Democracy Spraffa

Agenda Document Pack - Planning and Placemaking Committee - 13/05/2026

Perth and Kinross Council · 13 May 2026
Back to Planning and Placemaking Committee — 13 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
05/05/2026 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 13 May 2026 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Ian Massie (Convener)
Councillor Grant Stewart (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Bailie Claire McLaren
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 158

Page 2

Page 2 of 158

Page 3

Planning and Placemaking Committee 
Wednesday, 13 May 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES 
2 DECLARATIONS OF INTEREST 
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 15 APRIL 2026 FOR
APPROVAL
(copy herewith) 
5 - 28 
4 DEPUTATIONS 
5 APPLICATIONS FOR DETERMINATION 
5(1)  MAJOR APPLICATIONS 
5(1)(i)  24/01188/FLM - FORMATION OF A 49.9 MW SOLAR FARM
AND BATTERY ENERGY STORAGE SYSTEM COMPRISING
OF GROUND MOUNTED SOLAR ARRAYS, INVERTERS,
TRANSFORMERS, A SUBSTATION, A DNO SUBSTATION,
SECURITY FENCING, CCTV CAMERAS, CABLING, ACCESS
TRACKS AND ASSOCIATED WORKS, KINNON PARK FARM,
METHVEN, PERTH, PH1 3NE
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/124) 
29 - 56 
5(1)(ii)  25/00168/FLM - FORMATION OF A 49.9 MW BATTERY
ENERGY STORAGE FACILITY COMPRISING BATTERY
STORAGE UNITS, ANCILLARY BUILDINGS AND
EQUIPMENT ACCESS ROAD AND ASSOCIATED WORKS,
LAND 300 METRES WEST OF TIR ARTAIR, KILLIN, FK21 8TX
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/125) 
57 - 84
Page 3 of 158

Page 4

5(2)  LOCAL APPLICATIONS 
5(2)(i)  25/01174/FLL - PART CHANGE OF USE OF AN ARTIFICIAL
INSEMINATION CENTRE TO FORM A DISTILLERY,
GLENCARSE STUD FARM, COTTOWN, GLENCARSE,
PERTH, PH2 7NL
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/126) 
85 - 104 
5(2)(ii)  25/01834/FLL - ERECTION OF STAFF ACCOMMODATION
UNIT, AMENITY BUILDING, CAFÉ, FORMATION OF
OUTDOOR SEATING AREA, CAR PARK AND ASSOCIATED
WORKS, MOOR OF RANNOCH HOTEL, RANNOCH,
PITLOCHRY, PH17 2QA
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/127) 
105 - 134 
5(2)(iii)  25/01855/FLL - ERECTION OF FREE-RANGE EGG
PRODUCTION BUILDING AND ASSOCIATED WORKS,
GLOAGBURN FARM, TIBBERMORE, PERTH, PH1 1QL
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/128) 
135 - 158 
Page 4 of 158

Page 5

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 15 April 2026 at 9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, Bailie R Brock (substituting
for Councillor D Cuthbert), K Harvey, D Illingworth, I James, I MacPherson (substituting
for Councillor R Watters) Bailie C McLaren and M Frampton (substituting for Bailie
M Williamson). 
In Attendance: L McLean, C Morilly, S Panton, L Reid, K Smith, N Sworowski; and
P Williamson (all Economy, Development and Planning); A Brown, C Elliott, S Dockerill
and E Ferguson (all Legal and Governance). 
Apologies: Councillors D Cuthbert, R Watters and Bailie M Williamson. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted apologies
as above.   
2. Declarations of Interest 
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The minute of meeting of the Planning and Placemaking Committee of 11 March
2026 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
25/01826/FLM 5(1)(ii)
25/01273/FLL 5(2)(i)
25/01587/FLL 5(2)(ii)
25/01671/FLL 5(2)(iii) 
3
Page 5 of 158

Page 6

5. Applications For Determination 
(1) Major Applications 
(i) 25/01582/42M - Section 42 to vary condition 2 (period within
which development should commence) of permission
22/01071/FLM - Battery Energy Storage System (BESS), land
170 metres south of Newhouse Farm, Perth (Report No. 26/90) 
Sean Panton, Team Leader, requested minor amendments to
conditions, mainly to update document and condition references. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
General
1.  This planning permission will last only for three years from
the date of this decision notice unless the development has
been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997.
Biodiversity and Landscape
2.  The conclusions and recommended action points within the
supporting biodiversity survey submitted and hereby
approved (document(s) 21 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase
of development.
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite.
3.  An updated ecology survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the ecology survey approved
as part of this permission. The updated survey shall be
submitted to the Council as Planning Authority for written
agreement, in consultation with PKC Biodiversity Officer,
and works shall not commence until after such written
agreement has been issued by the Council.
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite. 
4.  Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted to and approved in writing by the
Planning Authority. The scheme shall include details of the
height and slopes of any mounding or recontouring of the
site, full details of all hard landscaping proposals including
materials and installation methods and, species, height, size
and density of trees and shrubs to be planted. The scheme
as subsequently approved shall be carried out and
Page 6 of 158

Page 7

completed within the first available planting season (October
to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority
within 7 days of that date. The scheme as agreed and
implemented shall thereafter be sufficiently maintained
Reason - In the interests of visual amenity and to ensure the
satisfactory implementation of the proposed planting
scheme. 
5.  Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, 10 bird nesting
boxes and 10 bat roosting boxes shall be provided within the
site as part of the approved landscape scheme, (Condition
4). The size, type and locations of the nesting and roosting
boxes shall be submitted to the Council as Planning
Authority for approval prior their placement onsite.
Thereafter, the agreed boxes shall be maintained in a
reasonable condition in perpetuity for the life of the
development
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite.
6.  The conclusions and recommended action points within the
supporting Preliminary Ecological Survey dated 26
November 2020, (Document 17) and Supporting Statement
dated 29 November 2022, prepared by Overland
Environmental Ltd, (Document 20), submitted and hereby
approved shall be fully adhered to, respected and
undertaken as part of the construction phase of
development, to the satisfaction of the Council as Planning
Authority. A written statement confirming and or setting out
the physical means of compliance with these mitigation
points shall be submitted to the Council as Planning
Authority prior to works commencing onsite. 
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite. 
Noise
7.  All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality. 
8.  In the event of a justified noise complaint being received by
the Council the operator shall, at its own expense, employ a
consultant approved by the Planning Authority to carry out a
Page 7 of 158

Page 8

noise assessment to verify compliance with condition 7. The
assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority. If
the noise assessment shows that the noise levels do not
comply with condition 7 a scheme of noise mitigation shall
be included with the noise assessment, specifying
timescales for the implementation of the scheme and shall
be submitted to the Planning Authority within 28 days of the
assessment. The mitigation scheme shall thereafter be
implemented in accordance with the approved scheme and
timescales. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality. 
9.  The hours of construction activity shall be restricted to
between 0700 hours and 1900 hours Monday to Saturday
only, with no construction activity permitted on Sundays. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
Lighting 
10.  All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
residential property and that light spillage beyond the
boundaries of the site is minimised. In association, the
operation of the lighting shall be controlled so as to only be
triggered by motion within the security fenced boundaries of
the site. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
Roads and Transportation
11.  Prior to the commencement of works associated to the
hereby approved development, a Construction Traffic
Management Scheme (TMS) shall be submitted for the
written approval of the Planning Authority, such TMS shall
include details of the following: (a) restriction of construction
traffic to approved routes and the measures to be put in
place to avoid other routes being used; (b) timing of
construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when
refuse collection is undertaken, on Sundays and during local
events; (c) a code of conduct for HGV drivers to allow for
queuing traffic to pass; (d) arrangements for liaison with the
Roads Authority regarding winter maintenance; (e)
emergency arrangements detailing communication and
contingency arrangements in the event of vehicle
breakdown; (f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from construction
sites associated with the development being deposited on
the road; (g) arrangements for cleaning of roads affected by
material deposited from construction sites associated with
the development; (h) arrangements for signage at site
accesses and crossovers and on roads to be used by
Page 8 of 158

