PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 13 March 2024 at 9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, D Cuthbert, K Harvey,
D Illingworth, I James, Bailie C McLaren, B Leishman, C Reid (from Item 5(1)(ii)
onwards), R Watters and Bailie M Williamson. 
In Attendance: L MacLean, S Panton, L Reid, K Smith and P Williamson (all
Economy, Place and Learning); A Brown, C Elliott, J Guild and M Pasternak (all
Strategy, People and Resources). 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.   
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors Code
of Conduct. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of
7 February 2024 were approved. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
22/02194/FLM 5(1)(i)
23/00491/FLM 5(1)(ii)
23/00005/CONSUL 5(2)(i)
23/01353/FLL 5(3)(ii)
23/01665/FLL 5(3)(iii) 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 22/02194/FLM - Change of use of agricultural land to form
extension to existing leisure park, formation of internal
access, parking, hardstanding, engineering works and
landscaping, land 200 metres north east of Erigmore
Caravan Site, St Mary's Road, Birnam (Report No. 24/71)

Page 2

Mr P Shannon, agent on behalf of the applicant, addressed the
Committee and answered Members questions. 
Resolved:
Refuse, for the following reasons:
1. The proposal comprises a significant new development
which would a) not respect the character and appearance
of the existing area, b) would require a new landscape
setting to be introduced, with proposals set out not
considered sufficient and c) would result in a visually
incongruous development within the context of the
surrounding area.  The proposal is therefore contrary to
Policy 1 (Placemaking), Policy 8 (Rural Business and
Diversification (criteria (c)) and Policy 9B (Caravan Sites,
Chalets and Timeshare Developments) of the adopted
Perth and Kinross Local Development Plan 2 (2019) and
the Council’s statutory supplementary planning guidance
on Placemaking (2020), as the development would not be
compatible with the existing surrounding land uses, and
would have an adverse impact on the existing character
and appearance of the surrounding area.  
2. The scale and nature of the development is neither
compatible or in keeping with the surrounding area.
Accordingly, the proposal is contrary to Policy 29(b)
(Rural Development) and Policy 26(d)(ii) (Business and
Industry) of the National Planning Framework 4 (2023),
both of which only support new developments which are
compatible and in keeping with the existing surrounding
areas. 
3. As the site is a) not allocated for development and b) not
explicitly supported by policies in the Local Development
Plan, the proposal is contrary to Policy 9 (Brownfield,
vacant and derelict land and empty buildings) of the
National Planning Framework 4 (2023) which only
permits new development on greenfield sites in certain
instances. 
Justification
The proposal is not in accordance with the Development Plan
and there are no material reasons which justify departing from
the Development Plan. 
COUNCILLOR C REID JOINED THE MEETING AT THIS POINT. 
(ii) 23/00491/FLM - Formation of leisure development
comprising erection of 124 holiday accommodation units,
community hub with reception/leisure/retail areas with
other associated uses, formation of vehicular access,
motorhome stances, SUDS ponds, treatment plant, parking,
landscaping and associated works, Whinstone Quarry,
Devonshaw, Powmill (Report No. 24/72)

Page 3

Ms N Marchant, objector on behalf of Fossoway District
Community Council, Ms C Pleass, objector and Mr K Davidson,
on behalf of Devonshaw Leisure Ltd and Mr J McCallum, agent
on behalf of the applicant, addressed the Committee and
answered Members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development
has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and
documents.
3. No development shall commence until a detailed phasing
and delivery plan confirming the programmed delivery of
the site including the siting of the lodges, glamping pods,
landscaping/planting, community hub (including Aires)
and construction works has been submitted and approved
in writing by the Council as Planning Authority. Once
approved, the development shall be implemented in
accordance with the agreed delivery plan.
Reason - In order to ensure the implementation and
completion of the development components of the
proposal to coincide with infrastructure delivery and to
release the elements of the proposed development which
the planning authority considers will bring economic and
social benefits to the area.
4. The infrastructure required to service the Aires shall be
implemented and maintained in accordance with the
approved details shown on drawing numbers 71 and 78
to the satisfaction of the Council as Planning Authority. 
The details as approved shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier.
Reason - to ensure adequate delivery of infrastructure.
5. Prior to the commencement of the development hereby
approved, full visibility splays of 215 metres along the
channel line shall be provided to the left and right of the
access, at a set-back of 2.4 metres to the standard and
specification required by the Council as Roads Authority

Page 4

to the satisfaction of the Planning Authority.  The visibility
splays shall be physically formed on the ground and any
existing fences, walls, hedges or other means of
enclosure or obstructions within the splays shall be
removed and relocated out with the splays.  Once
formed, the visibility splays shall be permanently retained
thereafter, and no visual obstruction of any kind shall be
permitted within the visibility splays so formed.
Reason - In the interests of road safety; to
ensure an acceptable standard of
construction within the public road boundary.
6. Prior to the commencement of development, a detail
design showing the vehicle access onto A977 public road
with the following schemes shall be provided for:
a. Ghost island right turning facility.
b. Full visibility splays of 215 metres along the
channel line shall be provided to the left and right
of the access, at a set-back of 2.4 metres to the
standard.
c. Road markings.
d. Bus boarders at and opposite the vehicle access
with suitable hard standing area for bus shelters
with a 24/7 electrical power supply to a Haldo pillar
adjacent to the hard standing.  Dropped kerbs will
be provided on both sides of the road to link the
bus boarders.
e. Outfall details, to include the headwall details,
manholes and pipe location.
f. Drainage proposals to prevent water discharge
onto the A977.
g. A pedestrian crossing island on the A977 in
the vicinity of the proposed bus stops.
All of the above shall be submitted to and approved in
writing by the Council as Planning Authority.  The
submission will confirm the road layout along the A977. 
The scheme for the approved shall thereafter be
implemented in full, prior to the commencement of
construction works on site to provide a safe access and
egress to the site.
Reason - In the interests of road, pedestrian safety and
connectivity with the residential developments to the
north and northwest of the development.
7. Prior to the occupation of the first lodge, the developer
shall provide and install bus shelters at and opposite the
site entrance on appropriate hard standing asphalt areas,
each with a 3 bay cantilever bus shelter supplied and
installed with passenger information board, LED
spotlights (one per bay), a 28in Ultra-Wide Display
Screen for Real Time Passenger Information installed on
the approach side of the shelter and a 24/7 electrical
power supply to a Haldo pillar adjacent to the shelter to
provide power for the LED lighting and Real Time

Page 5

Passenger Information display.  The design and
specification shall be to the satisfaction of the Council as
Planning Authority, in consultation with Perth & Kinross
Council's Public Transport Unit.
Reason - In the interest of sustainable travel.
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used.
b. timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events.
c. a code of conduct for HGV drivers to allow for
queuing traffic to pass.
d. arrangements for liaison with the Roads Authority
regarding winter maintenance.
e. emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown.
f. arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road.
g. arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development.
h. arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians.
i. details of information signs to inform other road
users of construction traffic.
j. arrangements to ensure that access for
emergency service vehicles are not impeded.
k. co-ordination with other significant developments
known to use roads affected by construction traffic.
l. traffic arrangements in the immediate vicinity of
temporary construction compounds.
m. monitoring, reporting and implementation
arrangements.
n. arrangements for dealing with non-compliance;
and
o. details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to
during the entire site construction programme.
Reason - In the interest of proper site management.

