Perth and Kinross Council 
Planning and Placemaking Committee – 6 August 2025 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/187) 
Proposal: Installation of battery storage system and solar energy park and
associated infrastructure (ECU00005014) 
Location: Land 600 metres north-west of Caddam Cottage, Keithick 
Ref. No: 24/00761/ECU36
Ward No: P2- Strathmore 
Summary 
Perth and Kinross Council has been consulted by the Scottish Government’s Energy
Consents Unit (ECU) on a proposal to develop a renewable energy generation and
storage facility consisting of a 50MW Battery Energy Storage System (BESS) an
accompanying 60MW solar park and all associated infrastructure, inclusive of cabling,
screening, planting and access. 
The findings of this report recommends that the Council does not object to the
proposal and recommends conditions for the acceptable development of the site
during its construction and operation. 
Background and Description of Proposal 
1 The purpose of the report is to make members aware of the relevant planning
considerations relating to the proposed development. Following consideration of
these matters the Council must advise the Scottish Government whether it
objects to the application. 
2 The site is located to the west of Coupar Angus on an area extending to
approximately 104.6 hectares, inclusive of cable routes. The site will be accessed
from four separate access points, one off the A923 (Site Access 1) and three off
the unnamed road (Site Access 2, 3 and 4) which dissects the southern areas of
the site. Coupar Angus is approximately 800m to the East and Burrelton
approximately 1.95km South-west.

Page 2

3 The proposal is in proximity to the consented Keithick Solar Energy Park (PKC
ref: 23/00022/CONSUL, ECU ref: ECU00004521), and is utilising 11.5MW of
solar area from the consented site, plus utilising an additional 48.5MW solar land
incorporated from the west and to the north. This is due to separate grid
connection points for the 50MW BESS site and 11.5MW portion of the consented
solar, which will be connected directly into Coupar Angus Substation. The
remainder of the consented Keithick Solar Energy Park, the 16MW BESS and
remaining 20.5MW solar development area, have a separate connection point
into the overhead line located to the south of the A94. 
4 The solar park, will utilise approximately 143,724 bifacial solar PV arrays with
mountings, cabling, with associated infrastructure components, such as
transformers, Inverters, DC and AC converters, switchgear and controllers, as
well as requisite substations which will be housed within units. The BESS will
consist of 20 battery storage units, 10 invertor stations and 10 transformers as
well as infrastructure such as fencing and storage. A 4m acoustic fence, as
previously consented, will be established to mitigate noise impacts. 
5 The lifetime of the development is expected to be 40 years. The solar park has
the capacity to produce over 58,320,000 kWh of electricity per year with the
ability to reduce carbon dioxide emissions by over 16,509 metric tonnes annually
whilst also supplying over 16,663 homes. 
6 The BESS has the capacity to store and supply over 73,000,000 kWh of
electricity per year with the ability to reduce carbon dioxide emissions by over
20,664 metric tonnes annually whilst also providing electricity storage equivalent
to supplying over 20,857 homes. 
Site History 
7 21/00019/PAN On 21 January 2022 for Installation of a 32MW solar farm and
16MW battery energy storage facilities and associated infrastructure 
8 22/00111/SCRN On 5 October 2022 for Installation of 16MW battery energy
storage solution and a 32MW solar farm with associated infrastructure 
9 22/00004/SCRN was Approved On 25 May 2022 for Development of a 50.1MW
BESS and all associated Infrastructure including cabling and landscaping 
10 22/00013/CONSUL (ECU ref: ECU00004521) on 5 December 2022 PKC did not
object to Scottish Ministers’ consultation on a proposal to construct and operate
an electricity generating station comprising a group of photovoltaic panels, batter
energy storage systems and associated infrastructure with a capacity of
approximately 98MW on Land at Keithick Farms, Coupar Angus. On 21 March
2023 the ECU granted consent for the proposal.

