Democracy Spraffa

24/01376/Amm

Perth and Kinross Council · 12 March 2025
Back to Planning and Placemaking Committee — 12 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 12 March 2025
Report of Handling by Strategic Lead: Economy, Development and Planning
(Report No. 25/51)
PROPOSAL: Erection of office building, workshop, yard, related infrastructure,
landscaping and associated development matters specified in
conditions 1(i - xvi), 3, 4, 9, 10, 11, 12, 13, 14,17 (approval of
matters specified in conditions of 21/01518/IPM)
LOCATION: Land 150 Metres South of Target House Ruthvenfield Road,
Inveralmond Industrial Estate, Perth
Ref. No: 24/01376/AMM
Ward No: P11- Perth City North
Summary
This report recommends approval of a Matters Specified in Conditions (AMSC)
application for the erection of office building, workshop, yard, related infrastructure,
landscaping and associated development matters relating to the southern part of the
site, referred to in the submitted indicative masterplan as Plot 16. This Report
concludes that the proposal is consistent with the Development Plan, the existing
Planning Permission in Principle (PPP) consent (Ref: 21/01518/IPM) and other
relevant material planning considerations.
Background and Description of Proposal
1 This application relates to an area of agricultural land that extends to
approximately 1.69 hectares, located immediately to the west of Inveralmond
Industrial Estate. The site falls within an area that forms part of the Local
Development Plan 2 (LDP2) allocation known as ‘E38’ (23.6ha), which is
identified for employment uses. Planning Permission in Principle (PPP) was also
approved on the wider allocated site in January 2021 (Ref: 19/02033/IPM) to
provide a mix of Class 4 (business), Class 5 (general industrial) and Class 6
(storage or distribution) uses and related access, landscaping, drainage and
other infrastructure.
2 A full planning application was approved in June 2022 (Ref: 22/00373/FLL) for
the erection of a new office building for SSE to the immediate north of this
proposal. That office building has not yet been constructed.

Page 2

3 That proposal was brought forward ahead of any application(s) for matters
specified by condition for the wider allocated site as SSE’s build programme was
significantly in advance of the anticipated development of the wider site.
4 An application was also approved in October 2023 (Ref: 23/00541/FLL) for an
access road providing a continuation of Ruthvenfield Way. The access road will
serve the SSE office building in addition to the proposed building that is subject
of this AMSC application. The access road proposals are aligned with the
secondary access proposed and approved as part of the masterplan submitted
with the PPP.
5 There have been three Section 42 (S42) applications (Ref: 21/01518/IPM,
21/01519/IPM and 21/01795/IPM) to delete conditions 2, 3 and 7 of the original
PPP approval. Condition 2 (21/01519/IPM) was refused (appeal dismissed),
Condition 3 (21/01795/IPM) was approved and Condition 7 (21/01518/IPM) was
refused, however, allowed on appeal, therefore, as the appeal decision notice is
the most recent, it is those conditions this AMSC application relates to.
6 This application forms the first AMSC application and proposes an office building
(Class 4), workshop, yard, drainage, hard and soft landscaping, access and
associated works. The proposals will provide a new headquarters for I and H
Brown Ltd and relates to plot 16 of the submitted indicative masterplan. The
application proposes to discharge conditions 1(i - xvi), 3, 4, 9, 10, 11, 12, 13,
14,17 (approval of matters specified in conditions of 21/01518/IPM)
7 Two separate buildings are proposed, one being for office use and the other
being a workshop. The office building will be positioned at the northern area of
the site with a car park located to the south and landscaping, bin storage and
secure bike storage to the southeast. Further south, a workshop, associated
parking and concrete yard is proposed. A hardcore yard is proposed south again,
which will complete the southern area of the site. Landscaping and perimeter
fencing will enclose the site. Vehicular access will be taken directly from
Ruthvenfield Way on the northwest boundary of the site. To the east of the office
building (outwith the red line site boundary), a large SuDS basin will be
incorporated into the wider landscape strategy for the site. This has been
consented through planning permission Ref: 23/00541/FLL.
Site History
8 17/00551/SCRN Development of site for business/industrial/storage and
associated works. Decision issued 9 May 2017 – EIA Required.
9 17/00004/PAN Commercial development (classes 1, 3, 4, 5, 6 and car showroom
sui genersis), landscaping, vehicular access and associated works. Approved 3
May 2017. 
10 18/00006/PAN Erection of industrial units (classes 4, 5 and 6), formation of
SUDS, landscaping and associated works. Approved 18 July 2018.

