Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 14 May 2025
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/118)
Proposal: Erection of 42 dwellinghouses and associated works - phase 2
(change of house type and plot layout of 22/02223/AMM)
Location: Scone North, Scone, Perth
Ref. No: 24/01483/AMM
Ward No: P2- Strathmore
Summary
This report recommends approval of a Matters Specified in Conditions (AMSC)
application for the erection of a total of 42 dwellinghouses within the site referred to as
‘Scone North’. This Report concludes that the proposal is consistent with the
Development Plan, the existing Planning Permission in Principle (PPP) consent (Ref:
16/02127/IPM) and other relevant material planning considerations.
Background and Description of Proposal
1 The application site extends to an area of approximately 2.7 ha and forms part of
the development site known as ‘Scone North, which extends to 63 ha and is
identified within the Local Development Plan 2 (LDP2) as H29, a residential led
(up to 700 dwellings) urban expansion. Planning Permission in Principle (PPP)
Ref: 16/02127/IPM and an associated Section 75 legal agreement relates, with
further detailed approvals in place for other phases.
2 Detailed designs have been approved through previous AMSC applications for
Phases 1A and 1B. Phase 1A is complete and the development of 1B is nearing
completion.
3 In addition, detailed approval has been granted for erection of 210
dwellinghouses on phase 2A (22/02223/AMM), which forms part of the area that
this application comprises and remains extant. Some of the conditions of the
PPP have been agreed under that consent and, due to the similarities with the
current application, do not require to be revisited. The current application for
AMSC will be required to be implemented concurrently with certain matters

Page 2

previously approved under 22/02223/AMM. These matters are detailed in the
assessment section of the report.
4 The developer for the previous AMSC was A & J Stephen. Persimmon has since
sought to acquire this section of site, thereby requiring some amendments to the
previous approval to reflect the different house types now proposed, alongside
some other relatively minor changes to the layout.
5 The 42 dwellings comprise a mix of detached, semi-detached and terraced
dwellinghouses. The numbers and tenure mix are:
 4 x two-bedroom terraced dwellinghouses;
 4 x three-bedroom terraced dwellinghouses;
 15 x three-bedroom semi-detached dwellinghouses;
 3 x three-bedroom detached dwellinghouses;
 13 x three-bedroom with study detached dwellinghouses; and
 3 x five-bedroom with study detached dwellinghouses.
6 All of the properties will have access to a private external amenity area and be
finished in white render, with a grey brick basecourse and sills and grey roof tiles.
The windows, doors and fascia boards will be white upvc and the rainwater
goods will be black upvc.
Site History
7 15/00017/PAN On 8 December 2015 PKC agreed a Proposal of Application
Notice for Residential development and associated infrastructure, access,
landscaping, SUDS, and open space.
8 16/00762/SCRN On 2 May 2016 an EIA screening opinion was issued by PKC
advising that residential development at Scone North was EIA development.
9 16/00995/SCOP On 11 July 2016 a Scoping Opinion was issued by PKC for an
EIA Report associated to a residential development at Scone North and
associated infrastructure, access, landscaping, drainage, SUDS, and open
space.
10 16/02127/IPM Planning Permission in Principle was approved on 18 April 2018
for Scone North’s residential development with open space, landscaping,
drainage and associated infrastructure (in principle).
11 18/00758/ADV Advertisement Consent was approved on 22 June 2018 for
display of signs.
12 18/00759/ADV Advertisement Consent was approved on 22 June 2018 for
display of signs.

