Perth and Kinross Council
Planning and Placemaking Committee – 11 December 2024
Pre-Application Report by Strategic Lead: Economy, Development & Planning
(Report No. 24/367) 
PROPOSAL: Formation of access track, bridge, compound and associated
works 
LOCATION: Land 360 Metres North of Glassick Farm, Braco, Dunblane,
FK15 9QZ 
Ref. No: 24/00012/PAN 
Ward No: P7- Strathallan 
Summary 
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for the formation of an access track,
bridge, compound and associated works at land 360 Metres North of Glassick
Farm, Braco, Dunblane, FK15 9QZ. The report also aims to highlight the key
planning policies and the likely stakeholders who would be involved in the decision
making process, and to offer a brief overview of the key planning issues which are
likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 25 October 2024. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for the formation of an access track, bridge,
compound and associated works.  Pre-application reports give the Committee
an opportunity to raise issues which it would like to see addressed in the
planning application. 
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.

Page 2

PRE-APPLICATION PROCESS 
4. The PoAN (reference 24/00012/PAN) confirmed that two public exhibitions will
be held at Braco Village Hall, Feddal Road, Braco, FK15 9QD, the first event
on 20 November 2024 between 3pm and 7pm and the second event on
26 February 2024 between 3pm and 7pm. The Ward Councillors, Braco and
Greenloaning Community Council, Blackford Community Council, Muthill and
Tullibardine Community Council and Auchterarder and District Community
Council, Dunblane Community Council and Kilmadock Community Council
have been notified. The results of the community consultation will be
submitted with the planning application as part of the required Pre-Application
Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crisis
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places 
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 18: Infrastructure First
• Policy 20: Blue and Green Infrastructure
• Policy 21: Play, Recreation and Sport
• Policy 22: Flood Risk and Water Management 
• Policy 23: Health and Safety

Page 3

Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
The principal relevant policies are, in summary: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 1C: Placemaking 
• Policy 1D: Placemaking
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries 
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access 
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 29: Gardens and Designated Landscapes
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape 
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 54: Health and Safety Consultation Zones 
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
10. The following non statutory guidance and documents are of particular
importance in the assessment of this application:

Page 4

• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)
• Planning Guidance - Planning & Biodiversity
• Perth and Kinross Local Transport Strategy (2010) 
NATIONAL GUIDANCE 
11. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
12. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN 1/2011 Planning and Noise
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport 
PLANNING SITE HISTORY 
13. 17/01810/FLL full planning approved on 24 November 2024 for Formation of
an energy storage facility, vehicular access and associated works. 
14. 20/00013/PAN on 5 February 2024 for Formation of an energy storage facility
comprising control building, battery storage container units, ancillary
equipment, parking, boundary treatments, landscaping and associated works. 
15. 21/00020/PAN on 3 February 2024 for Formation of a battery energy storage
compound comprising battery storage units, ancillary buildings and
equipment, landscaping and associated works 
16. 21/00756/FLL full planning approved on 14 December 2021 for Formation of
a 49.9MW energy storage facility comprising 50 battery storage container
units, control building, ancillary equipment, parking, access track, boundary
treatments, landscaping and associated works.

Page 5

17. 22/02231/FLM full planning approval on 24 October 2024 for Formation of a
49.99MW battery energy storage compound comprising battery storage units,
ancillary buildings and equipment, bogland restoration, landscaping and
associated works. 
18. 23/02147/SCRN on 7 February 2024 for Cambushinnie 400kV Substation -
New substation site near the existing Braco West substation. 
19. 24/00001/PAN on 23 February 2024 for Formation of 400kV substation
comprising erection of ancillary buildings, hardstanding, plant and machinery
access laydown/work compound area(s) and associated works. 
CONSULTATIONS 
20. As part of the planning application process the following would be consulted: 
External 
• Scottish Environment Protection Agency
• NatureScot
• Transport Scotland
• Historic Environment Scotland 
• Forestry Commission Scotland
• Health and Safety Executive 
• Perth and Kinross Heritage Trust 
• Braco and Greenloaning Community Council
• Blackford Community Council 
• Muthill and Tullibardine Community Council
• Auchterarder and District Community Council
• Dunblane Community Council
• Kilmadock Community Council  
Internal 
• Environmental Health (Odour/Noise, Private Water Supply, Contaminated
Land)
• Development Contributions Officer
• Community Greenspace including Access
• Transportation and Development
• Structures and Flooding
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
21. The key considerations against which the eventual application will be
assessed include: 
a.  Visual Impact 
b.  Scale, Design and Layout

Page 6

c.  Relationship to Nearby Land Uses 
d.  Natural Heritage and Ecology
e.  Landscape
f.   Water Resources and Soils 
g.  Air Quality  
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
22. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Economic Impact Assessment 
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment 
CONCLUSION AND RECOMMENDATION 
23. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Background Papers: None
Contact Officer: Kirsty Strong – Ext 01738 475333
Date: 29 November 2024 
DAVID LITTLEJOHN