Perth and Kinross Council
Planning and Placemaking Committee – 5 June 2024
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 24/168) 
PROPOSAL: Erection of a brewery, tap room, storage, formation of vehicle
access, parking area, installation of EV charging point, formation
of outdoor seating area, landscaping and associated works 
LOCATION: Land 50 Metres South of Council Cottages Ferry Road Pitlochry 
Ref. No: 23/01742/FLL
Ward No: P4- Highland 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The application is for a brewery comprising of a production facility, a cold store
facility, a taproom serving food and drink with a small shop and outdoor seating.
The proposal includes parking for 3 vehicles and 1 accessible parking bay with
an EV charging point, cycle parking and associated hard and soft landscaping. 
2 The operational hours of the site will be 08:00 – 16:00, with the tap room
operating 11:00 – 22:00 Tuesday – Sunday. The taproom would have a
capacity of 96 persons internally, and 36 externally.   
3 The application site is an area of woodland measuring 1824 sqm on the south
side of Ferry Road, Pitlochry. The site consists of a large, open flat area (formerly
used as a site compound) with steeply banked topography and mature trees to
the east, south and west. It is proposed to fell three trees and one tree group to
enable the development and remove six dead oak trees. Compensatory planting
is proposed together with bird and bat boxes on the brewery building. 
4 A single level build is proposed with two pitched roof buildings connected by a
low flat roof. The brew hall will have feature glazing on the northern elevation and
an internal glazed partition to showcase the technical production equipment
utilised by the brewery. The building is to be finished in dark grey corrugated
metal sheeting, grey aluminium and timber windows and doors and grey

Page 2

aluminium rainwater goods. The roof is to be corrugated steel sheeting in the
same dark grey colour as the cladding with translucent roof sheeting skylights
into the brew hall, taproom and goods incoming area. A southern aspect roof
mounted solar panel array is proposed. The north street facing elevations and
one east aspect pitched roof will feature company logos and signage. 
5 Pitlochry Community Hospital is approximately 50m to the northwest of the site
and Balhousie Pitlochry Care Home approximately 50m to the southwest of the
site. Residential properties (Burnside Cottages) are located 20m to the north and
50m to the east of the site at Bobbin Mill. 
Site History 
6 08/02104/FUL Full Planning Permission was Approved On 7 April 2009 for
Erection of 3 workshop/office units. 
7 11/01434/FLL Full Planning Permission was Approved On 25 November 2011 for
Erection of building to be used as a timber merchants. 
PRE-APPLICATION CONSULTATION 
8 Pre application Reference: 23/00073/PREAPL – The planning response
recognised that this was a hybrid proposal and there may be an opportunity to
split the uses into employment land and town centre locations. A sequential
assessment would be required for any future application to demonstrate there
are no suitable alternative sites and to also demonstrate the proposed
development would be compatible with the residential and health uses in the
immediate surrounding area. 
9 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
10 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019, along with its
associated statutory supplementary guidance). 
National Planning Framework 4 
11 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.

Page 3

12 NPF4 was adopted on 13 February 2023.  NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
13 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 12: Zero Waste
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 27: City, Town, Local and Commercial Centres
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 6: Settlement Boundaries
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 18: Pubs and Clubs in Residential Areas
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage

Page 4

• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals  
OTHER POLICIES 
Statutory Supplementary Guidance 
• Supplementary Guidance - Air Quality (adopted in 2020)
• (adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
NATIONAL GUIDANCE 
16 The Scottish Government expresses its planning policies through Planning
Advice Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars, in addition to NPF4.   
Planning Advice Notes 
17 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
18 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.

Page 5

Designing Streets 2010 
19 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.  
CONSULTATIONS 
21 As part of the planning application process the following bodies were consulted: 
External 
22 Network Rail - No objection, subject to an informative being attached to any
planning permission granted to highlight the site is close to a railway
underbridge. 
23 Perth And Kinross Heritage Trust - No objection. No issues raised in respect of
archaeology. 
24 Scottish Water - No objection. Scottish Water requested further information
during the application process on the abstraction volume as the site is in a
Drinking Water Protected Area. The consultation response notes the impact on
Water Resources and the operation of the brewery and accompanying amenities
has been reviewed against the confirmed abstraction volume of 200,000 litres
per annum (0.2Ml/annum). Assuming this water usage remains consistent with
these values, Scottish Water confirm the proposal can be considered as low-
medium risk regarding Water Resources. Scottish Water would have no
objections with the proposed volume of water and request that they should be
notified if these volumes change. Scottish Water also request that prior to work
commencing on site they are notified as they may wish to take water samples as
a precaution to protect water quality. It is recommended that an informative be
attached to any planning permission granted (Informative 5). 
25 Scottish Environment Protection Agency - No objection. 
26 NatureScot – No response.

Page 6

Internal 
27 Biodiversity/Tree Officer - No objection, subject to conditions. The Preliminary
Ecological Appraisal and Ecological Impact Assessment by Tay Ecology is in
accordance with best practice. No protected species were present, and no further
surveys were recommended. Biodiversity enhancement measures are
recommended. Conditions are recommended by the Tree Officer to ensure a
satisfactory standard of development and environmental quality. An updated
consultation response was received from the Tree Officer following the
submission of revised plans and a tree survey report after a site meeting was
held in February 2024 with the applicant’s agent, the planning officer and
transport planning. 
28 Structures and Flooding – No objection following review of further detailed
information submitted during the application process. 
29 Environmental Health (Contaminated Land) - No objection. An inspection of
the proposed development site did not raise any real concerns, although
mapping does indicate that there is land formerly occupied by various potentially
contaminative sources nearby. The applicant is advised that there may therefore
be potential for contamination within the site. Informative recommended. 
30 Environmental Health (Noise Odour) - No objection subject to conditions
following review of further detailed information submitted during the application
process. 
31 Environmental Health (Private Water) - No objection. The applicant has stated
that Public Mains water will be used, therefore as no existing private water
supplies will be affected by the proposed activities there is no comment at this
time. 
32 Development Contributions Officer - No contribution required in line with
supplementary guidance. 
33 Transportation and Development – No objection subject to conditions following
review of further information and revised plans requested after a site meeting on
5 February 2024 with the applicant’s agent, Tree Officer and Planning Officer. 
34 Development Plan – Reviewed further supporting information submitted during
the application process to ensure compliance with policies in NPF4 and LDP2. 
35 Commercial Waste Team - No objection. Bin storage sufficient. 
REPRESENTATIONS 
36 30 representations were received including 6 objections, 2 neutral
representations and 22 letters of support. The main issues raised within the
objections are:

