Perth and Kinross Council
Planning and Placemaking Committee – 11 September 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/244) 
PROPOSAL: Extension to battery energy storage system facility comprising
144 additional battery units (49.9MW) and associated works 
LOCATION: Land 130 Metres South East of Coupar Angus Substation,
Pleasance Road, Coupar Angus 
Ref. No: 24/00200/FLM
Ward No: P2- Strathmore 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1. The application seeks planning permission for the installation of 144 additional
batteries at the existing Coupar Angus Battery Energy Storage System (BESS)
which was consented under application 19/00513/FLM and revised under
22/00195/FLM. The proposed development is located adjacent to the existing
132kV substation and is approximately 250m south-west of the settlement
boundary of Coupar Angus. The site is largely surrounded by agricultural land
(Broad Valley Lowland) and the nearest residential properties to the site are
located approximately 330m to the northeast on Pleasance Road. Local
topography is generally level, with a slight slope up to the north. 
2. Access to the site is provided from a junction off Pleasance Road, with a section
of access track (approximately 70m in length) which links to the substation. This
track is formed on the western boundary of the site which has been implemented
as part of the previous planning permission 22/00195/FLM. This application will
increase the total number of batteries at the site from 120 to 264. The proposed
additional 144 batteries will be similar in size and scale to the existing approved
120 batteries.

Page 2

SITE HISTORY 
• 16/02230/FLL Full Planning Permission was approved on 9 March 2017 for
the erection of switch room facility and associated works
• 18/00016/PAN submitted on 6 February 2019 for the formation of an energy
storage compound including 15 battery storage units, inverters and
transformers, a substation, ancillary equipment, store, vehicular access, track
and associated works
• 19/00513/FLM Full Planning Permission was approved on 24 September
2019 for the formation of a battery storage facility, vehicular access and
associated works
• 21/00015/PAN Submitted on 18 November 2021 for the formation of battery
energy storage system with associated work and infrastructure of up to 49.9
MW
• 21/02234/SCRN On 1 February 2022 for ground mounted solar photovoltaic
array
• 22/00003/PAN application was withdrawn on 4 February 2022 for the
installation of a 49.9MW ground-mounted solar array and associated works
• 22/00195/FLM Full Planning Permission was approved on 1 June 2022 for
the formation of a battery energy storage system with associated work and
infrastructure of up to 49.9 MW
• 22/00006/PAN On 25 February 2022 for the installation of a 49.9MW ground-
mounted solar array and associated works
• 22/01285/FLM Full Planning Permission was refused on 23 February 2023
for the formation of a 49.9MW solar farm comprising ground mounted solar
arrays, inverters, transformers, a substation, security fencing, CCTV
cameras, cabling, access tracks and associated works
• 23/01294/FLM Full Planning Permission was refused on 13 December 2023
for the formation of a 49.9MW solar farm comprising ground mounted solar
arrays, inverters, transformers, a substation, security fencing, CCTV
cameras, cabling, access tracks and associated works
• 23/00014/PAN On 26 October 2023 for an extension to battery energy
storage system comprising of 144 additional battery units and associated
works
• 23/00015/PAN On 3 October 2023 for the formation of a battery energy
storage facility, including welfare and storage units, ancillary structures,
control room, switchgear room, steel enclosures containing inverters, security
and deer fencing, landscaping and associated works 
ENVIRONMENTAL IMPACT ASSESSMENT 
3. An EIA screening has been undertaken. The proposal being a Schedule 2
development in terms of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017. In the case of these regulations,
prohibition is given to the granting of planning permission to “EIA development”
unless an environmental impact assessment has been undertaken. In this case