Page 3

13 18/02231/AMM Approval of Matters Specified in Conditions related to
16/02127/IPM was approved on 30 August 2019, allowing for the erection of 42
dwellinghouses, landscaping and associated works (Phase 1a).
14 19/01478/ADV Advertisement Consent was approved on 5 November 2019 for
the display of a sign.
15 20/00382/FLL Full Planning Permission was approved on 8 July 2020 for the
erection of 5 dwellinghouses (revised design - change of house types at plots 28,
29, 33, 34 and 35) within Phase 1a.
16 20/01416/FLL Full Planning Permission was approved on 18 November 2020 for
the erection of a dwellinghouse and marketing suite (revised design - plot 3)
within Phase 1a.
17 20/01614/ADV Advertisement Consent was approved on 2 December 2020 for
display of a sign.
18 20/01752/FLL Full Planning Permission was approved on 12 July 2021 for
Erection of 2 dwellinghouse (revised design - change of house types - plots 26
and 27) within Phase 1a.
19 21/00484/FLL Full Planning Permission was approved on 12 July 2021 for the
erection of a dwellinghouse and garage (change of house type at plot 41) within
Phase 1a.
20 21/00609/AMM Approval of Matters Specified in Conditions related to
16/02127/IPM was approved on 24 September 2021 for the erection of 58
dwellinghouses and 3 detached garages, landscaping, and associated works
(Phase 1b).
21 21/02147/FLL Full Planning Permission was approved on 1 February 2022 for
erection of a dwellinghouse (revised design - plot 39) within Phase 1a.
22 21/02196/FLL Full Planning Permission was approved on 9 February 2022 for
Erection of 9 dwellinghouses (revised design - plots 45, 46, 51, 93, 95, 96, 98,
101 and 104) within Phase 1b.
23 22/00742/FLL Full Planning Permission was approved on 10 June 2022 for the
erection of 6 dwellinghouses and associated works (revised design - change of
house type to include sunrooms for plots 57, 60-61 and 75-77) within Phase 1b.
24 22/02223/AMM was approved on 13 December 2023 for the erection of 210
dwellinghouses, formation of landscaping, SUDS, and associated works
(approval of matters specified in conditions of 16/02127/IPM) (phase 2A).

Page 4

Environmental Impact Assessment
25 The impact of the wider development site was screened for EIA
(16/00762/SCRN) and it was determined that the proposal does constituted EIA
development. As such an EIA Report was submitted as part of the application for
planning permission in principle.
Pre-Application Consultation
26 Pre-application Reference: 15/00017/PAN.
Development Plan
27 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance.
National Planning Framework 4
28 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces. NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
29 The Council’s assessment of this application has considered the following
policies of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 13: Sustainable Transport
 Policy 14: Design, Quality and Place
 Policy 15: Local Living and 20 Minute Neighbourhoods
 Policy 16: Quality Homes
 Policy 18: Infrastructure First
 Policy 20: Blue and Green Infrastructure
 Policy 21: Play, Recreation and Sport
 Policy 22: Flood Risk and Water Management
Perth and Kinross Local Development Plan 2019
30 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and

Page 5

economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
31 The principal relevant policies are, in summary;
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 1D: Placemaking
 Policy 2: Design Statements
 Policy 5: Infrastructure Contributions
 Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
 Policy 15: Public Access
 Policy 20: Affordable Housing
 Policy 25: Housing Mix
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 29: Gardens and Designed Landscapes
 Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 42: Green Infrastructure
 Policy 52: New Development and Flooding
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 53E: Water Environment and Drainage: Water Supply
 Policy 56: Noise Pollution
 Policy 57: Air Quality
 Policy 58A: Contaminated and Unstable Land: Contaminated Land
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
 Policy 61: Airfield Safeguarding
Statutory Supplementary Guidance
32
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
 Supplementary Guidance - Placemaking (adopted in 2020)

Page 6

PKC Non Statutory Guidance
33
 Planning Guidance - Delivery of Development Sites
 Planning Guidance - Planning & Biodiversity
National Guidance
34 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4.
Planning Advice Notes
35 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:
 PAN 40 Development Management
 PAN 51 Planning, Environmental Protection and Regulation
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 68 Design Statements
 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport
Creating Places 2013
36 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Designing Streets 2010
37 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places.
National Roads Development Guide 2014
38 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.
Consultations
39 As part of the planning application process the following bodies were consulted:

