Perth and Kinross Council 
Planning and Placemaking Committee – 12 February 2025 
Report of Handling by Strategic Lead - Economy, Development and Planning
(Report No. 25/31) 
PROPOSAL: Erection of a brewery, tap room, storage, formation of vehicle
access, parking area, installation of EV charging point, formation
of outdoor seating area, landscaping and associated works 
LOCATION: Land 50 metres south of Council Cottages, Ferry Road, Pitlochry 
Ref. No: 23/01742/FLL
Ward No: P4- Highland 
Summary 
This report reconsiders this application as the previously issued permission was
quashed and the case returned to the Council for reconsideration, following a judicial
review.  That previous decision to approve was taken at the Planning and
Placemaking Committee on 5 June 2024. 
This report recommends approval of the application as, whilst the development is
contrary to NPF4 Policy 6 b) i) due to the loss of ancient woodland, it is considered that
the loss of trees would be limited and acceptable due to other material considerations,
and the removal of dead and invasive species will enhance and improve the woodland
and woodland habitat. Further, looking at the Development Plan in the round the
development is considered to comply with its wider relevant provisions and there are
no material considerations which are considered to justify refusal of the application. 
Background and Description of Proposal  
1 The application is unchanged from that considered by this Committee on 5 June
2024 and remains as a brewery comprising of: production and cold store
facilities, and a taproom serving food and drink with a small shop and outdoor
seating. The proposal includes parking for 3 vehicles and 1 accessible parking
bay with an EV charging point, cycle parking and associated hard and soft
landscaping. 
2 It is indicated that the core operating hours of the overall facility will be 08:00 –
22:00 Tuesday – Sunday. The taproom, opening 11:00 – 22:00, would have a
capacity of 96 persons internally, and a further 36 externally.

Page 2

3 The application site is a largely cleared area with woodland around its periphery
and extends to some 1824 sqm.  It sits on the south side of Ferry Road,
Pitlochry. The site consists of a large and open flat area (formerly used as a site
compound), with steeply banked sides and trees to the east, south and west. It is
proposed to fell 3 trees and one tree group to enable the development.  6 dead
oak trees are also to be removed. Compensatory planting is proposed, together
with bird and bat boxes on the brewery building. 
4 A single level building is proposed, comprising two pitched roof sections
connected by a low flat roof. The brew hall will have feature glazing on the
northern elevation and an internal glazed partition to showcase the technical
production equipment utilised by the brewery. The buildings walls are to be
finished in dark grey corrugated metal sheeting, grey aluminium and timber
windows and doors and grey aluminium rainwater goods. The roof is to be of
corrugated steel sheeting, in the same dark grey colour as the wall sheeting, with
translucent roof sheeting/skylights into the brew hall, taproom and goods
incoming area. Roof mounted solar panels are proposed on the south roof slope.
The north/street facing elevation and one east facing pitched roof will feature
company logos and signage, although this will require separate Advertisement
Consent. 
5 Pitlochry Community Hospital is approximately 50m to the northwest and
Balhousie Pitlochry Care Home approximately 50m to the southwest. Residential
properties (Burnside Cottages) are located 20m to the north and 50m to the east
at Bobbin Mill (also known as Tombauld Cottages). 
Judicial Review of the decision to approve the application 
6 The application was presented to the Planning and Placemaking Committee on 5
June 2024 when the application was approved. 
7 That grant of planning permission was subsequently challenged in the Court of
Session by a judicial review. 
8 The basis for challenge was that:
(i) the proposed development site includes an area of ‘ancient woodland’ and
that this aspect had not been considered in the Report of Handling, and 
(ii) the Council had failed to comply with the public sector equality duty set out
in the Equality Act 2010, Section 149. 
9 It was accepted that a full assessment in relation to ancient woodland, in terms of
NPF4 Policy 6 was not clearly carried out and addressed in the original Report of
Handling and that this should have happened. 
10 Following consideration of the first ground of challenge, the judicial review was
not opposed by the Council, the planning permission resulting from the approval
on 5 June 2024 was revoked and this planning application has been reverted
back to the Planning and Placemaking Committee for re-consideration in its

Page 3

entirety, with the ancient woodland issue covered in detail. The petitioner’s
second ground of challenge in terms of the Equality Act 2010 was not accepted. 
Site History 
11 08/02104/FUL Full Planning Permission was approved on 7 April 2009 for the
erection of 3 workshop/office units.  The layout in that instance had the three
units located eastwards of the site access, at the bottom of the
embankment/access road leading up to the Bobbin Mill site.  Yard space was to
be located to the west, leading to the south of the site where 6 parking spaces
were indicated at the edge of the southern embankment. 
12 11/01434/FLL Full Planning Permission was approved on 25 November 2011 for
the erection of building to be used as a timber merchants.  The layout in that
application saw an L-shaped building, angled away from the road to the north,
with a small parking and associated turning area.  The proposals in that
application were located slightly further away from the contoured embankments
within the application site. 
Pre-Application Consultation 
13 Pre application Reference: 23/00073/PREAPL – The planning response
recognised that this was a hybrid proposal and there may be an opportunity to
split the uses into employment land and town centre locations. A sequential
assessment would be required for any future application to demonstrate there
are no suitable alternative sites and to also demonstrate the proposed
development would be compatible with the residential and health uses in the
immediate surrounding area. 
14 The proposed development is not classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore the applicant was not required to undertake not any formal pre-
application consultation with the local community. 
Development Plan 
15 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019), along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
16 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.

Page 4

17 NPF4 was adopted on 13 February 2023.  NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
18 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 12: Zero Waste
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 26: Business and Industry
• Policy 27: City, Town, Local and Commercial Centres
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
20 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 6: Settlement Boundaries
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 18: Pubs and Clubs in Residential Areas
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 40A: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area

Page 5

• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
Other Policies 
Statutory Supplementary Guidance 
• Supplementary Guidance - Air Quality (adopted in 2020)
• (adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
21 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
22 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
23 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and

Page 6

contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
24 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
25 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
26 As part of the planning application process the following bodies were consulted: 
External 
27 Network Rail - No objection, subject to an informative being attached to any
planning permission granted to highlight the site is close to a railway
underbridge. 
28 Perth and Kinross Heritage Trust - No objection. No issues identified in respect
of archaeology. 
29 Scottish Water - No objection. Requested further information on the water
abstraction volume as the site is in a Drinking Water Protected Area. Notes the
impact on Water Resources and the operation of the brewery and accompanying
amenities has been reviewed against the confirmed abstraction volume of
200,000 litres per annum (0.2Ml/annum). Assuming this water usage remains
consistent with these values, Scottish Water confirm the proposal can be
considered as low-medium risk regarding Water Resources. Thus, no objections
with the proposed volume of water but request that they should be notified by the
applicant if these volumes change. Scottish Water also request that prior to work
commencing on site they are notified as they may wish to take water samples as
a precaution to protect water quality. It is recommended that an informative be
attached to any planning permission granted (Informative 5). 
30 Scottish Environment Protection Agency - No objection. 
31 NatureScot - No response.

