Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
27/05/2024 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 05 June 2024 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Councillor Brian Leishman
Bailie Claire McLaren
Councillor Crawford Reid
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 162

Page 2

Page 2 of 162

Page 3

Planning and Placemaking Committee 
Wednesday, 05 June 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 8 MAY 2024 FOR
APPROVAL
(copy herewith) 
5 - 22 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  MAJOR APPLICATIONS   
5(1)(i)  23/01167/AMM - ERECTION OF 209 DWELLINGHOUSES,
FORMATION OF SUDS, LANDSCAPING AND ASSOCIATED
WORKS (APPROVAL OF MATTERS SPECIFIED IN
CONDITIONS OF 15/01237/IPM) (LDP SITE MU7), LAND 300
METRES SOUTH WEST OF TIGHNACOILLE, BROICH ROAD,
CRIEFF
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 24/166) 
23 - 50 
5(2)  LOCAL APPLICATIONS   
5(2)(i)  23/00960/FLL - CHANGE OF USE OF AGRICULTURAL
BUILDINGS AND LAND TO BUSINESS (CLASS 4), GENERAL
INDUSTRY (CLASS 5), STORAGE AND DISTRIBUTION
(CLASS 6) (IN RETROSPECT), LAND 250 METRES SOUTH
EAST OF ISLA VILLA, GRANGE, ERROL 
51 - 68
Page 3 of 162

Page 4

Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 24/167) 
5(2)(ii)  23/01742/FLL - ERECTION OF A BREWERY, TAP ROOM,
STORAGE, FORMATION OF VEHICLE ACCESS, PARKING
AREA, INSTALLATION OF EV CHARGING POINT,
FORMATION OF OUTDOOR SEATING AREA, LANDSCAPING
AND ASSOCIATED WORKS, LAND 50 METRES SOUTH OF
COUNCIL COTTAGES, FERRY ROAD, PITLOCHRY
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 24/168) 
69 - 102 
5(2)(iii)  23/01349/FLL - PART CHANGE OF USE AND ALTERATIONS
TO BUILDING TO FORM 10 SHORT-TERM LET
ACCOMMODATION UNITS, 54-56 HIGH STREET, KINROSS,
KY13 8AN
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 24/169) 
103 - 120 
5(2)(iv)  23/01695/FLL - ERECTION OF A DWELLINGHOUSE, LAND 15
METRES EAST OF BORROWDALE, BLAIRADAM,
KELTYBRIDGE
Report of Handling by Strategic Lead - Economy, Development
and Planning (copy herewith 24/170) 
121 - 142 
6 PROPOSAL OF APPLICATION NOTICES (PAN)   
6(i)  24/00004/PAN - FORMATION OF A 49.9MW BATTERY
ENERGY STORAGE FACILITY AND ASSOCIATED WORKS,
LAND 200 METRES NORTH OF PITCURRAN HOUSE,
NEWBURGH ROAD, ABERNETHY, PERTH
Pre-Application Report by Strategic Lead - Economy,
Development and Planning (copy herewith 24/171) 
143 - 152 
6(ii)  24/00005/PAN - FORMATION OF A 49.9MW BATTERY
ENERGY STORAGE FACILITY AND ASSOCIATED WORKS,
LAND 300 METRE WEST OF TIR ARTAIR, KILLIN
Pre-Application by Strategic Lead - Economy, Development and
Planning (copy herewith 24/172) 
153 - 162 
Page 4 of 162

Page 5

PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 8 May 2024 at 9.30am. 
Present: Councillors I Massie, G Stewart, Bailie C Ahern (substituting for Councillor
K Allan), Councillors H Anderson (substituting for Councillor C Reid), B Brawn,
D Cuthbert, K Harvey, D Illingworth, I James, B Leishman, Bailie C McLaren,
Councillor I MacPherson (substituting for Councillor R Watters) and Bailie
M Williamson. 
In Attendance: G Bissett, L MacLean, C Morilly, S Panton, L Reid, K Smith and
P Williamson (all Economy, Place and Learning); A Brown, C Elliott, J Guild and
M Pasternak (all Strategy, People and Resources). 
Apologies: Councillors K Allan, C Reid, R Watters. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.   
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors Code
of Conduct. 
3. MINUTES 
(i) The Minute of Meeting of Planning and Placemaking Committee of 13 March
2024 was submitted and approved as a correct record. 
(ii) The Minute of Meeting of Planning and Placemaking Committee of 10 April
2024 was submitted and approved as a correct record. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
23/00504/FLM 5(1)(i)
23/00193/FLL 5(2)(i) 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Application 
(i) 23/00504/FLM – Mixed use development comprising
erection of 3 café/restaurant units (Class 3) with drive thru
3
Page 5 of 162

Page 6

facilities, business units (Class 4), electric vehicle charging
hub and formation of vehicular access, parking areas,
landscaping and associated works, land 90 metres south of
5 Broxden Avenue (E2), Perth (Report No. 24/145) 
Mr Murray Rankin, agent on behalf of the applicant, addressed
the Committee and answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The proposed development must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed on
the planning consent.
Reason - To ensure that the development is carried out in
accordance with the plans approved.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. The construction of all of the business units hereby
approved (as shown on plans 36 and 49) shall be
completed such that they are ready for use/occupation
prior to the occupation or bringing into use, whatever is
the earlier, of the 3 class 3 cafe/ restaurants units as
shown on plans 05, 10, 11, 12, 13 and 14. 
Reason - To secure the provision of the business units on
this allocated employment site. 
Access and Roads
4. Prior to the development hereby approved being
completed or brought into use, the vehicular access
shown on the approved drawings shall be implemented
and constructed in accordance with Perth & Kinross
Council's Road Development Guide, using the
Construction Type B from the Construction Details for
Access Types, C, D and E.  The Type B Road
construction detail shall continue into the entrance for a
distance of at least 5 metres from the boundary of the
public road surface.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
5. Prior to the occupation of any unit, the applicant shall
submit for the written approval by the Council as Planning
Authority, a Service Management Plan detailing the plans
for servicing and delivery operations, and timing,
Page 6 of 162

Page 7

including arrangements for the management of vehicular
and pedestrian traffic during servicing and delivery. 
Thereafter, the agreed scheme shall be implemented for
the life of the development.
Reason - In the interests of pedestrian and traffic safety.
6. Prior to the first occupation of any unit, a detailed design
for a minimum of:
a. 4 secure cycle parking bays for the Western Class
3 Plot 
b. 6 secure cycle parking bays for the Central Class 3
Plot
c. 4 secure cycle parking bays for the Eastern Class 3
Plot
d. 30 secure and covered cycle parking bays for the
business units
shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall
be implemented in accordance with the approved details
prior to the relevant unit being brought into use.
Reason - To encourage active travel and meet advice
within Scottish Planning Policy on transport.
7. Prior to commencement of works, the street lighting
design for adoptable areas must be submitted for the
further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council’s
Street Lighting Partnership.  The scheme shall include
details of light spill, brightness of the lighting and the
proposed hours of operation.  The agreed lighting
scheme shall be implemented prior to the occupation of
the first unit and maintained in full accordance with the
agreed scheme.
Reason - In the interests of pedestrian and traffic safety.
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
Page 7 of 162

Page 8

(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance;
(p) details of HGV movements to and from the site;
and
(q) details of sheeting for construction vehicles.
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interests of pedestrian and traffic safety.
9. Prior to the commencement of development, the
applicant shall submit to, for the prior written approval of
the Council as Planning Authority, a scheme supported
by survey work to demonstrate that the public drainage
system ensures a positive flow of water with no discharge
onto the public road network.  Thereafter, the agreed
scheme shall be implemented in full to ensure no
discharge onto the road network at any time.
Reason - In the interests of pedestrian and traffic safety.
10. No part of the development shall be occupied until a
Travel Plan (TP), aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transportation
and Development.  The TP will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.  Thereafter, the
Page 8 of 162

Page 9

agreed scheme shall be implemented in full for the life of
the development.
Reason - To promote sustainable transport options and to
meet advice within Scottish Planning Policy on transport.
11. Prior to the commencement of development details of a
barrier along the boundary of the trunk road to prevent
access to the trunk road shall be submitted to and agreed
in writing by the Council as Planning Authority, in
consultation with Transport Scotland as the Trunk Road
Authority.  The barrier as agreed shall be completed prior
to the use of the development and maintained by the
developer or subsequent owner of the land.
Reason - To minimise interference with the safety and
free flow of the traffic on the trunk road; and to minimise
the risk of pedestrians and animals gaining uncontrolled
access to the trunk road with the consequential risk of
accidents.
Biodiversity and Natural Environment
12. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 41 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
13. The findings and recommendations contained within the
supporting ecological impact assessment submitted and
hereby approved (document 43 relates) remain valid for a
period of 24 months. If the approved planning permission
is not implemented within 24 months of the date of the
survey, an updated survey is required to be submitted to
the Planning Authority for written approval and thereafter
the findings implicated accordingly. 
Reason - In the interests of protecting environmental
quality and of biodiversity.
14. Prior to the commencement of the development hereby
approved, an updated Biodiversity Action Plan including a
map/plan indicating the locations of all proposed
measures proposed (bird boxes, hedgehog homes, bug
hotels, hibernaculum piles, green roofs, and raingardens,
etc.) shall be submitted for the further written agreement
of the Council as Planning Authority.  Thereafter, the
agreed scheme shall be implemented and maintained in
a reasonable condition for the life of the development, to
the satisfaction of the Council as Planning Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
15. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, wildlife kerbs
Page 9 of 162

Page 10

shall be installed adjacent to all road gullies within
500metres of a SUDS pond or watercourse.  Thereafter,
the kerbs shall be retained in a reasonable condition for
the life of the development, to the satisfaction of the
Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity. 
16. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.
Amenity / Noise and Odour
17. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
18. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In the interests of road safety; to prevent a
possible danger to road users by avoiding excessive
glare or brightness.
19. Prior to the development hereby approved being
completed or brought into use, effective ventilation
systems commensurate with the nature and scale of
cooking to be undertaken shall be installed and operated
such that cooking odours are not exhausted into or
escape into any neighbouring buildings.  Thereafter the
system shall be maintained.
Reason - In order to safeguard the amenity of occupants
of nearby premises and to ensure the provision of a
satisfactory ventilation system for the premises.
Contamination
20. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
Page 10 of 162

Page 11

and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify: 
I. the nature, extent and type(s) of contamination on
the site 
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed 
III. measures to deal with contamination during
construction works 
IV. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority.  Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason - In order to deal with any potential ground
contamination.
Flooding
21. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
22. The measures identified in the Flood Risk Statement
(document 48 relates) to prevent flooding of the site,
approved as part of this permission, shall be fully
implemented.  Verification that the scheme has been fully
implemented must be submitted to the Council as
Planning Authority prior to completion or the bringing into
use of any part of the development, whichever is the
earlier.
Reason - In order to take account of the flood risk of the
adjacent sites close to the Glasgow Road (A93). 
23. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Page 11 of 162

Page 12

Reason - To ensure the provision of effective drainage for
the site.
Core Path
24. Prior to the commencement of development, a scheme
shall be submitted to Council as Planning Authority for
written agreement identifying improvements to the section
of the core path (CTYS/120) which passes through the
site. For the avoidance of doubt, the scheme shall
improve surfacing and accessibility for all users.
Thereafter, the agreed scheme shall be implemented in
full prior to the occupation of any unit hereby approved.
Reason – In the interests of promoting active travel.
25.  Prior to the commencement of the development hereby
approved, a management plan indicating any temporary
diversions and signage needed to facilitate the
development and/or any works proposed to the right of
way/core path as part of the development shall be
submitted for the agreement of the Council as Planning
Authority.  The plan as agreed shall be implemented in
accordance with the timings identified in the plan.
Reason - To ensure that public access is maintained at all
reasonable times, to the local path network.
Dust Management 
26.  Prior to the commencement of development, a
Construction Dust Management Plan (CDMP) shall be
submitted for the written approval of the Planning
Authority and once approved shall be adhered to
throughout the construction stage.  The CDMP shall
include mitigation measures for the control of dust during
all stages of the construction phase.
Reason - In order to ensure there are no negative
impacts from construction dust. 
Justification
The proposal is considered a minor departure from the
Development Plan however there are material reasons which
justify departing from the Development Plan. 
Procedural Notes
SEPA has submitted a holding objection to the proposed
development, in relation to flood risk.  The application will be
referred, if SEPA maintain their objection, to the Scottish
Ministers for authority to proceed. Thereafter, if agreed by
Scottish Ministers, the decision notice shall not be issued until
such time that the relevant transport infrastructure contributions
have been secured. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
Page 12 of 162

Page 13

which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  According to
Regulation 41 the notice must be:
•  Displayed in a prominent place at or in the vicinity of
the site of the development
•  Readily visible to the public
•  Printed on durable material
5. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
6. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the e-Planning portal if your
original application was lodged that way, otherwise send
it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
Page 13 of 162

Page 14

7. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to this development.
https://www.pkc.gov.uk/ldp2floodrisk. 
8. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
9. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits
10. The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to construct a new
road prior to the commencement of roadworks.
11. The applicant should be advised to contact Perth &
Kinross Council Street Lighting Department to obtain
technical approval for all street lighting provision.
12. Please consult the Street Naming and Numbering Officer,
The Environment Service, Perth and Kinross Council,
Pullar House, 35 Kinnoull Street, Perth PH1 5GD for a
new postal address.  The form is downloadable from
www.pkc.gov.uk and should be returned to
snn@pkc.gov.uk
13. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
14. The applicant is reminded that, should any protected
species be present, a licence may be required from
NatureScot to disturb a protected species. Failure to
obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-
compliance.
15. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
Page 14 of 162

Page 15

permission for a development does not provide a defence
against prosecution under this Act.
16. The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport
Scotland's Cycling by Design 2021 or similar design
guide. 
17. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
18. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations.
19. The granting of planning permission does not stop the
continued right of public access along the existing core
path.  An order under the Town and Country Planning
(Scotland) Act 1997, Section 208 or an amendment of the
Core Path Plan under the Land Reform (Scotland) Act
2003 should be sought in advance of any works
authorised by this planning permission being
commenced.  All relevant approvals should be in place
prior to any stopping up and diversion of the core path
taking place. 
(2) Local Application 
(i) 23/00193/FLL – Erection of office building (Class 4) and two
café/restaurant units (Class 3) with drive thru facilities, car
parking, landscaping and associated works, land 100
metres south west of 5 Broxden Avenue, Perth (Report No.
24/146) 
Mr Michael Lorimer, agent on behalf of the applicant,
accompanied by Mr Alastair Scott-Kiddie, engineer, addressed
the Committee and answered Members questions. 
THERE FOLLOWED A 5 MINUTE RECESS AND COMMITTEE RECONVENED. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Page 15 of 162

Page 16

Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. The construction of the office block hereby approved (as
shown on plan 08 and 09) shall be completed prior to the
occupation or bringing into use, whatever is the earlier, of
the 2 class 3 cafe/ restaurant units as shown on plans 06
and 07.
Reason - To secure the provision of the office block on
this allocated employment site. 
4. Prior to works commencing on site, details of a central
storage area for waste collection for each unit shall be
submitted to, and for the written approval of, Perth and
Kinross Council, as the Planning Authority.  Thereafter,
the agreed scheme shall be implemented prior to the
bringing in to use of any unit hereby approved.
Reason - To ensure sufficient waste collection for each
unit.
Amenity
5. Prior to the commencement of development, a
Construction Dust Management Plan shall be submitted
for approval of the Planning Authority and once approved
shall be adhered to throughout the construction stage. 
The CDMP shall include mitigation measures for the
control of dust as outlined in Table 20 of the air quality
assessment ‘Proposed Mixed Development, land
adjacent to Broxden Roundabout, Perth – Fairhurst’
document reference R24.12052/1/JH dated 26 February
2024.
Reason - In the interests of air quality.
Roads and Access
6. Prior to the development hereby approved being
completed or brought into use, the vehicular access
shown on the approved drawings shall be implemented
and constructed in accordance with Perth & Kinross
Council's Road Development Guide, using the
Construction Type B from the Construction Details for
Access Types, C, D and E.  The Type B Road
construction detail shall continue into the entrance for a
distance of 5 metres from the boundary of the public road
surface.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
7. Prior to the first occupation of each element, the applicant
shall provide, for approval by the Council as Roads
Page 16 of 162

Page 17

Authority, a Service Management Plan detailing the plans
for servicing and delivery operations, and timing,
including arrangements for the management of vehicular
and pedestrian traffic during servicing and delivery. 
Thereafter, the approved plan shall be adhered to for the
life of the development. 
Reason - In the interests of road safety.
8. Prior to the first occupation of each element, a detailed
design for a minimum of: 
a) Plot 2: 26 secure, covered cycle parking bays. 
b) Plot 3: 8 secure cycle parking bays.
c) Plot 4: 8 secure cycle parking bays.
shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall
be implemented in accordance with the approved details
to the satisfaction of the Council as Planning Authority
prior to the occupation of each element.
Reason - To encourage active travel and meet advice
within Scottish Planning Policy on transport.
9. Prior to commencement of works, the street lighting
design for adoptable areas must be submitted for the
further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council’s
Street Lighting Partnership.  The scheme shall include
details of light spill, brightness of the lighting and the
proposed hours of operation.  The agreed lighting
scheme shall be implemented prior to the occupation of
the first unit and maintained in full accordance with the
agreed scheme.
Reason - In the interests of road safety.
10.  Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
Page 17 of 162

Page 18

f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
i) details of information signs to inform other road
users of construction traffic;
j) arrangements to ensure that access for
emergency service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;
l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
n) monitoring, reporting and implementation
arrangements; 
o) arrangements for dealing with non-compliance;
and
p) details of HGV movements to and from the site.  
The TMS, as approved, shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
11. Prior to the commencement of development, the
applicant shall submit survey work to demonstrate that
the drainage system ensures a positive flow of water with
no discharge onto the public road network.  Thereafter,
the agreed scheme shall be implemented in full to ensure
no discharge onto the road network at any time.
Reason - In the interests of pedestrian and traffic safety.
12. No part of the development shall be occupied until a
Travel Plan (TP), aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transportation
and Development.  The TP will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.  Thereafter, the
agreed scheme shall be implemented in full for the life of
the development.
Reason - To promote sustainable transport options and to
meet advice within Scottish Planning Policy on transport.
13. Prior to the commencement of development details of a
barrier along the boundary of the trunk road to prevent
Page 18 of 162

Page 19

access to the trunk road shall be submitted to and agreed
in writing by the Council as Planning Authority, in
consultation with Transport Scotland as the Trunk Road
Authority.  The barrier, as agreed, shall be completed
prior to the use of the development and maintained by the
developer or subsequent owner of the land.
Reason - To minimise interference with the safety and
free flow of the traffic on the trunk road; and to minimise
the risk of pedestrians and animals gaining uncontrolled
access to the trunk road with the consequential risk of
accidents.
Floods / Drainage
14. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council
as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in the
SUDS Manual (C753) and the Council’s Flood Risk and
Flood Risk Assessments Developer Guidance and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - In the interests of best practice surface water
management; to avoid undue risks to public safety and
flood risk.
15. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
16. The measures identified in the revised Drainage
Assessment (document 20 hereby approved) to prevent
flooding of the site, approved as part of this permission,
shall be fully implemented.  Verification that the scheme
has been fully implemented must be submitted to the
Council as Planning Authority prior to completion or the
bringing into use of any part of the development,
whichever is the earlier.
Reason - In order to take account of the flood risk of the
adjacent sites close to the Glasgow Road (A93). 
Contaminated Land
17. Prior to the commencement of works on site, an
evaluation for the potential of the site to be affected by
contamination by a previous use should be undertaken
and as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) will be submitted for consideration
by the Council as Planning Authority.  If after the
preliminary risk assessment identifies the need for further
Page 19 of 162

Page 20

assessment, an intrusive investigation should be
undertaken to identify: 
I. the nature, extent and type(s) of contamination on
the site 
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed 
III. measures to deal with contamination during
construction works 
IV. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the agreed measures to decontaminate
the site shall be fully implemented as approved by the
Council as Planning Authority.  Validation that the
scheme has been fully implemented must also be
submitted to the Council as Planning Authority.
Reason - In order to deal with any potential ground
contamination. 
Justification
The proposal is considered a minor departure from the
Development Plan however there are material reasons which
justify departing from the Development Plan. 
Procedural Notes
SEPA have submitted a holding objection to the proposed
development, in relation to flood risk.  The application will be
referred, if SEPA maintain their objection, to the Scottish
Ministers for authority to proceed. Thereafter, if agreed by
Scottish Ministers, the decision notice shall not be issued until
such time that the relevant transport infrastructure contributions
have been secured. 
Informatives
1. The planning permission decision notice shall not be
issued until such time as the required Developer
Contributions have been secured or paid in full.
2. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
Page 20 of 162

Page 21

4. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works. Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
5. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks. 
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.  Please note
that a fee is chargeable for the processing of RCC
applications.
6. If the applicant is successful in gaining planning consent,
they must apply for a Vehicle Access Consent before
starting works on its formation.  More information on the
process can be found on the following website:
https://www.pkc.gov.uk/vehicleaccess.  Please note, that
as planning permission has been applied for, currently no
fee is required for the Vehicle Access Consent (VA1
form), please include the planning application number on
your VA application form.
7. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
8. Guidance on the detailed design and positioning of the
cycle storage can be sought from Transport Scotland's
Cycling by Design 2021.
9. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the e-Planning portal if your
original application was lodged that way, otherwise send
it to us at developmentmanagement@pkc.gov.uk. Please
be aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk. The
Page 21 of 162

