Democracy Spraffa

Minute of meeting of 8 July 2026

Perth and Kinross Council · 12 August 2026
Back to Planning and Placemaking Committee — 12 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 8 July 2026 at 9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, D Cuthbert, A Forbes
(substituting for D Illingworth), K Harvey, I James, Bailie C McLaren and R Watters. 
In Attendance: S Merone, Strategic Lead - Economy, Development and Planning;
L McLean, C Morilly, S Panton, L Reid and K Smith (all Economy, Development and
Planning); A Brown, C Elliott and M Pasternak (all Legal and Governance). 
Apologies: Councillor D Illingworth and Bailie M Williamson. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted apologies
as above.   
Members unanimously agreed to vary the order of business and consider the
applications at Item 5(1)(iv) and 5(2)(i) first. 
2. Declarations of Interest 
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The minute of meeting of the Planning and Placemaking Committee of 10 June
2026 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
25/01836/FLM   5(1)(i)
26/00067/FLM   5(1)(ii)
19/01927/MWM   5(1)(iv)
26/00045/FLL   5(2)(i) 
25/01794/FLL   5(2)(ii)

Page 2

5. Applications for Determination 
(1) Major Applications 
(iv) 19/01927/MWM - Mineral extraction and processing including
alterations to vehicular access, erection of ancillary buildings,
landscaping, reinstatement and associated works (Phase 3)
(in part retrospect), land south west of Arns Farm,
Auchterarder (Report No. 26/206) 
Mr M Richardson, agent, addressed the committee and answered
members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason: This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. Within 6 months of the date of this decision, a detailed
Water Management Plan shall be submitted to and
approved in writing by the Planning Authority in consultation
with SEPA. The Plan shall include full details of surface
water management during restoration works, including
earthworks and any stockpiling of soils, and shall include
details of silt management devices, cut-off drains, drainage
arrangements and any abstractions.  The approved details
shall be implemented in full during the restoration of the site.
Reason: To ensure adequate management of water on site.
3. Within 6 months of the date of this decision notice, an
Invasive Non-Native Species Control Plan shall be
submitted to and approved in writing by the Planning
Authority. The approved measures shall be implemented in
full during restoration works.
Reason: In the interests of protecting environmental quality
and of biodiversity.
4. Prior to the commencement of restoration works, an
updated Operational Environmental Management Plan
(OEMP) shall be submitted to and subsequently approved in
writing by the Planning Authority. The OEMP shall include
mitigation measures to control noise, dust, vibration, and
lighting associated with restoration activities and shall be
implemented in full throughout the restoration period.  The
finalised OEMP can be based upon the draft OEMP
(Appendix G of the Environmental Appraisal) submitted with
the application. The OEMP is a live document which shall be
updated to reflect changing site conditions as restoration

Page 3

works progress on site.  The OEMP, as approved, shall be
strictly adhered until the site is fully restored in accordance
with the approved restoration plans.
Reason: In the interests of neighbouring recreational and
residential amenity; to ensure a satisfactory standard of
local environmental quality is maintained.
5. The conclusions and recommended action points within the
supporting biodiversity survey (19/01927/28) submitted and
hereby approved shall be fully adhered to, respected and
undertaken as part of the restoration works.
Reason: In the interests of employing best practice ecology
and to ensure there is no adverse impact on any protected
species as identified under the Wildlife and Countryside Act
(1981).
6. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be implemented
for the duration of the restoration works. The measures may
include creation of sloping escape ramps for animals, which
may be achieved by edge profiling of trenches/excavations
or by using planks placed into them at the end of each
working day and open pipework greater than 150mm
outside diameter being blanked off at the end of each
working day.
Reason: In order to prevent animals from being trapped
within any open excavations.
7. Noise from any plant and machinery associated with the
development shall be controlled such that it does not exceed
55dBLAeq, 1 hour (free field) at 3.5m from the façade of
noise sensitive properties (except during temporary
operations as referred to in condition 8).
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
8. To allow for temporary operations such as soil stripping,
removing soil heaps, creating earth bunds, crushing
operations and restoration, noise levels measured at 3.5m
from the façade of any noise sensitive dwelling shall not
exceed 70dB LAeq, 1 hour (free field) for more than 8 weeks
in any one year.   Perth and Kinross Council, Environmental
Health and all neighbouring noise sensitive dwellings should
be advised in advance of the activities detailing the timings,
actual activities to be undertaken and any additional noise
mitigation measures.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
9. The hours of operation shall be limited to Monday to Friday
08:00 to 18:00 hours and 08:00 to 13:00 Saturdays. No
workings permitted on Sundays.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
10. All vehicles, plant and machinery shall operate only during
the permitted hours of operation and shall always be
silenced in accordance with the manufacturer's

Page 4

recommendations and so operated as to minimise noisy
emissions.  The Council as Planning Authority reserves the
right to insist on any reasonable additional measures to
further minimise noise emissions, should it prove expedient
to do so.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
11. The existing dry wheel bath on site shall be retained for the
duration of the restoration and until all restoration works
have been completed in accordance with the approved
plans and shall be utilised at all times.  The dry wheel bath
shall be supplemented by a road brush as required.
Reason: To ensure the public road is kept clear of debris
from the site.
12. Audible vehicle reversing alarms shall be operated on the
method that they only emit the warning if necessary, e.g. on
an infrared signal which detects persons to the rear of the
vehicle.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
13. No blasting shall take place on the site at any time.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
14. The restoration and aftercare of the site shall be carried out
in accordance with the approved restoration plans and
phasing programme.
Reason: In order to ensure the development proceeds in
accordance with the approved plans and documents and to
serve the rights of the Council as Planning Authority.
15. If, in the opinion of the Planning Authority, the development
gives rise to justified complaints relating to noise, dust or
other environmental effects, the applicant shall, at their own
expense, undertake monitoring by suitably qualified and
experienced consultants. The scope and methodology of
such monitoring shall be agreed in advance with the
Planning Authority. The results of the monitoring shall be
submitted to the Planning Authority, and any mitigation or
remedial measures identified shall thereafter be
implemented in full, unless otherwise agreed in writing by
the Planning Authority.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
16. All external lighting shall be sufficiently screened and
aligned to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
17. Should any external materials be required for site restoration
a detailed Traffic Management Plan (TMP) shall be
submitted to and approved in writing by the Planning

Page 5

Authority in consultation with the Roads Authority prior to
commencement of that phase of restoration.  The TMP shall
detail the number of HGV movements required for bringing
additional materials into the site to complete the restoration
phase. The Traffic Management Plan (TMP) shall include
the following:
(a)  restriction of construction traffic to approved routes and
the measures to be put in place to avoid other routes
being used;
(b) timing of construction traffic to minimise impact on local
communities particularly at school start and finishing
times, on days when refuse collection is undertaken,
on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing
traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication and
contingency arrangements in the event of vehicle
breakdown;
(f) arrangements for the cleaning of wheels and chassis of
vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
(g) arrangements for cleaning of roads affected by material
deposited from construction sites associated with the
development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
(i) details of information signs to inform other road users
of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to
the commencement of construction;
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.  
The TMP as approved shall be strictly adhered to during the
entire site construction programme.
Reason: To ensure adequate controls are put in place
should there be a significant uplift in HGV movements to the
site as a result of the restoration process.

