Perth and Kinross Council 
Planning and Placemaking Committee - 14 October 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/281) 
Proposal: Formation of permanent and temporary access tracks, temporary
bellmouth junctions and construction/laydown compounds and associated
works 
Location: Land 350 metres west of Studio Cottage, Tummel Bridge, Pitlochry, PH16
5SB 
Ref. No: 26/00501/FLM
Ward No: P4 - Highland 
Summary 
The application proposes approximately 1.7 km of permanent access track, two
associated temporary laydown / compound areas, two temporary junction bellmouths,
the widening of two sections of existing access track and construction of two sections of
temporary access track between the existing Errochty substation and the new
Kinardochy substation. 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The application relates to proposed tracks, junctions, compounds and other
works associated with wider work related to substations at Errochty and
Kinardochy. The overall project related to Scottish and UK Government’s Net
Zero climate change targets and are part of significant investment in new
transmission network infrastructure to transport renewable energy and reinforce
the network. 
2 The proposed access tracks and associated works will facilitate the installation of
a double circuit 132 Kv underground cable (UGC) between the Errochty and
Kinardochy substations, south of Tummel Bridge. The UGC work itself permitted
development. The area is characterised by above-ground, electrical
Infrastructure within otherwise: open moorland used primarily for rough grazing,

Page 2

commercial forestry plantation, native woodland planting and agricultural ground.
There are no core paths or statutory designations within the site boundary. In
terms of archaeology and cultural heritage, the main asset is the Tom Beithe
Military Road (MPK 1783), a well-preserved example of a military road, with
sections of road surface still exposed. Furthermore, the kiln associated with
Tombreck Township (MPK8855) is located nearby. 
3 The key components comprise: 
• 7km of permanent stone access track;
• 136m of temporary access track (north);
• 107m of temporary access track (south),
• 462m of existing track widening (north);
• 406m of existing track widening (south);
• Two temporary bellmouth junctions off the B846 public road;
• A temporary laydown / construction compound (north) approximately 80m x
50m
• A temporary laydown / construction compound (south) approximately 89m x
54m, and the reinstatement of temporary elements. Compounds would see
elements such as EV charging, generators, offices, toilets, canteens, toilets,
showers, fuel tanks, skips, etc. 
4 In addition, a small section of temporary stone access track is required to
facilitate a temporary diversion of an existing access to a residential property
(Tombreck Cottage) during the construction period. Two temporary bellmouth
junctions are also required to facilitate construction traffic off the adjacent B846.
In addition, two temporary construction compounds would provide office and
welfare facilities, parking, laydown areas, and holding and servicing space for
construction plant. 
5 Following the completion of the substation works, all temporary construction
areas will be reinstated, including landscaping which comprises a grass centre
strip and reseeding of the edges of the permanent track. Furthermore,
compensatory planting will be undertaken to ensure that an equivalent area of
woodland will be planted to what is being proposed to be felled. 
Site History 
6 21/00215/FLN – Planning Permission was granted on 30 August 2021. For a
National Scale proposal for the installation of an electricity substation and
ancillary buildings, formation of a vehicular access and track,
hardstanding/platform areas, landscaping and associated works | Land 1100
Metres North Of Braes Lodge, Foss 
21/01808/FLL – Planning permission was approved on 9/12/21 for the formation
of a site compound, associated welfare office and storage facility, parking and
associated works for a temporary period, at land 250m south-west of Baluain,
Tummel Bridge.

