Democracy Spraffa

24/01485/Amm

Perth and Kinross Council · 12 March 2025
Back to Planning and Placemaking Committee — 12 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 12 March 2025
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 25/52)
PROPOSAL: Erection of 41 dwellinghouse, landscaping and associated works
(change of house type plots 15-28 and 73-99 of 19/01130/AMM)
(allocated site H30)
LOCATION: Land at Stanley Village (H30), Stanley, Perth
Ref. No: 24/01485/AMM
Ward No: P5- Strathtay
Summary
This report recommends approval of the Approval of Matters Specified by Condition
(AMSC) application for the erection of 41 dwellinghouse, landscaping and associated
works (change of house type plots 15-28 and 73-99 of 19/01130/AMM)
on Land At Stanley Village (H30), Stanley. 
Overall the proposal remains consistent with the Development Plan and approved
masterplan and is recommended for approval, subject to conditions.
Background and Description of Proposal
1 The application site relates to land to the west of Perth Road, Stanley. The
applicant is proposing a remix of the housing on Phase 2 due to changing
economic conditions and market demand. As such the application seeks an
AMSC for the erection of 41 dwellinghouse, landscaping and associated works
(change of house type plots 15-28 and 73-99 of 19/01130/AMM). The proposal
results in a reduction of one plot (plot 100).
2 The site is allocated in the Perth and Kinross Local Development Plan (2019)
(LDP2) as H30. This allocations forms part of a wider masterplan and allocation
for residential development across Stanley comprising of five site allocations
(H30-H34). Cumulatively, the LDP2 allocations total an area of 25.7 hectares
(ha), with the indicative range of 248-387 residential units -of which only 280
units can be built by 2024.

Page 2

3 Planning Permission in Principle (PPP) was granted as one application across
the entire H30-H24 allocation in August 2018 (Ref: 17/00088/IPM), which was
subject to a Section 75 legal agreement and planning conditions, including an
Approval of Matters Specified in Condition (AMSC) requiring detailed layout and
design detail for all sites by August 2023. A masterplan and indicative layout plan
were submitted with the PPP application indicating 465 units in total for all sites,
with 125 dwellings on H30; however, these were not approved. Condition 7 of the
PPP does limit the permission to 431 residential units across the H30-H34
allocations.
4 The site (H30) extends to approximately 14.6ha and benefits from planning
permission for 183 dwellinghouses and 4 flats. This site is the southern-most site
in the proposed Stanley masterplan, located to the southwest of the village and is
bound by residential properties to the north, A93 to the east, agricultural land to
the south and a core path and railway line to the west. The topography is mixed;
with a hill and high point to the south, with a series of undulations towards the
northern boundary.
Environmental Impact Assessment
5 An EIA Report was not required to be submitted with the proposal as the scale of
amended development falls below the thresholds. The wider 183 dwellinghouses
and 4 flats, however, was screened and not considered to require EIA
(16/01867/SCRN).
Pre-Application Consultation
6 As an AMSC application, there is no formal further pre-application consultation
with the local community required.
Development Plan
7 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance.
National Planning Framework 4
8 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve peoples lives by making sustainable, liveable
and productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
9 The Council’s assessment of this application has considered the following
policies of NPF4:
  Policy 1: Tackling the Climate and Nature Crises

Page 3

 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 6: Forestry, Woodland and Trees
 Policy 13: Sustainable Transport
 Policy 14: Design, Quality and Place
 Policy 15: Local Living and 20 Minute Neighbourhoods
 Policy 16: Quality Homes
 Policy 18: Infrastructure First
 Policy 19: Heating and Cooling
 Policy 20: Blue and Green Infrastructure
 Policy 22: Flood Risk and Water Management
Perth and Kinross Local Development Plan 2019
10 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
11 The principal relevant policies are, in summary;
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 5: Infrastructure Contributions
 Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
 Policy 15: Public Access
 Policy 17: Residential Areas
 Policy 20: Affordable Housing
 Policy 23: Delivery of Development Sites
 Policy 25: Housing Mix
 Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
 Policy 34A: Sustainable Heating & Cooling: Heat Networks, Major
Development and LDP Site Allocations
 Policy 38A: Environment and Conservation: International Nature
Conservation Sites
 Policy 38B: Environment and Conservation: National Designations
 Policy 38C: Environment and Conservation: Local Designations
 Policy 39: Landscape
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 42: Green Infrastructure
 Policy 47: River Tay Catchment Area

