Perth and Kinross Council 
Planning and Placemaking Committee – 3 September 2025 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/216) 
Proposal: To construct and operate Glentarken Wind Farm (ECU00004700) 
Location: Land 5.5km North-west of The Kopje, St Fillans, Crieff, PH6 2NG 
Ref. No: 25/00151/ECU36
Ward No: P6- Strathearn 
Summary 
Perth and Kinross Council has been consulted by the Scottish Government’s Energy
Consents Unit (ECU) on the proposed Glentarken Wind Farm - ECU00004700. 
The findings of this report recommends that the Council objects to the proposal due
to its impact on Loch Rannoch and Glen Lyon National Scenic Area. 
Background and Description of Proposal 
1 The purpose of the report is to make members aware of the relevant planning
considerations relating to the proposed development. Following consideration of
these matters the Council must advise the Scottish Government whether it
objects to the application or not. 
2 The proposed development is located approximately 45 km west of Perth within
the Drummond Estate and approximately 2.8 km east of Lochearnhead. The site
includes land within the Perth and Kinross local authority area and the Stirling
local authority area. The turbine array will be within Perth and Kinross, while the
site entrance and a portion of the access track is located within the Stirling area. 
3 The Proposed Development would include the following key components: 
• Up to 12 Wind Turbine Generators (WTGs) of up to 180 m tip height with
internal transformers;
• WTG foundations;
• Battery Energy Storage Systems (BESS) with up to 50 MW capacity;
• Crane hardstandings and associated laydown area at each wind turbine
location;

Page 2

• Approximately 15.6 km of on-site access tracks comprising 11.8 km of cut
track, 2.8 km floated track and 1 km of upgraded existing track, to connect to
ancillary site infrastructure;
• An on-site substation, operations and control building, welfare facilities and
store;
• A network of underground cabling to connect each wind turbine to the on-site
substation;
• Telecommunications infrastructure;
• Watercourse crossings;
• A LiDAR unit to collect meteorological and wind speed data, and associated
hard stand; and
• Any other ancillary works required. 
4 In addition to the permanent components, the construction phase would
comprise the following temporary facilities: 
• Site compound areas, including welfare facilities, site cabins, storage and
parking;
• Batching plant facilities for temporary on-site concrete batching;
• Up to six borrow pits; and
• Any other ancillary works required. 
5 A further wind farm development, Glen Lednock Wind Farm, is proposed on an
adjacent site to the east (PKC ref: 25/00899/ECU36 - ECU ref: ECU00004966).
The proposal comprises of up to 19 wind turbines, of which up to 16 are 200m to
tip and up to 3 are 180m to tip, and associated infrastructure. Where necessary,
the cumulative impacts of the wind farms has been included and assessed in the
EIAR. 
Site History 
6 22/00017/CONSUL (ECU ref: ECU00004700) on 22 February 2023, The Scottish
Ministers, following consultation with PKC and other relevant bodies, adopted a
scoping opinion setting out the scope of the matters to be considered within the
EIA Report to be submitted alongside the application for a proposed wind farm
development (at that time known as Drummond Wind Farm). 
Environmental Impact Assessment 
7 The proposal is EIA development and an EIA Report has been submitted. An
assessment of the report’s findings and significant environmental effects is
provided in the appraisal section below. 
Pre-Application Consultation 
8 The proposed development is classed as a National Development within NPF4,
as provided for in Section 3A of the Town and Country Planning (Scotland) Act
1997 (as amended). However, unlike other National Development proposals,

Page 3

applications made under Section 36 of The Electricity Act 1989 are not subject to
mandatory pre-application consultation engagement requirements. 
9 Nevertheless, despite there being no statutory requirement to conduct public 
consultation, the applicant has submitted a PAC Report providing information on
engagement activities undertaken to gain insight into concerns and opinions from
members of the local community and surrounding area. Such engagement
involved public exhibitions being held in Lochearnhead Village Hall on 19th April
2023 and Sandison Hall, St Fillans on 20th April 2023. A second set of public
exhibitions were held in the same venues on 28th and 29th May 2024 with a third
set held on 19th and 20th November. In addition, virtual exhibitions were hosted
via an online platform on 2nd and 4th May 2023, 12th June 2024 and 28th
November 2024. The developer has also attended local community council
meetings, advertised the project in local press releases and hosts an online
webpage. 
Development Plan 
10 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
11 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
12 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
13 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and