Page 3

23/00526/FLL - Planning permission was approved on 5/07/23 for the erection of
2 transformers, a control building, associated plant and infrastructure, ancillary
facilities, laydown areas, temporary construction compound, siting of temporary
welfare/site office units, landscaping and associated works, at land 350m west of
Studio Cottage Tummel Bridge Pitlochry. 
24/00011/PAN - Submitted on 23.10.2024 for proposed access tracks, bellmouth
junctions, a short section of temporary access track and two temporary
construction compounds. Closed on 4.11.2024. The details of the proposed
public consultation were considered acceptable. 
25/00006/PREAPM - Pre-Application advice was sought and provided
(15/05/2026) in relation to the development of a permanent stone access track to
facilitate the installation of a 132 kV underground cable.  Also, ancillary
infrastructure required during the construction: two temporary bellmouth
junctions, two temporary construction compounds and a small section of
temporary stone access track, at Land 350m west of Studio Cottage, Tummel
Bridge, Pitlochry. 
Environmental Impact Assessment 
7 The proposal in itself is not EIA development, as it is not listed within Schedule 1
of the EIA Regulations and an EIA Report has not been submitted. The parallel
provision of the Kinardochy Substation (being a key element of part of the Beauly
to Denny line) was a National Development and as such was required to be
accompanied by an EIA at the time of the consideration of that application.  The
scale of works associated with the access track provision, bellmouth upgrades,
and set down areas in this instance, are a separate aspect for the intervening line
upgrade, between the Kinardochy and Errochty sub stations, which is itself
permitted development. 
Pre-Application Consultation 
8 Pre application Reference: 25/00006/PREAPM  
9 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009; therefore, the applicant was required to undertake formal pre-application
consultation with the local community. 
10 A Proposal of Application Notice (PAN) was submitted to the Council on 22
October 2024, triggering the beginning of the statutory consultation period. The
PAN outlined the application details, dates of public events and publicity
arrangements. A first public consultation event (November 2024) saw newspaper
notices published in The Scotsman and Perthshire Advertiser on 15 November
2024. A second PAN was submitted on 24 April 2025 to confirm a revised date
and venue. A second public consultation event (PAC Event 2), saw newspaper
notices were published in The Scotsman on 1 May 2025 and Perthshire
Advertiser on 29 April 2025. In addition, public consultation posters were

Page 4

circulated via email to the Killiecrankie, Fincastle and Tummel Community
Council for sharing within their communities. 
11 The event was held at Kynachan Village Hall on Tuesday 26 November 2024,
between 2 – 7pm. This provided an opportunity for all interested parties to view
information about the proposed development, ask questions, and provide
feedback. The second event was on Monday 12 May 2025 between 4 – 7pm,
again at Kynachan Village Hall. This event gave feedback on comments received
and a further opportunity to view information, ask questions, and provide
feedback. 
Development Plan 
12 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
13 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
14 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 14: Design, Quality and Place
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.

Page 5

16 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments
• Policy 26B: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 35: Electricity Transmission Infrastructure
• Policy 38B: National Designations
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 58A: Contaminated Land
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure 
Statutory Supplementary Guidance 
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Landscape( (adopted in 2020)
• Supplementary Guidance - Placemaking( (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
17 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below.

Page 6

Planning Advice Notes 
18 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
Creating Places 2013 
19 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy, and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving all
streets including parking provision. 
Local Place Plans 
21 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. In this instance, the application site does not lie within an area
covered by a Local Place Plan. 
Consultations 
22 As part of the planning application process the following bodies were consulted: 
External 
23 Historic Environment Scotland (HES) - No objection. Note that the application
should be determined in accordance with national and local policy, together with
related policy guidance. 
24 Scottish Forestry - No objection, subject to an informative requesting that the
felling of six semi-mature birch trees should be avoided and a condition requiring
compensatory planting. 
25 Perth and Kinross Heritage Trust (PKHT) - No objection, subject to conditions
relating to a programme of archaeological works and protective fencing around
Tombreck Kiln. 
26 Scottish Water - No objection. However, advise their records indicate potential
impact on existing Scottish Water assets. As such, the applicant should contact
the Asset Impact Team via the Customer Portal. Furthermore, written permission
must be obtained before any works are started within the area of any Scottish
Water owned apparatus.

Page 7

27 It is also advised that Scottish Water records indicate that the works fall within a
drinking water catchment where a Scottish Water abstraction is located, which
should be made evident in all future documentation. In addition, anyone working
on site should be made aware of this. 
28. Ministry of Defence (MOD) - No objection. Advise the proposals fall outside
MOD safeguarded areas and do not affect other MOD interests. 
Internal 
29 Environmental Health (Contaminated Land) - No objection. Advise historic
records do not raise any concerns regarding ground contamination and,
therefore, there are no adverse comments to make on the application.   
30 Environmental Health (Noise Odour) - No objection. There are no adverse
comments in relation to the application. 
31 Development Contributions Officer - The proposal is not subject to the terms
of the Developer Contributions and Affordable Housing Supplementary
Guidance. 
32 Community Greenspace - No objection. There are no specific comments or
concerns in relation to this planning application. 
33 Transportation and Development - No objection, subject to conditions relating
to the design of the proposed access and visibility splays. An informative is
recommended to ensure that any road opening is consented. 
34 Structures and Flooding - No objection, subject to a condition relating to SuDS. 
35 Biodiversity Officer - No objection, subject to conditions relating to biodiversity,
compensatory planting, an updated Ecology Report, the appointment of an
ecological clerk of works, a Site Biodiversity Action Plan, and a Peat
Management Plan. 
36 Private Water Supply Team - No objection, subject to a condition requiring
measures to safeguard any private water supplies. 
Representations 
37 No representations were received. 
Additional Statements 
Screening Opinion Submitted. EIA not required 
Environmental Impact Assessment (EIA):
Environmental Assessment Report
Not required
Not required 
Habitat Regulations Assessment Submitted

