Perth and Kinross Council
Planning and Placemaking Committee – 3 July 2024
Report of Handling by Strategic Lead - Economy, Development & Planning
(Report No. 24/206) 
PROPOSAL: S42 application to vary condition 9 (signalised junction) of
permission 21/02137/AMM 
LOCATION: The James Hutton Institute, Errol Road, Invergowrie, Dundee,
DD2 5DA 
Ref. No: 24/00594/AMM
Ward No: P1- Carse Of Gowrie 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no material
considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The James Hutton Institute (formerly known as the Scottish Crop Research
Institute) is an internationally renowned organisation that conducts scientific
research into agricultural and environmental issues, including research into crop
and food science. 
2 Planning Permission in Principle (PPP) (20/01103/IPM) was granted in
November 2020 for a mixed-use development including alterations to existing
and erection of new buildings.  All to be used for: agricultural research and
development; industry engagement; skills development, as well as the formation
of parking areas, landscaping, infrastructure and other associated works. 
3 Several other related planning permissions exist including: for the erection of
polytunnels (21/00651/FLL); the erection of 2 agricultural research buildings,
stores, wash/filling bays, formation of access road, footpaths, parking area,
hardstanding and associated works (21/00780/FLL); formation of SUDS ponds
(21/01662/FLL and 21/01663/FLL); a Section 42 approval to modify condition 3
(building height) of planning permission 20/01103/IPM.   
4 A separate detailed planning application (20/01104/FLL) has also been approved
for a new road from the Invergowrie roundabout, to serve the expanded campus.
This access road has been constructed, however, at present is only open to
construction vehicles.

Page 2

5 Of relevance to this current application is the AMSC planning permission
21/02137/AMM for the erection of two new facilities, an International Barley Hub
(IBH) and an Advanced Plant Growth Centre (APGC). This consent has been
implemented and these buildings are currently under construction with an
expected completion date of late summer 2024. 
6 Section 42 of the Act (Town and Country Planning (Scotland) Act 1997 as
Amended) applies to applications for Planning Permission to develop land which
departs from conditions attached to an existing permission.  The effect of
granting permission for a section 42 application is therefore such that a new and
separate permission exists for the development with different (or no) conditions
attached.  The previous planning permission remains unaltered by, and is not
varied by, the decision on the section 42 application. 
7 The primary purpose of this Section 42 (S42) application seeks a revision to the
requirements of Condition 9 of the extant AMSC consent 21/02137/AMM. 
8 The original wording of condition 9 currently states: 
9 Prior to the bringing into use of any part of the development hereby approved,
the proposed junction modifications shown on drawing number 40 for the
signalisation and improvements to the A85 Riverside Avenue/Main Street
junction shall be implemented in full and fully operational, to the satisfaction of
Perth & Kinross Council as Planning Authority. Prior to the implementation of the
scheme, the relevant written agreements must be sought from Perth & Kinross
Council and Dundee City Council as Roads Authorities. Evidence must be
provided to Perth & Kinross Council that the relevant agreements from Dundee
City Council are in place prior to the works being undertaken. For the avoidance
of doubt, the active travel provision at the junction shall be subject to further
discussion and written agreement from Perth & Kinross Council in consultation
with Dundee City Council. The applicant shall also provide specifications of the
provision of Close Circuit Television (CCTV) pole(s), camera(s) and hard line
connection to Dundee City Council Urban Traffic Control System (UTC) for
written agreement prior to any works being undertaken. 
10 Reason - In the interests of road safety and to provide active travel routes to the
development site. 
11 The proposal seeks to vary this condition, removing the requirement to deliver
the signalised junction at the A85 Riverside Avenue/Main Street junction with the
retention of “the active travel provision at the junction shall be subject to further
discussion and written agreement from Perth & Kinross Council in consultation
with Dundee City Council.” 
12 Assessment for the proposed changes for this condition is set out below.

