Perth and Kinross Council
Planning and Placemaking Committee – 14 May 2025
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 25/117)
Proposal: Formation of a 49.9MW battery energy storage facility comprising
battery storage units, ancillary buildings and equipment, access road
and associated works
Location: Land 200 metres north of Pitcurran House, Newburgh Road,
Abernethy, Perth, PH2 9LH
Ref. No: 24/01386/FLM
Ward No: P9- Almond and Earn
Summary
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan.
Background and Description of Proposal
1 The application is for a Battery Energy Storage System designed to deliver up to
49.9MW of electricity. A new access track will be required to access the site.
2 The purpose of a Battery Energy Storage System is to store excess of energy on
the grid at peak of generation moments and release energy at peak demand
moments of the day. Allowing a balancing mechanism that the grid requires to
allow the new renewable energy generators across the country in their
intermittent generation line. The energy generated is fed directly into the national
electricity grid, with the point of connection to the grid being an underground
33kV cable that runs below the fields and unnamed road into the Abernethy
Primary Substation, which is approximately 300m to the east of the site.
3 The proposed application site is located on part of an arable field located at
Balgonie Farm, east of Abernethy, 300m to the west of the existing Abernethy
substation. The site is within an area of low lying farmland which is located near
the confluence of the River Earn and the River Tay 1.5km to the north. It is
located to the immediate north of the transport corridors of the Perth to Ladybank

Page 2

Railway Line and A913, which runs from the outskirts of Perth to Cupar Angus in
the east. To the south the land rises to the Ochil Hills.
4 The site itself comprises the south western part of a regular medium-scale arable
field. The eastern boundary is formed by a hedgerow which separates the site
from the adjacent field. The southern boundary is formed by a small embankment
along the railway line and is vegetated with scattered scrub cover. To the north
and the west the site boundaries are undefined on the ground. Furthermore,
there are no specific landscape features within the application site. The access
for the proposed construction route is to/from the M90 to the west via Ferryfield
Road, the A913 and the A912. A new access track is required which is
approximately 5metres at maximum width, finished in gravel with associated
drainage ditches. This access track will connect to the existing road at
Jamesfield.
Site History
5 01/01389/FUL Full Planning Permission was approved on 14 November 2001 for
the erection of an organic produce processing unit with visitor centre, shop and
restaurant.
6 02/01804/FUL Full Planning Permission was approved on 22 January 2003 for
the erection of an organic produce processing unit with visitor centre shop and
restaurant.
7 07/02207/FUL Full Planning Permission was approved on 7 May 2008 for a part
change of use to form a children’s nursery at first floor level.
8 13/00438/FLL Full Planning Permission was refused on 31 October 2014 for the
erection of an agricultural shed.
9 17/01304/FLL Full Planning Permission was approved on 3 November 2017 for 
a change of use of upper floor from ancillary storage and nursery (class 10) to
mixed use (classes 1, 2, 4, 6 and 10) in part retrospect.
10 24/00003/PAN On 20 March 2024 for the formation of a battery energy storage
facility and associated works.
11 24/00004/PAN On 26 April 2024 for the formation of a 49.9MW battery energy
storage facility and associated works.
12 24/00580/SCRN On 6 May 2024 for the Installation of 49.9MW stand-alone
battery electricity storage system and ancilliary equipment to connect to the grid
at Abernethy Substation.

Page 3

Environmental Impact Assessment
13 An EIA screening has been undertaken. The proposal being a Schedule 2
development in terms of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017. In the case of these regulations,
prohibition is given to the granting of planning permission to “EIA development”
unless an environmental impact assessment has been undertaken. In this case
the Council has taken the opinion that it is not EIA development, and that
sufficient information has been submitted with the application to enable a
determination in consideration of all relevant environmental matters. These
environmental aspects requiring further consideration, are namely: noise,
landscape and visual amenity, trees and biodiversity, roads and transportation
and flood / drainage matters.
Pre-Application Consultation
14 Pre application Reference: 23/00031/PREAPM.
15 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009. Therefore, the applicant was required to undertake formal pre-application
consultation with the local community.
16 The objective of the community involvement and engagement phase is to inform
and engage with the local community and stakeholders, in order to ensure local
people are aware of the proposal and have the chance to find out more and
express their views and concerns.
17 A Proposal of Application Notice was submitted to Perth and Kinross Council on
the 9th April 2024. The reply was received on 26th April 2024 confirming that the
proposed consultation process was accepted. This was also sent to Abernethy
Community Council and all Ward Councillors by email on the 11th March 2024.
18 Two in person public exhibitions were staged in The Williamson Hall, Abernethy
on the 22nd April 2024 and the 22nd May 2024, to inform local residents about
the proposals. In addition, more than 768 households and local businesses were
directly informed of the exhibitions via a leaflet mailout or door drop on the 11th
April 2024 and the 7th May 2024 (this included all households within a 2 km
radius of the site) Adverts were placed in the Perthshire Advertiser, and were
published on the 9th April 2024 and 10th May 2024.
19 Furthermore, two leaflets providing information on the proposal were mailed to
768 households and local businesses on the 11th April 2024 and the 7th May
2024. This mailout included all properties within a 2 km radius of the site. Two
adverts were placed in the Perthshire Advertiser providing information on the
proposal. This was published on the 9th April 2024 and the 10th May 2024, and
invited local residents to attend to the public exhibition events.