Page 7

Internal 
32 Biodiversity/Tree Officer - No objection, subject to conditions. The consultation
response was further updated in November 2024 following the judicial review to
address the issue of ancient woodland. The consultation response is discussed
in detail below. 
33 Structures and Flooding - No objection following review of further detailed
information submitted during the application process. 
34 Environmental Health (Contaminated Land) - No objection. Advise an
inspection of the proposed development site did not raise any real concerns,
although mapping does indicate that there is land formerly occupied by various
potentially contaminative sources nearby. The applicant is advised that there
may therefore be potential for contamination within the site. Informative
recommended. 
35 Environmental Health (Noise Odour) - No objection subject to conditions
following review of further detailed information submitted during the application
process. 
36 Environmental Health (Private Water) - No objection. The applicant has stated
that Public Mains water will be used, therefore as no existing private water
supplies will be affected by the proposed activities there is no comment at this
time. 
37 Development Contributions Officer - No contribution required in line with
supplementary guidance. 
38 Transportation and Development - No objection subject to conditions following
review of further information and revised plans requested after a site meeting on
5 February 2024 with the applicant’s agent, Tree Officer and Planning Officer. 
39 Development Plan - Reviewed further supporting information submitted during
the application process to ensure compliance with policies in NPF4 and LDP2. 
40 Commercial Waste Team - No objection. Bin storage sufficient. 
Representations 
41 30 representations were received including 6 objections, 2 neutral
representations and 22 letters of support. The main issues raised within the
objections are: 
• Noise, disturbance and nuisance – detrimental impact on residential amenity
• Detrimental impact on natural environment and protected species

Page 8

• Catastrophic negative impact on the ancient woodland
• Traffic impact
• Road and pedestrian safety
• No evidence of impact assessment on sewerage, water pollution or flood risk 
• Impact on access to residential homes at Bobbin Mill
• Air and noise pollution 
• Contaminated site
• Poor design 
• The proposed use is incompatible with surrounding land uses which includes
a care home and medical centre
• Contrary to LDP policies including open space 
• Detrimental impact on safety of nearby residents, including those with
protected characteristics
• Loss of privacy  
42 The objections referred to the public sector equality duty under Section 149(1) of
the Equality Act (2010) and relevant human rights legal instruments to have due
regard to the need to eliminate harassment. The objections state that granting
permission for the development will increase the risk of the Gypsy Travellers who
live near to the site suffering harassment on account of their race. 
43 The Atholl Medical Centre requested the following matters be noted - that the
NHS site includes an ambulance dept with 24/7 access required; there should be
no obstructive parking on Ferry Road with access for GPs and staff required at
all times; and the parking at the medical centre is for the benefit of users of the
hospital and GP surgery only. 
44 The letters of support consider the development would bring wide ranging
economic benefits to the town and enhance the local area. 
45 The issues raised are considered in the report. 
Additional Statements 
46 Screening Opinion EIA Not Required 
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
/AA Not Required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
Submitted - Ecological Survey,
Tree Survey, Drainage
Assessment, Noise Impact
Assessment, Odour Impact
Assessment

Page 9

Appraisal 
47 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2 (2019) and statutory supplementary guidance. 
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance and issues raised in the representations. 
Principle 
48 A number of policies are relevant to the proposal, a mixed-use development on a
site located outwith the Pitlochry Town Centre boundary, as identified in LDP2. 
49 NPF4 Policy 26 Business and Industry supports development on sites allocated
for business and industry uses in the LDP (paragraph a). However, the site is not
allocated for business and industry use in LDP2. As such, NPF4 Policy 26 d)
applies and this states that “development proposals for business, general
industrial and storage and distribution uses outwith areas identified for those
uses in the LDP will only be supported where: 
i. It is demonstrated that there are no suitable alternatives allocated in the LDP 
or identified in the employment land audit; and
ii. The nature and scale of the activity will be compatible with the surrounding
area.” 
50 NPF4 Policy 27 City, Town, Local and Commercial Centres applies the Town
Centre First approach to help centres adapt positively to long-term economic,
environmental and societal changes, and by encouraging town centre living. 
51 NPF4 Policy 27 b) states “proposals for uses which will generate significant
footfall, including commercial, leisure, offices, community, sport and cultural
facilities, public buildings such as libraries, education and healthcare facilities,
and public spaces:
i.  will be supported in existing city, town and local centres, and
ii.  will not be supported outwith those centres unless a town centre first
assessment demonstrates that:
• all centre and edge of centre options have been sequentially assessed
and 
discounted as unsuitable or unavailable;
• the scale of development cannot reasonably be altered or reduced in
scale to allow it to be accommodated in a centre; and

Page 10

• the impacts on existing centres have been thoroughly assessed and
there will be no significant adverse effect on the vitality and viability of
the centres.” 
52 This policy aligns with LDP2 Policy 13: Retail and Commercial Leisure
Proposals. 
53 Also of relevance is LDP2 Policy 18: Pubs and Clubs in Residential Areas which
states there will be a presumption against the siting of these in the midst of other
(particularly residential) uses where problems of noise or disturbance cannot be
satisfactorily addressed. 
54 NPF4 Policy 30 Tourism intends to encourage, promote and facilitate sustainable
tourism development which benefits local people, is consistent with national net
zero and nature commitments, and inspires people to visit Scotland. Policy 30 a)
states “development proposals for new or extended tourist facilities or
accommodation, including caravan and camping sites, in locations identified in
the LDP, will be supported”. The site is not identified in the LDP for a tourism
related use. As such Policy 30 b) applies and this states “proposals for tourism
related development will take into account: 
i.  The contribution made to the local economy;
ii.  Compatibility with the surrounding area in terms of the nature and scale of
the activity and impacts of increased visitors;
iii.  Impacts on communities, for example by hindering the provision of homes
and services for local people;
iv.  Opportunities for sustainable travel and appropriate management of parking
and traffic generation and scope for sustaining public transport services
particularly in rural areas;
v.  Accessibility for disabled people;
vi.  Measures taken to minimise carbon emissions;
vii.  Opportunities to provide access to the natural environment.” 
55 A supporting statement has been submitted to address national and local
planning policies. This highlights that the business, an independently owned &
managed craft brewery, has outgrown its current site in Blair Atholl and is
seeking to relocate to a site in Pitlochry where its operations first began in 2016.
It notes that the relocation of the brewery will move 3.5 full time existing jobs to
Pitlochry, it will also immediately create at least 2.5 full-time jobs in Pitlochry, with
a further 2 full-time jobs expected in the years to come. 
56 The business requires more space than its current location can provide and there
is a lack of suitable existing industrial space for growth in Pitlochry, with no sites
identified in the town centre that are large enough to accommodate the business.
The statement reports that splitting the production and taproom uses between
two sites has been considered but is economically unviable and inefficient. Single
site operation is thus considered a necessity for the business. The implications of

