Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 11 December 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/363) 
PROPOSAL: Erection of dwellinghouse, workshop/ancillary accommodation,
and associated works 
LOCATION: Land 50 Metres South West Of Russaig House, Errol 
Ref. No: 24/00374/FLL
Ward No: P1- Carse Of Gowrie 
Summary 
This report recommends approval of a detailed planning application for a change of
house type and the erection of a new ancillary accommodation/workshop building on
a rural site outside of Errol as the development is considered to comply with the
relevant provisions of the Development Plan, and there are no material considerations
apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 This planning application seeks to obtain detailed planning permission for the
erection of a dwelling and an associated ancillary accommodation / workshop on
a site located on the northern bank of the River Tay at ‘Seasyde’ - a small
residential hamlet outside of Errol which comprises a mix of traditional buildings
(some listed) and more recent newly built properties. 
2 Detailed planning permission had previously existed on the site for a dwelling
that would have offered living accommodation over two full levels, and this
application proposes to amend the design of dwelling, amend its location on the
plot and to include an ancillary building which will be used as a domestic
workshop, and ancillary accommodation directly associated with the main
dwelling. 
3 The amended design is a contemporary design which will offer living
accommodation mostly over two full levels with an irregular shaped roof design
over a rectangular floor plan. A first floor level terraced balcony is the focal point
of the amended design and this would offers long views to the south towards to
the River Tay. The position of the dwelling has been moved closer the River Tay
(south) from the position of the previous approval on the site. During the course
of the assessment of the current application the applicant opted to move the

Page 2

dwelling and the ancillary back into the site to try and reduce the impact on the
neighbour immediately to the west and the final position is shown on Plan No 9. 
4 The ancillary building will be positioned at right angles to the main house creating
a ‘L’ shaped relationship between the two buildings. The ancillary building has a
rectangular shaped floor area, and will offer two levels of accommodation. The
workshop element would have a void space, with the ancillary accommodation
element accommodation split over two levels with the upper level within the
roofspace. The workshop is proposed for the applicant’s own personal use
(carpentry) and the applicant has confirmed that the accommodation would only
be for extended family members and friends to use and will not be used as
separate dwelling or a short term let/holiday accommodation. The external
finishes of both proposed buildings comprise a mix of smooth render and timber
cladding, with metal roofing material. 
5 Vehicular access to the site is via a long private access which is surfaced.
Drainage arrangements will all be private, and the design principles of these
have already agreed via the terms of the earlier approvals within the area. 
6 At the southwestern corner of the site is an unauthorised garden room which has
recently been sited. At the same time as amending the location of the buildings,
the applicant took the opportunity to include details of this outbuilding within the
current planning application to regulate the development. 
PROCEDURAL MATTER 
7 The applicant opted to amend the planning application during the assessment of
it by moving the buildings slightly north and also to include the garden room.
Notwithstanding the minor nature of the locational change and the addition of the
garden room, in order to ensure that all interested parties had a reasonable
opportunity to make either amended or new comments, the Council wrote to all
those who were notifiable neighbours and those who had initially commented on
the initial proposal. However, in practice the proposed changes only directly
affected the two immediately adjacent neighbours. 
SITE HISTORY 
8 The wider site has an extensive planning history of various applications relating
to new residential development. In relation to this particular site, the most
relevant recent planning application was 19/00862/FLL which granted a detailed
planning permission for a new dwelling. 
9 That permission appears to have expired with no obvious record of either the
pre-commencement conditions being addressed, or a formal verification issued
by the Council that a material start as per Section 27 of the Act was made within
the prescribed timeline. This current application is essentially looking to re-
establish the residential use on the site, to alter the design and location from
previously approved and to introduce an ancillary building.

Page 3

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
10 This proposal be below the threshold which requires EIA screening. 
PRE-APPLICATION CONSULTATION 
11 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
12 The Development Plan for the area comprises National Planning Framework 4,
Perth and Kinross Local Development Plan 2 (2019) and statutory supplementary
planning guidance (SPG). 
National Planning Framework 4 
13 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
14 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1 – Tackling the climate and nature crises 
• Policy 2 – Climate mitigation and adaptation 
• Policy 3 - Biodiversity 
• Policy 4 – Natural Places
• Policy 9 – Brownfield, vacant and derelict land and empty buildings
• Policy 14 – Design, quality and place
• Policy 16 – Quality Homes
• Policy 17 – Rural Homes 
• Policy 22 – Flood Risk management 
Perth and Kinross Local Development Plan 2 (2019) 
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.