Page 3

11 22/00016/PAN On 29 June 2022 for Formation of a 32MW solar farm, 16MW
battery energy storage system and associated works 
12 22/01031/SCRN On 7 June 2022 for Screening opinion for Keithick Energy
Storage Farm 
13 23/00022/CONSUL (ECU ref: ECU00004936) on 14 May 2024 The Scottish
Ministers, following consultation with PKC, adopted the opinion that the
construction and operation an electricity generating station comprising a 50
megawatt battery energy storage system and accompanying 70 megawatt solar
park, with the capacity to generate approximately 120 megawatts of electricity,
comprising multiple battery storage units, power converters and transformers,
switching station and ancillary infrastructure such as internal access tracks and
associated security measures does not constitute EIA development. 
Nearby sites 
14 22/00195/FLM 1 June 2022 Full Planning Permission granted for Formation of
battery energy storage system with associated work and infrastructure of up to
49.9 MW 
15 23/01294/FLM Formation of a 49.9MW solar farm comprising ground mounted
solar arrays, inverters, transformers, a substation, security fencing, CCTV
cameras, cabling, access tracks and associated works – this application was
called in by the Scottish Ministers and a decision is pending. 
Environmental Impact Assessment 
16 23/00022/CONSUL The proposal was screened for EIA and it was concluded
that the proposal does not constitute EIA development. 
Pre-Application Consultation 
17 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009. However, unlike Major Development proposals, Section 36 applications
are not subject to mandatory pre-application consultation engagement
requirements. 
18 Despite there being no statutory requirement to conduct public consultation, the
applicant has submitted a PAC. Public engagement was undertaken to gain
insight into concerns and opinions from members of the local community and
surrounding area. Such engagement involved the advertisement of the project in
local press releases, the hosting of an online webpage, and a public meeting was
held at the Red House Hotel in Coupar Angus in September 2023.

Page 4

Development Plan 
19 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
20 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces. NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
21 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 14: Design, Quality and Place
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
22 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
23 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 27A: Listed Buildings
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy

Page 5

• Policy 33C: Renewable and Low Carbon Energy: Decommissioning and
Restoration of Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 61: Airfield Safeguarding 
Statutory Supplementary Guidance 
• Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Landscape (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
24 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below.

Page 6

Planning Advice Notes 
25 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• Scottish Government Advice - Advice for planning authorities on large
photovoltaic arrays
• Scottish Government Advice - Advice for planning authorities on energy
storage issues 
CONSULTATIONS 
26 As part of the planning application process the following bodies were consulted: 
27 Perth and Kinross Heritage Trust - No objection. It is recommended that a
programme of archaeological works and protective fencing condition should be
attached to any consent to assess the presence / absence, character and
significance of archaeological deposits on the site. 
28 Biodiversity - The initial response advised that the submitted information was not
in accordance with legislation, policy and guidance. Additional information was
requested in the form of an Ecological Impact Assessment, tree protection
measures and confirmation of biodiversity enhancement over and above measures
required for mitigation and compensation for lost habitats. This information was
subsequently submitted and there are no objections subject to conditions to secure
a detailed landscaping and planting plan, a CEMP (including measures to mitigate
impacts of lighting on nocturnal species and tree protection measures) and a
commitment to submit all species records to NBN Gateway as part of the
biodiversity enhancement measures. 
29 Development Contributions Officer - No comments. 
30 Environmental Health (Contaminated Land) - A search of the historic records
did not raise any concerns regarding ground contamination and there are no
adverse comments to make on the application.   
31 Environmental Health (Noise Odour) - No objection. Conditions requested to
control noise, glint and glare and external lighting. 
32 Structures and Flooding - No objection. 
33 Transportation and Development - No objection. Conditions required for a
CTMS, passing places and junction visibility splays.

Page 7

34 These issues are addressed in the Appraisal section of the report. 
Additional Statements 
35 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Any required Habitats Regulations
Appraisal will be for the ECU 
Design Statement or Design and Access
Statement
Not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
PAC Report
Planning Supporting Statement
Glint and Glare Report
Heritage Impact Assessment
Noise Impact Assessment
Construction Traffic Management
Plan
Flood Risk and Drainage
Assessment
Landscape and Visual Impact
Assessment
Ecological Impact Assessment
Preliminary Ecological Appraisal 
Considerations 
36 Schedule 8 to Section 36 of the Electricity Act 1989 requires the Scottish
Government, as the appropriate authority, to serve notice of the application on
the Council as the relevant planning authority. The Council are required to
consider the proposal in accordance with the provisions of the Development Plan
unless material considerations indicate otherwise. 
37 The Development Plan comprises NPF4 and the Perth and Kinross Local
Development Plan 2019. The relevant policy considerations are outlined in the
policy section above and are considered in more detail below. In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance. 
Principle 
38 NPF4 Policy 1 (Tackling the Climate and Nature Crises) encourages, promotes
and facilitates development that addresses the global climate emergency and
nature crises. Similarly, Policy 2 (Climate Mitigation and Adaption) encourages
development that minimises emissions and adapts to the current and future
impacts of climate change.