Page 8

Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
Not required 
Appraisal 
38 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise. The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below. In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
39 The key determining policy issues include: the principle of the development and
its contribution towards renewable generation targets/net zero agenda, (Policies
33 and 35 of the LDP2 and Policies 1 and 11 of the NPF 4), landscape/visual
impact and recreational interests/access, (Polices 15 and 39 of the LDP2)
impacts on/from flooding and the water environment (Polies 52 and 53A of the
LDP2 and Policy 22 of the NPF4) biodiversity/ecological impact (Policies 40 and
11 41 of the LDP2 and Policy 3 of the NPF4) and transport (Policy 60A of the
LDP2 and Policy 13 of the NPF4). 
40 The proposal is for temporary and permanent access tracks, and associated
works, between the existing Errochty substation and the new Kinardochy
substation. The wider substation proposals related to Scottish and UK
Government Net Zero climate change targets which see significant increases in
renewable generation, requiring greater capacity across the UK grid. As such,
significant investment in new transmission network infrastructure to transport
renewable energy and reinforce the network is required. The Proposed
Development will facilitate the construction of a key component of a critical
expansion of the transmission network (substation) to enable renewable
connections and transmission of energy to the wider electricity network. 
41 Furthermore, this wider electricity network infrastructure is designated as a
National Development and explicitly supported by NPF4 under the provisions set
out in Policy 11(a)(ii): Energy. The proposed development is also considered to
be acceptable in relation to all of Policy 11’s environmental and technical topic
criteria. In light of this, there are no concerns with the principle of the proposed
development as it is considered to be required and appropriate in this locality.
The following report will assess the proposals against all other relevant NPF4
and LDP2 policies, which are listed above.

Page 9

Design and Layout 
42 LDP2 Policy 1A: Placemaking requires new development to positively contribute
to the quality of the surrounding built and natural environment. It further requires
consideration against a series of place making criteria (Part B). On this basis, the
physical nature of the proposal in terms of design, layout, and physical
characteristics must also be considered. 
43. NPF4 Policy 14 focuses on design, quality and placemaking. It requires that
development proposals improve the quality of an area, whether in urban or rural
locations, and be consistent with the six qualities of successful places: Healthy,
Pleasant, Connected, Distinctive, Sustainable, and Adaptable. Developments
that harm the amenity of surrounding areas or fail to meet these qualities will not
be supported. 
44 Design principles have been adopted to ensure the proposed development is
sited and designed as sensitively as possible, taking into account the
environment and the context in which it sits. The layout and design of the
proposals have been influenced by the potential impacts on sensitive receptors
and features within the surrounding environment. Potential sensitive receptors
within the study area are those where physical or perceptual effects may result
as a consequence of the proposed development. 
45 The two most sensitive receptors are forestry and ornithology. However, as noted
above, the design has sought to avoid the most sensitive areas of ancient
woodland, with no areas being affected by the proposals. In terms of any impact
on ornithology, mitigation has been provided, including a Construction
Environmental Management Plan (CEMP), which will include measures to protect
ornithological features: a pre-construction nesting bird check, and habitat
reinstatement / landscape planting which could provide alternatives to that
impacted. Furthermore, it is not predicted that there will be any long-term residual
effects on breeding birds. 
46 It is considered that the applicant has given careful consideration to the siting,
design, layout and access of the proposed development to ensure that it is
designed sensitively for the surroundings. The design seeks to minimise the
impact on the surrounding environment, whilst satisfying technical requirements
and functionality. Existing infrastructure has been utilised as much as possible,
which has limited the need for new tracks. The proposed development will also
support the delivery of sustainable development, reaching net zero targets, and
increased transmission of renewable energy. 
47. Furthermore, the proposed temporary laydown / construction compounds will
include office and welfare facilities for staff, parking, laydown areas, and holding
and servicing space for construction plant. The compounds are approximately
80m x 50m and 89m x 54m and will be removed on completion of works and the
land restored. Following an assessment of the proposed layout and design, it is
considered that the proposals are in accordance with LDP2 Policy 1A, and NPF4
Policy 14.