Page 3

the Council has taken the opinion that it is not EIA development, and that
sufficient information has been submitted with the application to enable a
determination in consideration of all relevant environmental matters. These
environmental aspects requiring further consideration, are namely: noise,
landscape and visual amenity, trees and biodiversity, roads and transportation
and flood / drainage matters. 
PRE-APPLICATION CONSULTATION 
4.  Pre application Reference: Not applicable to this application.  
5.  The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009; therefore, the applicant was required to undertake formal pre-application
consultation with the local community. 
6.  Given that the Proposed Development would be classed as a major application
and as the additional 144 batteries would increase the sites capacity, a Pre-
Application Consultation (PAC) Report is submitted with the planning application. 
7.  A Proposal of Application Notice (PAN) was submitted to Perth and Kinross
Council on the 12thSeptember 2023. The PAN sets out the consultation strategy
which includes the arrangement of two in-person consultation events, which were
held two weeks apart from each other. As a result of minor design changes to the
project, the consultation dates were revised, and an updated PAN was submitted
to Perth and Kinross Council on the 27thOctober 2023. Following approval of the
updated PAN, on the 30thOctober 2023, the two in-person consultation events
were held at the Red House Hotel, Station Road, Coupar Angus, Blairgowrie,
PH13 9AL on the following dates: 
•  14 November 2023 at 16:00 till 19:00
•  28 November 2023 at 16:00 till 19:00 
8. The consultation events were advertised in the Perthshire Advertiser seven days
before each consultation event. The first consultation event was advertised on
Tuesday 7th November 2023, and the second consultation event was advertised
on Tuesday 21st November 2023. A consultation website was also set up to
allow easy access to the consultation documents and to allow residents to submit
comments should they be unable to attend the in-person consultation events.
Furthermore, Community Councils were also invited, and invitations were sent to
inform Local Ward Council Members (Strathmore Ward), providing details about
the consultation events. A leaflet drop was also undertaken on the 21st of
November 2023 to maximise the advertising for the 2nd consultation event,
which included delivery to 300 householders closest to the Coupar Angus BESS
site.

Page 4

DEVELOPMENT PLAN 
9.  The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
10. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 11: Energy
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
11. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
12.  The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33B: Renewable and Low Carbon Energy: Repowering and Extending
Existing Facilities
• Policy 35: Electricity Transmission Infrastructure

Page 5

• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Flooding
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020) 
PKC NON-STATUTORY GUIDANCE 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
NATIONAL GUIDANCE 
13. The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
14. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport

Page 6

National Roads Development Guide 2014 
15. This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
CONSULTATIONS 
16. As part of the planning application process the following bodies were consulted: 
External 
17. National Gas - Given that the application site is located within the High Risk Zone
for National Gas Transmission PLC’s apparatus, all plans and a description of the
proposals must be submitted to, and for the review of, the Asset Protection Team. 
18.  Health and Safety Executive - No objection. 
19. National Gas Transmission - No objection. However, it has been requested that
National Gas Transmission are consulted during the design phase and that an
Earthing Report is submitted for review, and to ensure that the pipeline is not
affected 
20. Dundee Airport Ltd - No objection. 
21. Perth & Kinross Council Heritage Trust - No objection. The proposed
development does not raise any significant issues. 
22. Scottish Water - No objection. All proposed developments require to submit a
Pre-Development   Enquiry (PDE) Form to be submitted directly to Scottish
Water via THE Customer Portal prior to any formal Technical Application being
submitted. This will allow Scottish Water to fully appraise the proposals. Advice
has been given regarding reporting pollution incidents and on any pollutants that
may be used in the construction and operation of the development and that may
be a risk to drinking water. 
23. SEPA - No objection. 
Internal 
24. Community Greenspace - No objection. The proposed development will not
result in a negative impact on public access, core paths or rights of way.

Page 7

25. Contaminated Land - No objection. There is no history of ground contamination
at the application site. 
26. Biodiversity - No objection. Furthermore, the previously requested Update
Ecology Assessment has been submitted and all recommendations must be
adhered to in full. A condition is recommended to ensure this. The submitted
information is in accordance with legislation, policy and guidance. 
27. Transportation and Development - No objection. Conditions are recommended
relating to the on – going Construction Traffic Management Plan, and vehicle
movements. 
28. Structures and Flooding - No objection. Conditions are recommended in
relation to a Flood Action Plan, the full implementation of the Flood Risk
Assessment and SuDS. 
29. Environmental Health – Noise / Odour - No objection. Conditions are
recommended in relation to the noise rating of all plant or equipment, noise limits
for the development, the screening of all external lighting and construction hours. 
30. Coupar Angus Community Council - Coupar Angus Community Council have
raised concerns regarding the following: 
• Flooding and emergency access.
• Noise and lack of appropriate acoustic screening.
• Traffic management during construction. 
Representations 
31. 17 representations (in the form of objections) were received. The main issues
raised within the representations are: 
• Flood Risk
• Noise
• Impact on local environment
• Visual Impact
• Inappropriate development for a rural setting
• Size and Scale
• Increase in traffic congestion
• Safety concerns
• Improper management of the existing site 
These issues are addressed in the Appraisal section of the report.