Page 8

39 The solar park has the capacity to produce over 58,320,000 kWh of electricity per
year with the ability to reduce carbon dioxide emissions by over 16,509 metric
tonnes annually whilst also supplying over 16,663 homes. 
40 The BESS has the capacity to store and supply over 73,000,000 kWh of
electricity per year with the ability to reduce carbon dioxide emissions by over
20,664 metric tonnes annually whilst also providing electricity storage equivalent
to supplying over 20,857 homes. 
41 NPF4 Policy 11 (Energy) states that “development proposals for all forms of
renewable, low-carbon and zero emissions technologies will be supported. These
include enabling works, such as grid transmission and distribution infrastructure
and energy storage, such as battery storage and pumped storage hydro.” It
further advises that “proposals for the co-location of these technologies will be
supported.” 
42 The stated intent of Policy 11 is “To encourage, promote and facilitate all forms of
renewable energy development onshore and offshore. This includes energy
generation, storage, new and replacement transmission and distribution
infrastructure and emerging low-carbon and zero emissions technologies
including hydrogen and carbon capture utilisation and storage (CCUS).” 
43 LDP2 Policy 33A (Renewable and Low-Carbon Energy – New Proposals for
Renewable and Low-Carbon Energy) and Policy 35 (Electricity Transmission
Infrastructure) support proposals for the utilisation, distribution and development
of renewable and low-carbon sources of energy subject to set criteria being taken
into account, and the environmental and cumulative impacts can be satisfactorily
addressed. 
44 These policies establish that the principle of renewable energy developments,
such as the proposed solar array and BESS, is acceptable, and in recognition of
their importance in achieving net zero targets, such developments are lent
substantial support at both national and local level, subject to compliance with
other relevant Development Plan policies. 
Landscape and Visual Impact 
45 Safeguarding and enhancing landscape character is considered via LDP
Policies 1A, 1B, 33 and 39 of the LDP2. Whilst Policy 4(a) and (d) of the NPF4
considers impacts on the natural environment, Policy 11 (Energy) is of more
relevance to an equivalent landscape assessment. In that case the policy
balance favours renewable energy contribution over any landscape impacts. 
46 In terms of the landscape context of the site, it is set in a predominantly
rural/agricultural setting within the Broad Valley Lowlands – Tayside Landscape
Character Type as defined in the Landscape Character Assessment. However,

Page 9

there are no formal landscape designations covering the site, but the Sidlaw Hills
Local Landscape Area is located approximately 4km to the South-east. 
47 A Landscape & Visual Impact Assessment (LVIA) has been submitted in support
of the application. The LVIA includes a desk-based study, fieldwork, a Zone of
Theoretical Visibility (ZTV); and assessment of selected viewpoints. It considers
the potential direct and indirect effects of the proposed development upon the
landscape resources, views and visual amenity receptors within the existing
landscape and visual baseline across a 5km study zone. The study also
considers the potential for cumulative effects. 
48 The main landscape effects will be associated with the introduction of PV Panels
and BESS infrastructure within fields previously used for agricultural practices.
The  introduction of the solar farm and BESS site will lead to a change of
character within the confines of the site boundary. The proposal will alter the
landscape character within the confines of the site, adding an industrial character
to the site and immediate site surroundings where views are possible. 
49 Indirect change will occur outside of the site boundary, where the visibility of the
development has an influence on the perception of the character of the
landscape. The indirect change in landscape character is greatest in its
immediate and close surroundings, where open and partial views are possible
within an approximately 1km radius from the development boundary. 
50 Indirect change and the significance of landscape effects will reduce with
increasing distance from the site in the remaining study area (between
approximately 1km and 5km from the site boundary). Given the nature, scale and
setting of the proposed development, the change in character will not be
recognised over long distances throughout the wider study area in accessible
views. 
51 The LVIA concludes that the nature, scale and form of the development would
inevitably result in some adverse effects on landscape character and on visual
amenity. However, the limited height of the development combined with the
containment afforded by the framework of existing and new boundary vegetation,
setbacks and exclusion areas for development and topography ensures that
effects, including cumulative effects, would be mostly localised in their extent and
generally acceptable. 
52 Mitigation measures are detailed in the study and are supported by the
submission of a landscape plan and site layout drawings which includes
supplementing existing, and new additional planting. The proposed mitigation
and landscape measures along the site boundaries in the medium to long term
will help screen the development. In the short to medium term the proposed
development will inevitably have some adverse visual and landscape affects
within localised views.

