E) (in outline). 
13 07/00285/OUT was Approved On 11 September 2007 for Leisure and health
facilities 'timeshare' lodge and fractional ownership accommodation 70 bedrooms
and 10 staff living/bedroom studio residences (plot A) (in outline). 
14 07/00286/OUT was Refused On 11 September 2007 for Erection of 4
dwellinghouses (plot B) (in outline). 
15 07/00287/OUT was Approved On 11 September 2007 for Erection of 17 bedroom
suite accommodation including public lounge (plot D) (in outline). 
16 10/00505/IPL was Approved On 17 May 2010 for Leisure and health facilities
'timeshare' lodge and fractional ownership accommodation 70 bedrooms and 10
staff living/bedroom studio residences (plot A) (in principle) (renewal of
07/00285/OUT). 
17 10/00506/IPL was Approved On 17 May 2010 for Erection of 17 bedroom suite
accommodation including public lounge (plot D) (in principle) (renewal of
07/00287/OUT). 
18 20/01688/SCRN On 24 December 2020 for Screening opinion request. 
19 20/00010/PAN On 9 December 2020 for Residential development, extension to
hotel, erection of hotel accommodation units and staff accommodation units, spa
facility, golf training and indoor sports buildings, formation of camping grounds,
outdoor sports grounds, photovoltaic sites, access roads, SUDS ponds,
landscaping and associated works. 
20 21/00508/IPM application was Withdrawn On 4 April 2022 for Residential
development, extension to hotel, erection of hotel accommodation units, café,
spa and leisure facilities and groundskeeping buildings, formation of camping
grounds, outdoor sports grounds, photovoltaic site, access roads, SUDS ponds,
landscaping and associated works (in principle). 
21 21/01673/FLL Full Planning Permission was Approved On 11 July 2022 for
Relocation of driving range, erection of golf academy building and shop,
formation of parking area, part diversion of core path, landscaping and
associated works. 
22 22/00023/PAN On 2 February 2023 for Residential development, extension to
hotel, erection of hotel accommodation units, timeshare and fractional ownership
Page 17 of 126

Page 18

accommodation units, café, spa and leisure facility, formation of camping
grounds including camping pods, outdoor sports grounds, relocation of green
keeping buildings, formation of central delivery hub, photovoltaic sites and
associated access, drainage, and landscaping works (in principle). 
23 22/00024/PAN On 2 February 2023 for Extension to hotel, erection of hotel
accommodation units, timeshare and fractional ownership accommodation units,
café, spa and leisure facility, formation of camping grounds including camping
pods, outdoor sports grounds, relocation of green keeping buildings, formation of
central delivery hub, photovoltaic sites, associated access, drainage, and
landscaping works (phase 1). 
24 23/01798/FLL Full Planning Permission for Alterations and extension to core
path, installation of signage and associated works. 
25 23/00833/IPM was Approved On 13 December 2023 for Mixed-use development
comprising spa and leisure facility including ancillary food and drink; holiday
accommodation including lodges luxury units and timeshare/ vacation ownership
properties extension to hotel central delivery hub for deliveries staff facilities and
relocated greenkeeping services outdoor pursuits small-scale residential
conversion of existing greenkeepers compound and associated works including
photovoltaic array servicing access drainage and landscaping. 
26 24/00223/FLL Full Planning Permission On 16 February 2024 for Erection of 22
luxury glamping pods and associated access and drainage and landscaping
works. 
27 24/00368/FLL Full Planning Permission On for Siting of 22 holiday
accommodation units, formation of vehicular access, outdoor seating area and
associated works. 
Environmental Impact Assessment 
28 The impact of the wider development site, including the uses currently proposed,
was screened for EIA (20/01688/SCRN) and it was determined that the proposal
does not constitute an EIA development. 
Pre-Application Consultation 
29 Pre application Reference: 22/00024/PAN  
30 It should be noted that the pre-application consultation process undertaken
related to the submission of a masterplan application for planning permission in
principle (PPP) (23/00833/IPM). Although the current application does not seek
approval of the matters specified by that consent, the proposals now under
consideration were captured within the PPP and a further pre-application
procedure was not required. 
Page 18 of 126

Page 19

Development Plan 
31 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
32 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
33 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 27: City, Town, Local And Commercial Centres
• Policy 29: Rural Development
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
34 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
35 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 9B: Caravan Sites, Chalets and Timeshare Developments: New and
Expanded Touring Caravan, Motorhome / Campervan, and Camping Sites
Page 19 of 126

Page 20

• Policy 9C: Caravan Sites, Chalets and Timeshare Developments: Chalets,
Timeshare and Fractional Ownership
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 43: Green Belt
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
36 • Supplementary Guidance - Developer Contributions & Affordable
Housing (adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in
2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC NON STATUTORY GUIDANCE 
37 • Planning Guidance - Planning & Biodiversity 
NATIONAL GUIDANCE 
38 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4.
Page 20 of 126

Page 21

Planning Advice Notes 
39 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
40 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
41 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
42 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
43 As part of the planning application process the following bodies were consulted: 
External 
44 Scottish Water: No objection. Advise there is currently sufficient capacity at
Perth Water Treatment Works and Scone Waste Water Treatment Works to
service the Development. 
45 Perth and Kinross Heritage Trust: No objection. Advise that the area has
archaeological potential, and a condition is recommended to ensure that a
programme of archaeological works is required, and any archaeological remains
are appropriately dealt with. 
Page 21 of 126

Page 22

46 Transport Scotland: No objections. 
47 Historic Environment Scotland: No objections. 
48 Scone and District Community Council: Object. Consider that there are issues
with the width of the existing roads and impacts from construction and
operational traffic; impacts on biodiversity; further encroachment of the
greenspace around Scone; the design of the spa is inappropriate and oversized;
potential for noise disturbance and lack of parking provision. 
Internal 
49 Biodiversity/Tree Officer: No objections, subject to conditions on survey
requirements; provision of nesting boxes, wildlife kerbs and hedgehog highways. 
50 Commercial Waste: No objections, the waste proposals on site are sufficient. 
51 Conservation Team: No objections, the impact of the development will be neutral. 
52 Development Contributions Officer: A contribution towards transport
infrastructure is required. 
53 Development Plan: The principle of tourism-related development has already
been established in this location through 23/00833/IPM. 
54 Environmental Health (Noise Odour): No objections, subject to conditions
controlling plant noise, amplified music, external lighting and times of construction
work. 
55 Transportation and Development: No objections, subject to conditions on a
Construction Traffic Management Plan (CTMS); detailed design of the cycle and
powered two-wheeler parking details for the lodges and a detailed design for the
car parking, disabled car parking, powered two-wheeler parking and cycle parking
for the spa. 
56 Structures and Flooding: Further information was requested on culverts,
microdrainage modelling and greenfield runoff rate calculations. This was provided
and there are no objections to the proposal. 
57 Community Greenspace: No comments. 
Representations 
58 56 representations were received objecting to the proposals. The main material
issues raised within the representations are: 
• Application seeks to circumvent requirements of the approved PPP.
Page 22 of 126

Page 23

• Traffic and transport impacts
• Lack of parking at spa
• Too much parking for lodges
• The site is greenbelt and should not be developed
• Ecological impacts
• Suburbanisation of a rural landscape
• Visual impact
• Noise 
• Light pollution
• Spa is oversized 
59 These issues are addressed in the Appraisal Section of the report. 
Additional Statements 
60 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Flood Risk and Drainage
Assessment
• Design and Access Statement
• Energy Statement
• External Lighting Strategy
• Noise Impact Assessment
• Sustainability Statement
• Heritage Impact Assessment
• Landscape and Visual
Appraisal
• Ecological Impact Assessment
• Economic Benefits Statement
• Transport Statement
• Tree Survey and Impact
Assessment
• Planning Statement
• Biodiversity Plan
• Pre-application Consultation
Report 
Appraisal 
61 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
Page 23 of 126

Page 24

with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy Section above and
are considered in more detail below. 
Principle 
62 The principle of the proposal for the siting of a spa and leisure facility, holiday
accommodation units and associated vehicular access and parking has been
established through the previous granting of planning permission in principle for a
larger mixed-use development. 
63 The principle of the development is thus considered acceptable, provided the
proposals are compatible with the relevant policies of the development plan. 
64 The site is within the green belt and therefore Policy 8 of NPF4 and Policy 43 of
LDP2 are applicable. NPF4 makes allowance for development proposals in the
green belt if it is ‘for outdoor recreation, play and sport or leisure and tourism
uses; or where it is an intensification of established uses. Similarly, in the case of
LDP2, the proposed development could in principle comply with LDP2 policy 43
criterion (a) supporting an established use, providing that the proposals are
appropriate to meet the overall objectives of the Green Belt to protect and
enhance the character, landscape setting and identity of settlements. 
65 This proposal is a tourism related development. LDP2 Policy 8: Rural Business &
Diversification supports such proposals when they improve the quality of existing
visitor facilities. Sites outwith settlements may be acceptable where they offer
opportunities to diversify an existing business, or are related to an existing site-
specific resource or opportunity. The spa and lodges will comply with Policy 8
criteria (a) as the proposal will contribute to the local economy through the
provision of permanent employment, visitor accommodation, additional tourism
and recreational facilities. 
66 LDP2 Policy 9: Caravan Sites, Chalets and Timeshare Developments generally
supports the improvement of existing holiday-related uses. Policy 9C states that
“the Council will give favourable consideration to new chalet and
timeshare/fractional ownership developments where it is clear these cannot be
used as permanent residences”. 
67 NPF4 Policy 30: Tourism, sets out that proposals for tourism related
development will take into account factors such as the contribution made to the
local economy; compatibility with the surrounding area and impacts on
communities, along with sustainable principles and consideration of the natural
environment. 
68 Overall, NPF4 and LDP2 policies are generally supportive of the proposal as the
intensification of an existing tourist facility. Therefore, the development proposals
Page 24 of 126

Page 25

are acceptable in principle, subject to compliance with other relevant
development plan policies and material considerations, which are assessed
below. 
Design and Layout 
69 The siting and design of the proposed spa and leisure facility have been informed
by the opportunity to provide panoramic views beyond the estate. In response to
the topography of the site, a building level has been proposed to acknowledge
the need to avoid introducing a visually obtrusive form within the landscape. The
ground conditions will be altered by introducing some designated cutting into the
exiting slope to achieve a lower-level terraced area to accommodate the building. 
70 This change to the landform, combined with the building form and scale will
ensure existing outlooks to the surrounding landscape are maintained for
neighbouring properties, existing and proposed. 
71 The proposed external terrace provides the opportunity to link, visually and
physically, the various internal uses with a range of external landscaped areas.
To align with the simplistic architectural form, the materials have been limited to a
palette of natural timber cladding and a glazed wall system. 
72 The location of the building will provide strong connectivity between the spa and
leisure facility and the surrounding landscape and other leisure offerings beyond
the building itself. The path network within the estate will provide easy access to
other areas by walking or cycling. 
73 The proposed holiday lodges will be located directly to the east of the proposed
spa and leisure facility. The lodges will range from 1-2 storeys to suit the
topography of the site, with the variety of units staggered up the slope. 
74 These holiday lodges will range from 2-4 beds and will accommodate private
external terrace or balcony space. The lodges will be orientated to maximise the
views and the form, massing and material palette will all the reflective of rural
Perthshire and respond to the surrounding context. An innovative landscape
strategy is proposed to naturally embed the building into the existing setting. 
75 Overall, the proposed development will bring a modest change to the landscape
setting, with the landscape buffer and the planting of native trees and foliage will
help soften the impact of the new accommodation and leisure areas. The
proposal is considered to adopt good placemaking principles as the design and
siting respects the character and setting with a low impact proposal and thereby
accords with NPF4 Policy 14: Design, Quality and Place and LDP2 Policy 1:
Placemaking. 
Page 25 of 126

Page 26

Landscape and Visual Amenity 
76 NPF4 Policy 4: Natural Places, advises that development proposals that affect a
site designated as a local nature conservation site or landscape area in the LDP
will only be supported where development will not have significant adverse
effects on the integrity of the area or the qualities for which it has been identified.
LDP2 Policy 39: Landscapes, states that development proposals will be
supported where they do not conflict with the aim of maintaining and enhancing
the landscape qualities of Perth and Kinross. 
77 The site is situated in the Sidlaw Hills Local Landscape Area (LLA) and a
Landscape and Visual Impact Assessment (LVIA) has been submitted in support
of the application. The landscape and visual effects of the proposal are assessed
as generally minor to negligible in the expansive context of Murrayshall Estate.
The proposal will result in relatively minor changes to the general character of the
landscape. 
78 The LVIA illustrates that the influence of the proposal on its surroundings is
largely limited to the local surrounding landscape, particularly to the north.
Viewpoint analysis illustrates that effects are generally minor to negligible with
moderate effects only experienced adjacent to site boundaries. 
79 The landform of the site slopes steeply, east to west over the site with an overall
level change of over 17.5 metres. The ground levels continue to rise eastward
beyond the site. Utilising the lower area of the site for the larger spa and leisure
building location will enable the development to have a good fit within the
established landscape whilst limiting its visual impact. 
80 The Estate has a well-established structure of policy woodlands and mature
trees, and this will be supplemented through additional planting and landscaping.
Once tree and woodland planting starts to mature, the proposed built form will be
screened further. Overall, the effect of the development on surrounding
landscape designations is assessed to be minor. 
81 By improving and increasing recreation opportunities in the area and enhancing
the woodland structure of the Estate the proposal is considered in accordance
with the guidance for the Sidlaw Hills Local Landscape Area. The proposals will
not detract from the qualities of this LLA and the identified landscape character of
the site and surroundings. 
82 The visual effects of the proposal from surrounding representative receptors are
not considered to be significant. Any adverse effects will decrease in time
through maturing screening and landscape mitigation. The proposal is therefore
considered to comply with the aims of NPF4 Policy and LDP2 Policy 39. 
Page 26 of 126

Page 27

Roads and Access 
83 NPF4 Policy 13: Sustainable Transport seeks to encourage developments that
prioritise sustainable travel while LDP2 Policy 60 Transport Standards and
Accessibility Requirements requires consideration of transport and accessibility.
The applicant has submitted a Transport Statement in support of the application,
and this has been considered by PKC Transportation and Development. 
84 It is proposed that the new facilities will be accessed from the existing driveway
to the hotel. Six new passing places are required to ensure that construction and
operational traffic can adequately access the site (Condition 13). 
85 It was initially proposed to provide 24 parking spaces for the lodges and 20 for
the spa and leisure facility. Following discussions with PKC Transportation and
Development, the lodges are proposed to be provided with 48 standard parking
bays, three disabled spaces and three powered two-wheeler parking spaces. The
spa and leisure facility will be provided with 32 standard car parking spaces,
three disabled car parking spaces and four powered two-wheeler parking spaces. 
86 PKC Transportation and Development had initially requested 50 spaces for the
spa and leisure facility. However, this was based on a maximum standard and
following discussions the level of parking above is considered to be appropriate.
The applicant has highlighted that the primary purpose of the spa is to expand
the range of facilities available to residents of the hotel and proposed lodges, this
will mean that a number of the residents will be utilising existing car parking
within the site. It is also proposed to provide a shuttle service for the site. The
reduction in car parking and shuttle service is supported by NPF4 and LDP2
policies that seek to reduce the reliance on private cars. 
87 Overall, the proposal is acceptable in transport terms subject to further conditions
on a Construction Traffic Management Plan, parking details for different transport
modes, the core path, signage and a Travel Plan (Conditions 4, 5, 6, 7, 8, 9, 10,
11 and 12) 
Drainage and Flooding 
88 A Flood Risk and Drainage Assessment (FRDA) has been undertaken to assess
the potential increase to surface water run off attributed to the development from
all possible sources, in accordance with best practise and guidance presented
within NPF4. 
89 The proposed drainage/SUDS scheme for the site will comprise the management
of surface water runoff from the development via a combination of filter drains,
subsurface pipework, swales and linear drainage conveying runoff to two SUDS
ponds and subsurface cellular storage at the western end of the site. 
90 Roof drainage from the lodges will be collected by subsurface pipework whilst
road drainage will be collected by parallel filter drains and conveyed to
Page 27 of 126