Page 11

multi-site operation for licensing would mean duplicating the operational effort,
and the cost and complexity of the business. The statement highlights the
aspiration for a combined production and taproom experience is very similar to
that of a distillery & visitor experience. 
57 In respect of NPF4 Policy 26, the statement reports there are no suitable
alternative sites allocated in Pitlochry with very limited areas of employment
safeguarding and no specific development sites identified for further employment,
business and industry development. The nature of activity proposed is not
incongruous with the surrounding context of the area, which features a mixture of
town centre businesses, industry, tourism, residential, healthcare and leisure.
The proposals are conscious of the neighbouring residential amenity and the
healthcare facilities to the west. A noise impact assessment (NIA) has been
carried out which demonstrates there is negligible impact to the surrounding
area. The NIA also sets out mitigation recommendations, which can ultimately be
conditioned (Condition 15). It also highlights a licensed business must comply
with the Licensing (Scotland) Act 2005 and preventing public nuisance and crime
and disorder, amongst other elements, are core components of the business
operating plan and associated operational policies that will be governed by Perth
and Kinross Licensing Board on an ongoing basis. 
58 The site was selected predominantly because of its proximity to the town centre
boundary. In line with LDP2 Policy 27b) ii) the site is considered a suitable “edge
of centre option” being close to the boundary of the town centre in LDP2. The
scale of the development cannot be reasonably altered or reduced to
accommodate it within the town centre and the supporting statement asserts
there would be no significant adverse impact on the vitality and viability of the
existing centre. The proposed site achieves a greater balance of all desired
outcomes over a town centre location and is the best option available for the
space required. The statement reports the location is extremely accessible, being
no more than a 4-minute walk from the train station and the town centre junction
with Ferry Road. 
59 The supporting statement highlights that existing signage already encourages
tourism foot traffic from the town centre along Ferry Road toward the Pitlochry
Recreation Ground, Dam & Visitor Centre, Fish Ladder and Festival Theatre.
There are other business & industry uses along Ferry Road including a
restaurant and game butcher, meaning footfall from the town centre towards
Ferry Road and across the River Tummel, is already established. The proposal
will create a further attractive destination for tourism and create additional footfall
between the town centre and brewery bringing wider economic benefits. 
60 In respect of NPF4 Policy 30 Tourism, the supporting statement addresses the
relevant criteria and reports the proposal would create a dynamic visitor
experience and tourist destination in Pitlochry and increase local economic
benefits through tourism, in line with Policy 30 b) i) and ii) the proposed land use
and scale of development is compatible with the surrounding area. In line with
Policy 30 b) iv) and v) the site is easily accessible via sustainable travel modes

Page 12

and the scheme is designed to be accessible for disabled people. It outlines the
business is very carbon conscious, and a variety of renewable technologies will
be employed to minimise carbon emissions in line with Policy 30 b) vi). The
proposed site is adjacent to a core path and provides visitors with the opportunity
to access the surrounding natural environment in line with Policy 30 b) vii). 
61 The supporting statement reports the brewery is not just a bar or shop it is a
destination which will provide visitors with a full experience, seeing the end-to-
end production process, completed with an opportunity to sample the end
produce and experience the taproom which will showcase the best of the
brewery. The proposals are considered to successfully achieve the Policy 30
intent of promoting and facilitating sustainable tourism which benefits local
people and is consistent with NPF4 net zero and nature commitments, providing
further inspiration for people to visit Scotland. 
62 The supporting statement demonstrates why a combined facility is required and
that splitting the production and taproom uses between two sites is economically
unviable and inefficient and that the combined facility would operate very similar
to a distillery/visitor experience. 
63 It demonstrates a site selection process has been undertaken and there are no
suitable industrial sites available large enough to accommodate the business
growth required. The statement notes that the Ferry Road site achieves the
greater balance of the desired outcomes of the business, over a town centre
location where the brewery/production use would be closer to a higher density of
noise/odour sensitive receptors. 
64 The supporting statement also addresses the compatibility of the proposal in
relation to the surrounding area, including ensuring residential amenity is not
adversely impacted. In respect of amenity, also of relevance is LDP2 Policy 18:
Pubs and Clubs in Residential Areas which states there will be a presumption
against the siting of these in the midst of other (particularly residential) uses
where problems of noise or disturbance cannot be satisfactorily addressed. A
Noise Impact Assessment (Document 41) reports it is not likely that adverse
impacts will be experienced at any receptor due to the development. The Odour
Assessment (Document 33) reports odour from the proposed development is
predicted to be of negligible significance, subject to the satisfactory
implementation of mitigation measures (Condition 14). The supporting
documents have assessed the potential problems of noise or disturbance, and
this has been satisfactorily addressed in line with national and local planning
policy. This is reviewed further later in the report under ‘Residential Amenity’. 
65 The supporting statement does not provide a specific Town Centre Assessment,
as required by NPF4, rather further information is provided justifying the selection
of the site based on the operational requirements of the development alongside
the benefits of the edge of town centre location in achieving the best balance to
meet the objectives of the various elements of the business.

Page 13

66 Overall, it is considered that sufficient justification has been provided and that
there will be no significant adverse effect on the vitality and viability of the town
centre. The site is edge of centre, easily accessible from the town centre and well
connected to other uses in the surrounding area offering an opportunity for
greater interaction and linked trips to enhance the quality of experience in the
town. To protect surrounding amenity conditions are recommended as outlined
later in the report. As a new tourism facility, the supporting statement
demonstrates the proposal meets the criteria set out in Policy 30 b). 
67 The proposal satisfies NPF4 Policy 26 Business and Industry, NPF4 Policy 27
City, Town, Local and Commercial Centres, NPF4 Policy 30 Tourism and LDP2
Policy 13: Retail and Commercial Leisure Proposals and LDP2 Policy 18: Pubs
and Clubs in Residential Areas. 
Design and Layout 
68 NPF4 Policy 14 Design, Quality and Place states development which is poorly
designed, detrimental to the amenity of the surrounding area or inconsistent with
the six qualities of successful places will not be supported. LDP2 Policy 1:
Placemaking aligns with this national policy and states development must
contribute positively to the quality of the surrounding built and natural
environment.  All development should be planned and designed with reference
to climate change, mitigation and adaptation. The design, density and siting of
development should also respect the character and amenity of the place, and
should create and improve links within and, where practical, beyond the site. 
Proposals should also incorporate new landscape and planting works appropriate
to the local context and the scale and nature of the development. LDP2 Policy 1B
sets out the placemaking criteria which should be met. 
69 As set out in paragraph 4, the building would have accommodation over one floor
and be of a bespoke design and finish. The front/north elevation was amended to
accommodate a recessed roller shutter door and delivery bay (Drawing 52). The
supporting planning statement highlights the design strategy was to respond
sensitively to a site which has a flat central area and is sheltered by the
topography and tree screening (Document 42). The mass of the building is
broken up to reduce its visual impact with materials selected to help the building
recede into the landscape. The exterior landscaping will feature concrete
retaining walls to the south to account for minimised cutting into the existing
slopes. 
70 The proposals make the best use of the site and its orientation to create a
building that sits sheltered by its surroundings. The plan is predominantly linear
and follows the line of the existing grass clearing of the site, with the taproom
extending out toward the east from the main brewery building. This L-shape
helps create a sheltered public courtyard and outdoor seating area. All
accommodation is at ground floor with level access from external circulation
routes. Car parking is also kept to a minimum, to encourage the use of public
transport, cycling and walking. Although a disabled parking bay is provided.

