Perth and Kinross Council
Planning and Placemaking Committee – 11 December 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/357) 
PROPOSAL: Erection of 152 dwellinghouses and associated works (approval
of matters specified by conditions (17/00939/IPM) 
LOCATION: Land 200 Metres West of Blairgowrie & Rattray Cottage Hospital,
Perth Road, Blairgowrie 
Ref. No: 23/01941/AMM
Ward No: P3- Blairgowrie and Glens 
Summary
This report recommends approval of the application for a development comprising
the erection of 152 dwellinghouses on land 200 Metres West of Blairgowrie and
Rattray Cottage Hospital, Perth Road, Blairgowrie. 
The development is considered to comply with the relevant provisions of the
Development Plan and there are no material considerations that outweigh this
conclusion. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site is located to the immediate north of Dunkeld Road,
Blairgowrie. It slopes gently from north (c.94m AOD) to south (c.74m AOD),
extends to c.6.5 hectares and comprises grassland, bordered by a line of mature
trees and enclosed by post and wire fencing along the northern and western
boundaries. ‘Galabank’ footpath lies within the north and west extents, linking to
core path (BLAI/31) which connects users from Dunkeld Road to Newton Street. 
2 The settlement edge of Blairgowrie lies to the east and south.  Particularly
private gardens, relating to the properties on Dunkeld Road, are immediately
adjacent to the southern boundary. Further properties on Dunkeld Road adjoin
the western boundary. 
3 ‘Craighall Rattray’, a Garden and Designed Landscape is approximately 1.9km to
the north. There are also category A, B and C listed buildings nearby, including
Newton Castle (category A) to the north. 
4 The site is allocated within the Perth and Kinross Local Development
Plan 2 (2019) (LDP2) as the northern part of ‘MU5 - Western

Page 2

Blairgowrie’ a 24.55ha planned mixed-use opportunity (residential,
employment and education uses). Planning permission in principle
(PPP) for a mixed-use development (employment, retail, residential,
community and education) for the entire MU5 allocation was approved
in December 2018. 
5 MU5 related development has and is to be delivered in phases, with
Phase 1A focusing on retail units and associated works having been
approved in January 2020 (Ref: 19/00163/AMM) and now at an
advanced stage of construction. 
6 Planning permission (Ref: 22/00060/AMM) for 71 houses and 32 flats
(Phases 1B and 2A) was approved in March 2023. This permission includes
73 affordable housing units (34 Social Rent and 39 Mid-Market Rent), which
represents a significant proportion of the 25% requirement for the wider
MU5 allocation. Development has not yet commenced. 
7 Initially, the current application sought approval for 171 dwellinghouses,
however, however this was not seen as appropriate and the application has
taken account of feedback and reduced this number to 152, with other
associated revisions to the layout. The application was re-neighbour notified,
advertised and consulted as a result. 
8 The 152 dwellinghouses proposed will form Phase 3 of the MU5 allocation in
LDP2. There will be an access off Dunkeld Road, at the point of an existing
field access.  This access will run in an east-west direction, bisecting the
site.  Proposed SUDS will be located on its south side. Car parking is to be
provided in various parking courts, within plots and on-street parking. 
ENVIRONMENTAL IMPACT ASSESSMENT 
9 The impact of the MU5 development was screened for EIA
(14/01768/SCRN) and it was determined that the proposal did constitute EIA
development. As such an EIA Report supported the application for planning
permission in principle. 
PRE-APPLICATION CONSULTATION 
10 Pre application Reference: 14/00008/PAN. 
11 The proposed development is classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. However, as the proposal is an AMSC application, further
pre-application consultation (PAC) is not necessary beyond that already
undertaken for the planning permission in principle.

Page 3

DEVELOPMENT PLAN 
12 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
13 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
14 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 18: Infrastructure First
• Policy 19: Heating and Cooling
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety 
Perth and Kinross Local Development Plan 2019 
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
16 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions

Page 4

• Policy 6: Settlement Boundaries
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 25: Housing Mix
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 27A: Listed Buildings
• Policy 28A: Conservation Areas
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 34A: Sustainable Heating &Cooling: Heat Networks, Major
Development and LDP Site Allocations
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 45: Lunan Lochs Catchment Area
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
17
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020)

Page 5

PKC NON STATUTORY GUIDANCE
18
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
NATIONAL GUIDANCE 
19 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
20 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 2/2010 Affordable Housing and Housing Land Audits
• PAN 3/2010 Community Engagement
• PAN 1/2011 Planning and Noise
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places
• PAN 79 Water and Drainage 
Creating Places 2013 
21 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
22 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places.

Page 6

National Roads Development Guide 2014 
23 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
SITE HISTORY 
24 14/00008/PAN A Proposal of Application Notice was accepted by PKC in
November 2014 as sufficient for a mixed use development of employment,
residential, retail and education uses. 
25 14/01768/SCRN PKC advised that a proposed mixed use development required
an EIA in January 2015. 
26 17/00939/IPM Planning Permisison in Principle (PPP) was approved in December
2018 for a mixed use development comprising residential development,
employment land, education/recreation/community facilities, infrastructure
including roads, footpaths, landscaping, drainage, open space and associated
works. Approved in December 2018. 
27 19/00163/AMM Erection of 2 retail units (Class 1), a neighbourhood centre
comprising 3 retail units (Class 1), formation of parking areas, landscaping,
SUDS pond and associated works (approval of matters specified by conditions
17/00939/IPM) (Phase 1A - MU5). Approved in January 2020. 
28 22/00060/AMM Erection of 71 dwellinghouses and 32 flats (approval of matters
in conditions of 17/00939/IPM) (Phases 1B and 2A - MU5). Approved in March
2023. 
CONSULTATIONS 
29 As part of the planning application process the following bodies were consulted: 
External 
30 Historic Environment Scotland: No objection, however, the applicant is to be
reminded that should any works take place to the south of the A923 they must
avoid any accidental damage to the scheduled monument, Fir Hillock, burial
mound 750m E of Ardblair Castle (SM9612). Additionally, removal of trees from
within the scheduled monument may require Scheduled Monument Consent prior
to the commencement of works. 
31 Perth and Kinross Heritage Trust: No objection subject to condition. 
32 Scottish Environment Protection Agency: No objections. 
33 NatureScot: No objections.