Page 28

landscaped swale conveyance features passing through the centre of the
development site. These features are composed of a series of three swales,
connected by culverts, which collect surface water flows and convey them north-
west. The majority of runoff from the holiday lodge area will be conveyed to the
southern SUDS pond located at the south-west extent of the development area,
with a smaller portion of track drainage conveyed via filter drains to the northern
SUDS pond, with attenuated flows from both ponds discharging to the ditch
proposed as part of the separately approved driving range development. 
91 Runoff from impermeable areas of the spa facility will be collected via filter drains
and conveyed to a subsurface cellular storage feature, with the proposed car
park comprising permeable paving and discharging directly to the cellular
storage, and attenuated flows discharging to the existing ditch along the northern
boundary. 
92 PKC Flooding and Structures had initially requested the submission of further
information/clarifications. This information was subsequently submitted and
Flooding and Structures have confirmed that they have no further comments to
make on the proposals. 
93 Overall, the site is generally at a low risk of flooding and the proposal complies
with NPF4 Policy 22: Flood Risk and Water Management; and LDP2 Policy 52:
New Development and Flooding and Policy 53: Water Environment and
Drainage. 
Noise and Light Pollution 
94 As the spa and leisure facility building will contain plant equipment, including roof
mounted air source heat pumps (ASHPs) and the lodges will also be fitted with
ASHPs, the applicant has submitted a noise impact assessment (NIA). 
95 Noise from fixed plant equipment associated with both the leisure building and
proposed lodges have been evaluated with the results predicted to meet the
required level across all frequencies. It is however recommended that the ASHPs
on the roof of the leisure building have a maximum sound power level (SWL) of
85dB and the ASHPs are sited at the gable ends of the proposed lodges and
have a maximum SWL of 74dB.  
96 It is noted from the site plan that the leisure building will contain outdoor seating
and an external gym/studio area which hasn’t been included in the NIA. As such,
to protect residential amenity, a condition in relation to amplified music and
outdoor areas will be imposed (Condition 15). 
97 An external lighting strategy has been submitted with the application and
assessed by Environmental Health. Considering the distance to the nearest
residential properties, it is considered unlikely that the development will adversely
affect residential amenity. However, a condition is requested to control external
lighting (Condition 16).
Page 28 of 126

Page 29

Waste Collection 
98 Waste collection will be carried out using small electric buggies or carts. Refuse
will be collected from the lodges and taken to the existing waste storage area of
the hotel. No additional waste/storage facilities are required owing to existing
capacity at the hotel. 
Conservation Considerations 
99 A Heritage Impact Assessment has been submitted in support of the application
and has been assessed by Historic Environment Scotland (HES), Perth and
Kinross Heritage Trust (PKHT) and PKC’s Conservation Officer. 
100 PKHT has advised that the proposed development site lies within an area that
has known archaeological remains and is considered to have archaeological
potential. As a result, PKHT recommend that a programme of archaeological
works is attached as a condition (Condition 26) to ensure the development and
its impact on known and potentially unknown archaeological remains is
appropriately dealt with. The details of this programme should be agreed in
advance of works in a Written Scheme of Investigation with PKHT. 
101 The requested condition will ensure that the proposal complies with NPF4 Policy
7: Historic Assets and Places and LDP2 Policy 26: Scheduled Monuments and
Archaeology. 
Natural Heritage and Biodiversity 
102 NPF4 Policy 1: Sustainable Places, Policy 3: Biodiversity, Policy 4: Natural
Places and Policy 6: Forestry, Woodland and Trees are relevant considerations
as are LDP2 Policies 38: Environment and Conservation, 40: Forestry, Woodland
and Trees and 41: Biodiversity. 
103 The Council will seek to protect and enhance all wildlife and habitats, whether
formally designated or not, considering natural processes in the area. Planning
permission will not be granted for development likely to have an adverse effect
on protected species unless clear evidence can be provided that the ecological
impacts can be satisfactorily mitigated. The necessary surveys have been carried
out in line with best practice and it is recommended that the conclusions and
recommended action points within the surveys are required by condition
(Condition 21). 
104 NPF4 requires that major developments demonstrate that they will enhance
biodiversity, so they are in a better state than without intervention – including
future management. This should include significant enhancements following
avoidance, mitigation and compensation for all biodiversity loss. 
105 A Site Biodiversity Action Plan has been submitted but is not considered to
achieve the significant enhancement NPF4 requires. Four bat boxes, four bird
Page 29 of 126

Page 30

boxes, an undisclosed number of hedgehog boxes and wildflower meadow
sowing are proposed. 
106 More is required to bring the biodiversity enhancement in accordance with NPF4
and what is required in the PKC Planning for Nature Guidance including: 
• More bird boxes
• More bat boxes
• More hedgehog boxes
• Create hedgehog highways in any fence lines 
• Install wildlife kerbs adjacent to all road gullies within 500m of a SUDS pond. 
107 Conditions are recommended to ensure that biodiversity enhancement is
provided in accordance with NPF4 (Conditions 23 and 25). 
108 The submitted Tree Survey indicates 18 individuals, plus groups of trees are
proposed to be felled to facilitate the development access. The Scottish
Government Policy on Control of Woodland Removal advises that there will be a
presumption in favour of protecting woodland resources. Where the loss of
woodland is unavoidable, mitigation measures in the form of compensatory
planting will be required. 
109 The accompanying landscape strategy details the proposed additional tree
planting to be delivered on site, mitigating the proposed tree losses through
compensatory tree planting and resulting in an increase in tree cover as a result
of the development. 
110 Overall, the proposals are considered to comply with the relevant policies of
NPF4 and LDP2. 
Low and Zero Carbon Generating Technologies 
111 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. An Energy
Statement submitted in support of the application advises that the following
sustainability points are included within the design of the spa and leisure facility
and lodges: 
• An all-electric development is proposed which will lower the operational
carbon of the development and there is no proposed new gas to the site.
Page 30 of 126

Page 31

• Around 570m2 of solar PV is proposed on the spa and lodges to maximise
the proposals use of zero operational carbon electricity.
• The development will use an air source heat pump (ASHP) / variable
refrigerant volume (VRV) and solar photovoltaic (PV) panels to supply low
and zero carbon internal conditioning and energy. The use of an ASHP / VRV
will save between 11 – 50 kgCO2/m2 when compared to using gas. The use
of using solar PV will save between 5 – 11 kgCO2/m2 compared to not using
an array.
• All U-values will be at, or are a significant improvement upon, the required U-
Values as defined by the Scottish Building Standards Non-Domestic
Handbook.
• 100% of the lighting shall be served by highly efficient LED luminaires.
• All systems can be centrally controlled to maximise operational efficiency. 
112 The proposal therefore complies with the relevant policies. 
Developer Contributions 
113 The Council’s Transport Infrastructure Developer Contributions Supplementary
Guidance requires a financial contribution towards the cost of delivering the
transport infrastructure improvements which are required for the release of all
development sites in and around Perth. 
114 The site is located in the ‘Full’ Transport Infrastructure contributions zone
(Appendix 3 of the Supplementary Guidance). 
115 Holiday accommodation is calculated at the “Residential – Affordable” rate per
unit, and this will be applied to the 25 proposed lodges.  
116 New floorspace for the spa and leisure facility is calculated at the “Non-
Residential Other” rate, and staff/ office facilities may be calculated at the
“Employment” rate. 
117 Therefore the required contribution towards the cost of delivering the transport
infrastructure improvements is as follows: 
o Transport Infrastructure:
o Lodges: (25 x £2,184) £54,600
o Facility: (1,607 x £57) £91,599
o Staff areas: (660 x £17) £11,220 
o Total: £157,419 
118 Subject to completion of a Legal Agreement, or upfront payment, the application
is considered to satisfy contribution and infrastructure requirements. 
Page 31 of 126

Page 32

Economic Impact 
119 As part of the larger planning permission in principle, the applicant advised that
they believe there is an opportunity to reposition Murrayshall as one of the
leading four-star hotel and golf resorts in Scotland. They aim to achieve this
through the provision of a more extensive resort offering, including the
development of a spa and leisure club, new accommodation facilities, outdoor
pursuit facilities, and an enhanced golfing experience. This will enable the resort
to create additional income streams, reduce the risk of seasonality, become more
operationally efficient and capture new customer segments. 
120 This application represents a small part of the wider vision for Murrayshall and
seeks to diversify the existing accommodation offer and appeal to customers
seeking a more experiential stay. 
121 During the construction period, jobs will be created and sustained, supporting
indirect employment and revenue that this volume of construction activity will
generate from employees spending on local goods and services. Longer term,
additional residents to the area will support existing local employment and
services in the area. 
Variation of Application Under Section 32a 
122 This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to the vehicular and cycle parking
to ensure adequate provision is made for the development. 
Planning Obligations and Legal Agreements 
123 A Legal Agreement may be required to secure necessary transport infrastructure
requirements, unless an upfront payment is received. 
Direction by Scottish Ministers 
124 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
125 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Page 32 of 126

Page 33

Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions.  
Recommendation   
Approve subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The development hereby approved shall be used solely for holiday
accommodation and shall not be occupied as the sole or main residence of any
occupant. 
Reason - In order to clarify the terms of the permission; to control and restrict the
use of the building. 
Transport 
4. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
a) restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
Page 33 of 126

Page 34

e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f) arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h) arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i) details of information signs to inform other road users of construction
traffic;
j) arrangements to ensure that access for emergency service vehicles are
not impeded;
k) co-ordination with other significant developments known to use roads
affected by construction traffic;
l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
m) monitoring, reporting and implementation arrangements; 
n) arrangements for dealing with non-compliance; and
o) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management. 
5. Prior to the occupation of each lodge in Phase 1 as shown on Drawing 54, each
lodge shall be provided with a minimum of 2 parking spaces.  On occupation of
the final lodge within Phase 1, a total of 48 standard car parking bays will be
provided plus 3 disabled parking bays being provided, resulting in a total of 51
car parking spaces on site, as shown on Drawing 54.  
Reason - In the interest of providing a suitable number of off-street lodge parking   
6. Prior to commencement of any development on Phase 1 of the Lodge
development, a detailed design for the proposed secure covered cycle parking
facility for a minimum of 10 cycles, including its location, shall be submitted to
and approved in writing by the Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall be implemented in
accordance with the approved details prior to the lodge development being
brought into use.  
Reason - To encourage active travel and meet advice within National Planning
Framework on transport for the lodge development 
7. Prior to commencement of any development on Phase 1 of the Lodge
development, a detailed design for the proposed powered tow wheeler parking
Page 34 of 126

Page 35

facility for a minimum of 3 powered two wheelers, including its location, shall be
submitted to and approved in writing by the Planning Authority in consultation
with the Roads Authority.  The powered two wheelers parking, as approved in
writing, shall be implemented in accordance with the approved details prior to the
lodge development being brought into use. 
Reason - In the interest of providing a suitable number of off-street lodge parking. 
8. Prior to commencement of any development on the Spa and Leisure Facility, a
detailed design for the proposed parking shall be provided for the following
elements: 
• 32 standard car parking spaces
• 3 disabled car parking spaces
• 4 powered two-wheeler parking spaces  
Including its location, shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads Authority.  The parking, as
approved in writing, shall be implemented in accordance with the approved
details prior to the Spa and Leisure Facility being brought into use. 
Reason - In the interests of road safety; to ensure the provision of adequate off-
street parking facilities for disabled visitors and motorcyclists. 
9. The cycle parking as shown on Drawing 55, shall be constructed and operational
prior to the Spa and Leisure Facility being brought into use. 
Reason - To encourage active travel and meet advice within National Planning
Framework on transport. 
10. The core path which forms part of the site must not be obstructed during building
works or on completion.  Any damage done to the core path and associated
signage during building works shall be made good before occupation of the
development.  Any temporary restrictions to public access required to facilitate
works on site must be agreed in writing first with the Access Officer.  
Reason - In the interests of public access along the core path. 
11. Prior to commencement of any development on site, a detailed design showing
the signage for the development shall be provided with the following schemes
being designed: 
a) directional signage to be added to the public road network to direct
customers to the development site entrance along the preferred routes as
discussed in the Transport Statement;
Page 35 of 126

Page 36

b) directional signage to be removed from the public road network to
encourage customers to use the preferred route detailed as discussed in
the Transport Statement; and
c) passing place signage along the U84 and U85 from the A94 to the
development site entrance from the public road network  
The scheme shall be submitted to, and approved in writing by, the Council as
Planning Authority.  The submission will confirm the location of the signage,
specification and detailed design.  The scheme for the approved shall thereafter
be implemented in full, prior to the first element of the development hereby
approved being completed or brought into use. 
Reason: In the interests of road, to direct customers of development site along
the preferred route.  
12. No part of the development shall be occupied until a Travel Plan, aimed to
encourage more sustainable means of travel, has been submitted to and agreed
in writing by the Council in consultation with Transportation and Development. 
The Travel Plan will have particular regard to provision for walking, cycling and
connections to public transport access to in the form of the shuttle service,
detailing the frequency of the service and will identify the measures to be
provided along with the system of management, monitoring, review, reporting
and the duration of the plan. 
Reason - To promote sustainable transport options and to meet advice within
National Planning Framework on transport. 
13. Prior to commencement of any development on site, a detailed design for a
minimum of six passing places shall be submitted and approved in writing by the
Planning Authority in consultation with the Roads Authority for the following
locations: 
• Passing Place 3 - Unmade layby at 227m as detailed in the Transport
Statement in Appendix G - Passing Place Plan (SK005); 
• Passing Place 4 -Verge at 470m as detailed in the Transport Statement in
Appendix G - Passing Place Plan (SK005); 
• Passing places 7 - Field entry on right at 1090 m as detailed in the Transport
Statement in Appendix G - Passing Place Plan (SK005); and 
• Passing places 11 - Verge at the pedestrian access gate to Bonhard House at
1900 m as detailed in the Transport Statement in Appendix G - Passing Place
Plan (SK005); and 
• Passing places 13 - Verge at 2040 m as detailed in the Transport Statement
in Appendix G - Passing Place Plan (SK005); and 
• Passing places 15 -Verge at 2320 m as detailed in the Transport Statement in
Appendix G - Passing Place Plan (SK005) 
Page 36 of 126

Page 37

The passing places, shall be provided with a minimum carriageway width of 5.5
metres, for a minimum length of 11 metres with 30 degree tapers and surfaced in
accordance with the Perth & Kinross Council's Road Development Guide at the
agreed locations.  The passing places, as approved in writing, shall be
implemented in accordance with the approved details and be constructed and
operational in advance of any further works being undertaken on site.   Once
provided, the passing places shall thereafter be permanently retained as such. 
Reason - To ensure the existing road network can accommodate the traffic likely
to be associated with the proposed development in the interests of road safety. 
Amenity 
14. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
15. No amplified music, shall be permitted in the outdoor seating or external
gym/studio area at any time.  
Reason - In order to safeguard the neighbouring residential amenity in the area. 
16. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
17. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays or bank holidays (as identified by Scottish
Government). 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
18. Mitigation measures as described in Sections 5.5 of the Noise Impact
Assessment undertaken by ITP Energised dated 25.03.2024, shall be
undertaken to ensure a satisfactory level of residential amenity can be achieved. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
Page 37 of 126

Page 38

Trees and Landscaping  
19. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction. Protection measures, once in
place, shall remain in place for the duration of construction.  
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority.   
20. The detailed landscaping plan, which is hereby approved, shall be completed
within the first available planting season (October to March) after the completion
or bringing into use of the development, whichever is the earlier. The approved
scheme shall thereafter be maintained to the satisfaction of the Council as
Planning Authority, with any planting which fails to become established within five
years being replaced in the following planting season with others of a size and
species as previously approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
Biodiversity 
21. The conclusions and recommended action points within the supporting
Ecological Impact Assessment, Biodiversity Plan and Invasive Non-Native
Species Management Plan submitted and hereby approved (drawing numbers
52, 63 and 64 relate) shall be fully adhered to, respected and undertaken as part
of the construction phase of development, to the satisfaction of the Council as
Planning Authority. 
Reason - In the interests of protecting environmental quality and biodiversity.  
22. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981).   
23. Prior to the completion or occupation of the building(s) hereby approved,
whichever is the earlier, 12 bird nesting boxes, 12 bat roosting boxes, 10
hedgehog boxes shall be provided on suitable locations within the red line
boundary. Thereafter, the agreed scheme shall be maintained in a reasonable
Page 38 of 126

Page 39

condition for the life of the development, to the satisfaction of the Council as
Planning Authority.  
Reason - In the interests of protecting environmental quality and of biodiversity. 
24. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, wildlife kerbs shall be installed adjacent to all road
gullies within 500metres of a SUDS pond or watercourse. Thereafter, the kerbs
shall be retained in a reasonable condition for the life of the development, to the
satisfaction of the Council as Planning Authority.  
Reason - In the interests of protecting environmental quality and of biodiversity.  
25. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, hedgehog highways shall be created by providing
access gaps in wooden fences least 13cm x 13cm at ground level, to allow for
the free movement of hedgehogs. Thereafter, the hedgehog highways shall be
retained in a reasonable condition for the life of the development, to the
satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Archaeology 
26. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation analysis, the development
as approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT. The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress. 
Reason - To ensure a programme of archaeological works is carried out to
safeguard and record any archaeological remains within the development area. 
Materials  
27. Prior to the commencement of the spa and leisure building hereby approved,
details of the specification and colour of the proposed external finishing materials
Page 39 of 126

Page 40

to be used shall be submitted to and agreed in writing by the Council as Planning
Authority.  The scheme as agreed shall be implemented prior to the completion
or bringing into use of the development, whichever is the earlier. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
1. Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached herewith. 
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. In
accordance with Regulation 41 the notice must be: 
Displayed in a prominent place at or in the vicinity of the site of the development 
Readily visible to the public 
Printed on durable material. 
Page 40 of 126

