PLANNING AND PLACEMAKING COMMITTEE
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 12 February 2025 at
9.30am.
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, Bailie R Brock
(substituting for D Cuthbert), K Harvey, I James, D Illingworth, I MacPherson
(substituting for Councillor R Watters), Bailie C McLaren, and Bailie M Williamson.
In Attendance: L MacLean, S Panton, L Reid, K Smith, and P Williamson (all
Economy, Development and Planning); A Brown, C Elliott, S Dockerill and
R Ramsay (all Legal and Governance).
Apologies: Councillors D Cuthbert and R Watters.
Councillor I Massie, Convener, Presiding.
1. Welcome and Apologies
The Convener welcomed everyone present to the meeting and noted
apologies as above. 
2. Declarations of Interest
Bailie M Williamson declared a non-financial interest in Item 5(2)(i).
3. Minutes
The Minute of Meeting of Planning and Placemaking Committee of 8 January
2025 was submitted and approved as a correct record.
4. Deputations
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications:
Planning Application No. Item No.
24/00435/FLM 5(1)(i)
24/01303/AMM 5(1)(ii)
23/01742/FLL 5(2)(i)
24/01440/FLL 5(2)(ii)
5. Applications For Determination
(1) Major Applications

Page 2

DRAFT
(i) 24/00435/FLM - Erection of spa and leisure facility, 25
holiday accommodation units, formation of vehicular
access, parking areas, landscaping, drainage and
associated works, Murrayshall House Hotel, Murrayshall,
Perth, PH2 7PH (Report No. 25/29)
Mr S Hay, objector to the application, followed by Mr J Wall,
agent and Mr G Silcock, applicant, addressed the committee,
and answered Members questions.
Resolved:
Grant, subject to the following terms, conditions and
informatives:
Conditions
General
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The development hereby approved shall be used solely
for holiday accommodation and shall not be occupied as
the sole or main residence of any occupant.
Reason - In order to clarify the terms of the permission; to
control and restrict the use of the building.
Transport
4. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;

Page 3

DRAFT
e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
i) details of information signs to inform other road
users of construction traffic;
j) arrangements to ensure that access for
emergency service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;
l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) monitoring, reporting and implementation
arrangements;
n) arrangements for dealing with non-compliance;
and
o) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to
during the entire site construction programme.
Reason - In the interest of proper site management.
5. Prior to the occupation of each lodge in Phase 1 as
shown on Drawing 54, each lodge shall be provided with
a minimum of 2 parking spaces.  On occupation of the
final lodge within Phase 1, a total of 48 standard car
parking bays will be provided plus 3 disabled parking
bays being provided, resulting in a total of 51 car parking
spaces on site, as shown on Drawing 54.
Reason - In the interest of providing a suitable number of
off-street lodge parking
6. Prior to commencement of any development on Phase 1
of the Lodge development, a detailed design for the
proposed secure covered cycle parking facility for a
minimum of 10 cycles, including its location, shall be
submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority.  The
cycle parking, as approved in writing, shall be
implemented in accordance with the approved details
prior to the lodge development being brought into use.
Reason - To encourage active travel and meet advice
within National Planning Framework on transport for the
lodge development

