Perth and Kinross Council
Planning and Placemaking Committee – 11 June 2025
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/151)
Proposal: Formation of a 49.9MW solar farm comprising ground mounted solar
arrays, inverters, substation, ancillary buildings, fencing, CCTV
cameras, access tracks and associated work
Location: Land 500 Metres North West of East Saucher House, Kinrossie
Ref. No: 24/00070/FLM
Ward No: P2- Strathmore
Summary
This report recommends refusal of the application which proposes the formation of a
49.9MW solar farm comprising ground mounted solar arrays, inverters, substation,
ancillary buildings, fencing, CCTV cameras, access tracks and associated works on
land 500 metres north west of East Saucher House, Kinrossie. The report concludes
that the proposal does not comply with the relevant provisions of the Development
Plan.
Background and Description of Proposal
1 The application site, referred to as ‘Collace Solar Farm,’ is c.100 Hectares (ha) in
area and located in a rural setting on prime agricultural land at Milton of Collace,
Burrelton, adjacent to the A94, to the west of Collace. The proposed
development comprises the installation of a ground mounted solar farm with
generating capacity of up to 49.9MW, inverters, substation, ancillary buildings,
fencing, CCTV cameras, access tracks and associated works. The proposed
area of solar panels extends across eight, largely open fields typically
interspersed with tree belts and areas of woodland. Some fields are enclosed by
intermittent hedgerows, primarily adjacent to local roads, and occasional
roadside trees.
2 The site levels range between circa 110-130 above ordnance datum (AOD), with
the highest part of the site on the southern boundary. The nearest trunk road,
A94 runs directly along the western boundary of the site in a northeast to
southwest direction. There are several minor roads which cross the site, the most

Page 2

notable being the Collace Road leading to Saucher through the centre of the site
on a southeast to northwest direction.
3 There are a number of core paths within close proximity to the site, BURR/179-
180 lies adjacent to the southeast boundary of the site, BURR/15 adjacent to the
southwest boundary and BURR/15 further south, BURR/50 to the west, all of
which are outwith the red line site boundary.  Right of Way 37/15 is also present,
adjacent to the southeast boundary. In the wider area, further core paths are
present across elevated grounds within the Sidlaw Hills to the east BURR/18, 19-
20 towards Black Hill and BURR/17 to the north of Kings Seat.
4 The site is located approximately 1 km northwest of the ‘Sidlaw Hills’ Special
Landscape Area and the River Tay Special Area of Conservation (SAC) lies
approximately 5.59km to the west. The ‘Kinrossie’ Conservation Area is located
approximately 450m to the south (at the nearest point) and the Category C Listed
Building ‘Milton Farmhouse’ is located within the site, however outwith the red
line site boundaries. There are a number of other listed buildings within the
settlements of Kinrossie and Kirkton of Collace. The ‘Macbeth’s Law’ (SM3393)
and ‘Kirkton of Collace Cairn’ (SM7188) both Scheduled Monuments are located
390m northeast and 1.2km southeast. Dunsinane Hillfort is located approximately
2.8km east as its nearest point. Meikleour Area Site of Special Scientific Interest
(SSSI) is located 6.1km northwest and Stormont Loch SSSI 7.4km north.
5 In terms of access into the proposed development, this will initially be taken via
the existing Collace road that runs east-west from the A94. A total number of 5
access points are proposed.
6 It is anticipated that the development would be in operation for up to 40 years.
When it ceases to be operational, all elements would be removed and the site
reinstated to its former condition.
ENVIRONMENTAL IMPACT ASSESSMENT
7 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment. The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given.
8 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects. The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision.
9 An EIA screening has been undertaken (Reference 22/01152/SCRN),
concluding that an EIA was not required as the proposal was not considered

Page 3

likely to have significant environmental effects. However, a suite of supporting
assessments, presenting environmental information in respect of heritage,
archaeology, flooding/drainage, noise, ecology, traffic and transport and
landscape visual impact was required to support any planning application.
Pre-Application Consultation
10 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to size and scale. The applicant was therefore required to undertake formal
pre-application consultation with the local community. Feedback resulted with
the principle issues raised being: concerns over landscape and visual amenity;
use of prime agricultural land for renewables instead of agriculture; impact on
biodiversity and wildlife; glint and glare; light and noise pollution; industrial look
of fencing; end of life/restoration of site; if there were any community and or
economic benefits; impacts to recreation in the area and/or if there would be any
community benefits resulting from the development.
11 The Pre-Application Consultation (PAC) Report submitted with this application
noted that one public meeting was held on 25 April 2022 in advance of the
submission of the Proposal of Application Notice (PoAN) and one public meeting
was held on 23 November 2022 and two public exhibitions on 14 and 29 March
2023. A further presentation to the newly formed Burrelton Community Council
took place in June 2023.The content and coverage of the community
consultation exercise was comprehensive and as such considered sufficient and
proportionate and in line with the aforementioned regulations.
Development Plan
12 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance.
National Planning Framework 4
13 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve peoples lives by making sustainable, liveable
and productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
14 The Council’s assessment of this application has considered the following
policies of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity

Page 4

 Policy 4: Natural Places
 Policy 5: Soils
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 11: Energy
 Policy 12: Zero Waste
 Policy 14: Design, Quality and Place
 Policy 23: Health and Safety
 Policy 29: Rural Development
Perth and Kinross Local Development Plan 2019
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
16 The principal relevant policies are, in summary;
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 2: Design Statements
 Policy 5: Infrastructure Contributions
 Policy 6: Settlement Boundaries
 Policy 8: Rural Business and Diversification
 Policy 15: Public Access
 Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 27A: Listed Buildings
 Policy 28: Conservation Areas
 Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
 Policy 35: Electricity Transmission Infrastructure
 Policy 38A: Environment and Conservation: International Nature
Conservation Sites
 Policy 39: Landscape
 Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 50: Prime Agricultural Land
 Policy 51: Soils
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53C: Water Environment and Drainage: Surface Water Flooding
 Policy 53E: Private Water

Page 5

 Policy 55: Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
 Policy 60B: Transport Standards and Accessibility Requirements: NEw
Development Proposals
 Policy 61: Airfield Safeguarding
Statutory Supplementary Guidance
17
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Placemaking (adopted in 2020)
PKC Non Statutory Guidance
18
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft)
National Guidance
19 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4.
Planning Advice Notes
20 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:
 PAN 3/2010 Community Engagement
 PAN 51 Planning, Environmental Protection and Regulation
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 68 Design Statements
 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport
 PAN 79 Water and Drainage

Page 6

Site History
21 22/01152/SCRN EIA Screening Request – Installation of 49.9MW Solar Farm
with associated infrastructure – No EIA required 24 August 2022.
22 22/00022/PAN Installation of a 49.9MW ground-mounted solar array and
associated works – contents agreed 19 January 2023.
Consultations
23 As part of the planning application process the following bodies were consulted:
External
24 Dundee Airport Ltd:  no objection.
25 Scottish Water:  no objection, however, the applicant will be required to
consult with Scottish Water regarding any required water connections.
26 NatureScot:  no objection. The construction of a solar farm at this location is
unlikely to disturb or displace geese from any of the designated sites and it is not
anticipated that the proposal will have any likely significant effect on the Firth of
Tay and Eden Estuary Special Protection Area.
27 Asset Protection Team (formerly National Grid):  no objection. There are no
National Gas Transmission assets affected in this area.
28 Transport Scotland:  no objection.
29 Kettins Parish Community Council:  no comments.
30 Inchture Community Council:  no comments.
31 Perth and Kinross Heritage Trust:  no objection, subject to a programme of
archaeological work in accordance with a Written Scheme of Archaeological
Investigation (WSI) condition, as the site is within an area of Archaeological
interest and due to the undeveloped nature of this site, there remains the
possibility of buried remains still existing.
Internal
32 Structures and Flooding:  no objection subject to the inclusion of a condition
relating to the provision of a suitable Sustainable Urban Drainage System
(SUDS).
33 Development Contributions Officer:  no comments to make in terms of
Developer Contributions.