Page 3

11 18/01958/SCRN Employment development (Class 4, 5 and 6) Decision issued 7
November 2018 – EIA required. 
12 19/02033/IPM Employment use development (class 4, 5 and 6) and associated
works (allocated site E38) (in principle). Application Approved 14 January 2021.
13 21/01518/IPM S42 application to delete Condition 7 (Public Transport
Infrastructure) of permission 19/02033/IPM. Application Refused - 16 December
2021 (Appeal Allowed July 2022).
14 21/01519/IPM S42 application to delete Condition 2 (developer contributions) of
permission 19/02033/IPM. Application Refused - 16 December 2021 (Appeal
Dismissed May 2022).
15 21/01795/IPM S42 application to delete Condition 3 (Broxden traffic assessment)
of permission 19/02033/IPM. Application Approved - 21 February 2022.
16 22/00373/FLL Erection of an office building (Class 4), installation of lighting and
CCTV and associated works (allocated site E38). Application Approved - 10 June
2022.
Environmental Impact Assessment
17 The proposal is of a type listed within Schedule 2 of the EIA Regulations. The
impact of the wider development site has been subject of EIA screening
(18/01958/SCRN) and it was determined that the proposal does constitute an
EIA development. An EIA Report was submitted as part of the application for
planning permission in principle.
Pre-Application Consultation
18 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009. However, as the proposal is an AMSC application, further pre-application
consultation (PAC) is not necessary beyond that already undertaken for the
planning permission in principle.
Development Plan
19 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance.
National Planning Framework 4
20 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve peoples lives by making sustainable, liveable

Page 4

and productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
21 The Council’s assessment of this application has included the following policies
of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 13: Sustainable Transport
 Policy 14: Design, Quality and Place
 Policy 18: Infrastructure First
 Policy 22: Flood Risk and Water Management
 Policy 23: Health and Safety
 Policy 26: Business and Industry
Perth and Kinross Local Development Plan 2019
22 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
23 The principal relevant policies are, in summary;
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 5: Infrastructure Contributions
 Policy 7A: Employment and Mixed Used Areas: Business and Industrial
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
 Policy 39: Landscape
 Policy 40A: Forest, Woodland and Trees
 Policy 52: New Development and Flooding
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 55:Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 57: Air Pollution
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals

Page 5

Statutory Supplementary Guidance
24
 Supplementary Guidance - Air Quality (adopted in 2020)
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Placemaking (adopted in 2020)
PKC Non Statutory Guidance
25
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft)
National Guidance
26 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4.
Planning Advice Notes
27 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:
 PAN 51 Planning, Environmental Protection and Regulation
 PAN 60 Planning for Natural Heritage
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 69 Planning and Building Standards Advice on Flooding
 PAN 75 Planning for Transport
 PAN 77 Designing Safer Places
 PAN 79 Water and Drainage
 PAN 83 Masterplanning
Creating Places 2013
28 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.

Page 6

Designing Streets 2010
29 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places.
National Roads Development Guide 2014
30 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.
Consultations
31 As part of the planning application process the following bodies were consulted:
External
32 Scottish Water – no objections.
33 Transport Scotland – no objections.
34 Scottish Environment Protection Agency (SEPA) – no objections.
35 Perth and Kinross Heritage Trust (PKHT) – no objections.
Internal
36 Transportation and Development – no objections subject to conditions.
37 Biodiversity/Tree Officer – no objections subject to conditions.
38 Structures and Flooding – no objections.
39 Environmental Health (Noise Odour) – no objections subject to conditions.
40 Environmental Health (Contaminated Land) – no objections.
41 Commercial Waste Team – no objections.
42 Developer Contributions Officer – no objections.
Representations
43 None.

