DRAFT
PLANNING AND PLACEMAKING COMMITTEE
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 16 April 2025 at 9.30am.
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, K Harvey, I James,
D Illingworth, Bailie C McLaren, R Watters and Bailie M Williamson.
In Attendance: L MacLean, L Reid, K Smith, and P Williamson (all Economy,
Development and Planning); A Brown, C Elliott, M Pasternak and R Ramsay (all
Legal and Governance).
Apologies: Councillor D Cuthbert.
Councillor I Massie, Convener, Presiding.
1. Welcome and Apologies
The Convener welcomed everyone present to the meeting and noted
apologies as above. 
2. Declarations of Interest
The were no Declarations of Interest made in terms of the Councillors Code of
Conduct.
3. Minutes
The minute of meeting of the Planning and Placemaking Committee of
12 March 2025 was submitted and approved as a correct record.
4. Deputations
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications:
Planning Application No. Item No.
24/01128/FLL 5(2)(i)
24/01539/FLL 5(2)(ii)
24/01642/FLL 5(2)(iii)
5. Applications For Determination
(1) Major Application
(i) 24/01894/FLM - S42 Application to vary conditions 1 (in
accordance with plans), 10 (water) and 12 (archaeology) of
permission 22/00746/FLM, land 60 metres north of
Abernethy Cemetery, Newburgh Road, Abernethy (Report
No. 25/79)

Page 2

DRAFT
Resolved:
Grant, subject to the following terms, conditions (including
amended Condition 1) and informatives:
Conditions
General
1. The development hereby approved must be carried out in
accordance with the drawing and documents set out in
this decision notice, unless otherwise provided for by
other conditions imposed by this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
Noise
2. All hereby approved plant or equipment shall be so
enclosed, attenuated and/or maintained such that any
noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20
between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and
plotted on a rating curve chart.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
3. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
Condition 2.  The assessment will be carried out to an
appropriate methodology agreed in writing with the
Planning Authority.  If the noise assessment shows that
the noise levels do not comply with Condition 2 a scheme
of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation
of the scheme and shall be submitted to the Planning
Authority within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Lighting
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of residential property and that light spillage beyond the
boundaries of the site is minimised. In association, the
operation of the lighting shall be controlled so as to only
be triggered by motion within the security fenced
boundaries of the site.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.

Page 3

DRAFT
Roads and Transportation.
5. Prior to the commencement of works associated to the
hereby approved development, a Construction Traffic
Management Scheme (TMS) shall be submitted for the
written approval of the Planning Authority, such TMS
shall include details of the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to
the commencement of construction;
(n) monitoring, reporting and implementation
arrangements;
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.
The TMS, as approved, shall be strictly adhered to during
the entire site construction programme all to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of road safety.

Page 4

DRAFT
6. Prior to the commencement of works associated to the
hereby approved development, the details of any
abnormal load movements required, including any
accommodation measures necessary, shall be submitted
to and agreed in writing by the Planning Authority, in
consultation with Transport Scotland and the Councils
Transport Planning team.  Any request for approval shall
be submitted at least two months prior to the proposed
load movement.
Reason - To ensure that the transportation of abnormal
loads will not have any detrimental effect on the local or
trunk road network.
7. Prior to the commencement of works associated to the
hereby approved development, any additional signing or
temporary traffic control measures deemed necessary
due to the size or length of loads being delivered to the
development hereby approved must be undertaken by a
recognised Quality Assured Traffic Management
Consultant.  The details of any temporary traffic control
measures shall be submitted to and agreed in writing by
the Planning Authority, in consultation with Transport
Scotland and the Councils Transport Planning team.  Any
request for such approval shall be submitted at least two
months prior to the proposed temporary control measures
being implemented.
Reason - To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk
road network.
External Finishing Colour
8. Prior to the commencement of works associated to the
hereby approved development, details of the recessive
colour of the proposed external finishing materials to be
used for the hereby approved development components
(i.e., battery storage containers, transformers, DNO
Switchgear, perimeter fencing etc.) shall be submitted to
and agreed in writing by the Council as Planning
Authority.  The scheme as agreed shall be implemented
prior to the completion or bringing into use of the
development, whichever is the earlier.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Biodiversity
9. Prior to the commencement of works associated to the
hereby approved development, a detailed landscaping
and planting scheme for the site shall be submitted to and
approved in writing by the Planning Authority.  The
scheme shall include details of the height and slopes of
any mounding or recontouring of the site, full details of all
hard landscaping proposals including materials and
installation methods and, species, height, size and
density of trees and shrubs to be planted.  The scheme