Page 9

construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians; (i) details of
information signs to inform other road users of construction
traffic; (j) arrangements to ensure that access for emergency
service vehicles are not impeded; (k) co-ordination with
other significant developments known to use roads affected
by construction traffic; (l) traffic arrangements in the
immediate vicinity of temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to the
commencement of construction; (n) monitoring, reporting
and implementation arrangements; (o) arrangements for
dealing with non-compliance; and (p) details of HGV
movements to and from the site. The TMS as approved shall
be strictly adhered to during the entire site construction
programme all to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of road safety.
12.  The proposed route for any abnormal loads on the trunk
road network must be approved in writing prior to any such
movements being undertaken. Where any abnormal loads
are required to be undertaken in implementing the
development hereby approved, a written program of those
movements shall be submitted to the Council as Planning
Authority for approval in consultation with Transport
Scotland. Thereafter, any such movements shall be
undertaken in accordance with the agreed program of
movements, including any mitigation measures required.
Any accommodation measures required including the
removal of street furniture, junction widening, traffic
management must similarly be approved and should be
included with any written program of works. 
Reason - To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk road
network.
13.  Any additional signing or temporary traffic control measures
deemed necessary due to the size or length of loads being
delivered to the development hereby approved must be
undertaken by a recognised Quality Assured traffic
management consultant, to be approved in writing by the
Council as Planning Authority for approval in consultation
with Transport Scotland. The approval of any such
management consultant shall be agreed prior to the
placement or implementation of any signage and or traffic
control measures. 
Reason - To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk road
network.
External Finishes
14.  Prior to the commencement of the development hereby
approved, details of the specification and colour of the
Page 9 of 158

Page 10

proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority. The scheme as agreed shall be
implemented prior to the completion or bringing into use of
the development, whichever is the earlier. 
Reason - In the interests of visual amenity
Dust
15.  Prior to the commencement of construction for the
development a Dust Management Plan shall be submitted
for the written approval of the Planning Authority, in
consultation with Environmental Health. The plan shall
outline all construction activities that has the potential to
cause dust and shall state methods and procedures to
minimise the dust.  Thereafter, the agreed scheme shall be
implemented in full for the duration of the construction
period.
Reason - In the interests of residential amenity and to
ensure a satisfactory standard of local environmental quality. 
Archaeology
16.  Development shall not commence until the developer has
secured the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation
acceptable to the Council as Planning Authority, during
development work. The retained archaeological organisation
shall be afforded access at all reasonable times and allowed
to record and recover items of interest and finds. The name
of archaeological organisation retained by the developer
shall be given to the Planning Authority and Perth and
Kinross Heritage Trust in writing not less than fourteen days
before the commencement date provided in the Notice of
Initiation of Development. 
Reason - To ensure a programme of archaeological works is
carried out to safeguard and record any archaeological
remains within the development area. 
Paths
17.  The right of way, located within the site access road and
shown on approved drawing 22/01071/05 must not be
obstructed during building works or on completion of the
development. Any damage done to the route and/or the
associated signage during building works must be made
good before the development is completed or brought into
use, whichever is the earlier. 
Reason - To ensure that public access is maintained at all
reasonable times, to the local path network. 
Facility Lifespan 
18.  In the event the hereby approved development fails to store
electricity on a commercial basis for a continuous period of
12 months, or 50 years from the date of commencement of
development, whichever is sooner, then it shall be deemed
to have permanently ceased to be required. In such an
event the development shall be decommissioned, and the
Page 10 of 158

Page 11

relevant parts of the site reinstated within such timescale as
agreed in writing by the Council as Planning Authority. 
Reason - To ensure the facility is removed from the site at
the end of its operational life, and to protect the character of
the countryside, the visual amenity of the area and nature
conservation interests. 
Drainage
19.  Prior to the installation of any drainage works within the
development hereby approved, the final technical drainage
designs shall be submitted to, and approved in writing by,
the Planning Authority in consultation with the Council's
Structures and Flooding team. The drainage details as
approved shall be carried out in accordance with the agreed
scheme and operational prior to bringing into the use of the
approved phase of development. 
Reason - In order to safeguard any offsite drainage impacts
of the development and in the interests of public safety. 
20.  The discharge volume and rate from the proposed onsite
drainage system shall not exceed existing greenfield levels.
Compliance with this condition shall be demonstrated
through the provision of a drainage report in compliance with
Condition 19. 
Reason - In order to safeguard any offsite drainage impacts
of the development and in the interests of public safety. 
Soils
21.  All soils excavated in the course of the development hereby
approved shall be retained onsite and repurposed unless
otherwise approved in writing by the Council as Planning
Authority. Prior to the development hereby approved
commencing, a Soil Management Statement shall be
submitted to the Council as Planning Authority for approval
in writing. This Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be
reused and or managed onsite. All excavation and
repurposing of soil shall then proceed in accordance with
the agreed Statement. 
Reason - In the interests of appropriately managing prime
quality soils and minimising the long-term impacts of
developing the site in accordance with Policy 51 of the
LDP2. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
Page 11 of 158

Page 12

commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.
2. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has
two months to consider the information.  You should
therefore submit the required information more than two
months before your permission expires.  We cannot
guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with
before your permission lapses.
3. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (tel: 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
4. The applicant is advised that, in terms of Sections 56 of the
Roads (Scotland) Act 1984, he/she/they must obtain from
the Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works.
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment
Protection Agency.
5. The presence of protected species, and the extent to which
they could be affected by the proposed development, should
be established before works commence.  Should protected
species be identified within the site the developer should
ensure that all appropriate measures required to comply
with the relevant legislation are carried out.
6. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.
7. The granting of planning permission does not stop the
continued right of public access along the existing core path
METH 34/15 Ruthvenpark Path.  An order under the Town
and Country Planning (Scotland) Act 1997, Section 208 or
an amendment of the Core Path Plan under the Land
Page 12 of 158

Page 13

Reform (Scotland) Act 2003 should be sought in advance of
any works authorised by this planning permission being
commenced.  All relevant approvals should be in place prior
to any stopping up and diversion of the core path taking
place.
8. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development. https://www.pkc.gov.uk/ldp2floodrisk.
9. No work shall be commenced until an application for
building warrant has been submitted and approved.
10. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance. In accordance with Regulation
41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the
site of the development Readily visible to the public
Printed on durable material.
11. Existing buildings or structures may contain nesting birds
between 1 March and 31 August inclusive.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981,
as amended (Section 1), it is an offence to remove, damage
or destroy the nest of any wild bird while that nest is in use
or being built.  Planning permission for a development does
not provide a defence against prosecution under this Act. 
(ii) 25/01826/FLM - Formation of 2 all-weather sports pitches,
erection of spectator stand and fencing, installation of
floodlighting and associated works, Jeanfield Swifts Stadium,
Bute Drive, Perth, PH1 3BG (Report No. 26/91) 
Bailie C Ahern, Local Member, objecting, Ms P MacIntosh, on
behalf of North Muirton Community Council, Objectors and
Mr D Swan, on behalf of Your North Muirton, Objectors followed by
Mr R Gunnion, on behalf of Jeanfield Swifts Community Football
Club, addressed the Committee and answered members
questions. 
Resolved:
Grant, subject to the following terms, conditions (including
amended wording of Condition 11) and informatives: 
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Page 13 of 158

