Democracy Spraffa

25/00883/Amm

Perth and Kinross Council · 5 November 2025
Back to Planning and Placemaking Committee — 5 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council 
Planning and Placemaking Committee – 5 November 2025 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/283) 
PROPOSAL: Erection of 18 dwellinghouses and associated works (change of
house types, plot layouts and removal of private driveway for plots
135 -152 of 23/01941/AMM) 
LOCATION: Land 200 Metres West of Blairgowrie and Rattray Cottage Hospital,
Perth Road, Blairgowrie 
Ref. No: 25/00883/AMM
Ward No: P3- Blairgowrie and Glens 
Summary 
This report recommends approval of the application for a development comprising the
erection of 18 dwellinghouses and associated works (change of house types, plot
layouts and removal of private driveway for plots 135 -152 of 23/01941/AMM). 
The development is considered to continue to comply with the relevant provisions of
the Development Plan and there are no material considerations apparent which
outweigh this conclusion. 
Background and Description of Proposal 
1. The application site is located to the immediate north of Dunkeld Road to the
north of Blairgowrie. The site slopes gently from a point of 94m AOD on its
northern boundary to approximately 74m AOD near the southern boundary.
Galabank footpath lies within the site boundary to the west and north, linking to
core path (BLAI/31) and connects users from Dunkeld Road to Newton Street. 
2. The settled edge of Blairgowrie lies to the east and south with existing private
gardens, relating to the properties on Dunkeld Road, lying immediately adjacent
to the wider site’s southern boundary. A further line of properties on Dunkeld
Road is located to the west of the wider site. 
3. Craighall Rattray, a Garden and Designed Landscape is located approximately
1.9km north of the wider site. There are a mixture of category A, B and C listed

Page 2

buildings in close proximity to the site including Newton Castle (category A listed
building) which is located to the north of the application site. 
4. The site is allocated within the Perth and Kinross Local Development Plan 2
(2019) (LDP2) as MU5 for mixed use development (residential, employment and
education). Planning permission in principle (PPP) for a mixed-use development
(employment, retail, residential, community and education) for the entire MU5
allocation was approved in December 2018. 
5. The site is to be delivered in phases with Phase 1A for the erection of two retail
units (Class 1), a neighbourhood centre comprising three retail units (Class 1),
parking areas, landscaping, SUDS pond and associated works having been
approved in January 2020 (Ref: 19/00163/AMM). 
6. Planning application 22/00060/AMM for a residential development comprising 71
dwellinghouses and 32 flats (phases 1B and 2A) was approved in March 2023.
This phase of development will deliver 73 affordable housing units, which
represents a large proportion of the requirement for the wider site. The affordable
housing tenures will be 34 Social Rent and 39 Mid-Market Rent properties. 
7. Planning permission was approved in December 2024 for a residential
development comprising of 152 dwellinghouses (23/01941/AMM). This forms
phase 3 of the wider MU5 site. There is one access into the site which utilises the
existing open field entrance. Dunkeld Road, which runs in an east-west direction,
bisects the site with the SUDS to be located on the south side. Car parking is to
be provided through a mixture of parking courts, in curtilage parking and off-
street parking. Construction works have commenced. 
8. This proposal seeks planning permission for a change of house type for 18
dwellinghouses at plots 135-152 (as approved under 23/01941/AMM) including
revisions to plot layouts, site levels, finished floor levels (FFL), boundary
treatments and the removal of the private access located to the west of plots
135-137. 
Site History 
9. 14/00008/PAN Mixed use development for employment use, residential use,
retail use and education was considered sufficient in November 2014. 
10. 14/01768/SCRN Proposed mixed use development. EIA required January 2015. 
11. 17/00939/IPM Mixed use development comprising residential development,
employment land, education/recreation/community facilities, infrastructure
including roads, footpaths, landscaping, drainage, open space and associated
works. Approved in December 2018. 
12. 19/00163/AMM Erection of 2 retail units (Class 1), a neighbourhood centre
comprising 3 retail units (Class 1), formation of parking areas, landscaping,