Page 4

DRAFT
7. Prior to commencement of any development on Phase 1
of the Lodge development, a detailed design for the
proposed powered two wheeler parking facility for a
minimum of 3 powered two wheelers, including its
location, shall be submitted to and approved in writing by
the Planning Authority in consultation with the Roads
Authority.  The powered two wheelers parking, as
approved in writing, shall be implemented in accordance
with the approved details prior to the lodge development
being brought into use.
Reason - In the interest of providing a suitable number of
off-street lodge parking.
8. Prior to commencement of any development on the Spa
and Leisure Facility, a detailed design for the proposed
parking shall be provided for the following elements:
 32 standard car parking spaces
 3 disabled car parking spaces
 4 powered two-wheeler parking spaces
Including its location, shall be submitted to and approved
in writing by the Planning Authority in consultation with
the Roads Authority.  The parking, as approved in writing,
shall be implemented in accordance with the approved
details prior to the Spa and Leisure Facility being brought
into use.
Reason - In the interests of road safety; to ensure the
provision of adequate off-street parking facilities for
disabled visitors and motorcyclists.
9. The cycle parking as shown on Drawing 55, shall be
constructed and operational prior to the Spa and Leisure
Facility being brought into use.
Reason - To encourage active travel and meet advice
within National Planning Framework on transport.
10. The core path which forms part of the site must not be
obstructed during building works or on completion.  Any
damage done to the core path and associated signage
during building works shall be made good before
occupation of the development.  Any temporary
restrictions to public access required to facilitate works on
site must be agreed in writing first with the Access
Officer.
Reason - In the interests of public access along the core
path.
11. Prior to commencement of any development on site, a
detailed design showing the signage for the development
shall be provided with the following schemes being
designed:
a) directional signage to be added to the public road
network to direct customers to the development
site entrance along the preferred routes as
discussed in the Transport Statement;

Page 5

DRAFT
b) directional signage to be removed from the public
road network to encourage customers to use the
preferred route detailed as discussed in the
Transport Statement; and
c) passing place signage along the U84 and U85
from the A94 to the development site entrance
from the public road network
The scheme shall be submitted to, and approved in
writing by, the Council as Planning Authority.  The
submission will confirm the location of the signage,
specification and detailed design.  The scheme for the
approved shall thereafter be implemented in full, prior to
the first element of the development hereby approved
being completed or brought into use.
Reason: In the interests of road, to direct customers of
development site along the preferred route.
12. No part of the development shall be occupied until a
Travel Plan, aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transportation
and Development.  The Travel Plan will have particular
regard to provision for walking, cycling and connections
to public transport access to in the form of the shuttle
service, detailing the frequency of the service and will
identify the measures to be provided along with the
system of management, monitoring, review, reporting and
the duration of the plan.
Reason - To promote sustainable transport options and to
meet advice within National Planning Framework on
transport.
13. Prior to commencement of any development on site, a
detailed design for a minimum of six passing places shall
be submitted and approved in writing by the Planning
Authority in consultation with the Roads Authority for the
following locations:
 Passing Place 3 - Unmade layby at 227m as detailed
in the Transport Statement in Appendix G - Passing
Place Plan (SK005);
 Passing Place 4 -Verge at 470m as detailed in the
Transport Statement in Appendix G - Passing Place
Plan (SK005);
 Passing places 7 - Field entry on right at 1090 m as
detailed in the Transport Statement in Appendix G -
Passing Place Plan (SK005); and
 Passing places 11 - Verge at the pedestrian access
gate to Bonhard House at 1900 m as detailed in the
Transport Statement in Appendix G - Passing Place
Plan (SK005); and
 Passing places 13 - Verge at 2040 m as detailed in
the Transport Statement in Appendix G - Passing
Place Plan (SK005); and

Page 6

DRAFT
 Passing places 15 -Verge at 2320 m as detailed in the
Transport Statement in Appendix G - Passing Place
Plan (SK005)
The passing places, shall be provided with a minimum
carriageway width of 5.5 metres, for a minimum length of
11 metres with 30 degree tapers and surfaced in
accordance with the Perth & Kinross Council's Road
Development Guide at the agreed locations.  The passing
places, as approved in writing, shall be implemented in
accordance with the approved details and be constructed
and operational in advance of any further works being
undertaken on site.   Once provided, the passing places
shall thereafter be permanently retained as such.
Reason - To ensure the existing road network can
accommodate the traffic likely to be associated with the
proposed development in the interests of road safety.
Amenity
14. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
15. No amplified music, shall be permitted in the outdoor
seating or external gym/studio area at any time.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
16. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
17. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays (as identified by
Scottish Government).
Reason - In order to safeguard the neighbouring
residential amenity in the area.
18. Mitigation measures as described in Sections 5.5 of the
Noise Impact Assessment undertaken by ITP Energised
dated 25.03.2024, shall be undertaken to ensure a
satisfactory level of residential amenity can be achieved.
Reason - In order to safeguard the neighbouring
residential amenity in the area.