Page 7

34 Scottish Water: No objections. 
35 Blairgowrie and Rattray Community Council: Concerns have been raised
regarding the location of affordable housing, increased traffic, air pollution,
education provision, and flood risk/drainage. Concern was also expressed about
the impact on the health service, dentists and sewerage system. 
36 NHS/HSCP: No objection. Acknowledge that the development will place additional
pressure on health facilities, however, recognise that the site is an allocated site in
the LDP2 and has PPP consent and therefore it is too late to resist allocated sites
on NHS/HSCP grounds. 
Internal 
37 Structures and Flooding: No objection subject to condition. 
38 Transportation and Development: No objection subject to condition. 
39 Community Greenspace: No objection. 
40 Community Waste Advisor: No objection. Informative recommended. 
41 Biodiversity/Tree Officer: No objections subject to condition. 
42 Planning and Housing Strategy: No comments. 
43 Conservation Team: No objection. 
44 Environmental Health (Noise Odour): No objection subject to conditions. 
45 Environmental Health (Contaminated Land): No objection. 
46 Development Contributions Officer: A Section 75 (s75) has been secured
against the planning permission in principle. This development triggers
requirements within the s75, particularly in relation to primary education. 
Representations 
47 96 representations were received and 2 general comments. The main issues
raised within the representations are: 
• Adverse effect on visual amenity
• Contrary to Development Plan
• Excessive height
• Flood risk
• Employment provision – concerns regarding numbers provided
• Inappropriate housing density
• Over intensive development

Page 8

• Inappropriate land use
• Loss of open space
• Loss of sunlight and daylight
• Overlooking
• Loss of trees
• Noise pollution
• Light pollution
• Air quality
• Out of character with area
• Road safety concerns
• Over provision of car parking
• Lack or loss of car parking
• Traffic congestion
• Impact on wildlife/protected species
• Impact on conservation area/listed buildings
• Increased pressure on dentist, doctors, police and schools/nurseries 
48 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
49 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Transportation Statement
• Site Investigation Report
• Flood Risk Assessment
• Drainage Strategy
• Affordable Housing Strategy
• Energy Statement
• Tree Survey Report and
Arboricultural Impact
Assessment
• Ecology report
• Noise Impact Assessment 
APPRAISAL 
50 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.

Page 9

The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
51 The principle of the proposal has been established through the site’s allocation
as MU5 in LDP2 for a mixed-use development, including residential. The LDP2
allocation advises that the residential capacity of the site is 179-280 units.
Planning permission in principle (ref: 17/00939/IPM) has previously been
approved for the phased development of the site and the current proposal for
Phase 3 will deliver 152 residential units. 
52 The principle of the development is acceptable provided the proposals
are compatible with relevant policies of the development plan. 
Design and Layout 
53 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas, Policy 25: Housing Mix and Policy
42: Green Infrastructure. 
54 The matters specified in Condition 3 of the PPP sets the required detail in
respect of the layout and design considering: topography, siting, design, height
and external materials of the buildings and structures. The PPP also requires
further detail in respect of landscaping and open space, SUDS, car parking and
boundary treatments. 
55 Also relevant is the masterplan for the site which was assessed as part of the
PPP. It is, however, recognised that Condition 2 of the PPP states: 
56 The submitted masterplan, site layout plan and indicated scale of development,
of up to 400 dwellings and 4 hectares of business land, are purely indicative and
are hereby not approved. 
57 However, also of relevance is the Planning Officer’s assessment which states
the following within the Committee Report: 
58 "The principle of large-scale mixed use (residential and business) development
has been established through its allocation (MU5) in the LDP. Based on site
area of 25 hectares and 8 hectares required for business/education/sports pitch
provision, this leaves 17 hectares for residential use. Based on an indicative
number of 400 dwellings, the proposed development is a medium density
proposal (23 dwellings per hectare) and this is considered suitable for

Page 10

edge of settlement locations in the context of national policy stating the
desirability of using land efficiently. 
59 It is noted within the letters of representations received there are concerns in
respect to the plot density proposed here insofar as the number of
dwellinghouses proposed far exceed the numbers indicated within the LDP2. It
should be noted, however, that these numbers are not absolutes and the
number of dwellinghouses proposed here are assessed based on a number of
factors including the efficient use of land, how they fit in contextually, their
design, layout, garden sizes, permeability through the site etc. 
60 The proposed development of 152 dwellinghouses will result in 23.3 dwellings
per hectare and whilst the density may appear higher, complies with the
principles indicated in the masterplan. 
61 The design and scale of development should respect its surroundings and
adhere to Policies 1A and B of LDP2, which relate to placemaking. Further
guidance is also provided within the associated Placemaking Supplementary
Guidance. Policy 1B and 17 of the LDP2 and 14 of NPF4 require new housing
development to relate to the established character and density levels within a
particular area. 
62 The layout seeks to provide a logical movement pattern with emphasis on
creating permeability through the site. The Galabank Path is incorporated into the
layout with connections included. 
63 All 152 dwellinghouses will provide two levels of accommodation reaching a
height of 2/2.5 storeys. The majority of the units have been orientated to face a
road with limited numbers facing parking courts, where they can provide
passive surveillance. The proposal provides a mix of 2, 3 and 5 bedroom units,
addressing the needs of a range of households. Although the housing mix falls
marginally short of the required one/two bed units required by LDP2 Policy 25,
we can ensure through future applications for the remaining phases that an
overall balance of housing mix is achieved across the MU5 site. 
64 All the dwellinghouses will remain below the 90 meter contour line to the north
of the site as required by LDP2. It should, however, be noted that due to the
sloping nature of the site, the area between the rear of the dwellinghouses and
the northern boundary is to be re-engineered, with retaining walls to be erected
along the rear boundaries of plots 14-34 (inclusive) and re-grading of the
existing slope. Permacrib retaining walls with 1.8m high fencing is proposed on
top. The height of the retaining wall itself will vary along the extent of these
plots, ranging from between 0.3m up to 2.2m. 
65 All of the houses will have a private garden area and in-curtilage parking with
the terraced housing having communal parking spaces. Boundary treatments
comprise of timber fencing, masonry walls and a combination of both. Overall,

