Page 1

Perth and Kinross Council 
Planning and Placemaking Committee - 9 September 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/240) 
Proposal: Formation of operations complex comprising erection of welfare buildings,
office building, laundry facilities, workshop, alterations to existing access,
formation of roads, parking areas and associated works 
Location: Land 600 Metres North East Of Sealtainn, Bolfracks, Aberfeldy, PH15 2EY 
Ref. No: 24/01616/FLM
Ward No: P4 - Highland 
Summary 
The proposed Back of House Operations Village is recommended for approval as
essential permanent operational infrastructure required to support the management and
operation of Taymouth Castle Estate, an established rural business and tourism
destination of economic significance. It replaces temporary facilities in a more sensitive
part of the estate. 
The development principle is supported by Perth and Kinross Local Development Plan
(LDP2) Policy 8 and National Planning Framework 4 (NPF4) Policy 29, which encourage
the growth and diversification of existing rural businesses. Supporting information shows
that alternative estate locations are constrained by heritage, landscape, flood risk and
operational considerations, the proposal representing the most suitable option. 
While there will be localised landscape change within the Taymouth Castle Garden and
Designed Landscape, the proposal is carefully designed (as amended) to minimise
impacts via siting, scale, materials, landscaping and screening. Technical assessments
and consultation responses confirm that impacts on landscape, ecology, the River Tay
SAC, trees, noise, lighting, air quality, drainage, flood risk, transport and archaeology
can be satisfactorily mitigated through planning conditions. 
The proposal will also support the continued investment, employment and economic
benefits associated with the wider Taymouth Estate. The operational need, policy
support, lack of suitable alternatives, and acceptable environmental impacts weigh
significantly in favour of the development and overall the positives significantly outweigh
the negatives. Accordingly, the proposal is considered to accord with the Perth and
Kinross Local Development Plan and NPF4 and is recommended for approval subject to
conditions.

Page 2

Background and Description of Proposal 
1 This proposal is the erection of a “Back of House” Operations Village some 600
metres (m) north-east of Sealtainn, Bolfracks, Aberfeldy. This part of the wider
ongoing redevelopment and restoration of the Taymouth Castle Estate, a nationally
important heritage asset including a Category A listed building and designated
Designed Garden and Landscape. 
2 Comprising a purpose-built operations village and provide essential infrastructure
for the management, maintenance and operation of the estate. This includes a
range of facilities such as administration offices, staff welfare and service buildings,
a commissary (staff restaurant/food store) and associated infrastructure including
access improvements, internal roads, parking, and supporting development
comprising a greenhouse and link road. 
3 The development is required to replace existing temporary ‘back of house’ facilities
currently located just north of the A listed Taymouth Castle and not providing a
sustainable long-term solution, reflected by the time-limited consent expiring in 2029
(ref: 23/02148/FLL). This area eventually proposed as a formal landscaped garden. 
The relocation of facilities site reflects the needs of the estate while reducing
operational pressures within the sensitive core of the designed landscape. 
4 The location is set within Newhall Woods, in the far east of the main estate. This
area characterised by woodland, former plantation forestry and overhead powerline
infrastructure corridors. Thus whilst within nationally and locally designated
landscapes, it is considered a less sensitive part of the wider designed landscape.
The proposals taking this into account and resulting in a design responding to the
constraints, topography, and landscape context. 
5 The proposals include: 
• Upgrade of an existing vehicular access from the A827 adjacent to East Lodge
• Formation of a road, parallel to A827
• Security parking and kiosk 
• Roundabout and turning area
• Two lane loop around buildings
• Internal bus stops for shuttle service to remainder of estate
• Access road connecting west into the Taymouth Estate
• Commissary building – delivery hub with kitchen, bakery, canteen, lockers and
support services
• Administration offices – offices, meeting rooms and estate management
functions
• Laundry building – processing estate laundry (relocated from temporary location
north of castle, ref:23/02148/FLL)
• Staff gym and lounge – welfare facilities 
• Security/management kiosk – controlling site access
• Vehicle wash bay – for cleaning estate vehicles
• Refuse and recycling area

Page 3

• Greenhouse – growing food and flowers for estate use (subject to separate
application currently under consideration 24/01618/FLL)
• Car Park (subject to separate application also currently under consideration
24/01617/FLL)
• SSE Substation (subject to separate applications – 26/00740/FLL under
consideration and 26/01016/FLL - currently awaiting validation) 
6 The proposal is designed sustainability and with efficient use of existing resources,
reusing some of the operational buildings currently closer to Taymouth Castle within
the proposed Operations Village. These include existing delivery, laundry and
storage facilities, to be adapted for staff welfare, maintenance and estate
management uses. 
7 The supporting documents accompanying the application (Design and Access
Statement, Landscape and Visual Impact Assessment, Transport Assessment,
Flood Risk Assessment, and other technical reports) set out the design rationale,
environmental considerations, and policy context. 
Site History 
• 24/01617/FLL – Formation of Car Park – Under consideration. 
• 24/01618/FLL - Erection of greenhouse and formation of access road – Under
Consideration. 
• 26/00740/FLL - Land engineering operations to form platform for future works –
Under Consideration 
• 26/01016/FLL - Installation of switchroom, statcom unit and 2 transformers,
formation of access track and associated works – Awaiting validation/registration 
Environmental Impact Assessment 
8 A screening exercise was undertaken by the Planning Authority in August 2024
(ref:24/01282/SCRN) in accordance with the EIA (Scotland) Regulations 2017
which concluded that this development, whilst falling under Schedule 2 (10) and
(12) of the above regulations relating to Urban Development Projects and Tourism
and Leisure, was unlikely to result in significant environmental effects.  It was
therefore concluded that the proposal was not EIA development. 
Pre-Application Consultation 
9 The proposed development is classed as a Major development in terms of the Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009.
Therefore, the applicant was required to undertake formal pre application
consultation with the local community. The content of the Proposal of Application
Notice (PoAN) (ref. 23/00007/PAN) was approved by Perth and Kinross Council in
April 2023 and two public consultation events were subsequently held at the

Page 4

Kenmore Hotel on 17 May and 21 June 2023, alongside supporting engagement
including a dedicated project website, neighbour notification and press
advertisements. 
10 Public comment during the PAC process, as outlined in the submitted PAC Report,
identified a range of matters including the scale and visual impact of the
development within the rural landscape, potential ecological impacts, effects on
access and road safety, and the implications of specific elements such as the
originally proposed biomass plant. There was a mixed overall response, with
support noting economic benefits, job creation and the role of the development in
supporting the Taymouth Estate, while concerns focused on environmental and
landscape impacts. The applicant has confirmed that feedback has informed the
evolution of the proposals, including the removal of the biomass plant and
incorporation of mitigation measures. 
11 The PoAN was considered by the Planning and Development Management
Committee on 14 June 2023 with Members noting the proposed consultation
approach. 
Development Plan 
12 The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance. 
National Planning Framework 4 
13 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve peoples lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
14 The Council’s assessment of this application has considered the following policies
of NPF4: 
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 29: Rural Development
• Policy 30: Tourism

Page 5

Perth and Kinross Local Development Plan 2019 
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
16 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 29: Gardens and Designed Landscapes
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 38A: Environment and Conservation: International Nature Conservation
Sites
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and Development
• Policy 41: Biodiversity
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
17
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Delivering Zero Waste (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted in
2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)

Page 6

Other Material Considerations 
PKC Non Statutory Guidance
18
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC and
the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
19 The Scottish Government expresses its planning policies through various
documents including the National Roads Development Guide and a series of
Circulars in addition to NPF4. Those relevant are listed below. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision. 
Local Place Plans 
21 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There is no Local Place Plan in place covering this area. 
Consultations 
22 As part of the planning application process the following bodies were consulted: 
External 
23 Perth and Kinross Heritage Trust - No objection, but advise the site is
archaeologically sensitive, with potential for prehistoric remains and features
associated with Taymouth Castle and its designed landscape. PKHT supports the
submitted assessment and recommends that archaeological evaluation and
recording works be secured through a Written Scheme of Investigation (WSI) via
planning condition. 
24 Historic Environment Scotland - The principle of the development is considered
acceptable, being located within a less sensitive part of the Taymouth Castle
Designed Garden and Landscape. The western parts of the development would be
visible from the A827 where there are open views west across the designed
landscape and down to Kenmore. The assessment of potential setting and
landscape impacts submitted with the application are welcomed as are the
proposed mitigation measures.

