PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 11 September 2024 at
9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, Bailie R Brock
(substituting for D Cuthbert), D Illingworth, K Harvey, I James, Bailie C McLaren,
R Watters and Bailie M Williamson. 
In Attendance: D Littlejohn, Strategic Lead – Economy, Development and Planning,
L MacLean, C Morilly, S Panton, L Reid, K Smith and P Williamson (all Economy,
Place and Learning); A Brown, M Pasternak, C Elliott and J Guild (all Strategy,
People and Resources). 
Apologies: Councillor D Cuthbert. 
Councillor I Massie, Convener, Presiding. 
DUE TO TECHNICAL ISSUES THERE WAS A SLIGHT DELAY IN STARTING THE
MEETING. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting and noted
apologies as above.   
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors Code
of Conduct. 
3. MINUTES 
The Minute of Meeting of Planning and Placemaking Committee of 3 July
2024 was submitted and approved as a correct record. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
24/00200/FLM 5(1)(ii)
24/00368/FLL 5(2)(i)
23/00852/FLL 5(2)(ii)
23/01164/FLL 5(2)(iii)
23/01453/FLL 5(2)(iv)

Page 2

5. APPLICATIONS FOR DETERMINATION 
(1) Major Application 
(i) 23/00592/IPM – Residential development with associated
access road, landscaping, SUDS, and associated works
(LDP3 Allocated Site - MU27) (in principle), land 170 metres
south west of 8 Tayview, Luncarty (Report No. 24/243) 
Mr Smith introduced the report and advised an update had been
circulated to members prior to the meeting, removing the
requirement for the direction contained in the report, amended
wording for Conditions 1, 3, 9 and the procedural notes. 
Resolved:
Grant, subject to the following terms, direction, conditions and
informatives: 
Conditions
General
1.  The Development to which this planning permission in
principle relates shall be begun not later than 20 years
from the date of grant of this permission.
Reason - In accordance with the terms of Section
59(2A) of the Town and Country Planning (Scotland)
Act 1997 as amended, as there is a material reason
indicating a longer period should be set.
2.  No works in connection with the development hereby
approved shall take place until full details of the siting,
design, external appearance and landscaping of the
development and the means of access serving the
development (hereinafter referred to as the 'Matters
Specified in Condition') have been submitted to and
approved in writing by the Planning Authority.  The
specified matters include:
(i)  a detailed phasing plan, commensurate with the
phasing plan agreed as part of the wider MU27
allocation
(ii)  a detailed levels survey (existing and proposed) and
cross sections showing proposed finished ground
and floor levels of all buildings forming part of the
development phase, relative to existing ground
levels and a fixed datum point;
(iii)  the siting, design, height and external materials of all
buildings or structures;
(iv)  the details of all roads, footpaths, cycleways, core
path connections throughout the development, and
connecting to existing infrastructure; (v) details of
any screen walls/fencing to be provided (including
any acoustic barriers);

Page 3

(vi)  measures to maximise environmental sustainability
through design, orientation and planting or any other
means;
(vi)  details of all landscaping, structure planting and
screening associated with the development of each
site and incorporating suitable landscape buffers to
define the settlement edge and mitigate visual
impacts of built form;
(vii)  the lighting of all streets and footpaths;
(viii)  the layout of any play areas and the equipment to be
installed;
(ix)  full details of the proposed means of disposal of foul,
surface and roads water from the development;
(x)  details of car charging points to be provided within
the development; and
(xi)  A minimum 40% of dwellings shall incorporate swift
bricks and bat roost bricks at eaves height.
Reason - This is a Planning Permission in Principle under
Section 59 of the Town and Country Planning (Scotland)
Act 1997 as amended by Section 21 of The Planning etc.
(Scotland) Act 2006.
3.  The submitted masterplan, site layout plan and indicated
scale of development of up to 110 dwellinghouses are
purely indicative and are hereby not approved.  As part of
any application for Approval of Matters Specified in
Conditions, as set out in Condition 2(i) a phasing strategy
for the overall allocation (supported by appropriate plans)
shall be submitted to and approved in writing by the
Council as Planning Authority.  The phasing strategy shall
have regard to the requirements of Condition 3 and
include and demonstrate the following details:
(i)  The timing and number of dwellings to be
developed in this phase, and how their delivery
relates to the development of housing numbers
associated to the overall MU27 allocation;
(ii) The timing of delivery of infrastructure (including
roads/footways and other access requirements
associated to the overall MU27 allocation), open
space and landscaping.
Reason - The application is for planning permission in
principle only at this stage and an appropriate level of
development, layout and design shall be determined
through applications for the Approval of Matters Specified
in Conditions.
Public Access
4.  Any existing right of way or core path within or adjacent to
the proposed development shall at all times be protected
and remain operational during the construction phases.
Reason - In the interest of sustainable transportation.
5.   Prior to the commencement of development, a revised
Masterplan Strategy Layout shall be submitted to and
approved by the Council as Planning Authority, showing a

Page 4

link to the non-core path at the m1o cul-de-sac 25-35
Hatton Road.  In a form which would improve connectivity
and provide a key linkage to the existing nursery and
primary school, and also to include more east-west
linkages from the developable area to the river core path
(LUNC/2).
Reason - To ensure that the masterplan strategy is fully
in line with the masterplan strategy for application
17/00847/IPM, in accordance with LDP2 allocation MU27.
Soils
6.    Prior to works commencing on site, a soil re-use and
management plan shall be submitted to and approved in
writing by the Council as Planning Authority.  This Plan
will include details of the storage of all soils and their
appropriate re-use in future phases. 
Reason - To protect soils from damage such as erosion
or compaction, in accordance with LDP2 Policy 51: Soils
and NPF4 Policy 5.
Archaeology
7.  Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
to and agreed in writing by the Council as Planning
Authority, in consultation with Perth and Kinross Heritage
Trust.  Thereafter, the developer shall ensure that the
programme of archaeological works is fully implemented
during each phase including that all excavation,
preservation, recording, recovery, analysis, publication
and archiving of archaeological resources within the
development site is undertaken.  In addition, the
developer shall afford access at all reasonable times to
Perth and Kinross Heritage Trust or a nominated
representative and shall allow them to observe work in
progress.
Reason - In the interest of protecting archaeological
interest within the site.
8.  A noise assessment shall be submitted to demonstrate
acceptable internal noise levels of 35 dB within all
dwellings taking into account mitigation from any acoustic
barriers or other such mitigation proposed.
Reason - In the interests of residential amenity.
9.  Prior to the commencement of development of each
phase an updated Construction Environmental
Management Plan (CEMP), including a Dust
Management Plan, must be submitted for the approval of
the Council as Planning Authority.  The measures
outlined in the updated CEMP shall be adhered to at all
times during the construction period.
Reason - In the interests of protecting environmental
quality (including private water supplies) and biodiversity;

