Proposal: Mineral extraction and processing including alterations to vehicular
access, erection of ancillary buildings, landscaping, reinstatement and
associated works (Phase 3) (in part retrospect) 
Location: Land south west of Arns Farm, Auchterarder 
Ref. No: 19/01927/MWM
Ward No: P7 - Strathallan 
Summary 
This report recommends approval of the application for the cessation of mineral
extraction and accelerated restoration of Craigrossie Quarry, as the revised proposals
are considered to deliver a positive environmental outcome and an appropriate long-
term restoration of the site. The proposals represent a material change from the
previously approved scheme by bringing forward the cessation of quarrying activities
and securing restoration within a significantly shorter timeframe. 
While the Development Plan, in particular Policy 49B of LDP2 and associated
Supplementary Guidance, would normally require the provision of a financial restoration
bond secured through a legal agreement, this has not been achievable despite
prolonged efforts over a period exceeding six years. In these specific and exceptional
circumstances, it is considered that strict adherence to this requirement would continue
to delay or prevent restoration rather than secure it. Accordingly, the recommendation
represents a departure from the usual policy requirement for a financial bond, however
this is justified on a pragmatic basis given the scale and viability of the operation and
the need to secure a deliverable restoration outcome. 
It is therefore considered that, on balance, the proposed approach of securing
restoration through planning conditions, including a defined programme for cessation of
quarry operations, represents the most effective and proportionate solution. The
application is therefore recommended for approval, subject to conditions. 
Background and Description of Proposal 
1 Craigrossie Quarry has been the subject of a long‑standing discussions between
the Council and applicant regarding the issuing of a decision associated to this

Page 2

application, this relating to the securing of a financial bond should the proposed
restoration after quarrying not take place. This bond requirement in line with the
relevant policies and guidance and as per the decision taken at the Planning
and Placemaking Committee in March 2020, where Members resolved to
approve the proposal subject to conditions and the conclusion of a Section 75
Legal Agreement, including provision of a financial restoration bond. However,
since then, for a number of reasons it has not been possible to conclude that
agreement or secure such a bond, and the application has therefore remained
formally undetermined. 
2 This report relates to updated restoration proposals, which represent a material
change to that previously reported. The previous proposal presented to
Committee in 2020 sought to regularise ongoing extraction and facilitate further
quarry expansion, including sandstone extraction and a long-term phased
restoration extending to 2033. Now, the revised strategy involves the cessation
of all mineral extraction activities and the implementation of an accelerated
restoration programme. 
3 The submitted information confirms that restoration phases are to be brought
forward, with the site now proposed to be fully restored by circa (c.)2027. The
updated phasing schedule shows that areas previously identified for continued
extraction are now to be restored without further working, while existing
infrastructure, including the quarry compound, is to be removed as part of early
closure works. The accompanying restoration masterplan sets out the regrading
of the site to a more natural landform, incorporating meadow grassland,
woodland planting and wetland areas, and establishes a coherent framework for
the long-term restoration and after-use of the quarry. 
4 By way of context, the site extends to c.21.77 hectares and lies between
Aberuthven and Auchterarder, to the south of the A9, with some intervening
woodland and north of the Stirling to Perth rail line. To the west is the B8062,
from which access is taken, whilst east is some agricultural land and a further
area of woodland. It has for many years operated as by a small-scale sand and
gravel quarry, comprising a compound area, processing plant, silt ponds, access
tracks and areas of previously worked or partially restored land. The wider
setting sits low within a wider rural landscape. 
5 A separate planning application (ref. 26/00045/FLL) for a gun dog training facility
(“Dog Ranch”) is reported elsewhere on the Agenda of this Committee. While
clearly related, each application requires to be considered on its own merits.
However, the proposals are intrinsically linked in that the cessation of quarrying
and delivery of restoration provides the context for the proposed new use, which
is intended to occupy part of the restored site rather than operate alongside
active extraction. For clarity, the applicant for this proposal, Mr John Lockett, is
the same as the applicant when the application was originally reported to
Committee in March 2020. However, the site is currently under contract to the
operator of Mor Dor Gundogs (the applicant for the aforementioned gun dog
ranch), who intends to purchase the entire quarry site subject to obtaining