Page 7

25 Kenmore Community Council - No comments 
26 Scottish Water - No objection 
27 Scottish Environment Protection Agency - No objection, but highlight there may
be surface water run-off from drain B. Advising this is for the local authority to take a
view on. 
28 NatureScot - No objection, subject to mitigation. Advise that the development is
likely to have a significant effect on the River Tay SAC and therefore requires an
Appropriate Assessment. But conclude that there will be no adverse effect on site
integrity provided a Construction Method Statement (CMS) is implemented to
control pollution and sediment run-off during construction. Also advise that impacts
on protected freshwater pearl mussels can be avoided through the proposed
mitigation measures, including an appropriate sewage treatment plant and
implementation of the CMS. 
Internal 
29 Conservation Team - No objection in principle, notes that, although the site lies
within a less sensitive part of the Taymouth Castle Garden and Designed
Landscape, the scale of the development will result in a significant change to the
rural landscape character. Recommend that buildings remain single storey, that
natural and sympathetic materials are used, hard landscaping is minimised, and
landscaping and tree protection measures are secured by condition to reduce visual
impacts. 
30 Flooding - No objection, subject to conditions requiring the submission of a detailed
Drainage Strategy and SUDS scheme. Advise the site lies outwith the River Tay
floodplain and recommends a CMS to avoid impacts on the River Tay SAC. 
31 Environmental Health (Contaminated Land) - No objection 
32 Environmental Health (Noise Odour) - No objection. Advise the submitted Noise
Impact Assessment and Air Quality Impact Assessment are accepted and conclude
that operational noise, traffic and air quality impacts would not be significant.
Recommend conditions relating to operating hours for the workshop and vehicle
wash bay, noise limits for plant and equipment, external lighting, construction hours,
dust management and controls on vehicle idling. 
33 Transportation and Development - No objection, subject to conditions. Advise
satisfaction with the proposed access arrangements, parking provision, internal
road layout and transport assessment, but recommend conditions relating to access
construction, visibility splays, a Construction Traffic Management Plan, bus stop
infrastructure, covered cycle parking, a Green Travel Plan, and servicing
arrangements for the wastewater treatment plant. 
34 Development Contributions Officer - Advise no contributions are required.

Page 8

35 Commercial Waste Team - Advise the proposed waste storage facilities are
acceptable. 
36 Enterprise Team - No comments 
37 Biodiversity Officer - No objection, subject to conditions. Advise the submitted
ecological assessments are in accordance with best practice, with all mitigation
measures required to be implemented. Conditions are recommended to secure a
revised Biodiversity Enhancement Plan, an Invasive Non-Native Species Control
Plan, updated ecological surveys where necessary, and species protection
measures during construction. Also note the presence of bat roosts requiring
licensing from NatureScot and highlights concerns regarding the loss of trees within
an area of ancient woodland, requiring appropriate mitigation and compensation. 
Representations 
38 5 objections have been received, a summary of the issues are: 
• Traffic generation and impact
• Road Safety
• Contrary to Development Plan
• Alternative sites preferable
• Timing ang and hours of operation
• Noise and residential amenity impact
• “Salami” slicing of site
• Impact on tourism
• Waste management
• Impact on River Tay Special Area of Conservation
• Lighting impact
• Out of character with area
• Over intensive development
• Lack of Environmental Impact Assessment
• Flood Risk
• Loss of trees
• Loss of open space
• Impact on ecology 
39 These concerns are addressed in the Appraisal section below. 
Additional Statements 
Screening Opinion EIA not required
Environmental Impact Assessment
(EIA): Environmental Report
Not required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA completed

Page 9

Design Statement or Design and
Access Statement
Submitted
Report on Impact or Potential Impact
e.g. Flood Risk Assessment
Flood Risk Assessment (FRA)
Landscape and Visual Impact
Assessment (LVIA)
Drainage Report (DR)
Transport Statement (TS) and Draft
Green Travel Plan (DGTP)
Draft Construction Method Statement
(DCMS)
Drainage Impact Assessment (DIA)
Energy Statement (ES)
Ecological Appraisal (EA)
Arboricultural Impact Assessment (AIA)
Noise Impact Assessment (NIA)
Planning Statement (PS)
Air Quality Report (AQR)
PAC Report
Economic Impact Assessment (EcIA) 
Archaeology Report (AR) 
Appraisal 
40 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance as identified
above. 
Principle 
41 The principle of developing the site for a Back of House Operations Village falls to
be assessed against Policy 8 (Rural Business and Diversification) of the Perth and
Kinross Local Development Plan 2019 (LDP2) and NPF4 Policy 29 (Rural
Development), taking account of both the operational requirements of the Taymouth
Castle Estate and the environmental sensitivities of the site and its surroundings. 
42 The proposal is fundamentally linked to the ongoing redevelopment and operation
of Taymouth Castle Estate, which is an established and consented development of
considerable scale. Planning permissions across the estate include the
refurbishment of the castle, numerous listed buildings, development of the golf
course and the delivery of around 150 estate properties alongside associated
tourism and leisure uses, reflecting a significant long-term investment in the site and
its economic role within the area. The scale and complexity of this operation

Page 10

inevitably generates a requirement for a coordinated and properly designed back of
house facility to support estate management, servicing and staff functions. 
43 At present, these operational needs are being met through temporary facilities
located within the estate adjacent to Taymouth Castle, providing key services
including laundry, storage and staff welfare. However, these are approved on a
temporary basis and are not suitable as a permanent solution, particularly given
their location in proximity to the Category A listed castle and within a sensitive part
of the designed landscape. The application therefore seeks to replace this interim
arrangement with a permanent, consolidated facility designed to meet the long-term
operational needs of the estate. 
44 In this context, the proposal aligns positively with Policy 8 of the LDP, which
supports the expansion and diversification of existing rural businesses where
development is directly related to an established activity or site-specific opportunity.
The operations village is clearly not a standalone or speculative development;
rather, it represents essential supporting infrastructure required for the continued
and longer-term functioning and management of the developing Taymouth Estate.
This direct functional relationship is a key material consideration weighing in favour
of the principle of development. 
45 Similarly, the proposal accords with the intent of NPF4 Policy 29, which promotes
rural economic activity, diversification and investment where these contribute to the
sustainability of rural businesses and communities. The development forms part of
a wider programme of investment that will support tourism, employment and estate
management functions, thereby contributing to the local economy and helping to
secure the long-term future of the estate as a significant rural enterprise. 
46 Notwithstanding this support in principle, the assessment must also recognise that
the site lies within a highly sensitive landscape context, including designation as
part of the Taymouth Castle Garden and Designed Landscape. Development
therein being inherently constrained and must be carefully justified, particularly
where it introduces new built form into an undeveloped area.  The scale of the
proposal is c.11.9 hectares, emphasising the need to carefully balance operational
requirements against potential impacts on landscape character. 
47 The Planning Statement (PS) acknowledges these constraints and explains that the
ability to accommodate development of this scale/nature within the wider estate is
limited. Large areas being constrained by their proximity to listed buildings, their role
within the designed landscape, existing land uses such as the golf course, and
issues such as flood risk, particularly in areas closer to the castle.  While the estate
itself is extensive, the realistic opportunities for locating the proposed development
without unacceptable environmental or heritage impacts are restricted. 
48 In response, the applicant has undertaken an assessment of alternative sites within
their ownership and concluded that the proposed ‘Newhall’ location represents the
least sensitive and most suitable option available. The site is removed from the core
of the designed landscape and principal listed buildings, thereby limiting impacts on
the most sensitive heritage assets, while still maintaining a functional connection to