Page 8

ADDITIONAL STATEMENTS 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Noise Impact Assessment
submitted, Flood Risk
Assessment submitted,
Landscape and Visual Impact
Assessment submitted 
APPRAISAL 
32. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise. The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
33. The location is a peripheral rural area South West of Coupar Angus. Policy
considerations seeking to assess its suitability in principle are: LDP2 Policies 1A,
1B, Placemaking; Policy 8 Rural Diversification; Policy 33A and 33B Renewables
and Low Carbon Energy; Policy 50 Prime Agricultural Land; and Policy 51 Soils.
The relevant NPF4 policies are Policy 1 Tackling the Climate and Nature Crises;
Policy 2 Climate Mitigation and Adaptation; and Policy 11 Energy. Furthermore,
and of significant material consideration in the assessment of this application is
the previous approval of planning permission for the development of a battery
energy storage facility (19/00513/FLM and 22/00195/FLM). 
34. The proposal would provide essential energy balancing services to the National
grid, actively contributing towards Scotland's CO2 reduction targets, supporting
the principles of NPF4. Specifically, electricity would be drawn from the grid at
times of low demand, stored and released back as required. When demand is
higher, greater generation from non-renewable sources is required and energy
storage facilities such as that proposed could reduce reliance on non-renewable
resources, thus decreasing CO2 emissions. NPF4 sets out six overarching

Page 9

spatial principles with “Just Transition” relating to the construction of renewable
energy and their contribution to achieving net zero. The NPF4 Sustainable
Places section emphasises the link to Scotland’s Climate Change Plan and sets
the approach to achieving net zero emissions by 2045 and making significant
progress by 2030. The NPF4 also links to Scotland’s Energy Strategy and
highlights the importance of land and sea to be critical in delivering renewable
energy developments. NPF4 provides detailed policy on Climate Change and
Energy and details developer expectations to how proposed schemes will accord
with the policies set out in the document. The overarching policy intent in NPF4 is
to encourage, promote and facilitate all forms of renewable energy development
onshore and offshore. 
35. In this case, as the proposal is to expand an existing facility, it is considered that
there is no conflict with any of the relevant LDP2 or NPF4 policies. Whilst there is
a loss of prime agricultural land (identified as Class 2), the loss of land is no
greater than what has already been consented through the previous planning
permissions. This, combined with the locational need for the development close
to the existing electrical substation, in addition to any carbon offsetting potential,
outweigh those impacts on landscape values and agricultural use. Furthermore,
this substation has unconstrained capacity to import and export the electrical
energy required. 
36. Notwithstanding the above conflicts, Policy 33B of LDP2 and Policies 1, 2 and 11
of NPF4 specifically encourages low carbon energy solutions where specific grid
connection or the use of established infrastructure can occur. Therefore, on
balance, and given the site specific reasoning for the extension to the battery
storage unit, the proposed development can be supported. Furthermore,
consideration must be given to the finite lifespan of this facility. Whilst the overall
operational life will be some 50 years, minimal disturbance to the site will be
required, allowing the pre-existing land use to resume afterwards. 
Design and Layout 
37. The site currently has planning permission for 120 batteries which has been
implemented with the BESS facility now in operation. The proposed additional
144 batteries will be similar in size and scale to the existing approved 120
batteries. The proposed 144 additional batteries will be attached to both existing
and new concrete plinths (24 new plinths in total) and will connect to the existing
transformers. The dimensions are proposed to remain similar as previously
approved in 22/00195/FLM. 
38. Conditional control (condition 23) will ensure that external finishing colours are
appropriate for the area. In terms of new infrastructure, no additional
transformers are required, however, 12 additional cables are required, which will
follow the same route as the existing on-site cabling. All other features of the

