Perth and Kinross Council
Planning and Placemaking Committee – 11 December 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/364) 
PROPOSAL: Installation of drainage, floodlighting and landscaping works 
LOCATION: North Inch, Perth 
Ref. No: 24/01249/FLL
Ward No: P12- Perth City Centre 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 Full planning permission is sought for the installation of drainage, floodlighting
and landscaping works on rugby pitches located within the North Inch in Perth
which are utilised by Perthshire Rugby Club.  At present there are 4 pitches
used by the rugby club, 3 of these sit within a row adjacent and to the east of
Bells Sports Centre.  A further 4th pitched is located further east, closer to the
River Tay.  The central pitch (pitch 2) has existing floodlights and as such it is
heavily used during winter months.  It is the only pitch which currently is floodlit. 
The North Inch is occupied by a golf course which is located to the north east of
the pitches and the starters hut for the golf course is located via a relatively new
tarmac path which is located between pitches 1 and 2, which links to the Bell
Sports Centre Car Park.  There is a perimeter path around the North Inch, part
of which runs along the western edge of pitches 1-3.  This path is part of the
formal core path network (NINC/101). 
2 The proposals involve the re-surfacing and installation of underground drainage
of pitches 1-3 which are those closest to Bells Sports Centre.  This will involve
digging out the existing pitches and subsoil, installing new drainage across all
three pitches, before building up the pitch level and laying grass.  The works to
the pitches is proposed to be phased to allow the use of the remaining pitches
while one is being improved.  This is likely to be over a 2-3 year period. 
3 The floodlights are proposed around pitches 1 and 3.  Furthermore, it is also
proposed that new lighting is incorporated to the east facing side of the new

Page 2

posts on pitch 3 and the existing posts on pitch 2 to enable illumination of training
areas to the east of the existing pitches.  This is to help with reducing the use of
the main pitches during the winter months allowing them to remain in good
condition for matches.  A total of 14 new floodlight poles are proposed to be
installed and are to be a height of 15m which is the same height as the currently
installed floodlights on pitch 2. 
4 This application is a re-submission following the withdrawal of application
23/01208/FLL following concerns about how the proposed works related to the
common good and public use of the land.  The previous application included
hedging around pitch 1 to "dissuade the public from walking their dogs and mis-
using the surface".  This hedge has now been entirely omitted from the proposal
due to concerns on how this would tie in with the public right of access to the
land as part of the wider use of the North Inch as open space. 
SITE HISTORY 
5 23/01208/FLL Full Planning Permission application for installation of drainage
and floodlighting and landscaping works was withdrawn on 15 September 2023. 
PRE-APPLICATION CONSULTATION 
6 Pre application Reference: None  
DEVELOPMENT PLAN 
7 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
8 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
9 The Council’s assessment of this application has considered the following
policies of NPF4 : 
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place

Page 3

• Policy 21: Play, Recreation and Sport
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety 
Perth and Kinross Local Development Plan 2019 
10 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
11 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 15: Public Access
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 27A: Listed Buildings
• Policy 28A: Conservation Areas: New Development
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 43: Green Belt
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage 
Statutory Supplementary Guidance
12
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC NON STATUTORY GUIDANCE
13
▪ Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
▪ Planning Guidance - Planning & Biodiversity

Page 4

▪ Conservation areas 
NATIONAL GUIDANCE 
14 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding 
CONSULTATIONS 
16 As part of the planning application process the following bodies were consulted: 
External 
17 Scottish Environment Protection Agency – no comments as proposal is covered
via SEPA;s standing advice. 
18 North Inch and Muirton Community Council – impact on cultural heritage, impact
on common good status of North Inch, concerns regarding floor risk and drainage
impact, impact of grass cutting and chemicals on pollinator species and general
impact on protected species. 
19 Perth and Kinross Heritage Trust – condition recommended to ensure
archaeological investigation is carried out given likely archaeological sensitivity of
site. 
Internal 
20 Environmental Health (Noise Odour) – no objection subject to conditions which
control the use of the flood lights in order to limit light pollution and limit the
impact on the amenity of the area. 
21 Development Contributions Officer – no developer contributions required. 
22 Structures and Flooding – no objection.