Page 7

• Noise, disturbance and nuisance – detrimental impact on residential amenity
• Detrimental impact on natural environment and protected species
• Traffic impact 
• Impact on access to residential homes at Bobbin Mill
• Air and noise pollution 
• Contaminated site
• Poor design 
• The proposed use is incompatible with surrounding land uses which includes
a care home and medical centre
• Contrary to LDP policies including open space 
• Detrimental impact on safety of nearby residents  
37 The Atholl Medical Centre requested the following matters be noted - that the
NHS site includes an ambulance dept with 24/7 access required; there should be
no obstructive parking on Ferry Road with access for GPs and staff required at
all times; and the parking at the medical centre is for the benefit of users of the
hospital and GP surgery only. 
38 The letters of support consider the development would bring wide ranging
economic benefits to the town and enhance the local area. 
39 The issues raised are considered in full in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
40
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
/AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted - Ecological Survey,
Tree Survey, Drainage
Assessment 
APPRAISAL 
41 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance. 
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,

Page 8

this involves considerations of the Council’s other approved policies and
supplementary guidance and issues raised in the representations. 
Principle 
42 A number of policies are relevant to the proposed mixed-use development on a
site designated as open space and located outwith the Pitlochry Town Centre
boundary identified in LDP2. 
43 NPF4 Policy 26 Business and Industry supports development on sites allocated
for business and industry uses in the LDP (paragraph a). The site is not allocated
for business and industry use in LDP2. As such, NPF4 Policy 26 d) applies and
this states that development proposals for business, general industrial and
storage and distribution uses outwith areas identified for those uses in the LDP
will only be supported where: 
i.  It is demonstrated that there are no suitable alternatives allocated in the
LDP or identified in the employment land audit; and
ii.  The nature and scale of the activity will be compatible with the surrounding
area. 
44 NPF4 Policy 27 City, Town, Local and Commercial Centres applies the Town
Centre First approach to help centres adapt positively to long-term economic,
environmental and societal changes, and by encouraging town centre living. 
45 NPF4 Policy 27 b) states proposals for uses which will generate significant
footfall, including commercial, leisure, offices, community, sport and cultural
facilities, public buildings such as libraries, education and healthcare facilities,
and public spaces: 
i. will be supported in existing city, town and local centres, and
ii.  will not be supported outwith those centres unless a town centre first
assessment demonstrates that:
•  all centre and edge of centre options have been sequentially assessed
and discounted as unsuitable or unavailable;
•  the scale of development cannot reasonably be altered or reduced in
scale to allow it to be accommodated in a centre; and
•  the impacts on existing centres have been thoroughly assessed and
there will be no significant adverse effect on the vitality and viability of
the centres. 
46 This policy aligns with LDP2 Policy 13: Retail and Commercial Leisure
Proposals. 
47 Also of relevance is LDP2 Policy 18: Pubs and Clubs in Residential Areas which
states there will be a presumption against the siting of these in the midst of other
(particularly residential) uses where problems of noise or disturbance cannot be
satisfactorily addressed.

Page 9

48 NPF4 Policy 30 Tourism intends to encourage, promote and facilitate sustainable
tourism development which benefits local people, is consistent with national net
zero and nature commitments, and inspires people to visit Scotland. Policy 30 a)
states development proposals for new or extended tourist facilities or
accommodation, including caravan and camping sites, in locations identified in
the LDP, will be supported. The site is not identified in the LDP for a tourism
related use. As such Policy 30 b) applies and this states proposals for tourism
related development will take into account: 
i.  The contribution made to the local economy;
ii.  Compatibility with the surrounding area in terms of the nature and scale of
the activity and impacts of increased visitors;
iii.  Impacts on communities, for example by hindering the provision of homes
and services for local people;
iv.  Opportunities for sustainable travel and appropriate management of parking
and traffic generation and scope for sustaining public transport services
particularly in rural areas;
v.  Accessibility for disabled people;
vi.  Measures taken to minimise carbon emissions;
vii.  Opportunities to provide access to the natural environment. 
49 A supporting statement has been submitted to address national and local
planning policies. This highlights that the business, an independently owned &
managed craft brewery, has outgrown its current site in Blair Atholl and is
seeking to relocate to a site in Pitlochry where its operations first began in 2016.
It notes that the relocation of the brewery will move 3.5 full time existing jobs to
Pitlochry, it will immediately create at least 2.5 full-time jobs in Pitlochry, with a
further 2 full-time jobs expected to be required in the years to come. 
50 The business requires more space than its current location can provide and there
is a lack of suitable existing industrial space for growth in Pitlochry with no sites
identified in the town centre that are large enough to accommodate the business.
The statement reports that splitting the production and taproom uses between
two sites has been considered but is economically unviable and inefficient. Single
site operation is a necessity for the business. The implications of multi-site
operation for licensing would mean duplicating the operational effort, and the cost
and complexity of the business. The statement highlights the aspiration for a
combined production and taproom experience is very similar to that of a distillery
& visitor experience. 
51 In respect of NPF4 Policy 26, the statement reports there are no suitable
alternative sites allocated in Pitlochry with very limited areas of employment
safeguarding and no specific development sites identified for further employment,
business and industry development. The nature of activity proposed is not
incongruous with the surrounding context of the area, which features a mixture of
town centre businesses, industry, tourism, residential, healthcare and leisure.
The proposals are conscious of the neighbouring residential amenity and the
healthcare facilities to the west. A noise impact assessment has been carried out