Page 7

External
40 Historic Environment Scotland (HES): No objection. The proposed
development site is located within the Scone Palace Inventory Designed
Landscape (GDL00338). The site would be screened in views from the centre of
the estate by topography and existing and proposed policy woodland. The
development is not likely to have a significant adverse impact on the Inventory
garden and designed landscape.
41 Perth and Kinross Heritage Trust (PKHT): With respect to archaeology and the
planning process, as outlined by NPF4, the proposed development does not
raise any significant issues. No archaeological mitigation is required in this
instance.
42 Transport Scotland: No objection.
43 Scone and District Community Council: Objection.
44 Scottish Water: No comments. Response to previous application advised that
there was capacity at local water and wastewater treatment works.
45 Scottish Environment Protection Agency (SEPA): Initially submitted a holding
objection pending further information on the detailing of the drainage. This
information has now been received and SEPA will confirm their position prior to
the Planning & Placemaking Committee on the 14th May 2025.
Internal
46 Environmental Health (Contaminated Land): No objection. A Site Investigation
Report has identified the need for remedial works to ensure the wider site is
suitable for the proposed use. Condition required.
47 Environmental Health (Noise Odour): No objection. Conditions required to
control construction noise and the requirement for a CEMP.
48 Transportation and Development: Initially requested some further clarification.
This has subsequently been received and Transportation and Development offer
no objection.
49 Structures and Flooding: No objection. Changes to house types and plot layout
do not seem to have notably impacted the drainage layout and calculations. The
new finished floor levels (FFL) and finished ground levels (FGL) appear to
account for freeboard. Surface water flow extents appear reasonable. Any culvert
exceeding 2m in diameter will require Technical Approval.
50 Development Contributions Officer: No objection. The application seeks
change of house type and layout in Phase 2 of Scone North, previously approved

Page 8

under 22/02223/AMM. The comments provided with that application remain
applicable and no additional contributions are required in this instance.
51 Biodiversity: No objection. Conditions required to ensure recommendations
from biodiversity surveys and action plans are adhered to and implemented. An
updated ecological survey will be required if works begin outwith 24 months of
the approved survey. Wildlife kerbs and hedgehog highways should also be
provided.
52 Community Greenspace: No objection.
Representations
53 Two representations were received including from Scone and District Community
Council. The main issues raised within the representations are:
• Flood risk
• Noise
• Road safety concerns
54 These issues are addressed in the Appraisal section of the report.
Additional Statements
55
Screening Opinion EIA not required
Environmental Impact
Assessment (EIA):
Environmental Report
Not required
Appropriate Assessment under
Habitats Regulations
AA not required
Design Statement or Design
and Access Statement
Design Statement submitted
Report on Impact or Potential
Impact eg Flood Risk
Assessment
Drainage Strategy Report
Construction Environment Management
Plan
Sustainability Statement
Appraisal
56 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.

Page 9

Principle
57 The principle of the proposal has been established through the site’s allocation
as H29 in LDP2 for a residential development. Planning permission in Principle
(PPP) (16/02127/IPM) has also been granted for the development of the site for
residential use, reflective of that LDP2 allocation.
58 An extant Approval of Matters Specified in Conditions (AMSC) (22/02223/AMM)
is also in place for this phase of the development. The current proposal is
substantially similar to the extant AMSC for this area, and the principle of the
proposal is acceptable subject to compliance with the PPP, relevant development
plan policies and other material considerations. These matters are considered in
detail below.
Design and Layout
59 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant; as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas and Policy 25: Housing Mix. In
association, various PPP conditions also apply.
60 The layout is substantially similar to that of the extant AMSC, with the main
change seeking approval for the Persimmon house types. The layout continues
to follow the principles set down by approved masterplan. The proposed
dwellings all seek to provide an active frontage with the majority of the houses
oriented to overlook roads and areas of open space, including those fronting the
primary road passing through the site from Phase 1B to future phases to the
East.
61 The new house types are of an appropriate massing and scale which is
commensurate with the previous approval. The proposals will add variety and
visual interest to the street scene and provides a legible environment which
connects the new housing effectively to the existing residential areas with an
appropriate urban density.
62 The use of white render and a grey brick basecourse provides an appropriate fit
with the adjacent residential development, which is of similar finishes.
63 Overall, the proposed layout, design, scale and massing are considered to
comply with the Council’s placemaking policies, providing a logical and coherent
development. The proposals therefore are considered to accord with the terms of
PPP and the relevant NPF4 and LDP2 policies.
Landscape and Visual Impact
64 The majority of the proposal is roads and dwellinghouses with parking and
private garden areas. The larger areas of landscaping and open space to be