Page 10

53 A planning balance in this case must be considered having regard to any
landscape impacts against the zero carbon renewable energy benefits provided
by the NPF4. In this case it is the view of officers that the landscape impacts are
not substantial enough to outweigh the renewable energy benefits and as such
the proposal is considered to comply with the above-named policies. 
Soils and Prime Agricultural Land 
54 The soil classification of the site is predominantly Class 3.1 with some smaller
areas of Class 2. Prime agricultural land is that identified as being Class 1, 2 or
3.1 in the land capability classification for agriculture developed by Macaulay
Land Use Research Institute (now the James Hutton Institute). As the site is
located on an area of prime agricultural land, Policy 5 (Soils) of NPF4 and
Policies 50 (Prime Agricultural Land) and 51 (Soils) of LDP2 are relevant. 
55 NPF4 Policy 5 states that “Development proposals on prime agricultural land, or
land of lesser quality that is culturally or locally important for primary use, as
identified by the LDP, will only be supported where it is for: 
i. Essential infrastructure and there is a specific locational need and no other
suitable site;
iv. The generation of energy from renewable sources or the extraction of minerals
and there is secure provision for restoration; and 
In all of the above exceptions, the layout and design of the proposal minimises 
the amount of protected land that is required.” 
56 In terms of Criterion i, NPF4 specifies examples of what is considered “Essential
Infrastructure”, this includes “all forms of renewable, low-carbon and zero
emission technologies for electricity generation and distribution and transmission
electricity grid networks and primary sub stations”. The specific locational need
has not been justified through a sequential test, however, it is accepted that
proximity to infrastructure to support connection to the National Grid is a
significant factor in this type of development proposal. The co-location of a
renewables and BESS development near to the Coupar Angus Substation and
existing overhead lines where it can receive Grid connection removes the
requirement for what can be significant additional infrastructure necessary to
connect renewables and BESS to the Grid. It is therefore accepted that the
proposal satisfies Criterion i. 
57 In terms of Criterion iv, the solar element of the proposal is for the generation of
energy from renewable sources. The Scottish Government Chief Planner’s letter
of August 2020 confirms that the Scottish Government considers that a battery
installation is to be treated as a generating station. Therefore, the BESS element
also complies with Criterion iv. The decommissioning and restoration of the site
can be secured via condition (Condition 10). It is also recognised that the

Page 11

majority of the development will comprise the solar farm element which will not
result in the complete loss of prime agricultural land, rather the land use will
change temporarily, albeit for a period of 40 years. The predicted impact to soil is
in contrast to other forms of greenfield development, which are largely, if not
wholly, destructive. 
58 For those elements of the development that require the removal or movement of
soils e.g. substation and access tracks, under the terms of Policy 51 further
details will be required to demonstrate that the development is in compliance i.e.
a Soil Management Plan (Condition 9). 
59 Overall, NPF4 Policy 5 is the prevailing policy in terms of soils and prime
agricultural land and the proposal is assessed to broadly comply with its
requirements. As a result, the proposed development is supportable in this
location. 
Residential Amenity 
Noise 
60 LDP2 Policy 55: Nuisance from Artificial Light and Light Pollution and Policy 56:
Noise Pollution are the most relevant LDP2 policies. Policy 56 states that there
will be a presumption against the siting of development proposals which will
generate high levels of noise in the locality of existing or proposed noise
sensitive land uses and similarly against the locating of noise sensitive uses near
to sources of noise generation. 
61 A Noise Impact Assessment (NIA) has been submitted with the application and
concludes that the noise rating level produced by the proposed development will
fall below the measured background sound level at all assessed receptors.
However, no additional noise will be produced by this development and
exceedances are attributed to the consented Keithick Energy Park. Predicted
levels at the surrounding residential receptors for this development only are
provided as are the cumulative predictions. These levels are consistent with the
NIA undertaken for Keithick. Conditions are recommended to ensure any
potential noise during construction and operational; phase are within acceptable
limits (Conditions 11 and 13) 
Glint and Glare 
62 A Glint and Glare Report has been submitted with the application. Other than
figures showing solar irradiation, temperature, and location of sensitive receptors,
there is no detailed information on glint and glare impact on residential amenity.
The report concludes that protection will be through existing trees and new
proposed hedgerows, though no heights or year 0-10 predictions have been
included. It has been confirmed that the existing trees that are being relied upon