Page 5

to ensure no adverse impact on the River Tay and its
Special Area of Conservation designation.
10.  The times of construction are limited to Monday to Friday
07.00 to 19.00, Saturday 08.00 to 13.00 with no noise
generating work on a Sunday.
Reason - In the interests of residential amenity.
Rail Safety
11.  The applicant must provide a suitable trespass proof
fence of at least 1.8 metres in height adjacent to Network
Rail's boundary and provision for the fence's future
maintenance and renewal should be made.  Details of the
proposed fencing shall be submitted to the Council as
Planning Authority for written approval before
development is commenced and the development shall
be carried out in full accordance with such approved
details.
Reason - In the interests of public safety and the
protection of Network Rail infrastructure.
12.  All surface or foul water arising from the development
must be collected and diverted away from Network Rail
Property. Any Sustainable Urban Drainage Scheme shall
not be sited within 10 metres of the railway boundary and
should be designed with long term maintenance plans
which meet the needs of the development.  Details of the
design and construction of any drainage scheme shall be
submitted to the Council as Planning Authority for written
approval before development is commenced.  The
development shall be carried out in full accordance with
such approved details.
Reason - To protect the stability of the adjacent railway
cutting and the safety of the rail network.
Trees and Biodiversity
13.  A detailed Protected Species Survey, including breeding
birds and ecological surveys, shall be submitted as part
of any application for approval of Matters Specified by
Condition.  The surveys shall include appropriate
mitigation to protect identified species.
Reason - In the interest of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
14.  The conclusions and recommended action points within
the hereby approved supporting Environmental Impact
Assessment (EIA) shall be fully adhered to, respected
and undertaken as part of the construction phase of
development.  No development shall commence unless a
site specific Site Biodiversity Action Plan has been
submitted to and approved in writing by the planning
authority.  Thereafter, the approved scheme shall be
implemented in complete accordance with the approved
details.

Page 6

Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species.
15.  No site clearance or removal of vegetation, including
trees and shrubs will take place between 1st March and
31st August inclusive unless a competent ecologist has
undertaken a careful and detailed check of vegetation for
active birds' nests immediately before the vegetation is to
be cleared and provided written confirmation that no birds
will be harmed and/or that there are appropriate
measures in place to protect nesting birds on site.  Any
such written confirmation must be submitted to the
planning authority prior to commencement of works.
Reason: In the interest of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
16.  A scheme detailing measures to protect animals from
being trapped in open excavations and/or pipe and
culverts shall be submitted for the written approval of the
Council as Planning Authority.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.  Thereafter, the approved
scheme shall be implemented for the duration of the
construction works of the development hereby approved.
Reason - In order to prevent animals from being trapped
within any open
excavations.
17.  No work shall start on the relevant parts of the site unless
the trees to be retained, as identified in the submitted
surveys, have been protected by suitable fencing in
accordance with BS5837 2012 (Trees in Relation to
Construction).  The details of the protective fencing and
its location shall be first submitted to and agreed in
writing by the Council as Planning Authority.
Reason - to ensure adequate protection for the trees on
the site during the construction, in the interests of the
visual amenity of the area.
18. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved
as part of this permission.  The updated survey shall
include all trees and structures within and around the
application site and shall be submitted to the Council as
Planning Authority for written agreement and works shall
not commence until after such written agreement has
been issued by the Council.

Page 7

Reason - In the interests of protecting environmental
quality and of biodiversity.
19. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
20. Prior to commencement of development, the applicant
shall submit a bespoke Arboricultural Impact Assessment
which will identify the main development constraints on
the application site in respect of trees identified for
retention, including, the proximity of utilities, drainage
infrastructure, structures, and changes in ground levels,
which may impact the root protection areas of trees and
above ground tree parts.  The AIA must identify trees
being retained and removed at the site, provide details of
this impact, inform the construction methodology
(Construction Method Statement), and identify
appropriate measures of tree protection, remedial
arboricultural & woodland improvement works, and
mitigation planting
Reason - In the interests of tree protection and to ensure
appropriate mitigation measures are identified and
implemented.
Roads and Access
21.  The maximum number of dwellings permitted via this
application to be occupied by 2029 is 59 dwellings.
Furthermore, no more than 88 dwellings, as may be
approved by Matters Specified in Conditions
application(s), shall be occupied in advance of a scheme
for new transport infrastructure solutions to distribute
and/or reduce traffic from further development via
transport networks, has been submitted to and agreed in
writing by the Council as Planning Authority, in
consultation with Transport Scotland as the trunk roads
authority.  The solution may be a vehicular connection to

Page 8

the Cross Tay Link Road (CTLR) or an alternative
measure.  The submitted scheme shall be supported by a
new Transport Assessment (TA) with traffic modelling
informed using observed traffic generation data from a
minimum of 250 occupied residential units across the
wider MU27 site and include the timing for the delivery for
the infrastructure improvements.
Reason - In compliance with the allocation MU27 of the
Perth and Kinross Local Development Plan 2 (2019); in
the interests of local and trunk road traffic safety; and
enhancing connectivity and integration with Luncarty and
the wider area, all in the interests of good placemaking.
22. Details of the lighting within the site shall be submitted for
the approval of the Council as Planning Authority, in
consultation with Transport Scotland, as the Trunk Roads
Authority.  Thereafter, the development shall be
completed in accordance with the approved scheme. 
Reason: To ensure that there will be no distraction or
dazzle to drivers on the trunk road and that the safety of
the traffic on the trunk road will not be diminished.  
23.  There shall be no drainage connections to the trunk road
drainage system.
Reason: To ensure that the efficiency of the existing
drainage network is not affected.
24. An updated District Heating Feasibility Study for the
whole site shall be submitted to, and for the written
approval of the Council as Planning Authority to assess
the technical feasibility and financial viability of heat
network/district heating for this site, identifying all
available sources of heat (either within the site or offsite)
and other factors such as where land will be safeguarded
for future district heating infrastructure.
The accompanying Design and Access Statement or
other documents as agreed by the Council should
show/demonstrate how the findings of the feasibility study
has been incorporated into the finalised design and layout
of the proposal.
Reason - To identify future district heating opportunities
for the development.
25.  Prior to the commencement of works on the
development, the applicant shall submit for the written
approval of the Council as Planning Authority a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a)  restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;