Page 10

which demonstrates there is negligible impact to the surrounding area. The
accompanying noise impact assessment provides mitigation recommendations,
which can ultimately be conditioned. It also highlights a licensed business must
comply with the Licensing (Scotland) Act 2005 and preventing public nuisance
and crime and disorder, amongst other elements are core components of the
business operating plan and associated operational policies that will be governed
by Perth and Kinross Licensing Board on an ongoing basis. 
52 The site was selected predominantly because of its proximity to the town centre
boundary. In line with LDP2 Policy 27b) ii) the site is considered a suitable “edge
of centre option” being close to the boundary of the town centre in LDP2. The
scale of the development cannot be reasonably altered or reduced to
accommodate it within the town centre and the supporting statement asserts
there would be no significant adverse impact on the vitality and viability of the
existing centre. The proposed site achieves a greater balance of all desired
outcomes over a town centre location and is the best option available for the
space required. The statement reports the location is extremely accessible, being
no more than a 4-minute walk from the train station and the town centre junction
with Ferry Road. 
53 The supporting statement highlights that existing signage already encourages
tourism foot traffic from the town centre along Ferry Road toward the Pitlochry
Recreation Ground, Dam & Visitor Centre, Fish Ladder and Festival Theatre.
There are other business & industry uses along Ferry Road including a
restaurant and game butcher, meaning footfall from the town centre towards
Ferry Road and across the River Tummel, is already established. The proposal
will create a further attractive destination for tourism and create additional footfall
between the town centre and brewery bringing wider economic benefits. 
54 In respect of NPF4 Policy 30 Tourism, the supporting statement addresses the
relevant criteria and reports the proposal would create a dynamic visitor
experience and tourist destination in Pitlochry and increase local economic
benefits through tourism, in line with Policy 30 b) i) and in line with Policy 30 b) ii)
the proposed land use and scale of development is compatible with the
surrounding area. In line with Policy 30 b) iv) and v) the site is easily accessible
via sustainable travel and the scheme is designed to be accessible for disabled
people. It outlines the business is very carbon conscious, and a variety of
renewable technologies will be employed to minimise carbon emissions in line
with Policy 30 b) vi). The proposed site is adjacent to a core path and provides
visitors with the opportunity to access the surrounding natural environment in line
with Policy 30 b) vii). 
55 The supporting statement reports the brewery is not just a bar or shop it is a
destination which will provide visitors with a full experience, seeing the end-to-
end production process, completed with an opportunity to sample the end
produce and experience the taproom which will showcase the best of the
brewery. The proposals will successfully achieve the Policy 30 intent of
promoting and facilitating sustainable tourism which benefits local people and is

Page 11

consistent with NPF4 net zero and nature commitments, providing further
inspiration for people to visit Scotland. 
56 In response, the supporting statement demonstrates why a combined facility is
required and that splitting the production and taproom uses between two sites is
economically unviable and inefficient and that the combined facility would
operate very similar to a distillery/visitor experience. 
57 It demonstrates a site selection process has been undertaken and there are no
suitable industrial sites available large enough to accommodate the business
growth required. The statement notes that the Ferry Road site achieves the
greater balance of the desired outcomes of the business, over a town centre
location where the brewery/production use would be closer to a higher density of
noise/odour sensitive receptors. 
58 The supporting statement addresses the compatibility of the proposal in relation
to the surrounding area, including ensuring amenity is not adversely impacted. In
respect of amenity, also of relevance is LDP2 Policy 18: Pubs and Clubs in
Residential Areas which states there will be a presumption against the siting of
these in the midst of other (particularly residential) uses where problems of noise
or disturbance cannot be satisfactorily addressed. A Noise Impact Assessment
(Document 41) reports it is not likely that adverse impacts will be experienced at
any receptor due to the development. The Odour Assessment (Document 33)
reports odour from the proposed development is predicted to be of negligible
significance subject to the satisfactory implementation of mitigation measures.
The supporting documents have assessed the potential problems of noise or
disturbance, and this has been satisfactorily addressed in line with national and
local planning policy. This is reviewed further later in the report under ‘Residential
Amenity’. 
59 The supporting statement does not provide a specific Town Centre Assessment,
as required by NPF4, rather further information is provided justifying the selection
of the site based on the operational requirements of the development alongside
the benefits of the edge of town centre location in achieving the best balance to
meet the objectives of the various elements of the business. 
60 Overall, it is considered that sufficient justification has been provided for the
mixed-use development on the site at Ferry Road. There will be no significant
adverse effect on the vitality and viability of the town centre. The site is edge of
centre, easily accessible from the town centre and well connected to other uses
in the surrounding area offering an opportunity for greater interaction and linked
trips to enhance the quality of experience in the town. To protect surrounding
amenity conditions are recommended as outlined later in the report. As a new
tourism facility, the supporting statement demonstrates the proposal meets the
criteria set out in Policy 30 b). 
61 The proposal satisfies NPF4 Policy 26 Business and Industry, NPF4 Policy 27
City, Town, Local and Commercial Centres, NPF4 Policy 30 Tourism and LDP2