Page 4

 Policy 50: Prime Agricultural Land
 Policy 52: New Development and Flooding
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 56: Noise Pollution
 Policy 57: Air Quality
 Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
Statutory Supplementary Guidance
12
 Supplementary Guidance - Air Quality (adopted in 2020)
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
 Supplementary Guidance - Placemaking (adopted in 2020)
PKC Non Statutory Guidance
13
 Planning Guidance - Delivery of Development Sites
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity
National Guidance
14 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4.
Planning Advice Notes
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:
 PAN 2/2010 Affordable Housing and Housing Land Audits
 PAN 1/2011 Planning and Noise
 PAN 40 Development Management
 PAN 51 Planning, Environmental Protection and Regulation

Page 5

 PAN 60 Planning for Natural Heritage
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 63 Waste Management Planning
 PAN 65 Planning and Open Space
 PAN 67 Housing Quality
 PAN 68 Design Statements
 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport
 PAN 77 Designing Safer Places
 PAN 79 Water and Drainage
 PAN 83 Masterplanning
Creating Places 2013
16 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Designing Streets 2010
17 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places.
National Roads Development Guide 2014
18 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.
Site History
19 15/00010/PAN Proposed masterplan for village expansion 18 June 2015.
20 17/00088/IPM Mixed use development (in principle) Application Approved
24 August 2018.
21 19/01130/AMM Erection of 183 dwellinghouses and 4 flats, formation of a
vehicular access, play park, landscaping and associated works (approval of
matters specified in conditions of 17/00088/IPM) (allocated site H30) Application
Approved 3 June 2020.

Page 6

22 19/01373/FLL Alterations to public road, formation of vehicular access and
associated works Application Approved 2 July 2020.
23 20/00096/FLL Formation of a crossing point and associated works Application
Approved 3 July 2020.
24 22/00545/ADV Advertisement Consent for Display of 10 flagpoles and 4 signs
Approved 17 May 2022.
25 22/00602/FLL Full Planning Permission for siting of a sales cabin and associated
works (for a temporary period) Application Approved 10 June 2022.
26 23/00674/FLL Full Planning Permission for erection of 9 dwellinghouses (change
of house type), alterations to road layout and landscaping works Application
Approved on 3 October 2023.
Consultations
27 As part of the planning application process the following bodies were consulted:
External
28 Scottish Water – no comments.
29 Perth and Kinross Heritage Trust (PKHT)– no objections.
Internal
30 Environmental Health (Contaminated Land) – no objections.
31 Community Waste Advisor - Environment Service – no comments.
32 Affordable Housing Enabler – no objections.
33 Transportation and Development – no objections subject to conditions.
34 Development Contributions Officer – no objections.
35 Development Plan – no objections.
Representations
36 No letters of representation have been received.

Page 7

Additional Statements
37 Screening Opinion EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed:
AA not required
Design Statement or Design and Access
Statement
Not required
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not required
Appraisal
38 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance.
Principle
39 The key determining policy issues for this specific proposal at this location
include: the principle of the development and its contribution towards providing
high quality, affordable and sustainable homes (Policy 20, 24 and 25 of the LDP2
and Policy 16 of the NPF4), liveable places (design, quality and place) (Polices 1,
2, 56-57 of the LDP2 and Policy 14 of the NPF4), impacts on/from flooding and
the water environment (Polices 52 and 53A of the LDP2 and Policy 22 of the
NPF4), residential amenity (Policy 17 of LDP2 and Policy 15 of the NPF4),
biodiversity/ecological impact (Policies 40 and 41 of the LDP2 and Policy 3 of the
NPF4) and transport (Policy 60A of the LDP2 and Policy 13 of the NPF4).
40 The principle of residential development is well established through the allocation
of Site H30 in LDP2, PPP (17/00018/IPM) approved in 2018 and 19/01130/AMM
for 183 dwellinghouses and 4 flats, approved in 2020.
41 The principle of residential development is thus established. It is, however,
necessary to undertake an assessment of the detail of this proposal.