Page 6

9. Prior to commencement of any development on site, a
detailed design of the proposed footpath and footway (as
illustrated on drawings 74 and 75), showing the location,
specification and cross section, shall be submitted to and
approved in writing by the Planning Authority in
consultation with the Roads Authority, taking into account
the requirement to ensure that a positive flow of water is
maintained in existing drainage ditches. The footpath and
footway, as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority and undertaken prior
to the occupation of the first lodge or pod.
Reason - In the interests of road safety; to
ensure an acceptable standard of construction
within the public road boundary.
10. Prior to the commencement of works on site, detailed
drawings showing waste and recycling bin storage
locations and strategy for presenting the waste for
collection, shall be submitted for the written agreement of
the Council as Planning Authority.  None of the lodges or
pod units hereby approved shall be occupied until the
agreed scheme has been provided in full.
Reason - In the interests of road safety to prevent long
reversing manoeuvres.
11. Prior to the installation of the lodges and pods, a finalised
design for the cycle lockers shall be submitted to and
approved in writing by the Planning Authority in
consultation with the Roads Authority.  The cycle lockers,
as approved in writing, shall be implemented and
permanently maintained thereafter in accordance with the
approved details to the satisfaction of the Council as
Planning Authority and installed prior to the occupation of
any lodge or pod cluster.
Reason - To encourage active travel and meet
advice within National Planning Framework 4 on
transport.
12. Prior to the occupation of each lodge hereby approved
being completed or brought into use, a minimum of two
car parking spaces shall be provided at each lodge.
Reason - In the interests of road safety; to ensure the
provision of adequate off-street car parking facilities.
13. Prior to the occupation of each glamping pod hereby
approved being completed or brought into use, a
minimum of one car parking space shall be provided at
each glamping pod.
Reason - In the interests of road safety; to ensure the
provision of adequate off-street car parking facilities.
14. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be

Page 7

implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
15. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed decking(s) and any hot tubs shall be submitted
to and agreed in writing by the Council as Planning
Authority.  The scheme as agreed shall be implemented
prior to the completion or bringing into use of the relevant
unit, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
16. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the residential amenity of
the area.
17. Prior to the development hereby approved being
completed or brought into use, an effective ventilation
system commensurate with the nature and scale of
process to be undertaken shall be installed and operated
such that odours are not exhausted into or escape into
any neighbouring buildings. Thereafter the system shall
be maintained.
Reason - In order to safeguard the residential amenity of
the area.
18. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of
the area.
19. Prior to the commencement of the development a Noise
Management Plan shall be submitted for the written
approval of the planning authority. The plan shall include
all sources of noise associated with the premise,
including user noise and the measures that will be put in
place to minimise and/or control noise. The plan shall be
reviewed on a regular basis or, following receipt of a
justified complaint or at the request of the planning
authority. Once the Noise Management Plan has been
approved, it shall be fully implemented for the lifetime of
the development.
Reason - In order to safeguard the residential amenity of
the area.

Page 8

20. Servicing of and deliveries to the site shall be carried out
between 0700 and 1900 Monday to Sunday.
Reason - In order to safeguard the residential amenity of
the area.
21. Prior to the commencement of any hereby approved
development, all trees on site (other than those marked
for felling on the approved plans) and those which have
Root Protection Areas which fall within the site shall be
retained and protected. Protection methods shall be
strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.
Protection measures, once in place, shall remain in place
for the duration of construction.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
22. Prior to the commencement of the development hereby
approved, an updated detailed landscaping and planting
scheme for the site (including proposed phasing) shall be
submitted to and approved in writing by the Planning
Authority. The scheme shall be updated to include a
native hedgerow on the western boundary, adjacent to
Lodges 25 and 26. The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of each phase of the
development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority
within 7 days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to
protect the adjacent SSSI, and to ensure the
satisfactory implementation of the proposed planting
scheme.
23. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity
and to ensure the satisfactory
implementation of the proposed planting
scheme.
24. Prior to undertaking the operations prescribed within the
approved Management Plan, at Year 1, 3, 5, 7, 9, & year
10, the applicant shall notify the Planning Authority in
writing, in order to assess the thinning, planting and weed
control operations, as prescribed within the approved
Tree and Woodland Management Plan by Urban - Arb
Arboricultural Consultants (Sep 2023) (drawing number
65) & FinLand Proposed Development Devonshaw

Page 9

Quarry - Landscape Planning (Oct 2023) (drawing
number 69).
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
25. The conclusions and recommended action points within
the supporting Ecological Impact Assessment (including
Addendum) submitted and hereby approved
(document(s) 39 and 66 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
26. A minimum of two months prior to the commencement of
development, a site-specific Construction Environmental
Management Plan (CEMP) which shall include a
Construction Method Statement (CMS) shall be submitted
to and approved by the Council as Planning Authority in
consultation with key stakeholders as deemed
appropriate. The CEMP must also include a Pollution
Prevention Plan (PPP), Invasive Management Plan
(IMP), Site Waste Management Plan (SWMP), Site
Access Management Plan (SAMP), Construction
Exclusion Zone (CEZ), Construction Traffic Management
Plan (CTMP), Environmental Management Plan (EMP).
Proposed measures for bog restoration methods,
monitoring and ongoing long-term aftercare and
maintenance shall be included. Measures to ensure the
public road network is kept free from mud or debris shall
also be required. The CEMP will remain a live document,
any working practices deemed to be having an adverse
impact on ecology or the environment will be the subject
of revision. All revisions must be submitted to the
Planning Authority as soon as reasonably practicable.
Thereafter the development shall be fully undertaken in
accordance with the agreed CEMP.
Reason - In the interest of protecting environmental
quality and of biodiversity. To minimise any associated
adverse landscape and visual impact of the above ground
elements and protect the character and visual amenity of
the immediate and surrounding countryside and
associated nature and cultural heritage conservation
interests.
27. Prior to the commencement of the development hereby
approved, an independent and suitably qualified
Ecological Clerk of Works (ECoW) shall be appointed at
the developers' expense. Details of this appointment shall
be subject to the prior written agreement of the Council
as Planning Authority. The appointed person will remain
in post for the duration and subsequent restoration of the

