Argyll and Bute Council: Education 
CONSULTATION REPORT
Report on the outcome of the consultation relating to the Proposal to close
Kilchrenan Primary School 
August 2024 
This document has been issued by Argyll and Bute Council in regard to a
Proposal in terms of the Schools (Consultation) (Scotland) Act 2010, as
amended.
Appendix A

Page 2

CONTENTS
1. Summary of the Proposal ........................................................................................... 3
2. Reasons for the Proposal ........................................................................................... 3
3. Introduction ................................................................................................................. 3
4. Background ................................................................................................................ 4
5. Equality and Socio-Economic Impact ......................................................................... 5
6. The Consultation Process ........................................................................................... 5
7. Pupil Engagement ...................................................................................................... 6
8. Responses to the Consultation Exercise .................................................................... 7
9. Education Authority Response to Written/Oral Representations ................................. 8
10. Education Scotland Report ....................................................................................... 11
11. Education Authority Response to Education Scotland Report .................................. 11
12. Rural Schools – Compliance with Section 9(1) of the Schools (Consultation)
(Scotland) Act 2010 .................................................................................................. 12
13. Alleged Omissions or Inaccuracies ........................................................................... 18
14. Opportunity to Make Representations to the Scottish Ministers ................................ 18
15. Conclusion ................................................................................................................ 19
16. Recommendation ...................................................................................................... 20
Appendix 1 – Proposal Paper
Appendix 2 – EqSEIA
Appendix 3 – Public Meeting Minutes
Appendix 4 – Education Scotland Report
Appendix 5 – Pupil Focus Group Responses 
2

Page 3

3 
1. Summary of the Proposal 
1.1 It is proposed that education provision at Kilchrenan Primary School be permanently
discontinued with effect from 29th November 2024. 
1.2 The delineated catchment area of Taynuilt Primary School shall be extended to subsume the
whole delineated catchment area of Kilchrenan Primary School. 
2. Reasons for the Proposal 
2.1 The above is considered to be the best option to address the reasons for the Proposal which
are: 
• Kilchrenan Primary School has been mothballed for over two years. The School roll is
currently zero, and is not predicted to rise significantly in the near future.
• Along with several other rural local authorities, Argyll and Bute Council is facing
increasing challenges in recruiting staff. At the time the Proposal was issued as a basis
for statutory consultation (December 2023), there were 13.17 fte (full time equivalent)
vacancies for both teachers and head teachers in Argyll and Bute.
• Whilst the School is mothballed, the building is deteriorating, with limited budget for
maintenance. The costs of continued mothballing, and of bringing the fabric of the
school up to the required standard for any re-opening, are also considerable. 
3. Introduction
3.1 This is a Consultation Report prepared in compliance with the Schools (Consultation)
(Scotland) Act 2010, as amended (the 2010 Act) on the above Proposal. 
3.2 The purpose of this Report is to: 
• Provide a record of the total number of written responses made during the statutory
consultation period;
• Provide a summary of any written responses received;
• Provide a summary of oral representations made at the public meeting held on 25th January
2024 at 6.00 pm;
• Provide a statement of the Council’s response to those written and oral representations;
• Provide the full text of Education Scotland’s report on the Proposal, and a statement of the
Council’s response to this report;
• State how the Council reviewed the Proposal following the representations received during
the statutory consultation period and receipt of the report from Education Scotland;
• Provide details of any omission from, or inaccuracy in, the Proposal Paper and state how the
Council acted upon those;
• State how the Council has complied with Sections 11A to 13 of the 2010 Act when reviewing
the Proposal; and

Page 4

4 
• Explain the opportunity that may arise to make representations to the Scottish Ministers in
connection with Section 15(4) of the 2010 Act. 
4. Background
4.1 On 10th March 2022, Argyll and Bute Council’s Community Services Committee approved the
mothballing of Kilchrenan Primary School. It was agreed that the premises be retained for two
years on a care and maintenance basis and that a review of the School’s mothballing would
be prepared for the Committee’s March 2023 meeting, when Members could decide on a
continued period of mothballing, or request that officers begin an engagement process carried
out in accordance with the preliminary requirements of the 2010 Act, to consider the future
options for the School. It was also agreed that the community could have pre-arranged access
to the School premises for community functions during the period of mothballing: 
(Public Pack)Agenda Document for Community Services Committee, 10/03/2022 10:30 (argyll-
bute.gov.uk) 
4.2 On 9th March 2023, the Community Services Committee approved the continued mothballing
of Kilchrenan Primary School and agreed that the Education Service begin gathering
necessary information and carry out the exercise of assessing the options for the future of the
School, in accordance with the preliminary requirements of the 2010 Act: 
(Public Pack)Agenda Document for Community Services Committee, 09/03/2023 10:30 (argyll-
bute.gov.uk) 
4.3 The Community Services Committee received a report on 24th August 2023 providing details
of the Options Appraisal for Kilchrenan Primary School, carried out in accordance with the
preliminary requirements set out in Section 12A of the 2010 Act. The Committee agreed to
note the outcomes of this consideration of the preliminary requirements, and requested that
officers formulate a draft proposal for consideration at the meeting of the Committee on 14th
December 2023 which, if approved, would subsequently trigger a formal consultation process
under the 2010 Act: 
Agenda for Community Services Committee on Thursday, 24 August 2023, 10:30 am - Argyll and Bute
Council (argyll-bute.gov.uk) 
4.4 At the Community Services Committee meeting held on 14th December 2023, Members
considered, and agreed to adopt, the draft proposal as a “Relevant Proposal” that would proceed
to a statutory consultation under the 2010 Act. This statutory consultation opened on 21st
December 2023 and concluded on 23rd February 2024. A public meeting was also arranged
for 25th January 2024 in Kilchrenan Village Hall: 
Agenda for Community Services Committee on Thursday, 14 December 2023, 10:30 am -
Argyll and Bute Council (argyll-bute.gov.uk) 
4.5 Full details of the Proposal, reasons for the Proposal, the reasonable alternatives to the
Proposal that were identified, an assessment of the Proposal and each of the reasonable
alternatives, and an assessment of the educational benefits to the Proposal and each of the
alternatives are set out in the Proposal Paper, which is attached as Appendix 1.

Page 5

5 
5. Equality and Socio-Economic Impact
5.1 The Council as a public authority, has a duty under the Equality Act 2010, the Public Sector
Equality Duty 2011, the Fairer Scotland Duty and the Islands (Scotland) Act 2018 to have due
regard to their provisions when making strategic financial decisions. This is done through
assessing the potential impact of the decision on equality through Equality and Socio-
Economic Impact Assessments (EqSEIAs). The full EqSEIA in respect to the Proposal to
close Kilchrenan Primary School is attached as Appendix 2. 
5.2 The EqSEIA identifies no negative impact in relation to implementation of the Proposal,
having regard to the relevant circumstances. 
6. The Consultation Process
6.1 Following the Community Services Committee’s decision of 14th December 2023, where it
agreed to adopt the draft proposal as a “Relevant Proposal” in terms of the 2010 Act and
issue it as a basis for consultation, the Proposal Paper was made available on the Argyll and
Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
6.2 A summary of that document was also provided to: 
• The Parent Councils of the affected schools;
• The parents of the pupils at the affected schools;
• Parents of children expected to attend an affected school within two years of the date of
publication of the Proposal Paper;
• The pupils, deemed to be of suitable age and maturity to be able to communicate a
view on the Proposal, at the affected schools;
• The teaching and ancillary staff at the affected schools;
• The trade unions representatives of the above staff;
• Argyll and Bute Councillors – Ward 5 (Oban North and Lorn);
• Kilchrenan Community Council;
• Taynuilt Community Council;
• Argyll and Bute Community Planning Partnership;
• Relevant users of the affected schools;
• The Constituency MSP;
• List MSPs for the region;
• The Constituency MP;
• Chief Superintendent, Police Scotland;
• Chief Executive, NHS Highland;
• Chief Executive Strathclyde Partnership for Transport (SPT);
• Area Commander, Fire Scotland;
• Education Scotland.

Page 6

6 
6.3 Hard copies of the Proposal Paper were also made available for inspection at the
following locations: 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
• Oban Public Library, Albany St., Oban PA34 4AL
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
• Taynuilt Primary School, 2 Strathview, Taynuilt, PA35 1JF
• Oban Education Offices, Willowview, Soroba Road, Oban PA34 4SB
• Kilchrenan Village Hall, Kilchrenan, PA35 1HE 
6.4 It was possible for anyone to request a copy of the Proposal Paper in an alternative format,
translated to another language, or requests could be made for the services of an interpreter. 
6.5 Copies of the Summary Proposal (including information about where copies of the full
Proposal Paper could be accessed) were emailed to notify Education Scotland and all of the
relevant consultees (as prescribed by Schedule 2 of the 2010 Act) of the Proposal and
consultation exercise. All consultees were invited to make representations as part of the
consultation process. 
6.6 The consultation exercise ran from 21st December 2023 until 23rd February 2024 – a
continuous period in accordance with Section 6(4) of the 2010 Act. 
6.7 A public meeting was held at Kilchrenan Village Hall on 25th January 2023 at 6.00pm. Anyone
wishing to attend the meeting and participate was welcome to do so. Advance written notice
of this meeting was given to all of the Relevant Consultees, in terms of the 2010 Act. The
meeting was convened by the Education Authority, which presented reasons for bringing
forward the Proposal. There was an opportunity for questions to be asked and comments to
be made. 
6.8 This Consultation Report is the Education Service’s response to the issues raised regarding
the Proposal during the consultation period. It will be published on the Council’s website for
a period of no less than three weeks prior to final consideration of the Proposal by the
Council’s Community Services Committee on 22nd August 2024. 
7. Pupil Engagement
7.1 The Proposal to close Kilchrenan Primary School could have an impact on pupils,
parents/carers and the community. Pupils’ views are a significant part of the consultation
process. Therefore, the Education Service conducted focus groups with pupils, in order to give
them an opportunity to express their views on the Proposal. 
7.2 Two pupil focus group were consulted. The first, on 25th January 2024 at St. Columba’s
Primary School, consisted of six pupils attending the school, four of whom live within the
current Kilchrenan Primary School catchment area. The second focus group met on 25th

Page 7

7 
January 2024 at Taynuilt Primary School, and consisted of five pupils, four of whom live within
the current Kilchrenan Primary School catchment area. 
7.3 All pupils in the two focus groups were deemed to be of suitable age and maturity to be able
to communicate a view on the Proposal. The Proposal, the reasons for the Proposal and the
process relating to the Proposal were explained to pupils. A series of questions were then
put to them, to which they responded, enabling them to give their views, which were recorded
as part of the consultation process. 
7.4 Almost all pupils across both the focus groups, who had either attended Kilchrenan Primary
School before mothballing, or who lived in the Kilchrenan Primary School catchment area,
indicated their wish to continue their Education in their present schools.
7.5 Comments from pupils included the following: 
Taynuilt Primary School Focus Group 
• [Taynuilt] gives us lots of opportunities, like the London trip. It has lots of equipment, and
space and facilities.
• I have loads of friends [at Taynuilt]. Better learning, better teachers. The food is very good.
• I can do a variety of activities and sports in PE [at Taynuilt]. At Kilchrenan we couldn’t do as
many things.
• You have more choice of friends here [at Taynuilt]. And there being loads more pupils in the
class means learning is more fun and you can do more kinds of activities.
• I like Kilchrenan and I like Taynuilt.
• Sometimes it was fun all being in the one classroom [at Kilchrenan].
• Support for pupils with additional needs [at Taynuilt] is amazing. Sometimes at Kilchrenan
the work was easy.
• Bigger is better. I think we should try to have as many pupils as possible at Taynuilt. 
St. Columba’s Primary School Focus Group 
• [St. Columba’s] is a nice school and it has a good community.
• My learning is much better at St. Columba’s. I get work that is for my age and my level.
• We have learned more here since moving. The teacher can give you more time with her.
• [I want to] stay here. I have lots of friends here. At Kilchrenan you had to play with who was
there – you didn’t have choice about who your friends were.
• I would go back to Kilchrenan because I liked that there weren’t many people there.
• [Pupils coming to St. Columba’s] is good for the school. You can mix with more people.
People moving to St Columba’s will find that there are more learning strategies here. 
7.6 Full details of the pupil focus group responses are contained within Appendix 5. 
8. Responses to the Consultation Exercise
8.1 No written responses were received by the Council in relation to this consultation exercise.

Page 8

8 
8.2 Oral responses to the Proposal were gathered at the public meeting held at Kilchrenan Village
Hall on 25th January 2024. Five representatives from the local community attended along with
officers from the Education Authority. Minutes of the public meeting are attached as
Appendix 3. 
8.3 None of the five members of the public present at the public meeting expressed the view that
Kilchrenan Primary School should remain open. Contributions from attendees were principally
in the form of questions relating to the practicalities and logistics of formally closing Kilchrenan
Primary School, specifically relating to: 
• Travel arrangements for pupils;
• Staffing, pupil capacity and pupil roll at Taynuilt Primary School;
• Conditions that might lead to the reopening of Kilchrenan Primary School;
• The future of, the mechanisms for disposing of and potential community ownership of the
Kilchrenan Primary School building;
• The timescales relating to decision making around potential closure, and closure itself. 
8.4 One question raised at the public meeting implied concern relating to the proposed closure
of Kilchrenan Primary School, regarding the possible impact of closure on the demographic
of the Kilchrenan community, particularly concerning the age of the population. The question
also raised concern about the potential impact of closure on the connection between the
villages of Dalavich and Kilchrenan, both previously served by Kilchrenan Primary School. 
8.5 The Education Authority identified and assessed a number of reasonable alternatives to the
Proposal in its Proposal Paper and as part of the preliminary requirements (see Appendix
1). No further reasonable alternatives to the Proposal were submitted by any consultee as part
of the public consultation process. 
9. Education Authority Response to Written/Oral Representations
9.1 There were no written representations received from members of the public or any other
bodies during the period of the consultation. 
9.2 Questions raised through the consultation process (at the public meeting) fell into six main
themes: pupil views, transport, receiving school detail, placing requests, community interest
and processes and timelines. 
9.3 Pupil Views 
Question: What was the feedback from the pupils at today’s focus groups? 
Response: The feedback was similar to that provided in May 2023 when the preliminary
requirements and options were being explored. The pupils are very happy at the schools they
currently attend and are stimulated young learners. There were no negative voices.

Page 9

9 
9.4 Transport 
Question: Is there a statutory maximum travel distance that a child can be expected to travel? 
Response: There is no limit set out within the legislation. Travel distances are considered on
a case-by-case basis, having regard to a number of factors relevant to that particular
community. 
Question: In your presentation it was noted that travel considerations have been assessed
as carbon neutral. Of those who currently travel to Taynuilt or St Columba’s, do you know the
proportion who use the bus versus those who travel by car? 
Response: 87% of pupils residing in the catchment area use the school transport service. It
is recognised, however, that a minority taken to school by car as parents travel this route as
part of their daily routine. 
9.5 Receiving School Detail 
Question: What is the staffing situation at Taynuilt? 
Response: The staffing levels at Taynuilt are stable and strong, with no concerns to report.
Question: How many pupils currently attend Taynuilt?
Response: The current roll at Taynuilt Primary School is 55.
Question: What is the capacity at Taynuilt Primary?
Response: As mentioned above, the current roll is 55, with a capacity for 163 pupils.
Therefore there is ample capacity moving forward. The Education Service project school rolls
on an ongoing basis for each of our schools to plan for any envisaged increases. 
9.6 Placing Requests 
Question: It is common for children from small communities to request to attend schools in
larger villages in Argyll and Bute? And are they welcomed by the receiving school/pupils? 
Response: Yes, across Argyll and Bute many families submit placing requests for their
children to attend a school outwith their catchment area. The feedback from the pupils at
Taynuilt Primary and St Columba’s Primary is that they welcome new pupils as it provides
the opportunity to extend friendships with children from other areas. 
9.7 Community Interest 
Question: If a decision is taken to close Kilchrenan Primary School, in what scenario would
the Council consider re-opening the school? How many pupils would be required to consider
re-opening? 
Response: There is no minimum number of pupils specified in legislation. In Argyll and Bute,

Page 10

10 
the circumstances of each location/school is dealt with in their own merits. If a decision was
taken to close Kilchrenan Primary School, that would have an impact on the likelihood of a
new school being opened in the village in future years. 
Question: Have you considered the possible impact on the demographic of Kilchrenan
residents, for example the ageing population? There is currently a close connection between
the communities of Dalavich and Kilchrenan and there is a risk that this will break if the school
is closed. 
Response: Unfortunately, the position we find ourselves in is largely outwith the control of the
Council and comes down to parental choice, as parents have a legislative right to make
placing requests to schools outwith their catchment area if so minded. The root cause of
issues such as ageing population and population decline are ones which stretch far beyond
Argyll and Bute. The Education Service equip children and young people to have the best
start in life. Some of those young people will decide to stay in the area for employment, or to
have a family, but there are many who choose to move away for further/higher education or
employment and don’t return. 
Question: At what point is it sensible to begin engaging with the Council on a community
interest and with whom? 
Answer: If the community of Kilchrenan are interested in acquiring the school building, there
is no reason why they cannot engage with the Council at this stage, without of course pre-
empting any decision that may be taken by elected members in relation to closure or
otherwise of the school. The Council are happy to take contact details and pass these on to
the appropriate Officer. 
9.8 Processes and Timelines 
Question: Is the school in Connel being incorporated into the proposed new catchment area? 
Response: No – Achaleven Primary School is being considered as part of a separate exercise
that was ongoing at the time of the public meeting and has since resulted in the formal closure
of Achaleven Primary School (as of 31st May 2024). 
Question: What are the mechanics of disposing of the school building? 
Response: Should a decision be taken by elected members to close the school, the Council
will consider the future use of the building. For example, there may be community interests
that require to be explored or the best course of action may be to market it for sale if no
interested parties are forthcoming at that point. 
Question: When will a decision be taken by elected members? 
Response: Following the completion of the final consultation report, this will be submitted to
the Community Services Committee on 22nd August 2024 for consideration. If closure is
agreed, there is then an eight week period (in total) for any representations to be made to the
Scottish Ministers either against or in support of the closure, and for Ministers to consider

Page 11

11 
whether they will call-in a decision based on the representations made. If a decision is
subsequently taken by the Scottish Ministers not to call-in the proposal, the school would be
formally closed as of 29th November 2024. 
10. Education Scotland Report
10.1 In accordance with Section 8(2) of the Schools Consultation (Scotland) Act 2010, Education
Scotland produced a report on the educational aspects of the Proposal. 
10.2 In preparing their report, Education Scotland considered all relevant documentation in relation
to the proposal. They also visited Taynuilt Primary School and Oban High School to seek the
views of relevant consultees. A representative of Education Scotland was present at the
Public Meeting on 25th January 2024 in Kilchrenan Village Hall. 
10.3 The Education Scotland report is attached in full at Appendix 4. 
10.4 The Education Scotland report is supportive of the Proposal, and its conclusions can be
summarised as follows: 
a) Education Scotland agrees that there are educational benefits for children arising from the
Proposal to close Kilchrenan Primary School. These include access to a broader range of
experiences; an improved, larger and more modern learning environment; and
opportunities to learn, develop and socialise with a wider group of peers. 
b) Education Scotland suggests that, should the Council decide to implement the Proposal, it
should continue to engage with the local community to explore options for the future use of
the Kilchrenan Primary School building. 
11. Education Authority Response to Education Scotland Report
11.1 The Council welcomes the report from Education Scotland and agrees with its findings. 
11.2 The Council’s response to the findings contained within the Education Scotland Report is as
follows:
a) Education Scotland agrees that there are educational benefits for children arising
from the Proposal to close Kilchrenan Primary School. These include access to a
broader range of experiences; an improved, larger and more modern learning
environment; and opportunities to learn, develop and socialise with a wider group
of peers. 
11.3 The Council agrees that the educational benefits for current and future pupils are clear. The
curriculum at Taynuilt Primary School includes a broad range of planned experiences, to help
every child and young person to develop knowledge, skills and attributes for success in
learning, life and work. The learning environment is modern, well equipped and suitable for
the provision of high-quality learning experiences. Children at Taynuilt Primary School benefit
from being in classes composed of children from no more than two year groups, but still have

Page 12

12 
opportunities to work, play and learn with a wider number of peers and
children at other stages, helping to develop social skills. The opportunity to
transition to secondary school with a larger group of peers is also a clear
benefit. Stakeholders have also identified the nature and extent of the
educational benefits and opportunities for pupils at Taynuilt Primary School.
b) Education Scotland suggests that, should the Council decide to
implement the Proposal, it should continue to engage with the local
community to explore options for the future use of the Kilchrenan
Primary School building.
11.4 The Council is open to engaging with local community groups on any plans
to develop a sustainable community facility via a possible Community
Asset Transfer through the provisions of the Community Empowerment
(Scotland) Act 2015, or via some other agreed mechanism, and would be
interested to hear from any parties with potential proposals to that effect. It
is the Education Service’s understanding that in May 2024, a local
community group commenced the process of exploring possible transfer of
the asset (subject to closure of the School being ultimately agreed and
implemented) with the Council through the Expressions of Interest
process; and that this work is ongoing. 
12. Rural Schools – Compliance with Section 9(1) of
the Schools (Consultation) (Scotland) Act 2010
12.1 After the consultation process concluded and the Education Service received
Education Scotland’s report, officers carried out a further review of the
Proposal, having regard (in particular) to: 
• Views of pupils at affected schools as gathered during the consultation
exercise;
• Oral representations made (by any person) at the public meeting;
• The Education Scotland’s report. 
12.2 Normally, the Education Service would also be required to have particular
regard to all written representations received. However, as stated at
Paragraphs 8.1 and 9.1 above, no written representations were received by
the Service in connection with this consultation exercise. 
12.3 As part of the review of the consultation feedback, data and factual
information was checked where required and advice sought from other
Council services where necessary. This ensured that the Council met the
requirements to review the proposal under Sections 9(1) and 13(5) of the
2010 Act. In particular, given the fluidity of teacher vacancy figures in Argyll
and Bute Council (see Section 2.1, above), these have been recalculated
since the consultation was launched (December 2023). At the time of writing
this Consultation Report (July 2024), the vacancy figure has been updated to
10 fte (full time equivalent). Whilst this updated figure represents a small

Page 13

13 
reduction in teacher and Head Teacher vacancies since the consultation was
launched, it is the view of the Education Service that recruitment of teachers
continues to be a particular challenge in Argyll and Bute. 
12.4 In addition, given the passage of time since the consultation exercise opened,
officers have also reviewed and updated the financial information pertaining
to this Proposal. The annual cost of mothballing the school continues to be
approximately £13,317, and the cost to bring the property to an acceptable
standard to re-open the School continues to be approximately £29,000.
However, the costs to Education of transporting pupils to Taynuilt Primary
School have increased from £27,295 to £28,827. That figure would remain
the same if Kilchrenan Primary School were to re-open, given that both
schools are on the same bus route. Finally, the estimated annual running
costs of Kilchrenan Primary School being re-opened, occupied and
operational have increased from £179,118 to £184,427. This increase
reflects the 2024/25 salary template for employee costs. 
12.5 As part of their review, officers carried out a further assessment of the
Proposal and each of the reasonable alternatives to it as set out in the
Proposal Paper, having particular regard to the preliminary requirements for
rural school closures as set out in Section 12A of the 2010 Act. As mentioned
previously, no further reasonable alternatives to the proposal were identified
or advanced by stakeholders during or following the consultation exercise.
The Proposal and reasonable alternatives have therefore been reviewed as
follows: 
12.6 Option to re-open Kilchrenan Primary School 
12.6.1 If the school re-opened in August 2024, the projected school
roll was initially projected to be a maximum of eight. However,
the current school roll is zero as there were no enrolments to
the School since mothballing, and for the forthcoming school
year, The School roll is not projected to significantly rise in the
near future to a level that could make the School viable for re-
opening. 
12.6.2 If the School were to re-open the recruitment of staff would be
necessary. This would include a Headteacher, part time class
teacher and other ancillary staff. Previous staff employed at the
School were re-deployed when the School was mothballed.
This would mean that if the School were to re-open, staff would
need to be recruited for the School, which would incur
significant lead-in time. 
12.6.3 Argyll and Bute Council have found recruitment of teachers and
promoted posts challenging in remote rural areas, particularly
since the pandemic, and staffing remains an issue for many
schools nationally. Should Kilchrenan Primary School re-open,

Page 14

14 
staffing the school would be a significant challenge in the
current educational climate (see Paragraph 12.3, above). 
12.6.4 There are also financial implications if the School is to be re-
opened. The total annual running costs, including employees;
premises; supplies and services and catering consideration, to
re-open the School is approximately £184,427. The cost to
bring the property to an acceptable standard to re-open the
School is approximately £29,000. 
12.6.5 Whilst the School re-opening could allow community use of the
School building outside school hours, the Village Hall is in
regular use and this impact would be limited. There was very
little community support for re-opening the School during the
consultation exercise. However, it was indicated by the
consultees who participated that it could be worthwhile to
explore the re-purposing of the School building to become a
facility for the community. Formal closure of the School would
have to take place before any plans to that effect could be
progressed. 
12.6.6 The current travelling arrangements for pupils have been in
place since the mothballing of Kilchrenan Primary School.
Travel is an accepted aspect of living in the local community.
The re-opening of Kilchrenan Primary School could have a
positive impact for those pupils or staff who can cycle or walk,
but there could also be increased car usage by staff needing to
travel. However, it is noted that the School roll is currently zero
and is not predicted to rise to a level which will make the school
viable again in the near future. These positive and negative
impacts may therefore balance. 
12.6.7 There are no specific educational benefits from re-opening
the School as all
schools implement Curriculum for Excellence ensuring
effective learning and teaching matched to children’s needs.
Within current arrangements, children are benefitting from the
nursery at Taynuilt Primary School and the increased
opportunities to socialise with a wider peer group. 
12.6.8 When considering all of the above, in light of the consultation
findings, and alongside projected low pupil numbers, the
challenges in recruiting teaching staff and the considerable
expenditure needed to bring the building up to standard -
following a review of the Proposal and all of the reasonable
alternatives, re- opening Kilchrenan Primary School, is still not
considered to be a reasonable option to address the underlying
reasons behind the Proposal.

