Page 1

Perth and Kinross Council 
Planning and Placemaking Committee - 14 October 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/280) 
Proposal: Erection of 110 dwellinghouses and 4 flats and associated works (phases
3 and 4) (change of house types on plots 31-69, 100, 112, 115-187, layout
and phasing approved under 19/01130/AMM) (approval of matters
specified in conditions of planning permission in principle 17/00088/IPM) 
Location: Land at Stanley Village (H30), Stanley 
Ref. No: 26/00245/AMM
Ward No: P5 - Strathtay 
Summary 
This report recommends approval of the Approval of Matters Specified by Condition
(AMSC) application for the erection of 110 dwellinghouses and 4 flats and associated
works (phases 3 and 4) (change of house types on plots 31-69, 100, 112, 115-187,
layout and phasing approved under 19/01130/AMM) (approval of matters specified in
conditions of planning permission in principle 17/00088/IPM). 
Overall the proposal remains consistent with the Development Plan and approved
masterplan and is recommended for approval, subject to conditions. 
Background and Description of Proposal 
1 The application site relates to land to the west of Perth Road, Stanley. The
applicant is proposing a remix of the housing on Phases 3 and 4 due to changing
economic conditions and market demand. The proposal is to revise the house
types to align with the amended Phase 2 layout, as these are performing better in
the current market. Phase 2 private units are nearing completion. 
2 Muir Homes Ltd has advised that to maintain momentum and secure their
2026/27 budget, they need to progress onto the private plots in Phase 3. Their
proposal is to retain Plots 29–35 and 69–72 as per the existing permission with
the remaining plots to be remixed with the new house types, and the phasing will
be amended so that the 31 affordable units are delivered as a single phase,
reflecting discussions with PKC Affordable Housing Team who will be their client
for these units.

Page 2

3 This application therefore seeks an AMSC for the erection of 110 dwellinghouses
and 4 flats, landscaping and associated works (change of house types on plots
31-69, 100, 112, 115-187). Single garages have been introduced to some plots.
The proposal will not increase the number of units originally approved. The
proposal includes a minor amendment to the approved phasing, with the 31
affordable housing units now proposed to be delivered following in Phase 3B,
rather than within Phase 4 as previously approved. 
4 It should also be noted that the revised layout includes the removal of the LPG
tanks to the west of plot 72, albeit outwith the red line site boundary of this
application and solar PV panels have been replaced with ASHPs. 
5 The site is allocated in the Perth and Kinross Local Development Plan (2019)
(LDP2) as H30. This allocations forms part of a wider masterplan and allocation
for residential development across Stanley comprising five site allocations (H30-
H34). Cumulatively, the LDP2 allocations total an area of 25.7 hectares (ha), with
the indicative range of 248-387 residential units. 
6 Planning Permission in Principle (PPP) was granted as one application across
the entire H30-H24 allocation in August 2018 (Ref: 17/00088/IPM), which was
subject to a Section 75 legal agreement and planning conditions, including an
Approval of Matters Specified in Condition (AMSC) requiring detailed layout and
design detail for all sites by August 2023. A masterplan and indicative layout plan
were submitted with the PPP application indicating 465 units in total for all sites,
with 125 dwellings on H30; however, these elements were not approved.
Condition 7 of the PPP does limit the permission to 431 residential units across
the H30-H34 allocations. 
7 The site (H30) extends to approximately 14.6ha and benefits from planning
permission for 183 dwellinghouses and 4 flats, by virtue of permission
19/01130/AMM. This site is the southern-most site in the proposed Stanley
masterplan, located to the southwest of the village and is bound by residential
properties to the north, A93 to the east, agricultural land to the south and a core
path and railway line to the west. The topography is mixed with a hill and high
point to the south and a series of undulations towards the northern boundary. 
Site History 
8 15/00010/PAN Proposed masterplan for village expansion 18 June 2015.  
9 17/00088/IPM Mixed use development (in principle). Application approved 24
August 2018. 
10 19/01130/AMM Erection of 183 dwellinghouses and 4 flats, formation of a
vehicular access, play park, landscaping and associated works (approval of
matters specified in conditions of 17/00088/IPM) (allocated site H30). Application
approved 3 June 2020.

