Page 1

PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 8 May 2024 at 9.30am. 
Present: Councillors I Massie, G Stewart, Bailie C Ahern (substituting for Councillor
K Allan), Councillors H Anderson (substituting for Councillor C Reid), B Brawn,
D Cuthbert, K Harvey, D Illingworth, I James, B Leishman, Bailie C McLaren,
Councillor I MacPherson (substituting for Councillor R Watters) and Bailie
M Williamson. 
In Attendance: G Bissett, L MacLean, C Morilly, S Panton, L Reid, K Smith and
P Williamson (all Economy, Place and Learning); A Brown, C Elliott, J Guild and
M Pasternak (all Strategy, People and Resources). 
Apologies: Councillors K Allan, C Reid, R Watters. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.   
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors Code
of Conduct. 
3. MINUTES 
(i) The Minute of Meeting of Planning and Placemaking Committee of 13 March
2024 was submitted and approved as a correct record. 
(ii) The Minute of Meeting of Planning and Placemaking Committee of 10 April
2024 was submitted and approved as a correct record. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
23/00504/FLM 5(1)(i)
23/00193/FLL 5(2)(i) 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Application 
(i) 23/00504/FLM – Mixed use development comprising
erection of 3 café/restaurant units (Class 3) with drive thru

Page 2

facilities, business units (Class 4), electric vehicle charging
hub and formation of vehicular access, parking areas,
landscaping and associated works, land 90 metres south of
5 Broxden Avenue (E2), Perth (Report No. 24/145) 
Mr Murray Rankin, agent on behalf of the applicant, addressed
the Committee and answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The proposed development must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed on
the planning consent.
Reason - To ensure that the development is carried out in
accordance with the plans approved.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. The construction of all of the business units hereby
approved (as shown on plans 36 and 49) shall be
completed such that they are ready for use/occupation
prior to the occupation or bringing into use, whatever is
the earlier, of the 3 class 3 cafe/ restaurants units as
shown on plans 05, 10, 11, 12, 13 and 14. 
Reason - To secure the provision of the business units on
this allocated employment site. 
Access and Roads
4. Prior to the development hereby approved being
completed or brought into use, the vehicular access
shown on the approved drawings shall be implemented
and constructed in accordance with Perth & Kinross
Council's Road Development Guide, using the
Construction Type B from the Construction Details for
Access Types, C, D and E.  The Type B Road
construction detail shall continue into the entrance for a
distance of at least 5 metres from the boundary of the
public road surface.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
5. Prior to the occupation of any unit, the applicant shall
submit for the written approval by the Council as Planning
Authority, a Service Management Plan detailing the plans
for servicing and delivery operations, and timing,

Page 3

including arrangements for the management of vehicular
and pedestrian traffic during servicing and delivery. 
Thereafter, the agreed scheme shall be implemented for
the life of the development.
Reason - In the interests of pedestrian and traffic safety.
6. Prior to the first occupation of any unit, a detailed design
for a minimum of:
a. 4 secure cycle parking bays for the Western Class
3 Plot 
b. 6 secure cycle parking bays for the Central Class 3
Plot
c. 4 secure cycle parking bays for the Eastern Class 3
Plot
d. 30 secure and covered cycle parking bays for the
business units
shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall
be implemented in accordance with the approved details
prior to the relevant unit being brought into use.
Reason - To encourage active travel and meet advice
within Scottish Planning Policy on transport.
7. Prior to commencement of works, the street lighting
design for adoptable areas must be submitted for the
further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council’s
Street Lighting Partnership.  The scheme shall include
details of light spill, brightness of the lighting and the
proposed hours of operation.  The agreed lighting
scheme shall be implemented prior to the occupation of
the first unit and maintained in full accordance with the
agreed scheme.
Reason - In the interests of pedestrian and traffic safety.
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;

Page 4

(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance;
(p) details of HGV movements to and from the site;
and
(q) details of sheeting for construction vehicles.
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interests of pedestrian and traffic safety.
9. Prior to the commencement of development, the
applicant shall submit to, for the prior written approval of
the Council as Planning Authority, a scheme supported
by survey work to demonstrate that the public drainage
system ensures a positive flow of water with no discharge
onto the public road network.  Thereafter, the agreed
scheme shall be implemented in full to ensure no
discharge onto the road network at any time.
Reason - In the interests of pedestrian and traffic safety.
10. No part of the development shall be occupied until a
Travel Plan (TP), aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transportation
and Development.  The TP will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.  Thereafter, the