Page 11

the estate through existing access routes through Newhall Woods. The sites
selection reflects a balance between operational necessity and environmental
constraints, although it does result in the introduction of development into a
currently undeveloped area. 
49 The scale and form of the proposal also reflects the operational requirements of the
estate. The range of facilities proposed—including administrative buildings, staff
welfare facilities, servicing areas and associated infrastructure—corresponds with
the needs of a large, actively managed rural estate and is supported by detailed
justification within the submitted documents. While the overall footprint is
substantial, it is clear that the scale is driven by functional necessity. Nevertheless,
it is recognised that it will represent a significant change to the immediate character
of the surroundings, and its location outwith any defined settlement boundary
reinforces the need for robust justification. The separation of the operations village
from the core estate, while beneficial in reducing impacts on heritage assets, also
introduces built development into a new part of the landscape, which must be
carefully weighed in the overall planning balance. 
50 Taking all of these factors into account, the principle of development is considered
to be supported by the strong operational need for the facility, its clear functional
relationship to the Taymouth Castle Estate, and the broader policy support for rural
diversification and economic development. These considerations are balanced
against the sensitivity of the site and the scale of the proposal. However, the
evidence demonstrates that alternative locations within the estate are either
constrained or unsuitable, and that the chosen site represents the most appropriate
option available. 
51 On this basis, and subject to detailed consideration of landscape, visual and
environmental impacts, the principle of the development is considered to accord
with Policy 8 of the Perth and Kinross LDP2 and NPF4 Policy 29. 
Landscape and Visual Impact Assessment 
52 The proposed development has been assessed against the relevant provisions of
LDP2, in particular Policies 1A and B: Placemaking and Policy 39 (Landscape),
together with NPF4 policies relating to design, placemaking and the protection of
valued landscapes (including Policies 14, 20 and 29). Collectively these seek to
ensure that development responds sensitively to landscape character, safeguards
important views and designed landscapes, and achieves a high standard of design,
informed by site context. 
53 In this regard, the proposal incorporates an appropriate palette of materials,
including timber cladding and dark, non-reflective corrugated finishes, reflecting a
contemporary rural aesthetic and ensuring the development integrates with its
landscape setting. The buildings are predominantly single storey, reinforcing a low-
profile and subservient/appropriate form within the landscape. 
54 Particular attention has been given to the design and scale of the estate
administration building (Building 2). The initial design considered to be of a scale

Page 12

and massing not appropriate for this sensitive setting, with its design dominating the
overall composition of what is otherwise a grouping of small-scale rural structures.
Following a meeting with the project architect, amended plans were submitted
significantly reducing its scale and prominence. The revised design now allows the
proposal to be read as a cohesive grouping of related buildings rather than being
dominated by a single structure. This through a reduced overall massing, simplified
form, reduced gable heights, and a lowering of the roof pitch. In addition, associated
plant and solar panels have been repositioned and are now discreetly
accommodated at upper level, limiting their visibility in the wider landscape. The
updated material palette, including corrugated metal roofing and black wall cladding,
further reinforces the appearance of a cluster of ‘agricultural’ buildings, ensuring a
more sympathetic relationship with its rural context. 
55 In tandem, the originally proposed workshop building has been removed. This has
created space for the introduction of an SSEN substation at the western end of the
site. Two separate planning applications have been submitted: one by the current
applicant, relating to the formation of a concrete platform on which the substation
will be located (ref: 26/00740/FLL), and a second application submitted by SSEN for
the substation equipment and associated infrastructure (ref: 26/01016/FLL). These
applications are programmed to be determined following this committee meeting. 
56 The Planning Authority’s preference was for the substation to be incorporated within
the current application for the operations village as a single, comprehensive
proposal. However, due to operational and legal constraints between the developer
and SSEN, this has not been possible. While this presents more complex
procedural work, the principle of the substation’s location remains unchanged. 
57 Following pre-application discussions, it was agreed that the substation would be
most appropriately located as part of the grouping of buildings within the operations
village. This approach avoids the need to site such infrastructure elsewhere within
the designed landscape, where its landscape and visual impact could be more
pronounced. A detailed assessment of the landscape and visual effects of the
substation will be set out within the planning report for the relevant applications,
which concludes that the impacts are acceptable when considered within the
context of the wider operations village. 
58 As said the site lies within the Taymouth Castle Garden and Designed Landscape
(GDL), a designation of national importance, and within the wider Lower Upland
Glens Landscape Character Type. The submitted LVIA, together with subsequent
addendum, states that the development will result in localised, significant landscape
effects within the site itself and its immediate surroundings, reflecting the scale of
the proposal and the introduction of built form into a currently semi-natural area.
The addendum to the LVIA have been prepared to reflect the design amendments
to Building 2 and the proposed siting of the SSEN substation; however, the overall
conclusions of the assessment remain unchanged. The findings indicate that the
proposed substation would be viewed in the context of the wider Operations Village
and associated built development, with the effects of existing vegetation, buildings
and proposed planting providing a degree of screening. The updated assessment
does not identify any materially different landscape or visual effects from those

Page 13

previously assessed and concludes that the inclusion of the substation does not
alter the overall landscape and visual impact of the scheme to a significant extent. 
An independent assessment of the substation will be undertaken as part of the
consideration of applications 26/00740/FLL and 26/01016/FLL. 
59 The overall impacts are largely localised, with the LVIA concluding that effects on
the wider landscape character area and more distant receptors are negligible due to
the containment. The use of recessive colours and naturally weathering materials
further assists in limiting visual prominence. 
60 In this regard, it is an important material consideration that the development is sited
within a less sensitive part of the wider HGDL, which is already influenced by
existing infrastructure, most notably the Beauly–Denny overhead transmission line.
The presence of large-scale pylons and associated infrastructure introduces a
strong man-made component to the landscape and reduces the relative sensitivity
of this part of the HGDL compared to its core designed areas. The LVIA identifies
these pylons as prominent features within views, with the proposed development
typically read in this existing context rather than as an isolated or incongruous
addition. The proposed agricultural-style building forms and subdued material
palette reinforce this relationship with existing land uses and infrastructure. 
61 Furthermore, the development is physically and visually removed from the principal
listed buildings and key designed components of the estate, thereby limiting any
impact on the setting of the most sensitive heritage assets within the GDL. While
some tree loss and change within the immediate site will occur, the broader integrity
and appreciation of the HGDL is largely preserved, consistent with the aims of
LDP2 Policy 39 and NPF4 Policy 7(i). The simple, rural materiality and modest
detailing of buildings ensure that the development does not compete visually with
the historic architectural character of the estate. 
62 The topography is also a key moderating factor. The land slopes from the A827
southwards down towards the River Tay, with the developable area positioned
below the level of the A827. This landform, combined with existing woodland and
boundary features, limits outward visibility, particularly from the A827 and wider
receptors to the south. The LVIA confirms that visibility is largely restricted to the
immediate vicinity and a limited number of receptors due to this combination of
topography and vegetation. As such, while the development is of a relatively large
scale (c.11.7ha), its perceived scale in the landscape is partly addressed by
containment and screening, further mitigated by the materials used. 
63 In addition, the siting reflects environmental constraints, with the layout influenced
by flood risk associated with the River Tay and its floodplain to the south. This has
necessitated positioning the development on higher ground. The compact
arrangement of buildings, combined with the proposed materials, ensures that the
visual effects of built form are appropriate. 
64 In visual terms, the LVIA identifies significant effects primarily for receptors in close
proximity, including sections of the River Tay Way and the immediate HGDL,
particularly during construction. However, for the majority—including nearby

Page 14

settlements, road users and recreational routes—effects are assessed as moderate
or negligible and not significant, largely due to distance, screening and the presence
of existing built and infrastructural elements. Importantly, proposed mitigation,
including structural planting and woodland restocking, together with materials that
weather naturally and blend into the landscape, will further reduce visibility over
time, with residual effects diminishing to negligible in many instances by year 10. 
65 As mentioned above, separate applications have been submitted for additional car
parking (ref: 24/01617/FLL), located immediately to the south of the proposed
building group, and for a greenhouse and associated access track (ref:
24/01618/FLL), to the west of the operations village. The submission of these
proposals as separate applications is a consequence of the evolution of the wider
development proposals following the pre-application consultation process. The
original Proposal of Application Notice (PAN) site extended northwards to the River
Tay and included a significantly larger development area. However, subsequent site
investigations identified that much of the land in the northern part of the site,
adjacent to the River Tay, is affected by flood risk, thereby limiting its development
potential. As a result, elements originally envisaged, namely the greenhouse and
additional parking area, required to be relocated to land lying outwith the site area
that was subject to the PAN process. Consequently, these components have had to
be submitted as separate planning applications. 
66 Notwithstanding their separate submission, both applications have been assessed
in conjunction with the operations village proposal and are considered to be
acceptable in the context of the wider operations village development. A detailed
assessment of each proposal will be provided within the respective reports for those
applications; however, reference is made to them here for completeness given their
functional relationship with the operations village. These applications will be
determined following a decision on this committee item. 
67 Overall, while the development results in a degree of localised landscape change, it
is considered that the proposal responds appropriately to its context, making use of
a less sensitive part of the HGDL, taking advantage of existing screening and
topography and the presence of the existing OHL and incorporating mitigation
measures to reduce visual effects. The careful selection of timber, corrugated
cladding and muted colours contributes positively to this approach. On balance, the
proposal is considered to accord with the relevant provisions of LDP2 and NPF4
relating to landscape, visual impact, and placemaking, with no unacceptable
impacts on the wider landscape character, key views, or the integrity of the
designed landscape. 
Noise Impact and Residential Amenity 
68 The potential impact of the proposed development on residential amenity, with
particular regard to noise, has been assessed through the submitted Noise Impact
Assessment (NIA) and the consultation response from Environmental Health (EH).
This matter is primarily considered against Policy 56 (Noise Pollution) of the Perth
and Kinross Local Development Plan 2019, which seeks to prevent unacceptable
noise impacts on existing or proposed sensitive receptors, and NPF4 Policy 23