Page 22

Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
10. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk.
11. The refuse collection operative must have clear access to
the bin storage area and where possible the surfaces
must be a paved or hard finished, which must be smooth,
where possible, without steps or kerbs with a minimum
width of 1.5 metres and clear headroom of 2 metres.
12. Where a refuse vehicle is required to drive onto a site or
to work under any structure there should be a minimum
height clearance of 4.5 metres, with a minimum working
area of 3.5 metres width by 4 metres length where the
emptying of the containers will take place.
13. No work shall be commenced until an application for
building warrant has been submitted and approved.
14. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
15. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
16. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations. 
Page 22 of 162

Page 23

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Report of Handling by Strategic Lead - Economy, Development and Planning
(Report No. 24/166) 
PROPOSAL: Erection of 209 dwellinghouses, formation of SUDS, landscaping
and associated works (approval of matters specified in conditions
of 15/01237/IPM) (LDP site MU7) 
LOCATION: Land 300 Metres South West of Tighnacoille, Broich Road, Crieff 
Ref. No: 23/01167/AMM
Ward No: P6- Strathearn 
Summary 
This report recommends approval of a Matters Specified in Conditions (AMSC)
application related to residential Phases 5-6 of the MU7 mixed-use development,
allocated in LDP2. The application proposes details for the development of 209
dwellings within the phases, together with landscaping, SUDS, and other associated
works. This Report concludes that the proposal is consistent with the Development
Plan, the existing Planning Permission in Principle (PPP) (Ref: 15/01237/IPM) and
other relevant material planning considerations. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The proposed site forms part of the MU7 allocation in the Perth and Kinross
Local Development Plan (2019) (LDP2). The LDP2 allocation totals an area of 47
hectares (ha), with the indicative range of 409-639 residential units and 5 ha of
employment land. 
2 Planning Permission in Principle (PPP) was granted for the entire allocation in
December 2015 (15/01237/IPM) and again in June 2018 (18/02213/IPM), which
was subject to planning conditions, including an Approval of Matters Specified by
Condition (AMSC) requiring detailed layout and design detail for each phase. A
masterplan was submitted with the PPP application indicating 400+ units in total
for all residential phases, with 5 ha of employment land; however, the residential
figures were indicative and not approved. 
3 This proposed site forms Phases 5 and 6 of residential development and extends
to approximately 7.62ha. The site is located on the southern edge of Crieff, within
the settlement boundary. It is currently used as agricultural land and is
reasonably flat with a slight fall as you move south. It is bounded by the B8062
5(1)(i)
Page 23 of 162

Page 24

Broich Road to the north with Crieff Primary School and Strathearn Community
Campus immediately across the road; to the east is further agricultural land that
includes the site of a Scheduled Monument; to the west is the tree-lined access
road for Broich House with the ongoing residential development by Ogilvie
Homes beyond. To the south and south-west is woodland with a path to the River
Earn with further agricultural land beyond. 
4 Two vehicular accesses will be formed onto Broich Road, which will be widened
to 6m to accommodate the additional traffic movements created by the
development. Additional connections will be provided to the site to the west, to
the access road for Broich House, and to the south-west of the site. 
5 The majority of the houses are oriented to face a road or areas of open space,
with the units on the eastern edge of the site taking advantage of the open
outlook over the Scheduled Monument. Landscaping will be provided around the
site boundaries with the SUDS and associated pond/basin located in the
southern corner. 
6 Of the 209 residential units proposed, 157 will be for sale and 52 affordable
homes. These dwellings comprise a mix of detached, semi-detached, terraces
and flats. The numbers and tenure mix are: 
• 32 x two-bedroom flats;
• 15 x two-bedroom terraced houses;
• 22 x three-bedroom terraced houses;
• 55 x three-bedroom semi-detached houses;
• 22 x three-bedroom semi-detached houses with a study;
• 35 x three-bedroom detached houses; and
• 28 x three-bedroom detached houses with a study. 
7 All of the units will have access to a private external amenity area and be finished
with smooth white or pale render, with a brown or grey facing brick basecourse
and terracotta or grey roof tiles. The doors and windows will be white UPVC. 
Site History 
8 14/00005/PAN submitted on 28 August 2014 for Mixed use development
including residential, compatible employment uses, areas of open space, amenity
landscaping, formation of access roads, footpaths and cycleways, associated
drainage works and ancillary facilities. 
9 15/01237/IPM was approved on 9 December 2015 for Mixed use development
including residential, compatible employment uses, areas of open space, amenity
landscaping, formation of access roads, footpaths and cycleways, associated
drainage works and ancillary facilities. 
Page 24 of 162

Page 25

10 18/02213/IPM was approved on 6 June 2019 for Application under Section 42 of
the Town and Country Planning (Scotland) Act 1997 to amend condition 1
(timescales for submission of Approval of Matters Specified by Conditions
applications) and condition 3 (phasing of development) of planning permission
15/01237/IPM (mixed use development including residential, compatible
employment uses, areas of open space, amenity landscaping, formation of
access roads, footpaths and cycle ways, associated drainage works and ancillary
facilities (in principle)). 
11 19/01165/AMM was approved on 8 March 2021 for Erection of 246
dwellinghouses, formation of vehicular accesses, play park, landscaping and
associated works (approval of matters specified in conditions of 18/02213/IPM)
(allocated site MU7)  
PRE-APPLICATION CONSULTATION 
12 Pre application Reference: 22/00009/PREAPM   
13 The scale of development proposed is classified as ‘Major’ in terms of the Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009.
However, because the proposal is an AMSC application, further preapplication
consultation (PAC) is not necessary beyond that already undertaken for PPP
application. 
DEVELOPMENT PLAN 
14 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019), along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
15 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. 
16 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
17 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 7: Historic Assets and Places
Page 25 of 162

Page 26

• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 18: Infrastructure First
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
18 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
19 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1D: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 20: Affordable Housing
• Policy 25: Housing Mix
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 56: Noise Pollution
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Page 26 of 162

Page 27

OTHER POLICIES 
Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing (adopted
in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted in
2021)
• Supplementary Guidance - Open Space Provision for New Developments (adopted
in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non Statutory Guidance 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Planning & Biodiversity 
NATIONAL GUIDANCE 
20 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
21 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements 
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
22 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
23 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
Page 27 of 162

Page 28

away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
24 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.  
CONSULTATIONS 
25 As part of the planning application process the following bodies were consulted: 
External 
Crieff Community Council 
26 The Community Council has submitted a number of observations. The main
points raised are as follows: 
• The ongoing requirement for the development of the employment land;
• Concern at lack of improvements to Broich Road;
• Tree species included in the landscape plans;
• Density; and
• Impact on healthy trees. 
Historic Environment Scotland 
27 An initial objection was received due to the impact of proposed fencing and
walling, new trees, a surfaced path and a sloped area within the Scheduled
Monument. Following the removal or amendment of these matters HES have
withdrawn their objection. 
NHS 
28 Advise that the Health and Social Care Partnership is under pressure to meet
significant rising demands. However, there are no site-specific requirements to
contribute towards health care provision in the locality as this was not identified
during the preparation of LDP2. 
Perth And Kinross Heritage Trust 
29 The site is within an area considered to be archaeologically sensitive. A condition
is recommended to ensure a protection is installed around the Scheduled
Monument. 
Page 28 of 162

Page 29

Scottish Environment Protection Agency 
30 No objection to the proposal. 
Scottish Water 
31 No objections to the proposal. There is sufficient capacity in the Turret Water
Treatment Works to service the development. Scottish Water is unable to confirm
capacity within the Crieff Waste Water Treatment Works and suggest the
applicant completes a Pre-Development Enquiry Form for this purpose. 
Internal 
Biodiversity/Tree Officer 
32 Following the submission of revised plans, no objection to the proposal subject to
conditions on landscaping and biodiversity enhancement and protection
measures. 
Community Greenspace 
33 No objections. As there is no priority public open space within the development it
is acceptable for the open space to be privately factored. A contribution of
£26,079.03 is required for the ongoing maintenance and replacement of
equipment at King George V Park. 
Community Waste Advisor - Environment Service 
33 No objection to the proposal. 
Development Contributions Officer 
34 No objection. An S.75 is required for the delivery of affordable housing (52 units)
and a Primary Education Contribution (£5,164 per open market unit). 
Environmental Health (Contaminated Land) 
35 No objection subject to a condition requiring further investigations. 
Environmental Health (Noise/Odour) 
36 No objection subject to a condition requiring the implementation of noise
mitigation measures. 
Structures And Flooding 
37 No objection subject to the provision of updated information on discharge rates
and SUDS maintenance. This information has subsequently been submitted.
Page 29 of 162

Page 30

Transportation And Development 
38 No objections subject to conditions requiring the following: 
• Provision of a crossing on Broich Road;  
• A vehicular link to the western boundary;  
• The detailed design of parking bays, surfacing materials and traffic calming
measures within the site;  
• Street lighting design; 
• Wildlife kerbs; and 
• A Construction Transport Management Scheme (CTMS) 
REPRESENTATIONS 
39 One representation was received objecting to the development. The main issues
raised within the representation are: 
• Density is too high
• Detrimental impact on existing infrastructure and services 
• Volume of traffic on Broich Road 
40 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
41
Screening Opinion  EIA Not Required
Environmental Impact Assessment
(EIA): Environmental Report
Not Required (submitted as part of
IPM)
Appropriate Assessment under
Habitats Regulations
AA Not Required
Design and Access Statement Submitted
Report on Impact or Potential Impact
eg Flood Risk Assessment
Noise Impact Assessment;
CEMP;
Drainage Assessment;
Archaeological Evaluation And
Monitoring Report;
Ground Investigation Report;
Biodiversity Enhancement Plan;
Preliminary Ecological Appraisal;
Tree Survey;
Transport Statement;
Travel Plan;
Air Quality Mitigation Report;
Energy Statement;
Statement of Community Benefit. 
Page 30 of 162

Page 31

APPRAISAL 
42 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.   
Principle 
43 The principle of the proposal has been established through the site’s allocation
as MU7 in LDP2 for a mixed-use development, including residential. Planning
permission in principle (PPP) has also been granted for the development of the
wider site, with this area being approved for residential use, reflective of that
LDP2 allocation. 
44 In addition, an Approval of Matters Specified in Conditions (AMSC) has been
granted for the detailed design for 246 houses on Phases 1-4 has already been
granted and is substantially underway. This is the adjacent Ogilvie Homes
development. 
45 The principle of the development is thus considered acceptable, provided the
proposals are compatible with the PPP and relevant policies of the development
plan. This is assessed below. 
Design and Layout 
46 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant; as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas, Policy 25: Housing Mix and Policy
42: Green Infrastructure. 
47 The layout broadly complies with the principles of the approved masterplan and
seeks to provide a logical movement pattern through the site, with permeability
provided to surrounding areas. The proposed layout provides an appropriate
network of streets and open spaces, with the majority of the houses oriented to
overlook these areas. The eastern edge of the site bounds the Broich Cursus
Scheduled Monument (SM9135), which will remain undeveloped and the majority
of the houses along this edge will be positioned to take advantage of the open
outlook. The proposal provides a legible environment which connects the new
housing effectively to the existing residential areas with an appropriate urban
density. 
48 NPF4 promotes compact urban growth with higher density development helping
to sustain public transport and support local living and 20-minute
Page 31 of 162

Page 32

neighbourhoods. At 27 units per hectare, the development is of a slightly higher
density than the earlier residential phases of the wider site. However, the layout
is commensurate with the wider townscape of this area of Crieff, and the
proposed density is an efficient use of land on an allocated site for residential
development and is considered to be of a low density. 
49 The development proposes an appropriate mix of flats, terraces, semi-detached
and detached properties with two and three bedrooms. The proposed rear
gardens all comply with the Council’s minimum standards and will not
compromise daylight or privacy of each other. 
50 The heights of the proposed units reflect heights within the prevailing residential
context, both in terms of the older existing residential areas to the north and that
currently under construction in Phases 1-4. Proposed site levels and sections
have been assessed and are considered satisfactory. 
51 Overall, the proposed layout, design, heights, and materials are considered to
comply with the Council’s placemaking policies, providing a logical and coherent
structure and hierarchy of streets, buildings and open space. This also
appropriately considers the surrounding landscape character and amenity of the
area. The proposals therefore are considered to accord with the terms of both the
PPP and the relevant NPF4 and LDP2 policies. 
Landscape and Visual Amenity 
52 A detailed Landscape and Visual Impact Assessment was submitted, as part of
the PPP application. Phases 5-6 are broadly in line with the indicative PPP
masterplan. The houses will be visible within the locality, particularly on Broich
Road and the approach to Crieff from the east. The orientation of the units on the
northern and eastern fringes, coupled with the proposed landscaping, will form a
positive urban edge to the site. 
53 The open space and landscaping proposed for the development is
commensurate with the vision set out in the PPP masterplan. The site edges will
be enhanced by the landscaping and supplementary planting, creating a pleasant
environment for residents. Open space will be provided 
Residential Amenity 
54 Residential amenity requires to be considered under NPF4 Policy 16: Quality
Homes and LDP2 Policy 1: Placemaking and Policy 17: Residential Areas. 
Privacy, Daylight and Overshadowing 
55 The location of the proposed dwellinghouses, relevant to both themselves and
existing/approved residential properties is such that there will be no unacceptable
loss of privacy or daylight or overshadowing. 
Page 32 of 162

Page 33

Noise 
56 The applicant has submitted a Noise Impact Assessment (NIA)which has
assessed the impact of noise associated with road traffic from Broich Road
(B8062) and operational activities from the Crieff skatepark and Strathearn
Community Campus (with bus park and Multi Use Games Area (MUGA)). 
57 The noise impact due to road traffic noise from Broich Road within garden areas
for the proposed development predicted that the majority of gardens are
screened from road traffic noise due to intervening dwellings. However, the
modelling predicted that noise levels within some gardens will require mitigation
via closed boarding fencing at a height of 1.8m. 
58 Modelling indicated that the predicted noise levels from road noise sources would
meet the BS8233 and Who internal noise criteria with windows partially open for
ventilation. 
59 However, predicted noise levels at the proposed dwellings overlooking Broich
Road suggests that the criteria of 35dBLAeq,16h daytime and 30dBLAeq,8h nighttime
can only be met with windows closed and these proposed properties will require
further mitigation in the form of enhance glazing and ventilation specifications. 
60 The NIA also considered noise from the skate park and MUGA opposite the site.
The assessment found that the dominant source of noise in the immediate locale
was due to road traffic movements on Broich Road. Other nearby noise sources
are much lower in comparison and so mitigation of road traffic noise should also
satisfactorily reduce the potential noise impact of these other sources. 
61 Environmental Health has no objections to the proposal subject to a condition
(Condition 10) requiring the implementation of the recommendations and
mitigation measures contained in the NIA. 
Air Quality and Dust Management 
62 Air Quality modelling was undertaken as part of the wider PPP which predicted a
slight worsening of impacts along the High Street corridor (Crieff’s Air Quality
Management Area (AQMA)). However, the maximum impact was of slight
adverse impacts and Environmental Health had no objections subject to the
submission of a scheme of mitigation being submitted with each approval of
matters application. 
63 In this regard, an Air Quality Mitigation Report has been submitted in support of
this application. The report proposes potential mitigation measures to reduce
impacts on air quality including dust and emissions during the operational phase
of the development. Environmental Health has no objections to the proposal
subject to a condition (Condition 11) requiring the implementation of the
recommendations and mitigation measures contained in the Air Quality Mitigation
Report.
Page 33 of 162

Page 34

64 As required by the PPP, the applicant has submitted a Construction
Environmental Management Plan (CEMP). The CEMP has sections for
emissions to air, noise, vibration and dust and for each section identifies control
measures to be implemented throughout the construction stage of the
development. 
65 Environmental Health has confirmed that the submitted CEMP is acceptable and
will be subject to a condition to ensure that its measures and recommendations
are adhered to during the construction phase of the development (Condition 13). 
Contaminated Land 
66 The submitted Site Investigation Report suggests that ground gas monitoring is
incomplete and therefore the ground gas risk cannot be determined until further
monitoring has been carried out. As a result, it is appropriate to impose a
condition (Condition 9) to ensure that this work is completed, and any
recommendations implemented. 
Roads and Access 
67 It was detailed in the in-principle permission for the wider site that there would be
improvements for Broich Road, including the widening of the carriageway to 6
metres. The applicant has confirmed that Broich Road will be widened to 6
metres along the frontage of the site and a condition is required to secure this
requirement (Condition 3). In addition, the condition will require a toucan
crossing, bus stop and shelter and a footpath on the south side of Broich Road. 
68 The application proposes to create two new vehicle accesses onto Broich Road
giving access to all 209 dwellinghouses, with a series of linked streets. The
concept in the in-principle design showed that there would be vehicular
connectivity between this site and the adjacent Ogilvie Homes site and the site to
the north-west. The Ogilvie Homes site will provide a road stub to their boundary
and the Persimmon site will offer a similar stub opposite allowing for these to be
more formally connected in future and a condition is recommended to secure its
delivery (Condition 4). 
69 A strip of soft landscaping will be left along the eastern boundary of the site. It
was initially proposed that a path would be provided in this area. However, an
objection to that proposal was received from HES due to concerns with its impact
on the Scheduled Monument. This area will now be left as amenity grassland
allowing unrestricted views across the Scheduled Monument from the houses on
the west of the site. 
70 Transportation and Development has confirmed that they are satisfied with the
proposals subject to the previously referred to with the addition of further
conditions for roads design detailing (Condition 5), street lighting (Condition 6),
and a Construction Traffic Management Scheme (Condition 8).
Page 34 of 162

Page 35

Drainage and Flooding 
71 A Drainage Assessment has been submitted in support of the application.
Drainage and flooding mitigation for the site is required to be designed for a 1 in
200-year storm plus a 39% climate change allowance. The hydraulic modelling
carried out shows that overland flows will be safely managed within the site roads
network. 
72 SUDS are incorporated in the form of an end of line detention basin and end of
line swale, both of which will be located at the southern corner of the site. 
73 SEPA has advised that they have no objections to the proposal. Flooding and
Structures has offered no objections to proposal subject to an initial request for
some clarifications and further information, which has now been submitted. 
74 Overall, the proposal complies with NPF4 Policy 22: Flood Risk and Water
Management and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage. 
Waste Collection 
75 The PPP seeks to ensure appropriate waste and recycling provision is identified
and secured as part of MSC applications. In this regard there is considered to be
adequate provision proposed to accommodate requirements, satisfying the
conditional terms of the PPP. 
Cultural Heritage 
76 The Scheduled Monument 9135 (Broich Cursus) is located to the east of the
proposed development, with part of it located within the eastern boundary of the
site. As required by the PPP, the impact of the proposal on the Scheduled
Monument and archaeology in the area must be examined. 
77 The landscaping and layout along the eastern edge have been amended
following an initial objection from HES, due to potential direct adverse impacts on
the scheduled monument. This included proposals to erect fencing and walling,
plant trees, create a surfaced path and a sloped area within the scheduled
monument. These aspects have now been amended or removed from the
scheme and HES have confirmed that they have now withdrawn their objection. 
78 Perth and Kinross Heritage Trust (PKHT) has been consulted and also initially
raised concerns about the impact of the proposal on the Scheduled Monument.
However, as with HES, they have no objections to the amended proposal,
subject to a condition requiring protective fencing to be erected to protect the
Scheduled Monument during construction (Condition 12). 
79 PKHT further advised that the entire proposed development site lies within an
area that is considered to be archaeologically sensitive. An archaeological
Page 35 of 162

Page 36

evaluation has been carried out of the unscheduled area of the proposed
development. The report has been submitted within the supporting documents;
no significant material or physical evidence was uncovered during this work and
as such there is no further recommendation for work within the evaluated
unscheduled area. 
80 Overall, the proposal is considered to comply with NPF4 Policy 7: Historic Assets
and Places and LDP2 Policy 26: Scheduled Monuments and Archaeology. 
Natural Heritage and Biodiversity 
81 In relation to natural heritage and biodiversity, NPF4 Policies 1: Tackling the
Climate and Nature Crisis, 2: Climate Mitigation and Adaptation 3: Biodiversity
and 20: Blue and Green Infrastructure, are relevant. In addition, LDP2 Policies 40
and 41 directly apply. In association several conditions attached to the PPP
applications cover these issues. 
82 A Preliminary Ecological Appraisal Report (PEAR) has been submitted as
required by Condition 23 of the PPP. The PEAR was undertaken at the correct
time of year and with the addition of further details provides adequate information
to inform the development. 
83 The surveys and detailed landscape proposals have been assessed by both the
Council’s Biodiversity Officer and Community Greenspace. The details are
generally considered acceptable in terms of landscape and biodiversity value. 
84 NPF4 Policy 3(b) requires that major developments to demonstrate that they will
enhance biodiversity, so they are in a better state than without intervention,
including future management. This should include significant enhancements
following avoidance, mitigation, and compensation for all biodiversity loss. A
Biodiversity Enhancement Plan (BEP) has been provided which makes a number
of recommendations. A condition is required to ensure that the conclusions and
recommended action points contained in the BEP are adhered to (Condition 18). 
Low and Zero Carbon Generating Technologies 
85 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement. 
86  Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce greenhouse gas emissions. The
applicant has submitted an Energy Statement in support of the proposal. This
Statement advises that this requirement will be met through measures including:
the site layout being influenced by the need to maximize the opportunities for
Page 36 of 162