Page 7

34 Environmental Health (Noise Odour):  No objections, subject to conditions. In
terms of ‘Glint and Glare’ modelling predicts no impacts requiring mitigation on
residential amenity. Noise sensitive receptors are identified within the NIA. Noise
from the proposed development would not adversely affect the residential
amenity of nearby receptors. Conditions are recommended to control plant
equipment operations and that an appropriate complaint procedure is secured.
Construction noise has not been assessed due to the small scale and temporary
nature of the construction phase, however, construction information has been
outlined in the Construction and Environmental Plan and condition recommended
to control construction hours. Condition recommended that all external lighting is
sufficiently screened and aligned so that it is does not affect neighbouring land.
35 Environmental Health (Contaminated Land):  no objection.
36 Biodiversity/Tree Officer:  no objection subject to condition.
37 Development Plan:  no objection, subject to conditions regarding; night
sky protection; the decommissioning of the development at the end of its
life; and a soil management plan. The general principle of the development
is broadly supported by LDP2. However, the renewable energy
considerations must be balanced against any landscape impacts.
38 Transportation and Development:  no objection subject to conditions
relating to visibility splays, passing places, maintenance agreement in
respect to the C441 and C442 roads and a Construction Traffic Management
Plan (CTMP).
39 Community Greenspace:  no objection subject to the inclusion of an
informative relating to public access and existing core path/right of way.
40 Conservation Team:  no objections.
Representations
41 89 representations were received objecting to the proposed development and 4
representations were received in support. The main issues raised within the
representations are:
Material Considerations
 Adverse effect on visual amenity
 Contrary to Development Plan Policy
 Excessive Height
 No community benefit
 Inappropriate land use
 Loss of prime agricultural land
 Light Pollution

Page 8

 Impact on flightpaths for Scone Airport
 Loss of Open Space
 Impact on Core Paths
 Loss of Trees
 Impact on Landscape
 Impact on Residential Amenity
 Noise Pollution
 Out of character with the Area
 Over Intensive Development
 Cumulative Impact
 Inappropriate scale for rural setting
 Cumulative impact of other solar farms and battery storage in the area
 Proposal is not a small-scale development.
 Overlooking
 Traffic Congestion
 Road safety Concerns
 Impact on Biodiversity
 Impact on Economy
 Impact on Tourism
 Potential Fire Risk
 Decommissioning Concerns
 Glint and Glare Concerns
 Flooding/Drainage Concerns
 Carbon Savings Concerns
Support Comments
 Invaluable generation of renewable energy
 Drive towards net zero
 Chance for local farming businesses to diversify their income.
 Reduced carbon emissions
 Economic growth and job creation
 Reduce climate change.
 Significant community package worth 500/Mw per annum
Non-Material Considerations
 Impact of property values
 Loss of view
 Potential health risks
 Precedent
 No output values have been provided for individual panels.
42 A material consideration is a matter which is taken into account in assessing a
planning application. These are issues which are relevant to the decision. The

Page 9

material considerations noted above are addressed in the Appraisal section of
the report. 
Additional Statements
43 Screening Opinion EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
not required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed - AA not required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
 Heritage Impact Assessment
 Ecological Impact
Assessment
 Landscape and Visual Impact
Assessment
 Noise, Dust and Vibration
Assessments
 Construction Environmental
Management Plan
 Drainage Impact Assessment
 Transport Statement
including CTMP
 Impact Assessment on loss of
prime agricultural land (within
Planning Statement)
 Glint and Glare Study
 Pre-Application Consultation
(PAC) Report
Appraisal
44 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, namely the Placemaking Guide, Flood Risks and Flood
Assessment, Landscape, Planning and Biodiversity and Renewable and Low
Carbon Energy (draft).

Page 10

Principle
45 The key determining policy issues for this specific proposal at this location
include: the principle of the development and its contribution towards renewable
generation targets/net zero agenda, (Policies 1 and 11 of NPF4 and Policies 33
and 35 of LDP2), landscape/visual impact and recreational interests/access,
(Policy 21 of NPF4 and Polices 15 and 39 of LDP2), impacts on prime
agricultural land (Policy 5 of NPF4 and Policies 50 and 51 of LDP2), impacts on
the water environment (Policy 22 of NPF4 and Policies 52 and 53A of LDP2),
residential amenity (Policy 14 of NPF4 and Policies 1A and 1B of LDP2), cultural
heritage & historic environment (Policy 7 of NPF4 and Policies 26A, 26B, 27A of
LDP2), biodiversity/ecological impact (Policy 3 of NPF4 and Policies 38, 40 and
41 of the LDP2), pipeline and airfield safeguarding (Policy 23 of NPF4 and
Policies 54 and 61 of LDP2), and transport (Policy 13 of the NPF4 and Policy 60
of LDP2).
46 Policy 33 of the LDP2 generally provides support for the development of
renewable and low carbon energy and associated infrastructure, subject to
detailed assessment against various environmental and other planning issues.
Policy 35 of the LDP2 also supports the development of electricity transmission
infrastructure, where this is sensitively designed, and suitable mitigation is
ensured.
47 This is also reflected in Policies 1 and 11 of NPF4. NPF4 Policy 1 requires
significant weight to be given to the global climate and nature crises. Policy 11
supports the development of solar arrays. Project design and mitigation is
required to demonstrate how various impacts are addressed, however, in
considering these impacts significant weight is to be placed on the contribution of
the proposal to renewable energy generation targets and on greenhouse gas
emission reduction targets. Justification for the development in relation to the net
zero agenda is detailed in the submitted Planning, Design & Access Statement.
48 The site is identified as rural within the LDP2. As noted above, the development
plan supports solar development and other energy infrastructure where they will
contribute positively to the transition to a low carbon economy and have no
unacceptable adverse environmental impacts, taking into consideration a range
of factors which include, landscape, natural heritage, net economic impact, scale
of contribution to renewable energy generation targets, public access,
greenhouse gas emissions and road traffic.
49 It is clear that both parts of the development plan contain broad support for the
principle of the proposed solar farm, including in rural locations and on prime
agricultural land. This support is subject to a number of considerations, as
discussed later in the report.
50 The development proposes an output of 49.9 MW from the proposed solar farm
and associated infrastructure/works which would generate renewably sourced
electricity into the national grid, likely to be via the Coupar Angus sub-station. It is