Page 4

Development Plan
20 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance.
National Planning Framework 4
21 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
22 The Council’s assessment of this application has considered the following
policies of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 5: Soils
 Policy 6: Forestry, Woodland and Trees
 Policy 11: Energy
 Policy 29: Rural Development
Perth and Kinross Local Development Plan 2019
23 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
24 The principal relevant policies are, in summary:
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 5: Infrastructure Contributions
 Policy 6: Settlement Boundaries
 Policy 8: Rural Business and Diversification
 Policy 26A: Scheduled Ancient Monuments and Archaeology
 Policy 26B: Archaeology
 Policy 33A: New Proposals for Renewable and Low Carbon Energy
 Policy 34C: Energy Sources / Storage
 Policy 35: Electricity Transmission Infrastructure

Page 5

 Policy 39: Landscape
 Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 42: Green Infrastructure
 Policy 50: Prime Agricultural Land
 Policy 51: Soils
 Policy 52: New Development and Flooding
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 56: Noise Pollution
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
Statutory Supplementary Guidance
25
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Landscape (adopted in 2020)
PKC Non Statutory Guidance
26
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft)
National Guidance
27 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4.
Planning Advice Notes
28 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:
 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport
Creating Places 2013
29 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes

Page 6

that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
National Roads Development Guide 2014
30 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.
Consultations
31 As part of the planning application process the following bodies were consulted:
External
32 Health and Safety Executive (HSE) - No objection.
33 Transport Scotland - No objection to the proposed development.
34 Network Rail - Initially objected to the proposed development. Additional
information is required to fully assess the impacts of the development on the
adjacent railway. To allow Network Rail’s Fire Safety Engineer to fully assess the
proposal, the applicant must submit a site-specific Battery Safety Management
Plan. Network Rail has now reviewed additional information supplied by the
applicant, and are now content to remove the holding objection, subject to
conditions relating to the submission of a site-specific Battery Safety
Management Pan, the submission of further fire safety information and a surface
and foul water drainage scheme.
35 Scottish Water - Scottish Water has no objection to this planning application.
The applicant should be aware that this does not confirm that the proposed
development can currently be serviced.
36 This proposed development is within the Turrret Water Treatment Works
catchment. To allow Scottish Water to fully appraise the proposals, it is
suggested that the applicant completes a Pre-Development Enquiry (PDE) Form
and submits it directly to Scottish Water via the Customer Portal.
37 There is currently sufficient capacity for a foul only connection in the Abernethy
Waste Water Treatment works to service the proposed development. However,
please note that further investigations may be required to be carried out once a
formal application has been submitted to Scottish Water.
38 NatureScot - NatureScot did not respond to the consultation request.

Page 7

39 Perth and Kinross Heritage Trust (PKHT) - No objection, subject to the
inclusion of a condition relating to the submission of a programme of
archaeological works.
40 National Gas Assets Protection Team - No objection. there are no National
Gas Transmission assets affected in this area.
Internal
41 Environmental Health (Noise Odour) - As a result of the submission of a
revised, and more cumulatively based NIA, there are now no objections to the
proposed BESS.  However, this is subject to the inclusion of conditions relating to
:
a) The enclosure and maintenance of plant and equipment
b) Operational noise limits
c) Noise mitigation measures
d) Noise complaints
e) External lighting
f) Construction working hours
42 Environmental Health (Contaminated Land) - No objection. A search of the
historic records did not raise any concerns regarding ground contamination and
therefore there are no adverse comments to make on the application. 
43 Environmental Health – Private Water Supply Team - No objection, subject to
the inclusion of a suitably worded condition relating to the details of the location
and operational measures of any proposed sceptic tanks and soakaways, private
water sources and any associated infrastructure.
44 Transportation and Development - Following the submission of further
information, there are no objections to the proposed development, subject to the
inclusion of two informatives.
45 Biodiversity/Tree Officer - No objection subject to conditions relating to the
conclusions and recommendations of the submitted Biodiversity Study, an
updated Ecology Survey, a Construction Environment Management Plan, and
details of the proposed biodiversity enhancements.
46 Community Greenspace - No objection.
47 Development Plan Team - Following the submission of additional information in
the form of a Soil Management Plan and a Landscape and Visual Impact
Assessment (LVIA), there is now no objection from the Development Plan Team.
However, it is recommended that conditions are included in relation to the
maintenance of the proposed landscaping, a revised Landscape Plan and an
updated Soil Management Plan.