Page 3

11 19/01373/FLL Alterations to public road, formation of vehicular access and
associated works. Application approved 2 July 2020.  
12 20/00096/FLL Formation of a crossing point and associated works. Application
approved 3 July 2020. 
13 22/00545/ADV Advertisement Consent for display of 10 flagpoles and 4 signs.
Approved 17 May 2022. 
14 22/00602/FLL Full Planning Permission for siting of a sales cabin and associated
works (for a temporary period). Application approved 10 June 2022. 
15 23/00674/FLL Full Planning Permission for erection of 9 dwellinghouses (change
of house type), alterations to road layout and landscaping works. Application
approved on 3 October 2023. 
16 24/01485/AMM Full Planning Permission for erection of 41 dwellinghouses,
landscaping and associated works (change of house type plots 15-28 and 73-99
of 19/01130/AMM) (allocated site H30). Application approved on 12 March 2025. 
Environmental Impact Assessment 
17 An Environmental Impact Assessment Report is not required. The wider
development (183 dwellinghouses and 4 flats) was previously screened under
application ref. 16/01867/SCRN and was not considered to constitute EIA
development. 
18 The current proposal relates solely to a change in house types and phasing
within that approved development and does not alter the overall scale, nature or
extent of development. There are no new or different likely significant
environmental effects arising from the proposed amendments. Accordingly, the
conclusions of the previous screening remain applicable and no EIA is required. 
Pre-Application Consultation 
19 As an AMSC application, there is no formal further pre-application consultation
with the local community required. 
Development Plan 
20 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
21 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies.

Page 4

This strategy sets out how to improve peoples’ lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
22 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic assets and places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 18: Infrastructure First
• Policy 19: Heating and Cooling
• Policy 20: Blue and Green Infrastructure
• Policy 21: Play, Recreation and Sport
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
23 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
24 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 23: Delivery of Development Sites
• Policy 25: Housing Mix
• Policy 27A: Listed Buildings
• Policy 28A: New Development
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development

Page 5

• Policy 34A: Sustainable Heating & Cooling: Heat Networks, Major
Development and LDP Site Allocations
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure 
Statutory Supplementary Guidance 
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
OTHER MATERIAL CONSIDERATIONS 
PKC Non Statutory Guidance 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Conservation areas

Page 6

National Guidance 
25 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
26 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 1/2011 Planning and Noise
• PAN 65 Planning and Open Space 
Creating Places 2013 
27 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
28 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
29 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Local Place Plans 
30 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There are no Local Place Plans for this site. 
Consultations 
31 As part of the planning application process the following bodies were consulted:

Page 7

Internal 
32 Conservation Team – no comment. 
33 Structures and Flooding – no objection. 
34 Environmental Health (Contaminated Land) – no objection. 
35 Development Contributions Officer – no objection. 
36 Transportation and Development – no objection subject to conditions. 
37 Development Plan – no comment. 
38 Planning Enforcement Officer (Trees) – no comment. 
39 Biodiversity - An Ecological Impact Assessment (EcIA) and Biodiversity Action
Plan were requested by the Biodiversity Officer. However, as this application
seeks approval solely for changes to house types and rephasing within an
already approved development, it is not considered an appropriate stage in the
planning process to require new ecological assessments. Instead, the
biodiversity and natural heritage conditions attached to planning permission
19/01130/AMM are recommended to be re-applied should the current application
be approved, to ensure the continued delivery of the mitigation and enhancement
measures secured under the wider development. 
40 Affordable Housing Enabler – no objection to revised phasing. 
External 
41 Scottish Water - no comments. 
Representations 
42 One letter of representation was received. The main issues raised within the
representation are: 
• access arrangements;
• road safety;
• road calming;
• electric car charging points. 
43 These issues are addressed in the Appraisal section of the report.

Page 8

ADDITIONAL STATEMENTS 
Screening Opinion No new screening opinion required 
Environmental Impact Assessment (EIA):
Environmental Report
not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required 
Design Statement or Design and Access
Statement
not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
not required 
Appraisal 
44 Section 42(1) of the Town & Country Planning (Scotland) Act 1997 (as amended)
relates to applications for planning permission for the development of land
without complying with conditions subject to which a previous permission was
granted. 
45 Section 42(2) requires that the Planning Authority shall consider only the
question of the condition(s) subject to which planning permission should be
granted, and: 
(a) If they decide that planning permission should be granted subject to
conditions differing from those subject to which the previous permission was
granted, or that it would be granted unconditionally, they shall grant
planning permission accordingly; 
(b) If they decide that planning permission should be granted subject to the
same conditions as those subject to which the previous permission was
granted, they shall refuse the application. 
46 The determining issues in this case are whether the proposal complies with
Development Plan policy or if there are any other material considerations which
justify a departure from that policy. The Development Plan comprises NPF4, the
Perth and Kinross Local Development Plan 2019 and statutory supplementary
guidance. The relevant policy considerations are outlined in the policy section
above and are considered in more detail below.  In terms of other material
considerations, this involves considerations of the Council’s other approved
policies and supplementary guidance. 
Principle 
47 The key determining policy issues for this proposal include the provision of high-
quality, affordable and sustainable homes (Policies 20, 24 and 25 of LDP2 and
Policy 16 of NPF4), liveable places (Policies 1, 2, 56 and 57 of LDP2 and Policy
14 of NPF4), flooding and the water environment (Policies 52 and 53A of LDP2