Page 5

23 Community Greenspace - the area is owned by Perth & Kinross Council and
managed by Community Greenspace. The land is a common good asset and any
changes would need to be approved by Perth Common Good Fund Committee
as well as Perth & Kinross Council Community Greenspace as the landlord/asset
manager. The North Inch is a multi-functional space for informal recreation and is
used in relation to events throughout the year. 
24 The area is not for exclusive use of the rugby club and can be used by the public
when not in use by the rugby club. No actions should be taken to dissuade
access from members of the public while pitches are not in use. Other events
may take place on these pitches outside of the rugby season, as has been the
case in previous years. 
REPRESENTATIONS 
25 Two representations were received including one from the North Inch Community
Council. The main issues raised within the representations are: 
• Impact on cultural heritage
• Implications on common good status of the land
• Flood Risk and how proposed drainage relates to this
• Impact on ecology and protected species 
26 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
25 Screening Opinion Not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact Submitted 
APPRAISAL 
27 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,

Page 6

this involves considerations of the Council’s other approved policies and
supplementary guidance are outlined above. 
28 In this instance, section 14(2) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 places a duty on planning authorities in determining
such an application as this to have special regard to the desirability of preserving
the building or its setting or any features of special architectural or historic
interest which it possesses.  Section 64(1) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 is relevant and requires planning
authorities to pay special attention to the desirability of preserving or enhancing
the character or appearance of the designated conservation area. 
Principle 
29 The site is located within the North Inch of Perth which is located outwith the
settlement boundary of Perth and allocated as Green Belt where Policy 43 of the
Perth and Kinross Local Development Plan 2 (LDP2) applies.  Policy 8 of
National Planning Framework 4 (NPF4) is also applicable.  There are restrictions
on the type of development which are permitted within the green belt.  Both
policies indicate that proposals which support an established use which has a
direct relationship to the land can be accepted and highlight that uses involved in
outdoor recreation, play and sport or leisure and tourism uses can be supported. 
In this instance the proposals relate to the use of the land as a recreational
resource and seek to make improvements to the existing long established rugby
pitches on the North Inch.  Therefore, the principle of carrying out works to these
existing pitches is considered to be consistent with the requirements of Policy 43
of LDP2 and Policy 8 of NPF4. 
Design, Layout and Cultural Heritage 
30 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and B of LDP2 which relate to placemaking and Policy
14 of NPF4 which seeks to deliver well designed development.  Further
guidance is also provided within the associated Placemaking Supplementary
Guidance.  The site is also located within close proximity but outwith the Perth
Central Conservation Area and a number of listed buildings on Barossa Place to
the south west.  Bells Sports Centre to the west is also now a B listed building. 
Therefore, all physical works should ensure that they respect the character and
appearance of the Conservation Area, as required by Policy 28A and respect the
setting of adjacent listed buildings as required by Policy 27A of the LDP2.  Policy
7 of NPF4 is also applicable which seeks to ensure similar. 
31 The main physical changes to the site involve the installation of the floodlights. 
There are six existing floodlight poles on pitch 2.  Six poles are proposed on
pitch 1, along with six poles on pitch 3.  These poles are proposed to be 15
metres in height (the same height as the existing floodlights) and the new poles
will bring floodlighting closer to the Conservation Area boundary and closer to
listed buildings on Barossa Place and to Bells Sports Centre.  The poles have

Page 7

been designed to minimise visual intrusion.  The poles are slender, neutral in
colour, and positioned to blend with surrounding trees reducing their visibility. 
Furthermore, their placement along the core path edge and around the existing
pitches ensures they do not significantly alter views in and out of the
Conservation Area or impact on the setting of neighbouring listed buildings.  The
floodlights are also designed to minimise light spill and glare, so illumination is
focused on the pitches and training areas, preventing excessive brightness that
could detract from the historic character of the Conservation Area and listed
buildings.  The submitted light spill assessment is also further addressed within
the light pollution section below.  As such the proposals are considered to
comply with policies 1A, B, 27A and 28A of LDP2 and 7(c) and (d) of NPF4. 
Flood Risk and Drainage 
32 Policy 52 of LDP2 and Policy 22(a) of NPF4 refer to flooding.  Policy 22 of NPF4
states that development proposals at risk of flooding or within a flood risk area
will only be supported if they are for certain development types.  The Council's
Flooding Team have advised that the proposal for the new drainage works and
installation of flood lights are considered to be a water compatible use.  The
floodlights are not considered to interfere with the flow of flood water should there
be a flooding event. Therefore the proposal meets the requirements of Policy 22
of NPF4. 
33 The drainage works are outlined within the submitted Sports Pitch Condition
Assessment (doc ref:10) and indicate that the preference is to utilise sub surface
pipes as soakaway trenches (subject to a soakaway test being carried out).  If
an outfall is required this would travel across the golf course into the River Tay. 
The improvement of the drainage arrangements on the rugby pitches is
considered to be acceptable in principle.  The proposed drainage works are
designed to manage surface water more effectively than currently and will allow
for improved maintenance of the pitches and enhances playability, safety and
improve their durability.  It will also allow the pitches to remain useable after
periods of heavy rain, reducing downtime, allowing more consistent training and
matches. 
34 Properly installed drainage channels and permeable surfaces will allow excess
water to be absorbed or diverted more efficiently, enhancing the overall flood
resilience of the area.  For clarity the works fall below SEPA thresholds for a
consultation and they have advised that their Standing Advice on Flood Risk
applies.  In effect this advises that given the use which is proposed and the
works which will be undertaken there is no risk from a flooding perspective and
the works are compatible with the flood risk characteristics of the area. 
35 The proposed drainage works are designed to manage surface water more
effectively than currently and lessen wear and tear of the pitch.  The proposed
works are therefore not considered to exacerbate flood risk elsewhere and as
such the works comply with the relevant policies in regard to flood risk.

