Perth and Kinross Council 
Planning and Placemaking Committee – 3 December 2025 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/341) 
Proposal: Erection of a dwellinghouse 
Location: Land 50 Metres Southwest of Tigh Na Ba, Bridge of Cally 
Ref. No: 24/00800/FLL
Ward No: P3- Blairgowrie and Glens 
Summary 
This report recommends approval of the application as the residential development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1. The proposal is for a one-and-a-half storey dwellinghouse with dormer windows
on the south elevation and rooflights providing light into the roof space. Finishing
materials include white wet dash render and a natural slate roof. A glazed link
between the proposed dwellinghouse and an existing garage/workshop is
proposed. 
2. The application site is a plot with an existing garage/workshop located within a
small cluster of houses at Craigton, 6.5km north of Bridge of Cally, on the west
side of the A93 Old Military Road. The boundary with the Cairngorms National
Park is 5.5km to the north at Glenshee.  The site is bound to the south and west
by a field access and beyond this to the south is an area of dense woodland. To
the north and east are a cluster of buildings at Craigton including a converted
byre (Planning Reference 11/01163/FLL) and to the northwest the site is partially
bound by a belt of mixed native woodland. A small burn runs through the site and
is culverted beneath the existing field access. Vehicular access will be taken via
the existing shared access from the A93 public road. 
3. In late 2016 an application for planning permission in principle was approved for
the erection of a dwellinghouse within the plot. This permission was renewed in
2019.

Page 2

Site History 
4. 15/01861/IPL application was withdrawn on 8 January 2016 for Erection of
dwellinghouse (in principle) 
5. 16/01733/IPL was approved on 15 December 2016 for Erection of a
dwellinghouse (in principle) 
6. 19/01867/IPL was approved on 20 December 2019 for Renewal of permission
16/01733/IPL (Erection of a dwellinghouse (in principle)) 
7. 23/01018/FLL Full Planning Permission application was withdrawn on 11 October
2023 for Erection of a dwellinghouse 
Environmental Impact Assessment 
8. The proposal is not EIA development. 
Pre-Application Consultation 
9. Pre application Reference: None.  
10. The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore, the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
11. The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
12. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
13. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places

Page 3

• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 17: Rural Homes
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
14. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15. The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 15: Public Access
• Policy 19: Housing in the Countryside
• Policy 26B: Archaeology 
• Policy 31: Other Historic Environment Assets
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
16.
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)

Page 4

Other Material Considerations 
PKC Non-Statutory Guidance
17.
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
18. The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
19. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 67 Housing Quality
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
20. Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
21. Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
22. This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.

Page 5

Local Place Plans 
23. Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site is not located in an area with a Local Place
Plan. 
Consultations 
24. As part of the planning application process the following bodies were consulted: 
External 
25. Perth and Kinross Heritage Trust - No objection, no issues raised. 
26. Scottish Water - No objection. No Scottish Water infrastructure in the vicinity for
water and wastewater. 
27. Scottish Environment Protection Agency - No objection. 
Internal 
28. Transportation and Development - No objection subject to conditions. 
29. Development Contributions Officer - No contribution required. 
30. Structures and Flooding - No objection, subject to conditions to ensure the
recommendations of the FRA are implemented and a Suds design is submitted
for written approval prior to the commencement of development. 
31. Environmental Health (Noise Odour) - No objection, stove system informative
recommended. 
32. Environmental Health (Private Water) - No objection, informative
recommended regarding water supply. 
33. Community Greenspace - Core path MTBL/162 is within the application
boundary but has not been noted anywhere within the planning application.
Condition and informative recommended. Access along the core path cannot not
be obstructed or deterred during construction or on completion of this
development, should it be approved. 
34. Biodiversity – initial comments highlighted the submitted information is not in
accordance with legislation, policy and guidance. On review of ecological survey
reports conditions are recommended and this includes a condition for a pre-
works survey for red squirrel prior to works commencing on site.