Page 5

DRAFT
as subsequently approved shall be carried out and
completed within the first available planting season
(October to March) after the completion or bringing into
use of the development, whichever is the earlier, and the
date of Practical Completion of the landscaping scheme
shall be supplied in writing to the Council as Planning
Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained
to the satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
Soil Management
10. All soils excavated in the course of the development
hereby approved shall be retained onsite and repurposed
unless otherwise approved in writing by the Council as
Planning Authority. Prior to the development hereby
approved commencing, a Soil Management Statement
shall be submitted to the Planning Authority for approval
in writing.  This Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be
reused and or managed onsite.  All excavation and
repurposing of soil shall then proceed in accordance with
the agreed statement.
Reason - In the interests of appropriately managing prime
quality soils and minimising the long-term impacts of
developing the site in accordance with Policy 51 of the
LDP2.
Facility Lifespan
11. In the event the hereby approved development fails to
store electricity on a commercial basis for a continuous
period of 12 months, and or at the end of life for the
development (50 years from the commencement of
electricity storage) it shall be deemed to have
permanently ceased to be required. In either event the
development shall be decommissioned, and the relevant
parts of the site reinstated within such timescale as
agreed in writing by the Council as Planning Authority.
Reason - To ensure the facility is removed from the site
at the end of its operational life, and to protect the
character of the countryside, the visual amenity of the
area and nature conservation interests.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the

Page 6

DRAFT
development has been started within that period (see
Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended).
2. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
4. An application for Building Warrant may be required.
5. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
6. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended, it is an offence to
remove, damage or destroy the nest of any wild birds
while that nest is in use or being built.  Planning consent
for a development does not provide a defence against
prosecution under this act.
7. The applicant is reminded that, should any protected
species be present a license may be required from
Scottish Natural Heritage to disturb a protected species. 
Failure to obtain a license may constitute a criminal act
under the Habitats Regulations and penalties are severe
for non-compliance.
8. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. According to
Regulation 41 the notice must be:
 Displayed in a prominent place at or in the vicinity of
the site of the development.
 Readily visible to the public.
 Printed on durable material.
9. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original

Page 7

DRAFT
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request. The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
10. The developer is advised to contact Perth & Kinross
Heritage Trust should any unrecorded archaeology be
found during construction works.
11. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply
or septic drainage infrastructure in the development area
are honoured throughout and after completion of the
development.
12. The applicant shall ensure the private water supply for
the development complies with the Water Scotland Act
1980 (Section 63), The Private Water Supplies (Scotland)
Regulations 2006 and The Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations
2017.  Detailed information regarding the private water
supply, including the nature, location and adequacy of the
source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall
be submitted to Perth and Kinross Council Environmental
Health in line with the above Act and Regulations.
13. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
(2) Local Applications
(i) 24/01128/FLL - Change of use from workshop (Class 6) to
gym/fitness studio (Class 11), The Workshop, Montrose
Road, Auchterarder, PH3 1BZ (Report No. 25/80)
Ms A Connelly, objector, addressed the committee via
telephone, and answered Members questions.

