PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 3 July 2024 at 9.30am. 
Present: Councillors I Massie, G Stewart, Bailie C Ahern (substituting for Councillor
D Illingworth), Councillor K Allan, Bailie A Bailey (substituting for Councillor
B Leishman), Councillor B Brawn, Bailie R Brock (substituting for D Cuthbert),
Councillors A Forbes (substituting for Councillor C Reid), K Harvey, I James, Bailie
C McLaren, Councillor R Watters and Bailie M Williamson. 
In Attendance: D Littlejohn, Strategic Lead – Economy, Development and Planning,
J Janes, L MacLean, C Morilly, S Panton, L Reid, K Smith and R Stewart (all
Economy, Place and Learning); A Brown, S Dockerill, C Elliott and J Guild (all
Strategy, People and Resources). 
Apologies: Councillors D Cuthbert, D Illingworth, B Leishman and C Reid. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.   
2. DECLARATIONS OF INTEREST 
In terms of the Councillors Code of Conduct: 
(i) Councillor A Forbes declared a non-financial interest in Item 5(1)(iii). 
3. MINUTES 
The Minute of Meeting of Planning and Placemaking Committee of 5 June
2024 was submitted and approved as a correct record. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
23/01341/FLM 5(1)(i)
23/02134/IPM 5(1)(ii)
24/00594/AMM 5(1)(iii)
24/00589/FLL 5(2)(i)

Page 2

5. APPLICATIONS FOR DETERMINATION 
(1) Major Application 
(i) 23/01341/FLM - Mixed use development comprising golf
driving range (class 11) with café (class 3), retail unit (class
1A), formation of vehicular access and parking,
landscaping and associated works, land 240 metres north
east of Lethangie Waste Water Treatment Works, Kinross
(Report No. 24/204) 
Mr Panton introduced the report and advised an update had
been circulated to members prior to the meeting, advising of the
removal of the objection from SEPA referred to in Paragraph 30
and 116-119.  With the removal of the objection, it was also
advised that suggested Reason 3 for refusal would not be
required. 
Mr H Marchbank, agent and Mr J Montgomery, on behalf of the
applicant, addressed the Committee and answered Members
questions. 
Motion (Councillors R Watters and I James) 
Grant, the application subject to suitable terms, conditions and
informatives, on the basis there are material reasons to justify
departure from the Local Development Plan including benefits to
employment, local economy and tourism. 
Conditions
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason: To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason: This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. The café hereby approved shall be limited to a maximum
of 40 covers and shall only be open at such time that the
golf driving range is open. 
Reason: In order to ensure that the café remains ancillary
to the golf driving range use and to ensure there is no
detrimental impact upon the café offering in the nearby
Kinross and Milnathort Town Centres.

Page 3

Amenity
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason: In order to safeguard the neighbouring
residential amenity in the area.
5. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason: In order to safeguard the residential amenity of
the area.
6. All external lighting for the golf driving range shall not be
operated between the hours of 2300 and 0700hours
daily. 
Reason: In order to safeguard the residential amenity of
the area.
7. The hours of operation for the golf driving range shall be
restricted to 0800hours to 2200hours daily. 
Reason: In order to safeguard the residential amenity of
the area.
8. Prior to the development hereby approved being
completed or brought into use, an effective ventilation
system commensurate with the nature and scale of
cooking to be undertaken shall be installed and operated
such that cooking odours are not exhausted into or
escape into any neighbouring buildings.  Thereafter the
system shall be maintained.
Reason: In order to safeguard the amenity of occupants
of nearby premises and to ensure the provision of a
satisfactory ventilation system for the premises.
9. Servicing of and deliveries to the premises shall be
carried out between 0700 and 1900 Monday to Saturday
only, with no servicing or deliveries permitted on
Sundays.
Reason: In order to safeguard the residential amenity of
the area.
10. Within 2 months of receipt of a written request by the
Council as Planning Authority, following a substantiated
noise and/or light complaint from a sensitive property, the
operator/applicant shall, at its own expense, employ an
appropriate consultant approved by the Planning
Authority to carry out an assessment of noise and/or light
from the development.  The required assessment shall be
submitted to and approved in writing by the Planning
Authority.  The assessment must identify any mitigation

Page 4

measures required if appropriate.  Any mitigation
measures identified shall be implemented on site in
accordance with a timescale to be agreed with the
Planning Authority.
Reason: In order to safeguard the residential amenity of
the area.
Transport
11. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b. timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c. a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d. arrangements for liaison with the Roads Authority
regarding winter maintenance;
e. emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f. arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
g. arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h. arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i. details of information signs to inform other road
users of construction traffic;
j. arrangements to ensure that access for emergency
service vehicles are not impeded;
k. co-ordination with other significant developments
known to use roads affected by construction traffic;
l. traffic arrangements in the immediate vicinity of
temporary construction compounds;
m. monitoring, reporting and implementation
arrangements; 
n. arrangements for dealing with non-compliance; and
o. details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered to during
the entire site construction programme.