Page 9

and Policy 22 of NPF4), residential amenity (Policy 17 of LDP2 and Policy 15 of
NPF4), biodiversity and ecological impacts (Policies 40 and 41 of LDP2 and
Policy 3 of NPF4), and transport considerations (Policy 60A of LDP2 and Policy
13 of NPF4). 
48 The principle of residential development is well established through the allocation
of Site H30 in LDP2, PPP 17/00018/IPM approved in 2018 and 19/01130/AMM
for 183 dwellinghouses and 4 flats, approved in 2020. 
49 The principle of residential development is thus established. It is, however,
necessary to undertake an assessment of the detail of this proposal. 
Design, Layout and Phasing 
50 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas, Policy 25: Housing Mix and Policy
42: Green Infrastructure. 
51 This application relates to Phases 3 and 4. The overall site delivers 187 units,
comprising 140 private and 47 social housing units. Private housing is dominated
by 3 and 4-bed detached units, with a more limited proportion of semi-detached.
Affordable housing is entirely 2 and 3-bed, comprising terraced houses and
flatted blocks only, with no semi-detached or detached provision. 
52 There are a total of 119 plots in Phases 3 and 4, however 5 of the plots will
remain unchanged from the previous approval - Plots 29, 30, 70, 71 and 72. The
red line boundary has excluded these plots. 
53 Following a review of the planning layout for Phases 3 and 4, Muir Homes Ltd is
seeking a variation to the approved scheme. The proposed change involves a
substitution of house types and minor adjustments to the phasing. This revision is
required to respond to changing market conditions and to align the delivery of
affordable housing with discussions held with the Housing Strategy team
regarding the 31 affordable plots. The updated layout reflects house types
approved and constructed in Phase 2, while re-phasing the affordable plots to
ensure effective delivery. 
54 The plots being remixed are Plots 31 to 69, and Plots 119 to 187 inclusive. 
55 The proposed revisions are as follows: 
• Plot 100 re-introduced into Phase 3. Was removed through planning
permission 24/01485/AMM.
• Plot 112 re-introduced into Phase 3. Was removed through planning
permission 23/00674/AMM.

Page 10

• Revised phasing – 31 affordable plots were previously in Phase 4, now
proposed in Phase 3B.
• Affordable housing delivery redistributed: The 31 affordable units, previously
delivered wholly within Phase 4 (Plots 115–130 and 173–187), are now
distributed across multiple plot groupings (Plots 34–45, 100, 112, 115–127
and 166–169), with delivery brought forward into earlier phases.
• Increase in Phase 4 private housing: Phase 4 private housing increases from
42 units to 56 units.
• Reduction in Phase 3 private housing: Phase 3 private housing reduces from
44 units to 32 units.
• Introduction of detached garages: Several house types now incorporate
detached single garages within their plots, representing a change from the
previously approved integral garage arrangements.
• Change in house types and mix: The proposed development introduces
revised house types (including semi-detached/detached units with detached
garages and new detached bungalow types), replacing the previously
approved mix and altering unit distribution and floorspace across the site. 
Change in house types and mix 
56 In terms of private housing, a total of 46 semi-detached units are approved
across Phases 3 and 4. The proposal would reduce this to 14 semi-detached
units. Conversely, detached units would increase from 40 to 74, as set out in the
table below. 
57 The proposal results in a significant shift in the private housing mix, with
semi-detached units reducing by 32 units and detached units increasing by 34,
reflecting a marked move towards predominantly detached dwellinghouses
following the removal of the Kinkell semi-detached villa type. 
58 Using the approved and proposed private housing mix schedules for Phases 3
and 4, the bedroom mix would change as set out below. This includes the five
plots which remain unchanged from the original permission.

Page 11

59 As can be seen from the table above, this represents a reduction in smaller two
and three-bedroom private units and a significant increase in four-bedroom units,
with the overall number of private dwellings increasing from 86 to 88 units across
phases 3 and 4. 
60 In isolation the current proposal does not comply with LDP2 Policy 25: Housing
Mix, however, looking at the breakdown of housing across all phases, a total of
15 units (2 bedrooms) meets the 10% requirement across the private tenure of
the whole site (140 units) as shown in the table below. As required by Policy 25
of LDP2, this provision is over and above the on-site affordable provision, which
is 25%. The proposal therefore complies with LDP2 Policy 25, when considered
in the context of the wider development. 
61 Across Phases 3 and 4 combined, the proposed revisions reduce bungalow
provision from 25 to 16 units, while villa (2 storey) provision increases from 61 to
72 units. Across the whole private housing element, bungalow provision reduces
from 37 to 26 units, with villas increasing from 117 to 130 units as shown in the
table below. The proposal therefore represents a shift away from single-storey
bungalow accommodation towards a greater proportion of villa-style dwellings.