Page 11

indicated that this would be the equivalent to providing energy that could power
approximately 11,079 homes and save 15,229 tonnes of CO2. Notwithstanding
any environmental or other planning issues, the proposal would provide a
substantial contribution towards renewable energy generation to support national
and local objectives in relation to net zero and carbon emission reduction. This
being the case, the proposed development is considered to be supported by
NPF4, and in particular Policies 1 and 11 insofar as significant weight has to be
given to the climate crisis and from LDP2 Policy 33(A) reference to taking the
scale of contribution to renewable energy generation targets into account.
Design and Layout
51 The proposed development would consist of a series of linear rows (arrays) of
single axis tracker solar photovoltaic (PV) panels occupying approximately 70 of
the 100ha area. These will be mounted on steel frames, set into the ground by
direct piling or screw piling. The arrays would be arranged in north-south rows
and utilise a single tracking system that uses an east/west panel facing system
(facing a 90 degree orientation in the morning and 270 degrees in the evening)
with the panels typically tilting at angles of up to +/- 35 degrees from the
horizontal.
52 The panels include bifacial modules made of double glass structures. They
have an anti-reflective coating and dark colour to ensure maximum absorption
of solar radiation and reduction of reflections and have a varied height above
ground as they tilt, reaching a maximum height of around 3.1m above ground
level. The lower edge of the array varies in height above ground, with a
minimum clearance of approximately one metre. The supporting structure is
made of aluminum frames, mounted vertically into the ground to a depth of
approximately 2 metres. The panels will rotate vertically to track the sun moving
from approximately 60 degrees below the horizontal when the sun is at its
lowest to horizontal when the sun is at its highest.
53 Between each frame there would be a distance of approximately 4.5m
dependent on variations in topography, to avoid inter-panel shading and to
ensure optimal energy yield. There will be a stand-off around the end of each
array to allow for maintenance, access and ecological and landscape
enhancements. A range of setbacks are proposed from site boundaries for
environmental constraint, mitigation and enhancement.
54 Further associated infrastructure will comprise: inverters and transformers
(inverter stations 12.2m in length, 2.44m in width and 2.89m in height);
customer substation (12.72m in length, 4.03m in width and 3m in height); DNO
substation; a substation compound and 2 containers for onsite storage (2.6m in
height, 2.4m wide and 13.7m in length); a temporary construction compound
(approximately 45,000sqm); security cameras (mounted on 2.4m high poles)
and lighting; a 2.6 m high perimeter/deer fence; approximately 1.5km (3.5 m
wide) internal access track as indicated on the site layout as well as landscape
planting.

Page 12

55 No drawings have been provided for the DNO Substation, however, the planning
support statement advises that this is thought to be of the same dimensions as
the customer substation. The details of which can be secured by condition,
should the proposal gain support.
56 The temporary construction compound is to be located in the central area of the
site. In terms of structures this will comprise of:
 Construction worker welfare facilities.
 Site office.
 Plant and machinery storage shed.
57 No drawings have been provided for the above structures, however, this can also
be secured by condition.
58 Approximately 3.5km of internal access track is proposed which will be
approximately 3.5m wide. The tracks will be constructed using compacted
graded crushed aggregate. The tracks will be designed to have sufficient turning
space for the construction vehicles and plant. The Planning Statement advises
that all topsoil cleared for the construction of the access tracks will be retained on
site and used for landscaping. No soil will be removed from the site as part of the
development. Where stockpiled, this will be maintained at heights lower than 2m
to prevent compaction and loss of soil structure.
59 The design and layout essentially reflect the physical and engineering
requirements for this type of development, taking into account environmental and
technical standards. In physical terms all development will not exceed 3.1m in
height, with the tallest being the panels themselves.
60 In this case horizontal impacts of built development, in terms of the expansive
scale of development proposed, are more significant than vertical height. The
greatest observed horizontal expanse of panel strings or rows will be from the
east side of the A94 Perth to Coupar Angus Road. Owing to the site topography,
whereby the ground level slopes gently from the A94 to the north, the panels will
in many instances be located on gently sloping ground which will increase the
visual prominence of the development. Whilst the nature of the proposed tracking
system would provide differing views throughout the day, they would largely be
perceived as a regular linear and horizontal feature in the sloping open farmland.
61 Mitigation of any visual and landscape character impacts are to be addressed
through a mix of existing perimeter planting, supplemented by an extensive
landscape and planting scheme in addition to some mitigation offered by the
layout. The proposed solar panels are not to be located in more sensitive
sections of the site to the east and are to be set back from other boundaries to
the west by c.25 metres and to the north by c.18m to allow for buffer areas and
to maintain views across the site in a number of locations.

Page 13

62 Whilst there is no doubt introducing a renewable energy development on
existing arable land will result in a change in landscape character, the impact
here is more localised. From the information provided and research undertaken
on other solar farms, it is clear that the appearance of solar panels changes
depending on the angle of view in relation to the sun or light from the sky. The
panels are generally a dark recessive colour to help them recede into the
landscape, albeit will appear lighter dependent on the angle and sky/sunlight.
Overall, the layout of the proposed development, together with the existing and
proposed mitigation and setbacks proposed are considered to be acceptable. In
terms of design and layout the development is considered to comply with
Placemaking Policies 1A and 1B of the LDP2 2019.
Landscape and Visual Amenity
63 Safeguarding and enhancing landscape character is considered via LDP
Policies 1A, 1B, 33 and 39 of the LDP2. Whilst Policy 4(a) and (d) of the NPF4
considers impacts on the natural environment, Policy 11 (Energy) is of more
relevance to an equivalent landscape assessment. In that case the policy
balance favours renewable energy contribution over any landscape impacts. The
applicant states that elements of policy 39 have been superseded by policy 11.
The caveat in policy 11(e) can outweigh the considerations of policy 39 but they
are still relevant considerations compatible with NPF4 Policy 4(a). Policy 4(a)
states that development which by virtue of type, location or scale will have an
unacceptable impact on the natural environment, will not be supported.
Consideration of whether an aspect is acceptable relies firstly on the application
of LDP2 policy 39 and then whether the expectation in policy 11(e) is sufficient
to outweigh any significant impacts.
64 Policy 39 of LDP2 and associated Placemaking Supplementary Guidance is of
relevance in relation to the potential landscape and visual impact of the
development. Most aspects of policy 39 are addressed through the provided
LVIA. This should include, per policy 39(b), that views, viewpoints and
landmarks are safeguarded from development that would detract from their
visual integrity, identity or scenic quality. Policy 39(g) asks that the experience
of the night sky is conserved.
65 The landscape context sees the site set in a rural/agricultural setting in close
proximity to the small hamlet of Saucher with smaller clusters of, and individual
buildings, in the surrounding area. The location is within the ‘The Broad Valley
Lowlands – Tayside Landscape Character Type’ (LCT) as defined in the
Landscape Character Assessment (LCA), however, there are no formal
landscape designations associated, but the Sidlaw Hills Local Landscape Area
is located approximately 1km southeast of the site and not 2km as stated in the
Planning Statement at para 2.3.
66 The submitted Landscape and Visual Impact Assessment (LVIA) includes a
desk-based study, Zone of Theoretical Visibility (ZTV) and assessment of
selected viewpoints. The study has considered landscape character, local

