Democracy Spraffa

Agenda Document Pack - Planning and Placemaking Committee - 08/07/2026

Perth and Kinross Council · 8 July 2026
Back to Planning and Placemaking Committee — 8 July 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
30/06/2026 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 08 July 2026 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Ian Massie (Convener)
Councillor Grant Stewart (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Bailie Claire McLaren
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 212

Page 2

Page 2 of 212

Page 3

Planning and Placemaking Committee 
Wednesday, 08 July 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES 
2 DECLARATIONS OF INTEREST 
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 10 JUNE 2026
(copy herewith) 
7 - 12 
4 DEPUTATIONS 
5 APPLICATIONS FOR DETERMINATION 
5(1)  MAJOR APPLICATIONS 
5(1)(i)  25/01836/FLM - FORMATION OF A 39MW SOLAR FARM
COMPRISING GROUND-MOUNTED SOLAR PV ARRAY,
BATTERY ENERGY STORAGE SYSTEM (BESS), A
SUBSTATION, INVERTERS, TRANSFORMERS, WELFARE
CONTAINERS, FENCING, CCTV CAMERAS, VEHICULAR
ACCESS AND ASSOCIATED WORKS, LAND 890 METRES
EAST OF THE BYRE, BALVAIRD FARM, STRATHMIGLO,
KY14 7SR
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/203) 
13 - 44 
5(1)(ii)  26/00067/FLM - INSTALLATION OF 49.9MW BATTERY
ENERGY STORAGE SYSTEM (BESS), FORMATION OF
SUDS, ASSOCIATED INFRASTRUCTURE AND
LANDSCAPING WORKS, LAND 200 METRES NORTH WEST
OF JAMESFIELD GARDEN CENTRE, NEWBURGH, CUPAR,
KY14 6EW
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/204) 
45 - 74
Page 3 of 212

Page 4

5(1)(iii)  26/00228/42M - S42 APPLICATION TO VARY CONDITIONS 1,
3, 4, 5, 6, 7, 8, 12, 15, 19, 22, 23, 24, 26, 32, 33, 34, 35, 36, 38,
39, 40, 41, 42, 43, 45, 46, 49, 50 AND 53 OF PLANNING
PERMISSION IN PRINCIPLE 20/00667/IPM, PERTH WEST
(MU70) OLD GALLOWS ROAD, PERTH
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/205) 
75 - 104 
5(1)(iv)  19/01927/MWM - MINERAL EXTRACTION AND PROCESSING
INCLUDING ALTERATIONS TO VEHICULAR ACCESS,
ERECTION OF ANCILLARY BUILDINGS, LANDSCAPING,
REINSTATEMENT AND ASSOCIATED WORKS (PHASE 3) (IN
PART RETROSPECT), LAND SOUTH WEST OF ARNS FARM,
AUCHTERARDER
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/206) 
105 - 132 
5(2)  LOCAL APPLICATIONS 
5(2)(i)  26/00045/FLL - CHANGE OF USE OF QUARRY TO GUN DOG
TRAINING CENTRE, ERECTION OF KENNELS, VETERINARY
PRACTICE, RECEPTION BUILDING, INDOOR ARENA,
MAINTENANCE BUILDINGS, STAFF AND STUDENT
ACCOMMODATION, INSTALLATION OF PV AND ASHP AND
ASSOCIATED WORKS, LAND SOUTH WEST OF ARNS
FARM, AUCHTERARDER
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/207) 
133 - 164 
5(2)(ii)  25/01794/FLL - ERECTION OF 8 HOLIDAY
ACCOMMODATION UNITS AND ASSOCIATED WORKS,
LAND SOUTH WEST OF MILTON OF PITCASTLE,
STRATHTAY, PH9 0PJ
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/208) 
165 - 192 
6 PROPOSAL OF APPLICATION NOTICES (POAN) 
6(i)  26/00005/PAN - RESIDENTIAL DEVELOPMENT AND
ASSOCIATED WORKS, LAND 100 METRES WEST PF 28
STRATHMORE TERRACE, ALYTH, BLAIRGOWRIE, PH11
8DP
Pre-Application Report by Development Management and
Building Standards Service Manager (copy herewith 26/209) 
193 - 202 
6(ii)  26/00006/PAN - ERECTION OF AN OFFICE BUILDING,
FORMATION OF ACCESS AND PARKING AREA AND 
203 - 212
Page 4 of 212

Page 5

ASSOCIATED WORKS, LAND 880 METRES NORTH OF
BERTHA PARK FARM, PERTH, PH1 3EQ
Pre-Application Report by Development Management and
Building Standards Service Manager (copy herewith 26/210) 
Page 5 of 212

Page 6

Page 6 of 212

Page 7

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 10 June 2026 at 9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, K Harvey, D Illingworth,
I James, G Laing (substituting for Councillor D Cuthbert), I MacPherson (substituting for
Councillor R Watters), Bailie C McLaren and Bailie M Williamson. 
In Attendance: Councillor P Barrett; S Merone, Strategic Lead - Economy, Development
and Planning; S Durning, R Haines, L McLean, B Murray, L Reid, K Smith. K Stevens
and P Williamson (all Economy, Development and Planning); A Brown, N Edwards,
G Fogg, V Jordan, J Kirkwood and M Pasternak (all Legal and Governance). 
Apologies: Councillors D Cuthbert and R Watters. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted apologies
as above.   
2. Declarations of Interest 
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The minute of meeting of the Planning and Placemaking Committee of 13 May
2026 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
25/01678/FLL   5(1)(i)
26/00303/FLL   5(1)(ii) 
3
Page 7 of 212

Page 8

5. Applications For Determination 
(1) Local Applications 
(i) 25/01678/FLL - Erection of 35 dwellinghouses and associated
works (allocated site H40 in the Perth and Kinross Local
Development Plan 2 (2019)), site East of St Cedd's Road,
Ballinluig (Report No. 26/165) 
The Clerk read a statement by Ms K MacCorquodale, objector. 
Mr M Alexander, applicant and Mr M Richardson, agent addressed
the Committee and answered members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. Prior to the commencement of the development hereby
approved, precise details of the sustainable urban drainage
system (SUDS) shall be submitted to and approved in
writing by the Council as Planning Authority. For the
avoidance of doubt, the scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council’s Flood Risk and
Flood Risk Assessments Developer Guidance, shall
incorporate source control and shall incorporate biodiversity
enhancement measures. The approved details shall be
implemented in full. 
Reason – In order to clarify the terms of this planning
permission, to ensure the site is adequately drained and to
help ensure that a proportionate level of biodiversity
enhancements are delivered. 
3. Storm water drainage from all paved surfaces, including the
vehicular access, shall be disposed of by means of suitable
a Sustainable Urban Drainage System to meet the
requirements of best management practices. 
Reason – In order to ensure the site is adequately drained. 
4. Prior to the commencement of the development hereby
approved, a scheme to deal with surface water runoff and
soil movement/slippage during the construction phase shall
be submitted to and approved in writing by the Council as
Planning Authority. The approved scheme shall be
implemented in full at all times. 
Page 8 of 212

Page 9

Reason – In order to ensure that suitable temporary
measures are put in place during the construction phase to
deal with surface water and / or soil spillage/movements.
5. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays. These construction times shall be implemented
throughout the construction stage of the development unless
approval has been obtained in writing by the Council as
Planning Authority for alterative arrangements. 
Reason – In order to ensure the construction phase is
properly managed to avoid unnecessary impacts on existing
residential amenity.
6. Prior to the commencement of the development hereby
approved, precise details of all proposed retaining walls and
structures shall be submitted to and approved in writing by
the Council as Planning Authority. The details shall include
visual mitigation measures for exposed surfaces. The
approved details shall be implemented in full. 
Reason – In order to clarify the terms of this planning
permission.
7. Prior to the commencement of the development hereby
approved, precise details of all proposed boundary
treatments shall be submitted to and approved in writing by
the Council as Planning Authority. The approved details
shall be implemented in full, and be completed progressively
as the development processes. 
Reason – In order to clarify the terms of this planning
permission. 
8. Prior to the commencement of the development hereby
approved, a detailed landscaping and tree planting scheme
for the site (including a timescale for implementation and
ongoing maintenance) shall be submitted to and approved in
writing by the Council as Planning Authority. The details
must include the landscaping details of the proposed
amenity space area, which shall include biodiversity friendly
wildflower edges. All planting shall be undertaken
progressively as the development progresses. The
approved details shall be implemented in full, with any trees
that fails within the first 5 years replaced on a like for like
basis within the next available planting season.
Reason – In order to clarify the terms of this planning
permission.
9. All the approved residential units shall be affordable units,
as per the definitions contained within Planning Advice Note
2/2010 (Affordable Housing and Housing Land Audits)
Reason – The development has been approved as
affordable housing. 
10. Existing core paths in the area must not be obstructed
during the construction phase or on completion of the
development.  Any damage done to the route and/or the
associated signage during building phase must be made
Page 9 of 212

Page 10

good prior the development is completed or brought into
use, whichever is the earlier.
Reason – In order to protect existing public paths and to
ensure no unnecessary damage occurs.
11. Prior to the commencement of the development hereby
approved, a plan which shows the overland flow and
exceedance routing of surface water from outwith the site
and then on the site shall be submitted to and approved in
writing by the Council as Planning Authority. The details
must include a timeline for implementation, and an
exceedance plan showing 1:200 yr + CC overland flow
paths (including flows from the north and south catchments
and from the small watercourse) and show how they are
intercepted or routed so as not to impact the existing terrace
or cause ponding at the site access. Cross references to
finished levels and road gully locations must be included.
The approved details shall thereafter be implemented
progressively within the approved timeline, and completed in
full prior within the approved timeline. 
Reason – In order to ensure the site is adequately drained
and does not result ain surface water adversely affected
lower properties. 
12. All the recommendations contained within Section 8 of the
Ecology Assessment (Plan 29) shall be implemented in full.
For the avoidance of doubt, this relates to requirements
before and during the construction phase and upon
completion of the development. 
Reason – In order to ensure that a proportionate level of
biodiversity enhancement is delivered. 
13. Prior to the commencement of the development hereby
approved, a statement which demonstrates that at least
10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the
installation and operation of low and zero-carbon generating
technologies shall be submitted to and approved in writing
by the Council as Planning Authority. The approved
principles shall thereafter be implemented in full.
Reason – In order to comply with Policy 32 of the adopted
Perth and Kinross Local Development Plan 2 (2019)) 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
The formal decision notice shall not be issued until such time as
the required financial contribution for off site play provision
upgrades has been secured. This maybe be in the form of a
payment ‘up front’, or a legal agreement if the payment is to be
delayed. 
Page 10 of 212

Page 11

Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the planning authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached
herewith.
3. No development shall be commenced until an application for
building warrant has been submitted and approved.
4. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
5.  Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
6. The Air Source Heat Pump’s shall be certificated in
accordance with Microgeneration Certification Scheme 007
and installed by an installation company certificated in
accordance with Microgeneration Installation Standard 3005
and in compliance with the calculation procedure contained
in Table 1 of Microgeneration Certification Scheme Planning
Standards (MCS 020(a)), confirming that the permitted
development noise limit of 37 dB LAeq, 5 mins will be met. 
7. The Air Source Heat Pump’s shall be so enclosed,
attenuated and/or maintained such that any noise therefrom
shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
8. The applicant (or any other person taking on this
permissions) is advised that Perth and Kinross Council have
a charging scheme for recycling and waste bins for new
build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests 
Page 11 of 212

Page 12

(ii) 26/00303/FLL - Erection of gypsy/traveller transit site, 10
hardstanding pitches, amenity block and EV charging point,
sites 6-9 and 12 Islay Place, Perth (Report No. 26/166) 
Councillor P Barrett, local member followed by Ms E Ritchie, on
behalf of the applicant, supported by Mr A Cameron, architect (via
telephone), addressed the Committee and answered members
questions. 
Resolved:
Minded to Approve, subject to consideration by Scottish Ministers,
following the submission of suitable terms, conditions and
informatives to be drawn up by the planning officer. 
Justification
Although the application is contrary to Policy 22 of National
Planning Framework 4 and Policy 52 of the Local Development
Plan 2 there are material considerations which justify the planned
departures, including:
• the long-running failure of the Planning Authority to identify any
other suitable gypsy/traveller transit site within or around Perth
City and there being no prospect of any other site being found;
• the public sector duties of the Planning Authority under the
Equality Act 2010 to gypsy travellers and, in particular, their
accommodation needs;
• the long established, unauthorised occupation of the wider area
of the site by gypsy/travellers which the Council, as both
Housing and Planning Authority, has been unable to prevent;
• that considering that gypsy travellers will continue to use the
area as a transit site in any event, their safety and wellbeing will
be more secure at an authorised site, with flood mitigation
measures operating, including a flood evacuation plan, than can
be provided for an unauthorised encampment with no such
measures in place;
• the site is modest and the loss of employment land is not
significant. 
6. Proposal of Application Notices (PoAN) 
(i) 26/00004/PAN - Erection of residential development, landscaping and
associated infrastructure, land 60 Metres South of 43 Duntaylor Avenue,
Aberfeldy PH15 2BX (Report No. 26/167) 
Bailie M Williamson requested that consideration is given to the tree which has a
tree protection order during the construction period, the possibility of run off from
the fields that surround the site and how this is managed and traffic management
during the construction phase. 
The contents of the Report by the Development Management and Building
Standards Service Manager, were noted. 
Page 12 of 212

Page 13

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/203) 
Proposal: Formation of a 39MW solar farm comprising ground-mounted solar PV
array, battery energy storage system (BESS), a substation, inverters,
transformers, welfare containers, fencing, CCTV cameras, vehicular
access and associated works 
Location: Land 890 metres east of The Byre, Balvaird Farm, Strathmiglo, KY14 7SR 
Ref. No: 25/01836/FLM 
Ward No: P9 - Almond and Earn 
Summary 
This report recommends approval of the proposed solar farm and BESS as the
development is considered to comply with the relevant provisions of the Development
Plan and there are no material considerations apparent which outweigh the
Development Plan. 
The proposed solar farm and associated BESS are considered to provide positive
renewable energy benefits whilst impacts on biodiversity, landscape, visual and
residential amenity, improvements to access, drainage, water supplies, natural heritage,
archaeology/heritage assets and loss of agricultural land are acceptable in the context or
can be mitigated. 
Background and Description of Proposal 
1. The proposals relate to land some 4km north-west of Strathmiglo and 5km north-
east of Glenfarg. The site extends to circa (c.) 58.85 hectares (ha). The landform
is gently sloping, with elevation varying c.245m above ordinance datum (AOD) at
the eastern edge to c.205m in the south-west part. 
2. The site is currently used for rough grazing and growing of arable crops. The
Scotland Soils website indicates that the soils therein are Agricultural Land
Capability (ALC) Class 4.1 (land capable of producing a narrow range of crops)
in the eastern part and Class 5.1 (land capable of high-quality grassland) to the
west. The site is c.1km south-east of the Binn Eco Park. Access is from the west
via Millden Road, which connects to the A912. There are no other recognised
5(1)(i)
Page 13 of 212

Page 14

walking routes, rights of way, or core paths in the immediate vicinity. Otherwise,
there are some residential properties in the vicinity, the closest being
Gamekeeper’s Cottage (c.140m to the north of the NE corner of the site), a small
group of houses at Balvaird (to the west) and which are along side the Millden
Road.  Ther are also the small settlements of Glentarkie (to the southeast) and
Pittuncarty (a little further southeast). The closest designated heritage asset is
the Category ‘C’ listed Balvaird Farmhouse, to the west off Millden Road. 
3. There are no watercourses running through the site. In landscaping terms a
stand of coniferous woodland sits beyond the northern boundary, but there are
no trees within the site itself. Neither are there any designated ecological sites
within the site boundaries, however there are two Special Protection Areas
(SPAs) and Ramsar sites designated for pink-footed goose within 10 km. The
site is considered within core foraging distance for these geese and thus there is
a possible functional link with these European/international sites. 
4. The area is considered a fringe upland landscape characterised within the
immediate wider context by agricultural buildings, there is also an off-road driving
centre, and the industrial buildings and activity at Binn Eco-Park. 
5. The non-statutory landscape designation is the Ochil Hills Local Landscape Area
(LLA), with the Lomond Hills LLA 2.7 km to the south-west. No Abnormal
Indivisible Load Vehicles (AILVs) will be needed to deliver components to the
proposed development. 
Site History 
6. 25/00007/PAN A Proposal of Application Notice (PoAN) was submitted on 3 June
2025 for the installation of a 39MW solar farm comprising ground mounted solar
array, battery energy storage system (BESS), vehicular access and associated
works. The notice was considered sufficient and the consultation proposals
accepted. 
7. 25/00009/PAN A further PoAN was submitted on 19 June 2025 in relation to the:
Installation of a 39MW solar farm comprising ground mounted solar array, battery
energy storage system (BESS), vehicular access and associated works. The
notice was considered sufficient and the consultation proposals accepted. 
8. 25/01164/SCRN- A Screening Request was received and an Opinion issued by
the Council on 3 September 2025 relating to - Binn Farm, Proposed Solar and
BESS. Opinion – the proposals are not EIA development. 
9. 25/00007/PAN - received on 3 June 2025 for the Installation of a 39MW solar
farm comprising ground mounted solar array, battery energy storage system
(BESS), vehicular access and associated works. The notice was considered
sufficient and the consultation proposals accepted. 
Page 14 of 212

Page 15

10. 25/00009/PAN- received on 19 June 2025 for the installation of a 39MW solar
farm comprising ground mounted solar array, battery energy storage system
(BESS), vehicular access and associated works. The notice was considered
sufficient and the consultation proposals accepted. 
Environmental Impact Assessment 
11. As noted above an EIA Screening has been undertaken and an Opinion issued
by the Council. The proposal is a Schedule 2 Development in terms of the Town
and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. In the case of these regulations, planning permission cannot
be granted to “EIA development” unless an environmental impact assessment
has been undertaken. The Screening Opinion (Planning Ref: 25/01164/SCRN)
was issued by PKC on 3 September 2025 which confirmed that the application
would not require to be accompanied by an EIA. 
12. The Council is of the opinion that it does not constitute EIA development, and
that sufficient information has been submitted with the application to enable a
determination in consideration of all relevant environmental matters. These
environmental aspects requiring further consideration, are noise, landscape and
visual amenity, trees and biodiversity, roads and transportation and flood /
drainage matters. 
Pre-Application Consultation 
13. Pre application Reference: 25/00011/PREAPM. As a result, the proposed
application was, generally, supported. However, concerns were raised
regarding the potential impact on local heritage assets, and the necessity
for a robust and comprehensive screen planting scheme. 
14. The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009; therefore, the applicant was required to undertake formal pre-application
consultation with the local community. 
15. The applicant has undertaken pre-application consultation as required under
sections 35A (1) and B of the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning Etc. (Scotland) Act 2006 and in compliance with the
Part 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, (as amended) by the Town and Country Planning
(Pre-Application Consultation) (Scotland) Amendment Regulations 2021) 
Summary of Pre- Application Public Consultation
16.
● Glenfarg Community Council (GCC) contacted and updated regularly on the
project, including the applicant presenting to two GCC meetings.
Page 15 of 212

Page 16

● Ward Councilors, the constituency and regional MSPs and the constituency
MP were all sent introductory emails with project information and offered
meetings with the applicant.
● A project website was launched on 30 May 2025
(https://www.blcenergy.com/projects/Binn/) and updated throughout the
consultation process; exhibition materials and news articles were added.
● Two public exhibitions were held at Glenfarg Community Centre. These on
25 June and 8 October 2025. The events were advertised in the local media
at least two weeks in advance and included: a description and location of the
proposed development; where to find further information; date and location of
the public event; how and when to submit comments to the applicant and a
statement that comments to the applicant were not formal representations to
Perth and Kinross Council.
• A virtual presentation was held after both public exhibitions for those who
could not attend. This was followed by question-and-answer sessions.
● An invitation flyer was delivered to 50 households, within a 2km distance of
the site, also two weeks prior to both public events.
● Feedback forms were provided at both public events, and people were also
invited to give their feedback by completing forms or online or by email.
● The first exhibition had seven pull up banners and six ‘kappa’ boards
displayed. The second exhibition had nine banners and seven boards. A 3D
model was also available at each public exhibition, showing a clear visual of
the solar panels in situ.
● A poster was sent to the local shop in Glenfarg.
● The project team responded to requests for information submitted by email
throughout the consultation and attended all the public and online events. 
Development Plan 
17. The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
18. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
19. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
Page 16 of 212

Page 17

• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 12: Zero Waste
• Policy 14: Design, Quality and Place
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
20. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
21. The principal relevant policies are: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
22.
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
Page 17 of 212

Page 18

Other Material Considerations 
PKC Non-Statutory Guidance
23.
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
24. The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
25. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
26. Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
27. This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
28. As part of the planning application process the following bodies were consulted: 
External 
29. Historic Environment Scotland - No objection. Advise that it is not considered
that there will be significant adverse impacts from the proposed development on
the integrity of the setting of scheduled monuments in the vicinity. 
Page 18 of 212

Page 19

30. Transport Scotland - No objection. Do not advise against the granting of
permission.   
31. Friends of the Ochils - No objection. Raise concerns in relation to: impacts on
views, such as from Balvaird Castle are screened or mitigated and that HES
should be consulted; loss of agricultural land, etc.; although the proximity to Binn
Ecopark is noted and reduced the level of concern. 
32. Scottish Environment Protection Agency - No objection. Confirm that as
proposals are being considered as compliant with NPF4 Policy 22a (i) and no
land raising is proposed, the proposals fall below the threshold where SEPA
provide site specific advice. As such consideration is directed towards SEPA’s
Flood Risk Standing Advice. 
33. Dundee Airport Ltd - No objection. Advise that the position and height of
proposed development will not infringe the safeguarding criteria and operation of
Dundee Airport. 
34. Scottish Water - No objection. Advise that the applicant should be aware that
this does not confirm that the proposed development can currently be serviced.
Further guidance provided. 
35. NatureScot - No objection. It has been advised that although there are natural
heritage interests of international importance nearby, with the site offering
foraging opportunity, it is not itself an identified asset, and NatureScot’s advice is
that the natural heritage interests will not be adversely affected by the proposal.
Furthermore, although the development will result in the loss of suitable foraging
habitat, the extent of other suitable foraging fields will ensure there is no adverse
effect on the integrity of the Loch Leven Special Protection Area (SPA) and
Ramsar and Firth of Tay and Eden Estuary SPA and Ramsar. 
36. Perth and Kinross Heritage Trust (PKHT) - No objection, subject to a condition
that the details of a programme of archaeological work should be clarified within
a Written Scheme of Investigation, to be submitted to PKHT for approval. 
Internal 
37. Environmental Health (Contaminated Land) - No objection, subject to an
informative advising of process should historic ground contamination be
discovered. 
38. Environmental Health (Noise Odour) - No objection, subject to conditions
relating to potential noise and mitigation, glint and glare, external lighting,
construction working hours and the submission of a Construction Environment
Management Plan (CEMP). 
39. Environmental Health (Private Water) - No objection, subject to a condition
relating to details of any septic tanks, soakaways, private water sources and
Page 19 of 212

Page 20

private water supply storage facilities. Two standard informatives are also
recommended. 
40. Transportation And Development - No objection, subject to a condition relating
to visibility splays onto the A912 and two informatives relating to site access
arrangements for the Fire and Rescue Service. 
41. Development Contributions Officer - No contributions required. 
42. Biodiversity Officer - No objection, subject to conditions relating to the
supporting Biodiversity Study, a Non – Native Species Control Plan and an
updated Biodiversity Enhancements Plan. 
43. Development Plan Team - No objection, subject to a recommended condition
relating to the details of the proposed fencing and the location of badger gates.
However, advise that no palisade fencing should be used unless absolutely
necessary, with a preference that weld mesh fencing be used. This has been
covered by the inclusion of Condition 17 
44. Planning Enforcement Officer (Trees) - No objection. Advise that the
landscape scheme has addressed issues raised and the proposed landscaping is
acceptable. 
45. Structures And Flooding - No objection, subject to an informative relating to the
Council’s supplementary flood guidance. 
Representations 
46. One letter of representation was received, seeking assurance that the proposed
screen planting will be sufficient to protect views of the site from local viewpoints. 
Additional Statements 
Screening Opinion Submitted. EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
Submitted 
Battery Safety Management Plan Submitted 
Landscape and Visual Assessment Submitted 
Transport Statement Submitted 
Historic Environment Desk Study Submitted
Page 20 of 212

Page 21

Water Environment Appraisal Submitted 
Glint and Glare Assessment Report Submitted 
Ecological Impact Assessment Submitted 
Design and Access Statement Submitted 
Planning Statement Submitted 
Grid Connection details Submitted 
Supporting Environmental Information
Report
Submitted 
Ornithology Report Submitted 
Pre – application Consultation Report Submitted 
Appraisal 
47. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise. The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below. In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
48. The site is in proximity to an available National Grid connection point at
Abernethy Substation, 5 km to the north-east. The Applicant advises that a grid
connection offer has been accepted for 2030. 
49. Policy considerations seeking to assess its suitability in principle are: LDP2
Policies 1A,1B: Placemaking; 8: Rural Diversification; 33A: Renewables and Low
Carbon Energy; 50: Prime Agricultural Land; and 51: Soils. The relevant NPF4
policies are Policies 1: Tackling the Climate and Nature Crises; 2: Climate
Mitigation and Adaptation; and 11: Energy. 
50. NPF4 sets out six overarching spatial principles with “Just Transition” relating to
the construction of renewable energy and their contribution to achieving net zero.
NPF4 in its section on Sustainable Places emphasises the link to Scotland’s
Climate Change Plan and sets the approach to achieving net zero emissions by
2045 and making significant progress by 2030. The NPF4 also links to Scotland’s
Energy Strategy and highlights the importance of land and sea to be critical in
delivering renewable energy developments. NPF4 provides detailed policy on
Climate Change and Energy and details developer expectations of how proposed
schemes will accord with the policies set out in the document. The overarching
Page 21 of 212

Page 22

policy intent in NPF4 is to encourage, promote and facilitate all forms of
renewable energy development onshore and offshore. 
51. Policy 33A of LDP2 and Policies 1, 2 and 11 of NPF4 specifically encourage low
carbon energy solutions where specific grid connection or the use of established
infrastructure can occur. Therefore, on balance, and given the physical and
visual relationship with Binn Ecopark, as well as the availability of a grid
connection (5km away) with limited adverse impacts associated, the proposed
development can be supported in principle. Furthermore, the proposals are in
accordance with NPF4 Policy 11, and any negative impacts will be outweighed
by the long term energy benefits. However, consideration must be given to the
finite lifespan of this facility. Whilst the overall operational life will be some 40
years, limited day to day access to the site will be required, and, therefore,
operational activity impacts will be low. The predicted low level of impact
throughout the life of the development, will also enable the pre-existing land use
to resume after the life of the development has ceased. 
Design and Layout 
52. LDP2 Policy 1A: Placemaking, requires new development to positively contribute
to the quality of the surrounding built and natural environment. It further requires
development to accord with a series of place making criteria outlined in part B of
the policy. On this basis, the physical nature of the proposal in terms of design,
layout and physical characteristics must also be considered. 
53. The Proposed Development will comprise a ground-mounted solar photovoltaic
(‘PV’) array and associated infrastructure with an export capacity of up to 30 MW.
The array will comprise PV modules arranged in rows with a clearance of
approximately 1 m Above Ground Level (AGL) and a maximum height of 2.7 m
AGL. 
54. The Proposed Development also includes a BESS with an export capacity of up
to 6 MW. The BESS will store excess energy generated by the solar PV array
during periods of low demand or high generation and release it during periods of
high demand or low generation. The BESS compound will consist of
approximately 48 battery components measuring approximately 1.3 m x 1.3 m
and installed in a rows of 6.  There will be 8 rows x 6 rack containers, measuring
a maximum of 8.3 m (l) x 3.1 m (w) x 2.6 m (h). 
55. Two associated Power Conversion Systems (PCS) units will be located adjacent
to the BESS containers, to allow the batteries to switch between inverter and
charger modes. They measure approximately 9.2 m (l) x 5.3 m (w) x 2.3 m (h).
The BESS and PCS units will be located in a compound in the north-west of the
Site. 
56. The infrastructure associated with the Proposed Development will include: 
• PV module mounting frames;
Page 22 of 212

Page 23

• Battery units housed in containers;
• Substations;
• Inverter cabins to convert direct current (DC) electricity into usable alternating
current (AC) power;
• Transformers;
• Underground cabling;
• Internal access tracks;
• Temporary construction compound;
• Spares container;
• CCTV cameras mounted on posts;
• Perimeter fencing;
• Site drainage; and
• Biodiversity and landscaping enhancements. 
Landscape and Visual Amenity 
57. NPF4 Policy 4: Natural Places states that development proposals which by virtue
of type, location or scale will have an unacceptable impact on the natural
environment, will not be supported. Furthermore, development proposals that are
likely to have a significant effect on an existing or proposed European site
(Special Area of Conservation or Special Protection Areas) and are not directly
connected with or necessary to their conservation management are required to
be subject to an “appropriate assessment” of the implications for the
conservation objectives. 
58. Perth and Kinross Council LDP2, Policy 39: Landscape states that development
and land use change, including the creation of new hill tracks, should be
compatible with the distinctive characteristics and features of Perth and Kinross’
landscapes. Accordingly, development proposals will be supported where they
do not conflict with the aim of maintaining and enhancing the landscape qualities
of Perth and Kinross, or the quality of landscape experience. 
59. There are no national or international landscape designations within the site.
However, the location is within the Ochil Hills Local Landscape Area (LLA). The
proposal sits on top of an undulating plateau to the south of Binn Farm, the
southern third of the site slopes towards the south. From lower elevations to the
north, the proposed development is largely obscured by topography and existing
commercial planting. 
60. Operational visual effects will be limited given the site’s location, which is
spatially remote from any sizeable residential settlements and busy travel routes.
Notable effects would be experienced by residents at Gamekeepers Cottage,
Easter Catochil, and Catochil Farm Cottage, located to the north or north-
northeast; as well as Rosiebank and MacGregor House, located to the southeast
and west. These effects would reduce over time in accordance with the
establishment of the proposed screen planting, although screening of
development in its entirety would not be possible.
Page 23 of 212

Page 24

61. Based on its proximity to proposed development and views to localised parts of
the solar array in the southwestern part of the site, effects on views from Balvaird
Castle would be notable. However, the proposed landscaping scheme, which
sees an intervening buffer of woodland and scrub planting introduced, would
lessen / soften the direct adverse effect of the southern extent of the array on this
cultural heritage asset. Furthermore, neither HES nor PKHT have objected to the
proposals. 
62. In this instance, a Landscape and Visual Impact Assessment (LVA) has been
submitted, which identified the potential landscape and visual effects that would
occur. A 3 km radius Study Area was been adopted, informed by analysis of
Zone of Theoretical Visibility (ZTV) maps and an early appraisal of potential
effects. It considers that any notable landscape or visual effects would be
confined within this geographical area. The LVA concludes that there will be
moderate visual impacts on local residences while the landscape impacts will be
localised. 
63. The proposal is on the edge of the Ochil Hills LLA and will result in some loss of
natural cover and associated habitat. However, the proposed development will
have limited impact on other special qualities, given the overall distance and
existing screening from the local core paths and that there will be limited impact
on views towards the site. Although there are limited in-combination effects with
existing and other proposed developments, there is a cumulative impact on the
rural landscape character, and in particular the LLA. Such as that within Binn
Ecopark and set out below. However, the limited addition to adverse impacts on
the special qualities is considered to be outweighed by the contribution of the
proposal to the national renewable energy targets under NPF4 Policies 1, 4(d)
and 11. 
64. There is potential for landscape and visual effects on a number of landscape and
visual receptors including residential properties, designated assets and
landscape character. However, the advantages of the site location from a
landscape and visual perspective are that it: 
• Is located away from most visual receptors, such a residential, with the
closest receptors being a small number of properties to the north-east and
south.
• It takes advantage of the existing screening along the northern boundary in
placing the BESS further away from residential receptors and in a well
screened location behind the woodlands.
• The additional landscaping proposals within the Landscape Enhancement
and Mitigation Plan (LEMP) (Annex D of the LVA Report) would be beneficial
to the landscape fabric of the local and wider area. 
65. The proposed development will introduce industrial elements to a rural
environment, However, the nearby Binn Ecopark is an existing large-scale waste
management complex that exerts a notable characterising influence across the
Page 24 of 212

Page 25

local landscape. This facility comprises of three large wind turbines, an array of
existing buildings; structures; storage areas; and associated infrastructure
elements / access, all of which is visible from local viewpoints and which has had
an adverse impact on the local landscape character and appearance. In light of
this, and given the scale of the Ecopark, it is not considered that the proposed
development would be out – of- keeping with the character and appearance of
the wider area, particularly to the north. 
66. Furthermore, the siting and design of the proposed development has been
sensitive to the local landscape context and utilises existing screening and
landscape topography to minimise landscape and visual effects through project
design and mitigation. Given the elevated nature of the site and its existing
context, blanket boundary mitigation planting of trees was not deemed an
appropriate option. 
67. Considered and sensitive landscape solutions have been proposed, which will
soften direct and indirect adverse impacts on identified sensitive receptors. The
proposed landscaping / planting will also be of benefit to local and wider habitats
by introducing biodiversity, which will, in turn, result in a reduction in more
intensive grazing and land management. 
68. In addition, the location of the BESS is well screened. Existing external roads
and tracks allow for minimal disruption outside of the site boundary, while new
internal tracks will match existing agricultural construction / formation methods. 
69. In light of the above, the proposed development is considered to be in
accordance with NPF4 Policies 1, 4 and 11 and LDP2 Policy 39. 
Residential Amenity 
70. NFP4 Policy 23 (e) states that development proposals that are likely to raise
unacceptable noise issues will not be supported. 
71. LDP2 Policy 17: Residential Areas, highlights that areas of residential and
compatible uses inside settlement boundaries will see existing residential
amenity protected and, where possible, improved. In this instance, it is proposed
to locate the BESS at least 500m and the solar infrastructure at least 100m away
from neighbouring residential receptors. 
72. The closest residential properties have seen careful consideration given to the
visual effects on them, particularly those within 1km. Mitigation planting is
proposed in order to protect residential visual amenity and further enhance the
overall visual appearance of the proposals. Furthermore, the effects are
considered to be local in nature and not resulting in unacceptable effects on
residential visual amenity. 
73. Overall, visual effects are restricted based on the site location, which is spatially
remote from sizeable residential settlements and busy travel routes. However, a
Page 25 of 212