Page 37

solar gain and energy generation through solar panels; a fabric first approach to
building, including high levels of insulation and air tightness and efficient
integrated home appliances. 
87 Overall, the proposed development will comply with the provisions of LDP2
Policy 32 and NPF4 Policy 2. 
Developer Contributions 
88 NPF4 Policy 18: Infrastructure First and LDP2 Policy 5: Infrastructure
Contributions requires consideration of the individual or cumulative impact of new
development on infrastructure and facilities and to secure contributions to
address this impact where the development exacerbates impacts or generates
additional need. 
89 A Section 75 Legal Agreement is required to secure the necessary infrastructure
and associated contribution payments, covering the following subject areas: 
• Affordable Housing provision
• Primary Education provision
• A contribution to the ongoing maintenance and replacement of equipment at
King George V Park. 
Affordable Housing 
90 NPF4 Policy 15: Local living and 20-minute Neighbourhoods and Policy 16:
Quality Homes seek to encourage and facilitate the delivery of high quality,
affordable and sustainable housing options. LDP2 Policy 20 requires an
Affordable Housing contribution equivalent to 25% of the units being developed.
It is confirmed that the full requirement (52 units) for this AMSC application will
be delivered on-site. This provision will ensure the PPP and LDP2 requirements
are met. 
Primary Education 
91 Primary Education contribution of £810,748 is required to ensure there will be
capacity within the adjacent Crieff Primary School. The contribution will be
phased to ensure the objectives of the PPP, NPF4 Policy 18: Infrastructure First,
LDP2 Policy 5 and Supplementary Guidance - Developer Contributions &
Affordable Housing is met. 
Health Provision 
92 The site is allocated in LDP2 and the National Health Service (NHS) were
formally consulted during the plan-making process. However, neither the NHS
nor the Perth & Kinross Health and Social Care Partnership (HSCP) advised that
there were pressures related to health care provision in the locality and that
Page 37 of 162

Page 38

developer obligations were required. On this basis, no site-specific requirements
to make contributions towards health care provision can be required at this time. 
Economic Impact 
93 The impact to the local economy both during construction and occupation will be
reasonably significant with additional available expenditure on local facilities and
services. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
94 A Section 75 is required to deal with financial contributions and securing the
delivery of primary education, affordable housing, transport infrastructure
improvements, open space and play area provision and maintenance. Consent
shall not to be issued until the Section 75 Agreement has been signed and
registered to take account of this application. The legal agreement should be
concluded and completed within 4 months of the date of any Committee
approval.   
DIRECTION BY SCOTTISH MINISTERS 
95 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
96 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions.  
RECOMMENDATION   
Approve the application.   
CONDITIONS AND REASONS FOR RECOMMENDATION 
1. The development hereby permitted shall be commenced no later than the
expiration of three years from the date of this consent or from the date of
subsequent approval of matters specified in conditions, or three years from the
date of planning permission in principle, whichever is the later. 
Page 38 of 162

Page 39

Reason - This is a Planning Permission in terms of Section 59 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. Prior to commencement of development on site, a detailed design showing the
frontage of the development site onto Broich Road shall be submitted for the
written approval of the Council as Planning Authority.  The submission shall
include the provision of the following: 
a)  a signalised toucan crossing on the B8062 Broich Road to link the
development site to the northern side of Broich Road, confirming the extents
of wall to be removed on the northern side of Broich Road;
b)  the position of uncontrolled crossing location(s) along the frontage of the
site to link the development site to the northern side of Broich Road;
c)  the location of the bus stop and bus shelter to be located at the rear of the
footway. The bus shelter shall be equipped with 24/7 electrical power supply
to a Haldo pillar adjacent to each shelter to facilitate LED lighting and Real
Time Passenger Information display, all of which must also be provided by
the Developer, and associated road markings;
d)  the footway on the southern side of Broich Road, to be a minimum width of
2 metres along the full frontage of the site;
e)  the carriageway widening of Broich Road to a minimum of 6 metres in width
along the frontage of the development site, thereafter the road will taper
back to the original width;
f)  the location of road drainage on the B8062 Broich Road along the frontage
of the site; and
g)  the location of road signage. 
The submission will confirm the location, specification, detailed design and
delivery timescales for the pedestrian crossings, location of the bus stop, road
widening, footway on southern side of Broich Road, road drainage and road
signage along the frontage of the development site.  The scheme for the
approved shall thereafter be implemented in full, prior to the occupation of the
first dwellinghouse. 
Reason - In the interests of road, pedestrian safety and connectivity with the
developments to the northern side of Broich Road. 
4. Prior to the commencement of the development hereby approved, a detailed
design showing the vehicle link to the north-western boundary connecting to the
Page 39 of 162

Page 40

wider approved PPP site shall be submitted and approved in writing by the
Council as Planning Authority.  The submission will include details of: 
a)  The provision of the road and footways to the north-western boundary of the
site;
b)  The provision of the cyclepath link to connect into the wider approved PPP
site;
c)  The submission will also confirm the specification of materials to be used. 
Thereafter, the approved scheme shall be implemented in full prior to the
completion of the 70th residential unit within phases 5-6 and to the satisfaction of
the Council as Planning Authority. 
Reason - In the interests of road, pedestrian safety and connectivity with the
remainder of the PPP site. 
5. Prior to the commencement of the development hereby approved, a detailed
design showing the following road details shall be submitted for the written
approval of the Council as Planning Authority; 
a)  step off facilities for visitor parking bays;
b)  finalised road surfacing materials;
c)  finalised footway and cyclepath surfacing materials;
d)  traffic calming measures within the site; and,
e)  a phasing plan for delivery. 
The roads, footways and cyclepath as approved in writing, shall be implemented
in accordance with the approved details to the satisfaction of the Council as
Planning Authority. 
Reason - In the interests of pedestrian and traffic safety. 
6. Prior to commencement of any development on site, the street lighting design
must be submitted for the further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council's Street Lighting
Partnership for the public road network.  The scheme shall include details of
light spill, brightness of the lighting and the proposed hours of operation for both
the public road network and the private areas, and timescales for delivery.  The
agreed lighting scheme shall be implemented and maintained in full accordance
with the agreed scheme. 
Reason - In the interests of road safety. 
7. Prior to the commencement of development, a phasing plan shall be submitted
showing the locations of and timescales for delivery of wildlife kerbs.  For the
avoidance of doubt, all road gullies within 500m of a waterbody or Sustainable
Urban Drainage System (SUDs) pond shall have wildlife kerbs installed. 
Page 40 of 162

Page 41

Thereafter, the kerbs shall be installed in accordance with the approved phasing
plan. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
8. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
a)  restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used; 
b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c)  a code of conduct for HGV drivers to allow for queuing traffic to pass;
d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f)  arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h)  arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i)  details of information signs to inform other road users of construction traffic;
j)  arrangements to ensure that access for emergency service vehicles are not
impeded;
k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
m)  the provision and installation of traffic counters at the applicant's expense at
locations to be agreed prior to the commencement of construction;
n)  monitoring, reporting and implementation arrangements;
o)  arrangements for dealing with non-compliance; and
p)  details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management. 
9. Development shall not commence on site until an evaluation for the potential of
the site to be affected by contamination by a previous use has been undertaken
Page 41 of 162

Page 42

and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify; 
I.  the nature, extent and type(s) of contamination on the site
II.  measures to treat/remove contamination to ensure the site is fit for the use
proposed
III.  measures to deal with contamination during construction works
IV.  condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason - In order to deal with any potential contamination of the site as a result
of its former use. 
10. All recommendations and mitigation measures shall be implemented in
accordance with Section 7, Appendix A, Figures 3 - 8 and Table 13 of the
approved Noise Impact Assessment reference Broich Road, Crieff dated 11 July
2023 which was undertaken by KSG Acoustics to the satisfaction of the Planning
Authority. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
11. The recommendations and mitigation measures for the construction and
operational stages of the development as stated in Section 6 of the Air Quality
Mitigation Report' Broich Road AQ Mitigation Report, Persimmon Homes (North
Scotland)' dated May 2023 which was undertaken by AECOM shall be
implemented to the satisfaction of the Council as Planning Authority. 
Reason - In order to safeguard the residential amenity of the area. 
12. Prior to the commencement of the development hereby approved, protective
fencing shall be erected around SM9135 incorporating an appropriate buffer,
insofar as the land lies within the control of the applicant and/or developer, in a
manner and for a time period to be agreed in writing in advance with the Council
as Planning Authority in consultation with Perth and Kinross Heritage Trust
(PKHT).  No works shall take place within the area inside that fencing without
prior written agreement of the Council as Planning Authority in consultation with
PKHT. 
Reason - To ensure the preservation of the historic environment. 
Page 42 of 162

Page 43

13. The submitted Construction Environment Management Plan (CEMP) (Rev A)
shall be implemented concurrent with the development.  The CEMP will remain
a dynamic document throughout the duration of construction and until the
completion of development.  The CEMP can be amended as necessary to meet
best practice in terms of environment or ecology.  Any amended document shall
be submitted to the Planning Authority as soon as reasonably practicable citing
the relevant amendment and appropriate guidance. 
Reason - In the interest of protecting environmental quality and of biodiversity. 
14. Concurrent with the initiation of the development hereby approved, and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved
development works.  The temporary surface water treatment facility shall remain
in place until the permanent surface water drainage scheme is implemented. 
Reason - In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk. 
15. Prior to the commencement of the development hereby approved, a scheme
detailing the provision of electric car charging points for the development shall be
submitted for further written approval of the Council as Planning Authority.
Thereafter the approved scheme shall be installed to the satisfaction of the
Planning Authority. 
Reason - In the interests of sustainable transport. 
16. All trees on site, other than those marked for felling on the approved plans, shall
be retained.  All trees identified for retention and any peripheral trees bounding
the site, which may be affected by any element of the approved development and
its associated construction, (including land within the blue site area) shall be
protected in full accordance with BS 5837: 2012 'Trees in relation to design,
demolition and construction'.  Approved Tree Protection measures shall not be
removed breached or altered without prior written authorisation from the local
planning authority but shall remain in a functional condition throughout the entire
development or as per the phasing plan.  If such protection measures are
damaged beyond effective functioning then works that may compromise the
protection of trees shall cease until the protection can be repaired or replaced
with a specification that shall provide a similar degree of protection. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
17. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
Page 43 of 162

Page 44

established within five years being replaced in the following planting season with
others of a size and species as previously approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
18. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document(s) Biodiversity
Enhancement Plan Revision B (May 2024) relates) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
19. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
JUSTIFICATION 
The proposal is considered to comply with the Development Plan and there are
no other material considerations that would justify a departure from the relevant
policies.   
PROCEDURAL NOTES 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers. 
INFORMATIVES 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
Page 44 of 162

Page 45

which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be: 
Displayed in a prominent place at or in the vicinity of the site of the development 
Readily visible to the public
Printed on durable material. 
4. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the commencement
of roadworks. Advice on the disposal of surface water must be sought at the
initial stages of design from Scottish Water and the Scottish Environmental
Protection Agency. Please note that a fee is chargeable for the processing of
RCC applications. 
5. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
6. The applicant should be advised to contact Perth & Kinross Council Street
Lighting Department to obtain technical approval for all street lighting provision. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species.  Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
8. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (section 1), it is an offence to remove, damage or destroy the nest of
any wild bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
Page 45 of 162

Page 46

9. The developer should please note the following: 
Refuse collection vehicles will only enter the site during development where there
is clear access, adequate turning, and a suitable road surface with no raised
ironworks.  This means that Waste Services may not be able to provide a full
kerbside recycling service to residents whilst the build is ongoing, and bins may
have to be emptied from a collection point, specified by the area Community
Waste Adviser, until full access is made available for refuse collection vehicles. 
The developer must contact the Community Waste Team to discuss bin
collections as the site progresses. 
10. No work shall be commenced until an application for building warrant has been
submitted and approved. 
11. The applicant is advised to refer to Perth & Kinross Council's Flood Risk and
Flood Risk Assessments Supplementary Guidance, and the CIRIA SuDS manual
as it contains advice relevant to your development. 
Background Papers:  1 letter of representation
Contact Officer:  Alex Gudgeon
Date: 24th May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT AND PLANNING 
Page 46 of 162

Page 47

Ü
Erection of 209 dwellinghouses, formation of SUDS, landscaping and associated works (approval of matters
specified in conditions of 15/01237/IPM) (LDP site MU7) on Land 300 Metres South West Of Tighnacoille
Broich Road Crieff
23/01167/AMM
Scale
1:10,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(i)
Page 47 of 162

Page 48

Page 48 of 162

Page 49

Ü
Erection of 209 dwellinghouses, formation of SUDS, landscaping and associated works (approval of matters
specified in conditions of 15/01237/IPM) (LDP site MU7) on Land 300 Metres South West Of Tighnacoille
Broich Road Crieff
23/01167/AMM
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(i)
Page 49 of 162

Page 50

Page 50 of 162

Page 51

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Report of Handling by Strategic Lead - Economy, Development & Planning
(Report No. 24/167) 
PROPOSAL: Change of use of agricultural buildings and land to business
(class 4), general industry (class 5), storage and distribution
(class 6) (in retrospect) 
LOCATION: Land 250 Metres South East Of Isla Villa, Grange, Errol 
Ref. No: 23/00960/FLL
Ward No: P1 - Carse Of Gowrie 
Summary 
This report recommends approval of a retrospective detailed planning application to
regulate the change of use of a series of buildings and their associated outside space
to business (Class 4), general industry (Class 5) and storage and distribution (Class
6) uses on a site within the Grange/Errol Airfield settlement, as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 This planning application seeks to regulate a number of unlawful existing uses on
a site within the settlement of Grange/Errol Airfield. The site is currently used by
a number of established businesses, whose activities fall within either business
(Class 4), General Industry (class 5) or Storage and Distribution (Class 6) uses.
The site comprises three principal buildings which were originally built for either
poultry use or as aircraft hangers, but the uses of these building have moved
onto other types of business and commercial uses over the years. Two of these
buildings (Yard 75) are joined with a small connecting link. In between the
buildings are areas of hardstanding (former taxi runways/parking areas for
planes) and grassed areas - both of which have been used for outside storage. 
2 All three of the buildings have been renovated over the years, with new external
cladding and internal alterations. Those alterations are not part of this planning
application as they are considered to be a mix of either permitted and / or de-
minimis development which does not require to be regulated. 
3 Vehicular access to the site is via a private access which is partially shared with
several residential properties. The access is immediately adjacent to some of
5(2)(i)
Page 51 of 162

Page 52

those properties’ residential curtilages. A large area of land adjacent to the
vehicular access has been included within the planning application site boundary.
This area is not proposed for any outside storage but was included within the
planning submission to allow for alterative access ‘options’ to be available to the
applicant if deemed necessary and appropriate. 
PRE-APPLICATION CONSULTATION 
4 The proposal is not of a scale which requires formal pre-application consultation
with the local community. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
5 The proposal is not of a scale which requires assessment through EIA. 
DEVELOPMENT PLAN 
6 The Development Plan for the area comprises National Planning Framework 4
(NPF4), Perth and Kinross Local Development Plan 2 (2019) (LDP2) and
statutory supplementary planning guidance (SPG). 
National Planning Framework 4 
7 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces. 
8 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. The
Council’s assessment of this application has considered the following policies of
NPF4: 
• Policy 3: Biodiversity 
• Policy 4: Natural Places
• Policy 14: Design, Quality and Place 
• Policy 26: Business and Industry 
Perth and Kinross Local Development Plan 2 (2019)  
9 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
Page 52 of 162

Page 53

10 The principal part of the site is located within the settlement of the Grange/Errol
Airfield, and the area has been identified as a mixed use site. A small section of
the existing access which is proposed to be use to access the site is located
outwith the settlement boundary. The following policies are therefore applicable, 
• Policy 1A: Placemaking  
• Policy 1B: Placemaking  
• Policy 5: Developer Contributions
• Policy 6: Settlement Boundaries 
• Policy 7B: Mixed Use Sites 
• Policy 41: Biodiversity 
• Policy 55: Nuisance from Artificial Light and Light Pollution 
• Policy 56: Noise Pollution 
• Policy 60: Transport Standards and Accessibility Requirements 
Statutory Supplementary Planning Guidance 
11 The following statutory SPG are applicable to this proposal, 
• Placemaking 2020
• Developer Contributions and Affordable Housing 2023 
OTHER PKC POLICIES 
Non-Statutory Planning Guidance 
12 The following non-statutory PG is applicable, 
• Planning & Nature 2020 
NATIONAL PLANNING GUIDANCE 
13 The Scottish Government expresses its planning policies and guidance through
Advice Notes (PAN), Creating Places, Designing Streets, National Roads
Development Guide and a series of Circulars. 
Planning Advice Notes 
14 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements 
Page 53 of 162

Page 54

SITE HISTORY 
15 21/00827/LAW - Use of land as (Class 4) business and light industry (existing).
This application was refused due to insufficient evidence to demonstrate that the
existing use(s) were lawful. 
16 22/00101/LAW - Use of units as business and light industry, general industrial
and storage or distribution (existing) - This application was refused due to
insufficient evidence to demonstrate that the existing use(s) were lawful. A
subsequent appeal of that decision to the DPEA was dismissed. 
CONSULTATIONS 
17 As part of the planning application process the following bodies were consulted: 
External  
Scottish Water 
18 No objection to the proposal.   
Internal 
Transportation and Development 
19 No objection to the proposal in terms of the means of the vehicular access and
parking provision, subject to improvements to the junction to the public road. 
Flooding and Structures 
20 No objection subject to conditions concerning surface water disposal and
clarification of alternative routes to and from the site, and a flood action plan
during a flood event.   
Community Waste 
21 No objections in terms of waste and recycling provision. 
Developer Contributions Officer 
22 No requirement for any developer contributions. 
Environmental Health 
23 No objection in terms contaminated land issues or noise, subject to conditions
being attached to any permission.   
Page 54 of 162

Page 55

REPRESENTATIONS 
24 Thirteen letters of representation have been received, of which six are objecting
and seven are offering support. In terms of the letters of objections, the main
issues which have been raises are, 
• Contrary to the Development Plan 
• Inappropriate land use 
• Traffic concerns 
• Impact on residential amenity via noise nuisance 
25 These issues are addressed below in the main appraisal section.   
26 In terms of the letters of support, these largely relate to the economic benefit that
the proposal would bring to the area. In addition to the individual representations,
the Local Community Council have made a representation which is neutral,
suggestions that if the proposal was to be supported then conditions relating to
the junction, the surface of the road and operating hours should be considered. 
ADDITIONAL STATEMENTS
27
Screening Opinion  Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
AA Not Required
Design Statement or Design and Access
Statement
Supporting statement 
Report on Impact or Potential Impact  Noise Impact Assessment   
APPRAISAL 
28 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the LDP2 and
statutory SPG. The relevant policy considerations are outlined in the policy
section above and are considered in more detail below.   
29 In terms of other material considerations, this involves considerations of the sites
previous planning history, and consideration of the Council’s non-statutory
planning guidance. 
Policy 
30 There are relevant policies contained in all parts of the Development Plan. 
Page 55 of 162

Page 56

31 Within the NPF4, Policy 3 (biodiversity) places biodiversity front and centre of all
planning decisions whilst Policy 14 (Design, quality and place) promotes high
quality design for all new proposals. Policy 26 (business and industry) supports
and promotes new businesses and the expansion of existing ones in suitable
locations but only in cases when they are proven to be compatible with existing
land uses.   
32 Within the LDP2, with the exception of the proposed (existing) vehicular access,
the principal area of the site lies within the settlement of Grange/Errol Airfield
where land use Policies 1 (placemaking), 6 (Settlement Boundaries), 7B (mixed
use sites), 41 (biodiversity), 55 (Artificial light), 56 (noise nuisance) and 60
(Transport Standards) are all applicable. 
33 Policy 1 seeks to ensure that all new developments do not have an adverse
impact on the local environment, which includes visual and residential amenity
impacts. Policy 6 looks to limit new development on area which are immediately
adjacent and outwith settlement boundaries. Policy 7B identities areas for mixed
use which are intended to promote the integration of employment opportunities
with housing, but subject to certain criteria being met and delivered. Policy 41
seeks to protect both local and protected wildlife, whilst Policies 55 and 56 looks
to protect residential amenity from both artificial light pollution and noise
nuisance. Policy 60 looks to ensure that all matters concerning access and
parking related matters comply with both the Council’s standards and that of the
NRDG. 
34 In terms of statutory SPG, the Council’s policies on Placemaking, Developer
Contributions and Housing in the Countryside are all applicable, and the content
of these broadly follows the comparable LDP2 policies. 
Land Use Acceptability  
35 With the exception of part of the (existing) vehicular access site, the majority of
the site has been identified within the LDP2 as an existing area of mixed use
where Policy 7B of the LDP2 is directly applicable. In terms of this policy, ‘mixed
use’ is defined as being a range of uses including residential, offices, light
industry, surgeries and leisure, and new proposals which look to introduce these
uses into areas identified as being of ‘mixed use’ will generally be acceptable.
For the avoidance of doubt, light industry is typically defined as a use which can
be undertaken in a residential area without detriment to the amenity of the area
by generating noise, vibration, smell, fumes, smoke, soot, ash, dust or grit. 
36 On the site at present there is a mix of different uses, however these are all
industrial and commercial in nature with no residential. There are however
existing residential uses along the vehicular access to the site. 
37 In addition to the uses listed under Policy 7B of the LDP2, this planning
application seeks the approval for a General Industrial Use (Class 5), which is
what the activities associated with Alfa Doors would typically fall under. With the
Page 56 of 162