Page 8

48 Structures and Flooding - No objection.
Representations
49 Three representations were received. The main issues raised within the
representations are:
 Loss of prime agricultural land.
 Increase in traffic on Ferryfield Road.
 Road safety concerns.
 Noise pollution.
 Visual impact.
 Fire risk.
 Impact on biodiversity and ecology.
50 These issues are addressed in the Appraisal section of the report.
Additional Statements
51
Screening Opinion EIA not required
Environmental Impact Assessment
(EIA): Environmental Report
Not required
Appropriate Assessment under
Habitats Regulations
AA not required
Ecological Appraisal Submitted
Design Statement or Design and
Access Statement
Design and Access Statement
Submitted
Report on Impact or Potential Impact
eg Flood Risk Assessment
Noise Impact Assessment
Ecological Appraisal
Fire Management Plan
Transport Statement
Landscape and Visual Overview
Soil Management Plan
FRA submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Appraisal
52 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,

Page 9

this involves considerations of the Council’s other approved policies and
supplementary guidance.
Principle
53 The location is a peripheral rural area approximately 200m north of Abernethy.
Policy considerations seeking to assess its suitability in principle are: LDP2
Policies 1A, 1B, Placemaking; Policy 8 Rural Diversification; Policy 33A:
Renewables and Low Carbon Energy; Policy 50 Prime Agricultural Land; and
Policy 51 Soils. The relevant NPF4 policies are Policy 1 Tackling the Climate and
Nature Crises; Policy 2 Climate Mitigation and Adaptation; and Policy 11 Energy.
54 The proposal would provide essential energy balancing services to the National
grid, actively contributing towards Scotland's CO2 reduction targets, supporting
the principles of Scotland’s Energy Strategy (SES). Specifically, electricity would
be drawn from the grid at times of low demand, stored and released back as
required. When demand is higher, greater generation from non-renewable
sources is required and energy storage facilities such as that proposed could
reduce reliance on non-renewable resources, thus decreasing CO2 emissions.
Over the course of a year, the proposed BESS will cover the electricity equivalent
of the annual consumption of approx. 12,500 homes.
55 NPF4 sets out six overarching spatial principles with “Just Transition” relating to
the construction of renewable energy and their contribution to achieving net zero.
NPF4Sustainable Places section emphasises the link to Scotland’s Climate
Change Plan and sets the approach to achieving net zero emissions by 2045 and
making significant progress by 2030. The NPF4 also links to Scotland’s Energy
Strategy and highlights the importance of land and sea to be critical in delivering
renewable energy developments. NPF4 provides detailed policy on Climate
Change and Energy and details developer expectations to how proposed
schemes will accord with the policies set out in the document. The overarching
policy intent in NPF4 is to encourage, promote and facilitate all forms of
renewable energy development onshore and offshore.
56 In this case, it is considered that there is no conflict with any of the relevant LDP2
or NPF4 policies. Whilst there is a loss of prime agricultural land (identified as
Class 2), the loss of land is not considered to result in a significant impact. This is
because NPF4 Policy 5 provides for essential infrastructure on prime agricultural
land provided that the layout and design of the proposal minimises the amount of
land that is required. A Soil Management Plan has been submitted, which sets
out details of the proposed on-site management to minimise the loss of soil
material from the site, to reduce any potential soil contamination and to ensure
that soil structure and productive capacity can be retained and enhanced. The
total land available at Balgonie Farm is approximately 185 acres, with the
proposed BESS occupying 3 acres, which is only 1.6% of the total farm area.
This is considered to outweigh the loss of 3 acres of prime agricultural land that
will be utilised for this development.

Page 10

57 In this instance, the proposed BESS is a temporary development and it is
anticipated that it will be in operation for 30 years. Once the project reaches the
end of its lifespan the site will be decommissioned and will be restored to its
original condition, with no impact remaining or any structures still on site that
could compromise the agricultural productivity of the site. It is proposed that
following the decommissioning of the BESS site, the subsoil and topsoil should
be returned to its original location and a process of soil cultivation enacted to
return the soil to a state suitable for agricultural use. Site surveys should be
conducted before and after decommissioning to provide clarity on the
remediation work required. Stored soil should be returned to the area of the site
where it was sourced and the original soil profile reinstated. 
58 Given the advances in the efficiency of the technology associated with BESS
developments, the footprint of the project has been reduced in 40% (number and
size of equipment, and therefore occupied land) since the PAN was submitted.
Furthermore, it is fully anticipated that, by the time that the proposed BESS is
commissioned in 2027, further advances in BESS technology will result in a
further reduction in the overall footprint of the development, and therefore, less of
an uptake of prime agricultural land. This, combined with the locational need for
the development close to the existing electrical substation, in addition to any
carbon offsetting potential, outweigh any impact on landscape values and
agricultural use. Furthermore, this substation has unconstrained capacity to
import and export the electrical energy required.
59 Notwithstanding the above, Policy 33a of LDP2 and Policies 1, 2 and 11 of NPF4
specifically encourages low carbon energy solutions where specific grid
connection or the use of established infrastructure can occur. Therefore, on
balance, and given the site-specific reasoning for the location of the battery
storage unit, the proposed development can be supported. Furthermore,
consideration must be given to the finite lifespan of this facility. Whilst the overall
operational life will be some 30 years, minimal disturbance to the site will be
required, allowing the pre-existing land use to resume afterwards.
Design and Layout
60 LDP2 Policy 1: Placemaking, requires that development must contribute
positively to the quality of the surrounding built and natural environment. All
development should be planned and designed with reference to climate change,
mitigation and adaptation. The design, density and siting of development should
respect the character and amenity of the place.
61 The proposed development comprises of a battery energy storage system
(BESS) contained within a fenced compound and surrounded by proposed. The
17 no. battery containers and the rest of equipment will be mounted on concrete
beams arranged in a linear fashion across the site in rows. There will be
approximately 6m between each container. The layout of the proposed BESS
includes both inverters and transformers. A total of 17 inverters and transformers
will be erected and spread across the site. A substation, split in to two separate