Page 26

condition is recommended that a Construction Environmental Management Plan
(CEMP), including a Noise Management Plan and Dust Management Plan is
submitted for approval prior to the commencement of development.
(Condition15) 
74. LDP2 Policy 55: Nuisance from Artificial Lights and Light Pollution states that
consent will not be granted for proposals where the lighting would result in
obtrusive and/or intrusive effects. The Council can control any issues through the
use of planning conditions, and in this instance it has been covered through the
inclusion of Condition 14. 
75. A Glint and Glare Assessment (GGA) supports the application. Overall, the GGA
provides a conservative assessment of potential glare impacts, incorporating
worst-case assumptions such as daily sunny conditions, and real-world impacts
are expected to be lower. The assessment has concluded that the impacts on
sensitive receptors would be low, and PKC Environmental Health having
reviewed the GAA have no objections subject to a condition relating updating the
Glint and Glare Assessment if there are any complaints once the development
was in situ. (Condition 16) 
76. LDP2 Policy 56: Noise Pollution presumes against development proposals which
will generate high levels of noise near noise sensitive land uses and vice versa. 
77. In this instance, the predominant source of operational noise will be from the
BESS facility. The solar array will have inline inverters, rather than a centralised
large inverter, thus producing limited noise. 
78. The applicant has submitted a Noise Impact Assessment (NIA) which assesses
the potential operational noise impacts on the closest noise sensitive receptors
(NSRs): residential properties at Milden Road (NSR1) and Balvaird (NSR2). 
79. The NIA concludes that no specific additional mitigation is required for the
operational phase, as effects from noise are not significant. The NIA included an
assessment of the cumulative effects from approved schemes within a 5km
radius. This indicating the cumulative effect at NSRs is expected to be negligible. 
80. In light of the above, conditions have been included to ensure that all plant and
equipment is enclosed and does not exceed noise ratings for different times of
day, a Construction Environment Management Plan (CEMP), complaints from
the public to the Council regarding noise, and construction working hours
(Conditions 10, 11,12, 13 and 15) 
81. Furthermore, LDP2 Policy 55: Nuisance from Artificial Light and Light pollution is
of relevance in the assessment of this application. In this instance, there is the
potential for amenity issues in relation to lighting during the construction phase.
To address this, a condition has been included that all external lighting shall be
sufficiently screened and aligned so as to ensure that there is no direct
illumination of neighbouring land. (Condition 14)
Page 26 of 212

Page 27

82. Given the above, and subject to the recommended conditions, it is considered
that the proposals are in accordance with NPF4 Policy 23e) and LDP2 Policies
17, 55 and 56. 
Roads and Access 
83.  Policy 15: Public Access states that development proposals that would have an
adverse impact upon the integrity of any (including proposed) core path, disused
railway line, asserted right of way or other well-used route and connectivity
proposals identified in the Regional Transport Strategy and Delivery Plan will not
be permitted. 
84. Access will be from Millden Road at its existing junction with the A912. Large
vehicles will use the A912 to the south of Millden Road, via the A91 and M90.
Immediate entry will be via an existing farm track on the north-west side.
Internally, it is proposed that existing tracks will be used where possible. 
85. LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. 
86. The junction visibility splays at the A912 junction are required to be improved, the
guidance being 160mx160m, a splay of 160m to the south can be provided,
whilst to the north a reduced 143m can be achieved, with vegetation
management. This being the case, a condition has been included in relation to
the set-back and design of the proposed visibility splays (Condition 7). 
87. Furthermore, there are no Core Paths within or near the site. The closest are
Core Paths ABNY/26 and ABNY/22 c.1.6 km to the east. There are no dedicated
cycling facilities in the vicinity and the A912 does not form part of the National
Cycle Network. 
88. In light of the above, the proposed solar farm and BESS is considered to be in
accordance with LDP2 Policies 15: Public Access and 60: Transport Standards
and Accessibility. 
Drainage and Flooding 
89. NPF4 Policy 22: Flood Risk and Water Management states that development
proposals must have regard to the water environment and drainage, including
floodwater management, within any proposal.  
90. LDP2 Policy 52: New Development and Flooding, states that the Council
supports the actions and objectives to avoid increased, reduce overall, and more
generally manage flood risk in alignment with SEPA Strategies and Plans. 
91. A Water Environment Environmental Appraisal has been undertaken, with a
Flood Risk and Drainage Impact Assessment (FRDA) included detailing the
Page 27 of 212

Page 28

Sustainable Drainage System (SuDS) proposed. This will ensure that surface
water runoff is appropriately managed onsite.  The design will be controlled via
a recommended planning condition (Condition 8). 
92. The attenuation sees a detention basin east of the compound eventually drain to
the Binn Burn. Potential impacts on Private Water Supply is also mitigated by the
design. 
93. Furthermore, no Ground Water Dependent Terrestrial Ecosystems (GWDTE’s)
are identified. Additionally, FRDA confirms only small, isolated areas of potential
surface water flooding. Safe access/egress avoiding areas at risk is to be
afforded by the existing tracks with no alterations required. The panels are to be
raised a minimum of 1m above ground level, which has been shown to be
sufficient to allow 600 mm freeboard from maximum surface water flood depths. 
94. In light of the above, and subject to condition, it is considered that the proposed
solar farm / BESS is considered to be in accordance with NPF4 Policy 22 and
LDP2 Policy 52 
Conservation Considerations 
95. Polices 26A and 26B of the LDP2 and Policy 7 of NPF4 are relevant. In general,
the site is not well documented in terms of potential historic environment assets,
with no previous invasive archaeological work within the boundary. However,
archaeological activity in the wider area identifies both designated and
undesignated heritage assets, and there is considered to be potential for
unknown buried remains. In their consultation response, PKHT have stated that
the submitted Historic Environment Desk Based Assessment Report recognises
that the location of the application site directly adjacent to Bein Law Hillfort
increases the potential for archaeology within the development area.
Furthermore, the proposed development would be partially visible from the
scheduled monument at Balvaird Castle (SM 90027) in views to the north-east
and this has also been assessed to have a potential for negative effect. 
96. However, the assessment concludes that key views along the valley and towards
Balvaird Castle will remain unaffected and that the proposals will result in only a
minimal impact on its setting. Furthermore, embedded landscape and visual
mitigation measures to lessen the visibility of the proposed development from
Balvaird Castle are proposed. These include the planting of a screening area of
native woodland on the south-western border of the proposed development. 
97. A recent walkover survey, undertaken as part of planning condition associated
with Bein Law Fort, has confirmed that the above ground archaeology has largely
gone, with only a few potential fragments of rampart surviving. However, below
ground remains are still likely to remain. Regarding designated sites and any
potential negative visual impacts, with particular relevance to Balvaird Castle,
HES agree that there is some negative impact on the castle’s setting. 
Page 28 of 212

Page 29

98. However, HES are broadly content that the proposed development would not
have a significant impact on the integrity of the setting of the Balvaird Castle.
Although it would be visible, it would not adversely impact on key views to and
from the castle as it would be situated fairly low to the ground beside an existing,
wooded small hill. This being the case, HES do not object. 
99. In line with the recommendations in the Heritage Environment Assessment,
PKHT recommend that archaeological evaluation be undertaken, to determine
any surviving archaeological remains. Thus, a programme of archaeological
works should be secured via condition to assess the presence / absence,
character and significance of any archaeological deposits (Condition 2). 
100. Therefore, subject to condition, the proposals are considered to accord with
NPF4 Policy 7 And LDP2 Policies 26A and 26B. 
Natural Heritage and Biodiversity 
101. NPF4 Policy 3: Biodiversity seeks development proposals to contribute to the
enhancement of biodiversity, by restoring degraded habitats and building and
strengthening nature networks and their connection. Also, by integrating nature-
based solutions. Furthermore, major developments will only be supported where
it can be demonstrated that the proposal will conserve, restore and enhance
biodiversity, including nature networks so they are in a demonstrably better state
than without intervention. This will include future management. To inform this,
best practice assessment methods should be used. 
102. In this instance, the submitted Landscape Plan contains native mixed
hedgerows. However, the hedgerow mix has not been extended to form a more
complete/comprehensive boundary treatment, which would connect the proposed
native scrub and woodland areas, and where there is an absence of existing
scrub and woodland areas. The use of hedgerows could be extended along the
track sides at the north and at the west boundaries to improve connectivity. In
light of this, a condition has been included that a revised Biodiversity
Enhancement Plan is submitted for approval. (Condition 5). A further condition is
recommended to ensure that the conclusions and recommendations of the
Biodiversity Study are delivered. (Condition 3) 
103. NPF4 Policy 4: Natural Places states that development proposals that are likely
to have an adverse effect on protected species will only be supported where the
proposal meets the relevant statutory tests. If there is reasonable evidence to
suggest that a protected species is present on a site or may be affected by a
proposed development, steps must be taken to establish its presence. The level
of protection required by legislation must be factored into the planning and
design of development, and potential impacts must be fully considered prior to
the determination of any application. 
104. In this instance, the Preliminary Ecological Appraisal Report states the design of
the proposed development shall be reviewed to determine if a 30 m no-
Page 29 of 212

Page 30

disturbance buffer can be maintained between the trees and the construction
works area, in the interest of bat foraging habitat. 
105. However, a letter dated 9 March 2026 from SLR Consulting states a 30m
exclusion zone will be maintained and an Environmental Clerk Of Works (ECOW)
will oversee the works to avoid the need for further survey. Furthermore, and
given that two invasive non-native species were noted during the survey, a
control plan is required (Condition 4). 
106. LDP2 Policy 40: Forestry, Woodland, and Trees requires Tree Surveys
accompany applications where the site contains trees, with a presumption of
protecting woodland resources. 
107. LDP2 Policy 41: Biodiversity seeks to protect and enhance all wildlife and wildlife
habitats, whilst taking into account the ecosystems and natural processes in the
area. 
108. In this instance, there is ancient woodland within 2km. There are no trees within
the site or to be felled beyond. The landscape plan has taken account of PKC
feedback and includes a woodland mix, native scrub, native hedgerows,
feathered tree stock, and a variety of woodland meadow mixes.  Furthermore,
the plan advises that low level grazing will still be achievable with the panels in
place, managing the existing grass areas and augmented with a wildflower
meadow mix. 
109. PKC’s Tree Officer is satisfied that the landscape scheme is appropriate. 
110. In light of the above, the proposed solar farm / BESS is considered to be in
accordance with NPF4 Polices 3,4 and LDP2 Policies 40, 41. 
Low and Zero Carbon Generating Technologies 
111. Given that the proposed development will include new buildings, LDP2 Policy 32
and NPF4 Policy 2 are relevant. However, given the nature of the proposals, and
that the buildings will not be habitable, heated or cooled, it is considered that the
solar farm and BESS are in accordance with the Development Plan. 
Lifespan of Facility / Decommissioning 
112. The submission commits to decommissioning and restoring the site to its
previous agricultural use after the operational lifespan. In the event the decision
was made that the Site could be repowered, then a new consenting process
would be required. 
113. Prior to decommissioning, a Restoration and Decommissioning Plan (RDP) will
be produced to reflect the current legislation and policy at that point in time and
will be agreed with the relevant statutory authorities 
Page 30 of 212

Page 31

114. Condition 9 is recommended to ensure that should operations cease for more
than 12 months, or after 40 years, that the site is then decommissioned and re-
instated to its original use. 
Grid Connection 
115. The proposed point of connection is the Abernethy Substation, 5 km to the east.
The date of connection is currently anticipated to be 2030. The cable route will be
subject to a separate consenting process, which has been accounted for in the
EIA Screening Opinion. 
Developer Contributions 
116. The Developer Contributions Guidance is not applicable to this application, and
therefore, no contributions are required in this instance. 
Economic Impact 
117. The direct economic impact of the proposal is likely to be minimal and limited to
the construction phase of the development. The proposal will support local
renewable energy generation by helping balance fluctuations of intermittent
energy generation. It will assist in the creation of a national grid asset of regional
significance for the Perth and Kinross area. 
118. No information has been provided on how the local community will benefit from
this application to satisfy the requirement in NPF4 Policy 11(c) (excluding
consideration of direct community benefit payments). Consideration should be
given to consideration of local priorities, maximising use of local supply chains
and opportunities for local training. Consideration should be given to how the
development can support NPF4 Policy 25. This consideration has been
addressed via recommended Condition 18. 
Variation of Application Under Section 32A 
119. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to landscaping and planting,
biodiversity enhancements and ecological surveys. 
Planning Obligations and Legal Agreements 
120. None required. 
Direction By Scottish Ministers 
121. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
Page 31 of 212

Page 32

by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
122. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding
the Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions.
. 
Recommendation   
Approve, subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
Archaeology and Cultural Heritage 
2. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
to, and agreed in writing by, the Council as Planning Authority, in consultation
with Perth and Kinross Heritage Trust (PKHT). Thereafter, the developer shall
ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development site
is undertaken. Should the archaeological works, as required by the WSI, identify
a requirement for post-excavation analysis, the development as approved shall
not be occupied or brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by the Council as Planning
Authority, in consultation with PKHT. The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the developer shall afford
access at all reasonable times to PKHT or a nominated representative and shall
allow them to observe work in progress 
Page 32 of 212

Page 33

Reason: In the interest of protecting archaeological interest within the site. 
Biodiversity 
3. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 39 relates) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development. 
Reason: In the interests of protecting environmental quality and of biodiversity 
4. Prior to the commencement of the development hereby approved, an Invasive
Non-Native Species Control Plan shall be submitted to, and approved in writing
by, the Council as Planning Authority. The plan shall contain measures to
eradicate and control invasive non-native species. Thereafter, the agreed
scheme, and its requirements and recommendations, shall be implemented in full
during the construction phase. 
Reason: In the interests of protecting environmental quality and of biodiversity 
5. Prior to the commencement of the development hereby approved, an updated
Biodiversity Enhancement Plan including the location, quantity, specification and
maintenance requirements for biodiversity enhancement measures shall be
submitted for the further written agreement of the Council as Planning Authority.
The plan shall include a commitment to submit species records found during
survey to the National Biodiversity Network Gateway and reference the
requirements set out in the PKC Planning for Nature Guidance. Thereafter, the
agreed scheme shall be maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
Roads and Transportation 
7. Prior to the commencement of the development hereby approved, full visibility
splays shown in drawing 405-065788-00001-TRA-0001a along the channel line
shall be provided to the left and right of the access, at a set-back of 2.4 metres
measured 1.05m above the road level to the standard and specification required
by the Council as Roads Authority. The visibility splays shall be physically formed
on the ground and any existing fences, walls, hedges or other means of
enclosure or obstructions within the splays shall be removed and relocated out
with the splays. Once formed, the visibility splays shall be permanently retained
thereafter, and no visual obstruction of any kind shall be permitted within the
visibility splays so formed. 
Reason: In the interest of road safety.
Page 33 of 212

Page 34

Flooding and Drainage 
8. Prior to works commencing on site, full drainage calculations and the final layout
and depth of the proposed SUDS ponds and associated infrastructure shall be
submitted to, and agreed in writing by, the Council as Planning Authority, in
consultation with Perth and Kinross Council Flooding Team. The agreed detail
shall thereafter be implemented prior to the completion of development. 
Reason: In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk. 
Facility Lifespan 
9. In the event the hereby approved development fails to generate and store
electricity on a commercial basis for a continuous period of 12 months, or after
operating for more than 40 years, then it shall be deemed to have permanently
ceased to be required. In such an event, the development shall be
decommissioned and the relevant parts of the site reinstated within such a
timescale as agreed by the Council as Planning Authority. 
Reason: To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
Environmental Health 
10. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason: In the interests of residential amenity. 
11. Noise from the battery storage facility shall not exceed 29dB LAeq, (15 min),
including any relevant penalties for tonality, impulsivity, intermittency, or other
sound characteristics, when measured at any residential property in accordance
with BS4142 – Method for Rating Industrial Noise Affecting Mixed Residential
and Industrial Areas. 
Reason: In the interest of residential amenity. 
12. In the event, that justified complaints for noise are received by the Council, the
applicant at their own expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from the development. The
appointed consultant and methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning Authority in consultation
with Environmental Health within 28 days of being notified of the complaint.
Page 34 of 212

Page 35

Within 28 days of approval of appointed consultant and methodology, a Noise
Assessment shall be submitted outlining mitigation and recommended timescales
for delivery. Thereafter, all mitigation measures shall be implemented within the
timescales recommended. 
Reason: In the interest of residential amenity 
13. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays. 
Reason: In the interest of residential amenity. 
14. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In the interest of residential amenity. 
15. Prior to the commencement of the development the applicant shall submit a
Construction Environmental Management Plan (CEMP) to be reviewed and
agreed in writing by the Planning Authority. The CEMP shall include a Noise
Management Plan which shall include the BS5228 construction noise limits
stated in section 1.6.4 of the NIA SLR Project No.: 405.0065788.00001 dated 15
December and Dust Management Plan which shall include a Dust Risk
Assessment (DRA) and site-specific dust mitigations derived from outcome of
DRA. 
Reason: In the interests of protecting environmental quality and biodiversity; to
ensure no adverse impact on the construction environment and residential
amenity. 
16. Within 2 months of receipt of a written request by the Council as Planning
Authority, following a substantiated complaint from a sensitive property, the
operator/applicant shall, at its own expense, employ a consultant approved by
the Planning Authority to carry out an assessment of glint and glare from the
development. The glint and glare assessment shall be submitted to and
approved in writing by the Planning Authority. The assessment must identify any
mitigation measures required if appropriate. Any mitigation measures identified
shall be implemented on site in accordance with a timescale to be agreed with
the Planning Authority. 
Reason: In the interest of residential amenity. 
Page 35 of 212

Page 36

Fencing Details 
17. Prior to development commencing on site, details of all fencing, including above
ground measurements and locations of badger gates, and gaps shall be
submitted to, and approved in writing by, the Council, as Planning Authority. 
Thereafter, the fencing shall be erected in full accordance with the approved
scheme. 
Reason: In the interest of visual amenity, and to ensure that badgers,hedgehogs
and amphibians can freely use the site. 
Maximising Local Net Economic Benefits 
18. Prior to the commencement of the development herby approved a statement
shall be submitted for the prior written approval of the Planning Authority, setting
out the approach taken by the developer to address the requirements of NPF4
Policies 11(c) and 25, in relation to maximising net economic impact
(employment/local business and supply chain benefits), community wealth
building and socio-economic benefits as a result of the development. The
statement should set out proposed strategies and how these would be
implemented to achieve these benefits, with an emphasis on long-term outcomes
and collaboration with stakeholders. 
Reason: In order to demonstrate the net economic impact of the development
has been maximised in the interests of the locality. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable to this application. 
Informatives 
1. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
2. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
3. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Page 36 of 212

Page 37

Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations. 
4. The applicant should note the site access requirements contained in the
guidance note - National Fire Chiefs Council’s guidance for Battery Energy
Storage Systems. Building Standards technical handbook 2022 – Dead End
Route – Fire and rescue service vehicles should not have to reverse more than
20m from the end of an access road.  Where the dead-end route is more than
20m long turning facilities should be provided. 
5. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
6. As soon as it is practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position. 
7. An application for a Building Warrant may be required. 
8. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period (see
section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended). 
9. The applicant is reminded that, should any protected species be present, a
license may be required from NatureScot to disturb a protected species. Failure
to obtain a license may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
10. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
Page 37 of 212

Page 38

• Readily visible to the public.
• Printed on durable material. 
11. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk.  The Council has
two months to consider the information.  You should therefore submit the
required information more than two months before your permission expires. We
cannot guarantee that submissions made within two months of the expiry date of
your permission will be able to be dealt with before your permission lapses. 
12. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
13. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works.
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
14. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment Protection Agency. 
15. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. Further information on radon
gas and the associated reports that can be obtained is available at
www.ukradon.org and at http://shop.bgs.ac.uk/georeports/. 
16. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
17. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Page 38 of 212

Page 39

Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations. 
18. The applicant should note the site access requirements contained in the
guidance note - National Fire Chiefs Council’s guidance for Battery Energy
Storage Systems. 
19. Building Standards technical handbook 2022 – Dead End Route – Fire and
rescue service vehicles should not have to reverse more than 20m from the end
of an access road.  Where the dead-end route is more than 20m long turning
facilities should be provided. 
20. A review of the proposed development site did not raise any real concerns,
although historical mapping indicates that there is a disused quarry at the NW
boundary of the site.  Based on the mapping the quarry has been disused for
many years.  The developer should satisfy themselves that the site is suitable
for the proposed use and should any contamination be found during the
approved works, works should cease, and the Land Quality team should be
contacted on 01738 475000 or contaminatedland@pkc.gov.uk for further advice. 
21. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
22. Due to the nature of the proposal, it is important to keep in mind the possibility of
finding bats when undertaking construction works. If bats are found during works,
the work should stop immediately, and you should contact NatureScot Species
Licensing Team for advice. Building works should avoid the times of year when
bats are most vulnerable to disturbance. The summer months, when bats are in
maternity roosts, and the winter months when bats are hibernating, should be
avoided. Typically, early spring and autumn months are the best times to do work
that may affect bats. If you suspect that bats are present, you should consult
NatureScot for advice. For further information visit the Bat Conservation Trust
website http://www.bats.org.uk/ .  Please note that bats are protected by law,
and it is a criminal offence to deliberately harm, capture, kill or disturb a bat or its
resting place. 
23. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act.
Page 39 of 212

Page 40

Background Papers
Letters of representation 1 
Authors
Name Designation Contact Details
Alan Atkins Planning Officer (Majors) 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager 26 June 2026 
Page 40 of 212

Page 41

¯
Formation of a 39MW solar farm comprising ground-mounted solar PV array, battery energy storage
system (BESS), a substation, inverters, transformers, welfare containers, fencing, CCTV cameras,
vehicular access and associated works
25/01836/FLM
Date 17/06/2026
Scale
1:25,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(i)
Page 41 of 212

Page 42

Page 42 of 212

Page 43

¯
Formation of a 38MW solar farm comprising ground-mounted solar PV array, battery energy storage
system (BESS), a substation, inverters, transformers, welfare containers, fencing, CCTV cameras,
vehicular access and associated works
25/01836/FLM
Scale
1:15,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(i)
Page 43 of 212

Page 44

Page 44 of 212

Page 45

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/204) 
Proposal: Installation of 49.9MW battery energy storage system (BESS), formation
of SUDS, associated infrastructure and landscaping works 
Location: Land 200 Metres North West of Jamesfield Garden Centre, Newburgh,
Cupar, KY14 6EW 
Ref. No: 26/00067/FLM 
Ward No: P9 - Almond and Earn 
Summary 
This report recommends approval of the application as the proposed BESS is
considered to comply with the relevant provisions of the Development Plan, and there
are no material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1. The purpose of the facility is to provide a range of stability services to the grid.
BESS are required to compensate for the loss of inertia and other electrical
characteristics resulting from the replacement of thermal generators by
renewable energy generation. 
2. The site is located to the west of an unnamed road which serves the Jamesfield
garden centre, farm shop and restaurant all located to the east. The Abernethy
substation is located to the south and bound by Abernethy Road beyond. 
3. The northern and western boundaries of the site are bound by agricultural fields
with Balgonie Cottage located further to the west. The Abernethy Road, located
to the south of the adjacent substation, runs west to east connecting Abernethy
village to the west and Newburgh to the east. Furthermore, a Scottish Gas
Networks owned high pressure gas transmission pipeline runs west to east 450m
from the application site’s northern boundary. Further  south, the land rises to the
Ochil Hills. 
4. The site itself is within an area of low-lying farmland which is located near the
confluence of the River Earn and the River Tay 1.5km to the north. Topography
5(1)(ii)
Page 45 of 212

Page 46

is relatively flat, if sloping to the northwest. As open and operational arable
farmland there are no significant landscape features within the site, which is
classified as Grade 2 Prime Agricultural Land. Two pylons sit within the site and
others beyond, with overhead lines running northwest to southeast across the
north-eastern part between pylons. A second powerline route between pylons
which sit outwith the site cross above the north-western corner. There are no
core paths running through the site and the nearest core path runs to the north,
outwith the north boundary. It connects Abernethy Primary School to Newburgh.
The nearest buildings are to the east at Jamesfield Garden Centre, farm shop
and restaurant. 
5. The facility is advised to have capacity to power up to circa (c.)161,898 houses
over a 4-hour period and that 20 direct jobs will be created during the
construction period. 
6. The proposal has evolved since initial engagement with the Council, addressing
matters raised during the pre-application process. The proposal includes: 
• 132/33kV Sub-station
• Hardstanding (e.g., for manoeuvring and parking of trucks);
• Access Tracks.
• Up to 48 containerised Battery Storage Units.
• Up to 12 inverter/transformer units.
• Switch Room.
• Subterranean fire water tanks.
• Welfare Unit (with chemical toilet).
• 2.4m Perimeter security fencing.
• CCTV columns.
• Profiled development platform and associated cuttings and embankments
• SUDs pond.
• Landscape works including tree and shrub planting. 
• 1.5 m high timber post and wire perimeter deer proof fencing.
• External artificial lighting to specific work areas.
• An underground cable connection to the substation to the south (c.770m). 
Site History 
7. 25/00014/PAN A Proposal of Application Notice (PoAN) was submitted on
17 September 2025 for the installation of a 49.9MW Battery Energy Storage
System (BESS) and associated infrastructure and landscaping works. The notice
was considered sufficient and the consultation proposals accepted. 
8. 25/01769/SCRN A Screening Request was received and a Screening Opinion
issued by the Council on 16 December 2025 in relation to the installation of a
49.9MW Battery Energy Storage System (BESS) including associated
infrastructure and landscaping. Given the low level of potential impact on the
environment, the proposed development was deemed not to be EIA
development.
Page 46 of 212

Page 47

Environmental Impact Assessment 
9. As noted above an EIA Screening has been undertaken and an Opinion issued
by the Council. The proposal is a Schedule 2 Development in terms of the Town
and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. In the case of these regulations, planning permission cannot
be granted to “EIA development” unless an environmental impact assessment
has been undertaken. The Screening Opinion (Planning Ref: 25/01769/SCRN)
was issued by PKC on 16 December 2025, which confirmed that the application
would not require to be accompanied by an EIA. The Council is of the opinion
that it does not constitute EIA development, and that sufficient information has
been submitted with the application to enable a determination in consideration of
all relevant environmental matters. These environmental aspects requiring further
consideration, are noise, landscape and visual amenity, trees and biodiversity,
roads and transportation and flood / drainage matters. 
Pre-Application Consultation 
10. Pre application Reference: 25/00025/PREAPM. As a result, the proposed
development was, generally, supported. Given its proximity to the Abernethy
Substation, the choice of site was considered appropriate. However, concerns
were raised regarding the potential impact on landscape character and
appearance, and the necessity for a robust and comprehensive screen planting
scheme.  
11. The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009; therefore, the applicant was required to undertake formal pre-application
consultation with the local community. 
12. Prior to the submission of the application for planning permission, a Proposal of
Application Notice (PAN) was submitted to Perth and Kinross Council relating to
the intended programme of pre-application consultation. The Council have,
subsequently, agreed the proposed consultation approach. 
13. A public notice was published in a local newspaper, the Perthshire Advertiser, on
25.09.25, and a second notice for a second event on the 27.10.25, meeting
statutory requirements. Following the first public notice, a total of 213 flyers were
locally circulated to further notify the community of the consultation event.
Further, a website was set up with project detail and other information related to
the consultation The first consultation event was held on 9.10.25 and the second
on 6.11.25 both at Williamson Hall, Kirk Wynd, Abernethy. 
Development Plan 
14. The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
Page 47 of 212

Page 48

National Planning Framework 4 
15. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
16. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 14: Design, Quality and Place
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
17. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
18. The principal relevant policies are, in summary. 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
Page 48 of 212

Page 49

• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
19.
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance
20.
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
21. The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
22. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
23. Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Page 49 of 212

Page 50

National Roads Development Guide 2014 
24. This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision 
Consultations 
26. As part of the planning application process the following bodies were consulted: 
External 
27. SSEN - No objection, subject to conditions relating to the access track ground
levels, the storage of materials and an updated Construction Traffic Management
Plan (CTMP) 
28. Scotland Gas Networks (SGN) - No objection, subject to a condition relating
assessment of potential interference on the adjacent pipeline. 
29. Transport Scotland - No objection, subject to conditions relating to a
Construction Traffic Management Plan (CTMP), details of routes for any
abnormal loads, accommodation measures and temporary traffic control
measures 
30. Perth and Kinross Heritage Trust (PKHT) - No objection, subject to a condition
relating to a Written Scheme of Archaeological Investigation (WSI) 
31. Historic Environment Scotland (HES) - No objection. 
Internal 
32. Environmental Health (Noise Odour) - No objection, subject to conditions
relating to plant enclosure, noise complaints to the Council, external lighting and
construction hours. 
33. Environmental Health (Contaminated Land) - No objection. Advise that review
of the proposals raised no concerns related to historical use of the land and
surrounding area. 
34. Environmental Health (Private Water) - No objection, subject to a condition
relating to the safeguarding the operation, or replacement, of any sceptic tanks
and private water sources 
35. Development Plan - No objection, subject to a condition relating to further
screen planting. 
36. Biodiversity - No objection, subject to conditions relating to: the retention of
trees unless approved, the conclusions and recommendations of the submitted
Biodiversity Study, an updated ecology survey be submitted and approved,
Page 50 of 212

Page 51

measures to prevent animals from being trapped in excavations, and a site
Biodiversity Action Plan. 
37. Roads and Transportation Team - No objection, subject to conditions relating
to: visibility splays, vehicle accesses and passing places, and the submission of
a Construction Traffic Management Strategy. 
38. Planning Enforcement Officer (Trees) - No objection. Advise the revised
landscape scheme is acceptable. 
39. Floods and Structures - No objection, subject to conditions relating to a detailed
design for SuDS, and to ensure that storm water from all paved areas is
disposed of via SuDS. 
Representations 
40. One representation was received, the main issues raised are: 
• Adverse impact due to level of construction traffic.
• Fire safety issues.
• Landscape and visual impact.
• Noise issues.
• Loss of prime agricultural land.
• No community benefits proposed. 
41. These issues are addressed in the Appraisal section of the report. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted 
Appraisal 
42. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
Page 51 of 212

Page 52

this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
43. Policy considerations seeking to assess its suitability in principle are: LDP2
Policies 1A, 1B, Placemaking; 8 Rural Diversification; 33A Renewables and Low
Carbon Energy; 50 Prime Agricultural Land; and 51 Soils. The relevant NPF4
policies are 1 Tackling the Climate and Nature Crises; 2 Climate Mitigation and
Adaptation; and 11 Energy. 
44. The proposal would provide essential energy balancing services to the National
grid, actively contributing towards Scotland's CO2 reduction targets, supporting
the principles of Scotland’s Energy Strategy (SES). Specifically, electricity would
be drawn from the grid at times of low demand, stored and released back as
required. When demand is higher, greater generation from non-renewable
sources is required and energy storage facilities such as that proposed could
reduce reliance on non-renewable resources, thus decreasing CO2 emissions. 
45. NPF4 sets out six overarching spatial principles with “Just Transition” relating to
the construction of renewable energy and their contribution to achieving net zero.
NPF4 in its section on Sustainable Places section emphasises the link to
Scotland’s Climate Change Plan and sets the approach to achieving net zero
emissions by 2045 and making significant progress by 2030. The NPF4 also links
to Scotland’s Energy Strategy and highlights the importance of land and sea to
be critical in delivering renewable energy developments. NPF4 provides detailed
policy on Climate Change and Energy and details developer expectations of how
proposed schemes will accord with the policies set out in the document. The
overarching policy intent in NPF4 is to encourage, promote and facilitate all forms
of renewable energy development onshore and offshore. 
46. Policy 33A of LDP2 and Policies 1, 2 and 11 of NPF4 specifically encourages low
carbon energy solutions where specific grid connection or the use of established
infrastructure can occur. Therefore, on balance, and given the site-specific
reasoning for the location of the battery storage unit, the proposed development
could be supported in principle. In this instance, the grid connection will only
require a total of 253m of underground cabling. Furthermore, consideration must
be given to the finite lifespan of this facility. Whilst the overall operational life will
be some 30 years, minimal disturbance to the site will be required, allowing the
pre-existing land use to resume afterwards. 
Design and Layout 
47. LDP2 Policy 1A: Placemaking, requires new development to positively contribute
to the quality of the surrounding built and natural environment. It further requires
development to accord a series of place making criteria outlined in part B of the
policy. On this basis, the physical nature of the proposal in terms of its design,
layout and physical characteristics, must also be considered. 
Page 52 of 212