Page 10

proposed development. The ECoW shall have
responsibility for the following:
(a)  Implementation of the Construction
Environmental Management Plan (CEMP)
approved by this permission.
(b)  Authority to stop operations or to alter
construction methods should there be any
works occurring which are having an adverse
impact on the natural heritage.
(c)  Prior to the commencement of development, they
shall provide an environmental/ecological tool box
talk for construction staff.
(d)  They will have authority to amend working
practices in the interests of natural heritage. Any
amendments shall be submitted to the Council as
Planning Authority as an addendum to the
approved CEMP.
(e)  They shall make weekly visits to the development
site at a time of their choosing. No notification of
this visit is required to be given to the developer or
contractor.
(f)  Within 10 working days of the end of each
calendar month, they are required to submit a
detailed monthly report for the review of the
Planning Authority in consultation with Scottish
Environment Protection Agency (SEPA) for the
duration of development. 
(g)  They shall notify the Council as Planning Authority
in writing of any requirement to halt development
in relation to this condition as soon as reasonably
practicable.
The above shall be implemented throughout the
construction of the development hereby approved unless
otherwise agreed in writing with the Council as Planning
Authority.  The CEMP shall contain a site-specific
Construction Method Statement (CMS) which will provide
concise details for the implementation of the CEMP for
site operatives.
Reason - To avoid habitat damage and safeguard natural
heritage interests.
28. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.

Page 11

29. Prior to the commencement of development detailed
plans for nighttime lighting of the proposed development
shall be submitted for the approval of the Planning
Authority. These plans should be submitted in strict
accordance with recognised impact reduction principles
and any lighting proposed shall be low level.
Reason - In the interests of visual amenity; to ensure
a satisfactory standard of local environmental quality;
to safeguard the welfare of any protected wildlife.
30. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify:
I. the nature, extent and type(s) of contamination on
the site
II.  measures to treat/remove contamination to ensure
the site is fit for the use proposed
III.  measures to deal with contamination during
construction works
IV.  condition of the site on completion of
decontamination measures.
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason - In order to deal with any potential
contamination of the site as a result of its former use.
31. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance and shall
incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
32. The development hereby approved shall be used solely
for holiday accommodation and shall not be occupied as
the sole or main residence of any occupant.

Page 12

Reason - In order to clarify the terms of the permission; to
control and restrict the use of the site.
33. Notwithstanding the provisions of The Town and Country
Planning (General Permitted Development (Scotland)
Order 1992 or any order amending, revoking or re-
enacting that order, the proposed lodges shall not be
extended or altered in any way, not any building or means
of enclosure erected within the curtilage of any lodge
without an express grant of planning permission from the
Planning Authority.
Reason - In the interest of visual and residential amenity;
to ensure a satisfactory standard of local environmental
quality and to avoid over-intensive development of the
site.
34. Prior to the commencement of development, a recreation
plan shall be submitted for the approval of the Planning
Authority. The scheme as subsequently agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason - In the interests of ensuring
suitable public access and recreation. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken. Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. Part of the approved development includes holiday
accommodation or Short-term Let accommodation (STL). 
The developer is advised that holiday accommodation
and STLs require to be licensed under the terms of Article
3 of the Civic Government (Scotland) Act 1982 (Licensing
of Short-terms Lets) Order 2021 and therefore a licence
application should be made to Perth and Kinross Council

Page 13

prior to operation commencing.  Further information and
application forms are available at
https://www.pkc.gov.uk/shorttermlets.
5. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
6. The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council as Roads Authority Road Construction
Consent (RCC) to construct a new road prior to the
commencement of roadworks.  Advice on the disposal of
surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable
for the processing of RCC applications.
7. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
8. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
9. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
10. Part of the approved development includes 'caravans'. 
The developer is advised that caravans require to be
licensed under the terms of Section 1 of the Caravan
Sites and Control of Development Act 1960 and therefore
a licence application should be made to Environmental
Health.  Application forms are available at
https://www.pkc.gov.uk/article/15600/Licence-caravan-
site.
11. The applicant is advised that if any works are required
within the SSSI in relation to drainage from the proposal
site, permission from SEPA and/or consent from
NatureScot may be required in addition to any planning
permission.
12. The applicant is advised that any proposed signage will
require a further application to be submitted for

Page 14

advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
13. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
14. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended.
The variations incorporate changes to
Biodiversity/Tree/Woodland/Roads/Foul/Water/ASHP/Vis
uals.
15. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity
of the site of the development 
• Readily visible to the public
• Printed on durable material. 
THERE WAS A 10 MINUTE RECESS, THE COMMITTEE RECONVENED AT
11.50AM. 
(2) Energy Consent Unit Application 
(i) 23/00005/CONSUL - Erection of a 900MW Battery Storage
System and associated infrastructure, Haughend Farm,
Meigle, Blairgowrie, PH12 8RJ (Report No. 24/73) 
Councillor C Stewart, Local Member, and Ms A Ellis, agent on
behalf of the applicant, addressed the Committee and answered
Members questions. 
Mr S Panton, Team Leader, Major Developments, advised
Committee that the ECU advised Perth and Kinross Council this
week that the capacity of the plant will change from 450MW to
900MW.  Mr Panton further advised there is no change to any
infrastructure or plans before Committee.