Page 10

Landscape and Visual Amenity 
48 NPF4 Policy 4: Natural Places states that development proposals which by virtue
of type, location or scale will have an unacceptable impact on the natural
environment, will not be supported. Furthermore, development proposals that are
likely to have a significant effect on an existing or proposed European site
(Special Area of Conservation or Special Protection Areas) and are not directly
connected with or necessary to their conservation management are required to
be subject to an “appropriate assessment” of the implications for the
conservation objectives. 
49 Perth and Kinross Council LDP2, Policy 39: Landscape states that development
and land use change, including the creation of new hill tracks, should be
compatible with the distinctive characteristics and features of Perth and Kinross’
landscapes. Accordingly, development proposals will be supported where they
do not conflict with the aim of maintaining and enhancing the landscape qualities
of Perth and Kinross, or the quality of landscape experience. The Loch Tummel
National Scenic Area (NSA) adjoins the B846 to the east of the proposed
development, and the Loch Rannoch and Glen Lyon NSA is situated 1.5 km east
to southeast. Given the distance from these NSA’s, it is not considered that the
proposed development will have any adverse impacts on the character and
appearance of these natural heritage assets.   
50 The proposals are located within a landscape character of very few settlements,
with existing minor tracks used for sporting, forestry and recreation access.
There are also newer, more visible tracks used for access to wind farms, pylon
construction, and forestry. Overall, the application site and surrounding area
have a remote and wild character. 
51 The area also sees existing transmission infrastructure, i.e. overhead lines,
substations and associated tracks, which are significant components of the
existing landscape. The choice of route and design for the proposed access
tracks has been developed such that their length and impact are minimised.
Furthermore, the proposed tracks are similar in form to existing access tracks,
associated with other infrastructure in the surrounding landscape. Therefore,
given that there are existing industrial elements in the surrounding landscape, the
proposed access tracks will not result in a significant further impact. 
52 There are clusters of residential properties throughout the landscape, primarily
associated with farm steads. Tummel Bridge is the only village with potential to
be impacted and is c.300m to the north/northwest. Tummel Bridge comprising a
series of semi-detached, terraced and detached houses south of the River
Tummel and a holiday park to the north. Overall, given the distances involved
and the temporary nature of the much of the proposed works, there are no
predicted significant effects on communities or individual dwellings because of
the proposed development. 
53 Overall, it is considered that the proposals would contain features already evident
and frequently observed in the landscape and visual context of the surrounding

Page 11

area, such forestry and farm access tracks. As a result, it is not considered that
the proposals would unacceptably comprise the landscape experience of any
visitors to the area or see any unacceptable adverse impact on the surrounding
landscape and its visual amenity. 
54 Full reinstatement of grassland and compensatory tree planting will be carried
out within the next planting or seeding season following construction works, using
locally appropriate species. This will amount to at least the equivalent in
woodland area to what is proposed to be felled. In light of the above, the
proposed development is considered to be in accordance with LDP2 Policy 39
and NPF4 Policy 4. 
55 LDP2 Policy 56 relates to noise pollution and presumes against development
which generate high levels of noise near noise sensitive land uses and vice
versa. In this regard construction noise will be managed via a Construction
Environmental Management Plan (CEMP) via Condition 14. The CEMP will
include measures required to control noise and dust during the construction
phase including the two temporary compound areas. Furthermore, the CEMP
includes workings hours of 0700 – 1900 Monday to Friday, 0800 – 1300
Saturday, with no noise generating works taking place on a Sunday. Overall,
PKC Environmental Health Team (noise and odour) have no objections or
adverse comments to make regarding the proposed development. It is, therefore,
considered, subject to condition, the proposed development is in accordance with
LDP2 Poloicy 56. 
Roads and Access 
56 LDP2 Policy 15: Public Access states that development proposals that would
have an adverse impact upon the integrity of any (including proposed) core path,
disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted. 
57 LDP2 Policy 60A: Existing Infrastructure sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. 
58 In this instance, the construction and operation of the proposed development is
not considered to give rise to any significant adverse effects in terms of public
access or use of undesignated paths or tourist traffic routes. 
59 The primary access from the public road would be via the two new temporary bell
mouths off the B846 at Tummel Bridge. The first adjacent to the Errochty
Substation and the second approximately 1km further south along the B846.
Permanent stone access tracks are required to facilitate the installation of the
underground cable (UDC) and allow access to UGC joint bays for operation and
maintenance purposes. A section of temporary stone access track (north) is
required, to provide construction access, between the temporary bellmouth
leaving the B846 and the northern temporary construction access. A further