Page 3

Pre-Application Consultation 
13 The Pre-Application Consultation (PAC) requirements have been fulfilled in
association with the submission of planning application 20/01103/IPM and there
is no further PAC needed procedurally in relation to this Section 42 application. 
DEVELOPMENT PLAN
14 The Development Plan for the area comprises National Planning Framework 4
(NPF4) and the Perth and Kinross Local Development Plan 2 (2019) (LDP2). 
National Planning Framework 4 
15 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces.   
16 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
17 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the climate and nature crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place 
Perth and Kinross Local Development Plan 2 
18 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
19 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development 
Planning Advice Notes 
20 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:

Page 4

• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Supplementary Guidance 
• Supplementary Guidance - Placemaking (adopted in 2020) 
Creating Places 2013 
21 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
22 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
23 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
SITE HISTORY 
24 The following extensive planning history is relevant: 
25 98/01380/FUL Erection of research glasshouses and support header house.
Approved on 25 November 1998. 
26 01/01562/OUT Formation of science and technology park with shared facilities
for SCRI and associated roadworks (in outline). Approved on 29 October 2003. 
27 02/00169/PN Erection of a general building. Approved on 27 February 2002. 
28 02/01144/FUL Erection of research glasshouse and header building. Approved
on 3 September 2002. 
29 02/02026/FUL Extension of general building. Approved on 21 February 2003. 
30 03/00701/FUL Extension to header house building. Approved on 30 June 2003.

Page 5

31 03/01532/FUL Extensions to header and glass houses. Approved on 24 October
2003. 
31 07/01073/FUL Erection of research glasshouses and support headerhouse
Approved on 20 July 2007. 
32 07/01985/PN Erection of a general purpose agricultural storage building.
Approved on 1 October 2007. 
33 10/00005/FLL Erection of prefabricated building. Approved on 5 February 2010. 
34 15/00832/FLL Installation of solar PV panels. Approved on 10 June 2015. 
35 15/01731/IPL Erection of a plant growth facility and associated works (in
principle). Approved on 1 December 2015. 
36 16/00126/FLL Erection of a plant growth research and production facility and
ancillary works. Approved on 29 April 2016. 
37 19/00472/FLL Siting of 3 hydroponic containers. Approved on 1 May 2019. 
38 19/00011/PAN Mixed use development for Class 4 and Class 8 uses to include
agricultural research, industry engagement, skills development, training and
education, associated business uses, formation of vehicular access, car parking,
hard and soft landscaping and associated infrastructure works. Contents agreed
on 30 January 2020. 
39 20/00324/SCRN Erection of a 2MW solar farm. Decision issued April 2020. 
40 20/00348/SCRN Mixed use development Decision issued April 2020. 
41 20/00662/FLL Siting of 3 office/welfare facility units and formation of parking for a
temporary period. Approved on 21 July 2020. 
42 20/01103/IPM Mixed use development including alterations and erection of
buildings for agricultural research and development, industry engagement, skills
development and formation of parking areas, landscaping, infrastructure and
associated works (in principle). Approved on 19 November 2020. 
43 20/01104/FLL Formation of vehicular access, access road, SUDS pond and
associated works. Approved on 24 November 2020. 
44 20/01435/FLL Installation of a ground source heat pump system, formation of
equipment yard and associated works. Approved on 30 January 2021. 
45 20/01464/ADV Advertisement Consent for Display of signs. Approved on
24 November 2020. 
46 21/00651/FLL Erection of polytunnels. Approved on 17 June 2021.

Page 6

47 21/00780/FLL Erection of 2 agricultural research buildings, stores, wash/filling
bays, formation of access road, footpaths, parking area, hardstanding and
associated works. Approved on 31 August 2021. 
48 21/01494/FLL Erection of compost storage unit and associated works. Approved
on 20 October 2021. 
49 21/01495/FLL Erection of a chemical storage building, cold storage building and
associated works. Approved on 1 November 2021. 
50 21/01612/FLL Installation of cable and associated works. Approved on
19 January 2022. 
51 21/01662/FLL Formation of SUDS pond and associated works. Approved on
24 November 2021. 
52 21/01663/FLL Formation of SUDS pond and associated works Approved on
24 November 2021. 
53 21/02031/FLL Siting of 2 relocated portable office buildings and associated
works. Approved on 14 February 2022. 
54 21/02137/AMM Erection of a linked building for agricultural research and
development, industry engagement and skills development and formation of
roads, parking areas, landscaping, infrastructure and associated works (approval
of matters specified by conditions 20/01103/IPM). Approved on 11 August 2022. 
55 22/00187/IPM An application to modify condition 3 (building height) of planning
permission 20/01103/IPM. Approved on 14 April 2022. 
56 22/00212/FLL Planning permission for the change of use from a dwellinghouse
to an office (Class 4) for agricultural research and development industry
engagement and skills development. Approved on 2 May 2022. 
57 22/01685/FLL Siting of 4 office/staff welfare units (for a temporary period).
Approved on 21 December 2022. 
58 22/02258/FLL Extension to plant growth research building, erection of office
building and store, formation of parking and associated works. Approved on
30 June 2023. 
59 24/00544/ADV Advertisement Consent for display of signs. Approved on 27 May
2024. 
CONSULTATIONS 
60 As part of the planning application process the following bodies were consulted:

