Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Pre-Application Report by Strategic Lead - Economy, Development & Planning
(Report No. 24/172) 
PROPOSAL: Formation of a 49.9MW battery energy storage facility and
associated works 
LOCATION: Land 300 Metres West of Tir Artair, Killin 
Ref. No: 24/00005/PAN 
Ward No: P4-Highland 
Summary 
This report is to inform the Committee of a potential forthcoming planning application
in respect of a major development for formation of a 49.9MW battery energy storage
facility and associated works at land 300 metres West of Tir Artair, Killin, FK21 8TX.
The report also aims to highlight the key planning policies and the likely stakeholders
who would be involved in the decision making process, and to offer a brief overview
of the key planning issues which are likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 10 April 2024. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for formation of a 49.9MW battery energy
storage facility and associated works. Pre-application reports give the
Committee an opportunity to raise issues which it would like to see addressed
in the planning application. 
2. This PoAN seeks to formally establish a major development comprising
formation of a 49.9MW battery energy storage facility and associated works.
The exact range of uses, scale and design of the development will be arrived
at during pre-application discussions. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.  It is noted that
a screening opinion has already been provided reference 24/00581/SCRN,
and is not subject of an EIA development.

Page 2

PRE-APPLICATION PROCESS 
4. The PoAN (reference 24/00005/PAN) confirmed that two public exhibitions will
be held at McLaren Hall, Main Street, Killin, FK218UW on 24th April and 21st
May 2024 between 2.30pm and 6.30pm. The Ward Councillors, and Glenlyon
and Loch Tay Community Council have been notified. The results of the
community consultation will be submitted with the planning application as part
of the required Pre-Application Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crisis 
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy7: Historic Assets and Places 
• Policy 11: Energy
• Policy 13: Sustainable Transport 
• Policy 14: Design, Quality and Place 
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance.

Page 3

The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 6: Settlement Boundaries 
• Policy 8: Rural Business and Diversification
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33B: Renewable and Low Carbon Energy: Repowering and
Extending Existing Facilities
• Policy 33C: Renewable and Low Carbon Energy: Decommissioning and
Restoration of Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape 
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 47: River Tay Catchment Area
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
OTHER POLICIES 
10. The following supplementary guidance and documents are of particular
importance in the assessment of this application: 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Local Transport Strategy (2010) 
• Supplementary Guidance - Air Quality (adopted in 2020)

Page 4

• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
NATIONAL GUIDANCE 
11. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
12. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN1/2011 Planning and Noise 
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport 
PLANNING SITE HISTORY  
13. 24/00581/SCRN on 10 May 2024 for installation of 49.9MW stand alone
battery electricity storage system and ancillary equipment to connect to the
grid at Killin Substation 
CONSULTATIONS 
14. As part of the planning application process the following would be consulted: 
External 
• Scottish Environment Protection Agency
• NatureScot
• Scottish Water
• Transport Scotland
• Perth and Kinross Heritage Trust 
• Glenlyon and Loch Tay Community Council
• Scottish Fire and Rescue Service
• Stirling Council

Page 5

Internal 
• Environmental Health – Noise, Odour, Contaminated Land 
• Transportation and Development
• Structures and Flooding
• Economic Development
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
15. The key considerations against which the eventual application will be
assessed include: 
a.  Visual Impact 
b.  Scale, Design and Layout 
c.  Relationship to Nearby Land Uses 
d.  Natural Heritage and Ecology
e.  Landscape
f.   Water Resources and Soils 
g.  Air Quality  
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
16. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Leisure/Economic Impact Assessment 
• Transport Statement including Construction Traffic Management Plan
(CTMP)
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise Impact Assessment
• Construction Method Statement 
CONCLUSION AND RECOMMENDATION 
17. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in

Page 6

respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Background Papers: None
Contact Officer: Kirsty Strong – Ext 01738 475333
Date: 24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT & PLANNING