Page 1

Perth and Kinross Council 
Planning and Placemaking Committee - 8 July 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/207) 
Proposal: Change of use of quarry to gun dog training centre, erection of kennels,
veterinary practice, reception building, indoor arena, maintenance
buildings, staff and student accommodation, installation of PV and ASHP
and associated works 
Location: Land south west of Arns Farm, Auchterarder 
Ref. No: 26/00045/FLL
Ward No: P7 - Strathallan 
Summary 
This report recommends approval of the application, subject to the conclusion of a legal
agreement to secure the proposed residential elements as “employment-linked
affordable housing”. The proposal is considered to accord with the Development Plan,
comprising National Planning Framework 4 (NPF4) and the Perth and Kinross Local
Development Plan 2 (LDP2), in that it supports rural business diversification and
economic growth (NPF4 Policy 29; LDP2 Policy 8), makes effective use of a previously
developed quarry site alongside an accelerated restoration strategy (NPF4 Policy 9),
and provides a form of development that is appropriately located to meet its functional
needs. The scale, siting and design of the development is considered acceptable and
capable of integration within the landscape, while environmental impacts relating to
noise, transport, drainage, ecology and light pollution can be satisfactorily mitigated
through conditions. The inclusion of on-site accommodation is justified by operational
requirements and secured as employment-linked affordable housing, aligning with
LDP2 Policies 19 and 20 and NPF4 Policy 17. Subject to these controls and the
associated legal agreement, no material considerations have been identified that would
outweigh the Development Plan, and the proposal is therefore recommended for
approval. 
Background and Description of Proposal 
1 The proposal is to make use of parts of Craigrossie Quarry by the applicant
‘Mordor Gundogs’ as the “Dog Ranch”. Craigrossie Quarry being southwest of
Hall Farm, between Auchterarder and Aberuthven. The proposed use and
associated development works can be described as a mixed-use development
comprising kennels, training and operational facilities, a veterinary practice, staff

Page 2

and student accommodation, and associated infrastructure, alongside the
accelerated restoration of the quarry – the operation of which would cease to
facilitate the use as the Dog Ranch. 
2 The application site extends to approximately 1.9 hectares (ha) and sits within
the wider Craigrossie Quarry (c.21.7ha). The quarry is located between the
settlements of Aberuthven and Auchterarder, with the A9 forming the north-west
boundary of the site and the Stirling–Perth railway line forming the southern
boundary. Access is to the east off the B8062. The quarry has an extensive
planning history associated with sand and gravel extraction and restoration, most
recently under application reference 19/01927/MWM, which is reported
elsewhere on the Agenda of this Committee. 
3 The current application is closely linked to the long‑running planning situation at
Craigrossie Quarry and the associated undetermined mineral extraction and
restoration application associated with the wider quarry site. That application was
submitted in 2019 and sought to secure continued mineral extraction alongside a
structured and detailed restoration scheme post quarrying. The application was
reported to the Planning and Placemaking Committee in March 2020 with a
recommendation of approval, subject to conditions and the preparation and
agreement of a financial restoration bond intended to protect the Council’s
position in relation to the delivery of the approved restoration works. The
Committee agreed that recommendation. 
4 Despite sustained efforts by officers, it has proven very difficult to secure this
legal agreement with the applicant/operator of the quarry. As a result, and
notwithstanding the resolution of the committee, application 19/01927/MWM
remains undetermined. 
5 The current Dog Ranch proposals are associated to a new party, Mor Dor
Gundogs, who has a contract in place to purchase the entire Craigrossie Quarry
from the current owner, subject to receipt of planning permission. In parallel with
this application, a revised set of quarry restoration proposals are being
considered under application reference 19/01927/MWM. These revised plans
demonstrate an accelerated programme for the cessation of quarry operations
and the restoration of the site, designed to facilitate the delivery of the proposed
Dog Ranch. 
6 The updated proposals set out revised restoration proposals for application
19/01927/MWM considered elsewhere on this Committee’s Agenda. The
accelerated restoration effectively addressing the long‑standing objective of the
Council to secure the comprehensive restoration of the quarry, returning the land
to a more natural state following mineral extraction, while enabling the
redevelopment of part of the quarry as the Dog Ranch. 
7 A detailed assessment of the quarry restoration proposals is set out in that
separate report relating to application 19/01927/MWM. This report concentrating
on the planning considerations associated with the proposed Dog Ranch use.

Page 3

8 The proposed development would be located within the core operational area of
the quarry. The ‘red line’ boundary of the Dog Ranch encapsulating a
substantially smaller area (1.9ha) than the wider quarry (21.7ha). It is located on
an area of existing hardstanding, currently occupied by buildings, parking, and
machinery storage, and therefore does not, in itself, require extensive restoration. 
The remainder of the quarry is intended to be restored to a mix of farmland,
grassland, lochans and woodland in accordance with the proposed restoration
framework. The submitted application proposes that quarrying activities would
cease and that restoration of the quarry would be accelerated, with completion by
2027. 
9 The applicant, Mordor Gundogs, is an established rural business founded in
2003 and currently operates from Craighead Farm near Perth. The business
specialises in the breeding, training and support of gundogs and operates both
nationally and internationally. Supporting information sets out that the proposed
development is intended to consolidate and expand the existing business
activities, including training, education, kennelling, veterinary services and on-site
accommodation for staff and students. 
10 The application is supported by a Planning Statement, a Design and Access
Statement, and a range of technical and environmental assessments, including
transport, ecology and noise. The proposal has been subject to pre-application
consultation under reference 25/00090/PREAPL, and the application has been
submitted as a local development in accordance with the Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009. An
Environmental Impact Assessment screening process has been undertaken in
accordance with the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017 which concluded that the proposal
was not EIA Development. 
Description of Development 
11 The proposed layout comprises a series of distinct building groups within what
would be the former quarry and arranged to reflect both operational requirements
and a rural spatial pattern. Access is taken from the existing junction onto the
B8062, leading into a tree-lined avenue to a cluster of buildings accommodating
staff housing and student accommodation overlooking the access and acting as
a gateway to the wider development. 
12 Beyond this, to the northeast, the core operational area includes the reception
building, indoor training arena and veterinary practice. These are supported by a
range of kennel buildings, including ‘luxury’, ‘boarding’ and ‘gundog’ kennels, as
well as a dog park area, all grouped together to reflect their functional
relationship. A further ancillary general-purpose building is located to the
northwest, to be used for maintenance and storage purposes. 
13 The layout also incorporates a cottage and puppy kennels positioned slightly
separate from the main kennel complex, to provide an appropriate level of
supervision and operational segregation. Circulation within the site is achieved