Page 15

Resolved:
Offer no objection to the proposal and request the imposition of
the following suggested conditions: 
Suggested Conditions
1. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used on all
structures and any hard landscaping shall be submitted to
and agreed in writing by the Council as Planning
Authority.  The scheme as agreed shall be implemented
prior to the completion or bringing into use any part of the
development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality; to
reserve the rights of the Planning Authority.
2. Prior to the commencement of development hereby
approved, a Soil Management Plan (SMP) shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The plan as approved shall be strictly
adhered to concurrent with the construction phases of the
development.
Reason - To ensure that prime agricultural land soil is not
unnecessarily sterilised or lost and in the interests of
Policy 51 of LDP2.
3. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken.
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT.  The PERD shall be carried out in complete
accordance with the approved details.  Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress. 
Reason - To safeguard any archaeological interest of the
site.
4. Prior to the commencement of the development hereby
approved, protective fencing shall be erected around

Page 16

SM7263 / MPK4865 incorporating an appropriate buffer,
insofar as the land lies within the control of the applicant
and/or developer, in a manner and for a time period to be
agreed in writing in advance with the Council as Planning
Authority in consultation with Perth and Kinross Heritage
Trust (PKHT).  No works shall take place within the area
inside that fencing without prior written agreement of the
Council as Planning Authority in consultation with PKHT.
Reason - To ensure the preservation of the historic
environment safeguard the identified Scheduled
Monument within and adjacent to the site boundaries.
5. Prior to the commencement of development, an updated
ecological survey in the form of an Ecological Impact
Assessment (EcIA) be submitted and agreed in writing by
the Planning Authority.
Reason - In the interests of protecting and enhancing
biodiversity.
6. Prior to the commencement of development, a Species
Protection Plan for Osprey be submitted and agreed in
writing by the Planning Authority.
Reason - In the interests of protecting and enhancing
biodiversity.
7. Prior to the commencement of development, a detailed
Landscaping Plan including details of biodiversity
enhancement measures shall be submitted and agreed in
writing by the Planning Authority.
Reason - In the interests of protecting and enhancing
biodiversity.
8. A minimum of two months prior to the commencement of
development, a site specific Construction Environmental
Management Plan (CEMP) which shall include a
Construction Method Statement (CMS) shall be submitted
to and approved by the Council as Planning Authority in
consultation with key stakeholders as deemed
appropriate.  The CEMP must also include a Pollution
Prevention Plan (PPP), Invasive Management Plan
(IMP), Site Waste Management Plan (SWMP), Site
Access Management Plan (SAMP), Construction
Exclusion Zone (CEZ), Construction Traffic Management
Plan (CTMP) and Environmental Management Plan
(EMP).  A detailed compound layout which sets out
measures to ensure the public road network is kept free
from mud or debris shall also be included.  The CEMP
will remain a live document, any working practices
deemed to be having an adverse impact on ecology or
the environment will be the subject of revision.  All
revisions must be submitted to the Planning Authority as
soon as reasonably practicable.  Thereafter the
development shall be fully undertaken in accordance with
the agreed CEMP.
Reason - In the interest of protecting environmental
quality and of bio-diversity.  To minimise any associated

Page 17

adverse landscape and visual impact of the above ground
elements and protect the character and visual amenity of
the immediate and surrounding countryside and
associated nature and cultural heritage conservation
interests.
9. Prior to the commencement of the development hereby
approved, an independent and suitably qualified
Ecological Clerk of Works (ECoW) shall be appointed at
the developers' expense.  Details of this appointment
shall be subject to the prior written agreement of the
Council as Planning Authority.  The appointed person will
remain in post for the duration and subsequent
restoration of the proposed development.  The ECoW
shall have responsibility for the following:
(a)  Overseeing the implementation of the Construction
Environmental Management Plan (CEMP)
approved by this permission.
(b)  Authority to stop operations or to alter construction
methods should there be any works occurring
which are having an adverse impact on the natural
heritage.
(c)  Prior to the commencement of development, they
shall provide an environmental / ecological tool
box talk for construction staff.
(d)  They will have authority to amend working
practices in the interests of natural heritage. Any
amendments shall be submitted to the Council as
Planning Authority as an addendum to the
approved CEMP.
(e)  They shall make weekly visits to the development
site at a time of their choosing. No notification of
this visit is required to be given to the developer or
contractor.
(f)  Within 10 working days of the end of each
calendar month, they are required to submit a
detailed monthly report for the review of the
Planning Authority in consultation with Scottish
Environment Protection Agency (SEPA) for the
duration of development.
(g)  They shall notify the Council as Planning Authority
in writing of any requirement to halt development
in relation to this condition as soon as reasonably
practicable.
The above shall be implemented throughout the
construction, (including reinstatement and de-
commissioning of the construction compounds) hereby
approved unless otherwise agreed in writing with the
Council as Planning Authority.  The CEMP shall contain a
site-specific Construction Method Statement (CMS) which
will provide concise details for the implementation of the
CEMP for site operatives.

Page 18

Reason - To avoid habitat damage and safeguard natural
heritage interests.
10. In the event that justified complaints for noise are
received by the Council, the applicant at their own
expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from
the development.  The appointed consultant and
methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning
Authority in consultation with Environmental Health within
28 days of being notified of the complaint.  Within 28 days
of approval of appointed consultant and methodology, a
Noise Assessment shall be submitted outlining mitigation
and recommended timescales for delivery.  Thereafter, all
mitigation measures shall be implemented within the
timescales recommended.
Reason - In the interests of protecting residential amenity.
11. Prior to the battery storage facility being brought into use,
all noise mitigation measures outlined in Section 8.2 and
Appendix A of the Noise Impact Assessment undertaken
by Neo Environmental Ltd, dated 04/10/2022 shall be
implemented in full.
Reason - In the interests of protecting residential amenity.
12. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In the interests of protecting residential amenity.
13. Notwithstanding any requirement or restriction under
Condition 6, construction work shall be limited to Monday
to Friday 0700 hours to 1900 hours and Saturday 0800
hours to 1300 hours with no noisy works out with these
times or at any time on Sundays or bank holidays.
Reason - In the interests of protecting residential amenity.
14. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land. 
Reason - In the interests of protecting residential amenity.
15. Prior to the commencement of development, the
developer shall submit for the written approval of the
planning authority, a plan showing the upgrading of the
section of road from the substation to Haughend Farm
with passing places.  The works for the agreed upgrading
of the road shall be completed in full prior to the
commencement of works.