Page 6

Representations 
35. Nine (9) representations objecting to the proposals were received. The main
issues raised within the representations are: 
• Height and scale of the proposed dwellinghouse
• Negative impact on residential amenity – overlooking and loss of privacy
• Lack of parking
• Inappropriate housing density
• Inappropriate land use
• Out of character with area
• Over intensive development
• Plans show a staircase to an upper floor which could become additional
rooms
• Planting scheme on boundary
• Flood risk
• Foul drainage – capacity for dwellinghouse and proximity to private boundary
• Private water supply insufficient to service an additional dwellinghouse
• Detrimental impact on forest, wetland and wildlife habitat
• Road safety, access to A93 
36. These issues are addressed in the Appraisal section of the report. 
37. Other issues raised which are not a valid material planning consideration 
38. Land ownership relating to drainage – not a valid material planning consideration
and a private legal matter. 
39. Rights of access – not a valid material planning consideration and a private legal
matter. 
40. View of forest interrupted – loss of view is not a valid material planning
consideration. 
41. Small single-track road and access required at all times to private properties and
adjacent fields belonging to local farmer. This is a private access road and
blocking it during the construction phase or when the works are completed is a
private legal matter and not a valid material consideration in the assessment of
the application. 
42. The applicant has not shown shared access routes, driveways, privately owned
access tracks and public footpaths within the site boundaries or ensure that free
and unhindered access to neighbouring properties and agricultural land and
woodland will be respected. (Note: Forestry and Land Scotland have rights of
access to Dalrulzion Forest through the proposed development). 
43. Response - A condition is recommended to ensure access to the core path is
protected at all times (Condition 6). Private access rights to surrounding land and

Page 7

neighbouring properties is a private legal matter and not a valid material planning
consideration. 
44. The applicant should also identify on the planning application the location of the
septic tank serving Willowbank Cottage, and ensure there is unhindered access
to this land for the purposes of cleaning and maintenance. 
45. Response - An existing septic tank in the red line boundary of the application site
is shown on Drawing 14 and this was submitted to replace Drawing 04 during the
planning application process. Access to this land for the purposes of cleaning
and maintenance of the tank is not a valid material planning consideration and is
a private legal matter. 
Additional Statements 
Screening Opinion  EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal / AA not
required
Design Statement or Design and Access
Statement
not required
Report on Impact or Potential Impact eg
Flood Risk Assessment
submitted 
Appraisal 
46. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, namely Housing in the Countryside (2020), Flood Risk
and Flood Risk Assessments (2021), Placemaking (2020), Planning and
Biodiversity Planning Guidance and matters raised in the representations
received. 
Principle 
47. NPF4 Policy 17 Rural Homes supports proposals for new homes in rural areas
where the development is suitably scaled, sited and designed to be in keeping
with the character of the area and the development meets one or more of eight
criteria listed. From a review of historical records, and from the presence of the
existing buildings, the site is brownfield and as such the proposal meets NPF4

Page 8

Policy 17 criterion (ii) ‘reuses brownfield land where a return to a natural state
has not or will not happen without intervention’. 
48. LDP2 Policy 19 Housing in the Countryside and related Housing in the
Countryside Supplementary Guidance (2020) aligns with NPF4 Policy 17. The
Supplementary Guidance Category 1 Building Groups supports a new house
within building groups where it can be demonstrated that new housing will
respect the character, scale and form of the existing group, and will be integrated
into the existing layout and building pattern; new housing will not detract from the
visual amenity of the group when viewed from the wider landscape and a high
standard of residential amenity will be provided for both existing and new
housing. 
49. The application site had consent for a dwellinghouse (16/01733/IPL and
19/01867/IPL). This was granted on the basis that the site is relatively well-
defined and the proposal conformed to the criteria for housing development
within building groups in an earlier version of the Housing in the Countryside
Supplementary Guidance (2012). This offered support for new developments
within existing building groups providing the proposal does not detract from the
character of the area and that the development will take place in a defined site
with natural containment and a good landscape framework. 
50. The principle of a dwellinghouse on the site is accepted given the site history.
The proposed development will be integrated into the existing layout and building
pattern and will not detract from the visual amenity of the group when viewed
from the wider landscape. The siting, design and external appearance of the
dwellinghouse are considered in more detail in the following sections of the
report. 
Design and Layout and Visual Amenity 
51. A one and a half storey dwellinghouse is proposed with a floor to ceiling window
on the south elevation and a vaulted ceiling internally in the lounge space. In the
roof two dormer windows are proposed on the south elevation with rooflights
providing further amenity light into the upper-level space. A glazed link is
proposed between the dwellinghouse and an existing garage/workshop which is
to be lowered at eaves level with a reduced pitch. Finishing materials include
white wet dash render walls and a natural slate roof and the finish of the
garage/workshop is to match. 
52. There are a mix of single storey and one and a half storey dwellinghouses in the
building group at Craigton which includes a converted byre (11/01163/FLL). The
floor plans show two bedrooms on the ground floor with storage space at the
upper level. A representation highlighted that the upper-level could accommodate
further bedrooms. This could be undertaken without the need for planning
permission through Householder Permitted Development Rights (The Town and
Country Planning (General Permitted Development) (Scotland) Order 1992.