Page 14

There is also a large bike stance area proposed to encourage visitors to cycle to
the premises. 
71 Overall, the design and layout of the proposed development has been sensitively
considered to respect the site topography and surrounding natural and built
environment. The bespoke design incorporates sustainable design and
construction and new planting is proposed to enhance the surrounding woodland
and the setting of the new building. The proposal satisfies NPF4 Policy 2:
Climate Mitigation and Adaptation and NPF4 Policy 14 Design, Quality and Place
and LDP2 Policy 1: Placemaking and LDP 2 Policy 32: Embedding Low & Zero
Carbon Generating Technologies in New Development. 
Residential Amenity 
72 NPF4 Policy 14 Design, Quality and Place and LDP2 Policy 1: Placemaking
requires development to respect the amenity of the place. NPF4 Policy 23 Health
and Safety aims to protect people and places from environmental harm and
LDP2 Policy 55: Nuisance from Artificial Light and Light Pollution, LDP2 Policy
56: Noise Pollution and LDP2 Policy 57: Air Quality aligns with national planning
policy. 
73 There are potential noise sources associated with the proposed development.
These include: from patrons, including in the outdoor seating area; vehicles; and
plant equipment. Noise sensitive receptors include residential properties to the
north and east of the site, Balhousie Care Home and Pitlochry Community
Hospital to the west.  In the instance of Burnside Cottages to the north, the
approximate distance to the facility would be 23 metres, from the southern gable
of the dwelling to the north face of the brewery building.  In respect of the
outdoor seating area, it would be approximately 34 metres, although it would be
partially obscured by the corner of the brew hall.  It should be noted that the
south face of Burnside Cottage has no window or door openings, and windows
either face east, west or north.  There are however small areas of intervening
external garden ground.  Similarly, the distance to the nearest properties at the
Bobbin Mill is approximately 90 metres to the east, from the external seating
area, with intervening woodland and topographical change.  It must also be
appreciated that the Ferry Road area is also well used, particularly with activity
associated with the Community Hospital and care home, which already creates
activity and noise in the vicinity.  Notwithstanding, at those respective distances
to Burnside Cottages and Bobbin Mill, while the erection and operation of the
facility would represent a change on the current situation, it is not considered that
the associated noise impacts would be significant enough to warrant refusal of
this application.  Similarly, given the position in respect of distance to the
respective residential properties, and intervening public roads and footpaths, it is
not considered that any undue privacy issues would arise. 
74 The applicant submitted a Noise Impact Assessment (NIA) in November 2023
(Document 35). Following discussion between Environmental Health (EH) and
the noise consultant, an updated NIA was submitted in December 2023

Page 15

(Document 41). The scope and approach of the assessment was completed
considering both local planning policy and agreed methodology and criteria with
PKC. 
75 Background noise surveys were undertaken and are outlined in the NIA. In
respect of plant equipment these are all well within the acceptable limits,
provided that there is no change to the number and type of plant equipment
installed. Internal activities were assessed, and one issue raised was the use of a
compressor in the ‘goods incoming area’ whilst the shutter door is open.
Therefore, it is advised that the air compressor should not be in use whilst the
shutter door is open, noting that deliveries are expected to be 1-2 per day and all
carried out during normal working hours. Overall, operational noise levels are
considered likely to be barely perceptible and within acceptable limits. In respect
of patron noise this has been assessed for the ‘worse-case scenario’ and
mitigation is required. In order to meet acceptable levels, terraced seating on the
northeast side of the development has been removed from the plans. It will also
be necessary to limit the number of patrons in the outdoor area to 36. The
skylights must also be altered from polycarbonate sheeting to perspex of at least
6mm thickness and the sliding doors leading to the outdoor area should generally
remain closed. By putting in these measures, predicted levels are reduced below
the background level. The NIA reports it is not likely that adverse impacts will be
experienced at any receptor due to the development. 
76 Environmental Health have reviewed the NIA and recommend a number of
conditions to ensure surrounding amenity is protected (Conditions 8, 9, 10, 11,
15, 16, 17 and 18). 
77 Air Quality and Odour – The plans include the provision of a wood burning stove
and the installation of associated flue. The technical specifications supplied with
the application relates to a domestic sized stove and therefore EH have no
adverse comments to make with regards to air quality in relation to the stove.
Given the height of the flue and distance to residential properties EH do not
foresee smoke and/or odour affecting residential amenity of neighbouring
properties. 
78 The applicant has submitted an odour assessment with the application
(Document 33). The assessment states that the potential odour sources will be
the release of vapours through the ventilation duct above the brewing hall; and
when the effluent tanks are filled and emptied. As no effluent treatment is
proposed on site and all spent grains and other industrial effluent will be held in
sealed containers fitted with carbon filters, odour from effluent storage has not
been considered further. It is therefore stated that odour has been predicted for a
single scenario: emissions from the brewing hall vent. 
79 EH note in their consultation response that when assessing the impact of odour,
consideration has been taken from The Institute of Air Quality Management
(IAQM) Guidance on the assessment of odour for planning; and SEPA issued
guidance on odour assessment for processes that are subject to the Pollution

Page 16

Prevention and Control regulations (PPC). Whilst this does not apply to this
development, the Guidance provides a useful framework for assessing the
potential adverse impacts on amenity. SEPA’s guidance notes odour from
brewing falls into the category of ‘less offensive’. The assessment reports odour
from the proposed development is predicted to be of negligible significance
subject to the satisfactory implementation of mitigation measures. 
80 EH recommend a number of conditions to ensure odour from the proposed
development does not impact surrounding amenity (Conditions 13, 14 and 19). 
81 Lighting – EH recommend a condition to ensure external lighting does not
adversely affect neighbouring land (Condition 12). 
82 The supporting documents have assessed the potential issues of noise and
odour and these matters have been satisfactorily addressed in line with national
and local planning policy. Planning conditions are recommended to safeguard
the amenity of the surrounding area. The proposal satisfies NPF4 Policy 14
Design, Quality and Place and NPF4 Policy 23 Health and Safety and LDP2
Policy 1: Placemaking, LDP2 Policy 55: Nuisance from Artificial Light and Light
Pollution, LDP2 Policy 56: Noise Pollution and LDP2 Policy 57: Air Quality. 
Roads and Access  
83 Transportation and Development (T&D) note in their consultation response that
the site will have three regular parking bays, with one additional accessible
parking bay. One of the bays will be provided with an electric charge point and
cycle parking is also proposed.   
84 The applicant has provided a Transport Statement and a subsequent update that
now includes industry standard and verifiable trip rate and mode share data from
TRICS. This provides information on the level of person trips associated with the
type of development proposed.  Subsequent analysis of this data by T&D has
indicated that the proposed development will attract a total of approximately 39
vehicles per day, which can be accommodated in nearby offsite public parking.   
85 In response to matters raised in the representation from Atholl Medical Centre, 
T&D requested that a loading facility for vehicles up to 12 metres is provided, to
accommodate normal operations. Amended drawings have been submitted to
include such a service bay – proposed elevations (Drawing 52), proposed site
plan (Drawing 71) and swept path analysis (Drawings 67-69). T&D note this
service bay occupies the full width of the service strip of the public road network,
which as part of the development will be constructed as a footway. This is not
ideal, however, the scaled swept path analysis shows a 12-metre vehicle can
suitably enter the service bay proposed and not obstruct the public road. 
86 Further, in respect of the matters raised in the representation, T&D recommend
that a Construction Traffic Management Plan should be submitted for approval
prior to the commencement of works. This should have a specific focus on how