Page 4

16 The site is located within the landward area, and close to the environmentally
sensitive River Tay. The following policies are therefore relevant to this proposal, 
• Policy 1 – Placemaking 
• Policy 5 – Developer Contributions 
• Policy 19 – Housing in the Countryside 
• Policy 38 – Environmental Designations 
• Policy 41 – Biodiversity 
• Policy 47 – River Tay Catchment Area 
• Policy 56 – Noise 
• Policy 58 – Contaminated Land 
• Policy 60 – Transport Standards 
Statutory Supplementary Planning Guidance 
17 The following statutory SPG are applicable to this proposal, 
• Developer Contributions & Affordable Housing (adopted in 2023)
• Flood Risk and Flood Risk Assessments (adopted in 2021)
• Housing in the Countryside (adopted in 2020)
• Placemaking (adopted in 2020) 
OTHER PKC GUIDANCE 
Non-statutory Planning Guidance 
18 The following non-statutory guidance is applicable to this proposal, 
• Planning and Nature 
• Ancillary & Annex Accommodation 
NATIONAL PLANNING GUIDANCE 
19 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
20 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding

Page 5

National Roads Development Guide 2014 
21 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
CONSULTATIONS 
22 As part of the planning application process the following bodies were consulted: 
External 
23 Scottish Water – No objection. 
24 Structures and Flooding – No objection to the proposal in relation to flood risk,
but some recommendations made.   
25 Paragon Skydiving Club – No response received. 
26 NatureScot – No objection to the proposal subject to consideration of their
comments in relation to the environmental assets associated with the River Tay. 
Internal 
27 Environmental Health – No objection in terms of noise from uses and plant, or
contaminated land subject to compliance conditions being attached to the
permission. 
28 Development Contributions Officer – No developer contributions required as
they have previously been paid, and not returned 
29 Transportation and Development – No objection to the proposal in terms of all
road related matters, subject to some clarification on the means of servicing the
private drainage systems. 
REPRESENTATIONS 
30 Over the two rounds of notification, a total of seven letters of representations
have been received, of which all are objecting to the proposal. The main issues
raised within the representations are: 
• Contrary to the Development Plan 
• Inappropriate design and impact on visual amenity
• Impact in residential amenity
• Road safety concerns
• Noise concerns regarding the workshop

Page 6

31 These issues are addressed in the Appraisal section of the report. 
32 Within the representations, a number of queries over the applicants’ legal rights
to build a house in the position suggested (both as initially proposed and as
amended) and the extra ancillary unit have been raised. These focus on whether
or not the applicant has the appropriate legal vehicular access rights for ‘two
buildings’, and that the location of physical build is contrary to specific locational
restrictions imposed on the title burdens when the land was divided up for
residential plots. 
33 Legal restriction and title burdens will obviously have an impact on the ability of
applicants to progress without potential legal challenges, but they are not matters
to consider as part of this planning application. It is not appropriate for the
Planning Authority to adjudicate on legal conflicts or interpretations, as ultimately
the grant of any approval would not supersede any legal obligations or
restrictions. In addition to this, the potential for the devaluation of existing
property values has been raised within the representations. This also is not a
material planning consideration. 
ADDITIONAL STATEMENTS 
34 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
AA completed. No impact, subject
to mitigation and suitable
measures. Any impact would be
comparable to that of the previous
permissions. 
Design Statement or Design and Access
Statement
Design statement submitted 
Report on Impact or Potential Not required 
APPRAISAL 
35 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the LDP2 and
statutory SPGs.   
36 The relevant policy considerations are outlined in the policy section above and
are considered in more detail below. In terms of other material considerations,
this involves considerations of the Council’s other non-statutory policies and
supplementary guidance, as well as consideration of the site’s recent planning
history. The latter being a significant material consideration.