Page 12

section of temporary stone access track is required to facilitate the temporary
diversion of an existing access to a residential property during construction. 
60 All temporary access tracks will be removed on completion of the works and the
areas reinstated. Two additional sections of existing track will require temporary
widening to facilitate the installation of the UGC. These widened sections of
tracks will be removed upon completion of the works and the areas reinstated. 
61 The two bellmouth junctions off the B846, a 60mph speed limited, and 215m
visibility splays are required by Roads colleagues. The submitted plans only
indicate 160m splays, with no justification to justify this reduction. This being the
case, Condition 11 has been included and a further condition (Condition 10) to
ensure accordance with the Council’s Road Development Guide. In light of the
above, and subject to condition, it is considered that the proposed development
is in accordance with LDP2 Policies 15 and 60A. 
Drainage and Flooding 
62 NPF4 Policy 22: Flood Risk and Water Management states that development
proposals must have regard to the water environment and drainage, including
floodwater management, within any proposal. 
63 LDP2 Policy 52: New Development and Flooding states that the Council supports
the actions and objectives to avoid increased, reduce overall, and more generally
manage flood risk in alignment with SEPA Strategies and Plans. 
64 In this instance, the proposed access tracks are located out with areas shown to
be at medium or high fluvial flood risk. However, the proposed works could affect
surface water runoff and overland flow paths, particularly during construction. No
detailed drainage design has been submitted. In light of this, a condition has
been included (Condition13) to ensure that details of the proposed SuDS scheme
are submitted prior to development commencing. Furthermore, all tracks and
temporary compounds should include appropriate drainage measures to
intercept and safely discharge surface water without increasing flood risk
elsewhere. Any new or modified watercourse crossings, such as where the
permanent access track crosses a tributary of the Alt Kynachan burn, must be
designed to accommodate at least the 1 in 200-year event plus climate change,
and include appropriate allowance for debris as well as avoiding increasing flood
risk upstream or downstream. 
65 A further condition (Condition 12) has been included to ensure the safeguarding
of any private water supplies. The proposed access tracks are located outwith
areas that are shown to be at medium or high fluvial flood risk, and the design of
appropriate drainage measures have been covered by condition. In light of the
above, and subject to conditions, the proposed development is considered to be
in accordance with LDP2 Policy 52, and NPF4 Policy 22.

Page 13

Conservation and Cultural Heritage 
66 Polices 26A and 26B of the LDP2 and Policy 7 of NPF4 are relevant policies in
respect of conservation and cultural heritage matters. 
67 The assessment of effects on cultural heritage assets, considered in the
paragraphs below, has determined that no significant adverse effects are
predicted post-mitigation. The proposed mitigation being set out in Chapter 8 of
the EA Report, and centres upon protection of known assets, and a watching
brief to record any currently unknown assets. 
68     One of the most vulnerable assets is the Tom Beithe Military Road (MPK1783).
Given the nature of the remains, which are visible across the landscape, a field
survey prior to any physical excavations should be submitted. PKHT have
recommended that this is covered under a programme of works and should also
include an evaluation of suitable areas for potential unknown buried remains,
based on topography/ context etc. Overall, PKHT agree in principle with the
proposed mitigation, but this will need to be detailed in a Written Scheme of
Investigation (WSI). (Condition 2) Condition 3 is included to ensure that
protective fencing is erected to ensure no accidental damage during construction
works to the kiln associated with Tombreck Township (MPK8855), a good
example of an 18th century Scottish farmstead. 
69 In light of the above, and subject to conditions, the proposed development is
considered to be in accordance with Polices 26A and 26B of the LDP2 and Policy
7 of NPF4 
Natural Heritage and Biodiversity 
70 NPF4 Policy 3: Biodiversity seeks development proposals to contribute to the
enhancement of biodiversity, by restoring degraded habitats and building and
strengthening nature networks and their connection. Also, by integrating nature-
based solutions. Furthermore, major developments will only be supported where
it can be demonstrated that the proposal will conserve, restore and enhance
biodiversity, including nature networks, so they are in a demonstrably better state
than without intervention. This will include future management and to inform this,
best practice assessment methods should be used. 
71 NatureScot guidance states that NPF4 Policy 3 requires that proposals
demonstrate significant biodiversity enhancement, in addition to any proposed
mitigation. Enhancement can only be considered as such when it is over and
above the measures required for mitigation and compensation. 
72 In this instance, the submitted information states that Biodiversity Net Gain
Assessment will be provided with a commitment to deliver 10% net gain. This
has not been submitted, and therefore, a condition has been included to ensure
that a habitat management and biodiversity enhancement plan is submitted for
approval prior to development commencing (Condition 7). Furthermore, Scotland
does not yet have a biodiversity net gain metric and so to be in accordance with