Page 9

c)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
d)  emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
e)  arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
f)  arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
g)  arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
h)  details of information signs to inform other road
users of construction traffic;
i) arrangements to ensure that access for emergency
service vehicles are not impeded;
j)  monitoring, reporting and implementation
arrangements; and
k)  arrangements for dealing with non-compliance.
The TMS as approved shall be strictly adhered to during
the entire site construction programme all to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of road safety.
26.  Prior to the commencement of development mitigation
measures for the full length of Scarth Road are to be
submitted and agreed to the satisfaction of the Council as
Planning Authority to accommodate additional traffic
generation, and thereafter implemented in full.
Reason - In the interests of road safety and residential
amenity.
27.  No part of the development shall be occupied until a
comprehensive Green Travel Plan (GTP) that sets out
proposals for reducing dependency on the private car,
and associated Public Transport Plan (PTP) have been
submitted and approved in writing by the Council as
Planning Authority, after consultation with Transport
Scotland. The GTP and PTP will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided (including the provision of new and/or enhanced
public transport services), the system of management,
monitoring, review, reporting and the duration of the plan.
Reason - to be consistent with PAN 75 Planning for
Transport.
Drainage and Flooding
28.  As part of an application for the Approval of Matters
Specified in Condition, full drainage calculations and the
final layout and depth of the proposed SUDS ponds and

Page 10

associated infrastructure to be agreed in writing with the
Council as Planning Authority, in consultation with Perth
and Kinross Council Flooding Team.  The agreed detail
shall thereafter be implemented prior to the completion of
development.
Reason - In the interests of best practice surface water
management; to avoid undue risks to public safety and
flood risk.
Contaminated Land
29.  Prior to the commencement of works on site, an
evaluation for the potential of the site to be affected by
contamination by a previous use should be undertaken
and as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) will be submitted for consideration
by the Council as Planning Authority.  If after the
preliminary risk assessment identifies the need for further
assessment, an intrusive investigation should be
undertaken to identify; 
a) the nature, extent and type(s) of contamination on
the site 
b)  measures to treat/remove contamination to ensure
the site is fit for the use
c)  proposed measures to deal with contamination
during construction works 
d)  condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the agreed measures to decontaminate
the site shall be fully implemented as approved by the
Council as Planning Authority.  Validation that the
scheme has been fully implemented must also be
submitted to the Council as Planning Authority.
Reason - In order to deal with any potential ground
contamination. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
Consent shall not be issued until the Section 75 Agreement has
been completed, signed and registered to take account of this
application.  The legal agreement should be concluded and
completed within 4 months of the date of any Committee
approval.  Failure to conclude a legal agreement within 4
months will result in the planning application being re-assessed
and could be ultimately recommended for refusal under
delegated powers.

Page 11

Informatives
1.  The applicant is advised that to enable some of the
negative suspensive conditions to be fulfilled works which
are operational development may have to be undertaken
out with the application site.  These works themselves
may require the submission of a planning application.
2.  The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
3.  The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council as Roads Authority Road Construction
Consent (RCC) to construct a new road prior to the
commencement of roadworks.  Advice on the disposal of
surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable
for the processing of RCC applications.
4.  The applicants are advised that they must apply to the
Roads Authority for construction consent to form a new
street.  Please contact The Construction and
Maintenance Manager, The Environment Service, Perth
and Kinross Council, Pullar House, Perth.
5.  The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water’s assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
6.  The applicant is advised that the works may need a
license under the Water (Controlled Activities)
Regulations 2005 (CAR). The applicant should contact
SEPA's Perth Environmental Protection and Improvement
Team (Tel: 01738 627989) in regard to this.  The
applicant should ensure that all works on site comply with
the best practice guidelines laid out in SEPA's published
Pollution Prevention Guidance, found at www.sepa.org.uk 
7.  The Council's Community Waste Adviser in the
Environment Service should be contacted to clarify the
bin storage and recycling requirements for the
development.
8.  The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended, it is an offence to
remove, damage or destroy the nest of any wild birds

Page 12

while that nest is in use or being built.  Planning consent
for a development does not provide a defence against
prosecution under this act.
9.  The applicant is reminded that, should any protected
species be present a licence may be required from
NatureScot to disturb a protected species.  Failure to
obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-
compliance.
10.  The Council shall be immediately notified in writing if any
ground contamination is found during construction of the
development, and thereafter a scheme to deal with the
contamination shall be submitted to, and agreed in writing
by, the Council as Planning Authority.
11.  The applicant should be aware that any proposal for
noise or vibration sensitive use adjacent to the railway
may result in neighbour issues arising.  Every endeavour
should be made by the applicant in relation to adequate
protection of the uses contained within the site.
12.  The proximity and type of planting proposed are
important when considering a landscaping scheme.  Leaf
fall in particular can greatly impact upon the reliability of
the railway in certain seasons.  Network Rail can provide
details of planting recommendations for neighbours.
13.  Where trees/shrubs are to be planted adjacent to the
railway boundary these should be positioned at a
minimum distance from the boundary which is greater
than their predicted mature height.  Certain broad leaf
deciduous species should not be planted adjacent to the
railway boundary.
14.  Buildings should be situated at least 2 metres from
Network Rail's boundary.  The applicant must ensure that
the construction and subsequent maintenance of
proposed buildings can be carried out without adversely
affecting the safety of, or encroaching upon, Network
Rail's adjacent land.
15.  Construction works must be undertaken in a safe manner
which does not disturb the operation of the neighbouring
railway.  Applicants must be aware of any embankments
and supporting structures which are in close proximity to
their development.
16.  Details of all changes in ground levels, laying of
foundations, and operation of mechanical plant in
proximity to the rail line must be submitted to Network
Rail's Asset Protection Engineer for approval prior to
works commencing on site.  Where any works cannot be
carried out in a "fail-safe" manner, it will be necessary to
restrict those works to periods when the railway is closed
to rail traffic i.e. by a "possession" which must be booked
via Network Rail's Asset Protection Engineer and are
subject to a minimum prior notice period for booking of 20
weeks.