Page 7

DRAFT
Trees and Landscaping
19. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction. Protection
measures, once in
place, shall remain in place for the duration of
construction.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
20. The detailed landscaping plan, which is hereby approved,
shall be completed within the first available planting
season (October to March) after the completion or
bringing into use of the development, whichever is the
earlier. The approved scheme shall thereafter be
maintained to the satisfaction of the Council as Planning
Authority, with any planting which fails to become
established within five years being replaced in the
following planting season with others of a size and
species as previously approved.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
Biodiversity
21. The conclusions and recommended action points within
the supporting Ecological Impact Assessment,
Biodiversity Plan and Invasive Non-Native Species
Management Plan submitted and hereby approved
(drawing numbers 52, 63 and 64 relate) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of
the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and biodiversity.
22. An updated ecology survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey
shall be submitted to the Council as Planning Authority
for written agreement and works shall not commence until
after such written agreement has been issued by the
Council.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
23. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, 12 bird nesting

Page 8

DRAFT
boxes, 12 bat roosting boxes, 10 hedgehog boxes shall
be provided on suitable locations within the red line
boundary. Thereafter, the agreed scheme shall be
maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
24. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, wildlife kerbs
shall be installed adjacent to all road gullies within
500metres of a SUDS pond or watercourse. Thereafter,
the kerbs shall be retained in a reasonable condition for
the life of the development, to the satisfaction of the
Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
25. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, hedgehog
highways shall be created by providing access gaps in
wooden fences least 13cm x 13cm at ground level, to
allow for the free movement of hedgehogs. Thereafter,
the hedgehog highways shall be retained in a reasonable
condition for the life of the development, to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
Archaeology
26. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT. The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.

Page 9

DRAFT
Reason - To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
Materials
27. Prior to the commencement of the spa and leisure
building hereby approved, details of the specification and
colour of the proposed external finishing materials to be
used shall be submitted to and agreed in writing by the
Council as Planning Authority.  The scheme as agreed
shall be implemented prior to the completion or bringing
into use of the development, whichever is the earlier.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Procedural Notes
1. Permission shall not to be issued until the Section 75
Agreement has been signed and registered to take
account of this application. The legal agreement should
be concluded and completed within 4 months of the date
of any Committee approval. Failure to conclude a legal
agreement within 4 months will result in the planning
application being re-assessed through failing to comply
with the associated developer contributions policy and
may be ultimately recommended for refusal under
delegated powers
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management

Page 10

DRAFT
Procedure (Scotland) Regulations 2013, as amended.
The form of the notice is set out in Schedule 7 of the
Regulations and a draft notice is included for your
guidance. In accordance with Regulation 41 the notice
must be:
 Displayed in a prominent place at or in the vicinity of
the site of the development
 Readily visible to the public
 Printed on durable material.
4. The planning permission decision notice shall not be
issued until such time as the required Developer
Contributions have been secured or paid in full. 
In the event the applicant does not either make the
required payment within 28 days from the date the
agent/applicant is advised of the need for the
contributions, or complete a legal agreement for delayed
payment within a 4 month period from the date the
agent/applicant is advised of the need for the
contributions the application may be refused under
delegated powers without any further discussion with the
applicant.
5. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
6. The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport
Scotland's Cycling by Design 2021 or similar design
guide.
7. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, they must obtain from the
Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are
available at www.pkc.gov.uk/vehicleaccess.  Advice on
the disposal of surface water should be sought at the