Page 11

the scale and density of the development is commensurate with the masterplan
and the prevailing townscape in this part of Blairgowrie. 
66 Perth and Kinross Council Placemaking Guide 2020, page 39 specifies for off-
street parking that parking within the plot should not dominate the front garden
of houses. Similarly Designing Streets specifies that car parking should be level
with, or behind the main building line which is more aesthetically pleasing in
streetscape terms. It further references that parking within the front curtilage
should generally be avoided as it breaks up the frontage, can be unsightly and
restricts informal surveillance. 
67 Some of the parking spaces are situated to avoid a car dominated street view,
although this is not carried through the entire site. Where car parking is evident
within front gardens, views are broken up with appropriate landscaping. 
68 In terms of the proposed design of each house type, there is an acceptable range
of design and materials proposed. The Design and Access Statement describes
the house designs as being a contemporary interpretation of traditional building
style, designed to complement the local area. The proposed palette of materials,
including white and magnolia render, brick and a mixture of anthracite and
terracotta roof tiles, white garage doors and windows/doors is appropriate in
this location and is considered acceptable. The final specification of materials,
however, will be required to be determined via a condition (condition 33) 
69 The site has been well laid out and designed, taking into account key constraints
and opportunities. The site provides good connectivity, both within the
development and with the surrounding area, including providing access to
existing core path provision. The Design & Access Statement has provided a
sound justification for the design and layout of the site, considering a range of
key design parameters to illustrate how the proposed development responds to
the six qualities (healthy, pleasant, connected, distinctive, adaptable and
sustainable) of successful places established by NPF4. The site also
incorporates a range of 2–5-bedroom units. The site also mixes the size range of
properties across the development. 
70 Overall, the general layout, house designs and materials proposed are
acceptable. Although the proposed density may appear higher, it is acceptable
within the wider context. The proposed development provides an efficient use of
land whist at the same time contributes positively to the quality of the
surrounding built and natural environment providing an inherently sustainable
development and as such is in compliance with relevant NPF4 and LDP2
policies. 
Landscape and Visual Amenity 
71 In terms of the impact on visual amenity of the area, a residential development
will inevitably change the visual appearance of the area, however, the application
site has been identified for residential use in the LDP, therefore this degree of

Page 12

change was envisaged in the site allocation and permission granted under the
PPP.   
72 The landscape plans submitted for the site sets out how the areas of
landscaping will be managed and incorporated into the site. A linear landscape
corridor to the west and north of the proposed housing with structure tree and
shrub planting, wildflower meadow and hedgerows will provide a transition
between the Galabank footpath and proposed housing. Another additional
requirement of LDP2 is an enhanced woodland on the western boundary. It is
possible that additional trees could be planted here but we would be keen to
avoid anything too dense as this could have an impact on the nearby
dwellinghouses. This, however, can be controlled by condition (condition 29). 
73 The design and layout of the site, along with the proposed landscaping and
retention of existing trees is considered to be acceptable in landscape terms and
will not cause any unacceptable visual impacts. 
74 The proposal meets the objectives of Policies 4, 6 and 14 of NPF4 and LDP2
Policies 1, 39 and 40B. 
Residential Amenity 
75 NPF4 Policy 14(c), NPF4 Policy 23 and LDP2 Policy 1A, 1B, 17, 56 and 57
require any development to not detrimentally impact on residential amenity and
to ensure any occupiers of new development have an adequate level of
residential amenity. 
76 The Council's guidance generally seeks to ensure there is a minimum distance of
9m from windows to boundaries in order to mitigate overlooking from new
development. Given the location of the development and the layout proposed
there are not considered to be any overlooking concerns from the proposed
dwellings. In this case each dwelling has a minimum of 9m deep rear gardens
and more than the required 18m window to window distance required by
guidance. 
Privacy, Daylight and Overshadowing 
77 The location of the proposed dwellinghouses relevant to existing residential
properties is such that there will be no loss of privacy or loss of daylight or
overshadowing. Similarly, the new properties are adequately spaced out to
prevent any impact on amenity in terms of loss of privacy, daylight or
overshadowing. 
78 As such, the proposal accords with the intent of NPF4 Policy 14(c): Design,
Quality and Place and LDP2 Policies 1A and 1B, Placemaking and Policy 17
Residential Areas in respect of residential amenity.

Page 13

Noise 
79 Condition 26 of the PPP requires a noise assessment to be submitted to
demonstrate acceptable internal noise levels of 35 dB within all dwellings taking
into account any acoustic mitigation proposed. An updated noise impact
assessment has been submitted due to the proximity to the A93, Dunkeld Road
and Gallowbank Road and this has subsequently been reviewed by
Environmental Health. 
80 Measurements were undertaken at 6m from Dunkeld Road near kerbside with
results provided in the NIA. It was noted that the dominant noise source across
the proposed site is road traffic noise from the Dunkeld Road and local road
network. 
81 SoundPLAN modelling was used to demonstrate properties which would exceed
55 dB LAeq,16hr in gardens (shown in Figure1), 50 dB LAeq,16hr equating to
internal limit of 35 dB LAeq,16hr allowing for open window scenario (Figure 2)
and 45 dB LAeq,8hr again allowing for open window scenario (Figure 3). 
82 Results given in Table 2 indicate that at plots 2, 85, 100 and 103 the target levels
are not achievable for open windows scenario and a minimum of between 16 - 28
Rw,Ctr (glazing and alternative ventilation) is required for both ground and first
floor rooms (as shown in Table 2). 
83 Mitigation in the form of glazing and alternative ventilation as described in Page
13 and Table 2 of the noise impact assessment (NIA) undertaken by KSG
Acoustics dated 02 September 2024 (rev 5) shall be put in place prior to
occupation of plots 2, 85, 100 and 103 (condition 32). 
84 The impact of road traffic noise within garden grounds has also been predicted,
with results given in Table 3 (noted as Figure 3) and indicate that at plot 103, the
target level of 55 dB LAeq,16hr is not achievable without mitigation. 
85 Mitigation in the form of 1.8m high close boarded fencing with a minimum surface
density of 15kg/m2, with no air gaps between the fence and ground or any panel
or board, as shown in drawing 51, or alternative barrier construction such as a
brick wall, at the same height, at plot 103 has been recommended (condition 32). 
Dust 
86 A detailed Air Quality Impact Assessment (AQIA), which included a cumulative
assessment with other large-scale development in Blairgowrie, was assessed
as part of the PPP. Environmental Health had no objection to the assessment
within the PPP and no further appraisal is required. Therefore, there are no
conflicts with LDP2 Policy 57. The AQIA included dust control measures to be
put in place throughout the construction of the development. The recommended
measures are required to be implemented via Condition 9 of the PPP and will
remain enforceable for the duration of the construction.