Page 11

buildings are proposed to the southeast side of the site a control room. The
inverters are components stored in cabinets which are pale grey or green in
colour and approx. 7,40m length x 2.0m width x 2.2m height. The transformers
are smaller units of 2,40m length x 2,40m width x 2,1m height.
62 The sub-station will consist of pre-fabricated cabins depending on the
requirements from the Distribution Networks Operator (DNO). One cabin will be
for the internal connection of the electrical output from the site, with the other
required by the DNO for connection into the wider electricity network. A control
room will be situated next to the substation buildings near the southern boundary
of the site. The control room will be a single storey building and will measure up
to 26m length x 7m width x 2.9m height which is dark green in colour. A battery
storage racks will take the form of independent, single storey containers and will
measure up to 27,8m length x 3,1m width x 3.8m height.
63 The compound will be surrounded by a 2.75m palisade green fence, and all
equipment mounted on concrete beams. The surface of the compound will be
finished with aggregate, with a stronger base proposed for during construction
and maintenance of the proposed development. Infra-red security cameras will
be located around both sites, at a height of approximately 4.2m.
64 Landscaping is proposed, including native planting, around the site perimeter
including a 10m wide continuous border of native scrub and tree planting. Full
details of this have not been submitted but this can be controlled through a
suitably worded planning condition (condition 13). Access to the site will be taken
via a new access track which is approximately 5metres at maximum width,
finished in gravel with associated drainage ditches. This access track will connect
to the existing road at Jamesfield. The track will be contained fully within the red-
line site boundary of this application, however the exact coordinates of the route
and impact upon existing trees and hedgerows is yet to be determined. This can
be controlled via a pre-commencement planning condition (condition 18).
Landscape and Visual Amenity
65 Perth and Kinross Council LDP2, Policy 39: Landscape states that development
and land use change should be compatible with the distinctive characteristics
and features of Perth and Kinross’s landscapes. Accordingly, development
proposals will be supported where they do not conflict with the aim of maintaining
and enhancing the landscape qualities of Perth and Kinross.
66 In this instance, the development site is currently an agricultural field and is not
located within the Green Belt or any other designated landscape areas. A
”Landscape and Visual Overview” has been provided which considers the
individual application itself will not have a significant landscape or visual impact.
These impacts are primarily from the Ochil Hills LLA and from the core path
network.

Page 12

67 In addition, further information has been provided in an “Landscape & Visual
Overview Addendum”. This document acknowledges that the development would
result in further change to the landscape but that the change, in the context of the
existing built form components, allows for the development to be accommodated
and be further softened by landscaping. It is further acknowledged that there will
be a sequential impact of the development, including on views from the Ochil
Hills LLA.
68 Regarding cumulative landscape effects on the Ochil Hills LLA, it is
acknowledged that the landscape fabric and the aesthetic aspects of its
immediate setting to the north would experience a further degree of localised
change given the temporary conversion of agricultural land to renewable energy
installations. However, the renewable energy schemes would be relatively small-
scale in relation to the wider valley landscape and the prevailing open,
agricultural character of the LLA’s setting would remain intact. No physical
change would occur on the Ochil Hills LLA. However, the scale, when compared
with the wider landscape, along with the separation from any existing and
planned infrastructure, is sufficient to retain the appearance of a farmed
landscape.
69 Furthermore, the localised landscape setting is partly characterised by existing
built form components, road and rail infrastructure, as well as overhead visual
elements such as cables and pylons. These elements are considered to have
had an impact on the rural character of this landscape. It is therefore considered
that the local landscape setting has some capacity to accommodate such
development of a temporary nature as the type proposed. In addition, the
landscape proposals for the proposed development will physically and visually
integrate the scheme into the local landscape, utilising appropriate native species
to further mitigate any cumulative effects arising from the proposals. Overall, it is
considered that other impacts from viewpoints over the local character area are
too distant to be significant.
70 A Landscape and Visual Impact Assessment (LVIA) has been submitted, and
impacts from the various viewpoints have been analysed and it has been
determined that the majority of the impacts will be minimalised by the topography
of the landscape, the existing vegetation and the presence of local electricity
transmission infrastructure. Furthermore, any significant visual impacts from local
core paths can be mitigated with sensitive landscaping. However, as a result of
this proposed development, there will still be an impact on the rural, productive
nature of the landscape at ground level, but this localised impact is, overall,
considered acceptable. In light of the above, a condition (condition 15) has been
included that the final landscaping scheme is planted and maintained for the life
of the development, and at an appropriate height to ensure that views from the
Core Path and views to the Sidlaw Hills are retained. In light of the above, the
proposed BESS is in accordance with LDP2 Policy 39: Landscape and NPF4
Policy 4: Natural Places.