Page 9

53. Revised drawings were submitted during the application process to include two
dormer windows on the south elevation (away from other occupied property). 
This reflects the design of other buildings in the group. The position of the floor to
ceiling windows on the south elevation and other window openings have been
sensitively considered to remove any overlooking and privacy issues. The design
and material finish of the proposed dwellinghouse reflects the finishes on the
existing dwellinghouses in the building group. 
54. The existing garage/workshop is a breeze block construction with a timber panel
door and a steep pitched corrugated metal roof. The building has been on site for
more than ten years. It is to be altered and lowered at eaves level with a reduced
pitch with the external walls and roof finish to match the proposed dwellinghouse.
A glazed link is proposed to connect the garage/workshop to the dwellinghouse.
A condition is proposed to ensure the garage/workshop is used solely for
purposes incidental to the domestic enjoyment of the dwellinghouse (Condition
11). 
55. A revised site plan (Drawing 15) shows new tree and hedgerow planting in a wild
garden on the east side of the new dwellinghouse. A post and wire fence is
proposed around the boundaries of the site. 
56. It is therefore considered that the development is suitably scaled, sited and
designed to be in keeping with the character of the area. The proposal satisfies
NPF4 Policy 14 Design, Quality and Place and NPF4 Policy 17 Rural Homes and
LDP2 Policy 1 Placemaking and LDP2 Policy 19 Housing in the Countryside. 
Residential Amenity 
57. Representations raised the negative impact on residential amenity and the loss
of privacy and overlooking from the development. The location of the window
openings and the position of the floor to ceiling windows on the south elevation
ensures any potential overlooking and privacy issues have been carefully
considered. The window openings are mainly south facing towards the forest.
The garage/workshop is positioned between the application site and
dwellinghouses to the north and northeast. There is an upper window proposed
on the east elevation of the proposed dwellinghouse however the distance to the
nearest property (east) is 45m. There are no residential amenity issues arising
from the proposed development.   
58. This application is for the erection of a dwellinghouse which will include the
provision of a single woodburning stove and associated flue. Environmental
Health (EH) note that the flue will terminate at roof ridge height which will aid the
dispersion of emissions. They advise that smoke/odour could be further
minimised using fuel recommended by the stove manufacturer. The residential
amenity of neighbouring dwellinghouses should not be adversely affected by
smoke/odour. EH recommend a standard informative is attached to any consent
granted in respect of the operation of the stove (Informative 9).

