Democracy Spraffa

26/00006/Pan

Perth and Kinross Council · 8 July 2026
Back to Planning and Placemaking Committee — 8 July 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Pre-Application Report by Development Management and Building Standards
Service Manager
(Report No. 26/210) 
Proposal: Erection of an office building, formation of access and parking area and
associated works 
Location: Land 880 metres north of Bertha Park Farm, Perth, PH1 3EQ 
Ref. No: 26/00006/PAN
Ward No: P5 - Strathtay 
Summary 
This report is to inform the Committee of a potential forthcoming planning application in
respect of a major development for the erection of an office building, formation of
access and parking area and associated works on land 880metres North of Bertha Park
Farm, Perth, PH1 3EQ. The report also aims to highlight the key planning policies and
the likely stakeholders who would be involved in the decision making process, and to
offer a brief overview of the key planning issues which are likely to be relevant to the
proposal. 
Background and Description 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 22 May 2026. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for the erection of an office building, formation
of access and parking area and associated works on land 880metres North of
Bertha Park Farm, Perth, PH1 3EQ. The site is within the settlement boundary
of Perth in the Perth & Kinross Local Development Plan 2 (2019) and forms
part of mixed use allocations MU345 and MU168. Pre-application reports give
the Committee an opportunity to raise issues which it would like to see
addressed in the planning application. 
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions. 
Environmental Impact Assessment (EIA) 
3. The development is considered an EIA development under the EIA 2017
Regulations. A Scoping Request has been submitted (26/00553/SCOP) to

Page 2

establish the exact detailing required as part of the EIA submission. This
Scoping Request was responded to by the Council as Planning Authority on
2 June 2026. 
Pre-Application Process 
4. The PoAN (reference 26/00006/PAN) confirmed that two public exhibitions
will be held at the Bertha Park Community Hub, 15 Adamson Avenue, Perth,
PH1 0AL. The first event on 17 June 2026 between 2pm and 7pm and the
second event on 26 August 2026 between 2pm and 7pm. The Ward
Councillors, MSP’s, MP, Scone and District Community Council, and
Luncarty, Redgorton and Moneydie Community Council have all been notified.
The results of the community consultation will be submitted with the planning
application as part of the required Pre-Application Consultation (PAC) Report. 
Development Plan 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies. This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces. 
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the climate and nature crises
• Policy 2: Climate mitigation and adaptation
• Policy 3: Biodiversity 
• Policy 4: Natural places
• Policy 5: Soils
• Policy 6: Forestry, woodland and trees
• Policy 7: Historic assets and places
• Policy 13: Sustainable transport
• Policy 14: Design, quality and place
• Policy 15: Local living and 20 minute neighbourhoods
• Policy 18: Infrastructure first 
• Policy 20: Blue and green infrastructure
• Policy 22: Flood risk and water management  
• Policy 26: Business and industry

Page 3

Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
10. The principal relevant policies are, in summary: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 7B: Employment and Mixed Use Areas: Mixed-Use Sites
• Policy 14B: Open Space Retention and Provision: Open Space within
New Developments
• Policy 15: Public Access 
• Policy 17: Residential Areas 
• Policy 23: Delivery of Development Sites 
• Policy 24: Maintaining an Effective Housing Land Supply 
• Policy 25: Housing Mix 
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 39: Landscape
• Policy 40: Forestry, Woodland and Trees: Trees, Woodland and
Development 
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
11.  
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)

Page 4

• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
12. The following non statutory guidance and documents are of particular
importance in the assessment of this application: 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
National Guidance 
13. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars. 
Planning Advice Notes 
14. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN 65 Planning and Open space 
• PAN 1/2011 Planning and Noise 
Planning Site History of Relevance  
15. 15/01112/IPM - Residential development with community facilities,
employment land, open space, landscaping and associated infrastructure (in
principle) – Application Approved 
16. 18/01800/IPM - Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997 to amend condition 1 (timescales for submission
of Approval of Matters Specified by Conditions applications) and condition 2
(phasing of development) of planning permission 15/01112/IPM (residential
development with community facilities, employment land, open space,
landscaping and associated infrastructure (in principle)) – Application
Approved 
17. 26/00553/SCOP - On 2 June 2026 for Erection of an office building, formation
of vehicular parking, installation of EV charging units, sustainable drainage
systems, erection of security fencing, landscaping and associated works. 
Consultations 
18. As part of the planning application process the following would be consulted:

Page 5

External 
• Scottish Water
• Transport Scotland
• Perth and Kinross Heritage Trust (PKHT)
• Historic Environment Scotland (HES)
• Scottish Environment Protection Agency 
Internal 
• Environmental Health (Odour and Noise) (Contaminated Land) 
• Development Plans 
• Development Contributions Officer 
• Transportation and Development
• Structures and Flooding
• Waste Services
• Biodiversity Officer
• Community Greenspace including Access
• Economic Development 
Key Issues Against Which A Future Application Will Be Assessed 
19. The key considerations against which the eventual application will be
assessed include: 
a. Visual impact 
b. Scale, design and layout 
c. Relationship to nearby land uses 
d. Natural heritage and ecology
e. Landscape
f. Water resources and soils 
g. Air quality  
h.  Transport implications 
i.  Economic impact
j.  Impact on agriculture
k.  Archaeology and cultural heritage 
l.  Connection to active travel routes 
Additional Statements Which Will Be Required 
20. The following documents should be submitted with any planning application: 
• Planning Statement / Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Construction Traffic Management Plan 
• Travel Plan (including linkages to active travel routes)
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey

Page 6

• Archaeological Assessment
• Sustainability Assessment
• Air Quality Assessment
• Noise Impact Assessment 
Conclusion and Recommendation 
21. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise Officers of any other issues which they consider should
be included as part of the application and assessment.  
Authors
Name Designation Contact Details
Sean Panton Team Leader (Major
Applications and
Enforcement)
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager (Development
Management and Building Standards)
9 June 2026