Page 13

71 NPF4 5(b) requires applicants to demonstrate how the footprint and design has
minimised any potential impact. The applicant has stated that the footprint has
been reduced by 40% from the PAN but that there is a high possibility that the
site could be reduced further by the time the project is developed. The landscape
plan sets out a minimal use of hardstanding.
Soils
72 The site is on prime agricultural land (class 2). NPF4 Policy 5 provides for
essential infrastructure on prime agricultural land provided that the layout and
design of the proposal minimises the amount of land that is required. In this
instance, a draft Soil Management Plan has been submitted which is suitable to
minimise impact on soils and retain soils on site. However, a condition (Condition
16) has been included requiring an updated soil management plan to be
submitted, prior to the commencement of development.
73 Furthermore, an analysis of all available Class 3 land has been submitted. The
report states that areas of 3.2 land south of the proposal are inappropriate due to
topography and another area close to the Tay is also unsuitable. The closest
area of 3.2 land (marked as area B) is flat agricultural land near Cordon farm.
The report states that the vast majority of this field is not classified as flood risk
but that as it is flat it is still at risk of flooding. SEPA 2023 river flood maps show
this area as not at even low flood risk as river flooding is contained to the north of
the River Earn.
74 Subsequently, the applicant has provided information to confirm that the
landowner of the non-prime land has been contacted and not shown an interest
in hosting the development on this land. A further condition (Condition 17) has
been included to ensure that the site is reinstated as soon as the proposal has
ceased to be operational for a period of 12 months. Therefore, this land does not
need to be considered as an alternative to the proposed site. In light of the
above, the proposed BESS is considered to be in accordance with LDP2 Policy
51: Soils and NPF4 Policy 5: Soils
Residential Amenity
75 LDP2 Policy 56: Noise Pollution states that there will be a presumption against the
siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. In this
instance, there are residential properties within proximity to the proposed BESS,
located to the north, southeast and southwest. PKC Environmental Health Noise /
Odour initially objected to the proposals as insufficient information had been
provided to demonstrate that the application site was a suitable location for the
proposed development. It was not possible for Environmental Health to complete
an appraisal of the application until a cumulative noise impact assessment has
been undertaken. In light of this, a revised Noise Impact Assessment (NIA) was

Page 14

submitted, which includes updated inverter noise levels for day and nighttime
operations and a cumulative assessment.
76 As a result of the NIA, it has been concluded that the predicted worst case
external noise level at the nearest dwelling houses is below the maximum criteria
for external amenity space. Furthermore, internal predicted noise levels during
the nighttime period are below the maximum criteria that is considered the
threshold above which sleep disturbance may occur. This revised NIA now
includes a cumulative noise assessment for the potential noise contribution from
the various adjacent energy developments such as SSE substation on land off
Abernethy Road, BESS approved planning 22/00746/FLM, BESS approved
planning 22/00832/FLL and Solar Farm 17/00487/FLL. The assessment has
been undertaken assuming all schemes are operating simultaneously and is
based on the noise levels at the worst affected residential properties in relation to
the proposed BESS. The noise levels are below both the daytime and nighttime
criteria and achieve the nighttime criteria for the standard plant noise for areas
with low background levels.
77 In light of this, the proposed BESS will not result in a level of noise that will have
an adverse impact on residential amenity. However, in order to ensure that any
impact on residential amenity is minimised, a condition has been included to
ensure that all plant and machinery is enclosed (condition 3). A further condition
has been included stating a noise limit for the BESS (condition 4). Other
conditions that have been included relate to noise mitigation measures (condition
8), complaints from the public (condition 5), external lighting (condition 6) and
construction working hours(condition7).
78 Therefore, subject to the aforementioned conditions, the proposed development
is in accordance with LDP2 Policy 56 and NPF4 Policy 29.
Roads and Access
79 LDP2 Policy 15: Public Access states that development proposals that would
have an adverse impact upon the integrity of any (including proposed) core path,
disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted.
80 In this instance, the proposed development will not have an adverse impact on
public access and will not require any re- routing of a core path or right of way.
Therefore, the proposed BESS is in accordance with LDP2 Policy 15: Public
Access.
81 LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. The
new access track which is proposed will connect to the existing road at
Jamesfield. This will make use of existing infrastructure.