Page 7

Additional Statements
44 Screening Opinion EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
EIAR not required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal:
AA not required
Design Statement or Design and Access
Statement
Not required
Report on Impact or Potential Impact eg
Flood Risk Assessment
 Flood Risk Assessment
 Dust Management Pan
 Noise Impact Assessment
 Drainage
Calculations/Drainage
Construction Details
 Indicative Masterplan and
Phasing Plan
 Sustainability and Energy
Statement
 Written Scheme of
Investigation
 Biodiversity Action Plan
 Landscape Management Plan
and Maintenance Plan
 Lighting Plan
Appraisal
45 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.
In terms of other material considerations, this involves considerations of the
Council’s other approved policies and supplementary guidance.
Principle
46 The principle of the proposal has been established through the site’s allocation
as E38 in LDP2 for employment uses. This allocation in LDP2 is intended to
support the growth and expansion of the existing Inveralmond Industrial Estate.
Planning permission in principle (PPP) (Ref: 19/02033/IPM) has also been
granted for a mix of Class 4 (business), Class 5 (general industrial) and Class 6
(storage or distribution) uses and related access, landscaping, drainage and

Page 8

other infrastructure. The principle of the proposal is acceptable subject to
compliance with relevant development plan policies and other material
considerations. These matters are considered in detail below.
Design and Layout
47 NPF4 Policy 14: Design, Quality and Place and LDP2 Policy 1: Placemaking is of
relevance in association with various PPP conditions.
48 The proposed workshop comprises 4 bays with ancillary facilities. It will have a
footprint measuring approximately 617 sqm and will have a shallow pitched roof.
Finishing materials will comprise of grey concrete block for the basecourse with
insulated profiled metal sheeting finished in green for the walls and roof. The
windows will be aluminium clad, finished in green with steel roller doors, also
finished green. Access into the warehouse will be on the west elevation which
comprises of 4 doors. This building will be located adjacent to the eastern
boundary of the site, to the south of the office building/car parking/landscaping. A
concrete yard will be located to the west. The yard will measure approximately
18259 sqm and will incorporate a diesel tank, wash bay and parking. A further
hardcore yard is proposed further south and a 2m high fence will be installed
around the perimeter of the yard.
49 The proposed office building is a two-storey pitched roofed structure in a mix of
traditional/contemporary design, with a footprint measuring approximately
590sqm for office and ancillary facilities. The south elevation of the building will
be largely glazed as will the north, albeit to a lesser extent. Stone feature panels
are proposed on the north, south and west elevations whereby the company
name will be advertised (subject to a separate advertisement consent). Finishing
materials will comprise of off-white render for the basecourse and walls, green
vertical cladding to the upper level and aluminium clad windows, finished grey.
The roof will comprise of insulated profile metal sheeting, finished grey. The
building will be positioned within the northern area of the site with a car park
located to the south of the building.
50 The proposed office building will be of a high standard of design and finish, which
will introduce some visual interest into an area that is dominated by large,
relatively bland industrial buildings. Furthermore, the building will sit well with the
adjacent consented SSE office building.
51 The workshop building is of standard design which will not look out of place
within its context. The layout of the site is also well conceived, with the proposed
office building placed within its own landscaped area and the car park located to
the south, allowing the building to be the dominant feature of the development.
52 As such, it is considered that the design and layout of the development is
acceptable and complies with the requirements of NPF 4 Policy 14 and LDP2
Policies 1A and 1B.