Page 10

59. The proposal satisfies NPF4 Policy 14 Design, Quality and Place and NPF4
Policy 17 Rural Homes and LDP2 Policy 1 Placemaking and LDP2 Policy 19
Housing in the Countryside. 
Roads and Access 
60. The vehicle access to the public road network for the property will be via the
existing shared private vehicle track into the property. This track is taken off the
A93 public road. Transport Planning raise no issues with this arrangement. The
Council’s Roads Maintenance Partnership recommend that the vehicle access
onto the A93 is sealed to formalise the access from the public road and to
prevent the further discharge of surfacing aggregate onto the public road
(Condition 7). 
61. The consultation response from Transport Planning notes that the car parking for
two cars on the proposed block plan meets the requirements of the National
Roads Development Guide. Also, that there will be sufficient space for the
vehicles to turn and manoeuvre within the site. 
62. Representations highlighted the upper-level of the dwellinghouse could
accommodate further bedrooms in addition to the two on the ground floor with no
consideration of the impact this would have on the level of parking. The proposed
block plan shows space in the curtilage of the proposed dwellinghouse for two
cars and in addition there is garage space. This would be sufficient for a
dwellinghouse with an increase on the currently proposed level of two bedrooms. 
63. Within the redline boundary of the site is the core path MTBL/162. Access to the
core path is to be protected and remain open for use during construction and on
completion of the development (Condition 6). 
64. The proposal satisfies NPF4 Policy 13 Sustainable Transport and NPF4 Policy
20 Blue and Green Infrastructure (Core Path) and LDP2 Policy 15 Public Access
and LDP2 Policy 60B Transport and Accessibility. 
Drainage and Flooding 
Flood Risk 
65. There is a watercourse running through the site and flood risk was identified
through the historic applications. A Flood Risk Assessment (2024) was submitted
for review (Document 12). The FRA is an update of an assessment undertaken in
2016. 
66. The FRA reports that in the absence of flood risk there is no need for flood
alleviation or drainage enhancement measures that would only tend to increase
peak runoff from this small tributary. The report offered three recommendations
with recommendation 1 stating the site can safely be approved for development
without conditions.

Page 11

67. The Flooding Team were consulted, their initial consultation response dated 19
July 2024 recommended a standard condition to ensure that prior to the
commencement of works, the measures identified in the Flood Risk Assessment
to prevent flooding of the site shall be fully implemented in accordance with the
scheme agreed by the Council as Planning Authority. 
68. The requirement for this condition was followed up by Planning as three
recommendations were outlined in the FRA. The Flooding Team confirmed in an
email to Planning dated 29 July 2024 that they agreed with the FRA
recommendation 1 which states: Based on the above conclusions it is
recommended that no further formal flood risk assessment is necessary and the
site can safely be approved for development without special conditions. 
69. There is therefore no requirement for a standard condition to implement the
recommendations of the FRA. The FRA design and analysis are sufficient and
appropriate and confirm that the application site is not at risk of flooding. 
70. The proposal satisfies NPF4 Policy 22a Flood Risk and Water Management and
LDP2 Policy 52 New Development and Flooding. 
Drainage 
71. Surface Water Drainage – a rainwater soakaway is shown on Drawing 15. The
Flooding Team recommends a standard condition (Condition 9) for full details of
SUDS to be submitted for approval in writing prior to the commencement of
development. This is in line with NPF4 Policy 22c ii) Flood Risk and Water
Management and LDP2 Policy 53C Surface Water Drainage. 
72. Foul Drainage - Revised drawings were submitted to show an existing septic tank
in the red line boundary of the site, as identified in the comments received in the
representations. A bio disc foul water treatment system is proposed for the
dwellinghouse as shown on Drawing 15. The foul drainage proposal will be
subject to approval through the Building Warrant process. The proposal satisfies
LDP2 Policy 53B Foul Drainage. 
Private Water 
73. The application form stated the proposed dwellinghouse would be served by the
public water supply network. 
74. The Council’s Water Team noted in their consultation response that in this rural
area private water supplies (including Craigton borehole) are believed to serve
properties in the vicinity.  The Water Team noted that the applicant has
indicated that they will connect to the public mains water supply but should this
prove to be impractical a standard informative should be attached to any consent
granted (Informative 6). 
75. Following the consultation response from Scottish Water and the representations
which raised the issue of water supply, the agent checked the water supply