Page 53

48. In terms of design, the proposed BESS will include containers to be laid out in
rows running south-west to north-east. Each row will be fronted by an access
track, as well as a perimeter track. Access to the ‘compound’ will be from the
northeast via the unnamed road which also serves Jamesfield. There is also an
alternate access point at the southeast. An underground cable will connect the
battery storage facility to its grid connection at the substation directly to the
south. 
49. The battery storage facility is deliberately sited adjacent to the substation. Co-
locating presenting the most viable arrangement and offers a range of benefits by
maximising the efficiency of the battery storage facility and making best use of
the existing grid capacity. The proposals also include a switchroom (15.2m in
length and 3.2m in width), a control room (12.1m in length, 4m in width and 3.2m
high), containers (12.1m in length and 2.4m in width), auxiliary transformers
(1.7m in height and 2.2m in width) and battery storage units (6m in length and
2.8m in width). 
Landscape and Visual Impact 
50. NPF4 Policy 4: Natural Places states that development proposals which by virtue
of type, location or scale will have an unacceptable impact on the natural
environment, will not be supported. Furthermore, development proposals that are
likely to have a significant effect on an existing or proposed European site
(Special Area of Conservation or Special Protection Areas) and are not directly
connected with or necessary to their conservation management are required to
be subject to an “appropriate assessment” of the implications for the
conservation objectives. In this instance, the application site is currently an
agricultural field and is not located within the Green Belt or any other designated
landscape areas. 
51. Perth and Kinross Council LDP2, Policy 39: Landscape states that development
and land use change should be compatible with the distinctive characteristics
and features of Perth and Kinross’s landscapes. Accordingly, development
proposals will be supported where they do not conflict with the aim of maintaining
and enhancing the landscape qualities of Perth and Kinross. 
52. In this instance, a Landscape and Visual Impact Assessment (LVIA) has been
submitted, which states that due to the low-lying form, modest scale of the
proposed development and close visual relationship with Abernethy Substation,
any changes to the landscape character and views would be contained and
highly localised. Furthermore, visibility would be notably restricted by existing
vegetation and built features, and where views are available the proposed
development would appear as an incremental addition to an already modified
setting. 
53. These impacts will be further reduced through a planting strategy which would
provide high levels of additional screening to a proposed development which has
already limited visual impacts. It is proposed to plant both coniferous and
deciduous woodland to strengthen the character and pattern of woodland in the
Page 53 of 212

Page 54

area, adding to the existing characteristic of the baseline landscape. Post
mitigation the magnitude of impact reduces to low given this reduced visibility
and integration into the existing landscape pattern, resulting in a moderate/minor
level of effect. The proposed BESS will result in an extension to the north and
west of the overall extent of BESS development in and around Abernethy.
However, according to the LVIA, the magnitude of change to the Local
Landscape Areas are moderate to minor. Again, this impact is likely to reduce
further once the proposed landscape mitigation is established. Thus, it is
considered that the proposed landscaping scheme mitigates the visual impact of
the proposed development whilst maintaining views over the Tay estuary. 
54. In light of the above, and subject to the maturation of the approved landscape
and planting scheme, the proposed BESS is considered to be in accordance with
NPF4 Policy 4 and LDP2 Policy 39 
Prime Agricultural Land and Soils 
55. In this instance, the relevant policies are LDP2 Policy 50: Prime Agricultural
Land, Policy 51: Soils, and NPF4 Policy 5: Soils. 
56. NPF4 Policy 5 provides for renewable energy development where
decommissioning can be secured. It further states that: 
a)  Development proposals will only be supported if they are designed and
constructed:
i.  In accordance with the mitigation hierarchy by first avoiding and then
minimising the amount of disturbance to soils on undeveloped land;
and
ii.  In a manner that protects soil from damage including from compaction
and erosion, and that minimises soil sealing. 
b)  Development proposals on prime agricultural land, or land of lesser quality
that is culturally or locally important for primary use, as identified by
the LDP, will only be supported where it is for:
i.  Essential infrastructure and there is a specific locational need and no
other suitable site;
ii.  Small-scale development directly linked to a rural business, farm or
croft or for essential workers for the rural business to be able to live
onsite;
iii.  The generation of energy from renewable sources or the extraction of
minerals and there is secure provision for restoration; and
In all of the above exceptions, the layout and design of the proposal
minimises the amount of protected land that is required. 
57.  A detailed soil survey was carried out in November 2025, and a Land Capability
for Agriculture (LCA) report was submitted in support of this planning application.
Given that BESS is defined as renewable energy generation and so, whilst the
site may be Prime Agricultural Land (PAL), development can be considered
acceptable where a Decommissioning Plan is provided secured, which can be
Page 54 of 212

Page 55

secured by condition. (Condition 18). This will ensure that proposed mitigation
measures in terms of prime agricultural land and soils are implemented in full. 
58. LDP2 Policy 50: Prime Agricultural Land states that outside the identified
settlements, development on prime agricultural land will not be permitted, unless
it is necessary to meet a specific established need, such as a major infrastructure
proposal and only when there is no other suitable site available on non-prime
land. Small scale development directly linked to rural business, including
housing, may also be acceptable on prime agricultural land, providing it is
compatible with all other aspects of the policy framework of the Plan and there
are no other suitable non-prime land sites available, and it does not adversely
affect the viability of the agricultural unit. 
59. LDP2 Policy 51: Soils states that the Council seeks to protect soils from damage
such as erosion or compaction. Developments located on areas of good quality
agricultural soils will only be supported where they:  
(a)  minimise impact on soil resources; 
(b)  Implement appropriate soil management measures, particularly for valuable
soils such as good-quality agricultural soils*, and soils with a high organic
content;
(c)  adopt best practice when moving, storing and reinstating soils 
(d)  consider opportunities to re-use soils necessarily excavated from the site. 
60. In this instance, the site is on prime agricultural land (class 2). NPF4 Policy 5
provides for essential infrastructure on prime agricultural land provided that the
layout and design of the proposal minimises the amount of land that is required.
Overall, the proposed BESS will result in a loss of 5 hectares of medium-term
loss of Class 2 land. Furthermore, it is anticipated that the proposed BESS has
the potential to supply 161,898 homes over 4 hours and given that the proposed
BESS is located in an area that has had several industrial elements introduced to
the landscape over the last 20 years. This being the case and given that the
proposed development has included appropriate soil management measures, the
predicted loss in Class 2 land is not considered to be significant. Therefore, the
proposed BESS is in accordance with LDP2 Policy 50: Prime Agricultural Land
and Policy 51: Soils. 
Residential Amenity 
61. NFP4 Policy 23 (e) states that development proposals that are likely to raise
unacceptable noise issues will not be supported. 
62. LDP2 Policy 17: Residential Areas, highlights that areas of residential and
compatible uses inside settlement boundaries will see existing residential
amenity protected and, where possible, improved. 
63. This application includes 48 containerised battery storage units, 12
inverters/transformer units, a switch room, subterranean fire water tank, welfare
unit, CCTV, and external lighting. The containers will be set in rows. An existing
Page 55 of 212

Page 56

substation is immediately to the south and there are several other consented
renewable infrastructure projects and BESS’s in the locality. 
64. The closest residential property is approximately 350 metres to the southwest. In
light of this distance the submitted Noise Impact Assessment considers there will
be no adverse impact on residential amenity. 
65. LDP2 Policy 55: Nuisance from Artificial Lights and Light Pollution states that
consent will not be granted for proposals where the lighting would result in
obtrusive and/or intrusive effects. The Council may secure the regulation of
lighting installations and their maintenance through the use of conditions
attached to the granting of planning permission. In order to ensure that no loss of
residential amenity results from any of the proposed external lighting, condition
has been included (Condition 10). 
66. LDP2 Policy 56: Noise Pollution states that there will be a presumption against
the siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. 
67. The submitted Noise Impact Assessment (NIA) has assessed the noise impact of
this proposed BESS and cumulative effects of the five consented developments
and a proposed development. Predicted noise levels at Noise Sensitive
Receptors (NSRs) are concluded to meet the adopted daytime and night-time
criteria at the closest (worst-affected) NSR by a comfortable margin in all octave
bands. The NIA advises that there will be no detrimental impact on noise
sensitive receptors from the operation of the proposed BESS, including
cumulatively with other known developments. 
68. Overall, there are no adverse noise issues. However, in order to further protect
residential amenity, conditions are recommended in relation to plant or
equipment enclosure, noise complaints to the Council, construction working
hours. (Conditions 8, 9, and 11). Subject to compliance with conditions, the
proposed BESS is considered to be in accordance with NPF4 Policy 23, and
LDP2 Policies 17, 55, and 56 
Roads and Access 
69. LDP2 Policy 15: Public Access states that development proposals that would
have an adverse impact upon the integrity of any (including proposed) core path,
disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted. The policy seeks to preserve the amenity of existing
public footpaths. Core Path ABNY/1 is located nearly 500m to the north of the
site. An assessment of the potential for visual effects on popular routes in the
area has been undertaken. For the Core Path 40/1, the LVIA confirms that
visibility would only be possible from around half of the path, and this view would
generally be oblique, especially while travelling north, with only a short section of
the path would generate direct views when travelling south. When viewing the
Page 56 of 212

Page 57

development from the north the existing substation would be seen in the
background. The magnitude of change is considered to be low, resulting in a
moderate level of effect. 
70.  Furthermore, As a mitigation measure, the proposed landscape planting scheme
includes vegetation along northwest corner, extending north-east to provide year-
round screening. In addition, an outer band of deciduous trees will provide a
more natural and softer edge enhancing the visual character of the area. In light
of this, it is considered that the proposed development is in accordance with
LDP2 Policy 15. 
71. LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. 
72. All development proposals that involve significant travel generation should be
well-served by, and easily accessible to all modes of transport. In this instance, it
is not considered that the proposed development will involve significant travel
generation, and there are a number of traffic management measures that are
proposed to reduce the impact during the construction period. The Construction
Traffic Management Plan (CTMP) demonstrates that the delivery and
construction/installation period of the proposed BESS is anticipated to take place
over a nine-month period. Access to the site will be taken via an upgraded field
access on the U75 which forms a cul-de-sac to the north and connects with
Abernethy Road to the south via a simple priority T-junction. A condition has
been included to ensure that the CTMP is adhered to in full throughout the
development (Condition 17) 
73. The road forms a two-way single carriageway that varies in width between
approximately 4.1m and 4.5m and is subject to a 40mph speed limit. The
expected vehicle trip generation for the proposed BESS development is expected
to be low and there are a number of traffic management measures that are
proposed to reduce the impact during the construction period. 
74. Generally, the BESS will operate on an unmanned basis. However, it is
understood that the proposed development will generate approximately between
10 and 15 visits per month (20- 30 two-way vehicle movements) to support site
operations and general maintenance activities at the facility. These trips will be
typically made by cars or LGVs (e.g. vans). Whilst the temporary construction
compound will be removed following construction completion, space will be
retained on-site for LGVs to turn around, ensuring that vehicles can enter and
exit in a forward gear. In the interest of road safety and site access, a further two
conditions have been included. (Conditions 15 and 16). In light of the above, and
subject to conditions, it is considered that the proposed development is in
accordance with LDP2 Policies 15 and 60A. 
Page 57 of 212

Page 58

Drainage and Flooding 
75. NPF4 Policy 22: Flood Risk and Water Management states that development
proposals at risk of flooding or in a flood risk area will only be supported if they
are for: 
i. essential infrastructure where the location is required for operational
reasons.
ii. water compatible uses.
iii. redevelopment of an existing building or site for an equal or less vulnerable
use; or.
iv. redevelopment of previously used sites in built up areas where the LDP has
identified a need to bring these into positive use and where proposals
demonstrate that long-term safety and resilience can be secured in
accordance with relevant SEPA advice 
76. The protection offered by an existing formal flood protection scheme, or one
under construction, can be taken into account when determining flood risk. 
77. LDP2 Policy 52: New Development and Flooding, states that the Council
supports the actions and objectives to avoid increased, reduce overall, and more
generally manage flood risk in alignment with SEPA Strategies and Plans. NPF4
Policy 22 states that development proposals must have regard to the water
environment, and drainage, including floodwater management, within any
proposal. 
78.  The proposed development is not within an area at risk of flooding and so is out
with flood risk areas that required development to be exceptional or otherwise
compliant with the criteria set out by NPF4 Policy 22. In this instance, a Flood
Risk Assessment (FRA) has been submitted as part of the application. The FRA
has demonstrated that the application site’s flood risk is Low/No Risk from all
sources. Furthermore, the Drainage Strategy is well designed and compliant with
PKC and national guidance, and the SuDS basin and controls are appropriately
sized. Furthermore, PKCs Flood Team consider that maintenance and
construction-phase measures have been satisfactorily addressed 
79. LDP2 Policy 53C: Surface Water Drainage, requires Sustainable Urban Drainage
Systems (SUDS) measures including relevant temporary measures at the
construction Phase. 
80. In this instance, the proposed surface water management strategy with
sustainable drainage principles allow the site to remain free of flooding during
design storm events, whilst ensuring no increase of flood risk to offsite receptors
and ensures no deterioration of the water environment. However, a condition has
been included that prior to any development commences on-site, a detailed
SuDS shall be submitted for approval (Condition 12). Furthermore, an additional
condition has been included to ensure that surface water from all areas of
hardstanding /paving can be disposed of by means of a suitable SuDS (Condition
13). LDP2 Policy 53E. states that all new development must be served either by
Page 58 of 212

Page 59

a satisfactory mains or private water supply complying with the Water (Scotland)
Act 1980 and associated Private Water Regulations, without prejudicing existing
users. It will be the responsibility of the developer to demonstrate that any new
supply is suitable and is safe to be consumed as drinking water in line with the
above act and regulations. In terms of the potential impact on any septic tanks
and soakaways, private water sources, etc Condition 14 has been included to
ensure that detailed measures to safeguard and allow the continued operation of
any private water sources, are submitted for approval. 
81. In terms of a private water supply, the applicant has indicated that they do not
require a connection to a private water supply. In light of thre above, the
proposed BESS is considered to be in accordance with NPF4 Policy 22 and
LDP2 Policies 52,53C and 53 E 
Conservation Considerations 
82. LDP2 Polices 26A, 26B and Policy 7 of NPF4 are considered applicable. The
location is considered a rich archaeological landscape with evidence of activity
spanning across multiple periods with particularly strong evidence of Roman
activity. PKHT are in agreement that there is medium potential for unknown
Buried remains on site. 
83. Furthermore, PKHT also agree with the impacts outlined, in particular the
negative impacts on Carpow Roman Fortress. There is also an accumulative
impact of development that could be considered from a landscape/ setting
perspective. PKHT have strongly recommended that appropriately sited and
designed environmental screening is undertaken, in order to mitigate the visual
impacts on the known historic environment assets. As evidenced and outlined in
the supporting Desk Based Assessment, it is recommended that a programme of
archaeological works assesses the presence/ absence, character, and
significance of archaeological deposits on the site. This has been covered by the
inclusion of Condition 19. In light if the above, and subject to condition, the
proposed BESS is considered to be in accordance with NPF4 Policy 7 and LDP2
Policies 26A and 26B. 
Natural Heritage and Biodiversity 
84. NPF4 Policy 3 Biodiversity states that proposals for local development will
include appropriate measures to conserve, restore and enhance biodiversity, in
accordance with national and local guidance. Measures should be proportionate
to the nature and scale of development 
85. NPF4 Policy 4: Natural Places states that development proposals that are likely
to have an adverse effect on species protected by legislation will only be
supported where the proposal meets the relevant statutory tests. If there is
reasonable evidence to suggest that a protected species is present on a site or
may be affected by a proposed development, steps must be taken to establish its
presence. The level of protection required by legislation must be factored into the
Page 59 of 212

Page 60

planning and design of development, and potential impacts must be fully
considered prior to the determination of any application. 
86. NPF4 Policy 6: Forestry, Woodland and Trees states that development proposals
will not be supported where they will result in adverse impacts on native
woodlands, hedgerows and individual trees of high biodiversity value, or
identified for protection in the Forestry and Woodland Strategy. 
87. The submitted Preliminary Ecological Appraisal Report (PEAR) is considered to
be of good quality and undertaken at the correct time of year. Furthermore, the
PEAR lists comprehensive enhancement measures in accordance with NPF4
and the PKC Planning for Nature Supplementary Guidance. Proposed
enhancement includes planting of c.130m of species rich hedgerows, species
rich wetland planting within the SuDS design, a wildflower mix and further
woodland planting. Furthermore, conditions are recommended requiring an
updated Ecology Study, and measures to prevent animals being trapped are
outlined in full prior to development commencing (Conditions 5 and 6) 
88. LDP2 Policy 40: Forestry, Woodland, and Trees states that Tree Surveys,
undertaken by a suitably qualified professional, should accompany applications
where sites contain trees and that there is a presumption in favour of protecting
woodland resources. 
89. In this instance, it is acknowledged that all existing trees, hedgerows and
woodlands will be retained. With mature trees at the southeast and west
boundary, and several smaller trees along the south boundary, shown on the
planting plan. However, a condition has been included to ensure that retained
trees are fully protected (Condition 3). Furthermore, and in order to provide better
screening, additional hedgerow planting is provided along the north-eastern
edge. In addition, along the western edge, the proposed shelter belts have been
extended with additional tree planting. Following the advice of PKC’s Tree
Officer, light standards have also been introduced along the southern edge.
Overall, light standard planting forms a total of 15% of the proposed planting. 
90. LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected
or not. All whilst taking into account the ecosystems and natural processes in the
area. In accordance with NPF4, development proposals for major development
will only be supported where it can be demonstrated that the proposal will
conserve, restore and enhance biodiversity, including nature networks so they
are in a demonstrably better state than without intervention. This will include
future management. 
91. In this instance, conditions have been included that the action points and
recommendations of the submitted Biodiversity Study shall be adhered to and
implemented in full, and that a Site Biodiversity Action Plan is submitted for
approval, prior to development commencing. 
Page 60 of 212

Page 61

92. In light of the above, and subject to conditions, the proposed BESS is considered
to be in accordance with NPF4 Policies 3, 4, 6 and LDP2 Policies 40 and 41. 
Low and Zero Carbon Generating Technologies 
93. LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. Given that the
proposed development will include new buildings, LDP2 Policy 32 and NPF4
Policy 2 are relevant. However, given the nature of the proposals, and that the
buildings will not be habitable, heated or cooled, it is considered that the
proposed BESS is in accordance with the Development Plan. 
Grid Connection 
94. The proposed point of connection is the Abernethy Substation, which is located
adjacent to the application site. The connection will take the form of an
underground cable, with an approximate length of approximately 253m. 
Lifespan of Facility / Decommissioning 
95. The Applicant is committed to decommissioning and restoring the Site to its
previous agricultural use at the end of the projects predicted 40-year lifespan. In
the event the decision was made that the Site could be repowered, then a new
consenting process would be required. 
96. Prior to decommissioning, a Restoration and Decommissioning Plan (RDP) will
be produced to reflect the current legislation and policy at that point in time and
will be agreed with the relevant statutory authorities. 
97. The lifespan of the facility is not specifically stated. However, based on the
expected lifespan of similar facilities approved within Perth and Kinross and the
expected battery life, a lifespan of approximately 40 years is anticipated. As
such, Condition 18 has been included to ensure that should the energy storage
facility not be in use for a continuous period of 12 months, or at the conclusion of
this term, that the site is then decommissioned and re-instated to its original use. 
Developer Contributions 
98. The Developer Contributions Guidance is not applicable to this application, and
therefore, no contributions are required in this instance. 
Page 61 of 212

Page 62

Economic Impact 
99. The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. However, the proposal will support local
renewable energy generation by helping balance fluctuations of intermittent
energy generation. It will assist in the creation of a national grid asset of regional
significance for the Perth and Kinross area. 
100. No information has been provided on how the local community will benefit from
this application to satisfy the requirement in NPF4 Policy 11(c) (excluding
consideration of direct community benefit payments). Consideration should be
given to consideration of local priorities, maximising use of local supply chains
and opportunities for local training. Consideration should be given to how the
development can support NPF4 Policy 25. 
Variation of Application Under Section 32A 
101. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to landscaping and planting, and
ecological surveys 
Planning Obligations And Legal Agreements 
102. None required. 
Direction By Scottish Ministers 
103. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
104. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding
the Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve subject to the following conditions: 
Page 62 of 212

Page 63

Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. No works shall commence on site until the applicant has undertaken an
assessment and modelling as required to determine the interference levels on
the Scotland Gas Networks’ adjacent pipeline from steady state and fault
conditions of the electrical infrastructure associated with the proposed
development, taking into consideration the nearby SGN pipeline and associated
equipment. This includes: 
• Any steady state AC or DC Interference 
• Fault Condition Interference in accordance with the limits in BS EN50122-
1:2022 
•  If required, the applicant shall also design appropriate mitigation to ensure
that levels of AC and DC interference are within acceptable limits (as
described by SGN/PM/ECP/2, BS EN ISO 18086:2020 and BS EN
50162:2004). The results of this modelling (and mitigation, if required) will be
submitted for the prior written approval of Scotland Gas Networks and the
Planning Authority before any work commences on site. 
Reason: In the interest of worker safety and to safeguard the integrity of the
adjacent SGN pipeline 
Biodiversity and Trees 
3. All trees on site, other than those marked for felling on the approved plans, shall
be retained. 
Reason: In the interests of protecting environmental quality and of biodiversity 
4. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 25 relates) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development. 
Reason: In the interests of protecting environmental quality and of biodiversity 
5. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
Page 63 of 212

Page 64

approved as part of this permission. The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
6. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150mm outside diameter being
blanked off at the end of each working day. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
7. Prior to the commencement of the development hereby approved, a Site
Biodiversity Action Plan including the location, quantity, specification and
maintenance requirements for the recommended biodiversity enhancement
measures within the supporting biodiversity survey submitted and hereby
approved (document 25 relates) shall be submitted for the further written
agreement of the Council as Planning Authority.  It shall include: 
a) Species rich hedgerow and woodland planting. 
b) Species rich wetland planting within the SUDs design and between the pond
and BESS site.
c) Enhancement of suitable habitat for badgers by planting trees and
hedgerows along site boundaries and leaving undeveloped areas within the
site boundary as rough grassland 
d) A section on artificial lighting of site boundaries (both during construction
and operation) including positioning of cowls, or timers to prevent spill on to
woodland edges, hedgerows and watercourses.
e) At least five Schwegler 1F bat boxes and one barn owl box
f) Commitment to submit all species records from ecological survey reports to
NBN Gateway. 
Thereafter, the agreed scheme shall be maintained in a reasonable condition for
the life of the development. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
Page 64 of 212

Page 65

Environmental Health 
8. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart.   
Reason: In the interest of residential amenity. 
9. In the event, that justified complaints for noise are received by the Council, the
applicant at their own expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from the development. The
appointed consultant and methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning Authority in consultation
with Environmental Health within 28 days of being notified of the complaint.
Within 28 days of approval of appointed consultant and methodology, a Noise
Assessment shall be submitted outlining mitigation and recommended timescales
for delivery. Thereafter, all mitigation measures shall be implemented within the
timescales recommended. 
Reason: In the interest of residential amenity 
10. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In the interest of residential amenity 
11. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays. 
Reason: In the interest of residential amenity. 
Flood and Drainage 
12. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the written agreement of the
Council as Planning Authority, in consultation with SEPA where necessary.  The
scheme shall be developed in accordance with the technical guidance contained
in The SUDS Manual (C753) and the Council’s Flood Risk and Flood Risk
Assessments Developer Guidance and shall incorporate source control. All
works shall be carried out in accordance with the agreed scheme and be
operational prior to the bringing into use of the development.   
Reason: In the interests of best practice surface water management; to avoid
undue risks to public safety and flood risk.
Page 65 of 212

Page 66

13. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable a Sustainable Urban Drainage System to meet
the requirements of best management practices. 
Reason: In the interests of best practice surface water management; to avoid  
undue risks to public safety and flood risk. 
Private Water Supply 
14. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority. The subsequently agreed protective or replacement measures shall be
put in place prior to the development being brought into use and shall thereafter
be so maintained insofar as it relates to the development hereby approved. 
Reason: In the interest of residential amenity and water quality. 
Roads and Transportation 
15. Prior to the commencement of the development hereby approved, full visibility
splays, as detailed in the Transport Statement, shall be provided along the
channel line to the left and right of the access, at a set-back of 2.4 metres
measured 1.05m above the road level to the standard and specification required
by the Council as Roads Authority. The visibility splays shall be physically formed
on the ground and any existing fences, walls, hedges or other means of
enclosure or obstructions within the splays shall be removed and relocated out
with the splays.  Once formed, the visibility splays shall be permanently retained
thereafter, and no visual obstruction of any kind shall be permitted within the
visibility splays so formed. 
Reason: In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
16. Prior to commencement of any development on site, a detailed design for the
passing place and vehicle accesses on the U75 shall be submitted to and
approved in writing by the Planning Authority in consultation with the Roads
Authority.  The passing place and vehicle access, as approved in writing, shall
be constructed prior to any construction works taking place on site, in
accordance with the approved details. 
Reason: In the interests of road safety and free flow traffic. 
17. The Construction Traffic Management Strategy provided as part of the
application, and hereby approved, shall be adhered to at all times throughout the
development
Page 66 of 212

Page 67

Reason: In the interests of road safety 
Facility Lifespan 
18. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, or after operating for
more than 40 years, then it shall be deemed to have permanently ceased to be
required. In such an event, the development shall be decommissioned and the
relevant parts of the site reinstated within such a timescale as agreed by the
Council as Planning Authority. 
Reason: To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
Archaeology and Cultural Heritage 
19. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
to and agreed in writing by the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT). Thereafter, the developer shall ensure
that the programme of archaeological works is fully implemented including that all
excavation, preservation, recording, recovery, analysis, publication and archiving
of archaeological resources within the development site is undertaken. Should
the archaeological works, as required by the WSI, identify a requirement for post-
excavation analysis, the development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design (PERD) has been
submitted to and agreed in writing by the Council as Planning Authority, in
consultation with PKHT. The PERD shall be carried out in complete accordance
with the approved details. Furthermore, the developer shall afford access at all
reasonable times to PKHT or a nominated representative and shall allow them to
observe work in progress 
Reason: In the interest of protecting archaeological interest within the site. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable to this application   
Page 67 of 212

Page 68

Informatives 
1. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
2. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
3. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations. 
4. The applicant should note the site access requirements contained in the
guidance note - National Fire Chiefs Council’s guidance for Battery Energy
Storage Systems. Building Standards technical handbook 2022 – Dead End
Route – Fire and rescue service vehicles should not have to reverse more than
20m from the end of an access road.  Where the dead-end route is more than
20m long turning facilities should be provided. 
5. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
6. As soon as it is practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position. 
7. An application for a Building Warrant may be required. 
8. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period (see
section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended). 
9. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
Page 68 of 212

Page 69

be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission 
10. The applicant is reminded that, should any protected species be present, a
license may be required from NatureScot to disturb a protected species. Failure
to obtain a license may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
11. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material. 
12. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time. The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk.  The Council has
two months to consider the information. You should therefore submit the required
information more than two months before your permission expires. We cannot
guarantee that submissions made within two months of the expiry date of your
permission will be able to be dealt with before your permission lapses. 
13. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
14. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works.
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess. Advice on
the disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environment Protection Agency. 
Page 69 of 212

Page 70

15. The appointed contractor should liaise with Stirling Council to raise these works
on the Scottish Road Works Register and provide confirmation of such to the
Road Authority (Perth and Kinross Council). 
16. It is noted that a geo-environmental report submitted as part of the application
recommends chemical analysis of soils as a precautionary check.  Should any
contamination be identified the Land Quality team should be contacted on 01738
475000 or contaminatedland@pkc.gov.uk for further advice. 
17. The applicant should note the site access requirements contained in the
guidance note - National Fire Chiefs Council’s guidance for Battery Energy
Storage Systems. 
Background Papers
Letters of representation 0 
Authors
Name Designation Contact Details
Alan Atkins Planning Officer (Major) 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager
(Development
Management and Building
Standards)
25 June 2026 
Page 70 of 212

Page 71

¯
Installation of 49.9MW battery energy storage system (BESS), formation
of SUDS, associated infrastructure and landscaping works
26/00067/FLM
Scale
1:10,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(ii)
Page 71 of 212

Page 72

Page 72 of 212

Page 73

¯
Installation of 49.9MW battery energy storage system (BESS), formation
of SUDS, associated infrastructure and landscaping works
26/00067/FLM
Scale
1:5,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(ii)
Page 73 of 212

Page 74

Page 74 of 212

Page 75

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/205) 
Proposal: S42 application to vary conditions 1, 3, 4, 5, 6, 7, 8, 12, 15, 19, 22, 23, 24,
26, 32, 33, 34, 35, 36, 38, 39, 40, 41, 42, 43, 45, 46, 49, 50 and 53 of
planning permission in principle 20/00667/IPM 
Location: Perth West (MU70) Old Gallows Road, Perth 
Ref. No: 26/00228/42M
Ward No: P9 - Almond and Earn 
Summary 
This report recommends approval of the application as the proposed revised wording
of the above conditions of 20/00667/IPM, and development of the various elements of
that application, which would result, is considered to comply with the relevant provisions
of the Development Plan. Furthermore, there are no material considerations apparent
which outweigh the Development Plan. 
Background and Description of Proposal 
1 The application site extends to approximately 257 hectares (ha), of which 161ha
forms part of the 262.3ha Perth and Kinross Local Development Plan 2019
(LDP2) allocation, referenced as MU70 and generally referred to as ‘Perth West’.
The application site therefore includes 95ha of land outwith the MU70 allocation.
Of the land outwith the site, this comprises: 84 hectares of woodland at ‘West
Lamberkin Wood’, located in the western part of the site; and a further 11
hectares of woodland at ‘Lamberkin Wood’, on the south side of the A9. A
smaller parcel of circa 1.1ha is situated on the east side of the A9, at Broxden
Business Park and is to accommodate a point of access. 
2 The overall MU70 allocation is identified within LDP2 for: 2,210-3,453 homes;
25+ hectares of employment land; two local employment and community
focussed centres; land for a medical centre; land for two ‘double stream’
primaries; and land for cemetery provision, within either the MU70 allocation or
Lamberkin Woodland. 
5(1)(iii)
Page 75 of 212

Page 76

3 As the name would suggest, the application site is located immediately to the
west of Perth, beyond the A9(T). It is generally characterised by open arable
agricultural land, related landscaped shelterbelts, with active farm groupings at
East Mid-Lamberkin and West Mid-Lamberkin. There are seven other residential
properties within the site: Mid Lamberkin Cottages (two), Cotton Cottages (three)
and Windyedge Cottages (two). 
4 Other site surroundings are: further farmland and forestry to the south, west and
north. To the north-east and west of the A9, there is a collection of buildings
around ‘Glendevon Farm’, adjacent to Old Gallows Road and known as ‘Noah’s
Ark’. That complex mainly comprises of business uses and leisure facilities. All
these properties are accessed from Perth by a single-lane road bridge over the
A9. 
5 A key component of the proposals is the development of a ‘Perth Eco-Innovation
Park’ (PEIP), comprising circa 26 ha in the southern and eastern part of the site.
This PEIP proposes a grouping of businesses within the energy, logistics and
mobility sectors co-located with academic institutions, to form a ‘knowledge hub’.
The PEIP also seeks to take advantage of the locational attributes of Perth: as an
axis with the north-east, north-west, and central belt of Scotland, whilst
capitalising on future investment in energy, mobility, and data sectors. 
6 Within the PEIP, a ‘Perth Innovation Highway’ (PIH) is included and proposes to
develop and implement a new strategy of how people and goods move in and out
of Perth; and inform the land uses which would enable future mobility patterns to
be decarbonised, connected and accessible. The PIH will be the first stage of
creating a city/region link between the PEIP site and Perth city centre. PIH
benefits from funding from the UK Government, via the Tay Cites Deal. The PIH
is identified as a corridor of land, to contain physical and digital infrastructure that
will connect and enable delivery of land uses, including: a freight consolidation
centre; and ‘last mile’ logistics centre and integrate these with existing and future
neighbourhoods. It proposes to facilitate route prioritisation for public transport,
support active travel, and enable new models of urban logistics, which would be
integrated with digital infrastructure (e.g. smart lighting, responsive traffic lights). 
Site History 
18/01184/SCOP - EIA Scoping Request for Mixed Use Development. Content of
EIA Report agreed September 2018. 
20/00001/PAN - Proposal of Application Notice for Mixed Use Development,
Contents of PoAN accepted February 2020 
20/00667/IPM - Mixed use development comprising residential, business (class
4), general industry (class 5), storage and distribution (class 6), shops (class 1),
financial, professional and other services (class 2), food and drink (class 3),
hotels (class 7), non-residential institutions (class 10), bus depot, car parking,
Perth Innovation Highway, hydrogen fuelling/charging centre, formation of road
Page 76 of 212

Page 77

junction, underpass and road network, road alterations, footways, cycleways,
greenspace, landscaping, and associated works (in principle). Granted 1.06.21 
Environmental Impact Assessment 
7 The proposal is of a type listed within Schedule 2 of the EIA Regulations and
overall agreement between PKC and the applicant was reached, without the
need for screening, that the proposals comprised EIA development. As such the
proposal was the subject of an EIA scoping (18/01184/SCOP) to determine what
subject areas required to be assessed and included in an EIA Report. An EIA
Report was consequently submitted with this application. 
Pre-Application Consultation 
8 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009. However, given that this application is to vary the wording of certain
conditions associated with 20/00667/IPM, the applicant was not required to
undertake any formal pre-application consultation with the local community. 
Development Plan 
9 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
10 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
11 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 17: Rural Homes
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
Page 77 of 212

