Perth and Kinross Council
Planning and Placemaking Committee – 11 September 2024
Report of Handling by Strategic Lead – Economy, Development and Planning
(Report No. 24/243) 
PROPOSAL: Residential development with associated access road,
landscaping, SUDS, and associated works (LDP3 Allocated Site -
MU27) (in principle) 
LOCATION: Land 170 Metres South-West of 8 Tayview, Luncarty 
Ref. No: 23/00592/IPM
Ward No: P5- Strathtay 
Summary 
The proposal seeks Planning Permission in Principle (PPIP) for a residential
development and associated access, landscaping, SUDS, and other works. An
indicative masterplan supporting the application for 110 dwellinghouses shows
vehicular access to the site would pass through the adjacent land, also allocated for
residential development and which has already seen PPIP granted (17/00847/IPM). 
This report recommends approval, subject to conditions and a S75 legal agreement or
other suitable mechanism to control developer contributions and infrastructure, as the
development is considered to comply with the relevant provisions of the Development
Plan and there are no material considerations apparent which outweigh the
Development Plan. 
This report is an updated version to that which saw planning permission approved at
the Councils Planning and Placemaking Committee of 10 January 2024. This update
is required as, subsequent to that committee it was identified that more detail on the
developer contributions and infrastructure required and the relationship with planning
permission 17/00847/IPM, which allows the development of adjacent land -
particularly its associated Section 75 agreement. As such it is necessary to see the
application reconsidered afresh and a new decision taken, to allow an appropriate
Section 75 agreement to be prepared and entered into. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1. The application site extends to some 14.37 hectares and is part of the wider
‘MU27: Luncarty South’ site, which is allocated for residential and commercial
development within the Perth and Kinross Local Development Plan 2 (2019).

Page 2

2. It currently comprises arable farmland, with scattered field trees and riverside
woodland, and is located to the immediate south of Luncarty.  The landscape
area is characterised by NatureScot as ‘Lowland River Valley’. The River Tay
being a short distance beyond the eastern boundary. To the south and west is
further low-lying agricultural land, also identified within MU27, whilst further west
is the A9(T) road linking Perth and Inverness. The proposed development would
result in the development of the farmland, but thereafter include new native
woodland, tree planting, and meadow and wetland areas. 
3. The site is identified, in an approved ‘phasing plan’ associated to planning
permission Ref:17/00847/IPM, as being surrounded by Phases 3, 4 and 6. The
site itself being Phase 5.  However, this application proposes that the application
area be brought forward one phase, from Phase 5 to Phase 4. The existing
Phase 4 swapping to become Phase 5. The proposals are for a residential
development for 110 units, access, landscaping, SUDS, and associated works. 
An indicative layout shows a mix of detached and semi-detached units ranging
one-to-5-bedroom properties.  
4. The Pre-Application Consultation (PAC) Report, submitted in support of the
application, provides an overview of the steps taken by the applicant in
undertaking pre-application consultation between them, the local community, and
other interested parties. The submission of this PPIP follows on from that 12-
week pre-application consultation period, which ran until 24th June 2022. As part
of the consultation, two in-person public consultation events were held at the
Luncarty Church Hall on 28 April and 31 May 2022. Both between 2:30pm and
6:30pm. 
5. The application is also supported by an Environmental Impact Assessment
Report (EIAR). 
Pre-Application Advice 
6. Pre application Reference: 21/00586/PREAPP. This advised that overall the
principle of residential development is supported, as it is located on an allocated
site for residential use within LDP2. 
NATIONAL POLICY AND GUIDANCE 
7. The Scottish Government expresses its planning policies through The National
Planning Framework, Planning Advice Notes, Creating Places, Designing
Streets, National Roads Development Guide, and a series of Circulars.   
National Planning Framework 4 
8. The National Planning Framework 4 (NPF4) was approved by the Scottish
Parliament on 11 January 2023. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan.

Page 3

9. The Council’s assessment of this application has taken into account the policies
of NPF4 and it is considered that the development proposal accords with the
intentions of this document. The most relevant policies to the application are: 
• Policy 1: Tackling the Climate and Nature Crisis.
• Policy 2: Climate Mitigation and Adaptation.
• Policy 3: Biodiversity.
• Policy 4: Natural Places.
• Policy 5: Soils.
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places.
• Policy 12: Zero Waste.
• Policy 13: Sustainable Travel.
• Policy 14: Design, Quality and Place.
• Policy 15: Local Living and 20 Minute Neighbourhoods.
• Policy 16: Quality Homes.
• Policy 18: Infrastructure First.
• Policy 19: Heating and Cooling.
• Policy 20: Blue and Green Infrastructure.
• Policy 21: Play, Recreation and Sport.
• Policy 22: Flood Risk and Management. 
Planning Advice Notes 
10. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are also of relevance: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
11. Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities, and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.

Page 4

Designing Streets 2010 
12. Designing Streets is the policy statement in Scotland for street design and
changes. The emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
13. This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
DEVELOPMENT PLAN 
14. The Development Plan for the area comprises the NPF4 and the Perth and
Kinross Local Development Plan 2 (2019) 
Perth and Kinross Local Development Plan 2 
15. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. The application site is allocated in
LDP2 under MU27. The Luncarty Settlement Summary states the site-specific
developer requirements for the application site as including: 
• A comprehensive Masterplan submitted at the time of any planning
application.
• The open space/landscape buffer which abuts the river Tay must be defined
by a Flood Risk Assessment and protected from built development.
• An updated full Transport Assessment.
• Enhancement of biodiversity and protection of riverbank habitats enhancing
connectivity into the Green Network.
• Developer requirements for the enhancement of core paths and pedestrian
connections into Luncarty and the wider network.
• Investigation of provision of a district heating system and combined heat and
power infrastructure utilising renewable resources.
• Construction Method Statement to be provided for all aspects of the
development to protect the watercourse; and
• A desk-based archaeological assessment of the site. 
16. The principal relevant LDP2 policies are: 
• Policy 1A: Placemaking

Page 5

• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 23: Delivery of Development Sites
• Policy 24: Maintaining an Effective Housing Land Supply
• Policy 25: Housing Mix
• Policy 26: Scheduled Monuments and Archaeology
• Policy 29: Gardens and Designed Landscapes
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 34A: Sustainable Heating &Cooling: Heat Networks, Major
Development and LDP Site Allocations
• Policy 36A: Waste Management
• Policy 36B Waste Management
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland, and Trees: Forest and Woodlan Strategy
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Developer Contributions and Affordable Housing Supplementary Guidance
(2023) 
17. This document sets out the Council’s policies on Developer Contributions in
relation to Primary Education and Transport Infrastructure/A9 junction upgrades,
as well as setting out what Affordable Housing provision is required for new
developments.

