Perth and Kinross Council
Planning and Placemaking Committee – 9 October 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/279) 
PROPOSAL: Erection of 7 dwellinghouses, formation of vehicular access,
landscaping and associated works 
LOCATION: Land east of Honeysuckle Cottage, Carnbo 
Ref. No: 23/01313/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan.  A Section
75 Legal Agreement or other suitable mechanism will be required to secure
contributions for affordable housing. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is within the settlement boundary of Carnbo, which is approximately 6
km west of Milnathort. The site is accessed from the A91 extending south then
east linear in form. It is bound by residential development to the north/east/west
with the settlement boundary forming the southern site boundary with agricultural
land beyond. 
2 The application has been revised since the original submission to address
concerns about drainage and density/dwelling positioning. The revised plans
have been subject to advertisement, notification and consultation. 
3 The proposal is to erect 7 dwellings with one infilling on the main street (A91),
one dwelling flanking the new access into the site the remaining plots forming a
linear row extending east along the south site boundary.  The development will
also include amenity planting and SUDS area.   
SITE HISTORY 
4 09/01229/IPL was approved on 29 March 2011 for erection of a dwellinghouse
(in principle). 
5 14/00535/AML was approved on 22 May 2014 for erection of dwellinghouse and
garage (matters reserved by conditions)

Page 2

PRE-APPLICATION CONSULTATION 
6 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
7 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
8 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
9 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 7: Historic Assets and Places
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 18: Infrastructure first 
Perth and Kinross Local Development Plan 2019 
10 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
11 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking

Page 3

• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 46A: Loch Leven Catchment Area
• Policy 46B: Loch Leven Catchment Area
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
12 • Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC NON STATUTORY GUIDANCE 
13 • Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
NATIONAL GUIDANCE 
14 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
16 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes

Page 4

that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
17 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
18 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
CONSULTATIONS 
19 As part of the planning application process the following bodies were consulted: 
External 
20 Scottish Environment Protection Agency – additional mitigation submitted to
address SEPAs initial objection; conditions required. 
21 Fossoway and District Community Council – Objection to proposal; contrary
to LDP2, over development, inappropriate design, no open space and does not
enhance biodiversity. 
22 Scottish Water - No objection subject to standard advice. 
Internal 
23 Perth and Kinross Heritage Trust - No objection, Written Scheme of
Investigation (WSI) and be submitted for PKHT for approval. 
24 Transportation and Development - No objection, subject to conditions and
informatives. 
25 Development Contributions Officer - Developer contributions required outlined 
26 Environmental Health (Contaminated Land) - Contaminated land condition
required 
27 Community Waste Advisor - Environment Service - No response within time
but informative added

Page 5

REPRESENTATIONS 
28 12 representations were received. The main issues raised within the
representations are: 
• Contrary to policy 
• Lack of services
• Loss of privacy 
• Inappropriate design
• Light pollution 
• Noise pollution 
• Traffic 
• Road safety concerns 
• Overdevelopment
• Disturbance to field drains in building phase could cause flooding. 
• Inadequate bin storage
• Adverse effect on visual amenity
• Contrary to Development Plan policy
• Inappropriate housing density
• Loss of open space
• Out of character with the area
• Over intensive development
• Over looking
• No gaps for hedgehogs 
29 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
30 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted 
APPRAISAL 
31 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and