Page 13

17.  The developer is advised to contact Sophie Nicol,
Archaeologist to discuss terms of reference for work
required Tel 01738 477027.
18.  For guidance on cycle paths please see Sustrans Design
Manual Handbook for cycle-friendly design (drawings on
P21-22).
19.  Please consult the Street Naming and Numbering Officer,
The Environment Service, Perth and Kinross Council,
Pullar House, 35 Kinnoull Street, Perth PH1 5GD.
20.  Any structures & all walls/embankments that act singly or
together to support a carriageway or footpath & retain
over 1.5m fill will require Technical Approval.
21.  The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
22.  This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of
the site of the development
• Readily visible to the public
• Printed on durable material.
23.  The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
24. If there is any proposal to alter a route of an existing core
path or right of way a further legal procedure is required. 
The granting of planning permission does not stop the
continued right of public access along the existing core
path or right of way. An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an
amendment of the Core Path Plan under the Land
Reform (Scotland) Act 2003 should be sought. 
(ii) 24/00200/FLM - Extension to battery energy storage system
facility comprising 144 additional battery units (49.9MW)
and associated works, land 130 metres south east of
Coupar Angus Substation, Pleasance Road, Coupar Angus
(Report No. 24/244) 
Mr S Galloway, objector, followed by Ms S Thomas, agent on
behalf of the applicant (via telephone) and Mr I Kanellopoulos,

Page 14

applicant (via telephone), addressed the Committee and
answered Members questions. 
HAVING LEFT THE MEETING DURING CONSIDERATION OF THIS ITEM
COUNCILLOR K ALLAN DID NOT TAKE PART IN THE DECISION. 
Motion (Bailie M Williamson and Councillor D Illingworth) 
Grant, subject to the following terms, conditions and
informatives: 
Conditions
General
1. The proposed development must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed on
the planning consent.
Reason - To ensure that the development is carried out in
accordance with the approved plans.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
Flooding and Drainage
3. Prior to the commencement of development, a Flood
Action Plan shall be prepared for the site and submitted
for the agreement in writing of the Planning Authority in
consultation with the Council’s Structures and Flooding
Team.  This should detail access and egress
arrangements during a flooding event.  Thereafter, the
agreed Plan shall be implemented in full prior to the
bringing into use of the development. 
Reason - In order to take full account of the flood risk of
the site.
4. The measures identified in the Flood Risk Assessment
(document 28 hereby approved) to prevent flooding of the
site, approved as part of this permission, shall be fully
implemented.  Verification that the scheme has been fully
implemented must be submitted to the Council as
Planning Authority prior to completion or the bringing into
use of any part of the development, whichever is the
earlier.
Reason - In order to take full account of the flood risk of
the site.
5. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of a suitable
Sustainable Urban Drainage System to meet the
requirements of best management practices.  Details to

Page 15

be approved in writing by the Council, as Planning
Authority and, thereafter, implemented in full.
Reason - To ensure the provision of effective drainage for
the site.
6. For the avoidance of doubt, parts of the site are located
within the 1/200 (0.5% AEP) flood extent, with a medium
to high risk of flooding.  Such areas must not be raised
above existing ground levels.  This applies to the entirety
of the site as identified by the red line shown in drawing
01 hereby approved, titled 'Site Location Plan’.
Reason - To ensure no displacement of floodwater to the
rest of floodplain.
Roads and Access 
7. The Construction Traffic Management Scheme
(document 21 hereby approved) shall be strictly adhered
to during the entire site construction programme all to the
satisfaction of the Council as Planning Authority.
Reason - In the interest of proper site management.
Amenity
9. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
10. Noise from the battery storage facility shall not exceed
33dB LAeq,(15 min), including any relevant penalties for
tonality, impulsivity, intermittency, or other sound
characteristics, when measured at any residential
property in accordance with BS4142 – Method for Rating
Industrial Noise Affecting Mixed Residential and Industrial
Areas.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
11. In the event, that justified complaints for noise are
received by the Council, the applicant at their own
expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from
the development.  The appointed consultant and
methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning
Authority in consultation with Environmental Health within
28 days of being notified of the complaint.  Within 28 days
of approval of appointed consultant and methodology, a
Noise Assessment shall be submitted for approval
outlining mitigation and recommended timescales for
delivery.  Thereafter, all mitigation measures shall be
implemented within the timescales recommended.

Page 16

Reason - In order to safeguard the neighbouring
residential amenity in the area.
12. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land. 
Reason - In order to safeguard the neighbouring
residential amenity in the area.
13. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality
during the construction period.
14.  The acoustic fence hereby approved as part of planning
permission 22/00195/FLM (documents 37, 38, 39 and 40
relate) must be installed prior to the installation of the new
battery units hereby approved becoming operational.
Thereafter, the fence shall be maintained in a reasonable
condition for the life of the development. 
Reason - In the interests of protecting residential amenity. 
Biodiversity and Natural Environment
15. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 33 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
16. An Updated ecology survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey
shall be submitted to the Council as Planning Authority
for written agreement and works shall not commence until
after such written agreement has been issued by the
Council. For the avoidance of doubt, any
recommendations made within any updated ecology
survey approved shall be adhered to in full. 
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
17. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, five bat boxes,
five bird boxes and log piles shall be provided in line with
recommendations in the supporting biodiversity survey
submitted and hereby approved.  Thereafter, the agreed

Page 17

scheme shall be maintained in a reasonable condition for
the life of the development, to the satisfaction of the
Council as Planning Authority.
Reason - To increase the number of bat and bird boxes
to ensure significant biodiversity enhancement.
18. No removal of hedgerows, trees or shrubs that may be
used by breeding birds shall take place between 1st
March and 31st August inclusive, unless a competent
ecologist has undertaken a careful, detailed check of
vegetation for active birds’ nests immediately before the
vegetation is cleared and provided written confirmation
that no birds will be harmed and/or that there are
appropriate measures in place to protect nesting bird
interests on site.  Any such written confirmation should be
submitted in advance to the local Planning Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
19.  Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.
Landscaping
20. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme, as agreed and
implemented, shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.