Page 10

proposed development will remain the same as what has previously been
approved. 
Residential Amenity 
39. LDP2 Policy 56: Noise Pollution states that there will be a presumption against the
siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. In this
instance, a Noise Impact Assessment was submitted for the original application
(19/00513/FLM) and updated as a result of the submission of application 22/
00195/FLM. The applicant now wishes to extend the BESS by adding an
additional 144 batteries. However, there is no intention to add additional storage
compounds or associated equipment, such as inverters and transformers. It has
been confirmed that the most dominant sound source associated with
developments of this type are the inverters and as there is no intention to add
additional inverters on site. Furthermore, an extension to the existing acoustic
fence has been granted as a non – material variation, which will reduce noise
levels further. Conditional control (condition 14) will ensure the implementation of
this acoustic fence prior to the new batteries becoming operational. This being
the case, the increase in the number of batteries being proposed will only result
in a slight increase of less than one decibel in the noise levels emitting from the
development, which is considered to be acceptable. 
40. However, given an on- going compliant from a neighbour regarding noise levels
from the existing facility, further conditions have been included relating to the
enclosure of all plant and equipment (condition 9) the noise rating to which the
facility can operate (condition 10), a further noise assessment if complaints from
the public are forthcoming (condition 11),  external lighting (condition 12) and
construction working hours (condition 13). 
Landscape and Visual Amenity 
41. Perth and Kinross Council LDP2, Policy 39: Landscape states that development
and land use change should be compatible with the distinctive characteristics
and features of Perth and Kinross’s landscapes. Accordingly, development
proposals will be supported where they do not conflict with the aim of maintaining
and enhancing the landscape qualities of Perth and Kinross. 
42. An updated Landscape and Visual Appraisal (LVA) has been carried out which
builds on the Landscape and Visual Appraisal carried out in 2022. It assesses
the potential landscape impacts of the previous proposal approved under
planning permission (22/00195/FLM). This proposal seeks to increase the
capacity of the site by adding an additional 144 batteries. The updated LVA
assesses any further landscape impacts that the proposed development may
have on the immediate and wider landscape character. It has been concluded

Page 11

that, since 2022, there have been no significant changes to the landscape and
visual baseline conditions assessed under the previous LVA. 
43. Overall, the updated LVA has concluded that the proposed development would
result in no loss of, or changes to, landscape features in the immediate area of
the Coupar Angus BESS site. The increase in the number of the battery storage
racks would very slightly increase the visual impact of the BESS site on the
surrounding landscape. However, the proposed increase in visual impact will not
result in adverse visual harm to the defining features and key characteristics of
the Broad Valley Lowlands Tayside Local Character Type (LCT). The updated
LVA has reassessed the key viewpoints originally assessed under planning
permission 22/00195/FLM, to ensure that key views from sensitive receptors
remain protected. Given that the proposals do not take up any further prime
agricultural land, the extension to the existing battery storage unit is in
accordance with LDP2 Policies 50 and 51. 
44. In light of the above, and in terms of landscape and visual impact, it is considered
that the proposed extension to the battery storage unit at Coupar Angus is in
accordance with LDP2 Policies 39, 40A, and 40B, and NPF4 Policy 6. A
condition (condition 20) will ensure that further landscaping is incorporated into
the design to further minimise the landscape impact of the development. 
Roads and Access 
45. LDP2 Policy 15: Public Access states that development proposals that would
have an adverse impact upon the integrity of any (including proposed) core path,
disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted. 
46. LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. 
47. As this is a pre-existing site, there are no changes in terms of access roads, and
as such the implementation of the 144 additional battery units would not
significantly change the overall layout of the site, when compared to the previous
planning permission (22/00195/FLM). The previous consent had a condition for
the formation of the vehicle access onto the Public Road network to ensure the
formation of the vehicle access was suitable for the level of development.
However, there have been several complaints by local residents regarding the
management of the existing development site, and, in particular, non-compliance
with the approved Construction Traffic Management Scheme (CTMS). This being
the case, a condition has been included (Condition 7) to ensure that the CTMS is
strictly adhered to during the entire site construction programme. This condition

Page 12

was recommended by Transportation and Development, who have no objection
to the proposed development subject to this condition being applied. 
48. In light of the above, it is considered that the proposed extension to the battery
storage facility is in accordance with LDP2 Policies 15 and 60A, and NPF4
Policies 11 and 12. 
Drainage and Flooding 
49. LDP2 Policy 52: New Development and Flooding, states that the Council
supports the actions and objectives to avoid increased, reduce overall, and more
generally manage flood risk in alignment with SEPA Strategies and Plans. NPF4
Policy 22 states that development proposals must have regard to the water
environment, and drainage, including floodwater management, within any
proposal. 
50. The Council’s Structures and Flooding Team has submitted no objections to the
proposal but has recommended certain conditions. In terms of flooding, the
application site is located adjacent to the flood pain of the Coupar Burn.
According to NPF4 Policy 22, the development is categorised as essential
infrastructure, which can be built on flood risk areas if certain requirements are
met. The submitted Flood Risk Assessment (FRA) appears to have addressed
the policy requirements and has taken steps to mitigate against any flood risks
associated with the development. However, a condition has been included
(Condition 3) that a Flood Action Plan is submitted for the site to improve access
and egress. A further condition has been included (condition 4) to ensure that all
the measures identified in the FRA to prevent the flooding of the site, shall be
fully implemented. Full consideration must be given to the potential of any
impacts on the River Tay Special Area of Conservation. It is not considered that
any adverse concerns arise in this regard. 
51. LDP2 Policy 53C: Surface Water Drainage, requires Sustainable Urban Drainage
Systems (SUDS) measures including relevant temporary measures at the
construction phase. In order to facilitate the draining of the site, a condition
(condition 5) has been included to ensure that water drainage from all paved
surfaces shall be disposed of by means of a SUDS. 
52. In light of the above, it is considered that the proposed extension to the battery
storage facility is in accordance with LDP2 Policies 52, 53C and 60A, and NPF4
policy 22. 
Natural Heritage and Biodiversity 
53. LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected
or not. All whilst taking into account the ecosystems and natural processes in the