Page 6

Site History 
18. 
• 14/00009/PAN The content of a Proposal of Application Notice (PAN) related
to a residential development was agreed by PKC on 5 November 2014.
• 15/00419/SCRN An EIA Screening Opinion for a mixed-use development was
issued by PKC on 24 March 2015, indicating that an EIA was required.
• 15/00511/SCOP An EIA Scoping Request for a residential development was 
• agreed by PKC on 30 April 2015.
• 17/00847/IPM Planning Permission in Principle was approved by PKC on 30
August 2019 on adjacent land for a mixed-use development comprising
residential and employment land, infrastructure including roads, footpaths,
landscaping, drainage, open space and associated works.
• 21/01908/SCRN An EIA Screening Opinion for a proposed residential
development was issued by PKC on 29 November 2021, indicating that an
EIA was required.
• 22/00009/PAN The content of a further PAN was agreed on 10 March 2022,
relating to a residential development, access, landscaping, SUDS and
associated works (allocated site MU27).
• 22/00727/SCOP An EIA Scoping Request for a residential development was
agreed by PKC on 26 May 2022
• 22/00869/IPM A S42 application to modify condition 3 (occupation of
dwellings) of permission 17/00847/IPM was approved on 22 February 2023.
The MU27 allocation and associated site-specific requirements, as well as
condition 3 of application 17/00847/IPM, recognise there is a need for an
appropriate trigger to consider potential additional transport infrastructure
requirements. 
CONSULTATIONS 
19.  As part of the planning application process the following bodies were consulted: 
External 
20. SEPA - No objection: a revised Flood Risk Assessment acknowledges housing is
proposed above 20mAOD and free from flood risk from the River Tay. Green
buffers along the River Tay are welcomed. Advice is provided on SuDS and it is
noted that foul drainage is to be connected to the public sewerage system. It is
further noted that there may be dewatering during construction and advice is
provided. 
21. Historic Environment Scotland (HES) - No objection: HES welcome the
assessment of cultural heritage impact in the EIAR and are content that

Page 7

significant impacts are unlikely, with the mitigation proposed. However, more
detailed analysis would be welcomed – such as in relation to landscaping works. 
22. Transport Scotland - No comments. However, in response to a consultation on
an earlier PPiP (17/00847/IPM) for the immediately adjacent land no objections
were raised subject to the inclusion of conditions relating to the masterplan, site
layout plan, new roads infrastructure requirements and proposed phasing plans. 
23. Luncarty, Redgorton and Moneydie Community Council - No comments.  
24. Scottish Water - No objection: Confirm sufficient capacity in the Perth Water
Treatment Works, but insufficient capacity at Perth Waste Water Treatment
Works.  To mitigate this contact should be made with Scottish Water's
Development Operations Department to discuss phasing and delivery
timescales. Advise that records indicate that site falls within a drinking water
abstraction catchment. However, the proposals are a sufficient distance from the
intake, and thus there is low to medium risk to water quality. Given that water
quality protection measures must be implemented, Scottish Water should be
involved in discussions around the more detailed proposals and potential
mitigation measures prior to the submission of a detailed planning application.
Further advice is provided to the applicant on engagement with Scottish Water. 
25. NatureScot - No objection. Conditions are recommended to mitigate impact on 
internationally important natural heritage interests associated to the River Tay
Special Area of Conservation (SAC), designated for its populations of: Atlantic
salmon; otter; brook, river, and sea lamprey; and clearwater lochs. It is noted that
Fresh Water Pearl Mussels (FWPM) are not currently a River Tay SAC qualifier;
however, they are a protected species. It is an offence to intentionally or
recklessly kill, injure take or disturb mussels, or to damage their habitat and a
Species Protection Plan (SPP) should be produced to address impacts from any
outfall to the mussel population. 
26. Perth and Kinross Heritage Trust (PKHT) - No objection: PKHT confirm that
there is archaeological potential, with a number of sites recorded nearby, as well
as designated heritage assets in the vicinity (Scheduled Monuments, Listed
Buildings, Gardens and Designed Landscapes). A condition for a programme of
archaeological work is recommended and will inform a mitigation strategy. The
details of this should be agreed in a Written Scheme of Investigation (WSI)
approved via condition. (Condition 7) 
Internal 
27. Environmental Health (Contaminated Land) - No objection: reiterate the
requirement for a contaminated land condition. (Condition 29) 
28. Environmental Health (Noise, Odour) - No objection: Advise there will be no
significant noise or vibration impacts subject to a condition requiring a Noise

Page 8

Management Plan within the Construction Environmental Management Plan
(CEMP) and an additional condition relating to fixed plant. Further advise that Air
Quality can be protected via a condition requiring a Dust Management Plan.  All
of which could be incorporated into the CEMP. No significant post completion
impacts on the Perth AQMA are anticipated.  
29. Transportation and Development - No objection. However, advise that
Condition 3 of 22/00869/IPM states that no more than 350 dwellinghouses by
2029 and then subsequently no more than 520 dwellings and 5 hectares of
employment land must be constructed, and occupied, in advance of a scheme for
new road infrastructure solutions. It is recommended that a similar condition,
reflective of the scale of this application, is included in any consent issued.
(Condition 21) 
30. Access to the site will be via earlier Phases consented under applications
17/00847/IPM and 22/00869/IPM. The Transport Assessment (TA) advises of
core paths to the north, east and south and it is proposed to connect with these
paths. Although indicative details have been provided, any future MSC
submissions will require to clearly detail the connections, along with any
enhancements to the core path. A planning condition is recommended to secure
details regarding any obstruction, dissecting and re-routing of any core paths.
(Conditions 4 and 5) 
31. The phased implementation of a Public Transport Plan (PTP) should be carried
out prior to the occupation of the 1st/50th/100th dwellings, in line with other similar
developments. Furthermore, the location and standard of bus stops must be
confirmed and delivered, including the incorporation of real-time bus information.
This has been covered by the inclusion of Condition 27. 
32. In line with application 17/00847/IPM, further assessment is required to identify a
new road infrastructure solution to distribute traffic from the development via
transport networks. Thus, a similar condition is recommended. Further advice on
parking and cycle parking; and waste collection vehicle access, to be included in
conditions, is provided. This has been covered by the inclusion of Condition 27. 
33. Development Contributions Officer - No objection. The application site forms
part of LDP2 site allocation MU27 “Luncarty South", allocated for 589-760 homes
and 5ha employment land.  Consent has been granted for the land adjacent
(17/00847/IPM and varied via 22/00869/IPM). That land and this site form LDP2
site MU27. A Section 75 Agreement was entered into for the adjacent land, which
includes planning obligations relating to core paths, public transport, sports
facilities, play facilities, open space, affordable housing, primary education, and
transport infrastructure. Those obligations should be considered insofar as they
relate to the current application site. 
34. Issues to address include: compliance with the Affordable Housing Policy (25%
of 110 units would be 27.5 units); and that Luncarty Primary School sees