Page 14

87 Therefore, subject to conditions, the proposal meets the terms of the PPP and
the above noted policies. 
Roads and Access 
88 Condition 3(iv) of the PPP specifies details required for roads, footpaths,
cycleways and path connections. NPF4 Policy 13: Sustainable Transport seeks
to encourage developments that prioritise sustainable travel while LDP2 Policy
60 Transport Standards and Accessibility Requirements requires consideration
of transport and accessibility. A supporting Transport Statement has been
assessed by the Council’s Transport Planning team, who do not object with the
scale of development and parking requirements considered adequate. 
89 The applicant is proposing to create one new vehicle access onto Dunkeld
Road for 145 of the dwellinghouses. The remaining 7 will have vehicle
accesses directly onto Dunkeld Road. The applicant is proposing 38 visitor
parking spaces throughout the development site, which complies with the
requirements of the National Roads Development Guide. It is noted that all plots
will have the option to add electrical charge points. 
90 The applicant is proposing links to the Galabank path to the west of the site and
also path links through to Gallowbank Road to the east of the site. The paths
will be finished in asphalt to tie in with the footpaths located elsewhere within
the site. An appropriately worded condition will be added to the consent to
ensure footpaths link into exiting paths and are usable (conditions 14 - 16). 
91 Communications have taken place regarding design standards throughout the
proposed development, in particular, continuous footways, raised tables, step
off facilities at visitor parking, parking provision, electric charge points, roads
drainage, trip generation, visibility splays, street lighting and the requirement for
a residential travel plan. These issues are now resolved subject to the
imposition of relevant conditions. 
92 The applicant has shown roads drainage on the plans provided and have
advised that the main carrier pipe will be adopted by Scottish Water with the
gulleys marked for the Roads Authority. There will also be a filter trench. The
finalised Roads Drainage details will be agreed through the Road Construction
Consent Process. Informative recommended.  
93 The applicant has provided a swept path to show that the waste services
vehicle can navigate the site. It should also be noted that whilst the build is
ongoing, the Refuse Collection Vehicle will only access the site, if the Waste
Services team are happy with the surfaces of the roads and footways for
operatives and vehicles to work on and within, along with a suitable turning
facility for the vehicles; otherwise waste will need to be presented at a location
agreeable to the Waste Services team.

Page 15

94 The applicant has provided details on the trip rates for the site. The applicant
has confirmed that the level of trips for the site have reduced from that of the
levels expected in January 2023, where it was expected that there would be
175 dwellinghouses. This number has reduced to 152 in the current site layout. 
95 An approved street lighting design required, including improvements to the
existing street lighting on Dunkeld Road at the proposed site access. The
applicant is requested to show the proposed lighting arrangements for the
private locations, including parking courts, to show an appropriate level of
illumination. This will be controlled by condition 12.  
96 The applicant shall provide a residential travel plan applicable to the site. This
will be conditioned accordingly (condition 17). 
97 Therefore, subject to the conditions specified above and a further condition to
manage construction traffic activity through a Construction Traffic Management
Plan (condition 10), the proposal meets the terms of the PPP, NPF4 Policy 13:
Sustainable Transport and LDP2 Policy 60: Transport Standards and
Accessibility Requirements. 
Core Path 
98 LDP2 Policy 15 is concerned with public access; including core paths and rights
of way, and development proposals must not have an adverse impact on such
routes. The LDP2 MU5 allocation requires protection of local footpaths. Core
path BLAI/31 and Right of Way 17/31 have potential to be impacted by any
development in this area. Plans include this path in the design, with links
creating a strong connection to it from the western edge of the proposed
development. A condition is proposed to ensure that core paths be protected
and remain operational during the construction phases (condition 18). 
Drainage and Flooding 
99 PPP Condition 3(ix) requires details of the proposed foul and surface water
Drainage to be provided. Conditions 10 and 11 support Condition 3(ix) and
specify the approach to flood risk assessment and surface water drainage
arrangements. The supporting Flood Risk Assessment (FRA) and Drainage
Impact Assessment (DIA) have been assessed by the Council’s Structures and
Flooding team. Structures and Flooding initially sought clarifications in relation
to the flood risk and surface water drainage arrangements. However, following
receipt of further technical drawings and information, these concerns, subject to
conditions, have been addressed (conditions 4-7 (inclusive)). 
100 Scottish Water have advised that they do not object to this planning
application, however, this does not confirm that the proposed development
can currently be serviced. They further advise, however, that the applicant
should be aware that they are unable to reserve capacity and once a formal

Page 16

connection application is submitted to Scottish Water, they will review the
availability of capacity.   
101 Overall, the proposal complies with NPF4 Policy 22: Flood Risk and Water
Management and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage. 
Waste Collection 
102 The Council’s Community Waste Advisers have been consulted and have
provided information on what provision should be made for waste and recycling. 
The dwellings will receive the 4-bin system. An informative note is recommended
regarding waste collection and will be attached to the permission (Informative 6). 
Archaeology 
103 Perth and Kinross Heritage Trust (PKHT) have been consulted and advised that
the proposed development site lies within an area that is considered to have
archaeological potential given the number of pre-historic archaeological sites
located in close proximity to the proposed development site. An Archaeological
Assessment was presented as part of 17/00939/IPM which was carried out by
professional archaeological contractors AOC Archaeology. This considered the
direct and indirect effects of the proposed development on heritage assets, and
concluded that overall, there is considered to be a high potential for remains of
prehistoric to Roman date to be present within the development area. 
104 The first phase of development at Field 4 was evaluated by trial trenching in
2020 and also part of Field 3 in 2023, during which nothing of archaeological
interest was identified, however, the northern areas of the development
boundary, which includes the present development area, have not been
evaluated, and there remains a high potential for buried archaeological remains
here which would be impacted upon by the development. 
105 As required by condition 8 of the PPP, PKHT recommend that an
archaeological programme of works take place. This should comprise in the first
instance of a 10% Trial Trenching evaluation to assess the presence / absence,
character and significance of archaeological deposits on the site and the extent
to which the development will impact upon them. This evaluation will inform a
mitigation strategy, if required, to either preserve significant deposits within the
development or for further archaeological works, to consist of the excavation
and post-excavation analysis / publication of these deposits. The scope of these
works should be discussed with PKHT and be clarified in a Written Scheme of
Investigation (WSI). 
106 Additionally, it is noted that the boundary of this development extends to the
south of Dunkeld Road (A923 and should be included in the programme of
works above. Furthermore, this area is adjacent to the burial mound at Fir
Hillock (SM9612) and fencing off of this site with an appropriate buffer, to be