Page 15

(Health and Safety), which requires that new development does not result in
unacceptable risks to health, safety or amenity. 
69 The NIA identifies three principal noise sensitive receptors, including nearby
residential properties at Styx Cottage, Carse Farm and the Gatehouse, and
assesses the impact of operational noise sources associated with the development,
including plant, ventilation systems, workshop activities and the vehicle wash bay.
The assessment has been undertaken in accordance with BS4142:2014, comparing
predicted operational noise levels against measured background noise levels, which
are derived from a site-specific baseline survey. 
70 The results of the assessment indicate that, at all identified receptors, the predicted
noise levels associated with the development are well below existing background
levels, both during daytime and night-time periods.  For example, rating levels are
shown to be between 2 dB and 25 dB below background levels, depending on
receptor and time of day, which equates to a low or negligible impact with a low
likelihood of noise being perceptible.  As such no specific mitigation measures are
required in order to achieve acceptable levels. 
71 These findings are supported by the consultation response from EH, who raise no
objection.  EH accepts the methodology and conclusions of the NIA and confirms
that the development can be accommodated without adverse effects on nearby
residential properties, subject to the imposition of planning conditions. These
include restrictions on the hours of operation for the workshop and vehicle wash
bay, and a requirement that all plant and equipment be controlled to specified noise
rating limits at neighbouring properties (Conditions 5, 6, 7, 8 and 9).  Such
conditions provide additional safeguards to ensure that noise levels remain within
acceptable thresholds over the lifetime of the development. 
72 It is also relevant that the site is located approximately 300 metres or more from the
nearest third-party residential receptors, within a predominantly rural environment
where background noise is already influenced by traffic along the A827 and other
factors.  This separation distance alone, combined with the relatively low predicted
noise levels, limits the potential for adverse amenity impacts.  
73 Notwithstanding the positive findings, it is recognised that the development
introduces new operational activity, including plant that may operate on a 24-hour
basis. While the modelling demonstrates that noise levels remain below background
levels, the introduction of continuous low-level noise in a rural setting has the
potential to be perceptible in certain circumstances. However, the conservative
assumptions applied in the modelling, alongside the recommended planning
conditions, provide confidence that any such effects would be limited and would not
rise to a level that would be considered unacceptable. 
74 Overall, the evidence demonstrates that the proposal would not give rise to
significant adverse impacts on residential amenity in terms of noise. Subject to the
recommended conditions, the development is considered to comply with Policy 56
of the LDP2, in that it would not generate noise at a level that would adversely affect

Page 16

neighbouring receptors, and with NPF4 Policy 23, as it would not give rise to
unacceptable impacts on health, safety or amenity. 
Lighting 
75 The application is supported by a Lighting Technical Note (LTN) which sets out a
strategy based on minimising light spill, glare and sky glow through the use of low-
level, directional and dark-sky compliant lighting. This includes the use of low colour
temperature (c.1750K) luminaires, zero upward tilt, shielding and controls such as
timers and Passive Infrared (PIR) or ‘motion’ sensors to ensure lighting is only used
when required. 
76 It is acknowledged that the introduction of an operations village in this ‘dark’, rural
location will inevitably result in a discernible change to the existing lighting
environment. However, the level and extent of lighting has been carefully limited to
essential operational areas, with boundary levels kept low (generally below 0.4 lux)
to protect surrounding dark areas and ecological interests. 
77 In assessing this impact, it is important to consider the findings of the wider siting
and design assessment, which concludes that the chosen location reflects
operational requirements and limited site availability within the Estate. In that
context, the lighting is considered to be an anticipated and necessary consequence
of the development, but one that has been appropriately mitigated through design.
A condition is recommended to ensure limits on light spill beyond the site
boundaries (Condition 7). 
78 Overall, the proposal is considered to accord with LDP2 Policy 55 and NPF4 Policy
23, as the lighting strategy minimises adverse impacts on amenity, ecology and the
night sky as far as reasonably possible. Subject to the submission and approval of
an updated lighting plan and the implementation of the proposed mitigation and
controls, the level of impact is considered acceptable. 
Air Quality 
79 Th supporting Air Quality Impact Assessment (AQIA) considers the effects of
operational and construction traffic, emissions from the laundry facility and
construction dust. It follows recognised guidance and identifies that, while the
development exceeds initial Stage 1 screening criteria, due to the scale of parking
provision and combustion sources, it does not exceed Stage 2. As such, the overall
effect of operational traffic and emissions is concluded to be not significant. 
80 During the construction phase, the assessment identifies a medium risk of dust
impacts on a nearby ecological receptor, with low risk associated with track out onto
the A827. However, this is subject to the implementation of standard and site-
specific mitigation measures, which are set out in the AQIA and are considered to
appropriately manage these effects.

Page 17

81 The findings of the AQIA have been reviewed and accepted by EH, subject to
conditions securing the recommended mitigation, particularly in regard to
construction dust mitigation (Condition 9). 
82 Having regard to LDP2 air quality policy requirements and NPF4 Policy 23, the
proposal is considered acceptable in that it would not result in significant adverse
impacts on air quality. The assessment demonstrates that both operational and
construction effects can be effectively controlled, and the development is therefore
considered to comply with the relevant policy framework. 
Flood Risk 
83 The application is supported by a Flood Risk Assessment (FRA), which considers
the potential for flooding from nearby watercourses, including the River Tay, the
Croftmoraig Burn and the Tullichuil Burn, as well as smaller drainage channels. This
is assessed against NPF4 Policy 22 and LDP2 Policy 52, which aim to avoid
development in areas at risk of flooding and ensure risks are properly managed. 
84 The FRA shows that while the site sits relatively close to the River Tay and is
influenced by the Croftmoraig Burn and Tullichuil Burn, the buildings themselves are
located on higher ground that is not at risk from predicted flooding, even during a
very rare and severe event (a 1 in 200 year flood including climate change). Areas
of lower ground closer to the River Tay could flood in such circumstances, but these
are free from built development. The assessment also looks at smaller burns and
drainage routes within the site, where water can flow during heavy rain. It notes
there may be some localised surface water and minor ponding, particularly along
these drainage channels, but this is not unusual and can be managed through
standard drainage design approaches. 
85 Consultation responses support these findings. The Scottish Environment
Protection Agency (SEPA) confirms that the site is outwith areas at risk of flooding
from the River Tay and the nearby burns, raising no objection.  SEPA does note a
small potential issue with surface water from one drain, but this is a detailed design
matter rather than a constraint to development. 
86 In addition, the Council’s flooding team has been consulted and has raised no
objection, indicating that the approach taken is acceptable. 
87 Overall, the development has been designed to avoid flood risk from the River Tay,
Croftmoraig Burn and Tullichuil Burn, with any minor surface water issues capable
of being managed through standard measures. On that basis, the proposal
complies with NPF4 Policy 22 and LDP2 Policy 52, and would not result in
unacceptable flood risk either on the site or elsewhere. 
Drainage 
88 The application is supported by a Drainage Impact Assessment (DIA) which sets
out how both foul and surface water will be managed. This has been assessed
against Policy 53 (B and C) of LDP2 and NPF4 Policy 23, which seek to ensure that