Page 9

predicted capacity rate issues associated to the development, and thus
contributions towards education infrastructure are required. 
35. The Transport Infrastructure Developer Contributions Supplementary Guidance
also states that there is a requirement for the development to make a financial
contribution towards the cost of delivering transport infrastructure improvements. 
36. Community Waste Advisor - Environment Services - No objections. Advise
that the developer must contact the Community Waste Team to discuss waste
collection requirements (access for vehicles and bin storage arrangements) as
the site progresses. Advice on during construction arrangements is also
provided. This has been covered by the inclusion of Informative 7.  
37. Biodiversity/Tree Officer - No objections. Provides advice on the required
information related to the SAC, Protected Species and Habitats Regulations
Appraisal (HRA). 
38. Further advise that more information is required on trees: map plotting and an
impact assessment associated to the development. Condition 20 has been
recommended to cover the potential for impact on trees. A bat survey is also
requested, along with a detailed landscaping plan and planting schedule, which
has been covered by the inclusion of Conditions 18 and 2. 
39. Conclusions from the EIAR and requirements detailed in the LDP2, and PKCs
Planning for Nature Supplementary Guidance should be used to create a Site
Biodiversity Action Plan, required by Condition 14. 
40. Community Greenspace - No objections. This development (Wedge) is
inherently linked with the mixed-use development outlined in planning application
17/00847/IPM (A&J Stephen/I&H Brown). Heads of Terms were drawn up for the
Stephen/Brown development that incorporated development at the Wedge site.
Costs as described in the Heads of Terms were split proportionally between
developers (72.5%:27.5%) In this instance, although a play area would not be
required, a financial contribution towards the upkeep and future upgrade of
existing play areas in Luncarty should be secured (110 units would see a
payment of £13,231.50 (uplifted with RPI) associated to the upkeep of the nearby
NEAP). This will be secured via a S75 or other suitable mechanism.  
41. Otherwise, a detailed layout plan including elevations, tree planting plan, and
maintenance plan would be required before a figure can be estimated for the
adoption of any open space by PKC. Advice on open space adoption and costs
is also provided.  This has been covered by the inclusion of Condition 5 and 19. 
42. Finally, it is advised that access along the core paths LUNC/100, LUNC/116,
LUNC/117, LUNC/2 and rights of way 36/2 should not be obstructed or deterred.
This has been covered by the inclusion of Condition 4.

Page 10

43. Development Plan Team - No objections. Support the principle of residential
development via the MU27 allocation in LDP2, subject to assessment against the
site-specific developer requirements, and policies of the Development Plan.
44. It is noted that the indicative layout shows four connections to the other phases,
two to the south and two to the east. A revised masterplan strategy layout is
sought to include this link, and also to include more east west linkages from the
developable area to the river core path (LUNC/2). It is recommended that
Condition 5 is included to this effect. 
45. An updated District Heating Feasibility Study for the whole site is also required to
be submitted in writing for the approval of the Planning Authority to assess the
technical feasibility and financial viability of heat network/district heating for this
site. This has been covered by the inclusion of Condition 24. 
46. The accompanying Design and Access Statement, or other document as agreed
by the Council, should demonstrate how the findings of the District Heating
Feasibility Study has been incorporated into the finalised design and layout of the
proposal. As a phase of the overall masterplan for MU27, many of the conditions
of the 17/00847/IPM should also be added to this permission. 
47. Structures And Flooding - No objections. Advise that there are no known
watercourses running through the site. The River Tay runs to the east flowing
from north to south. A supporting Drainage Impact Assessment and a Masterplan
Strategy show the existing site contours, the proposed development areas and
two potential locations for SuDS features. 
48. The indicated SuDS areas appear inadequate to attenuate anticipated volumes,
without significant basin depths and should be addressed at the detailed design
stage. This has been covered by the inclusion of Condition 28. 
49. There are two watercourses close by; the River Tay and the Schochie Burn to
the north. As such the detailed design stage should see buildings suitably set
back and landscaping or groundworks within the flood extent designed to ensure
no loss of storage or impact on flood risk. 
Representations 
50. Four objections and one submission in support of the application were received.
The main issues raised are:
• Adverse effect on visual amenity.
• Inappropriate housing density.
• Inappropriate land use.
• Loss of trees.
• Out of character with the surrounding area.
• Over development.
• Issues of overlooking / loss of privacy.
• Road safety issues.

Page 11

• Traffic congestion.
• Loss of open space.
• Impact on wildlife.
• Impact on local footpath network. 
51. The main point of support was that there is a need for new homes in the area. 
52. These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
53 Screening Opinion EIA Required 
Environmental Impact Assessment (EIA):
Environmental Report
Submitted 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations
AA Not Required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact e.g.,
Flood Risk Assessment
Submitted 
APPRAISAL 
54. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan unless material considerations
indicate otherwise. The Development Plan comprises NPF4 and the Perth and
Kinross Local Development Plan 2 (2019). 
Principle 
55. The principle of residential development at the site and adjacent land is
supported by the Development Plan through allocation in the LDP2 (MU27) for
residential and commercial use. Furthermore, the remainder of MU27 saw PPiP
approved (ref: 17/00847/IPM) on 30 August 2019, with an implementation period
of 20 years. That 2019 permission then being supplemented by a fresh consent in
2023 (ref: 22/00869/IPM). 
56. MU27 is contained within the defined Luncarty settlement boundary as a planned
urban expansion. The proposal is thus compliant with Policy 6: Settlement
Boundaries, and the principle of residential development is accepted, subject to
the site-specific requirements. Concerns have been raised in an objection over
the use of the land for housing. However, given the LDP2 allocation and
subsequent approved adjacent consents as related phases, the development of
housing is accepted. In addition, the overall size of the application site and likely
densities, as indicated in supporting information, do not see it considered that
over development would result. In addition, an objection considers the proposed

Page 12

density inappropriate. However, the proposals reflect densities in the residential
areas of Luncarty and other similar contexts. 
Design and Layout 
57. As a PPiP, the proposals seek to establish the acceptability of the principle of
residential development. However, precise details such as siting, layout, scale,
height, design of buildings are not yet sought to be confirmed and would require
to be controlled via conditions. 
58. The information submitted, whilst illustrative, indicates a broadly acceptable
development layout in planning terms. It provides information including where the
residential areas will be located and how they would be accessed. An indicative
masterplan shows that nearly 32% of the units with either 1 or 2 bedrooms and a
mix of both houses and flats. This provision of smaller properties is higher than
the 10% required by Policy 25 of LDP2 and is welcomed. In addition, the
requirement of LDP2 Policy 20 to have 25% of all dwellings to be ‘affordable
housing’ is also identified. There will be 5 different house sizes, providing a good
mix and choice. 
59. The development principles set out are considered acceptable, taking into
cognisance required landscape mitigation while still allowing retention of control
over further detailed design matters. The requirement for an updated District
Heating Feasibility Study for the whole site can be controlled via condition to
assess the technical feasibility and financial viability of heat network/district
heating for this site (Condition 24). The submitted Planning Policy, Design and
Access Statement, accords with LDP2 Policy 2: Design Statements. Overall, the
proposal is considered to demonstrate the ability to comply with LDP 2 Policy 1:
Placemaking, subject to detailed design work, and NPF4 Policy 14: Design,
Quality and Place, Policy 15: Local Living and 20 Minute Neighbourhoods and
Policy 16: Quality Homes. 
60. Detailed design issues would be confirmed through subsequent applications for
the Approval of Matters Specified in Conditions (AMSC), via recommended
conditions. 
Landscape 
61. LDP 2 Policy 39 states that development should be compatible with the
distinctive characteristics and features of Perth and Kinross’ landscapes. In this
respect the proposal would see the development of arable farmland through the
introduction of new buildings, associated access and services, as well as
proposed areas of new native woodland, tree planting, meadow, and wetland.
Although development will result in the loss of agricultural land this has been
accepted via the allocation in LDP2, it is also proposed to provide open space in
the northern and eastern areas. Furthermore, tree planting is proposed along the
indicated spine road and residential streets. Therefore, given the level of
agricultural land adjacent to the application site and wider context of landscape