Page 13

area. In accordance with NPF4, development proposals for national or major
development, will only be supported where it can be demonstrated that the
proposal will conserve, restore and enhance biodiversity, including nature
networks so they are in a demonstrably better state than without intervention.
This will include future management. In light of this, a condition (condition 15)
has been included to ensure that the previously requested Updated Ecology
Assessment has been submitted and that all recommendations must be adhered
to in full. Furthermore, Condition 18 has been included to ensure that no
hedgerows and shrubs or trees that may be used by breeding birds, are removed
during the breeding season. In terms of biodiversity enhancements, NPF4
requires major planning applications to provide significant biodiversity
enhancement, that will ensure things are significantly better than before.
Enhancement must be long term, and all information must be provided
upfront. Condition 16 has been included to ensure that an updated ecological
survey is submitted. 
Two bat boxes, two bird boxes and log piles have been proposed in addition to
the measures proposed for 22/00195/FLM. A condition (condition 17) has been
included to increase the number of bat and bird boxes to ensure significant
enhancement. Therefore, the proposal is in accordance with LDP2 Policy 41 and
NPF4 Policy 5. 
54. LDP2 Policy 40: Forestry, Woodland, and Trees states that Tree Surveys,
undertaken by a suitably qualified professional, should accompany all
applications for planning permission where their sites contain trees and that there
is a presumption in favour of protecting woodland resources. In this instance,
there has been no information submitted regarding the removal of any trees.
Condition 20 has been included to ensure that landscape and planting plan is
submitted for approval 
Developer Contributions 
55. The Developer Contributions Guidance is not applicable to this application, and
therefore, no contributions are required in this instance. 
Economic Impact 
56. The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. The proposal will support local
renewable energy generation by helping balance fluctuations of intermittent
energy generation. It will assist in the creation of a national grid asset of regional
significance for the Perth and Kinross area.

Page 14

VARIATION OF APPLICATION UNDER SECTION 32A 
57. This application was not varied prior to determination, in accordance with the
terms of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.   
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
58. None required. 
DIRECTION BY SCOTTISH MINISTERS 
59. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
60. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions. 
RECOMMENDATION   
61. Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. The proposed development must be carried out in accordance with the approved
drawings and documents, unless otherwise provided for by conditions imposed
on the planning consent. 
Reason - To ensure that the development is carried out in accordance with the   
approved plans. 
2. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period.

Page 15

Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
Flooding and Drainage 
3. Prior to the commencement of development, a Flood Action Plan shall be
prepared for the site and submitted for the agreement in writing of the Planning
Authority in consultation with the Council’s Structures and Flooding Team. This
should detail access and egress arrangements during a flooding event.
Thereafter, the agreed Plan shall be implemented in full prior to the bringing into
use of the development. 
Reason - In order to take full account of the flood risk of the site. 
4. The measures identified in the Flood Risk Assessment (document 28 hereby
approved) to prevent flooding of the site, approved as part of this permission,
shall be fully implemented. Verification that the scheme has been fully
implemented must be submitted to the Council as Planning Authority prior to
completion or the bringing into use of any part of the development, whichever is
the earlier. 
Reason - In order to take full account of the flood risk of the site. 
5. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable a Sustainable Urban Drainage System to meet
the requirements of best management practices. Details to be approved by the
Council, as Planning Authority and, thereafter, implemented in full 
Reason - To ensure the provision of effective drainage for the site. 
6. For the avoidance of doubt, parts of the site are located within the 1/200 (0.5%
AEP) flood extent, with a medium to high risk of flooding. Such areas must not be
raised above existing ground levels. This applies to the entirety of the site as
identified by the red line shown in drawing 01 hereby approved, titled 'Site
Location Plan’. 
Reason - To ensure no displacement of floodwater to the rest of floodplain 
Roads and Access 
7. The Construction Traffic Management Scheme (document 21 hereby approved)
shall be strictly adhered to during the entire site construction programme all to
the satisfaction of the Council as Planning Authority. 
Reason - In the interest of proper site management.