Page 8

Design, Layout and Visual Amenity
42 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are LDP2
Policy 1: Placemaking, Policy 14B: Open Space within New Developments, Policy
17: Residential Areas, Policy 25: Housing Mix and Policy 42: Green Infrastructure
43 The proposed revisions are as follows:
 Plot 100 is to be removed.
 Plot 96 will step out further.
 Bungalows proposed at plots 88/89, 93/94, 21/22, 15, 98/97/96 (10
bungalows replacing 2 storey units).
 Detached garages to be introduced.
 Visitor parking relocated from the north of plot 98 to the north of plot 80.
 No bungalows approved in this phase, however, bungalows approved in
other phases mixed with 2 storey dwellings.
 Fraser HT is a 2 bed bungalow (as approved). This proposal will introduce a
Fraser HT 3 bed bungalow.
44 The new proposals are for 25 private dwellinghouses and 16 affordable
dwellinghouses. The affordable housetypes are to be plots 26-28, 73-84 and 99
(inclusive) and comprise a mixture of 2 and 3 bed units. The private homes
comprise of a mixture of 3 and 4 bed units.
45 The approved and proposed housing mix can be seen below:

Page 9

Proposed Accommodation Schedule
46 In isolation the proposal does not comply with LDP2 Policy 25 – Housing Mix,
however, looking at the breakdown of housing across the phases, a total of 16
units (2 bedrooms) meets the 10% requirement across the private tenure of the
whole site (138 units). As required by Policy 25 of LDP2 this is over and above
the on-site affordable provision which is 25%. The proposal therefore complies
with LDP2 Policy 25.
47 In terms of LDP2 Policy 20: Affordable Housing, as noted above 25% of the total
number of units proposed must be affordable housing. The proposal does not
alter the provision on site. The affordable housing is to be located in the same
vicinity as already approved. The proposal, therefore, complies with LDP2 Policy
20.
48 Informal discussions took place with the applicant prior to the submission of the
application which have been taken on board through this submission, with the
exception of revisions to the housetype for plots 16/17. It was suggested that
these housetypes be amended to bungalows, to replicate plots 97/98 in order to
provide a more balanced approach when entering this phase from the east.
Unfortunately, this revision could not be accommodated due to site restrictions
which include a drop in levels and a temporary electrical cable that runs around
the perimeter of these plots and therefore there is no adequate space to
accommodate bungalows. All said, having reviewed the street elevation submitted
with the application, the proposal does not raise any significant concerns.

Page 10

49 In terms of materials, an acceptable palette of materials is proposed. The
applicant proposes finishes of white render, buff facing brick and base course,
and anthracite roof tiles. This will deliver a reasonably consistent design
approach with the remaining phases and will help integrate the development into
the locale.
50 The massing and scale of the dwellings can be accommodated within the plots
without having an adverse impact on the amenity of each other. As a result of the
site’s location at the edge of a settlement, it is considered that the proposed
density is acceptable and is in line with the approved masterplan.
51 The proposed change of house types raises no adverse concerns. There is no
increase in the overall number of units, to the contrary the proposal will result in a
reduction of one unit. The general layout is broadly similar to that approved.
52 The revised designs remain to be commensurate with the remainder of the
development and will not appear out of place. The external finishing materials are
also consistent and as such will complement the rest of the development.
53 Overall, this phase is in line with the approved masterplan, phasing plan and S75
legal agreement. The proposal will provide a mix of open market housing and
affordable housing within the overall site that complies with the above-named
policies.
Play Area
54 There is no requirement to provide a play area within this phase of the
development. The play area approved under 19/01130/AMM within the central
area between phases 3 and 5 of the development will remain. The delivery of the
playpark condition attached to 19/01130/AMM will be re-applied (condition 7).
55 It is considered that the location of proposed open space and landscape buffers
is acceptable. The proposal, therefore, complies with NPF4 Policy 21: Play
Recreation, and Sport and LDP2 Policy 14 – Open Space Retention and
Provision.
Landscape and Visual Amenity
56 In terms of the impact on visual amenity of the area, a residential development
will inevitably change the visual appearance of the area, however, the application
site has been identified for residential use in the LDP, therefore this degree of
change was envisaged in the site allocation and permission granted under the
PPP and subsequent AMSC (19/01130/AMM). 
57 The landscape plans approved or the site, as per planning approval
19/01130/AMM, sets out how the areas of landscaping will be managed and
incorporated into the site. The proposed change of house types will not have a
significant impact upon the approved landscaping. There will be minor changes