Page 14

Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
Residential Amenity
2. The hours of operation shall be restricted to 0800 hours to
2200 hours daily.
Reason - To safeguard the neighbouring residential amenity
in the area.
3. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land by
complying with the ILP ‘Guidance notes for the Reduction of
Obtrusive Light’ Environmental Zone 3 Levels.
Reason - To safeguard the neighbouring residential amenity
in the area.
4. Prior to the commencement of the development, a noise
management plan shall be submitted for the written approval
of the planning authority. The plan shall include all sources
of noise associated with the use of the synthetic pitches,
including user noise and activity noise and the measures
that will be put in place to minimise and/or control noise. The
plan shall be reviewed on a regular basis or, following
receipt of a justified complaint or at the request of the
planning authority. Once the noise management plan has
been approved, it shall be fully implemented for the lifetime
of the development.
Reason - To safeguard the neighbouring residential amenity
in the area.
5. No music shall be played through the PA/tannoy system,
and the system shall be limited to safety announcements
only.
Reason - To safeguard the neighbouring residential amenity
in the area.
6. An acoustic fence as detailed in Sections 4.35 – 4.37 of the
noise impact assessment (NIA) (document no. 23 relates)
and shown on drawing no. 33 shall be installed prior to the
development being brought into use.
Reason - To safeguard the neighbouring residential amenity
in the area.
7. Noise mitigation measures as detailed in Section 4.38 of the
noise impact assessment (NIA) (document no. 23 relates)
shall be installed prior to the development being brought into
use.
Reason - To safeguard the neighbouring residential amenity
in the area.
Transport
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
Page 14 of 158

Page 15

agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
construction traffic management scheme (TMS) which shall
include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used; 
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events; 
(c) arrangements to ensure that access for emergency
service vehicles are not impeded; and
(d) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the
entire site construction programme. 
Reason - In the interest of proper site management.
9. The core path which forms part of the track must not be
obstructed during building works or on completion.  Any
damage done to the core path and associated signage
during building works shall be made good.  Any temporary
restrictions to public access required to facilitate works on
site must be agreed in writing first with the Access Officer.
Reason - In the interests of public access along the core
path.
10. The existing car park must be fully surfaced and lined to
provide the 63 spaces, together with the coach turning area
containing 5 parking spaces and the 11-space overflow
parking area. All of these areas must be completed and
available for use prior to either of the all-weather sport
pitches being brought into use.
Reason - In the interests of traffic management.
11. Prior to the completion or bringing into use of the
development, whichever is the earlier, a match day traffic
management plan must be submitted to the Council as
Planning Authority, in consultation with the Roads Authority,
for written approval. The match day traffic management plan
shall ensure that all users and visitors of the facility are
aware of parking arrangements, this will cover details of:
 How access to the allotments on the riverside access
track will be maintained.
 If large crowds are expected (over 100 spectators
across the site at any given time), access to the
parking at surrounding schools is provided and all
users and visitors are made aware that this is
available.
 What measures will be in place on match days to
ensure compliance with the match day traffic
management plan.  For the avoidance of doubt,
Page 15 of 158

Page 16

relevant stewardship should be included as part of
the management plan.
Thereafter, the agreed plan shall be implemented in full
accordance on each match day.
Reason - In the interests of road safety and proper traffic
management.
Natural Heritage and Biodiversity
12. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the approved
plans) and those which have Root Protection Areas which
fall within the site shall be retained and protected. Protection
methods shall be strictly in accordance with BS 5837 2012:
Trees in Relation to Design, Demolition and
Construction.  Protection measures, once in place, shall
remain in place for the duration of construction.
Reason - To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority.
13. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted for the further written agreement
of the Council as Planning Authority.  The scheme shall
include:
(a) confirmation of tree and hedge planting as
compensatory planting for tree loss
(b) confirmation of tree and hedge planting as
biodiversity enhancement
(c) details of the species, height, size, location, density
and maintenance regime of trees and shrubs to be
planted. 
The scheme as subsequently approved shall be carried out
and completed within the first available planting season
(October to March) after the completion or bringing into use
of the development, whichever is the earlier. The approved
scheme shall thereafter be maintained, with any planting
which fails to become established within five years being
replaced in the following planting season with others of a
size and species as previously approved. 
Reason - In the interests of visual amenity and to ensure the
satisfactory implementation of a compensatory planting
scheme.
14. The conclusions and recommended action points within the
supporting ecological survey submitted and hereby
approved (document no. 28 relates) shall be fully adhered
to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental quality
and of biodiversity.
15. An updated ecology survey will be required prior to the
commencement of works, if works have not commenced
Page 16 of 158

Page 17

within 24 months of the date of the ecology survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason - In the interests of protecting environmental quality
and of biodiversity.
16. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, three swift and
three sparrow nesting boxes shall be provided on the
existing clubhouse, and six bat boxes shall be provided on
suitable nearby trees. Thereafter, the agreed scheme shall
be maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning
Authority.
Reason - In the interests of protecting environmental quality
and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken. Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position. Please use the form attached
herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended.  The form of the
notice is set out in Schedule 7 of the Regulations and a draft
notice is included for your guidance.  In accordance with
Regulation 41 the notice must be:
Displayed in a prominent place at or in the vicinity of the site
of the development Readily visible to the public Printed on
durable material.
Page 17 of 158

Page 18

4. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two months
of the expiry date of your permission will be able to be dealt
with before your permission lapses.
5. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive.  Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The presence of protected species, and the extent to which
they could be affected by the proposed development, should
be established before works commence.  Should protected
species be identified within the site the developer should
ensure that all appropriate measures required to comply
with the relevant legislation are carried out.
7. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
(The Committee took a short recess and then reconvened.) 
Page 18 of 158

Page 19

(2) Local Application 
(i) 25/01273/FLL - Siting of residential caravan (for a temporary
period) (in retrospect), land 250 metres north of The
Farmhouse, Easter Muirhead Farm, Blairingone, Dollar, FK14
7ND (Report No. 26/92) 
Mrs V Humphreys, objector, followed by Miss A Anderson,
applicant, addressed the Committee and answered members
questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. The caravan is approved for a temporary period only until
31 March 2028. Upon expiry of this temporary period the
caravan shall be removed from the site and the site returned
to its original condition to the satisfaction of the Council as
Planning Authority.
Reason - In view of the temporary nature of the caravan and
to enable the Planning Authority to review the circumstances
pertaining to the proposal within a reasonable period of time.
2. The hours of operation of the generator shall be restricted to
between 0800 hours and 1900 hours Monday to Saturday
only, with no operations permitted on Sundays. 
Reason - In order to safeguard the residential amenity of the
area.
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the residential amenity of the
area.
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of the
area.
5. The applicant shall ensure the private water supply for the
development complies with the Water Scotland Act 1980
(Section 63), The Private Water Supplies (Scotland)
Regulations 2006 and The Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations
2017.  In so doing, the applicant shall submit detailed
information regarding the private water supply to Perth and
Page 19 of 158

Page 20

Kinross Council Environmental Health by 31 May 2026,
including the nature, location and adequacy of the source,
any storage tanks/ pipework and the filtration and
disinfection treatment to ensure provision of an adequate
and consistently wholesome water supply.
Reason - To ensure the new development has an adequate
and consistently wholesome supply of water and to maintain
water quality and supply in the interests of residential
amenity and ensure the private water supply of neighbours
of the development remain accessible for future
maintenance.
6. Full details of how drainage is managed on site including
wastewater associated with the caravan shall be submitted
by 31 May 2026 for the written approval of the Council as
Planning Authority. 
Reason - To ensure the provision of effective drainage for
the site.
7. Details of the location and measures proposed for the
safeguarding and continued operation, or replacement, of
any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water
supply pipes serving properties in the vicinity, sited within
and running through the application site, shall be submitted
by 31 May 2026 for approval in writing by the Council as
Planning Authority.  The subsequently agreed protective or
replacement measures shall be put in place and thereafter
be so maintained insofar as it relates to the development
hereby approved.
Reason - To ensure existing water and drainage
infrastructures are not compromised. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. The proposed development lies within a coal mining area
which may contain unrecorded coal mining related hazards. 
If any coal mining feature is encountered during
development, this should be reported immediately to the
Coal Authority on 0345 762 6848.
Further information is also available on the Coal Authority
website at: www.gov.uk/government/organisations/the-coal-
authority. 
2. Dam Wood to the north of the site is designated as ancient
woodland (ID 33214). Native Woodlands are protected
through NPF4 Policy 6.
3. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
Page 20 of 158