Page 17

agreed with Historic Environment Scotland, prior to and for the during the
course of development works will also be required. This will be secured by
condition (condition 9). 
107 It is recommended that a condition is imposed (condition 8) requiring a
programme of archaeological works to be undertaken prior to any development
taking place. The requested condition will ensure that the proposal complies
with NPF4 Policy 7: Historic Assets and Places and LDP2 Policy 26:
Scheduled Monuments and Archaeology. 
Conservation Considerations 
108 Colleagues with conservation expertise have been consulted and have advised
that the proposed development does not raise any concerns in respect to any
significant impact on the Blairgowrie Conservation Area or any listed building
due to their being adequate separation distance. 
109 As such the proposal complies with NPF4 Policy 7 and LDP2 Policies 27 and
28. 
Natural Heritage and Biodiversity 
110 The consideration of natural heritage and biodiversity is integral to the layout,
design and landscaping detail required by the PPP. NPF4 Policy 1: Sustainable
Places, Policy 3: Biodiversity, Policy 4: Natural Places and Policy 6: Forestry
Woodland and Trees are relevant considerations as are LDP2 Policies 38:
Environment and Conservation, 40: Forestry, Woodland and Trees, Policy 41:
Biodiversity and Policy 45: Lunan Lochs Catchment Area. 
111 The PPP requires an updated Ecological Assessment and a Protected Species
Survey, of which have been submitted. It should also be noted that whilst a
Woodland Management Plan (WMP) to satisfy condition 12 (ix) of the PPP is
required to be submitted, as there is no woodland associated with this part of
the wider PPP site, this has not been submitted. A Planting Notes and
Landscaping Maintenance and Management Proposals document dated June
2024 by Brindleys, however, has been submitted to satisfy the requirements for
maintenance arrangements for all landscaping and planting associated with the
development proposed for Phase 3. Furthermore, a WMP was approved as part
of a previous AMSC application (22/00060/AMM) and one which contains an
ancient woodland. As such it is considered this part of condition 12 is satisfied. 
112 The Preliminary Ecological Appraisal (PEA) specifies that the study area
contains no sites with a statutory nature conservation designation, however,
there are two internationally designated site which are within 2.5km of the site;
Dunkeld and Blairgowrie Lochs SAC and the River Tay SAC and 3 nationally
designated sites; Ardblair and Myreside Fens SSSI, Craighall Gorge SSSI; and
Hare Myre, Monk Myre and Stormont Loch SSSI. The PEA demonstrates the
proposed development will not adversely affect these designates sites.

Page 18

113 NatureScot and SEPA have been consulted and offer no comment on the
proposal. The proposed development is connecting to the public sewerage
system, the dwellinghouses are being built on a field that doesn’t have
connectivity to the Lochs and the SUDS pond, although proposed in the field
adjacent, will not have connectivity. As such, there are no adverse impacts
forecast for these designations. In terms of protected species, the updated
Ecological Appraisal reiterates the sites low potential for use by European
Protected Species, and low habitat diversity and biodiversity value. 
114 The Ecological Appraisal and detailed landscape proposals have been
assessed by the Council’s Biodiversity/Tree Officer and Community
Greenspace. One hundred and thirty-five trees have been identified within the
tree report, of which it is proposed to remove three. Tree selection and
landscaping throughout the site is considered acceptable. It is, however, worth
noting that this agricultural land is very likely to have existing field drains that
control surface and ground water respectively. There is a likelihood of surface
water runoff from this sloping site into the properties adjacent to the north side
of Dunkeld Road, following soil stripping and ground works. The developer will,
therefore, be required to put in appropriate measures to control surface water
run-off. This will be secured by condition. 
115 Following an update to the plans to provide more information the details are
considered acceptable in terms of landscape and biodiversity value. 
116 Planning conditions are proposed to ensure appropriate protection or mitigation
of habitats and species during and post-construction. During the construction
phase, a Construction Environmental Management Plan (CEMP) is required to
ensure adequate controls are in place to preserve environmental quality and
biodiversity (condition 20). 
117 It is concluded that, within the site, the proposal adequately provides for and
enhances natural heritage and biodiversity and thereby complies with the
relevant policies of NPF4 and LDP2. 
Contamination 
118 NPF4 Policy 9 Brownfield, vacant and derelict land and empty buildings and
LDP2 Policy 58A: Contaminated and Unstable Land are relevant considerations. 
119 A Site Investigation Report produced by Bayne Stevenson Associates Ltd dated
November 2021 has been submitted to this application. The report covers Phase
2C & 3 of the wider development and has not identified any constraints with
regards to contaminated land. However, it shall be the responsibility of the
applicant to satisfy themselves that the ground conditions are suitable for the
development for which planning consent has been granted. 
120 It is concluded that, the proposal complies with the relevant policies of NPF4 and
LDP2 subject to the above.

Page 19

Sustainability 
121 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new buildings, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. 
122 In this instance, the submission refers to Solar PV panels and improved
insulation on each home. The energy statement submitted states that the
proposed design provides opportunities for passive and natural energy sources
in order to create a low-energy development. The energy statement further states
that through sustainable design, building practices and the incorporation of
micro-renewable technologies into the dwellinghouses, they can achieve the
carbon reduction targets set within LDP2. This will be covered by condition to
ensure the proposal complies with policy 32 (condition 19). 
123 NPF4 Policy 19: Heating and Cooling, LDP2 Policy 34: Sustainable Heating and
Cooling and in line with condition 17 of the PPP, the applicant was required to
submit a District Heating Feasibility Study to assess the technical feasibility and
financial viability of district heating for the site as part of the first AMSC
application (ref: 19/00163/AMM). The study concluded that it is not currently
viable to incorporate district heating within the development due to the size of the
site and high capital cost. This position was accepted as part of 19/00163/AMM
and 22/00060/MM and there is no further requirement for its consideration as
part of this phase. 
124 It is, however, worth noting that the Local Heat and Energy Efficiency Strategy
(LHEES) has been adopted by Perth and Kinross Council in July 2024 and as
such weight should be attributed to Heat Network Zones (HNZs) identified in the
LHEES. Potential LHEES zones identify areas where heat networks could be a
potential option for decarbonization. They consider things like: heat demand
density, proximity to large heat demands, potential constraints and opportunities,
and proximity to existing heat networks. Noted on page 73 of the LHEES is an
indicative Blairgowrie HNZ. 
125 Anchor loads identified in this zone are Blairgowrie Community Hospital,
Blairgowrie High School and Live Active Blairgowrie. Proctor Production Facilities
and Blairgowrie Community Campus are located to the north and south of the
zone respectively. The zone is adjacent to the development site (MU5) identified
for mixed-use development. 
126 NPF4 Policy 19 sets out the Scottish Governments policy in relation to
decarbonised heating. The proposal has been considered in relation to the policy
criteria of NPF4 Policy 19a-c, none of which is relevant to this proposal.