Page 18

developments are properly drained, incorporate sustainable drainage systems
(SuDS), and avoid harm to the water environment. 
Foul Drainage 
89 Given the site is not connected to the public sewer network, a private foul drainage
system is proposed. This will collect and direct wastewater to a specialist treatment
plant, before controlled discharge to the River Tay, subject to the necessary SEPA
authorisation and EASR Permit (formerly CAR license). 
90 The system includes standard drainage arrangements, together with additional
safeguards such as a grease separator for the kitchen facilities, a cooling tank for
the laundry building, and covered washbay and refuse areas to prevent
unnecessary contamination. These measures ensure that wastewater is
appropriately treated prior to discharge and that risks of pollution are minimised. 
91 This approach reflects the requirements of LDP2 Policy 53B and NPF4 Policy 23 by
providing a suitable and controlled means of foul water treatment where a public
sewer connection is not available. 
Surface Water and SuDS 
92 Surface water from the development will be managed through a comprehensive
SuDS strategy, designed to mimic natural drainage as far as possible. The
proposals include a combination of: 
• Permeable paving for access roads, parking areas and yards
• Roadside filter trenches to collect, treat and convey runoff
• Underground storage and attenuation, ensuring flows are restricted
• Rainwater harvesting within the greenhouse. 
93 The Council’s Flooding and Drainage Team have accepted the principle of the
proposed drainage system subject to a condition which requires the fully detailed
design to be submitted for approval which can be secured by condition (Condition
25). 
94 Overall, the proposed drainage strategy demonstrates that the development can be
satisfactorily drained without adverse impact on the surrounding area or water
environment. It incorporates appropriate foul treatment, a robust SuDS network, and
effective pollution control measures, in accordance with Policy 53B and 53C of
LDP2 and NPF4 Policy 23. 
95 Accordingly, the drainage arrangements are considered acceptable. 
96 A separate assessment of potential effects on the River Tay SAC is provided
elsewhere within this report.

Page 19

Ecology 
97 The application is supported by a comprehensive Ecological Impact Assessment
(EcIA), which has been undertaken in accordance with recognised guidance and
informed by detailed desk study and field survey work. The EcIA identifies a range
of ecological receptors within and adjacent to the site, including the River Tay SAC,
areas of ancient woodland, and a number of protected species such as bats, otter,
freshwater pearl mussel and breeding birds. 
98 The assessment concludes that, in the absence of mitigation, construction activities
have potential for temporary significant effects on certain receptors, particularly in
relation to water quality, habitat disturbance and protected species. However, the
EcIA contains mitigation measures, including a Construction Environmental
Management Plan, Ecological Clerk of Works supervision, pre-construction surveys,
species protection plans and habitat management measures. Subject to these
measures, the EcIA concludes that there would be no significant residual effects
during either the construction or operational phases. 
99 The Biodiversity Officer has reviewed the EcIA and confirms that it conforms with
best practice and was undertaken at an appropriate time of year.  Thus has no
objection subject to conditions securing: mitigation, species licensing (in relation to
bat roosts), and a revised Biodiversity Enhancement Plan (BEP). (Conditions 10-
16). They highlights the importance of fully implementing mitigation measures,
strengthening enhancement proposals, and addressing invasive species. 
100 Having regard to LDP2 Policy 41 and NPF4 Policy 3, the proposal demonstrates
compliance with the mitigation hierarchy and ensures that impacts on protected
species, habitats and designated sites are avoided, minimised and appropriately
mitigated. Furthermore, subject to the refinement of the BEP through condition, the
development has scope to deliver biodiversity enhancement in line with policy
objectives (Condition 12). 
101 A Fresh Water Pearl Mussel Survey was undertaken and accepted by Nature Scot,
subject to submission and agreement on a Construction Method Statement and by
installing an appropriately specified sewage treatment plant (Condition 27). 
102 Overall, taking account of the EcIA findings and consultation responses, and subject
to conditions securing mitigation, enhancement and ongoing management, the
proposal is considered to accord with Policy 41 of LDP2 and Policy 3 of NPF4, as it
will not result in unacceptable adverse impacts on biodiversity and provides an
appropriate framework for ecological protection and enhancement. 
River Tay Special Area of Conservation 
103 The EcIA identifies the River Tay SAC as an internationally designated site of high
sensitivity, designated for qualifying features including Atlantic Salmon, brook, river
and sea lamprey, otter and clear-water lochs with aquatic vegetation. An
Appropriate Assessment has been undertaken, which considers the potential for
likely significant effects on the integrity of the SAC.

Page 20

104 While construction activities have the potential to give rise to adverse indirect
effects, particularly through impacts on water quality, such as sedimentation,
pollution and hydrological change, the assessment confirms that these risks can be
effectively mitigated. In particular, the implementation of a robust Construction
Environmental Management Plan (CEMP) and detailed Construction Method
Statements (CMS) would ensure appropriate controls are in place, including
pollution prevention measures, buffer zones to watercourses and ecological
supervision. Such measures reflect established approaches that have been
successfully applied elsewhere within the wider Taymouth Estate. (Condition 16). 
105 Subject to the implementation of these measures, the EcIA concludes that there
would be no adverse effect on the integrity of the River Tay SAC, and no significant
residual effects on its qualifying interests. As confirmed via the Appropriate
Assessment.  Accordingly, the impact on the SAC is considered to be appropriately
addressed and acceptable in policy terms. 
Trees 
106 The application is supported by an Arboricultural Impact Assessment (AIA) and
Tree Management and Mitigation Plan (TMMP) prepared in accordance with
BS5837. The AIA identifies 21 significant trees within and adjacent to the site,
comprising a mix of high (Category A), moderate (Category B) and lower quality
specimens, together with areas  of mixed woodland and self-set planting. 
107 The proposed development will require the removal of a number of trees, including
12 identified significant trees in addition to 2 Category U trees which are
recommended for removal on arboricultural and safety grounds. This includes the
loss of some higher value Category A and B trees, and it is acknowledged that this
represents an impact on the existing tree resource and local landscape character. 
However, the wider assessment notes that much of the surrounding woodland is of
limited quality, including commercial forestry with a higher risk of windthrow, and
that some removal is necessary to facilitate safe access and development. 
108 The proposal seeks to retain trees where feasible, the implementation of root
protection areas during construction, and the provision of compensatory planting as
mitigation. The TMMP demonstrates that substantial areas of woodland will be
retained and supplemented by new planting, resulting in a longer-term
enhancement of tree cover and habitat value. In addition, detailed measures
including protective fencing, no dig construction techniques and arboricultural
supervision are proposed to ensure the safeguarding of retained trees throughout
the construction process. These measures are secured by condition (Condition 4 
109 Having regard to LDP2 Policy 40B and NPF4 Policy 6, it is recognised that the
proposal will result in some loss of trees and woodland, including individual trees of
higher value. However, this must be considered in the context of the site’s
characteristics and the operational requirements of the development. The submitted
assessment demonstrates that tree loss has been minimised as far as reasonably
practicable, that poorer quality and unsafe trees are prioritised for removal, and that
mitigation and compensatory planting will secure a net improvement in arboricultural

Page 21

amenity over time. The compensatory planting will be secured by condition
(Conditions 2 and 3). 
110 Overall, subject to conditions securing the implementation of the Tree Management
Plan, protective measures and replacement planting, the proposal is considered to
comply with the aims of LDP2 Policy 40B and NPF4 Policy 6, in that impacts on
trees are appropriately managed and mitigated, and the long-term woodland
resource is safeguarded and enhanced. 
Landscaping and Tree Planting/Compensatory Planting 
111 The proposals see retention of trees where feasible, the protection of root protection
areas during construction, and the provision of compensatory planting. The
submitted landscape proposals demonstrate a substantial level of replanting,
including approximately 261 new trees (based on a 3:1 replacement ratio),
comprising a mix of native and characteristic estate species such as oak, beech,
lime, birch, rowan and cherry. These are supplemented by extensive structural
planting, including over 300 linear metres of hedgerow, areas of shrub planting, and
significant groundcover including circa 5,600m² of meadow and 900m² of lawn. The
planting is focused on reinforcing and extending the riverside woodland corridor,
strengthening landscape structure along the northern boundary, and providing
screening and integration of the development, with particular emphasis on creating
a continuous tree belt along the River Tay and enhancing ecological connectivity.
All secured by condition (Conditions 2 and 3). 
112 Having regard to LDP2 Policy 40B and NPF4 Policy 6, it is recognised that the
proposal will result in some loss of trees and woodland, including individual trees of
higher value. However, this must be considered in the context of the site’s
characteristics and the operational requirements of the development. The submitted
assessment demonstrates that tree loss has been minimised as far as reasonably
practicable, that poorer quality and unsafe trees are prioritised for removal, and that
mitigation and compensatory planting will secure a net improvement in arboricultural
amenity over time. 
113 Overall, subject to conditions securing the implementation of the Tree Management
Plan, protective measures and replacement planting, the proposal is considered to
comply with the aims of Policy 40B and NPF4 Policy 6 in that impacts on trees are
appropriately managed and mitigated, and the long-term woodland resource is
safeguarded and enhanced. 
Traffic and Access 
114 The application is supported by a Transport Statement (TS) and Draft Green Travel
Plan (DGTP), and PKC Transport Planning raise no objection subject to conditions.
The site lies in a rural location within Taymouth Estate, the immediate surroundings
see opportunities for walking and cycling limited due to distance and infrastructure
constraints. While there are some core paths in the wider area and limited bus
services connecting Kenmore and Aberfeldy, these options are not well aligned with
staff travel patterns and are unlikely to serve as primary modes of access.