Page 12

belong to the landowner. It is recommended that a condition is imposed on any
consent to protect nearby residential amenity from external lighting and
illumination (Condition 12). 
Roads and Access 
63 Policy 13 (Sustainable Transport) of NPF4 focuses on sustainable travel and
ensures development is sited appropriately. LDP2 Policy 60 (Transport
Standards and Accessibility Requirements) requires that local road networks be
capable of absorbing traffic generated by development and that satisfactory
access is provided. 
64 Impacts from the operational phase of the proposed development, consisting of
between 20 - 40 LGVs per year, is not considered to be significant and therefore
a full Transport Assessment is not required. However, increased volumes of
traffic will be generated during the construction period, and this has been
assessed in a Construction Traffic Management Plan. Nevertheless, the overall
volumes of traffic generated by the proposed development during the
construction period are considered to be quite low. During the anticipated 6-
month construction period, a total of 571 HGV deliveries will be made to the site.
During the peak construction period there will be an approximate maximum of 20
daily HGV deliveries. 
65 The site will be accessed from four separate access points; one from the A923
and three from the unnamed road which dissects the southern areas of the site.
PKC Transport Planning has no objections to the proposal subject to conditions
requiring the submission of a CTMS and details of passing places and junction
visibility splays (Conditions 1-8). 
Drainage and Flooding 
66 Policy 22 (Flood Risk and Water Management) of NPF4 sets out that proposals
will not increase the risk of surface water flooding to others, or itself be at risk,
manage all rain and surface water through sustainable urban drainage systems
(SUDS) and seek to minimise the area of impermeable surfaces. In addition,
Policy 53 (Water Environment and Drainage) of LDP2 sets out that development
proposals at any location and of any scale should protect and where practical
improve the water environment. 
67 A Flood Risk and Drainage Assessment (FRDA) has been submitted and
assessed by PKC Flooding and Structures, who advise that they have no
objections to the proposal. 
68 The FRDA advises that the proposal will result in no significant cumulative impact
when considering the existing proposed infrastructure associated with the

Page 13

Keithick Solar Farm development and BESS and therefore, no formal drainage
strategy is required. 
69 The flood risk screening assessment found that there was no or low flood risk
from all sources from groundwater, surface water and infrastructure with
predominantly low risk of fluvial flooding, with a section of medium risk to the
south of Plot 1. This includes modelled results of the 1:200 year plus 53% climate
change allowance fluvial event which shows flooding up to 2.14m deep at the
southern extent of Plot 1. It has been recommended that the construction of solar
infrastructure is avoided in this area. The site layout shows this area to be
retained in agricultural use. 
Conservation and Archaeology 
70 NPF4 Policy 7 (Historic Assets and Places) and LDP2 Policies 26 (Scheduled
Monuments and Archaeology) and 27 (Listed Buildings) are relevant to the
development. A Heritage Impact Assessment (HIA) has been submitted in
support of the development. 
71 Perth and Kinross Heritage Trust (PKHT) has been consulted on the proposal
and advised that while they broadly agree with but disagree on the proposed
mitigation given the scale of development and potential for archaeological
remains. There is high density evidence of archaeological activity from multiple
periods within the wider study area, evidenced by both designated and
undesignated heritage assets. It appears the land has been used for agricultural
purposes for a considerable time and as such there remains the possibility that
unknown buried remains may exist within the development area. Given the site is
greenfield with no recorded development alongside the evidence outlined within
the HIA, PKHT strongly recommend that a 10% archaeological evaluation be
undertaken in the first instance, to determine any surviving archaeological
remains. The layout of these trenches and details of monitoring should be agreed
with PKHT in advance of any site works. 
72 In addition, the development layout seems to sit on or very close to known
potential archaeological sites within the red line boundary – i.e. MP4745 Kemphill
potential prehistoric unenclosed settlement and MPK5037 Islabank potential ring
ditch. While some consideration has been made to protect these assets in situ,
the condition, full extent nor character of the archaeological remains is not
currently known. Archaeological evaluation will establish if these crop marks are
potentially geological or indeed archaeological and more extensive. Following
this assessment, if plans to ensure preservation in situ should be implemented
and long-term management plans such as appropriate fencing and protection put
place for the duration of the scheme and for any retrofitting/decommissioning/
repairs, alterations etc. Mitigation adjacent to or on known heritage assets may
work best under strip map and record methodology to ensure any associate
remains are comprehensively dealt with.