Page 15

15 
12.7 Option to continue mothballing of Kilchrenan Primary School with the pupils
zoned to Taynuilt Primary School 
12.7.1 The School roll projections have been re-examined for
Kilchrenan Primary School, and numbers of primary school
pupils in the forthcoming years are not expected to rise
significantly (based on pre-school aged children living within the
catchment area). 
12.7.2 Kilchrenan Primary School has been mothballed for over 2
years, and whilst mothballed, the building continues to
deteriorate. The current annual cost of mothballing the school
is £13,317. This includes electricity, heating oil and ground
maintenance but does not include building maintenance and
repair costs. It also does not take into account the cost to bring
the property to an acceptable standard to re-open which is
£29,000 and would rise year on year if the building remains
mothballed. The current annual transport cost for taking pupils
to Taynuilt Primary School is £28,827. 
12.7.3 Those who attended the public meeting are keen to ensure a
future for the building if possible and felt that mothballing the
School for a prolonged period could potentially affect the
sustainability for the community. The School roll is not
projected to significantly rise in the near future. 
12.7.4 There are no specific educational benefits from continuing the
mothballing of Kilchrenan Primary School. 
12.7.5 When taking into consideration assessment of the rural factors,
the continuing education of pupils at Taynuilt Primary School
would not change the current impact on the local community as
these arrangements have been in place since mothballing.
Pupil numbers at Kilchrenan Primary School are not expected
to increase. Whilst mothballed, the School building would
continue to deteriorate and would not be available for potential
community opportunities such as a community hub. There
would be no change to current travel arrangements. All schools
implement Curriculum for Excellence ensuring effective
learning and teaching matched to children’s needs. Within
current arrangements children are
benefitting from the nursery at Taynuilt Primary School and the
increased opportunities to socialise with a wider peer group.
The building’s mothballing is not of benefit to the community or
the Council. Therefore, continued mothballing would still be
viewed as not a reasonable option.

Page 16

16 
12.8 Option to re-open Kilchrenan Primary School and realign/extend its
catchment area 
12.8.1 Community feedback gathered before and during the
consultation exercise generally supports the closing of
Kilchrenan Primary School with potential for the School to be
used as a community asset. 
12.8.2 There were no written responses to the consultation received.
Therefore, there were no suggestions that re-opening
Kilchrenan Primary School and realigning its catchment area
would be a preferred alternative to the Proposal as consulted
on. 
12.8.3 There are no specific educational benefits from re-opening the
School as all schools implement Curriculum for Excellence,
ensuring effective learning and teaching matched to children’s
needs. Taynuilt Primary School is a rural school. Children from
the Kilchrenan area who attend Taynuilt Primary School did not
move from a school that is completely different from their home
environment. At Taynuilt Primary School children benefit from
increased opportunities to socialise with a wider peer group.
The re-opening of Kilchrenan Primary School and the
realignment of the catchment area would therefore still be
viewed as not a reasonable option. 
12.9 Option to close Kilchrenan Primary School and realign the catchment area for
Taynuilt Primary School to include the Kilchrenan Primary School
catchment area (the Proposal)
12.9.1 Consultation feedback generally supports the closing of
Kilchrenan Primary School with potential for the School to be
used as a community asset. Formal closure of the School would
mean any plans for community use/ownership of the School
premises could potentially be progressed. 
12.9.2 The roll for Kilchrenan Primary School is currently zero and is
not expected to rise significantly in the future. The current
occupancy rate for Taynuilt Primary School is approximately
40% with this predicted to only increase slightly in 2024/25. 
12.9.3 Current travelling arrangements for pupils have been in place
since the mothballing of Kilchrenan Primary School and there
would be no change to these arrangements for staff and pupils
should closure be implemented. Travel is an accepted aspect
of living in the Kilchrenan community. The existing school
transport service means that the additional annual transport
costs would continue.

Page 17

17 
12.9.4 There are no specific educational benefits from re-opening the
school as all schools implement Curriculum for Excellence,
ensuring effective learning and teaching matched to children’s
needs. Both Kilchrenan Primary and Taynuilt Primary are rural
schools. Children from the Kilchrenan area who attend Taynuilt
Primary School did not move from a school that is completely
different from their home environment. At Taynuilt Primary
School children benefit from increased opportunities to socialise
with a wider peer group. 
12.9.5 After further assessment of the Proposal, the underlying
reasons for it, the consultation feedback, Education Scotland’s
report, and careful consideration of the rural school factors, it
has been assessed by officers that implementation of the
Proposal would still be viewed as the most reasonable option to
address the underlying reasons why the future of Kilchrenan
Primary School is being considered. 
12.10 Officers of the Education Authority have listened carefully to the points made
at the public meeting and have considered equally carefully the Education
Scotland report. The Proposal was reviewed to consider whether any of the
representations led the Council to reconsider any other options as being
reasonable alternatives to the proposal to close Kilchrenan Primary School.
As outlined above, none of the representations led officers to conclude that
any of these options should be reconsidered as reasonable alternatives. The
Educational Benefits were reviewed in respect of the Education Scotland
report and representations made. There were no factors included in the
Education Scotland report or representations made requiring any aspect of
the Educational Benefits to be reconsidered. Further consideration was also
given to the likely effect on the local community. Having reviewed the
Education Scotland report and feedback from consultees in respect of the
proposal and each of the reasonable alternatives, officers are of the view that
implementation of the Proposal continues to be the most appropriate
response to the underlying reasons for its formulation. 
12.11 Officers concluded that the educational benefits of the Proposal far outweigh
any potential disadvantages. Formal closure of the School will allow any
plans to acquire the building to be progressed by the local community, which
in turn will increase the availability of the premises to the community and even
benefit the sustainability of the community. Implementation of the Proposal
would have a neutral impact on travelling arrangements, as these have been
in place since the mothballing of Kilchrenan Primary School in 2022. The
overwhelming majority of consultation feedback received is not in support of
Kilchrenan Primary School being re-opened for educational provision.
Education Scotland’s report is also supportive of the Proposal. 
12.12 The Education Service has carefully considered the points made at the public

Page 18

18 
meeting, at the pupil focus groups and within Education Scotland’s report.
Officers duly carried out a review of the Proposal and all the reasonable
alternatives, and have concluded that the Proposal remains the best solution
to address the underlying reasons for the Proposal, as set out at Section 2 of
this Report. Implementation of the Proposal will allow children in the present
Kilchrenan Primary School catchment area to have access to increased
learning opportunities, wider experiences and better socialisation through
being part of a larger school with more modern facilities. There are insufficient
parents/carers within the Kilchrenan Primary School catchment area
indicating a wish to place their children there to make the school viable for re-
opening. If the school were to remain mothballed this would be a continuing
drain on the Council’s resources. Implementation of this Proposal will assist
the Council to deliver ‘Best Value’ through making more efficient and
effective use of its resources. Furthermore, the Council will continue to support
local groups within the Kilchrenan community to explore options for potential
future use of the School premises. 
13. Alleged Omissions or Inaccuracies
13.1 Section 10(3) of the 2010 Act places a requirement on the Council to provide
details of any inaccuracy or omission in the Proposal Paper which has either
been identified by the Council or raised by consultees. This provision also
requires the Council to provide a statement on the action taken in respect of
the inaccuracy or omission, or if no action was taken, to state that fact and
why. 
13.2 In the course of the statutory consultation relating to the proposed closure
of Kilchrenan Primary School, there were no areas identified by the any
consultees, or officers, as being inaccurate. 
13.3 The Education Service would also like to highlight that data relating to pupil
numbers and teacher vacancy numbers are by their nature fluid, were
accurate at the time of writing, and have been reviewed as this process
progressed (see Paragraph 12.3, above). 
14. Opportunity to Make Representations to the Scottish
Ministers
14.1 If the Education Authority makes a closure decision, it shall notify the Scottish
Ministers within six working days of that decision and publish the fact that
the Scottish Ministers have been notified, and that representations can be
made to them. The Education Authority would also be required to publish a
notice on its website of the decision to implement the Proposal, and why it
has been satisfied that closure is the most appropriate response to the
reasons for formulating the Proposal.

Page 19

19 
14.2 The Scottish Ministers will have a maximum of eight weeks to call in any
closure decision made by the Education Authority in certain circumstances.
This eight week timeframe would consist of an initial three weeks from the
date of decision, during which representations can be made to the Ministers,
and a further five weeks for the Scottish Ministers to decide whether to issue
a Call-In Notice. During this period the Education Authority will not proceed
to implement any closure decision. If the Scottish Ministers call-in a closure
proposal, it will be referred to the Convener of the School Closure Review
Panels. The Convener must constitute a School Closure Review Panel within
seven days for determination. The Education Authority may not implement a
closure decision in whole or in part until the Panel has made its
determination. It will usually issue a decision within eight weeks of the Panel
being constituted. 
14.3 If the School Closure Review Panel refuses to consent to the closure
decision, or following publication of the Consultation Report, the Education
Authority decides not to implement the closure proposal, the Education
Authority cannot publish a further closure proposal in relation to the school for
five years, unless there is a significant change in the school’s circumstances. 
15. Conclusion
15.1 It is proposed that education provision at Kilchrenan Primary School be
permanently discontinued with effect from 29th November 2024; and that the
catchment area of Taynuilt Primary School shall be extended to include the
current catchment area of Kilchrenan Primary School. 
15.2 This is considered to be the best option to address the reasons for the
Proposal which are: 
• Kilchrenan Primary School has been mothballed for over two years. The
School roll is currently zero and not predicted to rise significantly in the near
future.
• Along with several other rural local authorities, Argyll and Bute Council is
facing increasing challenges in recruiting staff. At the time of writing there are
10 fte (full time equivalent) vacancies for both teachers and Head Teachers
in Argyll and Bute.
• Whilst the School is mothballed, the building is deteriorating, with limited
budget for maintenance. The costs of continued mothballing, and of bringing
the fabric of the school to the required standard for any re-opening, are also
considerable.

Page 20

20 
16. Recommendation 
16.1 On the basis of the consultation responses received, Education Scotland’s
report, and having particular regard to the specific factors for rural school
closures, it is recommended that education provision at Kilchrenan Primary
School be permanently discontinued with effect from 29th November 2024;
and that the delineated catchment area of Taynuilt Primary School shall be
permanently extended to subsume the whole delineated catchment area of
Kilchrenan Primary School.

Page 21

Argyll and Bute Council
Education 
Review of Education Provision
Kilchrenan Primary School 
PROPOSAL DOCUMENT: December 2023
APPENDIX 1

Page 22

2 
Proposal for the closure of Kilchrenan Primary School 
SUMMARY PROPOSAL
It is proposed that education provision at Kilchrenan Primary School be discontinued
with effect from 29th November 2024. 
The catchment area of Taynuilt Primary School shall be extended to include the current
catchment area of Kilchrenan Primary School. 
Reasons for this proposal 
Following examination of several options, this is the best option to address the reasons
for the proposal which are:
• Kilchrenan Primary School has been mothballed for 21 months. The school roll
is currently zero and not predicted to rise significantly in the near future.
• Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 13.17 fte (full time
equivalent) vacancies for both teachers and Head Teachers in Argyll and Bute.
• While the school is mothballed, the building is deteriorating, with limited budget
for maintenance. The costs of continued mothballing, and of bringing the fabric
of the school to the required standard for any re-opening, are also considerable. 
This document has been issued by Argyll and Bute Council in regard to a proposal in
terms of the Schools (Consultation) (Scotland) Act 2010 as amended. This document
has been prepared by the Council’s Education Service with input from other Council
Services. 
DISTRIBUTION 
A copy of this document is available on the Argyll and Bute Council website:
https://www.argyll-bute.gov.uk/school-consultations-and-proposals
A summary of this document will be provided to:
• The Parent Councils of the affected schools
• The parents of the pupils at the affected schools
• Parents of children expected to attend an affected school within 2 years of the
date of publication of this Proposal Document
• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools

Page 23

3 
• The teaching and ancillary staff at the affected schools
• The trade unions representatives of the above staff
• Argyll and Bute Councillors – (Ward 5: Oban North and Lorn)
• Kilchrenan Community Council
• Taynuilt Community Council
• Community Planning Partnership
• Relevant users of the affected schools
• The Constituency MSP
• List MSPs for the area
• The Constituency MP
• Chief Superintendent, Police Scotland
• Chief Executive, NHS Highland
• Chief Executive Strathclyde Partnership for Transport (SPT)
• Area Commander, Fire Scotland
• Education Scotland
A copy of this document is also available from: 
▪ Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT
▪ Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
▪ Oban Public Library, Albany St., Oban PA34 4AL
▪ Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
▪ Taynuilt Primary School, 2 Strathview, Taynuilt, PA35 1JF
▪ Oban Education Offices, Willowview, Soroba Road, Oban PA34 4SB
▪ Kilchrenan Village Hall, Kilchrenan, PA35 1HE

Page 24

4 
This document is available in alternative formats or in translated form for readers
whose first language is not English.
If you would like this document in another language or format, or if you require the
services of an interpreter, please apply to the Executive Director, Argyll and Bute
Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT. 
Jezeli chcieliby Pañstwo otrzymaO ten dokument w innym jzyku lub w innym
formacie albo jeeIi potrzebna jest pomoc Uumacza, to prosimy o kontakt z nami.

Page 25

5 
1 INTRODUCTION
1.1 On 10th March 2022, Argyll and Bute Council approved the mothballing of
Kilchrenan Primary School. It was agreed that the premises be retained for
two years on a care and maintenance basis and that a review of the school’s
mothballing would be prepared for the Committee’s March 2023 meeting,
when Members could decide on a continued period of mothballing, or request
that officers begin an engagement process, carried out in accordance with the
preliminary requirements of the Schools (Consultation) (Scotland) Act 2010, to
consider the future options for Kilchrenan Primary School. It was also agreed
that the community could have pre-arranged access to the School premises
for community functions during the period of mothballing. 
(Public Pack)Agenda Document for Community Services Committee,
10/03/2022 10:30 (argyll-bute.gov.uk) 
1.2 On 9th March 2023, the Community Services Committee approved the
continued mothballing of Kilchrenan Primary School and agreed that the
Education Service begin gathering necessary information and carry out the
exercise of assessing the options for the future of Kilchrenan Primary School,
in accordance with the preliminary requirements of the Schools
(Consultation)(Scotland) Act 2010. 
(Public Pack)Agenda Document for Community Services Committee,
09/03/2023 10:30 (argyll-bute.gov.uk) 
1.3 The Community Services Committee received a report on 24th August 2023
providing details of the Options Appraisal for Kilchrenan Primary School, carried
out in accordance with the preliminary requirements set out in Section 12A of
the Schools (Consultation) (Scotland) Act 2010, as amended. The Committee
agreed to note the outcome of this consideration of the preliminary requirements
and requested that officers formulate a draft proposal for consideration at the
meeting of the Community Services Committee on 14th December 2023 which,
if approved, would subsequently trigger the formal consultation process under
the Schools (Consultation) (Scotland) Act 2010. 
Agenda for Community Services Committee on Thursday, 24 August 2023,
10:30 am - Argyll and Bute Council (argyll-bute.gov.uk) 
1.4 The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young
People (Scotland) Act 2014. The Act, as amended, introduced a presumption
against closure of a rural school and details specific requirements which the
education authority is required to follow if they are formulating a proposal to
close a rural school. This includes the introduction of certain preliminary
requirements which must be satisfied prior to the formulation of a proposal.

Page 26

6 
1.5 In addition, the Community Empowerment (Scotland) Act 2015 sets out a
statutory right for community organisations to request the transfer of local assets
into local community ownership/management. This may be something that the
Community wish to consider as part of or as a consequence of this process.
Public bodies including Councils must consider such requests and make a
decision within six months of receiving a valid request. 
1.6 Kilchrenan Primary School has had zero pupils enrolled since elected members
approved its mothballing. 
1.7 There is a requirement to have special regard to the rural schools factors prior
to formulating a proposal to close a rural school. In particular it is necessary to
consider any reasonable alternatives before considering closure. It is also
necessary to consider the impact on the wider community of a potential closure
and the impact of any different travel arrangements. These factors have been
considered in the preliminary requirements which were undertaken prior to this
proposal being written. A full assessment of the preliminary requirements is set
out in the Options Appraisal, which is attached as Appendix 5. 
1.8 A new Corporate Plan (2023-2027) was agreed by the Council on 29th June
2023. The Plan contains the new set of Council Priorities. The Argyll and Bute
Corporate Plan 2023-2027 states its vision of a successful and vibrant Argyll
and Bute with a growing population and thriving economy. The area has a rich
mix of remote, rural and island communities. The Council will use its strong track
record in partnership working, at all levels, to secure the best possible outcomes.
In the Corporate Plan for 2023-2027, through the agreed priorities, the Council
undertakes to ensure the following: 
• Children and young people will attain and achieve at all stages We will
improve outcomes for our children and young people;
• Our schools are effective, sustainable learning environments;
• Continued support for all of our children and young people with additional
support needs across Argyll and Bute, within our schools and other
service areas;
• We will support connections to, from and within Argyll and Bute;
• Recognition of the importance of marine connections to and from our
island and mainland communities and our role in maintaining these links;
• We will reduce our carbon emissions;
• We seek to increase availability of all types of housing, including
affordable homes;
• We build up and strengthen our communities as attractive, vibrant places
to live, work and do business;
• We make assets work now while we plan for and invest in the future;
• We commit to working in partnership wherever we need to as well as
calling on others, with responsibility, to take the action that is required to
safeguard Argyll and Bute’s success.

Page 27

7 
1.9 The Council, as an Education Authority, has a statutory duty in terms of the
Education (Scotland) Act 1980 to make adequate and efficient provision of
school education across its entire area for the current school population and
future pattern of demand. This is reflected in “Our Children, Their Future” which
is the Education Vision and Strategy for Argyll and Bute Council. 
2 PROPOSAL 
2.1 It is proposed that education provision at Kilchrenan Primary School be
discontinued with effect from 29th November 2024, and that the catchment area
of Taynuilt Primary School shall be extended to include the current catchment
area of Kilchrenan Primary School. 
Reasons for the Proposal 
2.2  This is the best option to address the underlying reasons for the proposal which
are: 
1. Kilchrenan Primary School has been mothballed for 21 months. The school
roll is currently zero and is not predicted to rise significantly in the near
future. 
2. Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing, there are 13.17 full- time
equivalent (fte) vacancies across Head Teacher and teacher posts.
3. While the school is mothballed, the building is deteriorating, with limited
budgets for maintenance. The costs of continued mothballing, and of
bringing the fabric of the school to the required standard for any re- opening,
are also considerable. 
Additional Considerations
• The Council needs to allocate its resources in a way that ensures the quality of
all of its services;
• This proposal will bring educational benefits and assist in ensuring that the
Education budget is more sustainable into the future. This proposal document
contains an Educational Benefits Statement;
• The costs per pupil in under-occupied schools are excessively high;
• Schools in the Council area are expensive to maintain and operate. Retaining
unnecessary accommodation is a serious drain on the resources of the Council
and diverts spending from areas that directly affect the educational attainment
of pupils; and

Page 28

8 
• There is no realistic possibility at present of the Council being able to bring its
whole school estate up to a satisfactory condition. The present condition is
unsustainable and can only be improved by reducing the extent of the estate. 
3 PRELIMINARY REQUIREMENTS 
3.1 The Council is required to consider the future of Kilchrenan Primary School, as
it has been mothballed for almost two years. The Council have considered the
reasons for making this proposal, and have also considered other viable
alternatives, the likely effect on the community and the likely effect of different
travelling arrangements as a consequence of this proposal. Financial
implications have also been considered. Some of these figures have been
recalculated since the Options Appraisal was produced. 
3.2 The Council considered how the implementation of this proposal would impact
on the education of the children affected. The Council also considered the
impact on the children who currently live in the catchment area but attend other
schools, as well as children who may potentially live in the catchment area in
the future. 
3.3 The place of the school in the community was also considered, in terms of the
impact this proposal would have on the sustainability of the community itself.
Since the mothballing of the School, the community has not used the school or
the school grounds. Kilchrenan Village Hall is used as the community hub, is
situated centrally within Kilchrenan village and is well equipped and appointed,
having been recently refurbished. 
3.4 Impact on the environment was taken into account during the initial pre-
consultation process. This included a consideration of the transport implications
if this proposal were to be implemented, as children would have to travel by bus
to attend Taynuilt Primary School, although extensive use of bus transport had
previously been necessary to bring children to Kilchrenan each day. 
3.5 Four options were presented to the local community by the Council for
consideration during the pre-consultation phase, as required by section 12A of
the 2010 Act. 
3.6 Of the four options which were considered by the community and the Council;
(d) is the option favoured by the Council, as it was considered that it most
adequately addressed the reasons for the proposal. The four options were: 
a) Re-open Kilchrenan Primary School;
b) Continued Mothballing of Kilchrenan Primary School with pupils zoned to
Taynuilt Primary School;
c) Re-open Kilchrenan Primary School and realign its catchment area;
d) Close Kilchrenan Primary School and realign its catchment area to Taynuilt
Primary School (The Proposal).