Page 5

agreed scheme shall be implemented in full for the life of
the development.
Reason - To promote sustainable transport options and to
meet advice within Scottish Planning Policy on transport.
11. Prior to the commencement of development details of a
barrier along the boundary of the trunk road to prevent
access to the trunk road shall be submitted to and agreed
in writing by the Council as Planning Authority, in
consultation with Transport Scotland as the Trunk Road
Authority.  The barrier as agreed shall be completed prior
to the use of the development and maintained by the
developer or subsequent owner of the land.
Reason - To minimise interference with the safety and
free flow of the traffic on the trunk road; and to minimise
the risk of pedestrians and animals gaining uncontrolled
access to the trunk road with the consequential risk of
accidents.
Biodiversity and Natural Environment
12. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 41 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
13. The findings and recommendations contained within the
supporting ecological impact assessment submitted and
hereby approved (document 43 relates) remain valid for a
period of 24 months. If the approved planning permission
is not implemented within 24 months of the date of the
survey, an updated survey is required to be submitted to
the Planning Authority for written approval and thereafter
the findings implicated accordingly. 
Reason - In the interests of protecting environmental
quality and of biodiversity.
14. Prior to the commencement of the development hereby
approved, an updated Biodiversity Action Plan including a
map/plan indicating the locations of all proposed
measures proposed (bird boxes, hedgehog homes, bug
hotels, hibernaculum piles, green roofs, and raingardens,
etc.) shall be submitted for the further written agreement
of the Council as Planning Authority.  Thereafter, the
agreed scheme shall be implemented and maintained in
a reasonable condition for the life of the development, to
the satisfaction of the Council as Planning Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
15. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, wildlife kerbs

Page 6

shall be installed adjacent to all road gullies within
500metres of a SUDS pond or watercourse.  Thereafter,
the kerbs shall be retained in a reasonable condition for
the life of the development, to the satisfaction of the
Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity. 
16. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.
Amenity / Noise and Odour
17. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
18. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In the interests of road safety; to prevent a
possible danger to road users by avoiding excessive
glare or brightness.
19. Prior to the development hereby approved being
completed or brought into use, effective ventilation
systems commensurate with the nature and scale of
cooking to be undertaken shall be installed and operated
such that cooking odours are not exhausted into or
escape into any neighbouring buildings.  Thereafter the
system shall be maintained.
Reason - In order to safeguard the amenity of occupants
of nearby premises and to ensure the provision of a
satisfactory ventilation system for the premises.
Contamination
20. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken

Page 7

and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify: 
I. the nature, extent and type(s) of contamination on
the site 
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed 
III. measures to deal with contamination during
construction works 
IV. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority.  Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason - In order to deal with any potential ground
contamination.
Flooding
21. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
22. The measures identified in the Flood Risk Statement
(document 48 relates) to prevent flooding of the site,
approved as part of this permission, shall be fully
implemented.  Verification that the scheme has been fully
implemented must be submitted to the Council as
Planning Authority prior to completion or the bringing into
use of any part of the development, whichever is the
earlier.
Reason - In order to take account of the flood risk of the
adjacent sites close to the Glasgow Road (A93). 
23. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.

Page 8

Reason - To ensure the provision of effective drainage for
the site.
Core Path
24. Prior to the commencement of development, a scheme
shall be submitted to Council as Planning Authority for
written agreement identifying improvements to the section
of the core path (CTYS/120) which passes through the
site. For the avoidance of doubt, the scheme shall
improve surfacing and accessibility for all users.
Thereafter, the agreed scheme shall be implemented in
full prior to the occupation of any unit hereby approved.
Reason – In the interests of promoting active travel.
25.  Prior to the commencement of the development hereby
approved, a management plan indicating any temporary
diversions and signage needed to facilitate the
development and/or any works proposed to the right of
way/core path as part of the development shall be
submitted for the agreement of the Council as Planning
Authority.  The plan as agreed shall be implemented in
accordance with the timings identified in the plan.
Reason - To ensure that public access is maintained at all
reasonable times, to the local path network.
Dust Management 
26.  Prior to the commencement of development, a
Construction Dust Management Plan (CDMP) shall be
submitted for the written approval of the Planning
Authority and once approved shall be adhered to
throughout the construction stage.  The CDMP shall
include mitigation measures for the control of dust during
all stages of the construction phase.
Reason - In order to ensure there are no negative
impacts from construction dust. 
Justification
The proposal is considered a minor departure from the
Development Plan however there are material reasons which
justify departing from the Development Plan. 
Procedural Notes
SEPA has submitted a holding objection to the proposed
development, in relation to flood risk.  The application will be
referred, if SEPA maintain their objection, to the Scottish
Ministers for authority to proceed. Thereafter, if agreed by
Scottish Ministers, the decision notice shall not be issued until
such time that the relevant transport infrastructure contributions
have been secured. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on

Page 9

which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  According to
Regulation 41 the notice must be:
•  Displayed in a prominent place at or in the vicinity of
the site of the development
•  Readily visible to the public
•  Printed on durable material
5. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
6. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the e-Planning portal if your
original application was lodged that way, otherwise send
it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.