Page 3

SUDS pond and associated works (approval of matters specified by conditions
17/00939/IPM) (Phase 1A - MU5). Approved in January 2020. 
13. 22/00060/AMM Erection of 71 dwellinghouses and 32 flats (approval of matters
in conditions of 17/00939/IPM) (Phases 1B and 2A - MU5). Approved in March
2023. 
14. 23/01941/AMM Erection of 152 dwellinghouses and associated works (approval
of matters specified by conditions (17/00939/IPM). Approved in December 2024. 
15. 24/01529/ADV Advertisement Consent for display of signs. Approved in January
2025. 
16. 25/00593/FLL for Erection of a sales office (for a temporary period). Application
returned. 
Environmental Impact Assessment 
17. The impact of the wider development site was screened for EIA
(14/01768/SCRN) and it was determined that the proposal does constitute an
EIA development.  An EIA Report was submitted as part of the application for
planning permission in principle. 
Pre-Application Consultation 
18. Pre application Reference: 14/00008/PAN  
19. The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009. However, as the proposal is an AMSC application, further pre-application
consultation (PAC) is not necessary beyond that already undertaken for the
planning permission in principle. 
Development Plan 
20. The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
21. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
22. The Council’s assessment of this application has considered the following
policies of NPF4:

Page 4

Policy 1: Tackling the Climate and Nature Crises
Policy 2: Climate Mitigation and Adaptation
Policy 3: Biodiversity
Policy 4: Natural Places
Policy 6: Forestry, Woodland and Trees
Policy 7: Historic Assets and Places
Policy 13: Sustainable Transport
Policy 14: Design, Quality and Place
Policy 15: Local Living and 20 Minute Neighbourhoods
Policy 16: Quality Homes
Policy 18: Infrastructure First
Policy 19: Heating and Cooling
Policy 20: Blue and Green Infrastructure
Policy 22: Flood Risk and Water Management
Policy 23: Health and Safety 
Perth and Kinross Local Development Plan 2019 
23. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
24. The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 25: Housing Mix
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 27A: Listed Buildings
• Policy 28A: Conservation Areas: New Development
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 34A: Sustainable Heating & Cooling: Heat Networks, Major
Development and LDP Site Allocations
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 39: Landscape

Page 5

• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 45A: Lunan Lochs Catchment Area
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
25.
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable
Housing (adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New
Developments (adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
26.
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Conservation areas
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
27. The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below.

Page 6

Planning Advice Notes 
28. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 2/2010 Affordable Housing and Housing Land Audits
• PAN 3/2010 Community Engagement
• PAN 1/2011 Planning and Noise
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places
• PAN 79 Water and Drainage 
Creating Places 2013 
29. Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
30. Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
31. This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Local Place Plans 
32. Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site lies within ‘Name of’ Blairgowrie and Rattray
Local Place Plan. The LPP raises no issues in respect of the consideration of this
application. 
Consultations 
33. As part of the planning application process the following bodies were consulted:

Page 7

External 
34. Historic Environment Scotland: No objection. 
35. Blairgowrie and Rattray Community Council: No comments. 
36. Scottish Water: No objection. 
37. Perth and Kinross Heritage Trust: No objection. 
Internal 
38. Conservation Team: No objection. 
39. Structures and Flooding: No objection. 
40. Environmental Health (Noise Odour): No objection. 
41. Environmental Health (Contaminated Land): No objection, subject to
condition. 
42. Transportation and Development: No objection, subject to condition. 
43. Development Contributions: Officer: No comments. 
44. Commercial Waste Team: No objection. Informative recommended. 
45. Biodiversity: No objection. 
46. Community Greenspace: No comments. 
Representations 
47. No representations were received. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required 
Design Statement or Design and Access
Statement
submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
not required