Page 4

through an internal access route linking all building groups, with areas of parking
and servicing located close to the main operational buildings. 
14 The majority of the wider quarry site is given over to landscape restoration,
including the creation of new woodland, open ground and water features
associated with the quarry restoration works. Existing woodland belts are
retained and supplemented with new planting to provide enclosure and
integration of the development into the surrounding landscape. The restoration
proposals are assessed separately under application 19/01927/MWM. 
15 The acceptability of the gun dog facility proposed under this application must be
considered separately and independently from the associated restoration
application, and does not predetermine its outcome, nor vice versa. 
16 Nevertheless, the two proposals are interrelated and, when viewed together,
present an opportunity to resolve the long-standing planning position at
Craigrossie Quarry by pairing a viable end use with a deliverable strategy for the
restoration of the wider site. 
Site History 
17 08/00423/FUL Full Planning Permission was approved on 21 July 2009 for Re-
alignment of farm access road and second phase of sand and gravel extraction. 
18 08/00428/MW A Mineral Works application was approved on 21 July 2009 for
Re-alignment of farm access road and second phase of small scale sand and
gravel extraction. 
19 18/00009/PAN On 14 August 2018 a Proposal of Application Notice was
submitted for Phase 3 small scale minerals extraction and processing activities
(in part retrospect), including reinstatement, restoration, landscaping, processing
building and ancillary accommodation, access and associated works – the
intended approach to consultation was accepted. 
20 18/01423/SCRN On 14 August 2018 Perth and Kinross Council issued a
Screening Opinion advising that proposals for a Phase 3 of minerals extraction.
and processing activities did not constitute EIA development. 
21 19/01927/MWM A Major Application for Mineral Works was submitted in 2019 for
Mineral extraction and processing including alterations to vehicular access,
erection of ancillary buildings, landscaping, reinstatement and associated works
(Phase 3) (in part retrospect) – Pending Consideration 
Environmental Impact Assessment 
22 An Environmental Impact Assessment (EIA) screening exercise has been
undertaken in accordance with the Town and Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017. This established that, whilst
the proposal falls within the scope of Schedule 2 development by virtue of its

Page 5

scale and nature, it is not considered to be EIA development having regard to the
selection criteria set out in Schedule 3 of the Regulations. The assessment
concluded that the proposed development would not be likely to give rise to
significant environmental effects. On that basis, it has been determined that the
submission of an Environmental Impact Assessment Report was not required. 
Pre-Application Consultation 
23 Pre application Reference: 25/00090/PREAPL  
Major Application 
24 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
25 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
26 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
27 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 2: Climate Mitigation and Adaption
• Policy 4: Natural Places
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 17: Rural Homes
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 29: Rural Development
• Policy 33: Minerals

Page 6

Perth and Kinross Local Development Plan 2019 
28 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
29 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 19: Housing in the Countryside
• Policy 20: Affordable Housing
• Policy 32: Embedding Low and Zero Carbon Technology
• Policy 39: Landscape
• Policy 48A: Minerals and Other Extractive Activities - Safeguarding:
Sterilisation of Mineral Deposits
• Policy 49A: Minerals and Other Activities - Supply: Extraction
• Policy 49B: Minerals and Other Activities - Supply: Restoration
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
30
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Financial Guarantees for Minerals Development
(adopted in 2021)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)

Page 7

Other Material Considerations 
PKC Non Statutory Guidance
31
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
32 The Scottish Government expresses its planning policies through various
documents including the National Roads Development Guide and a series of
Circulars in addition to NPF4. Those relevant are listed below. 
Creating Places 2013 
33 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
34 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Others 
35 Tayside Landscape Character Assessment (TLCA) 
CONSULTATIONS 
36 As part of the planning application process the following bodies were consulted: 
External 
37 Scottish Water – No objection 
38 Transport Scotland – No objection and did not advise against approval of the
proposed development. 
Internal 
39 Environmental Health (Noise/Odour) – No objection, subject to conditions
controlling noise levels, operational activities and mitigation measures.  This
following additional information being submitted in relation to the initial Noise
Impact Assessment. This incorporated background monitoring and a more robust

Page 8

methodology to demonstrate that noise impacts would be low and not result in
unacceptable effects on nearby residential amenity. 
40 Development Contributions Officer – No objection. This followed clarification
over education contributions due to identified capacity constraints at
Auchterarder Primary However, as the proposed residential units were (on
clarification) accepted as ‘employment‑linked affordable housing’ (to be
controlled through a legal agreement), no education contribution is considered
required. Similarly, no contribution towards A9 Junction improvements is sought,
as the development is not expected to increase traffic and would reduce travel
demand from the existing use and through on‑site employment and
accommodation provision. 
41 Flooding – No objection. Advise that the proposed private foul and surface water
drainage strategy, incorporating on‑site treatment and SuDS, is acceptable. No
adverse environmental or flood risk impacts are identified. Subject to detailed
design and regulatory approval, the proposal is considered to comply with
relevant drainage and flooding policies. 
42 Transportation and Development - No objection, subject to conditions. Advise
the proposal would not adversely affect road safety or the network and benefits
from reduced travel demand through on‑site accommodation and appropriate
infrastructure provision. 
43 Environmental Health (Private Water) – No objection. Advise the use of a
private water supply via a borehole is acceptable, subject to registration and
monitoring. Conditions are recommended to ensure this supply is appropriately
managed and meets regulatory standards. 
44 Environmental Health (Contaminated Land) – No objection subject to a
condition associated to a site investigation to assess ground conditions and
ensure the land is suitable for the proposed use, given the quarry use. 
Representations 
45 One representation has been received which, whilst not objecting to the proposal
raises the following issues.   
• Impact on residential amenity/noise control
• Extent of dog training beyond red line planning boundary 
46 These issues are addressed in the Appraisal section of the report. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required