Page 3

planning permission. Subject to obtaining planning permission, the intention
would be for the restoration works to be tendered to a competent contractor. 
6 This report therefore focuses on the acceptability of the revised restoration
strategy and its environmental implications, noting that: 
• quarry operations are proposed to cease;
• restoration is to be accelerated; and
• the Dog Ranch proposal represents a separate, though related, development
within the restored landscape. 
7 The acceptability of the restoration proposals under this application must be
considered separately and independently from the associated gun dog facility
application, and does not predetermine its outcome, nor vice versa. 
8 Nevertheless, the two proposals are interrelated, and when viewed together they
present an opportunity to resolve the long-standing unresolved regulatory
planning position at Craigrossie Quarry, by securing both a deliverable
restoration strategy and a viable future use for the restored site. 
Site History 
9 08/00423/FUL Full Planning Permission was approved on 21 July 2009 for the
re-alignment of a farm access road and second phase of sand and gravel
extraction. 
10 08/00428/MW Mineral Works application was approved on 21 July 2009 for the
re-alignment of a farm access road and second phase of small scale sand and
gravel extraction. 
11 18/00009/PAN on 14 August 2018 a Proposal of Application Notice PoAN was
submitted for a Phase 3 of small scale minerals extraction and processing
activities (in part retrospect), including reinstatement, restoration, landscaping,
processing building and ancillary accommodation, access and associated works
– the intended approach to consultation was accepted. 
12 18/01423/SCRN On 14 August 2018 Perth and Kinross Council issued
Screening Opinion advising that proposals for a Phase 3 of minerals extraction.
and processing activities did not constitute EIA development. 
13 26/00045/FLL An application for Full Planning Permission for the Change of use
of quarry to gun dog training centre, erection of kennels, veterinary practice ,
reception building, indoor arena, maintenance buildings, staff and student
accommodation, installation of PV and ASHP and associated works – Pending
Consideration and also presented for determination at this Committee.
Environmental Impact Assessment 
14 A screening exercise (ref:18/01423/SCRN) was undertaken by the Planning
Authority in September 2018 in accordance with the EIA (Scotland) Regulations

Page 4

2017 which concluded that this development, whilst falling under Schedule 2 (3)
of the above regulations relating to extractive industry, the development was
unlikely to result in significant environmental effects. The Opinion concluded that
the proposal was not EIA development. 
Waste Management Regulations 2010 
15 The Management of Extractive Waste (Scotland) Regulations 2010 remain the
relevant regulatory framework for mineral developments and associated waste.
However, the revised proposals differ from the previously assessed scheme in
that no further mineral extraction is proposed, and the site is to move directly
into the restoration phase. 
16 As such, the generation and ongoing management of extractive waste
associated with active quarrying will no longer occur. Instead, existing materials
on site will be utilised as part of the restoration process, including regrading and
infilling works. These activities are considered to fall within normal site
restoration operations and do not give rise to the need for a formal extractive
waste management plan as previously envisaged. 
17 Notwithstanding this, all works must be undertaken in accordance with relevant
environmental controls, including measures to ensure the stability of placed
material and to prevent pollution. These matters can be appropriately regulated
through recommended planning conditions and separate environmental
legislation where relevant. 
Pre-Application Consultation 
18 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was required to undertake formal pre
application consultation with the local community. The content of the Proposal of
Application Notice (PoAN) (18/00009/PAN) was approved in August 2018 and a
public consultation was held at Aberuthven Village Hall on Tuesday 21 August
2018. Given that the application has effectively been under consideration since
its submission in November 2019 no additional or refreshed public consultation
is considered to be required. 
19 Public comment during the PAC process, as outlined in the PAC Report, related
to: 
• Use of heavy traffic between the A824 and the B8062 and potential
requirement for road improvements. 
20 The PoAN was reported to the Planning and Development Management
Committee for comment on 26 September 2018 (Report: 18/299). Members
noted the report and made no further comments.

Page 5

Development Plan 
21 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
22 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
23 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 13: Sustainable Transport
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 26: Business and Industry
• Policy 29: Rural Development
• Policy 33: Minerals 
Perth and Kinross Local Development Plan 2019 
24 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
25 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments

Page 6

• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 36A: Waste Management Infrastructure: Existing Waste Management
Infrastructure
• Policy 36B: Waste Management Infrastructure: New Waste Management
Infrastructure
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 49A: Minerals and Other Activities - Supply: Extraction
• Policy 49B: Minerals and Other Activities - Supply: Restoration
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
26 
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
• Supplementary Guidance - Delivering Zero Waste (adopted in 2020)
• Supplementary Guidance - Financial Guarantees for Minerals (adopted in
2021)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
27
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)

Page 7

National Guidance 
28 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
National Roads Development Guide 2014 
29 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Others 
30 Tayside Landscape Character Assessment (TLCA) 
Consultations 
31 The consultation responses summarised below relate to the original application
proposals as submitted and considered by Committee in March 2020. Given that
the revised submission solely relates to the cessation of mineral extraction and
the acceleration of the previously approved restoration programme, and does
not introduce new built development or materially increase the scope of
environmental effects, it was not considered necessary to undertake a further
round of consultation. The amendments are considered to represent a reduction
in operational impacts and a progression towards site restoration, rather than
anything which would require further consultation. 
32 As part of the planning application process the following bodies were consulted: 
External 
33 Nature Scot - No Objection. Advised of standing advice on protected species
and to consider need for species licenses. 
34 Historic Environment Scotland - No objection. Advised of proximity to three
Scheduled Monuments. 
35 Transport Scotland - No objection and did not advise against approval of the
proposed development. 
36 Auchterarder and District Community Council - No objection. 
37 Network Rail - No objections, advisory notes recommended relating to the
safety of the railway. 
38 Scottish Water - No objection. Comment provided on drinking water protected
areas (DWPA) but advised that development is a sufficient distance from the