Page 14

73 Therefore, if permission is granted for this development, it is recommended that a
programme of archaeological works and protective fencing condition should be
attached to consent to assess the presence / absence, character and
significance of archaeological deposits on the site. This will inform a mitigation
strategy, if required, to either preserve significant deposits within the
development or for further archaeological works, to consist of the excavation and
post-excavation analysis / publication of these deposits. The details of this should
be clarified within a Written Scheme of Investigation (WSI) and be submitted to
PKHT for approval (Conditions 16 and 17). 
74 There are two Category C listed buildings in close proximity to the site, Kemphill
Farmhouse and Kemphill Steading. The HIA acknowledges that the proposed
development would appear as a modern change to the agricultural land to the
south of the Farmhouse and would constitute a change to the agricultural setting
of the Farmhouse and Steading in one direction. This would constitute a medium
and adverse level of change to the current setting of the listed building. However,
it is important to note that while this area forms part of the current application, the
Keithick consent has already approved solar panels and a BESS in the same
location. The HIA advises that the proposal is screened from the listed buildings
by vegetation similar to the field boundaries in existence in the local environment
to preserve a partial agricultural setting on all sides of the buildings and in order
to retain a sense of their historic setting. 
Natural Heritage and Biodiversity 
75 Policies 3 (Biodiversity) and 6 (Forestry, Woodland and Trees) of NPF4 and
Policies 40 (Forestry, Woodland and Trees) and 41 (Biodiversity) of LDP2 are
applicable to the proposal. 
76 An Ecological Impact Assessment (EcIA) has been submitted with the proposal
and its content is accepted. Trees with bat roost potential have been identified
and the PEAR states no activity will take place within 30m to avoid the need for
further survey. 
77 NPF4 Policy 3 requires development proposals for national or major
development to demonstrate that they will provide significant biodiversity
enhancements, in addition to any proposed mitigation. This should include nature
networks, linking to and strengthening habitat connectivity within and beyond the
development, secured within a reasonable timescale and with reasonable
certainty. Management arrangements for their long-term retention and monitoring
should also be included, wherever appropriate. 
78 The proposed measures for biodiversity enhancement are acceptable although
numbers, locations and specifications of bird boxes is omitted (Condition 16).
Planting native trees and hedgerows to improve connectivity and contribute

Page 15

towards nature networks is welcomed. A detailed landscaping and planting plan
is also required (Condition 14). 
79 The EcIA notes that the design has been adapted to ensure a 30m buffer around
trees with bat roost potential and the 400-year-old beech tree and 250-year-old
ash tree which is welcomed. Root protection areas should be protected during
construction to avoid damage to trees. Tree protection measures should be
included as part of a CEMP (Condition 15). 
80 Parts of the site are separated by the River Isla, which forms part of the River
Tay SAC. The sites will be connected across the SAC by cables. Details should
be provided in the CEMP of how the cabling will be installed and measures taken
to ensure that the SAC is protected during construction. 
Planning Obligations and Legal Agreements 
81 None required. 
Conclusion and Reasons for Recommendation 
82 To conclude, the proposed development is considered to comply with NPF4, and
the Local Development Plan 2 (20129). Account has been taken of the relevant
material considerations ad none has been found that would justify overriding the
Development Plan. 
83 Accordingly, it is recommended that the Council offers no objection to the
proposal and requests the imposition of the suggested conditions. 
Recommended Conditions and Reasons 
Transportation: 
1. Prior to commencement of any development on site, a detailed design showing
the locations of passing places at the following locations on the C436 public road
network: 
• Between Junction 1 and Junction 2
• Between Junction 2 and Junction 3 
shall be submitted to and approved in writing by the Planning Authority in
consultation with the Roads Authority. The passing places will create a road
width of 7.3 metres over a distance of 15 metres with 15 metres tapers on entry
and exit to the passing place. The passing places, as approved in writing, shall
be implemented in accordance with the approved details to the satisfaction of
Perth and Kinross Council as Planning Authority and undertaken prior to the
commencement of construction associated with this planning application.