Page 21

honoured throughout and after completion of the
development.
4. The applicant should take note of the information and advice
contained within the consultation response from Scottish
Gas Network. 
(ii) 25/01587/FLL - Erection of raised viewing platform, including a
glazed dome, safety barrier, formation of steps and associated
works, land 90 metres north west of Lochside Cottage,
Kenmore, Aberfeldy, PH15 2HW (Report No. 26/93) 
Mr W Lindsay, objector on behalf of Kenmore Community Council,
followed by Mr E Strickland, applicant, addressed the Committee
and answered members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. No development shall take place on site until a Construction
Method Statement has been submitted to and approved in
writing by the Council as Planning Authority. The
Construction Method Statement shall outline the measures
to protect watercourses and residential receptors from the
impact of pollution, sediment and dust to ensure no adverse
effects. The approved Construction Method Statement shall
thereafter be implemented as part of the construction phase
of the development.
Reason - In the interests of protecting environmental quality
and of biodiversity.
3. No development shall take place on site until a Construction
Traffic Management Scheme (TMS) has been submitted to
and approved in writing by the Council as Planning
Authority, in consultation with the Roads Authority
(Structures). The TMS shall include the following:
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b. timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c. arrangements to ensure that access for emergency
service vehicles are not impeded;
Page 21 of 158

Page 22

d. details of information signs to inform other road users
of construction traffic;
e. traffic arrangements in the immediate vicinity of the
site to ensure that deliveries to site are not
undertaken from the public road network; and
f. details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during the
entire site construction programme.
Reason - In the interest of proper site management.
4. Prior to the development being brought into use, a Noise
Management Plan shall be submitted to and approved in
writing by the Council as the Planning Authority. The plan
shall include all sources of noise associated with the
premises, including patron noise and the measures that will
be put in place to minimise and/or control noise. The plan
shall be reviewed on a regular basis or following receipt of a
justified complaint or at the request of the Planning
Authority. The Noise Management Plan as approved shall
be fully implemented for the lifetime of the development.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
5. Prior to the development being brought into use, details of
two gates to be installed at the proposed diving board and
external staircase to the water’s edge shall be submitted to
and approved in writing by the Council as the Planning
Authority. The details as approved shall be fully
implemented prior to the development being brought into
use, and maintained in good working order for the lifetime of
the development.
Reason - In the interests of public safety.
6. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
7. No amplified music shall be permitted within the dome at
any time. No music, amplified or otherwise, shall be
permitted at any time in any associated external area.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
8. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land by
complying with the ILP ‘Guidance notes for the Reduction of
Obtrusive Light’ Environmental Zone 1 Levels.
Page 22 of 158

Page 23

Reason - In order to safeguard the neighbouring residential
amenity in the area.
9. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, two bird nesting
boxes shall be provided on nearby buildings or trees within
the applicant's control. Thereafter, the agreed scheme shall
be maintained in a reasonable condition for the life of the
development.
Reason - In the interests of protecting environmental quality
and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith.
3. An application for Building Warrant may be required.
4. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development. https://www.pkc.gov.uk/ldp2floodrisk
5. A variation of the existing alcohol licence for the wider resort
development may be required to lawfully serve alcohol
within the development which has been hereby granted
planning permission.  The developer should contact
LiquorLicensing@pkc.gov.uk for further information.
6. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town and
Country Planning (Scotland) Act 1997, as amended.  The
variations incorporate changes to provide additional clarity
regarding the proposal.
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
Page 23 of 158

Page 24

submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk. 
The Council has two months to consider the information. 
You should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two months
of the expiry date of your permission will be able to be dealt
with before your permission lapses. 
(iii) 25/01671/FLL - Erection of dwellinghouse, alterations to
assess track and associated works, land north of The Croft,
Fearnan, Aberfeldy, PH15 2PF (Report No. 26/94) 
Ms J Robertson, on behalf of Glen Lyon and Loch Tay Community
Council, objector (via telephone), followed by Mr R Johnston, agent
on behalf of the applicant, addressed the Committee and answered
members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. Prior to commencement of any works on site, the relocated
passing place shown on Drawing 03 shall be provided in
accordance with the approved plans to the satisfaction of
the Planning Authority.
Reason - In the interests of pedestrian and traffic safety
3. Prior to the commencement of development a biodiversity
enhancement scheme and a replacement tree plan using
selected standard size tree stock, planted within prepared
tree pits, staked, and securely tied.  Tree species to be silver
birch/rowan/hawthorn, details on the hedge and boundary
fencing shall be submitted to and agreed in writing by the
Council as Planning Authority.  The agreed scheme shall be
completed prior to the occupation or completion of the
dwelling, whichever is sooner, and thereafter be maintained
in a reasonable condition for the life of the development, to
the satisfaction of the Council as Planning Authority.
Page 24 of 158

Page 25

Reason - In the interests of protecting environmental quality
and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this application. 
The legal agreement should be concluded and completed within 4
months of the date of any Committee approval.  Failure to conclude
a legal agreement within 4 months will result in the planning
application being re-assessed through failing to comply with the
associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith. 
3. No work shall be commenced until an application for
building warrant has been submitted and approved. 
4. Application for a new postal address should be made via the
Street Naming and Numbering page on the Perth & Kinross
Council website at www.pkc.gov.uk/snn.  Please note there
is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved.
5. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests. 
6. The Air Source Heat Pump shall be certificated in
accordance with Microgeneration Certification Scheme 007
and installed by an installation company certificated in
accordance with Microgeneration Installation Standard 3005
and in compliance with the calculation procedure contained
Page 25 of 158

Page 26

in Table 2 of Microgeneration Certification Scheme Planning
Standards (MCS 020), confirming that the permitted
development noise limit of 42 dB LAeq, 5 mins will be met.
In addition, the Air Source Heat Pump shall be so enclosed,
attenuated and/or maintained such that any noise therefrom
shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
7. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town and
Country Planning (Scotland) Act 1997, as amended.  The
variations incorporate changes to clarify site levels,
section/house sections, drainage. 
(iv) 25/01834/FLL - Erection of staff accommodation unit, amenity
building, café, formation of outdoor seating area, car park and
associated works, Moor of Rannoch Hotel, Rannoch, Pitlochry,
PH17 2QA (Report No. 26/95) 
This application was withdrawn from the agenda. 
6 Proposal of Application Notices (PoAN) 
6(i) 26/00001/PAN - Residential development, landscaping and
associated infrastructure (part allocated site H14), land 150 metres
south west of Kintillo Cemetery (H14), Bridge of Earn (26/96) 
Councillor D Illingworth requested that officers consider access to the site
and whether or not two entrance/exit roads, one from the Wick O Baiglie
Road and one from the Meadows are required. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted. 
6(ii) 26/00002/PAN - Formation of mixed leisure and visitor development
comprising erection of holiday accommodation units, formation of
hub/spa facility, indoor and outdoor recreational areas,
footpath/cycleway link, vehicular access, parking, landscaping and
associated infrastructure, land 400 metres west of Tarnhill,
Milnathort (26/97) 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted. 
Page 26 of 158

Page 27

6(iii) 26/00003/PAN - Erection of hydrogen production facilities and
associated works, land 1.4km north west of Beannie Farm, Braco,
Dunblane, FK15 9LL (26/98) 
Councillor K Allan requested that consideration be given to the cumulative
impacts with the SSEN substation, construction traffic and the suitability of
the site access; along with possibility that making hydrogen will cause
acid rain. 
Councillor K Harvey requested that full details are submitted to HSE for
their consideration to allay fears of this type of development. 
Councillor I James requested that consideration is given to the safe
distances of the development from other infrastructure for safety reasons. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted. 
Page 27 of 158