Page 9

Phasing and Delivery Plan
53 Condition 1 (i) requires the submission of a detailed phasing and delivery plan for
the whole site. This has been submitted which reflects the planning approvals to
date and forward thinking for the remainder of the PPP site. Included within the
masterplan is an area outwith the PPP boundary, however, within the E38
allocation. This site, however, will be subject to a future application. The
development of the SSE plot is currently unknown but it is anticipated that the
access road will come forward first, followed by the I and H Brown plot (subject to
gaining consent) which is programmed to commence in Spring 2026.
Landscape and Visual Amenity
54 Condition 1 (vii) and 13 of the PPP requires details of landscaping, structure
planting and screening associated with the development. NPF4 Policy 6:
Forestry, Woodland and Trees; and LDP2 Polices 1: Placemaking; 39:
Landscape; and 40A: Forestry, Woodland and Trees are all relevant in
considering landscape and visual amenity.
55 The proposed development is located within an industrial estate, on a site that is
zoned for large scale development. It is considered that the proposed
development will not appear out of place in the landscape when viewed in
context with the adjacent large industrial buildings. The proposals also provide a
reasonably robust landscaping scheme for the area around the building
comprising of a variety of trees, plants and shrubs that will enhance the visual
amenity of the immediate area. No tree/hedge planting is proposed on the
western boundary of the site as this area includes a service strip. A woodland
mix of shrubs and trees (minimum 5m wide) are proposed on the southern and
eastern boundaries of the site.
56 As such, it is considered that the proposed development will not have any
adverse impact on the character of the landscape or visual amenity of the
area. It is a logical extension of the existing employment offer at
Inveralmond and as such the proposal, subject to condition 11, accords
with the provisions of PPP and meets the objectives of NPF4 Policy 6,
LDP2 Policy 1, Policy 39 and Policy 40A.
Residential Amenity
57 Residential amenity requires to be considered under NPF4 Policy 26: Business
and Industry, LDP2 Policy 1: Placemaking and Policy 17: Residential Areas as
well as PPP conditions. Additionally, NPF4 Policy 23 and LDP2 Policies 55, 56
and 57 which relate to light, air and noise pollution are relevant.
58 The proposed site is located within the Inveralmond Industrial Estate within an
area that is zoned for industrial uses. It will also be remote from any nearby
housing development. As such, it is unlikely that the proposed development
would result in any adverse impact on any nearby residential amenity.

Page 10

Noise
59 Condition 1(ix) and 10 of the PPP requires an assessment of noise. The
applicant has submitted a noise impact assessment (NIA) document reference
1857 R001 V1 AH dated 23 October 2023 which was undertaken by CPS
Acoustics. This has been reviewed by Environmental Health Officers.
60 The NIA assessed plant and operational noise from the site and the predicted
noise levels at the five noise sensitive receptors assessed. The NIA assessment
concluded that predicted noise from plant and operations from the development
would meet the NR 35 daytime criteria for plant noise and the BS4142 to meet a
rating noise level no more than 5dB above residual background noise level.
61 To ensure compliance with LDP2 Policy 55 and 56, Environmental Health has
recommended standard conditions relating to noise from plant and equipment,
noise from the battery storage facility and external lighting, in order to ensure that
adequate controls are in place to prevent any impact on the amenity of the area.
A condition limiting construction hours has also been applied in order to be
consistent with the terms of the 2019 PPP for the wider site and a condition in
relation to servicing of and deliveries to the premises.
Air Quality
62 Condition 9 of the PPP requires an assessment of dust for the construction
stage, detailing prevention control and mitigation measures for dust.
63 The applicant has submitted a Dust Management Plan (DMP), dated August
2024, ‘Dust Management Plan, I&H Brown Office Building & Plant Depot
Ruthvenfield, Perth’ which has been reviewed by Environmental Health Officers.
64 A dust risk assessment was undertaken in line with IAQM Guidance on the
assessment of dust from demolition and construction August 2023 and site
classification was Medium Risk sensitivity of receptors and the dust prevention,
suppression and monitoring procedures set out within the DMP are based on this
classification.
65 Subject to condition insofar as the recommendations and mitigation measures in
the DMP, drawing No.26, shall be implemented in full throughout the construction
phase of the development, Environmental Health Officers have no adverse
comments, therefore, there are no conflicts with LDP2 Policy 57.
66 Overall, subject to conditions 3-9 (inclusive) the proposal accords with the
provisions of PPP and meets the objectives of NPF4 and LDP2.
Roads and Access
67 Condition 1(iv) of the PPP specifies details required for access, car parking,
public transport facilities, roads, footpaths, cycleways and related structures.