Page 6

are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
32 The site is located within the settlement boundary of Carnbo and is not an
allocated housing site.  In terms of the principle of development Policy 1
Placemaking and Policy 17 Residential Areas of LDP2 apply. In terms of NPF4
Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings, Policy 14:
Design, Quality and Place and Policy 16: Quality Homes are all applicable.   
33 Policy 1 Placemaking of LDP2 seeks to ensure that all new developments do not
adversely affect the areas in which they are located, whilst Policy 17 ensures that
all new developments within settlement are compatible with existing uses and do
not adversely impact on residential amenity. 
34 In terms of NPF4, Policy 9 Brownfield, vacant and derelict land and empty
buildings seeks to encourage, promote and facilitate the reuse of brownfield and
vacant land, Policy 14 (Design, Quality and Place) looks to promote good design
for all developments and Policy 16 (quality homes) looks to deliver quality and
affordable homes across the country.   
35 The site is considered to be a logical infill residential site given its undeveloped
vacant status and location within the settlement boundary.  It is also important to
ensure that the development potential of the site is fully realised due to its siting
in relation to existing infrastructure.    The lack of services in Carnbo has been
noted but the development is within the settlement and services will not be
provided unless the village grows.  Although existing residents may be
dependent on the car an increase in dwellings may encourage additional bus
services or local businesses.   
36 The general principle of residential development on this site is therefore
acceptable and the proposal and is considered to accord with Policy 17 of the
LDP2 and 14 and 16 of NPF4.  The proposal is also a brownfield site and
therefore meets the requirements of Policy 9 of NPF4 regarding the use of
vacant land to reduce greenfield development. 
Design and Layout 
37 Carnbo is a linear settlement with the majority of dwellings accessed directly onto
the A91. There is a more modern development to the west of the settlement
(Pitcanie Lane) with a courtyard of 4 dwellings and a number of new build
housing forming a small cul-de-sac.  The proposal in essence will create a
secondary street, but it would be difficult to develop the site in any other way. 
38 Plot 1 is the smallest at 352sqm sitting at the entrance of the site fronting the
A91.  It appears from a site visit that it once formed a small dwelling plot. Plot 1

Page 7

has 120sqm of amenity space which is in excess of the minimum set out within
the placemaking guidance.  Plot 2 is approximately 425sqm with 200sqm of
amenity space. It is noted that Carnbo has a number of generous house plots but
a variety of house types and plots sizes are required to meet different individual
needs.  The inclusion of the two smaller cottage style 3 bedroom properties on
Plots 1 and 2 provide more choice within the settlement. 
39 The remaining plots 3 - 7 range from 570sqm to 670sqm in area. These
accommodate 4 bedroom homes with single or double garages.  The house
types vary from plot to plot with the same material pallet throughout.   
40 The plots are in excess of placemaking guidance with amenity space ranging
from 120sqm to 400sqm all of which are in excess of the guidance which
requires a minimum of 80sqm. 
41 The scale, form and finish of the buildings and overall site layout is considered to
respect the character and visual amenity of the area and therefore accord with
policies 1A and B of the LDP2 and 14 of NPF4.  
Residential Amenity 
42 The dwellings only directly adjoin one property boundary as there is a proposed
access road with amenity strip running to the north which separates plots 3 - 7.   
43 The dwelling proposed on plot 1 is orientated to face the public road with the
majority of the windows (inc all upper floor bedrooms) facing the public road. 
There are no windows on the east elevation which faces the neighbouring
dwelling.  Plot 2 is positioned to the west of the plot and as it replicates plot 1 the
majority of windows will overlook the new access road.  The only windows on
the rear of these properties are at ground floor and can be mitigated by normal
boundary treatments.  These dwellings are both smaller 3 bedroom cottage style
which have 120sqm and 200sqm areas of amenity space which is in excess of
the minimum standard for 3 bedroom dwellings as set out in the Placemaking
Supplementary Guidance.  There are no upper floor windows proposed with 9m
of the boundary with the existing dwelling.   
44 Plots 3 – 7 have an access road between the proposed dwellings and existing
property boundaries to the north. They are spaced a minimum of 15m from the
front elevation to the adjoining property boundaries.  The garden depths of these
existing properties are a minimum of 20m.  The dwellings proposed are
therefore 15m from the neighbouring gardens and 35m in total from the
dwellings.   This is in excess of the guidelines set out in the placemaking
supplementary guidance. 
45 As such, the proposal accords with the intent of NPF4 Policy 14(c): Design,
Quality and Place and LDP2 Policies 1A and 1B, Placemaking and Policy 17
Residential Areas in respect of residential amenity.