Page 29

9 
When considering the above options during the Options Appraisal process, the
following factors were key in arriving at option (d) as the most appropriate
response to the underlying reasons behind consideration of this proposal:
• the positive educational benefits of attendance at Taynuilt Primary
School;
• projected low pupil numbers at Kilchrenan Primary School, and the
associated impact on pupils’ educational progress and social
development;
• the challenges in recruiting and retaining teaching staff;
• the considerable expenditure needed to bring the Kilchrenan Primary
School building up to the required standard for reopening;
• the lack of expressed local support for reopening Kilchrenan Primary
School.
3.7 Following an initial Options Appraisal which was presented to the Council’s
Community Services Committee on 24th August 2023, it was agreed that the
preliminary requirements had been satisfied enabling this Proposal Paper to be
formulated, with the option to close Kilchrenan Primary School and realign its
catchment area to Taynuilt Primary School being identified as the most
adequate means of addressing the reasons for considering possible proposals. 
3.8 During the preliminary consultation regarding the future options for Kilchrenan
Primary School, there were a range of viewpoints gathered from parents, young
people and members of the community. 
3.9 Almost all in the community felt that continuing to mothball the school was not
an option. It was felt that a decision should be made as the building would only
continue to deteriorate. The option of re-opening the school, but with a wider
catchment area was not seen by any consulted during the Options Appraisal as
a viable option. A small number of those consulted expressed a wish for
Kilchrenan Primary School to reopen, but the majority conveyed their
contentment with the provision and situation which had been in place since
mothballing: principally, the quality of educational provision at the other schools
children were now attending; the positive effect attendance at such schools was
having on children; the relative lack of change in transport arrangements; the
benefits to the receiving school(s) and the absence of negative impact
experienced thus far on the Kilchrenan community following mothballing. 
3.10 Closing the school would have no impact on staff or pupil travel arrangements
in place since mothballing. There would be little or no alteration to the current
environmental impact. 
Alternatives to the Proposal 
3.11 The community engagement process prior to the drafting of this Proposal
considered the views of members of the community and also considered any

Page 30

10 
other alternatives to the closure of Kilchrenan Primary School. Full details of the
community engagement, and the findings from the fulfilling of preliminary
requirements, are set out in Appendix 5.
3.12 In conclusion, after the pre-consultation with the community, the Council feels
that the proposal to close Kilchrenan Primary School and realign its catchment
area to Taynuilt Primary School is the most reasonable means to address the
underlying reasons for considering the future of Kilchrenan Primary School.
Further detail is provided below in relation to educational benefits, travel,
environmental impact, community impact and financial impact. 
4 ASSESSMENT OF THE PROPOSAL 
4.1 It is proposed that education provision at Kilchrenan Primary School be
discontinued with effect from 29th November 2024. The catchment area of
Taynuilt Primary School shall be extended to include the current catchment area
of Kilchrenan Primary School. 
4.2 Kilchrenan Primary School has been mothballed for 21 months. The school
condition is deteriorating with limited budgets for maintenance. The school roll
is currently zero and is not predicted to rise significantly in the near future. 
4.3 Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 13.17 fte vacancies
for Head Teachers and Teachers in Argyll and Bute.
4.4 The costs of continued mothballing, and of bringing the fabric of the school to
the required standard for any re-opening, are also considerable. 
4.5 The current annual cost of mothballing the school premises is £13,317 
4.6 The Council needs to allocate its resources in a way that ensures the quality of
all of its services. 
4.7 This proposal will bring educational benefits and assist in ensuring that the
Education budget is more sustainable into the future. 
4.8 The costs per pupil in under-occupied schools are excessively high. 
4.9 Schools in the Council area are expensive to maintain and operate. Retaining
unnecessary accommodation is a serious drain on the resources of the Council
and diverts spending from areas that directly affect the educational attainment
of pupils. 
4.10 There is no realistic possibility at present of the Council being able to bring its
whole school estate up to a satisfactory condition. The present condition is
unsustainable and can only be improved by reducing the extent of the estate.

Page 31

11 
4.11 As part of the preliminary requirements in the drafting of this proposal, the
Council considered four options. The favoured option by the Council is (d),
below, as it was considered it most adequately addressed the reasons for the
proposal.
a) Re-open Kilchrenan Primary School;
b) Continued Mothballing of Kilchrenan Primary with the pupils zoned to
Taynuilt Primary School;
c) Re-open Kilchrenan Primary School and realign its catchment area;
d) Close Kilchrenan Primary School and realign its catchment area to
Taynuilt Primary School (The Proposal). 
4.12 Having considered these other alternatives the Council does not consider them
to be viable alternatives to the closure proposal at this juncture, and will proceed
to consult on the proposal to close Kilchrenan Primary School and extend the
catchment area of Taynuilt Primary School to include the current catchment
area for Kilchrenan Primary School. 
4.13 The Council has undertaken an appraisal of impact were this proposal to be
implemented. 
4.14 This includes an assessment of:
• the school roll and predicted school roll;
• teacher numbers;
• the condition of the building; 
4.13 The Council has carefully considered and reviewed the steps it has taken to
address the underlying reasons for the proposal (as outlined at Section 2.2,
above), prior to formulating this Proposal Paper. 
4.13.1 In relation to the reduction to zero of the school roll, and no material
increase being predicted in coming years, the Council mothballed the
school almost two years ago as a result of such changes to the school’s
circumstances. The Education Authority decided to mothball the school
as a temporary measure, in order to monitor the situation and assess
whether there was any likelihood of the school roll increasing to the
extent that the school could become viable again in the near future. The
mothballing was subject to review at least annually and the Education
Service undertook to review the position should any further school-age
pupils move into the catchment area and/or if there was demonstrated a
sufficient level of demand for the school to justify its re-opening. During
the period of mothballing, no placing requests have been made to
Kilchrenan Primary School, and no children within the catchment area
have applied to enrol in the school. As mentioned above, the school has
been mothballed for 21 months, and its roll is not predicted to rise in
coming years to a level which would make the school suitable for re-
opening. As there has been no material change in the

Page 32

12 
circumstances evidenced, and having kept the position under review over
the past two years, the Education Service are of the view that matters
should now move forward in the form of a statutory closure consultation
in order to determine the future of Kilchrenan Primary School. This
approach aligns with that suggested by the Statutory Guidance for the
2010 Act, and Paragraphs 63-65 in particular. Further details in relation
to the school roll are set out at Section 5 of this Proposal Paper. 
4.13.2 In relation to the underlying reason for this proposal regarding
recruitment of teachers, the issues that have been faced by the
Education Service regarding the recruitment of teachers to Kilchrenan
Primary School are detailed at Section 6 of this Proposal Paper. When
the previous Head Teacher retired in February 2022, attempts to recruit
a new Head Teacher were unsuccessful, which triggered considerations
relating to the mothballing of the school. Since 2020, in order to address
this particular issue, and prior to formulating this proposal, the Education
Service have offered a number of posts across the Authority area on a
permanent basis to a locality, rather than to a school, as an attempt to
increase the likelihood of attracting a permanent post. The Council has
also entered into a strategic housing agreement with social housing
partners to support staff with sourcing accommodation (which is a
particular pressure in remote areas of Argyll and Bute), as well as offering
relocation packages. Furthermore, the Education Service continues to
work with UHI Argyll to recruit more local candidates for teacher training.
Notwithstanding these efforts, the recruitment of teaching staff within
Argyll and Bute remains a considerable challenge, and constitutes a main
underlying reason for this closure proposal.
4.13.3 In relation to the underlying reason for this proposal concerning the
condition of the school premises, the school property will continue to
deteriorate while it remains mothballed. As mentioned at Paragraph
4.13.1, above, there is currently no evidence to suggest that the school
will become viable for re-opening in the near future. While the school
remains mothballed, it costs the Council £13,317 annually. Accordingly,
if the Proposal is subsequently implemented following a statutory
consultation process, it will allow the Education Service to use any
savings generated to the benefit of the other occupied schools and all
pupils within the Education Authority’s area. It would also allow any plans
for alternative usage of the school property to be progressed, as the
school building will require to be permanently discontinued as an
educational establishment before any such initiatives can be pursued.
Further details about the condition of the school building are set out within
Section 7 of this Proposal Paper. 
4.14 The Council has also undertaken an assessment of likely educational benefits
or effects which this proposal may have, if implemented, on: 
• the pupils of any affected school;

Page 33

13 
• any other users of the school’s facilities;
• any children who would (in the future, but for implementation of the
closure proposal) be likely to become pupils of the school; and
• the pupils of any other schools in the Council area
4.15 In addition, the Council has also considered how to minimise or avoid any
adverse educational effects that may arise from the implementation of this
proposal. 
4.16 As Kilchrenan Primary School is classified as a very remote rural school, the
Council has also given special regard to the following factors if this proposal
were to be implemented:
• the likely effect on the local community, as assessed in terms of:
o the sustainability of the community; and
o availability of the school’s premises and other facilities for use by
the school community. 
• the likely effect caused by different travelling arrangements, as assessed in
terms of the impact of such arrangements on:
o the environment; and
o the school’s pupils and staff and other users of the school’s
facilities. 
4.17 Finally, the Council has also considered the financial implications of
implementation of the proposal, and information on this is set out later in this
document. 
5 SCHOOL ROLL 
5.1 The information in relation to school rolls as shown below is drawn from the
yearly pupil census which takes place in September each year. Past pupil
numbers are historic data from past pupil censuses. Pupil projections are based
on the 2022 pupil census. School rolls by their nature may fluctuate slightly on
an ongoing basis due to changes in pupil numbers as a result of pupils moving
to and from the catchment area and parents/carers exercising their right to make
placing requests. 
The school roll of Kilchrenan Primary School has seen a considerable and
consistent declining trend since 2006. 
Table 1 shows the historic and current pupil numbers for both Kilchrenan and
Taynuilt Primary schools. Table 2 shows the predicted roll for both schools until
2026-2027. It should be noted that the projected roll figures for Kilchrenan
Primary School are based on the number of primary school-age children
projected to be within the catchment area, and does not take account of parental
decisions to send their children to other schools in the authority.

Page 34

14 
Table 1 
Kilchrenan PS Taynuilt PS
Capacity 41 163 
Roll Roll
2006-07 23 72
2007-08 20 77
2008-09 19 79
2009-10 18 78
2010-11 10 88
2011-12 10 81
2012-13 8 81
2013-14 7 83
2014-15 4 91
2015-16 4 83
2016-17 9 82
2017-18 6 79
2018-19 7 72
2019-20 8 69
2020-21 12 67
2021-22 6 70
2022-23 0 66
2023-24 0 55 
Table 2 
Kilchrenan PS Taynuilt PS
Roll Roll
Capacity 41 163
2024 -2025 0 60
2025-2026 2 55
2026-2027 0 48 
In August 2023, no primary 1 pupils registered to attend Kilchrenan Primary
School for session 2023-24. 
5.2 The Kilchrenan Primary School roll dropped to zero over the course of the 2021-
2022 school year (see Table 1, above). Projected pupils within the catchment
area (as set out in Table 2, above) do not reflect the number of

Page 35

15 
pupils who would be attending Kilchrenan Primary School because parents
choose to send their children to Taynuilt PS or to the local denominational
primary school for the area, St. Columba’s PS in Oban. 
5.3 Kilchrenan Primary School catchment area includes the following development
management zones: Inverinan, Dalavich, Kilchrenan and Annat settlements,
also countryside and remote countryside zones. 
5.4 An area of the Kilchrenan Primary School catchment falls within the Tobermory-
Oban-Dalmally Growth Corridor identified in the Proposed Local Development
Plan 2. 
5.5 There are approved consents for 19 dwelling houses within the past three years,
the majority being in close proximity to the primary school. 
5.6 There are an additional two dwellings under construction with consents over
three years old. The two dwellings under construction are technically from
consents for two dwellings each where one dwelling has been completed on
each site. There is no evidence that either of these second units are actively
under construction. With the consents being over three years old, neither
second dwellings may ever reach construction stage. 
5.7 Six further housing units are allocated to H4026.
5.8 The number of planning permissions for dwellings do not include any granted
after 30th June 2023. They include both planning permission and planning
permission in principle. They do not include any dwellings from planning
applications that are pending a decision. One consented dwelling has been
discounted from the figures as it involves the demolition of a fire damaged
dwelling. 
5.9 There is a mineral allocation M4005, Barachander Quarry, within the catchment
area. 
6 TEACHER NUMBERS 
6.1 Teacher numbers are improving nationally, with a 6.3% increase in the number
of teachers nationally from 2016 – 2022. In Argyll and Bute there has been a
3.1% reduction in the fte number of teachers from 2016 – 2022. 
6.2 As the school has been mothballed for almost two years, the issue of recruitment
of staff to Kilchrenan Primary School has not changed. At the time of writing,
there are 13.17 fte vacancies for Head Teachers and class teachers in Argyll
and Bute. Schools within the area have struggled to recruit staff, particularly in
relation to Head Teachers and supply staff. Despite a sustained effort to secure
staff, there is no reason to think that staffing would not continue to be a
considerable challenge for Kilchrenan Primary School.

Page 36

16 
6.3 At the current time, if the proposal was to be accepted, there would be no impact
on staffing levels at Taynuilt Primary School. 
7 CONDITION OF THE BUILDING 
7.1 Argyll and Bute Council’s School Estate Management Planning process
identified in 2022 that the condition of Kichrenan Primary School was
satisfactory and graded a B. Outlined in the Options Appraisal (Appendix 5 –
section 6.3) are the full financial details of costs relating to the re-opening the
building or continuing to retain the building in mothballed status (the latter is also
detailed in Appendix 4). 
7.2 As part of the consultation process, the Council would be open to discussion
with the community with regard to the future of the building. There would exist
the possibility of transferring the building to a recognised community group
through the provisions of the Community Empowerment (Scotland) Act 2015 or
some other agreed mechanism, which could provide the opportunity to utilise
the building for benefit of the community and as a potential driver of regeneration
that could enhance the sustainability of the community. 
One such proposal from a local group relates to the use of the building as a hub
for local small businesses, and subsequently as a key part of the infrastructure
of a proposed Regional/National Park, proposals for which have been submitted
to the Scottish Government by the local community. 
8 EDUCATIONAL BENEFITS 
Assessment of likely educational benefits for pupils 
8.1 Should this proposal be implemented, the Council believes that there will arise
considerable educational benefits. These centre around:
• Learning and teaching;
• Educational Outcomes;
• Broadening the range of opportunities for children; and
• The environment for learning. 
8.2 The principles of Curriculum for Excellence recognise the professionalism of
teachers in exercising freedom and responsibility in their practice, within the
context of broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. All
schools in Argyll and Bute implement Curriculum for Excellence, ensuring
effective learning and teaching which is matched to the needs of children. 
8.3 Scottish Government classification defines both Kilchrenan and Taynuilt Primary
Schools as remote rural schools. However, Taynuilt Primary School

Page 37

17 
has a more accessible location in a larger village. Children from the Kilchrenan
area attending Taynuilt Primary School are benefitting from learning with a
greater number of peers of the same age and stage as themselves, as opposed
to experiencing a single, multi-composite classroom. Pupils also benefit from
the increased friendship groups that a larger school can offer, and from being
part of a social context in which they can build relationships with different groups
and individuals, develop social skills, meet challenges and exercise
responsibilities as members of a social group. They are able to interact and
socialise with larger groups of children, take part in team activities and move
with an established group of friends and peers to secondary school at Oban
High School. 
8.4 Learning and Teaching 
8.4.1 The following focuses on learning and the curriculum at Taynuilt Primary
School, which is the school most children in the Kilchrenan Primary
School catchment area have been attending since February 2022, and
which would be the future receiving school for children presently living
within the Kilchrenan Primary School catchment area. 
8.4.2 The curriculum at Taynuilt Primary School includes a broad range of
planned experiences, to help every child and young person to develop
knowledge, skills and attributes for success in learning, life and work. 
8.4.3 In Taynuilt Primary School, children are encouraged to be eager and
active participants who are engaged, resilient and highly motivated
during their learning. Children know that their views are sought, valued
and acted upon. The learning environment encourages a high level of
achievement, providing a wide range of opportunities for children to
achieve their full potential within the four contexts of learning – curriculum
areas and subjects, interdisciplinary learning, the ethos and life of the
school and opportunities for personal achievement. 
8.4.4 In Taynuilt Primary School, children are taught in composite classes
composed of children from no more than two year groups. Children
benefit from being part of a social context in which they can build
relationships with different groups and individuals, develop social skills,
meet challenges and exercise responsibilities as members of a social
group. They are able to interact and socialise with groups of children
through a variety of learning activities, as well as take part in team
activities and move with their peers to secondary school. 
8.4.5 There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and outcomes
of Curriculum for Excellence. The National Improvement Framework
priorities include raising attainment for all, and closing the gap between
the most and least disadvantaged children.

Page 38

18 
8.4.6 The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of such professionalism
in exercising autonomy, creativity and responsibility, in the context of
broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community.
The Head Teacher of Taynuilt Primary School leads a team of staff who
are challenged and supported through a range of continuing professional
review and development opportunities. The school is part of the Oban,
Lorn and the Isles Schools Cluster, which means that staff can be
supported to work together, moderation and tracking of pupil progress is
enabled and staff work collaboratively across stage- appropriate groups.
Colleagues within Taynuilt Primary School are able to support and
challenge each other on a daily basis. The whole staff are able to bring a
range of talents and skills to benefit outcomes for learners. 
8.4.7 Taynuilt Primary School has been focusing strongly on the development
of children’s understanding of their rights – the role of children’s rights in
wellbeing, sustainable living and school improvement – and working
towards Rights Respecting School accreditation. A further key focus for
the school is the empowerment of parents/carers in shaping and
participating in policy, learning and the life and ethos of the school
through a strong parent council and a vibrant parental voice. A third
improvement focus for the school community has been to develop further
the use of self-evaluation and attainment data to inform improvement
planning at whole-school level, and to support appropriate, effective,
timely interventions for children in their learning and attainment. Other
ongoing improvement priorities include supporting digital learning,
developing Reading through targeted interventions, supporting progress
in Numeracy through the use of Stages in Early Arithmetical Learning,
and promoting Pupil Leadership of activities and initiatives, and
ownership of and engagement with their own learning. 
8.4.8 Taynuilt Primary School encourages outdoor learning activities and
learning through play. Partnership working with local employers and the
Parent Council has helped to develop resources and outdoor learning
zones to support this approach. The poly-tunnel supports children’s
understanding of health and wellbeing, bio-diversity and sustainability. 
8.4.9 Taynuilt Primary School is located within the village of Taynuilt, which,
like Kilchrenan Primary School, is classed as a very remote rural school.
The Head Teacher has a strong understanding of the rural communities
that the school serves. 
8.4.10 Taynuilt Primary School has its own linked ELC on site, with which it
coordinates an active transition calendar. The school also has strong
links with Oban High School with which it liaises, alongside all other OLI
schools, throughout the year to ensure a smooth transition for P7 pupils
into S1.

Page 39

19 
8.5 Educational Outcomes
8.5.1 Through the Getting it Right for Every Child (GIRFEC) practice model,
meeting the needs of every child continues to be a key priority for staff at
Taynuilt Primary School, and teachers carefully plan and assess to
ensure each child has the opportunity to reach their potential. Careful
tracking and monitoring procedures are in place to evidence pupil
progress. This includes professional dialogue with teachers, learning
discussions with children, classroom observations, assessment and
analysis of pupil work. As a result of such practice, appropriate
interventions are put in place, involving parents/carers and other
agencies to ensure the needs of each child are met. 
8.5.2 In Taynuilt Primary School, most children are achieving the expected
levels for their stage in Reading, Writing, Listening and Talking and
Numeracy. The attainment of children at Taynuilt Primary School is
strong: between 2019 and 2023, attainment levels for P1, P4 and P7
pupils at Taynuilt Primary School in Numeracy and across the three
areas of Literacy (Reading, Writing and Listening and Talking) were
above the Argyll and Bute and National averages. 
8.5.3 Taynuilt Primary School continues to develop positive relationships within
the school through a focus on Nurture and Rights Respecting Schools.
The larger staff, parent/carer body and partner group of the school
naturally increases the breadth of talent and interest that may be
available to share within a school setting. This applies both in terms of
the wider curriculum and within aspects of the curriculum that may be
enhanced by staff individual expertise e.g. PE, languages, science,
expressive arts teaching. 
8.6 Experiences – Broadening the Range of Opportunities 
8.6.1 Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and physical
wellbeing both now and in the future. Taynuilt Primary School has been
evaluating its community links as part of its Covid Recovery Plans,
providing enhanced opportunities for social interaction and skills
development. 
8.6.2 There is also a strong transition planning process between Taynuilt
Primary School and Oban High School, which creates increased
opportunities for children to participate and to make new connections.

Page 40

20 
8.6.3 Children at Taynuilt Primary School are provided with a variety of
experiences to develop their sense of responsibility, independence,
confidence and to develop their creativity and enterprise skills.
8.6.4 Across the school, children are engaged with learning and contribute well
in lessons. Staff promote positive relationships at all levels, the impact of
this being that children enjoy good relationships with their peers. The
pupil voice is strong, and young leaders feel confident, entrusted and
empowered to take developments forward. 
8.7 Environment for Learning 
8.7.1 Taynuilt Primary School is a suitably-equipped and well supported
school, situated in the village of Taynuilt. The school building is graded
highly suitable for effective educational provision (Suitability Rating A)
and the grounds and surroundings are extensive and attractive, providing
ample space for play and outdoor learning. The building has facilities for
pupils and visitors with special access needs. 
8.7.2 Children from Kilchrenan Primary School attending Taynuilt Primary
School maintain links with friends who live in their own villages as well as
creating links with children from within the present Taynuilt catchment
area. These relationships also extend into clubs and activities that take
place in Taynuilt and Oban beyond the school day. Such relationships
enhance learning in school for pupils. 
8.7.3  In summary, were this proposal for the closure of Kilchrenan Primary
School to be implemented, there would be a range of educational benefits
for pupils, as summarised in the paragraphs above. There are benefits
for the development of social and emotional skills, as well as the
educational benefits resulting from access to a more diverse curriculum.
Overall, the learning environment in Taynuilt Primary School also offers
children the opportunity to participate in a wider range of high-quality
learning experiences across the four curricular contexts – learning across
subject areas, interdisciplinary/project learning, the broader life of the
school and pupils’ opportunities for achievement. 
8.8 Assessment of likely educational benefits on other users of the school’s
facilities 
8.8.1 Implications for staff 
8.8.1.1 Should this proposal be implemented, there will be no new
implications for teaching and ancillary staff in Taynuilt Primary
School.

Page 41

21 
8.8.1.2 Should this proposal be implemented, the Council does not envisage
any adverse effects from the proposal in respect of staffing. Should
issues arise however, these will be mitigated through the Council
Educational Management Team support structure. 
8.8.2 Implications for Early Learning Centre Users – Pre-Five Children 
8.8.2.1 Prior to the mothballing of Kilchrenan Primary school, children
from the school’s catchment area attended Taynuilt Primary
School Pre-Five Unit. The closure of Kilchrenan Primary School
would see no change in such arrangements. The transition
process and transition experience of children from pre-five to
primary education would be enhanced as a result of the close
relationship which exists between the nursery and the school in
Taynuilt, and the joint Early Level learning which is in place. 
8.9 Assessment of likely educational benefits on any children who would (in
the future but for implementation) be likely to become pupils of the school. 
8.9.1 Children who may live in this catchment area in the future will benefit from
the broad range of educational opportunities which are presented
through this proposal, as detailed above.
8.9.2 The proposal could increase the roll of Taynuilt Primary School over time,
thus extending the peer group for all pupils, present and future, living
within both the present Kilchrenan and Taynuilt catchment areas. The
larger school should be able to support a wider range of social and extra-
curricular activities. 
8.9.3 Pupils who would otherwise have attended Kilchrenan Primary School,
would benefit from daily interaction in a larger peer group and from
improved educational arrangements as described above. Pupils in the
combined school will have more shared experiences and opportunity for
friendships. This will enhance their confidence and make the transition
to secondary easier. Larger year groups make the provision of specialist
services more viable and provide enhanced opportunities for school trips. 
8.10 Assessment of likely educational benefits on the pupils of any other
schools in the Council area 
8.10.1 The current mothballing of the Kilchrenan Primary School has had an
indirect positive effect on other pupils in Argyll and Bute. The reduction
in the running costs for the school means that this is a saving to the
Council, which is not taken from elsewhere. If Kilchrenan Primary School
were to close, the current mothballing costs being incurred

Page 42

22 
would be re-directed and therefore indirectly benefit other school pupils
in Argyll and Bute.
8.10.2 There are no other significant impacts from this proposal, positive or
negative, on other pupils in the authority or who attend other schools.
8.11 Placing requests 
8.11.1 This proposal will not affect the right of parents to request that their child
attend a school of their choice rather than the designated school in
whose catchment area the family lives, as provided by the Education
(Scotland) Act 1980. 
8.12 Consideration of how to minimise or avoid any adverse effects that may
arise from the implementation of this proposal 
8.12.1 The main adverse effect resulting from this proposal would be the length
of the journey to school for children who live in the Kilchrenan Primary
School catchment area. However, children who previously attended
Kilchrenan Primary School and who for the past 21 months have
attended Taynuilt Primary School have made this this journey daily, and
families in the area engaged with thus far do not regard the length of
journey as a major consideration. The village of Taynuilt is 6.7 miles from
Kilchrenan. It is visited routinely the by residents in the Kilchrenan
catchment area as an aspect of everyday life, and it is the first village
residents pass through when travelling to Oban. Funded school transport
would also continue to be provided for pupils should this proposal be
implemented, as a result of the catchment area extension. Pupil and
parent feedback from the community engagement event provided
positive feedback with regards to present transport arrangements. 
8.13 Summary of educational benefits statement 
8.13.1 Consequences of this proposal, such as the ability for children to
participate in a more broad range of experiences and the ability to better
meet the educational, social and emotional needs of the children,
represent significant educational benefits. During the pre-consultation
phase, these benefits were explored in detail and details from the
community engagement and the findings from the preliminary
requirements, to include the alternative proposals and the authority’s
assessment of other likely effects of the proposal and the reasons for that
assessment, are attached as Appendix 5. 
8.13.2 While the positive educational benefits are numerous, the sole negative
aspect identified arising from children attending Taynuilt Primary School
centres around the fact that children have to travel by either bus or car to
school.  However it is considered that the positive aspects of this

Page 43

23 
proposal outweigh the negative aspect of some travelling for children.
It is worth noting that the broad and very rural nature of the Kilchrenan
catchment area naturally requires pupils to travel to and from school by
bus or car, as was the case prior to Kilchrenan Primary School’s
mothballing. 
9 FACTORS RELATING TO RURAL SCHOOL CLOSURES 
Kilchrenan Primary School is classified as a very remote rural school. The
council is therefore required, under the terms of the Children and Young People
(Scotland) Act (2014), to assess the likely effects of school closure in terms of
the following three factors:
• The likely educational benefits (See Section 8, above);
• The likely effect on the local community;
• The likely effects of different travel arrangements
9.1 The likely effect on the local community should the proposal be
implemented 
The Scottish Government focuses on four key areas of importance pertaining to
rural communities:
• a strong and diverse rural economy, harnessing traditional strengths and
with an appetite for change;
• thriving rural communities where everyone can enjoy a decent quality of life,
where the young are not forced to leave their communities to get on and
where the vulnerable are not excluded;
• strong, community-focused public services that are accessible, of the
highest possible quality and with the greatest possible choice;
• a rural Scotland whose natural and cultural heritage flourishes in all its
diversity.
9.1.1 In rural communities, the challenges and opportunities are largely defined by
the local area and can often best be met by a bottom-up, community-led
response. Strong community leadership is vital to articulating local priorities and
driving forward change and growth. 
9.1.2 Research1 has shown that when communities feel empowered, there is:
• greater participation in local democracy;
• increased confidence and development of skills among local people;
• more people volunteering in their communities; and
• greater satisfaction with quality of life in the neighbourhood.