Page 20

(a) Development proposals within or adjacent to a Heat Network Zone
identified in a LDP will only be supported where they are designed
and constructed to connect to the existing heat network.  LDP2 pre-
dates the formation of LHEES policy, therefore, there are no HNZs
identified in the adopted LDP. The next LDP (LDP3) will look to
incorporate any HNZs as part of the Spatial Strategy.
(b) Proposals for retrofitting a connection to a heat network will be
supported. There is no existing heat network scheme, so this is not
relevant.
(c) Where a heat network is planned but not yet in place, development
proposals will only be supported where they are designed and
constructed to allow for cost-effective connection at a later date.
There is no planned heat network scheme for the area, other than an
indicative heat network zone being established through the LHEES. 
Developer Contributions 
127 LDP2 Policy 5 – Infrastructure Contributions requires consideration of the
individual or cumulative impact of new development on infrastructure and
facilities and to secure contributions to address this impact where the
development exacerbates impacts or generates additional need. 
Affordable Housing 
128 The Council’s LDP2 Affordable Housing Policy requires that 25% of the total
number of houses, above a threshold of 5 units, for which planning consent is
being sought is to be in the form of affordable housing. 
129 There is an existing S75 Agreement in place for this site in connection with the
Planning Permission in Principle consent ref: 17/00939/IPM. 
130 Approval of matters specified in conditions application has also gained consent
since then, Phase 1A (19/00163/AMM) and Phases 1B and 2A
(22/00060/AMM). The current application relates to Phase 3. 
131 It is acknowledged that Phase 2, application 22/0060/AMM is approved on the
basis that 73 new affordable homes will be delivered. 
132 Notwithstanding, clause 5.2 of the S75 Agreement requires that prior to the
submission of the first Application for Approval of a Condition in each
development area, the relevant owner shall in either case following consultation
with the relevant Council and statutory undertakers, submit a draft Affordable
Housing Scheme to the Council for approval. An Affordable Housing Scheme
has been submitted which satisfies the S75 requirement. 
133 There is no requirement for affordable housing to be provided within this phase of
the wider MU5 site as this is provided for in other phases as noted above.

Page 21

Primary Education 
134 The existing S75 includes a requirement for a Primary School contribution to be
paid for the purpose of providing improved or additional primary education
facilities to serve the development. This phase of the development will trigger a
requirement for a contribution to be paid. The relevant timescale for the
payment is set out within the terms of the agreement. 
Play Park 
135 Community Greenspace have advised that the development falls within the
catchment for the play area at Lochy Park. They have requested a financial
contribution towards the maintenance of the park. A sum of £11,965.25 is being
sought. The applicant has advised this will be an upfront payment. 
136 As the SUDS is to be privately factored, no sum in this regard is sought. 
137 The agreement in place continues to meet the requirements of the PPP as well
as NPF4 Policy 18: Infrastructure First and LDP2 Policy 5: Infrastructure
Contributions. 
Local Living and 20 Minute Neighbourhoods 
138 NPF4 Policy 15 requires that development proposals contribute to local living
where the majority of people can meet their daily needs within reasonable
distance of their home. The proposed development is located within an allocated
site, within an existing residential area and is easily accessible by sustainable
modes of transport including public transport, walking, wheeling and cycling
networks. The development of the site would provide private homes in a location
which is well served by local shops, schools, parks and open space within easy
walking and wheeling distance and is therefore considered to meet the
requirements of Policy 15 of NPF4. 
Statement of Community Benefit 
139 NPF4 Policy 16 requires development proposals that include 50 or more homes,
and smaller developments if required by local policy or guidance, be
accompanied by a Statement of Community Benefit. The Applicant has submitted
a Statement of Community Benefit which concludes that the proposed
development will provide community benefits in 3 key areas: environmental,
economic and social benefits. It will provide a broad range of new homes of
varying sizes and tenures. Whilst not restricted to, benefits include areas of open
space, significant investment in associated local infrastructure and services and
in addition to this will increase consumer spending for local business and
services all to the benefit of the community. The proposed development,
therefore, is in compliance with NPF4 Policy 16.

Page 22

Future Phases 
140 The number of units proposed here together with those already consented
would result in 255 units over the masterplan area with subsequent phases
(2B and 2C) still to come forward. The indicative number within LDP2 is 179-
280, leaving only 25 units left for subsequent phases to fall within the
indicative number. It should, however, be noted that this figure is indicative
and not binding. The phasing plan submitted indicates 130 units in 2B and
102 units in phase 2C with a total of 487 units over all 3 phases. 
141 Whilst it is not a matter for this application, it is noted that whilst the overall total
number of units for the masterplan area of both private and affordable houses
and 39 Assisted Living units being above the indicative number of 179-280 in the
LDP, approval of PPP 17/00939/IPM included assessment of detailed supporting
documentation for a development of up to 400 dwellinghouses which was
considered suitable for edge of settlement locations in the context of national
policy, stating the desirability of using land efficiently. Nonetheless, that figure is
also indicative as highlighted by condition 2 of the PPP and is not binding. 
142 Referring back to the submitted phasing plan which indicates a total of 487 units
over all 3 phases, a figure which is above the indicative 400 dwellinghouses as
noted above, may result in the need to seek detailed planning permission for an
increased range on the remaining sites. 
Economic Impact 
143 During the construction period, jobs will be created and sustained, supporting
in-direct employment and revenue that this volume of construction activity will
generate from employees spending on local goods and services. Longer term,
additional residents to the area will also support existing local employment and
services in the area. 
VARIATION OF APPLICATION UNDER SECTION 32A 
144 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to reduce the number of
dwellinghouses from 171 to 152. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
145 A Section 75 agreement has been secured for the 17/00939/IPM planning
permission to secure necessary infrastructure improvements and contributions.
The agreement in place continues to meet the objectives of the PPP and LDP2
Policy 5, however, as noted above, a commuted sum will be required.