Page 8

Appraisal 
48. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
49. The principle of the proposal has been established through the site’s allocation
as MU5 in LDP2 for a mixed-use development, including residential. The LDP2
allocation advises that the residential capacity of the site is 179-280 units.
Planning permission in principle (ref: 17/00939/IPM) has previously been
approved for the phased development of the site and planning permission for
Phase 3 was approved in December 2024 for 152 residential units
(23/01941/AMM relates). 
50. The principle of development is acceptable provided the proposals are
compatible with relevant policies of the development plan. 
Design and Layout 
51. Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are LDP2
Policy 1: Placemaking, Policy 14B: Open Space within New Developments, Policy
17: Residential Areas, Policy 25: Housing Mix and Policy 42: Green Infrastructure. 
52. The matters specified in Condition 3 of the PPP sets the required detail in respect
of the layout and design considering: topography, siting, design, height and
external materials of the buildings and structures. The PPP also requires further
detail in respect of landscaping and open space, SUDS, car parking and
boundary treatments. 
53. The layout broadly remains similar to that already approved in this section of the
site providing a range of 3-bedroom, two storey detached and semi-detached
homes. The housing mix remains the same as previously approved. The main
revisions are with plots 135-138 and plots 151 and 152 which propose a change
of house type and plot layout and the remainder of the revisions relate to FFLs,
site levels and resultant revisions to retaining walls, albeit minor and some
revisions to boundary fencing. 
54. The revised designs remain to be commensurate with the remainder of the
development and will not appear out of place. The external finishing materials are
also consistent and as such will integrate well within the rest of the development.

Page 9

55. All of the houses will have a private garden area and in-curtilage parking.
Boundary treatments comprise of timber fencing, masonry walls and a
combination of both. 
56. Perth and Kinross Council Placemaking Guide 2020, page 39 specifies for off-
street parking that parking within the plot should not dominate the front garden of
houses. Similarly Designing Streets specifies that car parking should be level
with, or behind the main building line which is more aesthetically pleasing in
streetscape terms. It further references that parking within the front curtilage
should generally be avoided as it breaks up the frontage, can be unsightly and
restricts informal surveillance. 
57. Parking remains the same as previously approved with the exception of 2 plots
(formerly 136-137) which had a private access. This is to be removed, increasing
the size of the open space and parking is to be provided to the sides of the
dwellinghouses to reflect the revised layout. 
58. Overall, the general layout, house designs and materials proposed are
acceptable. The proposed development continues to contribute positively to the
quality of the surrounding built and natural environment providing an inherently
sustainable development and as such is in compliance with relevant NPF4 and
LDP2 policies. 
Affordable Housing 
59. The Council’s LDP2 Affordable Housing Policy requires that 25% of the total
number of houses, above a threshold of 5 units, for which planning consent is
being sought is to be in the form of affordable housing. 
60. There is an existing S75 Agreement in place for this site in connection with the
Planning Permission in Principle consent ref: 17/00939/IPM. 
61. Approval of matters specified in conditions application has also gained consent
since then, Phase 1A (19/00163/AMM) and Phases 1B and 2A (22/00060/AMM).
The current application relates to Phase 3. 
62. It is acknowledged that Phase 2, application 22/0060/AMM is approved on the
basis that 73 new affordable homes will be delivered. 
63. Notwithstanding, clause 5.2 of the S75 Agreement requires that prior to the
submission of the first Application for Approval of a Condition in each
development area, the relevant owner shall in either case following consultation
with the relevant Council and statutory undertakers, submit a draft Affordable
Housing Scheme to the Council for approval. An Affordable Housing Scheme has
previously been submitted which satisfies the S75 requirement. 
64. There is no requirement for affordable housing to be provided within this phase of
the wider MU5 site as this is provided for in other phases as noted above.