Page 8

DRAFT
Resolved:
Grant, subject to the following terms, conditions (including
amended Conditions 3 and 10) and informatives:
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The hours of operation shall be restricted to between
06:30 to 21:00hrs Monday to Friday; 08:00 to 18:00hrs
on Saturday, and 09:00 to 18:00hrs Sunday.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with
all windows slightly open, when measured and/ or
calculated and plotted on a rating curve.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
5. The mitigation measures within Section 5 of the approved
Noise Impact Assessment shall be implemented to the
appropriate level that is recommended, to ensure that the
minimum sound insulation requirements for Building
Regulations are achieved specifically (Sections 5.8 to
5.33) and (Section 5.51 to 5.53).  These measures shall
be implemented prior to the commencement of use, and
maintained to the appropriate standard in perpetuity.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
6. No music amplified, background or otherwise is allowed
within the premises unless all the relevant and
appropriate mitigation measures within in Section 5
specifically (5.34 to 5.50) and (5.51 to 5.53) of the Noise
Impact Assessment (NIA), ‘The Workshop’, Montrose
Road, Auchterarder, Technical Report R-10169-DR-CL
dated 27 January 2025 undertaken by RMP, are
implemented, once implemented a further sound
propagation test must be carried out by a suitably

Page 9

DRAFT
qualified noise consultant, to establish agreed sound
limiter level for amplified music, as recommended in
Sections 5.5 to 5.7 of the NIA.  The scope and timescale
submitted to and agreed in writing with the Council as
Planning Authority in consultation with Environmental
Health.  Thereafter any agreed mitigation measures shall
be implemented to ameliorate the nuisance.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
7. Prior to the commencement of use a Noise Management
Plan, shall be submitted to and agreed in writing by the
Council as Planning Authority and Environmental Health.
The plan shall include operational procedures and
mitigation measures to control noise from amplified
music, equipment / weights, and patrons.  This should
include Noise Management policy for patrons using gym
and a complaints procedure.  The details as approved
shall then be implemented in full as part of the operation
of the site.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
8. All windows and doors shall remain closed during the
operational hours of the gym/fitness studio.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
9. No gym activities are to be carried out at any time within
the mezzanine area of the building.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
10. Prior to the use or occupation of the development hereby
approved, all ground floor windows on the south-east
elevation, and all upper floor windows of the building
which overlook adjacent residential property shall be
installed with translucent film and this will remain in place
in perpetuity.
Reason - In order to minimise any overlooking onto
neighbouring properties. 
11. Prior to commencement of any development on site, a
detailed design for the proposed secure covered cycle
parking facility for a minimum of 10 cycles shall be
submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority.  The
cycle parking, as approved in writing, shall be
implemented in accordance with the approved details to
the satisfaction of the Council as Planning Authority prior
to the development being brought into use.
Reason - In order to encourage active travel
12. No part of the development shall be occupied until a
Green Travel Plan (GTP), aimed to encourage more
sustainable means of travel, has been submitted and
approved in writing by the Council.  The GTP will have

Page 10

DRAFT
particular regard to provision for walking, cycling and
public transport access to and from the site and will
identify the measures to be provided, the system of
management, monitoring, review, reporting and the
duration of the plan.
Reason- To promote sustainable transport options
13. The number of patrons (excluding staff) within the
building shall be limited to 15 at any one time.
Reason - In the interest of manging traffic vehicular
volumes on Montrose Road.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. The presence of protected species, and the extent to
which they could be affected by the proposed
development, should be established before works
commence.  Should protected species be identified within
the site the developer should ensure that all appropriate
measures required to comply with the relevant legislation
are carried out.
4. Guidance on the detailed design and positioning of the
cycle storage can be sought from Transport Scotland's
Cycling by Design 2021.
5. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
(The committee took a short recess before re-convening)