Page 5

Reason: In the interests of pedestrian and traffic safety.
12. Prior to the commencement of the development hereby
approved, full visibility splays of 160 metres along the
channel line shall be provided to the left and right of the
access, at a set-back of 2.4 metres measured 1.05m
above the road level to the standard and specification
required by the Council as Roads Authority to the
satisfaction of the Planning Authority.  The visibility splays
shall be physically formed on the ground and any existing
fences, walls, hedges or other means of enclosure or
obstructions within the splays shall be removed and
relocated outwith the splays.  Once formed, the visibility
splays shall be permanently retained thereafter, and no
visual obstruction of any kind shall be permitted within the
visibility splays so formed.
Reason: In the interests of road safety; to ensure the
provision of adequate visibility of the vehicular access.
13. No part of the development shall be occupied until a
Green Travel Plan (GTP), aimed to encourage more
sustainable means of travel, has been submitted to and
agreed in writing by the Council in consultation with
Transport Planning.  The GTP will have particular regard
to provision for walking, cycling and public transport
access to and within the site and will identify the
measures to be provided (including the provision of new
cycle storage, path links), the system of management,
monitoring, review, reporting and the duration of the plan.
Reason: In order to promote sustainable methods of
travel.
14. Prior to commencement of any development on site, a
detailed design for the proposed secure covered e-bike
cycle parking facility for a minimum of 12 cycles shall be
submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority.  The e-
bike cycle parking, as approved in writing, shall be
implemented in accordance with the approved details to
the satisfaction of the Council as Planning Authority prior
to the development being brought into use.
Reason: In order to promote sustainable methods of
travel.
15. No development in connection with the permission
hereby granted shall commence unless the vehicular
access has been provided and surfaced in accordance
with Perth & Kinross Council's Road Development Guide
Type C Figure 5.7 access detail, of Type B Road
construction detail.  The Type B Road construction detail
shall continue to the entrance for a distance of 6 metres.
Once provided, the vehicular and pedestrian access shall
thereafter be permanently retained as such.
Reason: In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.

Page 6

16. Prior to the commencement of development on site, a
detailed design for the path connection to the east of the
site to the Heritage Trail and for the drainage outfall to the
North Queich Burn shall be submitted to and approved in
writing by the Planning Authority in consultation with the
Roads Authority.  The path connection and drainage
outfall, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority and undertaken prior
to the commencement of construction associated with
this planning application (23/01341/FLM).  For the
avoidance of doubt, it is the applicant’s responsibility to
ensure that the correct consents are in place to deliver
the required infrastructure.
Reason: In the interests of ensuring suitable
infrastructure is in place to promote active travel
connections.
Core Path Network
17. Prior to the commencement of the development hereby
approved, a management plan indicating any temporary
diversions and signage needed to facilitate the
development and/or any works proposed to the right of
way/core path as part of the development shall be
submitted for the agreement of the Council as Planning
Authority.  The plan as agreed shall be implemented in
accordance with the timings identified in the plan.
Reason: To ensure continued public access to the public
paths and in the interests of public safety within the site.
Flooding
18. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason: To ensure the provision of effective drainage for
the site.
19. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason: To ensure the provision of effective drainage for
the site.
Biodiversity and Landscaping
20. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the

Page 7

approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  Protection
measures, once in place, shall remain in place for the
duration of construction.
Reason: To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
21. All trees on site, other than those marked for felling on
the approved plans, shall be retained.
Reason: To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
22. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason: In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
23. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 22 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason: In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
24. Prior to the commencement of works, a Construction
Method Statement (CMS) shall be submitted to the
Council for written approval.  The CMS must outline
measures to protect the adjacent watercourses from the
impacts of pollution and sediment to ensure no adverse
effects on Loch Leven and surrounding water courses. 
Reason: In the interests of protecting environmental
quality and of biodiversity.
25. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, all measures
listed in the submitted Biodiversity Enhancement
Measures and Biodiversity Net Gain Calculation Report
(Tay Ecology, July 2023) must be provided.

Page 8

Reason: In the interests of protecting environmental
quality and of biodiversity.
26. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason: In order to prevent animals from being trapped
within any open excavations.
27. The findings and recommendations contained within the
supporting biodiversity survey submitted and hereby
approved remain valid for a period of 24 months.  If the
approved planning permission is not implemented within
24 months of the date of the survey, an updated survey is
required.
Reason: In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
Archaeology
28. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT. The PERD shall be carried out in complete
accordance with the approved details.  Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason: To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.