Page 44

24 
1 https://www.gov.scot/policies/community-empowerment/

Page 45

25 
9.1.3 There is the potential, should this proposal be implemented, to capitalise on the
existing will and drive in this community, with opportunities to support and
enable local leaders to organise, motivate and inspire their neighbours. The
opportunity for the local community to acquire the building under the terms of
the Community Empowerment (Scotland) Act 2015 could be key to developing
the community as an independent, resilient place to live. The proposal being
presented by community leaders at both local and national levels, centres on
the use of the school building as a community drop-in office for small local home-
based businesses, and as the hub for the Kilchrenan Community Council’s
campaign to create a Regional or National Park around Loch Awe, as supported
by four further Community Councils in the Loch Awe area. 
9.1.4 It is acknowledged that the closure of a local school can have a detrimental
effect on the local community. However, community management of assets
such as Kilchrenan Primary School may be an important step in building
community confidence, promoting growth and enabling communities to realise
their aspirations. Formal closure would mean that the community’s plans and
proposals for the building could potentially be progressed. This could enhance
community life by establishing a community enterprise focus. 
9.1.5 Within the village of Kilchrenan is Kilchrenan Village Hall which is used for
community events and activities. This facility – recently renovated and well-
equipped – fulfils the role of a central hub for the community in a way that the
school building could not. The closure of Kilchrenan Primary School would not
have a negative impact on the community in terms of its capacity to meet, plan,
collaborate and implement initiatives and activities which are for the benefit of
all in the community.
9.1.6 It is therefore considered that formal closure of this school could have a positive
impact on the wider community, leading to agency, empowerment and
participation in the community, an increase in users of the facility, and
consequential improvement in economic growth. 
9.2 The likely effect of the proposal on travel arrangements 
9.2.1 The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via the B845.
Travel time is approximately 14 minutes. The travel arrangements, both in terms
of funded transport by the council and families’ private transport arrangements,
have been in place for 21 months. Travel is an accepted aspect of living in the
Kilchrenan community and the occasional issues relating to adverse weather,
particularly in winter, are acknowledged. 
9.2.2 The proposal to close the school would have no effect on the current travel
arrangements of staff and pupils, the associated costs or the environmental
impact of travel.

Page 46

26 
10 FINANCIAL IMPACT
10.1 The full breakdown of the financial analysis is detailed in Appendix 4. Some of
this information has been recalculated since the Options Appraisal was
prepared. In particular the annual cost of mothballing the school has been
recalculated from £9,888 to £13,317. This information gives details on the
estimated cost if Kilchrenan Primary School were still an occupied and
operational establishment. However, as Kilchrenan Primary School is currently
mothballed, the cost for the mothballing is estimated at £13,317 per year.
Should the school be reopened, occupied and operational, the running costs
per year are estimated at £179,118. In addition, the cost to bring the property
to an acceptable standard to re-open the school is £29,000. 
10.2 Column 2 of Table 1 at Appendix 4 shows the projected annual running costs
of Kilchrenan Primary School whilst Column 3 shows the additional impact on
Taynuilt Primary School as the receiving school. The annual recurring savings
(or costs) are shown in Column 4. 
10.3 The main elements included within a school budget are teacher employment
costs (i.e. basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure
incurred by the school (i.e. educational equipment, materials, staff travel, etc.).
Teacher staffing budgets are calculated on an annual basis and within the
primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of the pupils in each school. When a school ceases to be operational
the teacher staffing budget is adjusted (at the appropriate time), per entitlement
information from Education HR, with the staffing budget resulting in a nil value.
10.4 In line with the national priority of maintaining teacher numbers, the Education
Service operates on the basis that supernumerary teachers are redeployed and
therefore their salary costs still exist, with an increase to the receiving school’s
budget. The costs noted against teachers in column 2 of Table 1 at Appendix 4
have not directly impacted on Taynuilt Primary School but have been subsumed
by the Authority as a whole, specifically the costs of the teacher from Kilchrenan
having transferred to another school, which was then overstaffed. Similarly, the
costs relating to transport do not impact on Taynuilt Primary School 
10.5 As the school is mothballed, there are currently no annual transport costs for
pupils to attend Kilchrenan Primary School. Were Kilchrenan Primary School to
be reopened, transport costs are estimated at £27,295 per year, which is
identical to the present cost to transfer children in the Kilchrenan catchment
areas to Taynuilt Primary School, as the routes are identical and the bus

Page 47

27 
leaves from the same original starting point in Oban. As a result, no saving has
been indicated in Appendix 4 (column 4 of Table 1), but neither is this an
additional cost for Taynuilt Primary School.
10.6 Table 2 in Appendix 4 contains the notional 30 year lifecycle costs that would
arise based on the GIA of the various schools irrespective of the number of
pupils accommodated. Lifecycle costs are representative of the cost needed to
keep the building in a good state of repair. The cost over the next thirty years
therefore to maintain Kilchrenan Primary School is £222,252 and for Taynuilt
Primary School this is £955,392. 
10.7 Table 3 in Appendix 4 contains the annual running costs during mothballing of
Kilchrenan Primary School and these are estimated at £13,317 per year, which
would constitute an immediate saving on closure. If the school were to be
formally closed, this would allow the Council to take steps towards selling the
school to a third party or transferring ownership to the local community. 
11 EQUALITY AND SOCIO-ECONOMIC IMPACT 
The Council as a public authority has a duty under the Equality Act 2010, the
Public Sector Equality Duty 2011, the Fairer Scotland Duty (Part one of the
Equality Act) and the Islands (Scotland) Act (2018) to have due regard to
equality and socio-economic impact factors when making strategic financial
decisions. This is done through assessing the potential impact of decisions on
equality through Equality and Socio-Economic Impact Assessments (EQSEIAs).
The Council will engage with the EQSEIA process and carry out such an
assessment during the consultation process in respect of this proposal, to
ensure that due regard is given to such matters in the decision making process. 
12 CONSULTATION ARRANGEMENTS 
12.1 Prior to formulating a rural school closure proposal under the Schools
(Consultation) (Scotland) Act 2010 (the 2010 Act), as amended, the Education
Authority must satisfy the preliminary requirements set out in Section 12A of the
2010 Act. The Authority has previously identified its reasons for formulating a
possible proposal, has considered whether there were any reasonable
alternatives to the possible proposal as a response to those reasons, and has
assessed each of the options in accordance with Section 12A(2)(c) of the 2010
Act. After considering a paper addressing these preliminary requirements, on
24th August 2023 Community Services Committee decided that, having specific
regard to the reasons for formulating a prospective closure proposal, the option
to close Kilchrenan Primary School and redraw its catchment area to Taynuilt
Primary School is the most appropriate response to the specific reasons for the
potential proposal.

Page 48

28 
12.2 The proposal to close Kilchrenan Primary School and realign its catchment area
to Taynuilt Primary School was considered at the Community Services
Committee Meeting on 14th December 2023, where it was adopted as a
“relevant proposal” in terms of the 2010 Act, to be issued as a basis for statutory
consultation. No decision will be taken by the Council on the proposal contained
in this paper until after the end of the consultation period. The Council will
then receive a report on the consultation and will reach a view on the proposal. 
12.3 A summary of this document will be issued free of charge to all of the consultees
listed on page 2 of this document and it will also be published on the Council’s
website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
12.4 As part of a consultation process, the Education Authority must publish the
proposal paper, advertise it and notify Education Scotland and all of the relevant
consultees as prescribed by Schedule 2 of the 2010 Act, inviting them to make
representations on the proposal. The consultation period will be from 21st
December 2023 until 5pm on 23rd February 2024, which includes at least 30
school days. 
12.5 A public meeting will be held at 6pm in Kilchrenan Village Hall on Thursday 25th
January 2024. Anyone wishing to attend the meeting and participate is welcome
to do so. The meeting will be convened by the Education Authority and the
Education Authority will present reasons for bringing forward the proposal.
There will be an opportunity for questions to be asked and comments to be
made. A note will be taken so that comments can later be summarised and
considered. However, the Education Authority will also consider written
comments which should be sent to Education Services, School Consultations,
Argyll & Bute Council, Argyll House, Dunoon, Argyll, PA23 8AJ and should be
received no later than 5.00pm on 23rd February 2024.
12.6 Written representations may be made on the proposal and the alternatives to
the proposal. Written representations may also suggest other alternatives to the
proposal. 
12.7 Following the close of the consultation, the Education Authority will provide
Education Scotland with copies of the written representations submitted, a
summary of the oral representations made at the public meeting and any other
relevant documentation. This will allow Education Scotland to prepare a report
on the proposal within a period of three weeks. 
12.8 After receiving Education Scotland’s report, the Education Authority will then
prepare and publish a Consultation Report in accordance with Sections 9, 10
and 13 of the 2010 Act. The Education Authority will thereafter make its final
decision on whether to implement the proposal. The decision will be made a

Page 49

29 
minimum of three weeks after publication of the Consultation Report. If the
Education Authority makes a closure decision, it shall notify the Scottish
Ministers within six working days of that decision and publish the fact that the
Scottish Ministers have been notified, and that representations can be made to
them. The Education Authority would also be required to publish a notice on its
website of the decision to implement the proposal and why it has been satisfied
that closure is the most appropriate response to the reasons for formulating the
proposal. 
12.9 The Scottish Ministers will have a maximum of eight weeks to call in any closure
decision made by the Education Authority in certain circumstances. This eight
week timeframe would consist of an initial three weeks from the date of
decision, during which representations can be made to the ministers, and a
further five weeks for the Scottish Ministers to decide whether to issue a call in
notice. During this period the Education Authority will not proceed to implement
any closure decision. 
12.10 If the Scottish Ministers call in a closure proposal, it is referred to the Convener
of the School Closure Review Panels. The Convener must constitute a School
Closure Review Panel within seven days for determination. The Education
Authority may not implement a closure decision in whole or in part until the Panel
has made its determination. It will usually issue a decision within eight weeks of
the Panel being constituted. 
12.11 If the School Closure Review Panel refuses to consent to the closure decision,
or following publication of the Consultation Report the Education Authority
decides not to implement the closure proposal, the Education Authority cannot
publish a further closure proposal in relation to the school for five years, unless
there is a significant change in the school’s circumstances. 
13 CONCLUSION 
13.1 It is proposed that education provision at Kilchrenan Primary School be
discontinued with effect from 29th November 2024. The catchment area of
Taynuilt Primary School shall be extended to include the current catchment area
of Kilchrenan Primary School.
13.2 It has been assessed that the proposal is the most appropriate means of
addressing the underlying reasons for formulating it, which are: 
a) Kilchrenan Primary School has been mothballed for 21 months. The school roll
is currently zero and is not predicted to rise significantly in the near future. 
b) Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing, there are 13.17 full-time
equivalent (fte) vacancies across Head Teacher and teacher posts. 
c) While the School is mothballed, the building is deteriorating with limited budgets
for maintenance. The costs of continued mothballing, and of bringing

Page 50

30 
the fabric of the school to the required standard for any re-opening, are also
considerable. 
Other Considerations 
• The Council needs to allocate its resources in a way that ensures the quality of
all of its services.
• This proposal will bring educational benefits and assist in ensuring that the
Education budget is more sustainable into the future. This proposal document
contains an Educational Benefits Statement.
• The costs per pupil in under-occupied schools are excessively high.
• Schools in the Council area are expensive to maintain and operate. Retaining
unnecessary accomodation is a serious drain on the resources of the Council
and diverts spending from areas that directly affect the educational attainment
of pupils.
• There is no realistic possibility at present of the Council being able to bring its
whole school estate up to a satisfactory condition. The present condition is
unsustainable and can only be improved by reducing the extent of the estate. 
DOUGLAS HENDRY
Executive Director with responsibility for Education
Councillor Yvonne McNeilly
Policy Lead for Education
For further information contact:
Jennifer Crocket
Chief Education Officer/ Head of Education: Wellbeing, Inclusion and Achievement
Jennifer.Crocket@argyll-bute.gov.uk
Simon Easton
Education Manager
Simon.Easton@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Letter to consultees with Summary Proposal

Page 51

31 
Appendix 2 – Response form
Appendix 3 – Maps
Appendix 4 – Financial template
Appendix 5 - Options Appraisal

Page 52

32 
APPENDIX 1 
Argyll and Bute Council
Comhairle Earra Ghàidheal agus Bhòid 
Executive Director: Douglas Hendry 
Kilmory, Lochgilphead, Argyll, PA318RT
Telephone: 01436 657681 Fax:
Our Ref: Ref:
If phoning or calling please ask for:
e-mail: Simon.Easton@argyll-bute.gov.uk
Council Website: www.argyll-bute.gov.uk 
Kilchrenan Primary School 
Dear Consultee, 
Review of Education Provision
Notice and Summary of Proposal for closing Kilchrenan Primary School
Schools Consultation (Scotland) Act 2010 
Background 
Argyll and Bute Council, through its Education Service, aims to realise ambition,
excellence and equity for all. 
The Council is consulting on a proposal to close Kilchrenan Primary School. This
notice provides a summary of a proposal that you may have an interest in or are
required to be notified of, giving you key information about the proposal. 
The Council is conducting a public consultation process. This will commence on 21st
December 2023 and will conclude on 23rd February 2024. This is the period within
which you will be able to make written representations to the Council in respect of the
proposal. If you wish your view to be taken account of in the consultation exercise
you must submit your written representation within this period. This notice and
summary provides further information on where a full copy of the proposal may be
obtained or referenced and also advises on how you can make written
representations to the Council. 
The Council will hold a meeting where officers will be able to provide information on
the proposal. The details of the public meeting are contained in this notice and
summary. 
It is important that everyone we are consulting tells us what they think of the
proposal. Please read this notice and summary and then consider the contents of the
proposal document. You can then tell us what you think of the proposal by making

Page 53

33 
written representation and/or by attending the public meeting. This notice and
summary tell you how to do that.
The Proposal
It is proposed that education provision at Kilchrenan Primary School be discontinued
with effect from 29th November 2024. The catchment area of Kilchrenan Primary
School shall be extended to include the current catchment area of Taynuilt Primary
School. 
Reasons for this proposal 
This is considered to be the best option to address the reasons for the proposal
which are;
• Kilchrenan Primary School has been mothballed for almost 2 years. The
school roll is zero and not predicted to rise significantly in the near future.
• Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 25.23 fte
vacancies for both teachers and headteachers in Argyll and Bute.
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance. The annual cost of the mothballing of the building is
£13,317. 
The Council’s education strategy
Our Children Their Future 
Together we will realise ambition, excellence and equality for all.
• Raise educational attainment and achievement for all,
• Use performance information to secure improvement for children and young
people,
• Ensure children have the best start in life and are ready to succeed,
• Equip young people to secure and sustain positive destinations and achieve
success in life,
• Ensure high quality partnership working and community engagement,
• Strengthen leadership at all levels.
Alternatives to the Proposal 
The following alternatives to the proposal were considered at the preliminary pre-
consultation stage of this process: 
a) Re-open Kilchrenan Primary School;
b) Continued Mothballing of Kilchrenan Primary School with the pupils zoned to
Taynuilt Primary School;
c) Re-open Kilchrenan Primary School and realign its catchment area;

Page 54

34 
d) Close Kilchrenan Primary School and realign its catchment area to Taynuilt
Primary School (the Proposal).
Written representations may be made on those alternatives as well as on the
proposal.
Written representations on the proposal may suggest other alternatives to the
proposal. 
What will we do? 
We will consult with people by: 
▪ Providing a notice of the consultation and a summary of the proposal to the
relevant consultees. This is that notice and summary
▪ Placing an advert in the local press
▪ Putting information on our website https://www.argyll-bute.gov.uk/school-
consultations-and-proposals
▪ Holding a public meeting to explain the proposal
▪ Ask parents, carers, children, young people, teachers, support staff and others
to tell us what they think of the proposals. 
What to do now? 
▪ Please read the full proposal document
▪ Please attend the Public Meeting which will be held on 25th January 2024 at
6.00pm in Kilchrenan Village Hall.
▪ Let us know what you think by:
Letter to: Education Services
School Consultations
Argyll & Bute Council
Argyll House
Alexandra Parade
Dunoon
PA23 8AJ 
Returning the attached response sheet by post, or by Email to:
argyllhousereception@argyll-bute.gov.uk 
What next? 
Whilst the Council is engaging in a consultation process in relation to this proposal
that does not mean that the proposal will go ahead. It does mean that the Council is
engaging in a consultation process to seek your views on the proposal. 
All the points raised during the consultation will be carefully considered and Elected
Members will then decide if the plan should go ahead.

Page 55

35 
If the suggestion goes ahead, any children from Kilchrenan Primary School
catchment area would be educated at Taynuilt Primary School.
Please note that this summary document is for convenience only. Full details of the
consultation can be obtained from:
▪ Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
▪ Oban Public Library, Albany St., Oban PA34 4AL
▪ Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
▪ Taynuilt Primary School, 2 Strathview, Taynuilt, PA35 1JF
▪ Oban Education Offices, Willowview, Soroba Road, Oban PA34 4SB
▪ Kilchrenan Village Hall, Kilchrenan, PA35 1HE 
It is also available electronically via our website:
▪ https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
Yours faithfully, 
Douglas Hendry
Executive Director with responsibility for Education

Page 56

36 
APPENDIX 2 
Argyll and Bute Council
Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access restricted to
Elected Members and Council Officers of Argyll and Bute Council. 
Proposal
It is proposed that:
Education provision at Kilchrenan Primary School be discontinued with effect from 29th
November 2024. The catchment area of Taynuilt Primary School shall be extended to include
the current catchment area of Kilchrenan Primary School. 
This part of the form must be completed for a valid response:
Name: (please print) Address:
Post Code:
I agree/do not agree (delete which does not apply) that my response can be made publicly
available
Signature: Date: 
YOUR INTEREST: (please tick)   
Child /        
Parent Young Person Staff Other * 
Elected Member / MSP / MP Member of Community Council
*Other: (please specify)
Please state your views on the proposal (continue overleaf if necessary)

Page 57

37 
APPENDIX 3 – Map of current primary school catchment areas
MAP OF CURRENT KILCHRENAN AND TAYNUILT PRIMARY SCHOOL CATCHMENT
AREAS TO BE COMBINED

Page 58

38 
APPENDIX 4 – FINANCIAL TEMPLATE
Table 12 
Name of School
Kilchrenan Primary School
Projected
annual costs
for full
financial year
2023/24
Additional
financial
impact on
receiving
school –
Taynuilt
Primary
School
Annual
recurring
savings
(column 2
minus
column 3)
School costs   
Employee costs -   
teaching staff 101,074 0 101,074
support staff 20,638 0 20,638
teaching staff training (CPD etc) 0 0 0
support staff training 0 0 0
Supply costs 3,030  3,030
Employers Liability Insurance 181 0 181
Public Liability Insurance 165 0 165
Staff Group Life Assurance 269 0 269 
Building costs:   
property insurance 516 0 516
non domestic rates 514 0 514
water & sewerage charges 142 0 142
energy costs 13,305 0 13,305
cleaning (contract or in-house) 367 0 367
building repair & maintenance 1,060 0 1,060
grounds maintenance 388 0 388
facilities management costs 0 0 0
revenue costs arising from capital 0 0 0
other - refuse collection;
telephones  1,070  0  1,070    
School operational costs:   
learning materials 2,757 132 2,757
catering (contract or in-house) 7,802 941 7,802 
2 These figures have been calculated based on Kilchrenan Primary School roll the last full year prior to
mothballing.