Page 9

Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Flood Risk Assessment
Drainage Impact Assessment
Noise Impact Assessment 
Appraisal 
47 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance as outlined above. 
Principle of Gun Dog Training Facility 
48 The proposal for a gun dog training facility, or ‘Dog Ranch’, at Craigrossie Quarry
falls to be assessed against Policy 8: Rural Business of the Perth and Kinross
Local Development Plan 2019 (LDP2) and Policy 29: Rural Development of
National Planning Framework 4 (NPF4). 
49 Policy 29 of NPF4 supports development proposals in rural areas that contribute
to the viability, sustainability and diversity of rural communities and the rural
economy, including the expansion and diversification of existing businesses,
where these are appropriately located, scaled and designed. In a similar vein,
Policy 8 of the LDP2 provides support in principle for new and expanding rural
businesses where proposals demonstrate an appropriate relationship to their
rural setting, do not give rise to unacceptable environmental or amenity impacts,
and can be accommodated in terms of access and infrastructure. 
50 The operational nature of the proposal is such that a countryside or location
away from property where amenity may be adversely affected is appropriate and
in effect fundamental to its function. Activities associated with gun dog training,
kennelling, veterinary services and demonstration events are inherently
land‑based and rely upon access to extensive outdoor areas, separation from
sensitive residential environments, and a rural context that would not be
achievable within a settlement. In this respect, the proposal aligns well with the
type of development envisaged by both Policy 8 and Policy 29, which recognise
the need for rural businesses to operate in locations dictated by their functional
requirements.

Page 10

51 The specific location of the site is also considered to be favourable in principle.
While rural in character, the site benefits from relative proximity to
Auchterarder/Aberuthven and direct access to the wider trunk road network. This
relationship provides an appropriate balance between seclusion and
accessibility, allowing the operation to cater both for local customers and for a
wider catchment drawing from across the Council area and beyond. This reflects
the applicant’s stated business model and reduces pressure for more remote
countryside locations to accommodate similar uses. In policy terms, the site can
therefore be regarded as suitably located in relation to both the operational
needs of the business and the accessibility considerations set out in Policy 8. 
52 The planning history of Craigrossie Quarry and the long‑running objective of
securing its effective restoration form an important part of the wider context for
this application. The proposed gun dog training facility is closely linked to the
accelerated restoration strategy submitted under application 19/01927/MWM,
which would bring an end to mineral extraction and return the majority of the site
to a more natural landscape, which the Planning Authority has been seeking to
achieve for some time. This carries considerable weight in demonstrating a
long‑term future for the site that moves away from extractive industry towards a
more sustainable land use. 
53 While the accelerated restoration proposals are a significant material
consideration and clearly strengthen the overall planning position of the site, they
are not, in themselves, sufficient to justify the development. The gun dog training
facility must still be acceptable in terms of the requirements of Policy 8 and Policy
29, including matters of scale, environmental impact, landscape fit, traffic
generation and compatibility with surrounding land uses. Those matters are
addressed below. 
54 On balance, it is considered that the principle of a rural business use of this
nature, in this location, is consistent with the strategic direction of national and
local planning policy. The proposal represents a form of rural economic activity
that is appropriately sited, makes functional use of a previously disturbed site,
and benefits from a location that combines rural characteristics with reasonable
accessibility. Subject to detailed consideration of specific impacts, the proposal
can therefore be regarded as acceptable in principle under Policy 8 of the Local
Development Plan and Policy 29 of National Planning Framework 4. 
55 The proposed residential accommodation associated with the operation raises
separate policy considerations and will be assessed independently under the
Housing in the Countryside policy framework below. Its acceptability does not
automatically flow from the acceptability of the rural business use. 
Principle of On‑Site Accommodation/Housing 
56 The application includes provision for five residential units, indicated as being
associated with the proposed wider gun dog training and other facilities. As
detailed in the supporting information, this comprises: two 2‑bed cottages, two
3‑bed cottages, and a 1‑bed flat located within the puppy kennel building. All are

Page 11

to be for staff use only and explicitly linked to the operation of the business. 
57 The acceptability of the proposed accommodation must be assessed primarily
against Policy 19: Housing in the Countryside of LDP2 and the associated
Housing in the Countryside Supplementary Guidance (SG).  Section 3.3 of the
SG provides for housing associated with a proposed or expanded economic
activity where it can be demonstrated that such accommodation is necessary for
the operation, management or sustainability of the business, reflecting a broader
policy objective of supporting rural employment, growth and diversification. This
approach is broadly consistent with the national policy framework set out in
NPF4, in particular Policy 17: Rural Homes, which supports housing in rural
areas where it is demonstrably linked to and required for the operation of a rural
business or economic activity, thereby reinforcing the principle of supporting
sustainable rural development. 
58 In this case, the proposed accommodation is directly related to the operational
requirements of the gun dog training facility. The applicant has identified a clear
functional need for an on‑site staff presence to support site security, animal
welfare, veterinary oversight and the supervision of puppies, including overnight
monitoring. Given the nature of the use, the welfare requirements of animals, and
the scale of the operation proposed, it is considered reasonable that staff
accommodation should be provided on site rather than relying on off‑site housing
in nearby settlements. Furthermore, the facility is intended to accommodate staff
and trainees attending for relatively short, intensive periods of training. This
reinforces the need for on‑site accommodation, as it reduces the need for regular
travel to and from the site and ensures that personnel can be readily available as
required, thereby supporting both the efficient operation of the facility and the
welfare of the animals. 
59 The rural location of Craigrossie Quarry further reinforces this position. The site
is located a reasonable distance from Auchterarder/Aberuthven and is not well
served by public transport, particularly outside normal daytime hours. In this
context, reliance on off‑site accommodation would raise practical concerns in
terms of response times, staff availability, night‑time supervision and overall site
security, while also increasing unsustainable travel patterns. The provision of
accommodation on site therefore supports the efficient and responsible operation
of the business. 
60 The scale of accommodation proposed—five units in total—is considered
proportionate to the size and functional needs of the operation as described. The
inclusion of a dedicated flat within the puppy kennel building specifically to
enable overnight supervision further demonstrates that the accommodation is
operationally driven rather than speculative or residential in nature. Importantly,
the units are intended solely for occupation by staff employed at the Dog Ranch,
with their use tied to the business through tenure and title arrangements which
can be secured via a Section 75 legal agreement. 
61 On this basis, it is considered that the proposed on‑site accommodation satisfies
the intent and requirements of Policy 19 of LDP2 and 17 of NFP4, insofar as it