Page 41

4. The planning permission decision notice shall not be issued until such time as
the required Developer Contributions have been secured or paid in full.   
In the event the applicant does not either make the required payment within 28
days from the date the agent/applicant is advised of the need for the
contributions, or complete a legal agreement for delayed payment within a 4
month period from the date the agent/applicant is advised of the need for the
contributions the application may be refused under delegated powers without any
further discussion with the applicant.  
5. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
6. The applicant can seek guidance on the detailed design and positioning of the
cycle storage from Transport Scotland's Cycling by Design 2021 or similar design
guide.  
7. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, they must obtain from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of works.  Information on
junction types, requirements for Vehicular Access consents (VA1) and
application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on the
disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environmental Protection Agency.  
8. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain from the Council, to place,
maintain or adjust apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-permits. 
9. Road drainage may be in the vicinity of the passing places and require remedial
works.  Contact Perth & Kinross Council Road Maintenance Department for
further details. 
Page 41 of 126

Page 42

10. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(Section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
11. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.   
12. Part of the approved development includes holiday accommodation or Short-term
Let accommodation (STL).  The developer is advised that holiday
accommodation and STLs require to be licensed under the terms of Article 3 of
the Civic Government (Scotland) Act 1982 (Licensing of Short-terms Lets) Order
2021 and therefore a licence application should be made to Perth and Kinross
Council prior to operation commencing.  Further information and application
forms are available at https://www.pkc.gov.uk/shorttermlets. 
13. Further information on the need for and level of provision of Changing Places
Toilet Facilities can be found in Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning (Changing Places Toilet
Facilities) (Scotland) Regulations 2020 and the associated Circular 1/2020:
Changing Places Toilets Regulations. 
14. No work shall be commenced until an application for building warrant has been
submitted and approved. 
15. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to the vehicular and cycle parking
to ensure adequate provision is made for the development. 
Background Papers
Letters of representation 56 
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Major Team) 01738 475300 
Page 42 of 126

Page 43

Approved
Name Designation Date
Sean Panton Team Leader (Major
Applications and Enforcement)
29 January 2025 
Page 43 of 126

Page 44

Page 44 of 126

Page 45

Ü
Erection of spa and leisure facility, 25 holiday accommodation units, formation of vehicular access, parking
areas, landscaping, drainage and associated works at Murrayshall House Hotel, Murrayshall, Perth
24/00435/FLM
Scale
1:15,000
Planning and Placemaking Committee - 12 February
2025
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(i)
Page 45 of 126

Page 46

Page 46 of 126

Page 47

Ü
Erection of spa and leisure facility, 25 holiday accommodation units, formation of vehicular access, parking
areas, landscaping, drainage and associated works at Murrayshall House Hotel, Murrayshall, Perth
24/00435/FLM
Scale
1:5,000
Planning and Placemaking Committee - 12 February
2025
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(i)
Page 47 of 126

Page 48

Page 48 of 126

Page 49

Perth and Kinross Council 
Planning and Placemaking Committee – 12 February 2025 
Report of Handling by Strategic Lead - Economy, Development and Planning
(Report No. 25/30) 
PROPOSAL: Construction of Bertha Park link road between phase 1 at Bertha
Park high school and phase 2 new A9 west roundabout and
associated works (approval of matters specified in conditions of
18/01800/IPM) 
LOCATION: Land at Bertha Park, Perth 
Ref. No: 24/01303/AMM
Ward No: P5- Strathtay 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The application seeks the detailed approval for a link road connecting Bertha
Park to the Cross Tay Link Road (CTLR) and A9. The development is a major
road infrastructure project proposed by Perth & Kinross Council (PKC) and is the
third phase (of four) within the Perth Transport Futures Project (PTFP) which it
was in June 2013. The first phase comprised the A9/A85 Junction Improvement
and Link Road to Bertha Park (completed in May 2019). Phase 2 comprises the
CTLR and realignment of the A9 (parts of the project are complete and open to
members of the public, with the project due to be fully open to the public in
Spring 2025). The current proposal will connect phases 1 and 2. 
2 The new road travels north from the existing roundabout adjacent to Bertha Park
High School, passing between the residential properties of the Bertha Park
village. The route then passes through areas of farmland and forestry before
meeting the new A9 west roundabout and CTLR. 
5(1)(ii)
Page 49 of 126

Page 50

3 The project consists of the following main elements: 
• A link road with an have an overall length of 1.4km. It will comprise a 7.3m
wide single carriageway road surfaced with asphalt; 
• A 3m wide shared cycle route along the east side of the road with a 1.5m
separation strip; 
• Two new roundabouts: 
- Parkland Roundabout – west facing arm ties into Bertha Way (constructed
by Springfield Properties’ development) and an east facing stub arm. 
- Woodland Roundabout – with 2 stub arms (west and east facing). 
Inclusion of both roundabouts in the scheme is subject to agreement with
the developer. If agreement is not reached only the link road will be
constructed at this time. 
• Two future development accesses (one being the access to the drainage
basin) between the Woodland and existing A9 West Roundabouts; 
• The south future development access is subject to agreement with the
developer. If agreement is not reached only the north access will be
constructed at this time. 
• Two bus lay-bys (Northbound, south of the Parkland Roundabout and
southbound, north of the Urban Roundabout); 
• Signal controlled pedestrian and cycle crossing facilities; 
• Street lighting along the full length of the link road and along the Bertha Way
tie-in; 
• Two drainage basins with access tracks; 
• Active travel connection to existing Bertha Loch path; 
• Accommodation works field accesses; 
• Two structural culverts (both precast concrete pipes, maximum 1.8m
diameter); and 
• Landscaping 
Page 50 of 126

Page 51

Site History 
4 14/00001/PAN On 10 February 2014 for Proposed housing development. 
5 14/01767/SCOP On 24 November 2014 for Housing development. 
6 15/01079/SCRN On 15 July 2015 for Erection of primary and secondary school,
associated road infrastructure and landscaping. 
7 15/01109/FLM Full Planning Permission Major was Approved On 12 December
2016 for Erection of residential units, commercial units (Classes 1,2,3 and 10),
formation of allotments/open space, landscaping and associated infrastructure
works. 
8 15/01112/IPM was Approved On 12 December 2016 for Residential development
with community facilities, employment land, open space, landscaping and
associated infrastructure (in principle). 
9 17/00198/FLM Full Planning Permission Major was Approved On 25 May 2017
for Erection of school, biomass/energy plant, formation of playground areas,
sports pitches, landscaping, car parking, vehicular accesses and associated
works. 
10 17/00919/FLM Full Planning Permission Major was Approved On 30 August
2017 for Erection of residential units, commercial units (Classes 1,2,3 and 10),
formation of allotments/open space, landscaping and associated infrastructure
works (revised site layout and change of house types). 
11 17/01232/FLL Full Planning Permission was Approved On 18 August 2017 for
Recontouring of land. 
12 18/00430/FLM Full Planning Permission Major was Approved On 6 June 2018 for
Erection of 62no. dwellinghouses and associated works (change of house type to
include sunrooms for plots 10001-10043, 10070-10071 and 10075-10091). 
13 18/01800/IPM was Approved On 25 September 2019 for Application under
Section 42 of the Town and Country Planning (Scotland) Act 1997 to amend
condition 1 (timescales for submission of Approval of Matters Specified by
Conditions applications) and condition 2 (phasing of development) of planning
permission 15/01112/IPM (residential development with community facilities,
employment land, open space, landscaping and associated infrastructure (in
principle)). 
14 18/02270/MPO On 3 June 2019 for Modification of planning obligation associated
with permission 15/01112/IPM (Residential development with community
facilities, employment land, open space, landscaping and associated
infrastructure (in principle)) to amend the S75 agreement. 
Page 51 of 126

Page 52

15 22/01800/FLL Full Planning Permission was Approved On 25 July 2023 for
Formation of SUDS basin, surface water outfall and associated infrastructure. 
16 22/02043/MPO was Approved On 28 March 2023 for Modification of planning
obligation associated with 15/01112/IPM (Residential development with
community facilities, employment land, open space, landscaping and associated
infrastructure) (in principle). 
Environmental Impact Assessment 
17 The wider Bertha Park development is of a type listed within Schedule 2 of the
EIA Regulations and has been subject of EIA scoping related to the planning
permission in principle (18/01800/IPM). 
Pre-Application Consultation 
18 As an AMSC application, the applicants were not required to undertake any
formal pre-application consultation with the local community. 
Development Plan 
19 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
20 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces. NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
21 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management 
Page 52 of 126

Page 53

Perth and Kinross Local Development Plan 2019 
22 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
23 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 4: Perth City Transport and Active Travel
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
24 • Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
25 • Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity  
Page 53 of 126

Page 54

National Guidance 
26 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
27 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
28 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
29 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
30 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
31 As part of the planning application process the following bodies were consulted: 
External 
32 Scottish Environment Protection Agency: SEPA initially objected to the
proposal due to a lack of information in relation to flood risk. Further information
was provided including post-development modelling showing that the presence of
Page 54 of 126

Page 55

the link road will result in a lower downstream volume and flow than before. The
objection was subsequently removed. 
33 Transport Scotland: No objections. 
34 NatureScot: No objections. Appropriate Assessment required. 
35 Perth and Kinross Heritage Trust: No comments received. 
36 Historic Environment Scotland: No objections. 
37 Health and Safety Executive: No comments. 
38 Scottish Water: No objections. 
39 Scottish and Southern Energy: No comments received. 
40 Methven Community Council: No comments received. 
41 Luncarty, Redgorton and Moneydie Community Council: No comments
received. 
Internal 
42 Transportation and Development: No objections, subject to conditions on final
construction details and a Construction Traffic Management Plan. 
43 Environmental Health (Contaminated Land): A search of the historical
mapping has not identified any potential sources of contamination likely to impact
upon the proposed development site. 
44 Environmental Health (Noise Odour): Methods for controlling noise and dust
during the construction phase are detailed in the CEMP and are acceptable. 
45 Development Contributions Officer: No comments 
46 Structures and Flooding: No objections. The route is not likely to be impacted
by fluvial or pluvial flooding. SUDS conditions applied for approval of detailed
drainage design. 
47 Community Greenspace: No comments received. 
48 Biodiversity/Tree Officer: Further information required on biodiversity
monitoring and trees. The requisite information has been submitted and
conditions covering these matters are recommended.
Representations 
49 One representation was received from the Woodland Trust. The main issues
Page 55 of 126

Page 56

raised within the representation are: 
• Loss of LEPO woodland;
• Severance of LEPO woodland and fragmentation from other woodland areas
and natural habitats;
• Increased noise, light and dust pollution;
• Threats to long-term retention of trees from increased safety concerns;
• Adverse hydrological impacts;
• Cumulative effect of the above impacts resulting in long-term deterioration. 
50 These issues are addressed in the Appraisal section of the report. 
Additional Statements 
51 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA completed 
Design Statement or Design and Access
Statement
Not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Delivery Plan
• Delivery Statement
• Access Statement
• Road Design Statement
• Transport Statement
• Contaminated Land
Assessment
• Environmental Management
Plan
• Archaeological Written
Scheme of Investigation
• Flood Risk Assessment
(Updated)
• Drainage Design Statement
• Tree Felling and Protection
Schedule
• Tree Survey and Woodland
Management Plan (Updated)
• Biodiversity Monitoring
Strategy
Protected Species Report 
Page 56 of 126

Page 57

Appraisal 
52 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below. 
Principle 
53 The principle of the link road is established through its inclusion within LDP2 as
part of the wider MU345 Bertha Park allocation. Moreover, planning permission
in principle has been granted for the whole area, with the associated masterplan
determining the proposed location and route of the road. 
54 The principle of the link road is therefore considered to be established and
acceptable in land use terms, with the detail and associated environmental
considerations further assessed and set out in the relevant sections below. 
Roads and Access 
55 The application considers the delivery of the Berth Park Link Road, along with the
following junctions: 
Parkland Roundabout 
56 Contains four arms, two of which will be on the Berth Park Link Road, with two
further arms providing access to future development areas. 
Woodland Roundabout 
57 Contains four arms, two of which will be on the Berth Park Link Road, with two
further arms providing access to future development areas. 
Park & Choose / Service Station Priority Junction 
58 Contains three arms, two of which will be on the Berth Park Link Road, with one
further arm providing access to future development area for a Perk & Choose
facility and Service Station facilities. 
South Development Priority Junction 
59 Contains three arms in the form of a priority T Junction, two of which will be on
the Berth Park Link Road, with one further arm providing access to future
development area. 
Page 57 of 126

Page 58

60 The construction of the Parkland Roundabout, Woodland Roundabout and South
Development Priority Junction will be subject to a financial contribution and
agreement with the landowner/housing developer.  
61 With the opening of the Berth Park Link Road, this provides opportunities for
providing new active travel links and altering bus routes through the site. Any
alterations to bus routes will be subject to wider discussion with bus operators to
determine any new routing of services.  
62 The new link road will also be provided with active travel, which will link into the
Cross Tay Link Road, providing onward travel to Scone. At the Phase 1 side of
the route, this will connect into the A9/A85 junction and over the Sky Bridge
which will provide links to the wider Perth active travel routes. 
63 The applicant has undertaken traffic modelling at 2038 for to provide details of
the resultant trips that are expected when the Bertha Park Link Road opens. 
64 A junction assessment has been undertaken and each of the junctions have
been assessed to be within an acceptable capacity. 
65 The modelling highlights locations where there are changes in traffic demands
across the road network at nine locations. Taking a comparison where the only
change between the scenarios is the opening of Phase 3, the Bertha Park Link
Road, the main traffic flow change is within the Phase 1 area, where it is
expected that the daily flow on the B9993 South of the Urban Roundabout will
decrease by -49.7%. This is mainly due to the opening of the Bertha Park Link
Road which now introduces alternative routing options with vehicles now being
able to travel the full length of Phase 1 to 3 of Perth Transport Futures Project. At
the Inveralmond Roundabout there will be a small increase in traffic on the A9
North Arm +3.6% and A912 Southern Arm +4.3%. On the A9 west of
Inveralmond Roundabout, it can be seen that there is a reduction of -2.9%.  
66 There are a number of changes whereby the modelling takes account of the
houses considered by the wider masterplan area, consented through the PPP.
The modelling also considers the Park & Choose with the services. The
modelling forecasts that there will be increased flows at all nine locations
compared. 
67 As noted above, there is yet to be a final agreement on the overall construction of
the project, as such it is advised that a condition is imposed for the specific detail
of the link road to be approved for this initial phase (Condition 2). 
68 The proposal will have a positive impact in providing improved connections to the
north of Perth for communities both locally and within the wider area in an area
where considerable urban expansion is envisaged. The provision of bus laybys
and a dedicated active travel corridor for cycling and walking offers a choice of
means of travel to those utilising the route and encourages road users to move
away from using private motorised vehicles.
Page 58 of 126

Page 59

Design, Form and Visual Impact 
69 The route of the road has been established through the PPP and the delivery of
Phases 1 and 2 at either end. At the southern end, the development of the early
phases of Bertha Park has taken place on either side of the route and the
delivery of the road will improve the connections within the development and
beyond. The formation of connections from the Urban Roundabout and Bertha
Way as well as various crossing points will aid east-west movements across the
development as a well as the more obvious benefit of providing a more direct
route through the site. 
70 The road, active travel route and associated works will be functional by design
and its visual impact was considered in detail in the EIAR submitted with the PPP
for Bertha Park. The Landscape and Visual Impact Assessment (LVIA) also
assessed cumulative visual impacts from the wider development being viewed
alongside the CTLR. When considered in isolation, the impact of the link road
within the wider landscape is relatively minor and is acceptable in the context of
delivering a long-term infrastructure strategy. 
Residential Amenity 
Noise 
71 Condition 29 of the PPP refers to an updated noise impact assessment (NIA) at
each stage of the development being required. However, this application relates
to the construction of a link road and its impact on previously approved
residential development is not required at this stage having already been
assessed under 15/01109/FLM. 
CEMP  
72 A Construction Environmental Management Plan (CEMP) has been submitted,
which includes methods on how noise and dust will be controlled during the
construction phase to ensure the residential amenity of existing properties is not
adversely affected. This includes hours of working that are in line with
Environmental Health’s guideline hours for construction. 
Contaminated Land 
73 A search of the historical mapping has not identified any potential sources of
contamination likely to impact upon the proposed development site and there is
no further information to indicate that the application area has been affected by
contamination. However, it shall be the responsibility of the applicant to satisfy
themselves that the ground conditions are suitable for the development for which
planning consent has been granted. 
Page 59 of 126