Page 22

115 In transport terms, the development is expected to generate approximately 139
two‑way trips per day; however, a substantial proportion of these trips already occur
within the Estate and would simply be relocated. The net increase is therefore
considered relatively small and anticipated as the development progresses to
completion, and the assessment demonstrates that the A827 has sufficient capacity
to accommodate this uplift without adverse impact. Transport Planning agree, and it
is considered that the proposal complies with LDP2 Policy 60B in that it would not
prejudice the safe and efficient operation of the local road network. 
116 The proposed access arrangements involve upgrading the existing East Lodge
junction onto the A827, including the provision of visibility splays to a 2.4m x 215m
standard through removal or relocation of vegetation, fencing and other
obstructions. Swept path analysis demonstrates that the junction can accommodate
all likely vehicle movements, including service and emergency vehicles. Transport
Planning recommend conditions to secure the construction of the access, visibility
splays and a Construction Traffic Management Plan, subject to this the proposals
are considered acceptable in road safety terms (Conditions 17, 18 and 19). 
117 A key component is the emphasis on sustainable travel, particularly the provision of
a staff shuttle bus. Information confirms that this already operates, serving locations
such as Aberfeldy, Pitlochry and Perth, with an existing uptake of around 60% of
operational staff. Th applicant (River Tay Development Ltd) is to continue this
service as part of the Green Travel Plan, with a Travel Plan Co‑ordinator
responsible for monitoring and reporting. This is a significant mitigation measure
which will reduce reliance on private car use and is central to compliance with NPF4
Policy 13. A fully detailed Green Travel Plan and its implementation for the lifetime
of the development is secured by Condition 22. 
118 In terms of public transport infrastructure, Transport Planning have require a bus
boarder be provided on the north (development) side of the A827, provision on the
opposite side being constrained by visibility, safety considerations and third‑party
land ownership. This approach also consistent with the previously approved West
Gate access, where provision was similarly limited to one side of the road. A
condition securing the delivery of the bus boarder on the development side is
considered appropriate (Condition 21). Arrangements for west bound bus users
associated to the applicant’s business should be set out in the GTP. (Condition 22).
This may be a shuttle bus collection at the nearest suitable stop. 
119 The development also incorporates supporting measures for sustainable travel,
including covered cycle parking (Condition 23), shower and changing facilities,
electric vehicle charging points and internal pedestrian connections. While the rural
context limits the likely uptake of walking and cycling, these measures ensure that
opportunities for alternative modes are provided where feasible. In addition, a GTP
will be secured by condition 22, requiring ongoing monitoring, promotion of
sustainable transport options and the long‑term operation of the shuttle bus service. 
120 With regard to parking provision, the application includes a dedicated car park
comprising 53 spaces, including 6 electric vehicle charging spaces and 11

Page 23

accessible/disabled spaces. In addition, a separate car park providing a further 43
spaces is proposed under the associated planning application 24/01617/FLL.  A
total of 113 parking spaces would be available to support the proposed use. This
level of provision is considered sufficient to accommodate staff and visitor demand,
while also recognising the role of the staff shuttle service and other sustainable
travel measures in reducing reliance on private vehicle travel. It should also be
noted that a significant portion of staff who currently park at the temporary
operations buildings immediately adjacent to Taymouth Castle will be relocated to
the new operations village. 
121 Overall, the proposal is considered to satisfy the requirements of NPF4 Policy 13
and LDP2 Policy 60B. The level of traffic generated is modest and can be
accommodated within the existing network, safe access can be achieved, and a
comprehensive package of sustainable transport measures is proposed. Subject to
conditions, including the provision of the bus boarder and the implementation of the
Green Travel Plan with ongoing shuttle service provision, the transport impacts of
the development are considered acceptable. 
Archaeology 
122 The application is supported by an Archaeological Desk-Based Assessment and
Walkover Survey reflective of the location within the Taymouth Castle Inventory
Garden and Designed Landscape and the potential for previously unrecorded
buried archaeology. While no significant remains were identified within the site, the
wider area is known to be archaeologically rich, and ground disturbance could affect
unknown subsurface features. 
123 Perth and Kinross Heritage Trust raise no objection but confirms the archaeological
sensitivity and recommends a programme of archaeological works secured through
a Written Scheme of Investigation (WSI) to ensure any remains are appropriately
recorded (Condition 26). 
124 Having regard to LDP2 Policy 26B and NPF4 Policy 7, the potential impacts are
considered acceptable as they can be mitigated through evaluation, excavation and
recording secured by condition. Subject to these measures, the proposal would
safeguard archaeological interests and comply with policy. 
Economic Impact 
125 The submitted Economic Impact Assessment identifies a range of economic
benefits arising from the construction and operation of the proposed development,
which weigh in favour of the proposal. In the short term, the construction phase is
expected to support c.35 net additional jobs within Perth and Kinross, alongside
£1.1 million in wages and £2.5 million in Gross Value Added (GVA), providing a
temporary but positive boost to the local economy. 
126 More notably, the longer-term operational impacts are more substantial. The
development, as part of the wider Taymouth Estate, is estimated to support around
200 FTE jobs, with annual impacts of £8 million in wages and £14 million in GVA,

Page 24

equating to approximately £120 million in GVA and £60 million in wages over a 25-
year period.  These figures indicate a meaningful contribution to the rural economy,
particularly in supporting employment and reinforcing the viability of the estate as a
significant tourism and economic asset. The proposal also functions as enabling
infrastructure, helping to facilitate and sustain these wider economic benefits. 
127 However, the weight afforded to these impacts should be moderated. The figures
represent modelled estimates rather than guaranteed outcomes, and are subject to
assumptions around delivery, market conditions and operational performance.  In
addition, some benefits will be affected by leakage and displacement, and the scale
of the economic impact largely reflects the performance of the wider estate rather
than the operations village in isolation. 
128 Overall, while there is some uncertainty around the precise scale of benefits, the
proposal is likely to generate moderate to significant positive economic effects, and
this carries material weight in support of the development, albeit not determinative
on its own. 
Energy 
129 The proposal has been assessed against LDP2 Policy 32 and NPF4 Policy 2, which
require developments to reduce greenhouse gas emissions and incorporate low and
zero-carbon technologies. The submitted Energy Statement confirms that the
scheme adopts a fabric-first approach to minimise energy demand and will
incorporate renewable technologies, including air source heat pumps and
photovoltaic panels. Together with energy-efficient systems such as LED lighting
and heat recovery ventilation, these measures demonstrate that the development is
capable of meeting policy requirements and supporting climate mitigation
objectives. 
SSE Substation and Phasing 
130 The supporting information confirms that the delivery of a new electrical substation
forms a key element of the wider Taymouth Estate infrastructure, required to
provide a reliable energy supply to support the approved and emerging associated
development. The substation, comprising transformers, a switch room and
associated infrastructure, has been progressed in consultation with SSE and is
proposed within the operations village site following an assessment of alternative
locations and is subject to applications 26/00740/FLL and 26/01016/FLL. 
131 In this regard, the Council has indicated that the substation should be integrated
within the layout of the operations village, rather than located separately within the
wider Historic Garden and Designed Landscape (HGDL), in order to minimise
impacts on more sensitive parts of the designation. It is therefore considered that
the substation would only be acceptable where it is visually and functionally
associated with the operations village, forming part of a coherent built grouping.
When viewed in this context, the substation would also be read alongside existing
energy infrastructure, notably the Beauly–Denny overhead transmission line,
thereby limiting its perceived impact on the landscape.