Page 9

Justification
The proposal is considered a minor departure from the adopted
Local Development Plan, however, there are material
considerations which justify a departure. 
Informatives
1.  Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3.  No work shall be commenced until an application for
building warrant has been submitted and approved.
4.  This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
5.  This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development 
• Readily visible to the public

Page 10

• Printed on durable material.
6.  Please remember that the granting of planning
permission, listed building consent or other associated
consent by the Planning Authority does not affect the
responsibility of the developer to ensure all other
necessary permissions, consents and approvals are in
place prior to commencement of works.  Developers
should also ensure appropriate accommodations are
made in respect of services and third party infrastructure
and may wish to check proposals against the information
held at https://www.linesearchbeforeudig.co.uk/. 
7.  The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
8.  Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations.
9. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
10.  Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (Section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
11.  The granting of planning permission does not stop the
continued right of public access along the existing core
paths MTHT/102, MTHT/104, and MTHT/112 . An order
under the Town and Country Planning (Scotland) Act
1997, Section 208 or an amendment of the Core Path
Plan under the Land Reform (Scotland) Act 2003 should
be sought in advance of any works authorised by this
planning permission being commenced.  All relevant
approvals should be in place prior to any stopping up and
diversion of the core path taking place.
12.  The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice

Page 11

relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk 
13.  Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.
14.  The applicant is advised that the granting of planning
permission does not guarantee right of access to the site. 
This should be agreed with the relevant landowner(s)
prior to the commencement of the development.
15.  An inspection of the proposed development site did not
raise any real concerns, although historical mapping
indicates there was previously a nearby use which may
have resulted in contamination in the vicinity of the site. 
The applicant is advised that, given historical uses of the
wider area, there may be potential for contamination
within the site.  Should any contamination be found
during the approved works, works should cease and the
Land Quality team should be contacted on 01738 475000
or es@pkc.gov.uk for further advice.
16.  The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
17.  The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
18.  The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
19.  The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport
Scotland’s Cycling by Design 2021 or similar design
guidance.
20.  Road drainage may be in the vicinity of the new access
and require remedial works.  Contact Perth & Kinross
Council Road Maintenance Department for further details.
21.  The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain consent from the Council to place, maintain

Page 12

or adjust apparatus in or under a road, or to remove
apparatus from a road. 
22.  This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to flooding and
drainage arrangements. 
Amendment (Bailie A Bailey and Councillor K Harvey) 
Refuse, subject to Reasons 1 and 2 contained in Report 24/204. 
In terms of Standing Order 21.5 a roll call vote was taken. 
7 members voted for the Motion as follows:
Ahern, Allan, Brock, Forbes, James, McLaren, Watters 
6 members voted for the Amendment as follows:
Bailey, Brawn, Harvey, Massie, Stewart, Williamson 
Resolved:
In accordance with the Motion. 
(ii) 23/02134/IPM - Mixed use development comprising of the
erection of a poultry processing facility and demolition of
existing poultry processing facility for residential,
commercial, industrial uses including parking areas,
vehicular access, landscaping and associated works, 2
Sisters Food Group, George Street, Coupar Angus,
Blairgowrie, PH13 9LU (Report No. 24/205) 
Mr Panton introduced the report and advised the following
updates had been circulated to members prior to the meeting:
(i) Amended wording for Condition 1.
(ii) Amended wording for the Procedural Note.
(iii) Amendment to condition numbers referred to in the report
as follows:
• Paragraph 105 refers to condition 20 and should be
condition 21 
• Paragraph 125 refers to condition 20 and should be
condition 21 
• Paragraph 125 refers to condition 25 and should be
condition 26 
• Paragraph 133 refers to condition 23 and should be
condition 24 
• Paragraph 134 refers to condition 24 and should be
condition 25
(iv) Amended wording for Condition 28.

Page 13

Mr J Wall, agent on behalf of the applicant, accompanied by
Mr S McCarthy, applicant and Mr M Summers, addressed the
Committee and answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. Application for the approval required by a condition
imposed on this Planning Permission in Principle shall
conform with the requirements of Regulation 12 of the
Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 and of Section
59 (2) and (3) of the Town and Country Planning
(Scotland) Act 1997 as amended by Section 21 of the
Planning etc. (Scotland) Act 2006 and, in particular, must
be made before whichever is the latest of the following:
(i)  the expiration of 5 years from the date of the
granting of permission
(ii) the expiration of 6 months from the date on which an
earlier application for the requisite approval was
refused, or
(iii)  the expiration of 6 months from the date on which an
appeal against such refusal was dismissed.
Reason: In accordance with the terms of Section 59 of
the Town and Country Planning (Scotland) Act 1997 as
amended by Section 21 of the Planning etc. (Scotland)
Act 2006.
2. Plans and particulars of the matters listed below shall be
submitted for consideration by the planning authority, in
accordance with the timescales and other limitations in
Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended).  No work shall begin until the
written approval of the Planning Authority has been given,
and the development shall be carried out in accordance
with that approval.  For the avoidance of doubt, no
approval is hereby given to the layout shown in the
illustrative development framework which forms part of
the application for planning permission in principle.  The
specified matters include:
(a)  a site development layout and phasing plan showing
a phased implementation programme, including: the
location/position of all uses within the site; the
proposed built form (including orientation of
buildings); movement around and through the site,
including pedestrian and cycle links and landscape
provision;
(b)  for each phase of the development, a plan detailing
the siting, design and height of development,
including the design of all external features;