Page 10

Landscape and Visual Amenity 
65. In terms of the impact on visual amenity of the area, the proposal will not
significantly alter the visual appearance from what has already been approved. 
66. The landscaping scheme has been agreed under application 23/01941/AMM
which remains applicable and is considered to be acceptable, however, an
updated landscaping plan will be required to reflect the revised layout. Conditional
control will be re-applied to ensure this is implemented accordingly (condition 18). 
67. The design and layout of the site, along with the proposed landscaping is
considered to be acceptable and will not cause any unacceptable visual impacts. 
68. The proposal meets the objectives of Policies 4, 6 and 14 of NPF4 and LDP2
Policies 1, 39 and 40B. 
Residential Amenity 
69. NPF4 Policy 14(c), NPF4 Policy 23 and LDP2 Policy 1A, 1B, 17, 56 and 57
require any development to not detrimentally impact on residential amenity and
to ensure any occupiers of new development have an adequate level of
residential amenity.   
Privacy, Daylight and Overshadowing 
70. The Council's guidance generally seeks to ensure there is a minimum distance of
9m from windows to boundaries in order to mitigate overlooking from new
development. Given the location of the development and the layout proposed
there are not considered to be any overlooking concerns from the proposed
dwellings. Each dwelling has a minimum of 9m deep rear gardens. 
71. The location of the proposed dwellinghouses relevant to existing residential
properties is such that there will be no loss of privacy or loss of daylight or
overshadowing. Similarly, the new properties are adequately spaced out to
prevent any impact on amenity in terms of loss of privacy, daylight or
overshadowing. 
72. As such, the proposal accords with the intent of NPF4 Policy 14(c): Design,
Quality and Place and LDP2 Policies 1A and 1B, Placemaking and Policy 17
Residential Areas in respect of residential amenity. 
Noise 
73. Condition 26 of the PPP requires a noise assessment to be submitted to
demonstrate acceptable internal noise levels of 35 dB within all dwellings taking
into account any acoustic mitigation proposed. An updated noise impact
assessment was submitted with planning application 23/01941/AMM which
required mitigation measures to be put in place.

Page 11

74. These plots were included in the updated noise impact assessment (NIA)
undertaken by KSG Acoustics, dated 02 September 2024 (rev 5). Whilst noise
mitigation measures were required for a number of plots within the proposed
development, these measures do not relate to plots 135 – 152. 
Dust 
75. A detailed Air Quality Impact Assessment (AQIA), which included a cumulative
assessment with other large-scale development in Blairgowrie, was assessed as
part of the PPP. Environmental Health had no objection to the assessment within
the PPP and no further appraisal is required. Therefore, there are no conflicts
with LDP2 Policy 57. The AQIA included dust control measures to be put in place
throughout the construction of the development. The recommended measures
are required to be implemented via Condition 9 of the PPP and will remain
enforceable for the duration of the construction. 
76. Therefore, subject to conditions, the proposal meets the terms of the PPP and
the above noted policies. 
Roads and Access 
77. Condition 3(iv) of the PPP specifies details required for roads, footpaths,
cycleways and path connections. NPF4 Policy 13: Sustainable Transport seeks
to encourage developments that prioritise sustainable travel while LDP2 Policy
60 Transport Standards and Accessibility Requirements requires consideration of
transport and accessibility. A supporting Transport Statement was assessed by
the Council’s Transportation and Development Team for the previous planning
application 23/01941/AMM, who did not object to the scale of development and
parking requirements were considered adequate. 
78. The applicant is proposing to change the layout of 18 properties within the site.
The parking at the properties is to an acceptable level, each plot will be provided
with 2 parking spaces. The applicant shall be aware that any changes to this
layout will require the Road Construction Consent layout to be updated and
including any streetlighting.  
79. Due to the nature of this proposal, there will be no changes to the traffic demand
on site. 
80. Subject to the conditions being re-applied from 23/01941/AMM (conditions 5-7),
the proposal meets the terms of the PPP, NPF4 Policy 13: Sustainable Transport
and LDP2 Policy 60: Transport Standards and Accessibility Requirements. 
Drainage and Flooding 
81. PPP Condition 3(ix) requires details of the proposed foul and surface water
Drainage to be provided. Conditions 10 and 11 support Condition 3(ix) and
specify the approach to flood risk assessment and surface water drainage
arrangements. The supporting Flood Risk Assessment (FRA) and Drainage