Page 28

Page 28 of 158

Page 29

Perth and Kinross Council 
Planning and Placemaking Committee - 13 May 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/124) 
Proposal: Formation of a 49.9 MW solar farm and battery energy storage system
comprising of ground mounted solar arrays, inverters, transformers, a
substation, a DNO substation, security fencing, CCTV cameras, cabling,
access tracks and associated works 
Location: Kinnon Park Farm, Methven, Perth, PH1 3NE 
Ref. No: 24/01188/FLM
Ward No: P9 - Almond and Earn 
Summary 
This report recommends refusal of the application as the development is not
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1. The proposed development is located at Kinnon Park Farm lying 700m to the
south-west of the settlement of Methven, on the A85 and lying 3.5km west of the
city of Perth. Kinnon Park Farm steading comprises several vacant buildings and
fields which have been in agricultural use. The wider Kinnon Park area also
encompasses the occupied Kinnon Park Farmhouse and the part-occupied Kinnon
Park Cottages, which are not included within the proposals and are outwith the
applicant’s ownership.  In terms of existing watercourses, the East Pow borders the
site to the south. The Pow Water is a tributary of the River Almond which joins the
River Tay in Perth. 
2. The existing site topography shows the existing ground levels fall relatively steeply
through the northern third of the site from 98m at Morrishill Wood in the north to
40m across the central area. From here, the site generally slopes more gently down
to 20m at the watercourse known as East Pow, which flows east along the southern
site boundary. Small, elevated sections are present around the existing farm
buildings and in a relatively flat area in the east of the site. Broadly, the site aspect
is south facing and rises from south to north. 
5(1)(i)
Page 29 of 158

Page 30

3. The existing use of Kinnon Park Farm is agricultural arable land, mostly planted in
crop for grain. The group of buildings that form the farmstead complex are located
within the Site. However, none of the ancillary structures will be used as a site
compound, but the Site compound will be located next to them. The fields are
delineated by a combination of mixed shelter belts, hedgerows with individual trees
with evident gaps. The site rises approximately 35m in the south and to 95m in the
north. The southern fields of the site are relatively level with the landform rising
across the northern fields, located to the north of Kinnon Park. The East Pow
Watercourse defines the site’s southern boundary and field drains are found
throughout the site. The site is accessed by an existing track which connects to the
U47 before the A85 to the northeast. 
4. The proposed development includes the change of land use from agricultural to
enable renewable energy generation of up to 49.9MW and a battery energy storage
system for a period of up to 40 years. The total site area (all land) is 99 Ha, and the
total development site area after iterations of design and public consultation
feedback is approximately 80.66 Ha. 
5. The installation and operation of the solar farm and battery energy storage will
comprise: 
 Arrays of ground mounted solar panels. Panels will have mountings up to 3m
high, fixed south facing. The panels will be located in rows or strings to provide
a coherent and simple layout. 232 inverters and 20 transformers will be
positioned around the solar farm to allow conversion of energy into electrical
current suitable for feeding into the grid.
 The proposed battery storage unit and DNO substation will be installed in
secure containers at 3m in height and located adjacent to field 7. 
 The site’s proposed boundary treatment consists of 9.39km of 2m high deer
fencing and would be supported by wooden posts, also 2m high. CCTV will be
erected at strategic locations throughout the site as shown on the proposed
plans. 
 The creation of 2,000 sq m new access tracks is proposed, to service
maintenance of the solar panels 
 Landscape mitigation measures for the site include additional boundary
landscaping to the east, west and south of the site boundary, and areas of
ecological enhancement adjacent to Kinnon Park Farmhouse and Kinnon Park
Cottages. 
 Approximately 7,900 m of new native deciduous species rich hedgerow. 
 New hedgerow tree planting: total of 249no including large scale woodland trees
such as Oaks and Beech, and small scale hedgerow trees for example
Hawthorn and Field Maple. 
 13 hectares of wildflower meadow grassland. 
 79 hectares of grassland inside the security fencing sown with a grazing mix 
 Two large areas comprising 4Ha to be retained as “no development” and to be
managed as ecological areas nearest to the existing residential properties
around the Kinnon Park Farmstead and farmhouse 
Page 30 of 158

Page 31

Site History 
6. 04/02335/FUL An application for Full Planning Permission was withdrawn on 23
December 2005 for the conversion of an existing steading and erection of 11
dwellinghouses 
7. 05/01778/OUT was approved on 23 December 2005 for the construction of a golf
course and associated buildings and parking (in outline) 
8. 23/00012/PAN  submitted on 18 August 2023 for the formation of a 49.9 MW solar
farm comprising ground mounted solar arrays, inverters, transformers, a substation,
a DNO substation, battery storage facility, security fencing, CCTV cameras, cabling,
access tracks and associated works 
9. 23/01609/SCRN  submitted on 17 October 2023 for the formation of a 49,9mw
solar farm 
Environmental Impact Assessment 
10. An EIA screening has been undertaken. The proposal being a Schedule 2
development in terms of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017. In the case of these regulations,
prohibition is given to the granting of planning permission to “EIA development”
unless an environmental impact assessment has been undertaken. In this case the
Council has taken the opinion that it is not EIA development, and that sufficient
information has been submitted with the application to enable a determination in
consideration of all relevant environmental matters. These environmental aspects
requiring further consideration, are namely: noise, landscape and visual amenity,
trees and biodiversity, roads and transportation and flood / drainage matters. It
should be noted that the Council requested detailing of the grid connection as this
was not submitted with the initial proposals. Upon receipt of this grid connection, the
Council maintain the view that the project as a whole would not require an EIA to be
undertaken. 
Pre-Application Consultation 
11. Pre application Reference: 23/00015/PREAPM  
12. The proposed development is classed as a Major development in terms of the Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
therefore the applicant was required to undertake formal pre-application
consultation with the local community. 
13. A Pre-Application Consultation (PAC) Report has been submitted with the planning
application. A Proposal of Application Notice (PAN) was submitted to Perth and
Kinross Council on the 9th August 2023. The PAN sets out the consultation strategy
which includes the arrangement of two in-person consultation events, which were
held two weeks apart from each other. 
Page 31 of 158

Page 32

14. In this instance, two Public Notices detailing all relevant information regarding the
consultation process were published in the Perthshire Advertiser and The Courier
on the 15th of August and the 17th of October 2023. On Monday and Tuesday 16th
and 17th of October 2023, 2,500 flyers were hand-delivered to the homes of those
living closest to the application site. Furthermore, a consultation website was set up
in advance of the first and second public consultation events at Kinnon Park -
Namene Solar outlining the proposals, and the consultation process, as well as an
ability to download the information boards and an option to leave online feedback.
The website has remained active for visits at any time. 
15. Two public events in the form of a ‘drop-in session’ were held on Tuesday 22nd of
August 2023 between 15.30 and 19.30 hours and a second on Tuesday 24th
October 2023 between 1530 and 1930 hours. Both events were hosted at the
Methven Community Centre. 
Development Plan 
16. The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance. 
National Planning Framework 4 
17. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
18. The Council’s assessment of this application has considered the following policies
of NPF4: 
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 5: Soils
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 11: Energy
 Policy 14: Design, Quality and Place
 Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
19. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
Page 32 of 158

Page 33

economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
20. The principal relevant policies are, in summary. 
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 2: Design Statements
 Policy 6: Settlement Boundaries
 Policy 8: Rural Business and Diversification
 Policy 15: Public Access
 Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 29: Gardens and Designed Landscapes
 Policy 31: Other Historic Assets 
 Policy 32: Embedding Low and Zero Carbon Generating Technology in New
Development
 Policy 33A: Renewable and Low Carbon Energy: New Proposals for Renewable
and Low-Carbon Energy
 Policy 35: Electricity Transmission Infrastructure
 Policy 38C: Environment and Conservation: Local Designations
 Policy 39: Landscape
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and Development
 Policy 41: Biodiversity
 Policy 47: River Tay Catchment Area
 Policy 50: Prime Agricultural Land
 Policy 51: Soils
 Policy 52: New Development and Flooding
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53C: Water Environment and Drainage: Surface Water Flooding
 Policy 55: Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
 Policy 61: Airfield Safeguarding 
Statutory Supplementary Guidance
21.
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020) 
Page 33 of 158