Page 18

Reason - In the interest of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
21.  The soil management plan approved as part of planning
permission 22/00195/FLM (document 41) shall be
adhered to in full as part of the site development.
Reason - In order to ensure proper soil management. 
Facility Lifespan
22.  In the event the hereby approved development fails to
store electricity on a commercial basis for a continuous
period of 12 months, then it shall be deemed to have
permanently ceased to be required.  In such an event the
development shall be decommissioned and the relevant
parts of the site reinstated within such timescale as
agreed in writing by the Council as Planning Authority.
Reason - To ensure the facility is removed from the site
at the end of its operational life, and to protect the
character of the countryside, the visual amenity of the
area and nature conservation interests.
External Finishing Colour
23.  Prior to the commencement of the development hereby
approved, details of the recessive, natural colour of the
proposed external finishing materials to be used for the
hereby approved fence and other structures (i.e. auxiliary
generator, battery pack racks, battery storage substation,
client substation invertor and LV Room, etc.) shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country

Page 19

Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended, it is an offence to
remove, damage or destroy the nest of any wild birds
while that nest is in use or being built.  Planning consent
for a development does not provide a defence against
prosecution under this act.
5. The applicant is reminded that, should any protected
species be present a licence may be required from
NatureScot to disturb a protected species.  Failure to
obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-
compliance.
6. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  According to
Regulation 41 the notice must be:
•  Displayed in a prominent place at or in the vicinity of
the site of the development.
•  Readily visible to the public.
•  Printed on durable material.
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
8. National Gas Transmission should be consulted during the
design phase and that an Earthing Report is submitted for
review, and to ensure that the pipeline is not affected.
9. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.

Page 20

10. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
11. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk 
Amendment (Councillors I James and B Brawn) 
Refuse, on the basis the proposal is contrary to National
Planning Framework 4 Policy 11 e) i Energy and Policy 23 e)
Health and Safety, and Perth and Kinross Local Development
Plan 2 (2019) Policy 56 Noise, as it has not been demonstrated
that there will not be a significant adverse impact on residential
amenity of the local community, mainly due to the impact of
noise. 
In terms of Standing Order 21.5 a roll call vote was taken. 
7 members voted for the Motion as follows:
Bailie R Brock, Councillors K Harvey, D Illingworth, I Massie, G
Stewart, R Watters and Bailie M Williamson. 
3 members voted for the Amendment as follows:
Councillors B Brawn, I James and Bailie C McLaren. 
Resolved:
In accordance with the Motion. 
THE COMMITTEE TOOK A 10 MINUTE RECESS. 
(2) Local Application 
(i) 24/00368/FLL - Siting of 22 holiday accommodation units,
change of use and alterations to storage building to form
event space, formation of vehicular access, outdoor seating
area and associated works, Murrayshall House Hotel,
Murrayshall, Perth, PH2 7PH (Report No. 24/245) 
Mrs M Elphinstone and Mr M Butler, objectors to the application,
Mr J Wall, agent on behalf of the applicant and Mr G Silcock, on
behalf of the applicant, addressed the Committee and answered
Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives:

Page 21

Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i) details of information signs to inform other road
users of construction traffic;
j) arrangements to ensure that access for emergency
service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;

Page 22

l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) monitoring, reporting and implementation
arrangements; 
n) arrangements for dealing with non-compliance; and
o) details of HGV movements to and from the site.  
The TMS as approved, shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
4. Prior to commencement of any development on site, a
detailed design showing the signage for the development
shall be provided with the following schemes being
designed:
a) directional signage to be added to the public road
network to direct customers to the development site
entrance along the preferred routes as discussed in
the Transport Statement;
b) directional signage to be removed from the public
road network to encourage customers to use the
preferred route detailed as discussed in the
Transport Statement;
c) passing place signage along the U84 and U85 from
the A94 to the development site entrance from the
public road network; and
d) car parking signage on the development site for a
minimum of 12 car parking spaces intended for the
holiday accommodation units.
Shall be submitted to, and approved in writing by, the
Council as Planning Authority. The submission will
confirm the location of the signage, specification and
detailed design. The scheme for the approved shall
thereafter be implemented in full, prior to the
development hereby approved being completed or
brought into use.
Reason - In the interests of road safety and to direct
customers of development site along the preferred route.
5. No part of the development shall be occupied until a
Travel Plan, aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transport
Planning.  The Travel Plan will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided along with the system of management,
monitoring, review, reporting and the duration of the plan.
Reason - To promote sustainable transport options and to
meet advice within National Planning Framework on
transport.
6. Prior to commencement of any development on site, a
detailed design for a minimum of four passing places
shall be submitted and approved in writing by the

Page 23

planning Authority in consultation with the Roads
Authority for the following locations:
• Passing Place 3 – Unmade layby at 227m as detailed
in the Transport Statement in Appendix G – Passing
Place Plan (SK005); and
• Passing places 7 – Field entry on right at 1090 m as
detailed in the Transport Statement in Appendix G –
Passing Place Plan (SK005); and 
• Plus, a minimum of two further passing places
between the west entrance to Murrayshall House
Hotel at approximately 2.5km from the A94 and the
east entrance to Murrayshall House Hotel at
approximately 3km from the A94
The passing places shall be provided with a minimum
carriageway width of 5.5 metres, for a minimum length of
11 metres with 30-degree tapers and surfaced in
accordance with the Perth & Kinross Council's Road
Development Guide at the agreed locations. The passing
places, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority and be constructed
and operational in advance of any further works being
undertaken on site. Once provided, the passing places
shall thereafter be permanently retained as such.
Reason - To ensure the existing road network can
accommodate the traffic likely to be associated with the
proposed development in the interests of road safety.
7. Prior to the commencement of the development, details
of the permeable access track will be submitted for the
approval of the Council as Planning Authority. 
Thereafter, the track shall be implemented in line with the
approved details and maintained in perpetuity.
Reason – To ensure the site is adequately drained and
the protection of tree root areas.
8. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
9. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In order to safeguard the neighbouring
residential amenity in the area.

Page 24

10. The conclusions and recommended action points within
the supporting Ecological Impact Assessment,
Biodiversity Plan and Invasive Non-Native Species
Management Plan submitted and hereby approved
(drawing numbers 33, 34 and 35 relate) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and biodiversity.
11. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason - In the interests of protecting environmental
quality and biodiversity.
12. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction. Protection
measures, once in place, shall remain in place for the
duration of construction.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
13. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.