Page 60

Drainage and Flooding 
74 Policy 22(a) of NPF4 provides exceptions where development proposals which
are at risk of flooding or in a flood risk area could be supported. One of the
exceptions is for ‘essential infrastructure’. Transport proposals and travel
networks identified in the local development plan are defined within NPF4 as
‘essential infrastructure’, and the proposal therefore meets this exception. 
75 The main flood risk to the proposed development is fluvial flooding from two
unnamed watercourses denoted as A and B in the SEPA fluvial flood mapping,
which indicates that the proposed development is not at risk of fluvial flooding.
However, the watercourses are not fully represented by SEPA fluvial flood
mapping, most likely due to their small size and rural setting. Therefore, detailed
hydraulic modelling was undertaken to better ascertain the flood risk to and from
the proposed development. The modelling indicated that the development will not
increase the risk of flooding to others and may, in fact, provide a betterment by
reducing the flood volume downstream of the confluence of watercourses A and
B. 
76 Overall, the submitted Flood Risk Assessment concludes that the proposed
development is suitably designed to manage and mitigate flood risks, ensuring
the long-term safety and resilience of the infrastructure and the surrounding
community, with a positive contribution to flood risk management in the area. 
77 There are no objections from SEPA or PKC Flooding and Structures subject to
conditions on SUDS details (Conditions 13 and 14). 
78 Overall, the proposals are compatible with NPF4 Policy 22: Flood Risk and Water
Management; and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage. 
Natural Heritage and Biodiversity 
79 NPF4 Policy 3: Biodiversity requires development proposals of this nature to
conserve, restore and enhance biodiversity, including nature networks so they
are in a demonstrably better state than without intervention. In addition, LDP2
Policy 41: Biodiversity seeks to protect and enhance all wildlife and habitats,
whether formally designated or not, considering natural processes in the area. 
80 A Protected Species Report has been submitted and is in accordance with best
practice. It is recommended that a condition is imposed to ensure that all
recommendations made within the report are implemented (Condition 9). 
81 The Biodiversity Monitoring Strategy required by Condition 23 of the PPP is
considered to be acceptable. The on-site implementation of its recommendations
should be overseen by the appointed Economic Clerk of Works (Condition 8). 
Page 60 of 126

Page 61

82 NPF4 Policy 6 Forestry, woodland and trees seeks to protect and expand forests,
woodlands and trees. In addition, LDP2 Policy 40: Forestry, Woodland and Trees
seeks to protect existing trees/ woodland whilst securing the delivery of new
woodland where appropriate. 
83 A Tree Survey and 25-year Woodland Management Plan has been submitted
and provides management recommendations for the four distinct woodlands
within the vicinity of the site. The development will result in the loss of a number
of existing trees, including one veteran oak and 31 mature oaks. Compensation
is proposed for this loss with three new oak trees to be planted for each
veteran/mature oak felled. The compensatory planting area is approximately 1km
from the development and details of the scheme will require to be submitted for
approval (Condition 10). 
84 In terms of enhancement, the proposal includes tree planting along the route and
the expansion of some of the existing woodlands. In total 295 new trees will be
planted along with riparian planting and plug planting. A condition is required to
ensure that the trees and landscaping become established (Condition 11). 
85 The proposal contains many positive actions that would result in biodiversity
enhancement, positive contributions towards nature networks and achieve PKC
actions in the Tayside Local Biodiversity Action Plan. Overall, the proposals are
acceptable and comply with relevant development plan policies and the PPP. 
Conservation Considerations 
86 NPF4 Policy 7: Historic Assets and Places and LDP2 Policies 26: Scheduled
Monuments and Archaeology are applicable. 
87 A Written Scheme of Investigation (WSI) has been submitted as required by
Condition 27 of the PPP. The WSI states that a variety of heritage assets have
been recorded in close vicinity of the proposed development, and as a result,
there is considerable potential for archaeological remains to survive within the
site. 
88 PKHT have confirmed that they are broadly happy with the content of this
document, but it will need some revisions to ensure it meets the requirements for
the scheme, including a revised trench plan and a clear timetable for reporting
and any post excavation works (Condition 4). 
Developer Contributions 
89 None required. Works and contributions for the formation of the links into Bertha
Park are required by the developer of that site. 
Planning Obligations and Legal Agreements 
90 None required.
Page 61 of 126

Page 62

Direction by Scottish Ministers 
91 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
92 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions.  
Recommendation   
Approve subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. This approval will last only for three years from the date of this decision notice,
unless the development has been lawfully started within that period. 
Reason - This is an approval in terms of Section 59 of the Town and Country
Planning (Scotland) Act 1997, as amended. 
Transport 
2. Prior to the commencement of development (with the exception of site clearance
works), should the roundabouts and/or access roads not be provided, as per the
annotation on drawing 03 hereby approved, a detailed design showing the
omission of the roundabouts and/or access roads shall be submitted to the
Planning Authority for written approval. 
The detailed design will include the following: 
• Mainline Layout Plans; 
• Road Lighting Layout Plans; 
• Service Ducting Layout Plans;
• Traffic Signal Ducts Layout Plans;
• Landscape Layout Plans; and
• Drainage Layout Plans.
Page 62 of 126

Page 63

Thereafter, the agreed scheme shall be implemented in accordance with the
approved drawings. For the avoidance of doubt, this would not prevent the
formation of the roundabouts as per the approved drawings at a later date. 
Reason - To provide confirmation of the road layout to be delivered. 
3. The Construction Traffic Management Plan detailed in Document 81, hereby
approved, shall be strictly adhered to during the entirety of the site construction
programme. 
Reason - In the interest of proper site management. 
Archaeology 
4. Prior to the commencement of development (with the exception of site clearance
works) the developer shall secure the implementation of a programme of
archaeological work in accordance with a Written Scheme of Archaeological
Investigation (WSI) which has been submitted by the developer and agreed in
writing by the Council as Planning Authority, in consultation with Perth and
Kinross Heritage Trust (PKHT).  Thereafter, the developer shall ensure that the
programme of archaeological works is fully implemented including that all
excavation, preservation, recording, recovery, analysis, publication and archiving
of archaeological resources within the development site is undertaken.  Should
the archaeological works, as required by the WSI, identify a requirement for post-
excavation analysis, the development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design (PERD) has been
submitted to and agreed in writing by the Council as Planning Authority, in
consultation with PKHT.  The PERD shall be carried out in complete accordance
with the approved details.  Furthermore, the developer shall afford access at all
reasonable times to PKHT or a nominated representative and shall allow them to
observe work in progress. 
Reason - To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area. 
Environment 
5. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason - to ensure adequate protection for the trees on the site during the
construction, in the interests of the visual amenity of the area. 
Page 63 of 126

Page 64

6. The recommendations contained within the Protected Species Report (Document
82) shall be implemented in full. Any deviation from the recommendations will
require to be agreed by written approval of the Planning Authority. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
7. The submitted Construction Environment Management Plan (CEMP), hereby
approved (Document 79) shall be implemented concurrent with the development. 
The CEMP will remain a dynamic document throughout the duration of
construction and until the completion of development. The CEMP can be
amended as necessary to meet best practice in terms of environment or ecology. 
Any amended document shall be submitted to the Planning Authority as soon as
reasonably practicable citing the relevant amendment and appropriate guidance. 
Reason - In the interests of protecting environmental quality. 
Biodiversity and Landscaping 
8. Prior to the commencement of the development, an independent and suitably
qualified ecologist shall be appointed by the developer at their expense as the
'Ecological Clerk of Works' (ECOW) for the site.  This appointment shall be
subject to the prior written approval of the Planning Authority and detail the
extent of inspections to be undertaken by the ECOW and how this relates to the
delivery of the development.  The ECOW shall oversee, on behalf of the
Planning Authority, the implementation of all ecology related planning conditions. 
The ECOW shall undertake a watching brief throughout the construction of the
development and shall have the authority to stop operations or to alter
construction methods should there be any works occurring which are having an
adverse impact on natural heritage. 
The ECOW shall have responsibility for the following: 
a)  Monitoring compliance with the mitigation works related to the development
as set out in the Construction Environment Management Plan and other
relevant environmental conditions.
b)  Advising the developer on adequate protection of nature conservation
interest on the site, including altering construction practices if existing
practices are having an adverse impact on the natural heritage of the site.
c)  If any protected species are found on site, the Ecological Clerk of Works will
ensure that work is suspended at that location and that a protected species
protection plan is implemented. 
The ECOW is required to notify the Planning Authority: 
d) If there has been a requirement to stop or alter works in relation to this
condition.
Page 64 of 126

Page 65

e)  They are required to submit a report on their inspection (frequency to be
agreed) for the review of the Planning Authority during construction
operations.
f)  They will have the power to amend the CEMP, where required, with any
amendments and measures to mitigate submitted to the Planning Authority. 
Reason - In order to ensure that an ECOW is appointed and is suitability qualified
and has a suitable job description and powers to oversee all salient ecological
matters affecting the construction of the development. 
9. The conclusions and recommended action points within the supporting
Biodiversity Monitoring Strategy (Document 75), hereby approved, shall be fully
adhered to, respected and undertaken as part of the construction phase of
development.  Any deviation from the recommendations will require to be
agreed by written approval of the Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
10. Prior to the road being opened for use by the public, the location and details,
including numbers, species and sizes of the compensatory tree planting will be
provided for the approval of the Planning Authority.  Thereafter, the trees will be
planted as agreed at the earliest opportunity and prior to the road being opened
for use by the public. 
Reason - In the interests of ensuring that adequate compensatory tree planting is
provided to offset the impact of the development. 
11. Any planting failing to become established within five years shall be replaced in
the following planting season with others of similar size, species and number to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
12. The location and number of bat, bird and hedgehog boxes will be submitted and
agreed with the Planning Authority prior to their installation, in line with the
timescales set out in the Woodland Management Plan. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Drainage and Flooding 
13. Development shall not commence on site (with the exception of site clearance
works) until a detailed sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council as Planning Authority,
in consultation with SEPA where necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The SUDS Manual (C753)
and the Council's Flood Risk and Flood Risk Assessments Developer Guidance,
Page 65 of 126

Page 66

and shall incorporate source control. All works shall be carried out in accordance
with the agreed scheme and be operational prior to the bringing into use of the
development. 
Reason - To ensure the provision of effective drainage for the site. 
14. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable Sustainable Urban Drainage Systems to meet
the requirements of best management practices. 
Reason - To ensure the provision of effective drainage for the site. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
1 None. 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development 
• Readily visible to the public 
• Printed on durable material.
Page 66 of 126

Page 67

4. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 they must obtain from the Council as Roads Authority Road Construction
Consent (RCC) to construct a new road prior to the commencement of
roadworks.  Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency.  Please note that a fee is chargeable for the processing of RCC
applications. 
5. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 they must obtain from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of works.  Information on
junction types, requirements for Vehicular Access consents (VA1) and
application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on the
disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environment Protection Agency. 
6. The applicant should be advised to contact Perth & Kinross Council Street
Lighting Department to obtain technical approval for all street lighting provision. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species. Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
8. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (Section 1), it is an offence to remove, damage or destroy the nest of
any wild bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
9. The applicant is advised to refer to Perth & Kinross Council's Flood Risk and
Flood Risk Assessments Supplementary Guidance, and the CIRIA SuDS manual
as it contains advice relevant to your development. 
Background Papers
Letters of representation 1 
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Major
Applications)
01738 475300 
Approved
Name Designation Date
Sean Panton Team Leader (Major
Applications and Enforcement)
27 January 2025 
Page 67 of 126

Page 68

Page 68 of 126

Page 69

Ü
Construction of Bertha Park link road between phase 1 at Bertha Park high school and phase 2 new A9 west
roundabout and associated works (approval of matters specified in conditions of 18/01800/IPM) at Land At
Bertha Park, Perth
24/01303/AMM
Scale
1:25,000
Planning and Placemaking Committee - 12 February
2025
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(ii)
Page 69 of 126

Page 70

Page 70 of 126

Page 71

Ü
Construction of Bertha Park link road between phase 1 at Bertha Park high school and phase 2 new A9 west
roundabout and associated works (approval of matters specified in conditions of 18/01800/IPM) at Land At
Bertha Park, Perth
24/01303/AMM
Scale
1:10,000
Planning and Placemaking Committee - 12 February
2025
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(ii)
Page 71 of 126

Page 72

Page 72 of 126

Page 73

Perth and Kinross Council 
Planning and Placemaking Committee – 12 February 2025 
Report of Handling by Strategic Lead - Economy, Development and Planning
(Report No. 25/31) 
PROPOSAL: Erection of a brewery, tap room, storage, formation of vehicle
access, parking area, installation of EV charging point, formation
of outdoor seating area, landscaping and associated works 
LOCATION: Land 50 metres south of Council Cottages, Ferry Road, Pitlochry 
Ref. No: 23/01742/FLL
Ward No: P4- Highland 
Summary 
This report reconsiders this application as the previously issued permission was
quashed and the case returned to the Council for reconsideration, following a judicial
review.  That previous decision to approve was taken at the Planning and
Placemaking Committee on 5 June 2024. 
This report recommends approval of the application as, whilst the development is
contrary to NPF4 Policy 6 b) i) due to the loss of ancient woodland, it is considered that
the loss of trees would be limited and acceptable due to other material considerations,
and the removal of dead and invasive species will enhance and improve the woodland
and woodland habitat. Further, looking at the Development Plan in the round the
development is considered to comply with its wider relevant provisions and there are
no material considerations which are considered to justify refusal of the application. 
Background and Description of Proposal  
1 The application is unchanged from that considered by this Committee on 5 June
2024 and remains as a brewery comprising of: production and cold store
facilities, and a taproom serving food and drink with a small shop and outdoor
seating. The proposal includes parking for 3 vehicles and 1 accessible parking
bay with an EV charging point, cycle parking and associated hard and soft
landscaping. 
2 It is indicated that the core operating hours of the overall facility will be 08:00 –
22:00 Tuesday – Sunday. The taproom, opening 11:00 – 22:00, would have a
capacity of 96 persons internally, and a further 36 externally.  
5(2)(i)
Page 73 of 126

Page 74

3 The application site is a largely cleared area with woodland around its periphery
and extends to some 1824 sqm.  It sits on the south side of Ferry Road,
Pitlochry. The site consists of a large and open flat area (formerly used as a site
compound), with steeply banked sides and trees to the east, south and west. It is
proposed to fell 3 trees and one tree group to enable the development.  6 dead
oak trees are also to be removed. Compensatory planting is proposed, together
with bird and bat boxes on the brewery building. 
4 A single level building is proposed, comprising two pitched roof sections
connected by a low flat roof. The brew hall will have feature glazing on the
northern elevation and an internal glazed partition to showcase the technical
production equipment utilised by the brewery. The buildings walls are to be
finished in dark grey corrugated metal sheeting, grey aluminium and timber
windows and doors and grey aluminium rainwater goods. The roof is to be of
corrugated steel sheeting, in the same dark grey colour as the wall sheeting, with
translucent roof sheeting/skylights into the brew hall, taproom and goods
incoming area. Roof mounted solar panels are proposed on the south roof slope.
The north/street facing elevation and one east facing pitched roof will feature
company logos and signage, although this will require separate Advertisement
Consent. 
5 Pitlochry Community Hospital is approximately 50m to the northwest and
Balhousie Pitlochry Care Home approximately 50m to the southwest. Residential
properties (Burnside Cottages) are located 20m to the north and 50m to the east
at Bobbin Mill (also known as Tombauld Cottages). 
Judicial Review of the decision to approve the application 
6 The application was presented to the Planning and Placemaking Committee on 5
June 2024 when the application was approved. 
7 That grant of planning permission was subsequently challenged in the Court of
Session by a judicial review. 
8 The basis for challenge was that:
(i) the proposed development site includes an area of ‘ancient woodland’ and
that this aspect had not been considered in the Report of Handling, and 
(ii) the Council had failed to comply with the public sector equality duty set out
in the Equality Act 2010, Section 149. 
9 It was accepted that a full assessment in relation to ancient woodland, in terms of
NPF4 Policy 6 was not clearly carried out and addressed in the original Report of
Handling and that this should have happened. 
10 Following consideration of the first ground of challenge, the judicial review was
not opposed by the Council, the planning permission resulting from the approval
on 5 June 2024 was revoked and this planning application has been reverted
back to the Planning and Placemaking Committee for re-consideration in its
Page 74 of 126

Page 75

entirety, with the ancient woodland issue covered in detail. The petitioner’s
second ground of challenge in terms of the Equality Act 2010 was not accepted. 
Site History 
11 08/02104/FUL Full Planning Permission was approved on 7 April 2009 for the
erection of 3 workshop/office units.  The layout in that instance had the three
units located eastwards of the site access, at the bottom of the
embankment/access road leading up to the Bobbin Mill site.  Yard space was to
be located to the west, leading to the south of the site where 6 parking spaces
were indicated at the edge of the southern embankment. 
12 11/01434/FLL Full Planning Permission was approved on 25 November 2011 for
the erection of building to be used as a timber merchants.  The layout in that
application saw an L-shaped building, angled away from the road to the north,
with a small parking and associated turning area.  The proposals in that
application were located slightly further away from the contoured embankments
within the application site. 
Pre-Application Consultation 
13 Pre application Reference: 23/00073/PREAPL – The planning response
recognised that this was a hybrid proposal and there may be an opportunity to
split the uses into employment land and town centre locations. A sequential
assessment would be required for any future application to demonstrate there
are no suitable alternative sites and to also demonstrate the proposed
development would be compatible with the residential and health uses in the
immediate surrounding area. 
14 The proposed development is not classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore the applicant was not required to undertake not any formal pre-
application consultation with the local community. 
Development Plan 
15 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019), along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
16 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. 
Page 75 of 126

Page 76

17 NPF4 was adopted on 13 February 2023.  NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
18 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 12: Zero Waste
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 26: Business and Industry
• Policy 27: City, Town, Local and Commercial Centres
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
20 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 6: Settlement Boundaries
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 18: Pubs and Clubs in Residential Areas
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 40A: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
Page 76 of 126

Page 77

• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
Other Policies 
Statutory Supplementary Guidance 
• Supplementary Guidance - Air Quality (adopted in 2020)
• (adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
21 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
22 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
23 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
Page 77 of 126