Page 14

NPF4, the applicant must demonstrate how significant biodiversity enhancement
will be achieved. A further condition (Condition 4) has been included to ensure
that the conclusions and recommended action points of the submitted
Biodiversity Study are adhered to in full. 
73 NPF4 Policy 4: Natural Places states that development proposals that are likely
to have an adverse effect on protected species will only be supported where the
proposal meets the relevant statutory tests. If there is reasonable evidence to
suggest that a protected species is present on a site or may be affected by a
proposed development, steps must be taken to establish its presence. The level
of protection required by legislation must be factored into the planning and
design of development, and potential impacts must be fully considered prior to
the determination of any application. Furthermore, NPF4 Policy 4 (f) states that
development proposals that are likely to have an adverse effect on species
protected by legislation will only be supported where the proposal meets the
relevant statutory tests. 
74 The submitted Environmental Assessment (EA) has considered the effects on
European sites designated for nature conservation, and no residual effects are
predicted. The proposed development is noted as having potential connectivity
with the River Tay SAC. As a result, a Habitats Regulations Appraisal (HRA) has
been undertaken. This considers the potential impacts in further detail, with
regards to the conservation objectives, supporting habitats, site integrity, and any
likely significant effects on the SAC. It is considered that the proposed
development will not adversely affect the integrity of the River Tay SAC, in view
of the site conservations objectives, subject to the mitigation measures outlined.
However, an updated Ecology Survey is required, which has been covered by
the inclusion of Condition 5. 
75 The Proposed Development lies within 75m of the River Tummel which forms
part of the River Tay Special Area of Conservation (SAC). In addition, tributaries
which share ecological and hydrological connectivity with the SAC flow through
the site, notably Allt Kynachan. Construction works are to take place within
relative proximity to these locations, and therefore, there is potential for pollution
incidents to result in indirect impacts on the SAC. Associated measures within a
CEMP, including actions to reduce lighting, will mitigate the impacts on the River
Tay SAC and nocturnal species. A further condition (Condition 6) has been
included relating to the appointment of an Ecological Clerk of Works. This is to
ensure that all construction works that may, potentially, adversely affect the
environment are carried out according to the relevant planning conditions. 
76 Given that the proposed development will cross through areas of peatland. A
Peat Management Plan (PMP) is required to be agreed prior to the construction
phase. (Condition 8) 
77 LDP2 Policy 40: Forestry, Woodland, and Trees requires that Tree Surveys
should accompany applications where the site contains trees, with a presumption
of protecting woodland resources.

Page 15

78 However, no works will take place within areas designated as Ancient Woodland.
Although to allow this development to proceed, a possible felling of 0.13 ha of
woodland or young trees, mainly scrub, bog myrtle, willow and birch is required.
Particularly approximately six semi mature birch are present at the western
extent of the proposed felling area. The submitted information states that the
applicant is committed to providing compensatory planting of equivalent
woodland area with at least the equivalent woodland-related net public benefits. 
79 Compensatory tree planting is required on a ratio of 1:3 for every tree lost/area of
woodland removed, as set out in the PKC Planning for Nature Supplementary
Guidance. To ensure that this is achieved, Condition 9 has been included. 
80 LDP2 Policy 41: Biodiversity seeks to protect and enhance all wildlife and wildlife
habitats, whilst taking into account the ecosystems and natural processes in the
area. A Biodiversity Net Gain (BNG) Assessment is being undertaken and will be
provided to support the application once completed. The applicant is committed
to delivering 10% net gain in all projects. 
81 In light of the above, and subject to conditions, the proposed development is
considered to be in accordance with LDP2 Policies 40 and 41 and NPF4 Policies
3 and 4. 
Developer Contributions 
82 Not applicable to this application 
Economic Impact 
83 The economic impact of the proposal in isolation is likely to be limited to the
construction works. However, the proposals form part of several other major
network upgrades planned in the north of Scotland, and link with a Great Britain
wide programme to meet UK and Scottish Government energy targets. There is a
strong expectation from Government and Ofgem that these projects will be
delivered by 2030. Specifically, these projects are needed to deliver the
Government’s 2030 renewable targets as set within the British Energy Security
Strategy (BESS) (April 2022).  This overall scheme of works is likely to have
significant economic benefits in relation to both the construction and operational
phases. 
Variation of Application Under Section 32A 
84 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to roads and transportation, in
terms of the proposed visibility splays. 
Planning Obligations and Legal Agreements 
85 None required.