Page 13

features and the proposed developments the impact on the landscape character
is accepted and mitigations are to be undertaken. 
62. New tree planting will focus on native species, especially those that will thrive in
the local conditions. There will be an emphasis on broad-leaved species that
would contribute to biodiversity enhancement as well as local landscape
character and visual amenity. All trees would be planted, and wildflower
meadows seeded, at the first available opportunity in accordance with seasonal
restrictions. Where possible, advanced planting would be undertaken to ensure
the early establishment of new woodland areas. This will be covered by the
inclusion of recommended Condition 2 and 19.  As such, it is considered that the
proposed development is in accordance with LDP2 Policy 39: Landscape; LDP2
Policy 51: Soils, NPF4 Policies 3: Biodiversity, 4: Natural Places, 5: Soils, 6:
Forestry, Woodland and Trees and 20: Blue and Green Infrastructure.      
Residential Amenity 
63. LDP2 Policy 17: Residential Areas, highlights that areas of residential and
compatible uses inside settlement boundaries will see existing residential
amenity protected and, where possible, improved. The proposed buildings would
be of a scale consistent with that of existing built form within Luncarty and the
isolated dwellings in the surrounding area. Also accounting for the fact that the
site is allocated for residential land use in LDP2. The built form will vary to create
a residential development which will enhance the residential amenity of Luncarty.
Any potential for loss of privacy / overlooking as well as occupier and wider
amenity can be addressed at the detailed planning application stages. (i.e.
Condition 2) 
64. LDP2 Policy 56: Noise Pollution states that there will be a presumption against the
siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. In this
regard noise impact issues have been assessed, particularly focusing on areas
to the west of the site which are near the A9 trunk road and the Perth to
Inverness rail line. 
65. It is anticipated that there will be some impact on residential amenity from noise,
focused during the construction phase. This noise need not be excessive and will
be no more that can be expected from development works common to this nature
and size of proposal. However, given that the use of fixed plant is anticipated,
and in order to protect residential amenity, Condition 8 is recommended to
require a Noise Impact Assessment. Restrictions on working hours are also to be
controlled via Condition 10. 
66. LDP2 Policy 57: Air Quality states that the Council has a responsibility of
improving air quality by seeking to prevent the creation of new pollution hotspots,
and to prevent introduction of new human exposure where there could be

Page 14

existing poor air quality. Any proposed development that could be adverse,
through exacerbation of existing air quality issues or introduction of new sources
of pollution (including dust and/or odour), must provide appropriate mitigation
measures. These will be included in a Construction Environment Management
Plan (CEMP), which is covered by recommended Condition 9. 
67. A Dust Risk Assessment has been submitted concluding that the proposed
development sees a medium risk of adverse impacts from dust. This being the
case, a Dust Management Plan must be included in the CEMP. Subject to this
the development is not expected to have an adverse effect on local air quality or
any of Perth’s Air Quality Monitoring Areas (AQMA). The proposed development
is, therefore, considered in accordance with LDP2 Policies 56: Noise Pollution
and 57: Air Quality. 
Visual Amenity 
68. Matters relating from the detailed design/layout and resultant visual impact will be
fully assessed via subsequent MSC applications. However, the principle of the
proposal is considered to comply with LDP2 Policy 39. Concerns have been
raised in representations that the proposed development will lead to a loss of
visual amenity. However, recommended Condition 2 will address the site-specific
requirements for landscape framework provision, enhancement of biodiversity
and compensatory planting for any felled trees – all to ensure appropriate visual
amenity in the context of the development being a planned urban extension
within LDP2. 
Roads and Access   
69. LDP2 Policy 15: Public Access states that development proposals that would
have an adverse impact upon the integrity of any (including proposed) core path,
disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted. Although, it is recognised that the proposed
development may lead to an increase in traffic on local roads, a proportion of this
can be accommodated on the existing roads network and able to be mitigated by
sustainable transport options for various journeys.  Thereafter once the triggers
set out in Condition 21 are reached there is a requirement to implement a
scheme of new road infrastructure solutions, to be agreed and implemented via
that condition. 
70. In this instance, the site is currently accessed off the B9099, via Scarth Road and
a minor private road. The proposals have been designed not to impact the core
path which runs adjacent. As part of any detailed application all accesses shall
be clearly set out, along with any enhancements to the core path. It is noted that
vehicular access, will involve dissecting the core path network, the detail of which
shall also be provided with any planning submission. Condition 4 and 5 is
recommended to ensure that core paths are not adversely affected.

Page 15

71. A path network for active travel, within the site, for: walking, cycling, and
wheeling has yet to be fully defined but will be required at MSC stage. This will
ensure that there is no adverse impact on the local footpath network, but likely
result in enhancement. The application highlights that parts of Fairview have
footways but that sections of Scarth Road do not. The junction improvement
works identified in application 17/00847/IPM, will provide connectivity to the site
from the B9099. These issues have been addressed by the inclusion of
Conditions 2, 26 and 27. 
72. LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities, provided the improvements are compatible with adjoining land uses. 
73. LDP2 Policy 60B: New Development Proposals, states that all development
proposals that involve significant travel generation should be well-served by, and
easily accessible to all modes of transport. In particular, sustainable modes:
walking, cycling and public transport should be considered, prior to private car
journeys. 
74.   In this instance, the submitted Transport Statement highlights the need for local
bus services to connect to the development, as a result a Public Transport Plan
is required. Developer Contributions are also required to provide transport
infrastructure improvements. Routes to and from the development will also need
to be bus/coach suitable, confirmed via swept path analysis, and areas are to
beidentified for the uplift/set down of passengers/school pupils and where bus
stops/shelter infrastructure can be provided. Implementation of the Public
Transport Plan (PTP) will be carried out prior to the occupation of dwellings (first,
fiftieth and one hundredth dwelling)   
75. In line with permission 17/00847/IPM, a further assessment shall take place to
identify a road infrastructure solution to distribute traffic from the development via
transport networks. Condition 21 is recommended on a similar format pro rata.
The Travel Plan Framework information is considered acceptable and sets out
means of delivery. This will be developed further as part of any detailed planning
application submitted. 
76. Overall, the proposed development does not raise any insurmountable issues,
subject to conditions relating to the masterplan, site layout, scale, access, core
paths, and a Construction Traffic Management Plan. On this basis and subject to
the recommended conditions, the proposed development can comply with LDP2
Policies 15, 60A and 60B; and NPF4 Policies 13: Sustainable Travel, 14: Design
Quality and Place,18: Infrastructure First, and 21: Play, Recreation and Sport. 
Drainage and Flooding 
77. LDP2 Policy 52: New Development and Flooding, states that the Council
supports actions and objectives to avoid increased, reduce overall, and more
generally manage flood risk in alignment with SEPA Strategies and Plans.