Page 25

132 Amended plans support this application, identifying the proposed location of the
substation at the western end of the building cluster, ensuring it is physically and
visually integrated with the operations village rather than being isolated. It is noted
that the substation itself remains subject to separate planning applications
(26/00740/FLL and 26/01016/FLL). 
133 To ensure that the substation remains appropriately integrated and does not come
forward in isolation, it is recommended that a condition is attached requiring the
submission and approval of a Phasing and Implementation Plan for the wider
operations village (Condition 28) in association with the substation, greenhouse and
car park. This will secure the coordinated delivery of the substation alongside the
wider development, including clear timing of works, provision of structural
landscaping and boundary treatments, and defined trigger points for subsequent
phases. The condition will also ensure that the substation cannot remain as a
standalone feature in the longer term, with requirements for the timely
commencement of the wider operations village and implementation of landscaping,
thereby safeguarding the character and integrity of the HGDL. 
Variation of Application Under Section 32A 
134 This application was varied prior to determination, in accordance with the terms of
section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the design of Building 2 and amendments to
accommodate the proposed SSEN substation. 
Planning Obligations and Legal Agreements 
135 None required. 
Direction By Scottish Ministers 
136 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
137 The proposed Back of House Operations Village is considered to constitute
essential operational infrastructure required to support the long-term management
and operation of the evolving Taymouth Castle Estate. The development has a
clear functional relationship with an established rural enterprise and is supported in
principle by LDP Policy 8 and NPF4 Policy 29. 
138 While the proposal will introduce substantial new development within the Taymouth
Castle Garden and Designed Landscape and result in localised landscape change
and tree loss, the evidence demonstrates that alternative locations are constrained
and that the application site represents the most suitable and least sensitive option
available. Design revisions, the use of appropriate materials, structural landscaping,

Page 26

and significant compensatory planting have reduced the scale and visual impact of
the proposal, with effects largely confined to the immediate area. 
139 Technical assessments and consultation responses confirm that impacts relating to
landscape, residential amenity, lighting, air quality, flood risk, drainage, ecology, the
River Tay SAC, trees, transport and archaeology can be satisfactorily mitigated and
managed through planning conditions. 
140 The proposal will also deliver economic benefits through supporting the ongoing
operation of the estate, employment opportunities and wider rural investment. 
141 On balance, it is considered that the operational and economic benefits of the
development outweigh the identified localised impacts, which can be appropriately
mitigated. Subject to the recommended conditions, the proposal is considered to
accord with the relevant policies of the Perth and Kinross Local Development Plan
2019 and National Planning Framework 4. Accordingly, the application is
recommended for approval. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this decision
notice, unless the development has been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019. 
2. The detailed landscaping and planting scheme hereby approved shall be
implemented on a phased basis.  Prior to the commencement of any development
details of the phasing and timetable for the implementation of the landscaping and
planting scheme shall be submitted to and approved in writing by the Planning
Authority.  The phasing and timetable shall accord with the Phasing and
Implementation Plan required by Condition 27 of this permission.  Each phase of
landscaping and planting shall be implemented in accordance with the approved
phasing and timetable.  Thereafter, the approved scheme shall be maintained, with
any planting which fails to become established within five years being replaced
during the next planting season with others of a size and species previously
approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
3. Prior to the commencement of each phase of development identified in the Phasing
and Implementation Plan approved pursuant to Condition 27 of this permission, a
Landscape Management Plan for that phase, including long-term design objectives,

Page 27

management responsibilities and maintenance schedules for all landscape areas
within the phase, shall be submitted to and approved in writing by the Council as
Planning Authority.  The Plan shall provide for the management and maintenance
of the landscaping and planting approved under Condition 2 and shall accord with
the approved landscaping phasing and implementation timetable.  Thereafter, the
approved Landscape Management Plan shall be implemented and adhered to in
full. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
4. Prior to the commencement of any hereby approved works, all trees on site (other
than those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected. Protection
methods shall be strictly in accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction and the mitigation contained within the
approved Tree Management Plan (doc ref: 80).  Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason - To ensure the protection of retained trees on site. 
5. The hours of operation of the hereby approved vehicle wash bay shall be restricted
to between 0900 hours and 1700 hours daily. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
6. All hereby approved plant or equipment shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property, with all windows slightly
open, when measured and/ or calculated and plotted on a rating curve chart. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
7. All hereby approved external lighting shall be sufficiently screened and aligned so
as to ensure that there is no direct illumination of neighbouring land and that light
spillage beyond the boundaries of the site is minimised to a degree that it does not
adversely affect the amenity of the neighbouring land. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
8. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times or
at any time on Sundays or bank holidays (as identified by Scottish Government).

Page 28

Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
9. Prior to the commencement of development, a Construction Dust Management Plan
(CDMP) shall be submitted to and subsequently agreed in writing by the council as
Planning Authority and in consultation with Environmental Health.  The approved
CDMP shall be strictly adhered to for the duration of the construction of the
development. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
10. The conclusions and recommended action points within the supporting biodiversity
survey submitted and hereby approved (documents 69-75 inclusive) shall be fully
adhered to, respected and undertaken as part of the construction phase of
development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. An updated ecology survey will be required prior to the commencement of
development, if development has not commenced within 24 months of the date of
the ecology survey approved as part of this permission.  The updated survey shall
be submitted to the Council as Planning Authority for written agreement and
development shall not commence until after such written agreement has been
issued by the Council. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
12. Prior to the commencement of development, a revised Biodiversity Enhancement
Plan/Action Plan, including the location, quantity, specification and maintenance
requirements for all biodiversity enhancement measures, shall be submitted to and
approved in writing by the Planning Authority. Thereafter, the biodiversity
enhancement measures shall be implemented in accordance with the approved
plan and retained and maintained in accordance with its provisions for the lifetime of
the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
13. Prior to the commencement of development, an Invasive Non-Native Species
Control Plan shall be submitted to and subsequently approved in writing by the
Planning Authority.  The plan shall contain measures to eradicate and control
invasive non-native species.  Thereafter, the agreed measures shall be
implemented in full. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
14. Prior to the occupation of each phase of development identified in the Phasing and
Implementation Plan approved pursuant to Condition 27 of this permission, wildlife
kerbs shall be installed adjacent to all road gullies within that phase located within

Page 29

500 metres of a SUDS pond or watercourse.  Thereafter, the wildlife kerbs shall be
retained and maintained for the lifetime of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
15. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of the
development hereby approved.  The measures may include creation of sloping
escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
16. Development shall not commence until a detailed Construction Environmental
Management Plan (CEMP) detailing environmental mitigation measures and
construction method statements, including specific measures for environmental
monitoring during construction, shall be submitted to and subsequently agreed in
writing by the Planning Authority.  Such details shall be submitted not less than two
months prior to the agreed scheduled commencement date and shall incorporate
detailed pollution avoidance and mitigation measures for all construction elements
and how the proposed development will be constructed to avoid conflict with the
400kV overhead transmission line running through the site.  The CEMP must
include measures to prevent harmful materials entering the River Tay SAC, which
could reduce water quality and lead to a damaging impact on salmon, otter and
lamprey interests.  The CMS should include the following: 
a) pollution prevention safeguards including drainage arrangements and the
possible use of siltation traps, settlement tanks and bunds 
b) storage and disposal of materials including the siting of stock piles, use of
buffer strips and disposal methods 
c) construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound 
d) timing, duration and phasing of construction particularly in relation to salmon
and lamprey migration/spawning. 
e) how construction will proceed to avoid conflict with the overhead line. 
The CEMP and mitigations as agreed shall be fully implemented as part of the
development of the site. 
Thereafter the development shall be fully undertaken in accordance with the
agreed CEMP.   
Reason - To protect the River Tay Special Area of Conservation and the overhead
transmission line. 
17. Prior to any construction on site hereby approved, the vehicle access shown of
approved Drawing 47 Appendix G, shall be constructed (using the Construction