Page 10

delivered as part of the wider Scone North development is located on other
phases. However, there are small areas of open space and some areas abutting
the larger expanses of open space within the application site.
65 The changes to the house types to the north of plot 19 has moved the units
North, which in turn has increased the area of open space to the South, allowing
improved landscaping to be provided on this corner. Otherwise, the site
landscaping remains broadly in line with the extant AMSC and proposes
appropriate planting and boundary treatments.
66 Therefore, the proposal complies with NPF4 Policies 6: Forestry, Woodland and
Trees and Policy 20: Blue and Green Infrastructure and LDP2 Polices 39:
Landscape; 40B: Forestry, Woodland and Trees - Trees, Woodland and
Development; and 42: Green Infrastructure. In association, the conditions
attached to the PPP are also satisfied.
Residential Amenity
67 Residential amenity requires to be considered under NPF4 Policy 16: Quality
Homes and LDP2 Policy 1: Placemaking and Policy 17: Residential Areas as well
as PPP conditions.
Privacy, Daylight and Overshadowing
68 The location of the proposed dwellinghouses, relevant to both themselves and
existing/approved residential properties is such that there will be no unacceptable
loss of privacy or daylight or overshadowing.
Noise, Vibration and Dust
69 The applicant has submitted a Construction Environment Management Plan
(CEMP) with the application, which includes methods on how noise, vibration and
dust will be controlled during the construction phase to ensure the residential
amenity of existing properties is not adversely affected. This includes hours of
working with are in line with PKC’s guideline hours for construction and vibration
monitoring. Environmental Health has confirmed that they have no adverse
comments subject to conditions to control construction noise and adherence to
the CEMP (Condition 3).
Contaminated Land
70 A Site Investigation Report submitted for the extant AMSC has identified the
need for remedial works to ensure the wider site is suitable for the proposed use.
Therefore, the works outlined in this report also relate to this application.
71 Therefore, the condition should be reimposed on this approval to ensure the
necessary investigations and works undertaken (Condition 7).

Page 11

Roads and Access
72 In respect of the internal road layout and parking provision, PKC Transportation
and Development raise no concerns. The proposed internal movement layout,
including road hierarchy and associated private and public parking provision is
considered satisfactory and consistent with the approach and principles adopted
in the original masterplan submission and extant AMSC.
Drainage and Flooding
73 The parameters agreed within the Flood Risk Assessment for the previous
approval are not changed by the Persimmon site design. Therefore, the previous
FRA for the site remains relevant and this matter does not need to be revisited in
the consideration of this application. PKC Flooding and Structures has confirmed
that the changes to house types and plot layout do not have notably impacted the
drainage layout and calculations. They have advised that the new finished floor
levels (FFL) and finished ground levels (FGL) account for freeboard and that
surface water flow extents appear reasonable. As a result, they have no
objections to the proposal. SEPA initially submitted a holding objection pending
further information on the detailing of the drainage. This information has now
been received and SEPA will confirm their position prior to the Planning &
Placemaking Committee on the 14th May 2025.
Waste Collection
74 The PPP seeks to ensure appropriate waste and recycling provision is identified
and secured as part of MSC applications. In this regard there is considered to be
adequate provision proposed to accommodate requirements, satisfying the
conditional terms of the PPP.
Natural Heritage and Biodiversity
75 In relation to natural heritage and biodiversity, NPF4 Policies 1: Tackling the
Climate and Nature Crisis, 2: Climate Mitigation and Adaptation and 3:
Biodiversity apply along with LDP2 Policy 41 Biodiversity. In association, several
conditions attached to the PPP applications cover these issues.
76 NPF4 advises that development proposals for national or major development will
only be supported where it can be demonstrated that significant biodiversity
enhancements are provided, in addition to any proposed mitigation.
77 The ecological survey information submitted for planning reference
22/02223/AMM can be used to inform this application as the data is less than 24
months old. All recommendations made in the ecology and tree survey reports
including the Arboricultural Impact Assessment must be adhered to in full
(conditions 10 and 11).