Page 16

78.  LDP2 Policy 53A: Water Environment, requires that any development should
protect and where practical improve the water environment (ground and surface
water). 
79. LDP2 Policy 53B: Foul Drainage, asks that foul drainage from all developments
within and close to settlements should connect to the public sewer. 
80. LDP2 Policy 53C: Surface Water Drainage, requires Sustainable Urban Drainage
Systems (SUDS), including relevant temporary measures at the construction
phase. Matters relating to SUDS are covered in recommended Conditions 12 and
28. 
81. In this instance, the proposed development sits above a level at threat of river
flooding. The mitigation measures identified in the Environmental Impact
Assessment Report (EIAR) will ensure that water quality standards are met and
comply with SEPA’s requirements. This has been covered by Condition 14. 
82.  In terms of construction phase surface water, a Construction Environment
Management Plan (CEMP) should be submitted at the detailed application stage.
This should include a Pollution Prevention Plan and further information regarding
the flood history of the River Tay. In addition, final layouts should see buildings
set back sufficiently from the Schochie Burn. In light of the above, the proposed
development is considered to accord with LDP2 policies 52, 53A, 53B, 53C; and
NPF4 policies 14: Design, Quality and Place, 16: Quality Homes, 18:
Infrastructure First, and 22: Flood Risk Management. 
Waste Collection 
83. The Council’s Community Waste Advisor is satisfied with the proposed waste
management arrangements but asks that further discussions on detail should
take place. An informative note is recommended (Informative 7). Subject to this
being reflected in the detailed submissions the proposed development is in
accordance with LDP2 Policies 36A, 36B: Waste Management, and NPF4 Policy
12: Zero Waste. 
Natural Heritage and Biodiversity 
84. LDP2 Policy 40: Forestry, Woodland, and Trees states that Tree Surveys,
undertaken by a suitably qualified professional, should accompany all relevant
applications for planning permission containing trees and that there is a
presumption in favour of protecting woodland resources. 
85. A Tree Survey has been submitted, but no impact assessment on the potential
adverse impact on trees. However, this has been covered by the inclusion of
Condition 20. Concerns have been raised in representations that the proposed
development will result in an unacceptable loss of trees. However, whilst there
are likely to be trees felled, mitigation, in the form of tree and shrub planting, will

Page 17

ensure that the overall tree loss is appropriate. This has been covered by the
inclusion of Conditions 2(vi) and 19. 
86. Therefore, any consent issued will include a condition (Condition 20) that such a
Tree Impact Assessment is submitted. Further conditions will require a detailed
landscape plan and planting schedule (Conditions 2, 19). This future landscaping
should see a predominance towards native Scottish trees and hedgerows and
also include fruit bearing trees for biodiversity purposes. Furthermore, any
existing mature trees located within 30m of the site should be surveyed for bats.
(Condition 18). Subject to these detailed matters the proposed development is
likely to be in accordance with LDP2 Policy 40: Forestry, Woodland, and Tress,
and NPF4 Policy 6: Forestry, Woodland, and Tress. 
87. LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected
or not. All whilst taking into account the ecosystems and natural processes in the
area. Issues relating to the impact on, and protection of wildlife and habitats are
controlled via recommended Conditions 2, 13, 14, 15, 16, and 18. 
88. A bat survey must be submitted with any detailed planning application, in line
with Condition 18. Furthermore, an Ecological Impact Assessment Report is
required with any detailed planning application, to include all the relevant impact
assessments for habitats, species, and existing trees on site. This has been
covered by the inclusion of Condition 14. The conclusions of the Ecological
Conservation Impact Assessment (EcIA), in addition to PKC Planning for Nature
Supplementary Guidance, will provide guidance to form the basis of a Site
Biodiversity Action Plan. Subject to the addition of the referred, suitably worded
conditions, the proposed development is considered in accordance with LDP2
Policy 41: Biodiversity, and NPF4 Policy 3: Biodiversity. 
89. LDP2 Policy 42: Green Infrastructure, states that the Council will require all new
development to contribute by: 
(a) creating new multifunctional green infrastructure,
(b) incorporating high standards of environmental design,
(c) ensuring that development does not lead to the fragmentation of existing
green and blue networks, and
(d) the protection, enhancement, and management of existing green
infrastructure. 
90. In this instance, the proposed development indicates centrally positioned open
space, with formal avenue-style tree planting and small tree groups. This would
contribute towards creating green routes through the site and enhance the
residential character / setting.  During development phases there would be
gradual establishment of the proposed native tree planting and habitat creation,
to limit impacts and see early establishment and delivery of appropriate planting,
Condition 2(vi) is recommended.

Page 18

91. These embedded landscape design / biodiversity enhancements would provide
new green infrastructure benefiting the surrounding area. Therefore, the
proposed development principles are considered in accordance with LDP2 Policy
42: Green Infrastructure.   
92. LDP2 Policy 47: River Tay Catchment Area, requires protection and
enhancement of the nature conservation interests within the River Tay
Catchment Area. 
93. In this respect surface water drainage systems will be designed to provide
treatment to maintain water quality. Given otters were surveyed during the EIA
process, appropriate mitigation is recommended and will be required – with
protected species surveys (Conditions 13 and 14). Any consent should also
require a Construction Environmental Management Plan (CEMP) is submitted, to
avoid risk of adverse impact on the River Tay SAC (Condition 9). Subject to this,
the proposed development is considered in accordance with LDP2 Policy 47:
River Tay Catchment Area, and NPF4 Policy 3: Biodiversity and Policy 4: Natural
Places. 
94. LDP2 Policy 51: Soils states that The Council seeks to protect soils from damage
such as erosion or compaction. 
95. In this instance during construction subsoil and topsoil would be separated and
retained in order to maximise the quality of subsequent reinstatement works. The
soil would be appropriately stored, to avoid mixing and to preserve their
structure. 
96. Soils would subsequently be re-graded to blend with the surrounding landform.
The re-spreading of stored subsoils would be focused across areas of proposed
wildflower meadow, where lower fertility soils would prevent grasses from
outcompeting the slower establishing wildflowers. The re-spreading of higher
fertility topsoil would be focused across areas of tree planting and garden areas.
Condition 6 relates to these aspects. Subject to this, the proposed development
would be in accordance with Policy 51: Soils, and NPF Policy 5: Soils. 
Developer Contributions 
97. There are requirements in relation to: affordable housing (25% of overall
dwellings); primary education infrastructure; open space, play area upkeep and
maintenance; and maintenance of core path connections. A Section 75 legal
agreement is required in this regard. 
98. Particularly, being within the catchment of Luncarty Primary School and to see
consistency with the terms of the Section 75 Agreement for the adjacent site, a
financial developer contribution will be sought toward the provision of additional
accommodation at Luncarty Primary School.