Page 11

Condition1 (xiii) requires the submission of a green travel plan including provision
of electric vehicle charging points.  Condition 1 (xvi) requires vehicular access
and egress road levels. Condition 3 supplements condition 1 (iv), condition 4
supplements condition 1 (xiii), condition 5 requires the submission of a
Construction Traffic Management Scheme (CTMS), and condition 6 requires a
scheme for a new shared path.
68 NPF4 Policy 13: Sustainable Transport seeks to encourage developments that
prioritise sustainable travel while LDP2 Policy 60 Transport Standards and
Accessibility Requirements requires consideration of transport and accessibility
Condition 1(iv)
69 No Road Construction Consent (RCC) has been granted yet for the access road
(extension of Ruthvenfield Way), and following consent, an RCC amendment
may be required in order to form the proposed vehicular access. An informative 
is recommended. 
70 In respect of car parking, in addition to the parking proposed, the applicant shall
provide two disabled parking bays for the Workshop based on the Class 5
parking standards outlined in the National Roads Development Guide. This can
be controlled by condition.
71 Adequate space for parking and turning of service vehicles is provided within the
yard space.
72 In terms of cycle parking, adequate provision is proposed with a 20 space two
tier cycle shelter to be located to the southeast of the office building.
73 The matter of footpaths has not been addressed, however, this condition can be
re-applied.
Condition 1 (xiii)
74 The Green Travel Plan (GTP) framework for the master site has been provided
by the applicant which will form the basis of any subsequent travel plans for the
operators of the individual plots. This condition, however, will be re-applied to
ensure a GTP is submitted for this individual plot.
Condition 1 (xvi)
75 No Road Construction Consent (RCC) has been granted yet for the access road
(extension of Ruthvenfield Way), and following consent, an RCC amendment
may be required in order to form the proposed vehicular access. An informative
is recommended. The vehicular access and egress levels can be secured
through this process.

Page 12

Condition 3
76 See comments for Condition 1(iv). This condition will be re-applied.
Condition 4
77 See comments for Condition 1(xiii). This condition will be re-applied.
Condition 5
78 The proposal does not seek to discharge this condition and therefore the
construction traffic management scheme (CTMS) has not been provided. This
condition shall be re-applied.
Condition 6
79 The proposal does not seek to discharge this condition, therefore, no information
has been provided in terms of the shared path along Ruthvenfield Road. This
condition shall be re-applied.
Streetlighting
80 An approved street lighting design is required for any PKC adoptable areas and
include any alterations to existing street lighting on Ruthvenfield Way and Road.
A condition will be applied to discuss the lighting design and to obtain approval.
81 Overall, it is considered that the proposals raise no issues or concerns in respect
to roads or access related matters. Both the Council’s Transport Planning Team
and Transport Scotland have also received the proposals and have made no
objection, subject to conditions 15-20 (inclusive), to the development. The
proposal accords with the provisions of PPP and meets the objectives of NPF4
and LDP2.
Drainage and Flooding
82 PPP Condition 1 (viii) and condition 17 requires details of foul and surface water
drainage to be submitted. A Drainage Strategy Plan has been submitted with the
application which outlines the proposed foul and surface water details.
Colleagues in the Council’s Structures and Flooding Team and SEPA have
reviewed this and have not raised any objections.
83 In terms of Flood Risk, the site is located approximately 35m north of the Town’s
Lade watercourse and approximately 470m south of the River Almond. The site
is located in the High (greater than two hundred years (1:200) – 0.5% change of
flooding), Medium (once in every two hundred years (1:200) – 0.5% chance of
flooding) and Low (once in every thousand years (1:1000) – 0.1% chance of
flooding) likelihood of fluvial flooding extents as shown on the SEPA flood
mapping.