Page 7

External 
61 Dundee City Council – no objection. 
62 Transport Scotland – no objection. 
63 Invergowrie and Kingoodie Community Council – no comment. 
Internal 
64 Strategy and Policy – no comment. 
65 Transportation and Development - no objection subject to revised conditions. 
66 Enterprise Team – no comment. 
Representations 
67 One representation was received. The main issues raised within the
representation are: 
• Traffic Congestion 
68 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
69 Screening Opinion Not Required 
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal 
AA not required 
Design Statement or Design and Access
Statement
Not Required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not Required 
APPRAISAL 
70 Section 42(1) of the Town & Country Planning (Scotland) Act 1997 (as amended)
relates to applications for planning permission for the development of land
without complying with conditions subject to which a previous permission was
granted. 
71 Section 42(2) requires that the Planning Authority shall consider only the
question of the condition(s) subject to which planning permission should be
granted, and:

Page 8

(a) If they decide that planning permission should be granted subject to
conditions differing from those subject to which the previous permission
was granted, or that it would be granted unconditionally, they shall grant
planning permission accordingly;
(b) If they decide that planning permission should be granted subject to the
same conditions as those subject to which the previous permission was
granted, they shall refuse the application. 
72 The determining issues in this case are whether the proposal complies with
Development Plan policy or if there are any other material considerations which
justify a departure from that policy The Development Plan comprises NPF4 and
the Perth and Kinross Local Development Plan 2 (2019). The relevant policy
considerations are outlined in the policy section above and are considered in
more detail below. In terms of other material considerations, this involves
considerations of supplementary guidance, statutory consultees and additional
statements submitted. 
73 It is important to note that both National Planning Framework (NPF4) policies and
Local Development Plan 2 (LDP2) policies apply except where they are not
compatible in which case NPF4 policies prevail. 
Principle 
74 The principle of the development subject of the application has been previously
established through the approval of the extant planning permission
(21/02137/AMM). The principle of the development is therefore well-established
and is not reviewed as part of this S42 application. The amendment of Condition
9 to remove the requirement to deliver the signalised junction at the A85
Riverside Avenue/Main Street junction with the retention of “the active travel
provision at the junction shall be subject to further discussion and written
agreement from Perth & Kinross Council in consultation with Dundee City
Council” is not in itself contrary to the general terms of the Development Plan,
however, consideration must be given to the specific characteristics of the
amendment and whether any adverse impacts are calculated. 
Condition 9 
75 The requirement for mitigation to the A85 Riverside Avenue/Main Street Junction
had been identified by the applicant through their Transport Assessment for
Planning Application 20/01103/IPM. At the time of submitting the application the
applicant had identified that to mitigate the capacity issues associated with their
development at the A85 Riverside Drive/Main Street that signalisation should be
implemented. The layout presented by the applicant provided additional ahead
lanes on both the north and south A85 approaches by widening the carriageway
into the large central reservation.  The applicant also proposed to provide
signalised pedestrian crossings for active travel.  The initial mitigation concept
provided by the applicant was presented with the Transport Assessment in
Appendix J, as shown in Figure 1.