Page 11

DRAFT
(ii) 24/01539/FLL - Siting of container unit for use as hot food
takeaway, formation of decking and outdoor seating area,
The Craft Diner, Atholl Street, Dunkeld (Report No. 25/81)
Ms C Claydon, objector; Mr M Stead, supporter; and
Mr O Cevik, applicant, addressed the committee, and answered
Members questions.
Resolved:
Grant, subject to the following terms, conditions (including
amended Condition 12) and informatives (including additional
Informative 5):
Conditions
1. Planning permission is hereby granted for a temporary
period until 30 April 2030.  Prior to this date, all
development shall be removed from the site, and the use
shall cease.  If the use of the site ceases prior to this date
for a continuous period of 6 months, then all development
shall be removed from site within a period of 2 months
from the date of a formal notification by the Council as
Planning Authority, and the site reinstated back to its
natural state.
Reason - This is a temporary planning permission.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, precise details of the proposed decking area,
base of the container and other ancillary storage
containers shall be submitted to and approved in writing
by the Council as Planning Authority.  The details must
ensure that a) pressure on the roots is not excessive and
b) suitable drainage to the ground beneath can take
place.  The approved details shall thereafter be
implemented in full.
Reason - In order to safeguard surrounding trees.
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with
all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
Reason - In order to protect existing residential amenity.
5. Prior to the development hereby approved being
completed or brought into use, an effective ventilation
system commensurate with the nature and scale of

Page 12

DRAFT
cooking to be undertaken shall be installed and operated
such that cooking odours are not exhausted into or
escape into any neighbouring buildings.  Thereafter the
system shall be maintained as per the manufacturers
specifications.
Reason - In order to protect existing residential amenity.
6. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.  All lighting (internal and external) must be
biodiversity friendly.
Reason - In order to protect existing residential amenity.
7. Prior to the commencement of the development hereby
approved, precise details of the external finish of the
container shall be submitted to and approved in writing
by the Council as Planning Authority.  Thereafter the
container shall be finished in the approved colour, and
the external finish thereafter maintained yearly.
Reason - In order to protect the visual amenity of the
area.
8. No trees shall be removed under the terms of this
planning permission. Prior to the delivery of the
container, all trees on site and those which have Root
Protection Areas which fall within the site shall be
retained and protected. Protection methods shall take
into account the requirements of BS 5837 2012: Trees in
Relation to Design, Demolition and Construction, and
details of the protection measures shall be submitted to
and approved in writing by the Council as Planning
Authority prior to the commencement of the development
hereby approved.  The measures shall thereafter be in
place for the duration of installation phase.
Reason - In order to protect existing trees from
unnecessary damage during the delivery of the container.
9. Prior to the commencement of the development hereby
approved, detailed drawings showing all waste and
recycling facility enclosures or waste and recycling facility
storage areas and associated locations for bin
presentation shall be submitted to and approved in
writing by the Council as Planning Authority.  The details
must include details of the collection provider.  The
approved details shall thereafter be implemented in full
after commencement.
Reason - In order to clarify the terms of this planning
permission.
10. The onsite refuse storage area for these premises shall
be operated and maintained such that detriment is not
caused to the amenity of the area or any neighbouring
premises.

Page 13

DRAFT
Reason - In the interest of proper site management.
11. The two asserted core paths close to the site (DUNK/25
and 70) must not be obstructed during installation or on
completion of the development.  Any damage done to the
route and/or the associated signage during building
works must be made good before the development is
completed or brought into use, whichever is the earlier.
Reason - In order to protect public access rights.
12. Prior to the commencement of the development hereby
approved, an Operational Management Plan shall be
submitted to and approved in writing by the Council as
Planning Authority. The Plan must include opening hours,
details of means of deliveries and timing, a waste
management plan, a procedure for dealing with onsite
anti-social behaviour, a complaints procedure, and a
review procedure. The approved plan shall be
implemented in full at all times.
Reason - In order to protect residential amenity
13. Prior to the installation of the container and associated
development approved by this planning permission, the
existing container and its associated development shall
be removed and the area of that former development
reinstated back to its former condition.
Reason - In the interest of protecting visual amenity, and
to protect the character and appearance of the
Conservation Area,
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
3. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.

