Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 10 June 2026 at 9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, K Harvey, D Illingworth,
I James, G Laing (substituting for Councillor D Cuthbert), I MacPherson (substituting for
Councillor R Watters), Bailie C McLaren and Bailie M Williamson. 
In Attendance: Councillor P Barrett; S Merone, Strategic Lead - Economy, Development
and Planning; S Durning, R Haines, L McLean, B Murray, L Reid, K Smith. K Stevens
and P Williamson (all Economy, Development and Planning); A Brown, N Edwards,
G Fogg, V Jordan, J Kirkwood and M Pasternak (all Legal and Governance). 
Apologies: Councillors D Cuthbert and R Watters. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted apologies
as above.   
2. Declarations of Interest 
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The minute of meeting of the Planning and Placemaking Committee of 13 May
2026 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
25/01678/FLL   5(1)(i)
26/00303/FLL   5(1)(ii)

Page 2

5. Applications For Determination 
(1) Local Applications 
(i) 25/01678/FLL - Erection of 35 dwellinghouses and associated
works (allocated site H40 in the Perth and Kinross Local
Development Plan 2 (2019)), site East of St Cedd's Road,
Ballinluig (Report No. 26/165) 
The Clerk read a statement by Ms K MacCorquodale, objector. 
Mr M Alexander, applicant and Mr M Richardson, agent addressed
the Committee and answered members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. Prior to the commencement of the development hereby
approved, precise details of the sustainable urban drainage
system (SUDS) shall be submitted to and approved in
writing by the Council as Planning Authority. For the
avoidance of doubt, the scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council’s Flood Risk and
Flood Risk Assessments Developer Guidance, shall
incorporate source control and shall incorporate biodiversity
enhancement measures. The approved details shall be
implemented in full. 
Reason – In order to clarify the terms of this planning
permission, to ensure the site is adequately drained and to
help ensure that a proportionate level of biodiversity
enhancements are delivered. 
3. Storm water drainage from all paved surfaces, including the
vehicular access, shall be disposed of by means of suitable
a Sustainable Urban Drainage System to meet the
requirements of best management practices. 
Reason – In order to ensure the site is adequately drained. 
4. Prior to the commencement of the development hereby
approved, a scheme to deal with surface water runoff and
soil movement/slippage during the construction phase shall
be submitted to and approved in writing by the Council as
Planning Authority. The approved scheme shall be
implemented in full at all times.

Page 3

Reason – In order to ensure that suitable temporary
measures are put in place during the construction phase to
deal with surface water and / or soil spillage/movements.
5. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays. These construction times shall be implemented
throughout the construction stage of the development unless
approval has been obtained in writing by the Council as
Planning Authority for alterative arrangements. 
Reason – In order to ensure the construction phase is
properly managed to avoid unnecessary impacts on existing
residential amenity.
6. Prior to the commencement of the development hereby
approved, precise details of all proposed retaining walls and
structures shall be submitted to and approved in writing by
the Council as Planning Authority. The details shall include
visual mitigation measures for exposed surfaces. The
approved details shall be implemented in full. 
Reason – In order to clarify the terms of this planning
permission.
7. Prior to the commencement of the development hereby
approved, precise details of all proposed boundary
treatments shall be submitted to and approved in writing by
the Council as Planning Authority. The approved details
shall be implemented in full, and be completed progressively
as the development processes. 
Reason – In order to clarify the terms of this planning
permission. 
8. Prior to the commencement of the development hereby
approved, a detailed landscaping and tree planting scheme
for the site (including a timescale for implementation and
ongoing maintenance) shall be submitted to and approved in
writing by the Council as Planning Authority. The details
must include the landscaping details of the proposed
amenity space area, which shall include biodiversity friendly
wildflower edges. All planting shall be undertaken
progressively as the development progresses. The
approved details shall be implemented in full, with any trees
that fails within the first 5 years replaced on a like for like
basis within the next available planting season.
Reason – In order to clarify the terms of this planning
permission.
9. All the approved residential units shall be affordable units,
as per the definitions contained within Planning Advice Note
2/2010 (Affordable Housing and Housing Land Audits)
Reason – The development has been approved as
affordable housing. 
10. Existing core paths in the area must not be obstructed
during the construction phase or on completion of the
development.  Any damage done to the route and/or the
associated signage during building phase must be made