Page 9

Figure 1: 20/01103/IPM Design 
76 Due to the design being conceptual at the point of determining Planning
Application 20/01103/IPM, Condition 15 was applied, so that the further details
could be provided for the junction design and the date for the signals to be
implemented. 
77 Condition 9 of planning permission 21/02137/AMM was applied after much
discussion with the applicants, who initially provided no information to satisfy
Condition 15 (below) of Planning Application 20/01103/IPM: 
78 As part of any application for the Approval of Matters Specified by Condition
(AMSC) or Page 6 of 10 detailed application the mitigation measures identified
for Junction 4 - A85 Riverside Avenue / Main Street for its signalisation to reduce
the queueing impact from the development, a detailed design shall be
undertaken, along with a date for their implementation shall be submitted and
agreed in writing by the Council as Planning Authority. 
79 Reason - In the interests of road safety. 
80 Planning Application 21/02137/AMM submitted a Road Safety Audit but did not
submit an updated Transport Assessment to that previously undertaken in 2020.

Page 10

Noted within the Planning Statement, the writer has stated that an updated
assessment addressing the new access to the A90 and revised traffic flows
alongside changed working patterns may have circumvented the imposition of
Condition 9, however, this information was not requested by PKC. Whilst this
may have been the case, it should be noted that if the applicant had felt that the
junction mitigation was not required or their circumstances had changed at that
time, due to changing traffic volumes or patterns, this was for the applicant to
have undertaken an assessment and presented the data to Perth and Kinross
Council for consideration.   
81 As alluded to above, when the applicant initially submitted application
21/02137/AMM, the applicant did not provide any details in relation to Condition
15 that was applied to 20/01103/IPM, so Transportation and Development were
not initially in a position to support the application. 
82 During the determination of Planning Application 21/02137/AMM and after much
discussion, the applicant submitted a detailed design which resulted in the design
as shown in Figure 2 (drawing number 40), for the mitigation at the junction. They
did not present any data to alter the position that the signals were not required as
mitigation and as such the condition was applied for the delivery of the signals as
mitigation.   
Figure 2: 21/02137/AMM Design

Page 11

83 It can be seen from the initial designs submitted for the mitigation by the
applicant as shown in Figure 1 and the changes identified by the applicants
Stage 1 Roads Safety Audit which identified a number of actions from large
vehicles over-running verges and footways, signing strategy, relocation of
gulleys, future maintenance, signal position and increasing active travel
provision, which resulted the design shown in Figure 2. 
84 Noted within the Planning Statement for this current application, following
approval of planning permission 21/02137/AMM, JHI identified that the originally
reserved budget of £100,000 for any potential upgrades was significantly
deficient in covering the infrastructure costs subsequently imposed by Condition
9. In 2023, JHI identified the associated costs imposed by Condition 9 were circa.
£1 million plus VAT, resulting in a significant deficit and as such they are not
financially able to deliver the signalised junction. The Planning Statement advises
that the JHI had originally budgeted for £100,000, however, the imposition of
Condition 9, imposed a requirement for significantly more upgrades than was
ever anticipated by the JHI, or budgeted for. 
85 The Planning Statement further advises that the lack of funds jeopardises the
delivery of the International Barley Hub (IBH) and Advanced Plant Growth Centre
(AGPC) due to the imposition of Condition 9. 
86 With regards to the increased costs being attributed to Perth and Kinross
Councils requests through Condition 9, the requests for the inclusion of Close
Circuit Television (CCTV) pole(s), camera(s) and hard-line connection to Dundee
City Council Urban Traffic Control System (UTC) would not have resulted
increased costings from £100,000 to £1million. Notwithstanding that, the
applicant has not presented where the cost increases from £100,000 to £1million
are attributed. Had the imposition of Condition 9 increased costs from £100,000
to £1million, reducing these requirements back to the original design concept to
bring the costings back in line with their estimates could have been considered.
Whilst a number of options were tabled by the Applicant as shown below, this
was not one of them. 
1 Apply for the removal of the condition.
2 Apply to vary the timescales of the condition.
3 For JHI to pay the sum of £100,00 to PKC as a contribution to the junction
upgrade with the works to be carried out by others.
4 For the JHI to pay 1/3rds contribution of the total costs for the junction
upgrade up to a maximum of £250,000 with the remaining 2/3rds shared
between PKC and Dundee City Council (DCC) with he works to be carried
out by others. 
87 The JHIs preferred approach was option 3 and PKCs preferred approach was
option 2 which would require the submission of a S42 application with supporting
information to fully justify the delayed delivery of the mitigation, with a proposed
date for delivery.