Page 4

economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
14 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33D: Renewable and Low Carbon Energy: Spatial Framework for
Wind Energy
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 41: Biodiversity
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53D: Water Environment and Drainage: Reinstatement of Natural
Watercourses
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure 
Statutory Supplementary Guidance
15
• Supplementary Guidance - Landscape (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
16
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)

Page 5

National Guidance 
17 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
18 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• Scottish Government Advice: Onshore wind turbines (May 2014)
• Scottish Government Advice: Energy storage (December 2013) 
Consultations 
19 As part of the consideration process for this consultation, the following bodies
were consulted: 
20 NatureScot: Object to the proposal as it would result in significant adverse
effects on the Special Landscape Qualities of the Loch Lomond and The
Trossachs National Park and the Loch Rannoch and Glen Lyon National Scenic
Area. 
21 Biodiversity: No objection. Conditions are recommended to secure a revised
CEMP, including measures to mitigate impacts of lighting on nocturnal species, a
revised Biodiversity Net Gain Plan/Habitat Management Plan, details of
monitoring arrangements and details of an ECOW. 
22 Mr Dick Bowdler (Noise): No objection. Conditions are recommended to ensure
that noise from the operational turbines can be controlled and construction noise,
including times of operation, are controlled via the CEMP. 
23 Community Greenspace: No comments. 
24 Conservation Team: No objection. There are several heritage assets outwith
the subject site that are potentially vulnerable to setting impacts from the
proposed development. However these have been demonstrated to have
minimal impact from the proposal. 
25 Development Contributions Officer: No comments. 
26 Environmental Health (Private Water): No objection. It is recommended that a
condition is imposed requiring a detailed survey to be carried out to identify any
spring, borehole or private water supply potentially affected by the development,
and details of any necessary mitigation measures and maintenance of quantity
and quality of water supplies.

Page 6

27 Structures and Flooding: No objection. Conditions are recommended to ensure
that recommendations in the EIAR Volume 1, Main Report, Chapter 8 – Geology,
Peat, Hydrology and Hydrogeology shall be followed and are included in the
CEMP. 
28 Perth and Kinross Heritage Trust: No objection. It is recommended that
conditions are imposed requiring that a programme of archaeological work is
undertaken pre-construction phase, with construction phase monitoring, and the
engagement of an Archaeological Clerk of Works to oversee the programme. 
29 Transportation and Development: No objection. The Abnormal Indivisible
Route to the site and access location are all on trunk roads outwith PKC
jurisdiction. 
Additional Statements 
30 Screening Opinion EIA required 
Environmental Impact Assessment (EIA):
Environmental Report
Submitted 
Appropriate Assessment under Habitats
Regulations
Any required Habitats Regulations
Appraisal will be for the ECU 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
• PAC Report
• Planning Supporting Statement
• EIA Report covering the
following:
− Landscape and Visual
− Ornithology
− Ecology
− Geology, Peat, Hydrology and
Hydrogeology
− Noise and Vibration
− Cultural Heritage
− Traffic, Transport and Access;
− Socioeconomics, Recreation
and Tourism;
− Aviation; and
− Television and Radio. 
Appraisal 
31 Schedule 8 to Section 36 of the Electricity Act 1989 requires the Scottish
Government, as the appropriate authority, to serve notice of the application on
the Council as the relevant planning authority. There is no primacy of the
Development Plan for S.36 applications. However, the Council are required to
consider the proposal in accordance with the provisions of the Development
Plan, as a material consideration.