Page 11

to the landscaping as a result of the change of house types, however, this has
been addressed in the submitted landscaping drawings. To ensure satisfactory
implementation of the landscaping and subsequent maintenance, a landscaping
and planting condition will be applied (conditions 6).
58 The proposed development will integrate well within the landscape and wider
development and will not cause any unacceptable visual impacts. As such the
proposal meets the objectives of Policies 4, 6 and 14 of NPF4 and LDP2 Policies
1, 39 and 40B with delivery of the landscaping being secured by condition as
detailed above.
Residential Amenity
Overlooking
59 The Council's guidance generally seeks to ensure there is a minimum distance of
9m from windows to boundaries in order to mitigate overlooking from new
development. Given the location of the development and the layout proposed
there are not considered to be any overlooking concerns from the proposed
dwellings. In this case each dwelling has a minimum of 9m deep rear gardens
and more than the required 18m window to window distance required by
guidance.
Overshadowing, loss of sunlight and daylight
60 The Building Research Establishment (BRE) document ’Site Layout Planning for
Daylight and Sunlight - a guide to good practice 1991’ sets out guidelines on how
to assess the potential impact, although it should be noted that the standards are
not mandatory and should be interpreted flexibly.
61 Taking cognisance of this BRE document, the distances between the new
properties and site levels, it is considered an acceptable level of daylight and
sunlight will be provided to each property. Overall, in terms of residential amenity
the proposal complies with NPF4 - Policy 14: Design, Quality and Place and
LDP2 Policy 1 – Placemaking and the Placemaking Guidance 2020.
62 Conditional control will be applied (condition 21) to limit servicing and/or
deliveries to the LPG compound to protect existing amenity. The condition is
worded in line with the planning approval (19/01130/AMM).
Roads and Access
63 The applicant is proposing to change a number of house types within the
development. The applicant has confirmed in the covering letter that this
application under review does not propose any changes to the formation of the
site access or internal road layout as consented – it is purely proposing changes
to house types and associated plot alterations and related changes to open
space and landscaping.

Page 12

64 The Council’s Transportation and Development Team were consulted as part of
this application and advised that the proposal fails to provide adequate parking
and some spaces were not of the required width, the latter has since been
revised.
65 The applicant has shown that there is sufficient car parking on site for plots 85-98
and 15-25, however, the parking for the affordable housing plots 73-84, 99 and
26-27 sees a shortfall (20 spaces and 6 visitor spaces proposed). Each of the 16
properties require 2 spaces each. Furthermore, whilst the application proposes to
make changes to the visitor parking on site, with the visitor parking relocated
from the north of plot 98 to the north of plot 80, Roads colleagues have advised
that there is insufficient visitor parking provided and 23 spaces is required.
66 Subsequently, a revised layout plan was provided which increases the number of
parking spaces to 30 with no visitor parking proposed in this location of the site.
This number, however, is an increase on what was originally approved through
the AMSC application 19/01130/AMM, which proposed 22 spaces. The 6 visitor
parking spaces proposed for this section of the site remains the same as
previously approved, albeit 2 spaces are proposed to be relocated as noted
above.
67 Whilst it is noted that the proposed parking for the affordable housing does not
meet the requirements as set out in the National Roads Development Guide, the
proposal provides betterment to that already approved and for that reason is
accepted.
68 The roads conditions that were attached to the previous permission
19/01130/AMM will be re-applied (conditions 3, 4 and 5).
69 Overall, the proposal complies NPF4 Policy 13: Sustainable Transport and
LDP2 Policy 60: Transport Standards and Accessibility Requirements.
Drainage and Flooding
70 The proposed change of house types will not impact upon the drainage and
flooding of the area. The drainage condition attached to 19/01130/AMM will be re
-applied (condition 20).
71 The proposal complies with NPF4 Policy 22: Flood Risk and Water
Management and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage.
Waste Collection
72 The Council’s Waste Services team have not objected to the change of house
types. The dwellings will receive the 4-bin system. An informative note is
recommended regarding waste collection and will be attached to the permission
(Informative 6). A suitable location for the provision of a recycling centre has