Page 11

DRAFT
initial stages of design from Scottish Water and the
Scottish Environmental Protection Agency.
8. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
9. Road drainage may be in the vicinity of the passing
places and require remedial works.  Contact Perth &
Kinross Council Road Maintenance Department for
further details.
10. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (Section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
11. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984. 
12. Part of the approved development includes holiday
accommodation or Short-term Let accommodation (STL).
The developer is advised that holiday accommodation
and STLs require to be licensed under the terms of Article
3 of the Civic Government (Scotland) Act 1982 (Licensing
of Short-terms Lets) Order 2021 and therefore a licence
application should be made to Perth and Kinross Council
prior to operation commencing.  Further information and
application forms are available at
https://www.pkc.gov.uk/shorttermlets.
13. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning
(Changing Places Toilet Facilities) (Scotland) Regulations
2020 and the associated Circular 1/2020: Changing
Places Toilets Regulations.
14. No work shall be commenced until an application for
building warrant has been submitted and approved.
15. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended.
The variations incorporate changes to the vehicular and

Page 12

DRAFT
cycle parking to ensure adequate provision is made for
the development.
(The committee took short recess and reconvened at 10.38am.)
(ii) 24/01303/AMM - Construction of Bertha Park link road
between phase 1 at Bertha Park High School and phase 2
new A9 west roundabout and associated works (approval of
matters specified in conditions 18/01800/IPM), land at
Bertha Park, Perth (Report No. 25/30)
Mrs J Ferguson, on behalf of the Council as applicant,
answered Members questions.
Resolved:
General
1. This approval will last only for three years from the date
of this decision notice, unless the development has been
lawfully started within that period.
Reason - This is an approval in terms of Section 59 of the
Town and Country Planning (Scotland) Act 1997, as
amended.
Transport
2. Prior to the commencement of development (with the
exception of site clearance works), should the
roundabouts and/or access roads not be provided, as per
the annotation on drawing 03 hereby approved, a detailed
design showing the omission of the roundabouts and/or
access roads shall be submitted to the Planning Authority
for written approval.
The detailed design will include the following:
 Mainline Layout Plans;
 Road Lighting Layout Plans;
 Service Ducting Layout Plans;
 Traffic Signal Ducts Layout Plans;
 Landscape Layout Plans; and
 Drainage Layout Plans.
Thereafter, the agreed scheme shall be implemented in
accordance with the approved drawings. For the
avoidance of doubt, this would not prevent the formation
of the roundabouts as per the approved drawings at a
later date.
Reason - To provide confirmation of the road layout to be
delivered.
3. The Construction Traffic Management Plan detailed in
Document 81, hereby approved, shall be strictly adhered
to during the entirety of the site construction programme.
Reason - In the interest of proper site management.
Archaeology
4. Prior to the commencement of development (with the
exception of site clearance works) the developer shall

Page 13

DRAFT
secure the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT.  The PERD shall be carried out in complete
accordance with the approved details.  Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason - To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.
Environment
5. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  Protection
measures, once in place, shall remain in place for the
duration of construction.
Reason - to ensure adequate protection for the trees on
the site during the construction, in the interests of the
visual amenity of the area.
6. The recommendations contained within the Protected
Species Report (Document 82) shall be implemented in
full. Any deviation from the recommendations will require
to be agreed by written approval of the Planning
Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
7. The submitted Construction Environment Management
Plan (CEMP), hereby approved (Document 79) shall be
implemented concurrent with the development.  The
CEMP will remain a dynamic document throughout the
duration of construction and until the completion of