Page 7

32 The Development Plan comprises National Planning Framework 4 (NPF4) and
the Perth and Kinross Local Development Plan 2019 (LDP2). The relevant policy
considerations are outlined in the policy section above and are considered in
more detail below. In terms of other material considerations, this involves
considerations of the Council’s other approved policies and supplementary
guidance. 
33 NPF4 identifies ‘Strategic Renewable Electricity Generation and Transmission
Infrastructure’ as a National Development. The National Development explicitly
supports renewable electricity generation, which generates above 50 megawatts
capacity which is applicable in this case. The policy intent of NPF4 Policy 11:
Energy is to ‘encourage, promote and facilitate all forms of renewable energy
development onshore and offshore’…including energy generation and storage.
Policy 11a also provides support for all forms of renewable, low carbon energy
including: (i) wind farms, (iii) energy storage, and (vii) co-location.  
34 Co-location of the battery energy storage system with the wind farm is supported. 
35 NPF4 highlights the importance of enabling developments that contribute
towards greenhouse gas emissions reduction targets and wider national
commitments to tackle the climate crisis. The application includes a carbon
calculator for the development. The carbon balance for the development
suggests a payback time of around 0.9 years (11 months) when compared to the
fossil grid fuel mix of electricity generation or 1.9 years when compared to the
grid mix electricity generation. Beyond this point, the applicant considers the
development to represent a positive contribution to national emissions reductions
objectives for the remaining of its operational life. 
36 Schedule 9 of the Electricity Act 1989 requires licence holders to “have regard to
the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiographical features of special interest” and “shall do what he
reasonably can to mitigate any effect”. 
37 In terms of LDP2, Policy 33: Renewable and Low Carbon Energy and Policy 39:
Landscape are also relevant in the assessment of the proposed development. It
is accepted that NPF4 Policy 11 supersedes LDP2 Policy 39 where they are
incompatible but the specific considerations in Policy 39 are relevant
considerations that should be taken into account as expressions of impacts
considered of most importance in the region. 
Landscape 
38 NPF 4 Policies 4: Natural Places and 11: Energy and LDP2 Policies 33:
Renewable and Low Carbon Energy and 39: Landscape area all relevant to the
assessment of the proposal. A Landscape and Visual Impact Assessment (LVIA)
has been carried out to consider the landscape impacts of the proposal.The EIAR
assessment of the resulting development has identified that the turbines have the
potential to cause effects on:

Page 8

a) Core paths within a 5km radius; 
b) Landscape character of the following Landscape Character Types (LCT)
(different degrees of impact):
− LCT 147 Summits and Plateaux – Central (Unit 2, Beinn Leabhainn)
− LCT 254 Straths and Glens with Lochs (Unit 3, Loch Earn)
− LCT 251 Highland Summits (Unit 2, Ben More/Ben Vorlich)
− LCT 376 Summits & Plateaux – Tayside (Unit 1, Forest of Glenartney,
south of Loch Earn; Unit 2, Ben Chonzie / Sron Mhor / Meall nam Fuaran);
and Unit 3, Ben Lawers and Beinn Heasgarnich)
− LCT 371 Mid Upland Glens (Unit 2, Glen Lednock)
− LCT 372 Lower Upland Glens
− LCT 374 Mid Upland Glens with Lochs 
c) Landscape character of the following Landscape Designations:
− Creag Gharbh LLA (Major and significant impact)
− Loch Tay LLA (Moderate-minor and not significant impact)
− Loch Lomond and Trossachs National Park (LLTNP):
• SLQ 7 (Tranquillity): Moderate and not significant effect
• SLQ 2 (Wild and rugged highlands contrasting with pastoral lowlands):
Moderate and significant effect
• SLQ 9 (Steep mountains and long glens): Moderate and significant
effect  
39 Cumulative impacts for consented and application scenarios are assessed by the
applicant as minor and not significant. For the wider scoping scenario, cumulative
effect is considered moderate and significant. 
40 Despite these impacts, the EIAR considers the development does not cause
significant effect on the overall ‘integrity’ of the LLTNP. 
• Loch Rannoch and Glen Lyon NSA
− SLQ 5 (Secluded side glens and ancient shielings): Moderate and not
significant effect
− SLQ 6 (The wild summits): Moderate and not significant effect
− SLQ 12 (The dominance of Ben Lawers): Major/moderate and significant 
41 Cumulative impacts for consented and application scenarios are minor and not
significant. For the wider scoping scenario, cumulative effect for SLQ 5 and
SLQ6 is moderate and not significant. For SLQ 12, the resulting cumulative effect
is moderate and significant. 
• River Earn (Comrie to St Fillans) NSA
− SLQ 1 (A harmonious combination of highland and lowland): moderate
and not significant effect
− SLQ 8 (The viewpoint of Dundurn, St Fillans Hill): Moderate and not
significant

Page 9

42 Cumulative impacts for consented and application scenarios are minor and not
significant. For the wider scoping scenario, the resulting cumulative effect is
major-moderate and significant. 
• Views for recreational users at a series of selected viewpoints. Some of these
points are located within Landscape Designations. These impacts for different
locations range in magnitude and significance. 
43 The impacts identified on landscape designations (point c) are assessed against
NPF4 Policy 4 (c). This states that development proposals that will affect
National Parks and NSAs will only be supported where: ‘(i) the objective of
designation and the overall integrity of the areas will not be compromised’. It is
important to note that impact on National Parks landscapes is still noticeable
even when the development is outside of the boundary of the designated area. 
44 While the content of the application focuses on the integrity of designated areas,
the text of NPF4 policy also aims to protect the quality of these designations.
Some SLQs are expected to suffer significant impact, which is an undesirable
outcome of the development when considered against national policy. 
45 There are therefore significant landscape character effects within a stated
maximum of 12km of the proposed development, and significant visual effects up
to approximately 16km from the site. 
46 For national designations (in this case, National Parks and NSAs), NPF4 Policy 4
(c)(i) requires the objectives of designation and the overall integrity of the
designated area to not be compromised. In reference to local natural
conservation sites or landscape areas, NPF4 Policy 4 (d)(i) also demands that
development will not have significant adverse effects on the integrity of the area
or the qualities for which it has been identified. However, both articles within
NPF4 Policy 4 also recognise that significant adverse effects on those protected
areas can be outweighed by social, environmental or economic benefits. 
47 The EIAR states character impacts are limited to a maximum of 12km from the
proposed development, with 16km for significant visual impacts. The significant
impact on the character of the landscape here includes areas of significant value
to the region of Perth and Kinross as a whole and wider national interests, and
not just the immediate locality. The landscape designations impacted, including
National Parks, NSA and LLA, should add significant weight to whether the
impacts are localised. 
48 NatureScot has been consulted by the ECU directly on the proposal and also by
PKC due to their role as national advisors on matters including landscape.
NatureScot has objected to the proposal as it would result in significant adverse
effects on the Special Landscape Qualities of the Loch Lomond and The
Trossachs National Park and the Loch Rannoch and Glen Lyon National Scenic
Area. Loch Lomond and the Trossachs National Park Authority is also a

Page 10

consultee to the ECU and will return their own comments on any impacts on the
National Park. 
49 Loch Rannoch and Glen Lyon National Scenic Area is located almost entirely
within the PKC boundary, to the north of the site. NatureScot consider that
effects on Loch Rannoch and Glen Lyon NSA are such that the objectives of the
designations and overall integrity of the areas would be compromised. These
effects are unlikely to be overcome through re-design or removal of turbines. It is
also noted that there would be significant adverse effects on the Special
Landscape Qualities of the River Earn (Comrie to St Fillans) National Scenic
Area. However, these are not to the extent that the overall integrity of the area
would be compromised. 
50 Policy 4 states that development in National Scenic Areas will not be supported
where development has significant adverse effects on the integrity of the area or
the qualities for which it has been identified. Policy 4 when read together with
Policy 11(e)(ii) provides further interpretation requires appropriate mitigation
where a landscape is recognised as sensitive. The EIA significant effects table
has taken the sensitivity of these areas into account resulting in the finding of a
significant adverse effect on the integrity of the area. 
51 NPF4 Policy 1 lends significant weight to the climate crisis, and the status of the
development as a national development. Additionally, NPF4 Policy 11(e) states
that development impacts and the proposed mitigation measures should be
considered giving significant weight to the contribution of the proposal to
renewable energy generation targets and on greenhouse gas emissions
reduction targets. However, the proposed development is in an area with a large
number of designated areas. The landscapes and natural environments have
long been identified as being of high quality and worthy of protection. The
description of impacts offers sufficient evidence that the development will bring
permanent change to the qualities of these designated areas. The magnitude of
the development, together the number and value of the protected areas, raises
significant concern about the acceptability of these impacts even after mitigation. 
52 In conclusion, the proposal will bring about significant adverse effects on Loch
Rannoch and Glen Lyon NSA to the extent that the overall integrity of the area
will be compromised. While considerable weight is to be given to the contribution
the proposed development could make in achieving renewable energy
generation targets, this does not overcome the significant detrimental impact the
proposal will have on a nationally important landscape designation. The proposal
is therefore contrary to NPF4 Policy 4 and LDP2 Policies 33 and 39. 
Residential Amenity 
53 NPF4 Policy 11: Energy and LDP2 Policies 33: Renewable and Low-Carbon
Energy, 55: Nuisance from Artificial Light and Light Pollution and 56: Noise
Pollution are relevant.

Page 11

54 PKC has engaged an external specialist noise consultant to review the noise
section of the EIAR. The four nearest properties have been assessed and the
distances of these from the nearest turbines range from just under 3km to just
under 6km. 
55 Technical guidance for the assessment of noise emissions from onshore wind
turbines, known as ETSU-R-97, provides comprehensive advice to local
authorities across the UK for appraising planning applications for onshore wind
developments. The propagation methodology described in the EIAR are
appropriate and the resulting turbine noise levels are correct in accordance with
good practice. The turbine noise levels are shown to meet the ETSU-R-97
simplified limit of 35dB. 
56 The assessment also considered the cumulative noise levels for Glentarken
Wind Farm and the nearby Glen Lednock Wind Farm. The turbine noise levels
cumulatively from both wind farms was shown to comfortably meet the ETSU-R-
97 simplified limit of 35dB. 
57 The noise levels from the substation and BESS are considered to be low and due
to their distance from sensitive receptors a full assessment was not required.
However, should the consent be granted, relevant conditions will be required to
control noise during the construction phase and during the operational phase
should a complaint be received. 
58 Effects on visual amenity are considered in detail in the Landscape section
above, where it is concluded that the proposal will result in some significant
visual effects. 
59 Similarly, in terms of aviation lighting, it is proposed that four of the turbines will
have visible aviation lighting. The assessment of night time effects for the
proposed development has predicted significant effects for some of the
viewpoints considered in the LVIA. This is largely due to the appearance of
lighting on an upland horizon which has a currently dark baseline characteristic
and the high sensitivity of the receptors experiencing this lighting. 
60 Shadow flicker was scoped out of the EIAR, as there will be no significant effects
due to the separation distances between the residential properties and the
nearest turbine. 
Roads and Access 
61 Policy 13 (Sustainable Transport) of NPF4 focuses on sustainable travel and
ensures development is sited appropriately. LDP2 Policy 60 (Transport
Standards and Accessibility Requirements) requires that local road networks be
capable of absorbing traffic generated by development and that satisfactory
access is provided. 
62 The applicant has shown that the Abnormal Indivisible Route to the site will be
outwith Perth & Kinross Council area. There will however be traffic associated