Page 13

84 Modelling has been undertaken as part of this application which demonstrates
that the site is outside of the functional floodplain for the following events: 1 in 10
year, 1 in 200 year, 1 in 200 year plus 53% climate change and 1 in 1000 year.
85 SEPA have commented that with regards to the River Almond, the site would
likely be protected by flood defences to the north which would also likely ensure
safe access and egress via the Inveralmond Industrial Estate. The Town’s Lade
flows are controlled by a penstock upstream on the River Almond. This restrict
the flows that come down via this path and modelling has confirmed that the site
is unlikely to be at risk of flooding from this source.
86 Overall, the proposal complies with NPF4 Policy 22: Flood Risk and Water
Management and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage.
Waste Collection
87 The PPP seeks to ensure appropriate waste and recycling provision is identified
and secured as part of the AMSC applications. There is considered to be
adequate provision to accommodate the conditional requirements in this regard,
satisfying the terms of the PPP. There are therefore no waste collection
concerns.
Conservation Considerations
88 As required by Condition 1 (xiv) and 12 of the PPP a Written Scheme of
Investigation is required to fulfil the requirements of Perth and Kinross Heritage
Trust (PKHT) for an archaeological evaluation of the development area.
89 The historic background is outlined in a WSI carried out by CFA Archaeology
which has been submitted alongside this application. PKHT have been consulted
and advised that although the area falls within a wider application with
archaeological conditions, in this instance it is located next to and partially
covered by between two negative archaeological evaluations (EPK1600 and
EPK1162), therefore, for this red line site boundary only, no archaeological
mitigation is required.
90 As such, the proposal complies with NPF4 Policy 7: Historic Assets and Places
and LDP2 Policy 26: Scheduled Monuments and Archaeology.
Natural Heritage and Biodiversity
91 The consideration of natural heritage and biodiversity is integral to the layout,
design and landscaping detail required by the PPP. NPF4 Policy 1: Sustainable
Places, Policy 3: Biodiversity, Policy 4: Natural Places and Policy 6: Forestry
Woodland and Trees are relevant considerations as are LDP2 Policies 38:
Environment and Conservation, 40: Forestry, Woodland and Trees and 41:
Biodiversity. The PPP requires a Construction Environment Management Plan

Page 14

(CEMP), Biodiversity Action Plan (BAP) and detailed landscaping and planting
scheme as per conditions 1 (vii, xii), 9, 13 and 14, all of which have been
submitted.
92 Condition 9 requires an updated Construction Environment Management Plan
(CEMP) including a detailed Dust Management Plan. The submitted CEMP has
been reviewed by the Council’s Biodiversity Officer. It includes appropriate
measures for trees and biodiversity and from that perspective, is sufficient to
agree condition 9.
93 Condition 13 requires a detailed landscaping and planting scheme. The
submitted landscaping and planting scheme includes an appropriate level of
planting and screening and as such is sufficient to agree condition 13.
94 Condition 14 requires a Biodiversity Action Plan. The submitted Plan has been
reviewed by the Council’s Biodiversity Officer. Following an update to plans and
more information the details are considered to be acceptable in terms of
landscape and biodiversity value.
95 It is considered that the development of the site does not raise any issues or
concerns in respect to natural heritage or biodiversity. It is concluded that the
proposal adequately provides for and enhances natural heritage and biodiversity
and subject to conditions 12-14 (inclusive) complies with the relevant policies of
NPF4 and LDP2.
Low and Zero Carbon Generating Technologies
96 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce greenhouse gas emissions.
97 A Sustainability and Energy Statement has been provided that outlines how the
development will meet the CO2 emissions reductions through both the energy
efficiency of the constructions and installation of solar PV. It states that ‘In
addition to the installation of a highly efficient Mitsubishi RAF heat pump systems
providing sustainable heating and cooling to the building, renewable technology
is to be included in the development proposals in the form of Photovoltaic (PV)
panel array for both the office building and workshop. The workshop area will
also feature battery storage. This fits with the Council’s approach and a
suspensive condition has been applied to cover the actual calculations that can
be undertaken in relation to the finalised designs at the Building Warrant stage.
As such the proposal, subject to condition 11, complies with LDP2 Policy 32.