Page 7

Policy 
37 In terms of land use, there are relevant policies contained in all parts of the
Development Plan. 
38 In terms of the NPF4, Policies 1 (Tackling the climate and nature crises) and 2
(Climate mitigation and adaptation) both look to ensure that all developments
consider climate change and the effect that they may have on the environment.
Policy 3 (Biodiversity) looks to ensure that biodiversity enhancements are
included as part of new developments, and not just mitigation. Policy 4 (Natural
Places) looks to protect our environmental assets, whilst Policy 9 (Brownfield,
vacant and derelict land and empty buildings) offers support for new
development on greenfield land, providing the proposal complies with the
relevant LDP policies. Policy 14 (Design, quality and place) looks to ensure that
all new developments are of a high design standard, whilst Policy 16 (Quality
Homes) looks to promote quality new homes across the country. Policy 17 (Rural
Homes) offers support for new homes in the countryside in certain
circumstances, whilst Policy 22 (Flood Risk management) looks to ensure that
new development is not affected by flood risk and does not create additional
flooding off site. 
39 In terms of the LDP2, the site is located within the landward area where Policies
1 (Placemaking), 19 (Housing in the Countryside), 38 (Environmental Sites), 41
(Biodiversity), 47 (River Tay Catchment), 56 (Noise) and 60 (Transport
Standards) are all directly applicable. 
40 Policy 1 looks to ensure that all new developments do not have an adverse
impact on the area concerned. Policy 19 is the LDP version of the Housing in the
Countryside Policy and needs to be read in conjunction with the associated SPG.
Policies 38 and 47 looks to protect environmentally sensitive sites from
inappropriate new development, and Policy 47 is specific to the River Tay. Policy
41 looks to protect both local and protected wildlife and their habitats, and to
ensure that a full consideration is made during the assessment of planning
applications. Policy 56 looks to protect noise sensitive receptors from noisy uses
and that suitable mitigation measures are secured and delivered. Policy 60 looks
to ensure that all road related matters accord with both the Council’s policy. 
41 In terms of SPG, the Council’s policies on Housing in the Countryside, Developer
Contributions, Placemaking and Flooding are applicable. 
Land Use Acceptability 
42 Whilst the previous planning permission on this site has expired, the recent
timeline of that permission is a significant consideration for the assessment of
this current application. The site is a natural infill opportunity between two
existing properties, and support for this type of new housing opportunity in the
countryside is provided by all parts of the Development Plan. Whilst there has
been a significant change in the Development Plan since the 2019 planning

Page 8

permission was approved via the introduction of the NPF4, there has not been a
significant change in policy towards new housing in the countryside in relation to
infill sites between two existing homes which are themselves part of a wider
building group. It remains the case that when the site is comparable in size to its
neighbours, reasonably well contained with natural features and would not result
in visual or residential amenity harm to the area then support should be
forthcoming. 
43 For this proposal, as was the case in 2019, the proposal accord with all these key
criteria. 
44 In terms of the ancillary accommodation, and the new (domestic) workshop,
element neither would be considered a particular alien in a rural context for large
homes, and these two separate elements do not raise any issues in principle –
subject to controls over their use, and the level of noise generated. The ancillary
accommodation is close to the principal dwelling and is of a scale with is ancillary
to the main use which are the key principles of the Council’s non-statutory
Planning Guidance on Ancillary and Annex Buildings. 
45 In terms of the proposed garden room, this is a very small structure which is
located within an area previously identified as garden ground. It would have little
visual or residential amenity impact on neighbour properties. It also needs to be
borne in mind that if the garden room was not approved now its size and location
is such that it would be permitted development in ordinarily instances if it was
associated with an occupied dwelling. 
46 In all, the proposed land uses raise no issues with the Development Plan. 
Visual Amenity, Design and Layout 
47 Within the representations, several of the comments relate to the placement of
the dwelling further towards the River Tay from the earlier permission. It has also
been suggested that there are specific title restrictions which control the position
of any physical build, which do not align with what is proposed (even after the
amendment). Whether or not this is the case, any legal restrictions would run
entirely separate from a planning application. For the purpose of this planning
application, the key test of whether or not the location of the building(s) is
acceptable or not is whether it would have an adverse impact on the character
and appearance of the existing building group, and whether the residential
amenity of the closeness neighbours would be adversely affected. 
48 The wider site at Seasyde is spectacular. Since the initial approval of two homes
was granted, other planning permissions have been applied for over the years
and many subsequently approved, which has meant that the original design
principles of the site have been slightly watered down, but there has remained a
staggered approach to the position of the dwellings along the edge of the Tay.