Page 57

exception of Alfa Doors, the other existing uses across the site would typically fall
under a combination of Class 4 (business) and Class 6 (Storage and
Distribution). To allow for flexibility, this application seeks approval for all three
classes across the site, without specific restrictions on individual buildings and /
or operators.   
38 In order to comply with Policy 7B of the LDP2 and the more general requirements
of Policy 56 of the LDP2, the proposed uses must be proven to be compatible
with residential amenity, and ordinarily a Class 5 use could be incompatible with
a residential use, depending on the individual location, relationships between the
uses and the circumstances of the businesses. On a similar theme, Policy 26:
Business and Industry of NPF4 also outlines that proposals will be supported
where they are compatible with the primary business function of the area, whilst
also in part d) consider the impact on surrounding residential amenity. 
39 To demonstrate the level of noise arising from the current operators, a Noise
Impact Assessment (NIA) was undertaken and submitted to support the planning
application. Within the NIA, predicted ‘worse’ case scenarios have been
established, and the results show that in the event of all the building(s) being in
operation, including the use of ‘noisy’ machinery and ‘noisy’ working, the
predicted impact on the residential properties would be within acceptable levels.
The NIA indicates that the principal noise generator in terms of activities onsite is
Alfa Doors in Building/Yard 74, and after visiting the site the Council does not
dispute this position. 
40 The NIA has been reviewed by Environmental Health, and the methodology and
assumptions are all in accordance with recognised standards. Subject to the
imposing of a number of compliance conditions, the amenity of existing
residential properties should be protected to acceptable levels. The most
significant conditions are that noise from each building should not exceed 35db
during daytime and 25db during the night (Condition 4). A separate condition
requires further technical assessments and then mitigation, if a valid noise
complaint is raised and verified, in relation to activities within the principal
industrial areas (Condition 8). In light of these conditions, and the presumptions
made within the NIA, it is not considered necessary to restrict this permission to
the existing user. 
41 Within the representations, a number of similar concerns have been raised
relating to noise and dust which is directly generated by HGVs visiting the site for
deliveries as opposed to those collecting waste /recycling. The NIA principally
covers operational noise from the site, but the NIA has considered noise levels
from deliveries and vehicles movements which are typical in terms of their
timings and volume. The noise data does not suggest noise levels of
unacceptable standards. There is no doubt that the surface of the road is poor
and a better surface adjacent to the affected residential properties would help to
reduce both noise levels from movement and also dust during dry periods.
However, a bound service from the junction to the site would be unreasonable,
unproportionate and unjustified and would fail to meet the tests of a competent
Page 57 of 162

Page 58

condition.  Alternatively, a minor improvement to the 2nd bend is more
reasonable and proportionate to protect residential amenity and has been
recommended as a condition (Condition 10). 
42 In terms of the location of the access, and it being outwith the settlement
boundary, this does not raise any concerns. The access is existing, and it would
be unreasonable to take a view that the development was contrary to Policy 6 of
the LDP2 for this reason. The area adjacent to the access which was included to
allow the applicant ‘options’ to amend the access route if it was required, will be
conditioned out of this permission as development (outside storage) within that
area would be considered contrary to the LDP2 (Condition 12). 
43 Subject to conditions, the proposal is considered to be consistent with the
relevant land use policies of the LDP2, and Policy 26 of the NPF4 which supports
business and industry in suitable locations. 
Visual Amenity, Design and Layout 
44 The principal impact on the visual amenity of the area is the potential for outside
storage to cause visual clutter, which can often occur with unfettered outside
storage. At the time of the most recent site visit the outside space was being
managed in a way which did not raise any visual offence, and in the absence of
any existing planning controls, this would largely be due to the diligence of the
occupiers of the various buildings. It is also the case that the area is not that
readily visible from the public road, and anyone taking offence at the visual
appearance of the site would have to be visiting the site, and visiting one of the
operating businesses or employed there. 
45 The existing position could however change fairly quickly with a new operator /
owner coming in, and in light of this and in order to monitor the appearance of the
site it is recommended that permission is granted for areas of outside storage but
only for a temporary period. After the expiry of that, a review of the
successfulness of the self-regulation can be made and a decision made as to
whether or not a further period of temporary permission should be forthcoming
(Condition 9). 
Residential Amenity 
46 In support of the planning application, a noise impact assessment (NIA) has been
submitted. Within that assessment ‘worse’ case scenarios have been predicted,
and the results show that in the event of all the buildings being in operation for
uses which fall within general industry i.e. the use of machinery and ‘noisy’
working, the impact on the residential properties is within acceptable levels. The
NIA has taken into account typical delivery times and the volume of HGVs using
the vehicular access. The NIA has been reviewed by Environmental Health, and
subject to conditions to a number of compliance conditions they have no
concerns in relation to noise matters. It should be noted that one of these
conditions requires further technical assessments and then mitigation, if a valid
Page 58 of 162

Page 59

noise complaint is raised in relation to activities within the principal industrial
areas (Condition 8). 
47 In terms of artificial light, a compliance condition is recommended which will
ensure that light spillage is controlled so that it does not spill onto neighbouring
land (Condition 6). 
48 As addressed above, there is a slight concern over the condition of the access
where it bounds the curtilages of the residential properties. Surfacing a short
stretch of this access would reduce the potential for dust, and inevitably would
also reduce some of the noise levels coming from HGVs. 
Roads and Access  
49 In principle, the proposal raises no issues in terms of the vehicular access or
parking related matters – which are all as existing. It is noted that a number of
the representation raises concerns over the access, and whilst it is
recommended that part of the access is surfaced (for amenity reasons), in terms
of road and pedestrian safely matters the existing arrangement is acceptable and
raises no concerns in relation to compatibility with Policy 60 of the LDP2. 
Trees 
50 There are trees to the west of the site, however these trees are not affected by
the proposal and suitable protection measures can be implemented to ensure
that no unnecessary damage occurs in relation to the access improvement
works. 
Impact on Biodiversity  
51 The uses are all existing, so the impact on biodiversity is low. There does remain
an opportunity to provide for some bio-diversity enhancements, and to deliver
this it is recommended that 4 bat boxes and 4 bird nesting boxes are installed
within the curtilage of the site (Condition 11). Subject to this, the proposal raises
no issues with the bio-diversity policies contained within the Development Plan.    
Drainage and Flooding  
52 The proposal raises no issues in terms flooding issues. The principal part of the
site is not liable to be affected by flood risk, whilst only parts of the vehicular
access are identified as being at potential risk of flooding. Nevertheless, to
ensure that the operators of the site have suitable contingencies in place for
emergencies during a flood event, it is recommended that a flood action plan is
submitted to and then approved in writing by the Council as Planning Authority. It
should also be borne in mind that due to the nature of the development, the
number of people ‘on site’ at any one time would not significant and largely
limited to staff, and those making deliveries In terms of drainage matters, the
Page 59 of 162

Page 60

applicant has indicated that there is agreement in place to connect to an existing
system which is already installed and servicing the property to the south. Subject
to the necessary agreement from Building Standards, and SEPA the principle of
this raises no concerns.    
Developer Contributions  
53 The proposal has no requirement for any Developer Contributions or Affordable
Housing provision. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
54 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
55 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, the adopted Local
Development Plan 2 (2019) and statutory SPG. Account has been taken account
of the relevant material considerations and none has been found that would
justify overriding the Development Plan. 
56 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION 
Approve the application, subject to the following conditions, 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. The hours of operation shall be restricted to between 0700 hours and 1900 hours
Monday to Saturday only, with no operations permitted on Sundays. 
Reason - In order to protect existing residential amenity.   
3. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays.   
Reason - In order to protect existing residential amenity.    
Page 60 of 162

Page 61

4. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to protect existing residential amenity.    
5. The sound insulation and sound transmission properties of the structure and
finishes shall be such that any airborne noise from the operations within the
premises does not constitute a statutory noise nuisance as determined by the
Council as Planning Authority. 
Reason - In order to protect existing residential amenity.   
6. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to protect existing residential amenity.    
7. Noise from operations on site shall not exceed L A90,1 hour background noise level
plus 5dB (A), including any relevant penalties for tonality, impulsivity, intermittency,
or other sound characteristics when measured at any residential property in
accordance with BS4142:2014+A1:2019. 
Reason - In order to protect existing residential amenity.   
8. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant (approved in writing by
the Council as Planning Authority) to carry out a noise assessment to verify
compliance with conditions 4, 5 and 7 above.  The assessment will be carried
out to an appropriate methodology that has been approved in writing with the
Council. If the noise assessment shows that the noise levels do not comply with
conditions 4, 5 and 7 a scheme of noise mitigation shall be included with the
noise assessment, specifying timescales for the implementation of the scheme
and shall be submitted to the Council with 28 days of the assessment.  The
approved mitigation scheme shall thereafter be implemented in full and within the
approved timescales.   
Reason - In order to protect existing residential amenity.   
9. All areas of outside storage use are temporary until 30 June 2029. 
Page 61 of 162

Page 62

Reason - In order to reserve the right of the Council to consider the
appropriateness of the use of areas for outside storage within a reasonable
timeline. 
10. Within 3 months from the date of the decision notice, a detailed scheme for the
improvements of the vehicular access up to the 2nd bend from the public road,
shall be submitted to and approved in writing by the Council as Planning Authority. 
The details must include specification, timing and long-term maintenance strategy,
together with any necessary tree protection.  Thereafter, the approved details
shall be implemented in full within the approved timeline. 
Reason - In order to protect existing residential amenity. 
11. Within 3 months from the date of the decision notice, 4 bat boxes and 4 bird
nesting boxes shall be installed within the curtilage of the site.  The boxes shall be
installed as per the guidance and specifications of the Scottish Wildlife Trust, and
after installation thereafter retained in a usable condition. 
Reason - In order to provide a bio-diversity enhancement. 
12. For the avoidance of doubt, the area adjacent to the access is not subject to any
permission for outside storage use. 
Reason - In order to clarify the terms of this planning permission. 
13 Within 1 month of the date of the decision, a flood action plan for the entire site
shall be submitted to and approved in writing by the Council as Planning
Authority.  The plan must include contingency measures for emergency vehicles
to access the site during a flood event.  The approved details shall thereafter be
implemented in full at all times. 
Reason - In the interests of safety and to minimise risk to life and property. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
PROCEDURAL NOTES 
None. 
INFORMATIVES 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
Page 62 of 162

Page 63

would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
Background Papers:  13 letters of representation
Contact Officer: Andy Baxter
Date: 24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD – ECONOMY, DEVELOPMENT & PLANNING 
Page 63 of 162

Page 64

Page 64 of 162

Page 65

Ü
Change of use of agricultural buildings and land to business (class 4), general industry (class 5), storage
and distribution (class 6) (in retrospect) on land 250 Metres South East of Isla Villa Grange Errol
23/00960/FLL
Scale
1:10,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(i)
Page 65 of 162

Page 66

Page 66 of 162

Page 67

Ü
Change of use of agricultural buildings and land to business (class 4), general industry (class 5), storage
and distribution (class 6) (in retrospect) on land 250 Metres South East of Isla Villa Grange Errol
23/00960/FLL
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(i)
Page 67 of 162

Page 68

Page 68 of 162

Page 69

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/168) 
PROPOSAL: Erection of a brewery, tap room, storage, formation of vehicle
access, parking area, installation of EV charging point, formation
of outdoor seating area, landscaping and associated works 
LOCATION: Land 50 Metres South of Council Cottages Ferry Road Pitlochry 
Ref. No: 23/01742/FLL
Ward No: P4- Highland 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The application is for a brewery comprising of a production facility, a cold store
facility, a taproom serving food and drink with a small shop and outdoor seating.
The proposal includes parking for 3 vehicles and 1 accessible parking bay with
an EV charging point, cycle parking and associated hard and soft landscaping. 
2 The operational hours of the site will be 08:00 – 16:00, with the tap room
operating 11:00 – 22:00 Tuesday – Sunday. The taproom would have a
capacity of 96 persons internally, and 36 externally.   
3 The application site is an area of woodland measuring 1824 sqm on the south
side of Ferry Road, Pitlochry. The site consists of a large, open flat area (formerly
used as a site compound) with steeply banked topography and mature trees to
the east, south and west. It is proposed to fell three trees and one tree group to
enable the development and remove six dead oak trees. Compensatory planting
is proposed together with bird and bat boxes on the brewery building. 
4 A single level build is proposed with two pitched roof buildings connected by a
low flat roof. The brew hall will have feature glazing on the northern elevation and
an internal glazed partition to showcase the technical production equipment
utilised by the brewery. The building is to be finished in dark grey corrugated
metal sheeting, grey aluminium and timber windows and doors and grey
5(2)(ii)
Page 69 of 162

Page 70

aluminium rainwater goods. The roof is to be corrugated steel sheeting in the
same dark grey colour as the cladding with translucent roof sheeting skylights
into the brew hall, taproom and goods incoming area. A southern aspect roof
mounted solar panel array is proposed. The north street facing elevations and
one east aspect pitched roof will feature company logos and signage. 
5 Pitlochry Community Hospital is approximately 50m to the northwest of the site
and Balhousie Pitlochry Care Home approximately 50m to the southwest of the
site. Residential properties (Burnside Cottages) are located 20m to the north and
50m to the east of the site at Bobbin Mill. 
Site History 
6 08/02104/FUL Full Planning Permission was Approved On 7 April 2009 for
Erection of 3 workshop/office units. 
7 11/01434/FLL Full Planning Permission was Approved On 25 November 2011 for
Erection of building to be used as a timber merchants. 
PRE-APPLICATION CONSULTATION 
8 Pre application Reference: 23/00073/PREAPL – The planning response
recognised that this was a hybrid proposal and there may be an opportunity to
split the uses into employment land and town centre locations. A sequential
assessment would be required for any future application to demonstrate there
are no suitable alternative sites and to also demonstrate the proposed
development would be compatible with the residential and health uses in the
immediate surrounding area. 
9 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
10 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019, along with its
associated statutory supplementary guidance). 
National Planning Framework 4 
11 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. 
Page 70 of 162

Page 71

12 NPF4 was adopted on 13 February 2023.  NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
13 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 12: Zero Waste
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 27: City, Town, Local and Commercial Centres
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 6: Settlement Boundaries
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 18: Pubs and Clubs in Residential Areas
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
Page 71 of 162

Page 72

• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
OTHER POLICIES 
Statutory Supplementary Guidance 
• Supplementary Guidance - Air Quality (adopted in 2020)
• (adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
NATIONAL GUIDANCE 
16 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
17 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
18 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Page 72 of 162

Page 73

Designing Streets 2010 
19 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.  
CONSULTATIONS 
21 As part of the planning application process the following bodies were consulted: 
External 
22 Network Rail - No objection, subject to an informative being attached to any
planning permission granted to highlight the site is close to a railway
underbridge. 
23 Perth And Kinross Heritage Trust - No objection. No issues raised in respect of
archaeology. 
24 Scottish Water - No objection. Scottish Water requested further information
during the application process on the abstraction volume as the site is in a
Drinking Water Protected Area. The consultation response notes the impact on
Water Resources and the operation of the brewery and accompanying amenities
has been reviewed against the confirmed abstraction volume of 200,000 litres
per annum (0.2Ml/annum). Assuming this water usage remains consistent with
these values, Scottish Water confirm the proposal can be considered as low-
medium risk regarding Water Resources. Scottish Water would have no
objections with the proposed volume of water and request that they should be
notified if these volumes change. Scottish Water also request that prior to work
commencing on site they are notified as they may wish to take water samples as
a precaution to protect water quality. It is recommended that an informative be
attached to any planning permission granted (Informative 5). 
25 Scottish Environment Protection Agency - No objection. 
26 NatureScot – No response. 
Page 73 of 162

Page 74

Internal 
27 Biodiversity/Tree Officer - No objection, subject to conditions. The Preliminary
Ecological Appraisal and Ecological Impact Assessment by Tay Ecology is in
accordance with best practice. No protected species were present, and no further
surveys were recommended. Biodiversity enhancement measures are
recommended. Conditions are recommended by the Tree Officer to ensure a
satisfactory standard of development and environmental quality. An updated
consultation response was received from the Tree Officer following the
submission of revised plans and a tree survey report after a site meeting was
held in February 2024 with the applicant’s agent, the planning officer and
transport planning. 
28 Structures and Flooding – No objection following review of further detailed
information submitted during the application process. 
29 Environmental Health (Contaminated Land) - No objection. An inspection of
the proposed development site did not raise any real concerns, although
mapping does indicate that there is land formerly occupied by various potentially
contaminative sources nearby. The applicant is advised that there may therefore
be potential for contamination within the site. Informative recommended. 
30 Environmental Health (Noise Odour) - No objection subject to conditions
following review of further detailed information submitted during the application
process. 
31 Environmental Health (Private Water) - No objection. The applicant has stated
that Public Mains water will be used, therefore as no existing private water
supplies will be affected by the proposed activities there is no comment at this
time. 
32 Development Contributions Officer - No contribution required in line with
supplementary guidance. 
33 Transportation and Development – No objection subject to conditions following
review of further information and revised plans requested after a site meeting on
5 February 2024 with the applicant’s agent, Tree Officer and Planning Officer. 
34 Development Plan – Reviewed further supporting information submitted during
the application process to ensure compliance with policies in NPF4 and LDP2. 
35 Commercial Waste Team - No objection. Bin storage sufficient. 
REPRESENTATIONS 
36 30 representations were received including 6 objections, 2 neutral
representations and 22 letters of support. The main issues raised within the
objections are: 
Page 74 of 162

Page 75

• Noise, disturbance and nuisance – detrimental impact on residential amenity
• Detrimental impact on natural environment and protected species
• Traffic impact 
• Impact on access to residential homes at Bobbin Mill
• Air and noise pollution 
• Contaminated site
• Poor design 
• The proposed use is incompatible with surrounding land uses which includes
a care home and medical centre
• Contrary to LDP policies including open space 
• Detrimental impact on safety of nearby residents  
37 The Atholl Medical Centre requested the following matters be noted - that the
NHS site includes an ambulance dept with 24/7 access required; there should be
no obstructive parking on Ferry Road with access for GPs and staff required at
all times; and the parking at the medical centre is for the benefit of users of the
hospital and GP surgery only. 
38 The letters of support consider the development would bring wide ranging
economic benefits to the town and enhance the local area. 
39 The issues raised are considered in full in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
40
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
/AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted - Ecological Survey,
Tree Survey, Drainage
Assessment 
APPRAISAL 
41 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance. 
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
Page 75 of 162

Page 76

this involves considerations of the Council’s other approved policies and
supplementary guidance and issues raised in the representations. 
Principle 
42 A number of policies are relevant to the proposed mixed-use development on a
site designated as open space and located outwith the Pitlochry Town Centre
boundary identified in LDP2. 
43 NPF4 Policy 26 Business and Industry supports development on sites allocated
for business and industry uses in the LDP (paragraph a). The site is not allocated
for business and industry use in LDP2. As such, NPF4 Policy 26 d) applies and
this states that development proposals for business, general industrial and
storage and distribution uses outwith areas identified for those uses in the LDP
will only be supported where: 
i.  It is demonstrated that there are no suitable alternatives allocated in the
LDP or identified in the employment land audit; and
ii.  The nature and scale of the activity will be compatible with the surrounding
area. 
44 NPF4 Policy 27 City, Town, Local and Commercial Centres applies the Town
Centre First approach to help centres adapt positively to long-term economic,
environmental and societal changes, and by encouraging town centre living. 
45 NPF4 Policy 27 b) states proposals for uses which will generate significant
footfall, including commercial, leisure, offices, community, sport and cultural
facilities, public buildings such as libraries, education and healthcare facilities,
and public spaces: 
i. will be supported in existing city, town and local centres, and
ii.  will not be supported outwith those centres unless a town centre first
assessment demonstrates that:
•  all centre and edge of centre options have been sequentially assessed
and discounted as unsuitable or unavailable;
•  the scale of development cannot reasonably be altered or reduced in
scale to allow it to be accommodated in a centre; and
•  the impacts on existing centres have been thoroughly assessed and
there will be no significant adverse effect on the vitality and viability of
the centres. 
46 This policy aligns with LDP2 Policy 13: Retail and Commercial Leisure
Proposals. 
47 Also of relevance is LDP2 Policy 18: Pubs and Clubs in Residential Areas which
states there will be a presumption against the siting of these in the midst of other
(particularly residential) uses where problems of noise or disturbance cannot be
satisfactorily addressed.
Page 76 of 162