Page 12

Impact Assessment (DIA) submitted with planning approval 23/01943/AMM were
assessed by the Council’s Structures and Flooding team. Subject to conditions,
flood risk and surface water drainage arrangements were acceptable. 
82. As previously noted, this application proposed a change of house type and layout
including revisions to site levels. The Structures and Flooding team have been
consulted and advised that the revisions do not meaningfully alter the flood risk
or drainage strategy for the site as a whole. 
83. Overall, the proposal complies with NPF4 Policy 22: Flood Risk and Water
Management and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage. 
Waste Collection 
84. The Council’s Community Waste Advisers have been consulted and have
provided information on what provision should be made for waste and recycling. 
The dwellings will receive the 4-bin system. An informative note is recommended
regarding waste collection and will be attached to the permission (Informative 6). 
Conservation Considerations 
85. Colleagues with conservation expertise have been consulted and have advised
that the proposed development does not raise any concerns in respect to any
significant impact on the Blairgowrie Conservation Area or any listed building due
to their being adequate separation distance. 
86. As such the proposal complies with NPF4 Policy 7 and LDP2 Policies 27 and 28. 
Archaeology 
87. The wider site lies within an area that is considered to have archaeological
potential, however, Perth and Kinross Heritage Trust (PKHT) have been
consulted and advised that this proposed development does not raise any
concerns. 
88. As such, the proposal complies with NPF4 Policy 7: Historic Assets and Places
and LDP2 Policy 26: Scheduled Monuments and Archaeology. 
Natural Heritage and Biodiversity 
89. The consideration of natural heritage and biodiversity is integral to the layout,
design and landscaping detail required by the PPP. NPF4 Policy 1: Sustainable
Places, Policy 3: Biodiversity, Policy 4: Natural Places and Policy 6: Forestry
Woodland and Trees are relevant considerations as are LDP2 Policies 38:
Environment and Conservation, 40: Forestry, Woodland and Trees, Policy 41:
Biodiversity and Policy 45: Lunan Lochs Catchment Area.

Page 13

90. The Ecological Appraisal and detailed landscape proposals submitted with
planning approval 23/01941/AMM have been previously assessed by the
Council’s Biodiversity/Tree Officer. Re-consultation has been carried out on this
application, however, due to the nature of the application, no objection has been
received. 
91. It is concluded that the proposal adequately provides for and enhances natural
heritage and biodiversity and thereby complies with the relevant policies of NPF4
and LDP2. Conditions for 23/01941/AMM will be re-applied (conditions 10-16). 
Contamination 
92. NPF4 Policy 9 Brownfield, vacant and derelict land and empty buildings and
LDP2 Policy 58A: Contaminated and Unstable Land are relevant considerations. 
93. A Site Investigation Report produced by Bayne Stevenson Associates Ltd dated
November 2021 was submitted with the previous approval and reviewed by
colleagues in Environmental Health. No objections were received or conditions
recommended. The report covers Phase 2C & 3 of the wider development and
has not identified any constraints with regards to contaminated land. Colleagues
in Environmental Health have been reconsulted and whilst no objection has been
raised, recommend a condition be applied insofar as any imported material
sampling should be verified in a Verification Report prior to the occupation of any
units. It is not, however, considered appropriate at this stage in the process to
apply such a condition, however, an informative will be added instead
(informative 18). 
94. It is concluded that, the proposal complies with the relevant policies of NPF4 and
LDP2. 
Developer Contributions 
95. LDP2 Policy 5 – Infrastructure Contributions requires consideration of the
individual or cumulative impact of new development on infrastructure and
facilities and to secure contributions to address this impact where the
development exacerbates impacts or generates additional need. 
96. The proposed application represents a change in house type/design/layout with
no overall change in unit numbers. There are no additional developer contribution
requirements. 
97. As such the proposal complies with LDP2 Policy 5. 
Local Living and 20 Minute Neighbourhoods 
98. NPF4 Policy 15 requires that development proposals contribute to local living
where the majority of people can meet their daily needs within reasonable
distance of their home. The proposed development is located within an allocated
site, within an existing residential area and is easily accessible by sustainable