Page 9

49 This proposal will still respect that staggered arrangement, and the position the
dwelling has been amended by moving back from almost inline with the property
to the west (6m back) to being around 16m back from its frontage, which results
in a better relationship with ‘Seabank’ and Russaig House’ – which are either
side of the site. This relationship with the existing properties would not result in a
development which in particularly incongruous, detrimental to the area or
adversely impact on the residential amenity of existing properties.   
50 The limited visibility from public areas is also a consideration. The initially
submitted proposal would have directly affect some of the views from inside
‘Seabank’ eastwards across the River Tay toward Dundee. Some windows and
internal arrangements of Seabank were specifically tailored to try and capture
these as much as possible, on the assumption that development on this site
would be perhaps further north – an equal point between Seabank and Russaig
House. The movement of the dwelling some 20m further back into the site has to
some degree addressed this issue, but it does need to be borne in mind that the
loss of a personal private view is not a planning consideration.   
51 In terms of the ancillary building, and its relationship to the neighbour only two
bathrooms face east (one for the workshop and one for the accommodation unit),
and one rooflight. This combination would not ordinarily be considered
unacceptable in terms of the potential for overlooking. New boundary treatments
along this, and the other mutual boundaries would also help to reduce the
potential for direct impacts. 
52 In terms of the overall design of the dwelling, the three other properties recently
built are all of different designs. The design of the current dwelling is perhaps
more contemporary than some others, however this alone is not a reason for
refusal and the NPF4 does promote innovation designs of a high standard. The
proposed finishes are of a high quality, and in this type of location a
contemporary style house design is considered to work reasonably well. 
53 In all the proposal raises no issues with any of the Placemaking or Design related
policies of the Development Plan. 
Residential Amenity 
54 In terms of being able to provide a suitable level of residential amenity for future
occupiers of the dwelling, the proposal raises no concerns. The plot is large and
there would be a significant level of usable private amenity space for future
occupiers of the dwelling to use. 
55 In terms of impacting on existing residential properties, on each side of the site
are existing properties. With the movement closer to the River Tay than previous
planning permissions, the distance to the mutual boundaries has increased
slightly from the relationship that the 2019 permission had with the neighbours.
The terms of the 2019 permission included specific conditions which looked to

Page 10

amend the eastern elevation to try and reduce the potential for overlooking to
occur. 
56 This amended proposal has a slightly different relationship with the neighbours,
with windows on the eastern elevation over 20m away from the boundary, and at
that distance the potential for unacceptable levels of overlooking or loss of
privacy to occur is reduced significantly. It is noted that a balcony feature is
proposed, and this area would have a degree of visibility to the east, however it
would be at a distance which again would not be considered unreasonable. It
would also be the case that any visibility arising from the balcony would be
directed to lower portion of the eastern neighbour’s garden with visibility to
immediate garden area adjacent to the property largely shielded from vision. 
57 To the west, there is a closer relationship between existing and proposed. The
garden area of the neighbour is around 14m away from the proposed dwelling,
with the dwelling to dwelling separation around 27m. Whilst these distance align
with the guidance of the Placemaking Guide, the separation distance of around
14m to the mutual boundary does mean that there is a far closer relationship with
the western neighbour, than to the east. 
58 14m does meet with the Council’s standards, however in a rural area it would
typically be expected that a greater degree of privacy for private amenity space
would be delivered. The principal area of interaction that could cause a concern
is a large first floor window which serves the main bedroom. Restricting this
window to a higher-level window would go some way to reducing the potential for
impression of overlooking to the property to the west (Condition 11). Large
windows and views would still be available through the principal windows facing
south elevation, so this slight amendment would not detract significant to the
visual value of the room. Suitable new boundary treatments and planting would
also help to reduce interaction at ground level, and this is subject to conditional
control (Condition 13). 
59 In terms of potential nuisance, there are two areas to consider, the domestic
workshop and proposed heat pump systems. In terms of the workshop, the
applicant has indicated that the workshop is not to be commercial and will be
used for ‘hobby’ carpentry. Domestic power tools are not likely to result in
unacceptable levels of noise, but their use can be controlled by a standard
compliance condition in relation to noise levels (Condition 9). The proximity of
between the workshop and the principal dwelling would also control noise levels,
and timings of activities to some degree. 
60 In relation to the heat pumps, there is mention to the use of air/ground source
heat pumps within the planning submission but limited details on the location of
the plant and equipment. In principle, neither system should adversely affect
residential amenity if properly installed and suitably sited, and renewable
systems for heating is generally encouraged by the Development Plan and
Scottish Government climate change ambitions. Conditions are attached which
will seek clarification on the means of heating systems, and any approved details