Page 6

18. Within 3 months of the date of this decision, a detailed
programme for the permanent cessation of quarry
operations, including clear timescales and phasing, shall be
submitted to and approved in writing by the Planning
Authority. Thereafter, the permanent cessation of quarry
operations shall be carried out strictly in accordance with the
approved cessation document.
Reason: To ensure that mineral extraction is brought to an
end in the interests of environmental protection and to
facilitate the appropriate restoration of the site in accordance
with Policies 49A and 49B of LDP2, Policy 33 of NPF4, and
the Council’s Supplementary Guidance on Financial
Guarantees for Minerals. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Informatives
1. As soon as practicable after the development is complete,
the person who completes the development is obliged by
section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the planning authority
written notice of that position.  Please use the form attached
herewith.
2. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 38 of the Development Management Procedure
(Scotland) Regulations 2008.The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance. According to Regulation 38 the
notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development.
• Readily available to the public
• Printed on durable material.
3. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive. Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates. The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
4. The applicant is advised that in terms of Sections 56 of the
Roads (Scotland) Act 1984 he/she/they must obtain from the
Council, as Roads Authority, consent to open an existing

Page 7

road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment
Protection Agency.
5. The applicant should be aware of the advice contained
within SEPA's consultation response dated 28 January
relating to pollution prevention control and the potential
requirement for CAR Authorisation and should make contact
with SEPA's regulatory team to discuss these matters.
6. The application should be aware of the guidance contained
within Scottish Water's consultation response dated 16
December 2019 relating to Drinking Water Protected Areas.
7. Cranes and jibbed machines, used in connection with the
works, must be so positioned that the jib or any suspended
load does not swing over railway infrastructure or within 3
metres of the nearest rail if the boundary is closer than 3
metres.
8. All cranes, machinery and constructional plant must be so
positioned and used to prevent the accidental entry onto
railway property of such plant, or loads attached thereto, in
the event of failure.
9. Only inert spoil shall be used as the backfill material.  In the
event that biodegradable waste is imported to the site,
Network Rail will hold the operator responsible for the
escape of hazardous landfill gas or leachate which may
affect railway operations or the safety of the public.
10. The applicant is reminded that there remains a duty to
comply with other regulatory requirements, including the
Water Environment (Controlled Activities) (Scotland)
Regulations 2011 (as amended), the Waste Management
Licensing (Scotland) Regulations 2011 and the Pollution
Prevention and Control (Scotland) Regulations 2012. These
regimes operate separately from planning control and may
require separate consents or authorisations in relation to
restoration works and any associated site activities. The
applicant is advised to liaise with SEPA as appropriate to
ensure all relevant regulatory requirements are met. 
(2) Local Applications 
(i) 26/00045/FLL - Change of use of quarry to gun dog training
centre, erection of kennels, veterinary practice, reception
building, indoor arena, maintenance buildings, staff and
student accommodation, installation of PV and ASHP and
associated works, land south west of Arns Farm, Auchterarder
(Report No. 26/207) 
Mr M Richardson, agent, and Mr C Thornburn, applicant,
addressed the committee and answered members questions.

Page 8

Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason: This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. The hereby approved development shall not commence on
site until an evaluation for the potential of the site to be
affected by contamination by a previous use has been
undertaken and, as a minimum, a Preliminary Risk
Assessment (Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation shall
be undertaken to identify; 
i. the nature, extent and type(s) of contamination on the
site 
ii. measures to treat/remove contamination to ensure the
site is fit for the use proposed 
iii. measures to deal with contamination during
construction works 
iv. condition of the site on completion of decontamination
measures. 
Prior to the completion or bringing into use of any part of the
development the measures to decontaminate the site shall
be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented
must also be submitted to the Council as Planning Authority.
Reason: In order to deal with any potential contamination of
the site as a result of its former use.
3. Prior to the development hereby approved being completed
or brought into use, the vehicular access shall be formed in
accordance with Perth & Kinross Council's Road
Development Guide Type E Figure 5.8 access detail, of
Type C Road construction detail.
Reason: In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.

Page 9

Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
5. Noise from operations on site shall not exceed 5dBA above
the L90 background level expressed as LAeq (1 hour)
(0700-2300 hours) and LAeq (15 minutes) (2300-0700
hours), including any relevant penalties for tonality,
impulsivity, intermittency, or other sound characteristics
when measured at any residential property in accordance
with BS4142:2014+A1:2019.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
6. In the event of a justified noise complaint being received by
the Council the operator shall, at its own expense, employ a
consultant approved by the Planning Authority to carry out a
noise assessment to verify compliance with conditions 4 and
5 above. The assessment shall be carried out to an
appropriate methodology agreed in writing with the Planning
Authority. If the noise assessment shows that the noise
levels do not comply with conditions 4 and 5, a scheme of
noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation of
the scheme and shall be submitted to the Planning Authority
with 28 days of the assessment. The mitigation scheme
shall thereafter be implemented in accordance with the
approved scheme and timescales.
Reason: In the interests of residential amenity and to ensure
ongoing compliance with noise control conditions.
7. The sound insulation and sound transmission properties of
all buildings hereby approved shall be such that any
airborne noise from the operations within the premises does
not constitute a statutory noise nuisance as determined by
the Local Planning Authority.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
8. Servicing or maintenance at the site shall be carried out
between 0800 and 1900 Monday to Saturday only.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
9. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason: In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
10. Prior to the commencement of the development hereby
approved, details of the location and measures proposed for
the safeguarding and continued operation, or replacement,
of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water
supply pipes serving properties in the vicinity, sited within
and running through the application site, shall be submitted

Page 10

to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or
replacement measures shall be put in place prior to the
commencement of the development being brought into use
and shall thereafter be so maintained insofar as it relates to
the development hereby approved.
Reason: To ensure the new development has an adequate
and consistently wholesome supply of water and to maintain
water quality and supply in the interests of residential
amenity and ensure the private water supply or septic
drainage systems of neighbours of the development remain
accessible for future maintenance.
11. Prior to the commencement of development, a Flood Action
Plan shall be submitted to and approved in writing by the
Planning Authority. The Flood Action Plan shall identify
potential flood risks affecting access to and from the site as
detailed within the approved Flood Risk Assessment (doc
ref:34) including flooding of the surrounding road network,
and set out appropriate mitigation, management and
emergency procedures.  The approved Flood Action Plan
shall thereafter be implemented in full and remain in place
for the duration of the use of the site,
Reason: To ensure that flood risk is appropriately managed,
particularly in relation to site access and the surrounding
road network, in the interests of public safety and in
accordance with relevant flood risk and drainage policies.
12 Prior to the commencement of the development hereby
approved, a detailed layout plan shall be submitted to and
approved in writing by the Planning Authority. The plan shall
include:
• the precise siting and arrangement of all buildings;
• detailed parking and turning areas, including servicing
arrangements;
• the extent, layout and treatment of all private and
communal garden ground of residential properties;
• boundary treatments; and
• hard and soft landscaping proposals, including species,
planting densities and implementation programme.
The development shall thereafter be carried out in
accordance with the approved details.
Reason: In the interests of securing a satisfactory standard
of design, layout, landscaping and residential amenity in
accordance with Policies 1A and 1B of LDP2 and Policy 14
of NPF4.
13. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be implemented
for the duration of the restoration works. The measures may
include creation of sloping escape ramps for animals, which
may be achieved by edge profiling of trenches/excavations
or by using planks placed into them at the end of each
working day and open pipework greater than 150mm

Page 11

outside diameter being blanked off at the end of each
working day.
Reason: In order to prevent animals from being trapped
within any open excavations. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this application.
The legal agreement should be concluded and completed within 4
months of the date of any Committee approval. Failure to conclude
a legal agreement within 4 months will result in the planning
application being re-assessed through failing to comply with the
associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the planning authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached
herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant is advised that in terms of Sections 56 of the
Roads (Scotland) Act 1984 he/she/they must obtain from the
Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment
Protection Agency.
5. Lighting cable beneath access to be lowered and twin-wall
ducted. Contact Perth & Kinross Council Street Lighting
department for further details.