Page 19

Reason - In the interests of road safety and adequate site
access.
16. Trees remaining on site and those which have Root
Protection Areas which fall within the site shall be
retained and protected.  Protection methods shall be
strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction and be
identified on the Construction Exclusion Zone (CEZ) Plan
within the Construction Environment Management Plan
(CEMP), in association with Condition 8. Protection
measures, once in place, shall remain in place for the
duration of construction.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority. 
With local sources indicating flooding precedent in the area,
including following extreme weather events of October 2023, it is
suggested that local consultation is undertaken prior to the
commencement of development to assist with assessment and
design. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
THERE WAS A RECESS FOR LUNCH.  THE COMMITTEE RECONVENED AT
1.40PM. 
(3) Local Applications 
(i) 23/01255/FLL - Siting of mobile crushing and screening
plant (for a temporary period), Newtyle Farm, Dunkeld, PH8
0HZ (Report No. 24/74) 
It was noted that this application had been withdrawn from this
agenda. 
(ii) 23/01353/FLL - Upgrading works affecting filter beds,
structures and access roads and engineering and
associated works, Glenfarg Water Treatment Works, The
Reservoir, Glenfarg, Perth, PH2 9QL (Report No. 24/75) 
Mr D Fraser, objector on behalf of Glenfarg Community Council,
Mrs Low, objector, and Mr M McIlvaney and Ms C Souter-Bell,
on behalf Scottish Water, addressed the Committee and
answered Members questions. 
Paul Williamson, Team Leader recommended that, if the
application is granted, condition 6 be revised to include

Page 20

reference to planting failing to become fully established within 5
years. 
THERE WAS A 5 MINUTE RECESS 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development, a
Construction Management Plan shall be submitted to and
agreed in writing by the Council as Planning Authority
and the Environmental Health Team.  The plan shall
include procedures, monitoring and mitigation measures
for the control of noise, vibration, and dust at the
construction stage of the development.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
4. Prior to commencement of any development on site, a
detailed design showing all passing places, including
current and those to be constructed or upgraded, with the
proposed construction works, cross sections,
specifications and signage of the passing places on both
the public road network and private road shall be
submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority, taking
into account the requirement to ensure that a positive
flow of water is maintained in the existing drainage
ditches.  The passing places shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority and shall be
undertaken prior to the commencement of construction
associated with this planning application.
Reason - In the interests of pedestrian and traffic safety. 
5. Prior to the commencement of the development hereby
approved, an updated Construction Traffic Management
Scheme (TMS) shall be submitted to and approved by the
Council as Planning Authority, in consultation with the

Page 21

Roads Authority (Structures).  The updated TMS shall
include the following (confirming the location,
specification and timescale for installation of each
measure): 
(a) Speed Reduction Measures; 
(b) Road Traffic Signage, including solar signage;
(c) Bailey Bridge to be constructed over Glendy Mill
Bridge Category C Listed Structure;
(d) Anti-skid surfacing; 
(e) Improvements to Lay-by Development for Escort
Vehicles & HGVs; 
(f) Parking restrictions; 
(g) Vegetation Clearance; 
(h) Verge Improvements; 
(i) Crossing Officer for the junction of Greenbank
Road/Ladeside/Duncrievie Road/Church Brae
(operational duration, daily times and operational
location); 
(j) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction; and
(k) Report on consultation undertaken on all aspects
of this updated TMS with local elected members
and Glenfarg Community Council.
The measures shall be implemented prior to the dates
agreed and approved in writing by the Planning Authority,
in consultation with the Roads Authority.
The TMS as approved shall be strictly adhered to during
the entire site construction programme. 
Reason - In the interest of proper site management. 
6.  Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted for the written agreement of the
Council as Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or
recontouring of the site, full details of all hard landscaping
proposals including materials and installation methods
and, species, height, size and density of trees and shrubs
to be planted.  The scheme as subsequently approved
shall be carried out and completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority, with any
planting which fails to become established within five
years being replaced in the following planting season with
others of a size and species as previously approved.

Page 22

Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
7. The plans and particulars submitted in accordance with
condition 7 above shall include: 
(a)  a plan, to a scale and level of accuracy appropriate
to the proposal, showing the position of every tree
on the site and on land adjacent to the site
(including street trees) that could influence or be
affected by the development, indicating which
trees are to be removed; and
(b) in relation to every tree identified a schedule
listing: 
i. information as specified in paragraph 4, BS
5837 2012: Trees in Relation to Design,
Demolition and Construction;
ii. any proposed pruning, felling or other work;
and
(c) in relation to every existing tree identified to be
retained on the plan referred to in (a) above,
details of: 
i.  any proposed alterations to existing ground
levels, and of the position of any proposed
excavation, that might affect the root
protection area (see BS 5837 2012: Trees
in Relation to Design, Demolition and
Construction) and 
ii.  all appropriate tree protection measures
required before and during the course of
development (in accordance with BS 5837
2012: Trees in Relation to Design,
Demolition and Construction), and
(d)  areas of existing landscaping to be protected from
construction operations and the method of
protection.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
8. Prior to the commencement of the development hereby
approved, a Scheme of Proposed Biodiversity
Enhancement shall be submitted to and approved by the
Council as Planning Authority.  The approved Scheme
shall be implemented prior to the completion or
occupation of the building(s) hereby approved, whichever
is the earlier.  Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority. 
Reason - In the interests of protecting environmental
quality and of biodiversity.
9.    Prior to the commencement of the development, a
maintenance agreement under Section 96 of the Roads

Page 23

(Scotland) Act 1984 shall be entered in to. Confirmation
of this agreement being in place shall be provided to the
Council, as Planning Authority, a minimum of two weeks
prior to the commencement of development.  The
maintenance agreement shall be in respect of the:
- B996 
- Ladeside 
- C414
These roads shall be inspected on a regular basis and
repairs carried out to the timescale and standards
specified by the Council as Roads Authority to the
satisfaction of Perth & Kinross Council. 
Reason - In the interests of road safety
10.   The measures identified in the Flood Risk Assessment
(Document 33 relates) to prevent flooding of the site,
approved as part of this permission, shall be fully
implemented.  Verification that the scheme has been fully
implemented shall be submitted to the Council as
Planning Authority prior to completion or the bringing into
use of any part of the development, whichever is the
earlier.
Reason - The site is located within the 1/200 (0.5% AEP)
flood extent and therefore has a medium to high risk of
flooding.
11. The conclusions and recommended action points within
the supporting Ecological Constraints Survey, Beaver
Survey and Bat Survey submitted and hereby approved
(document(s) 36, 42 and 44 relates) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
12.   All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
13. The sound pressure limits as presented in Section 8.4 of
the Noise Impact Assessment (Document 35 relates)
hereby approved shall be adhered to and the
recommended noise mitigation measures in section 8.6 of
the approved document shall be incorporated into
ongoing detailed design and coordination to ensure
compliance with Condition 12 of this planning permission.
Reason - In order to safeguard the neighbouring
residential amenity in the area.