Page 8

intake and is therefore considered to be low risk. Also advised that they will not
accept surface water connections into their combined sewers. 
39 Scottish Environment Protection Agency - No objection, subject to
submission of a Water Management Plan. Reference also made to their
regulatory requirements. 
40 Perth and Kinross Heritage Trust - No objection 
Internal 
41 Transportation and Development - No objection. Previously advised that an
upgraded site access junction and creation of run off areas were required, when
proposal involved ongoing extraction, but this is now not considered to be
necessary given changes to proposals. Conditions recommended regarding
control of traffic through site and traffic management. 
42 Environmental Health (Noise Odour) - No objection, confirmed previously that
the proposed quarry operational/working hours were acceptable and that the
submitted Noise Assessment and Vibration Report demonstrated that impacts
on nearby receptors would be minimal. The Operational Environmental
Management Plan was also considered acceptable, with appropriate mitigation
measures identified in relation to noise, dust and lighting, to be secured by
condition. EH have not been re‑consulted on the revised proposals; however,
given the nature of the changes the previous conclusions remain applicable, and
the same recommendations and conditions are considered appropriate. 
43 Community Greenspace - No objection. 
45 Biodiversity Officer - No objection. Advise the supporting Ecological Appraisal
shows no evidence of badger, bats, otter or red squirrel on site. Note that sand
martin nesting sites are protected and maintained. Also that Non-Native Species
Control Plan should be submitted. Finally that the mitigation measures listed in
the Operational Environmental Management Plan (OEMP) should be adhered to
in full with particular regard to protecting sand martin and limiting light spill into
woodland areas.  Conditions are recommended to ensure this. 
Representations 
44 No representations have been received. 
Additional Statements 
Screening Opinion Undertaken EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required

Page 9

Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Environmental Appraisal
Submitted which includes –
Phasing Programme
• Landscape and Visual
Assessment
• Ecological Appraisal
• Noise Impact Assessment
• Geo – Environmental
Assessment
• Draft Operational
Environmental Management
Plan
• Flood Risk Assessment
• Transport Statement 
Appraisal 
45 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise. The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, as outlined above. 
Principle 
46 It is important to note that application ref. 19/01927/MWM was previously
reported to the Planning and Placemaking Committee in March 2020 with a
recommendation of approval for mineral extraction and subsequent restoration
of the site. That recommendation was agreed by the Committee, subject to
conditions and the conclusion of a legal agreement. In this context, the principle
of the development—including both extraction and the requirement for
comprehensive restoration—has already been established and endorsed.
Accordingly, it is not considered necessary to revisit the principle of the
development as part of the current assessment. Instead, the focus of this report
is on the material changes now proposed, namely the cessation of extraction
and the introduction of an accelerated restoration programme, and whether
these revisions represent an acceptable and deliverable solution for the site. 
Landscape and Visual Impact 
47 National and local policy seeks to protect and enhance landscape character and
visual amenity. In this regard, NPF4 Policies 4 (Natural Places), 6 (Forestry,
Woodland and Trees) are of particular relevance, requiring development to

Page 10

protect, restore and enhance landscape features, strengthen nature networks
and deliver positive outcomes for biodiversity and green infrastructure. 
48 At a local level, Policies 1A and 1B of LDP2 remain relevant in assessing
whether development integrates appropriately with its surroundings and
respects landscape character and important views. 
49 The current proposals differ significantly from the previously assessed scheme
in that they no longer seek to extend mineral extraction operations. Instead, the
focus is on stopping quarrying and restoration of the site. As such, the
assessment of landscape and visual effects is primarily concerned with the
short-term restoration phase and the long-term restored landscape, rather than
prolonged operational impacts. 
50 The site lies within the Broad Valley Lowlands Landscape Character Area, as
defined in the Tayside Landscape Character Assessment (TLCA), which
identifies the historical influence of mineral extraction but emphasises the
importance of restoring a landscape structure characterised by woodland,
hedgerows, field patterns and integrated water features. 
51 The revised restoration proposals seek to regrade the site and deliver a
predominantly meadow grassland landscape with integrated woodland planting
and wetland features, reflecting the surrounding landscape character. Existing
woodland is retained and supplemented with additional native tree planting, to
reinforce landscape structure and soften the edges of the restored landform.   
52 The proposals also include the reshaping and retention of existing settlement
ponds to create a series of more naturalistic waterbodies and wetland habitats,
together with opportunities to safeguard and enhance ecological features such
as sand martin nesting areas. The removal of quarry infrastructure, including the
compound, processing buildings and haul roads, is a key component of the
restoration strategy, with these elements either removed or integrated into a
network of informal paths within the restored landscape. This is the same
detailed physical restoration which was accepted by Committee in March 2020,
albeit now accelerated. 
53 In landscape and visual terms, the site remains well contained by existing
topography and established woodland belts, particularly to the north and west.
As previously identified, views into the site are generally limited, with the primary
receptors being from elevated positions to the south, including the railway
corridor and more distant viewpoints. The revised proposals would, over time,
reduce the visual impact of the site through restoration and re-naturalisation of
the worked landform. 
54 In contrast to the previously proposed long-term extraction phases, the revised
scheme significantly reduces both the duration and extent of potential adverse
landscape effects, with restoration brought forward and delivered over a shorter
timeframe. The final restored landform remains consistent with that accepted in
2020, with the same detailed sectional drawings now proposed for approval. As

Page 11

such, the end-state landscape is unchanged in design intent but delivered
sooner, resulting in a landscape that is considered to better align with the
underlying character of the area and the objectives of the Tayside Landscape
Character Assessment (TLCA). 
55 Overall, the revised restoration proposals are considered to represent a positive
landscape outcome, restoring the site to a more natural and integrated rural
landscape, as was originally envisioned. The proposals accord with the aims of
NPF4 in delivering nature-based solutions, enhancing green infrastructure and
improving landscape quality, and are consistent with the requirements of LDP2
Policies 1A and 1B. 
Restoration and Aftercare 
56 An updated site-wide restoration strategy has been submitted which replaces
the previously proposed long-term extraction-led programme. The revised
approach being stopping quarrying operations and an accelerated delivery of
restoration, rather than altering the ultimate restoration objective. Importantly,
the overall restoration concept, final landform and finished site levels remain
consistent with those previously accepted in 2020. 
57 The restoration proposals include the removal of quarry infrastructure, with
these areas recontoured and reintegrated into the wider landscape. Existing
waterbodies are to be reshaped to more natural profiles, and additional native
planting will reinforce landscape structure and biodiversity. The use of on-site
materials in the regrading process will create a landform which reflects the
surrounding landscape character. 
58 The revised restoration framework also recognises that part of the restored site
may be utilised for the proposed Dog Ranch development, the acceptability of
which is being considered separately under application ref. 26/00045/FLL. The
restoration proposals have therefore been designed to provide a suitable and
integrated landscape setting for this potential future use, while ensuring that the
overall restoration objectives for the quarry are achieved. 
59 A condition (Condition 14) is recommended to ensure that the restoration and
aftercare are implemented in accordance with the approved plans and revised
phasing programme, thereby securing delivery of the agreed restoration
outcome within a significantly shorter timeframe and ensuring a satisfactory
long-term position in terms of landscape character, visual amenity and
environmental quality. 
Ecology 
60 Taking account of the submitted ecological information and the revised
restoration-led nature of the proposals, the development is not expected to give
rise to any significant adverse effects on protected species or valued habitats,
subject to appropriate mitigation and best practice measures secured by
condition. The proposals will result in the restoration of the site to a more natural

Page 12

and diverse landscape incorporating woodland, meadow and wetland habitats,
thereby delivering biodiversity enhancements in line with the objectives of NPF4
Policies 3 and 4. On this basis, the proposals are considered acceptable in
ecological terms. 
Trees 
61 Relevant policy is set out in NPF4 Policy 6 (Forestry, Woodland and Trees),
which seeks to protect existing woodland, expand tree cover and strengthen
connectivity, alongside LDP2 Policies 40A and 40B. The site is currently well
screened by established woodland belts, which are to be retained in full as part
of the revised proposals. No tree felling is required in association with the
updated restoration strategy. 
62 The revised restoration framework integrates new native tree and woodland
planting as a key component of the overall landscape strategy, with additional
planting proposed to reinforce boundaries, soften restored landforms and
enhance biodiversity. As such, the proposals not only safeguard existing tree
resources but also provide opportunities for woodland expansion and ecological
enhancement. 
63 On this basis, the proposals are considered to accord with the objectives of
NPF4 Policy 6 and LDP2 Policies 40A and 40B. 
Traffic and Transport 
64 The relevant policy framework is provided by NPF4 Policy 13 (Sustainable
Transport), which requires development to minimise the need to travel, reduce
reliance on unsustainable transport modes and ensure that proposals do not
have an unacceptable impact on the transport network or road safety. At a local
level, Policy T60B of LDP2 requires a full assessment of impacts on road safety
and accessibility. 
65 The revised proposals differ significantly from the previously assessed scheme
in that they no longer involve continued or expanded mineral extraction. Instead,
the proposals provide for the cessation of quarry operations and an accelerated
restoration of the site, resulting in the removal of HGV movements associated
with mineral export over time. 
66 As such, the previously anticipated traffic generation associated with ongoing
sand and gravel and sandstone extraction is no longer applicable. Whilst there
may be limited short-term traffic associated with restoration activities, including
the potential import of materials where necessary, these impacts are temporary
in nature and can be appropriately managed through condition. 
67 Traffic associated with the proposed “Dog Ranch” development is considered
separately under application ref. 26/00045/FLL and does not form part of the
assessment of this application.