Page 16

Direction By Scottish Ministers 
86 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
87 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken of the relevant material
considerations, and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions 
Recommendation   
Approve subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1.  This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
Archaeology and Cultural Heritage 
2. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation analysis, the development
as approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT.  The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the

Page 17

developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress 
Reason - In the interest of protecting archaeological interest within the site. 
3.  Prior to the commencement of the development hereby approved, protective
fencing shall be erected around MPK8855; incorporating an appropriate buffer,
insofar as the land lies within the control of the applicant and/or developer, in a
manner and for a time period to be agreed in writing in advance with the Council
as Planning Authority in consultation with Perth and Kinross Heritage Trust
(PKHT).  No development shall take place within the area inside that fencing
without prior written agreement of the Council as Planning Authority in
consultation with PKHT. 
Reason - In the interest of protecting archaeological interest within the site. 
Biodiversity and Ecology 
4.  The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 76 relates) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development. 
Reason - In the interests of protecting environmental quality and of biodiversity 
5. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement, and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
6. Prior to the commencement of the development hereby approved, a suitably
qualified, experienced, and independent Ecological Clerk of Works (“ECoW”)
shall be appointed prior to the commencement of construction works to ensure
that all construction that may adversely affect the environment is undertaken
according to planning conditions, the CEMP, HRA and to best practice
guidelines. The ECoW shall attend site once every four weeks, during the
construction phase, and report to the client group.  Any significant breaches of
best practice and/or legislation should be reported directly to the Planning
Authority.  The ECoW should undertake the monitoring watercourse required as
part of the Project’s construction phase and provide information for inclusion
within the Site Induction Information and undertake regular and on-going toolbox
talks to operatives as required.

Page 18

Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
7.  Prior to the commencement of the development hereby approved, a Site
Biodiversity Action Plan indicating location, quantity, specification and
maintenance requirements for compensation and biodiversity enhancement
measures shall be submitted for the further written agreement of the Council as
Planning Authority.  It shall include all habitat types: 
a) Habitat area being lost to allow development to proceed.
b) Habitat area being created as compensation for losses.
c) Habitat area being created as biodiversity enhancement over and above
compensation
d) Biodiversity enhancement measures over and above the measures required
for compensation. The plan shall include a commitment to submit species
e) records found during the survey to the NBN Gateway. Thereafter, the
agreed scheme shall be implemented in full and maintained in a reasonable
condition for the life of the development. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
8.  Prior to the commencement of the development hereby approved, a Peat
Management Plan shall be developed with input from the environmental
representative and shall be submitted for the further written agreement of the
Council as Planning Authority. Thereafter, the recommendations and conclusions
of the plan shall be implemented in full 
Reason - In the interests of protecting environmental quality and of biodiversity 
9.  No forestry works, associated with the construction and operation of the
Development, shall commence until a Compensatory Planting Plan (“CPP”) has
been submitted to and approved in writing by the Scottish Ministers (in
consultation with the Planning Authority and Scottish Forestry.  The CPP shall
provide for the planting of woodland commensurate with the level of woodland
that has been felled (anticipated to be approximately 0.39 hectares). 
The CPP shall comply with the requirements set out in the UK Forestry Standard
and the guidelines to which it refers, or such other replacement standard agreed
by the Planning Authority.  The CPP shall include: 
a) details of the location of the area to be planted;
b) the nature, design and specification of the proposed woodland to be
planted;
c) the phasing and associated timescales for implementing the Replanting
Scheme;