Page 59

39 
SQA costs 0 0 0
other school operational costs (e.g.
licences)  0  0  0    
Transport costs:   
home to school 27,295 27,295 0
other pupil transport costs 0 0 0
staff travel 0 0 0
SCHOOL COSTS SUB-TOTAL 179,958 28,368 152,643 
Income:   
Sale of meals -840 -840 0
Lets 0 0 0
External care provider 0 0 0
Other 0 0 0
SCHOOL INCOME SUB-TOTAL -840 -840 0    
TOTAL COSTS MINUS INCOME
FOR SCHOOL  179,118  27,528  151,590
UNIT COST PER PUPIL PER
YEAR  29,853  4,588  25,265 
Table 2 
Capital costs
School
proposed for
closure
Kilchrenan
Primary
School
Receiving
school 
Taynuilt
Primary
School
Capital Life Cycle cost 222,552 955,392
Third party contributions to capital costs 0 0 
Table 3 
Annual Property costs incurred (moth-balling) until disposal
property insurance 516
non domestic rates 514
water & sewerage charges 129
energy costs 5,720
cleaning (contract or in-house) 0
security costs 0
building repair & maintenance 2,140

Page 60

40 
grounds maintenance  388
facilities management costs 3,490
Other: equipment lease and alarm rental 420
TOTAL ANNUAL COST UNTIL
DISPOSAL  13,317 
Table 4 
Non-recurring revenue costs
Securing building 4,390
TOTAL NON-RECURRING REVENUE COSTS 4,390 
Table 5 
Impact on GAE 
The Primary Indicator determining the GAE allocation for Primary School
Teaching Staff is based on the number of primary school pupils with the
Secondary Indicator being the percentage of pupils in small schools (roll
< 70 pupils averaged over 2 years). Taynuilt Primary has a roll of < 70
pupils so the transfer of pupils from Kilchrenan will not impact on the
small school element of GAE funding for Taynuilt. 
Argyll and Bute Council, however, is supported by the floor mechanism
therefore any calculated reduction in GAE is unlikely to be significant in
terms of the overall GAE allocation.
0
GAE IMPACT 0

Page 61

41 
Appendix 5 – Options Appraisal: Kilchrenan Primary School, August 2023 
EDUCATION 
OPTIONS APPRAISAL
KILCHRENAN PRIMARY SCHOOL
AUGUST 2023

Page 62

42 
1.0 INTRODUCTION 
4.15 Immediately before the retiral of the Head Teacher of Kilchrenan Primary
School (PS) in February 2022 there were four pupils residing within the
Kilchrenan catchment area who were still attending the school. At that point,
the children transferred to Taynuilt Primary School. Three further pupils at
Kilchrenan PS had transferred to St. Columba’s Primary School in Oban at the
start of the 2021-2022 school session. There were no Primary 1 pupils
registered to attend Kilchrenan Primary School in session 2021-22, and one
possible primary 1 enrolment for August 2022. 
4.16 At the Community Services Committee on 10th March 2022, Argyll and Bute
Council approved the mothballing of Kilchrenan Primary School on a
temporary basis. It was agreed that the premises be retained for two years on
a care and maintenance basis and that a review of the school’s mothballing
would be prepared for the Committee’s March 2023 meeting, when Members
could decide on a continued period of mothballing, or request that officers
begin an engagement process, carried out in accordance with the preliminary
requirements of the Schools (Consultation) (Scotland) Act 2010, to consider
the future options for Kilchrenan Primary School. It was also agreed that the
community would have pre-arranged access to the buildings for community
functions during the period of mothballing. 
(Public Pack)Agenda Document for Community Services Committee, 10/03/2022
10:30 (argyll-bute.gov.uk) 
4.17 On 9th March 2023, Community Services Committee approved the continued
mothballing of Kilchrenan Primary School and that the Education Service
begin gathering necessary information and carry out the exercise of assessing
the options for the future of Kilchrenan Primary School, in accordance with the
preliminary requirements of the Schools (Consultation)(Scotland) Act 2010.
(Public Pack)Agenda Document for Community Services Committee, 09/03/2023
10:30 (argyll-bute.gov.uk) 
The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young
People (Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a rural school
and details specific requirements which the education authority is required to
follow if they are formulating a proposal to close a rural school. This includes
the introduction of a preliminary consultation process. 
In addition, the Community Empowerment (Scotland) Act 2015 sets out a new
right for community organisations to request the transfer of local assets into
local community ownership/management. Public bodies, including councils,

Page 63

43 
must consider such requests and respond to them within a reasonable
timescale.
Kilchrenan Primary School has had no further pupils enrolled since elected
members approved the mothballing.
At the aforementioned committee meeting on 9th March 2023, Community
Services Committee agreed that the Education Service would undertake the
preliminary requirements as set out in the 2010 Act, and prepare an Options
Appraisal for Kilchrenan Primary School, to enable the Education Service to
identify and consider the options for the school’s future. 
The 2010 Act makes special arrangements with regard to rural schools that are,
in effect, a presumption against their closure. There is a requirement to examine
specifically factors particularly relevant to rural schools prior to formulating a
proposal to close a rural school. In particular, it is necessary to consider any
reasonable alternatives before considering closure. It is also necessary to
consider the impact on the wider community of a potential closure, the impact
of any different travel arrangements, and the educational benefits or otherwise
for pupils should a rural school be closed. These factors have been considered
in this Options Appraisal. 
2.0 REASONS FOR THE PROPOSAL 
2.1 An authority that is contemplating formulating a rural school closure proposal
must satisfy the preliminary requirements set out in Section 12A of the 2010 Act
before starting to prepare its Proposal Paper. In particular, it must identify the
underlying reasons why the future of the School is being considered, which, in
the case of Kilchrenan PS, are as follows:
4. Kilchrenan Primary School has been mothballed for eighteen months. The
school roll is currently zero and is not predicted to rise in the near future.
5. Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing, there are 15.0 full-time
equivalent (fte) vacancies across Head Teacher and teacher posts.
6. While the School is mothballed, the building is deteriorating with limited
budgets for maintenance. The costs of continued mothballing, and of
bringing the fabric of the school to the required standard for any re- opening,
are also considerable. 
The Council is therefore considering the future of Kilchrenan Primary School.
The various options are explored within this paper. 
3.0 BACKGROUND 
Argyll and Bute is an area of outstanding natural beauty, with a strong cultural
identity. Today, the culture of Argyll and Bute is reflected in its traditional

Page 64

44 
industries of fishing, farming and crofting, sports such as shinty and in its world
class musicians and artists as well as its modern commercial industries such as
wind turbine production and fish farming.
Argyll and Bute is geographically the second largest authority in Scotland.
Education is delivered in a range of settings including schools, Further
Education, thorough partnerships and via youth services. 
3.1 Argyll and Bute Corporate Plan 
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of
Scotland with outstanding places, people and potential for a prosperous future
for everyone. Our Council, along with our Community Planning Partners, is
committed to ensuring that Argyll and Bute’s economic success is built on a
growing population. 
This strategic approach embraces the vision for our area, our communities and
our people as outlined in the Corporate Plan. Our key service priorities support
the delivery of our commitments in the plan, with focus on local outcomes that
will achieve meaningful improvements for the area, our local communities and
our citizens. 
Councils have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value. Our Community Services Asset
Management Plan provides a review of the property assets used to deliver
services. It incorporates the School Estate Management Plan which reflects the
local implementation of Building Better Schools: Investing in Scotland’s Future,
the national school estate strategy developed by the Scottish Government in
conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within Building
Better Schools are reflected throughout the Education and Children’s Services
Asset Management Plan (SAMP) for schools and public buildings, both in the
management of the existing assets and in the design and construction of new
developments. 
AB_CorporatePlan_3.pdf (argyll-bute.gov.uk) 
3.2 Our Children Their Future 
Education Authorities, have a statutory duty in terms of the Education (Scotland)
Act 1980 to make adequate and efficient provision of school education across
their entire area for the current school population and future pattern of demand.
This is reflected in Our Children, Their Future: Education Vision and Strategy. 
argyll_bute_vision_strategy_final_web.pdf (argyll-bute.gov.uk)

Page 65

45 
3.3 Kilchrenan and the Local Area - the Kilchrenan Primary School Setting 
Kilchrenan is a village situated in a scenically beautiful area to the west of Loch
Awe, six miles south of the village of Taynuilt, from where it is reached by a
single track road. The area around Kilchrenan features some of the rural
industries with which Argyll and Bute is associated, particularly forestry and
renewables, in the form of wind farms. Tourism is also a key element of the
local economy. Other villages in the area, from which children attended
Kilchrenan PS include Dalavich, Inverinan and Ardanaiseig. A plan to establish
a Regional or National Park around Loch Awe, applications for which are
already in motion, encompasses the whole catchment area for Kilchrenan
Primary School, and is supported and is being promoted by members of the
local community. 
3.4 The School within the Community 
Kilchrenan PS was previously active within the community, as a focus for social
and educational events. The pupils invited the community to attend events on
several occasions every year. During the period of mothballing, there were no
requests for the building to be used for community events. The newly-
refurbished Kilchrenan Village Hall is a community-managed facility that hosts
various community events and activities, and forms the civic hub of the village.
Some members of the local community in Kilchrenan have expressed interest
in exploring options for a transfer of the school building form the local authority
to the local community, under the terms of the Community Empowerment
(Scotland) Act 2015. The proposal centres on the use of the school building as
a community drop-in office for small local home-based businesses, and as the
hub for the Kilchrenan Community Council’s campaign to create a Regional or
National Park around Loch Awe, as supported by four further Community
Councils in the Loch Awe area. 
3.5 Population 
Argyll and Bute has an average population density of just 0.13 persons per
hectare. This, coupled with the changing demographic profile of the area,
presents one of our greatest challenges. Accurate 2011 census data for the
specific Kilchrenan Primary School catchment area is not available. More up-
to-date data is detailed in table 1 below, which contains details from the National
Records of Scotland (NRS) Small Area Population Estimates for the Loch Awe
2 datazone which includes the Kilchrenan catchment area. It shows the
changing population from 2011 to 2021 for the whole datazone population and
for age groups 0-11, 12-67 and over 67. 
Table 1: Population Information

Page 66

46 
Kilchrenan Area (Loch Awe 2 datazone) NRS Population
Estimates
2011 2021
Total Resident Population 637 Total Resident Population 703
Population under age of 12 58 Population under age of 12 54
Population aged 12-67 486 Population aged 12-67 492
Population aged over 67 93 Population aged over 67 157 
It can be seen that the population as a whole in the datazone has increased,
and that the increase is primarily in the 67 plus age-group. The number of
children under the age of 12 has fallen slightly in the last 10 years. It is
recognised that the datazone area and the catchment area of Kilchrenan
Primary School do not match exactly. The datazone also encompasses part of
the Kilninver Primary School catchment area. 
The map in Figure 1 below shows the extent of the Loch Awe 2 datazone:
Figure 1 
3.6 Development and House Building 
A new Local Development Plan (LDP2) is now available, which sets out planning
and development proposals for the next 10 years from 2020, and a vision for 20
years. The Argyll and Bute Local Development Plan provides the local planning
framework for the Council area, excluding the Loch Lomond and Trossachs
National Park area. The Plan is divided into the written statement and proposals
maps. The written statement provides the general
Loch Awe 2
Datazone

Page 67

47 
policy context against which planning applications for new development
proposals should be assessed. This is supported by the proposals maps which
show the range of development opportunities and constraints within the area,
for example:
• the key development areas i.e. the allocations for housing, industry and
business, community facilities and infrastructure;
• the potential areas for future development (Potential Development Areas);
• areas requiring actions such as environmental improvement or regeneration
(Areas for Action); and
• environmental designations such as national Scenic Areas, Sites of Specific
Scientific Interest (SSSIs), Special Protection Areas and Local Nature
Conservation Sites. 
• Appendix 1 shows the LDP2 for Kilchrenan
• Appendix 2 shows the LDP2 for Taynuilt
• Appendix 3 provides the key for Local Development Plans. 
3.7 Kilchrenan Primary School 
Kilchrenan PS is situated in the heart of the village of Kilchrenan and was built
in 1878. The school is co-educational and non-denominational. It has a
catchment area extending from south of Dalavich to north of Kilchrenan,
including Ardanaiseig to the northwest of Kilchrenan. The school comprises two
classrooms and a smaller room which is used for storage and teaching smaller
groups. There is a library/quiet room between the two classrooms and a kitchen
from which the lunches, brought daily from Taynuilt PS, are served. The school
grounds are used as an outdoor classroom, although areas of the grounds are
considered unsafe for pupils to use. 
Appendix 4 shows the Kilchrenan PS Floor Plan. 
Kilchrenan Primary School is 6.7 miles from Taynuilt Primary School, along the
B845, beside which Kilchrenan PS is located. 
The Scottish Government’s Rural School List 2021 classifies Kilchrenan PS as
‘very remote rural’. This is defined as an area with a population of less than
3,000 people, and with a drive time of over 60 minutes to a settlement of 10,000
or more. Kilchrenan Primary is one of 18 primary schools associated with Oban
High School. 
Rural schools in Scotland - gov.scot (www.gov.scot) 
3.8 Taynuilt Primary School 
Following the mothballing of Kilchrenan PS, children from the Kilchrenan
catchment area have attended Taynuilt PS. Taynuilt PS is a non-
denominational and co-educational school situated in the centre of Taynuilt
village. The present school building opened in 1989. The school

Page 68

48 
accommodation is of semi-open plan design, with one double and two single
class bays opening onto a shared open area. There is a large gymnasium,
which also acts as an assembly hall, lunch hall and houses the pre-school unit
each afternoon. In 2008, a purpose built nursery adjacent to the school
building was opened. 
Appendix 5 shows the Taynuilt Primary School Floor Plan. 
The school has strong and active traditions in outdoor learning, the creative arts,
STEM, ITC and in sport and physical activity. The school enjoys the support of
an active Parent Council and strong community partners. 
Like Kilchrenan PS, Taynuilt PS is classified as very remote rural by the Scottish
Government. The Map in Figure 2 below shows the adjoining catchment areas
of Kilchrenan and Taynuilt Primary Schools: 
Figure 2

Page 69

49 
3.9 Pupil Numbers 
Pupil projections, and data for 2023-24 are based on the 2022 pupil census, a
return prepared annually for the Scottish Government. Past pupil numbers are
historic data taken from past pupil censuses. 
Table 2 shows the historic and current pupil numbers for both Kilchrenan and
Taynuilt Primary schools:

Page 70

50 
Table 2 
Kilchrenan PS Taynuilt PS
Capacity 41 163 
Roll Roll
2006-07 23 72
2007-08 20 77
2008-09 19 79
2009-10 18 78
2010-11 10 88
2011-12 10 81
2012-13 8 81
2013-14 7 83
2014-15 4 91
2015-16 4 83
2016-17 9 82
2017-18 6 79
2018-19 7 72
2019-20 8 69
2020-21 12 67
2021-22 6 70
2022-23 0 66 
Table 3 shows projected rolls for Taynuilt PS and estimated numbers of pupils
in the Kilchrenan PS catchment area, according to figures held by Argyll and
Bute Council: 
Table 3 
Kilchrenan PS Taynuilt PS 
Roll Roll
Capacity 41 163
2023 -2024 8 58
2024 -2025 8 60
2025-2026 10 55
2026-2027 8 48 
The Kilchrenan PS roll further dropped to zero over the course of the 2021- 2022
school year (see Table 2, above). Pupils within the catchment area (as set out
in Table 3, above) do not reflect the number of pupils who would be attending
the school because parents choose to send their children to Taynuilt

Page 71

51 
PS or to the local denominational primary school for the area, St. Columba’s
PS in Oban.
In August 2022, no primary 1 pupils registered to attend Kilchrenan Primary
School for session 2022-23, and there have been no registrations for session
2023-24. 
4.0 COMMUNITY ENGAGEMENT 
4.1 Meetings
A Community Engagement Meeting was held in Kilchrenan Village Hall on 31st
May, 2023 from 09:00-18:00 hours. The meeting’s purpose was to seek the
views of the community on the future of Kilchrenan Primary School. Over the
course of the day, the meeting was attended by 20 people. 
A meeting also took place with the Head Teacher of Taynuilt PS as the formally
assigned receiving school in the event of the closure of Kilchrenan PS, to gauge
the views and of staff on the future of Kilchrenan Primary School. 
There was also a meeting with the Chair of the Parent Council of Taynuilt PS to
gather opinions from parents/carers on the potential impact of any decision that
is made on the future of Kilchrenan PS. 
A virtual meeting also took place with children living in the Kilchrenan catchment
area who now attend Taynuilt Primary School. The purpose of the meeting was
to gather pupils’ views on the future options for Kilchrenan Primary School, and,
where applicable, on their educational provision before and after leaving
Kilchrenan Primary School. 
A number of children from the Kilchrenan PS catchment area attend St.
Columba’s PS in Oban, and movement of pupils from Kilchrenan PS to St.
Columba’s PS in 2021 was one of the reasons for the Kilchrenan roll falling
significantly. In terms of catchment area, the Kilchrenan area falls within the
catchment for St Columba’s PS in its role as the sole denominational school in
the Oban, Lorn and the Isles area. Parents/carers within the Kilchrenan
catchment area therefore have the automatic right to enrol their children in St
Columba’s PS. Meetings with the HT of St. Columba’s PS, the Chair of the St.
Columba’s Parent Council and with the children attending St. Columba’s PS
from the Kilchrenan catchment area were held, to gather their views on the
future of the school. 
4.2 Attendees at the Community Engagement Event and at the other meetings
detailed above were provided with an overview of the information that the
Council would be using in this Options Appraisal. This included school roll

Page 72

52 
projections, and information relating to the recruitment and retention of staff,
transport and on local services and facilities.
The questions put to stakeholders were as follows:
Over the last 18 months, what has been the effect of mothballing Kilchrenan
Primary School on you, your family and community? 
In your view what are the pros/cons of the following options:
• Re-open the school
• Continue with mothballing
• Re-open the school but widen the catchment area
• Close the school 
4.3 Feedback 
There was a range of viewpoints on the future of Kilchrenan PS: 
• Community and Parents 
Almost all in the community felt that continuing to mothball the school
was not an option. It was felt that a decision should be made as the
building would only continue to deteriorate, although two parents with
children of pre-school age suggested that mothballing could continue
until such time as the school became a viable option once more,
allowing pre-5 children in the area to get to the stage where they were
ready to attend school. 
Eight of those attending the Community Engagement Event
supported the re-opening the school, only two of whom were parents
of pre-school-aged children who might wish to attend the school,
although some indicated they have families who may wish to move to
the area, and that they wished there to be a school for their
grandchildren to attend in such circumstances. 
Some members of the community were of the view that the
community of Kilchrenan would be negatively impacted by not having
its own primary school. They felt the village would be less attractive
to families who may wish to move to the area. They also suggested
that attracting people to the area was key to ensuring more affordable
housing for local people was built. The view was expressed by one
attendee that, as a result of children travelling to Taynuilt every day,
they and their parents were already spending significant amount of
time in another community, to the possible detriment of the Kilchrenan
community. The point was also made that the absence of a school
in Kilchrenan was having a negative

Page 73

53 
impact on the finances of the Kilchrenan Village Hall, as it was no
longer being hired by the council for PE sessions.
However, others made clear that they felt that Taynuilt was relatively
close by and offered a school which could still be viewed as being
within the local community, albeit six miles from Kilchrenan. The point
was also made that the present Kilchrenan catchment is not one
single community, Dalavich being eight miles from the school. As
regards social or more affordable housing, the point was made that it
is the absence of such, and not whether there is or is not a school in
the area, that prevents people from moving into and sustaining the
community, and it is this issue which should be addressed above the
closure or re-opening of the school. 
Distances to be covered by pupils in getting to school each day was
a further area raised by a minority of attendees. They pointed to
transport issues as a reason for keeping the school open: the travel
implications for pupils, particularly in the Dalavich area, travelling daily
to Taynuilt were seen as impracticable, and attendance at school
would be prey to adverse weather conditions. However, parents of
children currently travelling daily to Taynuilt and Oban from both
Kilchrenan and Dalavich said that the weather had also been a factor
prior to the mothballing of the school, and that the now direct bus
journey to Taynuilt, and even to Oban, took less time than the
previous school bus to Kilchrenan, as the latter took a circuitous route
and detours to pick up pupils. They also pointed out that the majority
of the after-school or evening activities in which children engaged
were in Taynuilt or Oban, and that the journey would therefore have
to be made anyway. Furthermore, parents were aware that
secondary education would be in Oban, and that the journey would
therefore become a necessity at some point. Some also spoke of their
own daily commute via Taynuilt, and observed that they were often
able to take their children to school themselves without issue.
As well as being clear on the advantages of attending a small rural
school, all attendees who wished to the school to be re-opened
nonetheless acknowledged the issues associated with very small
school rolls, and that this was not every parent/carer’s preference.
They also acknowledged the associated problems with the
recruitment and retention of staff, and the consequences of both
issues for a school’s sustainable future. 
The option of re-opening the school, but with a wider catchment area
was not seen by any attending the Community Engagement Event as
a viable option. It was acknowledged that this could lead to increased
transport costs for the local authority. It was also felt that extending
the catchment area would not necessarily bring more pupils to the
school, and could also negatively impact on neighbouring schools
which are also small in size. The specific

Page 74

54 
geography of the area was also seen as making any extension of the
Kilchrenan catchment area non-viable.
The majority of the community, and all parents attending who had
experience of sending their children to Kilchrenan PS, believed that
the most viable option is to formally close the school, as the decline
in school roll has been a result of parents actively choosing to send
their children to Taynuilt and St. Columba’s Primary Schools. Some
of those in attendance viewed the challenge of recruiting and retaining
high-quality staff as a reason to close the school. Five parents of
children now attending other primary schools said there were many
identifiable benefits of their children having moved from Kilchrenan
Primary School. 
Parents/carers of pupils now at other schools pointed to what they
see as a higher quality of educational provision due to less broad
composite classes and more individualised learning and support. 
They also spoke of children now having a greater range of
opportunities across the curriculum, particularly in PE and in practical
subjects. 
A wider scope and choice relating to socialisation and the
development of personal friendship groups and relationships was
also seen as an advantage for pupils who have moved from
Kilchrenan PS.
The outdoor spaces at Kilchrenan were criticised by some
parents/carers, who pointed out that sections of the outdoor spaces
at the school had been deemed unsafe for pupils to use. The facilities
available at Taynuilt were praised by parents/carers. 
The absence of catering facilities at Kilchrenan was criticised by
parents/carers, who felt that it restricted the variety, choice and
freshness of food and drink on offer, and that it was not a cost-
effective means of catering for children’s dietary needs. 
The general state of the fabric of Kilchrenan PS, and its recent further
deterioration, was also seen as a negative by parents who had
experience of sending their children there. The limited accessibility of
the building was also seen as problematic. 
The absence of a breakfast club at Kilchrenan was seen as restrictive
of flexibility for families. Some parents/carers also spoke of the
absence of wrap-around childcare and registered child minders in the
Kilchrenan area. They said any increase in flexibility created by
Kilchrenan PS being reopened was negated by the restrictions such
an absence of childcare had on parents’ ability to work.

Page 75

55 
The reopening of Kilchrenan PS was also seen by some parents as
having a potentially divisive effect on the local community. They felt
that, despite reopening, a significant number of parents/carers would
nevertheless continue to choose primary education in Taynuilt or
Oban. Parents spoke of the risk of resentment from those in the
community sending their children to Kilchrenan PS towards those
sending their children elsewhere; being potentially seen as disloyal to
the local community, and putting at risk the long term viability of the
school. 
As part of the engagement around this Options Appraisal, the
parent/carer body at Taynuilt PS expressed its concern about the
falling roll at their school. From their point of view, the re-opening of
Kilchrenan PS could mean children who would otherwise attend
Taynuilt PS may not do so, and despite the small number of children
involved each year, they see the closure of Kilchrenan PS as having
positive consequences for Taynuilt PS, in terms of pupils numbers
and its effect on the number of classes and teachers, the broadening
of the mix of children in the school, and the number of parents
potentially able to give of their time and resources for the benefit of
the school community. 
• Children/young people
As part of the pre-consultation on the future of Kilchrenan PS, the
views of children living in the catchment for Kilchrenan PS were
sought. Of the eight children spoken to in both Taynuilt PS and St.
Columba’s PS, five had had experience of being at Kilchrenan PS. 
Almost all children who could make a comparison spoke of the very
small group of which they were part at Kilchrenan PS. They said that
they had enjoyed this, one pupil saying that the close relationships
were missed, but were glad to have a wider group of peers with whom
to make friends and develop relationships. Two pupils spoke of not
having enough choice of people to play with at Kilchrenan. Two pupils
spoke of how attending Taynuilt PS was preparing them better for
meeting large groups of people in secondary school and beyond. One
pupil said that he was enjoying doing much more group work in
Taynuilt PS. One pupil said that after an argument or if there was a
problem, there were now more people to approach than at Kilchrenan. 
Almost all children spoke of the better facilities and range of activities
on offer in their new schools, with better PE and more sports on offer. 
Views on the travel from home to Taynuilt or Oban were mixed. One
pupil said the journey was too long, and others acknowledged that

Page 76

56 
there can be travel problems in bad weather. Others said they had
good fun on the bus and had special “bus friends”.
When asked to sum up their feelings, only one pupil said that
Kilchrenan should reopen and indicated a wish to return to Kilchrenan
as a pupil. The other pupils were happy to remain where they were.
Another indicated that the Kilchrenan building was in too poor a state
for it to be used as a school, and it should be made into a sports
centre, with football pitches. 
• Staff 
There was no contact with previous teaching staff from Kilchrenan PS
in the pre-consultation. The Head Teacher retired in 2022, and
the teacher at the school was redeployed elsewhere. However,
the views of staff in Taynuilt PS were summarised by the Head
Teacher, who indicated that the enrolment of former Kilchrenan
pupils had been positive for the school and posed no issues in
terms of capacity or provision to all learners. The same view was
offered by the Head Teacher of St. Columba’s PS, within the
catchment area of which the Kilchrenan area falls in terms of
denominational educational provision.
For details of individual comments made by attendees at the Community
Engagement Event, please see Appendix 4. 
5.0 THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE
PROPOSAL AS CONSIDERED AT THE COMMUNITY ENGAGEMENT
EVENT 
To summarise information provided above, Kilchrenan Primary School has been
mothballed for 18 months. The school roll reduced to zero in February 2022
following the Head Teacher’s retirement, attempts to recruit a replacement Head
Teacher having been unsuccessful. At that point, the remaining pupils in the
school transferred to Taynuilt PS. Their parents’/carers’ view was that the very
small school roll was not conducive to the type of education they sought, and
was limiting opportunities for social interaction and development. This followed
the moving of several pupils to St Columba’s PS the previous August. The
school was mothballed in the period after February 2022, and there have been
no attempts to register pupils for primary one, or any other stage, since then. 
While the building is mothballed it continues to deteriorate. The Community has
been proactive in making positive suggestions as to how the building could be
used.