Page 12

62 In terms of the affordable housing, the proposed redistribution of the affordable
housing does not alter the approved bedroom mix, which remains at 19 two-
bedroom units and 12 three-bedroom units, with no four-bedroom provision. The
proposal therefore maintains the approved affordable housing composition, with
no change in unit numbers or mix. 
63 In terms of materials, an acceptable palette of materials is proposed. The
applicant proposes finishes in a mix of buff/white render and split-face
random/regularised block in a combination of buff/natural, anthracite roof tiles
with white doors and window frames. Whilst differing from the materials approved
within some earlier phases, the proposed finishes are established elsewhere
within the wider development and will maintain a coherent overall design
approach whilst helping to integrate the development into the local area. 
64 The massing and scale of the revised house types can be accommodated within
the plots without having an adverse impact on the amenity of each other. As a
result of the site’s location at the edge of a settlement, it is considered that the
proposed density is acceptable and is in line with the previously approved
masterplan. 
65 The proposed change of house types raises no adverse concerns. Whilst there is
an increase of 2 units within Phase 3, the overall number of units remains the
same as originally approved across the wider site. The general layout is broadly
similar to that approved. 
66 The revised designs will be in keeping with the remainder of the development
and will not appear out of place. The external finishing materials are also
consistent and will therefore complement the rest of the development. 
67 Overall, this proposal is in line with the approved masterplan and S75 legal
agreement. The general layout, house designs and materials proposed are
acceptable and contribute positively to the quality of the surrounding built and
natural environment in compliance with relevant NPF4 and LDP2 policies.
Furthermore, the proposal will provide a mix of open-market housing and
affordable housing within the overall site that complies with the above-named
policies.

Page 13

Play Area 
68 The approved play area remains located within the central area of the wider
development between Phases 3 and 4 and is not proposed to be relocated. The
play area was approved under planning permission 19/01130/AMM and was
required by Condition 9 of that decision to be provided within six months of the
occupation of the first dwelling. The play area has not been delivered and the
development is therefore currently in breach of that condition. 
69 The applicant has advised that delivery has been delayed because of the
location of the play area and that construction of the Phase 3 road infrastructure
is required before the play area can be installed. However, this position has been
reviewed with the Council's Enforcement Monitoring Officer, who has advised
that there is no apparent physical or practical reason why the approved play area
could not be accessed and constructed from the southern part of the site in
advance of the Phase 3 road infrastructure being completed. Accordingly, it has
not been demonstrated that delivery of the play area is dependent upon
completion of the Phase 3 road network. 
70 Given that the play area should already have been provided in accordance with
the requirements of planning permission 19/01130/AMM, it is considered
appropriate that a revised condition be imposed requiring its provision within a
specified period should permission be granted. This would ensure that the
approved play facilities are delivered at the earliest opportunity and that existing
residents of the development benefit from the recreational infrastructure originally
envisaged as part of the approved masterplan. The submitted phasing strategy in
respect to the play area is therefore not accepted insofar as it relates to the
timing of delivery of the children's play area. A revised phasing strategy shall be
submitted to reflect the updated delivery programme for the play area and
associated infrastructure. These matters can be controlled by conditions 2 and 7. 
71 It is considered that the location of proposed open space and landscape buffers
is acceptable. The proposal, therefore, complies with NPF4 Policy 21: Play,
Recreation and Sport and LDP2 Policy 14: Open Space Retention and Provision. 
Landscape and Visual Amenity 
72 In terms of visual amenity, the wider residential development has already
established the character and appearance of this part of the site. The proposed
substitution of house types within Phases 3 and 4 would not result in a materially
different visual impact from that previously approved and would remain
consistent with the degree of change envisaged through the allocation of the site
for residential development and the permissions granted under 17/00018/IPM
and 19/01130/AMM. 
73 The landscape plans for the wider site, as approved under permission
19/01130/AMM, sets out how the areas of landscaping will be managed and
incorporated into the wider site. The proposed change of house types will not