Page 8

Light Pollution 
36 Policy 55 of LDP2 and Policy 14(c) of NPF4 relate to light pollution and state that
consent will not be granted for proposals where lighting would result in obtrusive
and/or intrusive effects.  The submission includes a Lighting Impact Study which
has been assessed by PKC Environmental Health.   The submission shows the
floodlight on 15m high poles and shows the proposed floodlighting, locations,
orientation, pitch lighting levels and predicted overspill, and the proposal has
been designed using appropriate lighting software. 
37 The report concludes that the proposed floodlights will comply with recognised
guidance notes for the reduction of obtrusive light at residential windows. 
Environmental Health have accepted the findings of the lighting assessment
which has been submitted and are satisfied that the floodlights will not be of
detriment to residential neighbours provided the findings of the report are
adhered to.  It is therefore recommended that conditions are applied to control
the hours of use and lux levels to ensure that the flood lights meet the
requirements outlined in the lighting assessment.  Furthermore, a complaints
investigation procedure should be employed to ensure any substantiated
complaint is properly addressed and mitigation proposed where required.. 
There is a condition on the existing permission for floodlights (12/00403/FLL)
which restricts use to between 0900hrs and 2200hrs Monday to Sunday and
therefore the same condition is recommended here for consistency.  Therefore,
subject to the above conditions the proposal is considered to comply with the
requirements of the above policies with regard to light pollution (Conditions 6, 7
and 8). 
Residential Amenity/Noise 
38 Policy 56 of the LDP2 relates to noise pollution and states that there is a
presumption against the siting of development which will generate high levels of
noise in the locality of existing noise sensitive land uses.  Policy 23(e) of NPF4
also seeks to ensure this. 
39 Planning control has a duty to future occupiers not to create situations of
potential conflict between neighbours.  As with all proposals, it is expected and
anticipated that existing residential amenity enjoyed by existing dwellinghouses
will be protected. 
40 These are existing pitches and are part of a wider recreational use in the form of
the North Inch.  The proposed works may allow the pitches to be utilised into the
evening during hours of darkness but this is not considered to alter the
established amenity levels of the area given the long established recreational use
of the North Inch.  As such the proposal is not considered to result in any
significant impact on residential amenity in terms of noise and therefore complies
with the above policies.

Page 9

Public Use of Land/Common Good Asset 
41 This area is owned by Perth & Kinross Council and managed by Community
Greenspace and is allocated as part of the green belt in the Perth and Kinross
Local Development Plan 2019. The land is a common good asset and any
changes would need to be approved by Perth Common Good Fund Committee
as well as Perth & Kinross Council Community Greenspace as the landlord/asset
manager. The North Inch is a multi-functional space for informal recreation and is
used in relation to events throughout the year.  This committee report solely
refers to assessment of the application in terms of planning legislation only. 
There will be separate consideration of the proposals via the Common Good
Fund Committee.  Any restrictions which apply to the use of the land as a
common good asset, such as the siting of permanent structures, will require to be
considered as part of that process and not via this planning application. 
Furthermore, any consultation or notification in relation to the use of the common
good asset would be undertaken as part of that process and not via this planning
application.  It is important to note that there is no material change of use
occurring here.  There are four current rugby pitches on the North Inch and
these are to remain as part of the wider recreational operation of the North Inch. 
The planning application solely relates to the installation of drainage and
floodlighting and the associated reinstatement of the pitches. 
42 The previous application for the site included the formation of hedging around
pitch 1 which could potentially restrict access to the pitch.  The Land Reform
(Scotland) Act 2003 contains "right to roam" elements.  As outlined above, the
pitches are part of a wider public recreational space (The North Inch) and
therefore it is important to ensure that public access rights across the pitches are
maintained. 
43 Whilst there are improvements being made to the pitches the land remains part
of the wider Noth Inch parkland and will remain available for public use.  There
is not considered to be a material change of use of the land as a result of these
proposals.  The hedging proposed as part of the previous application is now
omitted and there is no intention to enclose any of the pitches meaning public
access is maintained.  There may be a period of time when the development
works are taking place that the land will not be available for public use but this
will be limited and temporary.   
44 As such the proposal as now submitted it not considered to impact on public
access rights to the North Inch.   
45 A condition is recommended to make it clear that no fencing or hedging is
permitted around the pitches or training areas to ensure that they remain
available for public use (Condition 3).