Page 14

landscape context, character of the site and immediate context, landscape
designations and a range of other considerations such as scheduled
monuments, conservation areas, listed buildings, recreational routes, public
rights of way/core paths and visual receptors.
67 The study provides an appraisal of likely effects, mitigation and residual
landscape effects in relation to the above considerations including the potential
for cumulative impacts. Mitigation measures are details and are supported by
landscape plans which includes supplementing existing and new additional
planting.
68 Cumulative impacts are noted within the LVIA addendum. Two consented solar
farm sites, Keithick Estate Solar Farm, Coupar Angus (ECU00004521) and
Berryhill Solar Farm (Angus Council – 21/00535/FULM) were considered. There
is also a pending application with the Energy Consents unit (ECU00005014) for
Land to the North of Mains of Keithick Farm and Islabank, Coupar Angus and a
pending appeal (PPA-340-2156) in Coupar Angus. The cumulative ZTV shows
that there is some potential for visibility across the higher ridge slopes of the
Sidlaw Hills between 1-3km to the east of the proposed development, however,
it is limited elsewhere. As the cumulative impacts would be generally restricted
to higher hilltop points within the Sidlaw Hills where a range of expansive
panoramas are available in most directions, the proposed development does
not raise any cumulative landscape concerns due to their separation distance
and orientation.
69 The impact on the LCT is found to be moderate adverse on completion and
moderate to minor in the medium to long-term. This indicates a significant
impact at least in the short term. 
70 The analysis of viewpoints 1 (A94 east of Dunsinnan Wood) and 2 (A94 at
Parkneuk) with a high to medium visual change and moderate effect shows that
panels would disrupt views to the Sidlaw Hills LLA. The layout excludes
development from the eastern margins and nearest sections of the site to the
LLA in an attempt to reduce visibility of solar panels from viewpoints to the east,
where views are available to the Sidlaw Hills such as from the property known
as Tom Beithe to the southeast . A setback has also been provided to reduce
any impact along with mitigation planting. It should, however, be noted that
planting to screen the panels has the potential to further reduce the visibility of
the Sidlaws and the quality of the landscape experience and as such the
submitted landscape scheme is not approved. A condition would be required if
planning permission is approved insofar as a revised landscaping scheme be
submitted for further written approval.
71 Viewpoints 7 (Core Path BURR/20 at Dunsinane Hill) and 8 (Kings Seat Hill
Summit) indicate the impact on the strath and of views to the Grampians. The
impact on these viewpoints and the LLA itself are stated to be moderate to
minor. This is largely based on the solar farm being “seen within the mosaic of
fields and would contribute tonal or textural changes within the open farmland

Page 15

and a modest component in the surrounding landscape”. The photomontage for
viewpoint 7 indicates a dominant feature that draws the eye. Due to the size of
the installation the “tonal or textural changes” of the landscape are affected by
the imposition of the site. This might be reduced by further breaking up the size
of the installation with additional hedgerows with consideration given to the LCT
recognition of “tree and hedge loss weakening the landscape character
increasing openness of the landscape”. This can be addressed through the
submission of a revised landscaping scheme if the application is approved.
72 Impacts on the night sky experience in LDP2 Policy 39 (g) have not been
directly addressed in the proposal, however, no permanent lighting is required
for the proposed development and any lighting will be motion activated.
Nonetheless, if the application is approved, this can be controlled by condition
to ensure that the experience of the night sky is protected.
73 The caveat in policy 11(e)(ii) states that significant impacts are to be considered
acceptable where they are localised and/or appropriately mitigated. The
impacts shown in viewpoints 1 and 2 appear to be localised due to the proximity
of the road to the array. The regional significance of the views to the LLA should
be taken into account. Mitigation has been provided with a setback and
intervening planting but planting may well further obscure the views to the
Sidlaws. A further setback may have been appropriate. Again, this can be
addressed through the submission of a revised landscaping scheme, if the
application is approved.
74 It is less clear that the impact on the experience of the LCT is localised.
Mitigation has been applied with field patterns retained, however, some further
planting of the gaps may help to break this up further. To be addressed through
the submission of revised landscaping plans, should the application be
approved.
75 The consideration of these impacts must be influenced by the further instruction
in 11(e) that significant weight be placed on the contribution of the proposal to
renewable energy generation.
76 With regards the Local Landscape Area, NPF4 Policy 4 recognises that
significant adverse effects can be outweighed by social, environmental or
economic benefits of at least local importance. NPF4 Policy 1 lends significant
weight to the climate crisis.
77 Following consideration of whether the impacts on the landscape are
acceptable under policy 4(a) additional weight in favour of renewable energy
that reduces greenhouse gas emissions is provided by policy 1.
78 The applicant has assessed the proposed developments impact on nearby
residential houses. These included an assessment of visual impacts, an
assessment of glint and glare and a noise assessment. Whilst some adverse
impact on private amenity from the proposed development can be inevitable,

Page 16

generally speaking the view from an existing dwellinghouse is not treated as a
material consideration in planning terms, however, if a development has such
an impact which would make it an undesirable or unsatisfactory place to live, it
would also be an adverse consideration.
79 It is clear from the assessments submitted, in particular for Tom Beithe, that the
proposed development would undoubtedly have a presence, however, it is
considered that the proposed set back between the proposed development and
the dwellinghouse would reduce the impact of noise and glare as well as visual
impact. Furthermore, the design of the panels and screening, taken together
with the existing vegetation within the property boundary are sufficient that the
house would not become an unsatisfactory or undesirable place to live. Any
impacts are, therefore, likely to be low.
80 There is no doubt the proposal will introduce a new large-scale feature into the
landscape and in some views will appear as a striking feature. Landscape and
visual impacts have been assessed across the eight fields from differing
viewpoints. The proposal has considered sensitive receptors, panels omitted
from more sensitive sections and setbacks from boundaries in a number of
locations. The proposed mitigation and landscape measures along the site
boundaries in the medium to long term will help screen the development. In the
short to medium term the proposed development will undoubtedly have a
substantial presence until such time as landscaping matures and screening
increased.
81 A planning balance in this case must be considered having regard to any
landscape impacts against the zero carbon renewable energy benefits provided
by the NPF4. In this case it is the view of officers that the landscape impacts are
not substantial enough to outweigh the renewable energy benefits and as such
the proposal is considered to comply with the above-named policies.
Residential Amenity
82 NPF4 Policy 23 and LDP2 Policies 55 and 56 are of relevance in relation to
light and noise pollution. The Council’s Environmental Health team has been
consulted to consider any impact in relation to noise as well as glint and glare.
Glint and Glare
83 The applicant has submitted a glint and glare assessment ‘Solar Photovoltaic
Glint and Glare Study, Atmos Consulting Limited, Collace Solar Farm,’ dated
September 2024 which was undertaken by PagerPower.
84 This assessment has been undertaken to consider the possible effects on the
surrounding road network and the residential properties within a 1km radius.
The assessment modelling showed that solar reflections are geometrically
possible towards 49 of the 81 dwelling locations assessed within the 1km
assessment area.