Page 12

6. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
honoured throughout and after completion of the
development.
7. The applicant shall ensure the private water supply for the
dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water Supplies
(Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland)
Regulations 2017.  Detailed information regarding the
private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and
the filtration and disinfection treatment proposed to ensure
provision of an adequate and consistently wholesome water
supply shall be submitted to Perth and Kinross Council
Environmental Health in line with the above Act and
Regulations.
8. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 38 of the Development Management Procedure
(Scotland) Regulations 2008.The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance. According to Regulation 38 the
notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development.
• Readily available to the public
• Printed on durable material. 
(1) Major Applications (cont.) 
(i) 25/01836/FLM - Formation of a 39MW solar farm comprising
ground-mounted solar PV array, battery energy storage
system (BESS), a substation, inverters, transformers, welfare
containers, fencing, CCTV cameras, vehicular access and
associated works, land 890 metres east of The Byre, Balvaird
Farm, Strathmiglo, KY14 7SR (Report No. 26/203) 
Mr S Panton introduced the report and advised members that if
minded to approve the application, in line with the update circulated
to members, it was also recommended that Condition 15 be
reworded and Informatives 8, 16, 17, 18, 19 and 21 removed as
they are duplicates. 
Mr N Linsday, applicant, addressed the committee and answered
members questions.

Page 13

Resolved:
Grant, subject to the following amended terms, conditions and
informatives: 
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason: This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
Archaeology and Cultural Heritage
2. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written Scheme of
Archaeological Investigation (WSI) which has been
submitted to, and agreed in writing by, the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust (PKHT). Thereafter, the developer shall
ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken. Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation
analysis, the development as approved shall not be
occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and
agreed in writing by the Council as Planning Authority, in
consultation with PKHT. The PERD shall be carried out in
complete accordance with the approved details.
Furthermore, the developer shall afford access at all
reasonable times to PKHT or a nominated representative
and shall allow them to observe work in progress
Reason: In the interest of protecting archaeological interest
within the site.
Biodiversity
3. The conclusions and recommended action points within the
supporting biodiversity survey submitted and hereby
approved (document 39 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase
of development.
Reason: In the interests of protecting environmental quality
and of biodiversity
4. Prior to the commencement of the development hereby
approved, an Invasive Non-Native Species Control Plan
shall be submitted to, and approved in writing by, the
Council as Planning Authority. The plan shall contain
measures to eradicate and control invasive non-native
species. Thereafter, the agreed scheme, and its

Page 14

requirements and recommendations, shall be implemented
in full during the construction phase.
Reason: In the interests of protecting environmental quality
and of biodiversity
5. Prior to the commencement of the development hereby
approved, an updated Biodiversity Enhancement Plan
including the location, quantity, specification and
maintenance requirements for biodiversity enhancement
measures shall be submitted for the further written
agreement of the Council as Planning Authority. The plan
shall include a commitment to submit species records found
during survey to the National Biodiversity Network Gateway
and reference the requirements set out in the PKC Planning
for Nature Guidance. Thereafter, the agreed scheme shall
be maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning
Authority.
Reason: In the interests of employing best practice ecology
and to ensure there is no adverse impact on any protected
species as identified under the Wildlife and Countryside Act
(1981).
Roads and Transportation
6. Prior to the commencement of the development hereby
approved, full visibility splays shown in drawing 405-065788-
00001-TRA-0001a along the channel line shall be provided
to the left and right of the access, at a set-back of 2.4
metres measured 1.05m above the road level to the
standard and specification required by the Council as Roads
Authority. The visibility splays shall be physically formed on
the ground and any existing fences, walls, hedges or other
means of enclosure or obstructions within the splays shall
be removed and relocated out with the splays. Once formed,
the visibility splays shall be permanently retained thereafter,
and no visual obstruction of any kind shall be permitted
within the visibility splays so formed.
Reason: In the interest of road safety.
Flooding and Drainage
7. Prior to works commencing on site, full drainage calculations
and the final layout and depth of the proposed SUDS ponds
and associated infrastructure shall be submitted to, and
agreed in writing by, the Council as Planning Authority, in
consultation with Perth and Kinross Council Flooding Team.
The agreed detail shall thereafter be implemented prior to
the completion of development.
Reason: In the interests of best practice surface water
management; to avoid undue risks to public safety and flood
risk.
Facility Lifespan
8. In the event the hereby approved development fails to
generate and store electricity on a commercial basis for a
continuous period of 12 months, or after operating for more
than 40 years, then it shall be deemed to have permanently

Page 15

ceased to be required. In such an event, the development
shall be decommissioned and the relevant parts of the site
reinstated within such a timescale as agreed by the Council
as Planning Authority.
Reason: To ensure the facility is removed from the site at
the end of its operational life, and to protect the character of
the countryside, the visual amenity of the area and nature
conservation interests.
Environmental Health
9. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason: In the interests of residential amenity.
10. Noise from the battery storage facility shall not exceed 29dB
LAeq, (15 min), including any relevant penalties for tonality,
impulsivity, intermittency, or other sound characteristics,
when measured at any residential property in accordance
with BS4142 – Method for Rating Industrial Noise Affecting
Mixed Residential and Industrial Areas.
Reason: In the interest of residential amenity.
11. In the event, that justified complaints for noise are received
by the Council, the applicant at their own expense, shall
employ an independent and suitably qualified consultant to
carry out a Noise Assessment from the development. The
appointed consultant and methodology for the Noise
Assessment shall be submitted to and approved in writing
by the Planning Authority in consultation with Environmental
Health within 28 days of being notified of the complaint.
Within 28 days of approval of appointed consultant and
methodology, a Noise Assessment shall be submitted
outlining mitigation and recommended timescales for
delivery. Thereafter, all mitigation measures shall be
implemented within the timescales recommended.
Reason: In the interest of residential amenity
12. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays.
Reason: In the interest of residential amenity.
13. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason: In the interest of residential amenity.
14. Prior to the commencement of the development the
applicant shall submit a Construction Environmental
Management Plan (CEMP) to be submitted and agreed in

Page 16

writing by the Planning Authority.  The CEMP shall include a
Noise Management Plan which shall include the BS5228
construction noise limits stated in section 1.6.4 of the NIA
SLR Project No.: 405.0065788.00001 dated 15 December. 
The CEMP shall also include a Dust Management Plan
which shall include a Dust Risk Assessment (DRA) and site-
specific dust mitigations derived from outcome of DRA. 
There after, the agreed CEMP shall be adhered to in full for
the duration of the construction period.
Reason: In the interests of protecting environmental quality
and biodiversity; to ensure no adverse impact on the
construction environment and residential amenity.
15. Within 2 months of receipt of a written request by the
Council as Planning Authority, following a substantiated
complaint from a sensitive property, the operator/applicant
shall, at its own expense, employ a consultant approved by
the Planning Authority to carry out an assessment of glint
and glare from the development. The glint and glare
assessment shall be submitted to and approved in writing by
the Planning Authority. The assessment must identify any
mitigation measures required if appropriate. Any mitigation
measures identified shall be implemented on site in
accordance with a timescale to be agreed with the Planning
Authority.
Reason: In the interest of residential amenity.
Fencing Details
16. Prior to development commencing on site, details of all
fencing, including above ground measurements and
locations of badger gates, and gaps shall be submitted to,
and approved in writing by, the Council, as Planning
Authority.  Thereafter, the fencing shall be erected in full
accordance with the approved scheme.
Reason: In the interest of visual amenity, and to ensure that
badgers, hedgehogs and amphibians can freely use the site. 
Maximising Local Net Economic Benefits
17. Prior to the commencement of the development herby
approved a statement shall be submitted for the prior written
approval of the Planning Authority, setting out the approach
taken by the developer to address the requirements of NPF4
Policies 11(c) and 25, in relation to maximising net economic
impact (employment/local business and supply chain
benefits), community wealth building and socio-economic
benefits as a result of the development. The statement
should set out proposed strategies and how these would be
implemented to achieve these benefits, with an emphasis on
long-term outcomes and collaboration with stakeholders.
Reason: In order to demonstrate the net economic impact of
the development has been maximised in the interests of the
locality.