Page 30

Type B from the Construction Details for Access Types, C, D and E) to the
satisfaction of the Planning Authority in consultation with the Roads Authority.  The
Type B Road construction detail shall continue to the entrance for a minimum of 30
metres from the boundary of the public road surface. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
18. Prior to the commencement of any development, full visibility splays of 215 metres
along the channel line shall be provided to the left and right of the access, at a set-
back of 2.4 metres measured 1.05m above the road level to the standard and
specification required by the Council as Roads Authority to the satisfaction of the
Planning Authority.  The visibility splays shall be physically formed on the ground
and any existing fences, walls, hedges or other means of enclosure or obstructions
within the splays shall be removed and relocated outwith the splays.  Once formed,
the visibility splays shall be permanently retained thereafter, and no visual
obstruction of any kind shall be permitted within the visibility splays so formed. 
Reason - In the interests of road safety; to ensure the provision of adequate visibility
of the vehicular access. 
19. Prior to the commencement of the development hereby approved, the developer
shall submit for the written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a Construction Traffic
Management Scheme (TMS) which shall include the following: 
a) restriction of construction traffic to approved routes and the measures to be put
in place to avoid other routes being used;
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse collection
is undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h) arrangements for signage at site accesses and crossovers and on roads to be
used by construction traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
i) details of information signs to inform other road users of construction traffic;
j) arrangements to ensure that access for emergency service vehicles are not
impeded;
k) co-ordination with other significant developments known to use roads affected
by construction traffic;

Page 31

l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
m) the provision and installation of traffic counters at the developer 's expense at
locations to be agreed prior to the commencement of construction;
n) monitoring, reporting and implementation arrangements; 
o) arrangements for dealing with non-compliance; and
p) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site construction
programme. 
Reason - In the interest of proper site management. 
20. All heavy commercial vehicles carrying materials to or from the site during the
construction and operational phases of the development shall ensure that any loads
liable to generate dust, debris, litter or other material capable of being deposited on
the public road network are securely covered, contained or otherwise enclosed
during transit, except where loads require inspection upon arrival at the site. 
Thereafter, all such vehicles shall operate in accordance with these requirements. 
Reason - To prevent the escape of dust, debris and litter from vehicles in the
interests of road safety, residential amenity and environmental protection. 
21. Prior to the commencement of any development on site, a detailed design for a bus
stop facility comprising a bus boarder and flagpole on the north (development) side
of the A827 shall be submitted to and subsequently approved in writing by the
Planning Authority in consultation with the Public Transport Unit.  The bus stop
facility, as approved in writing, shall be implemented in accordance with the
approved details prior to the development being brought into use and shall
thereafter be retained for the lifetime of the development. 
Reason - To encourage the use of public transport and in the interests of road
safety and sustainable travel. 
22. No part of the development hereby approved shall be occupied until a Green Travel
Plan (GTP) has been submitted to and approved in writing by the Planning Authority
in consultation with Transport Planning.  The GTP shall include: 
- Details of the client funded shuttle bus service, including routes, frequency,
capacity and hours of operation.
- A commitment to the ongoing operation of the shuttle bus service for the lifetime
of the development.
- Appointment of a Travel Plan Co-ordinator.
- Measures to promote sustainable travel choice for staff, including walking,
cycling and public transport. Including arrangements for staff arriving via public
transport via all available routes (noting that a bus boarder/stop is not available
nearby on the south side of the A827).  
- Monitoring, review and reporting arrangements, with survey results submitted to
the Planning Authority at agreed intervals.

Page 32

The approved Green Travel Plan shall be implemented in full prior to the occupation
of the development. 
Reason - To promote sustainable transport choices, reduce reliance on private car
travel and accord with national and local transport policy. 
23. Prior to the commencement of development, details of a secure covered cycle
parking facility providing a minimum of 20 cycle spaces, including its location,
design and the phase of development in which it is to be delivered in accordance
with the Phasing and Implementation Plan approved pursuant to Condition 27 of
this permission, shall be submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority.  The cycle parking facility shall
thereafter be provided in accordance with the approved details and retained for that
purpose. 
Reason - To encourage active travel and meet advice within NPF4. 
24. Development shall not commence until a detailed Sustainable Urban Drainage
System (SUDS) scheme, including details of the phase or phases of development it
is intended to serve in accordance with the Phasing and Implementation Plan
approved pursuant to Condition 27 of this permission, has been submitted to and
approved in writing by the Council as Planning Authority, in consultation with SEPA
where necessary.  The scheme shall be developed in accordance with the
technical guidance contained in The SUDS Manual (C753) and the Council's Flood
Risk and Flood Risk Assessments Developer Guidance and shall incorporate
source control.  The approved SUDS infrastructure for each phase shall be fully
implemented and operational prior to the occupation or bringing into use of that
phase.  Thereafter, the approved scheme shall be retained and maintained. 
Reason - To ensure the provision of effective drainage for the site. 
25. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has been submitted by the
developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT).  Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required by
the WSI, identify a requirement for post-excavation analysis, the development as
approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT.  The PERD shall be
carried out in complete accordance with the approved details.  Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress.

Page 33

Reason - The site lies adjacent to an area of archaeological interest. 
26. Prior to the commencement of any development a detailed specification of the
proposed sewage treatment plant and associated discharge arrangements shall be
submitted to and subsequently approved in writing by the Planning Authority.  The
submitted details shall demonstrate that the system will not adversely affect the
water environment, including freshwater pearl mussel populations or their habitat.
Thereafter, the development shall be carried out and maintained in accordance with
the approved details. 
Reason - To protect the water environment and freshwater pearl mussels from
pollution arising from foul drainage and to address comments from Nature Scot. 
27. No development shall commence until a Phasing and Implementation Plan for the
Operations Village, including the approved substation subject to planning
applications ref. 26/00740/FLL and 26/01617/FLL, greenhouse (ref: 24/01618/FLL)
and car park (ref:24/01617/FLL) or any future amendments or follow up
applications, has been submitted to and approved in writing by the Planning
Authority. 
The Phasing and Implementation Plan shall include: 
i. the sequencing and timing of construction of all elements of the Operations
Village, including the substation, car park and greenhouse.
ii. full details of all structural landscaping, planting and boundary treatments
associated with the substation and its integration within the wider Operations
Village, together with a timetable for implementation;
iii. trigger points and programme milestones for the delivery of subsequent
phases of the Operations Village following completion of the substation. 
Thereafter, development shall be carried out in accordance with the approved
Phasing and Implementation Plan. 
All structural landscaping associated with the development shall be implemented in
accordance with the approved Phasing and Implementation Plan and landscaping
timetable. Landscaping for each phase shall be completed no later than the first
planting season (October to March) following the completion or bringing into use of
that phase, whichever is the earlier. 
In the event that the next phase of the Operations Village has not substantially
commenced within the period specified in the Phasing and Implementation Plan,
following completion of the substation, a revised Phasing and Implementation Plan,
including additional landscaping and planting mitigation measures for the substation
and its setting, shall be submitted to and approved in writing by the Planning
Authority within 6 months of that date. The development shall thereafter be carried
out in accordance with the approved revised details. 
Reason - To secure the coordinated delivery of the Operations Village and
associated substation, and to ensure that appropriate landscaping and mitigation

Page 34

measures are delivered at an early stage in the interests of visual amenity and
integration with the surrounding landscape. 
Justification 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
Procedural Notes 
N/A  
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the Planning
Authority prior written notification of the date on which it is intended to commence
the development.  A failure to comply with this statutory requirement would
constitute a breach of planning control under Section 123(1) of that Act, which may
result in enforcement action being taken.  Please use the form attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to be
assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended (section
1), it is an offence to remove, damage or destroy the nest of any wild bird while that
nest is in use or being built.  Planning permission for a development does not
provide a defence against prosecution under this Act. 
5. The developer should engage with the Council's Structures Team to confirm the
scope of technical approval required for the retaining wall adjacent to the A827 and
the need for Roads Construction Consent. 
6. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
7. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(tel 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of reference
for work required.

Page 35

8. For the purposes of condition 28, "substantially commenced" shall mean the
completion of foundations and works above ground level. 
9. SSEN Transmission recommend the applicant/developer adheres to HSE (Health
and Safety Executive) GS6: Avoiding Danger from Overhead Powerlines guidance
for any work planned to take place within 15m of their overhead line.  Additional
advice can be sought from the following weblink:  Helping you work safely near our
network - SSEN Transmission 
10. The applicant/developer shall contact SSEN Transmission at least 30 days in
advance of commencing development at
transmission.asset.management@sse.com to obtain safe working practises
recommendations for working near and underneath the overhead transmission line. 
Background Papers
Letters of representation 5 
Authors
Name Designation Contact Details
John Williamson Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton   Team Leader (Major Applications and
Enforcement) 
18 August 2026  
Kristian Smith Service Manager 26 August 2026