Page 25

Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this
application. The legal agreement should be concluded and
completed within 4 months of the date of any Committee
approval. Failure to conclude a legal agreement within 4 months
will result in the planning application being re-assessed through
failing to comply with the associated developer contributions
policy and may be ultimately recommended for refusal under
delegated powers.  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith. 
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith. 
3. Part of the approved development includes 'caravans'.
The developer is advised that caravans require to be
licensed under the terms of Section 1 of the Caravan
Sites and Control of Development Act 1960 and therefore
a licence application should be made to Environmental
Health.  Application forms are available at
https://www.pkc.gov.uk/article/15600/Licence-caravan-
site
4. The planning permission decision notice shall not be
issued until such time as the required Developer
Contributions have been secured or paid in full.  
In the event the applicant does not either make the
required payment within 28 days from the date the
agent/applicant is advised of the need for the
contributions, or complete a legal agreement for delayed
payment within a 4 month period from the date the
agent/applicant is advised of the need for the
contributions the application may be refused under
delegated powers without any further discussion with the
applicant.
5. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original

Page 26

application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
6. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
7. The presence of protected species, and the extent to
which they could be affected by the proposed
development, should be established before works
commence.  Should protected species be identified within
the site the developer should ensure that all appropriate
measures required to comply with the relevant legislation
are carried out.
8. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (Section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act 
THE COMMITTEE TOOK A ONE HOUR RECESS AT THIS POINT. 
COUNCILLOR D ILLINGWORTH LEFT THE MEETING AT THIS POINT. 
THE MEETING RECOMMENCED AT 1.20PM 
(ii) 23/00852/FLL - Erection of 9 dwellinghouses and 29 flats in
2 blocks, formation of vehicular access, parking areas,
landscaping and associated works, land 60 metres east of
Scotmid, Hatton Road, Rattray, Blairgowrie (Report No.
24/246) 
Mr G Reddick, objector to the application (via telephone),
addressed the Committee and answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives:

Page 27

Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The dwellinghouses hereby approved shall be used for
the purposes of affordable housing as defined in Perth &
Kinross Council's Developer Contributions and Affordable
Housing Supplementary Guidance 2023.
Reason – To comply with the Perth & Kinross Council's
Developer Contributions and Affordable Housing
Supplementary Guidance 2023.
4. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays. 
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality
during the construction period. 
5. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
6. Prior to the commencement of development hereby
approved, a scheme shall be submitted to, and approved
in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon
emissions reduction set by the Scottish Buildings
Standards will be met through the installation and
operation of low and zero-carbon technologies.  This
scheme shall detail the following: 
a)  the technology types; 
b)  illustrate, through technical calculations, that these
will meet at least the 10% reduction;

Page 28

c)  their siting and location; and 
d)  ongoing operation and maintenance. 
Once approved, the development shall be completed in
accordance with the approved scheme. 
Reason: In order to comply with Policy 32 of the adopted
Perth and Kinross Local Development Plan 2 (2019).
7. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.   The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.   The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.   The scheme as agreed and
implemented shall thereafter be maintained, with any
planting which fails to become established within five
years being replaced in the following planting season with
others of a size and species as previously approved.  
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme. 
8. Prior to the commencement of the development hereby
approved, a detailed plan indicating location, quantity,
specification, and maintenance requirements for
biodiversity enhancement measures including bat
boxes/bricks, swift boxes/bricks, provision of hedgehog
highways and wildlife kerbs and native tree and/or
hedgerow planting for the site shall be submitted for the
further written agreement of the Council as Planning
Authority.  The agreed scheme shall be implemented
prior to the bringing into use or completion of the
development, whichever is the earlier, and thereafter
maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
9. No site clearance or removal of vegetation, including
trees and shrubs will take place between 1st March and
31st August inclusive unless a competent ecologist has
undertaken a careful and detailed check of vegetation for
active birds' nests immediately before the vegetation is to
be cleared and provided written confirmation that no birds
will be harmed and/or that there are appropriate

Page 29

measures in place to protect nesting birds on site.  Any
such written confirmation must be submitted to the
planning authority prior to commencement of works. 
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981). 
10. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.
11. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document(s) 15 relates) shall be fully adhered
to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
12. Prior to the occupation of the development or any phase
of the development, whichever is the sooner, a landscape
management plan, including long term design objectives,
management responsibilities and maintenance schedules
for all landscape areas (other than small privately-owned
domestic gardens) shall be submitted to and agreed in
writing by the Council as Planning Authority, for its
approved use.  The landscape management plan as
agreed shall, where appropriate, include phased
implementation concurrent with the development and
shall be fully implemented to the satisfaction of the
Council as Planning Authority. 
Reason - To ensure adequate protection for the trees on
the site during the construction, in the interests of the
visual amenity of the area. 
13. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:

Page 30

(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds; 
(m)  the provision and installation of traffic counters at the
developer 's expense at locations to be agreed prior
to the commencement of construction; 
(n)  monitoring, reporting and implementation
arrangements;  
(o)  arrangements for dealing with non-compliance; and 
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during
the entire site construction programme. 
Reason - In the interest of proper site management.
14. Prior to commencement of any development on site, the
street lighting design must be submitted for the further
written agreement of the Council as Planning Authority, in
consultation with Perth & Kinross Council’s Street
Lighting Partnership for the public road network.  The
scheme shall include details of light spill, brightness of
the lighting and the proposed hours of operation for both
the public road network and the private areas.  The

Page 31

agreed lighting scheme shall be implemented and
maintained in full accordance with the agreed scheme.
Reason - In the interests of road safety.
15.  Prior to commencement of any development on site, a
detailed design of the Roads Drainage system shall be
submitted and approved in writing by the Planning
Authority in consultation with the Roads Authority, taking
into account the requirement to ensure that the water
from the public road network does not utilise any part of
the private system proposed.  The Roads Drainage as
approved in writing, shall be implemented in accordance
with the approved details to the satisfaction of the Council
as Planning Authority and undertaken prior to the
development being completed or brought into use.
Reason - In the interests of ensuring an acceptable
standard of construction within the public road boundary
16. Prior to the occupation of the first dwellinghouse, the
developer shall provide a 3 bay bus shelter at Ferguson
Park Road (NaPTAN: 73726575) with a 24/7 electrical
power supply to facilitate internal LED lighting and an
RTPI screen.  
The 3 bay cantilever bus shelter shall be supplied and
installed with passenger information board, LED
spotlights (one per bay), a 28in Ultra-Wide Display
Screen for Real Time Passenger Information installed on
the approach side of the shelter and a 24/7 electrical
power supply to a Haldo pillar adjacent to the shelter to
provide power for the LED lighting and Real Time
Passenger Information display.  The design and
specification shall be to the satisfaction of the Council as
Planning Authority, in consultation with Perth & Kinross
Council’s Public Transport Unit.
Reason - In the interest of sustainable travel.
17. Prior to the development hereby approved being
completed or brought into use, the footpath marked
pedestrian link adjacent to the SUDS/Open Space at the
eats site boundary plan no 30 shall be constructed and
linked to the footpath on the opposite side of the wall.
Reason - In the interests of providing a vital link to wider
Rattray and the children’s play park.
18. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays. 
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality
during the construction period. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.