Page 16

Reason – In the interests of pedestrian and traffic safety 
2. Prior to commencement of any development on site, a detailed design showing
the locations of intervisible passing places at 200 metre centres for the existing
private access for Keithick Farm, between the A94 and C436, shall be submitted
to and approved in writing. The passing places, as approved in writing, shall be
implemented and permanently maintained thereafter in accordance with the
approved details to the satisfaction of Perth and Kinross Council and undertaken
prior to the commencement of construction associated with this planning
application. 
Reason – In the interests of pedestrian and traffic safety 
3. Prior to commencement of any development on site, a detailed design showing
the locations of intervisible passing places at 200 metre centres for the existing
private access for Keithick Farm, between the A94 and C436, shall be submitted
to and approved in writing. The passing places, as approved in writing, shall be
implemented and permanently maintained thereafter in accordance with the
approved details to the satisfaction of Perth and Kinross Council and undertaken
prior to the commencement of construction associated with this planning
application. 
Reason – In the interests of pedestrian and traffic safety. 
4. Prior to commencement of any development on site, the applicant shall submit
for the further written agreement a Construction Traffic Management Scheme
(TMS) which shall include the following: 
(a) restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;

Page 17

(i) details of information signs to inform other road users of construction
traffic;
(j) arrangements to ensure that access for emergency service vehicles are
not impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction;
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interests of road safety. 
5. Prior to the commencement of works, a maintenance agreement under Section
96 of the Roads (Scotland) Act 1984 shall be entered in to. Confirmation of this
agreement being in place shall be provided to Perth and Kinross Council, a
minimum of two weeks prior to the commencement of development. The
maintenance agreement shall be in respect of the: 
• C436 from a point 700 metres north east of North Lodge, Keithick,
Blairgowrie, PH13 9NE to Caddam Road Coupar Angus for a distance of
approximately 1.7km 
These roads shall be inspected on a regular basis and repairs carried out to the
timescale and standards specified by the Council as Roads Authority to the
satisfaction of Perth & Kinross Council. 
Reason - In the interests of road safety. 
6. The core path which forms part of the access track to the site (COUP/107;
Caddam Road at disused railway via near Kemphill to road bend at Main
Plantation) must not be obstructed during building works or on completion. Any
damage done to the core path (COUP/107) and associated signage during
building works shall be made good before operation of the Solar Farm or Battery
Energy Storage. Any temporary restrictions to public access required to facilitate
works on site must be agreed in writing first with Perth and Kinross Council. 
Reason - In the interests of public access along the core path. 
7. Prior to the commencement of construction associated with the Solar Farm or

Page 18

Battery Energy Storage facilities, full visibility splays channel line shall be
provided to the left and right of each access: 
• Junction 1
Full visibility splays of 215 metres shall be provided to the left and right of the
access, at a set-back of 4.5 metres 
• Junction 2
Full visibility splays of 187 metres shall be provided to the left and full visibility
splays of 215 metres shall be provided to the right of the access, at a set-back of
4.5 metres 
• Junction 3
Full visibility splays of 215 metres shall be provided to the left, ahead and right of
the access, at a set-back of 4.5 metres to the standard and specification required
by Perth and Kinross Council. The visibility splays shall be physically formed on
the ground and any existing fences, walls, hedges or other means of enclosure
or obstructions within the splays shall be removed and relocated outwith the
splays. Once formed, the visibility splays shall be permanently retained
thereafter, and no visual obstruction of any kind shall be permitted within the
visibility splays so formed. The visibility splays, as approved in writing, shall be
implemented in accordance with the approved details to the satisfaction of Perth
and Kinross Council and undertaken prior to the commencement of construction. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
8. Prior to the commencement of construction associated with the Solar Farm or
Battery Energy Storage facilities, the vehicle access onto the A94 shall be
widened to a minimum width of 7.3 metres for a minimum distance of 15 metres
from the edge of the public road network.   
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
Soil Protection: 
9. All soils excavated in the course of the development hereby approved shall be
retained onsite and repurposed unless otherwise approved in writing by the
Council as Planning Authority. Prior to the development hereby approved
commencing, a Soil Management Statement shall be submitted to the Council as
Planning Authority for approval in writing, this Statement shall set out the extent
of any excavation works to be undertaken and how soils shall be reused and or
managed onsite. All excavation and repurposing of soil shall then proceed in
accordance with the agreed Statement.