Page 78

• Policy 26: Business and Industry 
Perth and Kinross Local Development Plan 2019 
12 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
13 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1C: Placemaking
• Policy 1D: Placemaking
• Policy 2: Design Statements
• Policy 4: Perth City Transport and Active Travel
• Policy 5: Infrastructure Contributions
• Policy 7B: Employment and Mixed Used Areas: Mixed Use Sites
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 16: Social, Cultural and Communities Facilities
• Policy 20: Affordable Housing
• Policy 23: Delivery of Development Sites
• Policy 25: Housing Mix
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 27A: Listed Buildings
• Policy 30: Protection, Promotion and Interpretation of Historic Battlefields
• Policy 31: Other Historic Environment Assets
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 34A: Sustainable Heating & Cooling: Heat Networks, Major
Development and LDP Site Allocations
• Policy 34B: Sustainable Heating & Cooling: Co-Location of Heat and Cooling
Users / Producers
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
Page 78 of 212

Page 79

• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 43: Green Belt
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 54: Health and Safety Consultation Zones
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 59: Digital Infrastructure
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
Page 79 of 212

Page 80

National Guidance 
14 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 75 Planning for Transport 
Creating Places 2013 
16 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
17 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
18 As part of the planning application process the following bodies were consulted: 
External 
19 Transport Scotland - No objection, subject to a revision in the wording of
Conditions 4 and 5, to include Transport Scotland’s involvement 
20 Perth and Kinross Heritage Trust (PKHT) - No objection. However, given the
sensitivities around developing on a designated battlefield and the requirement/
intent to develop in a manner that is appropriate to the place and the character of
this site, it is the opinion of PKHT that a Design and Access Statement should
still be required, as per the wording of the existing condition. Furthermore, PKHT
would need to see some reference to them in Condition 38, in order to ensure
that it is fit for purpose. 
Internal 
21 Development Plan Team - No objection. The proposed variations are largely
considered justified and necessary.
Page 80 of 212

Page 81

22 Biodiversity - No objection. The proposed revision to the relevant biodiversity
and trees conditions are considered reasonable. 
23 Planning Enforcement Officer (Trees) - No objection. 
24 Transportation and Development - There is no objection to this application,
subject to the original conditions being applied. However, it is recommended that
the proposed wording of the following conditions is revised:
1,3,5,6,7,8,12,15,22,23,24,45. 
25 Structures and Flooding - No objection. The proposal seeks to amend the
wording and timing of conditions associated with Planning Permission in Principle
20/00667/IPM to reflect revised phasing. No changes are proposed to the layout
of the site or to the established principles for drainage and flood risk
management. However, the requirement for submission and approval of an
updated Flood Risk Assessment and detailed Drainage Strategy, including SUDS
design, remains secured through existing planning conditions and will be
addressed at the relevant stages. 
26 Environmental Health (Contaminated Land) - No objection. There are no
adverse comments in relation to the s42 application to vary condition 34
contaminated land of planning permission in principle 20/00667/IPM. 
27 Environmental Health (Noise Odour) - No objection. There are no adverse
comments in relation to the s42 application to vary condition 32 Air Quality and
Condition 33 Noise of planning permission in principle 20/00667/IPM. 
28 Developer Contributions Officer - No objection, subject to a Members Update
to be drafted, which outlines the variation to the Section 75 Agreement that is still
pending. 
Representations 
29 No representations were received. 
Additional Statements 
Screening Opinion EIA required 
Environmental Impact Assessment (EIA):
Environmental Report
EIA required 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted 
Page 81 of 212

Page 82

Appraisal 
30 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
31 PKC Local Development Plan 2, MU70, is allocated for mixed used development
including up to 3,453 homes; 25+ hectares employment land; 2 local employment
and community centres; medical centre, 2 double-stream primaries and cemetery
provision (within the allocation or within Lamberkin Woodland). In terms of the
LDP2 MU70 allocation, approximately 50% is incorporated into the application
site. MU70 is intended to support the growth and expansion of Perth. 
32 The principle of the overall development, approved by the parent application, has
been previously established, ultimately through the approval of the extant
planning permission (20/00667/IPM). This is a significant material consideration
and therefore, the principle of the development is well-established and does not
need reviewed through this S42 application. However, the changes sought to the
conditions must still align with the provisions of the aforementioned Development
Plan. 
33 The changes sought to the conditions have been requested to ensure that
information is submitted at the appropriate time of the development. Many of the
conditions in their current wording would require an extensive amount of
information to be submitted as part of the first approval of matters application.
This would make the first approval of matters application have significant
requirements. This is no longer considered to be appropriate as the first approval
of matters application is likely to be an infrastructure only application. It is not
considered proportionate that all of the information currently required is submitted
for an application such as this. Consequently, it is sought to amend a number of
conditions to ensure that the information sought is only required at the required
phase of the development. This will ensure that smaller scale infrastructure only
applications, or similar, are not met with significant requirements. It is important
to note that it is not sought to delete any of the requirements attached to the
parent permission through this section 42 application. Instead, it is only sough to
amend the timing of the requirements to be proportionate to the phase of the
development. All relevant consultees have been contacted, none of which have
any objection to the proposed re-wording of the conditions. 
34 The technical variation of conditions 1, 3, 4, 5, 6, 7, 8, 12, 15, 19, 22, 23, 24, 26,
32, 33, 34, 35, 36, 38, 39, 40, 41, 42, 43, 45, 46, 49, 50 and 53 of permission
Page 82 of 212

Page 83

26/00228/42M, is therefore not considered contrary to the general terms of the
Development Plan. The content of the conditions will still be required to be
adhered to, although will now be timed more appropriately to accord with the
overall phasing of the development. 
Developer Contributions 
35 Not applicable to this application. 
Economic Impact 
36 Not applicable to this application 
Variation of Application Under Section 32A 
37 This application was not varied prior to determination, in accordance with the
terms of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. 
Planning Obligations and Legal Agreements 
38 None required. 
Direction By Scottish Ministers 
39 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Other Matters 
40 As part of this application, it is appropriate to consider and review other material
considerations and associated conditions in the extant planning permission.
There were 57 planning conditions associated with planning application
20/00667/IPM, and it Is good practice, where seeking to approve a S42
application, to review and update conditions to meet current regulations and
requirements. Similarly, any conditions that still require to be addressed or
adhered to, should remain. The original suite of conditions has therefore been
reviewed and updated reflective of the ongoing nature of the development. 
Conclusion and Reasons for Recommendation 
41 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding
Page 83 of 212

Page 84

the Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions.  
Recommendation   
Subject to the following conditions: 
Conditions and Reasons for Recommendation 
NB. The changes to the conditions from the previous permission are
identified by red. 
1. The Permission hereby approved shall be limited to: 
• residential development of a maximum of 1,500 dwellings; 
• commercial development of 26 hectares comprising: business (class 4);
general industry (class 5); storage and distribution (class 6); shops (class 1);
financial; professional and other services (class 2); food and drink (class 3);
hotels (class 7); and non-residential institutions (class 10); and 
• Infrastructure development comprising: bus depot; car parking; Perth
Innovation Highway; hydrogen fuelling/charging centre; formation of road
junction; underpass and road network; road alterations; footways; cycleways;
greenspace; landscaping; and associated works. 
No works in connection within any individual phase of the development hereby
approved shall take place until full details of the siting, design, external
appearance and landscaping of the development and the means of access
serving the development of that phase (hereinafter referred to as the 'matters
specified by condition') have been submitted to and approved in writing by the
Planning Authority. 
The specified matters, where relevant to that phase, shall include: 
i. a detailed updated phasing and delivery plan (incorporating commercial,
residential, transport infrastructure, drainage infrastructure and open space)
which shall specify that commercial uses are delivered in the first zones
within Phase 1a and Phase 1b and for the delivery of Phases 1-3 to accord
with the Transport Assessment (Ref: 20/00667/15); 
ii. a detailed levels survey (existing and proposed) and cross sections showing
proposed finished ground and floor levels of all buildings forming part of
each development phase, relative to existing ground levels and a fixed
datum point.
iii. the siting, design, height, and external materials of all buildings or structures
iv. the details of all access, car parking, public transport facilities,
footpaths/cycleways, the road layout, design, and specification (including
the disposal of surface water) and related structures throughout the relevant
phase of the development.
Page 84 of 212

Page 85

v. details of any screen walls/fencing including any retaining walls to be
provided. 
vi. for each building, specifying measures to maximise environmental
sustainability through design, orientation and planting or any other means.
These measures shall include a scheme that demonstrates how current
carbon emissions reduction set by the Scottish Buildings Standards will be
met through the installation and operation of low and zero-carbon
technologies, specifying what these technology types are, their location and
ongoing operation and maintenance; 
vii. details of any landscaping, structure planting, boundary treatments and
screening associated within the relevant phase of the development; 
viii. full details of the proposed means of disposal of foul and surface water from
the development; 
ix. noise impact assessment 
x. lighting details; 
xi. bin storage, collection location, recycling facilities provision and access; 
xii. biodiversity action plan 
xiii. a green travel plan including provision of electric vehicle (EV) charging
points; 
xiv. archaeological working scheme of investigation; 
xv. updated Transport Assessment; 
Each phase of the development shall thereafter be carried out in full accordance
with the details approved for that phase and any approved Phasing and Delivery
Plan, unless otherwise agreed in writing by the Planning Authority. 
Reason: This is a Planning Permission in Principle under Section 59 of the Town
and Country Planning (Scotland) Act 1997 (as amended). 
2.  The submitted Masterplan (Ref: 20/00667/15) and Development Parameters
Plan and Schedule of Uses and Floorspace (Ref: 20/00667/5) are purely
indicative only and are not approved. 
Reason: The application is for planning permission in principle only at this stage. 
3.  As part of any application for the Approval of Matters Specified by Condition
(AMSC) under Condition 1(iv), all matters shall be in accordance with the
standards required by the Council as Roads Authority (as detailed in the National
Roads Development Guide). 
Reason: In the interests of road safety. 
4.  The development of the application site, shall be reviewed by 2035 or when there
have been 1,001 housing units or 20 hectares of employment land developed,
whichever comes first, to reassess the impact on the road network and the
amount of modal shift. The applicant shall refer to LDP2 Main Issue Report or
page 52/189 of the Perth West: Transport Assessment Ref:
GB01T20A18.2PROJ.10964013 (SYSTRA, 22/05/20) for details of the "Pause
and Review". No further development shall take place until the review has been
Page 85 of 212

Page 86

undertaken, submitted, and agreed in writing by the Council as Planning
Authority. 
Reason: In the interests of road safety. 
5.  As part of the first Approval of Matters Specified by Condition (AMSC)
application, if relevant to that phase, details of the proposed multi-storey car park
shall be submitted for the approval of the Council as Planning Authority. For the
avoidance of doubt the multi-storey car park must occur before the
implementation of any parking restrictions on Lamberkine Drive or Tweed Place
and continue to be available for the vehicles displaced as result of the
restrictions. The number of parking spaces to be made available for displaced
vehicles shall be agreed with the Council as Planning Authority before the first
AMSC application. 
Reason: In the interests of road safety. 
6 As part of any Approval of Matters Specified by Condition (AMSC) application, all
external lighting and streetlighting details relevant to that phase, submitted under
Conditions 1 (iv) and/or (x) shall be designed to be sufficiently screened and
aligned so as to ensure that there is no direct illumination of neighbouring land
and that light spillage beyond the boundaries of the site is minimised to a degree
that it does not adversely affect the amenity of the neighbouring land. 
Reason: In the interests of minimising light pollution, protecting amenity and road
safety. 
7.  As part of the first Approval of Matters Specified by Condition (AMSC)
application, if relevant to that phase of the development, a detailed design for the
signalisation identified for the A93/Lamberkine Drive shall be provided and
including the upgrade of the zebra crossing on Lamberkine Drive to a controlled
crossing, to reduce the impact of queueing from the development. A detailed
design shall be undertaken, along with a date for their implementation by the
developer and shall be agreed in writing by the Council as Planning Authority.
Thereafter the development shall be fully undertaken in accordance with the
approved scheme. 
Reason: In the interests of road safety. 
8. As part of the first Approval of Matters Specified by Condition (AMSC) application
if relevant to that phase of the development, a scheme for mitigation measures
for the core path CTYS/112; Cycleway, Lamberkine Drive & Cedar Drive to
Fairhill View & Glasgow Road at Woodlands, where it crosses Lamberkine Drive,
shall be submitted to and approved in writing by the Council as Planning
Authority. This scheme shall include a detailed design that facilitates the safe
crossing of pedestrians and cyclists and must also specify a date for its
implementation by the developer. The scheme as approved shall be
implemented prior to the occupation of the 100th dwellinghouse. 
Reason: In the interests of road safety. 
Page 86 of 212

Page 87

9. As part of any application for the Approval of Matters Specified by Condition
(AMSC), the phasing of the project as part of any approval under Condition 1(i) of
this permission, will be such that the upgraded A9(T) Tibbermore grade-
separated junction shall be operational by the completion of the 1,001st housing
unit on the site. 
Reason: In the interests of road safety. 
10.  No development shall commence until appropriate mitigation measures have
been agreed to address the impact of the development at the Broxden
Roundabout on the A9 trunk road. The nature of the mitigation shall either be
physical improvements to this junction in the form of traffic signals and widening
of approaches, or a financial contribution in lieu of the said physical works. The
details of the physical works or the level of financial contribution required shall be
agreed in writing with the Planning Authority, in consultation with Transport
Scotland. 
Reason: To mitigate the adverse impact of the development on the safe and
efficient operation of the trunk road network. 
11.  Prior to the commencement of any works on site, a scheme for the delivery of the
proposed Broxden Underpass shall be submitted to and approved in writing by
the Planning Authority, in conjunction with Transport Scotland. Thereafter, the
approved details shall be implemented in accordance with the approved
timescales. 
Reason: To mitigate the impact of the development on the safe and efficient
operation of the trunk road. 
12. Prior to the occupation of any unit on site, a scheme for the delivery of a signal
controlled A93 / Lamberkine Drive junction shall be submitted to and approved in
writing by the Planning Authority in conjunction with Transport Scotland.
Thereafter, the approved details shall be implemented in accordance with the
approved timescales. 
Reason: To mitigate the impact of the development on the safe and efficient
operation of the trunk road. 
13. Prior to the commencement of any works on Phase 3 of the development, a
scheme for the delivery of the proposed Tibbermore grade-separated junction
shall be submitted to and approved in writing by the Planning Authority in
conjunction with Transport Scotland. Thereafter, the approved details shall be
implemented in accordance with the approved timescales. 
Reason: To mitigate the impact of the development on the safe and efficient
operation of the trunk road. 
14. Prior to the commencement of any works on Phase 3 of the development, a
scheme for the delivery of the proposed Tibbermore Link Road shall be
Page 87 of 212

Page 88

submitted to and approved in writing by the Planning Authority in conjunction with
Transport Scotland. Thereafter, the approved details shall be implemented in
accordance with the approved timescales. 
Reason: To mitigate the impact of the development on the safe and efficient
operation of the trunk road. 
15. Prior to the commencement of any works on site, a scheme for the delivery of the
proposed temporary emergency access shall be submitted to and approved in
writing by the Planning Authority in consultation with Transport Scotland.
Thereafter, the approved details shall be implemented in accordance with the
approved timescales. The temporary access shall be closed once the A9
Tibbermore grade-separated junction becomes operational. 
Reason: To mitigate the impact of the development on the safe and efficient
operation of the trunk road. 
16. Prior to the commencement of any works on site, a Construction Traffic
Management Plan (CTMP) for each phase of the development, covering the
construction of that phase, shall be submitted for prior approval of the Planning
Authority, after consultation with Transport Scotland as the Trunk Road Authority. 
Reason: To minimise interference with the safety and free flow of the traffic on
the trunk road; to ensure the safety of pedestrians and cyclists using the trunk
road and adjacent facilities; and to be consistent with current guidance and best
practice. 
17. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (CTMS) which shall include the following: a) b) c) d)
e) f) g) h) i) j) k) l) restriction of construction traffic to approved routes and the
measures to be put in place to avoid other routes being used; timing of
construction traffic to minimise impact on local communities particularly at school
start and finishing times, on days when refuse collection is undertaken, on
Sundays and during local events; a code of conduct for HGV drivers to allow for
queuing traffic to pass; arrangements for liaison with the Roads Authority
regarding winter maintenance; emergency arrangements detailing
communication and contingency arrangements in the event of vehicle
breakdown; arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development being
deposited on the road; arrangements for cleaning of roads affected by material
deposited from construction sites associated with the development;
arrangements for signage at site accesses and crossovers and on roads to be
used by construction traffic in order to provide safe access for pedestrians,
cyclists and equestrians; details of information signs to inform other road users of
construction traffic; arrangements to ensure that access for emergency service
vehicles are not impeded; co-ordination with other significant developments
known to use roads affected by construction traffic; traffic arrangements in the
Page 88 of 212

Page 89

immediate vicinity of temporary construction compounds; m) the provision and
installation of traffic counters at the applicant's expense locations to be agreed
prior to the commencement of construction; n) monitoring, reporting and
implementation arrangements; o) p) arrangements for dealing with non-
compliance; and details of HGV movements to and from the site. The CTMS as
approved shall be strictly adhered to during the entire site construction
programme. 
Reason: In the interests of road safety. 
18. All vehicles transporting construction material to and from the proposed
development shall be sheeted. 
Reason: To ensure that material from the site is not deposited on the trunk road
to the detriment of road safety. 
19. Prior to the commencement of any works on each phase of the development,
vehicle wheel cleaning facilities shall be installed and brought into operation on
the site, the design and siting of which shall be subject to the prior approval of
the Planning Authority, after consultation with Transport Scotland as the Trunk
Road Authority. 
Reason: To ensure that material from the site is not deposited on the trunk road
to the detriment of road safety. 
20. Prior to the occupation of any part of the phased development, a comprehensive
Residential Travel Plan that sets out proposals for reducing dependency on the
private car shall be submitted to and approved in writing by the Planning
Authority, after consultation with Transport Scotland as the Trunk Road Authority.
The Travel Plan shall identify measures to be implemented, the system of
management, monitoring, review, reporting and the duration of the plan. 
Reason: To be consistent with the requirements of PAN 75 Planning for
Transport. 
21. Prior to the occupation of any part of the phased development, a comprehensive
Commercial Travel Plan that sets out proposals for reducing dependency on the
private car shall be submitted to and approved in writing by the Planning
Authority, after consultation with Transport Scotland as the Trunk Roads
Authority. The Travel Plan shall identify measures to be implemented, the system
of management, monitoring, review, reporting and the duration of the plan. 
Reason: To be consistent with the requirements of PAN 75 Planning for
Transport. 
22. Development shall not commence until a detailed phased Green Travel Plan
(GTP), aimed at encouraging more sustainable means of travel, as required
under Condition 1 (xiii), has been submitted to and agreed in writing by the
Council as Planning Authority. A strategy shall be included in the GTP for
Page 89 of 212

Page 90

monitoring, reporting, and updating the plan as necessary. The GTP will have
particular regard to provision for: a) b) c) d) e) walking and cycling; public
transport access to and within the site; provision of electric vehicle (EV) charging
points within all residential, commercial and community use development
parcels; identify measures to be provided (including the provision of new and/or
enhanced public transport services); any phasing, the system of management,
monitoring, review, reporting and the duration of the Plan. The GTP as agreed
shall be fully implemented by the applicant. 
Reason: In the interests of sustainable transport. 
23. Prior to the commencement of any phased development, with the exception of
any infrastructure only phases, a Development Phasing Strategy shall be
submitted to and agreed in writing with the Planning Authority, after consultation
with Transport Scotland as the Trunk Road Authority, that establishes what level
of development mitigation interventions will be required. 
Reason: To minimise any interference with the safety and free flow of traffic on
the trunk road network. 
24. Prior to the commencement of any phased development, if relevant to that phase
of the development, a Public Transport Strategy shall be submitted to and agreed
in writing with the Planning Authority, after consultation with Transport Scotland
as the Trunk Road Authority, that considers the various public transport
improvements cited in the Transport Assessment. 
Reason: To ensure that the development is adequately served by public
transport services; and to minimise any interference with the safety and free flow
of traffic on the trunk road network. 
25. A barrier of a type approved by the Planning Authority, after consultation with
Transport Scotland as the Trunk Road Authority, shall be provided and
maintained by the developer or subsequent owner of the land along the boundary
of the site with the trunk road. 
Reason: To minimise interference with the safety and free flow of the traffic on
the trunk road; and to minimise the risk of pedestrians and animals gaining
uncontrolled access to the trunk road with the consequential risk of accidents. 
26. Prior to the commencement of any works on site, details of the lighting relating to
that phase of works shall be submitted for the approval of the Planning Authority,
after consultation with Transport Scotland as the Trunk Road Authority. Reason:
To ensure that there will be no distraction or dazzle to drivers on the trunk road
and that the safety of the traffic on the trunk road will not be diminished. 
27. There shall be no drainage connections to the trunk road drainage system. 
Reason: To ensure that the efficiency of the existing drainage network is not
affected.
Page 90 of 212

Page 91

28. The proposed development shall be limited to the scale assessed within the
Transport Assessment (Ref: 20/00667/15). 
Reason: To ensure that the scale of development does not exceed that assessed
by the supporting Transport Assessment and to ensure that the scale of
development is commensurate with the infrastructure required to support the
development. 
29. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works outwith these times
or at any time on Sundays or bank holidays (as identified by the Scottish
Government). 
Reason: To ensure a satisfactory standard of local environmental quality. 
30. As part of any Approval of Matters Specified by Condition (AMSC) application, a
detailed Construction Environmental Management Plan (CEMP) detailing
environmental mitigation measures and construction method statements,
including specific measures for environmental monitoring during construction,
shall be submitted for the written agreement of the Council as Planning Authority
in consultation with NatureScot, Scottish Environment Protection Agency (SEPA)
and Environmental Health. Such details shall be submitted not less than two
months prior to the agreed scheduled commencement date and shall incorporate
detailed pollution avoidance and mitigation measures for all construction
elements. The CEMP shall include noise & vibration and dust assessments; to
assess the impacts from construction operations. The CEMP shall also include
procedures, limit values and mitigation measures to control noise and vibration
and a detailed quantitative dust assessment shall be undertaken. Thereafter the
development shall be fully undertaken in accordance with the agreed CEMP. 
Reason: In the interest of proper site management and to protect the amenity of
the area. 
31. Prior to the commencement of the development hereby approved, an
independent and suitably qualified Ecological Clerk of Works (ECoW) shall be
appointed at the developers' expense. Details of this appointment shall be
subject to the prior written agreement of the Council as Planning Authority. The
appointed person will remain in post for the duration and subsequent restoration
of the proposed development. The ECoW shall have responsibility for the
following: 
• Implementation of the Construction Environmental Management Plan
(CEMP) approved by this permission. Implementation of the Aftercare
Monitoring Plan (AMP) required by this permission. 
• Authority to stop operations or to alter construction methods should there be
any works occurring which are having an adverse impact on the natural
heritage. 
Page 91 of 212

Page 92

• Prior to the commencement of development, they shall provide an
environmental / ecological toolbox talk for construction staff. 
• They will have authority to amend working practices in the interests of natural
heritage. Any amendments shall be submitted to the Council as Planning
Authority as an addendum to the approved CEMP. 
• They shall make weekly visits to the development site at a time of their
choosing. No notification of this visit is required to be given to the developer
or contractor. 
• Within 10 working days of the end of each calendar month, they are required
to submit a detailed monthly report for the review of the Planning Authority in
consultation with Scottish Environment Protection Agency (SEPA) for the
duration of development. 
• They shall notify the Council as Planning Authority in writing of any
requirement to halt development in relation to this condition as soon as
reasonably practicable. The above shall be implemented throughout the
construction, re-instatement and de commissioning of the development
hereby approved unless otherwise agreed in writing with the Council as
Planning Authority. The CEMP shall contain a site-specific Construction
Method Statement (CMS) which will provide concise details for the
implementation of the CEMP for site operatives. 
Reason: In the interest of proper site management and to protect the amenity of
the area. 
32. As part of any Approval of Matters Specified by Condition (AMSC) application, a
detailed Air Quality Assessment (AQA) must be prepared by a suitable qualified
party and shall be submitted for the approval of the Council as Planning
Authority. Thereafter the plan will be implemented in full accordance with the
agreed scheme. 
Reason: To ensure a satisfactory standard of local environmental quality. 
33 As part of any Approval of Matters Specified by Condition (AMSC) application, a
detailed Noise Impact Assessment (NIA) must be prepared by a suitable qualified
party and shall be submitted for the approval of the Council as Planning
Authority. Thereafter the plan will be implemented in full accordance with the
agreed scheme. 
Reason: To ensure a satisfactory standard of local environmental quality. 
34 As part of any Approval of Matters Specified by Condition (AMSC) application, an
evaluation for the potential of the site, relevant to that phase of the development,
to be affected by contamination by a previous use has been undertaken and, as
a minimum, a Preliminary Risk Assessment (Phase 1 Page 8 of 16 Desk Study)
has been submitted for consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify: 
Page 92 of 212

Page 93

• the nature, extent, and type(s) of contamination on the site measures to
treat/remove contamination to ensure the site is fit for the use proposed 
• measures to deal with contamination during construction works 
• condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason: In order to deal with any potential contamination of the site as a result of
its former use. 
35. As part of any Approval of Matters Specified by Condition (AMSC) application
sought under Condition 1 a detailed phased report setting out protection of key
heritage assets and their settings shall be submitted to and approved by the
Planning Authority in consultation with Perth and Kinross Heritage Trust (PKHT).
Thereafter the agreed actions will be implemented in full accordance with the
agreed scheme. 
Reason: The protection of key heritage assets. 
36. No development shall take place within the development site until the developer
has secured the implementation of a programme of archaeological works in
accordance with a Written Scheme of Investigation which has been submitted by
the applicant, relating to that phase of works, agreed by Perth and Kinross
Heritage Trust, and approved by the Planning Authority. Thereafter the developer
shall ensure that the programme of archaeological works is fully implemented
and that all recording and recovery of archaeological resources within the
development site is undertaken in line with the agreed measures. 
Reason: To safeguard archaeology in the area. 
37. As part of any Approval of Matters Specified by Condition (AMSC) application, a
scheme detailing the provision and timing of protective fencing shall be submitted
to the Council for approval as Planning Authority, in consultation with Perth and
Kinross Heritage Trust. Once approved, the fencing shall be erected around the
historic battlefield area in a manner as approved and retained in accordance with
the approved scheme. No works shall take place within the area inside that
fencing without prior written agreement of the Council as Planning Authority in
consultation with Perth and Kinross Heritage Trust. 
Reason: To ensure the preservation of the historic environment. 
38. As part of any Approval of Matters Specified by Condition (AMSC) application
sought under Condition 1 an Updated Battlefield Conservation Plan (BCP), if
relevant to that phase of the development, shall be submitted for the approval of
Page 93 of 212

Page 94

the Council as Planning Authority. Thereafter the agreed scheme will be
implemented in full accordance with the agreed details. 
Reason: To ensure the preservation and enhancement of the historic
environment. 
39. As part of any application for the Approval of Matters Specified by Condition
(AMSC) sought under Condition 1, a detailed landscaping and planting scheme
for each phase shall be submitted for the approval of the Council as Planning
Authority. The scheme shall include details of the height and slopes of any
mounding or recontouring of the site, full details of all hard-landscaping proposals
including materials and installation methods and, species, height, size and
density of trees and shrubs to be planted. The scheme as subsequently
approved shall be carried out and completed within the first available planting
season (October to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the Council as Planning
Authority within 7 days of that date. The scheme as agreed and implemented
shall thereafter be maintained. 
Reason: To ensure a satisfactory standard of local environmental quality. 
40. Prior to the occupation of the development or any phase of the development,
whichever is the sooner, a landscape management plan, including long term
design objectives, management responsibilities and maintenance schedules for
all landscape areas (other than small privately-owned domestic gardens) shall be
submitted to and agreed in writing by the Council as Planning Authority, for its
approved use. The landscape management plan as agreed shall, where
appropriate, include phased implementation concurrent with the development
and shall be fully implemented in accordance with the agreed scheme. 
Reason: To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
41. As part of any Approval of Matters Specified by Condition (AMSC) application, a
1:200 site plan, which identifies the Construction Exclusion Zone (CEZ), relevant
to that phase of the development, shall be submitted for the written agreement of
the Council as Planning Authority. This plan shall ensure all fencing adheres to
BS 5837 2012: Trees in Relation to Design, Demolition and Construction are
provided to demarcate the CEZ and protect trees. The CEZ as subsequently
agreed shall be strictly adhered to during construction of the development. 
Reason: To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
42. As part of any Approval of Matters Specified by Condition (AMSC) application, a
Tree Protection Plan for all trees on site (other than those marked for felling),
relevant to that phase of the development, and those which have Root Protection
Areas which fall within the site shall be submitted for the written agreement of the
Page 94 of 212

Page 95

Council as Planning Authority shall be retained and protected. Protection
methods shall be strictly in accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction. The Tree Protection Plan as subsequently
agreed shall be strictly adhered to during construction of the development. 
Reason: To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
43. As part of any Approval of Matters Specified by Condition (AMSC) application,
details of the proposed boundary treatments relevant to that phase of the
development, shall be submitted for the written agreement of the Council as
Planning Authority. The scheme as subsequently agreed shall be implemented
prior to the completion or bringing into use of the development, whichever is the
earlier.   
Reason: To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
44. The asserted right of way/core paths METH/121, METH/13, METH/131 and
CTYS/112 must not be obstructed during building works or on completion of the
development. Any damage done to the route and/or the associated signage
during building works must be made good before the development is completed
or brought into use, whichever is the earlier. 
Reason: To ensure continued public access to the public paths and in the
interests of public safety within the site. 
45. As part of any Approval of Matters Specified by Condition (AMSC) application, a
phased management plan indicating any temporary diversions and signage
needed to facilitate the development and/or any works proposed to the right of
way/core path as part of the development shall be submitted for the agreement of
the Council as Planning Authority. The plan as agreed shall be implemented in
accordance with the timings identified in the plan. 
Reason: To ensure that public access is maintained at all reasonable times, to
the local path network. 
46. As part of any Approval of Matters Specified by Condition (AMSC) application, a
phased Biodiversity Action Plan shall be submitted to and approved in writing by
the Council as Planning Authority. Any action or mitigation incorporated within
the approved Biodiversity Action Plan shall be implemented in accordance with
the approved plan. 
Reason: To ensure a satisfactory standard of local environmental quality; to
safeguard the welfare of any protected wildlife. 
47. As part of any Approval of Matters Specified by Condition (AMSC) application, an
updated Ecological Assessment including breeding birds, protected species and
deer shall be submitted to and approved in writing by the Council as Planning
Page 95 of 212

Page 96

Authority. The conclusions and recommended action points shall be fully adhered
to, respected, and undertaken as part of the construction phase of development. 
Reason: To ensure a satisfactory standard of local environmental quality; to
safeguard the welfare of any protected wildlife. 
48. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason: To ensure a satisfactory standard of local environmental quality; to
safeguard the welfare of any protected wildlife. 
49. As part of any Approval of Matters Specified by Condition (AMSC) application,
details of the location and specification of the swift brick(s) or swift nest box(s)
shall be submitted for the written agreement of the Council as Planning Authority,
if relevant to that phase of the development. Thereafter, the swift brick(s) or swift
nest box(s) shall be installed in accordance with the agreed details prior to the
occupation of the relevant residential unit. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
50. As part of any Approval of Matters Specified by Condition (AMSC) application,
details of the location and specification of the bat brick(s) or bat nest box(s) shall
be submitted and approved in writing by the Council as Planning Authority, if
relevant to that phase of the development. Thereafter, the bat brick(s) or bat nest
box(s) shall be installed in accordance with the agreed details prior to the
occupation of the relevant residential unit. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
51. As part of any Approval of Matters Specified by Condition (AMSC) application, an
Updated Flood Risk Assessment, shall be submitted for approval of the Council
as Planning Authority, in consultation with SEPA where necessary. Thereafter
the development shall be fully undertaken in accordance with the agreed Flood
Risk Assessment. 
Reason: To reduce flood risk. 
52. As part of any Approval of Matters Specified by Condition (AMSC) application, an
updated Drainage Strategy including detailed sustainable urban drainage system
(SUDS) shall been submitted for approval of the Council as Planning Authority, in
consultation with SEPA where necessary. The strategy and scheme shall be
developed in accordance with the technical guidance contained in The SUDS
Manual (C753) and the Council's Flood Risk and Flood Risk Assessments
Page 96 of 212

Page 97

Developer Guidance and shall incorporate source control. All works shall be
carried out in accordance with the agreed scheme and be operational prior to the
bringing into use of the development. 
Reason: To ensure the provision of provide effective drainage for the site. 
53. Concurrent with the initiation of the phased development hereby approved and
for the duration of construction, a temporary surface water treatment facility shall
be implemented on site and maintained for the duration of the approved
development works. The temporary surface water treatment facility shall remain
in place until the permanent surface water drainage scheme is implemented
unless otherwise agreed in writing by the Council as Planning Authority. 
Reason: To ensure the appropriate management of construction surface water
run-off to minimise flooding and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the interests of residential and
environmental amenity. 
54. As part of any Approval of Matters Specified by Condition (AMSC) application,
following consultation with SEPA and NatureScot a detailed Blue/Green
Infrastructure Scheme, shall be submitted for approval of the Council as Planning
Authority. All works shall be carried out in accordance with the agreed scheme
and be operational prior to the bringing into use of the development. 
Reason: To ensure the provision of provide effective drainage for the site in line
with Councils policies on good placemaking. 
55. As part of any application for the Approval of Matters Specified by Condition
(AMSC), an updated, detailed Energy Statement supporting a zero-carbon
development shall be submitted for the written agreement of the Council as
Planning Authority. The statement must include timescales for the provision of
zero carbon developments within the site. The agreed energy measures and
zero-carbon initiatives shall thereafter be implemented in accordance with the
agreed details and timescales. 
Reason: To reduce reliance on fossil fuels and to deliver a zero-carbon
development at Perth West. 
56. Prior to the commencement of works on site, detailed drawings showing waste
and recycling facility enclosures or waste and recycling facility storage areas and
associated locations for bin presentation shall be submitted for the written
agreement of the Council as Planning Authority. None of the commercial or
residential units shall be occupied until the agreed scheme has been provided in
full. 
Reason: In order to ensure adequate servicing facilities are provided. 57 Perth &
Kinross direct that Section 59 of the Town and Country Planning (Scotland) Act
1997 applies as respects the Planning Permission in Principle (20/00667/IPM)
with the substitution of the period of 5 years referred to Section59(2A) (a), with
Page 97 of 212