Page 32

Procedural Notes
Permission shall not to be issued until it has been confirmed if a
Section 75 Agreement is required.
If required, the decision shall not be issues until the legal
agreement has been signed and registered to take account of
this application.  The legal agreement should be concluded and
completed within 4 months of the date of any Committee
approval.  Failure to conclude a legal agreement within 4
months will result in the planning application being re-assessed
through failing to comply with the associated developer
contributions policy and may be ultimately recommended for
refusal under delegated powers. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
4. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.

Page 33

5. No work shall be commenced until an application for
building warrant has been submitted and approved.
6. Refuse collection vehicles will only enter the site during
development where there is clear access, adequate
turning, and a suitable road surface with no raised
ironworks.  This means that Waste Services may not be
able to provide a full kerbside recycling service to
residents whilst the build is ongoing, and bins may have
to be emptied from a collection point, specified by the
area Community Waste Adviser, until full access is made
available for refuse collection vehicles.  The developer
must contact the Community Waste Team to discuss bin
collections as the site progresses.
7. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. 
Further information can be found at:
https://www.pkc.gov.uk/binrequests
8. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks. 
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.  Please note
that a fee is chargeable for the processing of RCC
applications.
9. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
10. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits. 
(iii)  23/01164/FLL - Erection of café (Class 3) with drive thru
facilities, installation of electric vehicle charging points,
landscaping and associated works, land 40 metres north
west of Aldi, Broich Road, Crieff (Report No. 24/247) 
Mr H Rankin, on behalf of the applicant, addressed the
Committee and answered Members questions.

Page 34

Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
4. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
5. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
6. Prior to the operation and/or use of the development
hereby approved, whichever is the earliest, an acoustic
imperforate barrier rising to a total height of 3.2 metres
above ground level with the top 1 metre cranked at a 45

Page 35

degrees towards the drive-thru roadway with a minimum
superficial mass of 12kg/m2 shall be installed in
accordance with Appendix B site plan layout of the
"Starbuck Crieff Noise Impact Assessment" dated 24 May
2024 (doc ref: 21) and the associated drawings (doc
ref:12, 13 and 14).  The acoustic barrier shall be retained
and maintained for the lifetime of the development.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
7. Servicing of and deliveries to the premises shall be
carried out between 0700 and 1900 Monday to Saturday
only, with no servicing or deliveries permitted on
Sundays.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
8. All delivery vehicle engines shall be turned off during the
unloading period of any delivery to the premises.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
9. The hours of operations shall be restricted to 0700 hours
to 2100 hours daily.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
10. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
11. Prior to the development hereby approved being
completed or brought into use, an effective ventilation
system commensurate with the nature and scale of
cooking to be undertaken shall be installed and operated
such that cooking odours are not exhausted into or
escape into any neighbouring buildings.  Thereafter the
system shall be maintained.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
12. Prior to the commencement of any development a
Construction Dust Management Plan (CDMP) shall be
submitted to and subsequently approved in writing by the
Planning Authority.  The CDMP shall include procedures
and mitigation measures for the control of dust to prevent
or minimise the release of dust during any stages of the
construction period of the development.  The construction
of the development shall proceed in strict accordance
with the CDMP.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.

Page 36

13. In the event that justified complaints for noise are
received by the Council, the applicant at their own
expense, shall employ a consultant to carry out an
assessment of noise from the development, with the
appointment and methodology to be approved in writing
by the Planning Authority.  Thereafter the
recommendations/mitigation measures along with
timescales for implementation which result from this
assessment shall be incorporated into a Noise
Management Plan (NMP).  The NMP shall be submitted
to the Planning Authority within 28 days of the
assessment and requires to be approved in writing by the
Planning Authority.  All operations shall proceed in
accordance with the approved NMP.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
14. Prior to commencement of any development on site, a
detailed design for the proposed secure covered cycle
parking facility for a minimum of 6 cycles shall be
submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority.  The
cycle parking, as approved in writing, shall be
implemented in accordance with the approved details to
the satisfaction of the Council as Planning Authority prior
to the development being brought into use.
Reason - To encourage active travel and meet advice
within Scottish Planning Policy on transport.
15. The car parking layout, as approved in drawing 15, shall
be implemented in accordance with the approved details
to the satisfaction of the Council as Planning Authority
prior to the development being brought into use.
Reason - To ensure adequate provision of car parking
(including disabled bays)
16. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following: 
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used; 
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events; 
(c) arrangements to allow the safe operation of the
existing car parking facilities
(d) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;

Page 37

(e) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians
and cyclists;
(f) arrangements to ensure that access for emergency
service vehicles are not impeded; and
(g) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during
the entire site construction programme. 
Reason - In the interest of proper site management. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.

Page 38

5. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
6. The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport
Scotland's Cycling by Design 2021 or similar design
guide. 
(iv)  23/01453/FLL - Change of use of agricultural land to form
dog training park (in retrospect), land north west of Elisdon,
Stanley, Perth (Report No. 24/248) 
Ms N Connelly, objector, addressed the Committee and
answered Members questions.  The Clerk read out a statement
on behalf of the applicant. 
THERE WAS A SHORT RECESS AT THIS POINT. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The hours of operations shall be restricted to 0800 hours
to 2100 hours daily, excluding a 15min set up and close
down period.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
2. The maximum number of dogs at the park at any given
time shall be 4.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
3. The Noise Management Plan agreed (plan ref 03) shall
be reviewed on a regular basis, following receipt of a
justified complaint or at the request of the planning
authority.  The Noise Management Plan as approved,
shall be fully implemented for the lifetime of the
development.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
4. In the event, that justified complaints for noise are
received by the Council, the applicant at their own
expense, shall employ a consultant to carry out an
assessment of noise from the development, with the
appointment and methodology to approved in writing by
the Planning Authority.  Thereafter
recommendations/mitigation measures along with
timescales for implementation will be incorporated into a
revised Noise Management Plan (NMP) and submitted to
the Planning Authority within 28 days of the assessment.