Page 78

contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
24 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
25 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
26 As part of the planning application process the following bodies were consulted: 
External 
27 Network Rail - No objection, subject to an informative being attached to any
planning permission granted to highlight the site is close to a railway
underbridge. 
28 Perth and Kinross Heritage Trust - No objection. No issues identified in respect
of archaeology. 
29 Scottish Water - No objection. Requested further information on the water
abstraction volume as the site is in a Drinking Water Protected Area. Notes the
impact on Water Resources and the operation of the brewery and accompanying
amenities has been reviewed against the confirmed abstraction volume of
200,000 litres per annum (0.2Ml/annum). Assuming this water usage remains
consistent with these values, Scottish Water confirm the proposal can be
considered as low-medium risk regarding Water Resources. Thus, no objections
with the proposed volume of water but request that they should be notified by the
applicant if these volumes change. Scottish Water also request that prior to work
commencing on site they are notified as they may wish to take water samples as
a precaution to protect water quality. It is recommended that an informative be
attached to any planning permission granted (Informative 5). 
30 Scottish Environment Protection Agency - No objection. 
31 NatureScot - No response. 
Page 78 of 126

Page 79

Internal 
32 Biodiversity/Tree Officer - No objection, subject to conditions. The consultation
response was further updated in November 2024 following the judicial review to
address the issue of ancient woodland. The consultation response is discussed
in detail below. 
33 Structures and Flooding - No objection following review of further detailed
information submitted during the application process. 
34 Environmental Health (Contaminated Land) - No objection. Advise an
inspection of the proposed development site did not raise any real concerns,
although mapping does indicate that there is land formerly occupied by various
potentially contaminative sources nearby. The applicant is advised that there
may therefore be potential for contamination within the site. Informative
recommended. 
35 Environmental Health (Noise Odour) - No objection subject to conditions
following review of further detailed information submitted during the application
process. 
36 Environmental Health (Private Water) - No objection. The applicant has stated
that Public Mains water will be used, therefore as no existing private water
supplies will be affected by the proposed activities there is no comment at this
time. 
37 Development Contributions Officer - No contribution required in line with
supplementary guidance. 
38 Transportation and Development - No objection subject to conditions following
review of further information and revised plans requested after a site meeting on
5 February 2024 with the applicant’s agent, Tree Officer and Planning Officer. 
39 Development Plan - Reviewed further supporting information submitted during
the application process to ensure compliance with policies in NPF4 and LDP2. 
40 Commercial Waste Team - No objection. Bin storage sufficient. 
Representations 
41 30 representations were received including 6 objections, 2 neutral
representations and 22 letters of support. The main issues raised within the
objections are: 
• Noise, disturbance and nuisance – detrimental impact on residential amenity
• Detrimental impact on natural environment and protected species
Page 79 of 126

Page 80

• Catastrophic negative impact on the ancient woodland
• Traffic impact
• Road and pedestrian safety
• No evidence of impact assessment on sewerage, water pollution or flood risk 
• Impact on access to residential homes at Bobbin Mill
• Air and noise pollution 
• Contaminated site
• Poor design 
• The proposed use is incompatible with surrounding land uses which includes
a care home and medical centre
• Contrary to LDP policies including open space 
• Detrimental impact on safety of nearby residents, including those with
protected characteristics
• Loss of privacy  
42 The objections referred to the public sector equality duty under Section 149(1) of
the Equality Act (2010) and relevant human rights legal instruments to have due
regard to the need to eliminate harassment. The objections state that granting
permission for the development will increase the risk of the Gypsy Travellers who
live near to the site suffering harassment on account of their race. 
43 The Atholl Medical Centre requested the following matters be noted - that the
NHS site includes an ambulance dept with 24/7 access required; there should be
no obstructive parking on Ferry Road with access for GPs and staff required at
all times; and the parking at the medical centre is for the benefit of users of the
hospital and GP surgery only. 
44 The letters of support consider the development would bring wide ranging
economic benefits to the town and enhance the local area. 
45 The issues raised are considered in the report. 
Additional Statements 
46 Screening Opinion EIA Not Required 
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
/AA Not Required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
Submitted - Ecological Survey,
Tree Survey, Drainage
Assessment, Noise Impact
Assessment, Odour Impact
Assessment  
Page 80 of 126

Page 81

Appraisal 
47 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2 (2019) and statutory supplementary guidance. 
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance and issues raised in the representations. 
Principle 
48 A number of policies are relevant to the proposal, a mixed-use development on a
site located outwith the Pitlochry Town Centre boundary, as identified in LDP2. 
49 NPF4 Policy 26 Business and Industry supports development on sites allocated
for business and industry uses in the LDP (paragraph a). However, the site is not
allocated for business and industry use in LDP2. As such, NPF4 Policy 26 d)
applies and this states that “development proposals for business, general
industrial and storage and distribution uses outwith areas identified for those
uses in the LDP will only be supported where: 
i. It is demonstrated that there are no suitable alternatives allocated in the LDP 
or identified in the employment land audit; and
ii. The nature and scale of the activity will be compatible with the surrounding
area.” 
50 NPF4 Policy 27 City, Town, Local and Commercial Centres applies the Town
Centre First approach to help centres adapt positively to long-term economic,
environmental and societal changes, and by encouraging town centre living. 
51 NPF4 Policy 27 b) states “proposals for uses which will generate significant
footfall, including commercial, leisure, offices, community, sport and cultural
facilities, public buildings such as libraries, education and healthcare facilities,
and public spaces:
i.  will be supported in existing city, town and local centres, and
ii.  will not be supported outwith those centres unless a town centre first
assessment demonstrates that:
• all centre and edge of centre options have been sequentially assessed
and 
discounted as unsuitable or unavailable;
• the scale of development cannot reasonably be altered or reduced in
scale to allow it to be accommodated in a centre; and
Page 81 of 126

Page 82

• the impacts on existing centres have been thoroughly assessed and
there will be no significant adverse effect on the vitality and viability of
the centres.” 
52 This policy aligns with LDP2 Policy 13: Retail and Commercial Leisure
Proposals. 
53 Also of relevance is LDP2 Policy 18: Pubs and Clubs in Residential Areas which
states there will be a presumption against the siting of these in the midst of other
(particularly residential) uses where problems of noise or disturbance cannot be
satisfactorily addressed. 
54 NPF4 Policy 30 Tourism intends to encourage, promote and facilitate sustainable
tourism development which benefits local people, is consistent with national net
zero and nature commitments, and inspires people to visit Scotland. Policy 30 a)
states “development proposals for new or extended tourist facilities or
accommodation, including caravan and camping sites, in locations identified in
the LDP, will be supported”. The site is not identified in the LDP for a tourism
related use. As such Policy 30 b) applies and this states “proposals for tourism
related development will take into account: 
i.  The contribution made to the local economy;
ii.  Compatibility with the surrounding area in terms of the nature and scale of
the activity and impacts of increased visitors;
iii.  Impacts on communities, for example by hindering the provision of homes
and services for local people;
iv.  Opportunities for sustainable travel and appropriate management of parking
and traffic generation and scope for sustaining public transport services
particularly in rural areas;
v.  Accessibility for disabled people;
vi.  Measures taken to minimise carbon emissions;
vii.  Opportunities to provide access to the natural environment.” 
55 A supporting statement has been submitted to address national and local
planning policies. This highlights that the business, an independently owned &
managed craft brewery, has outgrown its current site in Blair Atholl and is
seeking to relocate to a site in Pitlochry where its operations first began in 2016.
It notes that the relocation of the brewery will move 3.5 full time existing jobs to
Pitlochry, it will also immediately create at least 2.5 full-time jobs in Pitlochry, with
a further 2 full-time jobs expected in the years to come. 
56 The business requires more space than its current location can provide and there
is a lack of suitable existing industrial space for growth in Pitlochry, with no sites
identified in the town centre that are large enough to accommodate the business.
The statement reports that splitting the production and taproom uses between
two sites has been considered but is economically unviable and inefficient. Single
site operation is thus considered a necessity for the business. The implications of
Page 82 of 126

Page 83

multi-site operation for licensing would mean duplicating the operational effort,
and the cost and complexity of the business. The statement highlights the
aspiration for a combined production and taproom experience is very similar to
that of a distillery & visitor experience. 
57 In respect of NPF4 Policy 26, the statement reports there are no suitable
alternative sites allocated in Pitlochry with very limited areas of employment
safeguarding and no specific development sites identified for further employment,
business and industry development. The nature of activity proposed is not
incongruous with the surrounding context of the area, which features a mixture of
town centre businesses, industry, tourism, residential, healthcare and leisure.
The proposals are conscious of the neighbouring residential amenity and the
healthcare facilities to the west. A noise impact assessment (NIA) has been
carried out which demonstrates there is negligible impact to the surrounding
area. The NIA also sets out mitigation recommendations, which can ultimately be
conditioned (Condition 15). It also highlights a licensed business must comply
with the Licensing (Scotland) Act 2005 and preventing public nuisance and crime
and disorder, amongst other elements, are core components of the business
operating plan and associated operational policies that will be governed by Perth
and Kinross Licensing Board on an ongoing basis. 
58 The site was selected predominantly because of its proximity to the town centre
boundary. In line with LDP2 Policy 27b) ii) the site is considered a suitable “edge
of centre option” being close to the boundary of the town centre in LDP2. The
scale of the development cannot be reasonably altered or reduced to
accommodate it within the town centre and the supporting statement asserts
there would be no significant adverse impact on the vitality and viability of the
existing centre. The proposed site achieves a greater balance of all desired
outcomes over a town centre location and is the best option available for the
space required. The statement reports the location is extremely accessible, being
no more than a 4-minute walk from the train station and the town centre junction
with Ferry Road. 
59 The supporting statement highlights that existing signage already encourages
tourism foot traffic from the town centre along Ferry Road toward the Pitlochry
Recreation Ground, Dam & Visitor Centre, Fish Ladder and Festival Theatre.
There are other business & industry uses along Ferry Road including a
restaurant and game butcher, meaning footfall from the town centre towards
Ferry Road and across the River Tummel, is already established. The proposal
will create a further attractive destination for tourism and create additional footfall
between the town centre and brewery bringing wider economic benefits. 
60 In respect of NPF4 Policy 30 Tourism, the supporting statement addresses the
relevant criteria and reports the proposal would create a dynamic visitor
experience and tourist destination in Pitlochry and increase local economic
benefits through tourism, in line with Policy 30 b) i) and ii) the proposed land use
and scale of development is compatible with the surrounding area. In line with
Policy 30 b) iv) and v) the site is easily accessible via sustainable travel modes
Page 83 of 126

Page 84

and the scheme is designed to be accessible for disabled people. It outlines the
business is very carbon conscious, and a variety of renewable technologies will
be employed to minimise carbon emissions in line with Policy 30 b) vi). The
proposed site is adjacent to a core path and provides visitors with the opportunity
to access the surrounding natural environment in line with Policy 30 b) vii). 
61 The supporting statement reports the brewery is not just a bar or shop it is a
destination which will provide visitors with a full experience, seeing the end-to-
end production process, completed with an opportunity to sample the end
produce and experience the taproom which will showcase the best of the
brewery. The proposals are considered to successfully achieve the Policy 30
intent of promoting and facilitating sustainable tourism which benefits local
people and is consistent with NPF4 net zero and nature commitments, providing
further inspiration for people to visit Scotland. 
62 The supporting statement demonstrates why a combined facility is required and
that splitting the production and taproom uses between two sites is economically
unviable and inefficient and that the combined facility would operate very similar
to a distillery/visitor experience. 
63 It demonstrates a site selection process has been undertaken and there are no
suitable industrial sites available large enough to accommodate the business
growth required. The statement notes that the Ferry Road site achieves the
greater balance of the desired outcomes of the business, over a town centre
location where the brewery/production use would be closer to a higher density of
noise/odour sensitive receptors. 
64 The supporting statement also addresses the compatibility of the proposal in
relation to the surrounding area, including ensuring residential amenity is not
adversely impacted. In respect of amenity, also of relevance is LDP2 Policy 18:
Pubs and Clubs in Residential Areas which states there will be a presumption
against the siting of these in the midst of other (particularly residential) uses
where problems of noise or disturbance cannot be satisfactorily addressed. A
Noise Impact Assessment (Document 41) reports it is not likely that adverse
impacts will be experienced at any receptor due to the development. The Odour
Assessment (Document 33) reports odour from the proposed development is
predicted to be of negligible significance, subject to the satisfactory
implementation of mitigation measures (Condition 14). The supporting
documents have assessed the potential problems of noise or disturbance, and
this has been satisfactorily addressed in line with national and local planning
policy. This is reviewed further later in the report under ‘Residential Amenity’. 
65 The supporting statement does not provide a specific Town Centre Assessment,
as required by NPF4, rather further information is provided justifying the selection
of the site based on the operational requirements of the development alongside
the benefits of the edge of town centre location in achieving the best balance to
meet the objectives of the various elements of the business. 
Page 84 of 126

Page 85

66 Overall, it is considered that sufficient justification has been provided and that
there will be no significant adverse effect on the vitality and viability of the town
centre. The site is edge of centre, easily accessible from the town centre and well
connected to other uses in the surrounding area offering an opportunity for
greater interaction and linked trips to enhance the quality of experience in the
town. To protect surrounding amenity conditions are recommended as outlined
later in the report. As a new tourism facility, the supporting statement
demonstrates the proposal meets the criteria set out in Policy 30 b). 
67 The proposal satisfies NPF4 Policy 26 Business and Industry, NPF4 Policy 27
City, Town, Local and Commercial Centres, NPF4 Policy 30 Tourism and LDP2
Policy 13: Retail and Commercial Leisure Proposals and LDP2 Policy 18: Pubs
and Clubs in Residential Areas. 
Design and Layout 
68 NPF4 Policy 14 Design, Quality and Place states development which is poorly
designed, detrimental to the amenity of the surrounding area or inconsistent with
the six qualities of successful places will not be supported. LDP2 Policy 1:
Placemaking aligns with this national policy and states development must
contribute positively to the quality of the surrounding built and natural
environment.  All development should be planned and designed with reference
to climate change, mitigation and adaptation. The design, density and siting of
development should also respect the character and amenity of the place, and
should create and improve links within and, where practical, beyond the site. 
Proposals should also incorporate new landscape and planting works appropriate
to the local context and the scale and nature of the development. LDP2 Policy 1B
sets out the placemaking criteria which should be met. 
69 As set out in paragraph 4, the building would have accommodation over one floor
and be of a bespoke design and finish. The front/north elevation was amended to
accommodate a recessed roller shutter door and delivery bay (Drawing 52). The
supporting planning statement highlights the design strategy was to respond
sensitively to a site which has a flat central area and is sheltered by the
topography and tree screening (Document 42). The mass of the building is
broken up to reduce its visual impact with materials selected to help the building
recede into the landscape. The exterior landscaping will feature concrete
retaining walls to the south to account for minimised cutting into the existing
slopes. 
70 The proposals make the best use of the site and its orientation to create a
building that sits sheltered by its surroundings. The plan is predominantly linear
and follows the line of the existing grass clearing of the site, with the taproom
extending out toward the east from the main brewery building. This L-shape
helps create a sheltered public courtyard and outdoor seating area. All
accommodation is at ground floor with level access from external circulation
routes. Car parking is also kept to a minimum, to encourage the use of public
transport, cycling and walking. Although a disabled parking bay is provided.
Page 85 of 126

Page 86

There is also a large bike stance area proposed to encourage visitors to cycle to
the premises. 
71 Overall, the design and layout of the proposed development has been sensitively
considered to respect the site topography and surrounding natural and built
environment. The bespoke design incorporates sustainable design and
construction and new planting is proposed to enhance the surrounding woodland
and the setting of the new building. The proposal satisfies NPF4 Policy 2:
Climate Mitigation and Adaptation and NPF4 Policy 14 Design, Quality and Place
and LDP2 Policy 1: Placemaking and LDP 2 Policy 32: Embedding Low & Zero
Carbon Generating Technologies in New Development. 
Residential Amenity 
72 NPF4 Policy 14 Design, Quality and Place and LDP2 Policy 1: Placemaking
requires development to respect the amenity of the place. NPF4 Policy 23 Health
and Safety aims to protect people and places from environmental harm and
LDP2 Policy 55: Nuisance from Artificial Light and Light Pollution, LDP2 Policy
56: Noise Pollution and LDP2 Policy 57: Air Quality aligns with national planning
policy. 
73 There are potential noise sources associated with the proposed development.
These include: from patrons, including in the outdoor seating area; vehicles; and
plant equipment. Noise sensitive receptors include residential properties to the
north and east of the site, Balhousie Care Home and Pitlochry Community
Hospital to the west.  In the instance of Burnside Cottages to the north, the
approximate distance to the facility would be 23 metres, from the southern gable
of the dwelling to the north face of the brewery building.  In respect of the
outdoor seating area, it would be approximately 34 metres, although it would be
partially obscured by the corner of the brew hall.  It should be noted that the
south face of Burnside Cottage has no window or door openings, and windows
either face east, west or north.  There are however small areas of intervening
external garden ground.  Similarly, the distance to the nearest properties at the
Bobbin Mill is approximately 90 metres to the east, from the external seating
area, with intervening woodland and topographical change.  It must also be
appreciated that the Ferry Road area is also well used, particularly with activity
associated with the Community Hospital and care home, which already creates
activity and noise in the vicinity.  Notwithstanding, at those respective distances
to Burnside Cottages and Bobbin Mill, while the erection and operation of the
facility would represent a change on the current situation, it is not considered that
the associated noise impacts would be significant enough to warrant refusal of
this application.  Similarly, given the position in respect of distance to the
respective residential properties, and intervening public roads and footpaths, it is
not considered that any undue privacy issues would arise. 
74 The applicant submitted a Noise Impact Assessment (NIA) in November 2023
(Document 35). Following discussion between Environmental Health (EH) and
the noise consultant, an updated NIA was submitted in December 2023
Page 86 of 126