Page 13

been addressed through planning condition 17 of 19/01130/AMM (drawing
numbers 19/01130/170 and 19/01130/06). The location of the recycling centre is
in the same area as previously approved. It remains, however, that the
facilities/equipment require to be maintained, which can be addressed through a
reworded condition (condition 18).
Conservation Considerations
73 The proposed change of house types on plots 15-28 and 73-99 will have no
impact upon conservation.
Natural Heritage and Biodiversity
74 The proposed change of house types will not impact upon the natural heritage
and biodiversity of the area. The natural heritage and biodiversity conditions
attached to 19/01130/AMM will be re-applied (conditions 9 – 15).
Developer Contributions
75 The Council’s Development Contributions Officer was consulted as part of this
application and confirmed that no further contributions are required as the overall
number of units on the site will not be increasing. An informative (informative 6)
will be added to the consent highlighting that the existing Section 75 associated
with application 17/00088/IPM remains applicable.
Economic Impact
76 The development of 41 dwellinghouses will provide jobs directly and indirectly
during construction and, afterwards, have a positive impact through homeowners
spending on local goods and services in the local economy and further afield.
Both will have a positive impact on the local area.
Legal Agreements
77 The site falls under the wider PPP approval 17/00088/IPM which has an
associated Section 75 Legal Agreement which secures the necessary Developer
Contributions including Affordable Housing. A minute of variation was undertaken
through 23/00674/FLL as the agreement did not have a “future proofing” clause
to accommodate for subsequent changes to the development. This has now
been addressed through the minute of variation. No further action is therefore
necessary for this application.
Direction by Scottish Ministers
78 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.

Page 14

Conclusion and Reasons for Recommendation
79 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly the proposal is recommended for approval
subject to the following conditions.
Recommendation 
Approve the application subject to the following conditions:
Conditions and Reasons for Recommendation
General
1. The development hereby permitted shall be commenced no later than the
expiration of two years from the date of this consent or from the date of
subsequent approval of matters specified in conditions, or three years from the
date of planning permission in principle, whichever is the later.
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents.
Roads and Access
3. Prior to the development hereby approved being completed or brought into use,
all matters regarding access, car parking, in curtilage electric car charging, road
layout, design and specification, including the disposal of surface water, shall be
in accordance with the standards required by the Council as Roads Authority.
Reason - In the interest of vehicle and pedestrian safety and in accordance with
the policies of the adopted Perth and Kinross Local Development Plan 2019.
4. The details submitted and agreed as part of condition 4 of planning permission
19/01130/AMM (drawing number 19/01130/194) with regards to Construction
Traffic Management Scheme (TMS), shall be adhered to at all times to the
satisfaction of the Council as Planning Authority, unless otherwise agreed in

Page 15

writing by the Council as Planning Authority.  The TMS is to remain a fluid
document and will be required to be updated where necessary.
Reason - In the interests of road safety.
5. No part of the development shall be occupied until an updated Travel Plan,
aimed to encourage more sustainable means of travel, has been submitted and
approved in writing by the Council.  The Travel Plan will have regard to provision
for walking, cycling and public transport access to and within the site and will
identify the measures to be provided (including the provision of new and/or
enhanced public transport services), the system of management, monitoring,
review, reporting and the duration of the plan.
Reason - In the interests of sustainable transport.
Landscaping
6. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier.  The
approved scheme shall thereafter be maintained with any planting which fails to
become established within five years being replaced in the following planting
season with others of a size and species as previously approved.
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme.
Play Park
7. For the avoidance of doubt, this permission does not supersede the requirements
of Condition 9 of 19/01130/AMM which requires the approved children's play
area on plan reference 19/01130/131 (drawing no. SC10463-01) shall be
designed, laid out and equipped in accordance with the Planning Authority's
current criteria for play area provision within six months of the occupation of the
first dwelling.  The play area and its facilities/equipment shall thereafter be
maintained.
Reason - In the interests of residential amenity and to ensure the satisfactory
provision and implementation of a children's play area.
Environmental Impact and Biodiversity
8. The details submitted and agreed as part of condition 6 of planning permission
19/01130/AMM with regards to low and zero-carbon technologies (drawing
numbers 19/01130/195 and 19/01130/196) shall be completed in accordance
with the approved scheme and no individual unit shall be occupied until the
scheme has been installed and operating.