Page 77

48 NPF4 Policy 30 Tourism intends to encourage, promote and facilitate sustainable
tourism development which benefits local people, is consistent with national net
zero and nature commitments, and inspires people to visit Scotland. Policy 30 a)
states development proposals for new or extended tourist facilities or
accommodation, including caravan and camping sites, in locations identified in
the LDP, will be supported. The site is not identified in the LDP for a tourism
related use. As such Policy 30 b) applies and this states proposals for tourism
related development will take into account: 
i.  The contribution made to the local economy;
ii.  Compatibility with the surrounding area in terms of the nature and scale of
the activity and impacts of increased visitors;
iii.  Impacts on communities, for example by hindering the provision of homes
and services for local people;
iv.  Opportunities for sustainable travel and appropriate management of parking
and traffic generation and scope for sustaining public transport services
particularly in rural areas;
v.  Accessibility for disabled people;
vi.  Measures taken to minimise carbon emissions;
vii.  Opportunities to provide access to the natural environment. 
49 A supporting statement has been submitted to address national and local
planning policies. This highlights that the business, an independently owned &
managed craft brewery, has outgrown its current site in Blair Atholl and is
seeking to relocate to a site in Pitlochry where its operations first began in 2016.
It notes that the relocation of the brewery will move 3.5 full time existing jobs to
Pitlochry, it will immediately create at least 2.5 full-time jobs in Pitlochry, with a
further 2 full-time jobs expected to be required in the years to come. 
50 The business requires more space than its current location can provide and there
is a lack of suitable existing industrial space for growth in Pitlochry with no sites
identified in the town centre that are large enough to accommodate the business.
The statement reports that splitting the production and taproom uses between
two sites has been considered but is economically unviable and inefficient. Single
site operation is a necessity for the business. The implications of multi-site
operation for licensing would mean duplicating the operational effort, and the cost
and complexity of the business. The statement highlights the aspiration for a
combined production and taproom experience is very similar to that of a distillery
& visitor experience. 
51 In respect of NPF4 Policy 26, the statement reports there are no suitable
alternative sites allocated in Pitlochry with very limited areas of employment
safeguarding and no specific development sites identified for further employment,
business and industry development. The nature of activity proposed is not
incongruous with the surrounding context of the area, which features a mixture of
town centre businesses, industry, tourism, residential, healthcare and leisure.
The proposals are conscious of the neighbouring residential amenity and the
healthcare facilities to the west. A noise impact assessment has been carried out
Page 77 of 162

Page 78

which demonstrates there is negligible impact to the surrounding area. The
accompanying noise impact assessment provides mitigation recommendations,
which can ultimately be conditioned. It also highlights a licensed business must
comply with the Licensing (Scotland) Act 2005 and preventing public nuisance
and crime and disorder, amongst other elements are core components of the
business operating plan and associated operational policies that will be governed
by Perth and Kinross Licensing Board on an ongoing basis. 
52 The site was selected predominantly because of its proximity to the town centre
boundary. In line with LDP2 Policy 27b) ii) the site is considered a suitable “edge
of centre option” being close to the boundary of the town centre in LDP2. The
scale of the development cannot be reasonably altered or reduced to
accommodate it within the town centre and the supporting statement asserts
there would be no significant adverse impact on the vitality and viability of the
existing centre. The proposed site achieves a greater balance of all desired
outcomes over a town centre location and is the best option available for the
space required. The statement reports the location is extremely accessible, being
no more than a 4-minute walk from the train station and the town centre junction
with Ferry Road. 
53 The supporting statement highlights that existing signage already encourages
tourism foot traffic from the town centre along Ferry Road toward the Pitlochry
Recreation Ground, Dam & Visitor Centre, Fish Ladder and Festival Theatre.
There are other business & industry uses along Ferry Road including a
restaurant and game butcher, meaning footfall from the town centre towards
Ferry Road and across the River Tummel, is already established. The proposal
will create a further attractive destination for tourism and create additional footfall
between the town centre and brewery bringing wider economic benefits. 
54 In respect of NPF4 Policy 30 Tourism, the supporting statement addresses the
relevant criteria and reports the proposal would create a dynamic visitor
experience and tourist destination in Pitlochry and increase local economic
benefits through tourism, in line with Policy 30 b) i) and in line with Policy 30 b) ii)
the proposed land use and scale of development is compatible with the
surrounding area. In line with Policy 30 b) iv) and v) the site is easily accessible
via sustainable travel and the scheme is designed to be accessible for disabled
people. It outlines the business is very carbon conscious, and a variety of
renewable technologies will be employed to minimise carbon emissions in line
with Policy 30 b) vi). The proposed site is adjacent to a core path and provides
visitors with the opportunity to access the surrounding natural environment in line
with Policy 30 b) vii). 
55 The supporting statement reports the brewery is not just a bar or shop it is a
destination which will provide visitors with a full experience, seeing the end-to-
end production process, completed with an opportunity to sample the end
produce and experience the taproom which will showcase the best of the
brewery. The proposals will successfully achieve the Policy 30 intent of
promoting and facilitating sustainable tourism which benefits local people and is
Page 78 of 162

Page 79

consistent with NPF4 net zero and nature commitments, providing further
inspiration for people to visit Scotland. 
56 In response, the supporting statement demonstrates why a combined facility is
required and that splitting the production and taproom uses between two sites is
economically unviable and inefficient and that the combined facility would
operate very similar to a distillery/visitor experience. 
57 It demonstrates a site selection process has been undertaken and there are no
suitable industrial sites available large enough to accommodate the business
growth required. The statement notes that the Ferry Road site achieves the
greater balance of the desired outcomes of the business, over a town centre
location where the brewery/production use would be closer to a higher density of
noise/odour sensitive receptors. 
58 The supporting statement addresses the compatibility of the proposal in relation
to the surrounding area, including ensuring amenity is not adversely impacted. In
respect of amenity, also of relevance is LDP2 Policy 18: Pubs and Clubs in
Residential Areas which states there will be a presumption against the siting of
these in the midst of other (particularly residential) uses where problems of noise
or disturbance cannot be satisfactorily addressed. A Noise Impact Assessment
(Document 41) reports it is not likely that adverse impacts will be experienced at
any receptor due to the development. The Odour Assessment (Document 33)
reports odour from the proposed development is predicted to be of negligible
significance subject to the satisfactory implementation of mitigation measures.
The supporting documents have assessed the potential problems of noise or
disturbance, and this has been satisfactorily addressed in line with national and
local planning policy. This is reviewed further later in the report under ‘Residential
Amenity’. 
59 The supporting statement does not provide a specific Town Centre Assessment,
as required by NPF4, rather further information is provided justifying the selection
of the site based on the operational requirements of the development alongside
the benefits of the edge of town centre location in achieving the best balance to
meet the objectives of the various elements of the business. 
60 Overall, it is considered that sufficient justification has been provided for the
mixed-use development on the site at Ferry Road. There will be no significant
adverse effect on the vitality and viability of the town centre. The site is edge of
centre, easily accessible from the town centre and well connected to other uses
in the surrounding area offering an opportunity for greater interaction and linked
trips to enhance the quality of experience in the town. To protect surrounding
amenity conditions are recommended as outlined later in the report. As a new
tourism facility, the supporting statement demonstrates the proposal meets the
criteria set out in Policy 30 b). 
61 The proposal satisfies NPF4 Policy 26 Business and Industry, NPF4 Policy 27
City, Town, Local and Commercial Centres, NPF4 Policy 30 Tourism and LDP2
Page 79 of 162

Page 80

Policy 13: Retail and Commercial Leisure Proposals and LDP2 Policy 18: Pubs
and Clubs in Residential Areas. 
Design and Layout 
62 NPF4 Policy 14 Design, Quality and Place states development which is poorly
designed, detrimental to the amenity of the surrounding area or inconsistent with
the six qualities of successful places will not be supported. LDP2 Policy 1:
Placemaking aligns with this national policy and states development must
contribute positively to the quality of the surrounding built and natural
environment.  All development should be planned and designed with reference
to climate change, mitigation and adaptation. The design, density and siting of
development should respect the character and amenity of the place, and should
create and improve links within and, where practical, beyond the site.  Proposals
should also incorporate new landscape and planting works appropriate to the
local context and the scale and nature of the development. Policy 1B sets out the
placemaking criteria which should be met. 
63 A single level bespoke build is proposed with two pitched roof buildings
connected by a low flat roof. The brew hall will have feature glazing on the
northern aspect elevation and an internal glazed partition to showcase the
technical production equipment utilised by the brewery. The building is to be
finished in dark grey corrugated metal sheeting, grey aluminium and timber
windows and doors and grey aluminium rainwater goods. The roof is to be
corrugated steel sheeting in the same dark grey colour as the cladding with
translucent roof sheeting skylights into the brew hall, taproom and goods
incoming area. A southern aspect roof mounted solar panel array is proposed.
The north street facing elevations and one east aspect pitched roof will feature
company logos and signage. The front/north elevation was amended to
accommodate a recessed roller shutter door and delivery bay (Drawing 52). 
64 The supporting planning statement highlights the design strategy was to respond
sensitively to a site which has a flat central area and is sheltered by the
topography and tree screening (Document 42). The mass of the building is
broken up to reduce its visual impact with materials selected to help the building
recede into the landscape. The exterior landscaping will feature concrete
retaining walls to the south to account for cutting into the existing sloped
topography which has been minimised. 
65 The proposals make the best use of the site and its orientation to create a
building that sits sheltered by its surroundings. The plan is predominantly linear
and follows the line of the existing grass clearing of the site, with the taproom
extending out toward the east from the main brewery building. This L-shape
helps create a sheltered public courtyard and outdoor seating area. All
accommodation is at ground floor with level access from external circulation
routes. Car parking is kept to a minimum, to encourage the use of public
transport, cycling and walking to the site. A disabled parking bay is provided.
There is a large bike stance area to allow visitors to cycle to the premises.
Page 80 of 162

Page 81

66 Overall, the design and layout of the proposed development has been sensitively
considered to respect the site topography and surrounding natural and built
environment. The bespoke design incorporates sustainable design and
construction and new planting is proposed to enhance the surrounding woodland
and the setting of the new building. The proposal satisfies NPF4 Policy 2:
Climate Mitigation and Adaptation and NPF4 Policy 14 Design, Quality and Place
and LDP2 Policy 1: Placemaking and LDP 2 Policy 32: Embedding Low & Zero
Carbon Generating Technologies in New Development. 
Residential Amenity 
67 NPF4 Policy 14 Design, Quality and Place and LDP2 Policy 1: Placemaking
requires development to respect the amenity of the place. NPF4 Policy 23 Health
and Safety aims to protect people and places from environmental harm and this
aligns with LDP2 Policy 55: Nuisance from Artificial Light and Light Pollution,
LDP2 Policy 56: Noise Pollution and LDP2 Policy 57: Air Quality. 
68 Noise – There are a number of potential noise sources associated with the
proposed development. These include patron noise, including the outdoor
seating area, vehicle noise and plant equipment noise. Noise sensitive receptors
include residential properties to the north and east of the site, Balhousie Care
Home and Pitlochry Community Hospital to the west.   
69 The applicant submitted a Noise Impact Assessment (NIA) in November 2023
(Document 35). Following discussion between Environmental Health (EH) and
the noise consultant, an updated NIA was submitted in December 2023
(Document 41). The scope and approach of the assessment was completed
considering both local planning policy and agreed methodology and criteria with
PKC. 
70 Background noise surveys were undertaken and are outlined in the NIA. In
respect of plant equipment these are all well within the acceptable limits,
provided that there is no change to the number and type of plant equipment
installed. Internal activities were assessed, and one issue raised was the use of a
compressor in the goods incoming area whilst the shutter door is open during
deliveries, therefore, it is advised that the air compressor should not be in use
whilst the shutter door is open with deliveries expected to be 1-2 per day and all
carried out during normal working hours. Overall, operational noise levels are
barely perceptible and within acceptable limits. In respect of patron noise this has
been assessed for worse-case scenario and mitigation is required. In order to
meet acceptable levels, terraced seating on the northeast side of the
development has been removed from the plans. It will also be necessary to limit
the number of patrons in the outdoor area to 35. The skylights must also be
altered from polycarbonate sheeting to perspex of at least 6mm thickness and
the sliding doors leading to the outdoor area must remain closed at all times. By
putting in these measures, predicted levels are reduced below the background
level. The NIA reports it is not likely that adverse impacts will be experienced at
any receptor due to the development.
Page 81 of 162

Page 82

71 Environmental Health have reviewed the NIA and recommend a number of
conditions to ensure surrounding amenity is protected (Conditions 8, 9, 10, 11,
15, 16, 17 and 18). 
72 Air Quality and Odour – The plans include the provision of a wood burning stove
and the installation of associated flue. The technical specifications supplied with
the application relates to a domestic sized stove and therefore EH have no
adverse comments to make with regards to air quality in relation to the stove.
Given the height of the flue and distance to residential properties EH do not
foresee smoke and/or odour affecting residential amenity of neighbouring
properties. 
73 The applicant has submitted an odour assessment with the application
(Document 33). The assessment states that the potential odour sources will be
the release of vapours through the ventilation duct above the brewing hall and
when the effluent tanks are filled and emptied. As no effluent treatment is
proposed on site and all spent grains and other industrial effluent will he held in
sealed containers fitted with carbon filters, odour from effluent storage has not
been considered further. It is therefore stated that odour has been predicted for a
single scenario; emissions from the brewing hall vent. 
74 EH note in their consultation response that when assessing the impact of odour,
guidance has been taken from The Institute of Air Quality Management (IAQM)
Guidance on the assessment of odour for planning and SEPA issued guidance
on odour assessment for processes that are subject to the Pollution Prevention
and Control regulations (PPC). Whilst this does not apply to this development,
the Guidance provides a useful framework for assessing the potential adverse
impacts on amenity. SEPA’s guidance notes odour from brewing falls into the
category of less offensive. The assessment reports odour from the proposed
development is predicted to be of negligible significance subject to the
satisfactory implementation of mitigation measures. 
75 EH recommend a number of conditions to ensure odour from the proposed
development does not impact surrounding amenity (Conditions 13, 14 and 19). 
76 Lighting – EH recommend a condition to ensure external lighting does not
adversely affect neighbouring land (Condition 12). 
77 The supporting documents have assessed the potential issues of noise and
odour and these matters have been satisfactorily addressed in line with national
and local planning policy. Planning conditions are recommended to safeguard
the amenity of the surrounding area. The proposal satisfies NPF4 Policy 14
Design, Quality and Place and NPF4 Policy 23 Health and Safety and LDP2
Policy 1: Placemaking, LDP2 Policy 55: Nuisance from Artificial Light and Light
Pollution, LDP2 Policy 56: Noise Pollution and LDP2 Policy 57: Air Quality. 
Page 82 of 162

Page 83

Roads and Access  
78 Transport Planning note in their response that the site will have three regular
parking bays, with one additional accessible parking bay. One of the bays will be
provided with an electric charge point and cycle parking is proposed on site.   
79 The applicant has provided a Transport Statement for the site and has provided a
subsequent update that now includes industry standard and verifiable trip rate
and mode share data from TRICS that provides information on the level of
person trips associated with the type of development proposed.  Subsequent
analysis of this data by Transportation and Development has indicated that the
proposed development will attract a total of approx. 39 vehicles per day which
can be accommodate in nearby offsitre public parking.   
80 In response to matters raised in the representation from Atholl Medical Centre,
Transport Planning requested that a loading facility for vehicles up to 12 metres
is provided on site to accommodate normal operations. Amended drawings have
been submitted to show a 12-metre service bay – proposed elevations (Drawing
52), proposed site plan (Drawing 71) and swept path analysis (Drawings 67-69).
Transport Planning note this service bay will end up occupying the full width of
the service strip of the public road network which as part of the development will
be constructed as a footway. This is far from ideal however the scaled swept
path analysis shows a 12-metre vehicle can suitably enter the service bay
proposed and not obstruct the public road. 
81 Further, in respect of the matters raised in the representation, Transport Planning
recommend that a Construction Traffic Management Plan should be submitted
for the written approval of the Council as Planning Authority prior to the
commencement of any works on the site. This should have a specific focus on
how the applicant proposes to construct the building without any impediment on
the public road (Condition 22). Also, a Service Management Plan detailing the
plans for servicing and delivery operations, and timing, including arrangements
for the management of vehicular and pedestrian traffic during servicing and
delivery, paying particular attention to the need for all deliveries to be undertaken
off the public road is recommended, and a condition is proposed (Condition 23). 
82 The applicant will be constructing a new vehicle access across the frontage of
the site with a footway being provided with the finalised design and location of
the dropped kerbs on the north and south of Ferry Road to be provided through a
condition (Condition 24). 
83 A secure covered cycle parking area is proposed to the east of the building,
which is welcomed to encourage active and sustainable travel.  A condition is
recommended to ensure that prior to the commencement of development a
detailed design of the facility is submitted for a minimum of 10 bicycles for the
written approval of the Council as Planning Authority and is implemented prior to
the development being brought into use (Condition 25).   
Page 83 of 162

Page 84

84 The application site is located close to the town centre and is easily accessible
by all modes of transport including walking, cycling and public transport to reduce
the need to travel unsustainably. Accessible parking is to be provided including
an electric vehicle charging bay and cycle parking is proposed. Although parking
is low for the site, it is well served by sustainable transport modes and there are
public car parks a short distance from the application site. Conditions are
recommended to mitigate any impact on the public road and to provide a safe
crossing for pedestrians. The proposal satisfies NPF4 Policy 13 Sustainable
Transport and LDP2 Policy 60B subject to conditions. 
Drainage and Flooding 
85 A Drainage & Flood Statement reports the application site is not at risk from
fluvial flooding and a small area of the site is shown to have a medium-low
likelihood of surface water flooding. It reports this isolated patch appears to be
the result of run-off from a steep slope to the east. A perimeter drain is proposed
during the construction phase and the drainage design incorporates measures to
ensure surface water run-off will be low. 
86 The drainage layout plan (Document 70) and Drainage & Flood Statement
(Document 66) were revised during the application process in consultation with
the Council’s Flooding Team. Given site constraints and space restrictions, two
sets of cellular storage crates are proposed as the main form of attenuation for all
surface water run-off. Filter trenches are proposed to capture run-off from the
adjacent slopes. Due to concerns raised by Transport Planning, the applicant has
relocated the attenuation tank at the east of the site, as this was to be located
within the embankment supporting the road to residential properties, with the risk
of causing damage to the embankment supporting this road. The surface water
will be treated within the site before discharging to the existing surface water
sewer in Ferry Road. A maintenance schedule is included. In respect of foul
water this will drain to the existing public combined sewer located in Ferry Road. 
87 SEPA were consulted and have no objection to the proposal. Following review of
the further information submitted, the Council’s Flooding Team are satisfied with
the drainage design and that there is no risk of flooding. 
88 The proposal satisfies NPF4 Policy 22 Flood Risk and Water Management and
LDP2 Policy 52: New Development and Flooding, LDP2 Policy 53B: Foul
Drainage and LDP2 Policy 53C: Surface Water Drainage. 
89 In respect of NPF4 Policy 22 d) and Policy 53E: Water Supply, as noted in the
external consultation responses, the site is in a Drinking Water Protected Area
and Scottish Water requested further information during the application process
on the abstraction volume. The impact on Water Resources of the operation of
the brewery and accompanying amenities has been reviewed against the
confirmed abstraction volume of 200,000 litres per annum (0.2Ml/annum).
Assuming this water usage remains consistent with these values, this proposal
can be considered as low-medium risk regarding Water Resources. Scottish
Page 84 of 162

Page 85

Water would have no objections with the proposed volume of water and request
that they should be notified if these volumes change. Scottish Water also request
that prior to work commencing on site they are notified as they may wish to take
water samples as a precaution to protect water quality. It is recommended that
an informative be attached to any planning permission granted (informative 5). 
Waste Collection 
90 The refuse storage and its location are acceptable as confirmed by the Council’s
Waste Service. 
Natural Heritage and Biodiversity 
Open Space 
91 The application site is designated as Open Space in LDP2 and comprises land
that has been previously cleared from trees for a site compound during
construction of the neighbouring hospital/care home. The supporting statement
considers that the development of this area of land will not pose any significant
detrimental impact to the surrounding green infrastructure provision and the
overall integrity of the network will be maintained, as well as having no impact on
the existing footpath impact including a core path. 
92 While the loss of a near 1800 square metre area, is notable it would be deemed
minor in relation to the requirements of LDP2 Policy 14A: Open Space Retention
and Provision – Existing Areas criteria (b), where it must only involve a minor part
of the site which would not affect its continued use as a recreational or amenity
resource.  In this instance this land has effectively been out of any formal
recreational use as it was mainly cleared of trees and used as a yard in the
construction of Pitlochry Community Hospital and has not fully regenerated.  The
vast majority of the wider wooded resource would be retained.  More generally
Pitlochry does benefit from generous open space provision in its own right.  On
balance therefore, the loss of this area of previously developed land within the
open space designation, can be accepted in light of the wider benefits associated
with this proposal, and the opportunity to compensate for tree loss and
biodiversity enhancement as shall be discussed below.  The proposal is
therefore considered to comply with Policy 14: Open space Retention and
Provision. 
Biodiversity 
93 A Preliminary Ecological Appraisal and Ecological Impact Assessment by Tay
Ecology (Document 28) was reviewed by the Biodiversity Officer and confirmed
as being in line with best practice. The report identified that no protected species
were present during the survey and no further surveys were therefore required.
The report recommends biodiversity enhancement measures and in line with this
bird and bat boxes are proposed on the west elevation of the brewery building
(Drawing 52). 
Page 85 of 162