Page 15

Developer Contributions
98 Condition 2 of the original Planning Permission in Principle (19/02033/IPM) for
this site allows for the 10,000 sqm of the development to be exempt from any
Transport Infrastructure contributions. To date, 2,450sqm has been approved at
the site (22/00373/FLL). The current application therefore qualifies for this
exemption.
Economic Impact
99 The proposal is considered to have a positive economic impact on Perth and the
wider area and there is also likely to be positive impacts from the construction
phase of the development.
Planning Obligations and Legal Agreements
100 None required.
Direction by Scottish Ministers
101 None applicable to this proposal.
Conclusion and Reasons for Recommendation
102 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken of the relevant material
considerations and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions.
Recommendation 
Approve the application subject to the following conditions:
Conditions and Reasons for Recommendation
General
1. The development hereby permitted shall be commenced no later than the
expiration of two years from the date of this consent or from the date of
subsequent approval of matters specified in conditions, or three years from the
date of planning permission in principle, whichever is the later.
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.

Page 16

2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents.
Residential Amenity
3. The recommendations and mitigation measures in the approved Dust
Management Plan dated August 2024, Drawing No.26, shall be implemented in
full throughout the construction phase of the development to the satisfaction of
the Council as Planning Authority.
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality.
4. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve.
Reason - In order to safeguard the neighbouring residential amenity in the area.
5. Noise from the battery storage facility shall not exceed 37dB LAeq, (15 min),
including any relevant penalties for tonality, impulsivity, intermittency, or other
sound characteristics, when measured at any residential property in accordance
with BS4142 – Method for Rating Industrial Noise Affecting Mixed Residential
and Industrial Areas.
Reason - In order to safeguard the neighbouring residential amenity in the area.
6. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays or bank holidays (as identified by Scottish
Government). The above shall be implemented throughout the construction stage
of the development unless otherwise agreed in writing with the Council as
Planning Authority andin consultation with Environmental Health.
Reason - To ensure a satisfactory standard of local environmental quality.
7. The hours of operations shall be restricted to 0700 hours to 1900 hours daily.
Reason - To ensure a satisfactory standard of local environmental quality.
8. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 daily.

Page 17

Reason - To ensure a satisfactory standard of local environmental quality.
9. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of the area.
Landscaping
10. The detailed landscaping and planting scheme which is hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier.  The
approved scheme shall thereafter be maintained with any planting which fails to
become established within five years being replaced in the following planting
season with others of a size and species as previously approved.
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme.
Environmental Impact and Biodiversity
11. Prior to the occupation of development hereby approved, a scheme shall be
submitted to, and approved in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon emissions reduction set by
the Scottish Buildings Standards will be met through the installation and
operation of low and zero-carbon technologies. This scheme shall detail the
following:
a) the technology types;
b) illustrate, through technical calculations, that these will meet at least the
10% reduction;
c) their siting and location; and
d) ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme and no individual unit shall be occupied until the scheme has
been installed and operating.
Reason - In order to demonstrate compliance with both Policy 32 of the local
development plan and the carbon emissions reduction set by Scottish Building
Standards.
12. The conclusions and recommended action points within the Biodiversity Action
Plan (drawing number 36) submitted and hereby approved shall be fully adhered
to, respected and undertaken.

Page 18

Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority.
13. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day.
Reason - To ensure a satisfactory standard of local environmental quality; to
safeguard the welfare of any protected wildlife.
14. The submitted Construction Environment Management Plan (CEMP) shall be
implemented concurrent with the development. The CEMP will remain a dynamic
document throughout the duration of construction and until the completion of
development. The CEMP can be amended as necessary to meet best practice in
terms of environment or ecology. Any amendments will be submitted to the
Planning Authority as soon as reasonably practicable citing the relevant
amendment and appropriate guidance for written approval.
Reason - In the interest of protecting environmental quality and of biodiversity.
Roads and Access
15. Prior to the commencement of the development hereby approved, the
developer shall submit for the further written agreement of the Council as
Planning Authority, in consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which shall include the
following:
a. restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
b. timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c. a code of conduct for HGV drivers to allow for queuing traffic to pass;
d. arrangements for liaison with the Roads Authority regarding winter
maintenance;
e. emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f. arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;