Page 19

99. In addition, the Council Transport Infrastructure Developer Contributions
Supplementary Guidance requires a financial contribution towards the cost of
delivering the transport infrastructure improvements required to accommodate all
development sites in and around Perth. The site being within the ‘Full’ Transport
Infrastructure contributions zone (Appendix 3 of the Supplementary Guidance). 
Furthermore, the Section 75 for 17/00847/IPM references this site, whereby there
are a number of contributions identified, including for Transport (infrastructure)
and Public Transport. These should be included in the Section 75. It is also
recommended that the contribution figures are re-indexed at the date of
concluding the agreement and that indexing continues thereafter. 
100. All eligible public open space must be adopted by the Council with payment of
the appropriate commuted sums (CS) at time of adoption and transfer of the
Priority Public Open Space title. This application includes a significant amount of
open space, which would likely be subject to a higher commuted sum if the
developer wishes for this to be adopted by the Council. A detailed layout plan
including elevations, tree planting plan, and maintenance plan would be required
before a figure can be estimated. Assuming 110 houses (as per drawing
UDS65599- A2-0201), the commuted sum for adoption of greenspace within the
development would be some £115,000.00 
101. The Provision of 2 offsite football pitches, a changing facility and maintenance
payments totalling £100,833 are also required (27.5% of £366,666 total). 
Furthermore, LDP2 requires core footpaths to be accommodated and potential
contributions for improvements. The LDP also identifies that pedestrian and cycle
routes to the village should be provided and suitable boundary treatments
provided to create a village edge. A proportionate contribution towards the
Luncarty/Stanley Path Improvement project of £12,090 is identified. 
102.  For this development a play area would not be required, but a financial
contribution towards the upkeep and future upgrade of existing play areas in
Luncarty is to be required, given the additional pressure and use these would
receive. The amount requested would be dependent on the number of
dwellinghouses proposed and would see the S75 incorporate values. 
Economic Impact 
103. The development of dwellinghouses at this location will provide jobs directly and
indirectly during construction and, afterwards, have a positive impact through
homeowners spending on goods and services in the local economy and beyond. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
104.  A Section 75 Agreement is required, including for core path, public transport,
sports facilities, play facilities, open space, affordable housing, primary
education, and transport infrastructure. Reference will be had to the approach in
the related Section 75 for 17/00847/IPM, including the pro-rata arrangement.

Page 20

DIRECTION BY SCOTTISH MINISTERS 
105. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
106. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019), subject to conditions and a legal agreement.
Account has been taken account of the relevant material considerations and
none has been found that would justify overriding the Development Plan.
Accordingly, the proposal is recommended for approval subject to the following
terms and conditions. 
RECOMMENDATION   
Approve the application      
Direction 
1. Perth and Kinross Council direct that sub-sections (2)(a)(i) and (3) of Section
59 of the Town and Country Planning (Scotland) Act 1997 apply with respect
to the in Principle Permission (23/00592/IPM) with the substitution of the
period of 3 years referred to in each of those subsections, with the period of
20 years. 
Conditions and Reasons for Recommendation 
General 
1.  Application for the approval required by a condition imposed on this Planning
Permission in Principle shall conform with the requirements of Regulation 12 of
the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 and of Section 59 (2) and (3) of the Town and
Country Planning (Scotland) Act 1997 as amended by Section 21 of the
Planning etc. (Scotland) Act 2006 and, in particular, must be made before
whichever is the latest of the following: 
(i) the expiration of 6 months from the date on which an earlier application for
the requisite approval was refused, or
(ii) the expiration of 6 months from the date on which an appeal against such
refusal was dismissed.

Page 21

Reason - In accordance with the terms of Section 59 of the Town and Country
Planning (Scotland) Act 1997 as amended by Section 21 of the Planning etc.
(Scotland) Act 2006. 
2.  No works in connection with the development hereby approved shall take place
until full details of the siting, design, external appearance and landscaping of the
development and the means of access serving the development (hereinafter
referred to as the 'Matters Specified in Condition') have been submitted to and
approved in writing by the Planning Authority. The specified matters include: 
(i)  a detailed phasing plan, commensurate with the phasing plan agreed as
part of the wider MU27 allocation
(ii)  a detailed levels survey (existing and proposed) and cross sections showing
proposed finished ground and floor levels of all buildings forming part of the
development phase, relative to existing ground levels and a fixed datum
point;
(iii)  the siting, design, height and external materials of all buildings or structures;
(iv)  the details of all roads, footpaths, cycleways, core path connections
throughout the development, and connecting to existing infrastructure; (v)
details of any screen walls/fencing to be provided (including any acoustic
barriers);
(vi)  measures to maximise environmental sustainability through design,
orientation and planting or any other means;
(vi)  details of all landscaping, structure planting and screening associated with
the development of each site and incorporating suitable landscape buffers
to define the settlement edge and mitigate visual impacts of built form;
(vii)  the lighting of all streets and footpaths;
(viii)  the layout of any play areas and the equipment to be installed;
(ix)  full details of the proposed means of disposal of foul, surface and roads
water from the development;
(x)  details of car charging points to be provided within the development; and
(xi)  A minimum 40% of dwellings shall incorporate swift bricks and bat roost
bricks at eaves height. 
Reason - This is a Planning Permission in Principle under Section 59 of the Town
and Country Planning (Scotland) Act 1997 as amended by Section 21 of The
Planning etc. (Scotland) Act 2006. 
3.  As part of any application for Approval of Matters Specified in Conditions, as set
out in Condition 2(i),a phasing strategy for the overall allocation (supported by
appropriate plans) shall be submitted to and approved in writing by the Council
as Planning Authority. The phasing strategy shall have regard to the
requirements of Condition 3 and include and demonstrate the following details: 
(i)  The timing and number of dwellings to be developed in this phase shall not
exceed 110 dwellinghouses/units, and how their delivery relates to the
development of housing numbers associated to the overall MU27 allocation;

Page 22

(ii)  The timing of delivery of infrastructure (including roads/footways and other
access requirements associated to the overall MU27 allocation), open
space and landscaping. 
Reason - The application is for planning permission in principle only at this stage
and an appropriate level of development, layout and design shall be determined
through applications for the Approval of Matters Specified in Conditions 
Public Access 
4.  Any existing right of way or core path within or adjacent to the proposed
development shall at all times be protected and remain operational during the
construction phases. 
Reason - In the interest of sustainable transportation. 
5.   Prior to the commencement of development, a revised Masterplan Strategy
Layout shall be submitted to and approved by the Council as Planning Authority,
showing a link to the non-core path at the cul-de-sac 25-35 Hatton Road.  In a
form which would improve connectivity and provide a key linkage to the existing
nursery and primary school, and also to include more east-west linkages from the
developable area to the river core path (LUNC/2). 
Reason - To ensure that the masterplan strategy is fully in line with the masterplan
strategy for application 17/00847/IPM, in accordance with LDP2 allocation MU27. 
Soils 
6.    Prior to works commencing on site, a soil re-use and management plan shall be
submitted to and approved in writing by the Council as Planning Authority. This
Plan will include details of the storage of all soils and their appropriate re-use in
future phases. 
Reason - To protect soils from damage such as erosion or compaction, in
accordance with LDP2 Policy 51: Soils and NPF4 Policy 5. 
Archaeology 
7.  Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted to and
agreed in writing by the Council as Planning Authority, in consultation with Perth
and Kinross Heritage Trust. Thereafter, the developer shall ensure that the
programme of archaeological works is fully implemented during each phase
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development site
is undertaken. In addition, the developer shall afford access at all reasonable