Page 17

the applicant proposes to construct the building without any impediment on the
public road (Condition 22). Also, a Service Management Plan is recommended
detailing the plans for servicing and delivery operations, and timing, including
arrangements for the management of vehicular and pedestrian traffic during
servicing and delivery, paying particular attention to the need for all deliveries to
be undertaken off the public road, and a condition is proposed (Condition 23). 
87 The constructing of a new vehicle access across the frontage of the site, with a
footway being provided.  The finalised design and location of the dropped kerbs
on the north and south of Ferry Road is to be provided through condition
(Condition 24). The provision of these works would not result in any physical
restriction to the retained access to the Bobbin Mill site to the east, which while in
close proximity to the application site boundary, would not be altered as part of
the proposals. 
88 A secure covered cycle parking area is proposed to the east of the building, to
encourage active and sustainable travel.  A condition is recommended to ensure
that a detailed design for a minimum of 10 bicycles is submitted for approval prior
to the commencement of development and thereafter implemented prior to first
use (Condition 25).   
89 The application site is located close to the town centre and is easily accessible
by all modes of transport including walking, cycling and public transport. Thus,
reducing the need to travel unsustainably. Accessible parking, an electric vehicle
charging bay and cycle parking is proposed. Although onsite parking provision is
limited, the site is well served by sustainable transport modes and there are
public car parks a short distance from the application site. Conditions are
recommended to mitigate any impact on the public road and to provide a safe
crossing for pedestrians. The proposal satisfies NPF4 Policy 13 Sustainable
Transport and LDP2 Policy 60B subject to conditions. 
Drainage and Flooding 
90 A Drainage & Flood Statement reports no risk from fluvial flooding and only a
small area of the site is shown to have a medium-low likelihood of surface water
flooding. It reports this isolated patch appears to be the result of run-off from a
steep slope to the east. A perimeter drain is proposed during the construction
phase and the drainage design incorporates measures to ensure surface water
run-off will be controlled. 
91 The drainage layout plan (Document 70) and Drainage & Flood Statement
(Document 66) were revised during the application process, in consultation with
the Council’s Flooding Team. Given site constraints and space restrictions, two
sets of cellular storage crates are proposed as the main form of attenuation for all
surface water run-off. Filter trenches are proposed to capture run-off from the
adjacent slopes. The attenuation tank at the east of the site has been relocated
due to concerns raised by Transportation and Development, having been initially
proposed within the embankment supporting the road to residential properties.

Page 18

That seeing a risk of causing damage to the embankment. The surface water will
be treated within the site before discharging to the existing surface water sewer
in Ferry Road. A maintenance schedule is included. In respect of foul water this
will drain to the existing public combined sewer located in Ferry Road. 
92 SEPA were consulted and have no objection to the proposal. Following review of
the further information submitted, the Council’s Flooding Team are satisfied with
the drainage design and that there is no risk of flooding. 
93 The proposal satisfies NPF4 Policy 22 Flood Risk and Water Management and
LDP2 Policy 52: New Development and Flooding, LDP2 Policy 53B: Foul
Drainage and LDP2 Policy 53C: Surface Water Drainage. 
94 In respect of NPF4 Policy 22 d) and LDP2 Policy 53E: Water Supply, as noted in
the external consultation responses, the site is in a Drinking Water Protected
Area and Scottish Water requested further information during the application
process on the abstraction volume. The impact on Water Resources of the
operation of the brewery and accompanying amenities has been reviewed
against the confirmed abstraction volume of 200,000 litres per annum
(0.2Ml/annum). Assuming this water usage remains consistent with these values,
this proposal can be considered as low-medium risk regarding Water Resources.
Scottish Water would have no objections with the proposed volume of water and
request that they should be notified if these volumes change. Scottish Water also
request they are notified prior to work commencing on site as they may wish to
take water samples as a precaution to protect water quality. It is recommended
that an informative be attached to any planning permission granted (informative
5). 
Waste Collection 
95 The refuse storage and its location are acceptable as confirmed by the Council’s
Waste Service. 
Natural Heritage and Biodiversity 
Open Space 
96 The application site is designated as Open Space in LDP2. Historical mapping
shows evidence of industrial uses within and surrounding the site boundaries as
far back as 200 years ago. Most recently, the majority of the site was used as a
compound during construction of the neighbouring hospital/care home. The
applicant’s supporting statement (Document 40) has extracts of historical maps
which show these former industrial uses. The area of the site designated as open
space in LDP2 comprises only a minor part of a much larger designation and the
proposed development will not create a significant deficit in available outdoor
recreational space, whether in scale or quality.  As has been indicated above
much of the site has previously been cleared of trees at various points in time.
Most recently the surface was also prepared as a compound area, through the

Page 19

laying of hardcore.  It is also evident that the site has been formed as a more
level clearing, through the likely removal of surface material to create a flatter
area.  This sees slopes at the periphery, where this material has been
excavated.  In respect of NPF4 Policy 20 Blue and Green Infrastructure and
LDP2 Policy 42: Green Infrastructure, the development of this area of land will
not pose any significant detrimental impact to the surrounding green
infrastructure provision and the overall integrity of the network will be maintained.
The proposed development will have no impact on the existing footpath network
including the adjacent core path (PLRY/109) and a condition is recommended to
ensure continued public access to public paths during building works and on
completion of the development (Condition 20). 
97 While the development of a near 1800 square metre area is notable it is
considered minor in relation to the requirements of LDP2 Policy 14A: Open
Space Retention and Provision – Existing Areas criteria (b).  It only involves a
minor part of the overall designation and would not significantly affect its
continued use as a wider recreational or amenity resource.  In this instance the
area to be developed has effectively been out of any formal recreational use for a
long time.  Most recently having been used as a yard in the construction of
Pitlochry Community Hospital and has not fully regenerated.  The vast majority
of the wider wooded resource would be retained.  More generally, Pitlochry
does benefit from generous open space provision.  On balance therefore, the
loss of this area of largely previously developed land within the open space
designation, can be accepted in light of the wider benefits associated with this
proposal, and the opportunity to compensate for tree loss and biodiversity
enhancement as shall be discussed below.  The proposal is therefore
considered to comply with NPF4 Policy 20 a) and LDP2 Policy 14: Open Space
Retention and Provision. 
Biodiversity 
98 A Preliminary Ecological Appraisal and Ecological Impact Assessment by Tay
Ecology (Document 28) was reviewed by the Biodiversity Officer and confirmed
as being in line with best practice. The report identified that no protected species
were present during the survey and no further surveys were therefore required.
The report recommends biodiversity enhancement measures and in line with this
bird and bat boxes are proposed on the west elevation of the brewery building
(Drawing 52). 
99 A condition is recommended to ensure the recommendations set out in the Tay
Ecology Report are carried out to protect environmental quality and biodiversity
(Condition 3). 
100 The proposal satisfies NPF4 Policy 3 Biodiversity paragraphs a), c) and d) and
LDP2 Policy 41: Biodiversity.