Page 14

have a significant impact upon the approved landscaping. There will be minor
changes to the landscaping as a result of the change of house types, however,
this has been addressed in the submitted landscaping drawings (drawing
numbers 28, 29, 30 and 31). To ensure satisfactory implementation of the
landscaping and subsequent maintenance, a landscaping and planting condition
will be applied. 
74 The revised scheme will integrate well within the landscape and wider
development and will not cause any unacceptable visual impacts. As such the
proposal meets the objectives of Policies 4, 6 and 14 of NPF4 and LDP2 Policies
1, 39 and 40B with delivery of the landscaping being secured by condition as
detailed above. 
Residential Amenity 
75 Residential amenity requires to be considered under NPF4 Policy 14 and LDP2
Policies 1 and 17. 
Overlooking 
76 The Council’s Placemaking Guidance generally seeks to ensure a minimum
distance of 9 metres between windows and boundaries to mitigate overlooking.
In this case, the proposed layout maintains compliance with this guidance, with
each dwelling benefiting from rear gardens of at least 9 metres in depth and
achieving separation distances in excess of the 18 metres window-to-window
standard. The proposed changes of house types do not result in any additional or
materially different overlooking impacts compared to the previous, approved
scheme. 
Overshadowing, loss of sunlight and daylight 
77 The Building Research Establishment (BRE) document Site Layout Planning for
Daylight and Sunlight – A Guide to Good Practice (1991) provides guidance on
assessing impacts on daylight and sunlight. While not mandatory, it is a material
consideration in the assessment of residential amenity. 
78 Having regard to the BRE guidance, the separation distances between dwellings,
site layout and levels, it is considered that an acceptable level of daylight and
sunlight will be maintained for all properties. The proposed amendments do not
materially alter the relationship between plots and therefore do not give rise to
additional overshadowing or loss of light compared to the approved scheme. 
Conclusion 
79 Overall, the proposal is not considered to result in adverse impacts on residential
amenity and is consistent with the requirements of NPF4 Policy 14: Design,
Quality and Place and LDP2 Policy 1: Placemaking and associated Placemaking
Guidance (2020) and LDP2 Policy 17: Residential Areas.

Page 15

Roads and Access 
80 The concerns raised within the letter of representation regarding access
arrangements, road safety and traffic generation are noted. The proposed road
layout and access strategy have been subject to consultation with Transportation
& Development, who has not objected to the proposal. The single point access
has not been revised from the original planning permission (19/01130/AMM). No
changes are proposed in respect of the road layout, visibility splays, parking
provision or access arrangements. 
81 Matters relating to traffic management, road calming and the detailed design of
roads, including potential traffic calming measures, are addressed through the
Roads Construction Consent process. The provision of electric vehicle charging
infrastructure is considered under current building standards and relevant policy
requirements; however, its absence at this stage does not in itself warrant
refusal. Overall, the proposal to change some house types, layout and phasing is
not considered to give rise to unacceptable impacts in terms of road safety or
network capacity. 
82 Overall, the proposal complies NPF4 Policy 13: Sustainable Transport and LDP2
Policy 60: Transport Standards and Accessibility Requirements. 
Drainage and Flooding 
83 Perth and Kinross Council’s Flooding and Structures Team has raised no
objection to the proposal. The proposed change of house types is not considered
to result in any additional or materially different impacts on drainage or flood risk
compared to the previously approved scheme. 
84 The proposal does not alter the drainage network layout or impact flood risk for
the wider development. The drainage condition attached to planning permission
19/01130/AMM will be re-applied, ensuring the continued implementation and
maintenance of the approved drainage infrastructure, 
85 Subject to re-imposition of this condition, the proposal is considered to accord
with NPF4 Policy 22: Flood Risk and Water Management and LDP2 Policy 52:
New Development and Flooding and Policy 53: Water Environment and
Drainage. 
Waste Collection 
86 The proposed dwellings will be served by the Council’s standard four-bin waste
collection system. An informative note regarding waste storage and collection
arrangements will be attached to the permission. 
87 Provision for a recycling facility has been secured under Condition 17 of planning
permission 19/01130/AMM (Drawing Nos. 19/01130/170 and 19/01130/06). The

Page 16

approved recycling centre is located in the same position as previously approved,
albeit outwith the red line boundary of the current application. 
88 The ongoing provision and maintenance of the recycling facilities are secured
through conditions attached to earlier permissions, and no further provision is
required as part of this application. It is worth noting that should provision not be
made in accordance with the earlier condition, action could be taken through
enforcement powers. 
Conservation Considerations 
89 The proposed change of house types is not considered to result in any additional
or materially different impacts on built heritage or the historic environment
compared to the previously approved development. The proposal does not alter
the overall layout, site coverage or relationship with any heritage assets, and
therefore does not affect their setting or character. The proposal is therefore in
accordance with NPF4 Policy 7: Historic Assets and Places and LDP2 Policies
27A: Listed Buildings and 28A: Conservation Areas. 
Natural Heritage and Biodiversity 
90 The proposed change of house types, layout and phasing is not considered to
result in any additional or materially different impacts on natural heritage or
biodiversity compared to the previously approved development. The proposal
does not alter the overall site layout, extent of development, or established green
infrastructure framework. 
91 The development is therefore consistent with the objectives of NPF4 Policy 3:
Biodiversity, which seeks to protect and enhance biodiversity, and LDP2 Policy
41: Biodiversity, which requires development to safeguard ecological interests
and deliver positive effects where possible. 
92 The Council’s Biodiversity Officer requested that an Ecological Impact
Assessment (EcIA) and Biodiversity Enhancement Plan be submitted. However,
as this is an AMSC application relating solely to changes in house types and
phasing, it is not considered an appropriate stage in the planning process to
require new ecological assessments. Informal discussions have taken place with
the Biodiversity Officer and agreement has been reached that the natural
heritage and biodiversity conditions attached to planning permission
19/01130/AMM will be re-applied to the current permission. This will ensure the
continued delivery of the mitigation and enhancement measures secured as part
of the wider development. Subject to these conditions, the proposal is not
considered likely to give rise to adverse effects on biodiversity and is therefore
compliant with the above policies.