Page 12

78 Similarly, a Biodiversity Action Plan was submitted in support of 22/02223/AMM
and all actions outlined in the Plan should be adhered to in full (conditions 10 and
11).
Archaeology and Conservation Considerations
79 NPF4 Policy 7: Historic Assets and Places; LDP2 Policies 26B: Archaeology and
29: Gardens and Designed Landscapes and conditions attached to the PPP
application apply.
80 Proportionate archaeological trenching and investigation has been undertaken as
part of the previous AMSC, with findings reported back to Perth and Kinross
Heritage Trust (PKHT). No further archaeological investigation or survey work is
considered necessary, within this phase. HES have also confirmed that the
proposals do not conflict with or cause adverse impact on the Historic and
Designed Landscape of Scone Palace.
Low and Zero Carbon Generating Technologies
81 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. In this
instance, a Sustainability Statement has been submitted in support of the
application. The Statement advises that the requirements will be met through the
fabric energy efficiency of the development being designed to reduce heat
demand and energy needs through providing high levels of insulation and low air
permeability, with consideration for thermal bridging junctions. Photovoltaic roof
panels, low voltage lighting, low flush sanitary appliances will also be installed on
all properties. The proposal therefore complies with the relevant policies.
Developer Contributions
82 A Section 75 legal agreement covers the 16/02127/IPM permission to ensure
necessary infrastructure is delivered, including:
 Community Facility Delivery
 Contribution towards Sports Facilities, including provision towards Sports
pitches and pavilion.
 Open Space Provision and Maintenance
 Compensatory Tree Planting
 Public Transport Improvement
 Affordable Housing
 Structure Planting Delivery

Page 13

83 The legal agreement in place adequately secures these elements and no further
changes are required.
84 With specific regard to affordable housing, there were no affordable housing units
proposed in this area as part of the previous AMSC. As a result, there are no
affordable homes included within this proposal. The requisite provision will be
delivered on other areas of the wider Scone North development.
Economic Impact
85 During the construction period, jobs will be created and sustained, supporting
indirect employment and revenue that this volume of construction activity will
generate from employees spending on local goods and services. Longer term,
additional residents to the area will support existing local employment and
services in the area.
Planning Obligations and Legal Agreements
86 None required.
Direction By Scottish Ministers
87 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.
Conclusion and Reasons for Recommendation
88 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly the proposal is recommended for approval
subject to the following conditions.
Recommendation 
Approve the application subject to the following conditions:
Conditions and Reasons for Recommendation
1. The development must be begun not later than the expiration of three years
beginning with the date on which this approval of matters specified in condition is
granted.  If development has not begun at the expiration of this period, the
approval of matters specified in condition lapses.

Page 14

Reason: In order to ensure the development to which this approval of matters
specified in conditions relates is commenced timeously and in accordance with
Section 41(1)(c) of the Town and Country Planning (Scotland) Act 1997.
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason: To ensure the development is carried out in accordance with the
approved drawings and documents.
3. The Construction Environment Management Plan (CEMP) submitted to satisfy
Condition 19 of planning permission 16/02127/IPM shall be implemented
concurrent with the development.  The CEMP will remain a dynamic document
throughout the duration of construction and until the completion of development.
The CEMP can be amended as necessary to meet best practice in terms of
environment or ecology.  Any amended document shall be submitted to the
Planning Authority for written approval as soon as reasonably practicable citing
the relevant amendment and appropriate guidance.
Reason: In the interest of protecting environmental quality and of biodiversity.
4. All road gullies within 500m of a waterbody or Sustainable Urban Drainage
(SUDS) pond shall have wildlife kerbs installed adjacent to the gully.
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981).
5. All trees identified for retention and any peripheral trees bounding the site, which
may be affected by any element of the approved development and its associated
construction, (including land within the blue site area) shall be protected in full
accordance with BS 5837: 2012 'Trees in relation to design, demolition and
construction'.
Reason: In the interest of tree protection in the interests of biodiversity and
amenity of the area.
6. The detailed landscaping and planting proposal specifications as hereby
approved shall be undertaken and delivered commensurate with the residential
development elements and thereafter maintained to the satisfaction of the
Council as Planning Authority.  Any planting failing to become established within
five years shall be replaced in the following planting season with others of similar
sizes and species to the satisfaction of the Council as Planning Authority.
Reason: In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality and in pursuance of satisfying placemaking policy
criteria of the adopted LDP.

