Democracy Spraffa

25/00005/Pan

Perth and Kinross Council · 11 June 2025
Back to Planning and Placemaking Committee — 11 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 11 June 2025
Pre-Application Report by Development Management and Building Standards
Service Manager
(Report No. 25/153)
Proposal: Proposed demolition, re-development and enlargement of poultry
farm, associated infrastructure and works
Location: Balado Bridge Poultry Farm, Balado
Ref. No: 25/00005/PAN
Ward No: P8- Kinross-shire
Summary
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for proposed demolition, re-
development and enlargement of poultry farm, associated infrastructure and works
at Balado Bridge Poultry Farm, Balado. The report also aims to highlight the key
planning policies and the likely stakeholders who would be involved in the decision
making process, and to offer a brief overview of the key planning issues which are
likely to be relevant to the proposal.
Background and Description
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 12 March 2025. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for proposed demolition, re-development and
enlargement of poultry farm, associated infrastructure and works at Balado
Bridge Poultry Farm, Balado. Pre-application reports give the Committee an
opportunity to raise issues which it would like to see addressed in the
planning application.
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions.
Environmental Impact Assessment (EIA)
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.

Page 2

Pre-Application Process
4. The PoAN (reference 25/00005/PAN) confirmed that two public exhibitions
will be held at Millbridge Hall, Kinross, the first event on 7th May between 1pm
and 6pm and the second event on 21st May between 1pm and 6pm. The Ward
Councillors, and Kinross Community Council have been notified. The results
of the community consultation will be submitted with the planning application
as part of the required Pre-Application Consultation (PAC) Report.
Development Plan
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2).
National Planning Framework 4
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces. 
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan.
8. The Council’s assessment of this application has considered the following
policies of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 5: Soils
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 9: Brownfield, Vacant and derelict land and empty buildings
 Policy 13: Sustainable Trasport
 Policy 14: Design, Quality and Place
 Policy 18: Infrastructure First
 Policy 20: Blue and Green Infrastructure
 Policy 22: Flood Risk and Water Management
 Policy 29: Rural Development
Perth and Kinross Local Development Plan 2019
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance.

Page 3

The principal relevant policies are, in summary:
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 5: Infrastructure Contributions
 Policy 6: Settlement Boundaries
 Policy 8: Rural Business and Diversification
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 32: Embedding Low and Zero Carbon Generating Technology in
New Development
 Policy 38A: Environment and Conservation: International Nature
Conservations Sites
 Policy 38: Environment and Conservation: National Designations
 Policy 39: Landscape
 Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 42: Green Infrastructure
 Policy 46A: Loch Leven Catchment Area
 Policy 46B: Loch Leven Catchment Area
 Policy 51: Soils
 Policy 52: New Development and Flooding
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 54: Health and Safety Consultation Zones
 Policy 55: Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 58A: Contaminated and Unstable Land: Contaminated Land
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
 Policy 61: Airfield Safeguarding
Statutory Supplementary Guidance
10.
 Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Placemaking (adopted in 2020)
PKC Non-Statutory Guidance

Page 4

11. The following non statutory guidance and documents are of particular
importance in the assessment of this application:
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
 Planning Guidance - Planning & Biodiversity
National Guidance
12. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars. 
Planning Advice Notes
13. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal:
 PAN 1/2011 Planning and Noise
 PAN 2/2011 Planning and Archaeology
 PAN 3/2010 Community Engagement
 PAN 51 Planning, Environmental Protection and Regulation
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 73 Rural Diversification
 PAN 75 Planning for Transport
Site History
14. 97/00200/FUL Full Planning Permission was Approved on 17 June 1997 for
Conversion of existing farm buildings to 2 dwellinghouses
15. 98/01059/FUL Full Planning Permission was Approved on 13 October 1998
for Change of use from private to commercial trout fishery and site portable
building and toilet
16. 99/00200/FUL Full Planning Permission was Approved on 11 May 1999 for
Modification of existing consent to erect a house and detached double garage
at plot 6
17. 99/00754/FOR was Approved on 15 June 1999 for new planting of 3.4
hectares
18. 02/01029/FUL Full Planning Permission was Refused on 1 November 2002
for Renewal of consent for the conversion of farm buildings to two
dwellinghouses
19. 03/01540/FUL Full Planning Permission was Approved on 2 December 2003
for Conversion of farm building into two dwellinghouses

Page 5

20. 04/00127/FUL Full Planning Permission was Approved on 21 June 2004 for
Formation of lorry compound with associated fencing
21. 08/01016/FUL Full Planning Permission was Approved on 15 July 2008 for
Renewal of previous planning consent (03/01540/FUL) for the conversion of
farm buildings into 2 dwellinghouses
22. 13/01125/SCRN on 5 July 2013 for Erection of wind turbine
Consultations
23. As part of the planning application process the following would be consulted:
External
- Scottish Environment Protection Agency
- NatureScot
- Scottish Water
- Historic Environment Scotland
- Health and Safety Executive
- Perth and Kinross Heritage Trust
- Kinross Community Council
- INEOS FPS
Internal
- Environmental Health (Noise and Odour), (Contaminated Land), (Private
Water)
- Planning and Housing Strategy
- Development Contributions Officer
- Transportation and Development
- Structures and Flooding
- Biodiversity Officer
Key Issues Against Which a Future Application Will Be Assessed
24. The key considerations against which the eventual application will be
assessed include:
a. Visual Impact
b. Scale, Design and Layout
c. Relationship to Nearby Land Uses
d. Natural Heritage and Ecology
e. Landscape
f. Water Resources and Soils
g. Air Quality 
h. Transport Implications
i. Tourism and Economy
j. Impact on Agriculture
k. Archaeology and Cultural Heritage

Page 6

Additional Statements Which Will Be Required
25. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application:
- Planning Statement
- Design and Access Statement
- Pre-Application Consultation (PAC) Report
- Transport Assessment
- Flood Risk and Drainage Assessment
- Landscape and Visual Impact Assessment
- Tree Survey including tree protection plan and details of compensatory
planting
- Habitat Survey including protected species survey and potential Ecological
Impact Assessment
- Archaeological Assessment
- Noise Impact Assessment
- Air Quality/Dust and Odour Impact Assessment
- Construction Management Scheme
Conclusion And Recommendation
26. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.
Authors
Name Designation Contact Details
Kirsty Strong Planning Support
Officer
01738 475300
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
22 May 2025