Page 87

(Document 41). The scope and approach of the assessment was completed
considering both local planning policy and agreed methodology and criteria with
PKC. 
75 Background noise surveys were undertaken and are outlined in the NIA. In
respect of plant equipment these are all well within the acceptable limits,
provided that there is no change to the number and type of plant equipment
installed. Internal activities were assessed, and one issue raised was the use of a
compressor in the ‘goods incoming area’ whilst the shutter door is open.
Therefore, it is advised that the air compressor should not be in use whilst the
shutter door is open, noting that deliveries are expected to be 1-2 per day and all
carried out during normal working hours. Overall, operational noise levels are
considered likely to be barely perceptible and within acceptable limits. In respect
of patron noise this has been assessed for the ‘worse-case scenario’ and
mitigation is required. In order to meet acceptable levels, terraced seating on the
northeast side of the development has been removed from the plans. It will also
be necessary to limit the number of patrons in the outdoor area to 36. The
skylights must also be altered from polycarbonate sheeting to perspex of at least
6mm thickness and the sliding doors leading to the outdoor area should generally
remain closed. By putting in these measures, predicted levels are reduced below
the background level. The NIA reports it is not likely that adverse impacts will be
experienced at any receptor due to the development. 
76 Environmental Health have reviewed the NIA and recommend a number of
conditions to ensure surrounding amenity is protected (Conditions 8, 9, 10, 11,
15, 16, 17 and 18). 
77 Air Quality and Odour – The plans include the provision of a wood burning stove
and the installation of associated flue. The technical specifications supplied with
the application relates to a domestic sized stove and therefore EH have no
adverse comments to make with regards to air quality in relation to the stove.
Given the height of the flue and distance to residential properties EH do not
foresee smoke and/or odour affecting residential amenity of neighbouring
properties. 
78 The applicant has submitted an odour assessment with the application
(Document 33). The assessment states that the potential odour sources will be
the release of vapours through the ventilation duct above the brewing hall; and
when the effluent tanks are filled and emptied. As no effluent treatment is
proposed on site and all spent grains and other industrial effluent will be held in
sealed containers fitted with carbon filters, odour from effluent storage has not
been considered further. It is therefore stated that odour has been predicted for a
single scenario: emissions from the brewing hall vent. 
79 EH note in their consultation response that when assessing the impact of odour,
consideration has been taken from The Institute of Air Quality Management
(IAQM) Guidance on the assessment of odour for planning; and SEPA issued
guidance on odour assessment for processes that are subject to the Pollution
Page 87 of 126

Page 88

Prevention and Control regulations (PPC). Whilst this does not apply to this
development, the Guidance provides a useful framework for assessing the
potential adverse impacts on amenity. SEPA’s guidance notes odour from
brewing falls into the category of ‘less offensive’. The assessment reports odour
from the proposed development is predicted to be of negligible significance
subject to the satisfactory implementation of mitigation measures. 
80 EH recommend a number of conditions to ensure odour from the proposed
development does not impact surrounding amenity (Conditions 13, 14 and 19). 
81 Lighting – EH recommend a condition to ensure external lighting does not
adversely affect neighbouring land (Condition 12). 
82 The supporting documents have assessed the potential issues of noise and
odour and these matters have been satisfactorily addressed in line with national
and local planning policy. Planning conditions are recommended to safeguard
the amenity of the surrounding area. The proposal satisfies NPF4 Policy 14
Design, Quality and Place and NPF4 Policy 23 Health and Safety and LDP2
Policy 1: Placemaking, LDP2 Policy 55: Nuisance from Artificial Light and Light
Pollution, LDP2 Policy 56: Noise Pollution and LDP2 Policy 57: Air Quality. 
Roads and Access  
83 Transportation and Development (T&D) note in their consultation response that
the site will have three regular parking bays, with one additional accessible
parking bay. One of the bays will be provided with an electric charge point and
cycle parking is also proposed.   
84 The applicant has provided a Transport Statement and a subsequent update that
now includes industry standard and verifiable trip rate and mode share data from
TRICS. This provides information on the level of person trips associated with the
type of development proposed.  Subsequent analysis of this data by T&D has
indicated that the proposed development will attract a total of approximately 39
vehicles per day, which can be accommodated in nearby offsite public parking.   
85 In response to matters raised in the representation from Atholl Medical Centre, 
T&D requested that a loading facility for vehicles up to 12 metres is provided, to
accommodate normal operations. Amended drawings have been submitted to
include such a service bay – proposed elevations (Drawing 52), proposed site
plan (Drawing 71) and swept path analysis (Drawings 67-69). T&D note this
service bay occupies the full width of the service strip of the public road network,
which as part of the development will be constructed as a footway. This is not
ideal, however, the scaled swept path analysis shows a 12-metre vehicle can
suitably enter the service bay proposed and not obstruct the public road. 
86 Further, in respect of the matters raised in the representation, T&D recommend
that a Construction Traffic Management Plan should be submitted for approval
prior to the commencement of works. This should have a specific focus on how
Page 88 of 126

Page 89

the applicant proposes to construct the building without any impediment on the
public road (Condition 22). Also, a Service Management Plan is recommended
detailing the plans for servicing and delivery operations, and timing, including
arrangements for the management of vehicular and pedestrian traffic during
servicing and delivery, paying particular attention to the need for all deliveries to
be undertaken off the public road, and a condition is proposed (Condition 23). 
87 The constructing of a new vehicle access across the frontage of the site, with a
footway being provided.  The finalised design and location of the dropped kerbs
on the north and south of Ferry Road is to be provided through condition
(Condition 24). The provision of these works would not result in any physical
restriction to the retained access to the Bobbin Mill site to the east, which while in
close proximity to the application site boundary, would not be altered as part of
the proposals. 
88 A secure covered cycle parking area is proposed to the east of the building, to
encourage active and sustainable travel.  A condition is recommended to ensure
that a detailed design for a minimum of 10 bicycles is submitted for approval prior
to the commencement of development and thereafter implemented prior to first
use (Condition 25).   
89 The application site is located close to the town centre and is easily accessible
by all modes of transport including walking, cycling and public transport. Thus,
reducing the need to travel unsustainably. Accessible parking, an electric vehicle
charging bay and cycle parking is proposed. Although onsite parking provision is
limited, the site is well served by sustainable transport modes and there are
public car parks a short distance from the application site. Conditions are
recommended to mitigate any impact on the public road and to provide a safe
crossing for pedestrians. The proposal satisfies NPF4 Policy 13 Sustainable
Transport and LDP2 Policy 60B subject to conditions. 
Drainage and Flooding 
90 A Drainage & Flood Statement reports no risk from fluvial flooding and only a
small area of the site is shown to have a medium-low likelihood of surface water
flooding. It reports this isolated patch appears to be the result of run-off from a
steep slope to the east. A perimeter drain is proposed during the construction
phase and the drainage design incorporates measures to ensure surface water
run-off will be controlled. 
91 The drainage layout plan (Document 70) and Drainage & Flood Statement
(Document 66) were revised during the application process, in consultation with
the Council’s Flooding Team. Given site constraints and space restrictions, two
sets of cellular storage crates are proposed as the main form of attenuation for all
surface water run-off. Filter trenches are proposed to capture run-off from the
adjacent slopes. The attenuation tank at the east of the site has been relocated
due to concerns raised by Transportation and Development, having been initially
proposed within the embankment supporting the road to residential properties. 
Page 89 of 126

Page 90

That seeing a risk of causing damage to the embankment. The surface water will
be treated within the site before discharging to the existing surface water sewer
in Ferry Road. A maintenance schedule is included. In respect of foul water this
will drain to the existing public combined sewer located in Ferry Road. 
92 SEPA were consulted and have no objection to the proposal. Following review of
the further information submitted, the Council’s Flooding Team are satisfied with
the drainage design and that there is no risk of flooding. 
93 The proposal satisfies NPF4 Policy 22 Flood Risk and Water Management and
LDP2 Policy 52: New Development and Flooding, LDP2 Policy 53B: Foul
Drainage and LDP2 Policy 53C: Surface Water Drainage. 
94 In respect of NPF4 Policy 22 d) and LDP2 Policy 53E: Water Supply, as noted in
the external consultation responses, the site is in a Drinking Water Protected
Area and Scottish Water requested further information during the application
process on the abstraction volume. The impact on Water Resources of the
operation of the brewery and accompanying amenities has been reviewed
against the confirmed abstraction volume of 200,000 litres per annum
(0.2Ml/annum). Assuming this water usage remains consistent with these values,
this proposal can be considered as low-medium risk regarding Water Resources.
Scottish Water would have no objections with the proposed volume of water and
request that they should be notified if these volumes change. Scottish Water also
request they are notified prior to work commencing on site as they may wish to
take water samples as a precaution to protect water quality. It is recommended
that an informative be attached to any planning permission granted (informative
5). 
Waste Collection 
95 The refuse storage and its location are acceptable as confirmed by the Council’s
Waste Service. 
Natural Heritage and Biodiversity 
Open Space 
96 The application site is designated as Open Space in LDP2. Historical mapping
shows evidence of industrial uses within and surrounding the site boundaries as
far back as 200 years ago. Most recently, the majority of the site was used as a
compound during construction of the neighbouring hospital/care home. The
applicant’s supporting statement (Document 40) has extracts of historical maps
which show these former industrial uses. The area of the site designated as open
space in LDP2 comprises only a minor part of a much larger designation and the
proposed development will not create a significant deficit in available outdoor
recreational space, whether in scale or quality.  As has been indicated above
much of the site has previously been cleared of trees at various points in time.
Most recently the surface was also prepared as a compound area, through the
Page 90 of 126

Page 91

laying of hardcore.  It is also evident that the site has been formed as a more
level clearing, through the likely removal of surface material to create a flatter
area.  This sees slopes at the periphery, where this material has been
excavated.  In respect of NPF4 Policy 20 Blue and Green Infrastructure and
LDP2 Policy 42: Green Infrastructure, the development of this area of land will
not pose any significant detrimental impact to the surrounding green
infrastructure provision and the overall integrity of the network will be maintained.
The proposed development will have no impact on the existing footpath network
including the adjacent core path (PLRY/109) and a condition is recommended to
ensure continued public access to public paths during building works and on
completion of the development (Condition 20). 
97 While the development of a near 1800 square metre area is notable it is
considered minor in relation to the requirements of LDP2 Policy 14A: Open
Space Retention and Provision – Existing Areas criteria (b).  It only involves a
minor part of the overall designation and would not significantly affect its
continued use as a wider recreational or amenity resource.  In this instance the
area to be developed has effectively been out of any formal recreational use for a
long time.  Most recently having been used as a yard in the construction of
Pitlochry Community Hospital and has not fully regenerated.  The vast majority
of the wider wooded resource would be retained.  More generally, Pitlochry
does benefit from generous open space provision.  On balance therefore, the
loss of this area of largely previously developed land within the open space
designation, can be accepted in light of the wider benefits associated with this
proposal, and the opportunity to compensate for tree loss and biodiversity
enhancement as shall be discussed below.  The proposal is therefore
considered to comply with NPF4 Policy 20 a) and LDP2 Policy 14: Open Space
Retention and Provision. 
Biodiversity 
98 A Preliminary Ecological Appraisal and Ecological Impact Assessment by Tay
Ecology (Document 28) was reviewed by the Biodiversity Officer and confirmed
as being in line with best practice. The report identified that no protected species
were present during the survey and no further surveys were therefore required.
The report recommends biodiversity enhancement measures and in line with this
bird and bat boxes are proposed on the west elevation of the brewery building
(Drawing 52). 
99 A condition is recommended to ensure the recommendations set out in the Tay
Ecology Report are carried out to protect environmental quality and biodiversity
(Condition 3). 
100 The proposal satisfies NPF4 Policy 3 Biodiversity paragraphs a), c) and d) and
LDP2 Policy 41: Biodiversity. 
Page 91 of 126

Page 92

Trees / Ancient Woodland 
101 Some representations highlight the loss of ancient woodland, as a result of the
proposed development and the ‘Catastrophic negative impact on the ancient
woodland’.  Reference is made in the representations to a woodland
management plan coproduced in 2009 by Dr Rick Worrell, Forestry Consultant,
which concluded that Bobbin Mill constituted Ancient Woodland. The
representation states such Ancient Woodland is protected by the National
Planning Framework. 
102 In exploring this, the woodland area at Bobbin Mill is not identified as ancient
woodland on maps published by NatureScot (Ancient Woodland Inventory) or on
Perth and Kinross Council’s GIS layering system. Further, the site is not
identified as ancient woodland within the applicant’s Ecology Report. 
103 The Council does not hold a copy of the referenced woodland management plan
and only received a copy of a ‘draft’ document from an objector.  Scottish
Forestry have since confirmed that the draft Bobbin Mill Management Plan is an
appendix to the ‘Pitlochry Estate Long Term Forest Plan (2012)’ which was
approved by Scottish Forestry. This shows the Bobbin Mill woodland marked as
a Natural Woodland Management Grant Area. 
104 This draft Woodland Management Plan covers a wide area referred to as the
‘Bobbin Mill woodland area’ and concludes that this general woodland area
identifies as ‘semi-ancient’ woodland.  Within Para 3.6 of the report Dr Rick
Worrell states – “The flora clearly suggests that most of the site is ancient semi
natural woodland”. This statement is based on identifying certain areas of ground
flora as being characteristic of oak – birch (National Vegetation Class W11), and
ash woodland (NVC W9). It is then stated “that it is clearly ancient woodland, but
does not appear in the Ancient Semi Natural Woodland Inventory due to an
oversight”. 
105 The available evidence indicates that the cleared area within the application site
has either not been wooded for a considerable time or is shown as open space in
the woodland management plan.  Whilst it is difficult to accurately compare the
planning application boundary with the outline of the Bobbin Mill wooded area as
set out in the Woodland Management Plan, it appears that at least some of the
periphery, the sloped areas, are identified as ancient woodland (primarily that
area immediately adjacent to the access to Bobbin Mill).  Although there is this
comparison issue, it is accepted for the purposes of assessing this planning
application that all of the trees on site are covered within the ancient woodland
designation. Thus NPF4 Policy 6 Forestry, Woodland and Trees applies, together
with LDP2 Policy 40 which broadly aligns with that national policy. 
106 NPF4 Policy 6 states – 
a)  Development proposals that enhance, expand and improve woodland and
tree cover will be supported.
Page 92 of 126

Page 93

b) Development proposals will not be supported where they will result in: 
i.  Any loss of ancient woodlands, ancient and veteran trees, or adverse
impact on their ecological condition; 
ii.  Adverse impacts on native woodlands, hedgerows and individual trees
of high biodiversity value, or identified for protection in the Forestry and
Woodland Strategy; 
iii.  Fragmenting or severing woodland habitats, unless appropriate
mitigation measures are identified and implemented in line with the
mitigation hierarchy; 
iv.  Conflict with Restocking Direction, Remedial Notice or Registered
Notice to Comply issued by Scottish Forestry. 
c)  Development proposals involving woodland removal will only be supported
where they will achieve significant and clearly defined additional public
benefits in accordance with relevant Scottish Government policy on
woodland removal. Where woodland is to be removed, compensatory
planting will most likely be expected to be delivered. 
d)  Development proposals on sites which include an area of existing woodland
or land identified in the Forestry and Woodland Strategy as being suitable
for woodland creation will only be supported where the enhancement and
improvement of woodlands and the planting of new trees on the site (in
accordance with the Forestry and Woodland Strategy) are integrated into
the design. 
107 In line with LDP2 Policy 40B, a Tree Survey Report (TSR) (Document 58) was
submitted together with a Tree Constraints Plan, Tree Protection Plan and details
of compensatory planting (Documents 59-64). The TSR assessed 31 trees and 1
tree group and identified that the site contains sycamore and oak, with 45.5% of
trees being Category C. 
108 Honey fungus, Armillaria mellea, a root/soil borne fungal disease is also identified
to have colonised some of the oak.  This causes tree demise and failure.
Indeed, there are six Category U oak trees, T173, 174, 175, 183, 187 and 196,
which have died as a result of honey fungus and are to be removed. 
109 It is proposed to fell three trees comprising of two Category B (T177 Sycamore,
and T184 Oak) and one Category C (T181 sycamore) and one group of nine self-
seeded wild cherry trees. 
110  2 Category A, 7 Category B and 13 Category C trees are proposed for retention.
So this would see 12 trees to be removed, many due to honey fungus, and 19
retained from a total of 31 surveyed. 
Page 93 of 126