Page 14

DRAFT
development. The CEMP can be amended as necessary
to meet best practice in terms of environment or ecology.
Any amended document shall be submitted to the
Planning Authority as soon as reasonably practicable
citing the relevant amendment and appropriate guidance.
Reason - In the interests of protecting environmental
quality.
Biodiversity and Landscaping
8. Prior to the commencement of the development, an
independent and suitably qualified ecologist shall be
appointed by the developer at their expense as the
'Ecological Clerk of Works' (ECOW) for the site.  This
appointment shall be subject to the prior written approval
of the Planning Authority and detail the extent of
inspections to be undertaken by the ECOW and how this
relates to the delivery of the development.  The ECOW
shall oversee, on behalf of the Planning Authority, the
implementation of all ecology related planning conditions.
The ECOW shall undertake a watching brief throughout
the construction of the development and shall have the
authority to stop operations or to alter construction
methods should there be any works occurring which are
having an adverse impact on natural heritage.
The ECOW shall have responsibility for the following:
a) Monitoring compliance with the mitigation works
related to the development as set out in the
Construction Environment Management Plan and
other relevant environmental conditions.
b) Advising the developer on adequate protection of
nature conservation interest on the site, including
altering construction practices if existing practices
are having an adverse impact on the natural
heritage of the site.
c) If any protected species are found on site, the
Ecological Clerk of Works will ensure that work is
suspended at that location and that a protected
species protection plan is implemented.
The ECOW is required to notify the Planning Authority:
d) If there has been a requirement to stop or alter
works in relation to this condition.
e) They are required to submit a report on their
inspection (frequency to be agreed) for the review of
the Planning Authority during construction
operations.
f) They will have the power to amend the CEMP,
where required, with any amendments and
measures to mitigate submitted to the Planning
Authority.
Reason - In order to ensure that an ECOW is appointed
and is suitability qualified and has a suitable job
description and powers to oversee all salient ecological
matters affecting the construction of the development.

Page 15

DRAFT
9. The conclusions and recommended action points within
the supporting Biodiversity Monitoring Strategy
(Document 75), hereby approved, shall be fully adhered
to, respected and undertaken as part of the construction
phase of development.  Any deviation from the
recommendations will require to be agreed by written
approval of the Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
10. Prior to the road being opened for use by the public, the
location and details, including numbers, species and
sizes of the compensatory tree planting will be provided
for the approval of the Planning Authority.  Thereafter, the
trees will be planted as agreed at the earliest opportunity
and prior to the road being opened for use by the public.
Reason - In the interests of ensuring that adequate
compensatory tree planting is provided to offset the
impact of the development.
11. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
12. The location and number of bat, bird and hedgehog
boxes will be submitted and agreed with the Planning
Authority prior to their installation, in line with the
timescales set out in the Woodland Management Plan.
Reason - In the interests of protecting environmental
quality and of biodiversity.
Drainage and Flooding
13. Development shall not commence on site (with the
exception of site clearance works) until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council
as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
14. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.

Page 16

DRAFT
Reason - To ensure the provision of effective drainage for
the site.
Justification
The proposal is a minor departure to the Development Plan due
to the loss of ancient woodland, however, there are material
considerations which justify a departure from the Plan.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be:
 Displayed in a prominent place at or in the vicinity of
the site of the development
 Readily visible to the public
 Printed on durable material.
4. The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority Road Construction Consent
(RCC) to construct a new road prior to the
commencement of roadworks.  Advice on the disposal of
surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable
for the processing of RCC applications.
5. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 they must obtain from the
Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular

Page 17

DRAFT
Access consents (VA1) and application forms are
available at www.pkc.gov.uk/vehicleaccess.  Advice on
the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
6. The applicant should be advised to contact Perth &
Kinross Council Street Lighting Department to obtain
technical approval for all street lighting provision.
7. The applicant is reminded that, should any protected
species be present a licence may be required from
NatureScot to disturb a protected species. Failure to
obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-
compliance.
8. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
9. The applicant is advised to refer to Perth & Kinross
Council's Flood Risk and Flood Risk Assessments
Supplementary Guidance, and the CIRIA SuDS manual
as it contains advice relevant to your development.
(Having declared a financial interest in the following item, Bailie M Williamson left the
meeting at this time.)
(2) Local Applications
(i) 23/01742/FLL - Erection of a brewery, tap room, storage,
formation of vehicle access, parking area, installation of EV
charging point, formation of outdoor seating area,
landscaping and associated works, land 50 metres south of
Council Cottages, Ferry Road, Pitlochry (Report No. 25/31)
Mr J Low, applicant, addressed the committee, and answered
Members questions.
Resolved:
Grant, subject to the following terms, conditions and
informatives:
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.