Page 17

Low and Zero Carbon Generating Technologies 
93 LDP2 Policy 32: Embedding Low and Zero Carbon Generating Technology in
New Development states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of new buildings, consideration must be given to this requirement.
Further, NPF4 Policy 2: Climate Mitigation and Adaptation requires that
development should be designed to reduce green gas emissions. 
94 Solar panels were originally proposed; however, these have subsequently been
replaced with air source heat pumps. The submitted information does not confirm
whether the revised proposal achieves the required 10% reduction in carbon
emissions / 10% contribution from low and zero carbon generating technologies,
and further clarification is therefore required. 
95 Accordingly, a condition will be attached requiring the submission and approval
of details of low and zero-carbon generating technologies, together with a
supporting carbon emissions statement, to ensure compliance with the above
policies. 
Developer Contributions 
96 The Council’s Development Contributions Officer was consulted as part of this
application and confirmed that no further contributions are required as the overall
number of units on the site will not be increasing. An informative (informative 6)
will be added to the permission highlighting that the existing Section 75
associated with permission 17/00088/IPM remains applicable. 
Economic Impact 
97 The development of 110 dwellinghouses and 4 flats will provide jobs directly and
indirectly during construction and afterwards, have a positive impact through
homeowners spending on local goods and services in the local economy in
particular and further afield. Both will have a positive impact on the local area. 
Other Matters 
98 It is good practice when determining a Section 42 application to review and
update conditions to ensure they reflect current regulations, policy requirements
and best practice. Equally, any conditions that remain outstanding or require
ongoing compliance should be retained, with appropriate reference made to
details or specifications approved through the discharge of conditions process
under the existing AMSC permission. Accordingly, a number of conditions, as set
out in the recommendation section below, have been updated to reflect current
requirements, whilst previous Section 42 approvals have been incorporated to

Page 18

ensure that all relevant modifications are carried forward and recognised as part
of this permission. 
Pre-Commencement Conditions and Notice of Initiation 
99 Prior to the commencement of development associated with this planning
permission, all pre-commencement conditions must be agreed in writing with the
Planning Authority. In addition, a Notice of Initiation must be submitted, advising
of the intended start date for the approved development. This is to ensure that all
necessary requirements are in place before works commence and to provide
clear communication regarding the commencement of development. 
100 For the purposes of Section 27 of the Town and Country Planning (Scotland) Act
1997, as amended, development is deemed to have lawfully commenced only
when any material operation forming part of the approved development is carried
out. As such, commencement can only be established where the works
undertaken clearly fall within the statutory definition of material operations and
are consistent with the approved development plans and conditions. 
Legal Agreements 
101 The site falls under the wider PPP approval 17/00088/IPM which has an
associated Section 75 Legal Agreement which secures the necessary Developer
Contributions including Affordable Housing. A minute of variation was undertaken
through permission 23/00674/FLL as the agreement did not have a “future
proofing” clause to accommodate for subsequent changes to the development.
This has now been addressed through that minute of variation. No further action
is therefore necessary for this proposal. 
Direction By Scottish Ministers 
102 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
103 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions.

Page 19

Recommendation   
Approve subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. The development hereby approved shall be commenced no later than 24 August
2032. 
Reason - In order to meet the terms of the direction set out in planning
permission in principle 17/00088/IPM. 
2. No development shall commence until a detailed phasing strategy (supported by
appropriate plans) is submitted to and approved in writing by the Council as
Planning Authority. The phasing strategy shall include the following details: 
i. the timing and number of dwellings to be developed within each phase;
ii. the timing and delivery of infrastructure, including paths, open space and
landscape specification;
iii. the timing and location of any temporary construction compounds and
associated site facilities; and
iv. the programme for the implementation of landscaping and open space
provision. 
Thereafter, the development shall be carried out in accordance with the approved
Phasing Strategy. The landscaping and planting associated with each phase
shall be undertaken concurrently with the construction of that phase and
completed prior to the occupation of the final dwelling within that phase. Any
proposed amendment to the approved Phasing Strategy shall be submitted to
and approved in writing by the Council as Planning Authority prior to
implementation, and the development shall thereafter proceed in accordance
with the revised approved Phasing Strategy. 
Reason - In order to ensure the satisfactory implementation and completion of
the development. 
3. Prior to the development hereby approved being completed or brought into use,
all matters regarding access, car parking, in-curtilage electric car charging, road
layout, design and specification, including the disposal of surface water, shall be
in accordance with the standards required by the Council as Roads Authority. 
Reason - In the interest of vehicle and pedestrian safety and in accordance with
the policies of the adopted Perth and Kinross Local Development Plan 2 (2019). 
4. Notwithstanding the Construction Traffic Management Scheme approved
pursuant to Condition 4 of planning permission 19/01130/AMM, an updated
Construction Traffic Management Scheme (CTMS) shall be submitted to and
approved in writing by the Council as Planning Authority within one month of the