Page 34

PKC Non Statutory Guidance
22. 
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
23. The Scottish Government expresses its planning policies through Planning Advise
Notes, Creating Places, Designing Streets, National Roads Development Guide and
a series of Circulars in addition to NPF4. 
Planning Advice Notes 
24. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport 
Creating Places 2013 
25. Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
26. This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision. 
Consultations 
27. As part of the planning application process the following bodies were consulted: 
External 
28. Historic Environment Scotland (HES) - No objection. However, it recommended
that all PKHT comments are fully taken into consideration. 
29. Transport Scotland - No objection subject to the inclusion of a condition relating to
a Construction Traffic Management Plan (CTMP) 
30. National Gas Transmissions (NGT) - Given that NGT operates a high-pressure
gas pipeline that runs through the proposed development site, a holding objection
Page 34 of 158

Page 35

has been submitted, and the applicant must not proceed with any development
without further assessment being undertaken by the Asset Protection Team. This is
to ensure that no works are undertaken in the vicinity of any gas pipelines. 
However, NGT have stated that the holding objection is subject to several
conditions relating to development within the Easement Strip of the pipeline,
pipeline crossings, cables crossing and works to be carried out in accordance with
the relevant British Standards policy. 
31. NatureScot - No objection. Given the much-reduced population of geese, and the
amount of suitable habitat in the vicinity of the Special Protected Area (SPA),
NatureScot not considered that the proposed development will have an adverse
impact on the goose interest of the SPA. 
32. Scottish Water - No objection. 
33. Scottish Environment Protection Agency (SEPA) - No objection, subject to the
inclusion of a condition to ensure that the proposed infrastructure is built to the
levels specified in the now updated Flood Risk Assessment. 
34. Health and Safety Executive - No objection. However, the applicant is advised to
see the full consultation response for any further guidance. 
35. Dundee Airport Ltd - No objection. It has been confirmed that, at the given position
and height, this development would not infringe the safeguarding criteria and
operation of Dundee Airport. 
36. Perth and Kinross Heritage Trust (PKHT) - Initial objection. However, as a result
of a subsequently submitted photomontage, PKHT have removed their objection. 
Internal 
37. Transportation and Development - No objection, subject to the inclusion of
conditions relating to the upgrade of a road junction, a temporary speed limit, core
path obstruction and fire and emergency vehicles access. 
38. Developer Contributions Officer - No contributions required. 
39. Tree Officer - No objection 
40. Structures and Flooding - No objection, following the submission of a revised
surface water drainage scheme, including design drawings and calculations, and
fire water safety information for the BESS site. 
41. Development Plan Team - No objection subject to the inclusion of a condition to
secure a Soil Management Plan. However, it has been recognised that the
proposed development will result in an industrialisation of a countryside location,
and that there will be adverse impacts on local visual amenity. 
Page 35 of 158

Page 36

42. Biodiversity Officer - No objection, subject to the inclusion of conditions relating to
the Biodiversity Study, an updated Ecology Study, a site Biodiversity Action Plan,
and exclusion zones around all trees. 
43. Environmental Health (Contaminated Land) - No objection. A search of the
historic records did not raise any concerns regarding ground contamination. 
44. Environmental Health (Noise Odour) - No objection, subject to the inclusion of
conditions relating to nose ratings, noise complaints, external lighting, a screening
plan, glint and glare and construction working hours. 
Representations 
45. 320 representations were received (316x objection, 1x general comment, and 3x
support). The main issues raised within the representations are: 
46.  Objection Comments  
 The proposed development will result in an adverse effect on visual amenity
 The proposed development is contrary to Local Development Plan Policy
 The proposed development will result in an adverse impact on employment
provision 
 The proposals are excessive in terms of height
 The proposed development will result in a flood risk
 The proposed development will result in an inappropriate land use 
 The proposed development will result in a loss of open space
 There is a lack of car parking proposed
 The proposed development will result in light pollution
 The proposed development will result in a loss of trees
 The proposed development will result in a loss of sunlight and daylight
 The proposed development will result in noise pollution 
 The proposed development is out of character with the surrounding area
 The proposals will result in over intensive development
 The proposed development will result in overlooking
 The proposed development will result in roads safety concerns
 The proposed development will result in Traffic Congestion
 The proposed development will have an adverse impact on local biodiversity 
47. Support Comments 
 The proposed development will result in environmental improvement 
48. Non-Material 
 The proposed development will devalue surrounding properties 
 The proposed development will result in an increase in the price of available
agricultural land
Page 36 of 158

Page 37

 No local community benefit has been proposed.
 No indication of what other sites been explored for suitability. 
49. These issues are addressed in the Appraisal section of the report. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg Flood
Risk Assessment
Submitted 
Battery Safety Management Plan Submitted 
Drainage Impact Assessment Submitted 
Tree Protection Plan Submitted 
Glint and Glare Study Submitted 
Access Management Plan Submitted 
Bat Tree Survey and Assessment Submitted 
Landscape and Visual Impact Assessment Submitted 
Ecological Impact Assessment Submitted 
Planning Statement Submitted 
Construction Environment Management Plan Submitted 
Appraisal 
50. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise. The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance.  
Principle 
51. The key determining policy issues for this specific proposal at this location include:
the principle of the development and its contribution towards renewable generation
targets/net zero agenda, (Policies 33 and 35 of the LDP2 and Policies 1 and 11 of
the NPF 4), landscape/visual impact and recreational interests/access, (Polices 15
Page 37 of 158

Page 38

and 39 of the LDP2 and Policy 21 of the NPF4), impacts on prime agricultural land
(Policy 50 of the LDP2 and Policy 5 of the NPF 4), impacts on/from flooding and the
water environment (Polies 52, 53A and 53C of the LDP2 and Policy 22 of the
NPF4), residential amenity (Policies 1A and 1B), cultural heritage & historic
environment (Policies 26A, 26B, 27A of the LDP2 and Policy 7 of the NPF4),
biodiversity/ecological impact (Policies 40 and 41 of the LDP2 and Policy 3 of the
NPF4), pipeline and airfield safeguarding (Policies 54 and 61 of the LDP2), and
transport (Policy 60A of the LDP2 and Policy 13 of the NPF4). 
52. Policy 33 of the LDP2 generally provides support for the development of renewable
and low carbon energy and associated infrastructure, subject to detailed
assessment against various environmental and other planning issues. This is also
reflected in Policies 1 and 11 of the NPF4. However, stronger emphasis is placed
over the contribution of the proposal to renewable energy generations targets than
to other landscape and or amenity impacts. Justification for the development in
relation to the net zero agenda is detailed in the submitted Planning, Design and
Access Statement. In this case, the proposal is a 49.9MW solar farm and
associated infrastructure/works which would generate renewably sourced electricity
into the national grid, via the Boroughmuir substation. It is indicated that this would
be the equivalent to providing energy that could power approximately 11,000
homes. Notwithstanding any environmental or other planning issues, the proposal
would provide a substantial contribution towards renewable energy generation to
support national and local objectives in relation to net zero and carbon emission
reduction. This being the case, the proposed development is considered to be
supported by the general principals of NPF4, and in particular Policy 11: Energy.
However, the development, owing to inadequate mitigation in seeking to offset
landscape concerns raised, fails to comply with Policy 11(e)(ii) ‘Energy’, of the
National Planning Framework 4 (2023). 
53. Policy 35 of the LDP2 also supports the development of electricity transmission
infrastructure, where this is sensitively designed, and suitable mitigation is ensured.
In this case, it is not considered that the development is sensitively designed, or that
suitable mitigation is offered. The development proposed raises significant
landscape and visual amenity concerns being of a scale, form and location which
will dominate the immediately adjoining settlement of Methven. It is considered that
its visually prominent location, partially situated on elevated ground adjacent to the
Greenbelt, will greatly alter the character and appearance of this location, at odds
with the wider agricultural setting in which it is located. Changes have been made in
terms of reducing the scale and location of the development, with two fields being
removed. The development, as proposed, is still excessive in scale and too close to
residential properties, footpaths, and roads. Therefore, the development, owing to
its size, scale, appearance and location, raises significant landscape character and
visual impact concerns, failing to contribute positively to the quality of the
surrounding built and natural environment. The development is subsequently
considered contrary to Policies 1A, 1B ‘Placemaking’, and Policy 39 ‘Landscape’ of
the adopted Perth & Kinross Local Development Plan 2 (2019) and Policy 4(a)
‘Natural Places’, of National Planning Framework 4 (2023), as well as the Council’s
Placemaking Supplementary Guidance (2020). 
Page 38 of 158