Page 18

DRAFT
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document(s) Ecological Appraisal by Tay
Ecology 3 October 2023 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
4. Prior to the occupation of the building hereby approved,
evidence that the bird and bat boxes have been installed
shall be submitted for the written approval of the Council
as Planning Authority, reference drawing 52.  Thereafter,
the bird and bat boxes shall be maintained in a
reasonable condition for the life of the development to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
5. A site meeting will be held with the Enforcement Officer
(Trees) of the Council to examine completed tree works,
honey fungus mitigation, and to inspect tree protection
measures in place that accord with standard (fencing/non
dig construction, etc), drainage, and site storage facilities.
This meeting shall be with the project manager,
arboriculturist, and ground works contractor.  Contact
should be made with the Planning Authority to arrange
this meeting prior to the commencement of the
development.
Reason - In the interests of protecting environmental
quality and of biodiversity.
6. Prior to the commencement of development, a site-
specific method statement outlining measures to mitigate
against the spread of honey fungus shall be submitted to
the Council as Planning Authority for review and written
approval.  The statement shall include details on the
removal of affected trees (6 x dead oak), disposal of soil
areas contaminated with honey fungus and provide full
details of disposal of all excess materials.  Clarity shall be
provided on where the soil materials excavated will be
deposited when levelling site, formation of building
footprint, filtration trenches/drainage, and access/parking.
Clarity shall be provided on how the drainage works will
be undertaken, and whether larger encroaching roots
would be permitted within the drainage material, and how
the cutting into the banking will be undertaken, the
foundation type for structures, and subbase for

Page 19

DRAFT
paths/surfacing, where they impact and encroach the
RPA of adjacent trees.  Thereafter the measures shall be
carried out in complete accordance with the details as so
agreed.
Reason - In the interests of protecting environmental
quality and of biodiversity.
7. Prior to the building being brought into use a post
development tree report/audit confirming details of the
trees retained on site, their condition, and a statement as
to the effectiveness of protection measures followed shall
be submitted for review and written approval of the
Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
8. Servicing of and deliveries to the premises shall be
carried out between 0700 and 1900 Monday to Saturday
only, with no servicing or deliveries permitted on
Sundays.
Reason - In order to safeguard the residential amenity of
the area.
9. The hours of operation of the outdoor seating area shall
be restricted to between 1100 to 2200 hours Monday to
Sunday.
Reason - In order to safeguard the residential amenity of
the area.
10. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with
all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
11. No music, amplified or otherwise, shall be permitted in
the outdoor seating area at any time.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
12. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In order to safeguard the residential amenity of
the area.
13. No odours from the distillery shall be discernible on the
boundary with the nearest residential property.
Reason - In order to safeguard the residential amenity of
the area.
14. All mitigation measures as detailed within Section 6 of
the Odour Assessment undertaken by The Airshed,

Page 20

DRAFT
reference AS 1020 Pitlochry Brewery Airshed, dated 18
October 2023 shall be fully implemented.
Reason - In order to safeguard the residential amenity of
the area.
15. All mitigation measures as detailed within Section 7 of
the Noise Impact Assessment undertaken by CSP
Acoustics, reference 1866 R001 V3 AH, dated 12
December 2023 shall be fully implemented.
Reason - In order to safeguard the residential amenity of
the area.
16. Noise from operations on site shall not exceed L A90,1
hour background noise level plus 5dB (A), including any
relevant penalties for tonality, impulsivity, intermittency,
or other sound characteristics when measured at any
residential property in accordance with
BS4142:2014+A1:2019.
Reason - In order to safeguard the residential amenity of
the area.
17. A Noise Management Plan shall be submitted for the
written approval of the Planning Authority.  The plan shall
include all sources of noise associated with the premise,
including patron noise, deliveries, compressor etc and
the measures that will be put in place to minimise and/or
control noise.  The plan shall be reviewed on a regular
basis or, following receipt of a justified complaint or at the
request of the Planning Authority.  Once the Noise
Management Plan has been approved, it shall be fully
implemented for the lifetime of the development.
Reason - In order to safeguard the residential amenity of
the area.
18. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
conditions 10, 15, 16 and 17 above.  The assessment will
be carried out to an appropriate methodology agreed in
writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply
with conditions 10, 15, 16 and 17 a scheme of noise
mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the
scheme and shall be submitted to the Planning Authority
for written approval within 28 days of the assessment. 
The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales.
Reason - In order to safeguard the residential amenity of
the area.
19. In the event of a justified odour complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out an odour assessment to verify compliance
with conditions 13 and 14 above.  The assessment will