Page 94

111 Compensatory planting of 36 trees is proposed using both native species and
fruit trees recognised as resistant/tolerant of honey fungus (Drawing 62). The
supporting information states that 12 trees are proposed to be planted at
Pitlochry High School Nursery (Document 64), which is understood to have
already taken place. Should an additional 4 trees be impacted upon by drainage
measures then additional compensatory planting (at a rate of 3 to 1) would be
required, thereby increasing the overall number of trees (by a further 12) to 48.
The compensatory planting is in line with planning guidance. 
112 In consideration of the criteria listed in NPF4 Policy 6 b) – 
i.  the central core of the development site does not contain trees and is not
considered as ancient woodland. It consists mostly of aggregate type
material and little soil, so has clearly been significantly disturbed. It is
unlikely to re-seed with trees synonymous with the surrounding woodland.
The periphery slopes to the east of the application site are however
accepted for the purposes of the consideration to contain ancient woodland
and are in the red line boundary of the site. The proposal would therefore
result in the loss of ancient woodland and as such is contrary to criterion i)
of NPF4 Policy 6 b). 
ii.  the woodland is within the Forest Woodland Strategy as existing woodland
but is not specifically identified as being suitable for woodland creation. 
iii. as outlined previously in the report, compensatory planting is proposed
using both native species and fruit trees recognised as resistant/tolerant of
honey fungus. The removal of invasive species and planting of new trees
would enhance and improve the woodland generally. 
iv.  Scottish Forestry have not issued a direction or notice on the site. 
113 In respect of Policy 6 c), the area of trees being removed to facilitate the
development does not constitute ‘woodland’ removal, as it is less than 0.1ha. The
applicant is also committed to offset tree loss through on and off-site tree
planting. 
114 In respect of Policy 6 d), the removal of the honey fungus and the removal of the
invasive species would enhance and improve the woodland quality generally.
The proposed planting of new trees is also in accordance with the Forestry and
Woodland Strategy. The 2009 Woodland Management Plan proposes the
controlled removal of the non-native invasive sycamore and Norway maple and
stipulated a time frame for these works.  The Tree Officer’s consultation
response highlights that from assessing the development site and noting the
number of sycamores present, it is clear that the woodland management
proposals have not been carried out within the vicinity of the application site, and
the advent of development would secure the removal of certain sycamores (T177
& T181) at the site boundaries and achieve some of the woodland management
plan outcomes and objectives.
Page 94 of 126

Page 95

115 The proposed development will nevertheless result in the loss of ancient
woodland. However, as highlighted in the Tree Officer’s consultation response,
the vegetation on the edges of the planning application site and on the periphery
of the general woodland at Bobbin Mill hosts non-native invasive species and six
dead oak trees with honey fungus. Their removal would not result in an adverse
impact on the ancient woodland or their ecological condition. Two category A
trees are proposed for retention as are the majority of category B trees. Within
the context of the overall Bobbin Mill woodland, the loss of trees would be
minimal, and the removal of dead and invasive species will enhance and improve
the woodland and woodland habitat. 
116 The proposed development will enhance and improve woodland and tree cover
in line with NPF4 Policy 6 a) and it is considered that the proposal would not
constitute a significant departure from the development plan due to the loss of
ancient woodland. Overall, the proposal aligns with the policy intent and policy
outcomes of NPF4 Policy 6 Forestry, Woodland and Trees and LDP2 Policy 40:
Forestry, Woodland and Trees. 
117 Conditions are recommended by the Tree Officer to ensure a pre-site meeting
takes place to examine tree works and protection measures; a method statement
is submitted for written approval of the Council and to include details of how the
removal of diseased trees and soil will be handled; and for a post-development
tree report to be submitted (Conditions 5, 6 and 7). 
118 The proposal incorporates new landscape and tree planting appropriate to the
local context and the scale and nature of the development. It will not lead to the
fragmentation of existing blue and green infrastructure and will enhance and
create new woodland habitats. The proposal satisfies NPF4 Policy 14 Design,
Quality and Place, NPF4 Policy 20 Blue and Green Infrastructure, LDP2 Policy 1:
Placemaking and LDP2 Policy 42: Green Infrastructure. 
Core Path  
118 An adopted core path is located immediately to the east of the application site
(PLRY/109) and a condition is recommended to ensure this remains accessible
to the public during the construction and operational phases of the development
(Condition 20). 
119 This is in line with NPF4 Policy 20 Blue and Green Infrastructure and LDP2
Policy 15: Public Access. 
Contamination 
120 An inspection of the proposed development site by the Council’s Contaminated
Land Officer did not raise any real concerns, although mapping does indicate that
there is land formerly occupied by various potentially contaminative sources
nearby. The applicant is advised that there may therefore be potential for
Page 95 of 126

Page 96

contamination within the site. Should any contamination be found during the
approved works, works should cease and the Land Quality team contacted. It is
recommended that an informative to this effect is attached to any consent
(Informative 7). 
121 The proposal satisfies NPF4 Policy 9 c) Brownfield, Vacant and Derelict Land
and Empty Buildings and LDP2 Policy 58A: Contaminated Land. 
Material Considerations 
122 The representations received are a material consideration. Thirty (30)
representations were received including 6 objections, 2 neutral representations
and 22 letters of support. 
Representations - objections 
123 The main issues raised within the objections have been addressed in the report. 
124 The objections also raised the potential for anti-social behaviour from the
consumption of alcohol at the brewery and the perceived impact of this on the
well-being of nearby residents. The objections referred to the public sector
equality duty under Section 149(1) of the Equality Act (2010) and relevant human
rights legislation to have due regard to the need to eliminate harassment. The
objections state that granting permission for the development will increase the
risk of the Gypsy Travellers who live near to the site suffering harassment on
account of their race. 
125 The applicant’s supporting statement (Document 40) responds to the issues
raised in the representations. The applicant highlights the supporting documents
submitted with the application including Noise and Odour Impact Assessments to
demonstrate the proposal would not have a significant detrimental impact on
residential amenity and the proposal is designed to be compatible with the
surrounding uses and a good neighbour. The supporting documents have been
reviewed by Environmental Health and Planning and the potential issues of noise
and odour have been satisfactorily addressed in line with national and local
planning policy. Planning conditions are recommended to safeguard the amenity
of the surrounding area (Conditions 8 – 19). 
126 There is a multi-agency partnership approach in place to tackle anti-social
behaviour in the community. As the proposal would be a licensed business there
is a duty under the Licensing (Scotland) Act 2005 to prevent crime and disorder,
prevent public nuisance and secure public safety which is governed by Perth &
Kinross Licensing Board. This duty is highlighted in the applicant’s supporting
statement.  
127 Through the planning application process the material planning issues raised in
the objections have been considered and have been satisfactorily addressed in
Page 96 of 126

Page 97

line with national and local planning policy. The issues raised are not of sufficient
weight to justify the refusal of the planning application. 
Representations – support 
128 The 22 letters of support highlighted the development would bring wide ranging
economic benefits to the town and enhance the local area. 
129 As noted in the supporting documents this is a successful local business seeking
to grow and invest in Pitlochry with multi-faceted economic and social benefits for
the town. 
130 NPF4 recognises the challenges faces by the hospitality and tourism sectors and
aims to improve business development and entrepreneurship. 
Developer Contributions 
131 None required by the Council’s supplementary guidance. 
Economic Impact 
132 The proposed development will bring a range of economic benefits to the town,
including an enhanced visitor attraction and footfall, together with jobs during
construction and afterwards. 
Variation of Application Under Section 32A 
133 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the north elevation of the
building and the vehicular access. 
Planning Obligations and Legal Agreements 
134 None required. 
Direction by Scottish Ministers 
135 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
136 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, although the proposal does not comply with criterion i) of NPF4 Policy 6
Page 97 of 126

Page 98

b) there are material considerations to justify a departure. The proposal is
considered to otherwise comply with NPF4, and the adopted Local Development
Plan 2 (2019).  Account has been taken of the relevant material considerations
and none have been found that would justify refusal.  Accordingly, the proposal
is recommended for approval subject to the following conditions. 
Recommendation   
Approve the application subject to conditions. 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document(s) Ecological
Appraisal by Tay Ecology 3 October 2023 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the occupation of the building hereby approved, evidence that the bird
and bat boxes have been installed shall be submitted for the written approval of
the Council as Planning Authority, reference drawing 52.  Thereafter, the bird
and bat boxes shall be maintained in a reasonable condition for the life of the
development to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
5. A site meeting will be held with the Enforcement Officer (Trees) of the Council to
examine completed tree works, honey fungus mitigation, and to inspect tree
protection measures in place that accord with standard (fencing/non dig
construction, etc), drainage, and site storage facilities.  This meeting shall be
with the project manager, arboriculturist, and ground works contractor.  Contact
Page 98 of 126

Page 99

should be made with the Planning Authority to arrange this meeting prior to the
commencement of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
6. Prior to the commencement of development, a site-specific method statement
outlining measures to mitigate against the spread of honey fungus shall be
submitted to the Council as Planning Authority for review and written approval. 
The statement shall include details on the removal of affected trees (6 x dead
oak), disposal of soil areas contaminated with honey fungus and provide full
details of disposal of all excess materials.  Clarity shall be provided on where
the soil materials excavated will be deposited when levelling site, formation of
building footprint, filtration trenches/drainage, and access/parking.  Clarity shall
be provided on how the drainage works will be undertaken, and whether larger
encroaching roots would be permitted within the drainage material, and how the
cutting into the banking will be undertaken, the foundation type for structures,
and subbase for paths/surfacing, where they impact and encroach the RPA of
adjacent trees.  Thereafter the measures shall be carried out in complete
accordance with the details as so agreed. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
7. Prior to the building being brought into use a post development tree report/audit
confirming details of the trees retained on site, their condition, and a statement
as to the effectiveness of protection measures followed shall be submitted for
review and written approval of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
8. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - In order to safeguard the residential amenity of the area. 
9. The hours of operation of the outdoor seating area shall be restricted to between
1100 to 2200 hours Monday to Sunday. 
Reason - In order to safeguard the residential amenity of the area. 
10. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
Page 99 of 126

Page 100

11. No music, amplified or otherwise, shall be permitted in the outdoor seating area
at any time. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
12. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the residential amenity of the area. 
13. No odours from the distillery shall be discernible on the boundary with the
nearest residential property. 
Reason - In order to safeguard the residential amenity of the area. 
14. All mitigation measures as detailed within Section 6 of the Odour Assessment
undertaken by The Airshed, reference AS 1020 Pitlochry Brewery Airshed, dated
18 October 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
15. All mitigation measures as detailed within Section 7 of the Noise Impact
Assessment undertaken by CSP Acoustics, reference 1866 R001 V3 AH, dated
12 December 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
16. Noise from operations on site shall not exceed L A90,1 hour background noise
level plus 5dB (A), including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when measured at any residential
property in accordance with BS4142:2014+A1:2019. 
Reason - In order to safeguard the residential amenity of the area. 
17. A Noise Management Plan shall be submitted for the written approval of the
Planning Authority.  The plan shall include all sources of noise associated with
the premise, including patron noise, deliveries, compressor etc and the measures
that will be put in place to minimise and/or control noise.  The plan shall be
reviewed on a regular basis or, following receipt of a justified complaint or at the
request of the Planning Authority.  Once the Noise Management Plan has been
approved, it shall be fully implemented for the lifetime of the development. 
Reason - In order to safeguard the residential amenity of the area. 
18. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Page 100 of 126

Page 101

Authority to carry out a noise assessment to verify compliance with conditions 10,
15, 16 and 17 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with conditions 10, 15, 16
and 17 a scheme of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation of the scheme and
shall be submitted to the Planning Authority for written approval within 28 days of
the assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
19. In the event of a justified odour complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out an odour assessment to verify compliance with conditions
13 and 14 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the odour
assessment shows that the odour levels do not comply with conditions 13 and 14
a scheme of odour mitigation shall be included with the odour assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority for written approval within 28 days of the
assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
20. The core path (PLRY/109) must not be obstructed during building works or on
completion of the development.  Any damage done to the route and/or the
associated signage during building works must be made good before the
development is completed or brought into use, whichever is the earlier. 
Reason - To ensure continued public access to the public paths and in the
interests of public safety within the site. 
21. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
established within five years being replaced in the following planting season with
others of a size and species as previously approved.   
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
22.  Prior to the commencement of the development hereby approved, the applicant
shall submit for the written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a Construction Traffic
Page 101 of 126

Page 102

Management Scheme (TMS). The TMS shall take cognisance of the fact that no
loading and unloading of vehicles shall be undertaken on the public road and
shall include the following: 
a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used; 
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
c) a code of conduct for HGV drivers for loading and unloading materials at the
site; 
d) arrangements for liaison with the Roads Authority regarding winter
maintenance; 
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown; 
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road; 
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development; 
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for all users
including pedestrians, cyclists and equestrians; 
i) details of information signs to inform other road users of construction traffic; 
j) arrangements to ensure that access for emergency service vehicles are not
impeded; 
k) traffic arrangements in the immediate vicinity of temporary construction
compounds; 
l) monitoring, reporting and implementation arrangements; 
m) arrangements for dealing with non-compliance; and 
n) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Page 102 of 126

Page 103

Reason - In the interest of proper site management. 
23.  Prior to the commencement of the development hereby approved, the developer
shall provide, for approval by the Council as Roads Authority, a Service
Management Plan detailing the plans for servicing and delivery operations, and
timing, including arrangements for the management of vehicular and pedestrian
traffic during servicing and delivery, paying particular attention to the need for all
deliveries to be undertaken off the public road.  Thereafter, the approved plan
shall be adhered to for the life of the development. 
Reason - In the interests of road safety. 
24.  Prior to commencement of any development on site, a detailed design showing
the frontage of the development site onto Ferry Road shall be provided with the
following schemes being provided: 
a)  position of uncontrolled crossing location(s) along the frontage of the site to
link the development site to the northern side of Ferry Road with dropped
kerbs linking both sides; 
b)  the footway on the southern side of Ferry Road, of a minimum width of 2
metres along the full frontage of the site; 
c) the location of road drainage on Ferry Road along the frontage of the site; 
d)  the finalised location of the streetlighting cable; 
e)  the construction details of the parking bays and the service area; and 
f)  full details of the vehicle access, to be constructed in the following materials: 
40mm Wearing Course - Hot Rolled Asphalt 
50mm Base Couse - Dense Bitumen Macadam 
130mm Roadbase - Dense Bitumen Macadam 
230mm Subbase - Type 1 
The submission will confirm the location, specification and detailed design for the
pedestrian crossing, location of the streetlighting infrastructure, footway on
southern side of Ferry Road, road drainage and vehicle access along the
frontage of the development site.  This shall be submitted for the written
approval of the Council as Planning Authority.  Thereafter the approved scheme
shall be implemented in full, prior to occupation of the brewery. 
Reason - In the interests of road and pedestrian safety and connectivity to the
northern side of Ferry Road.
Page 103 of 126

Page 104

25.  Prior to commencement of any development on site, a detailed design for the
proposed cycle parking facility for a minimum of 10 cycles shall be submitted to
and approved in writing by the Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction of the Council as
Planning Authority prior to the development being brought into use. 
Reason - To encourage active and sustainable modes of transport in line with
national and local planning policy. 
26. Prior to the commencement of development hereby approved, a statement shall
be submitted for approval in writing by the Council as Planning Authority to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. The statement as agreed shall be
fully implemented to the satisfaction of the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
Justification 
There are material considerations to justify a departure from the Development
Plan otherwise, the proposal is generally in accordance with the Development
Plan.  There are no material reasons which justify refusal. 
Informatives 
1. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
Further information on radon gas and the associated reports that can be
obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
2. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.
Page 104 of 126

Page 105

4. Please note the consultation response on file from Network Rail - A railway
underbridge located in close proximity to the site (UB 290/063 crossing Ferry
Road) has a headroom of 4.2m.  The applicant should ensure that all vehicles
required for construction and operation are able to clear this height. 
5. Please note the consultation response from Scottish Water on file - this includes
a request that prior to work commencing on site they are notified at
protectdwsources@scottishwater.co.uk as they may wish to take water samples
as a precaution to protect water quality.  In addition, increases in water usage
should also be relayed to Scottish Water. 
6. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the front elevation and
vehicular access. 
7. An inspection of the proposed development site did not raise any real concerns,
although historical mapping indicates there was previously a nearby use which
may have resulted in contamination in the vicinity of the site.  The applicant is
advised that, given historical uses of the wider area, there may be potential for
contamination within the site.  Should any contamination be found during the
approved works, works should cease and the Land Quality team should be
contacted on 01738 475000 or es@pkc.gov.uk for further advice. 
8. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that
smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
9. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
10. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
11. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain from the Council, to place,
Page 105 of 126