Page 12

88 The Applicant progressed option 2 and commissioned a fresh assessment of the
originally submitted Transport Assessment. This was carried out by Systra in
March 2023, the conclusions of which advised that the JHI may wish to consider
amendment or removal of the relevant planning condition as Systra’s analysis
confirmed that upgrading of the A85/Main Street junction is not required to
accommodate the proposed development, hence the submission of this current
S42 application. 
Roads and Access 
89 In progressing this S42 application PKCs Transport and Development team have
been consulted and reviewed the information provided by Systra and have made
the following comments: 
90 Through the work undertaken by SYSTRA, it has been identified that the
applicant’s original Transport Assessment April 2020 in support of Planning
Application 20/01103/IPM may have had an error in the modelling. The text
within the original Transport Assessment states that calibration factors were
applied to the Traffic Model for Junction 4 to accurately reflect the current
conditions, this resulted in the following parameters being applied: 
91 Following a detailed review of the previous Transport Assessment, undertaken
by SYSTRA it has been identified that the values above may have been
transposed, as the values in the text do not reflect the work undertaken in the
modelling. 
92 In the original Transport Assessment in April 2020 the applicant had stated that
there were 333 staff employed on site, with a proposed increase of a further 159
staff members.  This would have resulted in an estimated headcount of 48%. 
This assumption was applied to modelling and traffic volumes. 
93 The work that has been undertaken by SYSTRA in 2024, the applicant has
advised that the number of employees currently employed on site is 277, with a
future increase estimated to be 86 employees. The estimated headcount
increase has now reduced to 31%. It is clear from these new assumptions that
the level of staff being employed has reduced, by 56 employees and with the
estimated new 86 employees, this is a new estimated total of 363 employees on
site after works have been complete.  Thus, showing that from the April 2020
head count of 333, there is an increase of 9% in the number of jobs (+30), not
48% as originally planned.

Page 13

94 From the reports that have been presented by the applicant, there are a number
of different staff count figures being presented. It should be noted that the
SYSTRA 2024 report assumes that there were 242 staff employed on site, which
is a reduction of 91 from the figure used in the April 2020 Transport Assessment. 
95 The applicant has undertaken an analysis of the observed flows from 2020 and
the new count undertaken in 2024. The results have shown that in general the
inbound traffic volumes on the public road network at the three junctions have
decreased (Swallow Roundabout, A90 Invergowrie Roundabout and A85
Riverside Drive/Main Street Junction), with the exception of the A90 Invergowrie
Roundabout which has increased by 13% in the AM Peak Hour with a net
increase of 26 vehicles. The increase of 26 vehicles could be attributed to the
vehicles utilising the James Hutton Institute entrance off the A90 Invergowrie
Roundabout. 
96 An automatic traffic counter was installed on Errol Road close to the James
Hutton Institute entrance showing that in 2020 there were 744 vehicles arriving
and departing the site and in 2024 there were 563 vehicles arriving and departing
the site, equating a reduction of approximately -24%.  The applicant has
attributed this reduction to an increase in home working and flexible working. 
97 Using the data from the automatic traffic counter from 2024, the applicant has
then added the increase traffic volumes of 31%. A comparison of the new trips
predicted to be attracted to the site from the 2020 and 2024 reports have been
presented below: 
Period Scenario Inbound Outbound
AM 2020 TA 51 6  
2024 SYSTRA 22 2  
Change -57% -67%
PM 2020 TA 6 41  
2024 SYSTRA 2 14  
Change -67% -66% 
98 It can be seen that on all occasions there have been a reduction in the number of
new trips being attracted to the site, with reductions of up to two thirds from what
was assumed in the 2020 Transport Assessment. 
99 The applicant has then used the new data and traffic predictions for the new staff
members attracted to the site to undertake a junction modelling of the A85
Riverside Drive/Main Street junction.  This has shown that the in 2024, the
junction appears to operate within an acceptable capacity both with and without
the development. 
100 The applicant has also proposed that all traffic will utilise the A90 to access the
site, resulting in no traffic for the James Hutton Institute utilising Main Street.
Further details have been submitted on this proposal which advises in order to