Page 14

(c)  design and configuration of public and open spaces,
all external materials and finishes;
(d)  car and cycle parking, access, road layouts and
alignment, classification of streets, and servicing
areas;
(e)  footpaths and cycle routes, including proposed multi-
use paths, the designs shall detail pedestrian and
cyclist priority junctions at the proposed vehicular
access points along the shared use cycleway on the
A94 and right turn ghost island facilities into the site;
(f)  details of safe pedestrian crossing points at all
vehicle entrances over core path COUP/139;
(g)  waste management and recycling facilities;
(h)  surface water and drainage arrangements;
(i)  a detailed levels survey (existing and proposed) and
cross sections showing proposed finished ground
and floor levels of all buildings forming part of the
development phase, relative to existing ground
levels and a fixed datum point;
(j)  full details of sustainability measures in accordance
with LDP2 Policy 32: Embedding Low and Zero
Carbon Generating Technology in New
Development;
(k)  hard and soft landscaping details, including:
i.  the type and location of new trees, shrubs and
hedges;
ii.  a schedule of plants to comprise species, plant
size and proposed number/density;
iii.  programme of completion and subsequent
maintenance including a separate maintenance
plan for the SuDS areas;
iv.  existing and proposed services such as cables,
pipelines, substations;
v.  other artefacts and structures including street
furniture, lighting columns and fittings; and 
vi.  details of phasing of these works in relation to
implementation and phasing of the
development.
Reason: To ensure that the matters referred to within this
Planning Permission is Principle are given full
consideration and to accord with the requirements of
Section 59 Town and Country Planning (Scotland) Act
1997 (as amended).
3. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that

Page 15

all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT.  The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason: To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.
4. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council
as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council’s Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.  
Reason: To reduce flood risk.
5. In pursuance of Condition 2(i), the finished floor level(s)
shall be set a minimum of 600mm above the 1 in 200
AEP event including 39% climate change flood level
expected adjacent to the built development. The Phase 1
minimum FFL is 52.31mAOD and Phase 2 is
52.87mAOD.  In addition, the finished floor levels shall be
set a minimum of 150mm above adjacent ground levels.
Reason: In the interests of flood prevention.
6. Prior to the commencement of development of each
phase, details of a temporary surface water treatment
facility shall be submitted to the Council as Planning
Authority for approval.  Thereafter, concurrent with the
initiation of the development hereby approved and for the
duration of construction, the approved temporary surface
water treatment facility shall be implemented on site and
maintained for the duration of the approved development
works.  The temporary surface water treatment facility
shall remain in place until the permanent surface water
drainage scheme is implemented unless otherwise
agreed in writing by the Council as Planning Authority. 
Reason: In the interests of flood prevention.

Page 16

7. All matters regarding: access, car parking, public
transport facilities, walking and cycling facilities, the road
layout, design, and specification (including the disposal of
surface water) shall be in accordance with the standards
required by the Council as Roads Authority (as detailed in
the National Roads Development Guide) and to the
satisfaction of the Planning Authority. 
Reason: To ensure the roads and accesses are
developed to an acceptable standard.
8. As part of any application for the Approval of Matters
Specified by Condition (AMSC), the applicant shall
include a updated transport assessment (relating to the
different land uses) scoped to include the means of
access to the site from the wider public road network to
include all modes of transport (walking, cycling, public
transport, private car and HGV movements), to the
satisfaction of and approved in writing by the Council as
Planning Authority.
Reason: In the interests of road safety.
9. As part of any application for the Approval of Matters
Specified by Condition (AMSC), a Stage 1 Road Safety
Audit shall be submitted to and approved in writing by the
Council as Planning Authority.  The road safety audit
shall also include an assessment of the need for a
revision to the national speed limit, informed by a traffic
speed survey along the A94.
Reason: In the interests of road safety. 
10. As part of any application for the Approval of Matters
Specified by Condition (AMSC), the applicant shall
provide detailed designs for the pedestrian and cyclist
connectivity to the development to the North of the site
and to the Co-Op store in George Street.
Reason: In the interests of road safety and in the interest
of promoting walking and cycling as sustainable modes of
travel.
11. As part of any application for the Approval of Matters
Specified by Condition (AMSC), the applicant shall detail
adequate parking facilities for each class of use in
accordance with the National Roads Development Guide.
HGV parking and EV Parking for the factory shall also be
included as part of any detailed application.
Reason: To provide a suitable parking provision for the
development. 
12. As part of any application for the Approval of Matters
Specified by Condition (AMSC), the applicant shall
provide a detailed design for the upgrading of existing
bus stops on George Street , or another location as
agreed with the Public Transport Unit.  Coupar Angus
bound, the applicant shall provide a detailed design for
the supply and installation of a new enclosed bus shelter
set back from footpath. Perth bound, the applicant shall
provide a detailed design for the supply and installation of

