Democracy Spraffa

Minute of meeting of 8 January 2025

Perth and Kinross Council · 12 February 2025
Back to Planning and Placemaking Committee — 12 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 8 January 2025 at 9.30am. 
Present: Councillors I Massie (up to and including Item 5(1)(i)), G Stewart, K Allan,
B Brawn, D Cuthbert, K Harvey, D Illingworth, I James, Bailie C McLaren, R Watters,
and Bailie M Williamson. 
In Attendance: S Merone, L MacLean, C Morilly, L Reid, K Smith, and P Williamson
(all Economy, Development and Planning); A Brown, G Fogg, S Dockerill,
M Pasternak and R Ramsay (all Legal and Governance). 
Apologies: Councillor R Watters. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted
apologies as above.   
2. Declarations of Interest 
The were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The Minute of Meeting of Planning and Placemaking Committee of
13 November 2024 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
23/01941/AMM 5(1)(i) 
5. Applications for Determination 
(1) Local Application 
(i) 24/01297/FLL – Alterations and extension to outbuilding to
form dwellinghouse and garage/workshop, land 35 metres
north west of Gentian, Fortingall, Aberfeldy, PH15 2LH
(Report No. 25/1)

Page 2

Ms A Brown read out a statement on behalf of Glenlyon and
Loch Tay Community Council, objectors to the application and
Mr R Taylor, on behalf of the applicant, addressed the
committee, and answered Members questions. 
Motion (Councillor B Brawn and Bailie M Williamson) 
Approve, in accordance with Report 25/1 with the
additional/amended conditions to:
(i) augment the proposed conditions in relation to private
water supply; and
(ii) make additional provision in relation to specimen in the
replating programme. 
Amendment (Councillors R Watters and D Cuthbert) 
Approve, in accordance with Report 25/1 with the
additional/amended conditions to:
(i) augment the proposed conditions in relation to private
water supply; 
(ii) make additional provision in relation to specimen in the
replating programme; and
(iii) make additional provision in terms of a conditions to
ensure delivery of low carbon technologies. 
In terms of Standing Order 21.5 a roll call vote was taken. 
7 members voted for the Motion as follows:
Councillors K Allan, B Brawn, D Illingworth, I James, I Massie,
Bailie C McLaren and Bailie M Williamson. 
4 members voted for the Amendment as follows:
Councillors D Cuthbert, K Harvey, G Stewart and R Watters. 
Resolved:
Grant, subject to the following terms, amended conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.

Page 3

Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
4. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of:
• the height and slopes of any mounding or
recontouring of the site;
• full details of all hard landscaping proposals including
materials and installation methods; 
• compensatory planting including the inclusion of
specimen tree species, as mitigation for the loss of
specimen trees;
• tree protection strictly in accordance with BS 5837
2012: Trees in Relation to Design, Demolition and
Construction, including in relation to potential impact
on hedging in adjacent property; and, 
• species, height, size and density of trees and shrubs
to be planted (with a suggested inclusion of hornbeam
at a minimum height of 60cm). 
The scheme as subsequently approved shall be carried
out and completed within the first available planting
season (October to March) after the completion or
bringing into use of the development, whichever is the
earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the
Council as Planning Authority within 7 days of that date. 
The scheme as agreed and implemented shall thereafter
be maintained to the satisfaction of the Council as
Planning Authority.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
5. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.

Page 4

6. No windows or other openings shall be formed in the
southeast gable elevation of the dwellinghouse hereby
approved.
Reason - In the interests of residential amenity; in order
to safeguard the privacy and amenity of the residents of
the neighbouring dwellinghouse(s).
7. Prior to the commencement of the development hereby
approved, details of the proposed boundary treatments
for the site shall be submitted to and agreed by the
Council as Planning Authority.  The scheme as
subsequently agreed shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
8. Prior to the development hereby approved being
completed or brought into use, the vehicular access
junction with the C448 shall be surfaced in accordance
with Perth & Kinross Council's Road Development Guide,
using the Construction Type B from the Construction
Details for Access Types, C, D and E.  The Type B Road
construction detail shall continue into the entrance for a
minimum distance of 5 metres from the boundary of the
public road surface.
Reason - In the interests of road safety
9. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility which accords
with Sustainable Urban Drainage System principles shall
be implemented for the site and maintained for the
duration of the approved development works.  The
temporary surface water treatment facility shall remain in
place until the permanent surface water drainage scheme
is implemented.
Reason - To ensure the appropriate management of
construction surface water run-off to minimise flooding
and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the
interests of residential and environmental amenity.
10. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be