Page 86

94 A condition is recommended to ensure the recommendations set out in the Tay
Ecology Report are carried out to protect environmental quality and biodiversity
(Condition 3). 
95 The proposal satisfies NPF4 Policy 3 Biodiversity paragraphs a), c) and d) and
LDP2 Policy 41: Biodiversity. 
Trees  
96 A revised Tree Survey Report (Document 58) was submitted together with a tree
constraints plan, tree protection plan and details of compensatory planting
(Documents 59-64). 
97 The report assessed 31 trees and 1 x tree group and identified that the site
consists of sycamore and oak, with 45.5% being category C. 
98 There are six dead Category U oak trees, T173, 174, 175, 183, 187 and 196
which are proposed for removal as colonised with honey fungus. Honey fungus,
Armillaria mellea, a root/soil borne fungal disease has colonised some of the oak
at the site, which causes tree demise and failure. 
99 It is proposed to fell three trees and one tree group, these are two Category B
and one Category C tree and one tree group of nine trees. 
100 2 Category A trees, 7 Category B trees and 13 Category C trees are proposed
for retention. 
101 Compensatory planting of 36 trees is proposed using both native species and
fruit trees recognised as resistant/tolerant of honey fungus (Drawing 62). The
supporting information states that 12 trees are proposed to be planted at
Pitlochry High School Nursery (Document 64). 
102 Overall, the tree removal is accepted to enable the development and the
compensatory planting is in line with planning guidance. Conditions are
recommended by the Tree Officer to ensure a pre-site meeting takes place to
examine tree works and protection measures; a method statement is submitted
for written approval of the Council and to include details of how the removal of
diseased trees and soil will be handled and for a post-development tree report to
be submitted (Conditions 5, 6 and 7). 
103 The proposal satisfies NPF4 Policy 6 Forestry, Woodland and Trees and LDP2
Policy 40B: Trees, Woodland and Development. 
104 The proposal will not lead to the fragmentation of blue and green infrastructure
and incorporates new landscape and planting works appropriate to the local
context and the scale and nature of the development. This is in line with NPF4
Policy 14 Design, Quality and Place, NPF4 Policy 20 Blue and Green
Infrastructure and LDP2 Policy 1: Placemaking. 
Page 86 of 162

Page 87

Core Path  
105 An adopted core path is located to the east of the application site (PLRY/109)
and a condition is recommended to ensure this remains accessible to the public
during the construction and operational phases of the development (Condition
20). 
106 This is in line with NPF4 Policy 20 Blue and Green Infrastructure and LDP2
Policy 15: Public Access. 
Contamination 
107 An inspection of the proposed development site by the Council’s Contaminated
Land Officer did not raise any real concerns, although mapping does indicate that
there is land formerly occupied by various potentially contaminative sources
nearby. The applicant is advised that there may therefore be potential for
contamination within the site. Should any contamination be found during the
approved works, works should cease and the Land Quality team contacted. It is
recommended that an informative to this effect is attached to any consent
(Informative 7). 
108 The proposal satisfies NPF4 Policy 9 c) Brownfield, Vacant and Derelict Land
and Empty Buildings and LDP2 Policy 58A: Contaminated Land. 
Material Considerations 
109 30 representations were received including 6 objections, 2 neutral
representations and 22 letters of support. 
110 The main issues raised within the objections have been addressed in the report.
The objections also raised the potential for anti-social behaviour from the
consumption of alcohol at the brewery and the perceived impact of this on the
well-being of nearby residents. 
111 This matter is addressed in the applicant’s further supporting information
(Document 40). The applicant highlights the further supporting documents
submitted to demonstrate the proposal is designed to be compatible with the
surrounding uses and a good neighbour. Further, as a licensed business, it
highlights it has a duty under the Licensing (Scotland) Act 2005 to prevent crime
and disorder, prevent public nuisance and secure public safety which is governed
by Perth & Kinross Licensing Board. 
112 A multi-agency partnership approach is in place to tackle anti-social behaviour in
the community. The applicant has assessed the potential problems of noise or
disturbance from the proposed development, and this has been satisfactorily
addressed in line with national and local planning policy.  
Page 87 of 162

Page 88

113 The 22 letters of support highlighted the development would bring wide ranging
economic benefits to the town and enhance the local area. 
114 NPF4 recognises the challenges faces by the hospitality and tourism sectors and
aims to improve business development and entrepreneurship. As noted in the
supporting documents this is a successful local business seeking to grow and
invest in Pitlochry with multi-faceted economic and social benefits for the town. 
115 The issues raised in the letters of objection have been fully considered and
addressed in the report and are not of sufficient weight to justify the refusal of the
planning application. 
Developer Contributions 
116 None required in line with the Council’s supplementary guidance. 
Economic Impact 
117 The proposed development will bring a range of economic benefits to the town,
including an enhanced visitor attraction and footfall, together with jobs during
construction and afterwards. 
VARIATION OF APPLICATION UNDER SECTION 32A 
118 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the north elevation of the
building and the vehicular access. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
119 None required. 
DIRECTION BY SCOTTISH MINISTERS 
120 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
121 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Page 88 of 162

Page 89

Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
RECOMMENDATION   
Approve the application subject to conditions. 
CONDITIONS AND REASONS FOR RECOMMENDATION 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document(s) Ecological
Appraisal by Tay Ecology 3 October 2023 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the occupation of the building hereby approved, evidence that the bird
and bat boxes have been installed shall be submitted for the written approval of
the Council as Planning Authority, reference drawing 52.  Thereafter, the bird
and bat boxes shall be maintained in a reasonable condition for the life of the
development to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
5. A site meeting will be held with the Enforcement Officer (Trees) of the Council to
examine completed tree works, honey fungus mitigation, and to inspect tree
protection measures in place that accord with standard (fencing/non dig
construction, etc), drainage, and site storage facilities.  This meeting shall be
with the project manager, arboriculturalist, and ground works contractor. 
Contact should be made with the Planning Authority to arrange this meeting prior
to the commencement of the development. 
Page 89 of 162

Page 90

Reason - In the interests of protecting environmental quality and of biodiversity. 
6. Prior to the commencement of development, a site-specific method statement
outlining measures to mitigate against the spread of honey fungus shall be
submitted to the Council as Planning Authority for review and written approval. 
The statement shall include details on the removal of affected trees (6 x dead
oak), disposal of soil areas contaminated with honey fungus and provide full
details of disposal of all excess materials.  Clarity shall be provided on where the
soil materials excavated will be deposited when levelling site, formation of
building footprint, filtration trenches/drainage, and access/parking.  Clarity shall
be provided on how the drainage works will be undertaken, and whether larger
encroaching roots would be permitted within the drainage material, and how the
cutting into the banking will be undertaken, the foundation type for structures,
and subbase for paths/surfacing, where they impact and encroach the RPA of
adjacent trees.  Thereafter the measures shall be carried out in complete
accordance with the details as so agreed. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
7. Prior to the building being brought into use a post development tree report/audit
confirming details of the trees retained on site, their condition, and a statement
as to the effectiveness of protection measures followed shall be submitted for
review and written approval of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
8. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - In order to safeguard the residential amenity of the area. 
9. The hours of operation of the outdoor seating area shall be restricted to between
1100 to 2200 hours Monday to Sunday. 
Reason - In order to safeguard the residential amenity of the area. 
10. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
11. No music, amplified or otherwise, shall be permitted in the outdoor seating area
at any time. 
Page 90 of 162

Page 91

Reason - In order to safeguard the neighbouring residential amenity in the area. 
12. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the residential amenity of the area. 
13. No odours from the distillery shall be discernible on the boundary with the
nearest residential property. 
Reason - In order to safeguard the residential amenity of the area. 
14. All mitigation measures as detailed within Section 6 of the Odour Assessment
undertaken by The Airshed, reference AS 1020 Pitlochry Brewery Airshed, dated
18 October 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
15. All mitigation measures as detailed within Section 7 of the Noise Impact
Assessment undertaken by CSP Acoustics, reference 1866 R001 V3 AH, dated
12 December 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
16. Noise from operations on site shall not exceed L A90,1 hour background noise
level plus 5dB (A), including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when measured at any residential
property in accordance with BS4142:2014+A1:2019. 
Reason - In order to safeguard the residential amenity of the area. 
17. A Noise Management Plan shall be submitted for the written approval of the
Planning Authority.  The plan shall include all sources of noise associated with
the premise, including patron noise, deliveries, compressor etc and the measures
that will be put in place to minimise and/or control noise.  The plan shall be
reviewed on a regular basis or, following receipt of a justified complaint or at the
request of the Planning Authority.  Once the Noise Management Plan has been
approved, it shall be fully implemented for the lifetime of the development. 
Reason - In order to safeguard the residential amenity of the area. 
18. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out a noise assessment to verify compliance with conditions 10,
15, 16 and 17 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
Page 91 of 162

Page 92

assessment shows that the noise levels do not comply with conditions 10, 15, 16
and 17 a scheme of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation of the scheme and
shall be submitted to the Planning Authority for written approval within 28 days of
the assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
19. In the event of a justified odour complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out an odour assessment to verify compliance with conditions
13 and 14 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the odour
assessment shows that the odour levels do not comply with conditions 13 and 14
a scheme of odour mitigation shall be included with the odour assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority for written approval within 28 days of the
assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
20. The asserted right of way/core path on Ferry Road must not be obstructed during
building works or on completion of the development.  Any damage done to the
route and/or the associated signage during building works must be made good
before the development is completed or brought into use, whichever is the
earlier. 
Reason - To ensure continued public access to the public paths and in the
interests of public safety within the site. 
21. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
established within five years being replaced in the following planting season with
others of a size and species as previously approved.   
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
22. Prior to the commencement of the development hereby approved, the applicant
shall submit for the written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a Construction Traffic
Management Scheme (TMS).  The TMS shall take cognisance of the fact that no
Page 92 of 162

Page 93

loading and unloading of vehicles shall be undertaken on the public road and
shall include the following: 
a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used; 
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
c) a code of conduct for HGV drivers for loading and unloading materials at the
site; 
d) arrangements for liaison with the Roads Authority regarding winter
maintenance; 
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown; 
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road; 
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development; 
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for all users
including pedestrians, cyclists and equestrians; 
i) details of information signs to inform other road users of construction traffic; 
j) arrangements to ensure that access for emergency service vehicles are not
impeded; 
k) traffic arrangements in the immediate vicinity of temporary construction
compounds; 
l) monitoring, reporting and implementation arrangements; 
m) arrangements for dealing with non-compliance; and 
n) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management.
Page 93 of 162

Page 94

23. Prior to the commencement of the development hereby approved, the developer
shall provide, for approval by the Council as Roads Authority, a Service
Management Plan detailing the plans for servicing and delivery operations, and
timing, including arrangements for the management of vehicular and pedestrian
traffic during servicing and delivery, paying particular attention to the need for all
deliveries to be undertaken off the public road.  Thereafter, the approved plan
shall be adhered to for the life of the development. 
Reason - In the interests of road safety. 
24. Prior to commencement of any development on site, a detailed design showing
the frontage of the development site onto Ferry Road shall be provided with the
following schemes being provided: 
a)  position of uncontrolled crossing location(s) along the frontage of the site to
link the development site to the northern side of Ferry Road with dropped
kerbs linking both sides; 
b)  the footway on the southern side of Ferry Road, of a minimum width of 2
metres along the full frontage of the site; 
c)  the location of road drainage on the Ferry Road along the frontage of the
site; 
d)  the finalised location of the streetlighting cable; 
e)  the construction details of the parking bays and the service area; and 
f)  full details of the vehicle access, to be constructed in the following materials: 
40mm Wearing Course - Hot Rolled Asphalt 
50mm Base Couse - Dense Bitumen Macadam 
130mm Roadbase - Dense Bitumen Macadam 
230mm Subbase - Type 1  
The submission will confirm the location, specification and detailed design for the
pedestrian crossing, location of the streetlighting infrastructure, footway on
southern side of Ferry Road, road drainage and vehicle access along the
frontage of the development site.  This shall be submitted for the written
approval of the Council as Planning Authority.  Thereafter the approved scheme
shall be implemented in full, prior to occupation of the brewery. 
Reason - In the interests of road and pedestrian safety and connectivity to the
northern side of Ferry Road. 
Page 94 of 162

Page 95

25. Prior to commencement of any development on site, a detailed design for the
proposed cycle parking facility for a minimum of 10 cycles shall be submitted to
and approved in writing by the Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction of the Council as
Planning Authority prior to the development being brought into use. 
Reason - To encourage active and sustainable modes of transport in line with
national and local planning policy. 
26. Prior to the commencement of development hereby approved, a statement shall
be submitted for approval in writing by the Council as Planning Authority to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies.  The statement as agreed shall be
fully implemented to the satisfaction of the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
INFORMATIVES 
1. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
Further information on radon gas and the associated reports that can be obtained
is available at www.ukradon.org and at http://shop.bgs.ac.uk/georeports/. 
2. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
Page 95 of 162

Page 96

4. Please note the consultation response on file from Network Rail - A railway
underbridge located in close proximity to the site (UB 290/063 crossing Ferry
Road) has a headroom of 4.2m.  The applicant should ensure that all vehicles
required for construction and operation are able to clear this height. 
5. Please note the consultation response from Scottish Water on file - this includes
a request that prior to work commencing on site they are notified at
protectdwsources@scottishwater.co.uk as they may wish to take water samples
as a precaution to protect water quality. 
6. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the front elevation and
vehicular access. 
7. An inspection of the proposed development site did not raise any real concerns,
although historical mapping indicates there was previously a nearby use which
may have resulted in contamination in the vicinity of the site.  The applicant is
advised that, given historical uses of the wider area, there may be potential for
contamination within the site.  Should any contamination be found during the
approved works, works should cease and the Land Quality team should be
contacted on 01738 475000 or es@pkc.gov.uk for further advice. 
8. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that
smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
9. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
10. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
11. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain from the Council, to place,
maintain or adjust apparatus in, or under a Road or remove apparatus from a
Page 96 of 162

Page 97

road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-permits 
12. Road drainage may be in the vicinity of the new access and require remedial
works at the applicants expense.  Contact Perth & Kinross Council Road
Maintenance Department for further details. 
13. Street lighting infrastructure present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of infrastructure and its
relocation to facilitate the vehicle access.  Relocation to be undertaken at
applicant's expense.  Contact Mark Gorrie at Perth & Kinross Council Street
Lighting Department for further details. 
14. The applicant can seek guidance on the detailed design and positioning of the
cycle storage from Transport Scotland's Cycling by Design 2021 or similar design
guide. 
Background Papers:  30 letters of representation
Contact Officer:  Claire Myles
Date:  24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT AND PLANNING 
Page 97 of 162

Page 98

Page 98 of 162

Page 99

Ü
Erection of a brewery, tap room, storage, formation of vehicle access, parking area, installation of EV
charging point, formation of outdoor seating area, landscaping and associated works on land 50 metres
South of Council Cottages, Ferry Road, Pitlochry
23/01742/FLL
Scale
1:8,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(ii)
Page 99 of 162

Page 100

Page 100 of 162

Page 101

Ü
Erection of a brewery, tap room, storage, formation of vehicle access, parking area, installation of EV
charging point, formation of outdoor seating area, landscaping and associated works on land 50 metres
South of Council Cottages, Ferry Road, Pitlochry
23/01742/FLL
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(ii)
Page 101 of 162

Page 102

Page 102 of 162

Page 103

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/169) 
PROPOSAL: Part change of use and alterations to building to form 10 short-
term let accommodation units 
LOCATION: 54 - 56 High Street Kinross KY13 8AN 
Ref. No: 23/01349/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 This application seeks planning permission for the part change of use and
alterations to form 10 short-term let accommodation units at a commercial
building on High Street, Kinross.  The works are proposed to the first and second
floors of an existing building. The ground floor of the building is currently in use
as a supermarket. The upper floors are used for storage in association with the
supermarket.   
2 The proposals are for 8 one bedroom units at first floor level and 2 one bedroom
units at second floor level.  All have ensuite facilities and a kitchenette. A
communal seating/lounge area is sited at first floor level. 
3 The proposal is associated with an existing car park where there are currently 47
spaces. 10 of these spaces will be allocated for use of the guests of the self-
catering units. 
4 The site is within the Kinross Town Centre, Kinross Conservation Area and Loch
Leven Catchment. 
5 The proposal has attracted more than six objections and is therefore required to
be considered at Planning and Placemaking Committee.
5(2)(iii)
Page 103 of 162

Page 104

PRE-APPLICATION CONSULTATION 
6 Pre application Reference: None.   
7 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
8 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019, along with its
associated statutory supplementary guidance). 
National Planning Framework 4 
9 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces. 
10 NPF4 was adopted on 13 February 2023.  NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
11 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 27: City, Town, Local and Commercial Centres
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
12 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
13 The principal relevant policies are:  
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 10: City, Town and Neighbourhood Centres
Page 104 of 162

Page 105

• Policy 28A: Conservation Areas: New Development
• Policy 46A: Loch Leven Catchment Area
• Policy 46B: Loch Leven Catchment Area
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Placemaking (adopted in 2020) 
OTHER POLICIES 
Non Statutory Guidance 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC 
NATIONAL GUIDANCE 
14 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management 
• PAN 51 Planning, Environmental Protection and Regulation 
Creating Places 2013 
16 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
17 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
Page 105 of 162

Page 106

National Roads Development Guide 2014 
18 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
Site History 
• 86/00176/FUL Full Planning Permission was Approved on 2 March 1987 for
Display of Sign at Sands Supermarket
• 86/00177/FUL Full Planning Permission was Approved on 2 March 1987 for
Display of Sign at Sands Supermarket
• 93/01166/FUL Full Planning Permission was Approved on 8 October 1993 for
Demolition and Construction New Wall and Fence and Fence (in retrospect) at
Car Park. 
• 95/00331/FUL Full Planning Permission was Approved on 23 May 1995 for
Alterations to Shop Front and Disabled Access 
• 09/01670/FLL Full Planning Permission was Approved on 9 November 2009 for
Alterations to shop
• 10/00123/FLL Full Planning Permission was Approved on 11 March 2010 for
Alteration to glazed entrance screen to accommodate ATM machine.
• 12/01085/ADV Advertisement Consent was Approved on 27 July 2012 for
Display of signs
• 13/01702/ADV Advertisement Consent was Approved on 15 November 2013 for
Erection of illuminated totem
• 17/02260/ADV Advertisement Consent was Approved on 15 February 2018 for
Display of signs
• 22/02228/FLL Full Planning Permission was Approved on 8 March 2023 for
Alterations to building and associated works
• 23/01098/FLL Full Planning Permission on 30 June 2023 for Construction of
serviced apartments within the first and second floor of the existing building –
Application returned. 
CONSULTATIONS 
19 As part of the planning application process the following bodies were consulted: 
External 
Kinross Community Council 
20 The Community Council object to the proposal on the following grounds: 
• Conflict with delivery vehicles manoeuvring in the car park close to the
entrance, increase in deliveries due to loss of supermarket storage
• Query the appropriateness of the use
• Noise – impact on amenity
Page 106 of 162

Page 107

• Parking – impact on town centre parking
• Impact on Loch Leven from additional sewerage
• Impacts on waste collection
• Technical considerations relating to fire escape provision 
Scottish Water 
21 No objection.  There is sufficient capacity at the Glenfarg Water Treatment
Works, and the applicant should contact SW with a pre development enquiry
form relating to the Waste Water Treatment Works. 
Internal 
Communities Housing Strategy 
22 The postcode district level of saturation of potential short-term lets for KY13 is
1.0% and below the level at which it may be considered appropriate to introduce
a control area in order to help manage high concentrations of STLs where it
affects the availability of residential housing or the character of a neighbourhood. 
23 The number of units in the application would represent a 45% increase of self-
catering units in the area (based on 2021 figures) as the numbers are low in the
area. However, the overall saturation would still be below 1.1% and therefore not
deemed to be a significant loss of residential accommodation for the area. 
Transportation And Development 
24 No objection following receipt of further details of parking arrangements and
facilities provided for users of the accommodation. 
Environmental Health (Noise Odour) 
25 No objection, subject to informative drawing attention to Short Term Let licensing
requirements. 
Development Contributions Officer 
26 No comments to make in terms of the Developer Contributions and Affordable
Housing Supplementary Guidance. 
REPRESENTATIONS 
27 7 representations were received. The main issues raised within the
representations are: 
• Traffic and Parking – unclear where occupants of the units would park,
conflict with supermarket deliveries
Page 107 of 162

Page 108

• Sufficient provision already in the area of short term lets.  No need for more
• Loss of privacy / overlooking
• Design - does not enhance the Conservation Area and is contrary to
requirements set out in the Conservation Area Appraisal.  Need hard
landscaping and tree planting
• Drainage, environmental impact, additional water use and sewerage  –
already an issue with drain at the end of Piper Row with odour/capacity
issue
• Development should be in conjunction with civic improvements as set out in
Conservation Area Appraisal 
• Density of units/over intensive development
• Use of the units is unclear – what is short-term use
• Concern at how the units would be managed, and also matters such as
waste disposal
• Potential impacts through noise and odour (smoking etc)
• Loss of storage to supermarket 
• No design statement or impact assessment submitted
• Lack of fire escapes 
28 A further concern was also raised that the plans were inaccurate with regard to
land ownership – this matter has been addressed and revised site plans were
received removing a small section of the site that were in another ownership. 
Any other unresolved land ownership issues are not material to the consideration
of this application and are a civil matter for discussion/agreement between
interested parties. 
29 The reference to the presence of fire escapes would ultimately be a matter for
consideration through a parallel application for Building Warrant. 
ADDITIONAL STATEMENTS 
30
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
AA Not Required
Design Statement or Design and Access
Statement
Not Required
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not Required  
APPRAISAL 
31 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
Page 108 of 162