Page 11

would need to comply with the noise limits condition also (Condition 9). Subject
to this, the proposal will align positively with the requirements of Policy 56 of the
LDP2. 
Roads and Access 
61 The proposal raises no issues in terms of the means of access to the site, and
internal parking and turning provision – both in relation to the principal dwelling,
and the associated ancillary accommodation unit. The site is served by a long,
surfaced private access and maintenance responsibilities will be a civil matter
between the parties involved. Legal rights for an ancillary accommodation unit to
be access via the shared access would also be a civil matter. 
62 The proposal therefore raises no issues in relation to Policy 60 of the LDP2. 
Drainage and Flooding 
63 The area is served by private drainage, and the principles of acceptable technical
details of both the foul drainage and surface have already been approved
through the terms of the extant permission, and what has been installed for the
other three completed dwellings within the wider site. Nevertheless, for
completeness, it is recommended that conditions are attached to ensure that the
final details of the proposed drainage arrangements (foul and surface water) are
submitted for the further approval in writing by the Council as Planning Authority
(Condition 4). Subject to this, the proposal raises no issues with various drainage
and flooding related policies across the Development Plan. 
64 In terms of flood risk, it has been established previously that the site is outwith an
area of flood risk. It is noted that one of the representations has mention that part
of private access floods. There is a small area of known surface water flooding
identified on the SEPA flood maps just north of Seaside Farm Cottages, and
another short area close to the junction with the public road. As the existing
private access already serves a number of residential properties, it would be
unreasonable for this issue to influence the outcome of this planning application
particularly when this issue appears to be historic and already affects a number
of other properties. An informative note is however recommended to alter the
applicant to the fact that part of the private access may be affected by water at
certain times, and they should do their own due diligence over the risks involved. 
65 Subject to this, the proposal aligns with the relevant flooding and drainage
policies contained within the Development Plan. 
Waste Collection 
66 It is understood that the collection of waste and recycling bins takes place near to
the end of the long private access and not at the junction with the public road. To
ensure that there is suitable space for the bins associated with this proposal,
clarification on the means of bin storage and presentation areas will be sought

Page 12

via condition. It is however expected it will be similar to the arrangements for the
recently constructed new dwellings of Seabank, Russaig House and Carthagena
Cedars – who all share the same private vehicular access. 
Conservation Considerations 
67 There are some listed buildings within the area to the east, however this
development would not be located within their wider setting. The proposal raises
no issues with the relevant cultural heritage policies across the Development
Plan. 
Impact on the River Tay’s Environmental interests 
68 The proposal is adjacent to the Firth of Tay and Eden Estuary Special Protection
Area (SPA) classified for its breeding marsh harrier and little tern, and its non-
breeding bar-tailed godwit, common scoter, cormorant, dunlin, eider, goldeneye,
goosander, grey plover, greylag goose, red-breasted merganser, redshank,
sanderling, shelduck, velvet scoter and waterfowl assemblage. The proposal is
also adjacent to the Firth of Tay and Eden Estuary Special Area of Conservation
(SAC) designated for its intertidal sand/mudflats, subtidal sandbanks and estuary
habitat as well as its harbour seals. 
69 However, there have been a number of previous planning applications in the
area over the years and the likely impacts on the designations, habitats and
species associated with the River Tay’s environmental assets are known well
and understood. Subject to conditional controls over drainage (for pollution
issues), construction related pollution, and the timings of certain parts of the
development, the impact on the River Tay and its habitats and species can be
controlled so that limited impacts occur (Conditions 5, 6 and 7). The Council has
carried out an Appropriate Assessment in relation to the impact in the SAC/SPA,
and is satisfied that there would be no significant impact on the SAC/SPA. The
proposal raises no issues with either the Habitat Regulations, or the various
nature conservation policies of the Development Plan. An informative note for the
applicant to make contact with Tayside Raptor Group to discuss possible new
locations of breeding marsh harrier sites is also recommended. 
Natural Heritage and Biodiversity 
70 As stated above, during the consideration of previous planning applications in the
area, it was found that the biodiversity interest in this site and the wider
development of the new residential plots would be limited to the impact of new
drainage proposals, and potential noise and disturbance to birds associated with
the marsh and reed beds areas immediately adjacent to the River Tay. These
impacts are all controllable through conditional control and good practice
measures, such as the introduction of a CMS. 
71 In terms of the biodiversity value on the principal part of the site, away from the
reed and marshy edges of the River Tay, the site is largely unkept grass with a