Page 12

constitutes housing associated with a rural economic activity and supports the
growth, diversification and sustainable management of that enterprise. The
provision of on‑site housing of the scale proposed is therefore considered
acceptable in principle. 
62 An assessment of the design, form, siting and landscape impact of the proposed
accommodation and other development is assessed below. 
Use of Wider Quarry Site 
63 The application relates specifically to the defined red line boundary of
approximately 1.9 hectares, which contains the proposed built development,
associated access, parking areas and the enclosed outdoor dog park.  The
wider Craigrossie Quarry site, although intended to see ownership transferred to
the applicant, if planning permission is granted, lies out with this defined area.
Notwithstanding this, the supporting Planning Statement confirms that the
restored quarry landscape—comprising grassland, lochans and woodland—will
be utilised on a limited and ancillary basis for dog exercise and training activities.
This use is described as low intensity and incidental to the primary operation,
with no material change of use proposed for these areas, which will continue to
function as restored agricultural and natural land managed through grazing and
habitat creation. 
64 The Council will retain the right to a future review of the extent and nature of
activities taking place within the wider quarry area, should planning permission
be granted, in order to ensure that the use remains ancillary to any approved
development. Should the level or intensity of use extend beyond that described,
or constitute a material change of use of the wider site/quarry, it may be
necessary for the applicant to submit a further planning application to consider
that more intensive use. 
Design and Layout 
65 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and 1B of LDP2, which relate to placemaking,
alongside Policy 14 of NPF4 which seeks to deliver well-designed development.
Further guidance is also provided within the associated Placemaking
Supplementary Guidance. 
66 The layout is arranged as a series of clearly defined building groups, reflecting
both functional requirements and a rural settlement pattern. Staff and student
accommodation is positioned at the site entrance to provide an active frontage
and natural surveillance, while the main operational buildings, including
reception, training facilities, veterinary practice and kennels, are clustered further
to the north-east within an existing hardstanding area of the quarry to form the
core of the development and allow for efficient day-to-day operation. Ancillary
and service buildings are located in close proximity to support these uses. These
arrangements reflect the established position of the site access. The wider quarry
site is predominantly given over to landscape restoration, including new

Page 13

woodland planting and open areas, with existing vegetation retained and
reinforced to provide enclosure and assist integration into the surrounding
countryside. 
67 However, it is noted that the submitted plans provide only limited detail in respect
of the finalised layout, particularly in relation to detailed parking arrangements,
servicing, and the precise extent and treatment of garden ground associated with
the residential elements. Given the scale of the site and the evolving nature of
the proposals, this level of detail is not considered sufficient. 
68 Notwithstanding this, it is considered that the overall development framework is
acceptable and capable of delivering an appropriate outcome. Furthermore,
given the existing condition of the site as an operational quarry and the
associated visual impact, there is an opportunity for significant environmental
improvement through restoration and redevelopment. In this context, it is
considered both reasonable and proportionate to address these detailed design
matters through condition (Condition 12), requiring the submission of a more
detailed layout plan for the approval of the Planning Authority prior to
development taking place on the relevant parts of the site. 
69 A key aspect of the proposal is the accelerated restoration of the former quarry,
with all quarrying activities ceasing and the site being restored significantly earlier
than previously envisaged, thereby establishing an appropriate landscape
framework within which the development will sit. The buildings proposed across
the site are of a simple and utilitarian form, reflecting their operational function
and drawing on rural and agricultural building typologies, with materials such as
timber cladding and anthracite grey metal cladding to both walls and roofs. The
staff accommodation and housing adopts a similarly simple design with pitched
roof forms, which is considered appropriate for the location. 
70 In landscape terms, the site benefits from a degree of natural containment,
including existing woodland to the north and the enclosing landform of the quarry,
such that views from the wider area are limited, with the main receptors being the
adjacent railway line and elevated positions within the Ochil Hills to the south.
Taking all of these factors into account, and subject to the submission and
approval of a more detailed layout as noted above, it is considered that the
overall design, scale and layout of the development, alongside the accelerated
restoration of the quarry, are appropriate to the character of the site and its
surroundings and would not result in any unacceptable visual impact. 
Noise and Residential Amenity 
71 The proposed development has the potential to give rise to noise impacts, given
the use – primarily a gun dog training and kennelling facility. Noise and
residential amenity impact must be assessed primarily against Policy 56: Noise
Pollution of the LDP2 and Policy 23: Health and Safety of NPF4. These policies
seek to ensure that development does not result in unacceptable noise impacts
on noise‑sensitive receptors, including nearby residential properties, and that
risks to human health are appropriately mitigated.