Page 4

good prior the development is completed or brought into
use, whichever is the earlier.
Reason – In order to protect existing public paths and to
ensure no unnecessary damage occurs.
11. Prior to the commencement of the development hereby
approved, a plan which shows the overland flow and
exceedance routing of surface water from outwith the site
and then on the site shall be submitted to and approved in
writing by the Council as Planning Authority. The details
must include a timeline for implementation, and an
exceedance plan showing 1:200 yr + CC overland flow
paths (including flows from the north and south catchments
and from the small watercourse) and show how they are
intercepted or routed so as not to impact the existing terrace
or cause ponding at the site access. Cross references to
finished levels and road gully locations must be included.
The approved details shall thereafter be implemented
progressively within the approved timeline, and completed in
full prior within the approved timeline. 
Reason – In order to ensure the site is adequately drained
and does not result ain surface water adversely affected
lower properties. 
12. All the recommendations contained within Section 8 of the
Ecology Assessment (Plan 29) shall be implemented in full.
For the avoidance of doubt, this relates to requirements
before and during the construction phase and upon
completion of the development. 
Reason – In order to ensure that a proportionate level of
biodiversity enhancement is delivered. 
13. Prior to the commencement of the development hereby
approved, a statement which demonstrates that at least
10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the
installation and operation of low and zero-carbon generating
technologies shall be submitted to and approved in writing
by the Council as Planning Authority. The approved
principles shall thereafter be implemented in full.
Reason – In order to comply with Policy 32 of the adopted
Perth and Kinross Local Development Plan 2 (2019)) 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
The formal decision notice shall not be issued until such time as
the required financial contribution for off site play provision
upgrades has been secured. This maybe be in the form of a
payment ‘up front’, or a legal agreement if the payment is to be
delayed.

Page 5

Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the planning authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached
herewith.
3. No development shall be commenced until an application for
building warrant has been submitted and approved.
4. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
5.  Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
6. The Air Source Heat Pump’s shall be certificated in
accordance with Microgeneration Certification Scheme 007
and installed by an installation company certificated in
accordance with Microgeneration Installation Standard 3005
and in compliance with the calculation procedure contained
in Table 1 of Microgeneration Certification Scheme Planning
Standards (MCS 020(a)), confirming that the permitted
development noise limit of 37 dB LAeq, 5 mins will be met. 
7. The Air Source Heat Pump’s shall be so enclosed,
attenuated and/or maintained such that any noise therefrom
shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
8. The applicant (or any other person taking on this
permissions) is advised that Perth and Kinross Council have
a charging scheme for recycling and waste bins for new
build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests

Page 6

(ii) 26/00303/FLL - Erection of gypsy/traveller transit site, 10
hardstanding pitches, amenity block and EV charging point,
sites 6-9 and 12 Islay Place, Perth (Report No. 26/166) 
Councillor P Barrett, local member followed by Ms E Ritchie, on
behalf of the applicant, supported by Mr A Cameron, architect (via
telephone), addressed the Committee and answered members
questions. 
Resolved:
Minded to Approve, subject to consideration by Scottish Ministers,
following the submission of suitable terms, conditions and
informatives to be drawn up by the planning officer. 
Justification
Although the application is contrary to Policy 22 of National
Planning Framework 4 and Policy 52 of the Local Development
Plan 2 there are material considerations which justify the planned
departures, including:
• the long-running failure of the Planning Authority to identify any
other suitable gypsy/traveller transit site within or around Perth
City and there being no prospect of any other site being found;
• the public sector duties of the Planning Authority under the
Equality Act 2010 to gypsy travellers and, in particular, their
accommodation needs;
• the long established, unauthorised occupation of the wider area
of the site by gypsy/travellers which the Council, as both
Housing and Planning Authority, has been unable to prevent;
• that considering that gypsy travellers will continue to use the
area as a transit site in any event, their safety and wellbeing will
be more secure at an authorised site, with flood mitigation
measures operating, including a flood evacuation plan, than can
be provided for an unauthorised encampment with no such
measures in place;
• the site is modest and the loss of employment land is not
significant. 
6. Proposal of Application Notices (PoAN) 
(i) 26/00004/PAN - Erection of residential development, landscaping and
associated infrastructure, land 60 Metres South of 43 Duntaylor Avenue,
Aberfeldy PH15 2BX (Report No. 26/167) 
Bailie M Williamson requested that consideration is given to the tree which has a
tree protection order during the construction period, the possibility of run off from
the fields that surround the site and how this is managed and traffic management
during the construction phase. 
The contents of the Report by the Development Management and Building