Page 19

d) proposals for the maintenance of the Replanting Scheme, including annual
checks, replacement planting, fencing, ground preparation and drainage; and
e) proposals for reporting to the Planning Authority on compliance with
timescales for obtaining the necessary consents and implementation of the
Replanting Scheme. 
The approved Replanting Scheme shall be implemented in full, unless otherwise
agreed in writing by the Planning Authority. 
Reason - To secure compensatory planting to mitigate the effects of
deforestation arising from the proposed development. 
Roads and Transportation 
10. Prior to the commencement of the development hereby approved, full visibility
splays of 215 metres along the channel line shall be provided and maintained to
the left and right of the access, at a setback of 2.4 metres measured 1.05m
above the road level to the standard and specification required by the Council as
Roads Authority.  The visibility splays shall be physically formed on the ground,
and any existing fences, walls, hedges or other means of enclosure or
obstructions within the splays shall be removed and relocated out with the
splays.  Once formed, the visibility splays shall be permanently retained
thereafter, and no visual obstruction of any kind shall be permitted within the
visibility splays so formed. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
11. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type D Figure 5.7 access detail.  The
vehicular access shall be formed using Type B Road construction detail.  The
Type B Road construction detail shall continue to the entrance for a minimum of
15 metres from the boundary of the public road surface. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
Water Supply, Flooding and Drainage 
12. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the development being brought into use and shall

Page 20

thereafter be so maintained insofar as it relates to the development hereby
approved. 
Reason - In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk. 
13. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable a Sustainable Urban Drainage System to meet
the requirements of best management practices. 
Reason - In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk. 
Construction Environment Management Plan (CEMP) 
14. Prior to the commencement of the development, the applicant shall submit a
Construction Environmental Management Plan (CEMP) to be reviewed and
agreed in writing by the Planning Authority.  Furthermore, the hours of
construction activity shall be restricted to between 0700 hours and 1900 hours
Monday to Saturday only, with no operations permitted on Sundays.  The CEMP
shall include: 
• detailed environmental mitigation measures and construction method
statements, including specific measures for environmental monitoring during
construction.
• detailed pollution avoidance and mitigation measures for all construction
elements.
• measures to protect ornithological features,
• a pre-construction nesting bird check, and 
• habitat reinstatement / landscape planting which could provide alternative
habitat to use by nesting birds 
Thereafter, the recommendation and conclusions of the CEMP shall be
implemented in full. 
Reason: In the interests of protecting environmental quality and biodiversity; to
ensure no adverse impact on the construction environment and residential
amenity. 
Materials and Design 
15. For the avoidance of doubt, the proposed access tracks shall be constructed in
full accordance with the approved Site Layout Plan (Document 82 relates) 
Reason - In the interest of visual amenity.

Page 21

Justification 
The proposal is in accordance with the Development Plan, and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable to this application 
Informatives 
1.  Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.  Further information on
radon gas and the associated reports that can be obtained is available at
www.ukradon.org and at http://shop.bgs.ac.uk/georeports/. 
2.  Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(Section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
3.  Works likely to impact protected species should not commence until the applicant
has obtained the relevant licence issued by NatureScot authorizing the specified
activity/development to go ahead. 
4.  The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
5.  The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
6. The applicant shall ensure the private water supply for the development complies
with the Water Scotland Act 1980 (Section 63), The Private Water Supplies
(Scotland) Regulations 2006 and The Water Intended for Human Consumption
(Private Supplies) (Scotland) Regulations 2017.  Detailed information regarding
the private water supply, including the nature, location and adequacy of the
source, any storage tanks/ pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and consistently wholesome water
supply shall be submitted to Perth and Kinross Council Environmental Health in
line with the above Act and Regulations.

Page 22

7. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken. 
8. As soon as it is practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position. 
9. An application for a Building Warrant may be required. 
10. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations, and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material. 
11.  This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk.  The Council has
two months to consider the information. You should therefore submit the required
information more than two months before your permission expires.  We cannot
guarantee that submissions made within two months of the expiry date of your
permission will be able to be dealt with before your permission lapses. 
12.  The developer is advised to contact Sophie Nicol, Historic Environment Manager
(Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
13.  The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice

Page 23

on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
14.  The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks. 
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment Protection Agency. 
15. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
Background Papers
Letters of representation 0 
Authors
Name Designation Contact Details
Alan Atkins Planning Officer
(Major)
01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Development Management &
Building Standards Service
Manager
02/10/26