Page 109

with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance. 
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, namely 
32 In this instance, section 64(1) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 is relevant and requires planning authorities to pay
special attention to the desirability of preserving or enhancing the character or
appearance of the designated conservation area. 
Principle 
33 The proposal seeks to change the use of the upper floors of an existing building
in Kinross Town Centre to 10 short term let units. These could be for holiday or
other uses such as for short term workers in the area. 
34 LDP2 Placemaking Policies 1A and 1B, and 10, City, Town and Neighbourhood
Centres have relevance for a proposal of this nature.  Both seek to ensure that
new developments do not have an adverse impact on the area in which they are
located.  Policy 10 specifically encourages the retention and development of
housing and other uses on upper floors, particularly where property is
underutilised and the use would be compatible with existing town centre uses.  
NPF4 Policy 27: City, Town, Local and Commercial Centres is also relevant as it
promotes proposals which increase the mix of uses in city centres and enhance
and improve the vitality and viability of such centres. 
35 NPF4 Policy 30(e): Tourism, is relevant to this proposal. This states that
development proposals for the reuse of existing buildings for short term holiday
letting will not be supported where the proposal will result in:
i. An unacceptable impact on local amenity or the character of a
neighbourhood or area; or
ii. The loss of residential accommodation where such loss is not outweighed
by demonstrable local economic benefits. 
36 The building is not currently in use as residential accommodation so criterion ii of
(e) is not relevant. However it is noted that the postcode district level of
saturation of potential short-term lets for KY13 is 1.0% and below the level at
which it may be considered appropriate to introduce a control area in order to
help manage high concentrations of STLs where it affects the availability of
residential housing or the character of a neighbourhood. 
37 Whilst the number of units in the application would represent a 45% increase of
self-catering units in the area (based on 2021 figures) the numbers in general are
low in the area. However, the overall saturation would still be below 1.1% and
there will not be a loss of residential accommodation for the area.
Page 109 of 162

Page 110

38 The site is within a Conservation Area where the NPF4, Policy 7, Historic assets
and place, looks to protect historic assets from inappropriate new developments.
while Policy 28 of LDP2, Conservation Areas, seeks to protect historic heritage. 
39 In this case the principle of the use for short term let is supported by policy 10 of
LDP2.  The proposal will bring an active use to a building currently underutilised
that does not readily lend itself for mainstream residential or other commercial
uses.  The provision of 10 short term lets which do not need the amenity ground
provision etc of mainstream residential development is a sustainable use of the
building for a particular market at this time.  The development will contribute to
the increase in the mix of uses in the town centre and will add to the vitality and
viability of the centre as required by policy 27 of NPF4. 
40 Criterion (i) of NPF4 Policy 30(e), will not support proposals where there is an
unacceptable impact on local amenity or the character of a neighbourhood or
area.  The site is within a town centre location close to retail and other
commercial uses.  Whilst there will be an increase in footfall this will not impact
on the character or amenity of the area so long as good management practices
are in place.  In this case the application site’s town centre location with its mix of
uses, is such that the levels of activity associated with the short term let
accommodation will not adversely impact the amenity or character of the area. 
41 The proposal therefore accords in principle with NPF4 Policy 30(e): Tourism, and
the intent of NPF4 Policy 27: City, Town, Local and Commercial Centres, and
LDP2 Policies 1A and 1B: Placemaking and Policy 10: City, Town and
Neighbourhood Centres. 
Design, Layout and Visual Amenity 
42 NPF4 Policy 14: Design, Quality and Place and LDP2 Policies 1Aa nd 1B,
Placemaking, and LDP2 Policy10 City, Town and Neighbourhood Centres
supports proposals that are compatible with existing uses, the amenity and
character of the surrounding area, and consistent with the six qualities of
successful places. Representations refer to the lack of a Design Statement. This
has not been requested given the limited architectural qualities of the host
building. Whilst the site is in Conservation Area the proposals are limited in their
visual impact and their scope to impact on its character or appearance.  Internal
and external alterations are required to subdivide the building into 10 ensuite
bedrooms and provide windows to a building that has in the past been primarily
used for storage.  There will be no change to the east (front elevation). Two new
windows will be installed at first floor level on the north elevation and a line of
new windows will be installed on the west (rear) elevation at first floor level
including removal of one window and some railings. Given the associated
distances to the nearest residential property, and the existence of some windows
at first floor level already, there are no concerns in respect of privacy or
overlooking. 
Page 110 of 162

Page 111

43 The wall is currently blank and relatively non-descript.  The addition of windows
on the east and north elevation will not impact on the visual amenity or character
of the area and as such is in accordance with Placemaking and Design policies,
Placemaking 1B of the LDP and Policy 14, Design of NPF4. 
Landscape 
44 The town centre area close to the site was subject to an environmental
enhancement scheme some years ago.  Trees from this scheme provide some
vegetation and landscape features in the area. The proposal will not impact on
these or any other landscape features. 
Residential Amenity 
45 NPF4 Policy 14: Design, Quality and Place and LDP2 Policies 1A:
Placemaking, and 10 City, Town and Neighbourhood Centres supports
proposals that are compatible with existing uses, the amenity and character of
the surrounding area, and consistent with the six qualities of successful places. 
Policy 56, Noise Pollution, does not support the siting of activities that generate
high levels of noise alongside noise sensitive uses.  It is acknowledged that
short term lets can result in additional levels of disturbance and noise concerns,
and that the primary avenue to regulate such matters is via the separate
licensing regime. 
46 In this instance, there is the potential for noise from the users of the properties to
affect neighbouring residential properties. The introduction of Civic Government
(Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022 requires these to
be licensed and noise conditions will form part of the Licence. 
47 As set out in an appeal decision in 2023 from the DPEA elsewhere in Perth and
Kinross at Birnam (ref: PPA-340-2155), management guidelines cannot be
relied upon as a means to restrict or control the adverse impacts on
neighbouring properties and harm to amenity. In this case the potential for noise
nuisance has been raised in representations. However, the immediate area has
a mix of uses, and the property is situated above a supermarket on a busy
through route for vehicles passing through the town centre. It is considered that
the proposed use as a short-term let is compatible with the established
character and is unlikely to increase noise and disturbance to a harmful extent. 
Notwithstanding, these would ultimately be controlled through a parallel Short
Term Let licence. 
48 Representations have also raised concern with regard to overlooking and loss of
privacy.  As noted above, in this case the orientation of the building and distance
from rear and side elevations would not result in overlooking or loss of privacy from
the development. 
49 As such, the proposal accords with the intent of NPF4 Policy 14(c): Design,
Quality and Place and LDP2 Policies 1A and 1B, Placemaking and 10, City,
Page 111 of 162

Page 112

Town and Neighbourhood Centres in respect of residential amenity. It also
accords with Policy 56, Noise Pollution, of LDP2. 
Roads and Access  
50 The existing car park for the site currently allows one-hour free parking for
customers of the supermarket.  Parking for the site is stated in the planning
application at 47 spaces.  Additional clarification was sought from the applicant
as to how car parking for users of the units would be allocated.  Revised plans
show that 10 of the existing spaces will be allocated for the use of the guests of
the self-catering units.  While this would result in the loss of ten parking spaces
for the existing supermarket, this is a private facility which is not always at
capacity, and would leave a sufficient level of parking for both the existing and
proposed use. 
51 The site is in the centre of Kinross with easy access including by foot and by
cycle to local facilities including public transport.  Transport and Development do
not raise any matters of concern. 
52 The proposal satisfies policy 13, Sustainable Transport, of NPF4 and policy 60B
of LDP2. 
Drainage and Flooding 
53 The proposal is within the Loch Leven Catchment. The proposal will connect to
existing drainage infrastructure and as such satisfies Policy 46 parts A and B,
Loch Leven Catchment, which requires development within the Catchment to
connect to a publicly maintained drainage system incorporating phosphorus
reduction measures.   
54 An objection refers to capacity issues with an external drain.  This is an existing
situation and not a material consideration. Notwithstanding, Scottish Water (SW)
have confirmed that they have no objection to this planning application, and that
there is currently sufficient capacity in the Glenfarg Water Treatment Works.  In
respect of waste water, the applicant is advised to contact SW to undertake a pre
development enquiry form.  Notwithstanding, it is the responsibility of the
applicant to address if capacity issue, and maintenance of sewerage connections
in general). 
Waste Collection 
55 The application form states that the proposal will make use of the existing waste
collection services used for the property.  An informative note with regard to this
will be added. 
Page 112 of 162

Page 113

Conservation Considerations 
56 Policy 7 of NPF4 and Policy 28 of LDP2 share an aim to enhance and preserve
the character and appearance of Conservation Areas. The alterations relate to a
sizable building with little in the way of architectural merit. The provision of new
windows on the rear and side elevations will not have an adverse impact on the
character and appearance of the conservation area.  As such, the works are
considered compatible with policy and can be supported due to the positive
benefit the alterations will have on the proposal to find a new use for an under
utilised part of the building. 
57 The proposal is in accordance with Policy 7, Historic Assets and Places of NPF4
and Policy 28 Conservation Areas of LDP2. 
Developer Contributions 
58 The Developer Contributions Guidance is not applicable to this application and
therefore no contributions are required in this instance. 
Economic Impact 
59 The economic impact of the proposal is likely to be limited to guest
expenditure in the local economy and construction works required to convert
the building. 
VARIATION OF APPLICATION UNDER SECTION 32A 
60 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the site plan to clarify parking
arrangements. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
61 None required. 
DIRECTION BY SCOTTISH MINISTERS 
62 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
63 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Page 113 of 162

Page 114

Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions. 
RECOMMENDATION   
Approve the application 
CONDITIONS AND REASONS FOR RECOMMENDATION 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The development hereby approved shall be used solely for short term
accommodation and shall not be occupied as the sole or main residence of any
occupant. 
Reason - In order to clarify the terms of the permission; to control and restrict the
use of the building. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
PROCEDURAL NOTES 
None. 
INFORMATIVES 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
Page 114 of 162

Page 115

would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. An application for Building Warrant may be required. 
4. Part of the approved development includes holiday accommodation or Short-term
Let accommodation (STL).  The developer is advised that holiday
accommodation and STLs require to be licensed under the terms of Article 3 of
the Civic Government (Scotland) Act 1982 (Licensing of Short-terms Lets) Order
2021 and therefore a licence application should be made to Perth and Kinross
Council prior to operation commencing.  Further information and application
forms are available at https://www.pkc.gov.uk/shorttermlets 
5. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste.  
Background Papers:  7 letters of representation
Contact Officer:  Persephone Beer 
Date:  24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT AND PLANNING 
Page 115 of 162

Page 116

Page 116 of 162

Page 117

Ü
Part change of use and alterations to building to form 10 short-term let accommodation units 54 - 56 High
Street Kinross KY13 8AN
23/01349/FLL
Scale
1:10,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(iii)
Page 117 of 162

Page 118

Page 118 of 162

Page 119

Ü
Part change of use and alterations to building to form 10 short-term let accommodation units 54 - 56 High
Street Kinross KY13 8AN
23/01349/FLL
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(iii)
Page 119 of 162

Page 120

Page 120 of 162

Page 121

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/170) 
PROPOSAL: Erection of a dwellinghouse 
LOCATION: Land 15 metres East of Borrowdale, Blairadam, Keltybridge 
Ref. No: 23/01695/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The proposal is for a single storey dwellinghouse in the garden ground of an
existing single storey dwellinghouse. The site is located on a corner plot on the
south side of the junction of Blairadam Road with Main Street, Keltybridge. 
2 The application site has been cleared of vegetation, levelled and a retaining wall
built on the west boundary of the site. There is a hedge screening the site on the
north, east and south boundaries. 
3 Prior to being cleared, the garden ground sloped gently downwards west to east.
The existing dwellinghouse is in an elevated position with its front elevation
overlooking Main Street and the open countryside (east). The existing vehicular
access is from the north, Blairadam Road, and there is in curtilage parking and a
double garage located to the west of the entrance. The amenity space around
the dwellinghouse is a mix of hard and soft landscaping.   
4 Located at a lower level to the existing house, in front of a retaining wall (2.5m),
the proposed 4-bedroom bungalow reflects the layout of the existing bungalow
and will overlook the public road to the east. A new vehicle access is proposed
on the east boundary from Main Street and 3 parking spaces are proposed in the
curtilage of the new dwellinghouse together with amenity garden space to the
front and side. 
5(2)(iv)
Page 121 of 162

Page 122

5 The site is in an established residential area in the settlement of Keltybridge. The
site is bound to the north and east by a public road; to the south is an access
road to a residential development which is between the site and two 18th century
Category C listed houses. 
6 The application was varied prior to determination, in accordance with the terms of
section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the design and layout of the
dwellinghouse. 
Site History 
7 22/02027/FLL Full Planning Permission application was withdrawn on 6 April 2023
for the erection of a dwellinghouse. 
PRE-APPLICATION CONSULTATION 
8 Pre application Reference: None.   
9 The proposed development is not classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore the applicant was not required to undertake not any formal pre-
application consultation with the local community. 
DEVELOPMENT PLAN 
10 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019, along with its
associated statutory supplementary guidance). 
National Planning Framework 4 
11 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. 
12 NPF4 was adopted on 13 February 2023.  NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
13 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 7: Historic Assets and Places
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
Page 122 of 162

Page 123

• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 16: Quality Homes
• Policy 18: Infrastructure First
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety 
Perth and Kinross Local Development Plan 2019 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 17: Residential Areas
• Policy 27A: Listed Buildings
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 42: Green Infrastructure
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 58B: Contaminated and Unstable Land: Unstable Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
OTHER POLICIES 
Statutory Supplementary Guidance 
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
Page 123 of 162

Page 124

NATIONAL GUIDANCE 
16 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
17 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
18 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
19 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.  
CONSULTATIONS 
21 As part of the planning application process the following bodies were consulted: 
External 
22 Cleish and Blairadam Community Council - Objection. Contrary to NPF4 and
LDP2 placemaking and detrimental impact on setting and views of listed building.
Page 124 of 162

Page 125

23 The Coal Authority – Initial objection was removed following the submission of a
risk assessment for review. Conditions are recommended. 
24 Scottish Water - No objection. The consultation response highlights there is live
Scottish Water infrastructure in the proximity of the development area. 
Internal 
25 Environmental Health (Private Water) - No objection subject to condition. 
26 Environmental Health (Contaminated Land) – No objection. Condition
recommended for a detailed survey report to be provided prior to the
commencement of works on site. 
27 Conservation Team - No objection. Initially concerned about the impact on the
setting of the Category C listed buildings. Revised scheme lessens the impact
and conditions recommended to mitigate visual impact. 
28 Transportation and Development - No objection, subject to conditions. Initial
response required the applicant/agent to review the layout of parking. Revised
site plan submitted for review. 
29 Development Contributions Officer – No contributions required. 
REPRESENTATIONS 
30 3 representations have been received objecting to the proposal. The main issues
raised within the representations are: 
• Visual impact
• Impact on setting of listed buildings
• Overdevelopment of site
• Incompatible with rural character and amenity of the area and settlement
pattern
• Contrary to NPF4 and LDP2 placemaking policy
• Road Safety 
31 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
32
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal /
AA Not Required
Page 125 of 162

Page 126

Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted – Coal Mining Risk
Assessment  
APPRAISAL 
33 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance. 
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, namely. 
34 In this instance, section 14(2) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 places a duty on planning authorities in determining
such an application as this to have special regard to the desirability of preserving
the building or its setting or any features of special architectural or historic
interest which it possesses.  Section 59(1) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 is relevant and requires planning
authorities in considering applications which has a potential to affect the setting
of a listed building of preserving the building or its setting.   
Principal Policies 
35 The application site is located in an established residential area in the settlement
of Keltybridge. LDP2 reports the settlement has limited facilities but lies close to
the much larger Kelty. Due to the growth that has taken place in Keltybridge, a
tight settlement boundary has been drawn to limit any significant future growth. 
36 The principal policies for consideration include NPF4 Policy 14: Design, Quality
and Place which states development which is poorly designed, detrimental to the
amenity of the surrounding area or inconsistent with the six qualities of
successful places will not be supported. LDP2 Policy 1: Placemaking aligns with
this national policy and states development must contribute positively to the
quality of the surrounding built and natural environment. All development should
be planned and designed with reference to climate change, mitigation and
adaptation. The design, density and siting of development should respect the
character and amenity of the place, and should create and improve links within
and, where practical, beyond the site. Proposals should also incorporate new
landscape and planting works appropriate to the local context and the scale and
nature of the development. Policy 1B sets out the placemaking criteria which
should be met. 
Page 126 of 162

Page 127

37 The site is in an established residential area and LDP2 Policy 17: Residential
Areas states that in general, encouragement will be given to proposals which fall
into one or more categories of development (listed as a-e) and which are
compatible with the amenity and character of the area, with the following
categories being relevant to the proposal – 
(a)  Infill residential development at a density which represents the most efficient
use of the site while respecting its environs, and 
(c)  Proposals which will improve the character and environment of the area or
village. 
38 NPF4 Policy 16: Quality Homes encourages, promotes and facilitates the
delivery of more high quality, affordable and sustainable homes, in the right
locations. Policy 16 f) states proposals for new homes on land not allocated for
housing in the LDP will only be supported in limited circumstances and relevant
to the proposal is part (iii) the proposal is for smaller scale opportunities within an
existing settlement boundary. 
39 Located to the south of the application site are two 18th century Category C
listed houses (LB5286). Protecting the setting of the listed buildings is considered
through NPF4 Policy 7 and LDP2 Policy 27A. 
40 These policies are assessed further in the report below. 
Design, Layout and Residential Amenity 
41 The existing dwellinghouse is positioned in an elevated position in a large
residential plot measuring 1726 sqm. There is a level change of 3m from the
dwellinghouse to the east boundary and Main Street. The lower garden ground,
the application site, measures 775 sqm and has been cleared of vegetation and
a retaining wall (which is seeking retrospective permission for) built on the west
side. There is a hedge on the north, east and south boundaries which screens
the site. 
42 The proposed 4-bedroom bungalow is to be located in front of the existing
bungalow, on ground 2.5m below with a retaining wall to the rear. Designed to
mirror the position of the existing bungalow the proposed dwellinghouse will
overlook the public road to the east. The rear windows of the proposed
dwellinghouse will be screened by the retaining wall. 
43 Finishing materials include rubble stone on the front elevation (east) and white
render on the rear (west) and side elevations (north and south) with stone
quoins, a clay pantile roof and UPVC or timber windows and doors (Drawings 19
and 20). A new vehicle access is proposed on the east boundary from Main
Street and 3 parking spaces are proposed in the curtilage of the new
dwellinghouse (Drawing 22). 
Page 127 of 162

Page 128

44 A supporting statement (Document 23) outlines that the proposed finishing
materials, rubble stone and pantile roof, reflect the surrounding historic
environment and more recent developments in the area. The single storey
property will be built on a lower level to the existing bungalow and residential
amenity and privacy have been carefully considered. At it closest point, there are
7.3 metres from the front wall of Borrowdale, the to the rear wall of the proposed
house.  However, with the change in levels and retaining wall, it is considered
that any intervisibility between windows would be limited.  Similarly, the ridge
level of the proposed dwelling, would also sit around mid window level of the
dwelling above (at a separation of around 11.4 metres), therefore any impacts on
daylight and sunlight would be avoided.  The hedge is to be retained to provide
screening and respect the setting of the listed buildings. 
45 The proposal is for a small-scale infill opportunity in a settlement boundary which
is in line with NPF4 Policy 16: Quality Homes paragraph f) (iii). The surrounding
density is mixed due to modern residential developments and recent infill
developments and the proposed family sized dwellinghouse respects this and
would not be out of character and would be an efficient use of the site. 
46 The proposed design and layout acknowledge the constraints of the site, its
topography and the amenity of the existing dwellinghouse. Surrounding
residential amenity is protected as a result of the sympathetic layout and the
retention of the boundary hedge. The amenity garden ground afforded to the
existing dwellinghouse (465 sqm) and proposed dwellinghouse (245 sqm) is
sufficient and is comparable with the surrounding residential area. The design
complements the existing dwellinghouse and respects the character and amenity
of the surrounding area. 
47 In respect of the design, no information has been provided on the installation and
operation of low and zero-carbon generating technologies as required by NPF4
Policy 2 and LDP2 Policy 32. A condition is therefore recommended to ensure
that prior to the commencement of development a statement is submitted for
approval in writing by the Council to demonstrate that at least 10% of the current
carbon emissions reduction set by Scottish Building Standards will be met
through the installation and operation of low and zero-carbon generating
technologies (Condition 12). 
48 In respect of visual amenity, conditions are also recommended to ensure full
details of the finishing materials and boundary treatments are submitted for
written approval of the Council as Planning Authority, prior to the commencement
of the development (Conditions 3 and 4). Further, it is recommended that
householder permitted development rights are removed to ensure there is no
detrimental impact on visual amenity and the setting of the listed buildings from
any extension to the dwellinghouse or erection of outbuildings in the curtilage
(Condition 5).   
49 The proposal will contribute positively to the surrounding environment and the
character and amenity of the place. The proposal satisfies NPF4 Policy 14
Page 128 of 162