Page 20

date of this permission.  The updated CTMS shall reflect current site conditions
and construction arrangements and shall make provision for all remaining and
future phases of the development.  Thereafter, the approved CTMS shall be
implemented in full and adhered to at all times unless otherwise agreed in
advance and in writing by the Council as Planning Authority.  The CTMS shall
remain a live document and shall be updated as necessary throughout the
construction period to reflect the ongoing requirements of the development,
subject to the written approval of the Council as Planning Authority. 
Reason - In the interests of road safety. 
5. No part of the development shall be occupied until an updated Travel Plan,
aimed to encourage more sustainable means of travel, has been submitted to
and approved in writing by the Council.  The Travel Plan will have regard to
provision for walking, cycling and public transport access to and within the site
and will identify the measures to be provided (including the provision of new
and/or enhanced public transport services), the system of management,
monitoring, review, reporting and the duration of the Plan. 
Reason - In the interests of sustainable transport. 
6. The detailed landscaping and planting scheme hereby approved shall be
completed within the first available planting season (October to March) after the
completion or bringing into use of the relevant phase of the development,
whichever is the earlier.  The approved scheme shall thereafter be maintained
with any planting which fails to become established within five years being
replaced in the following planting season with others of a size and species as
previously approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
7. Within 6 months of the date of this permission the children's play area approved
under planning permission 19/01130/AMM and shown on drawing 19/01130/131
and drawing 33 (Masterplan 1342-002-MP rev ZZG) shall be made available for
public use. Thereafter, the play area and all associated facilities and equipment
shall be retained and maintained for the life of the development. 
Reason - To secure the prompt delivery of the approved children's play area in the
interests of residential amenity and to ensure the satisfactory provision and
implementation of a children's play area. 
Prior to the commencement of development hereby approved, a scheme shall be
submitted to, and approved in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon emissions reduction set by
the Scottish Buildings Standards will be met through the installation and
operation of low and zero-carbon technologies. This scheme shall detail for each
building:

Page 21

a) the technology types;
b) illustrate, through technical calculations, that these will meet at least the
10% reduction;
c) their siting and location; and
d) ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme and no individual unit shall be occupied until the scheme has
been installed and operating. 
Reason - To embed low and zero-carbon technologies within the development in
the interest of environmental sustainability. 
9. Within one month of the date of this permission, notwithstanding the Construction
Environmental Management Plan (CEMP) approved pursuant to Condition 10 of
planning permission 19/01130/AMM, an updated CEMP shall be submitted to
and approved in writing by the Council as Planning Authority.  Until such time as
the updated CEMP is approved, the previously approved CEMP shall remain in
force and be complied with.  The CEMP shall be maintained as a live document
and reviewed and updated as necessary to reflect the ongoing requirements of
the development.  Any amendments to the CEMP shall be submitted to the
Council as Planning Authority for approval. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
10. The conclusions and recommended action points set out within the Biodiversity
Survey, and in particular Section 2.15 of the Biodiversity Management Plan
prepared by IMT Ecological Consultancy (June 2019), approved under planning
permission 19/01130/AMM (document numbers 19/01130/95 and 19/01130/100),
shall be fully adhered to, respected and undertaken as part of the construction
phase of development insofar as they relate to this development site. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved.  The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason - In order to prevent animals from being trapped within any open
excavations. 
12. The details submitted and agreed as part of condition 13 of planning permission
19/01130/AMM (drawing number 19/01130/197) together with the proposed
masterplan, as approved in 26/00245/AMM (drawing number 33), shall be