Page 17

a reverse cantilever bus shelter.  The applicant shall
provide a detailed design for the supply and installation of
Real Time Passenger Information (RTPI) mountings,
cabling, and displays for Bus Shelters serving both
directions.  Thereafter, prior to the occupation or bringing
into use of the development, the agreed details shall be
implemented in full.
Reason: In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
13. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a)  restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b)  timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c)  a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
e)  emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f)  arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
g)  arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h)  arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i)  details of information signs to inform other road
users of construction traffic;
j)  arrangements to ensure that access for emergency
service vehicles are not impeded;
k)  co-ordination with other significant developments
known to use roads affected by construction traffic;
l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
m)  the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior
to the commencement of construction;

Page 18

n)  monitoring, reporting and implementation
arrangements; 
o)  arrangements for dealing with non-compliance; and
p)  details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason: In the interests of proper site management.
14. No part of the residential development shall be occupied
until a Residential Travel Plan (RTP), aimed to encourage
more sustainable means of travel, has been submitted to
and agreed in writing by the Council as Planning
Authority.  The RTP will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.
Reason: To promote sustainable transport options.
15. All plant or equipment associated with the commercial
units and residential units shall be so enclosed,
attenuated and/or maintained such that any noise
therefrom shall not exceed Noise Rating 35 between
0700 and 2300 hours daily, or Noise Rating 25 between
2300 and 0700 hours daily, within any neighbouring
residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve
chart.
Reason: In the interests of protecting residential amenity.
16. As part of any application for the Approval of Matters
Specified by Condition (AMSC) relating to the commercial
uses, the applicant shall submit for approval a Noise
Impact Assessment demonstrating that the sound
insulation and sound transmission properties of the
structure and finishes of the commercial units shall be
such that any airborne noise from the operations within
the premises does not constitute a statutory noise
nuisance as determined by the local Planning Authority. 
Reason: In the interests of protecting residential amenity.
17. For each phase of development, a Lighting Plan shall be
submitted for approval to the Council as Planning
Authority, to ensure that all external lighting shall be
sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and
that light spillage beyond the boundaries of the site is
minimised to a degree that it does not adversely affect
the amenity of the neighbouring land.  Prior to the first
occupation or uptake of the use of the relevant
development phase, the approved Lighting Plan shall be
installed and maintained in perpetuity thereafter.
Reason: In the interests of protecting residential amenity.
18. Noise from operations of the commercial units shall not
exceed L A90,1 hour (0700 – 2300) or exceed L A90,15
mins (2300 – 0700) background noise level plus 5dB (A),

Page 19

including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when
measured at any residential property in accordance with
BS4142:2014+A1:2019.
Reason: In the interests of protecting residential amenity.
19. At approval of matters stage for the new poultry
processing facility or any other phase of development for
uses within Use Class 4, 5 or 6, full details of an acoustic
fence designed to protect residential amenity shall be
submitted for approval of the Council as Planning
Authority.  Prior to the occupation or uptake of the use of
the relevant development phase, the approved acoustic
fence shall be installed, and maintained in perpetuity
thereafter.
Reason: In the interests of protecting residential amenity.
20. For each phase of development, an updated Ecological
Impact Assessment (EcIA) shall be undertaken by
suitably qualified and experienced persons shall be
submitted.  The EcIA must include the woodland in the
north, bats in buildings, bat roost potential of trees to be
felled/within 30m of works, Schedule 1 breeding birds and
inclusion of pre-commencement walk over surveys in the
mitigation measures. 
Reason: In the interests of protecting environmental
quality.
21. At least two months prior to the commencement of
development, a site specific, Construction Environment
Management Plan (CEMP), shall be submitted for the
further written agreement of the Council Planning
Authority.  Thereafter the CEMP will be updated to reflect
the phasing of the development and strictly adhered to
during the entirety of the construction phases. Measures
to be included within the CEMP comprise:
• The use of British Standards Best Practice
Guidelines to reduce disturbance resulting from
noise, surface run-off and vibration during works;
• Scottish Environment Protection Agency (SEPA)
Pollution Prevention Guidelines (PPG), incorporating
procedures for emergency environmental incidents
such as pollution events and encountering protected
species. A review plan for the PPGs is currently
underway, resulting in a replacement guidance
series, with new branding and title "Guidance for
Pollution Prevention" (GPPs). It is recommended
that the following PPG and GPP are considered:
− PPG1: Understanding your environmental
responsibilities - good environmental practices;
− GPP5: Works and maintenance in or near
water;
− PPG6: Working at construction and demolition
sites;