Page 10

7. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to this development.
https://www.pkc.gov.uk/ldp2floodrisk. 
8. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
9. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits
10. The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to construct a new
road prior to the commencement of roadworks.
11. The applicant should be advised to contact Perth &
Kinross Council Street Lighting Department to obtain
technical approval for all street lighting provision.
12. Please consult the Street Naming and Numbering Officer,
The Environment Service, Perth and Kinross Council,
Pullar House, 35 Kinnoull Street, Perth PH1 5GD for a
new postal address.  The form is downloadable from
www.pkc.gov.uk and should be returned to
snn@pkc.gov.uk
13. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
14. The applicant is reminded that, should any protected
species be present, a licence may be required from
NatureScot to disturb a protected species. Failure to
obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-
compliance.
15. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning

Page 11

permission for a development does not provide a defence
against prosecution under this Act.
16. The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport
Scotland's Cycling by Design 2021 or similar design
guide. 
17. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
18. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations.
19. The granting of planning permission does not stop the
continued right of public access along the existing core
path.  An order under the Town and Country Planning
(Scotland) Act 1997, Section 208 or an amendment of the
Core Path Plan under the Land Reform (Scotland) Act
2003 should be sought in advance of any works
authorised by this planning permission being
commenced.  All relevant approvals should be in place
prior to any stopping up and diversion of the core path
taking place. 
(2) Local Application 
(i) 23/00193/FLL – Erection of office building (Class 4) and two
café/restaurant units (Class 3) with drive thru facilities, car
parking, landscaping and associated works, land 100
metres south west of 5 Broxden Avenue, Perth (Report No.
24/146) 
Mr Michael Lorimer, agent on behalf of the applicant,
accompanied by Mr Alastair Scott-Kiddie, engineer, addressed
the Committee and answered Members questions. 
THERE FOLLOWED A 5 MINUTE RECESS AND COMMITTEE RECONVENED. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.

Page 12

Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. The construction of the office block hereby approved (as
shown on plan 08 and 09) shall be completed prior to the
occupation or bringing into use, whatever is the earlier, of
the 2 class 3 cafe/ restaurant units as shown on plans 06
and 07.
Reason - To secure the provision of the office block on
this allocated employment site. 
4. Prior to works commencing on site, details of a central
storage area for waste collection for each unit shall be
submitted to, and for the written approval of, Perth and
Kinross Council, as the Planning Authority.  Thereafter,
the agreed scheme shall be implemented prior to the
bringing in to use of any unit hereby approved.
Reason - To ensure sufficient waste collection for each
unit.
Amenity
5. Prior to the commencement of development, a
Construction Dust Management Plan shall be submitted
for approval of the Planning Authority and once approved
shall be adhered to throughout the construction stage. 
The CDMP shall include mitigation measures for the
control of dust as outlined in Table 20 of the air quality
assessment ‘Proposed Mixed Development, land
adjacent to Broxden Roundabout, Perth – Fairhurst’
document reference R24.12052/1/JH dated 26 February
2024.
Reason - In the interests of air quality.
Roads and Access
6. Prior to the development hereby approved being
completed or brought into use, the vehicular access
shown on the approved drawings shall be implemented
and constructed in accordance with Perth & Kinross
Council's Road Development Guide, using the
Construction Type B from the Construction Details for
Access Types, C, D and E.  The Type B Road
construction detail shall continue into the entrance for a
distance of 5 metres from the boundary of the public road
surface.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
7. Prior to the first occupation of each element, the applicant
shall provide, for approval by the Council as Roads

Page 13

Authority, a Service Management Plan detailing the plans
for servicing and delivery operations, and timing,
including arrangements for the management of vehicular
and pedestrian traffic during servicing and delivery. 
Thereafter, the approved plan shall be adhered to for the
life of the development. 
Reason - In the interests of road safety.
8. Prior to the first occupation of each element, a detailed
design for a minimum of: 
a) Plot 2: 26 secure, covered cycle parking bays. 
b) Plot 3: 8 secure cycle parking bays.
c) Plot 4: 8 secure cycle parking bays.
shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads
Authority.  The cycle parking, as approved in writing, shall
be implemented in accordance with the approved details
to the satisfaction of the Council as Planning Authority
prior to the occupation of each element.
Reason - To encourage active travel and meet advice
within Scottish Planning Policy on transport.
9. Prior to commencement of works, the street lighting
design for adoptable areas must be submitted for the
further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council’s
Street Lighting Partnership.  The scheme shall include
details of light spill, brightness of the lighting and the
proposed hours of operation.  The agreed lighting
scheme shall be implemented prior to the occupation of
the first unit and maintained in full accordance with the
agreed scheme.
Reason - In the interests of road safety.
10.  Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;