Page 20

Trees / Ancient Woodland 
101 Some representations highlight the loss of ancient woodland, as a result of the
proposed development and the ‘Catastrophic negative impact on the ancient
woodland’.  Reference is made in the representations to a woodland
management plan coproduced in 2009 by Dr Rick Worrell, Forestry Consultant,
which concluded that Bobbin Mill constituted Ancient Woodland. The
representation states such Ancient Woodland is protected by the National
Planning Framework. 
102 In exploring this, the woodland area at Bobbin Mill is not identified as ancient
woodland on maps published by NatureScot (Ancient Woodland Inventory) or on
Perth and Kinross Council’s GIS layering system. Further, the site is not
identified as ancient woodland within the applicant’s Ecology Report. 
103 The Council does not hold a copy of the referenced woodland management plan
and only received a copy of a ‘draft’ document from an objector.  Scottish
Forestry have since confirmed that the draft Bobbin Mill Management Plan is an
appendix to the ‘Pitlochry Estate Long Term Forest Plan (2012)’ which was
approved by Scottish Forestry. This shows the Bobbin Mill woodland marked as
a Natural Woodland Management Grant Area. 
104 This draft Woodland Management Plan covers a wide area referred to as the
‘Bobbin Mill woodland area’ and concludes that this general woodland area
identifies as ‘semi-ancient’ woodland.  Within Para 3.6 of the report Dr Rick
Worrell states – “The flora clearly suggests that most of the site is ancient semi
natural woodland”. This statement is based on identifying certain areas of ground
flora as being characteristic of oak – birch (National Vegetation Class W11), and
ash woodland (NVC W9). It is then stated “that it is clearly ancient woodland, but
does not appear in the Ancient Semi Natural Woodland Inventory due to an
oversight”. 
105 The available evidence indicates that the cleared area within the application site
has either not been wooded for a considerable time or is shown as open space in
the woodland management plan.  Whilst it is difficult to accurately compare the
planning application boundary with the outline of the Bobbin Mill wooded area as
set out in the Woodland Management Plan, it appears that at least some of the
periphery, the sloped areas, are identified as ancient woodland (primarily that
area immediately adjacent to the access to Bobbin Mill).  Although there is this
comparison issue, it is accepted for the purposes of assessing this planning
application that all of the trees on site are covered within the ancient woodland
designation. Thus NPF4 Policy 6 Forestry, Woodland and Trees applies, together
with LDP2 Policy 40 which broadly aligns with that national policy. 
106 NPF4 Policy 6 states – 
a)  Development proposals that enhance, expand and improve woodland and
tree cover will be supported.

Page 21

b) Development proposals will not be supported where they will result in: 
i.  Any loss of ancient woodlands, ancient and veteran trees, or adverse
impact on their ecological condition; 
ii.  Adverse impacts on native woodlands, hedgerows and individual trees
of high biodiversity value, or identified for protection in the Forestry and
Woodland Strategy; 
iii.  Fragmenting or severing woodland habitats, unless appropriate
mitigation measures are identified and implemented in line with the
mitigation hierarchy; 
iv.  Conflict with Restocking Direction, Remedial Notice or Registered
Notice to Comply issued by Scottish Forestry. 
c)  Development proposals involving woodland removal will only be supported
where they will achieve significant and clearly defined additional public
benefits in accordance with relevant Scottish Government policy on
woodland removal. Where woodland is to be removed, compensatory
planting will most likely be expected to be delivered. 
d)  Development proposals on sites which include an area of existing woodland
or land identified in the Forestry and Woodland Strategy as being suitable
for woodland creation will only be supported where the enhancement and
improvement of woodlands and the planting of new trees on the site (in
accordance with the Forestry and Woodland Strategy) are integrated into
the design. 
107 In line with LDP2 Policy 40B, a Tree Survey Report (TSR) (Document 58) was
submitted together with a Tree Constraints Plan, Tree Protection Plan and details
of compensatory planting (Documents 59-64). The TSR assessed 31 trees and 1
tree group and identified that the site contains sycamore and oak, with 45.5% of
trees being Category C. 
108 Honey fungus, Armillaria mellea, a root/soil borne fungal disease is also identified
to have colonised some of the oak.  This causes tree demise and failure.
Indeed, there are six Category U oak trees, T173, 174, 175, 183, 187 and 196,
which have died as a result of honey fungus and are to be removed. 
109 It is proposed to fell three trees comprising of two Category B (T177 Sycamore,
and T184 Oak) and one Category C (T181 sycamore) and one group of nine self-
seeded wild cherry trees. 
110  2 Category A, 7 Category B and 13 Category C trees are proposed for retention.
So this would see 12 trees to be removed, many due to honey fungus, and 19
retained from a total of 31 surveyed.

Page 22

111 Compensatory planting of 36 trees is proposed using both native species and
fruit trees recognised as resistant/tolerant of honey fungus (Drawing 62). The
supporting information states that 12 trees are proposed to be planted at
Pitlochry High School Nursery (Document 64), which is understood to have
already taken place. Should an additional 4 trees be impacted upon by drainage
measures then additional compensatory planting (at a rate of 3 to 1) would be
required, thereby increasing the overall number of trees (by a further 12) to 48.
The compensatory planting is in line with planning guidance. 
112 In consideration of the criteria listed in NPF4 Policy 6 b) – 
i.  the central core of the development site does not contain trees and is not
considered as ancient woodland. It consists mostly of aggregate type
material and little soil, so has clearly been significantly disturbed. It is
unlikely to re-seed with trees synonymous with the surrounding woodland.
The periphery slopes to the east of the application site are however
accepted for the purposes of the consideration to contain ancient woodland
and are in the red line boundary of the site. The proposal would therefore
result in the loss of ancient woodland and as such is contrary to criterion i)
of NPF4 Policy 6 b). 
ii.  the woodland is within the Forest Woodland Strategy as existing woodland
but is not specifically identified as being suitable for woodland creation. 
iii. as outlined previously in the report, compensatory planting is proposed
using both native species and fruit trees recognised as resistant/tolerant of
honey fungus. The removal of invasive species and planting of new trees
would enhance and improve the woodland generally. 
iv.  Scottish Forestry have not issued a direction or notice on the site. 
113 In respect of Policy 6 c), the area of trees being removed to facilitate the
development does not constitute ‘woodland’ removal, as it is less than 0.1ha. The
applicant is also committed to offset tree loss through on and off-site tree
planting. 
114 In respect of Policy 6 d), the removal of the honey fungus and the removal of the
invasive species would enhance and improve the woodland quality generally.
The proposed planting of new trees is also in accordance with the Forestry and
Woodland Strategy. The 2009 Woodland Management Plan proposes the
controlled removal of the non-native invasive sycamore and Norway maple and
stipulated a time frame for these works.  The Tree Officer’s consultation
response highlights that from assessing the development site and noting the
number of sycamores present, it is clear that the woodland management
proposals have not been carried out within the vicinity of the application site, and
the advent of development would secure the removal of certain sycamores (T177
& T181) at the site boundaries and achieve some of the woodland management
plan outcomes and objectives.