Page 17

85 It states that no significant impacts are predicted on any dwellings, because
where solar reflections are geometrically possible, there is significant existing or
proposed screening such that reflections lasting more than 60 minutes on any
given day and/or 3 months per year are not expected to be experienced. The
modelling results are presented in Table 3 of the report and mitigation is not
required. The assessment concluded that there were no impacts requiring
mitigation on residential amenity.
86 Whilst, Environmental Health Officers have no objection to the application with
regards to glint and glare in light of the above assessment conclusions, they
have recommended that should a substantiated complaint be received from a
sensitive property, the operator/applicant shall carry out an assessment of glint
and glare, to be submitted and approved by the Planning Authority. This,
however, can be controlled by condition if the application is to gain support.
Noise
87 The applicant has submitted a Noise Impact Assessment with the application
‘Collace Solar Farm, Collace Solar Limited, R8763R6 V2’ dated 24 August 2024
undertaken by Atmos Consulting Ltd.
88 The supporting information submitted with the application states that the
construction and installation of the development will take approximately 12
months, commencing in December 2027 with an expected completion date of
December 2028, and there will be a temporary construction compound on site
for the duration of the construction period. Construction noise has not been
assessed due to the small scale and temporary nature of the construction phase
however, construction information has been outlined in the Construction and
Environmental Plan.
89 The closest noise sensitive receptors are presented on Table 1 of the NIA report
(drawing number 84). An extract is provided below for ease of reference.

Page 18

90 Noise source data for the assessment has been provided by the applicant and
there are four key noise sources associated with the operational phase of the
development, customers substation, DNO substation and inverter/transformer
units (HEMK GEN3 central solar inverter).
91 A total of 14 inverter/transformer units are proposed for the site. The noise
source data for these inverters/transformers are based upon specifications
provided by the Applicant for the HEMK GEN3 Solar Inverter and verified by
operational noise monitoring tests conducted by Sungrow Power (SG250HX).
The inverters have been modelled under two operating modes, for operation
during the daytime (07:00 – 23:00) and at a reduced operating capacity for night
-time (23:00 – 07:00).
92 The solar panels include single axis tracking panels that use a tracking motor to
rotate each solar panel branch within the array. The tracking motors would each
generate a noise level of 39 dB(A) at 1m when operating. The operating time of

Page 19

the tracking motors is 20 minutes each day in episodes of 2 minutes, and 6
minutes during the early morning and evening periods and do not operate at
night. The total sound level was more than 10 dB below the LA90 background
sound level during the daytime at any given assessed receptor and therefore is
not considered to be perceptible. This has therefore been scoped out of
modelling and is not considered further in this assessment.
93 The noise levels associated with the development have been assessed using
modelling software to assess noise levels at the closest receptors. All noise
sources within the model have been modelled with 100% on time to represent a
reasonable worst-case scenario and no screening has been applied from any
existing or proposed structures such as buildings, fencing and proposed panels
etc.
94 Results of the assessment state that without mitigation the background LA90
levels are not exceeded during the daytime at any of the noise sensitive
receptors and are only exceeded at two properties Knoxfiled Estate Services
and Milton of Collace Farmhouse (financially tied property to the landowner)
during the night-time period.
95 The receptor at Knoxfield Estate Services, the predicted increase in noise level
above background level is predominantly due to the contribution from the DNO
substation.
96 Detailed information on the DNO substation was not available at the time of
writing, so for the purpose of this assessment, a sound power level of 83 dB
(Lw) was provided from technical data sheets and measurement reports for
noise-producing infrastructure that typically demonstrate higher noise levels than
would be experienced on sites of this size as a conservative estimate to
represent a modelled reasonable worst-case scenario. It is likely that the noise
levels associated with the DNO substation may be lower than those currently
predicted.
97 The calculated rating level at receptors in Table 12 of the NIA were modelled at
a height of 4m, representative of first floor bedroom heights and balconies.
Indoor ambient levels were assessed in line with BS8223 guidance which
recommends an indoor ambient level for daytime sleeping of no more than 35
dB(A), and for nighttime 30 dB(A). The predicted rating levels at all receptors
within 2km of the site show noise levels approximately 10 dB below the 30 dB(A)
threshold criteria. This also does not account for the further noise reduction
because of attenuation through an open window. WHO guidelines suggest a
further noise reduction of up to 15 dB through an open window, reducing the
predicted noise contribution further.
98 Overall, as most predicted rating noise levels at receptors are predicted to be
below background levels, most receptors would fall under a “low impact”
according to BS 4142:2014+A1:2019.

Page 20

99 Given that the predictions for Knoxfield Estate Services indicates that the rating
level will be above the background sound level at first floor level, an assessment
of indoor levels using Noise Rating (NR) curves has been carried out, the results
of which are presented in Table 13 of the NIA. NR20 has been chosen as the
criteria as a conservative approach. Knoxfield Estate Services internally meets
NR20 by a considerable margin and the NIA concluded that no further
assessment or mitigation is required.
100 Whilst, Environmental Health Officers have no objection to the development
considering the NIA that noise from the proposed development would not
adversely affect the residential amenity of the receptors assessed, they have still
recommended conditions are included on any given consent in order to
safeguard residential amenity.
Light from Operational Sources
101 It is stated within the Planning Statement that during the operation of the site
there will be no external artificial lighting. No permanent lighting is required for
the proposed development, however, any lighting required for the development
would be for maintenance and or security purposes. It is stated any lighting will
be motion activated security lighting and as such impacts are considered to be
able to be mitigated through appropriate placement and that it should only be
required where necessary. No significant concerns in terms of light pollution are
assessed.
102 Whilst the proposed development would give rise to some impact on amenity,
particularly during the construction phase, it is considered that, subject to
conditions, those impacts could be mitigated to ensure that they do not have a
significant impact on the amenity of the occupants of the nearby receptors. As
such the proposed development complies with NPF4 Policy 23 and LDP2
Policies 55 and 56.
Roads and Access
103 LDP2 Policy 60 requires that local road networks be capable of absorbing traffic
generated by development and that satisfactory access is provided. Policy 13 of
NPF4 focuses more on sustainable travel and ensures development is sited
appropriately.
104 The site is split across several fields and is bound by farmland and the A94 to the
west of the site. The C441 Collace Road runs northwest-southeast from the A94
and passes between the first two fields that make up the site.
105 A Transport Statement has been submitted to assess the traffic impacts of the
construction phase of the development and this has been reviewed by
colleagues in Transportation and Development. The applicant has advised that
the levels of traffic associated with the operational phases will be minimal due to
infrequent servicing and maintenance trips, which will be facilitated using light

Page 21

goods vehicles.  The Transport Statement advises that for the period of
decommissioning a similar level of traffic and transportation will be associated to
the construction period.
106 The applicant advises that 5 priority junctions will be created onto the existing
public road network at the following locations:
 Access 1 – C441 to the southwest of the public road approximately 450
metres from the A94
 Access 2 – C442 to the southeast of the public road approximately 160
metres from the C441
 Access 3 – C442 to the southeast of the public road approximately 195
metres from the C441
 Access 4 – C442 to the northwest of the public road approximately 240
metres from the C441
 Access 5 – Milton of Collace Farm Access to the northeast of the access
approximately 80 metres from the C442
107 No modifications are proposed for the A94/C441 junction itself.
108 The Planning Statement advises that the construction phase of the proposed
development is anticipated to last up to 12 months.
109 The estimated ‘worst-case number’ of construction traffic trips is:
 Weekly – 160 two-way trips
 Daily – No more than 29 two-way trips 
110 Whilst this may be the number of trips arriving at the site, there will be vehicle
movements along the public road network during the construction phase, to get
from one location to another, so the number of movements on the C441 and
C442 are likely to be greater with the movement of people, machinery and
equipment.  As such, suitably located passing places on the C442 will be
required at centres not more than 100 metres, which can be controlled by
condition. The applicant has confirmed that the U136 will not be used by
construction traffic, therefore, passing places are not required.
111 In terms of visibility splays, the applicant has submitted information in respect to
all 5 proposed accesses. These visibility splays are in accordance with the
National Roads Development Guide or are justified where this distance cannot
be achieved.
112 Overall, whilst the letters of representation are noted, no significant road and or
transport impacts are identified, and it is concluded subject to conditions
regarding passing places, visibility splays, maintenance agreement in respect of
the C441 and C442 roads and construction traffic management, that the
development conforms with LDP2 Policy 60B.