Page 8

Visual Amenity 
46 The proposal includes small areas of amenity space within the site along with a
communal drainage area.  A landscaping plan has been submitted and a
maintenance plan will need to be agreed as its unlikely that these small areas
would be adopted by the council. (condition 6) 
47 It has been raised that there is a utilities lines across the site which would prohibit
the completion of the landscape plan as proposed however the agent has
confirmed that the landowner can require their removal/relocation or that other
alternatives can be sought.  This would be out with the scope or control of
planning and if the landscaping plan can’t be completed as proposed the
applicant would then need to agree a revised plan. 
Roads and Access 
48 The site is to be accessed from the A91 via a new vehicular access creating an
internal road within the site to allow access to all properties. The applicant has
detailed visibility splays on the contextual block plan, demonstrating 60m visibility
to the east and west of the proposed vehicular access. A condition is
recommended for the formation of the vehicular access and footpath along the
frontage of the site (Core path FSWY/157)(Condition 9). 
49 The applicant has demonstrated that the standards within the National Roads
Development Guide have been met in terms of parking facilities.  Visitor parking
bays have also been provided and a condition is required to ensure to provide
step off facilities to enable occupants of the vehicles to safely exit the vehicles
onto an area of hardstanding. (Condition 10) A swept path assessment to
demonstrate that the refuse collection vehicle (10m) can turn within the site has  
been provided, a swept path for a 12m long vehicle is also required and  
tis can be conditioned. (Condition 11) 
50 The site will require service strips throughout, commencing from the entrance to 
the site, in order to support service infrastructure, including lighting columns. 
(Condition 12).  The drainage layout has been revised to provide more detail on 
the siting of soakaways but information on separate outfalls for the roads  
drainage and the location of the infiltration trench on the drainage layout is still 
required and can be covered by condition. (Condition 13) Additional conditions 
are required to cover the street lighting design and a construction traffic 
management plan. (Conditions 14 and 15) 
51 In terms of all road related matters, the proposal is acceptable and in accordance
with the requirements of Policy 60 of the LDP2 and Policy 13 of NPF4. 
Drainage and Flooding

Page 9

52 The site is out with the flood risk area but to ensure that the development takes
account of drainage issues in the area the proposed SUDS will be covered by
condition.   
53 The site is located within the Loch Leven catchment and as such phosphorus
mitigation is required.  SEPA has confirmed that there is sufficient phosphorus
mitigation within the proposals for the development. The applicant is proposing to
use 3 properties for mitigation which is more than they require and SEPA
welcome the betterment in the catchment. 
54 SEPA have made it clear that the mitigation is in excess of what is required and
that this cannot be used again for any extensions to the site or for any future
planning applications. Once the mitigation has been allocated it cannot be shared
or used in the future.  This will be added as an informative. 
55 Two of the mitigation properties have authorisations with us under the Water
Environment (Controlled Activities) Regulations (one being a 'registration' and the
other a 'licence'). These will need to be varied via an application to SEPA's Water
Permitting team in order to show the changes to the system and discharge limits
and the last mitigating property will need to be authorised by us via a new
application as well to the permitting team. 
56 With the addition of the Loch Leven mitigation conditions (3 and 4) the proposal 
is in accordance with the drainage polices of both LDP2 and NPF4 
Waste Collection 
57 It has been demonstrated that the site can be serviced by a refuse vehicle.  In
letters of representation the indicated 3 bins within each plot is insufficient.  If an
additional bin is required, each plot has more than enough space to facilitate it. 
Conservation Considerations 
58 The proposed development site lies within an area that is considered to be
archaeologically sensitive as it is located near to the recorded findspot of a
prehistoric cemetery (MPK1823). Cremation urns, probably dating to the Bronze
Age, were uncovered in 1842 though the finders recorded the burials as 'Roman
Remains'. Further remains are known nearby on Cairn Hill to the northwest,
which includes a later prehistoric unenclosed settlement site with Scheduled
Monument status (SM7625). 
59 A small evaluation (EPK1295) was undertaken west of the development site in
2018 during which no archaeological remains were identified. However, given
that little archaeological survey or evaluation work has been undertaken in or
around the village and that this parcel of land is located in an area of greenfield
with no record of previous development, PKHT believe archaeological mitigation
is required.