Page 14

72 The proposal has the potential to generate noise from a range of sources, most
notably dogs barking, in addition to general operational activity associated with
training sessions, staff movements and vehicle activity within the site. Dog
barking is inherently intermittent, impulsive and capable of carrying over long
distances, and therefore requires a robust assessment which reflects how the
site would operate in practice, including the number of dogs present, the
frequency and duration of training sessions, and the spatial distribution of
activities across the site. 
73 An initial Noise Impact Assessment (NIA) was submitted in support of the
application but was reviewed by the Council’s Environmental Health service and
considered to require additional content. In particular, the assessment had not
been undertaken in accordance with BS 4142, no background noise monitoring
had been carried out, and insufficient information had been provided on the
operational characteristics of the proposal, including the maximum number of
dogs involved in training sessions/lessons. The assessment also failed to
adequately consider the intermittent nature of barking noise or assess noise
generation with reference to the use of individual areas of the site. 
74 In addition, it was considered by EH colleagues that reliance on noise from the
operational quarry as part of the baseline or context was not appropriate, as
quarrying is unrelated to the proposed use and is intended to cease. The
assessment therefore required to refocus solely on noise arising from the gun
dog training facility itself. As a result, an updated NIA was submitted, the findings
of which are considered below. 
75 The updated NIA was informed by background noise monitoring undertaken at
two representative locations over a defined survey period and assessed impacts
at the four nearest noise‑sensitive receptors. Operational noise data was derived
from measurements taken at the applicant’s existing gun dog training facility,
supplemented where necessary by recognised acoustic data sources. The
assessment considered a range of noise sources associated with the proposal,
including kennel activity, external training exercises, dog barking, staff activity
and fixed plant, as well as potential noise breakout from buildings using acoustic
modelling. 
76 The assessment adopted a precautionary approach, including the application of
an acoustic correction to account for the potentially impulsive nature of dog
barking. Predicted noise levels at all assessed residential receptors were found
to be significantly below prevailing background sound levels (which include road
and rail traffic) during both daytime and night‑time periods. On this basis,
Environmental Health concluded that the proposed development would result in a
low noise impact and would not give rise to unacceptable effects on residential
amenity. 
77 Environmental Health therefore raised no objection in respect of noise, subject to
conditions (Conditions 4, 5, 6 and 7). These include controls on noise from plant
and equipment, limits on operational noise relative to background levels,

Page 15

requirements for sound insulation to kennel buildings, restrictions on servicing
and maintenance hours, and a mechanism for further noise assessment and
mitigation should justified complaints arise. These conditions are considered
necessary to ensure continued protection of residential amenity in accordance
with the development plan and national planning policy. 
Traffic and Access 
78 The proposed development has been assessed against Policy 60B: Transport for
New Development of the LDP2 and Policy 13: Sustainable Transport of NPF4,
both of which seek to ensure that development is safely and appropriately served
by the transport network, minimises reliance on private car travel where feasible,
and avoids adverse impacts on road safety or network operation. The Council’s
Transport and Development team has confirmed that, subject to conditions
(Conditions 3 and 12), the proposal raises no objection in transport terms. The
assessment recognises that the existing quarry use generates significant HGV
movements and that the proposed development would result in a different, and
more dispersed, traffic profile, which has been considered acceptable for the
local road network. On‑site staff accommodation, together with a managed
approach to student travel, are material factors in reducing commuting trips,
consistent with the sustainable travel hierarchy promoted by Policy 13 of NPF4.
Students are expected to initially arrive into the local area by coach, with drop‑off
at a central location within Auchterarder, before onward transfer to the site. This
arrangement is supported by the provision of on‑site student accommodation,
which minimises the need for repeated daily travel. Adequate parking provision,
including EV charging and coach turning facilities, is proposed, and the vehicular
access can be delivered to adoptable standards in accordance with the National
Roads Development Guide. Importantly, the site lies immediately south of the
consented Shinafoot junction improvements to the A9, and the submitted layout
safeguards the necessary land and does not prejudice or constrain the delivery
or future operation of that proposed junction. Transport Scotland has confirmed
that it does not propose to advise against the granting of planning permission. On
this basis, and subject to appropriate conditions, the proposal is considered to
comply with the requirements of Policy 60B of the LDP2 and NPF4 Policy 13. 
Drainage 
79 The proposal is to provide a private foul and surface water drainage solution. 
The principle of utilising private drainage infrastructure is acceptable in planning
terms and supported by Policy 53B (Wastewater Treatment and Drainage) of the
LDP2, which allows for private drainage solutions where connection to the public
sewer is not available, subject to appropriate safeguards and the absence of
unacceptable environmental impact. This approach is also consistent with NPF4,
which recognises private drainage systems as an appropriate solution in rural
locations, provided they are properly designed and regulated. In this regard, the
submitted drainage information demonstrates that a comprehensive strategy has
been developed, incorporating separate foul and surface water systems. The
drainage report confirms that, in the absence of a public sewer, foul drainage is
to be managed by a specialist on-site package treatment plant designed to treat