Page 19

h. arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i. details of information signs to inform other road users of construction traffic;
j. arrangements to ensure that access for emergency service vehicles are not
impeded;
k. co-ordination with other significant developments known to use roads
affected by construction traffic;
l. traffic arrangements in the immediate vicinity of temporary construction
compounds;
m. the provision and installation of traffic counters at the applicant's expense at
locations to be agreed prior to the commencement of construction;
n. monitoring, reporting and implementation arrangements;
o. arrangements for dealing with non-compliance; and
p. details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme.
Reason - In the interest of proper site management.
16. As part of the next application for the Approval of Matters Specified by Condition
(AMSC) for the wider site that has been granted in principle, planning ref:
21/01518/IPM, a scheme for a new shared path of an appropriate standard along
an agreed section of Ruthvenfield Road shall be submitted for the written
approval of the Council as Planning Authority.  The approved scheme shall
thereafter be fully installed as per the agreed details.
Reason – in the interests of road and pedestrian safety.
17. Development shall not commence until a detailed Green Travel Plan (GTP),
aimed at encouraging more sustainable means of travel has been submitted to
and agreed in writing by the Council as Planning Authority. The GTP will have
particular regard to provision for walking; cycling; public transport access to and
within the site; electric vehicle (EV) charging points and will identify the measures
to be provided (including the provision of new and/or enhanced public transport
services), any phasing, the system of management, monitoring, review, reporting
and the duration of the Plan. The GTP as agreed shall be fully implemented in
accordance with the details agreed.
Reason - In the interests of sustainable transport.
18. Prior to the development hereby approved being completed or brought into use,
all matters regarding access, car parking, public transport facilities,
footpaths/cycleways, road layout, design and specification, including the disposal
of surface water and related structures, shall be in accordance with the standards
required by the Council as Roads Authority.

Page 20

Reason - In the interest of vehicle and pedestrian safety and in accordance with
the policies of the adopted Perth and Kinross Local Development Plan 2019.
19. Prior to occupation, the applicant shall form two disabled parking bays adjacent
to the proposed Workshop, in accordance with the design principles outlined in
the National Roads Development Guide. 
Reason – In the interests of enabling inclusive access to the site.
200. Prior to commencement of works, the street lighting design for all adopted areas
must be submitted for the further written agreement of the Council as Planning
Authority, in consultation with Perth & Kinross Council’s Street Lighting
Partnership.  The scheme shall include details of light spill, brightness of the
lighting and the proposed hours of operation.  The agreed lighting scheme shall
be implemented prior to the occupation of the first dwellinghouse and maintained
in full accordance with the agreed scheme.
Reason - In the interests of road safety.
Justification
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.
Procedural Notes
None applicable.
Informatives
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.
3. No work shall be commenced until an application for building warrant has been
submitted and approved.

Page 21

4. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk
5. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
6. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water.
7. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. 
In accordance with Regulation 41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the site of the
development
 Readily visible to the public
 Printed on durable material.
8. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks. 
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environmental Protection Agency. 
Please note that a fee is chargeable for the processing of RCC applications.
9. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.  
The Council has two months to consider the information. You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your permission
lapses.

Page 22

10. The presence of protected species, and the extent to which they could be
affected by the proposed development, should be established before works
commence.  Should protected species be identified within the site the developer
should ensure that all appropriate measures required to comply with the relevant
legislation are carried out.
11. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(Section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act.
12. Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn.
Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved.
13. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 they must obtain from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of works.  Information on
junction types, requirements for Vehicular Access consents (VA1) and application
forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design from Scottish Water
and the Scottish Environmental Protection Agency.
Background Papers
Letters of representation 0
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer
(Majors)
01738 475300
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major
Applications and Enforcement)
26 February 2025