Page 13

68 Overall, given the cessation of mineral operations and the temporary nature of
any restoration-related traffic, the proposals are not expected to give rise to any
significant adverse impacts on the local road network and the previously
recommended conditions regarding the upgrade of the access are not
considered to be necessary. Subject to appropriate controls, the proposal is
considered to accord with NPF4 Policy 13 and LDP2 Policy 60B. 
Impact on Water Environment 
69 The relevant policy framework is set out in NPF4 Policy 22 (Flood Risk and
Water Management) and Policy 5 (Soils), together with LDP2 Policies 53B and
53C, which require development to incorporate appropriate drainage and
safeguard the water environment. 
Surface Water 
70 The principal surface water features associated with the site are the Ruthven
Water and the Pairney Burn, both of which have been identified as having a
“High” Water Framework Directive (WFD) status. 
71 A number of existing ponds and minor watercourses are present within the site,
some of which ultimately connect to the Ruthven Water via an unnamed
tributary. As previously identified, there is potential for indirect hydrological
connectivity between the site and surrounding watercourses. 
72 The revised proposals differ significantly from the previously assessed scheme
in that they no longer include ongoing or expanded mineral extraction. Instead,
they focus on the cessation of quarrying and the accelerated restoration of the
site, including the reshaping and retention of existing ponds as naturalised water
features within the restored landscape. 
73 As a result, the risk of pollution associated with active extraction, processing and
long-term stockpiling activities is substantially reduced. The restoration
proposals are expected to improve the overall condition of the site through
regrading, stabilisation of bare ground, and the establishment of vegetation
cover, thereby reducing sediment runoff and improving water quality over time. 
74 Notwithstanding this, short-term risks associated with restoration works,
including earth movement and potential import of materials, remain. These can
be appropriately managed through a detailed Water Management Plan, secured
by condition (Condition 2), incorporating SEPA requirements and pollution
prevention measures to protect downstream watercourses. Any discharges or
abstractions will continue to require appropriate authorisation under the Water
Environment (Controlled Activities) (Scotland) Regulations (CAR). 
Groundwater 
75 The site lies within the Crieff and Path of Condie groundwater bodies, both of
which hold a High WFD classification. Under the revised proposals, there is no

Page 14

longer any requirement for deep quarrying or potential dewatering associated
with sandstone extraction, thereby reducing the potential for groundwater
interaction or disturbance. 
76 The restoration-led approach is therefore considered to present a reduced risk
to groundwater, with the stabilisation of ground conditions and re-establishment
of vegetation expected to provide long-term environmental benefits. 
Drinking Water Supply 
77 Scottish Water has advised that the site lies within a drinking water catchment
area but given the scale of the catchment and distance from abstraction points,
the risk is considered low. This position remains unchanged under the revised
proposals. 
Water Environment Conclusion 
78 Overall, the cessation of mineral extraction and the implementation of an
accelerated restoration strategy significantly reduces the potential for adverse
impacts on the water environment. Subject to appropriate safeguards during the
restoration phase, the proposals are not expected to adversely affect surface
water or groundwater quality and will support long-term environmental
improvement. 
79 On this basis, the proposals are considered to accord with the objectives of
NPF4 Policy 22 and LDP2 Policies 53B and 53C. 
Flooding 
80 The relevant policy framework is set out in NPF4 Policy 22 (Flood Risk and
Water Management), which seeks to avoid development in areas at risk of
flooding and to ensure that proposals do not increase flood risk elsewhere,
alongside LDP2 Policy 52. 
81 SEPA flood mapping identifies an area of surface water flooding to the south of
the railway line, outwith the site, and limited areas of surface water risk within
associated with existing ponds and low-lying quarry workings. A Flood Risk
Assessment previously submitted concluded that there would be no increase in
flood risk as a result of the quarrying development then proposed. 
82 As discussed the revised proposals differ, including the reprofiling of land levels
and the retention and enhancement of ponds and wetland features. These
measures are expected to improve drainage characteristics, reduce exposed
and disturbed ground, and promote more natural water management across the
site. 
83 No new built development is proposed as part of the restoration strategy, and
the proposals are not considered to introduce any additional flood risk on or off

Page 15

site. Instead, the restoration works are likely to provide a neutral or beneficial
effect in terms of surface water management. 
84 Subject to the implementation of appropriate surface water management
measures secured by condition (Condition 2), the proposals are considered to
comply with the requirements of NPF4 Policy 22 and LDP2 Policy 52. 
Residential Amenity 
85 The relevant policy framework is set out in NPF4 Policy 23 (Health and Safety),
which seeks to ensure that new development does not give rise to unacceptable
impacts on residential amenity, including noise, dust, vibration and light
pollution, alongside LDP2 Policies 55 and 56. 
Noise 
86 Given the revised proposals, the long-term sources of operational noise
associated with mineral working will be removed. 
87 Noise impacts will therefore be limited to the short-term restoration phase,
including plant and machinery associated with earthworks. These impacts are
temporary in nature and can be appropriately controlled through conditions,
including restrictions on hours of operation and adherence to an updated
Operational Environmental Management Plan (OEMP) (Condition 4). 
88 Environmental Health has previously confirmed that noise levels associated with
the existing site are acceptable, and no complaints have been recorded. Given
the reduced scale and duration of activity under the revised proposals, no
significant adverse noise impacts are anticipated. 
Vibration 
89 With the removal of ongoing extraction activities, including any requirement for
intensive operations, the potential for vibration impacts is further reduced. Any
minor vibration associated with restoration works is temporary and not expected
to affect nearby sensitive receptors. 
Air Quality and Dust 
90 The cessation of mineral extraction will significantly reduce the potential for dust
generation compared to the previously assessed scheme. While some dust may
arise during restoration works, these impacts are short-term and can be
effectively mitigated through standard best practice measures secured within the
OEMP (Condition 4). 
Lighting 
91 No permanent operational lighting is proposed as part of the restoration
strategy. Any temporary lighting associated with restoration works will be limited

Page 16

in duration and controlled to minimise light spill. Given the existing screening
and rural context, no significant impacts on residential amenity are anticipated
(Conditions 4 and 16). 
Residential Amenity Conclusion 
92 Overall, the revised proposals are expected to result in an improved amenity
outcome over the longer term, through the removal of quarrying activity and
restoration of the site to a more natural landscape. Subject to appropriate
conditions (Conditions 4, 7, 8, 9, 10, 12, 13, 15 and 16) controlling the
restoration phase, the proposals are considered to comply with the requirements
of NPF4 Policy 23 and LDP2 Policies 55 and 56, and are acceptable in terms of
residential amenity. 
Socio-Economic Benefits 
93 The relevant policy context is provided by NPF4 Policy 26 (Business and
Industry), which supports sustainable economic activity and diversification,
particularly in rural areas. 
94 The revised proposals represent a significant shift from the previously assessed
scheme, moving away from mineral extraction to restoration of the site. As such,
while the existing quarry has historically provided local economic benefits
through employment and the supply of materials to the construction industry,
these benefits will reduce over time as operations cease. 
95 Notwithstanding this, the accelerated restoration of the site provides an
opportunity to secure a long-term beneficial future use, improving environmental
quality and enabling alternative forms of rural economic activity. In this regard,
the restoration proposals support a transition from extractive industry to a more
sustainable land use, with potential economic benefits linked to environmental
enhancement and the proposed Dog Ranch development considered separately
under application ref. 26/00045/FLL. 
96 On balance, the proposals are considered to accord with the broad objectives of
NPF4 in supporting sustainable rural economic transition and diversification, and
are acceptable in socio-economic terms. 
Quarry Cessation 
97 The principle of mineral extraction and its cessation must be considered against
the relevant provisions of LDP2, in particular Policies 49A and 49B, and NPF4
Policy 33: Minerals which together seek to ensure that mineral workings are
properly restored in a timely and effective manner to an appropriate after-use.
While the revised proposals involve the cessation of quarrying activity, which
would result in the loss of an established mineral operation, they importantly
provide a deliverable and secured restoration solution for the site. This is a
significant material consideration given that an acceptable restoration scheme
has not been achievable for a number of years. In this context, the proposals

Page 17

positively align with the objectives of both LDP2 and NPF4 in securing the
restoration and aftercare of mineral sites and are therefore considered to
represent an appropriate and beneficial outcome for the long-term management
of Craigrossie Quarry. 
Section 75 Legal Agreement and Financial Bond 
98 The proposal requires to be considered in the context of Policies 49A and 49B of
LDP2, Policy 33 of NPF4, and the Council’s Supplementary Guidance on
Financial Guarantees for Minerals, all of which seek to ensure the satisfactory
restoration of mineral sites through appropriate financial safeguards. Members
will recall that the previous “minded to grant” position for this application was
expressly subject to the conclusion of a Section 75 Agreement and the provision
of a financial restoration bond. However, owing to the limited scale of the
quarrying activity ongoing at any one time and the constrained financial position
of the applicant, it has proven difficult to secure such a bond, resulting in the
application remaining undetermined for over six years. While the Supplementary
Guidance anticipates that a bond and legal agreement will normally be required
to guarantee restoration, the prolonged period since the earlier resolution has
demonstrated that securing these mechanisms in this instance is unlikely to be
achieved. This reflects the nature of the site as a relatively small-scale, low-
output quarry with limited profitability, where the cost of obtaining a bond is
disproportionate and has prevented meaningful progress. In these particular
circumstances, there is a genuine risk that adherence to the standard policy
approach would continue to delay or frustrate restoration rather than secure it. 
Accordingly, having regard to the specific circumstances outlined above,
including the protracted but unsuccessful efforts to secure a bond and legal
agreement, it is considered appropriate in this instance to depart from the
requirements of Policy 49B and the associated Supplementary Guidance. On an
exceptional and justified basis, it is considered both reasonable and pragmatic
to advance the application without the provision of a financial guarantee, with
restoration instead secured through appropriately worded planning conditions.
This approach is considered to represent the most proportionate and effective
means of ensuring that restoration is ultimately delivered in the context of this
site. 
Conditions 
99 The conditions recommended broadly reflect those originally set out at the time
of the Committee’s resolution in March 2020; however, they have been updated
to reflect the material change in circumstances now proposed, namely the
cessation of mineral extraction and the delivery of an accelerated restoration of
the site. A condition is also recommended (condition 18) requiring the
submission of a detailed programme for the cessation of quarry operations, to
ensure that there is a clearly agreed timescale and structured approach to the
permanent cessation of mineral extraction. This will provide certainty that
extraction activity is brought to an end within an appropriate and controlled
timeframe, ensuring that the primary purpose of granting planning permission is
to secure the timely restoration of the site. In particular, conditions have been

Page 18

refocused to regulate restoration activity and associated environmental effects,
rather than ongoing quarry operations. While a number of conditions were
previously recommended in relation to upgrading the site access to
accommodate anticipated levels of quarry-related traffic, it is no longer
considered proportionate to impose these requirements given that mineral
extraction will cease and associated heavy goods vehicle movements will be
significantly reduced, particularly in the longer term. 
Planning Obligations and Legal Agreements 
100 None required. 
Direction By Scottish Ministers 
101 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion And Reasons For Recommendation 
102 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding
the Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Within 6 months of the date of this decision, a detailed Water Management Plan
shall be submitted to and approved in writing by the Planning Authority in
consultation with SEPA. The Plan shall include full details of surface water
management during restoration works, including earthworks and any stockpiling
of soils, and shall include details of silt management devices, cut-off drains,

Page 19

drainage arrangements and any abstractions.  The approved details shall be
implemented in full during the restoration of the site. 
Reason: To ensure adequate management of water on site. 
3. Within 6 months of the date of this decision notice, an Invasive Non-Native
Species Control Plan shall be submitted to and approved in writing by the
Planning Authority. The approved measures shall be implemented in full during
restoration works. 
Reason: In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the commencement of restoration works, an updated Operational
Environmental Management Plan (OEMP) shall be submitted to and
subsequently approved in writing by the Planning Authority. The OEMP shall
include mitigation measures to control noise, dust, vibration, and lighting
associated with restoration activities and shall be implemented in full throughout
the restoration period.  The finalised OEMP can be based upon the draft OEMP
(Appendix G of the Environmental Appraisal) submitted with the application. The
OEMP is a live document which shall be updated to reflect changing site
conditions as restoration works progress on site.  The OEMP, as approved,
shall be strictly adhered until the site is fully restored in accordance with the
approved restoration plans. 
Reason: In the interests of neighbouring recreational and residential amenity; to
ensure a satisfactory standard of local environmental quality is maintained. 
5. The conclusions and recommended action points within the supporting
biodiversity survey (19/01927/28) submitted and hereby approved shall be fully
adhered to, respected and undertaken as part of the restoration works. 
Reason: In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981).
6. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the restoration works. The
measures may include creation of sloping escape ramps for animals, which may
be achieved by edge profiling of trenches/excavations or by using planks placed
into them at the end of each working day and open pipework greater than
150mm outside diameter being blanked off at the end of each working day. 
Reason: In order to prevent animals from being trapped within any open
excavations. 
7. Noise from any plant and machinery associated with the development shall be
controlled such that it does not exceed 55dBLAeq, 1 hour (free field) at 3.5m
from the façade of noise sensitive properties (except during temporary
operations as referred to in condition 8.

Page 20

Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
8. To allow for temporary operations such as soil stripping, removing soil heaps,
creating earth bunds, crushing operations and restoration, noise levels
measured at 3.5m from the façade of any noise sensitive dwelling shall not
exceed 70dB LAeq, 1 hour (free field) for more than 8 weeks in any one year.  
Perth and Kinross Council, Environmental Health and all neighbouring noise
sensitive dwellings should be advised in advance of the activities detailing the
timings, actual activities to be undertaken and any additional noise mitigation
measures. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
9. The hours of operation shall be limited to Monday to Friday 08:00 to 18:00 hours
and 08:00 to 13:00 Saturdays. No workings permitted on Sundays. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
10. All vehicles, plant and machinery shall operate only during the permitted hours
of operation and shall always be silenced in accordance with the manufacturer's
recommendations and so operated as to minimise noisy emissions.  The
Council as Planning Authority reserves the right to insist on any reasonable
additional measures to further minimise noise emissions, should it prove
expedient to do so. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
11. The existing dry wheel bath on site shall be retained for the duration of the
restoration and until all restoration works have been completed in accordance
with the approved plans and shall be utilised at all times.  The dry wheel bath
shall be supplemented by a road brush as required. 
Reason: To ensure the public road is kept clear of debris from the site. 
12. Audible vehicle reversing alarms shall be operated on the method that they only
emit the warning if necessary, e.g. on an infrared signal which detects persons
to the rear of the vehicle. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
13. No blasting shall take place on the site at any time. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality.