Page 14

f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
i) details of information signs to inform other road
users of construction traffic;
j) arrangements to ensure that access for
emergency service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;
l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
n) monitoring, reporting and implementation
arrangements; 
o) arrangements for dealing with non-compliance;
and
p) details of HGV movements to and from the site.  
The TMS, as approved, shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
11. Prior to the commencement of development, the
applicant shall submit survey work to demonstrate that
the drainage system ensures a positive flow of water with
no discharge onto the public road network.  Thereafter,
the agreed scheme shall be implemented in full to ensure
no discharge onto the road network at any time.
Reason - In the interests of pedestrian and traffic safety.
12. No part of the development shall be occupied until a
Travel Plan (TP), aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transportation
and Development.  The TP will have particular regard to
provision for walking, cycling and public transport access
to and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.  Thereafter, the
agreed scheme shall be implemented in full for the life of
the development.
Reason - To promote sustainable transport options and to
meet advice within Scottish Planning Policy on transport.
13. Prior to the commencement of development details of a
barrier along the boundary of the trunk road to prevent

Page 15

access to the trunk road shall be submitted to and agreed
in writing by the Council as Planning Authority, in
consultation with Transport Scotland as the Trunk Road
Authority.  The barrier, as agreed, shall be completed
prior to the use of the development and maintained by the
developer or subsequent owner of the land.
Reason - To minimise interference with the safety and
free flow of the traffic on the trunk road; and to minimise
the risk of pedestrians and animals gaining uncontrolled
access to the trunk road with the consequential risk of
accidents.
Floods / Drainage
14. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council
as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in the
SUDS Manual (C753) and the Council’s Flood Risk and
Flood Risk Assessments Developer Guidance and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - In the interests of best practice surface water
management; to avoid undue risks to public safety and
flood risk.
15. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
16. The measures identified in the revised Drainage
Assessment (document 20 hereby approved) to prevent
flooding of the site, approved as part of this permission,
shall be fully implemented.  Verification that the scheme
has been fully implemented must be submitted to the
Council as Planning Authority prior to completion or the
bringing into use of any part of the development,
whichever is the earlier.
Reason - In order to take account of the flood risk of the
adjacent sites close to the Glasgow Road (A93). 
Contaminated Land
17. Prior to the commencement of works on site, an
evaluation for the potential of the site to be affected by
contamination by a previous use should be undertaken
and as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) will be submitted for consideration
by the Council as Planning Authority.  If after the
preliminary risk assessment identifies the need for further

Page 16

assessment, an intrusive investigation should be
undertaken to identify: 
I. the nature, extent and type(s) of contamination on
the site 
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed 
III. measures to deal with contamination during
construction works 
IV. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the agreed measures to decontaminate
the site shall be fully implemented as approved by the
Council as Planning Authority.  Validation that the
scheme has been fully implemented must also be
submitted to the Council as Planning Authority.
Reason - In order to deal with any potential ground
contamination. 
Justification
The proposal is considered a minor departure from the
Development Plan however there are material reasons which
justify departing from the Development Plan. 
Procedural Notes
SEPA have submitted a holding objection to the proposed
development, in relation to flood risk.  The application will be
referred, if SEPA maintain their objection, to the Scottish
Ministers for authority to proceed. Thereafter, if agreed by
Scottish Ministers, the decision notice shall not be issued until
such time that the relevant transport infrastructure contributions
have been secured. 
Informatives
1. The planning permission decision notice shall not be
issued until such time as the required Developer
Contributions have been secured or paid in full.
2. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.

Page 17

4. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works. Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
5. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks. 
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.  Please note
that a fee is chargeable for the processing of RCC
applications.
6. If the applicant is successful in gaining planning consent,
they must apply for a Vehicle Access Consent before
starting works on its formation.  More information on the
process can be found on the following website:
https://www.pkc.gov.uk/vehicleaccess.  Please note, that
as planning permission has been applied for, currently no
fee is required for the Vehicle Access Consent (VA1
form), please include the planning application number on
your VA application form.
7. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
8. Guidance on the detailed design and positioning of the
cycle storage can be sought from Transport Scotland's
Cycling by Design 2021.
9. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the e-Planning portal if your
original application was lodged that way, otherwise send
it to us at developmentmanagement@pkc.gov.uk. Please
be aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk. The

Page 18

Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
10. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk.
11. The refuse collection operative must have clear access to
the bin storage area and where possible the surfaces
must be a paved or hard finished, which must be smooth,
where possible, without steps or kerbs with a minimum
width of 1.5 metres and clear headroom of 2 metres.
12. Where a refuse vehicle is required to drive onto a site or
to work under any structure there should be a minimum
height clearance of 4.5 metres, with a minimum working
area of 3.5 metres width by 4 metres length where the
emptying of the containers will take place.
13. No work shall be commenced until an application for
building warrant has been submitted and approved.
14. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
15. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
16. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations.