Minute of meeting of 9 July 2025
Perth and Kinross Council · 3 September 2025
Back to Planning and Placemaking Committee — 3 September 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
PLANNING AND PLACEMAKING COMMITTEE Minute of hybrid meeting of the Planning and Placemaking Committee held in the Council Chambers, 2 High Street, Perth, on Wednesday 9 July 2025 at 9.30am. Present: Councillors I Massie, G Stewart, K Allan, B Brawn, D Cuthbert, K Harvey, D Illingworth, I James, I Macpherson (substituting for Councillor R Watters), Bailie C McLaren, and Bailie M Williamson. In Attendance: C Morilly, S Panton, L Reid, L Jardine and K Smith (all Economy, Development and Planning); A Brown, C Elliott, M Pasternak and R Ramsay (all Legal and Governance). Apologies: Councillor R Watters Councillor I Massie, Convener, Presiding. 1. Welcome and Apologies The Convener welcomed everyone present to the meeting and noted apologies as above. 2. Declarations of Interest There were no Declarations of Interest made in terms of the Councillors Code of Conduct. 3. Minutes The minute of meeting of the Planning and Placemaking Committee of 11 June 2025 was submitted and approved as a correct record. 4. Deputations In terms of Standing Order 13, the Committee agreed to hear deputations in relation to the following planning applications: Planning Application No. Item No. 25/00104/FLM 5(2)(i) 24/01609/FLL 5(3)(ii) 25/00213/IPL 5(3)(iii) 5. Applications For Determination (1) Section 36 Consultation (i) 25/00545/ECU36 - Installation of a 64.9MW battery energy storage system and associated infrastructure (ECU00005044), land 60 metres north of Abernethy Cemetery, Newburgh Road, Abernethy (Report No. 25/181)
Page 2
Mr S Panton introduced the report and provided the following update: (i) A revision in the wording of Condition 19 is required as a result of consultation with Perth and Kinross Heritage Trust. (ii) Due to a formatting error Informative 7 will be split into two informatives, with the additional informative created becoming Informative 10. (iii) Additional Informative 11 to be added given the potential impacts on a nearby private water supply. Resolved: Offer no objection to the proposal and request the imposition of the following suggested conditions, as amended: Suggested Conditions 1. The development hereby approved must be carried out in accordance with the approved drawings and documents, unless otherwise provided for by conditions imposed by this decision notice. Reason - To ensure the development is carried out in accordance with the approved drawings and documents. 2. This planning permission will last only for three years from the date of this decision notice, unless the development has been lawfully started within that period. Reason - This is a Planning Permission in terms of Section 58 of the Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning (Scotland) Act 2019. 3. Prior to the commencement of the development hereby approved, details of the specification and colour of the proposed external finishing materials to be used on all structures and any hard landscaping shall be submitted to and agreed in writing by the Council as Planning Authority. The scheme as agreed shall be implemented prior to the completion or bringing into use any part of the development, whichever is the earlier. Reason - In the interests of visual amenity; to ensure a satisfactory standard of local environmental quality; to reserve the rights of the Planning Authority. Soils 4. Prior to the commencement of development hereby approved, a Soil Management Plan (SMP) shall be submitted to and agreed in writing by the Council as Planning Authority. The plan as approved shall be strictly adhered to concurrent with the construction phases of the development. Reason - To ensure that prime agricultural land soil is not unnecessarily sterilised or lost and in the interests of Policy 51 of LDP2.
Page 3
Roads 5. Prior to the commencement of the development hereby approved, the developer shall submit for the further written agreement of the Council as Planning Authority, in consultation with the Roads Authority (Structures), a construction traffic management scheme (CTMS) which shall include the following: A. Restriction of construction traffic to approved routes and the measures to be put in place to avoid other routes being used. B. Timing of construction traffic to minimise the impact on local communities particularly at school start and finishing times, on days when refuse collection is undertaken, on Sundays, and during local events. C. A code of conduct for HGV drivers to allow for queuing traffic to pass. D. Arrangements for liaison with the Roads Authority regarding winter maintenance. E. Emergency arrangements detailing communication and contingency arrangements in the event of vehicle breakdown. F. Arrangements to for cleaning of wheels and chassis of vehicles to prevent material from construction sites associated with the development being deposited on the road. G. Arrangements for cleaning of roads affected by material deposited from construction sites associated with the development. H. Arrangements for signage at site accesses and crossovers and on roads to be used by construction traffic in order to provide safe access for pedestrians, cyclists and equestrians. I. Details of information signs to inform other road users of construction traffic. J. Arrangements to ensure that access for emergency service vehicles are not impeded. K. Co-ordination with other significant developments known to use the roads affected by construction traffic. L. Traffic arrangements in the immediate vicinity of temporary construction compounds. M. The provision and installation of traffic counters at the applicant’s expense at locations to be agreed prior to the commencement of construction. N. Monitoring, reporting, and implementation arrangements. O. Arrangements for dealing with non-compliance. P. Details of HGV movements to and from the site. The CTMS as approved shall be strictly adhered to during the entire site construction programme. Reason - In the interests of road safety.
Page 4
6. The proposed route for any abnormal loads on the trunk road network must be approved by the trunk roads authority in writing prior to the movement of any abnormal load. Any accommodation measures required including the removal of street furniture, junction widening, traffic management must be similarly approved. Reason - To ensure that the transportation of abnormal loads will not have any detrimental effect on the local or trunk road network. 7. Any additional signing or temporary traffic control measures deemed necessary due to the size or length of loads being delivered must be undertaken by a recognised Quality Assured traffic management consultant, to be approved by the trunk road authority before delivery commences. Reason - To ensure that the transportation of abnormal loads will not have any detrimental effect on the trunk road network. 8. The core path which forms part of the access track to the site must not be obstructed during building works or on completion. Any damage done to the core path and associated signage during building works shall be made good before operation of the development. Any temporary restrictions to public access required to facilitate works on site must be agreed in writing first with the Access Officer. Reason - In the interests of public access along the core path. 9. Prior to the development hereby approved being completed or brought into use, the vehicular access junctions shall be formed in accordance with Perth and Kinross Council’s Road Development Guide using Type B Road construction detail. Reason - In the interests of road safety; to ensure an acceptable standard of construction within the public road boundary. Private Water Supply 10. Prior to the commencement of the development hereby approved, details of the location and measures proposed for the safeguarding and continued operation, or replacement, of any septic tanks and soakaways, private water sources, private water supply storage facilities and/or private water supply pipes serving properties in the vicinity, sited within and running through the application site, shall be submitted to and approved in writing by the Council as Planning Authority. The subsequently agreed protective or replacement measures shall be put in place prior to the development being brought into use and shall thereafter be so maintained insofar as it relates to the development hereby approved.
Page 5
Reason - In the interests of protecting any existing private water infrastructure and to ensure the development compliance with the Water Scotland Act 1988. Environmental Health 11. All plant or equipment shall be so enclosed, attenuated and/or maintained such that any noise therefrom shall not exceed Noise Rating 35 between 0700 and 2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within any neighbouring residential property, with all windows slightly open, when measured and/ or calculated and plotted on a rating curve chart. Reason - In the interest of residential amenity 12. Noise from the battery storage facility shall not exceed LA90,15min background noise level plus 5dB(A) when measured at any residential property in accordance with BS4142:2014 including any relevant penalties for tonality, impulsivity, intermittency, or other sound characteristics, when measured at any residential property in accordance with BS4142:2014+A1:2019 Methods for Rating and Assessing Industrial and Commercial Sound. Reason - In the interest of residential amenity. 13. In the event that justified complaints for noise are received by the Council, the applicant at their own expense, shall employ an independent and suitably qualified consultant to carry out a Noise Assessment from the development. The appointed consultant and methodology for the Noise Assessment shall be submitted to and approved in writing by the Planning Authority in consultation with Environmental Health within 28 days of being notified of the complaint. Within 28 days of approval of appointed consultant and methodology, a Noise Assessment shall be submitted outlining mitigation and recommended timescales for delivery. Thereafter, all mitigation measures shall be implemented within the timescales recommended. Reason - In the interest of residential amenity. 14. All external lighting shall be sufficiently screened and aligned so as to ensure that there is no direct illumination of neighbouring land and that light spillage beyond the boundaries of the site is minimised to a degree that it does not adversely affect the amenity of the neighbouring land. Reason - In the interest of residential amenity. 15. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours and Saturday 0800 hours to 1300 hours with no noisy works out with these times or at any time on Sundays. Reason - In the interest of residential amenity. Biodiversity / Natural Environment 16. Prior to the commencement of development, a detailed landscaping and planting scheme shall be submitted to
Page 6
the Planning Authority for written approval. The plan shall include native planting around the site perimeter including a 10metre wide continuous border of native scrub and tree planting. Thereafter, the agreed scheme shall be implemented as part of the site development programme and in the first available planting season and thereafter maintained for the life of the development. Reason - In the interest of visual amenity and to ensure the satisfactory implementation of the proposed planting scheme. 17. Prior to the completion or bringing into use of the development hereby approved, 10 bat boxes, 10 bird boxes, 10 hibernacula and 10 bee/insect hotels shall be provided within the red line boundary. Thereafter, the agreed scheme shall be maintained in a reasonable condition for the life of the development. Reason - To increase the number of bat and bird boxes to ensure significant biodiversity enhancement. 18. Prior to the commencement of development, a detailed Ecological Impact Assessment, including all proposed mitigation measures, shall be submitted to the Planning Authority for written approval. Thereafter, the agreed scheme shall be implemented as part of the site development programme and in the first available planting season and thereafter maintained for the life of the development. Reason - In the interests of employing best practice ecology and to ensure there is no adverse impact on any protected species as identified under the Wildlife and Countryside Act (1981). Archaeology 19. Prior to the commencement of the development hereby approved, protective fencing shall be erected around MPK20389 incorporating an appropriate buffer, insofar as the land lies within the control of the applicant and/or developer, in a manner and for a time period to be agreed in writing in advance with the Council as Planning Authority in consultation with Perth and Kinross Heritage Trust (PKHT). No works shall take place within the area inside that fencing without prior written agreement of the Council as Planning Authority in consultation with PKHT. Reason - To ensure compliance with the preservation in situ of known archaeology. Floods and Drainage 20. Development shall not commence on site until a detailed sustainable urban drainage system (SUDS) has been submitted for the written agreement of the Council as Planning Authority, in consultation with SEPA where necessary. The scheme shall be developed in accordance with the technical guidance contained in The SUDS Manual (C753) and the Council’s Flood Risk and Flood Risk Assessments Developer Guidance and shall
Page 7
incorporate source control. All works shall be carried out in accordance with the agreed scheme and be operational prior to the bringing into use of the development. Reason - To ensure the provision of effective drainage for the site. 21. Storm water drainage from all paved surfaces, including the access, shall be disposed of by means of suitable a Sustainable Urban Drainage System to meet the requirements of best management practices. Reason - To ensure the provision of effective drainage for the site. Justification The proposal is in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan. Note In respect of Condition 16 and a detailed landscaping and planting scheme, it is recommended that this (i) includes the planting of a mix of Scottish wildflower seed, and (ii) does not include the planting of Ash due to Ash dieback. Informatives 1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as amended) the person undertaking the development is required to give the Planning Authority prior written notification of the date on which it is intended to commence the development. A failure to comply with this statutory requirement would constitute a breach of planning control under Section 123(1) of that Act, which may result in enforcement action being taken. 2. As soon as practicable after the development is complete, the person who completes the development is obliged by Section 27B of the Town and Country Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written notice of that position. 3. An application for Building Warrant may be required. 4. The developer is advised to contact Sophie Nicol, Historic Environment Manager (tel 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of reference for work required. 5. The applicant is advised that any proposed signage will require a further application to be submitted for advertisement consent unless it benefits from express consent as per the Town and Country Planning (Control of Advertisements) (Scotland) Regulations 1984. 6. Trees and scrub are likely to contain nesting birds between 1st March and 31st August inclusive. Trees and scrub are present on the application site and are to be
Page 8
assumed to contain nesting birds between the above dates. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as amended (section 1), it is an offence to remove, damage or destroy the nest of any wild bird while that nest is in use or being built. Planning permission for a development does not provide a defence against prosecution under this Act. 7. The applicant is advised that the granting of planning permission does not guarantee right of access to the site. This should be agreed with the relevant landowner(s) prior to the commencement of the development. 8. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act 1984, he/she/they must obtain from the Council, as Roads Authority, consent to open an existing road or footway prior to the commencement of works. Information on junction types, requirements for Vehicular Access consents (VA1) and application forms are available at www.pkc.gov.uk/vehicleaccess. Advice on the disposal of surface water should be sought at the initial stages of design from Scottish Water and the Scottish Environment Protection Agency. 9. The applicant is advised to refer to Perth & Kinross Council’s Supplementary guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice relevant to your development. 10. This development will require the 'Display of notice while development is carried out', under Section 27C(1) of the Town and Country Planning Act1997, as amended, and Regulation 41 of the Development Management Procedure (Scotland) Regulations 2013, as amended. The form of the notice is set out in Schedule 7 of the Regulations and a draft notice is included for your guidance. In accordance with Regulation 41 the notice must be: • Displayed in a prominent place at or in the vicinity of the site of the development • Readily visible to the public • Printed on durable material. 11. The applicant should ensure that any existing wayleaves for maintenance or repair to existing private water supply or septic drainage infrastructure in the development area are honoured throughout and after completion of the development.
Page 9
(2) Major Application (i) 25/00104/FLM Formation of a 22MW solar farm comprising ground mounted solar arrays, inverters, substation, ancillary buildings, fencing, CCTV cameras, access tracks and associated works, land 320 metres north-west of Peattie Farm, Kinnochtry, Coupar Angus, Blairgowrie, PH13 9LH (Report No. 25/182) Mr S Panton introduced the report and advised that the final sentence of Paragraph 81 should read “SEPA indicates that this site is at risk of fluvial flooding for all AEP events.” Mr D Ritchie, on behalf of Kettins Parish Community Council, followed by Ms P Jones (via telephone), objectors to the application and Mr J Jenkison, on behalf of the applicant, accompanied by Mrs L Russell, planning agent, addressed the committee, and answered Members questions. (The Committee took a short recess at this point) Motion (Councillors B Brawn and I James) Refuse, on the basis that the proposal is contrary to: (i) National Planning Framework 4, Policy 5 (Soils) and Perth and Kinross Council Local Development Plan 2 (2019), Policy 50 (Prime Agricultural Land), as the impacts upon soils and the loss and minimisation of this prime agricultural land has not been suitably demonstrated. (ii) Perth and Kinross Council Local Development Plan 2 (2019), Policies 1A and 1B(b)(Placemaking), as the proposal is out of character with the surrounding open countryside and does not contribute positively to the amenity of the area. Amendment (Councillor K Harvey and Bailie M Williamson) Approve, in accordance with Report 25/182 and the revision of Condition 7 to require an amended landscaping and planting scheme including semi-mature planting. In terms of Standing Order 21.5 a roll call vote was taken. 6 members voted for the Motion as follows: Councillors K Allan, B Brawn, D Cuthbert, D Illingworth, I James and Bailie C McLaren. 5 members voted for the Amendment as follows: Councillors K Harvey I MacPherson, I Massie, G Stewart and Bailie M Williamson.
Page 10
Resolved: In accordance with the Motion. (3) Local Application (i) 24/01328/FLL - Erection of 35 dwellinghouses (change of house type) and associated works (allocated site H14), land 150 metres south-west of Kintillo Cemetery (H14), Bridge of Earn, Perth (Report No. 25/183 (Revised)) Resolved: Grant, subject to the following terms, conditions and informatives: Conditions General 1. This planning permission will last only for three years from the date of this decision notice, unless the development has been lawfully started within that period. Reason - This is a Planning Permission in terms of Section 58 of the Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning (Scotland) Act 2019. 2. The development hereby approved must be carried out in accordance with the approved drawings and documents, unless otherwise provided for by conditions imposed by this decision notice. Reason - To ensure the development is carried out in accordance with the approved drawings and documents. 3. No development shall commence until a detailed phasing strategy (supported by appropriate plans) shall be submitted to and approved in writing by the Council as Planning Authority. The phasing strategy shall include the following details: (i) The timing and number of dwellings to be developed in each phase; (ii) The timing and delivery of infrastructure, open space and landscaping; (iii) The timing and location of any temporary construction compound; (iv) The timing and delivery of the affordable housing units. Once approved, the development shall proceed in accordance with the approved delivery phasing strategy. Reason - In order to ensure the satisfactory implementation and completion of the development. Drainage and Flooding 4. The drainage outfall as agreed as part of planning permission 22/02020/FLL or any other agreed in writing scheme by the Council, shall be implemented as part of the SUDs basin delivery and prior to the occupation of the first dwellinghouse.
Page 11
Reason - To ensure the provision of effective drainage for the site. 5. Prior to the commencement and completion of works, the watercourse to the northeast of the site, which the SUDs basin outfalls into, shall be cleared of vegetation and debris. Reason - To ensure the provision of effective drainage for the site. 6. Development shall not commence on site until a detailed sustainable urban drainage system (SUDS) has been submitted for the written agreement of the Council as Planning Authority, in consultation with SEPA where necessary. The scheme shall be developed in accordance with the technical guidance contained in The SUDS Manual (C753) and the Council's Flood Risk and Flood Risk Assessments Developer Guidance, and shall incorporate source control. All works shall be carried out in accordance with the agreed scheme and be operational prior to the bringing into use of the development. Reason - To ensure the provision of effective drainage for the site. 7. Concurrent with the initiation of the development hereby approved and for the duration of construction, a temporary surface water treatment facility which accords with Sustainable Urban Drainage System principles shall be implemented for the site and maintained for the duration of the approved development works. The temporary surface water treatment facility shall remain in place until the permanent surface water drainage scheme is implemented. Reason - To ensure the appropriate management of construction surface water run-off to minimise flooding and avoid discharge of sediment/pollution to the local water environment or neighbouring property, in the interests of residential and environmental amenity. 8. Storm water drainage from all paved surfaces, including the access, shall be disposed of by means of suitable a Sustainable Urban Drainage System to meet the requirements of best management practices. Reason - To ensure the provision of effective drainage for the site. Construction 9. Prior to the commencement of the development a Dust Management Plan shall be submitted to and agreed in writing by the Council as the Planning Authority in consultation with Environmental Health. The plan shall include measures for the control of dust, monitoring, and complaints procedures, at the construction stages of the development. Reason - In order to safeguard the residential amenity of the area.
Page 12
10. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours and Saturday 0800 hours to 1300 hours with no noisy works out with these times or at any time on Sundays or bank holidays (as identified by Scottish Government). Reason - In order to safeguard the residential amenity of the area. Roads and Access 11. Prior to the occupation of any residential plot, all matters regarding access, car parking, road layout, design and specification, including the disposal of surface water, shall be in accordance with the standards required by the Council as Roads Authority and to the satisfaction of the Planning Authority. Reason - In the interests of vehicle and pedestrian safety and in accordance with the policies of the adopted development plan. 12. Prior to commencement of works on site, the width of Wicks O'Baiglie Road shall be widened to a minimum width of 6 metres from south of 52 Wicks O'Baiglie Road to a distance of 6 metres south of the vehicle access bellmouth into the development, where the width of the road will taper back to the original width over a distance of at least 25 metres. The road widening shall be constructed to the standard and specification required by the Council as Roads Authority to the satisfaction of the Planning Authority. Reason - In the interests of road safety; to ensure an acceptable standard of construction within the public road boundary. 13. Prior to commencement of works, a street lighting design for any P&KC adoptable areas (including changes to the existing streetlighting on the Meadows and the extension of the street lighting on Wicks O Baiglie road to site access) must be submitted for the further written agreement of the Council as Planning Authority, in consultation with Perth & Kinross Council’s Street Lighting Partnership. The scheme shall include details of light spill, brightness of the lighting and the proposed hours of operation. The agreed lighting scheme shall be implemented and maintained in full accordance with the agreed scheme. Reason - In the interests of road safety. 14. Prior to the commencement of the development hereby approved, the applicant shall submit for the further written agreement of the Council as Planning Authority, in consultation with the Roads Authority (Structures), a Construction Traffic Management Scheme (TMS) which shall include the following: a. restriction of construction traffic to approved routes and the measures to be put in place to avoid other routes being used;
Page 13
b. timing of construction traffic to minimise impact on local communities particularly at school start and finishing times, on days when refuse collection is undertaken, on Sundays and during local events; c. a code of conduct for HGV drivers to allow for queuing traffic to pass; d. arrangements for liaison with the Roads Authority regarding winter maintenance; e. emergency arrangements detailing communication and contingency arrangements in the event of vehicle breakdown; f. arrangements for the cleaning of wheels and chassis of vehicles to prevent material from construction sites associated with the development being deposited on the road; g. arrangements for cleaning of roads affected by material deposited from construction sites associated with the development; h. arrangements for signage at site accesses and crossovers and on roads to be used by construction traffic in order to provide safe access for pedestrians, cyclists and equestrians; i. details of information signs to inform other road users of construction traffic; j. arrangements to ensure that access for emergency service vehicles are not impeded; k. co-ordination with other significant developments known to use roads affected by construction traffic; l. traffic arrangements in the immediate vicinity of temporary construction compounds; m. monitoring, reporting and implementation arrangements; n. arrangements for dealing with non-compliance; and o. details of HGV movements to and from the site. The TMS as approved shall be strictly adhered to during the entire site construction programme. Reason - In the interest of proper site management. 15. Prior to the occupation of the first dwellinghouse, the developer shall install a bus shelter at Main Street (outside the Post Office) (NaPTAN ID 73725792) with a 3 bay bus shelter supplied and installed with passenger information board, LED spotlights (one per bay), a 28in Ultra-Wide Display Screen for Real Time Passenger Information installed on the approach side of the shelter and a 24/7 electrical power supply to a Haldo pillar adjacent to the shelter to provide power for the LED lighting and Real Time Passenger Information display. The design and specification shall be to the satisfaction of the Council as Planning Authority, in consultation with Perth & Kinross Council's Public Transport Unit. In the event that it is not possible to install at this location, an
Page 14
alternative shall be agreed in writing with the planning authority. Reason - In the interest of sustainable travel. 16. No part of the development shall be occupied until a Residential Travel Plan (RTP), aimed to encourage more sustainable means of travel, has been submitted to and agreed in writing by the Council in consultation with Transport Planning. The RTP will have particular regard to provision for walking, cycling and public transport access to and within the site and will identify the measures to be provided, the system of management, monitoring, review, reporting and the duration of the plan. Reason - To promote sustainable transport options and to meet advice within Scottish Planning Policy on transport. 17. Prior to the commencement of the development hereby approved, full visibility splays for the vehicle access onto Wicks O'Baiglie Road of 120 metres along the channel line shall be provided to the left and right of the access, at a set-back of 2.4 metres from the edge of the carriageway, measured 1.05m above the road level to the standard and specification required by the Council as Roads Authority to the satisfaction of the Planning Authority. The visibility splays shall be physically formed on the ground and any existing fences, walls, hedges or other means of enclosure or obstructions within the splays shall be removed and relocated outwith the splays. Once formed, the visibility splays shall be permanently retained thereafter, and no visual obstruction of any kind shall be permitted within the visibility splays so formed. Reason - In the interests of road safety; to ensure an acceptable standard of construction within the public road boundary. 18. Prior to the occupation of any residential plot, details of the specification including materials of all footpaths shall be submitted to the Planning Authority for further approval. The agreed detail shall thereafter be implemented prior to the completion of the development. Reason - In the interests of pedestrian and cycle safety. 19. The occupation of the tenth dwellinghouse of housing allocation H14 as shown in the adopted Perth & Kinross Local Development Plan 2 (2019), shall not occur until the proposed footpath connection surrounding the SUDS at the northern side of the site and linking to both Dunbarney Avenue and Wicks O' Baiglie Road, as shown on drawing number 22/00817/182, has been implemented in line with the specification agreed as part of condition 18. Reason - In the interest of sustainable transport. 20. The occupation of the fifty-fifth dwellinghouse of housing allocation H14 as shown in the adopted Perth & Kinross
Page 15
Local Development Plan 2 (2019), shall not occur until the proposed footpath connection at the southern side of the site, linking this site to both Wicks O' Baiglie Road and The Meadows and the footpath connection to the west of the site linking to The Meadows, opposite Ptak Way, as shown on drawing number 22/00817/182, has been implemented in line with the specification agreed as part of condition 18. Reason - In the interest of sustainable transport. 21. The Meadows shall not be used at any time by construction traffic associated with the development, unless otherwise agreed by the Council as Planning Authority. Reason - In the interests of pedestrian and traffic safety, residential amenity. Environment and Biodiversity 22. Prior to the commencement of development a Construction Environmental Management Plan (CEMP), incorporating a Construction Method Statement (CMS), a Construction Traffic Management Plan (CTMP), a Site Waste Management Plan (SWMP), a Site Access Management Plan, a Drainage Management Plan (DMP) shall be submitted for the approval of the Planning Authority. Thereafter, the development shall be fully undertaken in accordance with the CEMP unless otherwise agreed in writing by the Planning Authority. Reason - In the interests of protecting environmental quality and of biodiversity. 23. The conclusions and recommended action points within the supporting Ecological Survey and Biodiversity Action Plan submitted and hereby approved (document number 80 relates) shall be fully adhered to, respected and undertaken as part of the construction phase of development, to the satisfaction of the Council as Planning Authority. Reason - In the interests of protecting environmental quality and of biodiversity. 24. An updated ecological survey will be required prior to the commencement of works, if works have not commenced within 24 months of the date of the survey approved as part of this permission. The updated survey shall be submitted to the Council as Planning Authority for written agreement and works shall not commence until after such written agreement has been issued by the Council. Reason - In the interests of protecting environmental quality and of biodiversity. 25. Prior to the completion or occupation of the development hereby approved, whichever is the earlier, wildlife kerbs shall be installed adjacent to all road gullies within 500metres of a SUDS pond or watercourse. Thereafter, the kerbs shall be retained in a reasonable condition for the life of the development.
Page 16
Reason - In the interests of protecting environmental quality and of biodiversity. 26. Prior to the completion or occupation of the development hereby approved, whichever is the earlier, hedgehog highways shall be created by providing access gaps in wooden fences on each plot at least 13cm x 13cm at ground level, to allow for the free movement of hedgehogs. Thereafter, the hedgehog highways shall be retained in a reasonable condition for the life of the development. Reason - In the interests of protecting environmental quality and of biodiversity. 27. Measures to protect animals from being trapped in open excavations and/or pipe and culverts shall be implemented for the duration of the construction works of the development hereby approved. The measures may include creation of sloping escape ramps for animals, which may be achieved by edge profiling of trenches/excavations or by using planks placed into them at the end of each working day and open pipework greater than 150 mm outside diameter being blanked off at the end of each working day. Reason - In the interests of protecting environmental quality and of biodiversity. 28. All biodiversity enhancement measures listed within the supporting biodiversity survey submitted and hereby approved shall be provided, including integrated bat and bird bricks. Thereafter, the agreed scheme shall be maintained in a reasonable condition for the life of the development, to the satisfaction of the Council as Planning Authority. Reason - In the interests of protecting environmental quality and of biodiversity. 29. Prior to the commencement of any works on site, all trees on site (other than those marked for felling on the approved plans) and those which have Root Protection Areas which fall within the site shall be retained and protected. Protection methods shall be strictly in accordance with BS 5837 2012: Trees in Relation to Design, Demolition and Construction. Protection measures, once in place, shall remain in place for the duration of construction. Reason - To ensure a satisfactory standard of development and environmental quality and to reserve the rights of the Planning Authority. 30. Prior to the commencement of the development hereby approved, a detailed landscaping and planting scheme for the site shall be submitted for the written agreement of the Council as Planning Authority. The scheme shall include details of the height and slopes of any mounding or recontouring of the site, full details of all hard landscaping proposals including materials and installation
Page 17
methods and, species, height, size and density of trees and shrubs to be planted. The scheme as subsequently approved shall be carried out and completed within the first available planting season (October to March) after the completion or bringing into use of the development, whichever is the earlier, and the date of Practical Completion of the landscaping scheme shall be supplied in writing to the Council as Planning Authority within 7 days of that date. The scheme as agreed and implemented shall thereafter be maintained to the satisfaction of the Council as Planning Authority. Reason - In the interests of visual amenity and to ensure the satisfactory implementation of the proposed planting scheme. 31. The areas of public open space in the landscape and planting drawings (as agreed by condition 31) shall be planted in accordance with the open space standards of the Planning Authority and completed to phase with the adjacent dwellinghouses in accordance with a programme to be submitted and agreed in writing by the Planning Authority, prior to the commencement of development. The scheme shall thereafter be maintained to the satisfaction of the Council as Planning Authority. Reason - In the interests of visual amenity; to ensure a satisfactory standard of local environmental quality and to reserve the rights of the Planning Authority. 32. All landscaped areas outwith the curtilages of the dwellings and shown on the drawings to be approved in condition 31, shall be permanently retained as such and shall at no time be used as private garden ground nor incorporated within the curtilage of any of the dwellings hereby approved without the express grant of planning permission by the Planning Authority. Reason - In the interests of the character and appearance of the development. 33. Prior to the occupation of the development or any phase of the development, whichever is the sooner, a landscape management plan, including long term design objectives, management responsibilities and maintenance schedules for all landscape areas (other than small privately-owned domestic gardens) shall be submitted to, and agreed in writing by, the Council as Planning Authority. The landscape management plan as agreed shall, where appropriate, include phased implementation concurrent with the development and shall be fully implemented and adhered to. Reason - To ensure satisfactory management of the scheme. 34. Prior to the commencement of development hereby approved, a scheme shall be submitted to, and approved in writing by, the Council as Planning Authority that
Page 18
demonstrates how at least 10% of the current carbon emissions reduction set by the Scottish Buildings Standards will be met through the installation and operation of low and zero-carbon technologies. This scheme shall detail for each building: a) the technology types; b) illustrate, through technical calculations, that these will meet at least the 10% reduction; c) their siting and location; and d) ongoing operation and maintenance. Once approved, the development shall be completed in accordance with the approved scheme and no individual unit shall be occupied until the scheme has been installed and operating. Reason - To embed low and zero-carbon technologies within the development in the interest of environmental sustainability. Waste 35. Prior to the commencement of development a site specific plan detailing bin storage areas, kerbside collection locations and recycling facilities shall be submitted to and approved in writing by the Planning Authority and thereafter undertaken in accordance with the approved details. Reason - In the interest of the sustainable disposal of waste. Contamination 36. Development shall not commence on site until an evaluation for the potential of the site to be affected by contamination by a previous use has been undertaken and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has been submitted for consideration and accepted by the Council as Planning Authority. If the preliminary risk assessment identifies the need for further assessment, an intrusive investigation shall be undertaken to identify; I. the nature, extent and type(s) of contamination on the site II. measures to treat/remove contamination to ensure the site is fit for the use proposed III. measures to deal with contamination during construction works IV. condition of the site on completion of decontamination measures. Prior to the completion or bringing into use of any part of the development the measures to decontaminate the site shall be fully implemented in accordance with the scheme subsequently agreed by the Council as Planning Authority. Verification that the scheme has been fully implemented must also be submitted to the Council as Planning Authority.
Page 19
Reason - In order to deal with any potential contamination of the site as a result of its former use. Archaeology 37. Development shall not commence until the developer has secured the implementation of a programme of archaeological work in accordance with a Written Scheme of Archaeological Investigation (WSI) which has been submitted by the developer and agreed in writing by the Council as Planning Authority, in consultation with Perth and Kinross Heritage Trust (PKHT). Thereafter, the developer shall ensure that the programme of archaeological works is fully implemented including that all excavation, preservation, recording, recovery, analysis, publication and archiving of archaeological resources within the development site is undertaken. Should the archaeological works, as required by the WSI, identify a requirement for post-excavation analysis, the development as approved shall not be occupied or brought into use until a Post-Excavation Research Design (PERD) has been submitted to and agreed in writing by the Council as Planning Authority, in consultation with PKHT. The PERD shall be carried out in complete accordance with the approved details. Furthermore, the developer shall afford access at all reasonable times to PKHT or a nominated representative and shall allow them to observe work in progress. Reason - To ensure a programme of archaeological works is carried out to safeguard and record any archaeological remains within the development area. Finishing Materials 38. Prior to the commencement of the development hereby approved, details of the specification and colour of the proposed external finishing materials to be used shall be submitted to and agreed in writing by the Council as Planning Authority. The scheme as agreed shall be implemented prior to the completion or bringing into use of the development, whichever is the earlier. Reason - In the interests of visual amenity; to ensure a satisfactory standard of local environmental quality. Justification The proposal is in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan. Informatives 1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as amended) the person undertaking the development is required to give the Planning Authority prior written notification of the date on which it is intended to commence the development. A failure to comply with this statutory requirement would
Page 20
constitute a breach of planning control under Section 123(1) of that Act, which may result in enforcement action being taken. Please use the form attached herewith. 2. As soon as practicable after the development is complete, the person who completes the development is obliged by Section 27B of the Town and Country Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written notice of that position. Please use the form attached herewith. 3. This development will require the 'Display of notice while development is carried out', under Section 27C(1) of the Town and Country Planning Act 1997, as amended, and Regulation 41 of the Development Management Procedure (Scotland) Regulations 2013, as amended. The form of the notice is set out in Schedule 7 of the Regulations and a draft notice is included for your guidance. In accordance with Regulation 41 the notice must be: • Displayed in a prominent place at or in the vicinity of the site of the development • Readily visible to the public • Printed on durable material. 4. The applicant is advised that any proposed signage will require a further application to be submitted for advertisement consent unless it benefits from express consent as per the Town and Country Planning (Control of Advertisements) (Scotland) Regulations 1984. 5. The applicant should be aware of the requirements of the Council's Environment and Regulatory Services in relation to waste collection from the site and should ensure adequate measures are provided on site to allow for the collection of waste. 6. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act 1984 he/she/they must obtain from the Council, as Roads Authority, consent to open an existing road or footway prior to the commencement of works. Information on junction types, requirements for Vehicular Access consents (VA1) and application forms are available at www.pkc.gov.uk/vehicleaccess. Advice on the disposal of surface water should be sought at the initial stages of design from Scottish Water and the Scottish Environment Protection Agency. 7. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act 1984 he/she/they must obtain from the Council as Roads Authority Road Construction Consent (RCC) to construct a new road prior to the commencement of roadworks. Advice on the disposal of surface water must be sought at the initial stages of design from Scottish Water and the Scottish Environment
Page 21
Protection Agency. Please note that a fee is chargeable for the processing of RCC applications. 8. Prior to the commencement of works a maintenance agreement under Section 96 of the Roads (Scotland) Act 1984 shall be entered in to in respect of the C416 Wicks O'Baiglie Road between the A912 and the M90 overbridge, a distance of approximately 1 km, whereby the road shall be inspected on a regular basis and repairs carried out to the timescale and standards specified by the Council as Roads Authority to the satisfaction of Perth & Kinross Council. 9. No work shall be commenced until an application for building warrant has been submitted and approved. 10. The applicant is advised that the granting of planning permission does not guarantee a connection to Scottish Water's assets. The applicant must make a separate application to Scottish Water Planning & Development Services team for permission to connect to the public wastewater system and/or water network and all their requirements must be fully adhered to. 11. This application was varied prior to determination, in accordance with the terms of section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. The variations incorporate changes to house types and parking. 12. Application for a new postal address should be made via the Street Naming and Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn. Please note there is a charge for this service and submission cannot be made until the relevant Building Warrant has been approved. 13. The applicant is advised to refer to Perth & Kinross Council's Supplementary Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 14. This planning permission is granted subject to conditions, some of which require further information to be submitted to Development Management either before works can start on site or at a certain time. The required information must be submitted via the ePlanning portal if your original application was lodged that way, otherwise send it to us at developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable in respect of each request made, though there is no limit to the number of conditions that can be discharged in a single request. The Fees Charter is available on our website www.pkc.gov.uk. The Council has two months to consider the information. You should therefore submit the required information more than two months before your permission expires. We cannot guarantee that submissions made within two
Page 22
months of the expiry date of your permission will be able to be dealt with before your permission lapses. 15. The applicant is reminded that, should any protected species be present a licence may be required from NatureScot. Failure to obtain a licence may constitute a criminal act under the Habitats Regulations and penalties are sever for non-compliance. 16. The applicant is reminded to discuss with the Council's Transport Unit the supply of a bus service and public transport infrastructure to ensure an adequate public transport provision for the site. 17. The applicant is advised that the granting of planning permission does not guarantee right of access to the site. This should be agreed with the relevant landowner(s) prior to the commencement of the development. 18. Trees and scrub are likely to contain nesting birds between 1st March and 31st August inclusive. Trees and scrub are present on the application site and are to be assumed to contain nesting birds between the above dates. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as amended (section 1), it is an offence to remove, damage or destroy the nest of any wild bird while that nest is in use or being built. Planning permission for a development does not provide a defence against prosecution under this Act. (ii) 24/01609/FLL - Erection of a foodstore (Class 1A) and associated works, former Perth and Kinross Council depot, Feus, Auchterarder (Report No. 25/184 (Revised)) Councillors S Carr and A Watt, Local Members in support, Mr D Campbell (via telephone), on behalf of The Co-operative Group, objectors to the application and Mr D Kennedy, on behalf of the applicant, accompanied by Mr G Morris, planning consultant, addressed the committee, and answered Members questions. Motion (Councillors K Allan and I James) Approve the application, subject to required developer contributions, suitable conditions and informatives. Although the proposal is contrary to National Planning Framework 4, Policy 28: Retail, the proposal is supported by other policies of the development plan, namely: (i) National Planning Framework 4, Policy 9(a): Brownfield, Vacant and Empty Buildings – the proposal would result in the sustainable reuse of brownfield land; and (2) National Planning Framework 4, Policy 15)(a): Local Living and 20 minute neighbourhoods – the proposal would contribute to local living including the 20 minute neighbourhood of the area. Local people will be able to meet their daily shopping needs by a variety of
Page 23
sustainable modes of travel, including walking and cycling. Councillor K Harvey moved an Amendment to refuse, in line with the Report No. 25/184 (Revised), however on failing to secure a seconder the Amendment fell. Resolved: Grant, subject to a possible legal agreement, and the following conditions and informatives: Conditions 1. This planning permission will last only for three years from the date of this decision notice, unless the development has been lawfully started within that period. Reason - This is a Planning Permission in terms of Section 58 of the Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning (Scotland) Act 2019. 2. The development hereby approved must be carried out in accordance with the approved drawings and documents, unless otherwise provided for by conditions imposed by this decision notice. Reason - To ensure the development is carried out in accordance with the approved drawings and documents. 3. Prior to the commencement of works on site, an evaluation for the potential of the site to be affected by contamination by a previous use should be undertaken and as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) shall be submitted for consideration by the Council as Planning Authority. If after the preliminary risk assessment identifies the need for further assessment, an intrusive investigation should be undertaken to identify; i) the nature, extent and type(s) of contamination on the site. ii) measures to treat/remove contamination to ensure the site is fit for the use proposed. iii) measures to deal with contamination during construction works. iv) condition of the site on completion of decontamination measures. Prior to the completion or bringing into use of any part of the development the agreed measures to decontaminate the site shall be fully implemented as approved by the Council as Planning Authority. Validation that the scheme has been fully implemented must also be submitted to the Council as Planning Authority. Reason - In order to deal with any potential contamination of the site as a result of its former use. 4. All plant or equipment shall be so enclosed, attenuated and/or maintained such that any noise therefrom shall not exceed Noise Rating 35 between 0700 and 2300 hours
Page 24
daily, or Noise Rating 25 between 2300 and 0700 hours daily, within any neighbouring residential property, with all windows slightly open, when measured and/ or calculated and plotted on a rating curve chart. Reason - In order to safeguard the neighbouring residential amenity in the area. 5. Prior to the development hereby approved being completed or brought into use a 2.4-metre-high acoustic barrier shall be constructed along the western boundary of the proposed development site in accordance to Figures 5.1 & 5.2 of Noise Impact Assessment, ‘SSL Auchterarder’, document reference 784-B055089 dated September 2024. The acoustic barrier must have a minimum mass per unit area of 15 Kg/m2; there must be no holes or gaps in the fabric of the barriers, and there must be no gaps between the lower edge of the barriers and the ground. Reason - In order to safeguard the neighbouring residential amenity in the area. 6. Prior to the development hereby approved being completed or brought into use all fixed plant shall be within 2.4-metre-high acoustic barrier plant compound on the east elevation of the development in line with Drawing 11. The acoustic barrier must have a minimum mass per unit area of 15 Kg/m2; there must be no holes or gaps in the fabric of the barriers, and there must be no gaps between the lower edge of the barriers and the ground. Reason - In order to safeguard the neighbouring residential amenity in the area. 7. Noise levels shall be limited to an internal nighttime target noise level of 42 dB LAFmax at residential receptors. Reason - In order to safeguard the neighbouring residential amenity in the area. 8. Prior to the commencement of the development an Operational Noise Management Plan shall be submitted to and agreed in writing by the Council as Planning Authority in consultation with Environmental Health. The plan shall include the procedures and mitigation measures to control noise from the development such as all service delivery operations of the store, plant maintenance etc. The details as approved shall then be implemented in full as part of the operation of the site. Reason - In order to safeguard the neighbouring residential amenity in the area. 9. In the event of a justified noise complaint being received by the Council relating to the operation of the development hereby approved, the operator shall, at its own expense, employ a consultant approved by the Planning Authority to carry out a noise assessment. The assessment shall be carried out to an appropriate methodology agreed in writing with the Planning Authority. If the noise assessment shows that the noise levels do
Page 25
not comply with noise conditions, a scheme of noise mitigation shall be included with the noise assessment, specifying timescales for the implementation of the scheme, and shall be submitted to the Planning Authority for written approval with 28 days of the assessment. The mitigation scheme shall thereafter be implemented in accordance with the approved scheme and timescales and included within an updated Noise Management Plan. Reason - In order to safeguard the neighbouring residential amenity in the area. 10. All external lighting shall be sufficiently screened and aligned so as to ensure that there is no direct illumination of neighbouring land and that light spillage beyond the boundaries of the site is minimised to a degree that it does not adversely affect the amenity of the neighbouring land. Reason - In order to safeguard the neighbouring residential amenity in the area. 11. Prior to the commencement of the development a Dust Management Plan shall be submitted to agreed in writing by the Planning Authority in in consultation with Environmental Health. The plan shall include good practise and site specific mitigation measures for the control of dust during the construction stages of the development. All works shall be carried out in accordance with the agreed plan. Reason - In order to safeguard the neighbouring residential amenity in the area. 12. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours and Saturday 0800 hours to 1300 hours with no noisy works out with these times or at any time on Sundays or bank holidays (as identified by Scottish Government). Reason - In order to safeguard the neighbouring residential amenity in the area. 13. Prior to commencement of the development, a detailed design for the proposed parking shall be provided for the following elements: • 25 standard car parking spaces • 3 disabled car parking spaces • 2 powered two wheeler parking spaces including its location, shall be submitted to and approved in writing by the Planning Authority in consultation with the Roads Authority. The parking, as approved in writing, shall be implemented in accordance with the approved details to the satisfaction of the Council as Planning Authority, prior to the trading of the store. Reason - In the interests of road safety; to ensure the provision of adequate off-street parking facilities for disabled visitors and motorcyclists.
Page 26
14. The core paths (AUCH/165 and AUCH/56) along the Feus must not be obstructed during building works or on completion. Any damage done to the core path and associated signage during building works shall be made good before trading of the store. Any temporary restrictions to public access required to facilitate works in relation to the development must be agreed in writing first with the Access Officer. Reason - In the interests of public access along the core path. 15. Prior to commencement of any development on site, a detailed design showing the frontage of the development site onto the Feus shall be provided with the following schemes being provided: i) position of crossing location(s) along the frontage of the site to link the development site to the southern side of the Feus; ii) the location of the bus stops (NaPTAN 73723235 Auchterarder, opposite Darnley Hill and NaPTAN 73725372 Auchterarder, at Darnley Hill ) with the associated road markings for the protection of boarding and alighting passengers on the Feus; iii) provide details of the street lighting infrastructure, including the lowering of the cable across the vehicle access to 850mm, with chambers installed at either side iv) the vehicle access with the kerbing along the frontage of the development on the Feus including the location of dropped kerbs across the vehicle access and to the southern side of the Feus; and v) confirm the construction details within the boundary of the public road network, Shall be submitted to, and approved in writing by, the Council as Planning Authority. The submission will confirm the location, specification, detailed design and delivery timescales for the crossing location, bus stop markings, street lighting infrastructure and kerbing. The scheme for the approved shall thereafter be implemented in full, prior to the trading of the store. Reason - In the interests of road, pedestrian safety and connectivity with the developments to the southern side of the Feus. 16. No part of the development shall be occupied until a Travel Plan aimed to encourage more sustainable means of travel, has been submitted to and agreed in writing by the Council in consultation with Transport Planning. The Travel Plan will have particular regard to provision for walking, cycling and public transport access to and within the site and will identify the measures to be provided (including the enhanced public transport infrastructure), the system of management, monitoring, review, reporting and the duration of the plan.
Page 27
Reason - To promote sustainable transport options and to meet advice within National Planning Framework on transport. 17. Prior to the development hereby approved being completed or brought into use, the access shall be constructed so that no surface water is discharged onto the public road. Reason - In the interests of road safety; to ensure an acceptable standard of construction within the public road boundary. 18. Prior to the commencement of the development hereby approved, the applicant shall submit for the further written agreement of the Council as Planning Authority, in consultation with the Roads Authority (Structures), a Construction Traffic Management Scheme (TMS) which shall include the following: i) restriction of construction traffic to approved routes and the measures to be put in place to avoid other routes being used; ii) timing of construction traffic to minimise impact on local communities particularly at school start and finishing times, on days when refuse collection is undertaken, on Sundays and during local events; iii) arrangements for signage at site accesses and crossovers and on roads to be used by construction traffic in order to provide safe access for pedestrians and cyclists; iv) details of information signs to inform other road users of construction traffic; v) arrangements to ensure that access for emergency service vehicles are not impeded; vi) co-ordination with other significant developments known to use roads affected by construction traffic; vii) details of HGV movements to and from the site. The TMS as approved shall be strictly adhered to during the entire site construction programme. Reason - In the interest of proper site management. 19. Prior to the commencement of development a statement shall be submitted to and agreed in writing by the Council as Planning Authority to demonstrate compliance that at least 10% of the current carbon emissions reduction set by Scottish Building Standards will be met through the installation and operation of low and zero-carbon generating technologies. The measures as agreed shall be installed prior to operation/binging into use of the development. Reason - to comply with Policy 32 of the Local Development Plan 2 20. Development shall not commence on site until a detailed sustainable urban drainage system (SUDS) has been submitted for the written agreement of the Council as
Page 28
Planning Authority, in consultation with SEPA where necessary. The scheme shall be developed in accordance with the technical guidance contained in The SUDS Manual (C753) and the Council’s Flood Risk and Flood Risk Assessments Developer Guidance, and shall incorporate source control. All works shall be carried out in accordance with the agreed scheme and be operational prior to the bringing into use of the development. Reason - To ensure the provision of effective drainage for the site. 21. Prior to the commencement of any works on site, all trees on site (other than those marked for felling on the approved plans) and those which have Root Protection Areas which fall within the site including the tree to the east of the access shall be retained and protected. Protection methods shall be strictly in accordance with BS 5837 2012: Trees in Relation to Design, Demolition and Construction with evidence of tree protection measures in situ submitted to and agreed in writing with the Council as Planning Authority. Protection measures, once in place, shall remain in place for the duration of construction. Reason - To ensure the protection of the tree to the east of the site. Justification Although the proposal is contrary to National Planning Framework 4, Policy 28: Retail, the proposal is supported by other policies of the development plan, namely: (i) National Planning Framework 4, Policy 9(a): Brownfield, Vacant and Empty Buildings – the proposal would result in the sustainable reuse of brownfield land; and (ii) National Planning Framework 4, Policy 15)(a): Local Living and 20 minute neighbourhoods – the proposal would contribute to local living including the 20 minute neighbourhood of the area. Local people will be able to meet their daily shopping needs by a variety of sustainable modes of travel, including walking and cycling. Informatives 1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as amended) the person undertaking the development is required to give the Planning Authority prior written notification of the date on which it is intended to commence the development. A failure to comply with this statutory requirement would constitute a breach of planning control under Section 123(1) of that Act, which may result in enforcement action being taken.
Page 29
2. As soon as practicable after the development is complete, the person who completes the development is obliged by Section 27B of the Town and Country Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written notice of that position. 3. No work shall be commenced until an application for building warrant has been submitted and approved. 4. Application for a new postal address should be made via the Street Naming and Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn. Please note there is a charge for this service and submission cannot be made until the relevant Building Warrant has been approved. 5. This planning permission is granted subject to conditions, some of which require further information to be submitted to Development Management either before works can start on site or at a certain time. The required information must be submitted via the ePlanning portal if your original application was lodged that way, otherwise send it to us at developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable in respect of each request made, though there is no limit to the number of conditions that can be discharged in a single request. The Fees Charter is available on our website www.pkc.gov.uk. The Council has two months to consider the information. You should therefore submit the required information more than two months before your permission expires. We cannot guarantee that submissions made within two months of the expiry date of your permission will be able to be dealt with before your permission lapses. 6. The applicant is advised that any proposed signage will require a further application to be submitted for advertisement consent unless it benefits from express consent as per the Town and Country Planning (Control of Advertisements) (Scotland) Regulations 1984. 7. The applicant is advised that, in terms of Sections 109 of the New Roads and Street Works Act 1991, he/she/they must obtain consent from the Council, to place, maintain or adjust apparatus in, or under a Road or remove apparatus from a road. Application forms are available at https://www.pkc.gov.uk/article/14916/Road-and-footway- permits. 8. The applicant is advised to contact the Street Lighting Partnership to obtain the locations of plant. Contact Perth & Kinross Council Street Lighting Department for further details. 9. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act 1984, he/she/they must obtain from the Council, as Roads Authority, consent to open an existing road or footway prior to the commencement of works. Information on junction types, requirements for
Page 30
Vehicular Access consents (VA1) and application forms are available at www.pkc.gov.uk/vehicleaccess. Advice on the disposal of surface water should be sought at the initial stages of design from Scottish Water and the Scottish Environment Protection Agency. Procedural note The planning permission decision notice shall not be issued until such time as the required Developer Contributions have been secured or paid in full. In the event the applicant does not either make the required payment within 28 days from the date the agent/applicant is advised of the need for the contributions, or complete a legal agreement for delayed payment within a 4 month period from the date the agent/applicant is advised of the need for the contributions the application may be refused under delegated powers without any further discussion with the applicant. (iii) 25/00213/IPL Residential development (in principle), land 25 metres east of Green Bank, Heughfield Road, Bridge of Earn (Report No. 25/185) Mr P Noad, on behalf of the applicant, joined the meeting via telephone, however due to technical difficulties was unable to participate. Resolved: Grant, subject to the following terms, conditions and informatives: Conditions 1. This planning permission in principle will last only for five years from the date of this decision notice, unless the development has been lawfully started within that period. Reason - This is a Planning Permission in Principle in terms of Section 59 of the Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning (Scotland) Act 2019. 2. The development shall not commence until the following specified matters have been the subject of a formal planning application for the approval of the Council as Planning Authority: the siting, design and external appearance of the development, the hard and soft landscaping of the site, details of biodiversity enhancement measures, all means of enclosure, means of access to the site, vehicle parking and turning facilities, levels, drainage and waste management provision. Reason - This is a Planning Permission in Principle under Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended by Section 21 of the Planning etc. (Scotland) Act 2006. 3. Notwithstanding the details shown on the drawings hereby approved, no permission is granted for the
Page 31
submitted layout, design, scale or position of the dwellings. Reason - In order to clarify the terms of the permission which is granted in principle only. 4. Further to Condition 2 above, a Tree Survey shall be submitted as part of the specified matters requiring to be the subject of a further formal planning application for the approval of the Council as Planning Authority. The Tree Survey shall include: (a) a plan, to a scale and level of accuracy appropriate to the proposal, showing the position of every tree on the site and on land adjacent to the site (including street trees) that could influence or be affected by the development, indicating which trees are to be removed; and (b) in relation to every tree identified a schedule listing: i. information as specified in paragraph 4, BS 5837 2012: Trees in Relation to Design, Demolition and Construction; ii. any proposed pruning, felling or other work; and (c) in relation to every existing tree identified to be retained on the plan referred to in (a) above, details of: i. any proposed alterations to existing ground levels, and of the position of any proposed excavation, that might affect the root protection area (see BS 5837 2012: Trees in Relation to Design, Demolition and Construction) and ii. all appropriate tree protection measures required before and during the course of development (in accordance with BS 5837 2012: Trees in Relation to Design, Demolition and Construction), and (d) areas of existing landscaping to be protected from construction operations and the method of protection. Reason - In order to ensure that existing trees and hedges are fully considered as part of further applications. 5. All existing trees and hedging on the site shall be retained and their retention or proposed lopping, topping or felling shall be shown in the submission of the matters specified in Condition 2 above. Reason - In order to ensure that existing trees and hedges are fully considered as part of further applications. 6. The development shall not commence until the following specified matters have been the subject of a formal planning application for the approval of the Council as Planning Authority: regarding access, car parking, public transport facilities, walking and cycling facilities, the road
Page 32
layout, design and specification (including the disposal of surface water) shall be in accordance with the standards required by the Council as Roads Authority (as detailed in the National Roads Development Guide) and to the satisfaction of the Planning Authority. Reason - In the interests of pedestrian and traffic safety. 7. Further to condition 2 above, a detailed sustainable urban drainage system (SUDS) shall be submitted for the written agreement of the Council as Planning Authority, in consultation with SEPA where necessary. The scheme shall be developed in accordance with the technical guidance contained in The SUDS Manual (C753) and the Council's Flood Risk and Flood Risk Assessments Developer Guidance, and shall incorporate source control. All works shall be carried out in accordance with the agreed scheme and be operational prior to the bringing into use of the development. Reason - This is a Planning Permission in Principle under Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended by Section 21 of the Planning etc. (Scotland) Act 2006 and there is a known issue relating to flooding and/or surface water. 8. Storm water drainage from all paved surfaces, including the access, shall be disposed of by means of suitable Sustainable Urban Drainage Systems to meet the requirements of best management practices. Reason - To ensure the provision of effective drainage for the site. 9. Further to condition 2 above, full details of the Deich Burn flood risk extent (0.5% annual probability + 39% climate change) shall be shown on the site layout and submitted as part of the specified matters requiring to be the subject of a further formal planning application for the approval of the Council as Planning Authority. The details shall include topographical plans and sections through the site to identify the flood extent and garden levels of the proposed development relative to the opposite bank of the Deich Burn. Reason - In order to demonstrate that there will not be any landraising in any lower areas of the site identified as functional floodplain on the SEPA flood maps and to ensure there is no loss of floodplain capacity. 10. Further to condition 2 above, a maintenance plan shall for the Deich Burn shall be submitted as part of the specified matters requiring to be the subject of a further formal planning application for the approval of the Council as Planning Authority. This plan, essential for the southern plot boundary, will outline regular inspections, seasonal work, and vegetation management, including removing overgrowth and sediment dredging. Reason - This is a Planning Permission in Principle under Section 59 of the Town and Country Planning (Scotland)
Page 33
Act 1997 as amended by Section 21 of the Planning etc. (Scotland) Act 2006 and there is a known issue relating to flooding and/or surface water. 11. Further to Condition 2 above, any detailed application to develop the site should be accompanied by a Design Statement as the proposal could affect the setting of Heughfield House, listed building. Reason - In order to protect the setting of the Listed Building. 12. Further to condition 2, a detailed statement shall be submitted for the approval of the Council as Planning Authority which demonstrates that at least 10% of the current carbon emissions reduction set by Scottish Building Standards will be met through the installation and operation of low and zero-carbon generating technologies. The approved measures shall thereafter be implemented to the satisfaction of the Council as Planning Authority. Reason - In order to demonstrate compliance with both Policy 32 of the local development plan and the carbon emissions reduction set by Scottish Building Standards. 13. The development shall be in accordance with the requirements of Perth & Kinross Council's Developer Contributions and Affordable Housing Supplementary Guidance 2023 in line with Policy 5: Infrastructure Contributions of the Perth & Kinross Local Development Plan 2 (2019) with particular regard to primary education infrastructure, or such subsequent Guidance and Policy which may replace these. Reason - To ensure the development is in accordance with the terms of the Perth and Kinross Local Development Plan 2 (2019) and to comply with the Council's policy on Developer Contributions and Affordable Housing Supplementary Guidance 2020. 14. The development shall be in accordance with the requirements of Perth & Kinross Council's Developer Contributions and Affordable Housing Supplementary Guidance 2023 in line with Policy 5: Infrastructure Contributions of the Perth & Kinross Local Development Plan 2 (2019) with particular regard to transport infrastructure, or such subsequent Guidance and Policy which may replace these. Reason - To ensure the development is in accordance with the terms of the Perth and Kinross Local Development Plan 2 (2019) and to comply with the Council's policy on Developer Contributions and Affordable Housing Supplementary Guidance 2020. Justification The proposal is in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan.
Page 34
Informatives 1. The applicant is advised that Perth and Kinross Council have a charging scheme for recycling and waste bins for new build properties and newly created dwellings. Further information can be found at: https://www.pkc.gov.uk/binrequests 2. The applicant is advised to refer to Perth & Kinross Council's Supplementary Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 3. The applicant should be aware of the requirements of the Council's Environment and Regulatory Services in relation to waste collection from the site and should ensure adequate measures are provided on site to allow for the collection of waste. 4. This application was varied prior to determination, in accordance with the terms of section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. The variations incorporate changes to the site plans to show site context. 5. The applicant should take note of the information and advice contained within the consultation response from Scottish Water. 6. Please be aware that your Planning Permission in Principle may be invalidated by the felling of trees which are required to be retained, if carried out prior to gaining approval of all matters specified in conditions. 7. The applicant should be aware that the Council reserves the right to seek a biodiversity survey of the site in respect of a further application, the need for which will take into account any proposed tree / hedge removals. 8. The applicant should take note of the information and advice contained within the consultation response from Transport Planning dated 14 March 2025. 6. Proposal of Application Notices (PoAN) (i) 25/00009/PAN Installation of a 39MW solar farm comprising ground mounted solar array, battery energy storage system (BESS), vehicular access and associated works, land 890 metres east of The Byre, Balvaird Farm, Strathmiglo, Cupar, KY14 7SR (Report No. 25/1) Councillors D Illingworth and I James both requested that due consideration be given to the sound impact on Gamekeepers Cottage and the visual impact on both Gamekeepers Cottage and Balvaird Castle. The contents of the Report by the Development Management and Building Standards Service Manager, were noted.