Page 98

the period of 10 years. Reason: This is an application in principle for which, in
view of the scale of the proposed development, this extended period is
appropriate. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Informatives 
1. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  Please send the required
information to us at developmentmanagement@pkc.gov.uk.  Please be aware
that the Council has two months to consider the information (or four months in
the case of a Major planning permission).  You should therefore submit the
required information more than two months (or four months) before your
permission expires.  We cannot guarantee that submissions made within two
months (or four months) of the expiry date of your permission will be able to be
dealt with before your permission lapses. 
2. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
3. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
4. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment Protection Agency.
Page 98 of 212

Page 99

5. The applicant should be advised that in terms of Section 56 of the Roads
(Scotland) Act 1984 he must obtain from the Council as Roads Authority consent
to open an existing road or footway prior to the commencement of works. Advice
on the disposal of surface water must be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
6. The applicant is advised to refer to Perth & Kinross Council's Supplementary
guidance on Flood Risk and Flood Risk Assessments 2014 as it contains advice
relevant to your development. 
7. For information, foul flows only will be allowed to discharge to the public system. 
The Developer should arrange to dispose of surface water privately, to the
satisfaction of the statutory Drainage Authority. 
8. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
9. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for consent to connect to the public wastewater system and/or water network and
all their requirements must be fully adhered to. 
10. The granting of planning permission does not stop the continued right of public
access along the existing core paths METH/121, METH/13, METH/131 and
CTYS/112. An order under the Town and Country Planning (Scotland) Act 1997,
Section 208 or an amendment of the Core Path Plan under the Land Reform
(Scotland) Act 2003 should be sought in advance of any works authorised by this
planning permission being commenced. All relevant approvals should be in place
prior to any stopping up and diversion of the core path taking place. 
11. There is a Section 75 legal obligation associated with this planning permission,
which relates to affordable housing provision (25%); primary education (provision
of a new primary school); and transport infrastructure including public transport,
open space, play areas, sports pitch provision, health care provision,
maintenance and core path connections, and establishment of Project Design
Team for any detailed applications. A copy is available to view on the Council's
Public Access portal. 
Background Papers
Letters of representation 0 
Authors
Name Designation Contact Details
Alan Atkins Planning Officer (Major) 01738 475300
developmentmanagement@pkc.gov.uk 
Page 99 of 212

Page 100

Approved
Name Designation Date
Sean Panton Team Leader (Major
Applications and Enforcement)
25 June 2026 
Page 100 of 212

Page 101

¯
S42 application to vary conditions 1, 3, 4, 5, 6, 7, 8, 12, 15, 19, 22, 23, 24, 26, 32, 33, 34, 35, 36,
38, 39, 40, 41, 42, 43, 45, 46, 49, 50 and 53 of planning permission in principle 20/00667/IPM
26/00228/42M
Scale
1:25,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(iii)
Page 101 of 212

Page 102

Page 102 of 212

Page 103

¯
S42 application to vary conditions 1, 3, 4, 5, 6, 7, 8, 12, 15, 19, 22, 23, 24, 26, 32, 33, 34, 35, 36,
38, 39, 40, 41, 42, 43, 45, 46, 49, 50 and 53 of planning permission in principle 20/00667/IPM
26/00228/42M
Scale
1:15,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(iii)
Page 103 of 212

Page 104

Page 104 of 212

Page 105

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/206) 
Proposal: Mineral extraction and processing including alterations to vehicular
access, erection of ancillary buildings, landscaping, reinstatement and
associated works (Phase 3) (in part retrospect) 
Location: Land south west of Arns Farm, Auchterarder 
Ref. No: 19/01927/MWM
Ward No: P7 - Strathallan 
Summary 
This report recommends approval of the application for the cessation of mineral
extraction and accelerated restoration of Craigrossie Quarry, as the revised proposals
are considered to deliver a positive environmental outcome and an appropriate long-
term restoration of the site. The proposals represent a material change from the
previously approved scheme by bringing forward the cessation of quarrying activities
and securing restoration within a significantly shorter timeframe. 
While the Development Plan, in particular Policy 49B of LDP2 and associated
Supplementary Guidance, would normally require the provision of a financial restoration
bond secured through a legal agreement, this has not been achievable despite
prolonged efforts over a period exceeding six years. In these specific and exceptional
circumstances, it is considered that strict adherence to this requirement would continue
to delay or prevent restoration rather than secure it. Accordingly, the recommendation
represents a departure from the usual policy requirement for a financial bond, however
this is justified on a pragmatic basis given the scale and viability of the operation and
the need to secure a deliverable restoration outcome. 
It is therefore considered that, on balance, the proposed approach of securing
restoration through planning conditions, including a defined programme for cessation of
quarry operations, represents the most effective and proportionate solution. The
application is therefore recommended for approval, subject to conditions. 
Background and Description of Proposal 
1 Craigrossie Quarry has been the subject of a long‑standing discussions between
the Council and applicant regarding the issuing of a decision associated to this
5(1)(iv)
Page 105 of 212

Page 106

application, this relating to the securing of a financial bond should the proposed
restoration after quarrying not take place. This bond requirement in line with the
relevant policies and guidance and as per the decision taken at the Planning
and Placemaking Committee in March 2020, where Members resolved to
approve the proposal subject to conditions and the conclusion of a Section 75
Legal Agreement, including provision of a financial restoration bond. However,
since then, for a number of reasons it has not been possible to conclude that
agreement or secure such a bond, and the application has therefore remained
formally undetermined. 
2 This report relates to updated restoration proposals, which represent a material
change to that previously reported. The previous proposal presented to
Committee in 2020 sought to regularise ongoing extraction and facilitate further
quarry expansion, including sandstone extraction and a long-term phased
restoration extending to 2033. Now, the revised strategy involves the cessation
of all mineral extraction activities and the implementation of an accelerated
restoration programme. 
3 The submitted information confirms that restoration phases are to be brought
forward, with the site now proposed to be fully restored by circa (c.)2027. The
updated phasing schedule shows that areas previously identified for continued
extraction are now to be restored without further working, while existing
infrastructure, including the quarry compound, is to be removed as part of early
closure works. The accompanying restoration masterplan sets out the regrading
of the site to a more natural landform, incorporating meadow grassland,
woodland planting and wetland areas, and establishes a coherent framework for
the long-term restoration and after-use of the quarry. 
4 By way of context, the site extends to c.21.77 hectares and lies between
Aberuthven and Auchterarder, to the south of the A9, with some intervening
woodland and north of the Stirling to Perth rail line. To the west is the B8062,
from which access is taken, whilst east is some agricultural land and a further
area of woodland. It has for many years operated as by a small-scale sand and
gravel quarry, comprising a compound area, processing plant, silt ponds, access
tracks and areas of previously worked or partially restored land. The wider
setting sits low within a wider rural landscape. 
5 A separate planning application (ref. 26/00045/FLL) for a gun dog training facility
(“Dog Ranch”) is reported elsewhere on the Agenda of this Committee. While
clearly related, each application requires to be considered on its own merits.
However, the proposals are intrinsically linked in that the cessation of quarrying
and delivery of restoration provides the context for the proposed new use, which
is intended to occupy part of the restored site rather than operate alongside
active extraction. For clarity, the applicant for this proposal, Mr John Lockett, is
the same as the applicant when the application was originally reported to
Committee in March 2020. However, the site is currently under contract to the
operator of Mor Dor Gundogs (the applicant for the aforementioned gun dog
ranch), who intends to purchase the entire quarry site subject to obtaining
Page 106 of 212

Page 107

planning permission. Subject to obtaining planning permission, the intention
would be for the restoration works to be tendered to a competent contractor. 
6 This report therefore focuses on the acceptability of the revised restoration
strategy and its environmental implications, noting that: 
• quarry operations are proposed to cease;
• restoration is to be accelerated; and
• the Dog Ranch proposal represents a separate, though related, development
within the restored landscape. 
7 The acceptability of the restoration proposals under this application must be
considered separately and independently from the associated gun dog facility
application, and does not predetermine its outcome, nor vice versa. 
8 Nevertheless, the two proposals are interrelated, and when viewed together they
present an opportunity to resolve the long-standing unresolved regulatory
planning position at Craigrossie Quarry, by securing both a deliverable
restoration strategy and a viable future use for the restored site. 
Site History 
9 08/00423/FUL Full Planning Permission was approved on 21 July 2009 for the
re-alignment of a farm access road and second phase of sand and gravel
extraction. 
10 08/00428/MW Mineral Works application was approved on 21 July 2009 for the
re-alignment of a farm access road and second phase of small scale sand and
gravel extraction. 
11 18/00009/PAN on 14 August 2018 a Proposal of Application Notice PoAN was
submitted for a Phase 3 of small scale minerals extraction and processing
activities (in part retrospect), including reinstatement, restoration, landscaping,
processing building and ancillary accommodation, access and associated works
– the intended approach to consultation was accepted. 
12 18/01423/SCRN On 14 August 2018 Perth and Kinross Council issued
Screening Opinion advising that proposals for a Phase 3 of minerals extraction.
and processing activities did not constitute EIA development. 
13 26/00045/FLL An application for Full Planning Permission for the Change of use
of quarry to gun dog training centre, erection of kennels, veterinary practice ,
reception building, indoor arena, maintenance buildings, staff and student
accommodation, installation of PV and ASHP and associated works – Pending
Consideration and also presented for determination at this Committee.
Environmental Impact Assessment 
14 A screening exercise (ref:18/01423/SCRN) was undertaken by the Planning
Authority in September 2018 in accordance with the EIA (Scotland) Regulations
Page 107 of 212

Page 108

2017 which concluded that this development, whilst falling under Schedule 2 (3)
of the above regulations relating to extractive industry, the development was
unlikely to result in significant environmental effects. The Opinion concluded that
the proposal was not EIA development. 
Waste Management Regulations 2010 
15 The Management of Extractive Waste (Scotland) Regulations 2010 remain the
relevant regulatory framework for mineral developments and associated waste.
However, the revised proposals differ from the previously assessed scheme in
that no further mineral extraction is proposed, and the site is to move directly
into the restoration phase. 
16 As such, the generation and ongoing management of extractive waste
associated with active quarrying will no longer occur. Instead, existing materials
on site will be utilised as part of the restoration process, including regrading and
infilling works. These activities are considered to fall within normal site
restoration operations and do not give rise to the need for a formal extractive
waste management plan as previously envisaged. 
17 Notwithstanding this, all works must be undertaken in accordance with relevant
environmental controls, including measures to ensure the stability of placed
material and to prevent pollution. These matters can be appropriately regulated
through recommended planning conditions and separate environmental
legislation where relevant. 
Pre-Application Consultation 
18 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was required to undertake formal pre
application consultation with the local community. The content of the Proposal of
Application Notice (PoAN) (18/00009/PAN) was approved in August 2018 and a
public consultation was held at Aberuthven Village Hall on Tuesday 21 August
2018. Given that the application has effectively been under consideration since
its submission in November 2019 no additional or refreshed public consultation
is considered to be required. 
19 Public comment during the PAC process, as outlined in the PAC Report, related
to: 
• Use of heavy traffic between the A824 and the B8062 and potential
requirement for road improvements. 
20 The PoAN was reported to the Planning and Development Management
Committee for comment on 26 September 2018 (Report: 18/299). Members
noted the report and made no further comments. 
Page 108 of 212

Page 109

Development Plan 
21 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
22 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
23 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 13: Sustainable Transport
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 26: Business and Industry
• Policy 29: Rural Development
• Policy 33: Minerals 
Perth and Kinross Local Development Plan 2019 
24 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
25 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments
Page 109 of 212

Page 110

• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 36A: Waste Management Infrastructure: Existing Waste Management
Infrastructure
• Policy 36B: Waste Management Infrastructure: New Waste Management
Infrastructure
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 49A: Minerals and Other Activities - Supply: Extraction
• Policy 49B: Minerals and Other Activities - Supply: Restoration
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
26 
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
• Supplementary Guidance - Delivering Zero Waste (adopted in 2020)
• Supplementary Guidance - Financial Guarantees for Minerals (adopted in
2021)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
27
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
Page 110 of 212

Page 111

National Guidance 
28 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
National Roads Development Guide 2014 
29 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Others 
30 Tayside Landscape Character Assessment (TLCA) 
Consultations 
31 The consultation responses summarised below relate to the original application
proposals as submitted and considered by Committee in March 2020. Given that
the revised submission solely relates to the cessation of mineral extraction and
the acceleration of the previously approved restoration programme, and does
not introduce new built development or materially increase the scope of
environmental effects, it was not considered necessary to undertake a further
round of consultation. The amendments are considered to represent a reduction
in operational impacts and a progression towards site restoration, rather than
anything which would require further consultation. 
32 As part of the planning application process the following bodies were consulted: 
External 
33 Nature Scot - No Objection. Advised of standing advice on protected species
and to consider need for species licenses. 
34 Historic Environment Scotland - No objection. Advised of proximity to three
Scheduled Monuments. 
35 Transport Scotland - No objection and did not advise against approval of the
proposed development. 
36 Auchterarder and District Community Council - No objection. 
37 Network Rail - No objections, advisory notes recommended relating to the
safety of the railway. 
38 Scottish Water - No objection. Comment provided on drinking water protected
areas (DWPA) but advised that development is a sufficient distance from the
Page 111 of 212

Page 112

intake and is therefore considered to be low risk. Also advised that they will not
accept surface water connections into their combined sewers. 
39 Scottish Environment Protection Agency - No objection, subject to
submission of a Water Management Plan. Reference also made to their
regulatory requirements. 
40 Perth and Kinross Heritage Trust - No objection 
Internal 
41 Transportation and Development - No objection. Previously advised that an
upgraded site access junction and creation of run off areas were required, when
proposal involved ongoing extraction, but this is now not considered to be
necessary given changes to proposals. Conditions recommended regarding
control of traffic through site and traffic management. 
42 Environmental Health (Noise Odour) - No objection, confirmed previously that
the proposed quarry operational/working hours were acceptable and that the
submitted Noise Assessment and Vibration Report demonstrated that impacts
on nearby receptors would be minimal. The Operational Environmental
Management Plan was also considered acceptable, with appropriate mitigation
measures identified in relation to noise, dust and lighting, to be secured by
condition. EH have not been re‑consulted on the revised proposals; however,
given the nature of the changes the previous conclusions remain applicable, and
the same recommendations and conditions are considered appropriate. 
43 Community Greenspace - No objection. 
45 Biodiversity Officer - No objection. Advise the supporting Ecological Appraisal
shows no evidence of badger, bats, otter or red squirrel on site. Note that sand
martin nesting sites are protected and maintained. Also that Non-Native Species
Control Plan should be submitted. Finally that the mitigation measures listed in
the Operational Environmental Management Plan (OEMP) should be adhered to
in full with particular regard to protecting sand martin and limiting light spill into
woodland areas.  Conditions are recommended to ensure this. 
Representations 
44 No representations have been received. 
Additional Statements 
Screening Opinion Undertaken EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required
Page 112 of 212

Page 113

Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Environmental Appraisal
Submitted which includes –
Phasing Programme
• Landscape and Visual
Assessment
• Ecological Appraisal
• Noise Impact Assessment
• Geo – Environmental
Assessment
• Draft Operational
Environmental Management
Plan
• Flood Risk Assessment
• Transport Statement 
Appraisal 
45 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise. The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, as outlined above. 
Principle 
46 It is important to note that application ref. 19/01927/MWM was previously
reported to the Planning and Placemaking Committee in March 2020 with a
recommendation of approval for mineral extraction and subsequent restoration
of the site. That recommendation was agreed by the Committee, subject to
conditions and the conclusion of a legal agreement. In this context, the principle
of the development—including both extraction and the requirement for
comprehensive restoration—has already been established and endorsed.
Accordingly, it is not considered necessary to revisit the principle of the
development as part of the current assessment. Instead, the focus of this report
is on the material changes now proposed, namely the cessation of extraction
and the introduction of an accelerated restoration programme, and whether
these revisions represent an acceptable and deliverable solution for the site. 
Landscape and Visual Impact 
47 National and local policy seeks to protect and enhance landscape character and
visual amenity. In this regard, NPF4 Policies 4 (Natural Places), 6 (Forestry,
Woodland and Trees) are of particular relevance, requiring development to
Page 113 of 212

Page 114

protect, restore and enhance landscape features, strengthen nature networks
and deliver positive outcomes for biodiversity and green infrastructure. 
48 At a local level, Policies 1A and 1B of LDP2 remain relevant in assessing
whether development integrates appropriately with its surroundings and
respects landscape character and important views. 
49 The current proposals differ significantly from the previously assessed scheme
in that they no longer seek to extend mineral extraction operations. Instead, the
focus is on stopping quarrying and restoration of the site. As such, the
assessment of landscape and visual effects is primarily concerned with the
short-term restoration phase and the long-term restored landscape, rather than
prolonged operational impacts. 
50 The site lies within the Broad Valley Lowlands Landscape Character Area, as
defined in the Tayside Landscape Character Assessment (TLCA), which
identifies the historical influence of mineral extraction but emphasises the
importance of restoring a landscape structure characterised by woodland,
hedgerows, field patterns and integrated water features. 
51 The revised restoration proposals seek to regrade the site and deliver a
predominantly meadow grassland landscape with integrated woodland planting
and wetland features, reflecting the surrounding landscape character. Existing
woodland is retained and supplemented with additional native tree planting, to
reinforce landscape structure and soften the edges of the restored landform.   
52 The proposals also include the reshaping and retention of existing settlement
ponds to create a series of more naturalistic waterbodies and wetland habitats,
together with opportunities to safeguard and enhance ecological features such
as sand martin nesting areas. The removal of quarry infrastructure, including the
compound, processing buildings and haul roads, is a key component of the
restoration strategy, with these elements either removed or integrated into a
network of informal paths within the restored landscape. This is the same
detailed physical restoration which was accepted by Committee in March 2020,
albeit now accelerated. 
53 In landscape and visual terms, the site remains well contained by existing
topography and established woodland belts, particularly to the north and west.
As previously identified, views into the site are generally limited, with the primary
receptors being from elevated positions to the south, including the railway
corridor and more distant viewpoints. The revised proposals would, over time,
reduce the visual impact of the site through restoration and re-naturalisation of
the worked landform. 
54 In contrast to the previously proposed long-term extraction phases, the revised
scheme significantly reduces both the duration and extent of potential adverse
landscape effects, with restoration brought forward and delivered over a shorter
timeframe. The final restored landform remains consistent with that accepted in
2020, with the same detailed sectional drawings now proposed for approval. As
Page 114 of 212

Page 115

such, the end-state landscape is unchanged in design intent but delivered
sooner, resulting in a landscape that is considered to better align with the
underlying character of the area and the objectives of the Tayside Landscape
Character Assessment (TLCA). 
55 Overall, the revised restoration proposals are considered to represent a positive
landscape outcome, restoring the site to a more natural and integrated rural
landscape, as was originally envisioned. The proposals accord with the aims of
NPF4 in delivering nature-based solutions, enhancing green infrastructure and
improving landscape quality, and are consistent with the requirements of LDP2
Policies 1A and 1B. 
Restoration and Aftercare 
56 An updated site-wide restoration strategy has been submitted which replaces
the previously proposed long-term extraction-led programme. The revised
approach being stopping quarrying operations and an accelerated delivery of
restoration, rather than altering the ultimate restoration objective. Importantly,
the overall restoration concept, final landform and finished site levels remain
consistent with those previously accepted in 2020. 
57 The restoration proposals include the removal of quarry infrastructure, with
these areas recontoured and reintegrated into the wider landscape. Existing
waterbodies are to be reshaped to more natural profiles, and additional native
planting will reinforce landscape structure and biodiversity. The use of on-site
materials in the regrading process will create a landform which reflects the
surrounding landscape character. 
58 The revised restoration framework also recognises that part of the restored site
may be utilised for the proposed Dog Ranch development, the acceptability of
which is being considered separately under application ref. 26/00045/FLL. The
restoration proposals have therefore been designed to provide a suitable and
integrated landscape setting for this potential future use, while ensuring that the
overall restoration objectives for the quarry are achieved. 
59 A condition (Condition 14) is recommended to ensure that the restoration and
aftercare are implemented in accordance with the approved plans and revised
phasing programme, thereby securing delivery of the agreed restoration
outcome within a significantly shorter timeframe and ensuring a satisfactory
long-term position in terms of landscape character, visual amenity and
environmental quality. 
Ecology 
60 Taking account of the submitted ecological information and the revised
restoration-led nature of the proposals, the development is not expected to give
rise to any significant adverse effects on protected species or valued habitats,
subject to appropriate mitigation and best practice measures secured by
condition. The proposals will result in the restoration of the site to a more natural
Page 115 of 212

Page 116

and diverse landscape incorporating woodland, meadow and wetland habitats,
thereby delivering biodiversity enhancements in line with the objectives of NPF4
Policies 3 and 4. On this basis, the proposals are considered acceptable in
ecological terms. 
Trees 
61 Relevant policy is set out in NPF4 Policy 6 (Forestry, Woodland and Trees),
which seeks to protect existing woodland, expand tree cover and strengthen
connectivity, alongside LDP2 Policies 40A and 40B. The site is currently well
screened by established woodland belts, which are to be retained in full as part
of the revised proposals. No tree felling is required in association with the
updated restoration strategy. 
62 The revised restoration framework integrates new native tree and woodland
planting as a key component of the overall landscape strategy, with additional
planting proposed to reinforce boundaries, soften restored landforms and
enhance biodiversity. As such, the proposals not only safeguard existing tree
resources but also provide opportunities for woodland expansion and ecological
enhancement. 
63 On this basis, the proposals are considered to accord with the objectives of
NPF4 Policy 6 and LDP2 Policies 40A and 40B. 
Traffic and Transport 
64 The relevant policy framework is provided by NPF4 Policy 13 (Sustainable
Transport), which requires development to minimise the need to travel, reduce
reliance on unsustainable transport modes and ensure that proposals do not
have an unacceptable impact on the transport network or road safety. At a local
level, Policy T60B of LDP2 requires a full assessment of impacts on road safety
and accessibility. 
65 The revised proposals differ significantly from the previously assessed scheme
in that they no longer involve continued or expanded mineral extraction. Instead,
the proposals provide for the cessation of quarry operations and an accelerated
restoration of the site, resulting in the removal of HGV movements associated
with mineral export over time. 
66 As such, the previously anticipated traffic generation associated with ongoing
sand and gravel and sandstone extraction is no longer applicable. Whilst there
may be limited short-term traffic associated with restoration activities, including
the potential import of materials where necessary, these impacts are temporary
in nature and can be appropriately managed through condition. 
67 Traffic associated with the proposed “Dog Ranch” development is considered
separately under application ref. 26/00045/FLL and does not form part of the
assessment of this application. 
Page 116 of 212

Page 117

68 Overall, given the cessation of mineral operations and the temporary nature of
any restoration-related traffic, the proposals are not expected to give rise to any
significant adverse impacts on the local road network and the previously
recommended conditions regarding the upgrade of the access are not
considered to be necessary. Subject to appropriate controls, the proposal is
considered to accord with NPF4 Policy 13 and LDP2 Policy 60B. 
Impact on Water Environment 
69 The relevant policy framework is set out in NPF4 Policy 22 (Flood Risk and
Water Management) and Policy 5 (Soils), together with LDP2 Policies 53B and
53C, which require development to incorporate appropriate drainage and
safeguard the water environment. 
Surface Water 
70 The principal surface water features associated with the site are the Ruthven
Water and the Pairney Burn, both of which have been identified as having a
“High” Water Framework Directive (WFD) status. 
71 A number of existing ponds and minor watercourses are present within the site,
some of which ultimately connect to the Ruthven Water via an unnamed
tributary. As previously identified, there is potential for indirect hydrological
connectivity between the site and surrounding watercourses. 
72 The revised proposals differ significantly from the previously assessed scheme
in that they no longer include ongoing or expanded mineral extraction. Instead,
they focus on the cessation of quarrying and the accelerated restoration of the
site, including the reshaping and retention of existing ponds as naturalised water
features within the restored landscape. 
73 As a result, the risk of pollution associated with active extraction, processing and
long-term stockpiling activities is substantially reduced. The restoration
proposals are expected to improve the overall condition of the site through
regrading, stabilisation of bare ground, and the establishment of vegetation
cover, thereby reducing sediment runoff and improving water quality over time. 
74 Notwithstanding this, short-term risks associated with restoration works,
including earth movement and potential import of materials, remain. These can
be appropriately managed through a detailed Water Management Plan, secured
by condition (Condition 2), incorporating SEPA requirements and pollution
prevention measures to protect downstream watercourses. Any discharges or
abstractions will continue to require appropriate authorisation under the Water
Environment (Controlled Activities) (Scotland) Regulations (CAR). 
Groundwater 
75 The site lies within the Crieff and Path of Condie groundwater bodies, both of
which hold a High WFD classification. Under the revised proposals, there is no
Page 117 of 212

Page 118

longer any requirement for deep quarrying or potential dewatering associated
with sandstone extraction, thereby reducing the potential for groundwater
interaction or disturbance. 
76 The restoration-led approach is therefore considered to present a reduced risk
to groundwater, with the stabilisation of ground conditions and re-establishment
of vegetation expected to provide long-term environmental benefits. 
Drinking Water Supply 
77 Scottish Water has advised that the site lies within a drinking water catchment
area but given the scale of the catchment and distance from abstraction points,
the risk is considered low. This position remains unchanged under the revised
proposals. 
Water Environment Conclusion 
78 Overall, the cessation of mineral extraction and the implementation of an
accelerated restoration strategy significantly reduces the potential for adverse
impacts on the water environment. Subject to appropriate safeguards during the
restoration phase, the proposals are not expected to adversely affect surface
water or groundwater quality and will support long-term environmental
improvement. 
79 On this basis, the proposals are considered to accord with the objectives of
NPF4 Policy 22 and LDP2 Policies 53B and 53C. 
Flooding 
80 The relevant policy framework is set out in NPF4 Policy 22 (Flood Risk and
Water Management), which seeks to avoid development in areas at risk of
flooding and to ensure that proposals do not increase flood risk elsewhere,
alongside LDP2 Policy 52. 
81 SEPA flood mapping identifies an area of surface water flooding to the south of
the railway line, outwith the site, and limited areas of surface water risk within
associated with existing ponds and low-lying quarry workings. A Flood Risk
Assessment previously submitted concluded that there would be no increase in
flood risk as a result of the quarrying development then proposed. 
82 As discussed the revised proposals differ, including the reprofiling of land levels
and the retention and enhancement of ponds and wetland features. These
measures are expected to improve drainage characteristics, reduce exposed
and disturbed ground, and promote more natural water management across the
site. 
83 No new built development is proposed as part of the restoration strategy, and
the proposals are not considered to introduce any additional flood risk on or off
Page 118 of 212

Page 119

site. Instead, the restoration works are likely to provide a neutral or beneficial
effect in terms of surface water management. 
84 Subject to the implementation of appropriate surface water management
measures secured by condition (Condition 2), the proposals are considered to
comply with the requirements of NPF4 Policy 22 and LDP2 Policy 52. 
Residential Amenity 
85 The relevant policy framework is set out in NPF4 Policy 23 (Health and Safety),
which seeks to ensure that new development does not give rise to unacceptable
impacts on residential amenity, including noise, dust, vibration and light
pollution, alongside LDP2 Policies 55 and 56. 
Noise 
86 Given the revised proposals, the long-term sources of operational noise
associated with mineral working will be removed. 
87 Noise impacts will therefore be limited to the short-term restoration phase,
including plant and machinery associated with earthworks. These impacts are
temporary in nature and can be appropriately controlled through conditions,
including restrictions on hours of operation and adherence to an updated
Operational Environmental Management Plan (OEMP) (Condition 4). 
88 Environmental Health has previously confirmed that noise levels associated with
the existing site are acceptable, and no complaints have been recorded. Given
the reduced scale and duration of activity under the revised proposals, no
significant adverse noise impacts are anticipated. 
Vibration 
89 With the removal of ongoing extraction activities, including any requirement for
intensive operations, the potential for vibration impacts is further reduced. Any
minor vibration associated with restoration works is temporary and not expected
to affect nearby sensitive receptors. 
Air Quality and Dust 
90 The cessation of mineral extraction will significantly reduce the potential for dust
generation compared to the previously assessed scheme. While some dust may
arise during restoration works, these impacts are short-term and can be
effectively mitigated through standard best practice measures secured within the
OEMP (Condition 4). 
Lighting 
91 No permanent operational lighting is proposed as part of the restoration
strategy. Any temporary lighting associated with restoration works will be limited
Page 119 of 212

Page 120

in duration and controlled to minimise light spill. Given the existing screening
and rural context, no significant impacts on residential amenity are anticipated
(Conditions 4 and 16). 
Residential Amenity Conclusion 
92 Overall, the revised proposals are expected to result in an improved amenity
outcome over the longer term, through the removal of quarrying activity and
restoration of the site to a more natural landscape. Subject to appropriate
conditions (Conditions 4, 7, 8, 9, 10, 12, 13, 15 and 16) controlling the
restoration phase, the proposals are considered to comply with the requirements
of NPF4 Policy 23 and LDP2 Policies 55 and 56, and are acceptable in terms of
residential amenity. 
Socio-Economic Benefits 
93 The relevant policy context is provided by NPF4 Policy 26 (Business and
Industry), which supports sustainable economic activity and diversification,
particularly in rural areas. 
94 The revised proposals represent a significant shift from the previously assessed
scheme, moving away from mineral extraction to restoration of the site. As such,
while the existing quarry has historically provided local economic benefits
through employment and the supply of materials to the construction industry,
these benefits will reduce over time as operations cease. 
95 Notwithstanding this, the accelerated restoration of the site provides an
opportunity to secure a long-term beneficial future use, improving environmental
quality and enabling alternative forms of rural economic activity. In this regard,
the restoration proposals support a transition from extractive industry to a more
sustainable land use, with potential economic benefits linked to environmental
enhancement and the proposed Dog Ranch development considered separately
under application ref. 26/00045/FLL. 
96 On balance, the proposals are considered to accord with the broad objectives of
NPF4 in supporting sustainable rural economic transition and diversification, and
are acceptable in socio-economic terms. 
Quarry Cessation 
97 The principle of mineral extraction and its cessation must be considered against
the relevant provisions of LDP2, in particular Policies 49A and 49B, and NPF4
Policy 33: Minerals which together seek to ensure that mineral workings are
properly restored in a timely and effective manner to an appropriate after-use.
While the revised proposals involve the cessation of quarrying activity, which
would result in the loss of an established mineral operation, they importantly
provide a deliverable and secured restoration solution for the site. This is a
significant material consideration given that an acceptable restoration scheme
has not been achievable for a number of years. In this context, the proposals
Page 120 of 212

Page 121

positively align with the objectives of both LDP2 and NPF4 in securing the
restoration and aftercare of mineral sites and are therefore considered to
represent an appropriate and beneficial outcome for the long-term management
of Craigrossie Quarry. 
Section 75 Legal Agreement and Financial Bond 
98 The proposal requires to be considered in the context of Policies 49A and 49B of
LDP2, Policy 33 of NPF4, and the Council’s Supplementary Guidance on
Financial Guarantees for Minerals, all of which seek to ensure the satisfactory
restoration of mineral sites through appropriate financial safeguards. Members
will recall that the previous “minded to grant” position for this application was
expressly subject to the conclusion of a Section 75 Agreement and the provision
of a financial restoration bond. However, owing to the limited scale of the
quarrying activity ongoing at any one time and the constrained financial position
of the applicant, it has proven difficult to secure such a bond, resulting in the
application remaining undetermined for over six years. While the Supplementary
Guidance anticipates that a bond and legal agreement will normally be required
to guarantee restoration, the prolonged period since the earlier resolution has
demonstrated that securing these mechanisms in this instance is unlikely to be
achieved. This reflects the nature of the site as a relatively small-scale, low-
output quarry with limited profitability, where the cost of obtaining a bond is
disproportionate and has prevented meaningful progress. In these particular
circumstances, there is a genuine risk that adherence to the standard policy
approach would continue to delay or frustrate restoration rather than secure it. 
Accordingly, having regard to the specific circumstances outlined above,
including the protracted but unsuccessful efforts to secure a bond and legal
agreement, it is considered appropriate in this instance to depart from the
requirements of Policy 49B and the associated Supplementary Guidance. On an
exceptional and justified basis, it is considered both reasonable and pragmatic
to advance the application without the provision of a financial guarantee, with
restoration instead secured through appropriately worded planning conditions.
This approach is considered to represent the most proportionate and effective
means of ensuring that restoration is ultimately delivered in the context of this
site. 
Conditions 
99 The conditions recommended broadly reflect those originally set out at the time
of the Committee’s resolution in March 2020; however, they have been updated
to reflect the material change in circumstances now proposed, namely the
cessation of mineral extraction and the delivery of an accelerated restoration of
the site. A condition is also recommended (condition 18) requiring the
submission of a detailed programme for the cessation of quarry operations, to
ensure that there is a clearly agreed timescale and structured approach to the
permanent cessation of mineral extraction. This will provide certainty that
extraction activity is brought to an end within an appropriate and controlled
timeframe, ensuring that the primary purpose of granting planning permission is
to secure the timely restoration of the site. In particular, conditions have been
Page 121 of 212