Page 16

Reason - To embed low and zero-carbon technologies within the development in
the interest of environmental sustainability.
9. The details submitted and agreed as part of condition 10 of planning permission
19/01130/AMM (drawing number 19/01130/194) with regards to Construction
Environment Management Plan (CEMP), shall be adhered to at all times to the
satisfaction of the Council as Planning Authority, unless otherwise agreed in
writing by the Council as Planning Authority.  The CEMP is to remain a fluid
document and will be required to be updated where necessary.
Reason - In the interests of protecting environmental quality and of biodiversity.
10. The conclusions and recommended action points within the supporting
Biodiversity Survey, in particular Section 2.15 of the submitted Biodiversity
Management Plan submitted by IMT Ecological Consultancy June 2019 and
hereby approved shall be fully adhered to, respected and undertaken as part of
the construction phase of development.
Reason - In the interests of protecting environmental quality and of biodiversity.
11. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved.  The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day.
Reason - In order to prevent animals from being trapped within any open
excavations.
12. The details submitted and agreed as part of condition 13 of planning permission
19/01130/AMM drawing number 19/01130/197) together with the proposed
masterplan, as approved in 24/01485/AMM (drawing number 04), shall be
implemented in accordance with the agreed detail and installed prior to the
occupation of the relevant residential unit.  A minimum of 30% of all completed
two storey houses shall incorporate one bat brick and one swift brick each and
shall be incorporated at eaves height and positioned appropriately.
Reason - In the interests of protecting environmental quality and of biodiversity.
13. No removal of hedgerows, trees or shrubs that may be used by breeding birds
shall take place between 1 March and 31 August inclusive, unless a competent
ecologist has undertaken a careful, detailed check of vegetation for active birds'
nests immediately before the vegetation is cleared and provided written
confirmation that no birds will be harmed and/or that there are appropriate
measures in place to protect nesting bird interest on site.  Any such written
confirmation should be submitted to the Planning Authority.

Page 17

Reason - To ensure adequate protection for the trees on the site during the
construction, in the interests of the visual amenity of the area.
14. All existing trees and hedgerows shown to be retained shall be protected by
suitable fencing in accordance with BS5837:2012 (Trees in Relation to
Construction).  No materials, supplies, plant, machinery, soil heaps, changes in
ground levels or construction activities shall be permitted within the protected
areas without the written agreement of the Council as Planning Authority.
Reason - To ensure adequate protection for the trees on the site during the
construction, in the interests of the visual amenity of the area.
15. All road gullies within 500m of a waterbody or Sustainable Urban Drainage
System (SUDs) pond shall have wildlife kerbs installed adjacent to the gully.
Reason - In the interests of protecting environmental quality and of biodiversity.
16. The details submitted and agreed as part of condition 21 of planning permission
19/01130/AMM (drawing numbers 19/01130/136 and 19/01130/196) with regards
to district heating shall be implemented in accordance with the agreed details.
Reason - To allow district heating to be incorporated within the site at a future
date.
17. Prior to commencement of development, details of the locations of the solar
photovoltaic panels on each plot shall be submitted to the Planning Authority for
written approval.  Thereafter, the agreed scheme should be installed and
operational prior to the occupation of each relevant unit.
Reason - To ensure compliance with Perth & Kinross Council adopted Local
Development Plan 2 (2019) Policy 32.
Recycling Facility
18. The details submitted and agreed as part of condition 17 of planning permission
19/01130/AMM (drawing number 19/01130/06) together with the proposed
masterplan, as approved in 24/01485/AMM (drawing number 04), with regards to
provision of a recycling facility shall be implemented in accordance with the
agreed details.  The facilities/equipment shall thereafter be maintained.
Reason - In the interests of environmental quality.
Core Path
19. The asserted core path (STAN/117) must not be obstructed during building works
or on completion of the development. Any damage done to the route and/or the
associated signage during building works must be made good before the
development is completed or brought into use, whichever is the earlier.