Page 13

low biodiversity value. However, the NPF4 looks to ensure that all new
developments look to provide a degree of betterment and enhancement for
biodiversity and in this regard, there will be conditional requirements for 2 bat and
bird nest boxes to be sited within the curtilage of the dwelling, and for new
planting to take place which is both biodiversity friendly and native species
(Condition 14). As no trees will be removed to accommodate the dwelling and the
ancillary buildings, the requirement for new tree planting will ensure that there will
be an enhancement to biodiversity as opposed to just mitigation measures.
Subject to these conditional requirements, the proposal is considered to be inline
with the requirements of the biodiversity requirements of the Development Plan. 
Low and Zero Carbon Generating Technologies 
72 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ also requires that development
should be designed to reduce green gas emissions. A condition is therefore
recommended to ensure that the requirements of Policy 32 of the LDP2 are met
(Condition 15). 
Contaminated Land 
73 Previous planning permissions in the area have highlighted the close proximity of
the site to a former steading, and the need to ensure that the proposed
residential sites are fit for the use proposed. Some technical work has been
undertaken previously, for completeness the Council’s standard condition in
relation to contaminated land is recommended to ensure that the proper due
diligence takes place. 
Developer Contributions 
74 Whilst the previous planning application has expired, the developer contributions
paid in relation to that application have not been returned. As this development
does not increase the number of residential units, there is no requirement for any
additional developer contributions.   
Economic Impact 
75 The proposal would have limited economic impact, and any impact would be
limited to the construction phase. 
VARIATION OF APPLICATION UNDER SECTION 32A 
76 None made.

Page 14

PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
77 None required. 
DIRECTION BY SCOTTISH MINISTERS 
78 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
79 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, the LDP2 and statutory
SPG.  Account has been taken account of the relevant material considerations
and none has been found that would justify overriding the Development Plan.
The proposal is therefore recommended for approval. 
RECOMMENDATION   
Approve the application subject to the following conditions: 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason: To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
3. Prior to the commencement of the development hereby approved, details of the
specification and colour of all wall and roofing finishes proposed to be used shall
be submitted to and approved in writing by the Council as Planning Authority. 
The approved details shall be implemented prior to the completion or bringing
into use of the development, whichever is the earlier. 
Reason: In the interests of protecting the visual amenity of the area

Page 15

4. Prior to the commencement of any development hereby approved, precise
details of the proposed foul drainage arrangement shall be submitted to and
approved in writing by the Council as Planning Authority. The approved details
shall thereafter be implemented in full. 
Reason: In order to ensure that the site is adequately drained and that there is no
adverse impact on the environmentally interests of the River Tay.    
5. Prior to the commencement of the development hereby approved, a timetable for
all construction and noise generating construction activities shall be submitted to
and approved in writing by the Council as Planning Authority, in consultation with
NatureScot. The timing of the construction phase and noise generating
construction activities must take into account the breeding season of the bearded
tit. The approved timetable shall thereafter be implemented in full. 
Reason: In order to protect the breeding grounds of a schedule 1 species of the
Wildlife and Countryside Act 1981  
6. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason: In the interest of proper site management. 
7. Prior to the commencement of the development hereby approved, a detailed
Construction Method Statement (CMS) shall be submitted to and approved in
writing by the Council as Planning Authority. The CMS must identify measures to
prevent harmful materials entering the River Tay SAC, which could reduce water
quality and lead to a damaging impact on the salmon, otter and lamprey
interests. The CMS should include the following:  
(a)  pollution prevention safeguards including drainage arrangements and the
possible use of siltation traps, settlement tanks and bunds
(b)  storage and disposal of materials including the siting of stock piles, use of
buffer strips and disposal methods
(c)  construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound
(d)  timing, duration and phasing of construction particularly in relation to salmon
and lamprey migration/spawning.  
The CMS and mitigations as agreed shall be fully implemented as part of the
planning permission.