Page 10

60 It is recommended that an archaeological evaluation should take place to assess
the presence / absence, character and significance of archaeological deposits on
the site and the extent to which the development will impact upon them.
(Condition 5) 
Natural Heritage and Biodiversity 
61 The site has little tree coverage other than those around the boundaries.  The
scheme includes a landscaping proposal. 
62  Enhancement of biodiversity should be demonstrated in all projects.  Details of
enhancement measures such as quantity, locations, techniques, timescales and
monitoring arrangements are required and will be covered by condition.
(Condition 10) 
Low and Zero Carbon Generating Technologies 
63 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. In this
instance, the proposal includes solar panels on the dwellings.  The proposal
therefore complies with the relevant policies. 
Developer Contributions 
Affordable Housing 
64 The Council's Affordable Housing Policy requires that 25% of the total number of
houses, above a threshold of 5 units, for which planning consent is being sought
is to be in the form of affordable housing. 
65 In terms of this proposal most available affordable options would likely not be
viable on this site, mainly as a result of a lack of amenities as well as poor
connectivity/lack of public transport to the nearest larger settlements. In this case
it is considered, in consultation with the Affordable Housing Enabler and taking
cognisance of the submission of the application before the adoption of the
updated Supplementary Guidance in December 2023, that a commuted sum is
appropriate in this instance.    
Primary Education 
66 The Council Developer Contributions Supplementary Guidance requires a
financial contribution towards increased primary school capacity in areas where a

Page 11

primary school capacity constraint has been identified. A capacity constraint is
defined as where a primary school is operating at over 80% and is likely to be
operating following completion of the proposed development, extant planning
permissions and Local Development Plan allocations, at or above 100% of total
capacity. 
67 This proposal is within the catchment of Fossoway Primary School. Education &
Children's Services have no capacity concerns in this catchment area at this
time. 
68 The proposal, subject to the settlement of developer obligations, the proposal
shall be compliant with Policy 18 Infrastructure First of NPF4 and Policy 5
Infrastructure contributions of LDP2. 
Economic Impact 
69 The site will provide economic benefit during the construction phase of the
development and see additional economic activity associated to Carnbo as a
result of an increased population. 
VARIATION OF APPLICATION UNDER SECTION 32A 
70 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to dwelling numbers and the site
layout. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
71 None required. 
DIRECTION BY SCOTTISH MINISTERS 
72 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
73 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions.

Page 12

RECOMMENDATION   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The foul drainage infrastructure capable of achieving not less than 125%
phosphorus mitigation associated with this development shall be undertaken in a
phased manner:
(a) No development shall commence on the approved development site until
the mitigating foul drainage infrastructure at the remote properties at Burach
Beg KY13 0NX, The Farmhouse KY13 0NX and Crossroads Cottage KY13
0NJ has been installed, 
(b) Following the installation of the foul drainage infrastructure at the remote
property/properties, the development site shall only be occupied once the
foul drainage infrastructure for the development site has been installed. 
For the avoidance of doubt the installed drainage infrastructure at the
development site as approved shall be retained.   
Reason - To ensure appropriate drainage arrangements are installed and
retained to remove phosphorus from the Loch Leven Catchment Area thereby
ensuring compliance with Policy 46 A & B: Loch Leven Catchment Area of the
Perth and Kinross Local Development Plan 2 (2019) and Enterprise and
Infrastructure Committee Resolution of 28 August 2013. 
4. Development shall not commence until the applicant has submitted approved
CAR licence(s) under the Water Environment (Controlled Activities)(Scotland)
Regulations 2011 for the drainage infrastructure associated with this project to
the Council as Planning Authority and the Planning Authority has confirmed
receipt of the documentation in writing. 
Reason - To ensure appropriate drainage arrangements are installed and
retained to remove phosphorus from the Loch Leven Catchment Area thereby