Page 129

Design, Quality and Place, NPF4 Policy 16 Quality Homes, LDP2 Policy 1:
Placemaking and LDP2 Policy 17: Residential Areas, subject to conditions. 
Conservation Considerations 
50 NPF4 Policy 7 aims to protect and enhance historic environment assets and
places, and to enable positive change as a catalyst for the regeneration of
places. LDP2 Policy 27A: Listed Buildings requires the layout, design, materials,
scale, siting and use of any development which will affect a listed building or its
setting to be appropriate to the building’s character, appearance and setting. 
51 There are two 18th century Category C listed houses to the south of the
application site (LB5286). The listed houses are gable to the street and the rear
of the houses back onto the south boundary of the application site. There is an
access road to a residential development between the listed buildings and the
application site. The existing view from the approach north is largely screened by
the boundary hedge and the rear elevation of the westernmost listed building, of
lesser interest due to later alterations and extension, will be screened by the
proposed development with the view of the end listed house retained. The view
of the listed buildings from the approach south is retained and not impacted
significantly by the proposal. 
52 A supporting statement (Document 23) outlines that the proposed rubble stone
finish of the dwellinghouse reflects the historic environment and the hedge is to
be retained to respect the setting of the listed buildings. During the application
process the proposal was amended to reduce the footprint of the dwellinghouse
and create a more respectful distance between the listed buildings and the
application site. Overall, the proposal has been sensitively designed to respect
the listed buildings.  
53 As outlined previously, conditions are recommended to ensure full details of the
finishing materials and boundary treatments are submitted for written approval of
the Council as Planning Authority, prior to the commencement of the
development (Conditions 3 and 4). Further, it is recommended that householder
permitted development rights are removed to ensure there is no detrimental
impact on visual amenity and the setting of the listed buildings from any
extension to the dwellinghouse or erection of outbuildings in the curtilage
(Condition 5).   
54 The proposal satisfies NPF4 Policy 7 Historic Assets and Places and LDP2
Policy 27A: Listed Buildings, subject to conditions. 
Roads and Access 
55 A new vehicle access is proposed from the public road, Main Street, on the east
boundary of the site. During the application process, an amended proposed site
plan was submitted to address initial consultation comments from Transportation
and Development. The plan shows a reduction to the hedge height on the east
Page 129 of 162

Page 130

boundary and an additional parking bay in the curtilage with three spaces
proposed in total (Drawing 22). Transportation and Development are satisfied
with the proposed vehicular access and the level of in curtilage parking.
Conditions are recommended to ensure the access is formed as per the
Council’s Road Development Guide and the hedge is retained at a maximum
height of 1.05m in the interests of road safety (Conditions 10 and 11). 
56 The application site is in an established residential area in the settlement
boundary of Keltybridge. The proposal satisfies NPF4 Policy 13 Sustainable
Transport and LDP2 Policy 60B: Transport Standards and Accessibility
Requirements: New Development Proposals. 
Drainage and Flooding 
57 There is no flood risk associated with the site. The proposed site plan shows
porous drainage to the driveway with attenuation tanks set below to manage
surface water drainage from the development (Drawing 22). Foul drainage is
proposed to connect to the public drainage network. Full details of surface water
drainage and foul drainage will be required to be submitted with a building
warrant. 
58 The proposal satisfies NPF4 Policy 22 Flood Risk and Water Management, LDP2
Policy 53B: Water Environment and Drainage: Foul Drainage and LDP2 Policy
53C: Water Environment and Drainage: Surface Water Drainage.  
59 The development is in a village with private water supplies believed to serve
properties in the vicinity (including Maryburgh and Keltybridge Supply).
Environmental Health recommend a condition and informative to ensure the new
development has an adequate and consistently wholesome supply of water and
to maintain water quality and supply in the interests of residential amenity and
ensure the private water supply or septic drainage systems of neighbours of the
development remain accessible for future maintenance. This is in line with NPF4
Policy 22 d) and LDP2 Policy 53E: Water Environment and Drainage: Water
Supply. 
Contamination 
60 The proposed development is within a former mining area. The Coal Authority
initially objected to the proposal on the grounds of mining concerns and a Coal
Mining Risk Assessment was requested for review during the application
process. This was subsequently updated at the request of The Coal Authority
(Document 09). 
61 The Coal Authority whilst withdrawing its objection to the proposed development,
remain concerned regarding the level of assessment contained within the Coal
Mining Risk Assessment of the risk posed by coal mining legacy to development
at the application site. The Coal Authority request conditions are attached to any
permission granted to ensure that prior to the commencement of development
Page 130 of 162

Page 131

intrusive site investigations and remedial works shall be carried out in
accordance with authoritative UK guidance (Conditions 6 and 7). This is in line
with NPF4 Policy 9 c) and LDP2 Policy 58B: Contaminated and Unstable Land:
Unstable Land. 
62 Environmental Health note there is a risk of ground gas contamination to future
users. Further information is required to determine this risk and a condition is
recommended to ensure a Preliminary Risk Assessment (Phase 1 Desk Study) is
submitted for consideration by the Council as Planning Authority prior to the
commencement of the development (Condition 9). This is in line with NPF4
Policy 9 c) and LDP2 Policy 58A: Contaminated and Unstable Land:
Contaminated Land. 
Natural Heritage and Biodiversity 
63 There is a hedge around the north, east and south boundary of the site and this
green infrastructure is protected as part of the development. The hedge adds to
the visual amenity of the area as well as providing a shelter and habitat for
biodiversity. The proposed drawings show its retention and a condition is
recommended to ensure the hedge is retained in perpetuity (Condition 4).
Transport planning have requested the hedge on the east boundary is
maintained to a height of 1.05m for road safety reasons as the vehicular access
is proposed on this boundary and a condition is recommended to ensure this
(Condition 11). 
64 The proposal satisfies NPF4 Policy 14 Design, Quality and Place and NPF4
Policy 20 Blue and Green Infrastructure and LDP2 Policy 1: Placemaking,
subject to the aforementioned conditions.   
Material considerations 
65 Three representations have been received objecting to the proposal. 
66 The issues raised have been fully considered and addressed in the report and
are not of sufficient weight to justify refusal of the planning application. 
Developer Contributions 
67 None required in line with Supplementary Guidance. 
Economic Impact 
68 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. 
Page 131 of 162

Page 132

VARIATION OF APPLICATION UNDER SECTION 32A 
69 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the design and layout of the
dwellinghouse. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
70 None required. 
DIRECTION BY SCOTTISH MINISTERS 
71 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
72 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions.  
RECOMMENDATION   
Approve the application, subject to conditions. 
CONDITIONS AND REASONS FOR RECOMMENDATION 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
20. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents.
Page 132 of 162

Page 133

3. Prior to the commencement of the development hereby approved, details of the
specification and colour of the proposed external finishing materials to be used
shall be submitted to and agreed in writing by the Council as Planning Authority. 
The scheme as agreed shall be implemented prior to the completion or bringing
into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
4. Prior to the commencement of the development hereby approved, details of the
proposed boundary treatments for the site shall be submitted to and agreed by
the Council as Planning Authority.  The scheme as subsequently agreed shall
be implemented prior to the completion or bringing into use of the development,
whichever is the earlier.  For the avoidance of doubt the existing hedgerow shall
be retained in perpetuity. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
5. No development or extensions, whether or not permitted by virtue of Schedule 1,
Part 1, of the Town and Country Planning (General Permitted Development)
(Scotland) Order, 1992 or any Order revoking and re-enacting that Order, shall
be erected within the curtilage of the dwellinghouse hereby approved. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
6. No development shall commence until; 
a) a scheme of intrusive investigations has been carried out on site to establish
the risks posed to the development by past shallow coal mining activity; and 
b)  any remediation works and/or mitigation measures to address land
instability arising from coal mining legacy, as may be necessary, have been
implemented on site in full in order to ensure that the site is made safe and
stable for the development proposed. 
The intrusive site investigations and remedial works shall be carried out in
accordance with authoritative UK guidance. 
Reason - In order to deal with any potential contamination of the site as a result
of its former use. 
7. Prior to the occupation of the development hereby approved, a signed statement
or declaration prepared by a suitably competent person confirming that the site
is, or has been made, safe and stable for the approved development shall be
submitted to the local Planning Authority for approval in writing.  This document
shall confirm the methods and findings of the intrusive site investigations and the
Page 133 of 162

Page 134

completion of any remedial works and/or mitigation necessary to address the
risks posed by past coal mining activity. 
Reason - In order to deal with any potential contamination of the site as a result
of its former use. 
8. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the commencement of the development being brought
into use and shall thereafter be so maintained insofar as it relates to the
development hereby approved. 
Reason - To ensure the new development has an adequate and consistently
wholesome supply of water and to maintain water quality and supply in the
interests of residential amenity and ensure the private water supply or septic
drainage systems of neighbours of the development remain accessible for future
maintenance. 
9. Development shall not commence on site until an evaluation for the potential of
the site to be affected by contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify; 
I.  the nature, extent and type(s) of contamination on the site 
II.  measures to treat/remove contamination to ensure the site is fit for the use
proposed 
III.  measures to deal with contamination during construction works 
IV.  condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason - In order to deal with any potential contamination of the site as a result
of its former use. 
10. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth and Kinross
Council's Road Development Guide Type C Figure 5.7 access detail, of Type B
Page 134 of 162

Page 135

Road construction detail. The Type B Road construction detail shall continue to
the entrance for a distance of 3 metres from the boundary of the public road
surface. 
Reason - In the interests of road safety. 
11. Prior to the commencement of the development hereby approved, the existing
hedge along the east boundary and in the location of the proposed vehicle
access shall be trimmed to a maximum heigh of 1.05m.  The hedge height on
the east boundary shall be permanently retained thereafter. 
Reason - In the interests of road safety. 
12.  Prior to the commencement of development hereby approved, a statement shall
be submitted for approval in writing by the Council as Planning Authority to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies.  The statement as agreed shall be
fully implemented to the satisfaction of the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
PROCEDURAL NOTES 
None. 
INFORMATIVES 
1. The proposed development lies within an area that has been defined by the Coal
Authority as containing potential hazards arising from former coal mining activity. 
These hazards can include: mine entries (shafts and adits); shallow coal
workings; geological features (fissures and break lines); mine gas and previous
surface mining sites.  Although such hazards are seldom readily visible, they
can often be present and problems can occur in the future, particularly as a
result of development taking place.   
It is recommended that information outlining how the former mining activities
affect the proposed development, along with any mitigation measures required
(for example the need for gas protection measures within the foundations), be
submitted alongside any subsequent application for Building Warrant approval (if
relevant).   
Page 135 of 162

Page 136

Any form of development over or within the influencing distance of a mine entry
can be dangerous and raises significant safety and engineering risks and
exposes all parties to potential financial liabilities.  As a general precautionary
principle, the Coal Authority considers that the building over or within the
influencing distance of a mine entry should wherever possible be avoided.  In
exceptional circumstance where this is unavoidable, expert advice must be
sought to ensure that a suitable engineering design is developed and agreed
with regulatory bodies which takes into account of all the relevant safety and
environmental risk factors, including gas and mine-water.  Your attention is
drawn to the Coal Authority Policy in relation to new development and mine
entries available at: 
www.gov.uk/government/publications/building-on-or-within-the-influencing-
distance-of-mine-entries 
Any intrusive activities which disturb or enter any coal seams, coal mine
workings or coal mine entries (shafts and adits) requires a Coal Authority Permit. 
Such activities could include site investigation boreholes, digging of foundations,
piling activities, other ground works and any subsequent treatment of coal mine
workings and coal mine entries for ground stability purposes.  Failure to obtain a
Coal Authority Permit for such activities is trespass, with the potential for court
action.   
Property-specific summary information on past, current and future coal mining
activity can be obtained from: www.groundstability.com or a similar service
provider. 
If any coal mining features are unexpectedly encountered during development,
this should be reported immediately to the Coal Authority on 0345 762 6848. 
Further information is available on the Coal Authority website at:
www.gov.uk/government/organisations/the-coal-authority. 
2. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
4. No work shall be commenced until an application for building warrant has been
submitted and approved. 
Page 136 of 162

Page 137

5. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
6. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations. 
7. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
8. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the design and layout. 
9. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
10. Under the Coal Industry Act 1994 any intrusive activities which disturb or enter
any coal seams, coal mine workings or coal mine entries (shafts and adits)
require the prior written permission of the Coal Authority since these activities
can have serious public health and safety implications.  Such activities could
include site investigation boreholes, excavations for foundations, piling activities,
other ground works and any subsequent treatment of coal mine workings and
coal mine entries for ground stability purposes.  Failure to obtain permission to
enter or disturb our property will result in the potential for court action. 
Application forms for Coal Authority permission and further guidance can be
obtained from The Coal Authority's website at: www.gov.uk/get-a-permit-to-deal-
with-a-coal-mine-on-your-property 
11. In areas where shallow coal seams are present caution should be taken when
carrying out any on site burning or heat focused activities. 
Background Papers: 3 letters of representation
Contact Officer:  Claire Myles
Date: 24 May 2024
Page 137 of 162

Page 138

DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT AND PLANNING 
Page 138 of 162

Page 139

Ü
Erection of a dwellinghouse on Land 15 Metres East Of Borrowdale Blairadam Keltybridge
23/01695/FLL
Scale
1:8,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(iv)
Page 139 of 162

Page 140

Page 140 of 162

Page 141

Ü
Erection of a dwellinghouse on land 15 metres East of Borrowdale, Blairadam, Keltybridge
23/01695/FLL
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(iv)
Page 141 of 162

Page 142

Page 142 of 162

Page 143

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Pre-Application Report by Strategic Lead – Economy, Development and Planning
(Report No. 24/171) 
PROPOSAL: Formation of a 49.9MW battery energy storage facility and
associated works 
LOCATION: Land 200 Metres North of Pitcurran House, Newburgh Road,
Abernethy, Perth 
Ref. No: 24/00004/PAN 
Ward No: P9- Almond and Earn 
Summary 
This report is to inform the Committee of a potential forthcoming planning application
in respect of a major development for formation of a 49.9MW battery energy storage
facility and associated works at land 200 metres North of Pitcurran House, Newburgh
Road, Abernethy, Perth, PH2 9LH. The report also aims to highlight the key planning
policies and the likely stakeholders who would be involved in the decision making
process, and to offer a brief overview of the key planning issues which are likely to be
relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 10 April 2024. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for formation of a 49.9MW battery energy
storage facility and associated works. Pre-application reports give the
Committee an opportunity to raise issues which it would like to see addressed
in the planning application. 
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant. It is noted that
a screening opinion has already been provided reference 24/00580/SCRN,
and is not subject of an EIA development.
6(i)
Page 143 of 162

Page 144

PRE-APPLICATION PROCESS 
4. The PoAN (reference 24/00004/PAN) confirmed that two public exhibitions
will be held at Williamson Hall, Kirk Wynd, Abernethy, PH2 9JD on 22nd April
and 22nd May 2024 between 2.30pm and 6.30pm. The Ward Councillors, and
Abernethy and District Community Council have been notified. The results of
the community consultation will be submitted with the planning application as
part of the required Pre-Application Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crisis 
• Policy 3: Biodiversity
• Policy 4: Natural Places 
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 20: Blue and Green Infrastructure
• Policy 21 Play, Recreation and Sport 
• Policy 22: Flood Risk and Water Management
• Policy 29 Rural Development 
• Policy 54: Health and Safety 
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance.
Page 144 of 162

Page 145

10. The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 6: Settlement Boundaries 
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access 
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33B: Renewable and Low Carbon Energy: Repowering and
Extending Existing Facilities
• Policy 33C: Renewable and Low Carbon Energy: Decommissioning and
Restoration of Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape 
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 54: Health and Safety Consultation Zones 
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
11. The following supplementary guidance and documents are of particular
importance in the assessment of this application:- 
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
Page 145 of 162

Page 146

• Supplementary Guidance - Placemaking (adopted in 2020)
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Local Transport Strategy (2010) 
NATIONAL GUIDANCE 
12. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
13. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN 1/2011 Planning and Noise 
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport 
PLANNING SITE HISTORY 
14. 24/00580/SCRN on 6th May 2024 for installation of 49.9MW stand alone
battery electricity storage system and ancillary equipment to connect to the
grid at Abernethy Substation 
CONSULTATIONS 
15. As part of the planning application process the following would be consulted: 
External 
• Scottish Environment Protection Agency
• NatureScot 
• Scottish Water
• Transport Scotland
• Asset Protection Team (formerly National Gas)
• Health and Safety Executive 
• Perth and Kinross Heritage Trust 
• Abernethy and District Community Council
• Scottish Fire and Rescue Service 
Page 146 of 162

Page 147

Internal 
• Environmental Health – Noise, Odour, Private Water Supply and
Contaminated Land
• Community Greenspace including Access
• Transportation and Development
• Structures and Flooding
• Economic Development
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
16. The key considerations against which the eventual application will be
assessed include: 
a. Visual Impact 
b. Scale, Design and Layout (including cumulative impact)
c. Relationship to Nearby Land Uses 
d. Natural Heritage and Ecology
e. Landscape
f. Water Resources and Soils 
g. Air Quality  
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
17. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Leisure/Economic Impact Assessment 
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise Impact Assessment
• Construction Management Plan
• Site Biodiversity Action Plan 
Page 147 of 162

Page 148

CONCLUSION AND RECOMMENDATION 
18. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment. 
Background Papers: None
Contact Officer: Kirsty Strong – Ext 01738 475333
Date: 24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT & PLANNING 
Page 148 of 162

Page 149

Ü
Formation of a 49.9MW battery energy storage facility and associated works on land 200 metres North of
Pitcurran House, Newburgh Road, Abernethy
24/00004/PAN
Scale
1:10,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
6(i)
Page 149 of 162

Page 150

Page 150 of 162

Page 151

Ü
Formation of a 49.9MW battery energy storage facility and associated works on land 200 metres North of
Pitcurran House, Newburgh Road, Abernethy
24/00004/PAN
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
6(i)
Page 151 of 162

Page 152

Page 152 of 162

Page 153

Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Pre-Application Report by Strategic Lead - Economy, Development & Planning
(Report No. 24/172) 
PROPOSAL: Formation of a 49.9MW battery energy storage facility and
associated works 
LOCATION: Land 300 Metres West of Tir Artair, Killin 
Ref. No: 24/00005/PAN 
Ward No: P4-Highland 
Summary 
This report is to inform the Committee of a potential forthcoming planning application
in respect of a major development for formation of a 49.9MW battery energy storage
facility and associated works at land 300 metres West of Tir Artair, Killin, FK21 8TX.
The report also aims to highlight the key planning policies and the likely stakeholders
who would be involved in the decision making process, and to offer a brief overview
of the key planning issues which are likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 10 April 2024. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for formation of a 49.9MW battery energy
storage facility and associated works. Pre-application reports give the
Committee an opportunity to raise issues which it would like to see addressed
in the planning application. 
2. This PoAN seeks to formally establish a major development comprising
formation of a 49.9MW battery energy storage facility and associated works.
The exact range of uses, scale and design of the development will be arrived
at during pre-application discussions. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.  It is noted that
a screening opinion has already been provided reference 24/00581/SCRN,
and is not subject of an EIA development. 
6(ii)
Page 153 of 162

Page 154

PRE-APPLICATION PROCESS 
4. The PoAN (reference 24/00005/PAN) confirmed that two public exhibitions will
be held at McLaren Hall, Main Street, Killin, FK218UW on 24th April and 21st
May 2024 between 2.30pm and 6.30pm. The Ward Councillors, and Glenlyon
and Loch Tay Community Council have been notified. The results of the
community consultation will be submitted with the planning application as part
of the required Pre-Application Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crisis 
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy7: Historic Assets and Places 
• Policy 11: Energy
• Policy 13: Sustainable Transport 
• Policy 14: Design, Quality and Place 
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
Page 154 of 162

Page 155

The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 6: Settlement Boundaries 
• Policy 8: Rural Business and Diversification
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33B: Renewable and Low Carbon Energy: Repowering and
Extending Existing Facilities
• Policy 33C: Renewable and Low Carbon Energy: Decommissioning and
Restoration of Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape 
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 47: River Tay Catchment Area
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
OTHER POLICIES 
10. The following supplementary guidance and documents are of particular
importance in the assessment of this application: 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Local Transport Strategy (2010) 
• Supplementary Guidance - Air Quality (adopted in 2020)
Page 155 of 162

Page 156

• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
NATIONAL GUIDANCE 
11. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
12. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN1/2011 Planning and Noise 
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport 
PLANNING SITE HISTORY  
13. 24/00581/SCRN on 10 May 2024 for installation of 49.9MW stand alone
battery electricity storage system and ancillary equipment to connect to the
grid at Killin Substation 
CONSULTATIONS 
14. As part of the planning application process the following would be consulted: 
External 
• Scottish Environment Protection Agency
• NatureScot
• Scottish Water
• Transport Scotland
• Perth and Kinross Heritage Trust 
• Glenlyon and Loch Tay Community Council
• Scottish Fire and Rescue Service
• Stirling Council 
Page 156 of 162

Page 157

Internal 
• Environmental Health – Noise, Odour, Contaminated Land 
• Transportation and Development
• Structures and Flooding
• Economic Development
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
15. The key considerations against which the eventual application will be
assessed include: 
a.  Visual Impact 
b.  Scale, Design and Layout 
c.  Relationship to Nearby Land Uses 
d.  Natural Heritage and Ecology
e.  Landscape
f.   Water Resources and Soils 
g.  Air Quality  
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
16. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Leisure/Economic Impact Assessment 
• Transport Statement including Construction Traffic Management Plan
(CTMP)
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise Impact Assessment
• Construction Method Statement 
CONCLUSION AND RECOMMENDATION 
17. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
Page 157 of 162

Page 158

respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Background Papers: None
Contact Officer: Kirsty Strong – Ext 01738 475333
Date: 24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT & PLANNING 
Page 158 of 162

Page 159

Ü
Formation of a 49.9MW battery energy storage facility and associated works on land 300 metres West of Tir
Artair, Killin
24/00005/PAN
Scale
1:10,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
6(ii)
Page 159 of 162

Page 160

Page 160 of 162

Page 161

Ü
Formation of a 49.9MW battery energy storage facility and associated works on land 300 metres West of Tir
Artair, Killin
24/00005/PAN
Scale
1:5,000
Planning and Placemaking Committee - 5 June 2024© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
6(ii)
Page 161 of 162

Page 162

Page 162 of 162