Page 22

implemented in accordance with the agreed detail and installed prior to the
occupation of the relevant residential unit, insofar as they relate to this
development site.  A minimum of 25% of all completed two storey houses shall
incorporate one bat brick and one swift brick each and shall be incorporated at
eaves height and positioned appropriately. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
13. No removal of hedgerows, trees or shrubs that may be used by breeding birds
shall take place between 1 March and 31 August inclusive, unless a competent
ecologist has undertaken a careful, detailed check of vegetation for active birds'
nests immediately before the vegetation is cleared and provided written
confirmation that no birds will be harmed and/or that there are appropriate
measures in place to protect nesting bird interest on site.  Any such written
confirmation should be submitted to the Planning Authority. 
Reason - To ensure adequate protection for the trees on the site during the
construction, in the interests of the visual amenity of the area. 
14. All existing trees and hedgerows shown to be retained shall be protected by
suitable fencing in accordance with BS5837:2012 (Trees in Relation to
Construction).  No materials, supplies, plant, machinery, soil heaps, changes in
ground levels or construction activities shall be permitted within the protected
areas without the written agreement of the Council as Planning Authority. 
Reason - To ensure adequate protection for the trees on the site during the
construction, in the interests of the visual amenity of the area. 
15. All road gullies within 500m of a waterbody or Sustainable Urban Drainage
System (SUDs) pond shall have wildlife kerbs installed adjacent to the gully. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
16. The details submitted and agreed as part of condition 21 of planning permission
19/01130/AMM (drawing numbers 19/01130/136 and 19/01130/196) with regards
to district heating shall be implemented in accordance with the agreed details,
insofar as they relate to this development site. 
Reason - To allow district heating to be incorporated within the site at a future
date. 
17. The asserted core path (STAN/117) must not be obstructed during building works
or on completion of the development. Any damage done to the route and/or the
associated signage during building works must be made good before the
development is completed or brought into use, whichever is the earlier. 
Reason - To ensure that public access is maintained at all reasonable times, to
the local path network.

Page 23

18. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved
development works. The temporary surface water treatment facility shall remain
in place until the permanent surface water drainage scheme is implemented. 
Reason - In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
None. 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
4. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment Protection Agency.

Page 24

5. The applicant should be advised that all proposed structures supporting the road,
or which the developer is intending the Council adopt, will require technical
approval in accordance with the Design Manual for Roads & Bridges standard
BD 2/12 (& HD 22/08 where relevant).  Bridges and culverts shall also be
designed in accordance with the requirements contained within Perth & Kinross
Council's Developers Guidance Note on Flooding & Drainage.  The developer is
advised to contact Perth & Kinross Council's Structures & Flooding Team (tel
01738 475000, email structuresplanning@pkc.gov.uk) for further information and
prior to commencing designs in order to ensure technical compliance. 
6. The applicant is reminded that this site is still subject to a Section 75 Legal
Agreement, securing Developer Contribution requirements and other matters, as
secured as part of planning permission 17/00088/IPM.  This permission
continues to be tied by this legal agreement and the associated requirements will
continue to apply. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot.  Failure to obtain a licence may
constitute a criminal act under the Habitats Regulations and penalties are severe
for non-compliance. 
8. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
9. Hedgehogs are a key species in the Tayside LBAP and enhancing connectivity is
an objective.  Gardens will provide suitable habitat for hedgehogs and
commuting should be made possible by creating access gaps in wooden fences
13cm x 13cm at ground level. 
10. The applicant is recommended to discuss with the Council's Public Transport
Unit the supply of bus services and public transport infrastructure to ensure an
adequate public transport provision for the site. 
11. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets.  The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
12. Construction work should minimise the impact on amenity to neighbouring
residents, which could be achieved by limiting noise generating activities to
Monday to Friday 07:00 to 19:00 and Saturday 08:00 to 13:00 with no noisy
works out with these times or at any time on Sundays or Bank Holidays.

Page 25

13. The stopping up or diversion of the Core Path STAN/117 is subject to agreement
under Section 208 of the Town and Country Planning (Scotland) Act 1997 (as
amended).  All relevant approvals in this regard should be in place prior to any
stopping up or diversions taking place. 
14. Construction works must be undertaken in a safe manner which does not disturb
the operation of the neighbouring railway.  Applicants must be aware of any
embankments and supporting structures which are in close proximity to their
development. 
15. Details of all changes in ground levels, laying of foundations, and operation of
mechanical plant in proximity to the rail line must be submitted to Network Rail's
Asset Protection Engineer for approval prior to works commencing on site.
Where any works cannot be carried out in a "fail-safe" manner, it will be
necessary to restrict those works to periods when the railway is closed to rail
traffic i.e. by a "possession" which must be booked via Network Rail's Asset
Protection Engineer and are subject to a minimum prior notice period for booking
of 20 weeks. 
The developer must contact our Asset Protection Engineers regarding the above
matters, see contact details below: 
Network Rail Asset Protection Engineer
151 St. Vincent Street, GLASGOW, G2 5NW
Tel: 0141 555 4352 
E-mail: AssetProtectionScotland@networkrail.co.uk 
16. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk. 
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
17. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended.  The form of the notice is set out in

Page 26

Schedule 7 of the Regulations and a draft notice is included for your guidance. 
In accordance with Regulation 41 the notice must be: 
- Displayed in a prominent place at or in the vicinity of the site of the
development 
- Readily visible to the public 
- Printed on durable material. 
18. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste. 
19. Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn. 
Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved. 
20. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created
dwellings. Further information can be found at:
https://www.pkc.gov.uk/binrequests 
Background Papers
Letters of representation 1 
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Christine McLaren Team Leader 29/09/2026