Page 23

times to Perth and Kinross Heritage Trust or a nominated representative and
shall allow them to observe work in progress. 
Reason - In the interest of protecting archaeological interest within the site.
8.  A noise assessment shall be submitted to demonstrate acceptable internal noise
levels of 35 dB within all dwellings taking into account mitigation from any
acoustic barriers or other such mitigation proposed. 
Reason - In the interests of residential amenity. 
9.  Prior to the commencement of development of each phase an updated
Construction Environmental Management Plan (CEMP) must be submitted for
the approval of the Council as Planning Authority. The measures outlined in the
updated CEMP shall be adhered to at all times during the construction period. 
Reason - In the interests of protecting environmental quality (including private
water supplies) and biodiversity; to ensure no adverse impact on the River Tay
and its Special Area of Conservation designation. 
10.  The times of construction are limited to Monday to Friday 07.00 to 19.00,
Saturday 08.00 to 13.00 with no noise generating work on a Sunday. 
Reason - In the interests of residential amenity. 
Rail Safety 
11.  The applicant must provide a suitable trespass proof fence of at least 1.8 metres
in height adjacent to Network Rail's boundary and provision for the fence's future
maintenance and renewal should be made. Details of the proposed fencing shall
be submitted to the Council as Planning Authority for written approval before
development is commenced and the development shall be carried out in full
accordance with such approved details. 
Reason - In the interests of public safety and the protection of Network Rail
infrastructure. 
12.  All surface or foul water arising from the development must be collected and
diverted away from Network Rail Property. Any Sustainable Urban Drainage
Scheme shall not be sited within 10 metres of the railway boundary and should
be designed with long term maintenance plans which meet the needs of the
development. Details of the design and construction of any drainage scheme
shall be submitted to the Council as Planning Authority for written approval
before development is commenced. The development shall be carried out in full
accordance with such approved details. 
Reason - To protect the stability of the adjacent railway cutting and the safety of
the rail network.

Page 24

Trees and Biodiversity 
13.  A detailed Protected Species Survey, including breeding birds and ecological
surveys, shall be submitted as part of any application for approval of Matters
Specified by Condition. The surveys shall include appropriate mitigation to
protect identified species. 
Reason - In the interest of employing best practice ecology and to ensure there is
no adverse impact on any protected species as identified under the Wildlife and
Countryside Act (1981). 
14.  The conclusions and recommended action points within the hereby approved
supporting Environmental Impact Assessment (EIA) shall be fully adhered to,
respected and undertaken as part of the construction phase of development. No
development shall commence unless a site specific Site Biodiversity Action Plan
has been submitted to and approved in writing by the planning authority. 
Thereafter, the approved scheme shall be implemented in complete accordance
with the approved details. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species. 
15.  No site clearance or removal of vegetation, including trees and shrubs will take
place between 1st March and 31st August inclusive unless a competent ecologist
has undertaken a careful and detailed check of vegetation for active birds' nests
immediately before the vegetation is to be cleared and provided written
confirmation that no birds will be harmed and/or that there are appropriate
measures in place to protect nesting birds on site. Any such written confirmation
must be submitted to the planning authority prior to commencement of works. 
Reason: In the interest of employing best practice ecology and to ensure there is
no adverse impact on any protected species as identified under the Wildlife and
Countryside Act (1981). 
16.  A scheme detailing measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be submitted for the written approval
of the Council as Planning Authority. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. Thereafter, the approved scheme
shall be implemented for the duration of the construction works of the
development hereby approved. 
Reason - In order to prevent animals from being trapped within any open
excavations.

Page 25

17.  No work shall start on the relevant parts of the site unless the trees to be
retained, as identified in the submitted surveys, have been protected by suitable
fencing in accordance with BS5837 2012 (Trees in Relation to Construction). The
details of the protective fencing and its location shall be first submitted to and
agreed in writing by the Council as Planning Authority.
Reason - to ensure adequate protection for the trees on the site during the
construction, in the interests of the visual amenity of the area. 
18. An updated bat survey will be required prior to the commencement of works, if
works have not commenced within 24 months of the date of the bat survey
approved as part of this permission. The updated survey shall include all trees
and structures within and around the application site and shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
19. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority. The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted. The
scheme as subsequently approved shall be carried out and completed within the
first available planting season (October to March) after the completion or bringing
into use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date. The scheme as agreed and
implemented shall thereafter be maintained to the satisfaction of the Council as
Planning Authority.  
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
20. Prior to commencement of development, the applicant shall submit a bespoke
Arboricultural Impact Assessment which will identify the main development
constraints on the application site in respect of trees identified for retention,
including, the proximity of utilities, drainage infrastructure, structures, and
changes in ground levels, which may impact the root protection areas of trees
and above ground tree parts. The AIA must identify trees being retained and
removed at the site, provide details of this impact, inform the construction
methodology (Construction Method Statement), and identify appropriate
measures of tree protection, remedial arboricultural & woodland improvement
works, and mitigation planting 
Reason - In the interests of tree protection and to ensure appropriate mitigation
measures are identified and implemented.

Page 26

Roads and Access 
21.  The maximum number of dwellings permitted via this application to be occupied
by 2029 is 59 dwellings. Furthermore, no more than 88 dwellings, as may be
approved by Matters Specified in Conditions application(s), shall be occupied in
advance of a scheme for new transport infrastructure solutions to distribute
and/or reduce traffic from further development via transport networks, has been
submitted to and agreed in writing by the Council as Planning Authority, in
consultation with Transport Scotland as the trunk roads authority. The solution
may be a vehicular connection to the Cross Tay Link Road (CTLR) or an
alternative measure. The submitted scheme shall be supported by a new
Transport Assessment (TA) with traffic modelling informed using observed traffic
generation data from a minimum of 250 occupied residential units across the
wider MU27 site and include the timing for the delivery for the infrastructure
improvements. 
Reason - In compliance with the allocation MU27 of the Perth and Kinross Local
Development Plan 2 (2019); in the interests of local and trunk road traffic safety;
and enhancing connectivity and integration with Luncarty and the wider area, all
in the interests of good placemaking 
22. Details of the lighting within the site shall be submitted for the approval of the
Council as Planning Authority, in consultation with Transport Scotland, as the
Trunk Roads Authority. Thereafter, the development shall be completed in
accordance with the approved scheme. 
Reason: To ensure that there will be no distraction or dazzle to drivers on the
trunk road and that the safety of the traffic on the trunk road will not be
diminished.   
23.  There shall be no drainage connections to the trunk road drainage system. 
Reason: To ensure that the efficiency of the existing drainage network is not
affected. 
24. An updated District Heating Feasibility Study for the whole site shall be submitted
to, and for the written approval of the Council as Planning Authority to assess the
technical feasibility and financial viability of heat network/district heating for this
site, identifying all available sources of heat (either within the site or offsite) and
other factors such as where land will be safeguarded for future district heating
infrastructure. 
The accompanying Design and Access Statement or other documents as agreed
by the Council should show/demonstrate how the findings of the feasibility study
has been incorporated into the finalised design and layout of the proposal. 
Reason - To identify future district heating opportunities for the development.