Page 14

modes of transport including public transport, walking, wheeling and cycling
networks. The development of the site would provide private homes in a location
which is well served by local shops, schools, parks and open space within easy
walking and wheeling distance and is therefore considered to meet the
requirements of Policy 15 of NPF4. 
Low and Zero Carbon Generating Technologies 
99. LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new buildings, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. 
100. The previous submission refers to Solar PV panels and improved insulation on
each home. The energy statement submitted stated that the proposed design
provides opportunities for passive and natural energy sources in order to create a
low-energy development. The energy statement further stated that through
sustainable design, building practices and the incorporation of micro-renewable
technologies into the dwellinghouses, they can achieve the carbon reduction
targets set within LDP2. A condition was placed on 23/01941/AMM to ensure
compliance with Policy 32 and subsequently agreed, however, to ensure
continued compliance an appropriately worded condition will be re-applied
(condition 9). 
Economic Impact 
101. During the construction period, jobs will be created and sustained, supporting in-
direct employment and revenue that this volume of construction activity will
generate from employees spending on local goods and services. Longer term,
additional residents to the area will also support existing local employment and
services in the area. 
Planning Obligations and Legal Agreements 
102. A Section 75 agreement has been secured for the 17/00939/IPM planning
permission to secure necessary infrastructure improvements and contributions.
The agreement in place continues to meet the objectives of the PPP and LDP2
Policy 5. An upfront payment was received towards the maintenance of the play
area at Lochy Park for planning approval 23/01941/AMM. No further contribution
is required. 
Direction By Scottish Ministers 
103. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions

Page 15

by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
104. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. The development hereby permitted shall be commenced no later than the
expiration of two years from the date of this consent or from the date of
subsequent approval of matters specified in conditions, or three years from the
date of planning permission in principle, whichever is the later. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
Phasing and Delivery 
2. The details submitted and agreed as part of condition 3 of planning permission
23/01941/AMM (drawing number 122) with regards to the phasing and delivery
plan, shall be implemented in accordance with the agreed delivery plan and
landscaping carried out concurrent with development. 
Reason - In order to ensure the satisfactory implementation and completion of
the development. 
Drainage and Flooding 
3. The developer shall ensure all SUDS features are fit for purpose and
appropriately control, treat and discharge surface water up to and including their
design standard. 
Reason - To ensure the provision of effective drainage for the site.

Page 16

4. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved
development works. The temporary surface water treatment facility shall remain
in place until the permanent surface water drainage scheme is implemented
unless otherwise agreed in writing by the Council as Planning Authority. 
Reason - To ensure the appropriate management of construction surface water
run-off to minimise flooding and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the interests of residential and
environmental amenity. 
Roads and Access 
5. The details submitted and agreed as part of condition 10 of planning permission
23/01941/AMM (drawing numbers 125 and 126) with regards to the Construction
Traffic Management Scheme (CTMS), shall be adhered to at all times. The
CTMS is to remain a fluid document and will be required to be updated where
necessary. 
Reason - In the interests of road safety 
6. Prior to commencement of any development on site, the street lighting design
must be submitted for the further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council's Street Lighting
Partnership for the public road network. The scheme shall include details of light
spill, brightness of the lighting and the proposed hours of operation for both the
public road network and the private areas, and timescales for delivery. The
agreed lighting scheme shall be implemented and maintained in full accordance
with the agreed scheme. 
Reason - In the interests of road safety 
7. The details submitted and agreed as part of condition 17 of planning permission
23/01941/AMM (drawing number 130) with regards to a Residential Travel Plan,
shall be implemented in accordance with the approved plan prior to the
completion of the development. 
Reason - To promote sustainable transport options and to meet advice within
National Planning Framework on Transport. 
Core Paths 
8. All existing rights of way, core paths within or adjacent to the completed
development shall at all times be protected and remain operational during the
construction phases. 
Reason - In the interest of sustainable transportation.