Page 15

7. Development shall not commence on site until an evaluation for the potential of
the site to be affected by contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify;
I. the nature, extent and type(s) of contamination on the site
II. measures to treat/remove contamination to ensure the site is fit for the use
proposed
III. measures to deal with contamination during construction works
IV. condition of the site on completion of decontamination measures.
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority. 
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority.
Reason: In order to deal with any potential contamination of the site as a result of
its former use.
8. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable Sustainable Urban Drainage Systems to meet
the requirements of best management practices.
Reason: To ensure the provision of provide effective drainage for the site.
9. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved
development works.  The temporary surface water treatment facility shall remain
in place until the permanent surface water drainage scheme is implemented
unless otherwise agreed in writing by the Council as Planning Authority.
Reason: To ensure the appropriate management of construction surface water
run-off to minimise flooding and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the interests of residential and
environmental amenity.
10. The conclusions and recommended action points within the supporting ecology
and tree survey reports including the Arboricultural Impact Assessment submitted
and approved as part of 22/02223/AMM shall be fully adhered to, respected and
undertaken as part of the construction phase of development.
If works are not commenced within 24 months of the date of the ecology and tree
survey reports approved as part of 22/02223/AMM, then updated surveys will be

Page 16

required to be submitted to the Planning Authority for written approval prior to the
commencement of works.
Reason: In the interests of protecting environmental quality and of biodiversity.
11. Prior to the completion or occupation of the building(s) hereby approved,
whichever is the earlier, all biodiversity enhancement measures in the Scone
North Phase 2A Biodiversity Action Plan (submitted for 22/02223/AMM) must be
provided in full. Thereafter, the agreed scheme shall be maintained in a
reasonable condition for the life of the development.
Reason: In the interests of protecting environmental quality and of biodiversity.
Justification
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.
Informatives
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended.  The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. 
In accordance with Regulation 41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the site of the
development
 Readily visible to the public
 Printed on durable material.
4. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 they must obtain from the Council as Roads Authority Road Construction
Consent (RCC) to construct a new road prior to the commencement of

Page 17

roadworks.  Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency.  Please note that a fee is chargeable for the processing of RCC
applications.
5. The applicant should be advised to contact Perth & Kinross Council Street
Lighting Department to obtain technical approval for all street lighting provision.
6. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species.  Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance.
7. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (Section 1), it is an offence to remove, damage or destroy the nest of
any wild bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act.
8. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste, including construction phasing.
9. No work shall be commenced until an application for building warrant has been
submitted and approved.
10. There is a continued requirement for a Section 75 legal obligation associated
with Planning Permission in Principle 16/02127/IPM, relating to:
 Community Facility delivery
 Contribution towards Sports Facilities, including provision towards sports
pitches and pavilion
 Open Space provision and maintenance
 Compensatory Tree planting
 Public Transport movement
 Affordable Housing
 Structure Planting delivery.
A copy is available to view on the Council's Public Access portal.
11. The applicant is advised to refer to Perth & Kinross Council's Flood Risk and
Flood Risk Assessments Supplementary Guidance, and the CIRIA SuDS manual
as it contains advice relevant to your development.
12. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, hedgehog highways shall be created by providing
access gaps in wooden fences on each plot at least 13cm x 13cm at ground
level, to allow for the free movement of hedgehogs.  Thereafter, the hedgehog

Page 18

highways shall be retained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning Authority.
13. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses.
14. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
Background Papers
Letters of representation 2
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Major
Team)
01738 475300
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications and
Enforcement)
1 May 2025