Page 15

82 Furthermore, the access for the proposed construction route is to/from the M90
to the west via Ferryfield Road, the A913 and the A912. This will then adjoin the
new access track. A Transport Statement (TS) has been submitted, which states
that there will be an estimated 5/6 HGV deliveries per day at the beginning of the
construction period. This will result in a relatively low level of construction traffic,
which will not have an adverse impact on traffic safety or traffic flows on the
surrounding road network. The TS has stated that the proposed access and
route for construction vehicles will not give rise to any road safety concerns.
83 A Construction Traffic Management Scheme (CTMS) has been submitted, which
shows the position and specification of signage and other control measures
being proposed. Furthermore, the CTMS sets out how the construction and
operational vehicular activities will be undertakes and managed.
84 Considering the above, it is considered that the proposed battery storage facility
is in accordance with LDP2 Policies 15 and 60A, and NPF4 Policies 11 and 12.
Drainage and Flooding
85 LDP2 Policy 52: New Development and Flooding, states that the Council
supports the actions and objectives to avoid increased, reduce overall, and more
generally manage flood risk in alignment with SEPA Strategies and Plans. NPF4
Policy 22 states that development proposals must have regard to the water
environment, and drainage, including floodwater management, within any
proposal. In this instance, the proposed development is classified as Essential
Infrastructure and can be built within a flood-risk area (200yr + Climate Change)
in accordance with NPF4 Policy 22a.
86 However, the proposed BESS should be designed and constructed to be
operational during floods, not impede water flow and not increase the risk of
flooding elsewhere. In this case, SEPA’s Surface Water Flood Map does not
identify any areas of pluvial/surface water flooding within proximity of the site
boundary. Furthermore, a review of SEPA’s groundwater flood maps indicates
that there is no groundwater flood risk for the proposed development.
87 A Flood Risk Assessment has been submitted, which has identified all potential
sources of flooding in the immediate area. The only watercourse upslope of the
site is the minor unnamed watercourse / drain which runs along the eastern edge
of the field. The watercourse has a small catchment area of approximately 0.23
square km and passes under the railway via a culvert of approximately 0.6m by
1.2m, which has adequate capacity during peak flood events. The minor field
drain to the west of the site has a very limited catchment area and is situated
downslope of the site. As such it presents no risk to the development. This being
the case, the proposed BESS is neither at risk of flooding from any existing
sources nor will it result in a risk of flooding elsewhere. This being the case, the
proposed development is in accordance with LDP2 Policy 52 and NPF4 Policy
22a.

Page 16

88 LDP2 Policy 53C: Surface Water Drainage, requires Sustainable Urban Drainage
Systems (SUDS) measures including relevant temporary measures at the
construction phase. Due to the site topography, land use and underlying geology,
the primary means of drainage at the site is likely to be initial soil adsorption /
infiltration. Furthermore, when the field capacity of the soils is exceeded, then
overland flow / runoff would shed towards the minor drainage ditch, located
northwest of the site boundary.
89 The proposed drainage / SuDS scheme for the site has been developed to
manage the surface water runoff from the battery storage development area. The
development site will be constructed with permeable materials (e.g. crushed
gravel) to allow rainwater to infiltrate into the ground, where it will be intercepted
by perforated pipework. Runoff from semi-permeable / impermeable surfaces will
be conveyed into a SuDS attenuation pond via a series of perforated and
conventional pipework, ditches and drains. The perforated pipework and liner
drainage features will convey runoff to a lined SuDS pond located in the
northwestern corner of the site. The pond will provide suitable treatment and
attenuation prior to discharge to the adjacent watercourse. The SuDS pond is to
be lined as it will serve a dual purpose for firewater runoff storage. Given that the
applicant has submitted adequate drainage drawings, design and overall
strategy, the proposed BESS is in accordance with LDP2 Policy 53C.
Conservation Considerations
90 LDP2 Polices 26A, 26B and Policy 7 of NPF4 are applicable to this application. In
this instance, the proposed development site lies within an area that is
considered archaeologically sensitive as its located within a rich archaeological
landscape with evidence of activity spanning across multiple periods with
particular strong evidence of Roman activity.
91 A Heritage Assessment has been submitted, which acknowledges that there is
medium potential for unknown buried remains on site. Given the site’s location
next to the road and the presence of existing screening from trees and other
developments, the proposed BESS will have a low impact on the setting of the
local Roman strongholds. However, as there is the potential for buried remains
on site, as requested by PKHT, a condition (condition 9) has been included that a
programme of archaeological works should be undertaken. Subject to this
condition, the proposed development is considered to be in accordance with
LDP2 Policies 26A, 26B and Policy 7 of NPF4.
Natural Heritage and Biodiversity
92 LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected
or not. All whilst taking into account the ecosystems and natural processes in the
area. In accordance with NPF4, development proposals for major development
will only be supported where it can be demonstrated that the proposal will
conserve, restore and enhance biodiversity, including nature networks so they