Page 13

ensuring compliance with Policy 46 A & B: Loch Leven Catchment Area of the
Perth and Kinross Local Development Plan 2 (2019) and Enterprise and
Infrastructure Committee Resolution of 28 August 2013. 
5. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation analysis, the development
as approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT.  The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress. 
Reason - To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area. 
6. Prior to the occupation of the development or any phase of the development,
whichever is the sooner, a landscape management plan, including long term
design objectives, management responsibilities and maintenance schedules for
all landscape areas (other than small privately-owned domestic gardens) shall be
submitted to and agreed in writing by the Council as Planning Authority, for its
approved use.  The landscape management plan as agreed shall, where
appropriate, include phased implementation concurrent with the development
and shall be fully implemented to the satisfaction of the Council as Planning
Authority. 
Reason - To secure the maintenance of communal areas. 
7  Prior to the commencement of the development hereby approved, a detailed plan
indicating location, quantity, specification, and maintenance requirements for
biodiversity enhancement measures including bat boxes/bricks, swift
boxes/bricks, provision of hedgehog highways and wildlife kerbs and native tree
and/or hedgerow planting for the site shall be submitted for the further written
agreement of the Council as Planning Authority.  The agreed scheme shall be
implemented prior to the bringing into use or completion of the development,
whichever is the earlier, and thereafter maintained in a reasonable condition for
the life of the development, to the satisfaction of the Council as Planning
Authority  
Reason - In the interests of protecting environmental quality and of biodiversity.

Page 14

8. Development shall not commence on site until an evaluation for the potential of
the site to be affected by contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify; 
I. the nature, extent and type(s) of contamination on the site 
II.  measures to treat/remove contamination to ensure the site is fit for the use
proposed 
III.  measures to deal with contamination during construction works 
IV.  condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason - In order to deal with any potential contamination of the site as a result
of its former use. 
9. Prior to the commencement of development details of the footpath along the
frontage of the site with the A91 and the vehicular access to the site shall be
submitted to and agreed in writing by the Council as Planning Authority.  The
details as agreed shall be completed prior to the occupation of the development. 
Reason - In the interests of pedestrian and traffic safety and in the interests of
free traffic flow. 
10. Prior to the commencement of development details of the visitor parking bays
shall be submitted to and agreed in writing by the Council as Planning Authority. 
The details submitted shall include step off facilities to enable occupants of the
vehicles to safely exit the vehicles onto an area of hardstanding.  The details as
agreed shall be completed prior to the occupation of the development. 
Reason - In the interests of road safety; to ensure the provision of adequate off
street car parking facilities. 
11. Prior to the commencement of development details a swept path assessment to
demonstrate that a 12m long vehicle. The details as agreed shall be completed
prior to the occupation of the development. 
Reason - In the interests of pedestrian and traffic safety and in the interests of
free traffic flow. 
12. Prior to the commencement of development details of the service strips
commencing from the entrance in order to support service infrastructure,

Page 15

including lighting columns shall be submitted to and agreed in writing by the
Council as Planning Authority.  The details as agreed shall be completed  prior
to the occupation of the development. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
13. Prior to the commencement of development details the outfalls for the roads
drainage and the location of the infiltration trench shall be submitted to and
agreed in writing by the Council as Planning Authority. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
14 Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following:
a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c)  a code of conduct for HGV drivers to allow for queuing traffic to pass;
d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f)  arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i)  details of information signs to inform other road users of construction traffic;
j)  arrangements to ensure that access for emergency service vehicles are not
impeded;
k)  co-ordination with other significant developments known to use roads
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds; 
(m)  the provision and installation of traffic counters at the developer 's expense
at locations to be agreed prior to the commencement of construction; 
(n)  monitoring, reporting and implementation arrangements;  
(o)  arrangements for dealing with non-compliance; and 
(p)  details of HGV movements to and from the site.

Page 16

The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
1. Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval.  Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn. 
Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved. 
5.  This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please

Page 17

be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk. 
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
6. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created
dwellings. Further information can be found at:
https://www.pkc.gov.uk/binrequests 
7. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to dwelling numbers and the site
layout. 
8. SEPA highlight that once the mitigation has been allocated it cannot be shared or
used in the future. 
Background Papers:  12 letters of representation
Contact Officer:  Joanne Ferguson
Date: 27 September 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD: ECONOMY, DEVELOPMENT AND PLANNING