Page 12

with the development that will utilise roads within Perth & Kinross Council area,
along the local road network and the trunk road network. 
63 The project is estimated to tale 18 months to construct. The traffic is associated
with the development is likely to be: 
• Staff transport, in either cars or staff minibuses; 
• Construction equipment and materials, deliveries of machinery and supplies
such as concrete materials and crushed rock; 
• Components relating to the BESS element, substation components and
associated infrastructure; and 
• Abnormal Indivisible Loads consisting of the wind turbine sections and heavy
lift cranes. 
64 At the peak of the project, it is estimated that there will be an additional 192 trips
per day, this will consist of 144 two-way HGV movements and 48 two-way car /
LGV movements. It is estimated that the vast majority of the traffic associated
with the development will utilise the A84 south of Lochearnhead. 
65 Insofar as roads matters are concerned there are no objections to the proposal
subject to conditions requiring a Construction Traffic Management Scheme and a
Staff Travel Plan. 
Drainage and Flooding 
66 Policy 22 (Flood Risk and Water Management) of NPF4 sets out that proposals
will not increase the risk of surface water flooding to others, or itself be at risk,
manage all rain and surface water through sustainable urban drainage systems
(SUDS) and seek to minimise the area of impermeable surfaces. In addition,
Policy 53 (Water Environment and Drainage) of LDP2 sets out that development
proposals at any location and of any scale should protect and where practical
improve the water environment. 
67 PKC Flooding and Structures has advised that they have no objections to the
proposal subject to the recommendations in the EIAR Chapter 8: Geology, Peat,
Hydrology and Hydrogeology being followed and implemented. 
68 The EIAR includes a detailed flood risk assessment, which evaluates potential
sources of flooding and indicates no risks to the site. Floodplains along the Beich
Burn do not encroach onto the proposed development. 
69 The EIAR states that using best construction practices and a final Construction
Environmental Management Plan (CEMP), along with ongoing monitoring, the
proposed development is not expected to significantly impact surface water flood
risk, geology, peat, hydrology, or hydrogeology.

Page 13

Conservation Considerations 
70 NPF4 Policy 7 (Historic Assets and Places) and LDP2 Policies 26 (Scheduled
Monuments and Archaeology) and 27 (Listed Buildings) are relevant to the
development. A Cultural Heritage Assessment (CHA) has been submitted in
support of the development as part of the EIAR. 
71 Perth and Kinross Heritage Trust (PKHT) has been consulted on the proposal
and advised that they are in broad agreement with the mitigation measures
proposed for undesignated assets as outlined in the CHA, Section 10.5 of the
EIAR. It is recommended that an Archaeological Clerk of Works is appointed
alongside the production of a Written Scheme of Investigation which will outline
in full the archaeological mitigation across the development site. These matters
would be required to be secured via appropriate conditions. 
72 Potential setting impacts have been assessed as the proposed development
would be theoretically visible from some listed buildings and scheduled
monuments in the vicinity. However, the CHA demonstrates consider that the
level of impact is unlikely to be significant. 
Natural Heritage and Biodiversity 
73 Policy 3 (Biodiversity) of NPF4 and policy 41 (Biodiversity) of LDP2 are
applicable to the proposal. 
74 The submitted information is comprehensive, and survey methods are in
accordance with published best practice. The Protected Species Survey Report
mentions presence of badgers, but the confidential part of the Report has not
been provided, and so no further comment can be provided at this time. A 30m
buffer zone is mentioned but it should be noted that a much higher distance is
required if it is a breeding sett.  
75 Application of the mitigation hierarchy has been shown in most areas through
avoidance and reduction. It is noted that 19.98% of the site area of D3
lichen/bryophyte heath will be lost to allow this development to proceed which
although classed as not significant, is a high proportion of the site value. It’s
unclear how this loss will be compensated for. 
76 A Biodiversity Net Gain calculation has been provided indicating that a 20% net
gain could be achieved. The proposed measures appear reasonable and
proposals to restore the degraded and highly fragmented peatland is welcomed.
No mention of how restored peatland areas will be protected by deer trampling
has been provided and should be included in any revised plan. 
77 A commitment to submit all species records to NBN Gateway would be
welcomed as positive contribution towards biodiversity enhancement, especially
as Perth and Kinross is not covered by a records centre.