Page 39

Design and Layout 
54. LDP2 Policy 1A: Placemaking states that development must contribute positively to
the quality of the surrounding built and natural environment. All development should
be planned and designed with reference to climate change, mitigation and
adaptation. The design, density and siting of development should respect the
character and amenity of the place, and should create and improve links within and,
where practical, beyond the site. Proposals should also incorporate new landscape
and planting works appropriate to the local context and the scale and nature of the
development. LDP Policy 1A and Policy 1B list a range of criteria upon which design
matters will be assessed. 
55. In this instance, the proposed layout shows that most of the site will accommodate
solar panel units, with a number of internal site access routes providing access
within the site. The individual solar panel units will sit at a height of approximately
2.66 metres, with a pitch of 15 degrees from horizontal. Each unit will be
approximately 7.2 metres wide and sit on support poles, which will be piled to a
depth of between 1.5 to 2.5 metres. The units would be enclosed by deer fencing
approximately 2 metres in height, with CCTV cameras mounted on 4 metres high
poles. 
56. A number of substations are also proposed within the site, close to its eastern
boundary. These form a group and include two Distribution Network Operator
(DNO) substations and a client substation. A battery station is also proposed to the
north-west of the DNO area. Each DNO substation will sit at 3.48 metres in height
(including base), measure just over 6 metres in length and be 2.4 metres wide. The
client substation and storage will be 3.2 metres high (including base), measure just
over 6 metres in length and be 2.4 metres wide. The battery energy storage system
(BESS) comprises a battery transformer, which will sit at a height of approximately 3
metres and measure just over 4.6 metres in length, with inverters and control gear
sitting at a height of approximately 2.65 metres (including base) and measure just
over 6.1 metres in length. 
57. The solar panel units would be connected to the client and DNO substations by
underground cabling, with the BESS adjoining field I (7) to its east. The proposed
development would then be connected with an underground cable that runs to
Burghmuir Station close to the A9 road to the west of Perth (approximately 3.4 km
east of the Site). The proposed development would use a limited materials palette
with muted colour finishes. The photovoltaic panels to the solar units have been
designed to absorb light rather than reflect it and their muted colour finish will
ensure that they are visually recessive in the landscape. 
58. Furthermore, the site will be secured by deer fencing of a standard design, with
large aperture galvanised mesh stretched on wire and supported by timber posts
approximately 2 metres in height. Where access gates are required, these are likely
to be double leaf timber gates, in a height and style to match the rest of the fencing. 
Page 39 of 158

Page 40

Landscape and Visual Amenity 
59. NPF4 Policy 4: Natural Places states that development proposals which by virtue of
type, location or scale will have an unacceptable impact on the natural environment,
will not be supported. Furthermore, development proposals that are likely to have a
significant effect on an existing or proposed European site (Special Area of
Conservation or Special Protection Areas) and are not directly connected with or
necessary to their conservation management are required to be subject to an
“appropriate assessment” of the implications for the conservation objectives. 
60. LDP 2 Policy 39 states that development should be compatible with the distinctive
characteristics and features of Perth and Kinross’ landscapes. 
61. A revised Landscape and Visual Impact Assessment (LVIA) has been prepared as
part of the Planning, Design & Access Statement submitted in support of this
application. Policy 39 of LDP2 and associated Placemaking Supplementary
Guidance is of relevance in relation to the potential landscape & visual impact of the
development. The landscape context sees the site set in a predominantly
rural/agricultural setting with the settlement of Methven to the north/northeast and
smaller clusters of, and individual, farm buildings and cottages in the surrounding
area. The location is within the ‘The Broad Valley Lowlands – Tayside Landscape
Character Type’ as defined in the Landscape Character Assessment. However,
there are no formal landscape designations associated with the proposed
development site. 
62. Whilst the development may soften in time as planting becomes established, there
will be an immediate and sudden change in landscape character in this localised
setting, impacting not just views outward from Methven, but also local walking and
cycling routes nearby. This will, ultimately, have an adverse impact on the
landscape experience of users of local core paths and roads, and will impact on the
views from the Greenbelt. Furthermore, the proposal will result in major or moderate
adverse visual effects from key viewpoints for users of footpaths and the local roads
network. Therefore, the proposed development is considered to be contrary to
Policies 1A and 1B of the LDP2 2019, as well as the adopted Placemaking
Supplementary Guidance. 
63. It is not considered that the development is contrary to Policy 11 of the NPF4
whereby greater weight in any planning balance under this policy is placed on
renewable energy benefits. However, in order for a development to be fully
supported by this policy, it is necessary for a development proposal to set out
appropriate mitigation. Even with a proposed increase in tree planting and
landscaping, it is not appropriate for mitigation to offset the significant landscape
character impacts. 
64. It is important to note that, in this instance, a planning balance must be considered
having regard to any landscape impacts against the zero carbon renewable energy
benefits provided by the NPF4. In this case, it is the view of officers that the
significant landscape impacts outweigh those renewable energy benefits. 
Page 40 of 158

Page 41

Prime Agricultural Land / Soils 
65. NPF4 Policy 5: Soils states that Development proposals will only be supported if   
they are designed and constructed: 
i) In accordance with the mitigation hierarchy by first avoiding and then
minimising  
ii) the amount of disturbance to soils on undeveloped land; and
iii) In a manner that protects soil from damage including from compaction and
erosion, and that minimises soil sealing. Furthermore, development proposals
on prime agricultural land, or land of lesser quality that is culturally or locally
important for primary use, as identified by the LDP, will only be supported
where it is for:
a) Essential infrastructure and there is a specific locational need and no
other suitable site.
b) Small-scale development directly linked to a rural business, farm or croft
or for essential workers for the rural business to be able to live onsite.
c) The development of production and processing facilities associated with
the land produce where no other local site is suitable.
d) The generation of energy from renewable sources or the extraction of
minerals and there is secure provision for restoration; and 
66. In all of the above exceptions, the layout and design of the proposal minimise the
amount of protected land that is required. 
67. LDP2 Policy 50: Prime Agricultural Land states that outside the identified
settlements, development on prime agricultural land will not be permitted, unless it
is necessary to meet a specific established need, such as a major infrastructure
proposal and only when there is no other suitable site available on non-prime land.
Small - scale development directly linked to rural business, including housing, may
also be acceptable on prime agricultural land, providing it is compatible with all
other aspects of the policy framework of the Plan and there are no other suitable
non-prime land sites available, and it does not adversely affect the viability of the
agricultural unit. 
68. In this instance, the land capability of the agricultural land within the application site
is classed as 2 & 3.1 & 3.2. Each relevant Class is explained further below:  
 Class 2 - Land capable of producing a wide range of crops
 Class 3.1 - Land capable of producing consistently high yields of a narrow range
of crops and/ or moderate yields of a wider range. Short grass leys are common
 Class 3.2 - Land capable of average production though high yields of barley,
oats and grass can be obtained. 
69. An updated layout plan has been provided which shows that the proposed panels,
located in the southeast of the site on class 2 land, have been removed. This is a
significant improvement as the loss of prime land has been reduced to
approximately 0.1ha of 3.1 class. However, it is important to note that, due to lack of
Page 41 of 158