Page 122

refocused to regulate restoration activity and associated environmental effects,
rather than ongoing quarry operations. While a number of conditions were
previously recommended in relation to upgrading the site access to
accommodate anticipated levels of quarry-related traffic, it is no longer
considered proportionate to impose these requirements given that mineral
extraction will cease and associated heavy goods vehicle movements will be
significantly reduced, particularly in the longer term. 
Planning Obligations and Legal Agreements 
100 None required. 
Direction By Scottish Ministers 
101 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion And Reasons For Recommendation 
102 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding
the Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Within 6 months of the date of this decision, a detailed Water Management Plan
shall be submitted to and approved in writing by the Planning Authority in
consultation with SEPA. The Plan shall include full details of surface water
management during restoration works, including earthworks and any stockpiling
of soils, and shall include details of silt management devices, cut-off drains,
Page 122 of 212

Page 123

drainage arrangements and any abstractions.  The approved details shall be
implemented in full during the restoration of the site. 
Reason: To ensure adequate management of water on site. 
3. Within 6 months of the date of this decision notice, an Invasive Non-Native
Species Control Plan shall be submitted to and approved in writing by the
Planning Authority. The approved measures shall be implemented in full during
restoration works. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the commencement of restoration works, an updated Operational
Environmental Management Plan (OEMP) shall be submitted to and
subsequently approved in writing by the Planning Authority. The OEMP shall
include mitigation measures to control noise, dust, vibration, and lighting
associated with restoration activities and shall be implemented in full throughout
the restoration period.  The finalised OEMP can be based upon the draft OEMP
(Appendix G of the Environmental Appraisal) submitted with the application. The
OEMP is a live document which shall be updated to reflect changing site
conditions as restoration works progress on site.  The OEMP, as approved,
shall be strictly adhered until the site is fully restored in accordance with the
approved restoration plans. 
Reason: In the interests of neighbouring recreational and residential amenity; to
ensure a satisfactory standard of local environmental quality is maintained. 
5. The conclusions and recommended action points within the supporting
biodiversity survey (19/01927/28) submitted and hereby approved shall be fully
adhered to, respected and undertaken as part of the restoration works. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981).
6. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the restoration works. The
measures may include creation of sloping escape ramps for animals, which may
be achieved by edge profiling of trenches/excavations or by using planks placed
into them at the end of each working day and open pipework greater than
150mm outside diameter being blanked off at the end of each working day. 
Reason: In order to prevent animals from being trapped within any open
excavations. 
7. Noise from any plant and machinery associated with the development shall be
controlled such that it does not exceed 55dBLAeq, 1 hour (free field) at 3.5m
from the façade of noise sensitive properties (except during temporary
operations as referred to in condition 8. 
Page 123 of 212

Page 124

Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
8. To allow for temporary operations such as soil stripping, removing soil heaps,
creating earth bunds, crushing operations and restoration, noise levels
measured at 3.5m from the façade of any noise sensitive dwelling shall not
exceed 70dB LAeq, 1 hour (free field) for more than 8 weeks in any one year.  
Perth and Kinross Council, Environmental Health and all neighbouring noise
sensitive dwellings should be advised in advance of the activities detailing the
timings, actual activities to be undertaken and any additional noise mitigation
measures. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
9. The hours of operation shall be limited to Monday to Friday 08:00 to 18:00 hours
and 08:00 to 13:00 Saturdays. No workings permitted on Sundays. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
10. All vehicles, plant and machinery shall operate only during the permitted hours
of operation and shall always be silenced in accordance with the manufacturer's
recommendations and so operated as to minimise noisy emissions.  The
Council as Planning Authority reserves the right to insist on any reasonable
additional measures to further minimise noise emissions, should it prove
expedient to do so. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
11. The existing dry wheel bath on site shall be retained for the duration of the
restoration and until all restoration works have been completed in accordance
with the approved plans and shall be utilised at all times.  The dry wheel bath
shall be supplemented by a road brush as required. 
Reason: To ensure the public road is kept clear of debris from the site. 
12. Audible vehicle reversing alarms shall be operated on the method that they only
emit the warning if necessary, e.g. on an infrared signal which detects persons
to the rear of the vehicle. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
13. No blasting shall take place on the site at any time. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality.
Page 124 of 212

Page 125

14. The restoration and aftercare of the site shall be carried out in accordance with
the approved restoration plans and phasing programme. 
Reason: In order to ensure the development proceeds in accordance with the
approved plans and documents and to serve the rights of the Council as
Planning Authority. 
15. If, in the opinion of the Planning Authority, the development gives rise to justified
complaints relating to noise, dust or other environmental effects, the applicant
shall, at their own expense, undertake monitoring by suitably qualified and
experienced consultants. The scope and methodology of such monitoring shall
be agreed in advance with the Planning Authority. The results of the monitoring
shall be submitted to the Planning Authority, and any mitigation or remedial
measures identified shall thereafter be implemented in full, unless otherwise
agreed in writing by the Planning Authority. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
16. All external lighting shall be sufficiently screened and aligned to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
17. Should any external materials be required for site restoration a detailed Traffic
Management Plan (TMP) shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads Authority prior to
commencement of that phase of restoration.  The TMP shall detail the number
of HGV movements required for bringing additional materials into the site to
complete the restoration phase. The Traffic Management Plan (TMP) shall
include the following: 
(a)  restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
Page 125 of 212

Page 126

(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction traffic;
(j) arrangements to ensure that access for emergency service vehicles are not
impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's expense at
locations to be agreed prior to the commencement of construction;
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.   
The TMP as approved shall be strictly adhered to during the entire site
construction programme. 
Reason: To ensure adequate controls are put in place should there be a
significant uplift in HGV movements to the site as a result of the restoration
process. 
18. Within 3 months of the date of this decision, a detailed programme for the
permanent cessation of quarry operations, including clear timescales and
phasing, shall be submitted to and approved in writing by the Planning Authority.
Thereafter, the permanent cessation of quarry operations shall be carried out
strictly in accordance with the approved cessation document. 
Reason: To ensure that mineral extraction is brought to an end in the interests of
environmental protection and to facilitate the appropriate restoration of the site in
accordance with Policies 49A and 49B of LDP2, Policy 33 of NPF4, and the
Council’s Supplementary Guidance on Financial Guarantees for Minerals. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
None 
Informatives 
1. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Page 126 of 212

Page 127

Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position.  Please use the form attached herewith. 
2. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 38 of the Development Management Procedure
(Scotland) Regulations 2008.The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 38 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily available to the public
• Printed on durable material. 
3. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
4. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents
(VA1) and application forms are available at www.pkc.gov.uk/vehicleaccess. 
Advice on the disposal of surface water should be sought at the initial stages of
design from Scottish Water and the Scottish Environmental Protection Agency. 
5. The applicant should be aware of the advice contained within SEPA's
consultation response dated 28 January relating to pollution prevention control
and the potential requirement for CAR Authorisation and should make contact
with SEPA's regulatory team to discuss these matters. 
6. The application should be aware of the guidance contained within Scottish
Water's consultation response dated 16th December 2019 relating to Drinking
Water Protected Areas. 
7. Cranes and jibbed machines, used in connection with the works, must be so
positioned that the jib or any suspended load does not swing over railway
infrastructure or within 3 metres of the nearest rail if the boundary is closer than
3 metres. 
8. All cranes, machinery and constructional plant must be so positioned and used
to prevent the accidental entry onto railway property of such plant, or loads
attached thereto, in the event of failure. 
Page 127 of 212

Page 128

9. Only inert spoil shall be used as the backfill material.  In the event that
biodegradable waste is imported to the site, Network Rail will hold the operator
responsible for the escape of hazardous landfill gas or leachate which may
affect railway operations or the safety of the public. 
10. The applicant is reminded that there remains a duty to comply with other
regulatory requirements, including the Water Environment (Controlled Activities)
(Scotland) Regulations 2011 (as amended), the Waste Management Licensing
(Scotland) Regulations 2011 and the Pollution Prevention and Control
(Scotland) Regulations 2012. These regimes operate separately from planning
control and may require separate consents or authorisations in relation to
restoration works and any associated site activities. The applicant is advised to
liaise with SEPA as appropriate to ensure all relevant regulatory requirements
are met. 
Background Papers
Letters of representation 0 
Authors
Name Designation Contact Details
John Williamson Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager 23 June 2026 
Page 128 of 212

Page 129

¯
Mineral extraction and processing including alterations to vehicular access, erection of ancillary
buildings, landscaping, reinstatement and associated works (Phase 3) (in part retrospect)
19/01927/MWM
Scale
1:10,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(iv)
Page 129 of 212

Page 130

Page 130 of 212

Page 131

¯
Mineral extraction and processing including alterations to vehicular access, erection of ancillary
buildings, landscaping, reinstatement and associated works (Phase 3) (in part retrospect)
19/01927/MWM
Scale
1:5,000
Planning and Placemaking
Committee - 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(1)(iv)
Page 131 of 212

Page 132

Page 132 of 212

Page 133

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/207) 
Proposal: Change of use of quarry to gun dog training centre, erection of kennels,
veterinary practice, reception building, indoor arena, maintenance
buildings, staff and student accommodation, installation of PV and ASHP
and associated works 
Location: Land south west of Arns Farm, Auchterarder 
Ref. No: 26/00045/FLL
Ward No: P7 - Strathallan 
Summary 
This report recommends approval of the application, subject to the conclusion of a legal
agreement to secure the proposed residential elements as “employment-linked
affordable housing”. The proposal is considered to accord with the Development Plan,
comprising National Planning Framework 4 (NPF4) and the Perth and Kinross Local
Development Plan 2 (LDP2), in that it supports rural business diversification and
economic growth (NPF4 Policy 29; LDP2 Policy 8), makes effective use of a previously
developed quarry site alongside an accelerated restoration strategy (NPF4 Policy 9),
and provides a form of development that is appropriately located to meet its functional
needs. The scale, siting and design of the development is considered acceptable and
capable of integration within the landscape, while environmental impacts relating to
noise, transport, drainage, ecology and light pollution can be satisfactorily mitigated
through conditions. The inclusion of on-site accommodation is justified by operational
requirements and secured as employment-linked affordable housing, aligning with
LDP2 Policies 19 and 20 and NPF4 Policy 17. Subject to these controls and the
associated legal agreement, no material considerations have been identified that would
outweigh the Development Plan, and the proposal is therefore recommended for
approval. 
Background and Description of Proposal 
1 The proposal is to make use of parts of Craigrossie Quarry by the applicant
‘Mordor Gundogs’ as the “Dog Ranch”. Craigrossie Quarry being southwest of
Hall Farm, between Auchterarder and Aberuthven. The proposed use and
associated development works can be described as a mixed-use development
comprising kennels, training and operational facilities, a veterinary practice, staff
5(2)(i)
Page 133 of 212

Page 134

and student accommodation, and associated infrastructure, alongside the
accelerated restoration of the quarry – the operation of which would cease to
facilitate the use as the Dog Ranch. 
2 The application site extends to approximately 1.9 hectares (ha) and sits within
the wider Craigrossie Quarry (c.21.7ha). The quarry is located between the
settlements of Aberuthven and Auchterarder, with the A9 forming the north-west
boundary of the site and the Stirling–Perth railway line forming the southern
boundary. Access is to the east off the B8062. The quarry has an extensive
planning history associated with sand and gravel extraction and restoration, most
recently under application reference 19/01927/MWM, which is reported
elsewhere on the Agenda of this Committee. 
3 The current application is closely linked to the long‑running planning situation at
Craigrossie Quarry and the associated undetermined mineral extraction and
restoration application associated with the wider quarry site. That application was
submitted in 2019 and sought to secure continued mineral extraction alongside a
structured and detailed restoration scheme post quarrying. The application was
reported to the Planning and Placemaking Committee in March 2020 with a
recommendation of approval, subject to conditions and the preparation and
agreement of a financial restoration bond intended to protect the Council’s
position in relation to the delivery of the approved restoration works. The
Committee agreed that recommendation. 
4 Despite sustained efforts by officers, it has proven very difficult to secure this
legal agreement with the applicant/operator of the quarry. As a result, and
notwithstanding the resolution of the committee, application 19/01927/MWM
remains undetermined. 
5 The current Dog Ranch proposals are associated to a new party, Mor Dor
Gundogs, who has a contract in place to purchase the entire Craigrossie Quarry
from the current owner, subject to receipt of planning permission. In parallel with
this application, a revised set of quarry restoration proposals are being
considered under application reference 19/01927/MWM. These revised plans
demonstrate an accelerated programme for the cessation of quarry operations
and the restoration of the site, designed to facilitate the delivery of the proposed
Dog Ranch. 
6 The updated proposals set out revised restoration proposals for application
19/01927/MWM considered elsewhere on this Committee’s Agenda. The
accelerated restoration effectively addressing the long‑standing objective of the
Council to secure the comprehensive restoration of the quarry, returning the land
to a more natural state following mineral extraction, while enabling the
redevelopment of part of the quarry as the Dog Ranch. 
7 A detailed assessment of the quarry restoration proposals is set out in that
separate report relating to application 19/01927/MWM. This report concentrating
on the planning considerations associated with the proposed Dog Ranch use. 
Page 134 of 212

Page 135

8 The proposed development would be located within the core operational area of
the quarry. The ‘red line’ boundary of the Dog Ranch encapsulating a
substantially smaller area (1.9ha) than the wider quarry (21.7ha). It is located on
an area of existing hardstanding, currently occupied by buildings, parking, and
machinery storage, and therefore does not, in itself, require extensive restoration. 
The remainder of the quarry is intended to be restored to a mix of farmland,
grassland, lochans and woodland in accordance with the proposed restoration
framework. The submitted application proposes that quarrying activities would
cease and that restoration of the quarry would be accelerated, with completion by
2027. 
9 The applicant, Mordor Gundogs, is an established rural business founded in
2003 and currently operates from Craighead Farm near Perth. The business
specialises in the breeding, training and support of gundogs and operates both
nationally and internationally. Supporting information sets out that the proposed
development is intended to consolidate and expand the existing business
activities, including training, education, kennelling, veterinary services and on-site
accommodation for staff and students. 
10 The application is supported by a Planning Statement, a Design and Access
Statement, and a range of technical and environmental assessments, including
transport, ecology and noise. The proposal has been subject to pre-application
consultation under reference 25/00090/PREAPL, and the application has been
submitted as a local development in accordance with the Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009. An
Environmental Impact Assessment screening process has been undertaken in
accordance with the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017 which concluded that the proposal
was not EIA Development. 
Description of Development 
11 The proposed layout comprises a series of distinct building groups within what
would be the former quarry and arranged to reflect both operational requirements
and a rural spatial pattern. Access is taken from the existing junction onto the
B8062, leading into a tree-lined avenue to a cluster of buildings accommodating
staff housing and student accommodation overlooking the access and acting as
a gateway to the wider development. 
12 Beyond this, to the northeast, the core operational area includes the reception
building, indoor training arena and veterinary practice. These are supported by a
range of kennel buildings, including ‘luxury’, ‘boarding’ and ‘gundog’ kennels, as
well as a dog park area, all grouped together to reflect their functional
relationship. A further ancillary general-purpose building is located to the
northwest, to be used for maintenance and storage purposes. 
13 The layout also incorporates a cottage and puppy kennels positioned slightly
separate from the main kennel complex, to provide an appropriate level of
supervision and operational segregation. Circulation within the site is achieved
Page 135 of 212

Page 136

through an internal access route linking all building groups, with areas of parking
and servicing located close to the main operational buildings. 
14 The majority of the wider quarry site is given over to landscape restoration,
including the creation of new woodland, open ground and water features
associated with the quarry restoration works. Existing woodland belts are
retained and supplemented with new planting to provide enclosure and
integration of the development into the surrounding landscape. The restoration
proposals are assessed separately under application 19/01927/MWM. 
15 The acceptability of the gun dog facility proposed under this application must be
considered separately and independently from the associated restoration
application, and does not predetermine its outcome, nor vice versa. 
16 Nevertheless, the two proposals are interrelated and, when viewed together,
present an opportunity to resolve the long-standing planning position at
Craigrossie Quarry by pairing a viable end use with a deliverable strategy for the
restoration of the wider site. 
Site History 
17 08/00423/FUL Full Planning Permission was approved on 21 July 2009 for Re-
alignment of farm access road and second phase of sand and gravel extraction. 
18 08/00428/MW A Mineral Works application was approved on 21 July 2009 for
Re-alignment of farm access road and second phase of small scale sand and
gravel extraction. 
19 18/00009/PAN On 14 August 2018 a Proposal of Application Notice was
submitted for Phase 3 small scale minerals extraction and processing activities
(in part retrospect), including reinstatement, restoration, landscaping, processing
building and ancillary accommodation, access and associated works – the
intended approach to consultation was accepted. 
20 18/01423/SCRN On 14 August 2018 Perth and Kinross Council issued a
Screening Opinion advising that proposals for a Phase 3 of minerals extraction.
and processing activities did not constitute EIA development. 
21 19/01927/MWM A Major Application for Mineral Works was submitted in 2019 for
Mineral extraction and processing including alterations to vehicular access,
erection of ancillary buildings, landscaping, reinstatement and associated works
(Phase 3) (in part retrospect) – Pending Consideration 
Environmental Impact Assessment 
22 An Environmental Impact Assessment (EIA) screening exercise has been
undertaken in accordance with the Town and Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017. This established that, whilst
the proposal falls within the scope of Schedule 2 development by virtue of its
Page 136 of 212

Page 137

scale and nature, it is not considered to be EIA development having regard to the
selection criteria set out in Schedule 3 of the Regulations. The assessment
concluded that the proposed development would not be likely to give rise to
significant environmental effects. On that basis, it has been determined that the
submission of an Environmental Impact Assessment Report was not required. 
Pre-Application Consultation 
23 Pre application Reference: 25/00090/PREAPL  
Major Application 
24 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
25 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
26 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
27 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 2: Climate Mitigation and Adaption
• Policy 4: Natural Places
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 17: Rural Homes
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 29: Rural Development
• Policy 33: Minerals 
Page 137 of 212

Page 138

Perth and Kinross Local Development Plan 2019 
28 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
29 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 19: Housing in the Countryside
• Policy 20: Affordable Housing
• Policy 32: Embedding Low and Zero Carbon Technology
• Policy 39: Landscape
• Policy 48A: Minerals and Other Extractive Activities - Safeguarding:
Sterilisation of Mineral Deposits
• Policy 49A: Minerals and Other Activities - Supply: Extraction
• Policy 49B: Minerals and Other Activities - Supply: Restoration
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
30
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Financial Guarantees for Minerals Development
(adopted in 2021)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Page 138 of 212

Page 139

Other Material Considerations 
PKC Non Statutory Guidance
31
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
32 The Scottish Government expresses its planning policies through various
documents including the National Roads Development Guide and a series of
Circulars in addition to NPF4. Those relevant are listed below. 
Creating Places 2013 
33 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
34 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Others 
35 Tayside Landscape Character Assessment (TLCA) 
CONSULTATIONS 
36 As part of the planning application process the following bodies were consulted: 
External 
37 Scottish Water – No objection 
38 Transport Scotland – No objection and did not advise against approval of the
proposed development. 
Internal 
39 Environmental Health (Noise/Odour) – No objection, subject to conditions
controlling noise levels, operational activities and mitigation measures.  This
following additional information being submitted in relation to the initial Noise
Impact Assessment. This incorporated background monitoring and a more robust
Page 139 of 212

Page 140

methodology to demonstrate that noise impacts would be low and not result in
unacceptable effects on nearby residential amenity. 
40 Development Contributions Officer – No objection. This followed clarification
over education contributions due to identified capacity constraints at
Auchterarder Primary However, as the proposed residential units were (on
clarification) accepted as ‘employment‑linked affordable housing’ (to be
controlled through a legal agreement), no education contribution is considered
required. Similarly, no contribution towards A9 Junction improvements is sought,
as the development is not expected to increase traffic and would reduce travel
demand from the existing use and through on‑site employment and
accommodation provision. 
41 Flooding – No objection. Advise that the proposed private foul and surface water
drainage strategy, incorporating on‑site treatment and SuDS, is acceptable. No
adverse environmental or flood risk impacts are identified. Subject to detailed
design and regulatory approval, the proposal is considered to comply with
relevant drainage and flooding policies. 
42 Transportation and Development - No objection, subject to conditions. Advise
the proposal would not adversely affect road safety or the network and benefits
from reduced travel demand through on‑site accommodation and appropriate
infrastructure provision. 
43 Environmental Health (Private Water) – No objection. Advise the use of a
private water supply via a borehole is acceptable, subject to registration and
monitoring. Conditions are recommended to ensure this supply is appropriately
managed and meets regulatory standards. 
44 Environmental Health (Contaminated Land) – No objection subject to a
condition associated to a site investigation to assess ground conditions and
ensure the land is suitable for the proposed use, given the quarry use. 
Representations 
45 One representation has been received which, whilst not objecting to the proposal
raises the following issues.   
• Impact on residential amenity/noise control
• Extent of dog training beyond red line planning boundary 
46 These issues are addressed in the Appraisal section of the report. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required
Page 140 of 212

Page 141

Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Flood Risk Assessment
Drainage Impact Assessment
Noise Impact Assessment 
Appraisal 
47 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance as outlined above. 
Principle of Gun Dog Training Facility 
48 The proposal for a gun dog training facility, or ‘Dog Ranch’, at Craigrossie Quarry
falls to be assessed against Policy 8: Rural Business of the Perth and Kinross
Local Development Plan 2019 (LDP2) and Policy 29: Rural Development of
National Planning Framework 4 (NPF4). 
49 Policy 29 of NPF4 supports development proposals in rural areas that contribute
to the viability, sustainability and diversity of rural communities and the rural
economy, including the expansion and diversification of existing businesses,
where these are appropriately located, scaled and designed. In a similar vein,
Policy 8 of the LDP2 provides support in principle for new and expanding rural
businesses where proposals demonstrate an appropriate relationship to their
rural setting, do not give rise to unacceptable environmental or amenity impacts,
and can be accommodated in terms of access and infrastructure. 
50 The operational nature of the proposal is such that a countryside or location
away from property where amenity may be adversely affected is appropriate and
in effect fundamental to its function. Activities associated with gun dog training,
kennelling, veterinary services and demonstration events are inherently
land‑based and rely upon access to extensive outdoor areas, separation from
sensitive residential environments, and a rural context that would not be
achievable within a settlement. In this respect, the proposal aligns well with the
type of development envisaged by both Policy 8 and Policy 29, which recognise
the need for rural businesses to operate in locations dictated by their functional
requirements. 
Page 141 of 212

Page 142

51 The specific location of the site is also considered to be favourable in principle.
While rural in character, the site benefits from relative proximity to
Auchterarder/Aberuthven and direct access to the wider trunk road network. This
relationship provides an appropriate balance between seclusion and
accessibility, allowing the operation to cater both for local customers and for a
wider catchment drawing from across the Council area and beyond. This reflects
the applicant’s stated business model and reduces pressure for more remote
countryside locations to accommodate similar uses. In policy terms, the site can
therefore be regarded as suitably located in relation to both the operational
needs of the business and the accessibility considerations set out in Policy 8. 
52 The planning history of Craigrossie Quarry and the long‑running objective of
securing its effective restoration form an important part of the wider context for
this application. The proposed gun dog training facility is closely linked to the
accelerated restoration strategy submitted under application 19/01927/MWM,
which would bring an end to mineral extraction and return the majority of the site
to a more natural landscape, which the Planning Authority has been seeking to
achieve for some time. This carries considerable weight in demonstrating a
long‑term future for the site that moves away from extractive industry towards a
more sustainable land use. 
53 While the accelerated restoration proposals are a significant material
consideration and clearly strengthen the overall planning position of the site, they
are not, in themselves, sufficient to justify the development. The gun dog training
facility must still be acceptable in terms of the requirements of Policy 8 and Policy
29, including matters of scale, environmental impact, landscape fit, traffic
generation and compatibility with surrounding land uses. Those matters are
addressed below. 
54 On balance, it is considered that the principle of a rural business use of this
nature, in this location, is consistent with the strategic direction of national and
local planning policy. The proposal represents a form of rural economic activity
that is appropriately sited, makes functional use of a previously disturbed site,
and benefits from a location that combines rural characteristics with reasonable
accessibility. Subject to detailed consideration of specific impacts, the proposal
can therefore be regarded as acceptable in principle under Policy 8 of the Local
Development Plan and Policy 29 of National Planning Framework 4. 
55 The proposed residential accommodation associated with the operation raises
separate policy considerations and will be assessed independently under the
Housing in the Countryside policy framework below. Its acceptability does not
automatically flow from the acceptability of the rural business use. 
Principle of On‑Site Accommodation/Housing 
56 The application includes provision for five residential units, indicated as being
associated with the proposed wider gun dog training and other facilities. As
detailed in the supporting information, this comprises: two 2‑bed cottages, two
3‑bed cottages, and a 1‑bed flat located within the puppy kennel building. All are
Page 142 of 212

Page 143

to be for staff use only and explicitly linked to the operation of the business. 
57 The acceptability of the proposed accommodation must be assessed primarily
against Policy 19: Housing in the Countryside of LDP2 and the associated
Housing in the Countryside Supplementary Guidance (SG).  Section 3.3 of the
SG provides for housing associated with a proposed or expanded economic
activity where it can be demonstrated that such accommodation is necessary for
the operation, management or sustainability of the business, reflecting a broader
policy objective of supporting rural employment, growth and diversification. This
approach is broadly consistent with the national policy framework set out in
NPF4, in particular Policy 17: Rural Homes, which supports housing in rural
areas where it is demonstrably linked to and required for the operation of a rural
business or economic activity, thereby reinforcing the principle of supporting
sustainable rural development. 
58 In this case, the proposed accommodation is directly related to the operational
requirements of the gun dog training facility. The applicant has identified a clear
functional need for an on‑site staff presence to support site security, animal
welfare, veterinary oversight and the supervision of puppies, including overnight
monitoring. Given the nature of the use, the welfare requirements of animals, and
the scale of the operation proposed, it is considered reasonable that staff
accommodation should be provided on site rather than relying on off‑site housing
in nearby settlements. Furthermore, the facility is intended to accommodate staff
and trainees attending for relatively short, intensive periods of training. This
reinforces the need for on‑site accommodation, as it reduces the need for regular
travel to and from the site and ensures that personnel can be readily available as
required, thereby supporting both the efficient operation of the facility and the
welfare of the animals. 
59 The rural location of Craigrossie Quarry further reinforces this position. The site
is located a reasonable distance from Auchterarder/Aberuthven and is not well
served by public transport, particularly outside normal daytime hours. In this
context, reliance on off‑site accommodation would raise practical concerns in
terms of response times, staff availability, night‑time supervision and overall site
security, while also increasing unsustainable travel patterns. The provision of
accommodation on site therefore supports the efficient and responsible operation
of the business. 
60 The scale of accommodation proposed—five units in total—is considered
proportionate to the size and functional needs of the operation as described. The
inclusion of a dedicated flat within the puppy kennel building specifically to
enable overnight supervision further demonstrates that the accommodation is
operationally driven rather than speculative or residential in nature. Importantly,
the units are intended solely for occupation by staff employed at the Dog Ranch,
with their use tied to the business through tenure and title arrangements which
can be secured via a Section 75 legal agreement. 
61 On this basis, it is considered that the proposed on‑site accommodation satisfies
the intent and requirements of Policy 19 of LDP2 and 17 of NFP4, insofar as it
Page 143 of 212

Page 144

constitutes housing associated with a rural economic activity and supports the
growth, diversification and sustainable management of that enterprise. The
provision of on‑site housing of the scale proposed is therefore considered
acceptable in principle. 
62 An assessment of the design, form, siting and landscape impact of the proposed
accommodation and other development is assessed below. 
Use of Wider Quarry Site 
63 The application relates specifically to the defined red line boundary of
approximately 1.9 hectares, which contains the proposed built development,
associated access, parking areas and the enclosed outdoor dog park.  The
wider Craigrossie Quarry site, although intended to see ownership transferred to
the applicant, if planning permission is granted, lies out with this defined area.
Notwithstanding this, the supporting Planning Statement confirms that the
restored quarry landscape—comprising grassland, lochans and woodland—will
be utilised on a limited and ancillary basis for dog exercise and training activities.
This use is described as low intensity and incidental to the primary operation,
with no material change of use proposed for these areas, which will continue to
function as restored agricultural and natural land managed through grazing and
habitat creation. 
64 The Council will retain the right to a future review of the extent and nature of
activities taking place within the wider quarry area, should planning permission
be granted, in order to ensure that the use remains ancillary to any approved
development. Should the level or intensity of use extend beyond that described,
or constitute a material change of use of the wider site/quarry, it may be
necessary for the applicant to submit a further planning application to consider
that more intensive use. 
Design and Layout 
65 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and 1B of LDP2, which relate to placemaking,
alongside Policy 14 of NPF4 which seeks to deliver well-designed development.
Further guidance is also provided within the associated Placemaking
Supplementary Guidance. 
66 The layout is arranged as a series of clearly defined building groups, reflecting
both functional requirements and a rural settlement pattern. Staff and student
accommodation is positioned at the site entrance to provide an active frontage
and natural surveillance, while the main operational buildings, including
reception, training facilities, veterinary practice and kennels, are clustered further
to the north-east within an existing hardstanding area of the quarry to form the
core of the development and allow for efficient day-to-day operation. Ancillary
and service buildings are located in close proximity to support these uses. These
arrangements reflect the established position of the site access. The wider quarry
site is predominantly given over to landscape restoration, including new
Page 144 of 212

Page 145

woodland planting and open areas, with existing vegetation retained and
reinforced to provide enclosure and assist integration into the surrounding
countryside. 
67 However, it is noted that the submitted plans provide only limited detail in respect
of the finalised layout, particularly in relation to detailed parking arrangements,
servicing, and the precise extent and treatment of garden ground associated with
the residential elements. Given the scale of the site and the evolving nature of
the proposals, this level of detail is not considered sufficient. 
68 Notwithstanding this, it is considered that the overall development framework is
acceptable and capable of delivering an appropriate outcome. Furthermore,
given the existing condition of the site as an operational quarry and the
associated visual impact, there is an opportunity for significant environmental
improvement through restoration and redevelopment. In this context, it is
considered both reasonable and proportionate to address these detailed design
matters through condition (Condition 12), requiring the submission of a more
detailed layout plan for the approval of the Planning Authority prior to
development taking place on the relevant parts of the site. 
69 A key aspect of the proposal is the accelerated restoration of the former quarry,
with all quarrying activities ceasing and the site being restored significantly earlier
than previously envisaged, thereby establishing an appropriate landscape
framework within which the development will sit. The buildings proposed across
the site are of a simple and utilitarian form, reflecting their operational function
and drawing on rural and agricultural building typologies, with materials such as
timber cladding and anthracite grey metal cladding to both walls and roofs. The
staff accommodation and housing adopts a similarly simple design with pitched
roof forms, which is considered appropriate for the location. 
70 In landscape terms, the site benefits from a degree of natural containment,
including existing woodland to the north and the enclosing landform of the quarry,
such that views from the wider area are limited, with the main receptors being the
adjacent railway line and elevated positions within the Ochil Hills to the south.
Taking all of these factors into account, and subject to the submission and
approval of a more detailed layout as noted above, it is considered that the
overall design, scale and layout of the development, alongside the accelerated
restoration of the quarry, are appropriate to the character of the site and its
surroundings and would not result in any unacceptable visual impact. 
Noise and Residential Amenity 
71 The proposed development has the potential to give rise to noise impacts, given
the use – primarily a gun dog training and kennelling facility. Noise and
residential amenity impact must be assessed primarily against Policy 56: Noise
Pollution of the LDP2 and Policy 23: Health and Safety of NPF4. These policies
seek to ensure that development does not result in unacceptable noise impacts
on noise‑sensitive receptors, including nearby residential properties, and that
risks to human health are appropriately mitigated.
Page 145 of 212

Page 146

72 The proposal has the potential to generate noise from a range of sources, most
notably dogs barking, in addition to general operational activity associated with
training sessions, staff movements and vehicle activity within the site. Dog
barking is inherently intermittent, impulsive and capable of carrying over long
distances, and therefore requires a robust assessment which reflects how the
site would operate in practice, including the number of dogs present, the
frequency and duration of training sessions, and the spatial distribution of
activities across the site. 
73 An initial Noise Impact Assessment (NIA) was submitted in support of the
application but was reviewed by the Council’s Environmental Health service and
considered to require additional content. In particular, the assessment had not
been undertaken in accordance with BS 4142, no background noise monitoring
had been carried out, and insufficient information had been provided on the
operational characteristics of the proposal, including the maximum number of
dogs involved in training sessions/lessons. The assessment also failed to
adequately consider the intermittent nature of barking noise or assess noise
generation with reference to the use of individual areas of the site. 
74 In addition, it was considered by EH colleagues that reliance on noise from the
operational quarry as part of the baseline or context was not appropriate, as
quarrying is unrelated to the proposed use and is intended to cease. The
assessment therefore required to refocus solely on noise arising from the gun
dog training facility itself. As a result, an updated NIA was submitted, the findings
of which are considered below. 
75 The updated NIA was informed by background noise monitoring undertaken at
two representative locations over a defined survey period and assessed impacts
at the four nearest noise‑sensitive receptors. Operational noise data was derived
from measurements taken at the applicant’s existing gun dog training facility,
supplemented where necessary by recognised acoustic data sources. The
assessment considered a range of noise sources associated with the proposal,
including kennel activity, external training exercises, dog barking, staff activity
and fixed plant, as well as potential noise breakout from buildings using acoustic
modelling. 
76 The assessment adopted a precautionary approach, including the application of
an acoustic correction to account for the potentially impulsive nature of dog
barking. Predicted noise levels at all assessed residential receptors were found
to be significantly below prevailing background sound levels (which include road
and rail traffic) during both daytime and night‑time periods. On this basis,
Environmental Health concluded that the proposed development would result in a
low noise impact and would not give rise to unacceptable effects on residential
amenity. 
77 Environmental Health therefore raised no objection in respect of noise, subject to
conditions (Conditions 4, 5, 6 and 7). These include controls on noise from plant
and equipment, limits on operational noise relative to background levels,
Page 146 of 212