Page 77

57 
Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time or writing there are 15.0 full-time
equivalent vacancies for both Head Teachers and Teachers. Recruitment in the
Oban, Lorn and the Isles area is challenging due to the rural location of almost
all of its schools. 
Of those who attended the Community Engagement Event on 31st May 2023,
the majority were in favour of closing Kilchrenan PS permanently, including
almost all parents/carers with children in primary education at present. A
minority of attendees wished to see the school re-open, primarily on the grounds
that the community is negatively impacted by the absence of a primary school,
although a small number said they wished their pre-school- aged children to
attend a re-opened Kilchrenan PS. 
The Council is required to consider the future of Kilchrenan PS, taking all factors
and views into account. The following options are explored within this paper: 
a) Re-open Kilchrenan PS;
b) Continue the mothballing of Kilchrenan PS with the pupils zoned to
Taynuilt PS;
c) Re-open Kilchrenan PS and realign/extend its catchment area;
d) Close Kilchrenan PS and realign the catchment area for Taynuilt PS to
include the Kilchrenan PS catchment area. 
6.0 OPTION A: RE-OPEN KILCHRENAN PRIMARY SCHOOL 
6.1 Community Feedback
Eight of those attending the Community Engagement Event supported the re-
opening the school. Their reasoning can be summarised as follows:
• Parents/carers of children presently under the age of five wish their
children to attend a local school which is within walking distance and
which reflects the local context;
• Residents with no children of school age foresee their families moving
to the area and wish there to be a school for their grandchildren;
• Community members believe the absence of a school makes it less
likely that the community will be sustained by families moving to the
area;
• Travel to schools outside of the immediate community is
inconvenient, potentially expensive and is at the mercy of adverse
weather conditions. 
6.2 Pupil Numbers

Page 78

58 
Table 3 above details the projected roll for Kilchrenan PS. If the school were to
reopen in August 2023, there would be no pupils on the roll, as there are no
children of primary one age in the catchment, and the parents/carers of the other
eight pupils living in the catchment have said they will not move their children
back to Kilchrenan PS, as their children are settled in their schools and
friendships have been established. As stated, the provision at the schools pupils
now attend in Taynuilt and Oban is viewed by those parents consulted to be
preferable to that which was available at Kilchrenan. 
The numbers presently projected to enter primary one, should the school re-
open and should parents decide to send children to Kilchrenan PS, over the
next three years is as follows: 
August 2024 – 1 pupil
August 2025 – 4 pupils
August 2026 – 1 pupil 
Were the school to re-open, a sustainable future for the school may not be viable
unless other parents in the catchment area reversed their decision to keep their
children at Taynuilt PS and St. Columba’s PS, which they have indicated they
will not do. As attendance at Taynuilt PS becomes more of a norm in the area,
and through positive reports of educational provision there, it is not guaranteed
that local children attaining primary school age will automatically attend
Kilchrenan PS, placing future viability further in doubt. 
6.3 Financial Information 
The finance to re-open the school, including costs relating to employees,
premises, supplies and services and catering is £150,763. 
In addition, the cost to bring the property to an acceptable standard to re-open
the school is £29,000. 
The annual cost of mothballing Kilchrenan Primary School is £9,888. This does
not include costs related to the transfer of a member of staff to another school,
and the associated over-staffing costs. 
The annual cost of transporting pupils to Taynuilt Primary School during the
mothballing of Kilchrenan PS is £27,295. Were the school to re-open, this cost
would no longer apply, although the previous costs of transporting pupils from
Inverinan, Dalavich and other areas of the catchment would be re-incurred. 
6.4 Assessment of Rural Factors 
Section 12A(2) of the Children and Young People (Scotland) Act (2014) requires
the education authority to identify its reasons for the closure proposal of a rural
school, and consider whether there are any reasonable alternatives

Page 79

59 
to the proposal which could respond to those reasons. For the proposal and any
alternatives identified, the education authority is required to assess the likely
educational benefits, the likely effect on the local community and the likely effect
of different travelling arrangements.
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
6.4.1 Community Impact
The reopening of the school would most likely increase opportunities for
the school premises to be used by the community. It would also be
possible that the school would invite the community to specific events.
The presence of a school and the facilities/activities that may be offered
could make the area a more attractive place to live. Reopening the school
may therefore encourage families with school age children to move to the
community. This in turn may make the community more sustainable. 
However the community have demonstrated that there is a limited desire
for the school to reopen. Some who attended the Community
Engagement Event indicated the desire for the school to become a hub
for the many local small businesses, and a base for the campaign to
establish a Regional or National Park around Loch Awe, and
subsequently a key facility within it, both of which could have significant
positive impact on the local community.
Although still available for such use, Kilchrenan Primary School has not
been used by or for the community since it has been mothballed. The
presence of a newly refurbished village hall near to the school means
that there is an existing, high-quality resource for community events in
the area. 
Other than the points about the school’s role in attracting potential
residents to the area, respondents did not note any negative impact on
the community of the school’s mothballing. 
6.4.2 Travel Arrangements 
The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via the
B845. Travel time is approximately 14 minutes. The B845 is a single
track road, access to which can be limited during adverse winter weather. 
The travel arrangements for pupils travelling to Taynuilt PS have been in
place since February 2022, and travel by car or bus is an accepted aspect
of living in the communities of Kilchrenan, Inverinan and Dalavich. If
Kilchrenan Primary school were to reopen there could be a positive
impact on the health and wellbeing of some pupils who are

Page 80

60 
able to walk or cycle to school. However, the lack of safe walking and
cycle routes and the considerable distances involved would limit this. For
example, it is 8.3 miles from Dalavich to Kilchrenan. Staff would either
travel to the school by car, or if they live locally could walk or cycle. There
may be a positive environmental impact as the use of vehicles to
transport pupils may decrease. Conversely, reopening the school would
mean increased car usage by staff with commensurate negative
environmental impact. 
6.4.3 Educational Benefits
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community, ensuring effective learning and teaching
which is matched to such needs. All school in Argyll and Bute implement
Curriculum for Excellence, and there are therefore no specific
educational benefits associated with the re-opening the Kilchrenan PS. 
However, the reopening of the school would entail those local children
choosing to attend being part of a very small school roll, which a number
of parents/carers, and indeed children, in the catchment area viewed as
disadvantageous to educational development for a number of reasons,
including limited social groups and interaction, fewer curricular
opportunities and experiences and less individual attention on account of
composite classes covering a wide range of age groups.
A small number of attendees indicated their views on the potential
benefits of attending a school with a very small roll. 
With respect to outdoor learning, community spaces could be used either
in the school grounds or in the immediate neighbourhood if the school
were to reopen. Outdoor learning is provided by all schools. 
As a result of the continued mothballing of the building, there would be
issues with respect to the current condition and suitability of the school
buildings and facilities which could negatively impact learning and
teaching. The building itself, when recovered from its mothballed state,
would still present the limitations which impacted learning previously,
including issues relating to its accessibility, the safety of its outdoor
spaces and the absence of dedicated PE and catering facilities. 
6.5 Summary 
Of the 20 people who attended the Community Engagement Event, less than
half supported the re-opening of Kilchrenan Primary School. If the school
reopened, the school roll would still be unsustainably low, most likely standing
at a maximum of one, five and and six pupils respectively over the next three
years, based on the projected numbers of primary one pupils.

Page 81

61 
There are financial implications associated with the reopening of Kilchrenan
Primary School. The total cost of re-opening the school is £150,763, while the
cost of bringing the property to the level and standard required for reopening is
£29,000. The annual expenditure of £9,888 mothballing costs would no longer
apply. 
If the School were to be reopened, the premises and facilities would be available
for use by the community, in addition to its use as an educational facility.
However, with the village hall being in regular use, this impact would be limited.
The reopening of the School may encourage families with school age children
to move to the community, which may make the community more sustainable. 
The present pupil travel arrangements have been in place for almost 18 months.
Should the school reopen, there may be a positive environmental impact as the
use of vehicles to transport pupils may decrease. Conversely, there could be
increased car usage by staff which may mean travel arrangements have a
negative environmental impact. 
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Considering all of the above, re-opening Kilchrenan PS is not considered to be
a reasonable option. 
7.0 OPTION B: CONTINUED MOTHBALLING OF KILCHRENAN PRIMARY
SCHOOL WITH PUPILS ZONED TO TAYNUILT PRIMARY SCHOOL 
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school
and the desirability of maintaining capacity to re-open a school there, but it is
unlikely that it should exceed 3 years in areas that are not very remote.”
Kilchrenan Primary School has been mothballed for 18 months. 
7.1 Community Feedback 
Only one attendee was of the view that mothballing of Kilchrenan PS could
continue, to allow children of pre-school age to attend the school once they
attained the required age. All others at the Community Engagement Event who
expressed an opinion felt that mothballing the school over a longer period would
be wasteful due to deterioration of the property, and that a firm decision to close
or re-open the school should be made. 
7.2 Pupil Numbers

Page 82

62 
Pupil numbers are not projected to increase over the next four years, as per
Table 3 above. The table reflects the maximum school roll possible, and does
not take into account the choices of all parents/carers of primary-aged children
to send children to Taynuilt PS or other schools outwith the catchment area by
virtue of making a placing request. 
7.3 Financial Information 
The annual cost of mothballing Kilchrenan Primary School is £9,888. This does
not include costs related to the transfer of a member of staff to another school,
and the associated over-staffing costs. Neither does this take into account the
cost to bring the property to an acceptable standard for any re- opening of the
school, which is £29,000. 
The annual cost of transporting pupils to Taynuilt Primary School during the
period of mothballing of Kilchrenan PS is £27,295. 
7.4 Assessment of Rural Factors 
Section 12A(2) of the Children and Young People (Scotland) Act (2014) requires
the education authority to identify its reasons for the closure proposal of a rural
school, and consider whether there are any reasonable alternatives to the
proposal which could respond to those reasons. For the proposal and each and
any alternatives identified, the education authority is required to assess the likely
educational benefits, the likely effect on the local community and the likely effect
of different travelling arrangements. 
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
7.4.1 Community Impact 
If mothballing of Kilchrenan PS were to continue, pupils would continue
their education at Taynuilt PS, or elsewhere, and there would be no
change to the current impact on the community. The building has not
been used by the community during the period of mothballing, with the
nearby Kilchrenan Village Hall fulfilling the civic requirements of the
community. Furthermore, if the mothballing of Kilchrenan PS were to
continue, the building would deteriorate further, with the result that it may
not be available for community use under any circumstances. 
Some members of the community view the buildings and grounds as an
opportunity to develop a local small business hub, and as both a base for
the campaign to create a Loch Awe Regional/National Park, and a key
facility within such a park should it be established. Continued mothballing
would stall any such developments, or any alternative plans for the
building brought by the local community.

Page 83

63 
It can therefore be seen that to continue to maintain KIlchrenan PS in its
mothballed state will have no positive impact on the local community,
which is reflected in the views of almost all those consulted during the
preliminary engagement exercise.
7.4.2 Travel Arrangements 
The continuation of the mothballing of Kilchrenan PS would entail no
change to the travel arrangements for children that are currently in place,
nor to the environmental impact of such travel arrangements, both of
which are detailed in section 6.4.2 above. 
7.4.3 Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community. All schools in Argyll and Bute implement
Curriculum for Excellence, ensuring effective learning and teaching
which is matched to such needs. For these reasons, the continued
mothballing would bring no specific educational benefits for pupils. 
The continued mothballing of Kilchrenan PS would continue the
arrangements which have been in place for the last 18 months. However,
any continued deterioration in the fabric and fittings of the school building
as a result of mothballing would exacerbate the issues associated with
re-opening, as described in section 6.4.3 above, and their potentially
negative impact on the quality of educational provision in the building in
any future scenario. 
7.6 Summary 
Almost all of those who attended the Community Engagement Event were
against continuing the 18 month mothballing of Kilchrenan Primary School.
There was a view that mothballing the school over a long period was wasteful
due to deterioration of the property and the costs involved, and that a decision
to close or re-open the school should be made. 
The current annual cost (2022/23) to the Council of the mothballed Kilchrenan
Primary School is £9,888. This includes electricity, heating oil, and ground
maintenance, building maintenance and repair costs. It does not include the
cost of over-staffing in another school to which the member of Kilchrenan’s staff
transferred. Neither does it take into account the cost to bring the property to
an acceptable standard should mothballing be followed by re- opening of the
school, which is £29,000. Continuation of mothballing would mean no change
to the annual transport cost of taking pupils to alternative schools, which is
£27,295.

Page 84

64 
The present travel arrangements have been in place for 18 months. Should the
school continue to be mothballed these travel arrangements would continue.
There are no specific educational benefits from continuing the mothballing of
Kilchrenan Primary school. 
On the basis that pupil numbers are not expected to increase and the building’s
mothballing is not of benefit to the community or the Council, continued
mothballing of Kilchrenan Primary School is not viewed as a reasonable option. 
8.0 OPTION C: RE-OPEN KILCHRENAN PRIMARY SCHOOL AND EXTEND
ITS CATCHMENT AREA 
8.1 Community Feedback 
As detailed in the map at section 3.8 above, the existing catchment area for
Kilchrenan Primary School is very rural and very sparsely populated. It already
covers a broad area, characterised by small communities which are mostly
situated along a single road over a distance of approximately 13 miles. This
linear aspect to the geography of the catchment area, and the absence of any
further significant habitation immediately to the south of the existing catchment
areas – the only direction in which the catchment area could realistically be
extended – means that there is limited scope for increasing the catchment area. 
Were the catchment area to be extended to the north, towards Taynuilt, again,
this would include very few dwellings, and, depending on the extent of the
extension, would impinge on the intake for Taynuilt PS, as would any significant
southwards extension on Kilmartin PS. This could have negative consequences
for staffing in these schools should their rolls fall to any degree. Loch Awe to the
east and inaccessible, unpopulated land to the west make any extension in
those directions unviable. 
All those attending the Community Engagement Event felt that extending the
catchment area was an unrealistic proposal for Kilchrenan Primary School. The
community felt that moving the boundary in any of the ways described above
would add very few, if any, pupils to the roll, and could increase transport
distances and times. 
8.2 Pupil Numbers 
It is very unlikely that the establishment of any new catchment area would
increase the potential roll of Kilchrenan PS, particularly as there is no guarantee
that children living in any newly-extended catchment area would necessarily
attend Kilchrenan PS – as placing requests can be made for children to attend
schools other than their catchment school.

Page 85

65 
8.3 Financial Information 
The finance required to re-open the school, including costs relating to
employees, premises, supplies and services and catering is £150,763 
In addition, the cost to bring the property to an acceptable standard to re-open
the school is £29,000.
There would also be a financial cost associated with the transport to school of
pupils within a larger catchment area. 
8.4 Assessment of Rural Factors 
Section 12A(2) of the Children and Young People (Scotland) Act (2014) requires
the education authority to identify its reasons for the closure proposal of a rural
school, and consider whether there are any reasonable alternatives to the
proposal which could respond to those reasons. For the proposal and each and
any alternatives identified, the education authority is required to assess the likely
educational benefits, the likely effect on the local community and the likely effect
of different travelling arrangements.
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
8.4.1 Community Impact 
The reopening of the school with a larger catchment area would increase
opportunities for the premises to be used by the community. It would also
be a possibility that the school pupils would invite the community to
specific events. The presence of a school and the facilities/activities that
may be offered could make the area a more attractive place to live.
Reopening the school may therefore encourage families with school-age
children to move to the community. This in turn may make the community
more sustainable. 
However the community have demonstrated that there is a limited desire
for the school to reopen. Some who attended the Community
Engagement Event indicated the desire for the school to become a hub
office for the many local small businesses, and a base for the campaign
to establish a Regional or National Park around Loch Awe, both of which
could have significant positive impact on the local community. 
Although still available for such use, Kilchrenan Primary School has not
been used by or for the community since it has been mothballed. The
presence of a newly refurbished village hall near to the school means
that there is an existing, high-quality resource for community events in
the area.

Page 86

66 
Other than the points about the school’s role in attracting potential
residents to the area, which could benefit the community’s economy and
sustainability, those consulted did not note any negative impact on the
community of the school’s mothballing. 
8.4.2 Travel Arrangements 
The travel distance from Kilchrenan Primary to Taynuilt Primary is 6.7
miles via the B845. Travel time is approximately 14 minutes. The B845
is a single track road, access to which can be limited during adverse
winter weather. 
The travel arrangements for pupils travelling to Taynuilt PS have been in
place since February 2022, and travel by car or bus is an accepted aspect
of living in the communities of Kilchrenan, Inverinan and Dalavich. If
Kilchrenan Primary school were to reopen with a wider catchment area,
there could be a positive impact on the health and wellbeing of some
pupils who are able to walk or cycle to school. However, the lack of safe
walking and cycle routes and the considerable distances involved would
limit this. For example, it is 8.3 miles from Dalavich to Kilchrenan, and
the extension of the catchment area could extend distances to school for
pupils within the catchment to over 10 miles. Staff would either travel to
the school by car, or if they live locally could walk or cycle. There may be
a positive environmental impact as the use of vehicles to transport pupils
may decrease. Conversely, reopening the school with a wider catchment
area would mean increased car usage by staff, and greater distances for
pupils to travel to school by vehicle, with commensurate negative
environmental impact. 
8.4.3 Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community. There are no specific educational benefits
associated with the re-opening the Kilchrenan PS with a wider catchment
area, as all schools implement Curriculum for Excellence, ensuring
effective learning and teaching which is matched to the needs of children. 
However, the reopening of the school, albeit with an extended catchment
area, would still mean those local children choosing to attend were part
of a very small school roll, which a number of parents/carers, and indeed
children, in the catchment area viewed as disadvantageous to
educational development for a number of reasons, including  limited
social groups  and interaction,  fewer  curricular

Page 87

67 
opportunities and experiences and less individual attention on account of
composite classes covering a wide range of age groups.
A small number of those consulted indicated the potential benefits of
attending a school with a very small roll.
With respect to outdoor learning, community spaces could be used either
in the school grounds or in the immediate neighbourhood if the school
were to reopen. Outdoor learning is provided by all schools. 
As a result of the continued mothballing of the building, there would be
issues with respect to the current condition and suitability of the school
buildings and facilities which could negatively impact learning and
teaching. The building itself, when recovered from its mothballed state,
would still present the limitations which impacted learning previously,
including issues relating to its accessibility, the safety of its outdoor
spaces and the absence of dedicated PE and catering facilities. 
8.5 Summary 
Of the 20 people who attended the Community Engagement Event, none
expressed support for the re-opening of Kilchrenan Primary School with an
extended catchment area. 
All who reflected on the option acknowledged that the unique geographical
character of the area makes an extension unviable. They saw it as unlikely that
any extension of the catchment area would increase the school roll, as there are
few dwellings that could be included in such an extension. Pupils now attending
Taynuilt PS or St. Columba’s PS would be very unlikely to transfer back to
Kilchrenan PS, and those families included in a newly- extended catchment area
may wish their children to remain in the school they presently attend. Therefore,
if the school reopened with an extended catchment area, the school roll would
most likely still be unsustainably low.
There are financial implications associated with the reopening of Kilchrenan
Primary School with an extended catchment area. The total cost of re-opening
the school for educational provision is £150,763, while the additional cost of
bringing the property to the level and standard required for reopening is
£29,000. The annual expenditure of £9,888 mothballing costs would no longer
apply. Additional transport costs could also be incurred by the local authority. 
If the School were to be reopened with an extension of the catchment area, the
premises and facilities would be available for use by the community, in addition
to its use as an educational facility. However, with the village hall being in regular
use, this impact would be limited. The reopening of the school may encourage
families with school age children to move to the community, which may make
the community more sustainable. 
The travel distance and time from Kilchrenan PS to Taynuilt PS is 6.7 miles in
14 minutes, via the B845. Adverse weather can be a factor, however this is no

Page 88

68 
different to other rural schools and areas. The present pupil travel arrangements
have been in place for almost 18 months. Should the school reopen with an
extended catchment area, there may be a positive environmental impact as the
use of vehicles to transport pupils may decrease. Conversely, there could be
increased car usage by staff, and further for pupils to travel by vehicle, which
may mean travel arrangements have a negative environmental impact. 
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Considering all of the above, reopening Kilchrenan PS with an extended
catchment area is not considered to be a reasonable option. 
9.0 OPTION D: CLOSE KILCHRENAN PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR TAYNUILT PRIMARY SCHOOL TO INCLUDE THE
CURRENT KILCHRENAN CATCHMENT AREA 
9.1 Community Feedback 
The majority of people who attended the Options Appraisal meeting were not in
favour of re-opening Kilchrenan PS as a school, and saw closure as the only
viable option. Parents/carers of school-age children commented that the
mothballing of the school after the roll fell to zero in February 2022 was a result
of parental choice – several pupils had left the school at the beginning of the
2021-22 school session, transferring to St Columba’s PS, and the remaining
pupils moved to Taynuilt PS on the retirement of the Head Teacher in February
2022. Parents spoke of their greater satisfaction with the overall educational
provision in their children’s new schools. Among the key reasons for this were
less broad composite classes, more focus on children’s individual learning
needs, a wider social mix and increased choice in terms of friendship groups,
wider curricular opportunities and a greater range of sports and activities on
offer. Parents acknowledged the benefits of a small and close school
community, but pointed out both that Taynuilt is not too far away, and that there
are already great physical distances within the Kilchrenan catchment area.
Some parents also said that the travel arrangements involved in getting to
Kilchrenan each day were not greatly different from those involved in getting to
their present schools in Taynuilt and beyond. 
Parents also felt that the absence of wrap-around childcare and child minders
in the Kilchrenan catchment area negated any benefits of there being a school
in Kilchrenan, as travel beyond Kilchrenan was required to access such
services, allowing parents to work. 
Some members of the community spoke of their active intentions to repurpose
a closed Kilchrenan PS for the benefit of the community. They wish to use the
school as a hub office for local small businesses, and as a base for the

Page 89

69 
campaign to establish a Regional/National Park in the Loch Awe area, as well
as a key facility in the park if it is subsequently established.
9.2 Pupil Numbers 
Table 4 below details the occupancy level for Taynuilt PS over the next four
years as a percentage of its maximum capacity, taking into account the likely
intake of pupils from the present Kilchrenan PS catchment area were Kilchrenan
PS to be closed. 
Table 4: School Occupancy 
2023/24 2024/25 2025/26 2026/27
Approved
Capacity
Taynuilt
PS
163 163 163 163
Projected
Roll
Taynuilt
PS
58 60 55 48
Kilchrenan
PS
Projected
Roll
8 8 10 8
Maximum
Roll
Projection
Taynuilt
Primary
66 68 65 56
Taynuilt
PS
Occupancy
%
40% 42% 40% 34% 
Should Kilchrenan PS close, pupils from the Kilchrenan PS catchment area
would attend Taynuilt PS, other than any pupils choosing denominational
education at St. Columba’s Roman Catholic PS, in the catchment for which
Kilchrenan lies. There is a declining trend in the school roll at Taynuilt PS and
the predicted occupancy rate for Taynuilt PS varies between 42% and 34% over
the next four years. There are no issues associated with the capacity of Taynuilt
PS to receive pupils from the present Kilchrenan catchment area, and such a
scenario can be seen as beneficial to the Taynuilt PS school community.