Page 17

Environmental Impact 
9. The energy statement submitted and agreed as part of condition 19 of planning
permission 23/01941/AMM (drawing number 128) shall be implemented in full
prior to the occupation of each dwellinghouse. 
Reason - To embed low and zero-carbon technologies within the development in
the interest of environmental sustainability. 
Biodiversity 
10. The details submitted and agreed as part of condition 20 of planning permission
23/01941/AMM (drawing number 125) with regards to the Construction
Environmental Management Plan CEMP shall be adhered to at all times. Further,
prior to the commencement of development of each phase an updated CEMP
must be submitted for the approval of the Planning Authority. Subsequently, the
measures outlined in the agreed CEMP shall be adhered to at all times during
the construction period. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. The conclusions and recommended action points within the supporting
Ecological Survey and Biodiversity Enhancement Plan submitted and approved
under planning permission 23/01941/AMM (document numbers 61 and 113) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
12. An updated ecological survey will be required prior to the commencement of
works, if works have not commenced within 24 months of the date of the survey
approved as part of this permission. The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
13. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, wildlife kerbs shall be installed adjacent to all road
gullies within 500metres of a SUDS pond or watercourse. Thereafter, the kerbs
shall be retained in a reasonable condition for the life of the development, to the
satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
14. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, hedgehog highways shall be created by providing
access gaps in wooden fences on each plot at least 13cm x 13cm at ground
level, to allow for the free movement of hedgehogs. Thereafter, the hedgehog

Page 18

highways shall be retained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
15. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
16. Prior to the commencement of development, an updated Planting Plan shall be
submitted to show the locations of the bird boxes and swift/bat bricks for the
written agreement of the Planning Authority. The scheme as subsequently
agreed shall be implemented prior to the occupation of each relevant residential
unit. Thereafter, they should be maintained in a reasonable condition for the life
of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Trees and Landscape 
17. All trees on site, other than those marked for felling on the approved plans, shall
be retained. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
18. Prior to the commencement of the development hereby approved, an updated
detailed landscaping and planting scheme, to reflect the revised layout, for the
site shall be submitted for the written agreement of the Council as Planning
Authority. The scheme as subsequently approved shall be carried out and
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier. The
approved scheme shall thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to become established within
five years being replaced in the following planting season with others of a size
and species as previously approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
19. All landscaped areas outwith the curtilages of the dwellings and shown on the
approved drawings shall be permanently retained as such and shall at no time be
used as private garden ground nor incorporated within the curtilage of any of the

Page 19

dwellings hereby approved without the express grant of planning permission by
the Planning Authority. 
Reason - In the interests of the character and appearance of the development. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
None applicable.  
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development
• Readily visible to the public
• Printed on durable material. 
4. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
5. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created

Page 20

dwellings. Further information can be found at:
https://www.pkc.gov.uk/binrequests 
6. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste. 
7. Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn. 
Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved. 
8. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the commencement
of roadworks.  Advice on the disposal of surface water must be sought at the
initial stages of design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable for the processing of
RCC applications. 
9. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
10. No work shall be commenced until an application for building warrant has been
submitted and approved. 
11. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
12. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
13. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is

Page 21

no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
14. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot. Failure to obtain a licence may
constitute a criminal act under the Habitats Regulations and penalties are sever
for non-compliance. 
15. The applicant is advised that technical approval will be required for all street
lighting apparatus within adoptable areas and should contact the Street Lighting
Partnership to obtain technical approval prior to the submission of a Road
Construction Consent application. 
16. The granting of planning permission does not stop the continued right of public
access along the existing core path BLAI/31. An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an amendment of the Core
Path Plan under the Land Reform (Scotland) Act 2003 should be sought in
advance of any works authorised by this planning permission being commenced.
All relevant approvals should be in place prior to any stopping up and diversion of
the core path taking place. 
17. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
18. The applicant should take note of the information and advice contained within the
consultation response from Perth and Kinross Council Environmental Health
(Contaminated Land) Team. 
Background Papers
Letters of representation 0 
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer
(Majors)
01738 475300
developmentmanagement@pkc.gov.

Page 22

Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
20 October 2025