Page 12

Policy 13: Retail and Commercial Leisure Proposals and LDP2 Policy 18: Pubs
and Clubs in Residential Areas. 
Design and Layout 
62 NPF4 Policy 14 Design, Quality and Place states development which is poorly
designed, detrimental to the amenity of the surrounding area or inconsistent with
the six qualities of successful places will not be supported. LDP2 Policy 1:
Placemaking aligns with this national policy and states development must
contribute positively to the quality of the surrounding built and natural
environment.  All development should be planned and designed with reference
to climate change, mitigation and adaptation. The design, density and siting of
development should respect the character and amenity of the place, and should
create and improve links within and, where practical, beyond the site.  Proposals
should also incorporate new landscape and planting works appropriate to the
local context and the scale and nature of the development. Policy 1B sets out the
placemaking criteria which should be met. 
63 A single level bespoke build is proposed with two pitched roof buildings
connected by a low flat roof. The brew hall will have feature glazing on the
northern aspect elevation and an internal glazed partition to showcase the
technical production equipment utilised by the brewery. The building is to be
finished in dark grey corrugated metal sheeting, grey aluminium and timber
windows and doors and grey aluminium rainwater goods. The roof is to be
corrugated steel sheeting in the same dark grey colour as the cladding with
translucent roof sheeting skylights into the brew hall, taproom and goods
incoming area. A southern aspect roof mounted solar panel array is proposed.
The north street facing elevations and one east aspect pitched roof will feature
company logos and signage. The front/north elevation was amended to
accommodate a recessed roller shutter door and delivery bay (Drawing 52). 
64 The supporting planning statement highlights the design strategy was to respond
sensitively to a site which has a flat central area and is sheltered by the
topography and tree screening (Document 42). The mass of the building is
broken up to reduce its visual impact with materials selected to help the building
recede into the landscape. The exterior landscaping will feature concrete
retaining walls to the south to account for cutting into the existing sloped
topography which has been minimised. 
65 The proposals make the best use of the site and its orientation to create a
building that sits sheltered by its surroundings. The plan is predominantly linear
and follows the line of the existing grass clearing of the site, with the taproom
extending out toward the east from the main brewery building. This L-shape
helps create a sheltered public courtyard and outdoor seating area. All
accommodation is at ground floor with level access from external circulation
routes. Car parking is kept to a minimum, to encourage the use of public
transport, cycling and walking to the site. A disabled parking bay is provided.
There is a large bike stance area to allow visitors to cycle to the premises.

Page 13

66 Overall, the design and layout of the proposed development has been sensitively
considered to respect the site topography and surrounding natural and built
environment. The bespoke design incorporates sustainable design and
construction and new planting is proposed to enhance the surrounding woodland
and the setting of the new building. The proposal satisfies NPF4 Policy 2:
Climate Mitigation and Adaptation and NPF4 Policy 14 Design, Quality and Place
and LDP2 Policy 1: Placemaking and LDP 2 Policy 32: Embedding Low & Zero
Carbon Generating Technologies in New Development. 
Residential Amenity 
67 NPF4 Policy 14 Design, Quality and Place and LDP2 Policy 1: Placemaking
requires development to respect the amenity of the place. NPF4 Policy 23 Health
and Safety aims to protect people and places from environmental harm and this
aligns with LDP2 Policy 55: Nuisance from Artificial Light and Light Pollution,
LDP2 Policy 56: Noise Pollution and LDP2 Policy 57: Air Quality. 
68 Noise – There are a number of potential noise sources associated with the
proposed development. These include patron noise, including the outdoor
seating area, vehicle noise and plant equipment noise. Noise sensitive receptors
include residential properties to the north and east of the site, Balhousie Care
Home and Pitlochry Community Hospital to the west.   
69 The applicant submitted a Noise Impact Assessment (NIA) in November 2023
(Document 35). Following discussion between Environmental Health (EH) and
the noise consultant, an updated NIA was submitted in December 2023
(Document 41). The scope and approach of the assessment was completed
considering both local planning policy and agreed methodology and criteria with
PKC. 
70 Background noise surveys were undertaken and are outlined in the NIA. In
respect of plant equipment these are all well within the acceptable limits,
provided that there is no change to the number and type of plant equipment
installed. Internal activities were assessed, and one issue raised was the use of a
compressor in the goods incoming area whilst the shutter door is open during
deliveries, therefore, it is advised that the air compressor should not be in use
whilst the shutter door is open with deliveries expected to be 1-2 per day and all
carried out during normal working hours. Overall, operational noise levels are
barely perceptible and within acceptable limits. In respect of patron noise this has
been assessed for worse-case scenario and mitigation is required. In order to
meet acceptable levels, terraced seating on the northeast side of the
development has been removed from the plans. It will also be necessary to limit
the number of patrons in the outdoor area to 35. The skylights must also be
altered from polycarbonate sheeting to perspex of at least 6mm thickness and
the sliding doors leading to the outdoor area must remain closed at all times. By
putting in these measures, predicted levels are reduced below the background
level. The NIA reports it is not likely that adverse impacts will be experienced at
any receptor due to the development.