Page 39

Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
5. Dog waste associated with the use hereby approved shall
be properly deposed of, binned, and removed from the
site for as long as the dog training area use operates.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
6. Servicing or maintenance at the site shall be carried out
between 0800 and 1900 Monday to Friday only.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.
Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
(v) 24/00509/FLL - Erection of a dwellinghouse, land 30 metres
south of Keithleyhead, Western Road, Auchterarder (Report
No.24/249) 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. Prior to the commencement of the development hereby
approved, a details landscaping and planting scheme
shall be submitted to and approved in writing by the

Page 40

Council as Planning Authority.  The plan must include
replacement tree planting on a ratio of 1:3 and include
native, bio-diversity friendly species.  The approved
details shall be implemented in full prior to the end of the
first planting season following the first occupation of the
dwelling.  Any planting failing within the first 5 years shall
be replaced within the next available planting season on
a like for like basis. 
Reason - In order to clarify the terms of this planning
permission and to provide for bio-diversity enhancement. 
4. Prior to the commencement of the development hereby
approved, detailed drawings showing waste and recycling
facility enclosures or waste and recycling facility storage
areas and associated locations for bin presentation shall
be submitted to and approved in writing by the Council as
Planning Authority.  The dwelling shall not be occupied
until the approved details have been implemented in full.
Reason – In order to clarify the terms of this planning
permission. 
5. Prior to the first occupation of the dwelling, two bat boxes
and two bird nesting boxes shall be installed within the
curtilage of the dwelling. All the boxes shall be installed in
line with the guidance and specification of the Scottish
Wildlife Trust, and once installed shall thereafter be
retained in a useable condition. 
Reason – In order to provide biodiversity enhancement. 
6. No further trees or hedgerows shall be removed until
approved by the Council as Planning Authority.  Prior to
the commencement of the development hereby
approved, a 1:200 site plan which identifies a) all trees
and hedges to be retained and b) the Construction
Exclusion Zone (CEZ) shall be submitted to and
approved in writing by the Council as Planning Authority. 
This plan shall ensure all fencing adheres to BS 5837
2012: Trees in Relation to Design, Demolition and
Construction.  The CEZ as subsequently approved shall
be strictly adhered to during the entire duration of the
construction phase of the development.
Reason - In order to clarify the terms of this permission
and to protect the existing trees and hedges from
unnecessary damage and removal 
7. Prior to the commencement of the development hereby
approved, all trees and hedges on site and along its
boundary (other than those marked for felling via
condition 6) and those which have Root Protection Areas
which fall within the site shall be retained and protected. 
Protection methods shall be strictly in accordance with
BS 5837 2012: Trees in Relation to Design, Demolition
and Construction.  Protection measures, once in place,
shall remain in place for the entire duration of the
construction phase of the development.

Page 41

Reason - In order to protect the existing trees and hedges
from unnecessary damage and removal  
8. For the avoidance of doubt, the finished floor level of the
dwelling shall be 119.15m AOD. Prior to the
commencement of the development hereby approved,
details of the means of dealing with the excess soil as a
result of obtaining the 119.15m AOD level shall be
submitted to and approved in writing by the Council as
Planning Authority.  The approved details shall thereafter
be implemented in full. 
Reason – In order to clarify the terms of this planning
permission. 
9. Prior to the commencement of the development hereby
approved, details of the finishes of the exposed opening
in the existing stone shall be submitted to and approved
in writing by the Council as Planning Authority.  The
approved details shall thereafter be implemented in full
prior to the first occupation of the dwelling. 
Reason – In the interest of protecting the visual amenity
of the area, and the structural integrity of the boundary
wall. 
10. The asserted right of core path along Bogie Brae Lane
must not be obstructed during building works or on
completion of the development.  Any damage done to the
route and/or the associated signage during building works
must be made good before the development is completed
or brought into use, whichever is the earlier. 
Reason – In order to ensure public access rights remain
unaffected.
11. Surface water shall be managed so that no water is shed
onto neighbouring land.
Reason – In order to ensure the site is adequately
drained and there is no adverse impact on neighbouring
land. 
12. Prior to the commencement of the development hereby
approved a statement which demonstrates how at least
10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the
installation and operation of low and zero-carbon
generating technologies shall be submitted to and
approved in writing by the Council as Planning Authority.
The approved details shall be implemented in full. 
Reason – In order to comply with the Development Plan
requirements. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.

Page 42

Procedural Notes
1. The formal decision notice shall not to be issued until the
applicant has either paid the developer contributions ‘up
front’ within 28 days of this Committee approval, or
completed a Section 75 Agreement within 4 months of
the date of this Committee approval.  Failure to meet
either timeline will result in the planning application being
re-assessed, and may be ultimately recommended for
refusal under delegated powers due to failure to comply
with the Council’s SPG on Developer Contributions and
Affordable Housing (2023). 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant should be mindful of the electricity pole
east of the proposed site, on the edge of the private
access track, which is not marked on the drawings. Care
must be taken that the proposed new driveway access
does not affect this pole or its associated infrastructure. 
5. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. 
Further information can be found at:
https://www.pkc.gov.uk/binrequests 
6. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be

Page 43

assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (Section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
8. The presence of protected species, and the extent to
which they could be affected by the proposed
development, should be established before works
commence.  Should protected species be identified within
the site the developer should ensure that all appropriate
measures required to comply with the relevant legislation
are carried out. 
(vi) 24/00866/FLL - S42 application to delete condition 3
(temporary period) of permission 22/00803/FLL, Tatha View,
4 Braes of Taymouth, Kenmore, Aberfeldy, PH15 2HQ
(Report No. 24/250) 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and
documents.
2. The use hereby approved shall be limited to holiday
accommodation to the satisfaction of the council as
planning authority. The owner of the property shall, for
periods when the property is occupied as a short term let,
maintain an up-to-date register of the name and address
of a main occupier or principal contact for each party
staying in the property, the size of the party (number of
guests), and the length of stay, and shall make this
information available at all reasonable times to the
Planning Authority.
Reason - In order to clarify the terms of the permission; to
control and restrict the use of the building in the interests
of safeguarding the residential amenity of neighbouring
properties.
3. The short-term let shall be operated in accordance with
the agreed noise management plan (22/00803/05) which
shall be implemented for the life of the development.
Reason - In order to safeguard the neighbouring
residential amenity in the area.

Page 44

Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
6. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 24/00006/PAN - Formation of a 30MW Battery Energy Storage
System (BESS), formation of vehicular accesses, tracks and
associated infrastructure, land 600 metres north east of Cordon
Farm, Abernethy (Report No. 24/251) 
Councillor I James requested due consideration be given to noise
measures and appropriate access. 
Councillor D Illingworth requested due consideration be given to
additional screening to minimise visual impact, prime agricultural land,
impacts upon core paths, cumulative impact of similar nearby
developments, cabling route which is currently proposed along the
main road in Abernethy due to be resurfaced in the coming weeks.
Residents do not want to see the roads dug up for cabling after being
resurfaced. 
The contents of the Report by the Strategic Lead – Economy,
Development and Planning, were noted.