Page 10

Archaeology 
46 Perth and Kinross Heritage Trust (PKHT) have indicated that the site is within an
area which is archaeologically sensitive.  The Inches are historically associated
with the Royal Burgh of Perth and lie close to the medieval town.  North Inch is
recorded as the site of the Battle of the Clans in 1396 and the execution site of
witches in the 17th century amongst other historic activity.  Therefore, there is
possibility for unknown buried remains to be present and this requires to be
assessed and considered before development.  Therefore, it is recommended
that an archaeological evaluation is undertaken to assess the presence/absence,
character and significance of archaeological deposits within the site (Condition
5).  This will inform a mitigation strategy, if required.  This can be secured by a
suitably worded planning condition and will therefore meet the requirements of
Policy 7(o) of NPF4 and Policy 26B of LDP2. 
Ecology and Protected Species 
47 There is no evidence to suggest that the installation of floodlights will negatively
impact on bird and wildlife when compared with the current situation given the
presence of existing floodlighting in the area.  There is not considered to be any
requirement for a protected species survey for this application. 
Trees  
48 There are a number of mature trees surrounding the pitches, however these are
not proposed to be impact upon by the proposed works.  A condition (Condition
9) is recommended to ensure that appropriate tree protection measures are
utilised during construction operations to protect the existing trees in accordance
with the requirements of Policy 40B of LDP2 and Policy 6 of NPF4. 
Access and Traffic 
49 The pitches are served by existing on street and off street parking arrangements
and the proposals are not considered to alter the existing traffic levels and as
such there are not considered to be any concerns regarding access, traffic or
parking with the proposal.  The site is also easily accessible by sustainable
transport given the proximity to the core path network which surrounds the North
Inch.  The proposal therefore complies with Policy 13 of NFP4. 
Use of Chemicals and Grass Cutting Regime 
50 The Community Council have raised concerns regarding the use of chemicals
and the grass cutting regime associated with the pitches.  There are already four
rugby pitches on the North Inch and these are to remain.  This is not a proposal
to increase the number of pitches or utilise other areas of the North Inch for
rugby than the current situation.  Nevertheless, the grass cutting regime and use
of chemicals is not a material planning consideration and is therefore not relevant
to the assessment of this planning application.

Page 11

Developer Contributions 
51 There is no developer contribution required for this development. 
Economic Impact 
52 There are not considered to be significant economic impacts associated with this
development other than from the construction phase of the development. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
53 None required. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
54 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
RECOMMENDATION   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason: To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
3. No fencing or hedging is permitted around any of the pitches or training areas. 
Reason: To ensure public access to the North Inch is retained.

Page 12

4. Prior to the commencement of any development details of the colour finish of the
floodlight poles shall be submitted to and subsequently approved in writing by the
Planning Authority.  The colour finish shall be a recessive, neutral colour.  The
colour, as approved in writing shall be implemented as part of the site
development and maintained in perpetuity. 
Reason: In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
5. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation analysis, the development
as approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT. The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress. 
Reason: The site lies adjacent to an area of archaeological interest. 
6. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land by complying with the ILP 'Guidance
notes for the Reduction of Obtrusive Light' Environmental Zone 3 Levels. 
Reason: To protect the amenity of neighbouring properties and maintain the
character of the surrounding area by preventing excessive light pollution. 
7. In the event of a justified light complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out a lighting assessment to verify compliance with condition 6
of this permission.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the assessment
shows that the lighting levels do not comply with condition 6 a scheme of
mitigation shall be included with the assessment, specifying timescales for the
implementation of the scheme, and shall be submitted to the Planning Authority
with 28 days of the assessment.  The mitigation scheme and timescales as
subsequently approved in writing, shall thereafter be implemented.

Page 13

Reason: To protect the amenity of neighbouring properties and maintain the
character of the surrounding area by preventing excessive light pollution. 
8. The hours of operation of the floodlights shall be 0900hrs to 2200hrs Monday to
Sunday with no operations out with this time. 
Reason: To protect the amenity of neighbouring properties and maintain the
character of the surrounding area by preventing excessive light pollution. 
9. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction.   
Reason: To ensure the protection and retention of mature trees on and adjacent
to the site. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken. Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. The existing management agreement for the pitches does not allow for grounds
works therefore approval will still be required from Community Greenspace as
the landlord/asset manager of the land.  The land is a common good asset and
any changes would require to be approved by Perth Common Good Fund
Committee. A new management agreement will need to be reached between
PKC Community Greenspace and the Rugby Club before any works could
proceed, should this planning application be approved.

Page 14

4. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(tel 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
Background Papers:  2 letters of representation
Contact Officer:  John Williamson
Date: 29 November 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD: ECONOMY, DEVELOPMENT AND PLANNING