Page 20

− GPP21: Pollution incident response planning;
and
− GPP 22: Dealing with spills.
• Pollution prevention measures including procedures
for oils and chemicals to prevent the release of any
accidental spillages and effects associated with
contaminated surface run-off;
• Supervision of delivery of fuel and oils with pipelines
and fuelling points protected from vandalism and
unauthorised interference, including being turned off
and locked when not in use to prevent effects
associated with the encroachment of construction
vehicles and plant and contaminated surface run-off;
• Use of drip trays when filling smaller containers from
tanks or drums to avoid drips and spills from
entering the ground or drainage systems and
watercourses to prevent effects associated with
contaminated surface run-off;
• Measures to minimise noise, vibration and dust; and
• Limiting construction works to daylight hours only
where possible, or having a suitable lighting strategy
in place, in order to minimise effects to nocturnal
faunal species.
Furthermore, the Construction Environmental
Management Plan (CEMP) shall include potential
constraints and mitigation with regard to potential or
confirmed ecological features identified in the updated
Ecological Impact Assessment.
Reason: to control pollution of air, land and water and.to
mitigate the adverse impact of development traffic on the
safe and efficient operation of the trunk road. 
22. Development shall not commence until a detailed
Construction Environmental Management Plan (CEMP)
detailing environmental mitigation measures, including
biodiversity and the control of dust and noise, shall be
submitted for the further written agreement of the Council
as Planning Authority.  Thereafter the CEMP will be
strictly adhered to during the entirety of the construction
phases.
Reason: In the interests of protecting environmental
quality.
23. Prior to the commencement of works on each
development phase, an evaluation for the potential of the
site to be affected by contamination by a previous use
should be undertaken and as a minimum, a Preliminary
Risk Assessment (Phase 1 Desk Study) will be submitted
for consideration by the Council as Planning Authority.  If
after the preliminary risk assessment identifies the need
for further assessment, an intrusive investigation should
be undertaken to identify;

Page 21

I. the nature, extent and type(s) of contamination on the
site 
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed 
III. measures to deal with contamination during
construction works 
IV. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the agreed measures to decontaminate
the site shall be fully implemented as approved by the
Council as Planning Authority. Validation that the scheme
has been fully implemented must also be submitted to the
Council as Planning Authority.
Reason: In order to deal with any potential contamination
of the site as a result of its former use.
24. The development shall be in accordance with the
requirements of Perth & Kinross Council’s Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 20: Affordable Housing
of the Perth & Kinross Local Development Plan 2 (2019),
or such subsequent Guidance and Policy which may
replace these.
Reason: To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council’s policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2023.
25. The development shall be in accordance with the
requirements of Perth & Kinross Council’s Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 5: Infrastructure
Contributions of the Perth & Kinross Local Development
Plan 2 (2019) with particular regard to primary education
infrastructure, or such subsequent Guidance and Policy
which may replace these.
Reason: To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council’s policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2023.
26.  At least two months prior to the commencement of the
development, an independent and suitably qualified
ecologist shall be appointed by the developer at their
expense as the ‘Ecological Clerk of Works’ (ECOW) for
the site.  This appointment shall be subject to the prior
written approval of the Planning Authority and detail the
extent of inspections to be undertaken by the ECOW and
how this relates to the delivery of the development
phases.  The ECOW shall oversee, on behalf of the
Planning Authority, the implementation of all ecology
related planning conditions and how this relates to the

Page 22

phase of development being constructed.  The ECOW
shall undertake a watching brief throughout the
construction of the development phase and shall have the
authority to stop operations or to alter construction
methods should there be any works occurring which are
having an adverse impact on natural heritage.
The ECOW shall have responsibility for the following:
a) Monitoring compliance with the mitigation works
related to the development as set out in the
Construction Environment Management Plan.
b)  Advising the developer on adequate protection of
nature conservation interest on the site, including
altering construction practices if existing practices
are having an adverse impact on the natural
heritage of the site.
c)  If any protected species are found on site, the
Ecological Clerk of Works will ensure that work is
suspended at that location and that a protected
species protection plan is implemented.
The ECOW is required to notify the Planning Authority:
d) If there has been a requirement to stop or alter
works in relation to this condition.
e)  They are required to submit a report on their
inspection (frequency to be agreed) for the review of
the Planning Authority in consultation with Scottish
Environment Protection Agency where necessary,
during construction operations.
f)  They will have the power to amend the CEMP,
where required, with any amendments and
measures to mitigate submitted to the Planning
Authority.
Reason: In order to ensure that an ECOW is appointed
and is suitability qualified and has a suitable job
description and powers to oversee all salient ecological
matters affecting the Construction phases of the
development.
27. As part of any application for the Approval of Matters
Specified by Condition (AMSC) a Site Biodiversity Action
Plan including biodiversity enhancement measures shall
be submitted for approval of the Council as Planning
Authority.  Thereafter, the approved Action Plan will be
implemented in full prior to the first occupation or uptake
of the use of the relevant development phase.
Reason: In the interests of protecting and enhancing
biodiversity.
28. As part of any application for the Approval of Matters
Specified by Condition (AMSC), a tree protection plan,
Arboricultural Impact Assessment and Arboricultural
Method Statement shall be submitted prior to the
commencement of development for the approval of the
Council as Planning Authority.  Thereafter, the approved
Action Plan will be implemented in full prior to the first