Page 17

Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development.
2. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
honoured throughout and after completion of the
development.
3. The applicant shall ensure the private water supply for the
dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water Supplies
(Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland)
Regulations 2017.  Detailed information regarding the
private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and
the filtration and disinfection treatment proposed to ensure
provision of an adequate and consistently wholesome water
supply shall be submitted to Perth and Kinross Council
Environmental Health in line with the above Act and
Regulations.
4. The applicant should note the site access requirements
contained in the guidance note - National Fire Chiefs
Council’s guidance for Battery Energy Storage Systems.
Building Standards technical handbook 2022 – Dead End
Route – Fire and rescue service vehicles should not have to
reverse more than 20m from the end of an access road. 
Where the dead-end route is more than 20m long turning
facilities should be provided.
5. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development. A failure to comply with this
statutory requirement would constitute a breach of planning
control under section 123(1) of that Act, which may result in
enforcement action being taken.
6. As soon as it is practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
7. An application for a Building Warrant may be required.
8. The applicant is reminded that, should any protected
species be present, a license may be required from

Page 18

NatureScot to disturb a protected species. Failure to obtain
a license may constitute a criminal act under the Habitats
Regulations and penalties are severe for non-compliance.
9. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance. According to Regulation 41 the
notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development.
• Readily visible to the public.
• Printed on durable material.
10. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has
two months to consider the information.  You should
therefore submit the required information more than two
months before your permission expires. We cannot
guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with
before your permission lapses.
11. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (Tel: 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
12. The applicant is advised that, in terms of Sections 56 of the
Roads (Scotland) Act 1984, he/she/they must obtain from
the Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works.
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment
Protection Agency.
13. The applicant should be advised that in terms of Section 21
of the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to construct a new road
prior to the commencement of roadworks. Advice on the
disposal of surface water must be sought at the initial stages

Page 19

of design from Scottish Water and the Scottish Environment
Protection Agency.
14. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required. Further information
on radon gas and the associated reports that can be
obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
15. A review of the proposed development site did not raise any
real concerns, although historical mapping indicates that
there is a disused quarry at the NW boundary of the site. 
Based on the mapping the quarry has been disused for
many years.  The developer should satisfy themselves that
the site is suitable for the proposed use and should any
contamination be found during the approved works, works
should cease, and the Land Quality team should be
contacted on 01738 475000 or
contaminatedland@pkc.gov.uk for further advice.
16. Due to the nature of the proposal, it is important to keep in
mind the possibility of finding bats when undertaking
construction works. If bats are found during works, the work
should stop immediately, and you should contact NatureScot
Species Licensing Team for advice. Building works should
avoid the times of year when bats are most vulnerable to
disturbance. The summer months, when bats are in
maternity roosts, and the winter months when bats are
hibernating, should be avoided. Typically, early spring and
autumn months are the best times to do work that may
affect bats. If you suspect that bats are present, you should
consult NatureScot for advice. For further information visit
the Bat Conservation Trust website http://www.bats.org.uk/ . 
Please note that bats are protected by law, and it is a
criminal offence to deliberately harm, capture, kill or disturb
a bat or its resting place.
17. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive. Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates. The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act. 
(The committee took a short recess at this point)

Page 20

(ii) 26/00067/FLM - Installation of 49.9MW battery energy storage
system (BESS), formation of SUDS, associated infrastructure
and landscaping works, land 200 metres north west of
Jamesfield Garden Centre, Newburgh, Cupar, KY14 6EW
(Report No. 26/204) 
Mr S Panton introduced the report and advised members that if
minded to approve the application, in line with the update circulated
to members, updated wording for condition 17, additional
conditions 20 and 21 and additional informatives 18 and 19 would
be required. 
Ms T Fletcher, applicant, addressed the committee and answered
members questions. 
(The Committee took a short recess at this point) 
Motion (Councillors B Brawn and I James) 
Refuse, on the basis that the proposal is contrary to National
Planning Framework 4 (2023), Policy 5 Soils and Perth and
Kinross Local Development Plan 2 (2019), Policy 50 Prime
Agricultural Land as the proposal is not on a suitable site as it
involves the loss of prime agricultural land and will, by virtue of its
cumulative impact with other consented developments,
industrialise the area. 
Amendment (Councillors I Massie and G Stewart) 
Grant, subject to the amended terms, conditions and informatives
contained in Report No. 26/204. 
In terms of Standing Order 21.5 a roll call vote was taken. 
6 members voted for the Motion as follows:
Councillors K Allan, B Brawn, D Cuthbert, A Forbes, I James and
Bailie C McLaren. 
4 members voted for the Amendment as follows:
Councillors K Harvey, I Massie, G Stewart and R Watters. 
Resolved:
In accordance with the Motion. 
(iii) 26/00228/42M - S42 application to vary conditions 1, 3, 4, 5, 6,
7, 8, 12, 15, 19, 22, 23, 24, 26, 32, 33, 34, 35, 36, 38, 39, 40, 41,
42, 43, 45, 46, 49, 50 and 53 of planning permission in principle
20/00667/IPM, Perth West (MU70) Old Gallows Road, Perth
(Report No. 26/205) 
Mr S Panton introduced the report and advised that if members are
minded to approve the application a minor amendment would be

Page 21

required to condition 35 to specify that the required document is a
Design and Access Statement. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. The Permission hereby approved shall be limited to: 
• residential development of a maximum of 1,500
dwellings; 
• commercial development of 26 hectares comprising:
business (class 4); general industry (class 5); storage
and distribution (class 6); shops (class 1); financial;
professional and other services (class 2); food and
drink (class 3); hotels (class 7); and non-residential
institutions (class 10); and 
• Infrastructure development comprising: bus depot; car
parking; Perth Innovation Highway; hydrogen
fuelling/charging centre; formation of road junction;
underpass and road network; road alterations;
footways; cycleways; greenspace; landscaping; and
associated works. 
No works in connection within any individual phase of the
development hereby approved shall take place until full
details of the siting, design, external appearance and
landscaping of the development and the means of access
serving the development of that phase (hereinafter referred
to as the 'matters specified by condition') have been
submitted to and approved in writing by the Planning
Authority.
The specified matters, where relevant to that phase, shall
include:
i. a detailed updated phasing and delivery plan
(incorporating commercial, residential, transport
infrastructure, drainage infrastructure and open space)
which shall specify that commercial uses are delivered
in the first zones within Phase 1a and Phase 1b and for
the delivery of Phases 1-3 to accord with the Transport
Assessment (Ref: 20/00667/15); 
ii. a detailed levels survey (existing and proposed) and
cross sections showing proposed finished ground and
floor levels of all buildings forming part of each
development phase, relative to existing ground levels
and a fixed datum point.
iii. the siting, design, height, and external materials of all
buildings or structures
iv. the details of all access, car parking, public transport
facilities, footpaths/cycleways, the road layout, design,
and specification (including the disposal of surface
water) and related structures throughout the relevant
phase of the development.