Page 16

both domestic wastewater and operational flows associated with the kennel use,
including washdown and veterinary facilities, with treated effluent discharged in a
controlled manner and subject to regulatory approval. 
80 Surface water is to be managed through a sustainable drainage (SuDS)
approach, with runoff from roofs and hardstanding directed to an underground
storm crate attenuation system providing both attenuation and partial infiltration.
Flows are controlled to greenfield runoff rates via a flow restriction device, with
exceedance managed through an overflow to an existing pond. Pre-treatment
measures including silt traps and filter drains are incorporated to ensure
adequate water quality treatment in line with CIRIA SuDS guidance and SEPA
requirements. The drainage design is considered sufficient to address any
localised surface water issues arising from the former quarry topography.
Overall, the drainage strategy accords with relevant technical standards and
demonstrates that the development can be adequately drained without giving rise
to flood risk or adverse environmental effects. 
Flood Risk 
81 The Council’s Flooding Team advised that, due to the known history of significant
fluvial flooding affecting the B8062, in the vicinity of the site access, a Flood Risk
Assessment (FRA) was required, together with a Drainage Impact Assessment
given that the proposal exceeds the relevant impermeable area thresholds.
These additional submissions have been provided in the form of a Flood Risk
Review (April 2026) and the Fairhurst FRA for the adjacent Shinafoot Junction.
This information confirms that flooding in the area is primarily associated with the
Pairney Burn and Ruthven Water, with modelling demonstrating that the B8062
can be overtopped during extreme events, with flood depths of up to
approximately 0.5m in a 1 in 200 year event plus climate change. However, this
flooding is largely confined to sections of the road to the northwest of the
proposed access, with ground level at the site access itself shown to remain
above the design flood level. The review further confirms that the site is not at
risk of fluvial flooding due to a significant level difference up from the road, and
that only localised surface water ponding may occur, which can be addressed
through reprofiling and drainage design. Importantly, the submitted assessments
confirm that the proposal accords with the Council’s established position that
development should not exacerbate existing flooding conditions on the B8062,
with modelling and assessment demonstrating a neutral or negligible impact on
flood risk elsewhere. Mitigation measures, including the preparation of a Flood
Action Plan and connection to SEPA’s flood warning system, are also proposed
to ensure user safety during extreme events. On this basis, and following review
of the submitted information, the Flooding Team raise no objection to the
proposal. The development is therefore considered, subject to condition
(Condition 11) to comply with Policy 52 (New Development and Flooding) of the
Perth and Kinross Local Development Plan 2 and Policy 22(f) of National
Planning Framework 4.

Page 17

Ecology 
82 Given the site’s established use as an operational sand and gravel quarry,
together with its history of ongoing mineral extraction and disturbance, the land is
considered to be of low ecological and biodiversity value. This conclusion is
supported by the Preliminary Ecological Survey, which confirms that the working
quarry itself is of negligible ecological value, with only small areas of poor
semi‑improved grassland (low value) and peripheral planted broadleaved
woodland (moderate value) present. While sand martins are known to utilise the
wider quarry for nesting within exposed faces, the development proposed under
this application is confined to the more active part of the quarry where levels of
disturbance and built development are already high and where there are no
existing excavations. As such, any impact on sand martins is considered to be
negligible. 
83  The survey identified no significant ecological constraints, with a low to negligible
likelihood of protected species being present or adversely affected by the
proposals. Notwithstanding this, appropriate safeguards can be secured by
condition, including measures to ensure that any excavations or temporary works
incorporate suitable escape provisions for mammals. (Condition 13) 
84  In this context, it is considered that the level of ecological assessment
undertaken is proportionate to the site’s limited baseline interest. Notwithstanding
this, the proposals incorporate a range of mitigation and enhancement measures,
including the retention and expansion of existing woodland, native planting, and
the creation of species‑rich grassland and habitat features. These measures are
expected to deliver a net enhancement in biodiversity across the site over time. 
85  These mitigation and enhancement measures will be secured and delivered as
part of the wider restoration strategy for the quarry, in accordance with the
approved restoration framework under application ref. 19/01927/MWM, ensuring
that biodiversity benefits are realised in a coordinated and comprehensive
manner across the wider site. 
Developer Contributions 
Education Infrastructure 
86 In terms of education infrastructure, the proposal has been assessed against the
Council’s Developer Contributions Supplementary Guidance, which requires
financial contributions towards primary school capacity where schools are subject
to constraint. The site falls within the catchment of Auchterarder Primary School,
where a capacity constraint has been identified. The development includes four
dwellinghouses, one flat and student accommodation; however, it is accepted
that the student accommodation would not likely place additional pressure on
primary education provision. Notwithstanding this, initial consultation identified
that a developer contribution may be required in respect of the residential units,
subject to their tenure. Further information was subsequently sought from the
applicant regarding the status of the proposed staff accommodation, including

Page 18

details of occupancy, management and rental arrangements. The submitted
supplemental statement confirms that the five units are to be retained in single
ownership, are tied to employment at the Dog Ranch, are not available on the
open market and are to be provided as part of staff remuneration, effectively
constituting employment-linked mid-market rental accommodation.  Following
review of this information and discussion with the Council’s Affordable Housing
Officer, it is accepted that the units can reasonably be regarded as affordable
housing in terms of Policy 20 of the LDP2 and NPF4 definitions. On that basis,
and subject to appropriate controls to secure their occupation and tenure via a
legal agreement, no Primary Education developer contribution is required, and
the proposal is considered to comply with the relevant requirements of the
Supplementary Guidance. 
A9 Junction Improvements 
87 In terms of A9 junction improvements, the proposal has again been assessed
against the Council’s Developer Contributions Supplementary Guidance, here in
relation to the Auchterarder A9 Junction improvements. While the site lies within
the Auchterarder and wider Strathearn housing market area where contributions
would normally be sought towards junction upgrades, the guidance confirms that
such requirements may not apply where development reduces the need to travel,
for example through the provision of local employment. In this case, the
application involves both the cessation of existing quarry operations and the
redevelopment of the site for a dog training and boarding facility, including
associated staff and student accommodation. When considering the net impact, it
is noted that the current quarry generates regular HGV movements, whereas the
proposed development would result in a different trip profile, with on-site staff
accommodation reducing commuting requirements and students anticipated to
arrive by coach. Furthermore, the proposal involves the relocation of an existing
business from a more remote location, thereby providing local employment
opportunities and reducing overall travel demand. Having regard to these factors
and following discussions with the Council’s Developer Contributions Officer, it is
considered that the development would not give rise to a net increase in traffic
requiring mitigation at the A9 junction and would, overall, reduce the need to
travel. Accordingly, an A9 Junction Improvement developer contribution is not
required in this instance. 
Affordable Housing 
88 Policy 20 of the LDP2 and the associated Supplementary Guidance refers to
affordable housing and require the provision of affordable housing as part of
qualifying residential developments. The proposal includes five residential units
which were initially subject to scrutiny to determine whether they would trigger an
affordable housing requirement or necessitate a commuted sum. As set out
above in relation to education infrastructure, further information was sought from
the applicant on the tenure and operation of these units. The submitted
supporting information confirms that all five units are effectively form
employment-linked mid-market rental accommodation. Following review of this
information, and in consultation with the Council’s Affordable Housing Officer, it is