Page 23

occupation or uptake of the use of the relevant
development phase.
Reason: In the interests of protecting environmental
quality and of biodiversity.
29. As part of any application for the Approval of Matters
Specified by Condition (AMSC) a detailed landscaping
and planting scheme including details of the species,
height, size, location, density and maintenance regime of
trees and shrubs to be planted, shall be submitted.  The
scheme must illustrate that adequate compensatory tree
planting for lost trees will be achieved with at least 3 trees
planted for every tree lost.
Reason: In order to justify the loss of any trees and to
ensure that adequate landscaping is provided for the
development.
30. As part of each application for the Approval of Matters
Specified by Condition (AMSC) details of the specific
measures for the installation and operation of low and
zero-carbon generating technologies reduce energy to
demand and emissions from the development shall be
submitted.
Reason: in the interests of reducing carbon emissions. 
Justification
The proposal is considered a minor departure from the
Development Plan however there are material reasons which
justify departing from the Development Plan. 
Procedural Notes
SEPA has submitted a holding objection to the proposed
development, in relation to flood risk.  If the Planning and
Placemaking Committee agree with the recommendation to
approve the application, then the application will have to be
referred to the Scottish Ministers for authority to proceed. 
Informatives
1. Additional groundwater monitoring should be carried out
over a full calendar year to include both summer and
winter periods.
2. If there is any proposal to alter a route of an existing core
path or right of way a further legal procedure is required. 
The granting of planning permission does not stop the
continued right of public access along the existing core
path or right of way.  An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an
amendment of the Core Path Plan under the Land
Reform (Scotland) Act 2003 should be sought.
3. The applicant is advised that the granting of planning
consent does not guarantee a connection to Scottish
Water's assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public

Page 24

wastewater system and/or water network and all their
requirements must be fully adhered to.
4. Where necessary, no work shall be commenced until an
application for building warrant has been submitted and
approved.
5. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent, unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
6. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works. Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.
7. Advice on the disposal of surface water should be sought
at the initial stages of design from Scottish Water and
SEPA. 
THE COMMITTEE TOOK A 5 MINUTE RECESS. 
HAVING DECLARED A NON-FINANCIAL INTEREST IN THE FOLLOWING ITEM
COUNCILLOR A FORBES LEFT THE MEETING AT THIS POINT. 
(iii) 24/00594/AMM - S42 application to vary condition 9
(signalised junction) of permission 21/02137/AMM, The
James Hutton Institute, Errol Road, Invergowrie, Dundee,
DD2 5DA (Report No. 24/206) 
Mr A Cox, James Hutton Institute, on behalf of the applicant,
addressed the Committee and answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason: To ensure the development is carried out in
accordance with the approved drawings and documents.
2. Prior to the use of any lifting equipment including cranes
etc the applicant must receive written confirmation from
Dundee Airport that aircraft departing and arriving on
runway 09/27 will be safeguarded.  Furthermore, the
applicant must receive written confirmation from Dundee
that the use of lights, during construction, shall not dazzle

Page 25

nor distract aircraft preparing to land at Dundee Airport,
all to the satisfaction of the Council as Planning Authority.
Reason: To not impact on the operations of Dundee City
Airport.
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason: In order to safeguard the residential amenity of
the area.
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason: In order to safeguard the residential amenity of
the area.
5. No part of the development shall be occupied or brought
into use, whichever is the earlier, until the applicant has
provided the minimum parking provision as shown on
drawing number 39 or 66 of planning approval
21/02137/AMM, to the satisfaction of the Council as
Planning Authority.  Once provided, the parking shall
thereafter be permanently retained as such for the life of
the development.
Reason: To provide a suitable parking provision for the
development.
6. Prior to the occupation of any of the development hereby
approved, the proposed modifications to the A90/Main
Street Roundabout, generally as illustrated on Drawing
No. 135585/sk7001 - page 86 of Transport Assessment
(PKC Ref: 20/01103/16) by Fairhurst dated April 2020,
shall be implemented and available for use for any
vehicles travelling to the site, subject to the satisfaction of
the Planning Authority, after consultation with Transport
Scotland.
Reason: To ensure that the standard of access layout
complies with the current standards, and that the safety
and free flow of traffic on the trunk road is not diminished.
7. No part of the development hereby approved shall be
occupied until the approved Staff Travel Plan (STP)
(document 71 of permission 21/02137/AMM) has been
updated.  The update shall be reflective of the removal of
the proposed mitigation works identified at A85 Riverside
Avenue/Main Street Junction and shall have regard for
the revised operational situation within the development
area identified on drawing number 1.  The updated STP
shall be submitted to and agreed in writing by the Council