Page 22

v. details of any screen walls/fencing including any
retaining walls to be provided. 
vi. for each building, specifying measures to maximise
environmental sustainability through design, orientation
and planting or any other means. These measures
shall include a scheme that demonstrates how current
carbon emissions reduction set by the Scottish
Buildings Standards will be met through the installation
and operation of low and zero-carbon technologies,
specifying what these technology types are, their
location and ongoing operation and maintenance; 
vii. details of any landscaping, structure planting, boundary
treatments and screening associated within the
relevant phase of the development; 
viii. full details of the proposed means of disposal of foul
and surface water from the development; 
ix. noise impact assessment 
x. lighting details; 
xi. bin storage, collection location, recycling facilities
provision and access; 
xii. biodiversity action plan 
xiii. a green travel plan including provision of electric
vehicle (EV) charging points; 
xiv. archaeological working scheme of investigation; 
xv. updated Transport Assessment;
Each phase of the development shall thereafter be carried
out in full accordance with the details approved for that
phase and any approved Phasing and Delivery Plan, unless
otherwise agreed in writing by the Planning Authority.
Reason: This is a Planning Permission in Principle under
Section 59 of the Town and Country Planning (Scotland) Act
1997 (as amended).
2.  The submitted Masterplan (Ref: 20/00667/15) and
Development Parameters Plan and Schedule of Uses and
Floorspace (Ref: 20/00667/5) are purely indicative only and
are not approved. 
Reason: The application is for planning permission in
principle only at this stage.
3.  As part of any application for the Approval of Matters
Specified by Condition (AMSC) under Condition 1(iv), all
matters shall be in accordance with the standards required
by the Council as Roads Authority (as detailed in the
National Roads Development Guide). 
Reason: In the interests of road safety. 
4.  The development of the application site, shall be reviewed
by 2035 or when there have been 1,001 housing units or 20
hectares of employment land developed, whichever comes
first, to reassess the impact on the road network and the
amount of modal shift. The applicant shall refer to LDP2
Main Issue Report or page 52/189 of the Perth West:
Transport Assessment Ref: GB01T20A18.2PROJ.10964013
(SYSTRA, 22/05/20) for details of the "Pause and Review".

Page 23

No further development shall take place until the review has
been undertaken, submitted, and agreed in writing by the
Council as Planning Authority. 
Reason: In the interests of road safety.
5.  As part of the first Approval of Matters Specified by
Condition (AMSC) application, if relevant to that phase,
details of the proposed multi-storey car park shall be
submitted for the approval of the Council as Planning
Authority. For the avoidance of doubt the multi-storey car
park must occur before the implementation of any parking
restrictions on Lamberkine Drive or Tweed Place and
continue to be available for the vehicles displaced as result
of the restrictions. The number of parking spaces to be
made available for displaced vehicles shall be agreed with
the Council as Planning Authority before the first AMSC
application. 
Reason: In the interests of road safety.
6 As part of any Approval of Matters Specified by Condition
(AMSC) application, all external lighting and streetlighting
details relevant to that phase, submitted under Conditions 1
(iv) and/or (x) shall be designed to be sufficiently screened
and aligned so as to ensure that there is no direct
illumination of neighbouring land and that light spillage
beyond the boundaries of the site is minimised to a degree
that it does not adversely affect the amenity of the
neighbouring land. 
Reason: In the interests of minimising light pollution,
protecting amenity and road safety. 
7.  As part of the first Approval of Matters Specified by
Condition (AMSC) application, if relevant to that phase of
the development, a detailed design for the signalisation
identified for the A93/Lamberkine Drive shall be provided
and including the upgrade of the zebra crossing on
Lamberkine Drive to a controlled crossing, to reduce the
impact of queueing from the development. A detailed design
shall be undertaken, along with a date for their
implementation by the developer and shall be agreed in
writing by the Council as Planning Authority. Thereafter the
development shall be fully undertaken in accordance with
the approved scheme. 
Reason: In the interests of road safety. 
8. As part of the first Approval of Matters Specified by
Condition (AMSC) application if relevant to that phase of the
development, a scheme for mitigation measures for the core
path CTYS/112; Cycleway, Lamberkine Drive & Cedar Drive
to Fairhill View & Glasgow Road at Woodlands, where it
crosses Lamberkine Drive, shall be submitted to and
approved in writing by the Council as Planning Authority.
This scheme shall include a detailed design that facilitates
the safe crossing of pedestrians and cyclists and must also
specify a date for its implementation by the developer. The

Page 24

scheme as approved shall be implemented prior to the
occupation of the 100th dwellinghouse.
Reason: In the interests of road safety. 
9. As part of any application for the Approval of Matters
Specified by Condition (AMSC), the phasing of the project
as part of any approval under Condition 1(i) of this
permission, will be such that the upgraded A9(T) Tibbermore
grade-separated junction shall be operational by the
completion of the 1,001st housing unit on the site. 
Reason: In the interests of road safety. 
10.  No development shall commence until appropriate mitigation
measures have been agreed to address the impact of the
development at the Broxden Roundabout on the A9 trunk
road. The nature of the mitigation shall either be physical
improvements to this junction in the form of traffic signals
and widening of approaches, or a financial contribution in
lieu of the said physical works. The details of the physical
works or the level of financial contribution required shall be
agreed in writing with the Planning Authority, in consultation
with Transport Scotland. 
Reason: To mitigate the adverse impact of the development
on the safe and efficient operation of the trunk road network. 
11.  Prior to the commencement of any works on site, a scheme
for the delivery of the proposed Broxden Underpass shall be
submitted to and approved in writing by the Planning
Authority, in conjunction with Transport Scotland. Thereafter,
the approved details shall be implemented in accordance
with the approved timescales. 
Reason: To mitigate the impact of the development on the
safe and efficient operation of the trunk road. 
12. Prior to the occupation of any unit on site, a scheme for the
delivery of a signal controlled A93 / Lamberkine Drive
junction shall be submitted to and approved in writing by the
Planning Authority in conjunction with Transport Scotland.
Thereafter, the approved details shall be implemented in
accordance with the approved timescales. 
Reason: To mitigate the impact of the development on the
safe and efficient operation of the trunk road. 
13. Prior to the commencement of any works on Phase 3 of the
development, a scheme for the delivery of the proposed
Tibbermore grade-separated junction shall be submitted to
and approved in writing by the Planning Authority in
conjunction with Transport Scotland. Thereafter, the
approved details shall be implemented in accordance with
the approved timescales. 
Reason: To mitigate the impact of the development on the
safe and efficient operation of the trunk road. 
14. Prior to the commencement of any works on Phase 3 of the
development, a scheme for the delivery of the proposed
Tibbermore Link Road shall be submitted to and approved in
writing by the Planning Authority in conjunction with

Page 25

Transport Scotland. Thereafter, the approved details shall be
implemented in accordance with the approved timescales. 
Reason: To mitigate the impact of the development on the
safe and efficient operation of the trunk road. 
15. Prior to the commencement of any works on site, a scheme
for the delivery of the proposed temporary emergency
access shall be submitted to and approved in writing by the
Planning Authority in consultation with Transport Scotland.
Thereafter, the approved details shall be implemented in
accordance with the approved timescales. The temporary
access shall be closed once the A9 Tibbermore grade-
separated junction becomes operational. 
Reason: To mitigate the impact of the development on the
safe and efficient operation of the trunk road. 
16. Prior to the commencement of any works on site, a
Construction Traffic Management Plan (CTMP) for each
phase of the development, covering the construction of that
phase, shall be submitted for prior approval of the Planning
Authority, after consultation with Transport Scotland as the
Trunk Road Authority. 
Reason: To minimise interference with the safety and free
flow of the traffic on the trunk road; to ensure the safety of
pedestrians and cyclists using the trunk road and adjacent
facilities; and to be consistent with current guidance and
best practice. 
17. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (CTMS) which
shall include the following: a) b) c) d) e) f) g) h) i) j) k) l)
restriction of construction traffic to approved routes and the
measures to be put in place to avoid other routes being
used; timing of construction traffic to minimise impact on
local communities particularly at school start and finishing
times, on days when refuse collection is undertaken, on
Sundays and during local events; a code of conduct for HGV
drivers to allow for queuing traffic to pass; arrangements for
liaison with the Roads Authority regarding winter
maintenance; emergency arrangements detailing
communication and contingency arrangements in the event
of vehicle breakdown; arrangements for the cleaning of
wheels and chassis of vehicles to prevent material from
construction sites associated with the development being
deposited on the road; arrangements for cleaning of roads
affected by material deposited from construction sites
associated with the development; arrangements for signage
at site accesses and crossovers and on roads to be used by
construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians; details of information
signs to inform other road users of construction traffic;
arrangements to ensure that access for emergency service