Page 14

71 Environmental Health have reviewed the NIA and recommend a number of
conditions to ensure surrounding amenity is protected (Conditions 8, 9, 10, 11,
15, 16, 17 and 18). 
72 Air Quality and Odour – The plans include the provision of a wood burning stove
and the installation of associated flue. The technical specifications supplied with
the application relates to a domestic sized stove and therefore EH have no
adverse comments to make with regards to air quality in relation to the stove.
Given the height of the flue and distance to residential properties EH do not
foresee smoke and/or odour affecting residential amenity of neighbouring
properties. 
73 The applicant has submitted an odour assessment with the application
(Document 33). The assessment states that the potential odour sources will be
the release of vapours through the ventilation duct above the brewing hall and
when the effluent tanks are filled and emptied. As no effluent treatment is
proposed on site and all spent grains and other industrial effluent will he held in
sealed containers fitted with carbon filters, odour from effluent storage has not
been considered further. It is therefore stated that odour has been predicted for a
single scenario; emissions from the brewing hall vent. 
74 EH note in their consultation response that when assessing the impact of odour,
guidance has been taken from The Institute of Air Quality Management (IAQM)
Guidance on the assessment of odour for planning and SEPA issued guidance
on odour assessment for processes that are subject to the Pollution Prevention
and Control regulations (PPC). Whilst this does not apply to this development,
the Guidance provides a useful framework for assessing the potential adverse
impacts on amenity. SEPA’s guidance notes odour from brewing falls into the
category of less offensive. The assessment reports odour from the proposed
development is predicted to be of negligible significance subject to the
satisfactory implementation of mitigation measures. 
75 EH recommend a number of conditions to ensure odour from the proposed
development does not impact surrounding amenity (Conditions 13, 14 and 19). 
76 Lighting – EH recommend a condition to ensure external lighting does not
adversely affect neighbouring land (Condition 12). 
77 The supporting documents have assessed the potential issues of noise and
odour and these matters have been satisfactorily addressed in line with national
and local planning policy. Planning conditions are recommended to safeguard
the amenity of the surrounding area. The proposal satisfies NPF4 Policy 14
Design, Quality and Place and NPF4 Policy 23 Health and Safety and LDP2
Policy 1: Placemaking, LDP2 Policy 55: Nuisance from Artificial Light and Light
Pollution, LDP2 Policy 56: Noise Pollution and LDP2 Policy 57: Air Quality.

Page 15

Roads and Access  
78 Transport Planning note in their response that the site will have three regular
parking bays, with one additional accessible parking bay. One of the bays will be
provided with an electric charge point and cycle parking is proposed on site.   
79 The applicant has provided a Transport Statement for the site and has provided a
subsequent update that now includes industry standard and verifiable trip rate
and mode share data from TRICS that provides information on the level of
person trips associated with the type of development proposed.  Subsequent
analysis of this data by Transportation and Development has indicated that the
proposed development will attract a total of approx. 39 vehicles per day which
can be accommodate in nearby offsitre public parking.   
80 In response to matters raised in the representation from Atholl Medical Centre,
Transport Planning requested that a loading facility for vehicles up to 12 metres
is provided on site to accommodate normal operations. Amended drawings have
been submitted to show a 12-metre service bay – proposed elevations (Drawing
52), proposed site plan (Drawing 71) and swept path analysis (Drawings 67-69).
Transport Planning note this service bay will end up occupying the full width of
the service strip of the public road network which as part of the development will
be constructed as a footway. This is far from ideal however the scaled swept
path analysis shows a 12-metre vehicle can suitably enter the service bay
proposed and not obstruct the public road. 
81 Further, in respect of the matters raised in the representation, Transport Planning
recommend that a Construction Traffic Management Plan should be submitted
for the written approval of the Council as Planning Authority prior to the
commencement of any works on the site. This should have a specific focus on
how the applicant proposes to construct the building without any impediment on
the public road (Condition 22). Also, a Service Management Plan detailing the
plans for servicing and delivery operations, and timing, including arrangements
for the management of vehicular and pedestrian traffic during servicing and
delivery, paying particular attention to the need for all deliveries to be undertaken
off the public road is recommended, and a condition is proposed (Condition 23). 
82 The applicant will be constructing a new vehicle access across the frontage of
the site with a footway being provided with the finalised design and location of
the dropped kerbs on the north and south of Ferry Road to be provided through a
condition (Condition 24). 
83 A secure covered cycle parking area is proposed to the east of the building,
which is welcomed to encourage active and sustainable travel.  A condition is
recommended to ensure that prior to the commencement of development a
detailed design of the facility is submitted for a minimum of 10 bicycles for the
written approval of the Council as Planning Authority and is implemented prior to
the development being brought into use (Condition 25).

Page 16

84 The application site is located close to the town centre and is easily accessible
by all modes of transport including walking, cycling and public transport to reduce
the need to travel unsustainably. Accessible parking is to be provided including
an electric vehicle charging bay and cycle parking is proposed. Although parking
is low for the site, it is well served by sustainable transport modes and there are
public car parks a short distance from the application site. Conditions are
recommended to mitigate any impact on the public road and to provide a safe
crossing for pedestrians. The proposal satisfies NPF4 Policy 13 Sustainable
Transport and LDP2 Policy 60B subject to conditions. 
Drainage and Flooding 
85 A Drainage & Flood Statement reports the application site is not at risk from
fluvial flooding and a small area of the site is shown to have a medium-low
likelihood of surface water flooding. It reports this isolated patch appears to be
the result of run-off from a steep slope to the east. A perimeter drain is proposed
during the construction phase and the drainage design incorporates measures to
ensure surface water run-off will be low. 
86 The drainage layout plan (Document 70) and Drainage & Flood Statement
(Document 66) were revised during the application process in consultation with
the Council’s Flooding Team. Given site constraints and space restrictions, two
sets of cellular storage crates are proposed as the main form of attenuation for all
surface water run-off. Filter trenches are proposed to capture run-off from the
adjacent slopes. Due to concerns raised by Transport Planning, the applicant has
relocated the attenuation tank at the east of the site, as this was to be located
within the embankment supporting the road to residential properties, with the risk
of causing damage to the embankment supporting this road. The surface water
will be treated within the site before discharging to the existing surface water
sewer in Ferry Road. A maintenance schedule is included. In respect of foul
water this will drain to the existing public combined sewer located in Ferry Road. 
87 SEPA were consulted and have no objection to the proposal. Following review of
the further information submitted, the Council’s Flooding Team are satisfied with
the drainage design and that there is no risk of flooding. 
88 The proposal satisfies NPF4 Policy 22 Flood Risk and Water Management and
LDP2 Policy 52: New Development and Flooding, LDP2 Policy 53B: Foul
Drainage and LDP2 Policy 53C: Surface Water Drainage. 
89 In respect of NPF4 Policy 22 d) and Policy 53E: Water Supply, as noted in the
external consultation responses, the site is in a Drinking Water Protected Area
and Scottish Water requested further information during the application process
on the abstraction volume. The impact on Water Resources of the operation of
the brewery and accompanying amenities has been reviewed against the
confirmed abstraction volume of 200,000 litres per annum (0.2Ml/annum).
Assuming this water usage remains consistent with these values, this proposal
can be considered as low-medium risk regarding Water Resources. Scottish