Page 22

Drainage and Flooding
113 Policy 53A and 53C of LDP2 sets out that development proposals must have
regard to the water environment and drainage, including floodwater management
within any proposal. Policy 22 of NPF4 sets out that proposals will not increase
the risk of surface water flooding to others, or itself be at risk, manage all rain
and surface water through sustainable urban drainage systems (SUDS) and seek
to minimise the area of impermeable surfaces.
114 In the case of this site, from reviewing the SEPA map, the site is not located in a
flood risk area, however there are pockets of both known surface water flooding
within the site and fluvial flooding in the vicinity of the Kinnochtry Burn, situated
adjacent to the northeast corner of the site. The solar panel arrangement,
however, has been set back from the site boundary and therefore avoids this
area.
115 A Drainage Impact Statement has been submitted which concludes that surface
water runoff from the proposed development can be suitably managed. The
proposed access roads are to discharge surface water runoff into adjacent filter
drains and infiltration trenches implemented to promote water quality treatment.
Surface water runoff from the access roads and other areas of hardstanding are
to be restricted to flow rates with storage provided within a geo-cellular tank and
attenuation basin.
116 The Council’s Flood Team have been consulted on the application and have
advised that the Drainage Impact Assessment (DIA) provides an adequate
strategy and drainage calculations, including levels of water storage, etc. Subject
to adequate information on the detail being submitted for the geo-cellular tank
and attenuation basin, which can be controlled by condition, no objection has
been received.
117 The risk of the development being flooded is considered negligible, owing to the
type of development in terms of land use vulnerability (i.e. the development will
not be occupied) and as the panels themselves are to be raised approximately
1m off ground level. Accordingly, as matters pertaining to surface water flood
risk have been satisfactorily addressed, the development is considered to
comply with Policies 53A and 53C of LDP2 and Policy 22 of NPF4.
Private Water
118 There are some known private water supplies at Milton of Collace and East
Redstone which are within the vicinity of the site. To maintain water quality and
supply in the interests of residential amenity and ensure the private water supply
or septic drainage systems of neighbours of the development remain accessible
for future maintenance, a condition and informative will be applied to any
planning approval. This ensures compliance with Policy 53E of LDP2.

Page 23

Conservation/Archaeology Considerations
119 Polices 26A, 26B, 27A and 28A of LDP2 and Policy 7 of NPF4 are applicable to
he application.
120 Perth and Kinross Heritage Trust have been consulted and confirmed that the
site lies within an area considered to be archaeologically sensitive. As it is
greenfield and does not appear to have been developed in the past there is
potential for unknown buried archaeological remains within the development
area. Despite the known areas of interest, no objection is raised by Perth and
Kinross Heritage Trust, however, a suspensive condition is recommended, in the
event that permission is granted, seeking a programme of archaeological works
to ensure the development does not destroy significant archaeological remains.
121 In terms of the Kinrossie Conservation Area and any heritage assets in the
immediate location (listed buildings, scheduled monuments), a Heritage Impact
Assessment (HIA) has been submitted with the application and reviewed by
Perth and Kinross Council’s Conservation Officer. Additionally, the Landscape
and Visual Impact Assessment (LVIA) has been reviewed by the Conservation
Officer.
122 This assessment considers the potential effects of the development on the
Kinrossie Conservation Area, Scheduled Monuments and listed buildings within
2km of the site. The Category C listed Milton of Collace, (a c.1800 two-storey
stone farmhouse) is located within the centre of the site, although it is excluded
from the red line boundary. Milton of Collace sits amongst a setting of
established trees with the wider setting linked with the historic farming use of the
site. The HIA states “the loss of farmland around the Farmhouse does, however,
impact the way it is understood and appreciated as a post-medieval farmhouse
located within farmland. The magnitude of impact is considered to be Medium
(Section 6.2 p.23).
123 Despite the assessment of the HIA of the proposal having a magnitude of impact
of medium, no mitigation was initially proposed. Furthermore, given that the
immediate setting of Milton of Collace includes established trees, no tree survey
or landscape plan had been provided for the setting of Milton of Collace. 
124 The Conservation Officer commented that the LVIA identified the landscape
elements that contribute to the site as having a medium sensitivity to
development i.e., a landscape of moderately valued characteristics with a
moderate level of susceptibility to change from the proposed development.
Despite this assessment, it did not consider the heritage assets that may be
affected by the proposal or provide mitigation for any of these potential impacts.
Furthermore, the viewpoints provided within the LVIA focus on impacts to road
users and residents, however there is a lack of viewpoints focusing on the
potential impact of the proposal on the heritage assets of the site.

Page 24

125 Further comments received were that mitigation measures would be particularly
important to protect the agricultural character of the wider setting of the listed
building within the site and other heritage assets. The loss of the historic
agricultural setting had not been assessed or mitigated in the proposal. Mitigation
measures are particularly important to protect the agricultural character of the
wider setting of the listed building within the site and other heritage assets. A
revised HIA and LVIA were subsequently submitted together with amendments to
increase the extent of proposed landscaping within the subject site.
126 The Council’s Conservation Officer was re-consulted and confirmed general
acceptance of the conclusions noted within the impact assessment. The loss of
the historic agricultural setting is to be mitigated by proposed landscaping,
therefore, no objections have been raised. As the development will not directly
impact the identified heritage assets locally, the proposal is considered to accord
with Policies 26A, 26B, 27A and 27B of LDP2 2019 as well as Policy 7 of NPF4.
Natural Heritage and Biodiversity
127 Policies 40 and 41 of LDP2 and Policy 3 of NPF4 are applicable in this regard.
The Council will apply the principles of the Scottish Government Policy on
Control of Woodland Removal and there will be a presumption in favour of
protecting woodland resources. Where the loss of woodland is unavoidable,
mitigation measures in the form of compensatory planting will be required.
Enhancing connectivity between existing and newly created habitats is strongly
encouraged to benefit biodiversity.
128 The Planning Statement states that all existing hedges, woodland, and trees will
be retained. The tree survey, however, recommends the removal of Ash, Tag
Number 517, Ash, Tag Number 518, Oak, Tag Number 559 (removal of broken
limb only) and Oak Tree, Tag Number 566 and having reviewed the tree removal
plans, the only tree shown to be removed is the Oak (Tag Number 566) which
contradicts the survey. Tree number 556 is located to the west of the site and
trees 517, 518 (east of Milton of Collace), and 559 (southwest of Tom Beithe). All
said, the Council’s Tree Officer has reviewed the proposal and has no concerns
over the removal of the trees as listed above.
129 The submitted Phase 1 Extended Habitat Survey and Ecological Impact
Assessment (EcIA) has been reviewed by the Council’s Biodiversity Officer. The
survey methods are in accordance with published best practice. Evidence of
application of the mitigation hierarchy has been provided and the proposed
design of the development avoids impacts to protected species. Due to the
potential presence of protected species, as a reminder, an informative will be
added to any planning consent for the inclusion of a toolbox talk to all personnel
as part of the proposed mitigation.
130 NPF4 Policy 3(b) requires that major developments demonstrate that they will
enhance biodiversity, so they are in a better state than without intervention –
including future management. This should include significant enhancements