Page 90

70 
9.3 Financial Information
Since the mothballing of Kilchrenan PS, there has been a bus service for pupils
travelling to Taynuilt PS, at an annual cost of £27,295. The closure of Kilchrenan
PS would therefore not incur any additional transport cost. It is possible that the
closure of Kilchrenan PS and the establishment of Taynuilt PS as the catchment
school could result in a gradual reduction of the numbers of pupils attending St.
Columba’s PS in Oban. Were this service from the Kilchrenan/Dalavich district
no longer required, a saving on transport to St. Columba’s PS may be possible.
At present, the cost of transporting pupils to St. Columba’s PS from the
Kilchrenan catchment area is £26,726 annually. 
If Kilchrenan Primary School were to be closed it would generate an annual
saving of £9,888, the current annual cost of mothballing (2022-23) not including
the cost relating to overstaffing in another school as a result of staff transfer from
Kilchrenan. The potential cost of reopening the school, totalling
£150,763 on an ongoing annual basis, plus £29,000 to bring the building up to
the required standard for reopening, would also require no further consideration. 
9.4 Assessment of Rural Factors 
Section 12A(2) of the Children and Young People (Scotland) Act (2014) requires
the education authority to identify its reasons for the closure proposal of a rural
school, and consider whether there are any reasonable alternatives to the
proposal which could respond to those reasons. For the proposal and each and
any alternatives identified, the education authority is required to assess the likely
educational benefits, the likely effect on the local community and the likely effect
of different travelling arrangements.
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
9.4.1 Community Impact 
If Kilchrenan PS were to close, pupils would continue their education at
Taynuilt PS – the catchment area of which would incorporate the present
Kilchrenan catchment area – or elsewhere, and there would be no
change in terms of the current impact on the community. The Kilchrenan
school building has not been used by the community during the period of
mothballing. The nearby Kilchrenan Village Hall fulfils a wide range of
civic requirements in the area, and is newly-refurbished, well-equipped
and community-co-ordinated.
Some members of the community view the buildings and grounds as an
opportunity to develop a local small business hub, and as both a base for
the campaign to create a Loch Awe Regional/National Park, and a key
facility within such a park if established. The closure of the school would
permit the local community to take such ventures forward, under the
terms of the Community Empowerment (Scotland) Act 2015. Such a

Page 91

71 
re-purposing of the building could potentially have a very positive impact
on the economy and sustainability of the community in the longer term.
The closure of the school may have a negative impact on the numbers of
those with children considering a move to the area, a concern held by
some of those who attended the Community Engagement Event. This
could have an adverse effect on the sustainability of the local community,
although others pointed to a lack of affordable housing being the greatest
issue for community sustainability. 
Other than the possible role of the reopened school attracting new
residents to the area, attendees at the Community Engagement Event
did not detail any further negative consequences of the school being
closed. 
9.4.2 Travel Arrangements 
The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via
the B845. Travel time is approximately 14 minutes. The travel
arrangements have been in place for 18 months. Travel is an accepted
aspect of living in the Kilchrenan community and the occasional issues
relating to adverse winter weather are acknowledged. The option to
close the school would have no effect on the current travel
arrangements of staff and pupils, the associated costs or the
environmental impact of travel. 
9.4.3 Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community. There are no specific educational benefits
associated with the closure of Kilchrenan PS, as all schools in Argyll and
Bute implement Curriculum for Excellence, ensuring effective learning
and teaching which is matched to the needs of children. 
Scottish Government classification defines both Kilchrenan PS and
Taynuilt PS as remote rural schools. However, Taynuilt PS has a more
accessible location in a larger village. Children from the Kilchrenan area,
attending Taynuilt Primary School are benefitting from learning with a
greater number of peers of the same age and stage as themselves, as
opposed to experiencing a single, multi-composite classroom. Pupils also
benefit from the increased friendship groups that a larger school can
offer, and from being part of a social context in which they can build
relationships with different groups and individuals, develop social skills,
meet challenges and exercise responsibilities as

Page 92

72 
members of a social group. They are able to interact and socialise with
larger groups of children, take part in team activities and move with an
established group of friends and peers to secondary school at Oban High
School.
In interview, two pupils spoke of not having enough choice of people to
play with at Kichrenan. Two pupils spoke of how attending Taynuilt PS
was preparing them better for meeting large groups of people in
secondary school and beyond. One pupils said that he was enjoying
doing much more group work in Taynuilt PS. One pupil said that after an
argument or if there was a problem, there were now more people to
approach than at Kilchrenan. 
Almost all children spoke of the better facilities and range of activities on
offer in their new schools, with better PE and more sports on offer. 
9.5 Summary 
From those who attended the community engagement event, there was majority
support for the closure of Kilchrenan PS as a school, and realigning the
catchment area of Taynuilt PS. 
The projected roll for Taynuilt PS ranges between 42% and 34% of the school’s
maximum capacity over the next four years. Upon the closure of Kilchrenan PS,
the intake of a small number of children from the previous Kilchrenan catchment
area will put no pressure on the school’s capacity, and will be positive for the
school in terms of the greater mix of children attending, the potential input of
additional engaged parents and the potentially positive impact on the school’s
staffing. 
The closure of Kilchrenan PS would incur no increased annual transportation
costs, and the annual costs of maintaining the school building in its mothballed
state, £9,888, would be saved by the council. The projected substantial costs of
re-opening the school would require no further consideration. 
Travel arrangements to Taynuilt PS, which almost all children and their parents
have deemed to be satisfactory, are already in place for children within the
Kilchrenan catchment area, and would continue should Kilchrenan PS be
closed. There would be no clear negative environmental issues associated with
the closure of the school. The vehicular transport arrangements would remain
as they are. 
In Taynuilt PS, children benefit from a positive learning environment, and from
learning and teaching which is matched to the needs of the young people who
attend the school. In addition there are more opportunities for personal and
social development, and for access to a potentially broader range of learning
experiences and activities.

Page 93

73 
After consideration of all that has been discussed above, the closure of
Kilchrenan PS and the realignment of the Taynuilt PS catchment area to include
the present Kilchrenan catchment area has been identified as a reasonable
option for further consideration and consultation. 
10.0 OVERVIEW OF OPTIONS 
Option Option Description Outcome
A Re-open Kilchrenan Primary School with
the existing catchment area.
Not a reasonable option.
B Continued Mothballing of Kilchrenan
Primary School with the pupils zoned to
Taynuilt Primary School. 
Not a reasonable option.
C Re-open Kilchrenan Primary School and
extend its catchment area.
Not a reasonable option
D Close Kilchrenan Primary School and
realign the catchment area of Taynuilt
Primary School to include the current
catchment area for Kilchrenan Primary
School.
A reasonable option, with
consideration given to
the present school
building becoming a
facility the community
can develop for its
benefit and sustainability. 
11.0 ANALYSIS OF REASONABLE OPTION: CLOSE KILCHRENAN PRIMARY
SCHOOL AND REALIGN THE CATCHMENT AREA FOR TAYNUILT
PRIMARY SCHOOL TO INCLUDE THE CURRENT KILCHRENAN
CATCHMENT AREA 
11.1 The closure of Kilchrenan PS, and the realignment of the Taynuilt PS catchment
area to include the current Kilchrenan catchment area, is assessed to be the
only reasonable option to be presented to members at committee, and, if
approved, to subsequently progress to formulation of a “relevant proposal”
under the Schools (Consultation) (Scotland) Act 2010, as amended by the
Children and Young People (Scotland) Act 2014. 
This section of the report both summarises and provides more information on the
key factors considered in such an assessment, and goes into significant detail
regarding the educational benefits of closing Kilchrenan PS, particularly as
regards the educational provision offered by Taynuilt PS. 
11.2 Pupil Projections 
As detailed above, the realignment of the Taynuilt PS catchment area to include
that of Kilchrenan PS, and the subsequent enrolment of additional pupils, will
not substantially affect the school occupancy in relation to the

Page 94

74 
school’s maximum capacity. As detailed in the table below, the predicted
occupancy rate for Taynuilt PS varies between 42% and 34% over the next four
years. There are no issues associated with the capacity of Taynuilt PS to
receive pupils from the present Kilchrenan catchment area, and such a scenario
can be seen as beneficial to the Taynuilt school community. 
2023/24 2024/25 2025/26 2026/27
Approved
Capacity
Taynuilt
PS
163 163 163 163
Projected
Roll
Taynuilt
PS
58 60 55 48
Kilchrenan
PS
Projected
Roll
8 8 10 8
Maximum
Roll
Projection
Taynuilt
Primary
66 68 65 56
Taynuilt
PS
Occupancy
%
40% 42% 40% 34% 
11.3 Assessment of Rural Factors 
11.3.1 Educational Benefits 
Learning and Teaching 
The following focuses on learning and the curriculum at Taynuilt PS, which is
the school most Kilchrenan PS pupils have been attending since February 2022,
and would be the future receiving school for children presently living within the
Kilchrenan PS catchment area. 
The curriculum at Taynuilt PS includes a broad range of planned experiences,
to help every child and young person to develop knowledge, skills and attributes
for success in learning, life and work.

Page 95

75 
In Taynuilt PS, children are encouraged to be eager and active participants who
are engaged, resilient and highly motivated during their learning. Children know
that their views are sought, valued and acted upon. The learning environment
encourages a high level of achievement, providing a wide range of opportunities
for children to achieve their full potential within the four contexts of learning –
curriculum areas and subjects, interdisciplinary learning, the ethos and life of
the school and opportunities for personal achievement. 
In Taynuilt PS, children are taught in composite classes composed of children
from no more than two year groups. Children benefit from being part of a social
context in which they can build relationships with different groups and
individuals, develop social skills, meet challenges and exercise responsibilities
as members of a social group. They are able to interact and socialise with
groups of children through a variety of learning activities, as well as take part in
team activities and move with their peers to secondary school. 
There is a continual challenge for all schools to deliver a school improvement
agenda and deliver effectively the principles and outcomes of curriculum for
excellence. The National Improvement Framework priorities include raising
attainment for all, and closing the gap between the most and least
disadvantaged children. 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising autonomy, creativity and
responsibility, in the context of broader guidance. This means that schools are
able to design their curriculum to meet the specific needs of their children and
community. The Head Teacher of Taynuilt Primary School leads a team of staff
who are challenged and supported through a range of continuing professional
review and development opportunities. The school is part of the Oban Lorn and
the Isles Schools Cluster, which means that staff can be supported to work
together, moderation and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within Taynuilt Primary School are
able to support and challenge each other on a daily basis. The whole staff are
able to bring a range of talents and skills to benefit outcomes for learners. 
Taynuilt PS has been focusing strongly on the development children’s
understanding of their rights – their role in wellbeing, sustainable living and
school improvement – and working towards Rights Respecting School
accreditation. A further key focus for the school is the empowerment of
parents/carers in shaping and participating in policy, learning and the life and
ethos of the school through a strong parent council and a vibrant parental voice.
A third improvement focus for the school community has been to develop further
the use of self-evaluation and attainment data to inform improvement planning
at whole-school level, and to support appropriate, effective, timely interventions
for children in their learning and attainment. Other ongoing improvement
priorities include supporting digital learning, developing Reading through
targeted interventions, supporting progress in Numeracy through the use of
Stages in Early Arithmetical Learning, and

Page 96

76 
promoting Pupil Leadership of activities and initiatives, and ownership of and
engagement with their own learning.
Taynuilt PS encourages outdoor learning activities and learning through play.
Partnership working with local employers and the Parent Council has helped to
develop resources and outdoor learning zones to support this approach. The
poly-tunnel supports children’s understanding of health and wellbeing, bio-
diversity and sustainability. 
Taynuilt PS is in a village location within Taynuilt, which, like Kilchrenan Primary
School, is classed as a very remote rural school. The Head Teacher has a
strong understanding of the rural communities that the school serves. 
Taynuilt PS has its own linked ELC on site, with which it coordinates an active
transition calendar. The school also has strong links with Oban High School
with which it liaises, alongside all other OLI schools, throughout the year to
ensure a smooth transition for P7 pupils into S1. 
Outcomes 
Through the GIRFEC practice model, meeting the needs of every child
continues to be a priority and teachers carefully plan and assess to ensure each
child has the opportunity to reach their potential. Careful tracking and monitoring
procedures are in place to evidence pupil progress. This includes professional
dialogue with teachers, learning discussions with children, classroom
observations, assessment and analysis of pupil work. As a result of such
practice, appropriate interventions are put in place, involving parents/carers and
other agencies to ensure the needs of each child are met.
In Taynuilt PS, most children are achieving the expected levels for their stage
in Reading, Writing, Listening and Talking and Numeracy. The attainment of
children at Taynuilt PS is strong: between 2019 and 2022, attainment levels for
P1, P4 and P7 pupils at Taynuilt PS in Numeracy and across the three areas of
Literacy were above the Argyll and Bute and National averages. 
Taynuilt PS continues to develop positive relationships within the school through
a focus on Nurture and Rights Respecting Schools. The larger staff,
parent/carer body and partner group of the school naturally increases the
breadth of talent and interest that may be available to share within a school
setting. This applies both in terms of the wider curriculum and within aspects of
the curriculum that may be enhanced by staff individual expertise e.g. PE,
language, science, expressive arts teaching. 
Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which help them
develop the knowledge and understanding, skills, capabilities and attributes
which they need for their mental, emotional, social and physical wellbeing both

Page 97

77 
now and in the future. Taynuilt PS has been evaluating its community links as
part of its Covid Recovery Plans, providing enhanced opportunities for social
interaction and skills development. 
Environment for Learning 
Taynuilt PS is a suitably-equipped and well supported school, situated in village
of Taynuilt. The school building is graded highly suitable for effective
educational provision (Suitability Rating A) and the grounds and surroundings
are extensive and attractive, providing ample space for play and outdoor
learning. The building has facilities for pupils and visitors with special access
needs. 
11.3.2 Community Impact 
While there was some variance of community views at the Community
Engagement Event, the majority of attendees supported closure of Kilchrenan
PS. 
It is understood that a school closure may have an effect on the community’s
sustainability, as a result of families with children being put off moving into the
area. However, members of the local community are being proactive in
developing proposals for the Kilchrenan school building, which, if fulfilled, could
have a positive effect on the economy and sustainability of the area and
community. Present proposals are to request the transfer of the Kilchrenan PS
building into local community ownership/management under the terms of the
Community Empowerment (Scotland) Act 2015. It is proposed that the building
become a hub office for local small businesses, and a centre for the campaign
to establish either a new Regional or National Park in the Loch Awe area, the
application processes relating to which are already underway. Should a park be
established at regional or national level, it is envisaged that the school building
could become a key facility within the park infrastructure. The formal closure of
the school would allow such plans to progress.
Any civic role which the school building may have previously played in the
Kilchrenan community, or which it could continue to play were it to remain open,
can be adopted by the Kilchrenan Village Hall, which is run and co- ordinated
by local community members. Having been recently refurbished, the hall is well
equipped to play a key role in staging key local events and activities, and is
doing so effectively. 
The closure of Kilchrenan PS could have positive consequences for the future
of Taynuilt PS, and by extension, the community of Taynuilt. Against the
backdrop of a school roll at Taynuilt which is projected to fall in coming years,
even a small increase in the number of pupils coming to the school as a result
of the closure of Kilchrenan could have benefits in terms of the school’s staffing
complement, the number of composite classes, the mix and diversity of the pupil
cohort and the number of parents potentially able to contribute to the life and
work of the school.

Page 98

78 
11.3.3 Travel Arrangements
Travel by vehicle is an accepted aspect of living in the Kilchrenan community,
and there were already considerable transport considerations for those
travelling from Inverinan or Dalavich to Kilchrenan before Kilchrenan PS was
mothballed. 
The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via the B845.
Travel time is approximately 14 minutes. The travel arrangements for pupils in
the Kilchrenan catchment area travelling to Taynuilt have been in place for 18
months. Occasional issues relating to adverse winter weather are
acknowledged. The option to close the school would have no effect on the
current travel arrangements of staff and pupils, the associated costs to the
Council or families or the environmental impact of travel. 
11.5 Financial Impact 
The main elements included within a school budget are teacher employment
costs (basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government Employee costs and an allocation for discretionary expenditure
incurred by the school (educational equipment, materials, staff travel, etc.).
Teacher staffing budgets are calculated on an annual basis and within the
Primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of pupils in each school. When a school ceases to be operational, the
teacher staffing budget is adjusted (at the appropriate time), as per entitlement
information from Education HR, with the staffing budget resulting in a nil value.
As a result of the authority’s policy for no teacher redundancies, it is presumed
that the staff will be deployed elsewhere within the authority and therefore their
salary costs still exist, and there is an increase to the receiving school’s budget.
This is also in line with the national priority of maintaining teacher numbers. This
methodology also applies to the school’s discretionary budget which again is
formula-based. The budget of the receiving school, in terms of any pupils being
transferred, will increase. The figures outlined below take account of the fact
that the staffing and discretionary budgets for Kilchrenan PS have been
adjusted to nil.
The annual running costs during mothballing of Kilchrenan Primary School are
£9,888. Therefore, annual savings generated through closing Kilchrenan
Primary School would be £9,888. 
The costs/savings outlined above assumes all revenue expenditure would
cease. This includes non-domestic rates, utility costs, insurances, etc. If the
school were to be formally closed, this would allow the council to take steps
towards selling the school premises to a third party or progressing its

Page 99

79 
handover to local community groups under the terms of the Community
Empowerment (Scotland) Act 2015.
11.6 Environmental Impact
Pupils currently travel to Taynuilt PS. The option to close Kilchrenan PS would
have no further environmental impact, and would have no impact on the current
travel arrangements for staff and pupils. Travel to access services and
amenities is an accepted aspect of rural life. 
12.0 CONCLUSION 
Four alternative options have been reviewed in considering the future of
Kilchrenan Primary School. For each option, information was collated and
consideration was given to: 
• Community feedback;
• Pupil numbers;
• Financial Information;
• Assessment of rural factors, including community impact, travel
arrangements, and educational benefits. 
An authority that is contemplating a rural school closure proposal must satisfy
the preliminary requirements set out in Section 12A of the 2010 Act before
formulating a proposal. 
After consideration of the preliminary requirements, as set out in the Act, and
the options, and having regard to the specific reasons identified at Section 2 of
this report, closing Kilchrenan Primary School and realigning the catchment
area of Taynuilt Primary School to include the current catchment area for
Kilchrenan Primary School has been identified as the most reasonable option
to address the underlying reasons for the proposal. 
Members are asked to:
• Note the outcome of this consideration of the preliminary requirements;
• Agree that Officers now formulate a draft closure proposal that will come
back to the December 2023 meeting of the Committee for consideration by
Members. If approved it would subsequently trigger a statutory consultation
process under the Schools (Consultation) (Scotland) Act 2010. 
Appendices 
• Appendix 1 – LDP2 for Kilchrenan
• Appendix 2 – LDP2 for Taynuilt
• Appendix 3 – Key for Local Development Plans
• Appendix 4 – Floor Plan of Kilchrenan PS
• Appendix 5 – Floor Plan of Taynuilt PS

Page 100

80 
• Appendix 6 – Record of views expressed at Community Engagement
Event, Kilchrenan Village Hall, 31st May 2023 
Appendix 1 – LDP2 for Kilchrenan

Page 101

81 
Appendix 2 - LDP2 for Taynuilt

Page 102

82 
Appendix 3 – key for Local Development Plans

Page 103

83 
Appendix 4 – Floor Plan of Kilchrenan PS 
Appendix 5 – Floor Plan of Taynuilt PS

Page 104

84

Page 105

85 
Appendix 6 – Record of views expressed at Community Engagement Event,
Kilchrenan Village Hall, 31st May 2023 
What has been the effect of the mothballing of Kilchrenan PS on the local
community?
• “None – some may say having a local primary school attracts young families
to the area, but as there is no affordable or social housing available, this is not
relevant.”
• “It is less likely that families will move to the area.”
• “Quieter without children in the playground.”
• “The Community Village Hall has lost revenue as the council no longer hires it
for PE lessons”
• “Children and parents are necessarily spending more time as part of a
different community.”
• “Very little change for a lot of us to be honest.” 
Option 1 – Continue with Mothballing of Kilchrenan PS
• Wider range of professionals moving to area due to improvement in
connectivity. There may be more children in the community in the future.
• Continue with mothballing until viability improves
• Having a school in the area may support the creation of more social/affordable
housing in the area, as families are more likely to move to the community.
• Continuing mothballing would be the worst of both worlds – better to make a
firm decision. (several attendees were of this view) 
Option 2 – Reopen Kilchrenan PS with the current catchment area
• The area is less attractive to families without a school – it is the hub of the
community
• There are concerns about transport for pupils from Dalavich travelling to
alternative schools further away.
• Kilchrenan could reopen within a hybrid model – links to other schools to
deliver aspects of the curriculum virtually.
• We would like our child to attend the local school here in the village of
Kilchrenan
• We would prefer to send our child to Taynuilt – better opportunities and a
wider social circle
• If Kilchrenan doesn’t reopen, the community is at risk as there will be nothing
to attract young families.
• 45 minutes to an hour on a bus to get to further away alternative schools is too
much for young primary pupils.
• The school could reopen for children in ELC and P1-P4 only
• Reopening the school is a lovely thought, but it feels unrealistic and

Page 106

86 
economically unlikely 
Option 3 – Reopen Kilchrenan PS with a widened catchment area 
• Extending the catchment area would lead to increased transport costs and
longer bus times for pupils within the catchment
• Greater distance within the catchment area would increase the risk of pupils
not making it to school because of travel problems or weather.
• Extending the catchment would take pupils away from other primary schools,
which are also small
• It is impractical due to the geography of the area. 
Option 4 - Close Kilchrenan PS permanently 
• At Kilchrenan PS, children don’t get the same opportunities as in other
schools.
• Kilchrenan PS pupils don’t get the PE choices of pupils in other schools.
• The building is dilapidated - fabric of the building is a concern.
• The answer from the previous HT to every complaint or suggestion was that
there is insufficient funding.
• KiIchrenan PS has no suitable play areas – play areas deemed “unsafe”.
• Closing the school is a no-brainer.
• In Kilchrenan PS, the standard of teaching for children was not good – wide
composite classes meant pupils weren’t getting individual attention.
• The travel options to Taynuilt and St Columba’s are not a problem – journey
times are comparable from Dalavich to Kilchrenan and Dalavich to St
Columba’s in Oban because of the detours on the route to Kilchrenan.
• There is no wrap-around childcare in Kilchrenan, and an absence of registered
childminders. Regardless of whether Kilchrenan is open, parents working is
difficult.
• There are no cooking facilities in Kilchrenan – meals have to be brought from
Taynuilt which is not a cost effective or efficient way of doing things and
restricts what children can have.
• No breakfast Club at Kilchrenan which affects flexibility for families.
• Children who were attending Kilchrenan were having to go to Oban and
Taynuilt anyway for after-school activities.
• By attending a larger, better-resourced school rather than Kilchrenan, children
are benefitting greatly socially, and have wider opportunities. “They can be
who they want to be, can choose who they are friends with”
• Kilchrenan is not accessible as a building, eg. for those with disability
• If Kilchrenan was closed, the cost of keeping it open could be redirected
towards enhanced transport for pupils
• Closing Kilchrenan would be our choice, as we would rather send our child to
Taynuilt.
• We are very satisfied with provision in Taynuilt PS and would not move our

Page 107

87 
children to a reopened Kilchrenan PS
• If Kilchrenan reopens, pressure may be brought to bear on those families who
choose and alternative – community pressure to attend the village school
• (From pupil) We could turn Kilchrenan school into a play areas – football
goals, rugby posts
• (From pupil) We could turn the grass into a football pitch

Page 108

APPENDIX 2 - EqSEIA 
Argyll and Bute Council: Equality and Socio-Economic Impact Assessment
Section 1: About the proposal
Title of Proposal
Kilchrenan Primary School Consultation Report 
Intended outcome of proposal
The report is to outline the outcome relating to the Proposal to close Kilchrenan Primary
School.
The Proposal is to close Kilchrenan Primary School. Through the consultation process, as
outlined in the Schools (Consultation) (Scotland) Act 2010, the views of all stakeholders
affected by this proposal have been sought. Local Authority Officers are preparing a
consultation report on the issue, with input from Education Scotland. This report will be
presented to the Community Services Committee (CSC) for their decision. 
The intended outcome, the closure of the school, which has been mothballed for over 2
years. If after consultation the stakeholders involved in the process, Education Scotland,
and the CSC feel that the closure is not a reasonable option, then the closure would not
take place.