Page 17

Water would have no objections with the proposed volume of water and request
that they should be notified if these volumes change. Scottish Water also request
that prior to work commencing on site they are notified as they may wish to take
water samples as a precaution to protect water quality. It is recommended that
an informative be attached to any planning permission granted (informative 5). 
Waste Collection 
90 The refuse storage and its location are acceptable as confirmed by the Council’s
Waste Service. 
Natural Heritage and Biodiversity 
Open Space 
91 The application site is designated as Open Space in LDP2 and comprises land
that has been previously cleared from trees for a site compound during
construction of the neighbouring hospital/care home. The supporting statement
considers that the development of this area of land will not pose any significant
detrimental impact to the surrounding green infrastructure provision and the
overall integrity of the network will be maintained, as well as having no impact on
the existing footpath impact including a core path. 
92 While the loss of a near 1800 square metre area, is notable it would be deemed
minor in relation to the requirements of LDP2 Policy 14A: Open Space Retention
and Provision – Existing Areas criteria (b), where it must only involve a minor part
of the site which would not affect its continued use as a recreational or amenity
resource.  In this instance this land has effectively been out of any formal
recreational use as it was mainly cleared of trees and used as a yard in the
construction of Pitlochry Community Hospital and has not fully regenerated.  The
vast majority of the wider wooded resource would be retained.  More generally
Pitlochry does benefit from generous open space provision in its own right.  On
balance therefore, the loss of this area of previously developed land within the
open space designation, can be accepted in light of the wider benefits associated
with this proposal, and the opportunity to compensate for tree loss and
biodiversity enhancement as shall be discussed below.  The proposal is
therefore considered to comply with Policy 14: Open space Retention and
Provision. 
Biodiversity 
93 A Preliminary Ecological Appraisal and Ecological Impact Assessment by Tay
Ecology (Document 28) was reviewed by the Biodiversity Officer and confirmed
as being in line with best practice. The report identified that no protected species
were present during the survey and no further surveys were therefore required.
The report recommends biodiversity enhancement measures and in line with this
bird and bat boxes are proposed on the west elevation of the brewery building
(Drawing 52).

Page 18

94 A condition is recommended to ensure the recommendations set out in the Tay
Ecology Report are carried out to protect environmental quality and biodiversity
(Condition 3). 
95 The proposal satisfies NPF4 Policy 3 Biodiversity paragraphs a), c) and d) and
LDP2 Policy 41: Biodiversity. 
Trees  
96 A revised Tree Survey Report (Document 58) was submitted together with a tree
constraints plan, tree protection plan and details of compensatory planting
(Documents 59-64). 
97 The report assessed 31 trees and 1 x tree group and identified that the site
consists of sycamore and oak, with 45.5% being category C. 
98 There are six dead Category U oak trees, T173, 174, 175, 183, 187 and 196
which are proposed for removal as colonised with honey fungus. Honey fungus,
Armillaria mellea, a root/soil borne fungal disease has colonised some of the oak
at the site, which causes tree demise and failure. 
99 It is proposed to fell three trees and one tree group, these are two Category B
and one Category C tree and one tree group of nine trees. 
100 2 Category A trees, 7 Category B trees and 13 Category C trees are proposed
for retention. 
101 Compensatory planting of 36 trees is proposed using both native species and
fruit trees recognised as resistant/tolerant of honey fungus (Drawing 62). The
supporting information states that 12 trees are proposed to be planted at
Pitlochry High School Nursery (Document 64). 
102 Overall, the tree removal is accepted to enable the development and the
compensatory planting is in line with planning guidance. Conditions are
recommended by the Tree Officer to ensure a pre-site meeting takes place to
examine tree works and protection measures; a method statement is submitted
for written approval of the Council and to include details of how the removal of
diseased trees and soil will be handled and for a post-development tree report to
be submitted (Conditions 5, 6 and 7). 
103 The proposal satisfies NPF4 Policy 6 Forestry, Woodland and Trees and LDP2
Policy 40B: Trees, Woodland and Development. 
104 The proposal will not lead to the fragmentation of blue and green infrastructure
and incorporates new landscape and planting works appropriate to the local
context and the scale and nature of the development. This is in line with NPF4
Policy 14 Design, Quality and Place, NPF4 Policy 20 Blue and Green
Infrastructure and LDP2 Policy 1: Placemaking.

Page 19

Core Path  
105 An adopted core path is located to the east of the application site (PLRY/109)
and a condition is recommended to ensure this remains accessible to the public
during the construction and operational phases of the development (Condition
20). 
106 This is in line with NPF4 Policy 20 Blue and Green Infrastructure and LDP2
Policy 15: Public Access. 
Contamination 
107 An inspection of the proposed development site by the Council’s Contaminated
Land Officer did not raise any real concerns, although mapping does indicate that
there is land formerly occupied by various potentially contaminative sources
nearby. The applicant is advised that there may therefore be potential for
contamination within the site. Should any contamination be found during the
approved works, works should cease and the Land Quality team contacted. It is
recommended that an informative to this effect is attached to any consent
(Informative 7). 
108 The proposal satisfies NPF4 Policy 9 c) Brownfield, Vacant and Derelict Land
and Empty Buildings and LDP2 Policy 58A: Contaminated Land. 
Material Considerations 
109 30 representations were received including 6 objections, 2 neutral
representations and 22 letters of support. 
110 The main issues raised within the objections have been addressed in the report.
The objections also raised the potential for anti-social behaviour from the
consumption of alcohol at the brewery and the perceived impact of this on the
well-being of nearby residents. 
111 This matter is addressed in the applicant’s further supporting information
(Document 40). The applicant highlights the further supporting documents
submitted to demonstrate the proposal is designed to be compatible with the
surrounding uses and a good neighbour. Further, as a licensed business, it
highlights it has a duty under the Licensing (Scotland) Act 2005 to prevent crime
and disorder, prevent public nuisance and secure public safety which is governed
by Perth & Kinross Licensing Board. 
112 A multi-agency partnership approach is in place to tackle anti-social behaviour in
the community. The applicant has assessed the potential problems of noise or
disturbance from the proposed development, and this has been satisfactorily
addressed in line with national and local planning policy.