Page 14

78 Overall, the proposal is compliant with NPF4 Policy 3 and LDP2 Policy 41.
However, should the application be approved, it is recommended that conditions
are imposed to secure a revised CEMP, including measures to mitigate impacts
of lighting on nocturnal species, a revised Biodiversity Net Gain Plan/Habitat
Management Plan, details of monitoring arrangements and details of the ECOW. 
Soils 
79 In terms of NPF4 Policy 5, the site includes areas of localised peat deposits, as
confirmed through site surveys/peat probing. Policy 5cii supports the
development of renewable energy generation proposals on peatland, carbon rich
soils and priority peatland habitats, with further information required as per Policy
5d. The development has been designed and sited to minimise the impact on
surveyed localised peat deposits. In line with Policy 5d, further consideration
should be made of the requirement for restoring and/or enhancing the site into a
functioning peatland system capable of achieving carbon sequestration,
potentially linked to Policy 3 requirements around biodiversity enhancement.  
80 The documentation addressing environmental constraints shows the construction
compound is to be located in areas with peat depths of 2 to over 3m. Figure 7.2
of the EIAR confirms the following components within the development are on
class 1 Nationally important carbon-rich soils, deep peat and priority peatland
habitat. 
• Construction compound 1
• LiDAR foundation
• Substation platform
• Batching plant
• Laydown area
• WTG Hardstands for T11E, T05E, T02E, T21, T16E
• Parts of borrow pit 3  
81 Figures 7.5 and 7.5.2 (peatland condition assessment) show a number of peat
areas marked as ‘actively eroding’ or ‘drained’. It is unclear whether this has
been taken into consideration during the design of the development layout.  
82 Figure 7.15 (Outline Biodiversity Enhancement Management) shows the majority
of class 1 areas impacted by the development are included in the proposed HMA
A Peatland Restoration/ Enhancement.  
83 The Peat Management Plan outlines over 200,000 m3 are expected to be
removed. While the plan includes the extensive reuse of that peat, the volume of
material removed raises concern. The location of some of the elements within the
development suggests that impact on high value soils could have been further
avoided. However, it is understood that SEPA have not opposed the proposed
impact and mitigation measures.

Page 15

Economic Impact and Community Benefit  
84 The Economic and Community Impact report describes the potential for the
development to create positive impact on local communities. The supply chain
development plan is framed around two scenarios: 
• Commitment scenario: 10% of CAPEX, 45% of OPEX will benefit businesses
in Perth and Kinross and Stirling. 30% and 92% will benefit those based in
Scotland. 
• Ambition scenario: 12% of CAPEX, 57% of OPEX would benefit businesses
in Perth and Kinross and Stirling. 33% and 98% to those based in Scotland. 
85 Based on the available information, it is unclear whether the applicant will be able
to achieve the ambition scenario, or the requirements for this to happen.  
86 The document also introduces the applicant’s approach to Community Wealth
Building, aiming to maximise net economic impact for the local community. This
includes plans to engage in early and open discussion with the supply chain and
potential businesses within Perth and Kinross and Stirling to share project plans,
identifying opportunities for local involvement and support any required
investment ahead of construction. 
87 The application considers that the experience of the applicant in the area, with
two other onshore wind farms operating since 2013, will allow them to establish a
more robust conversation with local supply chains, increasing their opportunity to
maximise positive impact.  
88 The proposed development is also expected to create positive impact on local
workforce and skills. Public exhibitions in St. Fillans and Lochearnhead allowed
the applicant to engage with local communities and businesses to raise
awareness of the opportunities related to the development. 
Conclusion and Reasons for Recommendation 
89 To conclude, the proposed development is considered to not be in accordance
with the Development Plan. Account has been taken of the relevant material
considerations and none has been found that would justify overriding the
Development Plan. 
90 Accordingly, it is recommended that PKC objects to the proposal on the grounds
identified below. 
Reasons for Recommendation 
1. The proposal will bring about significant adverse effects on Loch Rannoch and
Glen Lyon NSA to the extent that the overall integrity of the area will be
compromised. While considerable weight is to be given to the contribution the
proposed development could make in achieving renewable energy generation

Page 16

targets, this does not overcome the significant detrimental impact the proposal
will have on a nationally important landscape designation. The proposal is
therefore contrary to National Planning Framework 4 (2023) Policy 4 ‘Natural
Places’, as well as the adopted Perth & Kinross Local Development Plan 2
(2019) Policies 33 ‘Renewable and Low Carbon Energy’ and 39 ‘Landscape’. 
Background Papers
Letters of representation  N/A 
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Majors) developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
20 August 2025