Page 19

Reason - In the interests of soil protecting and management in accordance with
Policy 51 of the LDP2. 
Site Decommissioning: 
10. In the event the hereby approved development fails to store (BESS) or generate
(solar farm) electricity on a commercial basis for a continuous period of 12
months, or at the conclusion of 40 years from the date of commencement of
development, whichever is the sooner, then it shall be deemed to have
permanently ceased to be required.  In such an event the development shall be
decommissioned, and the relevant parts of the site reinstated to its pre-existing
agricultural use within a period of eighteen months following the expiry of such
period of cessation or within such timescale as agreed by Perth and Kinross
Council. 
Reason - To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
Residential Amenity 
11. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
• In the event, that justified complaints for noise are received by the Council,
the applicant at their own expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from the development. 
The appointed consultant and methodology for the Noise Assessment shall
be submitted to and approved in writing by the Planning Authority in
consultation with Environmental Health within 28 days of being notified of the
complaint. Within 28 days of approval of appointed consultant and
methodology, a Noise Assessment shall be submitted outlining mitigation and
recommended timescales for delivery. Thereafter, all mitigation measures
shall be implemented within the timescales recommended. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
12. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land.

Page 20

• Within 2 months of receipt of a written request by the Council as Planning
Authority, following a substantiated complaint from a sensitive property, the
operator/applicant shall, at its own expense, employ a consultant approved by
the Planning Authority to carry out an assessment of glint and glare from the
development. The glint and glare assessment shall be submitted to and
approved in writing by the Planning Authority. The assessment must identify
any mitigation measures required if appropriate. Any mitigation measures
identified shall be implemented on site in accordance with a timescale to be
agreed with the Planning Authority. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
13. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays or bank holidays. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
Trees and Landscaping 
14. Prior to the commencement of development a detailed landscape plan, including
measures to screen the development from the listed buildings, shall be submitted
and approved. The scheme shall include details of the height and slopes of any
mounding or recontouring of the site, full details of all hard landscaping proposals
including materials and installation methods and, species, height, size and
density of trees and shrubs to be planted. The scheme as subsequently
approved shall be carried out and completed within the first available planting
season (October to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the Council as Planning
Authority within 7 days of that date. The scheme as agreed and implemented
shall thereafter be maintained to the satisfaction of the Council as Planning
Authority. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
15. Trees remaining on site and those which have Root Protection Areas which fall
within the site shall be retained and protected. Protection methods shall be
strictly in accordance with BS 5837 2012. Protection measures, once in place,
shall remain in place for the duration of construction. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority.

Page 21

16. Prior to the development becoming operational details of the specification and
location of bird boxes shall be provided for the written approval of the Council as
Planning Authority. 
Reason – In the interests of providing ecological betterment. 
Archaeology 
17. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken. Should the archaeological works, as required by
the WSI, identify a requirement for post-excavation analysis, the development as
approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT. The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress. 
Reason - To ensure a programme of archaeological works is carried out to
safeguard and record any archaeological remains within the development area. 
18. Prior to the commencement of the development hereby approved, protective
fencing shall be erected around MPKs as agreed with PKHT in the overarching
WSI; incorporating an appropriate buffer, insofar as the land lies within the
control of the applicant and/or developer, in a manner and for a time period to be
agreed in writing in advance with the Council as Planning Authority in
consultation with Perth and Kinross Heritage Trust (PKHT). No works shall take
place within the area inside that fencing without prior written agreement of the
Council as Planning Authority in consultation with PKHT. 
Reason - In order to ensure any archaeological remains are appropriately
protected. 
Environmental Protection 
19. Prior to the commencement of development, a site specific Construction
Environmental Management Plan (CEMP) shall be submitted to and approved by
the Council as Planning Authority in consultation with key stakeholders as
deemed appropriate. The CEMP will remain a live document, any working

Page 22

practices deemed to be having an adverse impact on ecology or the environment
will be the subject of revision. All revisions must be submitted to the Planning
Authority as soon as reasonably practicable. Thereafter the development shall be
fully undertaken in accordance with the agreed CEMP. 
Reason - In the interest of protecting environmental quality and of bio-diversity.
To minimise any associated adverse landscape and visual impact of the above
ground elements and protect the character and visual amenity of the immediate
and surrounding countryside and associated nature and cultural heritage
conservation interests. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Background Papers
Letters of representation  N/A 
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Major
Team)
01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
18 July 2025