Page 20

113 The 22 letters of support highlighted the development would bring wide ranging
economic benefits to the town and enhance the local area. 
114 NPF4 recognises the challenges faces by the hospitality and tourism sectors and
aims to improve business development and entrepreneurship. As noted in the
supporting documents this is a successful local business seeking to grow and
invest in Pitlochry with multi-faceted economic and social benefits for the town. 
115 The issues raised in the letters of objection have been fully considered and
addressed in the report and are not of sufficient weight to justify the refusal of the
planning application. 
Developer Contributions 
116 None required in line with the Council’s supplementary guidance. 
Economic Impact 
117 The proposed development will bring a range of economic benefits to the town,
including an enhanced visitor attraction and footfall, together with jobs during
construction and afterwards. 
VARIATION OF APPLICATION UNDER SECTION 32A 
118 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the north elevation of the
building and the vehicular access. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
119 None required. 
DIRECTION BY SCOTTISH MINISTERS 
120 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
121 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the

Page 21

Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
RECOMMENDATION   
Approve the application subject to conditions. 
CONDITIONS AND REASONS FOR RECOMMENDATION 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document(s) Ecological
Appraisal by Tay Ecology 3 October 2023 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the occupation of the building hereby approved, evidence that the bird
and bat boxes have been installed shall be submitted for the written approval of
the Council as Planning Authority, reference drawing 52.  Thereafter, the bird
and bat boxes shall be maintained in a reasonable condition for the life of the
development to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
5. A site meeting will be held with the Enforcement Officer (Trees) of the Council to
examine completed tree works, honey fungus mitigation, and to inspect tree
protection measures in place that accord with standard (fencing/non dig
construction, etc), drainage, and site storage facilities.  This meeting shall be
with the project manager, arboriculturalist, and ground works contractor. 
Contact should be made with the Planning Authority to arrange this meeting prior
to the commencement of the development.

Page 22

Reason - In the interests of protecting environmental quality and of biodiversity. 
6. Prior to the commencement of development, a site-specific method statement
outlining measures to mitigate against the spread of honey fungus shall be
submitted to the Council as Planning Authority for review and written approval. 
The statement shall include details on the removal of affected trees (6 x dead
oak), disposal of soil areas contaminated with honey fungus and provide full
details of disposal of all excess materials.  Clarity shall be provided on where the
soil materials excavated will be deposited when levelling site, formation of
building footprint, filtration trenches/drainage, and access/parking.  Clarity shall
be provided on how the drainage works will be undertaken, and whether larger
encroaching roots would be permitted within the drainage material, and how the
cutting into the banking will be undertaken, the foundation type for structures,
and subbase for paths/surfacing, where they impact and encroach the RPA of
adjacent trees.  Thereafter the measures shall be carried out in complete
accordance with the details as so agreed. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
7. Prior to the building being brought into use a post development tree report/audit
confirming details of the trees retained on site, their condition, and a statement
as to the effectiveness of protection measures followed shall be submitted for
review and written approval of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
8. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - In order to safeguard the residential amenity of the area. 
9. The hours of operation of the outdoor seating area shall be restricted to between
1100 to 2200 hours Monday to Sunday. 
Reason - In order to safeguard the residential amenity of the area. 
10. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
11. No music, amplified or otherwise, shall be permitted in the outdoor seating area
at any time.

Page 23

Reason - In order to safeguard the neighbouring residential amenity in the area. 
12. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the residential amenity of the area. 
13. No odours from the distillery shall be discernible on the boundary with the
nearest residential property. 
Reason - In order to safeguard the residential amenity of the area. 
14. All mitigation measures as detailed within Section 6 of the Odour Assessment
undertaken by The Airshed, reference AS 1020 Pitlochry Brewery Airshed, dated
18 October 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
15. All mitigation measures as detailed within Section 7 of the Noise Impact
Assessment undertaken by CSP Acoustics, reference 1866 R001 V3 AH, dated
12 December 2023 shall be fully implemented. 
Reason - In order to safeguard the residential amenity of the area. 
16. Noise from operations on site shall not exceed L A90,1 hour background noise
level plus 5dB (A), including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when measured at any residential
property in accordance with BS4142:2014+A1:2019. 
Reason - In order to safeguard the residential amenity of the area. 
17. A Noise Management Plan shall be submitted for the written approval of the
Planning Authority.  The plan shall include all sources of noise associated with
the premise, including patron noise, deliveries, compressor etc and the measures
that will be put in place to minimise and/or control noise.  The plan shall be
reviewed on a regular basis or, following receipt of a justified complaint or at the
request of the Planning Authority.  Once the Noise Management Plan has been
approved, it shall be fully implemented for the lifetime of the development. 
Reason - In order to safeguard the residential amenity of the area. 
18. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out a noise assessment to verify compliance with conditions 10,
15, 16 and 17 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise

Page 24

assessment shows that the noise levels do not comply with conditions 10, 15, 16
and 17 a scheme of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation of the scheme and
shall be submitted to the Planning Authority for written approval within 28 days of
the assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
19. In the event of a justified odour complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out an odour assessment to verify compliance with conditions
13 and 14 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the odour
assessment shows that the odour levels do not comply with conditions 13 and 14
a scheme of odour mitigation shall be included with the odour assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority for written approval within 28 days of the
assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In order to safeguard the residential amenity of the area. 
20. The asserted right of way/core path on Ferry Road must not be obstructed during
building works or on completion of the development.  Any damage done to the
route and/or the associated signage during building works must be made good
before the development is completed or brought into use, whichever is the
earlier. 
Reason - To ensure continued public access to the public paths and in the
interests of public safety within the site. 
21. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
established within five years being replaced in the following planting season with
others of a size and species as previously approved.   
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
22. Prior to the commencement of the development hereby approved, the applicant
shall submit for the written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a Construction Traffic
Management Scheme (TMS).  The TMS shall take cognisance of the fact that no

Page 25

loading and unloading of vehicles shall be undertaken on the public road and
shall include the following: 
a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used; 
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
c) a code of conduct for HGV drivers for loading and unloading materials at the
site; 
d) arrangements for liaison with the Roads Authority regarding winter
maintenance; 
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown; 
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road; 
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development; 
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for all users
including pedestrians, cyclists and equestrians; 
i) details of information signs to inform other road users of construction traffic; 
j) arrangements to ensure that access for emergency service vehicles are not
impeded; 
k) traffic arrangements in the immediate vicinity of temporary construction
compounds; 
l) monitoring, reporting and implementation arrangements; 
m) arrangements for dealing with non-compliance; and 
n) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management.

Page 26

23. Prior to the commencement of the development hereby approved, the developer
shall provide, for approval by the Council as Roads Authority, a Service
Management Plan detailing the plans for servicing and delivery operations, and
timing, including arrangements for the management of vehicular and pedestrian
traffic during servicing and delivery, paying particular attention to the need for all
deliveries to be undertaken off the public road.  Thereafter, the approved plan
shall be adhered to for the life of the development. 
Reason - In the interests of road safety. 
24. Prior to commencement of any development on site, a detailed design showing
the frontage of the development site onto Ferry Road shall be provided with the
following schemes being provided: 
a)  position of uncontrolled crossing location(s) along the frontage of the site to
link the development site to the northern side of Ferry Road with dropped
kerbs linking both sides; 
b)  the footway on the southern side of Ferry Road, of a minimum width of 2
metres along the full frontage of the site; 
c)  the location of road drainage on the Ferry Road along the frontage of the
site; 
d)  the finalised location of the streetlighting cable; 
e)  the construction details of the parking bays and the service area; and 
f)  full details of the vehicle access, to be constructed in the following materials: 
40mm Wearing Course - Hot Rolled Asphalt 
50mm Base Couse - Dense Bitumen Macadam 
130mm Roadbase - Dense Bitumen Macadam 
230mm Subbase - Type 1  
The submission will confirm the location, specification and detailed design for the
pedestrian crossing, location of the streetlighting infrastructure, footway on
southern side of Ferry Road, road drainage and vehicle access along the
frontage of the development site.  This shall be submitted for the written
approval of the Council as Planning Authority.  Thereafter the approved scheme
shall be implemented in full, prior to occupation of the brewery. 
Reason - In the interests of road and pedestrian safety and connectivity to the
northern side of Ferry Road.

Page 27

25. Prior to commencement of any development on site, a detailed design for the
proposed cycle parking facility for a minimum of 10 cycles shall be submitted to
and approved in writing by the Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction of the Council as
Planning Authority prior to the development being brought into use. 
Reason - To encourage active and sustainable modes of transport in line with
national and local planning policy. 
26. Prior to the commencement of development hereby approved, a statement shall
be submitted for approval in writing by the Council as Planning Authority to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies.  The statement as agreed shall be
fully implemented to the satisfaction of the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
INFORMATIVES 
1. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
Further information on radon gas and the associated reports that can be obtained
is available at www.ukradon.org and at http://shop.bgs.ac.uk/georeports/. 
2. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.

Page 28

4. Please note the consultation response on file from Network Rail - A railway
underbridge located in close proximity to the site (UB 290/063 crossing Ferry
Road) has a headroom of 4.2m.  The applicant should ensure that all vehicles
required for construction and operation are able to clear this height. 
5. Please note the consultation response from Scottish Water on file - this includes
a request that prior to work commencing on site they are notified at
protectdwsources@scottishwater.co.uk as they may wish to take water samples
as a precaution to protect water quality. 
6. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the front elevation and
vehicular access. 
7. An inspection of the proposed development site did not raise any real concerns,
although historical mapping indicates there was previously a nearby use which
may have resulted in contamination in the vicinity of the site.  The applicant is
advised that, given historical uses of the wider area, there may be potential for
contamination within the site.  Should any contamination be found during the
approved works, works should cease and the Land Quality team should be
contacted on 01738 475000 or es@pkc.gov.uk for further advice. 
8. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that
smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
9. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
10. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
11. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain from the Council, to place,
maintain or adjust apparatus in, or under a Road or remove apparatus from a

Page 29

road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-permits 
12. Road drainage may be in the vicinity of the new access and require remedial
works at the applicants expense.  Contact Perth & Kinross Council Road
Maintenance Department for further details. 
13. Street lighting infrastructure present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of infrastructure and its
relocation to facilitate the vehicle access.  Relocation to be undertaken at
applicant's expense.  Contact Mark Gorrie at Perth & Kinross Council Street
Lighting Department for further details. 
14. The applicant can seek guidance on the detailed design and positioning of the
cycle storage from Transport Scotland's Cycling by Design 2021 or similar design
guide. 
Background Papers:  30 letters of representation
Contact Officer:  Claire Myles
Date:  24 May 2024 
DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT AND PLANNING