Page 26

vehicles are not impeded; co-ordination with other significant
developments known to use roads affected by construction
traffic; traffic arrangements in the immediate vicinity of
temporary construction compounds; m) the provision and
installation of traffic counters at the applicant's expense
locations to be agreed prior to the commencement of
construction; n) monitoring, reporting and implementation
arrangements; o) p) arrangements for dealing with non-
compliance; and details of HGV movements to and from the
site. The CTMS as approved shall be strictly adhered to
during the entire site construction programme. 
Reason: In the interests of road safety. 
18. All vehicles transporting construction material to and from
the proposed development shall be sheeted.
Reason: To ensure that material from the site is not
deposited on the trunk road to the detriment of road safety.
19. Prior to the commencement of any works on each phase of
the development, vehicle wheel cleaning facilities shall be
installed and brought into operation on the site, the design
and siting of which shall be subject to the prior approval of
the Planning Authority, after consultation with Transport
Scotland as the Trunk Road Authority. 
Reason: To ensure that material from the site is not
deposited on the trunk road to the detriment of road safety. 
20. Prior to the occupation of any part of the phased
development, a comprehensive Residential Travel Plan that
sets out proposals for reducing dependency on the private
car shall be submitted to and approved in writing by the
Planning Authority, after consultation with Transport
Scotland as the Trunk Road Authority. The Travel Plan shall
identify measures to be implemented, the system of
management, monitoring, review, reporting and the duration
of the plan. 
Reason: To be consistent with the requirements of PAN 75
Planning for Transport. 
21. Prior to the occupation of any part of the phased
development, a comprehensive Commercial Travel Plan that
sets out proposals for reducing dependency on the private
car shall be submitted to and approved in writing by the
Planning Authority, after consultation with Transport
Scotland as the Trunk Roads Authority. The Travel Plan
shall identify measures to be implemented, the system of
management, monitoring, review, reporting and the duration
of the plan. 
Reason: To be consistent with the requirements of PAN 75
Planning for Transport. 
22. Development shall not commence until a detailed phased
Green Travel Plan (GTP), aimed at encouraging more
sustainable means of travel, as required under Condition 1
(xiii), has been submitted to and agreed in writing by the
Council as Planning Authority. A strategy shall be included in
the GTP for monitoring, reporting, and updating the plan as

Page 27

necessary. The GTP will have particular regard to provision
for: a) b) c) d) e) walking and cycling; public transport
access to and within the site; provision of electric vehicle
(EV) charging points within all residential, commercial and
community use development parcels; identify measures to
be provided (including the provision of new and/or enhanced
public transport services); any phasing, the system of
management, monitoring, review, reporting and the duration
of the Plan. The GTP as agreed shall be fully implemented
by the applicant. 
Reason: In the interests of sustainable transport.
23. Prior to the commencement of any phased development,
with the exception of any infrastructure only phases, a
Development Phasing Strategy shall be submitted to and
agreed in writing with the Planning Authority, after
consultation with Transport Scotland as the Trunk Road
Authority, that establishes what level of development
mitigation interventions will be required. 
Reason: To minimise any interference with the safety and
free flow of traffic on the trunk road network. 
24. Prior to the commencement of any phased development, if
relevant to that phase of the development, a Public
Transport Strategy shall be submitted to and agreed in
writing with the Planning Authority, after consultation with
Transport Scotland as the Trunk Road Authority, that
considers the various public transport improvements cited in
the Transport Assessment. 
Reason: To ensure that the development is adequately
served by public transport services; and to minimise any
interference with the safety and free flow of traffic on the
trunk road network. 
25. A barrier of a type approved by the Planning Authority, after
consultation with Transport Scotland as the Trunk Road
Authority, shall be provided and maintained by the developer
or subsequent owner of the land along the boundary of the
site with the trunk road. 
Reason: To minimise interference with the safety and free
flow of the traffic on the trunk road; and to minimise the risk
of pedestrians and animals gaining uncontrolled access to
the trunk road with the consequential risk of accidents. 
26. Prior to the commencement of any works on site, details of
the lighting relating to that phase of works shall be submitted
for the approval of the Planning Authority, after consultation
with Transport Scotland as the Trunk Road Authority.
Reason: To ensure that there will be no distraction or dazzle
to drivers on the trunk road and that the safety of the traffic
on the trunk road will not be diminished. 
27. There shall be no drainage connections to the trunk road
drainage system. 
Reason: To ensure that the efficiency of the existing
drainage network is not affected.

Page 28

28. The proposed development shall be limited to the scale
assessed within the Transport Assessment (Ref:
20/00667/15). 
Reason: To ensure that the scale of development does not
exceed that assessed by the supporting Transport
Assessment and to ensure that the scale of development is
commensurate with the infrastructure required to support the
development. 
29. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works outwith these times or at any time on
Sundays or bank holidays (as identified by the Scottish
Government).
Reason: To ensure a satisfactory standard of local
environmental quality. 
30. As part of any Approval of Matters Specified by Condition
(AMSC) application, a detailed Construction Environmental
Management Plan (CEMP) detailing environmental
mitigation measures and construction method statements,
including specific measures for environmental monitoring
during construction, shall be submitted for the written
agreement of the Council as Planning Authority in
consultation with NatureScot, Scottish Environment
Protection Agency (SEPA) and Environmental Health. Such
details shall be submitted not less than two months prior to
the agreed scheduled commencement date and shall
incorporate detailed pollution avoidance and mitigation
measures for all construction elements. The CEMP shall
include noise & vibration and dust assessments; to assess
the impacts from construction operations. The CEMP shall
also include procedures, limit values and mitigation
measures to control noise and vibration and a detailed
quantitative dust assessment shall be undertaken.
Thereafter the development shall be fully undertaken in
accordance with the agreed CEMP. 
Reason: In the interest of proper site management and to
protect the amenity of the area. 
31. Prior to the commencement of the development hereby
approved, an independent and suitably qualified Ecological
Clerk of Works (ECoW) shall be appointed at the
developers' expense. Details of this appointment shall be
subject to the prior written agreement of the Council as
Planning Authority. The appointed person will remain in post
for the duration and subsequent restoration of the proposed
development. The ECoW shall have responsibility for the
following:
• Implementation of the Construction Environmental
Management Plan (CEMP) approved by this
permission. Implementation of the Aftercare Monitoring
Plan (AMP) required by this permission.

Page 29

• Authority to stop operations or to alter construction
methods should there be any works occurring which
are having an adverse impact on the natural heritage. 
• Prior to the commencement of development, they shall
provide an environmental / ecological toolbox talk for
construction staff. 
• They will have authority to amend working practices in
the interests of natural heritage. Any amendments shall
be submitted to the Council as Planning Authority as an
addendum to the approved CEMP. 
• They shall make weekly visits to the development site
at a time of their choosing. No notification of this visit is
required to be given to the developer or contractor. 
• Within 10 working days of the end of each calendar
month, they are required to submit a detailed monthly
report for the review of the Planning Authority in
consultation with Scottish Environment Protection
Agency (SEPA) for the duration of development. 
• They shall notify the Council as Planning Authority in
writing of any requirement to halt development in
relation to this condition as soon as reasonably
practicable. The above shall be implemented
throughout the construction, re-instatement and de
commissioning of the development hereby approved
unless otherwise agreed in writing with the Council as
Planning Authority. The CEMP shall contain a site-
specific Construction Method Statement (CMS) which
will provide concise details for the implementation of
the CEMP for site operatives. 
Reason: In the interest of proper site management and to
protect the amenity of the area. 
32. As part of any Approval of Matters Specified by Condition
(AMSC) application, a detailed Air Quality Assessment
(AQA) must be prepared by a suitable qualified party and
shall be submitted for the approval of the Council as
Planning Authority. Thereafter the plan will be implemented
in full accordance with the agreed scheme.
Reason: To ensure a satisfactory standard of local
environmental quality. 
33. As part of any Approval of Matters Specified by Condition
(AMSC) application, a detailed Noise Impact Assessment
(NIA) must be prepared by a suitable qualified party and
shall be submitted for the approval of the Council as
Planning Authority. Thereafter the plan will be implemented
in full accordance with the agreed scheme.
Reason: To ensure a satisfactory standard of local
environmental quality. 
34. As part of any Approval of Matters Specified by Condition
(AMSC) application, an evaluation for the potential of the
site, relevant to that phase of the development, to be
affected by contamination by a previous use has been