Page 23

DIRECTION BY SCOTTISH MINISTERS 
146 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
147 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1. The development hereby permitted shall be commenced no later than the
expiration of two years from the date of this consent or from the date of
subsequent approval of matters specified in conditions, or three years from the
date of planning permission in principle, whichever is the later. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason: To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. No development shall commence until a detailed phasing strategy (supported by
appropriate plans) shall be submitted to and approved in writing by the Council
as Planning Authority. The phasing strategy shall include the following details: 
(i)  The timing and number of dwellings to be developed in each phase;
(ii)  The timing and delivery of infrastructure, open space and landscaping;
(iii)  The timing and location of any temporary construction compound.

Page 24

Once approved, the development shall proceed in accordance with the approved
delivery phasing strategy to the satisfaction of the Council as Planning Authority. 
Reason: In order to ensure the satisfactory implementation and completion of the
development. 
Drainage and Flooding 
4 Development shall not commence on site until commentary and a plan drawing,
illustrating previously installed field drainage infrastructure to the North of the site,
has been submitted to and subsequently approved in writing by the Planning
Authority. 
Reason: to ensure the provision of effective drainage for the site. 
5. The developer shall ensure all SuDS features are fit for purpose and
appropriately control, treat and discharge surface water up to and including
their design standard. 
Reason: to ensure the provision of effective drainage for the site. 
6. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved development
works.  The temporary surface water treatment facility shall remain in place until
the permanent surface water drainage scheme is implemented unless otherwise
agreed in writing by the Council as Planning Authority.    
Reason: To ensure the appropriate management of construction surface water
run-off to minimise flooding and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the interests of residential and
environmental amenity. 
7. Development shall not commence on site until correspondence, confirming
relevant parties’ agreement to maintenance of SuDS features, has been
submitted to and subsequently approved in writing by the Planning Authority. 
Reason: To ensure the provision of effective drainage for the site. 
Archaeology 
8. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted by the
applicant and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust. Thereafter, the developer
shall ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development

Page 25

site is undertaken. In addition, the developer shall afford access at all
reasonable times to Perth and Kinross Heritage Trust or a nominated
representative and shall allow them to observe work in progress. 
Reason: The site lies adjacent to areas of archaeological significance. 
9. Prior to the commencement of any works on site, appropriate fencing
shall be put in place to protect the burial mound at Fir Hillock
(SM9612). The details of which to be submitted and agreed in writing
by the Planning Authority in consultation with Historic Environment
Scotland prior to installation. The agreed details shall, thereafter, be
implemented and remain in situ during the course of development. 
Reason: In order to safeguard the scheduled monument. 
Roads and Access 
10. Prior to the commencement of the development hereby approved, the
developer shall submit for the further written agreement of the Council as
Planning Authority, in consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which shall include the
following: 
(a) restriction of construction traffic to approved routes and the measures
to be put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding
winter maintenance; 
(e) emergency arrangements detailing communication and
contingency arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the
development being deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited
from construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on
roads to be used by construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction
traffic;
(j) arrangements to ensure that access for emergency service vehicles
are not impeded;
(k) co-ordination with other significant developments known to use
roads affected by construction traffic;

Page 26

(l) traffic arrangements in the immediate vicinity of temporary
construction compounds;
(m) monitoring, reporting and implementation arrangements;
(n) arrangements for dealing with non-compliance; and
(o) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason: In the interests of road safety 
11. Prior to the commencement of the development hereby approved, a detailed
design showing the relocated position of the vehicle activated speed sign shall be
submitted to and approved in writing by the Planning Authority in consultation
with the Roads Authority.  The vehicle activated speed sign, as approved in
writing shall be implemented in accordance with the approved details to the
satisfaction of the Council as Planning Authority and undertaken prior to works
commencing on Plots 97 to 103. 
Reason: In the interests of pedestrian and traffic safety 
12. Prior to commencement of any development on site, the street lighting design
must be submitted for the further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council's Street Lighting
Partnership for the public road network. The scheme shall include details of light
spill, brightness of the lighting and the proposed hours of operation for both the
public road network and the private areas, and timescales for delivery. The
agreed lighting scheme shall be implemented and maintained in full accordance
with the agreed scheme. 
Reason: In the interests of road safety. 
13. Prior to occupation of Plots 97 to 103, the visibility splays shown on Drawings
110 and 111 shall be provided in full.  The visibility splays shall be physically
formed on the ground and any existing fences, walls, hedges or other means of
enclosure or obstructions within the splays shall be removed and relocated
outwith the splays.  Once formed, the visibility splays shall be permanently
retained thereafter, and no visual obstruction of any kind shall be permitted within
the visibility splays so formed.  The visibility splays, as approved in writing, shall
be implemented in accordance with the approved details and retained to the
satisfaction of the Council as Planning Authority. 
Reason: In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
14. The occupation of plots 1-4 hereby approved shall not occur until the proposed
footpath connection to the immediate southwest of these plots connecting to the

Page 27

core path BLAI/31, as shown on drawing number 23/01941/56 is operational to
the satisfaction of the Planning Authority. 
Reason: In the interest of sustainable transport. 
15. The occupation of plots 8-10 hereby approved shall not occur until the proposed
footpath connection to the immediate south west of these plots connecting to the
core path BLAI/31, as shown on drawing number 23/01941/56 is operational to
the satisfaction of the Planning Authority. 
Reason: In the interest of sustainable transport. 
16. The occupation of plots 42-45 hereby approved shall not occur until the proposed
footpath connection to the immediate south east of these plots connecting to
Gallowbank Road as shown on drawing number 23/01941/56 is operational to
the satisfaction of the Planning Authority. 
Reason: In the interest of sustainable transport. 
17. No part of the development shall be occupied until a Residential Travel Plan
(RTP), aimed to encourage more sustainable means of travel, has been
submitted to and agreed in writing by the Council in consultation with Transport
Planning.  The RTP will have particular regard to provision for walking, cycling
and public transport access to and within the site and will identify the measures
to be provided, the system of management, monitoring, review, reporting and the
duration of the plan. 
Reason: To promote sustainable transport options and to meet advice within
National Planning Framework on transport. 
Core Paths 
18. All existing rights of way, core paths within or adjacent to the completed
development shall at all times be protected and remain operational during the
construction phases. 
Reason: In the interest of sustainable transportation. 
Environmental Impact 
19. Prior to the commencement of development hereby approved, a scheme shall
be submitted to, and approved in writing by, the Council as Planning Authority
that demonstrates how at least 10% of the current carbon emissions reduction
set by the Scottish Buildings Standards will be met through the installation and
operation of low and zero-carbon technologies. This scheme shall detail for
each building: 
a) the technology types;