Page 21

DRAFT
be carried out to an appropriate methodology agreed in
writing with the Planning Authority.  If the odour
assessment shows that the odour levels do not comply
with conditions 13 and 14 a scheme of odour mitigation
shall be included with the odour assessment, specifying
timescales for the implementation of the scheme and
shall be submitted to the Planning Authority for written
approval within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales.
Reason - In order to safeguard the residential amenity of
the area.
20. The core path (PLRY/109) must not be obstructed during
building works or on completion of the development.  Any
damage done to the route and/or the associated signage
during building works must be made good before the
development is completed or brought into use, whichever
is the earlier.
Reason - To ensure continued public access to the public
paths and in the interests of public safety within the site.
21. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved. 
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
22. Prior to the commencement of the development hereby
approved, the applicant shall submit for the written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS). The
TMS shall take cognisance of the fact that no loading and
unloading of vehicles shall be undertaken on the public
road and shall include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers for loading and
unloading materials at the site;

Page 22

DRAFT
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for all users including pedestrians, cyclists and
equestrians;
i) details of information signs to inform other road
users of construction traffic;
j) arrangements to ensure that access for
emergency service vehicles are not impeded;
k) traffic arrangements in the immediate vicinity of
temporary construction compounds;
l) monitoring, reporting and implementation
arrangements;
m) arrangements for dealing with non-compliance;
and
n) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
23. Prior to the commencement of the development hereby
approved, the developer shall provide, for approval by
the Council as Roads Authority, a Service Management
Plan detailing the plans for servicing and delivery
operations, and timing, including arrangements for the
management of vehicular and pedestrian traffic during
servicing and delivery, paying particular attention to the
need for all deliveries to be undertaken off the public
road.  Thereafter, the approved plan shall be adhered to
for the life of the development.
Reason - In the interests of road safety.
24. Prior to commencement of any development on site, a
detailed design showing the frontage of the development
site onto Ferry Road shall be provided with the following
schemes being provided:
a) position of uncontrolled crossing location(s) along
the frontage of the site to link the development site
to the northern side of Ferry Road with dropped
kerbs linking both sides;

Page 23

DRAFT
b) the footway on the southern side of Ferry Road, of
a minimum width of 2 metres along the full
frontage of the site;
c) the location of road drainage on Ferry Road along
the frontage of the site;
d) the finalised location of the streetlighting cable;
e) the construction details of the parking bays and
the service area; and
f) full details of the vehicle access, to be constructed
in the following materials:
40mm Wearing Course - Hot Rolled Asphalt
50mm Base Couse - Dense Bitumen Macadam
130mm Roadbase - Dense Bitumen Macadam
230mm Subbase - Type 1
The submission will confirm the location, specification
and detailed design for the pedestrian crossing, location
of the streetlighting infrastructure, footway on southern
side of Ferry Road, road drainage and vehicle access
along the frontage of the development site.  This shall be
submitted for the written approval of the Council as
Planning Authority.  Thereafter the approved scheme
shall be implemented in full, prior to occupation of the
brewery.
Reason - In the interests of road and pedestrian safety
and connectivity to the northern side of Ferry Road.
25. Prior to commencement of any development on site, a
detailed design for the proposed cycle parking facility for
a minimum of 10 cycles shall be submitted to and
approved in writing by the Planning Authority in
consultation with the Roads Authority.  The cycle parking,
as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority prior to the
development being brought into use.
Reason - To encourage active and sustainable modes of
transport in line with national and local planning policy.
26. Prior to the commencement of development hereby
approved, a statement shall be submitted for approval in
writing by the Council as Planning Authority to
demonstrate that at least 10% of the current carbon
emissions reduction set by Scottish Building Standards
will be met through the installation and operation of low
and zero-carbon generating technologies. The statement
as agreed shall be fully implemented to the satisfaction of
the Council as Planning Authority.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
Justification
There are material considerations to justify a departure from the
Development Plan otherwise, the proposal is generally in