Page 17

are in a demonstrably better state than without intervention. This will include
future management.
93 In this instance, the submitted Ecological Appraisal is comprehensive and all
methods were undertaken in accordance with best practice at the correct time of
year. The submitted Ecological Appraisal contains recommendations to achieve
biodiversity enhancement but lacks detail in terms of numbers and locations. For
major applications,  a Site Biodiversity Action Plan, which provides quantity,
locations, techniques, timescales and monitoring arrangements, should be
submitted.
94 However, in line with the response from the Council’s Biodiversity Officer, the
submitted Landscape Strategy Plan is considered sufficient to secure the
necessary biodiversity enhancement required by NPF4. Conditions have been
included to ensure that the submitted Biodiversity Survey is fully adhered to
(condition 10), an updated Ecology Survey is submitted (condition 11), a detailed
Construction Management Scheme is to be submitted (condition 12), the
Landscaping and Planting Scheme should be completed within the first available
planting season (condition 13), bat , bird boxes and other biodiversity
enhancement measures must be provided ( Condition 14) and that the proposed
planting must be maintained for the life of the development (condition 15).
Developer Contributions
95 The Developer Contributions Guidance is not applicable to this application, and
therefore, no contributions are required in this instance
Economic Impact
96 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. However, the proposal will support local
renewable energy generation by helping balance fluctuations of intermittent
energy generation. It will assist in the creation of a national grid asset of regional
significance for the Perth and Kinross area.
Variation Of Application Under Section 32A
97 This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations were relating to landscape and visual impact, soils,
floods and drainage.
Planning Obligations and Legal Agreements
98 None required.

Page 18

Direction By Scottish Ministers
99 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.
Conclusion and Reasons for Recommendation
100 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions.
Recommendation 
Approve subject to the following conditions:
Conditions and Reasons for Recommendation
General
1. The proposed development must be carried out in accordance with the approved
drawings and documents, unless otherwise provided for by conditions imposed
on the planning consent.
Reason: To ensure that the development is carried out in accordance with the
approved plans.
2. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period.
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
Environmental Health – Noise / Odour
3. All plant or equipment shall be so enclosed, attenuated and/or maintained such
residential property, with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
Reason: In order to safeguard the neighbouring residential amenity in the area.

Page 19

4. Noise from the battery storage facility shall not exceed 40dB LAeq daytime (07:00
to 23:00) and 34dBLAtq nighttime (23:00 to 07:00) when measured at the façade
of any residential property.
Reason: In order to safeguard the neighbouring residential amenity in the area.
5. In the event, that justified complaints for noise are received by the Council, the
Applicant at their own expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from the development.  The
appointed consultant and methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning Authority in consultation
with Environmental Health within 28 days of being notified of the complaint.
Within 28 days of approval of appointed consultant and methodology, a Noise
Assessment shall be submitted outlining mitigation and recommended timescales
for delivery.  Thereafter, all mitigation measures shall be implemented within the
timescales recommended.
Reason: In order to safeguard the neighbouring residential amenity in the area.
6. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land.
Reason: In order to safeguard the neighbouring residential amenity in the area.
7. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at anytime on Sundays or bank holidays.
Reason: In order to safeguard the neighbouring residential amenity in the area.
8. The Noise mitigation measure in the form of a 3 metre high acoustic barrier as
outlined in Section 4.2 and Figure 3 of the Noise Impact Assessment report
reference J004918-7825-CW-02, undertaken by Philip Dunbavin Acoustic Ltd,
dated January 2025, shall be implemented prior to the battery storage facility
being brought into use.
Reason: In order to safeguard the neighbouring residential amenity in the area.
Archaeology
9. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of archaeological works is fully

Page 20

implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required by
the WSI, identify a requirement for post-excavation analysis, the development as
approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT.  The PERD shall be
carried out in complete accordance with the approved details.  Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress.
Reason: In the interest of protecting archaeological interest within the site.
Biodiversity and Natural Environment
10. The conclusions and recommended action points within the supporting
Biodiversity Survey submitted and hereby approved (document 22 relates) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development, to the satisfaction of the Council as Planning Authority.
Reason: In the interests of protecting environmental quality and of biodiversity.
11. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council.
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981).
12. Development shall not commence until a detailed Construction Method
Statement (CMS) has been submitted to the Council as Planning Authority and
agreed in writing in consultation with NatureScot and Scottish Environment
Protection Agency (SEPA).  The CMS must identify measures to prevent harmful
materials entering the River Tay SAC, which could reduce water quality and lead
to a damaging impact on the salmon, otter and lamprey interests.  The CMS
should include the following:
a) pollution prevention safeguards including drainage arrangements and the
possible use of siltation traps, settlement tanks and bunds
b) storage and disposal of materials including the siting of stock piles, use of
buffer strips and disposal methods
c) construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound
d) timing, duration and phasing of construction particularly in relation to salmon
and lamprey migration/spawning.