Page 14

DRAFT
Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
4. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013, as amended. 
The form of the notice is set out in Schedule 7 of the
Regulations and a draft notice is included for your
guidance. In accordance with Regulation 41 the notice
must be:
 Displayed in a prominent place at or in the vicinity of
the site of the development
 Readily visible to the public
 Printed on durable material.
5. The applicant is advised that this type of proposal
requires a Street Trader's Licence under the terms of
Section 39 of the Civic Government (Scotland) Act 1982
and therefore a licence application should be made to
Licensing.  Application forms are available at
https://www.pkc.gov.uk/article/15623/Street-trading-
licence.
(iii) 24/01642/FLL - Change of use, alterations and extension to
steading to form dwellinghouse and associated works, land
35 metres south west of Gourdiehill Farmhouse, Bankfoot,
Perth, PH1 4DL (Report No. 25/82)
Mrs S Walker, objector; Mr S Green, objector; and Mr J Alberdi,
agent on behalf of the applicant, accompanied by Mr A Hodge,
applicant, addressed the committee, and answered members
questions.
Resolved:
Grant, subject to the following terms, conditions and
informatives:
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)

Page 15

DRAFT
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
3. No development or extensions, whether or not permitted
by virtue of Schedule 1, Part 1, Class 1A, 1B, 1D, 3A,
3AA, 3D and 3E; of the Town and Country Planning
(General Permitted Development)(Scotland) Order, 1992
or any Order revoking and re-enacting that Order, shall
be erected within the curtilage of the dwellinghouse
hereby approved.
Reason - In the interests of visual amenity and to ensure
the Planning Authority retains control over future
development on the site given its relatively exposed
nature.
4. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 23 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
5. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the further written
agreement of the Council as Planning Authority.  The
scheme shall include details of the height and slopes of
any mounding or recontouring of the site, species, height,
size and density of trees and shrubs to be planted plus
numbers, locations and specifications of bird boxes, bat
boxes and insect boxes.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
6. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after
such written agreement has been issued by the Council.
Reason - In the interests of protecting environmental
quality and of biodiversity.

Page 16

DRAFT
7. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, four bird
nesting boxes suitable for swallows shall be provided on
the completed building.  Thereafter, the agreed scheme
shall be maintained in a reasonable condition for the life
of the development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
8. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify;
I. the nature, extent and type(s) of contamination on
the site
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed
III. measures to deal with contamination during
construction works
IV. condition of the site on completion of
decontamination measures.
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the
scheme subsequently agreed by the Council as Planning
Authority.  Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason - In order to deal with any potential
contamination of the site as a result of its former use.
9. Prior to the development hereby approved being
completed or brought into use, the vehicular access shall
be formed in accordance with Perth and Kinross
Council's Road Development Guide Type C, Figure 5.7
access detail, of Type B Road Construction Detail.  The
Type B Road Construction Detail shall continue into the
entrance of the development for a minimum distance of 6
metres from the edge of the public road network.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
10. The core path (AGVN/120) which forms part of the
access track to the site must not be obstructed during
building works or on completion.  Any damage done to
the core path and associated signage during building

Page 17

DRAFT
works shall be made good before occupation of the
dwellinghouse.
Reason - In the interests of public access along the core
path.
11. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  The
subsequently agreed protective or replacement
measures shall be put in place prior to the
commencement of the development being brought into
use and shall thereafter be so maintained insofar as it
relates to the development hereby approved.
Reason - To ensure the new development has an
adequate and consistently wholesome supply of water
and to maintain water quality and supply in the interests
of residential amenity and ensure the private water
supply or septic drainage systems of neighbours of the
development remain accessible for future maintenance.
12. Development shall not commence until the developer has
secured an archaeological standing building survey, to be
carried out by an independent and suitably qualified
archaeological organisation.  The scope of the
archaeological standing building survey will be set by the
Council as Planning Authority, in consultation with Perth
and Kinross Heritage Trust.  The name of archaeological
organisation retained by the developer shall be given to
the Council as Planning Authority and PKHT in writing
not less than fourteen days before the commencement
date provided in the Notice of Initiation of Development. 
Copies of the resulting survey shall be deposited in the
National Record of the Historic Environment and in the
Perth and Kinross Historic Environment Record upon
completion of the survey.
Reason - To ensure an appropriate archaeological
standing building survey is carried out and the resulting
survey is recorded properly.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.