Page 14

seek to secure that traffic to the JHI utilises the A90 access, rather than Main
Street, the Applicant intends to update JHI’s Green Travel Plan (GTP), subject to
Planning Permission being granted, to make it clear to all staff and visitors they
must enter and leave the site at the A90 junction and not use the Main Street
junction. 
101 The response advises that the Travel plan will be updated, with new travel details
issued to staff advising that to access the site, with all traffic entering and exiting
the site at the A90.  If all traffic was to utilise the A90 junction only, this would
result in all egressing traffic heading south on the A90 to Longforgan Interchange
to undertake a U-turn manoeuvre at the Grade Separated Junction and then turn
back towards the Swallow Roundabout.  Whilst the applicant may advise staff
and visitors to exit via this route, this will result in staff and visitors having to
travel a further 4 miles to reach the Swallow Roundabout, rather than using the
Main Street Junction, however, should staff or visitors not follow the instructions
given to utilise the A90 Junction, there is capacity for the vehicles that may not
follow the instructions. 
102 With regard to the applicants proposed varying of Condition 9, there are
concerns with the wording of the proposed condition and its compliance with the
Scottish Government’s advice on imposing planning conditions, contained in
paragraph 2 of Scottish Government Circular 4/1998. It is, therefore,
recommended that the condition is deleted in full, with the Travel Plan condition
(condition 7) being updated to reflect that no further works will be undertaken at
the A85 Riverside Avenue junction. Furthermore, the requirements of the
condition will allow for the promotion of sustainable transport options. 
103 Taking into consideration the information submitted by the applicant and also the
views of PKC Transportation and Development colleagues, full removal of the
condition is satisfactory and the proposal therefore complies with the policies
noted above. 
Developer Contributions 
104 The site is not located within the Transport Infrastructure contributions zone,
therefore, no developer contributions are required, and proposal does not conflict
with LDP2 Policy 5 – Developer Contributions. 
Economic Impact 
105 The economic impact from this proposal is anticipated to be limited. 
LEGAL AGREEMENTS 
106 None required

Page 15

DIRECTION BY SCOTTISH MINISTERS 
107 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
108 To conclude, the application must be determined in accordance with the adopted
Development Plan unless material considerations indicate otherwise. The
proposed development in this instance relates solely to the change of condition
regarding the signalised junction at the A85/Riverside Drive. Having taken
account of the Development Plan and material considerations, the development
proposed does not conflict with the Development Plan. It should be noted that all
other matters are unaffected from the existing permission and, therefore, as a
new standalone permission would be granted here, all other conditions from the
existing permission are recommended to be re-attached. 
109 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason: To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. Prior to the use of any lifting equipment including cranes etc the applicant must
receive written confirmation from Dundee Airport that aircraft departing and
arriving on runway 09/27 will be safeguarded.  Furthermore, the applicant must
receive written confirmation from Dundee that the use of lights, during
construction, shall not dazzle nor distract aircraft preparing to land at Dundee
Airport, all to the satisfaction of the Council as Planning Authority. 
Reason: To not impact on the operations of Dundee City Airport. 
3. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason: In order to safeguard the residential amenity of the area.

Page 16

4. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In order to safeguard the residential amenity of the area. 
5. No part of the development shall be occupied or brought into use, whichever is
the earlier, until the applicant has provided the minimum parking provision as
shown on drawing number 39 or 66 of planning approval 21/02137/AMM, to the
satisfaction of the Council as Planning Authority.  Once provided, the parking
shall thereafter be permanently retained as such for the life of the development. 
Reason: To provide a suitable parking provision for the development. 
6. Prior to the occupation of any of the development hereby approved, the proposed
modifications to the A90/Main Street Roundabout, generally as illustrated on
Drawing No. 135585/sk7001 - page 86 of Transport Assessment (PKC Ref:
20/01103/16) by Fairhurst dated April 2020, shall be implemented and available
for use for any vehicles travelling to the site, subject to the satisfaction of the
Planning Authority, after consultation with Transport Scotland. 
Reason: To ensure that the standard of access layout complies with the current
standards, and that the safety and free flow of traffic on the trunk road is not
diminished. 
7. No part of the development hereby approved shall be occupied until the
approved Staff Travel Plan (STP) (document 71 of permission 21/02137/AMM)
has been updated.  The update shall be reflective of the removal of the
proposed mitigation works identified at A85 Riverside Avenue/Main Street
Junction and shall have regard for the revised operational situation within the
development area identified on drawing number 1.  The updated STP shall be
submitted to and agreed in writing by the Council as Planning Authority in
consultation with Transportation and Development.  Thereafter, the agreed STP
shall be brought into effect in line with the bringing into use of the development
and will be subsequently implemented for the life of the development. The STP
will have particular regard to the following: 
• provision for walking, cycling and public transport access to and within the
site and will identify the measures to be provided;
• the vehicular routes to the site for staff and visitors to access and egress the
site;
• the system of management, monitoring, review, reporting; and,
• the duration of the plan. 
Reason: To promote sustainable transport options and to meet advice within
National Planning Framework on transport.