Page 21

The CMS and mitigations as agreed shall be fully implemented as part of the
planning permission.
Reason: In the interest of protecting the environment and sustainability.
13. Prior to the commencement of development, a detailed landscaping and planting
scheme shall be submitted to the Planning Authority for written approval.  The
plan shall include native planting around the site perimeter including a 10metre
wide continuous border of native scrub and tree planting.  Thereafter, the agreed
scheme shall be implemented as part of the site development programme and in
the first available planting season, and thereafter maintained for the life of the
development.
Reason: In the interest of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme.
14. Prior to the completion or bringing into use of the development hereby approved,
10 bat boxes, 10 bird boxes, 10 hibernacula and 10 bee/insect hotels shall be
provided within the red line boundary.  Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the development.
Reason: To increase the number of bat and bird boxes to ensure significant
biodiversity enhancement.
15. Any planting failing to become established within five years shall be replaced in
the following planting season with others of similar size, species and number to
the satisfaction of the Council as Planning Authority.
Reason: In the interest of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme.
16. Prior to works commencing on site, a revised soil re-use and management plan
shall be submitted to and approved in writing by the Council as Planning
Authority.  This Plan will include details of the storage of all soils and their
appropriate re-use.  Thereafter, the agreed plan shall be implemented in full.
Reason: To protect soils from damage such as erosion or compaction, in
accordance with LDP2 Policy 51: Soils and NPF4 Policy 5.
Facility Lifespan
17. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, then it shall be deemed
to have permanently ceased to be required. In such an event, the development,
including the access track, shall be decommissioned and the relevant parts of the
site reinstated within such a timescale as agreed in writing by the Council as
Planning Authority.

Page 22

Reason: To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests.
New Access Road
18. Prior to the commencement of development, a scheme shall be submitted to the
Planning Authority for written approval, showing the precise location and
specification of the new access track. This scheme shall demonstrate how the
existing trees and hedgerows shall be protected, and if any loss of these trees or
hedgerows is required, a compensatory scheme for replacement planting shall
be included. Thereafter, the agreed scheme shall be implemented in full
accordance.
Reason: To ensure that the access track does not detract from the visual
qualities and the landscape character of the area.
Justification
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.
Procedural Notes
None applicable.
Informatives
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.
3. An application for a Building Warrant may be required.
4. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period (see
Section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended).

Page 23

5. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built.  Planning consent for a development
does not provide a defence against prosecution under this act.
6. The applicant is reminded that, should any protected species be present a
license may be required from NatureScot to disturb a protected species.  Failure
to obtain a license may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance.
7. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance.  According to
Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material.
8. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk.  The Council has
two months to consider the information. You should therefore submit the required
information more than two months before your permission expires. We cannot
guarantee that submissions made within two months of the expiry date of your
permission will be able to be dealt with before your permission lapses.
9. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required.
10. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on
the disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environment Protection Agency.

Page 24

11. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain from the Council, to place,
maintain or adjust apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available https://www.pkc.gov.uk/article/14916/Road-
and-footway-permits
12. National Gas Transmission should be consulted during the design phase and that
an Earthing Report is submitted for review, and to ensure that the pipeline is not
affected.
13. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(Section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act.
14. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development.
15. Details of all changes in ground levels, laying of foundations, and operation of
mechanical plant in proximity to the rail line must be submitted to Network Rail’s
Asset Protection Engineer for approval prior to works commencing on site. 
Where any works cannot be carried out in a “fail-safe” manner, it will be
necessary to restrict those works to periods when the railway is closed to
railtraffic i.e. by a “possession” which must be booked via Network Rail’s Asset
Protection Engineer and are subject to a minimum prior notice period for booking
of 20 weeks.
16. All construction works must be undertaken in a safe manner which does not
disturb the operation of the neighbouring railway.  Applicants must be aware of
any embankments and supporting structures which are in close proximity to their
development
17. The developer must contact Network Rail’s Asset Protection Engineers regarding
the above matters, either by submitting an enquiry on the Network Rail
website .
18. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development.
19. Information regarding Construction Method Statements, as required by condition
12, can be found at:  https://www.pkc.gov.uk/media/46816/River-Tay-SAC-

Page 25

Guidance-
Adopted2020/pdf/River_Tay_SAC_2020_Adopted.pdf?m=637426890920130000
Background Papers
Letters of representation 3
Authors
Name Designation Contact Details
Alan Atkins Planning Officer (Major
Team)
01738 475300
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications and
Enforcement)
28 April 2025