Page 5

operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
11. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  This should
also include a report detailing how existing and proposed
supplies shall be maintained/achieved specifically in
respect of : qualitatively and quantitively, catchments,
abstraction points and connections, and to record and
substantiate how these will not be adversely affected. 
The report should address both existing demand on the
private water supply and the projected demand of the
development hereby approved.  The subsequently
agreed protective or replacement measures shall be put
in place prior to the commencement of the development
being brought into use and shall thereafter be so
maintained insofar as it relates to the development
hereby approved.
Reason - To ensure the new development has an
adequate and consistently wholesome supply of water
and to maintain water quality and supply in the interests
of residential amenity and ensure the private water supply
or septic drainage systems of neighbours of the
development remain accessible for future maintenance.
12. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 07 Bat Survey Report Bird and
Protected Species Assessment 16 July 2024 and
document 08 Ecology Survey and Ecological Impact
Assessment 14 August 2024 relates) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
13. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.

Page 6

Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
14. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, six nesting
bricks/boxes shall be provided on the completed buildings
in accordance with the recommendations in the
supporting biodiversity survey submitted and hereby
approved.  Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
15. Prior to works commencing, a Construction Method
Statement must be provided outlining the measures to
protect the watercourse from the impact of pollution and
sediment to ensure no adverse effects on the River Tay
SAC.  Thereafter the CMS as agreed shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In order to ensure the development does not
impact negatively on the nearby Special Area of
Conservation. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.

Page 7

3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
5. A private wastewater treatment plant and septic tank
should be provided with an access for desludging.  The
desludging tanker should be provided with access to a
working area that:
• will provide a clear route for the suction hose from
the tanker to the tank, and
• is not more than 25m from the tank where it is not
more than 4m higher than the invert level of the
tank, and
• is sufficient to support a vehicle axle load of 14
tonnes.
6. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
investigation and possible action by Environmental Health
under the Environmental Protection Act 1990.
7. The Air Source Heat Pump shall be certificated in
accordance with Microgeneration Certification Scheme
007 and installed by an installation company certificated
in accordance with Microgeneration Installation Standard
3005 and in compliance with the calculation procedure
contained in Table 2 of Microgeneration Certification
Scheme Planning Standards (MCS 020), confirming that
the permitted development noise limit of 42 dB LAeq, 5
mins will be met.  In addition, the Air Source Heat Pump
shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating
35 between 0700 and 2300 hours daily, or Noise Rating
25 between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and
plotted on a rating curve chart.
8. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply
or septic drainage infrastructure in the development area

Page 8

are honoured throughout and after completion of the
development.
9. The applicant shall ensure the private water supply for
the dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted
to Perth and Kinross Council Environmental Health in line
with the above Act and Regulations.
10.  The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
11. The proposed demolition and/or building works likely to
cause harm to bats should not commence until the
applicant has obtained the relevant licence issued by
NatureScot pursuant to Regulation 53 of The
Conservation of Habitats and Species Regulations 2010
authorising the specified activity/development to go
ahead.
12. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
13. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk. 
14. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
15. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. 
Further information can be found at:
https://www.pkc.gov.uk/binrequests. 
16. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town

Page 9

and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to include flood risk
and drainage information. 
(Councillor I Massie left the meeting at this point and Councillor G Stewart took the
chair.) 
6. Proposal of Application Notices (PAN) 
(i) 24/00013/PAN - Formation of a 49.9MW battery storage system
and associated works, land 380 metres north east of St Annes,
Monorgan, Longforgan, DD2 5HT (Report No. 25/2) 
Mr P Williamson provided a short verbal update.  Paragraph 4 of
Report 25/2 refers to an event being held on 14 December 2024, this
did not take place.  Alternative dates for this event have been arranged
for 8 and 22 January 2025, both 1pm – 7pm at Longforgan Bowling
Club. 
Councillor D Illingworth requested due consideration be given to
screening and the route of the cabling connection to the substation to
try and avoid the digging up of roads. 
Councillor I James requested due consideration be given to potential
noise hazards of the facility and appropriate noise mitigation
measures. 
Councillor K Harvey requested due consideration be given to traffic
management due to narrow access routes and existing road issues in
the area. 
Bailie M Williamson requested due consideration be given to
necessary ecological surveys, including the potential for badgers
undermining the site. 
The contents of the Report by the Strategic Lead – Economy,
Development and Planning, were noted.