Page 18

DRAFT
Procedural Notes
The planning permission decision notice shall not be issued until
such time as the required Developer Contributions have been
secured or paid in full. 
In the event the applicant does not either make the required
payment within 28 days from the date the agent/applicant is
advised of the need for the contributions, or complete a legal
agreement for delayed payment within a 4 month period from
the date the agent/applicant is advised of the need for the
contributions the application may be refused under delegated
powers without any further discussion with the applicant.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.   A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  
The Council has two months to consider the information.
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
5. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an

Page 19

DRAFT
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
6. A private wastewater treatment plant and septic tank
should be provided with an access for desludging.  The
desludging tanker should be provided with access to a
working area that:
- will provide a clear route for the suction hose from the
tanker to the tank, and
- is not more than 25m from the tank where it is not
more than 4m higher than the invert level of the tank,
and
- is sufficient to support a vehicle axle load of 14
tonnes.
7. The applicant shall ensure the private water supply for
the dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted
to Perth and Kinross Council Environmental Health in line
with the above Act and Regulations.
8. The developer is advised to contact Sophie Nicol,
Historic Environment Manager (tel 01738 477027) Perth
and Kinross Heritage Trust, to discuss terms of reference
for work required.
9. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings.
Further information can be found at:
https://www.pkc.gov.uk/binrequests
(iv) 24/01736/IPL - Residential Development (in principle), land
50 metres north of Fearnach, Kirkmichael (Report No. 25/83)
Resolved:
Grant, subject to the following terms, conditions and
informatives:

Page 20

DRAFT
Conditions
1. This planning permission in principle will last only for five
years from the date of this decision notice, unless the
development has been started within that period.
Reason - This is a Planning Permission in Principle in
terms of Section 59 of the Town and Country Planning
(Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019)
2. The development shall not commence until the following
specified matters have been the subject of a formal
planning application for the approval of the Council as
Planning Authority: the siting, design and external
appearance of the development, the hard and soft
landscaping of the site, all means of enclosure, means of
access to the site, vehicle parking and turning facilities,
levels, foul and surface water drainage, and details of the
proposed waste and recycling provision.
Reason - This is a Planning Permission in Principle in
terms of Section 59 of the Town and Country Planning
(Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
3. Further to Condition 2 of this decision notice, a detailed
ecology survey covering the site shall be undertaken and
the resultant report then submitted as part of the specified
matters requiring to be the subject of a further formal
planning application for the approval of the Council as
Planning Authority.  The report shall include appropriate
mitigations to protect any identified species, and
measures to provide bio-diversity enhancements.
Reason - In order to ensure that all ecology matters are
fully considered and addressed at the appropriate stage.
4. Notwithstanding the terms of Condition 2 of this decision
notice, details of a new bus boarder adjacent to the site
shall be included as part of the development and precise
details submitted as part of the specified matters
requiring to be the subject of a further formal planning
application for the approval of the Council as Planning
Authority.
Reason - In order to clarify the terms of this planning
permission, and to ensure road and pedestrian safety is
protected.
5. No trees or hedging on or adjacent to the site shall be
felled without the prior written approval of the Council as
Planning Authority.  A tree survey (including root
protection areas) shall be submitted as part of the
specified matters requiring to be the subject of a further
formal planning application for the approval of the Council
as Planning Authority.  The tree survey must be carried
out by a qualified and independent arborist indicating the
type, age, condition, location and accurate canopy spread
of all the trees on and affected by the site and including a

Page 21

DRAFT
tree management report with details of the tree protection
measures to be employed during construction in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.
Reason - In order to clarify the terms of this planning
permission, and protect the existing trees from
unnecessary damage/removals.
6. The development shall be in accordance with the
requirements of Perth & Kinross Council’s Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 5: Infrastructure
Contributions of the Perth & Kinross Local Development
Plan 2 (2019) with particular regard to primary education
infrastructure, or such subsequent Guidance and Policy
which may replace these.
Reason - To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council’s policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2023.
7. The development shall be in accordance with the
requirements of Perth & Kinross Council’s Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 20: Affordable Housing
of the Perth & Kinross Local Development Plan 2 (2019),
or such subsequent Guidance and Policy which may
replace these.
Reason - To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council’s policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2020.
8. Notwithstanding the terms of Condition 2 of this decision
notice, any second level of accommodation must be
included within the roofspace.
Reason - In order to clarify the terms of this planning
permission, and to ensure the development protects the
visual amenity of the surrounding area.
9. Notwithstanding the terms of Condition 2 of this decision
notice, a Design Statement shall be submitted as part of
the details submitted as part of the specified matters
requiring to be the subject of a further formal planning
application for the approval of the Council as Planning
Authority.
Reason - In order to clarify the terms of this planning
permission, and to ensure the visual amenity and
character of the area is protected.
10. Notwithstanding the terms of Condition 2 of this decision
notice, a statement which demonstrates that at least 10%
of the current carbon emissions reduction set by Scottish
Building Standards will be met through the installation

Page 22

DRAFT
and operation of low and zero-carbon generating
technologies shall be submitted as part of the specified
matters requiring to be the subject of a further formal
planning application for the approval of the Council as
Planning Authority.
Reason - In order to comply with Policy 32 of the adopted
Perth and Kinross Local Development Plan 2 (2019).
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. The applicant (or any other person(s) taking this
permission on should be fully aware that this Planning
Permission in Principle may be invalidated by the felling
of trees which are required to be retained, if carried out
prior to gaining approval of all matters specified in
conditions.
2. A review of the proposed development site did not raise
any real concerns, although historical mapping indicates
that the proposed development is within the immediate
vicinity of a former underground tank(s) which may have
resulted in contamination in the vicinity of the site. Should
any contamination be found during the approved works,
all construction activities should cease, and the Land
Quality team should be contacted on
contaminatedland@pkc.gov.uk  for further advice.
3. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests
6. Proposal of Application Notices (PoAN)
(i) 25/00001/PAN - Residential Development (allocated site H341),
land 90 metres east of Westfields of Rattray, Balmoral Road,
Rattray, Blairgowrie, PH10 7HY (Report No. 25/84)
Bailie C McLaren requested due consideration be given to community
availability of building space for community use for groups to meet in
as part of ‘Building Our Stronger Communities’.
Councillor B Brawn requested due consideration be given to the
junction at Balmoral Road, the access of pedestrians into Rattray itself,
and the amount of parking spaces within the development.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.

Page 23

DRAFT
(ii) 25/00002/PAN - Change of use of holiday cottages to allow holiday
use or residential use as staff accommodation for employees of
Taymouth Castle Estate, Moness House Hotel and Country Club,
Aberfeldy, PH15 2DY (Report No. 25/85)
Bailie M Williamson requested due consideration be given to developer
contributions and possible access to the site from the rear entrance
which is currently closed off.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.
(iii) 25/00003/PAN - Erection of poultry facility, managers
accommodation, staff welfare facility, office, storage buildings,
security fencing, formation of vehicular access, SUDS,
landscaping and associated works, land at Newbigging Farm,
Kinclaven (Report No. 25/86)
Bailie M Williamson requested due consideration be given to the
environmental impact of the storage and disposal of poultry manure
and comments from SEPA.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.
(iv) 25/00004/PAN - Installation of a 49.9MW solar farm comprising
ground mounted solar arrays, inverters, substation, ancillary
buildings, fencing, CCTV cameras, vehicular access tracks and
associated works, West Pitnacree, Alyth, Blairgowrie, PH11 8JF
(Report No. 25/87)
Councillor I James requested due consideration be given to the size of
the site and whether this is good use of the land.
Bailie M Williamson requested due consideration be given to
community benefit and whether there will be a community benefit fund
associated with the development.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.