Page 19

accepted that the units meet the definition of affordable housing under Policy 20
and NPF4. On that basis, the proposal is considered to deliver 100% affordable
housing on site, and therefore fully satisfies the requirements of Policy 20 without
the need for any additional provision or commuted sum, subject to appropriate
controls being secured through a legal agreement to ensure the units remain as
affordable, employment-linked accommodation in perpetuity. 
Restoration Works to Quarry 
89 The accelerated restoration works for Craigrossie Quarry are proposed to be
secured through the revised plans submitted under application reference
19/01927/MWM. These revised restoration details, including the accelerated
programme for the cessation of extraction and site reinstatement, are not
determined as part of the current application but will instead be assessed
separately under application 19/01927/MWM, which is also reported to this
Committee. 
90 It is important to note that the application site for the proposed dog ranch relates
to a relatively small part of the overall quarry (1.9 hectares within a wider 21.7
hectare site) and is located on an existing area of hardstanding currently
occupied by buildings, machinery and car parking. As such, this part of the
quarry does not require significant restoration in its own right. Given both the
limited extent of the red line boundary and the nature of the land within it, it would
not be appropriate or reasonable to seek to secure the restoration of the wider
quarry through the present application and this instead requires to be secured
through application 19/01927/MWM. 
91 Members will recall that application 19/01927/MWM was previously presented to
the Planning and Placemaking Committee in March 2020 with a recommendation
for approval, which was accepted, subject to conditions and the provision of a
financial bond to secure restoration of the site. However, despite ongoing efforts
by the Planning Authority, it was not possible to reach agreement with the
applicant at that time on the necessary bond arrangements, and the application
has therefore remained undetermined. Concerns have therefore persisted
regarding the delivery of the overall reinstatement and restoration of the quarry. 
92 The submission of revised restoration proposals under application
19/01927/MWM, alongside the involvement of a new party with an interest in the
site, provides an opportunity to secure a clear, deliverable and accelerated
restoration strategy for the wider quarry. That restoration can be undertaken
around the proposed Dog Ranch use. For these reasons, it is essential that the
accelerated restoration of the quarry is secured explicitly through application
19/01927/MWM, rather than through the current application. The separate
consideration of these proposals ensures there is no ambiguity regarding the
restoration strategy, while enabling each application to be assessed on its own
merits. The proposed accelerated restoration works are considered appropriate,
as detailed within the separate committee report.

Page 20

Private Water 
93 The site is proposed to be served by a private water supply via a new borehole,
which is considered to be acceptable given the rural location of the development
and the absence of a public mains connection. The Council’s Private Water
Supply Team has been consulted and advise that the supply will require to be
registered with them to enable appropriate monitoring of water quality. To ensure
that the proposed water supply is suitable for its intended use and maintained to
an appropriate standard, a planning condition (Condition 10) and associated
informative (Informative 7) are recommended requiring the submission of details,
registration of the supply, and ongoing compliance with relevant regulatory
requirements. 
Low and Zero Carbon Generating Technologies 
94 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero‑carbon generating technologies. Further, NPF4 Policy 2 ‘Climate
Mitigation and Adaptation’ requires that development should be designed to
reduce greenhouse gas emissions. In this instance, the proposal incorporates a
range of integrated low‑carbon measures including roof‑mounted solar
photovoltaic (PV) panels and air source heat pumps serving the principal
buildings and accommodation, alongside a fabric‑first approach to building
design. These technologies are identified within the supporting Planning and
Design & Access Statements as enabling the development to exceed the 10%
CO₂ emissions reduction requirement set by Scottish Building Standards.  The
proposal therefore complies with the relevant policies and no condition is
considered to be required. 
Light Pollution 
95 The proposed development has been assessed in respect of potential light
pollution, having regard to Policy 55 (Lighting) of the Perth and Kinross Local
Development Plan 2 and Policy 23 (Health and Safety) of National Planning
Framework 4, both of which seek to ensure that external lighting does not result
in obtrusive or intrusive impacts on neighbouring receptors, the rural environment
or ecological interests. In this instance, the submitted details indicate that lighting
will be limited in extent and primarily associated with low‑level, sensor‑controlled
fittings to serve operational and safety requirements. Notwithstanding this, in
order to ensure full compliance with the policy framework, it is considered
necessary to attach a planning condition (Condition 9) requiring that all external
lighting is appropriately designed, positioned and angled to  prevent light
spillage beyond the application site boundary. Subject to the imposition of this
condition, it is considered that the proposal will not give rise to unacceptable light
pollution and accords with the requirements of LDP2 Policy 55 and NPF4 Policy
23.

Page 21

Contaminated Land 
96 The Council’s Contaminated Land Team has been consulted and has advised
that a site investigation is required to assess ground conditions and ensure the
land is suitable for the proposed use, having regard to its former quarry use
(Condition 2). This approach accords with Policy 58A (Contaminated Land) of the
Perth and Kinross Local Development Plan 2 and Policy 9(c) of National
Planning Framework 4, which require that development is not adversely affected
by contamination and that appropriate investigation and mitigation measures are
secured. 
Economic Impact 
97 The proposed Dog Ranch and associated gundog training facility would deliver
clear and measurable economic benefits for the local area through both direct job
creation and wider rural diversification. As set out in the Planning Statement, the
expansion of the established Mordor Gundogs enterprise—an internationally
recognised business would increase employment numbers from its current base
which employs 13 people to over 30 full-time positions, creating at least 17 new
permanent jobs across specialist roles including animal welfare, training,
veterinary services and administration. This growth will not only provide
meaningful employment opportunities for local residents but also support skills
development through associated veterinary training programmes and educational
partnerships. In addition, the facility will attract clients, students and visitors from
across the UK and internationally, generating expenditure within the local
economy and supporting secondary businesses such as accommodation,
transport and services, consistent with the supporting Design and Access
Statement which highlights the enterprise’s international reach and role in
education and training. The development therefore represents a significant form
of rural economic diversification, contributing to a more resilient local economy by
introducing a high-value, year-round business use on a restored brownfield site,
in line with national and local policy objectives to support sustainable economic
growth in rural areas. 
Variation of Application Under Section 32A 
98 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the site plan to accommodate
the drainage system and minor amendments to the planning and design and
access statement. 
Planning Obligations and Legal Agreements 
99 A legal agreement is required to secure the occupation and tenure of the
proposed residential units as employment‑linked affordable housing, ensuring
they remain tied to the operational needs of the development and are not
released to the open market. This mechanism is necessary to underpin the
justification for waiving developer contributions, particularly in relation to