Page 30

undertaken and, as a minimum, a Preliminary Risk
Assessment (Phase 1 Page 8 of 16 Desk Study) has been
submitted for consideration and accepted by the Council as
Planning Authority. If the preliminary risk assessment
identifies the need for further assessment, an intrusive
investigation shall be undertaken to identify: 
• the nature, extent, and type(s) of contamination on the
site measures to treat/remove contamination to ensure
the site is fit for the use proposed 
• measures to deal with contamination during
construction works 
• condition of the site on completion of decontamination
measures. 
Prior to the completion or bringing into use of any part of the
development the measures to decontaminate the site shall
be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented
must also be submitted to the Council as Planning Authority. 
Reason: In order to deal with any potential contamination of
the site as a result of its former use. 
35. As part of any Approval of Matters Specified by Condition
(AMSC) application sought under Condition 1, a detailed,
phased Design and Access Statement setting out protection
of key heritage assets and their settings shall be submitted
to and approved by the Planning Authority in consultation
with Perth and Kinross Heritage Trust (PKHT).  Thereafter
the agreed actions will be implemented in full accordance
with the agreed scheme.
Reason: The protection of key heritage assets. 
36. No development shall take place within the development site
until the developer has secured the implementation of a
programme of archaeological works in accordance with a
Written Scheme of Investigation which has been submitted
by the applicant, relating to that phase of works, agreed by
Perth and Kinross Heritage Trust, and approved by the
Planning Authority. Thereafter the developer shall ensure
that the programme of archaeological works is fully
implemented and that all recording and recovery of
archaeological resources within the development site is
undertaken in line with the agreed measures.
Reason: To safeguard archaeology in the area. 
37. As part of any Approval of Matters Specified by Condition
(AMSC) application, a scheme detailing the provision and
timing of protective fencing shall be submitted to the Council
for approval as Planning Authority, in consultation with Perth
and Kinross Heritage Trust. Once approved, the fencing
shall be erected around the historic battlefield area in a
manner as approved and retained in accordance with the
approved scheme. No works shall take place within the area
inside that fencing without prior written agreement of the

Page 31

Council as Planning Authority in consultation with Perth and
Kinross Heritage Trust. 
Reason: To ensure the preservation of the historic
environment. 
38. As part of any Approval of Matters Specified by Condition
(AMSC) application sought under Condition 1 an Updated
Battlefield Conservation Plan (BCP), if relevant to that phase
of the development, shall be submitted for the approval of
the Council as Planning Authority. Thereafter the agreed
scheme will be implemented in full accordance with the
agreed details.
Reason: To ensure the preservation and enhancement of
the historic environment. 
39. As part of any application for the Approval of Matters
Specified by Condition (AMSC) sought under Condition 1, a
detailed landscaping and planting scheme for each phase
shall be submitted for the approval of the Council as
Planning Authority. The scheme shall include details of the
height and slopes of any mounding or recontouring of the
site, full details of all hard-landscaping proposals including
materials and installation methods and, species, height, size
and density of trees and shrubs to be planted. The scheme
as subsequently approved shall be carried out and
completed within the first available planting season (October
to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority
within 7 days of that date. The scheme as agreed and
implemented shall thereafter be maintained.
Reason: To ensure a satisfactory standard of local
environmental quality. 
40. Prior to the occupation of the development or any phase of
the development, whichever is the sooner, a landscape
management plan, including long term design objectives,
management responsibilities and maintenance schedules
for all landscape areas (other than small privately-owned
domestic gardens) shall be submitted to and agreed in
writing by the Council as Planning Authority, for its approved
use. The landscape management plan as agreed shall,
where appropriate, include phased implementation
concurrent with the development and shall be fully
implemented in accordance with the agreed scheme. 
Reason: To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority. 
41. As part of any Approval of Matters Specified by Condition
(AMSC) application, a 1:200 site plan, which identifies the
Construction Exclusion Zone (CEZ), relevant to that phase
of the development, shall be submitted for the written
agreement of the Council as Planning Authority. This plan
shall ensure all fencing adheres to BS 5837 2012: Trees in

Page 32

Relation to Design, Demolition and Construction are
provided to demarcate the CEZ and protect trees. The CEZ
as subsequently agreed shall be strictly adhered to during
construction of the development. 
Reason: To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority. 
42. As part of any Approval of Matters Specified by Condition
(AMSC) application, a Tree Protection Plan for all trees on
site (other than those marked for felling), relevant to that
phase of the development, and those which have Root
Protection Areas which fall within the site shall be submitted
for the written agreement of the Council as Planning
Authority shall be retained and protected. Protection
methods shall be strictly in accordance with BS 5837 2012:
Trees in Relation to Design, Demolition and Construction.
The Tree Protection Plan as subsequently agreed shall be
strictly adhered to during construction of the development. 
Reason: To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority. 
43. As part of any Approval of Matters Specified by Condition
(AMSC) application, details of the proposed boundary
treatments relevant to that phase of the development, shall
be submitted for the written agreement of the Council as
Planning Authority. The scheme as subsequently agreed
shall be implemented prior to the completion or bringing into
use of the development, whichever is the earlier.  
Reason: To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority. 
44. The asserted right of way/core paths METH/121, METH/13,
METH/131 and CTYS/112 must not be obstructed during
building works or on completion of the development. Any
damage done to the route and/or the associated signage
during building works must be made good before the
development is completed or brought into use, whichever is
the earlier. 
Reason: To ensure continued public access to the public
paths and in the interests of public safety within the site. 
45. As part of any Approval of Matters Specified by Condition
(AMSC) application, a phased management plan indicating
any temporary diversions and signage needed to facilitate
the development and/or any works proposed to the right of
way/core path as part of the development shall be submitted
for the agreement of the Council as Planning Authority. The
plan as agreed shall be implemented in accordance with the
timings identified in the plan. 
Reason: To ensure that public access is maintained at all
reasonable times, to the local path network. 
46. As part of any Approval of Matters Specified by Condition
(AMSC) application, a phased Biodiversity Action Plan shall

Page 33

be submitted to and approved in writing by the Council as
Planning Authority. Any action or mitigation incorporated
within the approved Biodiversity Action Plan shall be
implemented in accordance with the approved plan.
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife. 
47. As part of any Approval of Matters Specified by Condition
(AMSC) application, an updated Ecological Assessment
including breeding birds, protected species and deer shall
be submitted to and approved in writing by the Council as
Planning Authority. The conclusions and recommended
action points shall be fully adhered to, respected, and
undertaken as part of the construction phase of
development. 
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife. 
48. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be implemented
for the duration of the construction works of the
development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be
achieved by edge profiling of trenches/excavations or by
using planks placed into them at the end of each working
day and open pipework greater than 150 mm outside
diameter being blanked off at the end of each working day. 
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife. 
49. As part of any Approval of Matters Specified by Condition
(AMSC) application, details of the location and specification
of the swift brick(s) or swift nest box(s) shall be submitted for
the written agreement of the Council as Planning Authority, if
relevant to that phase of the development. Thereafter, the
swift brick(s) or swift nest box(s) shall be installed in
accordance with the agreed details prior to the occupation of
the relevant residential unit. 
Reason: In the interests of protecting environmental quality
and of biodiversity. 
50. As part of any Approval of Matters Specified by Condition
(AMSC) application, details of the location and specification
of the bat brick(s) or bat nest box(s) shall be submitted and
approved in writing by the Council as Planning Authority, if
relevant to that phase of the development. Thereafter, the
bat brick(s) or bat nest box(s) shall be installed in
accordance with the agreed details prior to the occupation of
the relevant residential unit. 
Reason: In the interests of protecting environmental quality
and of biodiversity. 
51. As part of any Approval of Matters Specified by Condition
(AMSC) application, an Updated Flood Risk Assessment,