Page 24

DRAFT
accordance with the Development Plan.  There are no material
reasons which justify refusal.
Informatives
1. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.
Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
2. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken.  Please use the form attached
herewith.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
4. Please note the consultation response on file from
Network Rail - A railway underbridge located in close
proximity to the site (UB 290/063 crossing Ferry Road)
has a headroom of 4.2m.  The applicant should ensure
that all vehicles required for construction and operation
are able to clear this height.
5. Please note the consultation response from Scottish
Water on file - this includes a request that prior to work
commencing on site they are notified at
protectdwsources@scottishwater.co.uk as they may wish
to take water samples as a precaution to protect water
quality.  In addition, increases in water usage should also
be relayed to Scottish Water.
6. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended.
The variations incorporate changes to the front elevation
and vehicular access.
7. An inspection of the proposed development site did not
raise any real concerns, although historical mapping
indicates there was previously a nearby use which may
have resulted in contamination in the vicinity of the site. 
The applicant is advised that, given historical uses of the
wider area, there may be potential for contamination

Page 25

DRAFT
within the site.  Should any contamination be found
during the approved works, works should cease and the
Land Quality team should be contacted on 01738 475000
or es@pkc.gov.uk for further advice.
8. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
investigation and possible action by Environmental
Health under the Environmental Protection Act 1990.
9. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
10. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
11. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits
12. Road drainage may be in the vicinity of the new access
and require remedial works at the applicant’s expense. 
Contact Perth & Kinross Council Road Maintenance
Department for further details.
13. Street lighting infrastructure present at the site,
discussions must be had with the Street Lighting
Partnership to obtain the locations of infrastructure and
its relocation to facilitate the vehicle access.  Relocation
to be undertaken at applicant's expense.  Contact Mark
Gorrie at Perth & Kinross Council Street Lighting
Department for further details.
14. The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport

Page 26

DRAFT
Scotland's Cycling by Design 2021 or similar design
guide.
(Bailie M Williamson returned to the meeting.)
(ii) 24/01440/FLL - Change of use of flat to short-term let
accommodation in retrospect, Flat 3, 7 Brae Street,
Dunkeld, PH8 0BA (Report No. 25/32)
Mr F Potter, on behalf of the applicant, addressed the
committee, and answered Members questions.
Resolved:
Grant, subject to the following terms, conditions and
informatives:
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents.
2. The development hereby approved shall be used solely
for holiday accommodation and shall not be occupied as
the sole or main residence of any occupant.
Reason – In order to clarify the terms of the permission;
to control and restrict the use of the building.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Part of the approved development includes holiday
accommodation or Short-term Let accommodation (STL).
The developer is advised that holiday accommodation
and STLs require to be licensed under the terms of
Article 3 of the Civic Government (Scotland) Act 1982
(Licensing of Short-term Lets) Order 2021 and therefore
a licence application should be made to Perth and
Kinross Council prior to operation commencing.  Further
information and application forms are available at
https://www.pkc.gov.uk/shorttermlets.
2. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended.
The variations incorporated minor changes in the
interest of accuracy.