Page 25

following avoidance, mitigation, and compensation for all biodiversity loss. A Site
Biodiversity Action Plan containing quantity, locations, techniques, timescales
and monitoring arrangements, as set out in the PKC Planning for Nature
Guidance, was requested, however, was not provided. Details of biodiversity
enhancement have, however, been provided in a few documents and considered
acceptable.
131 The EcIA concluded that the site at present is of low ecological value. The
proposed development will provide opportunities to enhance the potential
biodiversity of the site. Subject to conditions to ensure implementation and
management of all biodiversity enhancement measures, the proposal complies
with Policies 40 and 41 of LDP2 2019 and Policy 3 of NPF4.
Loss of Agricultural Land
132 The site is located on an area of prime agricultural land and therefore Policies 50
(Prime Agricultural Land) and 51 (Soils) of LDP2 2019 and Policy 5 of NPF4 are
of relevance.
133 A sequential test has not been undertaken by the applicant to detail the site-
specific justification for the development, however, the Design and Access
Statement specifies that careful site selection has been undertaken to ensure
that an efficient, technically and economically viable solar farm can be developed
at this location without causing unacceptable significant adverse environmental
impacts. The site selection process was a ‘grid lead’ approach which comprised
of an evaluation of electricity grid connection, site availability and site suitability
containing a range of factors including size, orientation, topography, insolation
levels and accessibility.
134 The Design and Access Statement further advises that following a potentially
suitable site being identified, a desk top assessment was conducted to determine
potential environmental constraints. This included potential issues relating to
planning policy, landscape and visual, cultural heritage, residential and
recreational amenity, ecology and ornithology, site access and flood risk. The
process undertaken identified the application site as being the most suitable in
meeting the key selection criteria.
135 The proposal involves a significant area of land, with the developable area
extending to approximately 70ha. The Land Capability Classification for
Agriculture Map (1:50,000 scale) identifies the site is classified as Class 3.1
prime agricultural land, therefore, the proposal would result in the loss of prime
agricultural land. NPF4 Policy 5 is clear that the loss of prime agricultural land will
be supported where proposals constitute renewable energy development (NPF4
Policy 11 does not reference impacts of agricultural land) and there is secure
provision for site restoration. There is also a requirement to minimise the land
required.

Page 26

136 In that specific respect the proposed solar arrangement is considered to be
tightly spaced in terms of the panel layout, however, it is questionable whether a
smaller land area would be capable of achieving the same output. A matter
raised within a letter of representation questions the generation capacity of
49.9MW insofar as the proposed panels would exceed this. The applicant has
confirmed that the power plant controller will limit the output of the power plant to
49.9MW. Subsequently, the applicant was asked to clarify the requirement for
82,000 panels if in fact the proposals have the potential to generate in excess of
49.9MW and consequently a reduced number of panels could provide the
required output.
137 The response received was essentially that it is fairly common for solar farms to
be ‘overplanted’ to ensure that when capacity factor and conversions are
accounted for that the generation can still meet the 49.9MW rated output. The
agent further advised that it is standard practise to implement more panels than
the rated output of the generating station in order to ensure that they can
maximise the renewable generation energy generation efficiency of the
development over its lifetime and make the best use of the available grid
connection’s export capacity with the land that is available for the development
for the following reasons:
 Losses from transporting electricity and the power losses conversion from DC
to AC power for safe export to the grid
 Lower real-world generation of the solar farm at time of low radiation (e.g.
when it is cloudy or dependent on daylight hours and shading across portions
of the site at times of day/year
 A solar farm with a 1:1 ratio of peak DC generation to AC output would
therefore not be able to maximise the secured and available export capacity
of renewable energy to the grid.
138 In terms of the justification of the proposal in relation to prime agricultural land,
the development has been justified on the basis that a site is required to be
located in close proximity of an existing substation and whilst no sequential test
has been provided, other sites have not been identified as being more
favourable for various reasons.
139 The submission also identifies that the majority of the development will comprise
the solar farm element which will not result in the total loss of prime agricultural
land, rather the land use will change for a temporary period of 40 years (as
proposed) with grazing able to take place with the potential for the land to revert
back to productive agricultural land following decommissioning of the
development. The land will not be compromised as the development will involve
minimal disturbance to the soil through screw piling of the footings for the panel
arrays, no removal of soil from the site, and the commitment to fully restore the
land on cessation of the solar farm. The panel arrays will not cause compaction
or degradation of the soil structure, and in fact will likely result in a net benefit to
the soils productivity through cessation of intrusive agricultural practises and

Page 27

synthetic inputs. Cessation of agricultural activities would reduce soil erosion
and improve soil quality over the lifetime of the proposed development.
140 If the energy generation is still viable at the end of the 40 year period, a further
application for planning permission would be required to continue the use and
the removal of the agricultural land from production could be once again
assessed based upon the policy position at that time
141 Based on individual merits, and the justification provided, regard is had to the
particular site requirements of this type of development, noting that grid
connection is of critical importance to the development viability. As such the use
and occupation of prime land alone is not considered to be a reason for refusal.
However, consideration of the cumulative loss of prime land, noting the scale of
this development, must be considered further under Policy 50.
142 In this case an application has been consented by the Scottish Government
Energy Consents Unit (Reference: ECU00004521) on land at Keithick Farm,
Coupar Angus. That proposal is for a 32MW Solar Farm and two separate
Battery Energy Storage System (BESS), comprising 66MW capacity (occupying
54ha prime agricultural land). A further application is currently before the
Scottish Government Energy Consents Unit (Reference: ECU00005014) for
Land to the North of Mains of Keithick Farm and Islabank, Coupar Angus. That
proposal is for a 50MW BESS and accompanying 60MW Solar Park.
143 Whilst the application is not explicit in terms of which substation this proposed
development will connect into, it is assumed to be the Coupar Angus substation
as is the case for the pending appeal (PPA-340-2156). For the avoidance of
doubt, consideration of the connection is for a separate future procedure. Given
the connection capacity which exists at this substation there is a high likelihood
for further subsequent energy related development within this immediate location.
The cumulative impact, however, would need to be assessed on a case-by-case
basis.
144 When considering the potential cumulative impact, assuming worst case scenario
that the pending appeal (PPA-340-2156) (70ha prime), pending application
before the Energy Consents Unit (ECU00005014) (104ha prime) this current
application (70ha prime) gains approval and including the consented scheme
(ECU00004521) (54ha prime), results in approximately 298ha of prime land
being occupied, limiting food production and or food security potential for this
location over the lifetime of all developments. At that scale it is considered that
the cumulative loss of prime land is significant in a localised sense.
145 Letters of representations have been received raising concern over the loss of
prime quality agricultural land and consequential impacts on food security
resulting from taking prime agricultural land out of food production use. The
applicant has confirmed that, at present, the current land use of the holding is
approximately 80% spring barley supplied for malting/whisky production, with the
remaining 20% rented out for production of potatoes and peas. Following the