Page 24

14. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
15. In the event that justified complaints regarding noise are
received by the Council, the applicant, unless otherwise
agreed with the Planning Authority, shall at their own
expense employ a consultant approved by the Planning
Authority to carry out an assessment of noise from the
development, whether relating to noise from construction
or operation of the site.  The assessment will be carried
out to an appropriate methodology agreed with the
Planning Authority and the results of the assessment will
be submitted to the Planning Authority within 28 days of
the assessment.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
16.   Deliveries in relation to the construction site shall be
carried out between 0800 and 1800 Monday to Friday
only, with no construction deliveries permitted on
Saturdays and Sundays.  Construction deliveries shall be
timed to minimise the impact on local communities
particularly at school start and finishing times, on days
when refuse collection is undertaken, or during local
events. 
Reason - In the interests of road safety. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.

Page 25

3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
5. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
6. The applicant should take note of the information and
advice contained within the consultation response from
SEPA.
7. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to information
regarding biodiversity and transport.
8. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.
Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
9. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.

Page 26

(iii) 23/01665/FLL - Erection of a wind turbine (up to 2.3MW),
formation of access track, hardstanding and construction
compound, and associated works, Simon Howie Butchers,
Findony Farm, Dunning, Perth, PH2 9RA (Report No. 24/76) 
Mr C Young, objector on behalf of Dunning Community Council,
Dr G Gardner, objector, M S Howie, applicant and Mr R Collin
and Ms R Lyall, agent, addressed the Committee and answered
Members questions. 
Motion (Councillors I James and C Reid) 
Refuse, as the proposal is contrary to: 
(1)  NPF4 (2023) Policy 11(e)(ii): Energy, and Perth and
Kinross Local Development Plan 2 (2019) Policy 33A:
New Proposals for Renewable and Low-Carbon Energy,
due to significant adverse landscape and visual impact of
the proposal on Dunning and the wider area, beyond that
which is appropriate; and 
(2)  NPF 4 (2023) Policy 7(d): Historic Assets and Places,
and Perth and Kinross Local Development Plan 2 (2019)
Policy 28A: Conservation Areas New Development, as
due to the significant adverse landscape and visual
impact, the proposal does not preserve or enhance
Dunning Conservation Area. 
Amendment (Councillor R Watters and Bailie M Williamson) 
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. For the avoidance of doubt the wind turbine model hereby
approved is limited to that specified in the submission
(Enercon E70 E4 2.3MW machine with a 69m hub height
and a 70m rotor diameter) and which has informed all
supporting information and assessment by the Planning
Authority, particularly that related to noise, shadow flicker
and visual impact.  No other turbine shall be installed

Page 27

without a further grant of planning permission, the
assessment of which will review any changes in material
planning considerations. 
Reason - In the interests of ensuring that the impacts of
the development have been accurately assessed and that
planning conditions remain relevant to the development
implemented.
4. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT.  The PERD shall be carried out in complete
accordance with the approved details.  Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason - To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
5. Development shall not commence until a detailed
Construction Environmental Management Plan (CEMP)
and Pollution Prevention Plan (PPP) detailing
environmental mitigation measures and site-specific
construction method statements, has been submitted for
the further written agreement of the Council as Planning
Authority in consultation with Scottish Environment
Protection Agency (SEPA) as required.  Such details
shall be submitted not less than two months prior to the
agreed scheduled commencement date and shall
incorporate detailed pollution avoidance and mitigation
measures for all construction elements.  Thereafter the
development shall be fully undertaken in accordance with
the agreed CEMP.
Reason - In the interest of proper site management.
6. The wind turbine, buildings, areas of hardstanding and
tracks shall be constructed in the location shown on the
approved plans or as per the micro-siting allowances
granted by this condition.

Page 28

Unless otherwise approved in advance in writing by the
Planning Authority micro-siting is subject to the following
restrictions:
a. No wind turbine foundation shall be positioned
higher, when measured in metres Above
Ordnance Datum, than the position shown on the
approved plans;
b. No wind turbine, building, mast or hardstanding
shall be moved more than 10 m from the position
shown on the original approved plans;
No later than one month after the date of First
Commissioning, if required, an updated site plan must be
submitted to the Planning Authority showing the final
position of the wind turbine, and associated infrastructure
forming part of the development.  The plan should also
specify areas where micro-siting has taken place and, for
each instance, be accompanied by copies of the Planning
Authority's approval.
Reason - To minimise environmental impacts while taking
account of the need to site infrastructure according to
local ground conditions.
7. Prior to the commencement of development hereby
approved, a Soil Management Plan shall be submitted to
and agreed in writing by the Council as Planning
Authority.  The plan as approved shall be strictly adhered
to concurrent with the construction of the development.
Reason - In the interest of proper site management
8. Prior to the commencement of any development on site,
precise colour details of the turbine components, and
details of cabling routing (which shall be underground
where possible) shall be submitted for the further written
agreement of the Council as Planning Authority.  The
approved details shall be implemented in full and
thereafter retained for the duration of the development.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
9. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 12 Heritage Environmental Limited
Simon Howie Butchers Wind Turbine: Ecological Impact
Assessment October 2023) shall be fully adhered to,
respected and undertaken as part of the construction and
operation phase of the development, to the satisfaction of
the Council as Planning Authority.  This includes
implementation of the proposed biodiversity
enhancements listed on page 39 and 40 of the EIA which
must be in place prior to the operation of the turbine.
Reason - In the interests of protecting environmental
quality and of biodiversity.
10. An updated ecological impact assessment will be
required prior to the commencement of works, if works
have not commenced within 24 months of the date of the