Page 16

Reason: In order to protect the environmental interests of the River Tay during
the construction phase  
8. Prior to the commencement of the development hereby approved, a scheme to
deal with contamination on the site shall be submitted to and approved in writing
by the Council as Planning Authority. The scheme shall contain details of
proposals to deal with contamination to include:  
I. the nature, extent and type(s) of contamination on the site 
II. measures to treat/remove contamination to ensure the site is fit for the use  
III. proposed measures to deal with contamination during construction works
IV. condition of the site on completion of decontamination measures  
Before the dwelling is occupied the measures to decontaminate the site shall be
fully implemented as approved by the Council as Planning Authority, and
verification of any required mitigation measures submitted. 
Reason: In order to ensure the site is fit for the used proposed. 
9. All plant or equipment associated with any a) ground source heat pumps, b) air
source heat pumps and c) machinery within the workshop hall be so enclosed,
attenuated and/or maintained such that any noise therefrom shall not exceed
Noise Rating 35 between 0700 and 2300 hours daily, or Noise Rating 25
between 2300 and 0700 hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or calculated and plotted on
a rating curve chart. 
Reason: In order to protect existing residential amenity 
10. All uses within the ancillary building shall be for directly associated with the
principal dwelling. For the avoidance of doubt, this means the workshop shall not
be used for any commercial purposes and the accommodation shall not be
occupied as the main or sole resident of any occupant and shall only be occupied
by friends and family associated with the occupiers of the principal dwelling, and
not used for the purposes of a short term let or any other form of holiday
accommodation. 
Reason: In order to clarify the terms of this planning permission. 
11. The large window at first floor level on the west elevation serving the main
bedroom is not approved. Prior to the commencement of the development
hereby approved, a revised elevation and floor plan which shows a high level
window which reduces the potential for direct overlooking to Seabank shall be
submitted to and approved in writing by the Council as Planning Authority. The
approved details shall thereafter be implemented in full with no other alterations
permitted to the western elevation thereafter. 
Reason: In order to protect existing residential amenity.

Page 17

12. Prior to the commencement of the development hereby approved, precise details
of any a) air source heat pump or b) ground source heat pump system shall be
submitted to and approved in writing by the Council as Planning Authority. The
approved systems shall thereafter be implemented in full, and must comply with
the sound requirements listed in Condition 9 of this decision notice. 
Reason: In order to clarify the terms of this planning permission, and to protect
existing residential amenity. 
13. Prior to the commencement of the development hereby approved, a detailed
scheme which shows all boundary treatments and new tree planting shall be
submitted to and approved in writing by the Council as Planning Authority. The
details must include new tree planting to provide for biodiversity enhancement,
and include species which are both native and biodiversity friendly. All the details
shall be implemented in full prior to the first occupation of the dwelling, and any
planting which falls to become established within 5 years shall be replaced on a
like for like basis within the next available planting season.   
Reason: In order to protect existing residential amenity, and to provide
biodiversity enhancement. 
14. Prior to the first occupation of the dwelling, two bat boxes and two bird nesting
boxes shall be installed within the curtilage of the dwelling. All the boxes shall be
installed and sited in accordance with the requirements of the Scottish Wildlife
Trust. After installation, the boxes shall be retained in a usable condition
thereafter. 
Reason: In order to ensure that a biodiversity enhancement is provided. 
15. Prior to the commencement of the development hereby approved, a statement
which demonstrates how the Proposals will deliver at least 10% of the current
carbon emissions reduction set by Scottish through the installation and operation
of low and zero-carbon generating technologies shall be submitted to and
approved in writing by the Council as Planning Authority. The principles
contained in the statement shall thereafter be implemented in full. 
Reason: In order to comply with Policy 32 of the adopted Perth and Kinross Local
Development Plan 2 (2019). 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
None applicable.

Page 18

Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The applicant should be aware of the comments made by NatureScot in their
response dated the 2 May 2024. Particular note should be given to the need to
contact the Tayside Raptor Group at an early stage. 
Background Papers:  7 letters of representation
Contact Officer:  Andrew Baxter 
Date: 29 November 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD: ECONOMY, DEVELOPMENT AND PLANNING