Page 12

details and the applicant confirmed that a private water supply will be provided
for the new house. The agent stated that the applicant currently has a water
supply to the caravan installed on site. Drawing 15 shows a private water supply
borehole box. 
76. A standard condition is proposed for further information on the private water
source to be submitted for written approval of the Council as Planning Authority
prior to the commencement of the development (Condition 13). This condition is
in line with NPF4 Policy 22d Flood Risk and Water Management and LDP2
Policy 53E: Water Environment and Drainage: Water Supply. 
Waste Collection 
77. There will be no negative impact on the existing arrangement for the building
group. An informative (12) highlights that the Council operate a charging scheme
for bin provision for new dwellings. 
Conservation Considerations 
78. The application site is not in a conservation area and there are no listed
buildings. The wider site at Craigton is recorded on Perth and Kinross Heritage
Trust (PKHT) records (MPK17497). PKHT have no objection as the proposed
development does not raise any significant issues. No archaeological mitigation
is required in this instance. 
79. The proposal satisfies NPF4 Policy 7o Historic Assets and Places and LDP2
Policy 26B Archaeology and LDP2 Policy 31 Other Historic Environment Assets. 
Natural Heritage and Biodiversity 
Biodiversity 
80. A Preliminary Ecological Appraisal (September 2024) was submitted for review
(Document 13). Further information was requested by the Council’s Biodiversity
Officer as the submitted information was not in accordance with legislation, policy
and guidance and the garage/workshop building was assessed as providing high
bat roost suitability and should therefore be subject to emergence surveys by
experienced bat surveyors to confirm the presence and status of bat roosts. 
81. An Ecological Impact Assessment (June 2025) was then submitted for review
(Document 24). This noted bat activity surveys were carried out in May-June
2025. Due to the presence of bat roosts, no works can be undertaken before a
derogation licence from NatureScot has been issued. The submitted Ecological
Impact Assessment contains sufficient information for the Planning Authority to
be satisfied that all three tests are likely to be met. The same tests need to be
passed in order for NatureScot to issue a bat licence. 
82. Further information on the presence of squirrel dreys was requested by the
Biodiversity Officer and an updated Ecological Impact Assessment (Document

Page 13

25) submitted for review. The submitted information is in accordance with
legislation, policy and guidance. 
83. As recommended by the Biodiversity Officer a condition is proposed to ensure
the recommendations and actions set out in the Ecological Impact Assessment
are undertaken (Condition 2). Also, a condition is proposed for a pre-works
survey for red squirrel to be submitted for written approval of the Council as
Planning Authority prior to works commencing on site (Condition 3). A further
condition is proposed for biodiversity enhancement measures to be implemented
(Condition 5). 
84. The proposal satisfies NPF4 Policy 3c Biodiversity, NPF4 Policy 4f Natural
Places and LDP2 Policy 41 Biodiversity and LDP2 Policy 47 River Tay
Catchment Area. 
Trees 
85. A revised proposal for tree planting was submitted (Drawing 15) in response to
comments in the representations about conifer trees planted around the
boundary (Drawing 10). A hawthorn hedge on the east boundary is proposed
with a mix of tree species including silver birch and cherry in a wild garden.
Condition 8 is proposed to ensure the planting is implemented and replaced if the
trees and hedgerow fail within five years of planting. 
86. The proposal satisfies NPF4 Policy 6a Forestry, Woodland and Trees and NPF4
Policy 20b Blue and Green Infrastructure and LDP2 Policy 1 Placemaking and
LDP2 Policy 42 Green Infrastructure. 
Low and Zero Carbon Generating Technologies 
87. LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. 
88. No details have been provided with the application and a standard condition is
proposed for the required information to be submitted prior to the
commencement of the development (Condition 12). 
Material Considerations 
Representations 
89. The main issues raised within the representations are:

Page 14

• Height and Scale of the proposed dwellinghouse
• Negative impact on residential amenity – overlooking and loss of privacy
• Lack of parking
• Inappropriate housing density
• Inappropriate land use
• Out of character with area
• Over intensive development
• Plans show a staircase to an upper floor which could become additional
rooms
• Planting scheme on boundary
• Flood Risk
• Foul drainage – capacity for dwellinghouse and proximity to private boundary
• Private water supply insufficient to service an additional dwellinghouse
• Detrimental impact on forest, wetland and wildlife habitat
• Road safety, access to A93 
90. The issues raised in the representations have been fully considered and further
information including reports have been submitted for review or amended
drawings submitted during the application process. Conditions have also been
applied for information to be submitted for written approval of the Council as
Planning Authority prior to the commencement of the development. The
proposed development satisfies NPF4 and the Perth and Kinross Local
Development Plan 2 as outlined the report above. The valid material planning
issues raised are not of sufficient weight to justify refusal of planning permission. 
Developer Contributions 
91. No developer contributions required. 
Economic Impact 
92. The economic impact is likely to be minimal and limited to the construction
phase. 
Variation of Application Under Section 32A 
93. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to include two dormers on the
south elevation. 
Planning Obligations and Legal Agreements 
94. None required.