Page 147

requirements for sound insulation to kennel buildings, restrictions on servicing
and maintenance hours, and a mechanism for further noise assessment and
mitigation should justified complaints arise. These conditions are considered
necessary to ensure continued protection of residential amenity in accordance
with the development plan and national planning policy. 
Traffic and Access 
78 The proposed development has been assessed against Policy 60B: Transport for
New Development of the LDP2 and Policy 13: Sustainable Transport of NPF4,
both of which seek to ensure that development is safely and appropriately served
by the transport network, minimises reliance on private car travel where feasible,
and avoids adverse impacts on road safety or network operation. The Council’s
Transport and Development team has confirmed that, subject to conditions
(Conditions 3 and 12), the proposal raises no objection in transport terms. The
assessment recognises that the existing quarry use generates significant HGV
movements and that the proposed development would result in a different, and
more dispersed, traffic profile, which has been considered acceptable for the
local road network. On‑site staff accommodation, together with a managed
approach to student travel, are material factors in reducing commuting trips,
consistent with the sustainable travel hierarchy promoted by Policy 13 of NPF4.
Students are expected to initially arrive into the local area by coach, with drop‑off
at a central location within Auchterarder, before onward transfer to the site. This
arrangement is supported by the provision of on‑site student accommodation,
which minimises the need for repeated daily travel. Adequate parking provision,
including EV charging and coach turning facilities, is proposed, and the vehicular
access can be delivered to adoptable standards in accordance with the National
Roads Development Guide. Importantly, the site lies immediately south of the
consented Shinafoot junction improvements to the A9, and the submitted layout
safeguards the necessary land and does not prejudice or constrain the delivery
or future operation of that proposed junction. Transport Scotland has confirmed
that it does not propose to advise against the granting of planning permission. On
this basis, and subject to appropriate conditions, the proposal is considered to
comply with the requirements of Policy 60B of the LDP2 and NPF4 Policy 13. 
Drainage 
79 The proposal is to provide a private foul and surface water drainage solution. 
The principle of utilising private drainage infrastructure is acceptable in planning
terms and supported by Policy 53B (Wastewater Treatment and Drainage) of the
LDP2, which allows for private drainage solutions where connection to the public
sewer is not available, subject to appropriate safeguards and the absence of
unacceptable environmental impact. This approach is also consistent with NPF4,
which recognises private drainage systems as an appropriate solution in rural
locations, provided they are properly designed and regulated. In this regard, the
submitted drainage information demonstrates that a comprehensive strategy has
been developed, incorporating separate foul and surface water systems. The
drainage report confirms that, in the absence of a public sewer, foul drainage is
to be managed by a specialist on-site package treatment plant designed to treat
Page 147 of 212

Page 148

both domestic wastewater and operational flows associated with the kennel use,
including washdown and veterinary facilities, with treated effluent discharged in a
controlled manner and subject to regulatory approval. 
80 Surface water is to be managed through a sustainable drainage (SuDS)
approach, with runoff from roofs and hardstanding directed to an underground
storm crate attenuation system providing both attenuation and partial infiltration.
Flows are controlled to greenfield runoff rates via a flow restriction device, with
exceedance managed through an overflow to an existing pond. Pre-treatment
measures including silt traps and filter drains are incorporated to ensure
adequate water quality treatment in line with CIRIA SuDS guidance and SEPA
requirements. The drainage design is considered sufficient to address any
localised surface water issues arising from the former quarry topography.
Overall, the drainage strategy accords with relevant technical standards and
demonstrates that the development can be adequately drained without giving rise
to flood risk or adverse environmental effects. 
Flood Risk 
81 The Council’s Flooding Team advised that, due to the known history of significant
fluvial flooding affecting the B8062, in the vicinity of the site access, a Flood Risk
Assessment (FRA) was required, together with a Drainage Impact Assessment
given that the proposal exceeds the relevant impermeable area thresholds.
These additional submissions have been provided in the form of a Flood Risk
Review (April 2026) and the Fairhurst FRA for the adjacent Shinafoot Junction.
This information confirms that flooding in the area is primarily associated with the
Pairney Burn and Ruthven Water, with modelling demonstrating that the B8062
can be overtopped during extreme events, with flood depths of up to
approximately 0.5m in a 1 in 200 year event plus climate change. However, this
flooding is largely confined to sections of the road to the northwest of the
proposed access, with ground level at the site access itself shown to remain
above the design flood level. The review further confirms that the site is not at
risk of fluvial flooding due to a significant level difference up from the road, and
that only localised surface water ponding may occur, which can be addressed
through reprofiling and drainage design. Importantly, the submitted assessments
confirm that the proposal accords with the Council’s established position that
development should not exacerbate existing flooding conditions on the B8062,
with modelling and assessment demonstrating a neutral or negligible impact on
flood risk elsewhere. Mitigation measures, including the preparation of a Flood
Action Plan and connection to SEPA’s flood warning system, are also proposed
to ensure user safety during extreme events. On this basis, and following review
of the submitted information, the Flooding Team raise no objection to the
proposal. The development is therefore considered, subject to condition
(Condition 11) to comply with Policy 52 (New Development and Flooding) of the
Perth and Kinross Local Development Plan 2 and Policy 22(f) of National
Planning Framework 4. 
Page 148 of 212

Page 149

Ecology 
82 Given the site’s established use as an operational sand and gravel quarry,
together with its history of ongoing mineral extraction and disturbance, the land is
considered to be of low ecological and biodiversity value. This conclusion is
supported by the Preliminary Ecological Survey, which confirms that the working
quarry itself is of negligible ecological value, with only small areas of poor
semi‑improved grassland (low value) and peripheral planted broadleaved
woodland (moderate value) present. While sand martins are known to utilise the
wider quarry for nesting within exposed faces, the development proposed under
this application is confined to the more active part of the quarry where levels of
disturbance and built development are already high and where there are no
existing excavations. As such, any impact on sand martins is considered to be
negligible. 
83  The survey identified no significant ecological constraints, with a low to negligible
likelihood of protected species being present or adversely affected by the
proposals. Notwithstanding this, appropriate safeguards can be secured by
condition, including measures to ensure that any excavations or temporary works
incorporate suitable escape provisions for mammals. (Condition 13) 
84  In this context, it is considered that the level of ecological assessment
undertaken is proportionate to the site’s limited baseline interest. Notwithstanding
this, the proposals incorporate a range of mitigation and enhancement measures,
including the retention and expansion of existing woodland, native planting, and
the creation of species‑rich grassland and habitat features. These measures are
expected to deliver a net enhancement in biodiversity across the site over time. 
85  These mitigation and enhancement measures will be secured and delivered as
part of the wider restoration strategy for the quarry, in accordance with the
approved restoration framework under application ref. 19/01927/MWM, ensuring
that biodiversity benefits are realised in a coordinated and comprehensive
manner across the wider site. 
Developer Contributions 
Education Infrastructure 
86 In terms of education infrastructure, the proposal has been assessed against the
Council’s Developer Contributions Supplementary Guidance, which requires
financial contributions towards primary school capacity where schools are subject
to constraint. The site falls within the catchment of Auchterarder Primary School,
where a capacity constraint has been identified. The development includes four
dwellinghouses, one flat and student accommodation; however, it is accepted
that the student accommodation would not likely place additional pressure on
primary education provision. Notwithstanding this, initial consultation identified
that a developer contribution may be required in respect of the residential units,
subject to their tenure. Further information was subsequently sought from the
applicant regarding the status of the proposed staff accommodation, including
Page 149 of 212

Page 150

details of occupancy, management and rental arrangements. The submitted
supplemental statement confirms that the five units are to be retained in single
ownership, are tied to employment at the Dog Ranch, are not available on the
open market and are to be provided as part of staff remuneration, effectively
constituting employment-linked mid-market rental accommodation.  Following
review of this information and discussion with the Council’s Affordable Housing
Officer, it is accepted that the units can reasonably be regarded as affordable
housing in terms of Policy 20 of the LDP2 and NPF4 definitions. On that basis,
and subject to appropriate controls to secure their occupation and tenure via a
legal agreement, no Primary Education developer contribution is required, and
the proposal is considered to comply with the relevant requirements of the
Supplementary Guidance. 
A9 Junction Improvements 
87 In terms of A9 junction improvements, the proposal has again been assessed
against the Council’s Developer Contributions Supplementary Guidance, here in
relation to the Auchterarder A9 Junction improvements. While the site lies within
the Auchterarder and wider Strathearn housing market area where contributions
would normally be sought towards junction upgrades, the guidance confirms that
such requirements may not apply where development reduces the need to travel,
for example through the provision of local employment. In this case, the
application involves both the cessation of existing quarry operations and the
redevelopment of the site for a dog training and boarding facility, including
associated staff and student accommodation. When considering the net impact, it
is noted that the current quarry generates regular HGV movements, whereas the
proposed development would result in a different trip profile, with on-site staff
accommodation reducing commuting requirements and students anticipated to
arrive by coach. Furthermore, the proposal involves the relocation of an existing
business from a more remote location, thereby providing local employment
opportunities and reducing overall travel demand. Having regard to these factors
and following discussions with the Council’s Developer Contributions Officer, it is
considered that the development would not give rise to a net increase in traffic
requiring mitigation at the A9 junction and would, overall, reduce the need to
travel. Accordingly, an A9 Junction Improvement developer contribution is not
required in this instance. 
Affordable Housing 
88 Policy 20 of the LDP2 and the associated Supplementary Guidance refers to
affordable housing and require the provision of affordable housing as part of
qualifying residential developments. The proposal includes five residential units
which were initially subject to scrutiny to determine whether they would trigger an
affordable housing requirement or necessitate a commuted sum. As set out
above in relation to education infrastructure, further information was sought from
the applicant on the tenure and operation of these units. The submitted
supporting information confirms that all five units are effectively form
employment-linked mid-market rental accommodation. Following review of this
information, and in consultation with the Council’s Affordable Housing Officer, it is
Page 150 of 212

Page 151

accepted that the units meet the definition of affordable housing under Policy 20
and NPF4. On that basis, the proposal is considered to deliver 100% affordable
housing on site, and therefore fully satisfies the requirements of Policy 20 without
the need for any additional provision or commuted sum, subject to appropriate
controls being secured through a legal agreement to ensure the units remain as
affordable, employment-linked accommodation in perpetuity. 
Restoration Works to Quarry 
89 The accelerated restoration works for Craigrossie Quarry are proposed to be
secured through the revised plans submitted under application reference
19/01927/MWM. These revised restoration details, including the accelerated
programme for the cessation of extraction and site reinstatement, are not
determined as part of the current application but will instead be assessed
separately under application 19/01927/MWM, which is also reported to this
Committee. 
90 It is important to note that the application site for the proposed dog ranch relates
to a relatively small part of the overall quarry (1.9 hectares within a wider 21.7
hectare site) and is located on an existing area of hardstanding currently
occupied by buildings, machinery and car parking. As such, this part of the
quarry does not require significant restoration in its own right. Given both the
limited extent of the red line boundary and the nature of the land within it, it would
not be appropriate or reasonable to seek to secure the restoration of the wider
quarry through the present application and this instead requires to be secured
through application 19/01927/MWM. 
91 Members will recall that application 19/01927/MWM was previously presented to
the Planning and Placemaking Committee in March 2020 with a recommendation
for approval, which was accepted, subject to conditions and the provision of a
financial bond to secure restoration of the site. However, despite ongoing efforts
by the Planning Authority, it was not possible to reach agreement with the
applicant at that time on the necessary bond arrangements, and the application
has therefore remained undetermined. Concerns have therefore persisted
regarding the delivery of the overall reinstatement and restoration of the quarry. 
92 The submission of revised restoration proposals under application
19/01927/MWM, alongside the involvement of a new party with an interest in the
site, provides an opportunity to secure a clear, deliverable and accelerated
restoration strategy for the wider quarry. That restoration can be undertaken
around the proposed Dog Ranch use. For these reasons, it is essential that the
accelerated restoration of the quarry is secured explicitly through application
19/01927/MWM, rather than through the current application. The separate
consideration of these proposals ensures there is no ambiguity regarding the
restoration strategy, while enabling each application to be assessed on its own
merits. The proposed accelerated restoration works are considered appropriate,
as detailed within the separate committee report. 
Page 151 of 212

Page 152

Private Water 
93 The site is proposed to be served by a private water supply via a new borehole,
which is considered to be acceptable given the rural location of the development
and the absence of a public mains connection. The Council’s Private Water
Supply Team has been consulted and advise that the supply will require to be
registered with them to enable appropriate monitoring of water quality. To ensure
that the proposed water supply is suitable for its intended use and maintained to
an appropriate standard, a planning condition (Condition 10) and associated
informative (Informative 7) are recommended requiring the submission of details,
registration of the supply, and ongoing compliance with relevant regulatory
requirements. 
Low and Zero Carbon Generating Technologies 
94 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero‑carbon generating technologies. Further, NPF4 Policy 2 ‘Climate
Mitigation and Adaptation’ requires that development should be designed to
reduce greenhouse gas emissions. In this instance, the proposal incorporates a
range of integrated low‑carbon measures including roof‑mounted solar
photovoltaic (PV) panels and air source heat pumps serving the principal
buildings and accommodation, alongside a fabric‑first approach to building
design. These technologies are identified within the supporting Planning and
Design & Access Statements as enabling the development to exceed the 10%
CO₂ emissions reduction requirement set by Scottish Building Standards.  The
proposal therefore complies with the relevant policies and no condition is
considered to be required. 
Light Pollution 
95 The proposed development has been assessed in respect of potential light
pollution, having regard to Policy 55 (Lighting) of the Perth and Kinross Local
Development Plan 2 and Policy 23 (Health and Safety) of National Planning
Framework 4, both of which seek to ensure that external lighting does not result
in obtrusive or intrusive impacts on neighbouring receptors, the rural environment
or ecological interests. In this instance, the submitted details indicate that lighting
will be limited in extent and primarily associated with low‑level, sensor‑controlled
fittings to serve operational and safety requirements. Notwithstanding this, in
order to ensure full compliance with the policy framework, it is considered
necessary to attach a planning condition (Condition 9) requiring that all external
lighting is appropriately designed, positioned and angled to  prevent light
spillage beyond the application site boundary. Subject to the imposition of this
condition, it is considered that the proposal will not give rise to unacceptable light
pollution and accords with the requirements of LDP2 Policy 55 and NPF4 Policy
23. 
Page 152 of 212

Page 153

Contaminated Land 
96 The Council’s Contaminated Land Team has been consulted and has advised
that a site investigation is required to assess ground conditions and ensure the
land is suitable for the proposed use, having regard to its former quarry use
(Condition 2). This approach accords with Policy 58A (Contaminated Land) of the
Perth and Kinross Local Development Plan 2 and Policy 9(c) of National
Planning Framework 4, which require that development is not adversely affected
by contamination and that appropriate investigation and mitigation measures are
secured. 
Economic Impact 
97 The proposed Dog Ranch and associated gundog training facility would deliver
clear and measurable economic benefits for the local area through both direct job
creation and wider rural diversification. As set out in the Planning Statement, the
expansion of the established Mordor Gundogs enterprise—an internationally
recognised business would increase employment numbers from its current base
which employs 13 people to over 30 full-time positions, creating at least 17 new
permanent jobs across specialist roles including animal welfare, training,
veterinary services and administration. This growth will not only provide
meaningful employment opportunities for local residents but also support skills
development through associated veterinary training programmes and educational
partnerships. In addition, the facility will attract clients, students and visitors from
across the UK and internationally, generating expenditure within the local
economy and supporting secondary businesses such as accommodation,
transport and services, consistent with the supporting Design and Access
Statement which highlights the enterprise’s international reach and role in
education and training. The development therefore represents a significant form
of rural economic diversification, contributing to a more resilient local economy by
introducing a high-value, year-round business use on a restored brownfield site,
in line with national and local policy objectives to support sustainable economic
growth in rural areas. 
Variation of Application Under Section 32A 
98 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the site plan to accommodate
the drainage system and minor amendments to the planning and design and
access statement. 
Planning Obligations and Legal Agreements 
99 A legal agreement is required to secure the occupation and tenure of the
proposed residential units as employment‑linked affordable housing, ensuring
they remain tied to the operational needs of the development and are not
released to the open market. This mechanism is necessary to underpin the
justification for waiving developer contributions, particularly in relation to
Page 153 of 212

Page 154

education infrastructure, and to ensure the development continues to comply with
relevant Development Plan policies and supplementary guidance over the long
term. 
Direction By Scottish Ministers 
100 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
101 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding
the Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to a legal agreement and the following
conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The hereby approved development shall not commence on site until an
evaluation for the potential of the site to be affected by contamination by a
previous use has been undertaken and, as a minimum, a Preliminary Risk
Assessment (Phase 1 Desk Study) has been submitted for consideration and
accepted by the Council as Planning Authority. If the preliminary risk assessment
identifies the need for further assessment, an intrusive investigation shall be
undertaken to identify; 
i. the nature, extent and type(s) of contamination on the site 
ii. measures to treat/remove contamination to ensure the site is fit for the use
proposed 
iii. measures to deal with contamination during construction works 
iv. condition of the site on completion of decontamination measures. 
Page 154 of 212

Page 155

Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason: In order to deal with any potential contamination of the site as a result of
its former use. 
3. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type E Figure 5.8 access detail, of Type C
Road construction detail. 
Reason: In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
4. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
5. Noise from operations on site shall not exceed 5dBA above the L90 background
level expressed as LAeq (1 hour) (0700-2300 hours) and LAeq (15 minutes)
(2300-0700 hours), including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when measured at any residential
property in accordance with BS4142:2014+A1:2019. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
6. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out a noise assessment to verify compliance with conditions 4
and 5 above. The assessment shall be carried out to an appropriate methodology
agreed in writing with the Planning Authority. If the noise assessment shows that
the noise levels do not comply with conditions 4 and 5, a scheme of noise
mitigation shall be included with the noise assessment, specifying timescales for
the implementation of the scheme and shall be submitted to the Planning
Authority with 28 days of the assessment. The mitigation scheme shall thereafter
be implemented in accordance with the approved scheme and timescales. 
Reason: In the interests of residential amenity and to ensure ongoing compliance
with noise control conditions. 
Page 155 of 212

Page 156

7. The sound insulation and sound transmission properties of all buildings hereby
approved shall be such that any airborne noise from the operations within the
premises does not constitute a statutory noise nuisance as determined by the
Local Planning Authority. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
8. Servicing or maintenance at the site shall be carried out between 0800 and 1900
Monday to Saturday only. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
9. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
10. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the commencement of the development being brought
into use and shall thereafter be so maintained insofar as it relates to the
development hereby approved. 
Reason: To ensure the new development has an adequate and consistently
wholesome supply of water and to maintain water quality and supply in the
interests of residential amenity and ensure the private water supply or septic
drainage systems of neighbours of the development remain accessible for future
maintenance. 
11. Prior to the commencement of development, a Flood Action Plan shall be
submitted to and approved in writing by the Planning Authority. The Flood Action
Plan shall identify potential flood risks affecting access to and from the site as
detailed within the approved Flood Risk Assessment (doc ref:34) including
flooding of the surrounding road network, and set out appropriate mitigation,
management and emergency procedures.  The approved Flood Action Plan
shall thereafter be implemented in full and remain in place for the duration of the
use of the site, 
Page 156 of 212

Page 157

Reason: To ensure that flood risk is appropriately managed, particularly in
relation to site access and the surrounding road network, in the interests of public
safety and in accordance with relevant flood risk and drainage policies. 
12 Prior to the commencement of the development hereby approved, a detailed
layout plan shall be submitted to and approved in writing by the Planning
Authority. The plan shall include: 
• the precise siting and arrangement of all buildings;
• detailed parking and turning areas, including servicing arrangements;
• the extent, layout and treatment of all private and communal garden ground
of residential properties;
• boundary treatments; and
• hard and soft landscaping proposals, including species, planting densities
and implementation programme. 
The development shall thereafter be carried out in accordance with the approved
details. 
Reason: In the interests of securing a satisfactory standard of design, layout,
landscaping and residential amenity in accordance with Policies 1A and 1B of
LDP2 and Policy 14 of NPF4. 
13. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the restoration works. The
measures may include creation of sloping escape ramps for animals, which may
be achieved by edge profiling of trenches/excavations or by using planks placed
into them at the end of each working day and open pipework greater than
150mm outside diameter being blanked off at the end of each working day. 
Reason: In order to prevent animals from being trapped within any open
excavations. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Page 157 of 212

Page 158

Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
5. Lighting cable beneath access to be lowered and twin-wall ducted. Contact Perth
& Kinross Council Street Lighting department for further details. 
6. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
7. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations.  
8. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 38 of the Development Management Procedure
(Scotland) Regulations 2008.The form of the notice is set out in Schedule 7 of
Page 158 of 212

Page 159

the Regulations and a draft notice is included for your guidance. According to
Regulation 38 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily available to the public
• Printed on durable material. 
Background Papers
Letters of representation 1 
Authors
Name Designation Contact Details
John Williamson Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager 23 June 2026 
Page 159 of 212

Page 160

Page 160 of 212

Page 161

¯
Change of use of quarry to gun dog training centre, erection of kennels, veterinary practice , reception
building, indoor arena, maintenance buildings, staff and student accommodation, installation of PV and
ASHP and associated works
26/00045/FLL
Scale
1:10,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(2)(i)
Page 161 of 212

Page 162

Page 162 of 212

Page 163

¯
Change of use of quarry to gun dog training centre, erection of kennels, veterinary practice , reception
building, indoor arena, maintenance buildings, staff and student accommodation, installation of PV and
ASHP and associated works
26/00045/FLL
Scale
1:5,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(2)(i)
Page 163 of 212

Page 164

Page 164 of 212

Page 165

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/208) 
Proposal: Erection of 8 holiday accommodation units and associated works 
Location: Land south west of Milton of Pitcastle, Strathtay, PH9 0PJ 
Ref. No: 25/01794/FLL
Ward No: P4 - Highland 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background And Description Of Proposal 
1 The application is for the erection of 8 holiday accommodation units and
associated works.  The site lies to the southwest of Strathtay village within the
conservation area boundary but outwith the settlement.  The site is contained
within a larger grass field which is bordered by mature woodland to the north with
an access track to the south and the River Tay beyond. 
2 The proposal is to erect 8 holiday lodges comprising of 3 different types arranged
along the private access track to the south.  Parking is to be located at each
lodge with wider landscape planting proposed to contain the site.   
3 The access is taken from the existing road network through Strathtay, entering
the site from the northeast from adjacent to the Strathtay bridge. 
4 The plans have been revised from the original submission to remove a
secondary access to north west and to vary the lodge types and site layout.   
Site History 
5 25/01334/FLL Full Planning Permission application was withdrawn on
11 December 2025 for the erection of 8 holiday accommodation units and
associated works. 
5(2)(ii)
Page 165 of 212

Page 166

Pre-Application Consultation 
6 Pre application Reference: 24/00084/PREAPL  
7 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
8 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
9 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
10 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
11 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
12 The principal relevant policies are, in summary; 
Page 166 of 212

Page 167

• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 9C: Caravan Sites, Chalets and Timeshare Developments: Chalets,
Timeshare and Fractional Ownership
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Conservation areas 
National Guidance 
13 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
14 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
Page 167 of 212

Page 168

National Roads Development Guide 2014 
15 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
16 As part of the planning application process the following bodies were consulted: 
External 
17 Mid Atholl, Strathtay and Grandtully Community Council - The community
council objects to the proposal for the following reasons - contrary to policy, no
justification for this location, access and road safety concerns, inappropriate
siting (including layout, design, build, form and landscaping), flood risk, impact on
River Tay SAC, impact on wildlife and no demand for holiday accommodation. 
18 Perth and Kinross Heritage Trust - No objection to proposal albeit conditions
required. 
19 NatureScot - No objection to proposal condition required for construction method
statement. 
20 Scottish Water - No objection to proposal 
Internal 
21 Enterprise Team - Comments provided on economic elements of the scheme. 
22 Structures and Flooding - No objection and no conditions 
23 Environmental Health (Noise Odour) - No objections subject to conditions
regarding plant noise, lighting, construction hours and submission of a Noise
Management Plan.   
24 Transportation and Development - No objection to proposal subject to
conditions. 
25 Biodiversity - No objection to proposal subject to conditions 
26 Conservation Team - No objection to proposal subject to conditions ensuring
landscaping 
Representations 
27 57 representations were received. The main issues raised within the
representations are: 
Page 168 of 212

Page 169

28 41 Objections 
- Contrary to policy
- Contrary to conservation area appraisal
- Detrimental impact on character of conservation area
- Road safety 
- Increased traffic 
- Impact on biodiversity
- Impact of River Tay SAC
- Inappropriate design, layout, density, built form, materials
- Inadeqate landscaping
- No demand for holiday accommodation
- Flooding and drainage impacts 
- Noise pollution
- Light pollution 
- Pollution generally including littering
- Adverse effect on visual amenity
- Inappropriate land use
- Loss of open space
- Out of character with the area 
- Over intensive development
- Overlooking
- Impact of emergency secondary access – now removed from proposal 
29 16 Letters of Support 
- Local business support 
- Boost local spending and support business
- Increased accommodation options 
- Reduces pressure on existing housing stock 
Non-material considerations 
30 Precedents and unlawful material changes to the application have been raised. 
The reference sited relate to two applications in 2008 and 2009 for
dwellinghouses which were appealed to the DPEA.  These predate by some
way the most up to date Development Plan polices (LDP2 adopted 2019 and
NPF4 February 2023).  In relation to changes to the proposal the description
has not been altered nor the redline.  The plans have been revised to address
consultee comments but not significantly changed (from the description/redline). 
The application was readvertised and re-neighbour notified so there has been no
error in process. 
31 Loss of trees and inappropriate housing density have also been raised but there
are no trees proposed for felling and the development is not for housing 
32 The loss of prime agricultural land has been raised however the land is classed
as 3.2.  The development does therefore not result in the loss of any prime land. 
Page 169 of 212

Page 170

33 Risk of drowning has also been raised but this is not a material planning
consideration. 
34 The remaining issues are addressed in the Appraisal section of the report. 
Additional Statements 
35 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required 
Design Statement or Design and Access
Statement
submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
submitted 
Appraisal 
36 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
37 Section 64(1) of the Planning (Listed Buildings and Conservation Areas)
(Scotland) Act 1997 is relevant and requires planning authorities to pay special
attention to the desirability of preserving or enhancing the character or
appearance of the designated conservation area. 
Principle 
38 NPF4 Policies 29: Rural development and 30: Tourism are relevant as are LDP2
Policies 8: Rural Business and Diversification and 9: Caravan Sites, Chalets and
Timeshare Developments.  Policy 6 Settlement Boundaries of LDP2 is also a
consideration. 
39 NPF4 Policy 29 advises that development proposals that contribute to the
viability, sustainability and diversity of rural communities and local rural economy
will be supported. It further advises that development proposals in rural areas
should be suitably scaled, sited and designed to be in keeping with the character
of the area. They should also consider how the development will contribute
towards local living and take into account the transport needs of the development
as appropriate for the rural location.
Page 170 of 212

Page 171

40 NPF4 Policy 30 offers considerable support for new tourist accommodation. It
sets out that proposals for tourism related development will take into account
factors such as the contribution made to the local economy; compatibility with the
surrounding area and impacts on communities, along with sustainable principles
and consideration of the natural environment. 
41 LDP2 Policy 8: Rural Business & Diversification supports such proposals when
they improve the quality of existing visitor facilities. Sites outwith settlements may
be acceptable where they offer opportunities to diversify an existing business, or
are related to an existing site-specific resource or opportunity. The proposal will
comply with Policy 8 criteria (a) as it will contribute to the local economy through
the provision of permanent employment and visitor accommodation. 
42 LDP2 Policy 9: Caravan Sites, Chalets and Timeshare Developments generally
supports the improvement of existing holiday-related uses. Policy 9C states that
“the Council will give favourable consideration to new chalet and
timeshare/fractional ownership developments where it is clear these cannot be
used as permanent residences”. 
43 Policy 6 Settlement Boundaries of LDP2 seeks to protect settlement boundaries
and restricts development that adjoins the settlement boundaries unless one of
four categories is met.  In this case the existing access adjoins the settlement
boundary, but the application site does not.  It is therefore considered that as
there is intervening land the proposal would not raise issue with this policy the
generally proximity of the site to the settlement and its impact will however be
considered. 
44 The applicant is Pitcastle Estate and the supporting information notes that the
business is diverse, combining traditional rural operations with modern hospitality
and land use. It runs a sawmill producing timber from locally grown larch oak,
pine, ash, douglas fir, and cedar, supplying materials such as boards and
sleepers. The estate also offers livery services with stables, tack room facilities,
and 15 acres of pasture.  Tourism plays an important role, with the Milton of
Tullypowire holiday cottage welcoming guests and providing accommodation for
up to eight people. In addition, the estate manages over 200 deer and offers
trophy stalking as well as fishing rights on both banks of the River Tay. Other
ventures include a hydro scheme and wildlife management initiatives, all of which
contribute to a broad business model blending farming, forestry, sport, and
tourism. 
45 The proposed lodges are proposed to contribute to the business growth providing
a sustainable, year-round income stream that supports the broader rural
business and land management operations. Expanding into lodge tourism will
allow the business to diversify its income, extend the visitor season, and attract a
wider market. The proposal will support local employment and contribute to the
rural economy. 
Page 171 of 212

Page 172

46 There has been much raised through representations about inaccuracies in the
supporting information in relation to the business case and whether there is a
need for tourist accommodation. In addition, the siting has also been raised as
the estate has a large land holding.  The information submitted has been
reviewed by the Councils Economic Development Team. Perthshire attracts a
large number of tourists and the local area demonstrates a large number of
attractions/facilities.  Whilst there has been much analysis of the figures in
letters of representation the applicant has demonstrated as required by policy
that they have considered the business elements of the proposal.  The site is
also within an area that the council knows is popular in terms of tourism and
where there are other existing tourist facilities.   
47 The development of this site is for tourist accommodation in purpose built units
reducing impacts on local housing stock which is welcomed rather than the use
of existing properties converted to short term lets. The development will increase
tourist footfall to the benefit of other local hospitality businesses and local shops.
The development will increase the provision of self-catering accommodation in
the local area. It is difficult to deny that the proposal would not have a positive
economic impact. 
48 Thes submission demonstrates the land holding and other available land.  This
site whilst not in the settlement and in the conservation area offers an opportunity
for a low density development of buildings which are not uncommon in rural
areas to provide holiday accommodation within walking distance of a number of
facilities including those aimed at tourists and for local residents alike. 
49 Overall, NPF4 and LDP2 policies are supportive of the proposal as the
diversification of an existing rural business. Therefore, the development
proposals are acceptable in principle, subject to compliance with other relevant
development plan policies and material considerations, which are assessed
below. 
Design and Layout 
50 NPF4 Policy 14: Design, Quality and Place and LDP2 Policy 1: Placemaking are
relevant in the consideration of the design and layout of the proposal.  There is
also criteria with the tourism and rural business polices of LDP2 and NPF4 which
require that development be of high quality deign, be of a scale that’s in keeping
and be satisfactorily accommodated within the landscape and environmental
capacity of the site. 
51 The proposal is to site 8 holiday lodges single-storey with a simple design
positioned primarily along the southern edge of the site, close to the River Tay. 
The lodge design varies featuring a rectangular form with varying roof pitches;
mono pitch, shallow dual-pitched roof and asymmetric dual-pitch.  The proposed
external materials incorporate natural timber cladding, and dark roof finishes with
glazing. 
Page 172 of 212

Page 173

52 The development will be accessed from the existing private track which runs to
the south with will be extended in width. 
53 The development will incorporate landscape enhancement measures, including
extensive wildflower meadow planting, new tree and hedgerow planting, and a
central green space that contributes both visually and ecologically. The layout
and siting have been carefully chosen to protect existing trees, avoid steep
slopes, and preserve views from surrounding properties. 
54 The proposal is considered to comply with the Council’s Placemaking policies
and in particular LDP2 Policy 1, as the scale, design and siting of the
development in conjunction with the landscape setting would not detrimentally
impact the character and amenity of the place. 
Residential Amenity 
55 The proposed development has the potential to give rise to noise impacts, having
regard to the nature of the use as holiday accommodation. Noise and residential
amenity are assessed primarily against Policy 56: Noise Pollution of
the LDP2 and Policy 23: Health and Safety of NPF4. These policies seek to
ensure that development does not result in unacceptable noise impacts on
noise-sensitive receptors, including nearby residential properties, and that risks
to human health are appropriately mitigated. 
56 The site is separate from the settlement boundary and the nearest property to the
site out with the applicant’s ownership is approx. 200m to the north.  Given the
location and distance to neighbouring residential properties out-with the
ownership of the applicant the proposed units are not considered to have
significant impact on the residential amenity of neighbouring properties. 
However, the applicant will need to be mindful of noise that may be generated by
the users of the site. The standard noise management plan condition is
recommended in this regard (Condition 6). 
57 The main source of noise will be from patrons using the site, especially in the late
evening period. Environmental Health advise that this can be controlled through
good site management. There is also the potential for noise during the
construction phase. Should the application be approved Environmental Health
recommend that a Noise Management Plan will be required to be submitted and
agreed prior to the operation of the development. Further conditions will also be
required to control plant noise, delivery times and construction hours. (Conditions
3, 5 and 20). 
58 Environmental Health raised no concerns regarding light pollution and impact on
the nearest residential properties. They have requested a standard lighting
condition should the application be approved to prevent any light spillage issue
from occurring (Condition 4). The proposal is considered to comply with LDP2
Policy 55. 
Roads and Access 
Page 173 of 212