Page 27

25.  Prior to the commencement of works on the development, the applicant shall
submit for the written approval of the Council as Planning Authority a
Construction Traffic Management Scheme (TMS) which shall include the
following: 
a)  restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
d)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
e)  arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
f)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
g)  arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
h)  details of information signs to inform other road users of construction traffic;
i) arrangements to ensure that access for emergency service vehicles are not
impeded;
j)  monitoring, reporting and implementation arrangements; and
k)  arrangements for dealing with non-compliance. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme all to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of road safety. 
26.  Prior to the commencement of development mitigation measures for the full
length of Scarth Road are to be submitted and agreed to the satisfaction of the
Council as Planning Authority to accommodate additional traffic generation, and
thereafter implemented in full. 
Reason - In the interests of road safety and residential amenity. 
27.  No part of the development shall be occupied until a comprehensive Green
Travel Plan (GTP) that sets out proposals for reducing dependency on the
private car, and associated Public Transport Plan (PTP) have been submitted
and approved in writing by the Council as Planning Authority, after consultation
with Transport Scotland. The GTP and PTP will have particular regard to
provision for walking, cycling and public transport access to and within the site
and will identify the measures to be provided (including the provision of new

Page 28

and/or enhanced public transport services), the system of management,
monitoring, review, reporting and the duration of the plan. 
Reason - to be consistent with PAN 75 Planning for Transport. 
Drainage and Flooding 
28.  As part of an application for the Approval of Matters Specified in Condition, full
drainage calculations and the final layout and depth of the proposed SUDS
ponds and associated infrastructure to be agreed in writing with the Council as
Planning Authority, in consultation with Perth and Kinross Council Flooding
Team. The agreed detail shall thereafter be implemented prior to the completion
of development. 
Reason - In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk. 
Contaminated Land 
29.  Prior to the commencement of works on site, an evaluation for the potential of the
site to be affected by contamination by a previous use should be undertaken and
as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) will be
submitted for consideration by the Council as Planning Authority. If after the
preliminary risk assessment identifies the need for further assessment, an
intrusive investigation should be undertaken to identify; 
a) the nature, extent and type(s) of contamination on the site 
b)  measures to treat/remove contamination to ensure the site is fit for the use
c)  proposed measures to deal with contamination during construction works 
d)  condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
agreed measures to decontaminate the site shall be fully implemented as
approved by the Council as Planning Authority. Validation that the scheme has
been fully implemented must also be submitted to the Council as Planning
Authority. 
Reason - In order to deal with any potential ground contamination. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
PROCEDURAL NOTES 
Consent shall not be issued until the Section 75 Agreement has been modified,
signed and registered to take account of this application. The legal agreement

Page 29

should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed and could be ultimately
recommended for refusal under delegated powers. 
INFORMATIVES 
1.  The applicant is advised that to enable some of the negative suspensive
conditions to be fulfilled works which are operational development may have to
be undertaken out with the application site. These works themselves may require
the submission of a planning application. 
2.  The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works.
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess. Advice on
the disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environment Protection Agency. 
3.  The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the commencement
of roadworks. Advice on the disposal of surface water must be sought at the
initial stages of design from Scottish Water and the Scottish Environment
Protection Agency. Please note that a fee is chargeable for the processing of
RCC applications. 
4.  The applicants are advised that they must apply to the Roads Authority for
construction consent to form a new street. Please contact The Construction and
Maintenance Manager, The Environment Service, Perth and Kinross Council,
Pullar House, Perth. 
5.  The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water’s assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
6.  The applicant is advised that the works may need a license under the Water
(Controlled Activities) Regulations 2005 (CAR). The applicant should contact
SEPA's Perth Environmental Protection and Improvement Team (Tel: 01738
627989) in regard to this. The applicant should ensure that all works on site
comply with the best practice guidelines laid out in SEPA's published Pollution
Prevention Guidance, found at www.sepa.org.uk

Page 30

7.  The Council's Community Waste Adviser in the Environment Service should be
contacted to clarify the bin storage and recycling requirements for the
development. 
8.  The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a development
does not provide a defence against prosecution under this act. 
9.  The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species. Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
10.  The Council shall be immediately notified in writing if any ground contamination is
found during construction of the development, and thereafter a scheme to deal
with the contamination shall be submitted to, and agreed in writing by, the
Council as Planning Authority. 
11.  The applicant should be aware that any proposal for noise or vibration sensitive
use adjacent to the railway may result in neighbour issues arising. Every
endeavour should be made by the applicant in relation to adequate protection of
the uses contained within the site. 
12.  The proximity and type of planting proposed are important when considering a
landscaping scheme. Leaf fall in particular can greatly impact upon the reliability
of the railway in certain seasons. Network Rail can provide details of planting
recommendations for neighbours. 
13.  Where trees/shrubs are to be planted adjacent to the railway boundary these
should be positioned at a minimum distance from the boundary which is greater
than their predicted mature height. Certain broad leaf deciduous species should
not be planted adjacent to the railway boundary. 
14.  Buildings should be situated at least 2 metres from Network Rail's boundary. 
The applicant must ensure that the construction and subsequent maintenance of
proposed buildings can be carried out without adversely affecting the safety of, or
encroaching upon, Network Rail's adjacent land. 
15.  Construction works must be undertaken in a safe manner which does not disturb
the operation of the neighbouring railway. Applicants must be aware of any
embankments and supporting structures which are in close proximity to their
development. 
16.  Details of all changes in ground levels, laying of foundations, and operation of
mechanical plant in proximity to the rail line must be submitted to Network Rail's
Asset Protection Engineer for approval prior to works commencing on site. 
Where any works cannot be carried out in a "fail-safe" manner, it will be

Page 31

necessary to restrict those works to periods when the railway is closed to rail
traffic i.e. by a "possession" which must be booked via Network Rail's Asset
Protection Engineer and are subject to a minimum prior notice period for booking
of 20 weeks. 
17.  The developer is advised to contact Sophie Nicol, Archaeologist to discuss terms
of reference for work required Tel 01738 477027. 
18.  For guidance on cycle paths please see Sustrans Design Manual Handbook for
cycle-friendly design (drawings on P21-22). 
19.  Please consult the Street Naming and Numbering Officer, The Environment
Service, Perth and Kinross Council, Pullar House, 35 Kinnoull Street, Perth PH1
5GD. 
20.  Any structures & all walls/embankments that act singly or together to support a
carriageway or footpath & retain over 1.5m fill will require Technical Approval. 
21.  The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
22.  This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development
• Readily visible to the public
• Printed on durable material. 
23.  The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste. 
24.  If there is any proposal to alter a route of an existing core path or right of way a
further legal procedure is required. The granting of planning permission does not
stop the continued right of public access along the existing core path or right of
way. An order under the Town and Country Planning (Scotland) Act 1997,
Section 208 or an amendment of the Core Path Plan under the Land Reform
(Scotland) Act 2003 should be sought.

Page 32

Background Papers:  4 letters of representation
Contact Officer: Alan Atkins
Date:  30 August 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD – ECONOMY, DEVELOPMENT & PLANNING