Page 29

ecological impact assessment survey approved as part of
this permission.  The updated survey shall be submitted
to the Council as Planning Authority for written agreement
and works shall not commence until after such written
agreement has been issued by the Council.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
11. The annual results from the three-year post-construction
monitoring shall be reported to Biodiversity@pkc.gov.uk
by 31st October each year.
Reason - To ensure that the impact on biodiversity from
the development is monitored and recorded.
12. No structure or tower may be erected, unless and until
such time as the Local Planning Authority receive
confirmation from the Airport Operator in writing that: (a)
an IFP (Instrument Flight Procedure) Assessment has
demonstrated that an IFP Scheme is not required; or (b) if
an IFP Scheme is required such a scheme has been
approved by the Airport Operator; and (c) if an IFP
Scheme is required the Civil Aviation Authority has
evidenced its approval to the Airport Operator of the IFP
Scheme (if such approval is required); and (d) if an IFP
Scheme is required the scheme is accepted by NATS AIS
for implementation through the AIRAC Cycle (or any
successor publication) (where applicable) and is available
for use by aircraft.
Definitions:
"IFP Scheme" means a scheme to address the potential
impact of the turbines on the instrument flight procedures
of Edinburgh Airport.
"IFP Assessment" means a safeguarding assessment
against current and any possible future IFPs. This
assessment must be undertaken by a UK CAA Approved
Procedure Design Organisation (APDO).
Further information on IFP Safeguarding and a quote for
this assessment can be obtained by contacting
safeguarding@edinburghairport.com. 
Reason - In the interests of aviation safety.
13. Prior to commencing construction of any wind turbine
generators, or deploying any construction equipment or
temporal structure(s) 50 metres or more in height (above
ground level) the undertaker must submit an aviation
lighting scheme for the approval of the Perth & Kinross
Council in conjunction with the Ministry of Defence
defining how the development will be lit throughout its life
to maintain civil and military aviation safety requirements
as determined necessary for aviation safety by the
Ministry of Defence.

Page 30

This should set out:
a) details of any construction equipment and
temporal structures with a total height of 50 metres
or greater (above ground level) that will be
deployed during the construction of wind turbine
generators and details of any aviation warning
lighting that they will be fitted with; and
b) the locations and heights of all wind turbine
generators and any anemometry mast featured in
the development identifying those that will be fitted
with aviation warning lighting identifying the
position of the lights on the wind turbine
generators; the type(s) of lights that will be fitted
and the performance specification(s) of the lighting
type(s) to be used.
Thereafter, the undertaker must exhibit such lights as
detailed in the approved aviation lighting scheme. The
lighting installed will remain operational for the lifetime of
the development.
Reason - In the interests of aviation safety.
14. The undertaker must notify the Ministry of Defence, at
least 14 days prior to the commencement of the works, in
writing of the following information:
a) the date of the commencement of the erection of
wind turbine generators;
b) the maximum height of any construction
equipment to be used in the erection of the wind
turbines;
c) the date any wind turbine generators are brought
into use;
d) the latitude and longitude and maximum heights of
each wind turbine generator, and any anemometer
mast(s).
The Ministry of Defence must be notified of any changes
to the information supplied in accordance with these
requirements and of the completion of the construction of
the development.
Reason - In the interests of aviation safety.
15. Prior to the commencement of the development hereby
approved, full visibility splays of 215 metres along the
channel line shall be provided to the left and right of the
access, at a set-back of 2.4 metres measured 1.05m
above the road level to the standard and specification
required by the Council as Roads Authority to the
satisfaction of the Planning Authority.  The visibility splays
shall be physically formed on the ground and any existing
fences, walls, hedges or other means of enclosure or
obstructions within the splays shall be removed and
relocated outwith the splays.  Once formed, the visibility
splays shall be permanently retained thereafter, and no
visual obstruction of any kind shall be permitted within the
visibility splays so formed.

Page 31

Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
16. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following: 
• restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used; 
• timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events; 
• arrangements to ensure that access for
emergency service vehicles are not impeded; and
• details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during
the entire site construction programme. 
Reason - In the interest of proper site management
17. For all properties without any financial involvement, noise
emanating from the turbine during nighttime (as defined
in ETSU-R-97 as 23:00 to 07:00 on all days) shall not
exceed LA90, 10 mins 35dB(A) or the ETSU-R-97
derived night hours noise limit of LA90, 10 mins +5 dB(A)
above background whichever is the greater. In the event
that audible tones are generated by the wind turbine, a
5dB(A) penalty for tonal noise shall be added to the
measured noise level.
Reason - In order to safeguard the residential amenity of
the area.
18. For all properties without any financial involvement, noise
emanating from the wind turbine at any other time than
defined in condition above shall not exceed an L A90, 10
min of 35 dB at noise sensitive properties at wind speeds
not exceeding 10m/s and measured at a height of 10m
above ground at the wind turbine site, or the ETSU-R-97
derived 'quiet waking hours noise limit of LA90, 10 mins
+5dB above background, whichever is greater.  In the
event that audible tones are generated by the wind
turbine, a 5dB (A) penalty for tonal noise shall be added
to the measured noise level.
Reason - In order to safeguard the residential amenity of
the area.
19. For all properties with any financial involvement, noise
emanating from the turbine during nighttime (as defined
in ETSU-R-97 as 23:00 to 07:00 on all days) shall not
exceed LA90, 10 mins 45dB(A) or the ETSU -R - 97
derived night hours noise limit of LA90, 10 mins +5 dB(A)

Page 32

above background whichever is the greater.  In the event
that audible tones are generated by the wind turbine, a
5dB(A) penalty for tonal noise shall be added to the
measured noise level.
Reason - In order to safeguard the residential amenity of
the area.
20. For all properties with any financial involvement, noise
emanating from the wind turbine at any other time than
defined in condition above shall not exceed an L A90, 10
min of 45 dB at noise sensitive properties at wind speeds
not exceeding 10m/s and measured at a height of 10m
above ground at the wind turbine site, or the ETSU-R-97
derived 'quiet waking hours noise limit of LA90, 10 mins
+5dB above background, whichever is greater. In the
event that audible tones are generated by the wind
turbine, a 5dB (A) penalty for tonal noise shall be added
to the measured noise levels.
Reason - In order to safeguard the residential amenity of
the area.
21. Mitigation measures in the form of Reduced Power mode
outputs as outlined in Section 8.8.2 of The Supporting
Statement Ref C5726-1426 Section 8 v2 dated 19
December 2023 which was undertaken by Greencat
Renewables shall be implemented in full for the life time
of the development.
Reason - In order to safeguard the residential amenity of
the area.
22. Prior to the development hereby approved being brought
into use, and electricity generated, the wind turbine
operator shall submit a list of proposed independent
consultants (who may undertake compliance
measurements in accordance with the above conditions)
for the written agreement of the Planning Authority. 
Amendments to the list of approved consultants shall be
made only with the prior written approval of the Planning
Authority.
Reason - In order to safeguard the residential amenity of
the area.
23. Prior to the operation of the turbine a shadow flicker
management plan shall be submitted to, and approved in
writing by, the Planning Authority.  Within the plan the
applicant shall identify the range of residential properties
that can be remotely monitored for a period of one year
from the commissioning, and subsequent operation, of
the turbine to study the effect that shadow flicker could
have on residential amenity.  The plan shall also include
mitigation measures to ensure that shadow flicker can be
mitigated to an acceptable level should justified
complaints be received following the operation of the
turbine and details of a practical procedure to remediate
any shadow flicker that are capable of being implemented
by the applicant in the event of a justified complaint being