Page 22

education infrastructure, and to ensure the development continues to comply with
relevant Development Plan policies and supplementary guidance over the long
term. 
Direction By Scottish Ministers 
100 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
101 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding
the Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to a legal agreement and the following
conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The hereby approved development shall not commence on site until an
evaluation for the potential of the site to be affected by contamination by a
previous use has been undertaken and, as a minimum, a Preliminary Risk
Assessment (Phase 1 Desk Study) has been submitted for consideration and
accepted by the Council as Planning Authority. If the preliminary risk assessment
identifies the need for further assessment, an intrusive investigation shall be
undertaken to identify; 
i. the nature, extent and type(s) of contamination on the site 
ii. measures to treat/remove contamination to ensure the site is fit for the use
proposed 
iii. measures to deal with contamination during construction works 
iv. condition of the site on completion of decontamination measures.

Page 23

Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason: In order to deal with any potential contamination of the site as a result of
its former use. 
3. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type E Figure 5.8 access detail, of Type C
Road construction detail. 
Reason: In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
4. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
5. Noise from operations on site shall not exceed 5dBA above the L90 background
level expressed as LAeq (1 hour) (0700-2300 hours) and LAeq (15 minutes)
(2300-0700 hours), including any relevant penalties for tonality, impulsivity,
intermittency, or other sound characteristics when measured at any residential
property in accordance with BS4142:2014+A1:2019. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
6. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Authority to carry out a noise assessment to verify compliance with conditions 4
and 5 above. The assessment shall be carried out to an appropriate methodology
agreed in writing with the Planning Authority. If the noise assessment shows that
the noise levels do not comply with conditions 4 and 5, a scheme of noise
mitigation shall be included with the noise assessment, specifying timescales for
the implementation of the scheme and shall be submitted to the Planning
Authority with 28 days of the assessment. The mitigation scheme shall thereafter
be implemented in accordance with the approved scheme and timescales. 
Reason: In the interests of residential amenity and to ensure ongoing compliance
with noise control conditions.

Page 24

7. The sound insulation and sound transmission properties of all buildings hereby
approved shall be such that any airborne noise from the operations within the
premises does not constitute a statutory noise nuisance as determined by the
Local Planning Authority. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
8. Servicing or maintenance at the site shall be carried out between 0800 and 1900
Monday to Saturday only. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
9. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
10. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the commencement of the development being brought
into use and shall thereafter be so maintained insofar as it relates to the
development hereby approved. 
Reason: To ensure the new development has an adequate and consistently
wholesome supply of water and to maintain water quality and supply in the
interests of residential amenity and ensure the private water supply or septic
drainage systems of neighbours of the development remain accessible for future
maintenance. 
11. Prior to the commencement of development, a Flood Action Plan shall be
submitted to and approved in writing by the Planning Authority. The Flood Action
Plan shall identify potential flood risks affecting access to and from the site as
detailed within the approved Flood Risk Assessment (doc ref:34) including
flooding of the surrounding road network, and set out appropriate mitigation,
management and emergency procedures.  The approved Flood Action Plan
shall thereafter be implemented in full and remain in place for the duration of the
use of the site,

Page 25

Reason: To ensure that flood risk is appropriately managed, particularly in
relation to site access and the surrounding road network, in the interests of public
safety and in accordance with relevant flood risk and drainage policies. 
12 Prior to the commencement of the development hereby approved, a detailed
layout plan shall be submitted to and approved in writing by the Planning
Authority. The plan shall include: 
• the precise siting and arrangement of all buildings;
• detailed parking and turning areas, including servicing arrangements;
• the extent, layout and treatment of all private and communal garden ground
of residential properties;
• boundary treatments; and
• hard and soft landscaping proposals, including species, planting densities
and implementation programme. 
The development shall thereafter be carried out in accordance with the approved
details. 
Reason: In the interests of securing a satisfactory standard of design, layout,
landscaping and residential amenity in accordance with Policies 1A and 1B of
LDP2 and Policy 14 of NPF4. 
13. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the restoration works. The
measures may include creation of sloping escape ramps for animals, which may
be achieved by edge profiling of trenches/excavations or by using planks placed
into them at the end of each working day and open pipework greater than
150mm outside diameter being blanked off at the end of each working day. 
Reason: In order to prevent animals from being trapped within any open
excavations. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers

Page 26

Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
5. Lighting cable beneath access to be lowered and twin-wall ducted. Contact Perth
& Kinross Council Street Lighting department for further details. 
6. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
7. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017.  Detailed
information regarding the private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to Perth and Kinross
Council Environmental Health in line with the above Act and Regulations.  
8. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 38 of the Development Management Procedure
(Scotland) Regulations 2008.The form of the notice is set out in Schedule 7 of

Page 27

the Regulations and a draft notice is included for your guidance. According to
Regulation 38 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily available to the public
• Printed on durable material. 
Background Papers
Letters of representation 1 
Authors
Name Designation Contact Details
John Williamson Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager 23 June 2026