Page 26

as Planning Authority in consultation with Transportation
and Development.  Thereafter, the agreed STP shall be
brought into effect in line with the bringing into use of the
development and will be subsequently implemented for
the life of the development. The STP will have particular
regard to the following:
• provision for walking, cycling and public transport
access to and within the site and will identify the
measures to be provided;
• the vehicular routes to the site for staff and visitors
to access and egress the site;
• the system of management, monitoring, review,
reporting; and,
• the duration of the plan.
Reason: To promote sustainable transport options and to
meet advice within National Planning Framework on
transport.
8. The details submitted and agreed as part of condition 8 of
planning permission 21/02137/FLM (drawing number 50)
with regards to Construction Traffic Management Scheme
(TMS), shall be adhered to at all times to the satisfaction
of the Council as Planning Authority, unless otherwise
agreed in writing by the Council as Planning Authority. 
The TMP is to remain a fluid document and will be
required to be updated where necessary
Reason: In the interest of proper site management.
9. Access along core path INGI/8 and Right of Way 52/8, or
along the short diversion as specified in drawing number
38 should remain open for responsible access throughout
the construction phase.  On completion the diversion
must be removed and access along the original core
path/Right of Way restored.
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the core paths.
10. The details submitted and agreed as part of condition 11
of planning permission 21/02137/FLM with regards to
contamination (drawing numbers 48, 55 and 56), shall be
undertaken and delivered in line with the subsequently
approved plans, prior to the completion or bringing into
use of any part of the development.
Reason: to ensure a satisfactory standard of local
environmental quality.
11. The conclusions and recommended action points within
the supporting Ecological Surveys, Bird Mitigation Plan
and Biodiversity Action Plan submitted and approved as
part of planning approval 21/02137/FLM (drawing
numbers 26, 27 and 37) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development.
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife.

Page 27

12. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason: In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
13. The detailed landscaping and planting scheme (drawing
numbers 16, 23 and 31 of planning permission
21/02137/AMM) shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason: In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
14. The details submitted and agreed as part of condition 15
of planning permission 21/02137/FLM with regards to
external finishing materials (drawing numbers 49, 51, 52
and 53), shall be implemented prior to the completion or
bringing into use of the development, whichever is the
earlier, to the satisfaction of the Council as Planning
Authority,
Reason: In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
2. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The

Page 28

applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
3. The applicant is advised that if there is any proposal to
alter a route of an existing core path or right of way a
further legal procedure is required. 
The granting of planning permission does not stop the
continued right of public access along the existing core
path or right of way.  An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an
amendment of the Core Path Plan under the Land
Reform (Scotland) Act 2003 should be sought.
4. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
5. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
6. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
7. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations.
8. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and

Page 29

Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be:
Displayed in a prominent place at or in the vicinity of the
site of the development 
Readily visible to the public 
Printed on durable material. 
COUNCILLOR A FORBES RETURNED TO THE MEETING AT THIS POINT. 
(2) Local Application 
(i) 24/00589/FLL - Erection of a dwellinghouse and garage,
Seaforth, Kintillo Road, Bridge of Earn, Perth, PH2 9AZ
(Report No. 24/207) 
Mr J Bruce, Chair, Earn Community Council (via telephone) and
Mr R Taylor, agent on behalf of the applicant, addressed the
Committee and answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason: To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason: This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. Prior to the development hereby approved being
completed or brought into use, the vehicular access shall
be formed in accordance with Perth & Kinross Council's
Road Development Guide Type B Figure 5.6 access
detail, of Type B Road construction detail.
Reason: In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
4. By Friday 16 August 2024, the pedestrian route from
Kintillo Road to Todd Place shall be constructed and
provided with dropped kerbs at Todd Place and the
crossing over the driveways within the development, to

Page 30

permit easy access for pedestrians with prams and
wheelchairs.  The kerb upstands at the dropped kerbs
shall range from 0 mm to 10 mm at these locations.  The
pedestrian route shall connect into Kintillo Road footway
with a flush surface all to the satisfaction of the Council
as Planning Authority.
Reason: In the interests of pedestrian and traffic safety.
5. The detailed landscaping and planting scheme which is
hereby approved shall be implemented as part of the site
development programme and thereafter maintained to the
satisfaction of the Council as Planning Authority.
Reason: In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
6. The footway from Kintillo Road to Todd Place and the
associated lighting within the site shall be retained and
maintained in perpetuity to the satisfaction of the Council
as Planning Authority.
Reason: In the interests of visual and residential amenity
and to ensure ongoing permeability through the site. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
2. No work shall be commenced until an application for
building warrant has been submitted and approved.
3. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
4. Street lighting infrastructure is present at the site,
discussions must be had with the Street Lighting
Partnership to obtain the locations of infrastructure and its
relocation to facilitate the vehicle access.  Contact Mark
Gorrie at Perth & Kinross Council Street Lighting
Department for further details.

Page 31

5. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
6. The developer should be aware that should Scottish
Water not agree to accept surface water drainage into
their combined sewer, an alternative surface water
drainage solution will be required which may require
further planning permission.
7. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. 
Further information can be found at:
https://www.pkc.gov.uk/binrequests 
8. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.