Page 34

shall be submitted for approval of the Council as Planning
Authority, in consultation with SEPA where necessary.
Thereafter the development shall be fully undertaken in
accordance with the agreed Flood Risk Assessment. 
Reason: To reduce flood risk. 
52. As part of any Approval of Matters Specified by Condition
(AMSC) application, an updated Drainage Strategy including
detailed sustainable urban drainage system (SUDS) shall
been submitted for approval of the Council as Planning
Authority, in consultation with SEPA where necessary. The
strategy and scheme shall be developed in accordance with
the technical guidance contained in The SUDS Manual
(C753) and the Council's Flood Risk and Flood Risk
Assessments Developer Guidance and shall incorporate
source control. All works shall be carried out in accordance
with the agreed scheme and be operational prior to the
bringing into use of the development. 
Reason: To ensure the provision of provide effective
drainage for the site. 
53. Concurrent with the initiation of the phased development
hereby approved and for the duration of construction, a
temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the
approved development works. The temporary surface water
treatment facility shall remain in place until the permanent
surface water drainage scheme is implemented unless
otherwise agreed in writing by the Council as Planning
Authority. 
Reason: To ensure the appropriate management of
construction surface water run-off to minimise flooding and
avoid discharge of sediment/pollution to the local water
environment or neighbouring property, in the interests of
residential and environmental amenity. 
54. As part of any Approval of Matters Specified by Condition
(AMSC) application, following consultation with SEPA and
NatureScot a detailed Blue/Green Infrastructure Scheme,
shall be submitted for approval of the Council as Planning
Authority. All works shall be carried out in accordance with
the agreed scheme and be operational prior to the bringing
into use of the development. 
Reason: To ensure the provision of provide effective
drainage for the site in line with Councils policies on good
placemaking. 
55. As part of any application for the Approval of Matters
Specified by Condition (AMSC), an updated, detailed
Energy Statement supporting a zero-carbon development
shall be submitted for the written agreement of the Council
as Planning Authority. The statement must include
timescales for the provision of zero carbon developments
within the site. The agreed energy measures and zero-
carbon initiatives shall thereafter be implemented in
accordance with the agreed details and timescales.

Page 35

Reason: To reduce reliance on fossil fuels and to deliver a
zero-carbon development at Perth West. 
56. Prior to the commencement of works on site, detailed
drawings showing waste and recycling facility enclosures or
waste and recycling facility storage areas and associated
locations for bin presentation shall be submitted for the
written agreement of the Council as Planning Authority.
None of the commercial or residential units shall be
occupied until the agreed scheme has been provided in full. 
Reason: In order to ensure adequate servicing facilities are
provided. 
57. Perth & Kinross direct that Section 59 of the Town and
Country Planning (Scotland) Act 1997 applies as respects
the Planning Permission in Principle (20/00667/IPM) with
the substitution of the period of 5 years referred to
Section59(2A) (a), with the period of 10 years. 
Reason: This is an application in principle for which, in view
of the scale of the proposed development, this extended
period is appropriate. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this application.
The legal agreement should be concluded and completed within 4
months of the date of any Committee approval. Failure to conclude
a legal agreement within 4 months will result in the planning
application being re-assessed through failing to comply with the
associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Informatives
1. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  Please send the required
information to us at developmentmanagement@pkc.gov.uk. 
Please be aware that the Council has two months to
consider the information (or four months in the case of a
Major planning permission).  You should therefore submit
the required information more than two months (or four
months) before your permission expires.  We cannot
guarantee that submissions made within two months (or four
months) of the expiry date of your permission will be able to
be dealt with before your permission lapses.
2. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (Tel: 01738 477027) Perth and

Page 36

Kinross Heritage Trust, to discuss terms of reference for
work required.
3. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive. Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates. The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
4. The applicant should be advised that in terms of Section 21
of the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to construct a new road
prior to the commencement of roadworks. Advice on the
disposal of surface water must be sought at the initial stages
of design from Scottish Water and the Scottish Environment
Protection Agency.
5. The applicant should be advised that in terms of Section 56
of the Roads (Scotland) Act 1984 he must obtain from the
Council as Roads Authority consent to open an existing road
or footway prior to the commencement of works. Advice on
the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish
Environment Protection Agency.
6. The applicant is advised to refer to Perth & Kinross
Council's Supplementary guidance on Flood Risk and Flood
Risk Assessments 2014 as it contains advice relevant to
your development.
7. For information, foul flows only will be allowed to discharge
to the public system.  The Developer should arrange to
dispose of surface water privately, to the satisfaction of the
statutory Drainage Authority.
8. The applicant should take note of the information and advice
contained within the consultation response from Scottish
Water.
9. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for consent to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
10. The granting of planning permission does not stop the
continued right of public access along the existing core
paths METH/121, METH/13, METH/131 and CTYS/112. An
order under the Town and Country Planning (Scotland) Act
1997, Section 208 or an amendment of the Core Path Plan
under the Land Reform (Scotland) Act 2003 should be
sought in advance of any works authorised by this planning
permission being commenced. All relevant approvals should

Page 37

be in place prior to any stopping up and diversion of the core
path taking place.
11. There is a Section 75 legal obligation associated with this
planning permission, which relates to affordable housing
provision (25%); primary education (provision of a new
primary school); and transport infrastructure including public
transport, open space, play areas, sports pitch provision,
health care provision, maintenance and core path
connections, and establishment of Project Design Team for
any detailed applications. A copy is available to view on the
Council's Public Access portal. 
(2) Local Applications (cont.) 
(ii) 25/01794/FLL - Erection of 8 holiday accommodation units and
associated works, land south west of Milton of Pitcastle,
Strathtay, PH9 0PJ (Report No. 26/208) 
Ms H Houston and Mr S Cullen, objectors to the application, and
Mr G Salisbury, agent on behalf of the applicant, addressed the
committee and answered members questions. 
(The committee took a short recess at this point) 
Motion (Councillor D Cuthbert and Bailie C McLaren) 
Refuse, on the basis that the application is contrary to the Planning
(Listed Building and Conservation Areas (Scotland) Act 1997,
Section 64(1); National Planning Framework 4 (2023), Policy 7d:
Historic Assets and Places; and Perth and Kinross Local
Development Plan 2 (2019), Policy 28A: Conservation Areas –
New Development as the proposal fails to preserve or enhance
Grandtully and Strathtay Conservation Area by introducing modern
design built development in an open area important for the setting
of that conservation area. Further, the modern design and layout
does not reflect the pattern and styles within the conservation area. 
Amendment (Councillors I Massie and G Stewart) 
Grant, subject to the terms, conditions and informatives contained
in Report No. 26/208. 
In terms of Standing Order 21.5 a roll call vote was taken. 
8 members voted for the Motion as follows:
Councillors K Allan, B Brawn, D Cuthbert, A Forbes, K Harvey,
I James, Bailie C McLaren and R Watters. 
2 members voted for the Amendment as follows:
Councillors I Massie and G Stewart.

Page 38

Resolved:
In accordance with the Motion. 
6. Proposal of Application Notices (PoAN) 
(i) 26/00005/PAN - Residential development and associated works, land
100 metres west of 28 Strathmore Terrace, Alyth, Blairgowrie, PH11
8DP (Report No. 26/209) 
Bailie McLaren requested that consideration is given to path networks and
active travel routes through the site. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted. 
(ii) 26/00006/PAN - Erection of an office building, formation of access
and parking area and associated works, land 880 metres north of
Bertha Park Farm, Perth, PH1 3EQ (Report No. 26/210) 
Councillor James requested that consideration is given to the whether the
local services are sufficient for the building. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.