Page 109

Description of proposal
Consideration of this proposal means that a decision is being taken about permanently
closing Kilchrenan Primary School. As per the legislative guidance set out in the Schools
(Consultation) (Scotland) Act 2010, Argyll and Bute Council has sought stakeholder views
on the following proposal, namely:
It is proposed that education provision at Kilchrenan Primary School be discontinued with
effect from 29th November 2024.
Pupils of Kilchrenan Primary School will continue to be educated at Taynuilt Primary
School. 
The catchment area of Taynuilt Primary School shall be extended to subsume the whole
delineated catchment area of Kilchrenan Primary School.
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
Kilchrenan Primary School has been mothballed for over 2 years. The school roll is
currently zero, and is not predicted to rise significantly in the near future. 
Along with several other rural Councils, Argyll and Bute is facing increasing challenges in
recruiting staff. At the time the Proposal was issued as a basis for statutory consultation
(December 2023) there were 13.17 fte (full time equivalent) vacancies for both teachers
and head teachers in Argyll and Bute. 
Whilst the School is mothballed, the building is deteriorating, with limited budget for
maintenance. The costs of continued mothballing, and of bringing the fabric of the school
up to the required standard for any re-opening, are also considerable.
On 14th December 2023, Argyll and Bute Council’s Community Services Committee
agreed that a statutory consultation with all stakeholders be undertaken on the Proposal
as outlined in the 2010 Act. This statutory consultation opened on 21st December 2023
and concluded on 23rd February 2024. A public meeting was also arranged for 25th January
2024 in Kilchrenan Village Hall. 
Business Outcome(s) / Corporate Outcome(s) to which the proposal contributes
Community Wellbeing - Enabling a voice in collective decision making

Page 110

Lead officer details:
Name of lead officer Simon Easton
Job title Education Manager
Department Education
Appropriate officer details:
Name of appropriate officer Wendy Brownlie
Job title Head of Education – Performance and
Improvement
Department Community Services - Education
Sign off of EqSEIA 
Date of sign off 26/06/2024 
Who will deliver the proposal?
Should the closure go ahead, there will be in fact no change to the current arrangements
that have been in place since the school has been mothballed.
The Head Teacher of Taynuilt Primary School will be the senior officer of the Council who
provides the leadership of the educational experience for the children attending the
school, who would have otherwise attended Kilchrenan Primary School. The Education
Central team of the Council will be responsible for the support and challenge of the school
as per standard protocols.
Transport colleagues will be responsible for any travel arrangements for children who are
entitled to this, and this has already been in place since the school was mothballed.

Page 111

Section 2: Evidence used in the course of carrying out EqSEIA 
Consultation / engagement
Under the Schools (Consultation) (Scotland) Act 2010, if a local authority proposes to
close a school it must undertake a statutory consultation with the ‘relevant consultees’
affected by this proposal. 
The formal statutory consultation on the Proposal was undertaken under the terms of the
Schools (Consultation) (Scotland) Act 2010 (“the Act”). The consultation period was open
from 21st December 2023 to 23rd February 2024. Due written notice of the Proposal was
issued to the relevant consultees listed below: 
The Parent Councils of the affected schools;
The parents of the pupils at the affected schools;
Parents of children expected to attend an affected school within two years of the date of
publication of the Proposal Paper;
The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the Proposal, at the affected schools;
The teaching and ancillary staff at the affected schools;
The trade unions representatives of the above staff;
Argyll and Bute Councillors – Ward 5 (Oban North and Lorn);
Kilchrenan Community Council and Taynuilt Community Council;
Community Planning Partnership;
Relevant users of the affected schools;
The Constituency MSP;
List MSPs for the area;
The Constituency MP;
Chief Superintendent, Police Scotland;
Chief Executive, NHS Highland;
Chief Executive Strathclyde Partnership for Transport (SPT);
Area Commander, Fire Scotland;
Education Scotland. 
Hard copies of the Proposal Paper were also made available for inspection at the
following locations: 
Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
Oban Public Library, Albany St., Oban PA34 4AL
Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
Taynuilt Primary School, 2 Strathview, Taynuilt, PA35 1JF
Oban Education Offices, Willowview, Soroba Road, Oban PA34 4SB
Kilchrenan Village Hall, Kilchrenan, PA35 1HE
It was possible for anyone to request a copy of the Proposal Paper in an alternative format,
translated to another language, or requests could be made for the services of an
interpreter.

Page 112

Data
The catchment area for Kilchrenan Primary School is classed as remote rural. The
definition for remote rural are settlements with a population of less than 3,000 with a
greater than 30 minute drive time to the nearest settlement with a population of 10,000 or
more. National statistics detail a reducing and aging population for Argyll and Bute.
The National Records of Scotland details a reducing population in Argyll and Bute as per
the diagram below. Data gathered shows a 2.4 percentage point reduction in population in
Argyll and Bute. 
Population records held by National Records of Scotland show an ageing population in
Argyll and Bute with an increase to population groups above 45 years with a reduction to
population in age groups below 45. 
Source information:
Scotland's Population 2022 - The Registrar General's Annual Review of Demographic
Trends | National Records of Scotland (nrscotland.gov.uk)
Population Estimates of Scotland - National Records of Scotland (shinyapps.io)

Page 113

Other information
Evidence for this proposal was found in the Equality Evidence Finder, and in the Guidance
for the Fairer Scotland Act.
Additional evidence was found in the School (Consultation) (Scotland) Act 2010, in terms
of legislative compliance. Education management circulars, 1.33 on capacity, 3.01 on
admission and 3.09 on transfers were also consulted. The circular 3.23 on child protection
and safeguarding was also considered.
The national policy of GIRFEC – Getting it Right for Every Child, and the newly
incorporated United Nations Convention on the Rights of the Child were also considered
in the formation of this proposal, as was the Argyll and Bute Education vision and strategy,
Our Children, Their Future. 
Gaps in evidence
There are no gaps in evidence.
Section 3: Impact of proposal 
Impact on service users: 
Negative No
impact
Positive  Don’t
know
Protected characteristics:    
Age  X  
Disability  X  
Ethnicity  X  
Sex  X  
Gender reassignment  X  
Marriage and Civil Partnership  X  
Pregnancy and Maternity  X  
Religion  X  
Sexual Orientation  X  
Fairer Scotland Duty:    
Mainland rural population  X  
Island populations  X  
Low income  X  
Low wealth  X  
Material deprivation  X  
Area deprivation  X  
Socio-economic background  X  
Communities of place  X  
Communities of interest  X   
If you have identified any impacts on service users, explain what these will be.

Page 114

If any ‘don’t know’s have been identified, at what point will impacts on these groups
become identifiable?
If the proposal is accepted, there will be no immediate impact on pupils and families, as
there are no children currently living in the Kilchrenan Primary School catchment area.
There may be families who move into the revised catchment area who would then require
transport, and in addition, this may lead to changes in staffing levels in Taynuilt Primary
School. 
The Education Management team will use their existing quality assurance procedures to
monitor the education provided in the school. 
Impact on service deliverers (including employees, volunteers etc): 
Negative No
impact
Positive  Don’t
know
Protected characteristics:    
Age  X  
Disability  X  
Ethnicity  X  
Sex  X  
Gender reassignment  X  
Marriage and Civil Partnership  X  
Pregnancy and Maternity  X  
Religion  X  
Sexual Orientation  X  
Fairer Scotland Duty:    
Mainland rural population  X  
Island populations  X  
Low income  X  
Low wealth  X  
Material deprivation  X  
Area deprivation  X  
Socio-economic background  X  
Communities of place  X  
Communities of interest  X   
If you have identified any impacts on service deliverers, explain what these will be.
If any ‘don’t know’s have been identified, at what point will impacts on these groups
become identifiable?

Page 115

How has ‘due regard’ been given to any negative impacts that have been identified?
In looking at the educational benefits statement of this Proposal these have been
considered. All information is contained in the Proposal paper Proposal for the closure of
school (argyll-bute.gov.uk) 
Section 4: Interdependencies 
Is this proposal likely to have any knock-on effects for
any other activities carried out by or on behalf of the
council?
Potentially on transport, as
more children may require
transport who may move
into the catchment area. 
Details of knock-on effects identified
Increased number of children requesting free school transport may add pressure to the
transport system.
Section 5: Monitoring and review 
How will you monitor and evaluate the equality impacts of your proposal?
The Education Central Team including locality Education Managers will monitor the impact
this catchment area change would have, if implemented.

Page 116

APPENDIX 3
Kilchrenan Primary School Public Consultation Meeting
Held in Kilchrenan Village Hall on 25 January 2024 at 6pm 
Panel
Douglas Hendry, Executive Director
Jen Crocket, Chief Education Officer/Head of Education-Wellbeing, Inclusion and
Achievement
Simon Easton – Education Manager 
In attendance
Graeme McMillan - Transformation Programme Manager
Simon Ross – Education Scotland 
Admin:
Laura Blackwood – Directorate Support Officer
5 members of the public
Welcome and introductions were made by Mr Hendry 
Mr Hendry then outlined the objective of the meeting, to hear the views of the
community, parents and all other stakeholders. He set out the proposal which is being
consulted on, that education provision at Kilchrenan Primary School be discontinued
with effect from 29 November 2024 and provided information on the statutory process
which the Education Service must follow and the timeline for this. 
Ms Crocket and Mr Easton then spoke to a presentation which included:-
• The special considerations as Kilchrenan Primary School is a rural school.
• Information on the pre-consultation stage and the options which were
considered by officers.
• How the views of the community, parents and children have been collected.
• The timescale of the consultation process (21 December 2023 to 23 February
2024).
• The background to the proposal.
• The national and Council priorities for Education.
• Information on the school roll and projected figures.
• The educational benefits of the proposal.
• Feedback from the pupils who have been involved in the workshops.
• Information on the reasons for placing requests to other schools in the local
area.
• The assessed impact of the proposal on a range of factors – including the rural
school factors, to which the Council must have special regard to under the 2010
Act.
Questions were then invited from the audience. 
Audience
What was the feedback from the pupils at today’s focus groups?

Page 117

Panel Response
The feedback was similar to that provided in May 2023. The pupils are very happy at
the school they currently attend and are stimulated young learners. There were no
negative voices. 
Audience
Is the school in Connel being incorporated into the proposed new catchment area?
Panel Response
No – Achaleven Primary School is being considered as part of a separate exercise
that is ongoing.
Audience
Is there a statutory maximum travel distance that a child can be expected to travel?
Panel Response
There is no limit set out within the legislation. Travel distances are considered on a
case by case basis, having regard to a number of factors relevant to that particular
community. 
Audience
What is the staffing situation at Taynuilt? 
Panel Response
The staffing levels at Taynuilt are stable and strong, with no concerns to report. 
Audience
How many pupils currently attend Taynuilt? 
Panel Response
The current roll at Taynuilt Primary School is 55. 
Audience
It is common for children from small communities to request to attend schools in larger
villages in Argyll and Bute? And are they welcomed by the receiving school/pupils? 
Panel Response
Yes, across Argyll and Bute many families submit placing requests for their children to
attend a school outwith their catchment area. The feedback from the pupils at Taynuilt
Primary and St Columba’s Primary is that they welcome new pupils as it provides the
opportunity to extend friendships with children from other areas. 
Audience
If a decision is taken to close Kilchrenan Primary School, in what scenario would the
Council consider re-opening the school? How many pupils would be required to
consider re-opening? 
Panel Response
There is no minimum number of pupils specified in legislation. In Argyll and Bute, the
circumstances of each location/school is dealt with in their own merits. If a decision

Page 118

were taken to close Kilchrenan Primary School, that would have an impact on the
likelihood of a new school being opened in the village in future years. 
Audience
What is the capacity at Taynuilt Primary? 
Panel Response
As mentioned earlier the current roll is 55, with a capacity for 163 pupils, therefore
there is ample capacity moving forward. The Education Service project school rolls on
an ongoing basis for each of our schools to plan for any envisaged increases.
Audience
In your presentation it was noted that travel considerations have been assessed as
carbon neutral. Of those who currently travel to Taynuilt or St Columba’s, do you know
the proportion who use the bus versus those who travel by car? 
Panel Response
We do not have that detail hand but it is understood that the majority of pupils use the
current bus service. It is recognised, however, that some will be taken to school by car
as a number of parents travel this route as part of their daily routine. 
Audience
Have you considered the possible impact on the demographic of Kilchrenan residents,
for example the ageing population? There is currently a close connection between the
communities of Dalavich and Kilchrenan and there is a risk that this will break if the
school is closed. 
Panel Response
Unfortunately, the position we find ourselves in is largely outwith the control of the
Council and comes down to parental choice, as parents have a legislative right to make
placing requests to schools outwith their catchment area if so minded. The root cause
of issues such as ageing population and population decline are ones which stretch far
beyond Argyll and Bute. The Education Service equip children and young people to
have the best start in life. Some of those young people will decide to stay in the area
for employment, or to have a family, but there are many who choose to move away for
further/higher education or employment and don’t return. 
Audience
What are the mechanics of disposing of the school building? 
Panel Response
Should a decision be taken by elected members to close the school, the Council will
consider the future use of the building. For example, there may be community interests
that require to be explored or the best course of action may be to market it for sale if
no interested parties are forthcoming at that point. 
Audience
At what point is it sensible to begin engaging with the Council on a community interest
and with whom?

Page 119

Panel Response
If the community of Kilchrenan are interested in acquiring the school building, there is
no reason why they cannot engage with the Council at this stage, without of course
pre-empting any decision that may be taken by elected members in relation to closure
or otherwise of the school. The Council are happy to take contact details and pass
these on to the appropriate Officer. 
Audience
When will a decision be taken by elected members?
Panel Response
Following the completion of the final consultation report, this will be submitted to the
Community Services Committee on 22nd August 2024 for consideration. If the
proposals are agreed, there is then an 8 week period for any representations to be
made to Scottish Ministers either against or in support of the closure, and for Ministers
to consider whether they will call-in a decision based on the representations made. If
a decision is taken not to call in the proposal, the school would be formally closed as
of 29th November 2024. 
Mr Hendry closed the meeting and thanked everyone for their attendance and input to
the consultation.

Page 120

Schools (Consultation) (Scotland) Act 2010
Report by Education Scotland addressing educational aspects of
the proposal by Argyll and Bute Council to close Kilchrenan Primary
School and realign its catchment area to Taynuilt Primary School. 
March 2024
APPENDIX 4

Page 121

1  | Schools (Consultation) (Scotland) Act 2010
Argyll and Bute Council © Crown Copyright 
1. Introduction
1.1 This report from Education Scotland has been prepared by His Majesty’s Inspectors of
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of a proposal from Argyll and Bute Council to close Kilchrenan Primary School and
realign its catchment area to Taynuilt Primary School. Section 2 of the report sets out brief details
of the consultation process. Section 3 of the report sets out HM Inspectors’ consideration of the
educational aspects of the proposal, including significant views expressed by consultees.
Section 4 summarises HM Inspectors’ overall view of the proposal. Upon receipt of this report, the
Act requires the council to consider it and then prepare its final consultation report. The council’s
final consultation report should include this report and must contain an explanation of how, in
finalising the proposal, it has reviewed the initial proposal, including a summary of points raised
during the consultation process and the council’s response to them. The council has to publish its
final consultation report three weeks before it takes its final decision. Where a council is proposing
to close a school, it needs to follow all statutory obligations set out in the 2010 Act, including
notifying Ministers within six working days of making its final decision and explaining to consultees
the opportunity they have to make representations to Ministers and the special provisions that
apply to proposals to close a rural school.
1.2 HM Inspectors considered:
• the likely effects of the proposal for children of the school; any other users; children likely to
become pupils within two years of the date of publication of the proposal paper; and other
children and young people in the council area;
• any other likely effects of the proposal;
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3 In preparing this report, HM Inspectors undertook the following activities:
• attendance at the public meeting held on 25 January 2024 in connection with the council’s
proposals;
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others; and
• visits to the sites of Taynuilt Primary School and Oban High School, including discussion
with relevant consultees. 
1.4 As the proposal will lead to the closure of a rural school, HM Inspectors also took account of
the council’s consideration of any reasonable alternatives to closure of Kilchrenan Primary School,
the likely effect on the local community and the likely effect of any different travelling arrangements
of the proposed closure.
2. Consultation process
2.1 Argyll and Bute Council undertook the consultation on its proposal(s) with reference to the
Schools (Consultation) (Scotland) Act 2010.

Page 122

2  | Schools (Consultation) (Scotland) Act 2010
Argyll and Bute Council © Crown Copyright 
2.2 In March 2022, Argyll and Bute Council approved the mothballing of Kilchrenan Primary
School. In March 2023, the council agreed to undertake a preliminary consultation and options
appraisal required by the Schools (Consultation) (Scotland) Act 2010. The council considered
four options including the reopening of Kilchrenan Primary School, continued mothballing with the
pupils zoned to Taynuilt Primary School, and reopening of Kilchrenan Primary School and
realigning its catchment area. In December 2023, the council agreed to proceed with the
fourth option, to consult on a proposal to permanently close Kilchrenan Primary School from
29 November 2024, and to realign the catchment area to Taynuilt Primary School.
2.3 The council undertook the consultation between 21 December 2023 and 23 February 2024.
The proposal notice and a summary was advertised in the local press and sent to relevant
consultees. The full proposal document was published on the council website and was made
available in several locations. Argyll and Bute Council held a public meeting at Kilchrenan Village
Hall on 25 January 2024, which was attended by five members of the local community. The
discussion covered a range of topics including clarification around catchment areas, travel to
school, and details regarding the educational provision at Taynuilt Primary School. In addition,
there was further discussion about the potential future use of the school building if the closure is
approved. The council did not receive any written responses to the consultation.
2.4 In January 2024, council officials met with small groups of children in Taynuilt Primary
School and St Columba’s Primary School to discuss the proposal. Most of the children were from
the Kilchrenan Primary School catchment. Feedback from the focus groups shows that the
children are settled at school and benefitting from the educational provided.
3. Educational aspects of proposal
3.1 The council has set out clearly the educational benefits arising from the proposal to close
Kilchrenan Primary School and realign its catchment area to Taynuilt Primary School.
HM Inspectors agree that there are educational benefits for children. These include access to a
broader range of experiences, an improved learning environment, and opportunities to learn,
develop and socialise with a wider group of peers. 
3.2 HM Inspectors met with a few staff, primary school children from the Kilchrenan catchment,
and young people in Oban High School who had previously attended Kilchrenan Primary School.
All of these stakeholders agree with the proposal. Children and staff at Taynuilt Primary School
highlighted some of the educational benefits in the proposal including better spaces for outdoor
learning and access to more opportunities and experiences. Whilst the young people at Oban High
School have fond memories of their time at Kilchrenan Primary School, they accept the school is
no longer viable in the current context. 
3.3 As the proposal will lead to the closure of a rural school, HM Inspectors also took account
of the council’s consideration of the factors to which it should have special regard. The council has
clearly set out the reasons for consulting on the proposal to permanently close Kilchrenan Primary
School having taken appropriate steps and due consideration of alternatives. The journey time for
children is longer than it would be to Kilchrenan Primary School. Depending on where they live, for
a few this can be up to an hour. However, this is not having a significant negative impact on their
learning. The community currently benefit from having the use of a modern village hall. However,
all stakeholders that met with HM Inspectors agree that, should the proposal proceed, it would be
helpful to the community to secure an alternative use for the school building. For example, during
the preliminary consultation it was suggested the building and grounds could become a small
business hub or a campaign base for the creation of a Loch Awe Regional or National Park.

Page 123

3  | Schools (Consultation) (Scotland) Act 2010
Argyll and Bute Council © Crown Copyright 
4. Summary
HM Inspectors agree that there are educational benefits for children arising from the council’s
proposal to close Kilchrenan Primary School. For example, a larger and more modern learning
environment offering access to a broader range of experiences, and opportunities to learn,
develop and socialise with a wider group of peers. The council should continue to work with the
local community, including children and young people, to consider any future use for the school
building should the proposal to close be agreed. 
HM Inspectors
March 2024

Page 124

APPENDIX 5
Proposal to Close Kilchrenan Primary School, Argyll and Bute
Consultation 21/12/2023 – 23/2/2024
Focus Groups with children and young people potentially affected by the
proposal to close Kilchrenan PS 
St. Columba’s Primary School, Oban – Thursday 25th January 2024, 0930 –
1010
St. Columba’s PS is the denomination RC school for an area of Argyll and Bute
which includes the Kilchrenan PS catchment area. In August 2021 – seven months
before the mothballing of Kilchrenan PS, a number of children moved from
Kilchrenan to St. Columba’s.
Six children were interviewed (J, B, I, G,O and D) four of whom are resident in the
Kilchrenan catchment area. 
Question – Do you enjoy going to school at St. Columba’s?
J – Yes. It’s a nice school and it has a good community.
B – the playground is nice. It can be too loud sometimes
I – I like the school. The food is great.
G – It is friendly and I feel safe
D – I agree with what J said. 
Question – Tell me about your learning here at St Columba’s and what learning
was like at Kilchrenan.
D – My learning is much better at St. Columba’s. I get work that is for my age and
my level. At Kilchrenan, I got work that people older or younger than me were doing
too.
I – I didn’t get any numeracy at Kilchrenan. I am learning much better here than at
Kilchrenan.
J – When I moved, the work got harder. The teaching here is good.
O – We have learned more here since moving. The teacher can give you more time
with her.
G – I learn well at St Columba’s and learning is fun.

Page 125

Question – If you had the choice, would you stay at St Columba’s or go back to
Kilchrenan?
D – Stay here. I have lots of friends here. At Kilchrenan you had to play with who
was there – you didn’t have choice about who your friends were.
I – I want to stay here. The harder work is fun. I want to stay because I would be
leaving lots of friends behind if I went back to Kilchrenan.
B – I would go back to Kilchrenan because I liked that there weren’t many people
there. 
Question – How do you feel about other children from the Kilchrenan area
coming to school at St Columba’s in the future?
G – More people coming here is a good thing. It give you the chance to make more
friends.
O – It’s good for the school. You can mix with more people. People moving to St
Columba’s will find that there are more learning strategies here.
J – I like the idea of more people coming to St Columba’s from Kilchrenan. 
Anything else?
J – What are the plans for the Kilchrenan Building? Could it be a sports centre with
pitches? 
Taynuilt Primary School, Oban – Thursday 25th January 2024, 1330 – 1400
Should Kilchrenan Primary School be closed, Taynuilt Primary School is the school
of which the catchment area will be extended to include the present Kilchrenan PS
catchment. All children and young people presently in the Kilchrenan catchment
area will automatically have a place at Taynuilt Primary School.
Five children were interviewed (Z, H, J, A and Ar), four of whom live within the
Kilchrenan catchment area. 
Question – Do you enjoy going to school at Taynuilt PS?
Z – Yes because it gives us lots of opportunities, eg. the London trip. It has lots of
equipment, and space and facilities.
H – Yes. I like playing with all my friends. I really like the teachers because they’re
nice.

Page 126

J – Yes. I have loads of friends. Better learning, better teachers. The food is very
good.
A – Yes. I have lots of friends here and I can do a variety of activities and sports in
PE. At Kilchrenan we couldn’t do as many things.
Ar – Yes. I like the space and the playground. I have lots of friends here. There are
lots of activities, and nice teachers. 
Question – What are the main differences between Taynuilt and Kilchrenan?
J – You have more choice of friends here. And there being loads more pupils in the
class means learning is more fun and you can do more kinds of activities.
O – The building here is in better condition and it has better facilities. The
playground doesn’t have areas where you’re not allowed to go.
H – I like Kilchrenan and I like Taynuilt. 
Question – Tell me about your learning here at Taynuilt compared to what
learning was like at Kilchrenan.
Z – I feel I’m getting better every day. I am doing well in Numeracy and the
numeracy links to high school are helping me.
J – The teachers are good and the equipment we use is good. Support for pupils
with additional needs is amazing. Sometimes at Kilchrenan the work was easy and
you would wait for the teacher for a long time sometimes.
H – I like learning about the human body in science topic.
Ar – Learning is 4/5. 
Question – What do you miss about Kilchrenan?
J – It was a bit nearer but that isn’t really a problem.
A – Sometimes it was fun all being in the one classroom. 
Question – What do you feel about more pupils from the Kilchrenan area
coming to Taynuilt PS?
Ar – Bigger is better. I think we should try to have as many pupils as possible at
Taynuilt.
Z – I have no problem with pupils coming to Taynuilt from anywhere.
A – It is more people to make friends with.