Page 21

14. The restoration and aftercare of the site shall be carried out in accordance with
the approved restoration plans and phasing programme. 
Reason: In order to ensure the development proceeds in accordance with the
approved plans and documents and to serve the rights of the Council as
Planning Authority. 
15. If, in the opinion of the Planning Authority, the development gives rise to justified
complaints relating to noise, dust or other environmental effects, the applicant
shall, at their own expense, undertake monitoring by suitably qualified and
experienced consultants. The scope and methodology of such monitoring shall
be agreed in advance with the Planning Authority. The results of the monitoring
shall be submitted to the Planning Authority, and any mitigation or remedial
measures identified shall thereafter be implemented in full, unless otherwise
agreed in writing by the Planning Authority. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
16. All external lighting shall be sufficiently screened and aligned to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason: In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
17. Should any external materials be required for site restoration a detailed Traffic
Management Plan (TMP) shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads Authority prior to
commencement of that phase of restoration.  The TMP shall detail the number
of HGV movements required for bringing additional materials into the site to
complete the restoration phase. The Traffic Management Plan (TMP) shall
include the following: 
(a)  restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;

Page 22

(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction traffic;
(j) arrangements to ensure that access for emergency service vehicles are not
impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's expense at
locations to be agreed prior to the commencement of construction;
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.   
The TMP as approved shall be strictly adhered to during the entire site
construction programme. 
Reason: To ensure adequate controls are put in place should there be a
significant uplift in HGV movements to the site as a result of the restoration
process. 
18. Within 3 months of the date of this decision, a detailed programme for the
permanent cessation of quarry operations, including clear timescales and
phasing, shall be submitted to and approved in writing by the Planning Authority.
Thereafter, the permanent cessation of quarry operations shall be carried out
strictly in accordance with the approved cessation document. 
Reason: To ensure that mineral extraction is brought to an end in the interests of
environmental protection and to facilitate the appropriate restoration of the site in
accordance with Policies 49A and 49B of LDP2, Policy 33 of NPF4, and the
Council’s Supplementary Guidance on Financial Guarantees for Minerals. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
None 
Informatives 
1. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country

Page 23

Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position.  Please use the form attached herewith. 
2. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 38 of the Development Management Procedure
(Scotland) Regulations 2008.The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 38 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily available to the public
• Printed on durable material. 
3. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
4. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents
(VA1) and application forms are available at www.pkc.gov.uk/vehicleaccess. 
Advice on the disposal of surface water should be sought at the initial stages of
design from Scottish Water and the Scottish Environmental Protection Agency. 
5. The applicant should be aware of the advice contained within SEPA's
consultation response dated 28 January relating to pollution prevention control
and the potential requirement for CAR Authorisation and should make contact
with SEPA's regulatory team to discuss these matters. 
6. The application should be aware of the guidance contained within Scottish
Water's consultation response dated 16th December 2019 relating to Drinking
Water Protected Areas. 
7. Cranes and jibbed machines, used in connection with the works, must be so
positioned that the jib or any suspended load does not swing over railway
infrastructure or within 3 metres of the nearest rail if the boundary is closer than
3 metres. 
8. All cranes, machinery and constructional plant must be so positioned and used
to prevent the accidental entry onto railway property of such plant, or loads
attached thereto, in the event of failure.

Page 24

9. Only inert spoil shall be used as the backfill material.  In the event that
biodegradable waste is imported to the site, Network Rail will hold the operator
responsible for the escape of hazardous landfill gas or leachate which may
affect railway operations or the safety of the public. 
10. The applicant is reminded that there remains a duty to comply with other
regulatory requirements, including the Water Environment (Controlled Activities)
(Scotland) Regulations 2011 (as amended), the Waste Management Licensing
(Scotland) Regulations 2011 and the Pollution Prevention and Control
(Scotland) Regulations 2012. These regimes operate separately from planning
control and may require separate consents or authorisations in relation to
restoration works and any associated site activities. The applicant is advised to
liaise with SEPA as appropriate to ensure all relevant regulatory requirements
are met. 
Background Papers
Letters of representation 0 
Authors
Name Designation Contact Details
John Williamson Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Kristian Smith Service Manager 23 June 2026