Page 174

59 The proposed development has been assessed against Policy 60B: Transport for
New Development of the LDP2 and Policy 13: Sustainable Transport of NPF4,
both of which seek to ensure that development is safely and appropriately served
by the transport network, minimises reliance on private car travel where feasible,
and avoids adverse impacts on road safety or network operation. 
60 This positioning of the site near the settlement affords direct access to the Spar
Shop, Inn on the Tay public house, Ballintaggart restaurant and bar etc which are
all within walking distance and covered bus stops for public transport to a range
of larger settlements. 
61 The applicant’s intention to utilise an existing vehicle access onto the C447 to the
north of the Grandtully Bridge. The secondary access has now been removed
from the application and is no longer under consideration.  The proposal seeks
to widen the existing access track to the south of the site only, to provide
emergency egress and access to lodges.   
62 Transport Planning have visited the site to gain more information on the route
given that the secondary access has been removed and that concerns have
been raised about emergency vehicle access.  The carriageway kerb to kerb is
below 3.7 metres in places, which is the required for the operating space at the
scene of a fire, as described in Designing Streets.  The track although narrower
than 3.7m in parts does not mean an emergency vehicle cannot access, it means
the operating space is not adequate.  At the narrowest point the width is
approximately 3.3m and for reference a fire engine is 2.5m wide.   Designing
Streets notes that simply to reach a fire the access route could be reduced to
2.75m over short distances. Where the lodges are there is an informal track
which will be widened to 3.7m within which an emergency vehicle can operate. 
63 The access at the junction with the public road is approximately 3.3 metres in
width, and to the west of the access there is no clearly defined kerbing and
vegetation has encroached the vehicle access.  On travelling along the access
track towards the site, the vehicle access starts to widen to approximately 3.5
metres, again vegetation has encroached the access track.  To the south of
Milton of Pitcastle, the track narrows to a narrow rural track with two well
established tyre tracks.  The applicant is proposing to widen this track to 3.7
metres.  It is recommended that suitable passing places are also including in
this section to allow visitors the opportunity to pass. A passing place condition
will be added (Condition 17) 
64 The existing access junction which adjoins the public road network is at point
where the speed limit is 20mph and on the bridge to the right of the junction
further reduced to 10mph.  There are no footpaths and road users should be
familiar with the likelihood of encountering pedestrians, cyclists and horse riders. 
On existing the track onto the public road there is adequate visibility to the right
towards the bridge and to the left the road arrangement is such that traffic exiting
the junction where the war memorial is visible and there is a give way to traffic
coming from Strathtay village. The primary access onto the public road network
Page 174 of 212

Page 175

shall be surfaced to the requirements of the Roads Authority.  A condition is
recommended. (Condition 16). 
65 With regards to the servicing of the site, the applicant has updated the drainage
plan to show the location of a combined cycle and bin storage area at each of the
lodges.  The method for collection of the waste has not been detailed, as such a
waste strategy shall be required.  A condition is recommended. (Condition 18) 
66 The applicant is also proposing to install at Klargester Biodisc for 35 person
equivalents.  The applicant has provided details on the location and the turning
facilities in relation to the servicing of the foul treatment plant. 
67 The applicant will be required to provide a minimum of 2 parking spaces at each
holiday accommodation unit.  A condition is recommended. (Condition 19) 
68 A Construction Traffic Management Plan will be required for the development,
with a focus on the mitigation to be provided to the public road network during the
construction phases to prevent damage to the local road network and avoidance
of the Grandtully Bridge with its reduced weight limit. A condition is
recommended. (Condition 20) 
69 As such, the current proposal is acceptable in terms of roads and access,
according with NPF4 Policy 13: Sustainable transport and LDP2 Policy 60B:
Transport Standards and Accessibility Requirements: New Development
Proposals. 
Drainage and Flooding 
70 The proposal is to provide a private foul and surface water drainage solution for
the site.  The principle of utilising private drainage infrastructure is acceptable in
planning terms and is supported by Policy 53B (Wastewater Treatment and
Drainage) of the LDP2, which allows for private drainage solutions where
connection to the public sewer is not available, subject to appropriate safeguards
and the absence of unacceptable environmental impact. This approach is also
consistent with NPF4, which recognises private drainage systems as an
appropriate solution in rural locations, provided they are properly designed and
regulated. In this regard, the submitted drainage information demonstrates that a
comprehensive strategy has been developed for the site, incorporating separate
foul and surface water systems. The drainage report confirms that, in the
absence of a public sewer, foul drainage is to be managed by a specialist on-site
package treatment plant 
71 The site lies in close proximity to the River Tay, Policy 52 (New Development and
Flooding) of the Perth and Kinross Local Development Plan 2 and Policy 22(f) of
National Planning Framework 4 require that flood risk is considered.   
72 A number of concerns have been raised with regards to flooding.  The Flood
Team have reviewed the documents referred to in objections and sought further
information from the applicant agent.  
Page 175 of 212

Page 176

73 The SEPA flood map indicates that the site itself is not at risk of flooding.
However, the site boundary is shown to be at a high risk of fluvial flooding during
a 1 in 200-year flood event plus climate change. 
74 There is a hydrometric gauging station on the River Tay in close proximity to the
proposed development site. The highest recorded water level at this station is
4.355 m, which equates to approximately 65.025 m AOD. The proposed lodges
are set with finished floor levels of approximately 72.00 m AOD (as shown on the
Drainage Strategy Plan), providing a freeboard of over 7 m relative to the highest
recorded water level. 
75 On this basis, the Flood Team’s position is that the proposed development is
suitably elevated above the fluvial flood risk from the River Tay, and the SEPA’s
flood maps accurately represent the flood risk to the site. No further detailed
investigation is therefore required. 
Conservation Considerations 
76 The subject site is located within the south-western extent of the Grandtully and
Strathtay Conservation Area. The site is on a southern bend of the River Tay
which has historically not been built upon. The Grandtully and Strathtay
Conservation Area Appraisal (2008) states that ‘the river and its banks are an
important feature of the townscape and make a positive contribution to the
townscape experience of the village’. There is evidence along the riverbank of
mill lades from the Mills of Pitcastle (corn and lint) to the north of the site
(identified in the Heritage Assessment). 
77 The Grandtully and Strathtay Conservation Area Appraisal states that
conservation areas must be safeguarded and enhanced. This is defined through: 
• Defining the character that merits protection, including the space between
buildings;
• Use of appropriate controls over development, demolition and advertising;
• Financial assistance, where appropriate, for works of repair and restoration;
• Protection of trees;
• Interpretation schemes, through leaflets or exhibitions;
• The implementation of enhancement schemes based upon a conservation
area appraisal. 
78 The appraisal also clarifies that designation as a Conservation Area does not
place a ban upon all new development within its boundaries. However new
development will normally only be granted planning permission if it can be
demonstrated that it will not harm the character or visual quality of the area. New
development should also positively enhance the area through good design rather
than just create a neutral effect. 
79 The National Planning Framework (NPF4) under policy 7d states that;
‘Development proposals in or affecting conservation areas will only be supported
where the character and appearance of the conservation area and its setting is
Page 176 of 212

Page 177

preserved or enhanced. Relevant considerations include the: architectural and
historic character of the area; existing density, built form and layout; and context
and siting, quality of design and suitable materials’. 
80 Similarly, Policy 28A of the Perth & Kinross Local Development Plan 2 (LDP2)
states that ‘Development within a Conservation Area must preserve or enhance
its character and appearance. The design, materials, scale and siting of new
development within a conservation area, and development outwith an area that
will impact upon its form of Strathtay is informal, reflecting the undulating
topography that rises from the river. Development within the village is typically
low density, characterised by generous garden plots, mature individual trees, and
a loose, organic arrangement of buildings’. 
81 The original submission had the proposed chalets of just one type arranged in a
regular, uniform curved formation with identical landscaping and positioning. This
regimented layout and uniformity of design did not reflect the established
character of the conservation area. It was considered to minimise the visual
impact on the character of the conservation area, the siting of the chalets should
adopt a more irregular and organic pattern, responding more sensitively to the
limited topographical variation available on the site.  In addition to this
introducing variation in the design and scale of the chalets it should retain
modest proportions and utilise natural materials. 
82 The plans have been revised to introduce three different styles of lodge and
varied layout.  There have continued to be many objections regarding the lodge
design, layout and finishes and there is a difficult balance to be struck.  The
lodges proposed have maintained low ridge heights and modest timber clad
finish with dark roofing materials.  There is variation in the footprints, layout and
orientation.  The development is low impact and has no direct comparison with
existing buildings being well screened and contained from the building group. 
The design is considered appropriate for the use and the simpler design, form
and finish means the development can sit within the site reducing any wider
visual impact.   
83 There are no conservation concerns raised with the proposal to widen the
existing site access, however large areas of hardstanding should be avoided
within the site. Access within the site should be formed of gravel or similar to
avoid detracting from the setting of the conservation area this will be conditioned
via landscaping considerations (Condition 9).  
84 The Design & Access Statement states hedgerows will be planted, however no
detailed landscape plan is included. Formal landscaping of the site should be
avoided, and hedgerows should only be planted along historic field boundaries.
Landscaping along the riverbank should be native to support the local
environment. As noted above a detailed landscape plan will be conditioned.
(Condition 9) 
85 The Conservation Planner notes the location plan and subsequent site plans do
not identify the existing mill lade in relation to the exact siting of the chalets.
Page 177 of 212

Page 178

However the site does not extend beyond the access track which the Mill lade
lies to the south of, and the track is clearly noted on plans. There is an
opportunity for onsite interpretation should evidence of the lade be found in good
condition. (Condition 15) 
86 The proposed development site lies within an area that is archaeologically
sensitive as it is situated within known archaeology with the potential for further
remains to be discovered. As part of pre application work the developer
commissioned a Heritage Impact Assessment (HIA) of the area, which was
undertaken by AOC Archaeology in June 2025 and forms part of this submission.
PKHT agree with the results of this assessment, with the potential for unknown
archaeological remains to exist alongside the known assets of MPK20544 (linear
feature) and MPK20545 (curvilinear feature). Therefore, in line with the
recommendations made in the HIA, should permission be granted for this
development, it is recommended that a condition for a programme of
archaeological works be attached to ensure an appropriate level of works to
assess the area for potential, record where required and safeguard known
archaeology where appropriate. (Condition 7) 
Natural Heritage and Biodiversity 
87 NPF4 Policy 3: Biodiversity and Policy 6: Forestry, Woodland and Trees are
relevant considerations, as are LDP2 Policies 40: Forestry, Woodland and Trees
and 41: Biodiversity are relevant in the assessment of the application. 
88 The application site is to the north of the River Tay and within the River Tay
Special Area of Conversation (SAC). There are records of protected species in
the area, the site is grassland with mature trees to the north (out with the site. 
There are no buildings or mature trees within the site.   
89 All methods on the submitted Preliminary Ecology Survey and Ecological
Assessment Report are in accordance with best practice.  The proposed
development will lead to a loss of grassland and it is recommended that his is
compensated for by sowing native species rich wildflower mixes into retained
areas of grassland around the site.  All existing riparian habitat should be
retained and all further recommendation in section 7 of the report must be
adhered to in full (to be conditioned 10). Biodiversity enhancement and the
measures to protect animals from being trapped in open excavations will also be
added by condition. (Conditions 12 and 13) 
90 NatureScot have also considered the proposal and note that there are natural
heritage interests of international importance close to the site, however, their
advice is that these will not be adversely affected by the proposal, provided all
work is carried out in accordance with an appropriate Construction Environmental
Management Plan (CEMP). (Condition 8) 
91 A large number of issues with the survey have been raised in relation to the
content and competency of the Ecologists report and in relation to the
assessment provided by the Councils Biodiversity Officer.  As noted above the
Page 178 of 212

Page 179

site is grassland, has no mature trees within the site and there are no buildings
on the site.  The Biodiversity Officer confirms that the report is in accordance
with published best practice.  The Ecologist who undertook the assessment and
wrote the report is a member of CIEEM who are the leading professional body for
ecologists and environmental managers are.  The survey is in accordance with
published best practice, and the visits were undertaken during the optimal survey
season. The survey included habitat, vegetation, bats, badgers, birds, pine
martens, red squirrels, otters, beavers, water voles, amphibians, and reptiles.
The Ecologist is qualified to survey for these species. 
92 In relation to issues regarding the behaviour of individuals in relation to ecology
for example littering, disturbance etc.   The Biodiversity Officer confirms that
due to the Land Reform (Scotland) Act 2003, no habitat receives protection from
disturbance from people wishing to exercise their access rights responsibly.
Measures such as signage and directing people to established paths could be
used to help protect habitats. 
Construction Period 
93 The applicant has indicates that the site will be developed in phases and all
developments have a level of impact during construction, and this is not the
same as long-term impacts of the end development/use.  In this case it is
considered that a Construction Traffic Management Plan should be put in place
to mitigate and manage potential impacts (Condition 20). In addition, construction
hours can be controlled to limit the hours of noisy work (Condition 5) 
Low and Zero Carbon Generating Technologies 
94 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. 
95 A condition will be added to ensure that low and zero-carbon generating
technologies are integrated into the proposal. (Condition 14) 
Developer Contributions 
96 There are no developer contributions required. 
Economic Impact 
97 The proposal will assist the existing business income, extend the visitor season,
and attract a wider market. This modest expansion ensures the estate remains
Page 179 of 212

Page 180

financially resilient, supports local employment, and continues contributing to the
rural economy. 
Variation of Application Under Section 32A 
98 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the site layout, lodges and
access road. 
Planning Obligations and Legal Agreements 
99 None required. 
Direction By Scottish Ministers 
100 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
101 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions.  
Recommendation   
Approve, subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved shall be used solely for holiday
accommodation and shall not be occupied as the sole or main residence of any
occupant. 
Page 180 of 212

Page 181

Reason: In order to clarify the terms of the permission; to control and restrict the
use of the building. 
3. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason: In order to safeguard the neighbouring residential amenity in the area. 
4. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In order to safeguard the residential amenity of the area. 
5. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays. The above shall be implemented throughout the
construction stage of the development unless otherwise agreed in writing with the
Council as Planning Authority and Environmental Health. 
Reason: In order to safeguard the residential amenity of the area. 
6. Prior to the development being brought into use a Noise Management Plan shall
be submitted for the written approval of the planning authority. The plan shall
include all sources of noise associated with the development, including user
noise and the measures that will be put in place to minimise and/or control noise.
The plan shall be reviewed on a regular basis or, following receipt of a justified
complaint or at the request of the planning authority. Once the Noise
Management Plan has been approved, it shall be fully implemented for the
lifetime of the development. 
Reason: In order to safeguard the residential amenity of the area. 
7. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation analysis, the development
as approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Page 181 of 212

Page 182

Council as Planning Authority, in consultation with PKHT. The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress.   
Reason: To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area. 
8. Development shall not commence until a detailed Construction Environmental
Management Plan (CEMP) detailing environmental mitigation measures and
construction method statements, including specific measures for environmental
monitoring during construction, shall be submitted for the written agreement of
the Council as Planning Authority.  Such details shall be submitted not less than
two months prior to the agreed scheduled commencement date and shall
incorporate detailed pollution avoidance and mitigation measures for all
construction elements.  Thereafter the development shall be fully undertaken in
accordance with the agreed CEMP.  For clarification, the CEMP shall include
information to satisfy the matters referred to in the consultation response from
Nature Scot and dated 6th Nov 2025. 
Reason: In order to ensure the development does not impact negatively on the
nearby Special Area of Conservation. 
9. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted to and approved
in writing by the Planning Authority.  The scheme shall include details of the
height and slopes of any mounding or recontouring of the site, full details of all
hard landscaping proposals including the construction material finish of the
internal access roads and parking, materials and installation methods and,
species, height, size and density of trees and shrubs to be planted.  The
scheme as subsequently approved shall be carried out and completed within the
first available planting season (October to March) after the completion or bringing
into use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the satisfaction of the Council as
Planning Authority. Any planting failing to become established within five years
shall be replaced in the following planting season with others of similar
size, species and number to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
10. The conclusions and recommended action points within the supporting ecology
survey submitted by Tay Ecology dated 17th June 2025 and hereby approved
(document(s) 07 relates) shall be fully adhered to, respected and undertaken as
part of the construction phase of development, to the satisfaction of the Council
as Planning Authority. 
Page 182 of 212

Page 183

Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
11.  An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
12. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason: In order to prevent animals from being trapped within any open
excavations. 
13. Prior to the commencement of the development hereby approved, a detailed plan
indicating location, quantity, specification and maintenance requirements for
compensation and biodiversity enhancement measures shall be submitted for the
further written agreement of the Council as Planning Authority.  It shall include:
- Retention of existing riparian vegetation. 
- Sowing native species-rich wildflower meadow mixes into retained areas of
grassland as compensation.
- Biodiversity enhancement measures over and above the measures required
for compensation in accordance with the recommendations within the
supporting biodiversity survey submitted and hereby approved. 
Thereafter, the agreed scheme shall be maintained in a reasonable condition for
the life of the development, to the satisfaction of the Council as Planning
Authority. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
14. Development shall not commence until specifying measures to maximise
environmental sustainability through design, orientation and planting or any other
means has been submitted for the written agreement of the Council as Planning
Authority. These measures shall include a scheme that demonstrates how
current carbon emissions reduction set by the Scottish Buildings Standards will
Page 183 of 212

Page 184

be met through the installation and operation of low and zero-carbon
technologies, specifying what these technology types are, their location and
ongoing operation and maintenance. All works shall be carried out in accordance
with the agreed scheme and be operational prior to the use of the development. 
Reason: In the interest of protecting the environment and sustainability. 
15. Prior to the commencement of development details of an interpretation board for
the Mill Lade shall be submitted for the written approval of the Council as
Planning Authority in consultation with the Council's Conservation Officer. The
interpretation board shall be installed in a prominent and publicly accessible
location.  The interpretation board as agreed shall be installed prior to the use of
the development. 
Reason: In the interest of maintaining the historic environment. 
16. Prior to the occupation of first holiday accommodation unit, the vehicle access
from the public road network to the site shall be surfaced in accordance with
Perth & Kinross Council's Road Development Guide, using Construction Type B
from the Construction Details for Access Types, C, D and E), for a minimum
distance of 10 metres from the edge of the public road network into the site, with
a suitable tie into the existing carriageway surface. 
Reason: In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
17. Prior to commencement of any development on site, a detailed design showing
the locations of passing places shall be submitted to and approved in writing by
the Planning Authority in consultation with the Roads Authority.  For the
avoidance of doubt, the detailed design shall provide for passing places along
the full length of the access track from the public road to the furthest most holiday
accommodation units.  The passing places, as approved in writing, shall be
implemented in accordance with the approved details to the satisfaction of the
Council as Planning Authority and undertaken prior to the commencement of
construction associated with this planning application (25/01794/FLL). 
Reason: In the interests of pedestrian and traffic safety 
18. Prior to the commencement of works on site, detailed drawings showing waste
and recycling bin presentation locations and strategy for presenting and
collecting waste from the site, shall be submitted for the written agreement of the
Council as Planning Authority.  None of the holiday accommodation units
hereby approved shall be occupied until the agreed scheme has been provided
in full for all units.   
Reason: In the interests of road safety to prevent long reversing manoeuvres. 
Page 184 of 212

Page 185

19. Prior to the occupation of each holiday accommodation unit, the cycle and car
parking facilities shown on the approved drawings shall be implemented and
thereafter maintained. 
Reason: In the interests of road safety; to ensure the provision of adequate off-
street car parking facilities and cycle storage facilities. 
20. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) shall include the following: 
(a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used and the Grandtully Bridge; 
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
(c) arrangements to ensure that access for emergency service vehicles are not
impeded;
(d) measures to minimise the level of dust, dirt and debris on the local roads;
and
(e) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason: In the interest of proper site management 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
None required 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Page 185 of 212

Page 186

Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. An application for Building Warrant may be required. 
4. Part of the approved development includes 'caravans'.  The developer is
advised that caravans require to be licensed under the terms of Section 1 of the
Caravan Sites and Control of Development Act 1960 and therefore a licence
application should be made to Environmental Health.  Application forms are
available at https://www.pkc.gov.uk/article/15600/Licence-caravan-site. 
5. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(tel 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
6. Due to the nature of the proposed work it is important to keep in mind the
possibility of finding bats when doing work on the existing roof.  If bats are found
during works, the work should stop immediately and you should contact
NatureScot at Battleby immediately for advice.  Building works should avoid the
times of year when bats are most vulnerable to disturbance.  The summer
months, when bats are in maternity roosts, and the winter months when bats are
hibernating, should be avoided.  Typically, early spring and autumn months are
the best times to do work that may affect bats.  If you suspect that bats are
present you should consult NatureScot for advice.  For further information visit
the Bat Conservation Trust website http://www.bats.org.uk/.  Please note that
bats are protected by law, and it is a criminal offence to deliberately harm,
capture, kill or disturb a bat or its resting place. 
7. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the site layout, lodges and
access road. 
8. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
9. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environmental Protection Agency.  
10. The internal site is to remain private and as such will not be maintained by Perth
& Kinross Council, nor will it be suitable for future adoption.  The Waste
Services team have requested that if the developer would like the Waste
Collection Vehicle to enter the site to collect waste, then the developer will be
Page 186 of 212

Page 187

required to indemnify the Council through a signed waiver. 
11. In accordance with Building Standards, a private wastewater treatment plant and
septic tank should be provided with an access for desludging.  The desludging
tanker should be provided with access to a working area that:
• will provide a clear route for the suction hose from the tanker to the tank, and
• is not more than 25m from the tank where it is not more than 4m higher than
the invert level of the tank, and
• is sufficient to support a vehicle axle load of 14 tonnes. 
Background Papers
Letters of representation 65 
Authors
Name Designation Contact Details
Joanne Ferguson Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
23 June 2026 
Page 187 of 212

Page 188

Page 188 of 212

Page 189

¯
Erection of 8 holiday accommodation units and associated works
25/01794/FLL
Scale
1:15,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(2)(ii)
Page 189 of 212

Page 190

Page 190 of 212

Page 191

¯
Erection of 8 holiday accommodation units and associated works
25/01794/FLL
Scale
1:5,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
5(2)(ii)
Page 191 of 212

Page 192

Page 192 of 212

Page 193

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Pre-Application Report by Development Management and Building Standards
Service Manager
(Report No. 26/209) 
Proposal: Residential development and associated works 
Location: Land 100 metres west pf 28 Strathmore Terrace, Alyth, Blairgowrie, PH11
8DP 
Ref. No: 26/00005/PAN
Ward No: P2 - Strathmore 
Summary 
This report is to inform the Committee of a potential forthcoming planning application in
respect of a major development for a residential development and associated works on
land 100 Metres West Of 28 Strathmore Terrace, Alyth, Blairgowrie, PH11 8DP. The
report also aims to highlight the key planning policies and the likely stakeholders who
would be involved in the decision making process, and to offer a brief overview of the
key planning issues which are likely to be relevant to the proposal. 
Background and Description 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 1 May 2026. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for a residential development on land
100metres West of 28 Strathmore Terrace, Alyth. The site is within the
settlement boundary of Alyth in the Perth & Kinross Local Development Plan 2
(2019). The site is not allocated although is immediately adjacent the H59
housing allocation. Pre-application reports give the Committee an opportunity
to raise issues which it would like to see addressed in the planning
application. 
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions. 
Environmental Impact Assessment (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.
6(i)
Page 193 of 212

Page 194

Pre-Application Process 
4. The PoAN (reference 26/00005/PAN) confirmed that a public exhibition will be
held at Alyth Community Hall, Albert Street, Alyth, PH11 8AX. The first event
was held on 25 May 2026 between 3:30pm and 7:30pm and the second event
will be held on Thursday 2 July 2026 between 3.30pm and 7.30pm. The Ward
Councillors and Alyth Community Council have been notified. The results of
the community consultation will be submitted with the planning application as
part of the required Pre-Application Consultation (PAC) Report. 
Development Plan 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the climate and nature crises
• Policy 2: Climate mitigation and adaptation
• Policy 3: Biodiversity 
• Policy 4: Natural places
• Policy 5: Soils
• Policy 6: Forestry, woodland and trees
• Policy 7: Historic assets and places
• Policy 13: Sustainable transport
• Policy 14: Design, quality and place
• Policy 15: Local living and 20 minute neighbourhoods
• Policy 16: Quality homes
• Policy 18: Infrastructure first 
• Policy 20: Blue and green infrastructure
• Policy 22: Flood risk and water management   
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance.
Page 194 of 212

Page 195

10. The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 14B: Open Space Retention and Provision: Open Space within
New Developments
• Policy 15: Public Access 
• Policy 17: Residential Areas 
• Policy 23: Delivery of Development Sites 
• Policy 24: Maintaining an Effective Housing Land Supply 
• Policy 25: Housing Mix 
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 39: Landscape
• Policy 40: Forestry, Woodland and Trees: Trees, Woodland and
Development 
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
11.
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
12. The following non statutory guidance and documents are of particular
importance in the assessment of this application: 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
Page 195 of 212

Page 196

National Guidance 
13. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
14. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN 65 Planning and Open space 
Planning Site History 
15. 07/01505/FUL Full Planning Permission was Approved on 7 February 2008
for the erection of 34 detached two storey dwellings and associated site works 
16. 07/02789/ADV Advertisement Consent was Approved on 19 February 2008
for the display of a sign 
17. 08/01240/FUL Full Planning Permission was Approved on 16 July 2008 for
the change of house types on plots 101, 102 and 103 (approved as plots 25,
26 and 27). 
Consultations 
18. As part of the planning application process the following would be consulted: 
External 
• Scottish Water
• Perth and Kinross Heritage Trust 
• Alyth Community Council  
Internal 
• Environmental Health 
• Development Plans
• Development Contributions Officer
• Community Greenspace including Access
• Transportation and Development
• Structures and Flooding
• Waste Services
• Biodiversity Officer 
Key Issues Against Which a Future Application Will Be Assessed 
19. The key considerations against which the eventual application will be
assessed include: 
Page 196 of 212

Page 197

a.  Visual impact 
b.  Scale, design and layout 
c.  Relationship to nearby land uses 
d.  Natural heritage and ecology
e.  Landscape
f.   Water resources and soils 
g.  Air quality  
h.  Transport implications 
i.  Tourism and economy 
j.  Impact on agriculture
k.  Archaeology and cultural heritage 
Additional Statements Which Will Be Required 
20. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement /Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Flood Risk and Drainage Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment 
Conclusion and Recommendation 
21. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Authors
Name Designation Contact Details
Sean Panton Team Leader (Major
Applications and
Enforcement)
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager (Development
Management and Building Standards)
9 June 2026 
Page 197 of 212

Page 198

Page 198 of 212

Page 199

¯
Residential development and associated works
26/00005/PAN
Scale
1:10,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
6(i)
Page 199 of 212

Page 200

Page 200 of 212

Page 201

¯
Residential development and associated works
26/00005/PAN
Scale
1:5,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
6(i)
Page 201 of 212

Page 202

Page 202 of 212

Page 203

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Pre-Application Report by Development Management and Building Standards
Service Manager
(Report No. 26/210) 
Proposal: Erection of an office building, formation of access and parking area and
associated works 
Location: Land 880 metres north of Bertha Park Farm, Perth, PH1 3EQ 
Ref. No: 26/00006/PAN
Ward No: P5 - Strathtay 
Summary 
This report is to inform the Committee of a potential forthcoming planning application in
respect of a major development for the erection of an office building, formation of
access and parking area and associated works on land 880metres North of Bertha Park
Farm, Perth, PH1 3EQ. The report also aims to highlight the key planning policies and
the likely stakeholders who would be involved in the decision making process, and to
offer a brief overview of the key planning issues which are likely to be relevant to the
proposal. 
Background and Description 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 22 May 2026. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for the erection of an office building, formation
of access and parking area and associated works on land 880metres North of
Bertha Park Farm, Perth, PH1 3EQ. The site is within the settlement boundary
of Perth in the Perth & Kinross Local Development Plan 2 (2019) and forms
part of mixed use allocations MU345 and MU168. Pre-application reports give
the Committee an opportunity to raise issues which it would like to see
addressed in the planning application. 
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions. 
Environmental Impact Assessment (EIA) 
3. The development is considered an EIA development under the EIA 2017
Regulations. A Scoping Request has been submitted (26/00553/SCOP) to
6(ii)
Page 203 of 212

Page 204

establish the exact detailing required as part of the EIA submission. This
Scoping Request was responded to by the Council as Planning Authority on
2 June 2026. 
Pre-Application Process 
4. The PoAN (reference 26/00006/PAN) confirmed that two public exhibitions
will be held at the Bertha Park Community Hub, 15 Adamson Avenue, Perth,
PH1 0AL. The first event on 17 June 2026 between 2pm and 7pm and the
second event on 26 August 2026 between 2pm and 7pm. The Ward
Councillors, MSP’s, MP, Scone and District Community Council, and
Luncarty, Redgorton and Moneydie Community Council have all been notified.
The results of the community consultation will be submitted with the planning
application as part of the required Pre-Application Consultation (PAC) Report. 
Development Plan 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies. This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces. 
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the climate and nature crises
• Policy 2: Climate mitigation and adaptation
• Policy 3: Biodiversity 
• Policy 4: Natural places
• Policy 5: Soils
• Policy 6: Forestry, woodland and trees
• Policy 7: Historic assets and places
• Policy 13: Sustainable transport
• Policy 14: Design, quality and place
• Policy 15: Local living and 20 minute neighbourhoods
• Policy 18: Infrastructure first 
• Policy 20: Blue and green infrastructure
• Policy 22: Flood risk and water management  
• Policy 26: Business and industry 
Page 204 of 212

Page 205

Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
10. The principal relevant policies are, in summary: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 7B: Employment and Mixed Use Areas: Mixed-Use Sites
• Policy 14B: Open Space Retention and Provision: Open Space within
New Developments
• Policy 15: Public Access 
• Policy 17: Residential Areas 
• Policy 23: Delivery of Development Sites 
• Policy 24: Maintaining an Effective Housing Land Supply 
• Policy 25: Housing Mix 
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 39: Landscape
• Policy 40: Forestry, Woodland and Trees: Trees, Woodland and
Development 
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
11.  
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
Page 205 of 212

Page 206

• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
12. The following non statutory guidance and documents are of particular
importance in the assessment of this application: 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
National Guidance 
13. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars. 
Planning Advice Notes 
14. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN 65 Planning and Open space 
• PAN 1/2011 Planning and Noise 
Planning Site History of Relevance  
15. 15/01112/IPM - Residential development with community facilities,
employment land, open space, landscaping and associated infrastructure (in
principle) – Application Approved 
16. 18/01800/IPM - Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997 to amend condition 1 (timescales for submission
of Approval of Matters Specified by Conditions applications) and condition 2
(phasing of development) of planning permission 15/01112/IPM (residential
development with community facilities, employment land, open space,
landscaping and associated infrastructure (in principle)) – Application
Approved 
17. 26/00553/SCOP - On 2 June 2026 for Erection of an office building, formation
of vehicular parking, installation of EV charging units, sustainable drainage
systems, erection of security fencing, landscaping and associated works. 
Consultations 
18. As part of the planning application process the following would be consulted: 
Page 206 of 212

Page 207

External 
• Scottish Water
• Transport Scotland
• Perth and Kinross Heritage Trust (PKHT)
• Historic Environment Scotland (HES)
• Scottish Environment Protection Agency 
Internal 
• Environmental Health (Odour and Noise) (Contaminated Land) 
• Development Plans 
• Development Contributions Officer 
• Transportation and Development
• Structures and Flooding
• Waste Services
• Biodiversity Officer
• Community Greenspace including Access
• Economic Development 
Key Issues Against Which A Future Application Will Be Assessed 
19. The key considerations against which the eventual application will be
assessed include: 
a. Visual impact 
b. Scale, design and layout 
c. Relationship to nearby land uses 
d. Natural heritage and ecology
e. Landscape
f. Water resources and soils 
g. Air quality  
h.  Transport implications 
i.  Economic impact
j.  Impact on agriculture
k.  Archaeology and cultural heritage 
l.  Connection to active travel routes 
Additional Statements Which Will Be Required 
20. The following documents should be submitted with any planning application: 
• Planning Statement / Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Construction Traffic Management Plan 
• Travel Plan (including linkages to active travel routes)
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
Page 207 of 212

Page 208

• Archaeological Assessment
• Sustainability Assessment
• Air Quality Assessment
• Noise Impact Assessment 
Conclusion and Recommendation 
21. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise Officers of any other issues which they consider should
be included as part of the application and assessment.  
Authors
Name Designation Contact Details
Sean Panton Team Leader (Major
Applications and
Enforcement)
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager (Development
Management and Building Standards)
9 June 2026 
Page 208 of 212

Page 209

¯
Erection of an office building, formation of access and parking area and
associated works
26/00006/PAN
Scale
1:20,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
6(ii)
Page 209 of 212

Page 210

Page 210 of 212

Page 211

¯
Erection of an office building, formation of access and parking area and
associated works
26/00006/PAN
Scale
1:10,000
Planning and Placemaking
Committee – 8 July 2026
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
6(ii)
Page 211 of 212

Page 212

Page 212 of 212