Page 17

8. The details submitted and agreed as part of condition 8 of planning permission
21/02137/FLM (drawing number 50) with regards to Construction Traffic
Management Scheme (TMS), shall be adhered to at all times to the satisfaction
of the Council as Planning Authority, unless otherwise agreed in writing by the
Council as Planning Authority.  The TMP is to remain a fluid document and will
be required to be updated where necessary 
Reason: In the interest of proper site management. 
9. Access along core path INGI/8 and Right of Way 52/8, or along the short
diversion as specified in drawing number 38 should remain open for responsible
access throughout the construction phase.  On completion the diversion must be
removed and access along the original core path/Right of Way restored. 
Reason: To ensure a satisfactory standard of local environmental quality; to
safeguard the core paths. 
10. The details submitted and agreed as part of condition 11 of planning permission
21/02137/FLM with regards to contamination (drawing numbers 48, 55 and 56),
shall be undertaken and delivered in line with the subsequently approved plans,
prior to the completion or bringing into use of any part of the development. 
Reason: to ensure a satisfactory standard of local environmental quality. 
11. The conclusions and recommended action points within the supporting
Ecological Surveys, Bird Mitigation Plan and Biodiversity Action Plan submitted
and approved as part of planning approval 21/02137/FLM (drawing numbers 26,
27 and 37) shall be fully adhered to, respected and undertaken as part of the
construction phase of development. 
Reason: To ensure a satisfactory standard of local environmental quality; to
safeguard the welfare of any protected wildlife. 
12. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved.  The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
13. The detailed landscaping and planting scheme (drawing numbers 16, 23 and 31
of planning permission 21/02137/AMM) shall be completed within the first
available planting season (October to March) after the completion or bringing into
use of the development, whichever is the earlier.  The approved scheme shall

Page 18

thereafter be maintained to the satisfaction of the Council as Planning Authority,
with any planting which fails to become established within five years being
replaced in the following planting season with others of a size and species as
previously approved. 
Reason: In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
14. The details submitted and agreed as part of condition 15 of planning permission
21/02137/FLM with regards to external finishing materials (drawing numbers 49,
51, 52 and 53), shall be implemented prior to the completion or bringing into use
of the development, whichever is the earlier, to the satisfaction of the Council as
Planning Authority, 
Reason: In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
PROCEDURAL NOTES 
None  
INFORMATIVES 
1. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
2. Existing buildings or structures may contain nesting birds between 1st March and
31st August inclusive.  The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that nest is in use or being
built.  Planning permission for a development does not provide a defence
against prosecution under this Act. 
3. The applicant is advised that if there is any proposal to alter a route of an existing
core path or right of way a further legal procedure is required. 
4. The granting of planning permission does not stop the continued right of public
access along the existing core path or right of way.  An order under the Town
and Country Planning (Scotland) Act 1997, Section 208 or an amendment of the
Core Path Plan under the Land Reform (Scotland) Act 2003 should be sought.

Page 19

5. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
6. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
7. The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
8. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste. 
9. Further information on the need for and level of provision of Changing Places
Toilet Facilities can be found in Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning (Changing Places Toilet
Facilities) (Scotland) Regulations 2020 and the associated Circular 1/2020:
Changing Places Toilets Regulations. 
10. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be: 
11. Displayed in a prominent place at or in the vicinity of the site of the development 
Readily visible to the public 
Printed on durable material. 
Background Papers:  One letter of representation
Contact Officer:  Gillian Peebles 
Date: 20 June 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD: ECONOMY, DEVELOPMENT AND PLANNING