Page 23

115 The proposed development will nevertheless result in the loss of ancient
woodland. However, as highlighted in the Tree Officer’s consultation response,
the vegetation on the edges of the planning application site and on the periphery
of the general woodland at Bobbin Mill hosts non-native invasive species and six
dead oak trees with honey fungus. Their removal would not result in an adverse
impact on the ancient woodland or their ecological condition. Two category A
trees are proposed for retention as are the majority of category B trees. Within
the context of the overall Bobbin Mill woodland, the loss of trees would be
minimal, and the removal of dead and invasive species will enhance and improve
the woodland and woodland habitat. 
116 The proposed development will enhance and improve woodland and tree cover
in line with NPF4 Policy 6 a) and it is considered that the proposal would not
constitute a significant departure from the development plan due to the loss of
ancient woodland. Overall, the proposal aligns with the policy intent and policy
outcomes of NPF4 Policy 6 Forestry, Woodland and Trees and LDP2 Policy 40:
Forestry, Woodland and Trees. 
117 Conditions are recommended by the Tree Officer to ensure a pre-site meeting
takes place to examine tree works and protection measures; a method statement
is submitted for written approval of the Council and to include details of how the
removal of diseased trees and soil will be handled; and for a post-development
tree report to be submitted (Conditions 5, 6 and 7). 
118 The proposal incorporates new landscape and tree planting appropriate to the
local context and the scale and nature of the development. It will not lead to the
fragmentation of existing blue and green infrastructure and will enhance and
create new woodland habitats. The proposal satisfies NPF4 Policy 14 Design,
Quality and Place, NPF4 Policy 20 Blue and Green Infrastructure, LDP2 Policy 1:
Placemaking and LDP2 Policy 42: Green Infrastructure. 
Core Path  
118 An adopted core path is located immediately to the east of the application site
(PLRY/109) and a condition is recommended to ensure this remains accessible
to the public during the construction and operational phases of the development
(Condition 20). 
119 This is in line with NPF4 Policy 20 Blue and Green Infrastructure and LDP2
Policy 15: Public Access. 
Contamination 
120 An inspection of the proposed development site by the Council’s Contaminated
Land Officer did not raise any real concerns, although mapping does indicate that
there is land formerly occupied by various potentially contaminative sources
nearby. The applicant is advised that there may therefore be potential for

Page 24

contamination within the site. Should any contamination be found during the
approved works, works should cease and the Land Quality team contacted. It is
recommended that an informative to this effect is attached to any consent
(Informative 7). 
121 The proposal satisfies NPF4 Policy 9 c) Brownfield, Vacant and Derelict Land
and Empty Buildings and LDP2 Policy 58A: Contaminated Land. 
Material Considerations 
122 The representations received are a material consideration. Thirty (30)
representations were received including 6 objections, 2 neutral representations
and 22 letters of support. 
Representations - objections 
123 The main issues raised within the objections have been addressed in the report. 
124 The objections also raised the potential for anti-social behaviour from the
consumption of alcohol at the brewery and the perceived impact of this on the
well-being of nearby residents. The objections referred to the public sector
equality duty under Section 149(1) of the Equality Act (2010) and relevant human
rights legislation to have due regard to the need to eliminate harassment. The
objections state that granting permission for the development will increase the
risk of the Gypsy Travellers who live near to the site suffering harassment on
account of their race. 
125 The applicant’s supporting statement (Document 40) responds to the issues
raised in the representations. The applicant highlights the supporting documents
submitted with the application including Noise and Odour Impact Assessments to
demonstrate the proposal would not have a significant detrimental impact on
residential amenity and the proposal is designed to be compatible with the
surrounding uses and a good neighbour. The supporting documents have been
reviewed by Environmental Health and Planning and the potential issues of noise
and odour have been satisfactorily addressed in line with national and local
planning policy. Planning conditions are recommended to safeguard the amenity
of the surrounding area (Conditions 8 – 19). 
126 There is a multi-agency partnership approach in place to tackle anti-social
behaviour in the community. As the proposal would be a licensed business there
is a duty under the Licensing (Scotland) Act 2005 to prevent crime and disorder,
prevent public nuisance and secure public safety which is governed by Perth &
Kinross Licensing Board. This duty is highlighted in the applicant’s supporting
statement.  
127 Through the planning application process the material planning issues raised in
the objections have been considered and have been satisfactorily addressed in

Page 25

line with national and local planning policy. The issues raised are not of sufficient
weight to justify the refusal of the planning application. 
Representations – support 
128 The 22 letters of support highlighted the development would bring wide ranging
economic benefits to the town and enhance the local area. 
129 As noted in the supporting documents this is a successful local business seeking
to grow and invest in Pitlochry with multi-faceted economic and social benefits for
the town. 
130 NPF4 recognises the challenges faces by the hospitality and tourism sectors and
aims to improve business development and entrepreneurship. 
Developer Contributions 
131 None required by the Council’s supplementary guidance. 
Economic Impact 
132 The proposed development will bring a range of economic benefits to the town,
including an enhanced visitor attraction and footfall, together with jobs during
construction and afterwards. 
Variation of Application Under Section 32A 
133 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the north elevation of the
building and the vehicular access. 
Planning Obligations and Legal Agreements 
134 None required. 
Direction by Scottish Ministers 
135 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
136 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, although the proposal does not comply with criterion i) of NPF4 Policy 6

Page 26

b) there are material considerations to justify a departure. The proposal is
considered to otherwise comply with NPF4, and the adopted Local Development
Plan 2 (2019).  Account has been taken of the relevant material considerations
and none have been found that would justify refusal.  Accordingly, the proposal
is recommended for approval subject to the following conditions. 
Recommendation   
Approve the application subject to conditions. 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document(s) Ecological
Appraisal by Tay Ecology 3 October 2023 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the occupation of the building hereby approved, evidence that the bird
and bat boxes have been installed shall be submitted for the written approval of
the Council as Planning Authority, reference drawing 52.  Thereafter, the bird
and bat boxes shall be maintained in a reasonable condition for the life of the
development to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
5. A site meeting will be held with the Enforcement Officer (Trees) of the Council to
examine completed tree works, honey fungus mitigation, and to inspect tree
protection measures in place that accord with standard (fencing/non dig
construction, etc), drainage, and site storage facilities.  This meeting shall be
with the project manager, arboriculturist, and ground works contractor.  Contact

Page 27

should be made with the Planning Authority to arrange this meeting prior to the
commencement of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
6. Prior to the commencement of development, a site-specific method statement
outlining measures to mitigate against the spread of honey fungus shall be
submitted to the Council as Planning Authority for review and written approval. 
The statement shall include details on the removal of affected trees (6 x dead
oak), disposal of soil areas contaminated with honey fungus and provide full
details of disposal of all excess materials.  Clarity shall be provided on where
the soil materials excavated will be deposited when levelling site, formation of
building footprint, filtration trenches/drainage, and access/parking.  Clarity shall
be provided on how the drainage works will be undertaken, and whether larger
encroaching roots would be permitted within the drainage material, and how the
cutting into the banking will be undertaken, the foundation type for structures,
and subbase for paths/surfacing, where they impact and encroach the RPA of
adjacent trees.  Thereafter the measures shall be carried out in complete
accordance with the details as so agreed. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
7. Prior to the building being brought into use a post development tree report/audit
confirming details of the trees retained on site, their condition, and a statement
as to the effectiveness of protection measures followed shall be submitted for
review and written approval of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
8. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - In order to safeguard the residential amenity of the area. 
9. The hours of operation of the outdoor seating area shall be restricted to between
1100 to 2200 hours Monday to Sunday. 
Reason - In order to safeguard the residential amenity of the area. 
10. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area.

Page 28

11. No music, amplified or otherwise, shall be permitted in the outdoor seating area
at any time. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
12. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the residential amenity of the area. 
13. No odours from the distillery shall be discernible on the boundary with the
nearest residential property. 
Reason - In order to safeguard the residential amenity of the area. 
14. All mitigation measures as detailed within Section 6 of the Odour Assessment
undertaken by The Airshed, reference AS 1020 Pitlochry Brewery Airshed, dated
18 October 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
15. All mitigation measures as detailed within Section 7 of the Noise Impact
Assessment undertaken by CSP Acoustics, reference 1866 R001 V3 AH, dated
12 December 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
16. Noise from operations on site shall not exceed L A90,1 hour background noise
level plus 5dB (A), including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when measured at any residential
property in accordance with BS4142:2014+A1:2019. 
Reason - In order to safeguard the residential amenity of the area. 
17. A Noise Management Plan shall be submitted for the written approval of the
Planning Authority.  The plan shall include all sources of noise associated with
the premise, including patron noise, deliveries, compressor etc and the measures
that will be put in place to minimise and/or control noise.  The plan shall be
reviewed on a regular basis or, following receipt of a justified complaint or at the
request of the Planning Authority.  Once the Noise Management Plan has been
approved, it shall be fully implemented for the lifetime of the development. 
Reason - In order to safeguard the residential amenity of the area. 
18. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning

Page 29

Authority to carry out a noise assessment to verify compliance with conditions 10,
15, 16 and 17 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with conditions 10, 15, 16
and 17 a scheme of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation of the scheme and
shall be submitted to the Planning Authority for written approval within 28 days of
the assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
19. In the event of a justified odour complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out an odour assessment to verify compliance with conditions
13 and 14 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the odour
assessment shows that the odour levels do not comply with conditions 13 and 14
a scheme of odour mitigation shall be included with the odour assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority for written approval within 28 days of the
assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
20. The core path (PLRY/109) must not be obstructed during building works or on
completion of the development.  Any damage done to the route and/or the
associated signage during building works must be made good before the
development is completed or brought into use, whichever is the earlier. 
Reason - To ensure continued public access to the public paths and in the
interests of public safety within the site. 
21. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
established within five years being replaced in the following planting season with
others of a size and species as previously approved.   
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
22.  Prior to the commencement of the development hereby approved, the applicant
shall submit for the written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a Construction Traffic

Page 30

Management Scheme (TMS). The TMS shall take cognisance of the fact that no
loading and unloading of vehicles shall be undertaken on the public road and
shall include the following: 
a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used; 
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
c) a code of conduct for HGV drivers for loading and unloading materials at the
site; 
d) arrangements for liaison with the Roads Authority regarding winter
maintenance; 
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown; 
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road; 
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development; 
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for all users
including pedestrians, cyclists and equestrians; 
i) details of information signs to inform other road users of construction traffic; 
j) arrangements to ensure that access for emergency service vehicles are not
impeded; 
k) traffic arrangements in the immediate vicinity of temporary construction
compounds; 
l) monitoring, reporting and implementation arrangements; 
m) arrangements for dealing with non-compliance; and 
n) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme.

Page 31

Reason - In the interest of proper site management. 
23.  Prior to the commencement of the development hereby approved, the developer
shall provide, for approval by the Council as Roads Authority, a Service
Management Plan detailing the plans for servicing and delivery operations, and
timing, including arrangements for the management of vehicular and pedestrian
traffic during servicing and delivery, paying particular attention to the need for all
deliveries to be undertaken off the public road.  Thereafter, the approved plan
shall be adhered to for the life of the development. 
Reason - In the interests of road safety. 
24.  Prior to commencement of any development on site, a detailed design showing
the frontage of the development site onto Ferry Road shall be provided with the
following schemes being provided: 
a)  position of uncontrolled crossing location(s) along the frontage of the site to
link the development site to the northern side of Ferry Road with dropped
kerbs linking both sides; 
b)  the footway on the southern side of Ferry Road, of a minimum width of 2
metres along the full frontage of the site; 
c) the location of road drainage on Ferry Road along the frontage of the site; 
d)  the finalised location of the streetlighting cable; 
e)  the construction details of the parking bays and the service area; and 
f)  full details of the vehicle access, to be constructed in the following materials: 
40mm Wearing Course - Hot Rolled Asphalt 
50mm Base Couse - Dense Bitumen Macadam 
130mm Roadbase - Dense Bitumen Macadam 
230mm Subbase - Type 1 
The submission will confirm the location, specification and detailed design for the
pedestrian crossing, location of the streetlighting infrastructure, footway on
southern side of Ferry Road, road drainage and vehicle access along the
frontage of the development site.  This shall be submitted for the written
approval of the Council as Planning Authority.  Thereafter the approved scheme
shall be implemented in full, prior to occupation of the brewery. 
Reason - In the interests of road and pedestrian safety and connectivity to the
northern side of Ferry Road.

Page 32

25.  Prior to commencement of any development on site, a detailed design for the
proposed cycle parking facility for a minimum of 10 cycles shall be submitted to
and approved in writing by the Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction of the Council as
Planning Authority prior to the development being brought into use. 
Reason - To encourage active and sustainable modes of transport in line with
national and local planning policy. 
26. Prior to the commencement of development hereby approved, a statement shall
be submitted for approval in writing by the Council as Planning Authority to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. The statement as agreed shall be
fully implemented to the satisfaction of the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
Justification 
There are material considerations to justify a departure from the Development
Plan otherwise, the proposal is generally in accordance with the Development
Plan.  There are no material reasons which justify refusal. 
Informatives 
1. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
Further information on radon gas and the associated reports that can be
obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
2. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.

Page 33

4. Please note the consultation response on file from Network Rail - A railway
underbridge located in close proximity to the site (UB 290/063 crossing Ferry
Road) has a headroom of 4.2m.  The applicant should ensure that all vehicles
required for construction and operation are able to clear this height. 
5. Please note the consultation response from Scottish Water on file - this includes
a request that prior to work commencing on site they are notified at
protectdwsources@scottishwater.co.uk as they may wish to take water samples
as a precaution to protect water quality.  In addition, increases in water usage
should also be relayed to Scottish Water. 
6. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the front elevation and
vehicular access. 
7. An inspection of the proposed development site did not raise any real concerns,
although historical mapping indicates there was previously a nearby use which
may have resulted in contamination in the vicinity of the site.  The applicant is
advised that, given historical uses of the wider area, there may be potential for
contamination within the site.  Should any contamination be found during the
approved works, works should cease and the Land Quality team should be
contacted on 01738 475000 or es@pkc.gov.uk for further advice. 
8. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that
smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
9. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
10. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
11. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain from the Council, to place,

Page 34

maintain or adjust apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-permits 
12. Road drainage may be in the vicinity of the new access and require remedial
works at the applicant’s expense.  Contact Perth & Kinross Council Road
Maintenance Department for further details. 
13. Street lighting infrastructure present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of infrastructure and its
relocation to facilitate the vehicle access.  Relocation to be undertaken at
applicant's expense.  Contact Mark Gorrie at Perth & Kinross Council Street
Lighting Department for further details. 
14. The applicant can seek guidance on the detailed design and positioning of the
cycle storage from Transport Scotland's Cycling by Design 2021 or similar design
guide. 
Background Papers
Letters of representation 30 
Authors
Name Designation Contact Details
Claire Myles Planning Officer 01738 475300 
Approved
Name Designation Date
Paul Williamson Team Leader 17 January 2025
Kristian Smith Service Manager 23 January 2025