Page 33

registered by the Planning Authority using mitigation
measures detailed in the shadow flicker management
plan. 
Reason - In order to safeguard the residential amenity of
the area.
24. The wind turbine operator shall continuously log power
production, wind speed and wind direction, all in
accordance with Guidance Note 1(d) of Institute of
Acoustics’ Good Practice Guide to the application of
ETSU-R-97 for the Assessment and Rating of Wind
Turbine Noise.  These data shall be retained for a period
of not less than 24 months.  The wind farm operator shall
provide this information in the format set out in Guidance
Note 1(e) to the local Planning Authority on its request,
within 14 days of receipt in writing of such a request.
Reason - In order to safeguard the residential amenity of
the area.
25. Within 21 days from receipt of a written request from the
Local Planning Authority following a complaint to it from
an occupant of a dwelling alleging noise disturbance at
that dwelling, the wind turbine operator shall, at its
expense, employ a consultant approved by the Local
Planning Authority to assess the level of noise emissions
from the wind turbine at the complainant's property in
accordance with the procedures described in the Institute
of Acoustics’ Good Practice Guide to the application of
ETSU-R-97 for the Assessment and Rating of Wind
Turbine Noise Guidance Notes.  The written request from
the local Planning Authority shall set out at least the date,
time and location that the complaint relates to and any
identified atmospheric conditions, including wind
direction, and include a statement as to whether, in the
opinion of the local Planning Authority, the noise giving
rise to the complaint contains or is likely to contain a tonal
component.
Reason - In order to safeguard the residential amenity of
the area.
26. Within six months of the wind turbine being
decommissioned the owner shall submit a scheme for the
removal of the turbine, all associated plant and
equipment and undertake restoration measures to
reinstate the site to its pre-development condition. 
Thereafter the scheme as subsequently approved in
writing by the Planning Authority shall be implemented in
complete accordance with the details as so agreed.
Reason - To ensure the turbine is removed from the site
at the end of its operational life, and to protect the visual
amenity of the area. 
Justification
The proposal is not in full accordance with the Development
Plan however there are material reasons which justify departing

Page 34

from the Development Plan.  There are significant benefits that
renewable energy generation will bring to the wider business
and its net zero ambitions, that accord with NPF4 Policy 11,
Energy, 33A Renewable and Low Carbon Energy: New
Proposals for renewable and low carbon energy.  These
considerations have been balanced against the wider impacts,
arising from the proposal due to the scale of the turbine and its
location in close proximity to the historic settlement of Dunning
and other visual receptors of note. 
On balance, the contribution of the proposal to the reduction of
carbon emissions and to the Scottish Government net zero
targets are considered to outweigh the adverse landscape and
visual impacts and the impact on the setting of historic assets.    
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. An application for Building Warrant may be required.
4. The developer is advised to contact Grace Woolmer-
White Historic Environment Officer (tel 01738 477056)
Perth and Kinross Heritage Trust, to discuss terms of
reference for works required and, if necessary, prepare
for them written Terms of Reference.
5. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate the submission of a Drainage
Impact Assessment. 
6. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us

Page 35

at developmentmanagement@pkc.gov.uk   Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses. 
In terms of Standing Order 21.5 a roll call vote was taken. 
2 members voted for the Motion as follows:
Councillors I James and C Reid. 
11 members voted for the Amendment as follows:
Councillors K Allan, B Brawn, D Cuthbert, K Harvey,
D Illingworth, B Leishman, I Massie, Bailie C McLaren,
G Stewart, R Watters and Bailie M Williamson. 
Resolved:
In accordance with the Amendment. 
(iv) 23/01876/FLL - Change of use of building to dwellinghouse
and associated works, land 15 metres south east of
Woodbine Cottage, Duncrievie, Glenfarg (Report No. 24/77) 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, a 1:200 site plan which identifies the
Construction Exclusion Zone (CEZ) shall be submitted for
the written agreement of the Council as Planning
Authority.  This plan shall ensure all fencing adheres to

Page 36

BS 5837 2012: Trees in Relation to Design, Demolition
and Construction.  The CEZ as subsequently agreed
shall be strictly adhered to during construction of the
development.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
4. Prior to the commencement of any works on site a
Method Statement for work within any of the Root
Protection Areas (RPAs) of the existing trees shall be
submitted for the agreement of the Planning Authority.
Work within the RPAs shall be undertaken in accordance
with the agreed Method Statement.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
5. Development shall not commence on site until details of
foul and surface water drainage systems have been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The surface water drainage scheme shall be
developed in accordance with the technical guidance
contained in The SUDS Manual (C753) and the Council's
Flood Risk and Flood Risk Assessments Developer
Guidance, and shall incorporate source control. All works
shall be carried out in accordance with the agreed
scheme and be operational prior to the bringing into use
of the development.
Reason - To ensure the provision of effective drainage for
the site.
6.  The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 08 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
7. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day
Reason - In order to prevent animals from being trapped
within any open excavations.

Page 37

8. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981). 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
The planning permission decision notice shall not be issued until
such time as the required Developer Contributions have been
secured or paid in full.  
In the event the applicant does not either make the required
payment within 28 days from the date the agent/applicant is
advised of the need for the contributions or complete a legal
agreement for delayed payment within a 4 month period from
the date the agent/applicant is advised of the need for the
contributions the application may be refused under delegated
powers without any further discussion with the applicant. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant should ensure they familiarise themselves
with the legislative requirements under the Controlled
Activities Regulations.  More detail on this is provided in
section 2 of SEPA's Standing Advice document which is
online at sepa-triage-framework-and-standing-advice.pdf.

Page 38

5.  The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
6. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk. 
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses. 
6. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 23/00020/PAN - Formation of a 49.9MW Battery Energy Storage
System (BESS) and ancillary infrastructure, land 256 metres south
west of Taigh An Struith, Tibbermore, Perth (Report No. 24/78) 
Councillor D Illingworth requested due consideration to the visual
impact of the battery storage containers, the use of agricultural land
and arrangements for the restoration of the land at the end of use of
the containers.   
Bailie M Williamson requested due consideration be given to a traffic
management plan and appropriate lighting. 
The contents of the Report by the Strategic Lead – Economy,
Development and Planning, were noted.