Page 16

Amenity 
9. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
10. Noise from the battery storage facility shall not exceed 33dB LAeq,(15 min), including
any relevant penalties for tonality, impulsivity, intermittency, or other sound
characteristics, when measured at any residential property in accordance with
BS4142 – Method for Rating Industrial Noise Affecting Mixed Residential and
Industrial Areas. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
11. In the event, that justified complaints for noise are received by the Council, the
applicant at their own expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from the development. 
The appointed consultant and methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning Authority in consultation
with Environmental Health within 28 days of being notified of the complaint.
Within 28 days of approval of appointed consultant and methodology, a Noise
Assessment shall be submitted outlining mitigation and recommended timescales
for delivery. Thereafter, all mitigation measures shall be implemented within the
timescales recommended. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
12. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
13. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays or bank holidays. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality during the construction period.

Page 17

14.  The acoustic fence hereby approved as part of planning permission
22/00195/FLM (documents 37, 38, 39 and 40 relate) must be installed prior to the
installation of the new battery units hereby approved becoming operational.
Thereafter, the fence shall be maintained in a reasonable condition for the life of
the development. 
Reason - In the interests of protecting residential amenity. 
Biodiversity and Natural Environment 
15. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 33 relates) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
16. An Updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
17. Prior to the completion or occupation of the building(s) hereby approved,
whichever is the earlier, five bat boxes, five bird boxes and log piles shall be
provided in line with recommendations in the supporting biodiversity survey
submitted and hereby approved. Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the development, to the
satisfaction of the Council as Planning Authority. 
Reason - To increase the number of bat and bird boxes to ensure significant
biodiversity enhancement. 
18. No removal of hedgerows, trees or shrubs that may be used by breeding birds
shall take place between 1st March and 31st August inclusive, unless a
competent ecologist has undertaken a careful, detailed check of vegetation for
active birds’ nests immediately before the vegetation is cleared and provided
written confirmation that no birds will be harmed and/or that there are appropriate
measures in place to protect nesting bird interests on site. Any such written
confirmation should be submitted in advance to the local Planning Authority.

Page 18

Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
19.  Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day 
Reason - In order to prevent animals from being trapped within any open
excavations. 
Landscaping 
20. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority. The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted. The
scheme as subsequently approved shall be carried out and completed within the
first available planting season (October to March) after the completion or bringing
into use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date. The scheme, as agreed and
implemented, shall thereafter be maintained to the satisfaction of the Council as
Planning Authority. 
Reason - In the interest of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
21.  The soil management plan approved as part of planning permission
22/00195/FLM (document 41) shall be adhered to in full as part of the site
development. 
Reason - In order to ensure proper soil management. 
Facility Lifespan 
22.  In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, then it shall be deemed
to have permanently ceased to be required. In such an event the development

Page 19

shall be decommissioned and the relevant parts of the site reinstated within such
timescale as agreed in writing by the Council as Planning Authority. 
Reason - To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
External Finishing Colour 
23.  Prior to the commencement of the development hereby approved, details of the
recessive, natural colour of the proposed external finishing materials to be used
for the hereby approved fence and other structures (i.e. auxiliary generator,
battery pack racks, battery storage substation, client substation invertor and LV
Room, etc.) shall be submitted to and agreed in writing by the Council as
Planning Authority. The scheme as agreed shall be implemented prior to the
completion or bringing into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no 
material reasons which justify departing from the Development Plan. 
PROCEDURAL NOTES 
None applicable. 
INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved.

Page 20

4. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a development
does not provide a defence against prosecution under this act. 
5. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species. Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
6. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
•  Displayed in a prominent place at or in the vicinity of the site of the
development.
•  Readily visible to the public.
•  Printed on durable material. 
7. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time. The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk. Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk. The Council has
two months to consider the information. You should therefore submit the required
information more than two months before your permission expires. We cannot
guarantee that submissions made within two months of the expiry date of your
permission will be able to be dealt with before your permission lapses. 
8. National Gas Transmission should be consulted during the design phase and that
an Earthing Report is submitted for review, and to ensure that the pipeline is not
affected. 
9. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
10. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.

Page 21

11. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
Background Papers: 17 letters of representation
Contact Officer:  Alan Atkins 
Date: 29 August 2024 
DAVID LITTLEJOHN