Page 28

b) illustrate, through technical calculations, that these will meet at least the
10% reduction;
c) their siting and location; and
d) ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme and no individual unit shall be occupied until the scheme has
been installed and operating. 
Reason: To embed low and zero-carbon technologies within the development
in the interest of environmental sustainability. 
20. Prior to the commencement of development of each phase a Construction
Environmental Management Plan (CEMP) must be submitted for the approval
of the Planning Authority. The measures outlined in the agreed CEMP shall be
adhered to at all times during the construction period. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
Biodiversity 
21. The conclusions and recommended action points within the supporting
Ecological Survey and Biodiversity Action Plan submitted and hereby approved
(document number 113 relates) shall be fully adhered to, respected and
undertaken as part of the construction phase of development, to the satisfaction
of the Council as Planning Authority. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
22. An updated ecological survey will be required prior to the commencement of
works, if works have not commenced within 24 months of the date of the survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
23. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, wildlife kerbs shall be installed adjacent to all road
gullies within 500metres of a SUDS pond or watercourse. Thereafter, the kerbs
shall be retained in a reasonable condition for the life of the development, to the
satisfaction of the Council as Planning Authority. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
24. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, hedgehog highways shall be created by providing
access gaps in wooden fences on each plot at least 13cm x 13cm at ground

Page 29

level, to allow for the free movement of hedgehogs. Thereafter, the hedgehog
highways shall be retained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
25. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations or by using planks placed into them at the end
of each working day and open pipework greater than 150 mm outside diameter
being blanked off at the end of each working day. 
Reason: In order to prevent animals from being trapped within any open
Excavations. 
26. The bird boxes and swift/bat bricks as shown on plan 23/01941/100
hereby approved shall be implemented prior to the occupation of each
relevant residential unit. Thereafter, they should be maintained in a
reasonable condition for the life of the development. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
Trees and Landscape 
27. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction. Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason: To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
28. All trees on site, other than those marked for felling on the approved plans, shall
be retained. 
Reason: To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
29. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become

Page 30

established within five years being replaced in the following planting season with
others of a size and species as previously approved. 
Reason: In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
30. All landscaped areas outwith the curtilages of the dwellings and shown on the
approved drawings shall be permanently retained as such and shall at no time be
used as private garden ground nor incorporated within the curtilage of any of the
dwellings hereby approved without the express grant of planning permission by
the Planning Authority. 
Reason: In the interests of the character and appearance of the development. 
Residential Amenity 
31 An acoustic barrier as described in Page 14 of the noise impact assessment
(NIA) undertaken by KSG Acoustics, dated 02 September 2024 (rev 5) shall be
put in place prior to occupation of plot 103. 
Reason: In the interests of residential amenity. 
32. Mitigation measures, in the form of glazing and alternative ventilation as described
in Page 13 and Table 2 of the noise impact assessment (NIA) undertaken by KSG
Acoustics dated 02 September 2024 (rev 5) shall be put in place prior to
occupation of plots 2, 85, 100 and 103. 
Reason: In the interests of residential amenity. 
Materials 
33. Prior to the commencement of the development hereby approved, details of the
specification and colour of the proposed external finishing materials to be used
shall be submitted to and agreed in writing by the Council as Planning Authority.
The scheme as agreed shall be implemented prior to the completion or bringing
into use of the development, whichever is the earlier. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.

Page 31

Procedural Notes 
A sum of £11,965.25 is being sought for the maintenance of Lochy Park. This
payment must be made by the applicant before the decision notice can be
released. 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. Please use the form attached
herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position. Please use the form attached herewith. 
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of the
Regulations and a draft notice is included for your guidance. In accordance with
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development
• Readily visible to the public
• Printed on durable material. 
4. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
5. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created
dwellings. Further information can be found at:
https://www.pkc.gov.uk/binrequests 
6. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste.

Page 32

7. Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn. 
Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved. 
8. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the commencement
of roadworks. Advice on the disposal of surface water must be sought at the
initial stages of design from Scottish Water and the Scottish Environmental
Protection Agency.  Please note that a fee is chargeable for the processing of
RCC applications. 
9. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environmental Protection Agency. 
10. No work shall be commenced until an application for building warrant has been
submitted and approved. 
11. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
12. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to reduce number of
dwellinghouses. 
13. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
14. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.

Page 33

The Council has two months to consider the information. You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
15. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot. Failure to obtain a licence may
constitute a criminal act under the Habitats Regulations and penalties are sever
for non-compliance. 
16. The applicant is advised that technical approval will be required for all street
lighting apparatus within adoptable areas and should contact the Street Lighting
Partnership to obtain technical approval prior to the submission of a Road
Construction Consent application. 
17. The granting of planning permission does not stop the continued right of public
access along the existing core path BLAI/31. An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an amendment of the Core
Path Plan under the Land Reform (Scotland) Act 2003 should be sought in
advance of any works authorised by this planning permission being commenced.
All relevant approvals should be in place prior to any stopping up and diversion of
the core path taking place. 
18. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
19. The applicant is to be reminded that any works to the south of the A923 must
avoid any accidental damage to the scheduled monument, Fir Hillock, burial
mound 750m east of Ardblair Castle (SM9612). 
20. The planning permission decision notice shall not be issued until such time as
the required commuted sum for the maintenance of Lochy Park has been
secured or paid in full.   
In the event the applicant does not either make the required payment within 28
days from the date the agent/applicant is advised of the need for the
contributions or complete a legal agreement for delayed payment within a 4
month period from the date the agent/applicant is advised of the need for the
contributions the application may be refused under delegated powers without any
further discussion with the applicant.

Page 34

Background Papers: 98 letters of representation
Contact Officer:  Gillian Peebles 01738 475330
Date: 29 November 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD: ECONOMY, DEVELOPMENT AND PLANNING