Page 28

construction of the proposed development it is the landowner’s intention to graze
the land with sheep.
146 The land will then maintain its agricultural land use, albeit in a different function,
for the duration of the proposed development, whilst also positively contributing
to the countries need for renewable energy generation. It also must be borne in
mind that it is at the landowner’s discretion as to whether the land is actively
farmed regardless of the outcome of this application. There is no evidence to
suggest that the viability of the farm unit would be adversely affected by the
proposal. A condition would be applied (if approved) in regard to site restoration.
147 As indicated above, NPF4 allows the development of prime agricultural land for
the generation of energy from renewable sources, and it does not require
consideration of cumulative impact, however, notwithstanding the policy position
in relation to loss of prime agricultural land, it is of relevance to this application
that Scottish Ministers have issued a recall direction in relation to an appeal for a
solar development on prime agricultural land in Coupar Angus (PPA-340-2156).
The recall direction indicates it has been issued in view of the proposed
development’s potential impacts on prime agricultural land, in terms of
cumulative impacts with other development and in view of the long-term
strategic importance for national food security, that would benefit from further
scrutiny by the Scottish Ministers.
148 The issue raised by Scottish Ministers is a material planning consideration and
the weight to be attached to it is likely to be clarified by Scottish Ministers in their
decision on the recalled appeal. Whilst the benefits of renewable energy are not
an over-riding consideration, there is an increased and urgent need for
renewable energy developments to achieve statutory targets. No reduction,
however, should be given to the importance to the loss of prime land. A balance
must always be struck between policy aims in making a planning decision.
149 Approval of this application at this current time, however, would compromise
ability to have regard to the Ministerial decision and it could compound any issue
identified by Ministers. As such, the development, owing to its scale, massing
and location may contribute to the cumulative loss of prime agricultural land
within a wider setting, whilst also resulting in the loss of food production potential
and food security over its lifetime.  The development, therefore, does not comply
with Policy 50 of the LDP2 2019.
150 Whilst the applicant’s agent has provided an explanation for the number of
panels proposed, there is little justification to demonstrate why the proposal could
not be modified to reduce the extent of land take. Noted above, NPF4 Policy 5 is
clear that the loss of prime agricultural land will be supported where proposals
constitute renewable energy development, however, this is providing the layout
and design of the proposal minimises the amount of protected land that is
required. In these circumstances, it has not been demonstrated that a reduced
number of solar panels would provide the required 49.9MW output. As such the
development, on account of lack of technical detail, has not satisfactorily

Page 29

demonstrated that a reduced number of solar panels and resultant reduction of
prime agricultural land would provide the required output. Consequently, it cannot
be confirmed that the development complies with Policy 5 of National Planning
Framework 4.
151 For those elements of the development that require the removal or movement of
soils (e.g. substation and access tracks), under the terms of Policy 51 of the
LDP2 and Policy 5 of the NPF4 further details will be required to demonstrate
that the development complies, i.e. a Soil Management Plan. The Development
Plans Team in their assessment of this proposal have considered this matter
could be resolved by pre-commencement conditions if the proposal is to be
approved. Accordingly, the development is considered to be in compliance with
Policy 51 of the LDP2.
Airfield Safeguarding
152 Aviation safety was raised by an objector in terms of glint and glare. The site falls
within the consultation zone for Dundee Airport who were duly consulted. In the
absence of any objection from Dundee Airport or any other body with relevant
responsibility, this is not considered to be an adverse consideration.
Other matters
153 The range of concerns expressed in the letters of representation are noted which
focus on residential and visual amenity, road safety, biodiversity impacts and the
loss of agricultural land in an area important for food production. These matters
are addressed above.
154 Noted within the letters of representation are concerns with potential fire risk
associated with the proposed development. The safe operation of infrastructure
is, however, generally a matter for health and safety legislation as opposed to
planning legislation. No substantive evidence, however, has been presented
insofar as there is a particular risk associated with the proposed development e.g
fires are a known and frequent risk associated with developments of this type.
155 Whilst not relevant to the assessment of this application, it is noted within the
submission that the applicant notes the importance of community benefits and
that discussions have started with the local community. No weight, however, has
been given to the concerns raised in respect to the level of community benefit
offered given that community benefit schemes are not a material planning
consideration and as such are not relevant to the balance of planning
considerations.
Developer Contributions
156 None required.

Page 30

Economic Impact
157 In the short term, construction will create jobs with scope for local employment,
however, the development is not supported by any economic information to
further assess this impact. It is however predicted that once construction work is
complete, further employment opportunities will be limited. The development,
however, is a clear fit for the Scottish Governments policy direction set out within
the Scottish Energy Strategy and NPF4 of transitioning to a low carbon economy
with renewable energy generation. It also represents a significant inward
investment in rural Perthshire, assisting in the creation of a national grid asset of
regional significance for the Perth and Kinross area.
Planning Obligations and Legal Agreements
158 None required.
Direction By Scottish Ministers
159 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.
Conclusion and Reasons for Recommendation
160 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. Striking a
balance between the wider environmental benefits associated with renewable
energy generation and local environmental disbenefits is an exercise of planning
judgement. Significant weight must be given to the contribution the proposal
would make towards addressing the global climate and nature crises and there is
very strong policy support for this. This, however, does not mean that other policy
requirements should be set aside and that any renewable energy development
should be accepted anywhere irrespective of impact.
161 Development Plan policy seeks high quality design and for a development of this
nature, a successful design is one which responds to its landscape character and
context. NPF4 Policy 11 recognises that energy proposals are likely to give rise
to significant landscape and visual impacts. It indicates that such impacts will
generally be considered to be acceptable where they are localised and/or
appropriate design mitigation has been applied. In this case, the adverse impacts
are considered to be localised and the proposed development has been
appropriately mitigated. The proposal would deliver significant benefits towards
renewable generation targets/net zero. Nevertheless, it is not considered that
these considerations are sufficient to outweigh the concerns noted above in
respect to the cumulative loss of prime agricultural land.

Page 31

162 In this respect, the proposal is considered to be contrary to the Development
Plan. Account has been taken account of the relevant material considerations
and none has been found that would justify overriding the Development Plan.
Accordingly, the proposal is recommended for refusal on the grounds identified
below.
Recommendation 
Reasons for Recommendation
1. The proposal is contrary to Policies 50 ‘Prime Agricultural Land’ and 51 ‘Soils’ of
the adopted Perth & Kinross Local Development Plan 2 (2019), as the
development, owing to its excessive scale, massing and location would result in
a significant loss of prime agricultural land which would have a detrimental
impact upon soil resources.  Furthermore, it has not been suitably demonstrated
that there are no other non-prime land sites available.
2. The proposal is contrary to Policy 5 ‘Soils’ of the National Planning Framework 4
(2023), as the development, on account of lack of technical detail, has not
satisfactorily demonstrated that a reduced number of solar panels and resultant
reduction of prime agricultural land would provide the required output.  The
excessive scale of the development has therefore not been fully justified.
Justification
The proposal is not in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.
Procedural Notes
None.
Informatives
None.
Background Papers
Letters of representation 93
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer (Major
applications)
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications and
Enforcement)
21 May 2025