Page 18

Reason - To ensure that public access is maintained at all reasonable times, to
the local path network.
Drainage
20. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved
development works. The temporary surface water treatment facility shall remain
in place until the permanent surface water drainage scheme is implemented.
Reason - In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk.
Residential Amenity
21. Servicing of and deliveries to the LPG tank compound shall be carried out
between 0700 and 1900 Monday to Saturday only, with no servicing or deliveries
permitted on Sundays.
Reason - In the interests of residential amenity.
22. All plant or equipment associated with the LPG tank Compound shall be so
enclosed, attenuated and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours daily, or Noise Rating 25
between 2300 and 0700 hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or calculated and plotted on
a rating curve chart.
Reason - In the interests of residential amenity
23. The details submitted and agreed as part of condition 25 (dust management) of
planning permission 19/01130/AMM, within the approved Construction
Environmental Management Plan (CEMP) dated May 2023 (drawing number
19/01130/194), shall be implemented throughout the construction phase of the
development.
Reason - In the interests of residential amenity.
24. The noise and dust recommendations and mitigation measures within the
updated approved Construction Environmental Management Plan (CEMP) dated
May 2023 (drawing number 19/01130/194) shall be fully adhered to and
undertaken as part of the construction phase of the development.
Reason - In the interests of residential amenity.

Page 19

Justification
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.
Procedural Notes
None.
Informatives
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.
3. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on
the disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environment Protection Agency.
4. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environmental Protection Agency.
5. The applicant should be advised that all proposed structures supporting the road,
or which the developer is intending the Council adopt, will require technical
approval in accordance with the Design Manual for Roads & Bridges standard
BD 2/12 (& HD 22/08 where relevant).  Bridges and culverts shall also be
designed in accordance with the requirements contained within Perth & Kinross
Council's Developers Guidance Note on Flooding & Drainage.  The developer is
advised to contact Perth & Kinross Council's Structures & Flooding Team (tel
01738 475000, email structuresplanning@pkc.gov.uk) for further information and
prior to commencing designs in order to ensure technical compliance.

Page 20

6. The applicant is reminded that this site is still subject to a Section 75 Legal
Agreement, securing Developer Contribution requirements and other matters, as
secured as part of planning permission 17/00088/IPM. This permission continues
to be tied by this legal agreement and the associated requirements will continue
to apply.
7. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot. Failure to obtain a licence may
constitute a criminal act under the Habitats Regulations and penalties are severe
for non-compliance.
8. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended (section
1), it is an offence to remove, damage or destroy the nest of any wild bird while
that nest is in use or being built. Planning permission for a development does not
provide a defence against prosecution under this Act.
9. Hedgehogs are a key species in the Tayside LBAP and enhancing connectivity is
an objective. Gardens will provide suitable habitat for hedgehogs and commuting
should be made possible by creating access gaps in wooden fences 13cm x
13cm at ground level.
10. The applicant is recommended to discuss with the Council's Public Transport Unit
the supply of bus services and public transport infrastructure to ensure an
adequate public transport provision for the site.
11. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to.
12. Construction work should minimise the impact on amenity to neighbouring
residents, which could be achieved by limiting noise generating activities to
Monday to Friday 07:00 to 19:00 and Saturday 08:00 to 13:00 with no noisy
works out with these times or at any time on Sundays or Bank Holidays.
13. The stopping up or diversion of the Core Path STAN/117 is subject to agreement
under Section 208 of the Town and Country Planning (Scotland) Act 1997 (as
amended). All relevant approvals in this regard should be in place prior to any
stopping up or diversions taking place.
14. Construction works must be undertaken in a safe manner which does not disturb
the operation of the neighbouring railway. Applicants must be aware of any
embankments and supporting structures which are in close proximity to their
development.

Page 21

15. Details of all changes in ground levels, laying of foundations, and operation of
mechanical plant in proximity to the rail line must be submitted to Network Rail's
Asset Protection Engineer for approval prior to works commencing on site.
Where any works cannot be carried out in a "fail-safe" manner, it will be
necessary to restrict those works to periods when the railway is closed to rail
traffic i.e. by a "possession" which must be booked via Network Rail's Asset
Protection Engineer and are subject to a minimum prior notice period for booking
of 20 weeks.
The developer must contact our Asset Protection Engineers regarding the above
matters, see contact details below:
Network Rail Asset Protection Engineer
151 St. Vincent Street, GLASGOW, G2 5NW
Tel: 0141 555 4352
E-mail: AssetProtectionScotland@networkrail.co.uk
16. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.  
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your permission
lapses.
17. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the parking layout.
18. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. In
accordance with Regulation 41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the site of the
development
 Readily visible to the public
 Printed on durable material.

Page 22

Background Papers
Letters of representation 0
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer
(Majors)
01738 475300
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major
Applications and
Enforcement)
19th February 2025