Page 15

Direction By Scottish Ministers 
95. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
96. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none have been found that would justify overriding
the Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document(s) 25 relates)
shall be fully adhered to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
3. Prior to work commencing on site, a pre-works survey for red squirrels must be
undertaken by a suitably trained and experienced ecologist to ascertain the
presence of dreys. The results shall be used to inform a Species Protection Plan
to be submitted and approved in writing by the Council as Planning Authority. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
4. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey

Page 16

approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
5. Prior to the completion or occupation of the building(s) hereby approved,
whichever is the earlier, 4 hibernacula, 6 house martin cups, 4 swift nest boxes, 4
built in bat bricks and 2 external bat boxes shall be provided within the red line
boundary in accordance with recommendations within the supporting biodiversity
survey submitted and hereby approved. Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the development, to the
satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
6. The asserted right of way/core path shown on approved drawing MTBL/162 must
not be obstructed during building works or on completion of the development. 
Any damage done to the route and/or the associated signage during building
works must be made good before the development is completed or brought into
use, whichever is the earlier. 
Reason - To ensure continued public access to the public paths and in the
interests of public safety within the site.
7. Before the approved development is completed or put into use, the vehicular
access onto the public road network shall be constructed in accordance with
Perth & Kinross Council's Road Development Guide Type B Figure 5.6 access
detail of Type B Road construction detail. This construction detail must extend
into the entrance for a minimum of 3 meters from the boundary of the public road
surface. 
Reason - To ensure road safety and an acceptable standard of construction
within the public road boundary. 
8. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
established within five years being replaced in the following planting season with
others of a size and species as previously approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
9. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the written agreement of the

Page 17

Council as Planning Authority, in consultation with SEPA where necessary.  The
scheme shall be developed in accordance with the technical guidance contained
in The SUDS Manual (C753) and the Council's Flood Risk and Flood Risk
Assessments Developer Guidance, and shall incorporate source control. All
works shall be carried out in accordance with the agreed scheme and be
operational prior to the bringing into use of the development. 
Reason - To ensure the provision of effective drainage for the site. 
10. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable Sustainable Urban Drainage Systems to meet
the requirements of best management practices. 
Reason - To ensure the provision of effective drainage for the site. 
11. The garage hereby approved shall be used solely for purposes incidental to the
domestic enjoyment of the dwellinghouse. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
12. Prior to the commencement of development a statement shall be submitted for
approval in writing by the Council as Planning Authority to demonstrate that at
least 10% of the current carbon emissions reduction set by Scottish Building
Standards will be met through the installation and operation of low and zero-
carbon generating technologies. The statement as agreed shall be fully
implemented to the satisfaction of the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
13. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the development being brought into use and shall
thereafter be so maintained insofar as it relates to the development hereby
approved. 
Reason - To ensure the new development has an adequate and consistently
wholesome supply of water and to maintain water quality and supply in the
interests of residential amenity and ensure the private water supply or septic
drainage systems of neighbours of the development remain accessible for future
maintenance.

Page 18

Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
None.  
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
4. The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
5. Existing buildings or structures may contain nesting birds between 1st March and
31st August inclusive.  The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that nest is in use or being
built.  Planning permission for a development does not provide a defence
against prosecution under this Act. 
6. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is

Page 19

reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
7. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations. 
8. The granting of planning permission does not stop the continued right of public
access along the existing core path MTBL/162. An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an amendment of the Core
Path Plan under the Land Reform (Scotland) Act 2003 should be sought in
advance of any works authorised by this planning permission being commenced.
All relevant approvals should be in place prior to any stopping up and diversion of
the core path taking place. 
9. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environmental Protection Agency. 
10. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that
smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
11. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
12. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created
dwellings. Further information can be found at:
https://www.pkc.gov.uk/binrequests 
13. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water.

Page 20

14. The applicant should take note of the information and advice contained within the
consultation response from SEPA. 
15. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the dwellinghouse to include
dormer windows. 
Background Papers
Letters of representation 10 
Authors
Name Designation Contact Details
Claire Myles Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
20 December 2025