Page 106

maintain or adjust apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-permits 
12. Road drainage may be in the vicinity of the new access and require remedial
works at the applicant’s expense.  Contact Perth & Kinross Council Road
Maintenance Department for further details. 
13. Street lighting infrastructure present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of infrastructure and its
relocation to facilitate the vehicle access.  Relocation to be undertaken at
applicant's expense.  Contact Mark Gorrie at Perth & Kinross Council Street
Lighting Department for further details. 
14. The applicant can seek guidance on the detailed design and positioning of the
cycle storage from Transport Scotland's Cycling by Design 2021 or similar design
guide. 
Background Papers
Letters of representation 30 
Authors
Name Designation Contact Details
Claire Myles Planning Officer 01738 475300 
Approved
Name Designation Date
Paul Williamson Team Leader 17 January 2025
Kristian Smith Service Manager 23 January 2025 
Page 106 of 126

Page 107

Ü
Proposed brewery, tap room, storage and associated works on land 50 metres south of Council Cottages,
Ferry Road, Pitlochry
23/01742/FLL
Scale
1:10,000
Planning and Placemaking Committee - 12 February
2025
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(i)
Page 107 of 126

Page 108

Page 108 of 126

Page 109

Ü
Proposed brewery, tap room, storage and associated works on land 50 metres south of Council Cottages,
Ferry Road, Pitlochry
23/01742/FLL
Scale
1:2,500
Planning and Placemaking Committee - 12 February
2025
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(i)
Page 109 of 126

Page 110

Page 110 of 126

Page 111

Perth and Kinross Council 
Planning and Placemaking Committee – 12 February 2025 
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 25/32) 
PROPOSAL: Change of use of flat to short-term let accommodation unit in
retrospect 
LOCATION: Flat 3, 7 Brae Street, Dunkeld, PH8 0BA 
Ref. No: 24/01440/FLL
Ward No: P5- Strathtay 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 Planning application is retrospective in nature and relates to the change of use of
a 2-bedroomed flat into a short-term letting facility. 
2 The flat is located within the upper floor of a two storey high (plus basement to
rear), stone-built end-terrace block, situated on the southern side of Brae Street,
within the designated Dunkeld Town and Neighbourhood Centre. As the street
name suggests, the property is set on a steep incline on a hill heading eastwards
out of the town; the ground to the rear slopes downwards and has views to the
south towards the River Tay. 
3 The building is Category C Listed and within the Dunkeld Conservation Area. 
4 Access to the ground and upper floors is via a communal stairwell and steps from
Brae Street. The one bedroomed garden basement (flat 1), also within the
applicant’s ownership, has a separate direct means of access from the rear of
the property. It has recently obtained a Certificate of Lawfulness to formalise its
use as a short-term let - 24/00541/LAW refers. 
5 It is understood that Flat 3 has operated as a short time let previously, then
reverted to mainstream residential use until the ownership changed in 2021.
5(2)(ii)
Page 111 of 126

Page 112

Since then, both of the short-term lets have been associated with and managed
by the Taybank Hotel, the grounds of which border immediately to the south. 
6 A separate Licence has been granted under the Civic Government (Scotland) Act
1982 for the short-term let – 24/01549/LIC refers. 
Site History 
7 24/00541/LAW was approved on 7 June 2024. This relates to the basement (Flat
1) property within the building and to regularise its continued use for short-term
letting purposes. Sufficient evidence was provided with the Certificate of
Lawfulness to indicate that the unit had been operating as a short term let for a
period of 10 years or more. 
Environmental Impact Assessment 
8 The proposal is not EIA development. 
Pre-Application Consultation 
9 No pre application advice was sought.  
10 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
11 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
12 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
13 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 7: Historic Assets and Places
• Policy 14: Design, Quality and Place
• Policy 27: City, Town, Local and Commercial Centres
• Policy 30: Tourism
Page 112 of 126

Page 113

Perth and Kinross Local Development Plan 2019 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15 The principal relevant policies are, in summary; 
16 Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 10: Town and Neighbourhood Centres
• Policy 27A: Listed Buildings
• Policy 28A: Conservation Areas: New Development
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
17 • Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non Statutory Guidance 
18 • Conservation areas
• Planning Guidance - Change of Use of Residential Property to Short-
term Let 
National Guidance 
19 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
20 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 68 Design Statements
• PAN 71 Conservation Area Management
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Page 113 of 126

Page 114

Creating Places 2013 
21 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
22 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
23 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
24 As part of the planning application process the following bodies were consulted: 
External 
25 Dunkeld and Birnam Community Council - Have made reference to the issues
identified within Dunkeld, Birnam & District’s, Community Action Plan (CAP). This
Community Action Plan was a result of the multi-agency supported Community
Development Trust’s efforts in engaging and harnessing the views of the local
community into what issues matter in their (PH8 sector) area.  It also considers
associated priorities, projects and actions over a 5 year period.  Second in the
list of six strategic themes is ‘Housing for All’, which raises concerns about the
lack of affordable housing in the area. Top of the list of priorities for action is to
have fewer short term lets and second homes. The Community Council have
also noted the over provision of second or holiday accommodation and need to
implement a short-term let control area.  The CAP is a material consideration,
but does not carry the same weight as Development Plan policy. 
26 Other matters such as the number and likely use of other residential properties
within the ownership of the applicant locally, have no bearing on the
determination of this submission. If other properties are being used for short-term
lets, then they will require a Licence and would be subject of the usual
assessment as to whether any other formal permission is required. If any
properties may be operating without the relevant permissions, then potential
breaches can be pursed separately; the disclosure of which would help assist
Page 114 of 126

Page 115

with updating records of STL’s and help guide future policy making. In respect of
other procedural matters, the agent has forwarded fresh application forms to
reflect the recent business name change of ‘Lovesushi Ltd’ to ‘Arach Ltd’. 
Internal 
27 Environmental Health (Noise Odour) - As the development is for a holiday
accommodation unit, there is the potential for noise from the users of the
property to affect neighbouring residential properties, however due to the
introduction of Civic Government (Scotland) Act 1982 (Licensing of Short-term
Lets) Order 2022, these will be required to be licensed, and noise conditions will
form part of the licence. 
28 Communities Housing Strategy - NPF4 Policy 30: states that Development
proposals for the reuse of existing buildings for short term holiday letting will not
be supported where the proposal will result in: 
i. An unacceptable impact on local amenity or the character of a
neighbourhood or area; or 
ii. The loss of residential accommodation where such loss is not outweighed
by demonstrable local economic benefits 
29 The council adopted non-statutory planning guidance for the Change of Use of
Residential Property to Short-Term Let on 1st November 2023 to aid
implementation of the above policy in Perth and Kinross. Consideration 6
pertains to the potential loss of residential accommodation and whether the
change of use will be outweighed by the benefit to the local economy. 
30 The Local Housing Strategy 2022-27 includes an action to develop planning
policy through Local Development Plan 3, where appropriate, for STL Control
Areas. 
31 The property to which this application refers, is in an area of housing pressure.
Short-term letting is one of several contributors to housing pressure in this area
and as such, the economic benefits should be considered as to whether these
outweigh the loss of residential accommodation in the area. 
Representations 
32 7 representations were received, with 6 objections. The main issues raised within
the representations are: 
• Inappropriate use
• Retrospective nature
• Noise
• Already a high overprovision of short-term lets and second homes
• Lack of affordable housing
Page 115 of 126

Page 116

• Out of character with the area
• Contrary to policy
• Limited economic gain to justify use
• Will result in other flats being bought and used as short-term lets
• Lack of any designated parking provision
• Difficulties with access on steep brae
• Applicant has multiple properties/business interests 
33 The last point is not considered a valid planning objection to the application being
considered. 
34 The other issues are addressed in the Appraisal section of the report. 
35 Three letters in support of the proposals were received, as part of the application
submission and not independently submitted following the applications
advertisement/notification process.  As such they are not included as responses
received. 
Additional Statements 
36 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed – AA not required 
Design Statement or Design and Access
Statement
submitted 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
not required 
Appraisal 
37 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, as identified elsewhere within the report. 
38 In this instance, section 14(2) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 places a duty on planning authorities in determining
such an application as this to have special regard to the desirability of preserving
the building or its setting or any features of special architectural or historic
interest which it possesses.  Section 64(1) of the Planning (Listed Buildings and
Page 116 of 126

Page 117

Conservation Areas) (Scotland) Act 1997 is relevant and requires planning
authorities to pay special attention to the desirability of preserving or enhancing
the character or appearance of the designated conservation area. 
Change of Use and Residential Amenity 
39 Placemaking policies 1A and 1B are applicable as is policy 10, City, Town and
Neighbourhood Centres of LDP2, together with 14, Design, Quality and Place
and 27 City, Town, Local and Commercial Centres of NPF4. 
40 These policies essentially seek to maintain and enhance residential amenity
levels and to support proposals which contribute to the mix, character, vitality and
viability of town and neighbourhood centres. 
41 Policy 30, part (e) Tourism within NPF4 echoes the need for development to be
compatible with its surroundings and forms the most relevant, up to date policy
advice, indicating that proposals for the reuse of existing buildings for short term
holiday letting will not be supported where the proposal will result in: 
i. An unacceptable impact on local amenity or the character of a
neighborhood or area; or
ii. The loss of residential accommodation where such loss is not outweighed
by demonstrable local economic benefits. 
42 With regard to Criterion (i), the proposal is for a change of use of a 2-bedroom
upper floor flat, within a building containing 4 residential units; the basement
property of which is already operating as a STL. No objections to the proposals
have been received from any immediate neighbours, indicating it would appear
that the present arrangements have not resulted in any adverse amenity issues
in respect of noise or disturbance. The flat is accessed via a shared entrance
onto Brae Street and communal internal flight of stairs. This is the only aspect
however which is shared, as waste arrangements are dealt with by the hotel.
The use of the property as a short term let has, and will, result in footfall
associated with guests staying at the property; this is unlikely however to be at
levels that are significantly different from the footfall – or impacts associated
with the former use as a residential flat. 
43 As the layout and access arrangements for the unit remain unchanged, the
proposed use of the property as a short term let should not result in any undue
levels of disturbance or noise. The agent has also provided supporting
information to demonstrate how the unit is linked to the Taybank Hotel and
is/shall be managed on a day-to-day basis. 
44 While housekeeping matters and meal deliveries would create additional footfall,
this is limited in scale and effectively no different to a residential property getting
deliveries or engaging a domestic service. As Environmental Health Officers
have noted, noise levels will in any event be regulated via the need for a licence.
Page 117 of 126

Page 118

Accordingly, no adverse impacts are envisaged to the character of the area or
established residential amenity levels. 
45 In respect of criterion (ii) of NPF4 Policy 30(e), the proposal has resulted in the
loss of a flat to short term let accommodation within Dunkeld town centre. It is
acknowledged that the representations have raised valid concerns in respect of
the lack of affordable housing provision and the high provision of second
homes and STLs in the local area. Communities Housing Strategy have
confirmed that Dunkeld is an area of housing pressure and that the future
LDP3 will aim to develop policy with a view to help address any imbalance.
There is no guarantee however as to the property ever being viewed as
“affordable”, irrespective of the current use, given the town centre premium
location and attributes of the Listed Building in which located. 
46 The remaining assessment in terms of policy 30 (e) acceptability, therefore is
whether, or not, the loss of another mainstream residential unit is outweighed
by demonstrable economic benefits. 
47 The supporting evidence provided and proximity of the STL to the Taybank
Hotel and physical links in terms of parking, checking in/out, meals,
management and interconnecting paths, is sufficient to demonstrate that there
is an established relationship between the flats and the hotel, with a strong
demand for visitor accommodation that necessitated the need for additional
room provision. The loss of a flat is regrettable, but on balance, supportable,
given the site context and economic contribution made to an established
business and wider local area. 
48 The proposal therefore accords in principle with NPF4 Policy 30(e): Tourism, and
the intent of NPF4 Policy 27: City, Town, Local and Commercial Centres, as well
as LDP2 Policies 1A & 1B: Placemaking and 10: City, Town and Neighbourhood
Centres. 
Listed Building, Conservation Considerations and Visual Amenity 
49 As the proposal relates to a Listed Building within the Dunkeld Conservation
Area. Policy 7: Historic Assets and Places of NPF4 and 27A: Listed Buildings of
LDP2 are relevant as they seek to ensure that any proposal which affects a
Listed Building or its setting should be appropriate in terms of character,
appearance and setting.  Policy 28A (Conservation Areas) of the LDP2 also
requires development within a Conservation Area to be of a standard which
preserves or enhances its character or appearance. 
50 No internal or external alterations are proposed. Given the lack of any physical
change to the fabric of the building or Conservation Area, the proposals will
make no difference to the visual appearance or character of the building or
area in which it is located. The application is therefore acceptable in respect of
LDP2 Policies 1A: Placemaking, 27A: Listed Buildings, 28A: Conservation
Page 118 of 126

Page 119

Areas, and NPF4 Policies 7: Historic Assets and Places, and 14: Design,
Quality and Place. 
Roads and Access 
51 There are no designated parking spaces besides the flats. This is the case for
the other residential units. Confirmation has been received that those patrons
who travel by car can use one of the designated hotel parking bays located off
Tay Terrace. Notwithstanding, there is a range of on and off-street parking
available elsewhere within the town including the North and Tay Terrace Public
Car Parks, and on-street at Bridge Street, Atholl Street and High Street. 
52 As the proposals raise no issues or change in provision, no formal transportation
consultations have been undertaken. The application site is also within
convenient walking distance of the main road and links to public transport
options. In these respects, the proposal accords with NPF4 Policy 13:
Sustainable Transport and LDP2 Policy 60B: Transport Standards and
Accessibility Requirements: New Development Proposals. 
Drainage and Flooding 
53 There are no changes to existing connections or known issues relating to
drainage or flooding at the site. 
Waste Collection 
54 Although there will be waste storage arrangements in place at the building; plans
indicate that the bins associated with both STL’s are located beside the hotel
and will be dealt with as per present arrangements for the commercial
operations. As such, there are no adverse waste collection impacts on
properties in Brae Street. 
Other Material Considerations 
55 Planning Guidance short-term lets (STLs) has recently been produced due to
concerns expressed over the impact of STLs on services, local business staffing
and expansion, as well as housing affordability. The Guidance was formally
adopted by the Council on 1 November 2023 following consultation during
Summer 2023. The adopted Guidance forms the most up-to-date indication of
Council policy intent on the matter, and as such is a material consideration in
addition to other policy factors and supplementary guidance in the assessment of
the proposals. 
56 The Guidance acknowledges that while short-term lets can bring economic
benefits to the host and local areas, and that this must be balanced against the
impact the loss of that residential property has on the availability of housing for
local people.
Page 119 of 126

Page 120

57 Six considerations have been outlined within the Guidance to assist in the
application of the policy framework set out in NPF4. The considerations include
location, larger residential properties, refurbishment of long-term empty
properties, local amenity and character, business diversification, and the
relationship between loss of residential accommodation and local economic
benefits. The location consideration contains reference to three area types: city
and town centres; mixed-use areas within settlements; and predominantly
residential areas. 
58 In this instance, the application site is set within Dunkeld Town Centre and has a
direct connection with an existing commercial enterprise which requires to attract
visitors to remain economically viable. As noted previously, the STL use is
compatible with the character of the area and does not raise concerns in terms of
residential amenity impacts. The loss of residential accommodation whilst having
an impact in terms of the local availability of mainstream accommodation, is not
irreversible and will assist in bringing ongoing economic benefits to the local
area. 
59 As such, the proposal accords with the policy intent of the adopted Planning
Guidance, in terms of residential amenity, local character and housing
availability. 
Developer Contributions 
60 The Developer Contributions Guidance is not applicable to this application and
therefore no contributions are required in this instance. 
Economic Impact 
61 The economic impact of the proposal will directly support the Taybank Hotel and
through guest expenditure, contribute to the local economy. 
Variation of Application Under Section 32A 
62 This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to confirm land ownership,
waste/service provision and parking. 
Planning Obligations and Legal Agreements 
63 None required. 
Direction by Scottish Ministers 
64 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
Page 120 of 126

Page 121

by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
65 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. The development hereby approved shall be used solely for holiday
accommodation and shall not be occupied as the sole or main residence of any
occupant. 
Reason – In order to clarify the terms of the permission; to control and restrict the
use of the building. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
1 None.  
Informatives 
1. Part of the approved development includes holiday accommodation or Short-
term Let accommodation (STL).  The developer is advised that holiday
accommodation and STLs require to be licensed under the terms of Article 3 of
the Civic Government (Scotland) Act 1982 (Licensing of Short-terms Lets) Order
Page 121 of 126

Page 122

2021 and therefore a licence application should be made to Perth and Kinross
Council prior to operation commencing.  Further information and application
forms are available at https://www.pkc.gov.uk/shorttermlets. 
2. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporated minor changes in the interest of
accuracy. 
Background Papers
Letters of representation 7 
Authors
Name Designation Contact Details
Alma Bendall Planning Officer 01738 475300 
Approved
Name Designation Date
Paul Williamson Team Leader 29 January 2025 
Page 122 of 126

Page 123

Ü
Change of use of flat to short-term let accommodation unit at Flat 3, 7 Brae Street, Dunkeld
24/01440/FLL
Scale
1:8,000
Planning and Placemaking Committee© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(ii)
Page 123 of 126

Page 124

Page 124 of 126

Page 125

Ü
Change of use of flat to short-term let accommodation unit at Flat 3, 7 Brae Street, Dunkeld
24/01440/FLL
Scale
1:3,000
Planning and Placemaking Committee© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(ii)
Page 125 of 126

Page 126

Page 126 of 126