Page 42

cultivation, drainage & fertility management, the failure to actively manage the land
for crops is likely to result in the demise of its future capabilities. In the face of
potential food security issues, there are concerns over the loss of productive
agricultural land. 
70. The loss of agricultural land being actively used may also result in a future loss of
local skills in agricultural land management practices. Other than financial incentive,
it is difficult to justify the proposed development on productive agricultural land,
when poorer quality land could have been identified in less favourable, south facing
land within Perth & Kinross. In light of the above and given that the loss of Prime
Agricultural Land amounts to around 8% of the site, it is considered that the
proposed development is contrary to LDP2 Policy 50: Prime Agricultural Land. 
71. Furthermore, the proposed development has been justified on the basis of national
grid connection via the Boroughmuir Substation. Given the connection capacity
which exists at this substation there is a high likelihood for further subsequent
energy related development within this immediate location. When this factor is
considered alongside any wider visual amenity impacts that have been already
identified, the development is not considered to comply with Policy 50 of the LDP2. 
72. LDP2 Policy 51: Soils states that the Council seeks to protect soils from damage
such as erosion or compaction. Developments located on areas of good quality
agricultural soils will only be supported where they: 
(a)  minimise impact on soil resources. 
(b)  implement appropriate soil management measures, particularly for valuable
soils such as good-quality agricultural soils*, and soils with a high organic
content. 
(c)  adopt best practice when moving, storing and reinstating soils (see Scottish
Soils: https://soils.environment.gov.scot/) 
(d)  consider opportunities to re-use soils necessarily excavated from the site. 
73. In terms of the proposed development, the nature of the technology used will
provide a minimum impact on soils. However, trenching for cables and other
infrastructure may still have an impact. This being the case, and in order to protect
soils that may be subjected to movement, any consent issued would require a
condition that a Soil Management Plan is submitted for written approval. 
Residential Amenity 
74. NFP4 Policy 23 (e) states that development proposals that are likely to raise
unacceptable noise issues will not be supported. 
75. LDP2 Policy 17: Residential Areas, highlights that areas of residential and
compatible uses inside settlement boundaries will see existing residential amenity
protected and, where possible, improved. 
76. LDP2 Policy 55: Nuisance from Artificial Lights and Light Pollution states that
consent will not be granted for proposals where the lighting would result in obtrusive
Page 42 of 158

Page 43

and/or intrusive effects. The Council may secure the regulation of lighting
installations and their maintenance through the use of conditions attached to the
granting of planning permission. 
77. In this instance, the applicant sumitted a revised site layout plan and an updated
Solar Photovoltaic Glint and Glare Assessment. The Glint and Glare assessment
has been undertaken to assess the possible effects of glint and glare from the
proposed solar farm on the surrounding road network and any residential properties
within a 1km radius of the development. 
78. The assessment identified that solar reflections are geometrically possible towards
25 of the 30 assessed dwelling receptors. Regarding six of the dwellings, solar
reflections are possible for less than three months of the year and less than 60
minutes on any given day. Furthermore, screening has been identified to
significantly obstruct views of reflecting panels. In light of this, there is no impact is
predicted, and therefore, mitigation is not required. 
79. In terms of the further 15 dwellings where a solar reflection is geometrically possible
for more than three months and less than 60 minutes on any given day, screening,
in the form of existing vegetation is predicted to partially obstruct views of reflecting
panels for seven of these dwellings. Furthermore, there is a significant distance of
at least 400m, at its closest point, between the reflecting panel area and the
receptors. In addition, the solar reflection effects would mostly coincide with direct
sunlight, which is a more prominent source of light. This being the case, a low
impact is predicted, and therefore, mitigation is not required. 
80. For the remaining four dwellings, no significant screening or mitigation measures
have been identified for two of the properties, and, given that the duration of
reflections is predicted to be greater than three months a year, but less than 60
minutes on any given day, a moderate impact is predicted. Therefore, mitigation is
recommended in line with revised Glint and Glare Assessment. In light of this, any
consent issued would require conditions relating to external lighting, a Mitigation
Screening Plan as per the submitted Glint and Glare Assessment, and light pollution
complaints to the Council. Therefore, it is considered that, subject to conditions, the
proposed development is in accordance with LDP2 Policy 55. 
81. LDP2 Policy 56: Noise Pollution states that there will be a presumption against the
siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. 
82. In this instance, a Noise Impact Assessment was submitted with the application.
The assessment has been undertaken using worst case scenario with all
components identified working simultaneously and at 100% capacity. The NIA
states that component would not be operational continuously but for shorter periods
of a few hours at a time and maximum noise emissions occur when components are
working to charge or discharge electricity and lower when energy is being stored. 
Page 43 of 158

Page 44

83. The NIA states that transformers and inventors are operational during daylight
hours only 07:00 to 23:00 for the core hours of daytime period. During the nighttime
period only the battery station would be operating and cooling systems would
operate less frequently during the nighttime period than compared to daytime
periods. 
84. Therefore, the NIA concluded that, in line with BS4142, the development is less
likely to have an adverse impact on the residential properties. However, it is
recommended that any consent issued would require conditions relating to all plant
and equipment, noise limits, noise complaints to the Council and construction
working hours. Therefore, it is considered that, subject to conditions, the proposed
development is in accordance with NPF4 Policy 23, LDP2 Policies 17 and 56. 
Roads and Access 
85. LDP2 Policy 15: Public Access states that development proposals that would have
an adverse impact upon the integrity of any (including proposed) core path, disused
railway line, asserted right of way or other well-used route and connectivity
proposals identified in the Regional Transport Strategy and Delivery Plan will not be
permitted. 
86. Battery energy storage should have at least two access points and road networks
that Support emergency vehicles. A safe access route for fire appliances to
manoeuvre within the site should also be clearly demonstrated. Any street or private
drive forming part of a fire access way must be no less than 3.7m wide. In this
instance, the submitted Transport Statement shows emergency vehicle access at
least two separate access points into the battery station area of the site. However,
the internal roads layout and turning area would require to be amended. This could
however be controlled via condition if an approval had been recommended. 
87. Along the Kinnon Farm access, there are recognised core paths (METH/122,
METH/126). The potential for conflict between path users and construction traffic is
proposed to be mitigated through the installation of signage outlined in the
framework CTMP. It is noted that since a contractor is yet to be appointed to deliver
the works, the strategy is subject to refinement in consultation with PKC. While
there are existing verges, it is recommended that suitable opportunities for passing
are formalised along the core path at 100m intervals. It is recommended that any
consent issued shall include a condition to this effect. 
88. LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses 
89. In this instance, a Transport Statement has been submitted with the application.
The proposed operation will generate a minimal number of vehicle movements,
mainly associated with maintenance activities. Therefore, the area that has the
potential for most impact is during the construction phase is where HGVs will
access the site. However, no abnormal loads are associated with the construction
Page 44 of 158

Page 45

and installation activity, given that all loads are expected to be able to be delivered
by standard sized HGVs. 
90. The Transport Statement notes that construction activities are estimated to
generate an average of 6 two-way HGV movements over a working day. In addition,
there will be a number of car and van movements during this period that are
attributed to the 10 to 20 members of staff on site. Final numbers could be
controlled in a Construction Traffic Management Plan (CTMP) to determine traffic
management arrangements that are required. 
91. All generated traffic will access the site from the north via the U47 (Tibbermore
Loan), A85(T), and A9 over the construction period of approximately 20 weeks. All
HGVs are to access the site from the north, and the route will be enforced through
the CTMP. On the local road network, construction traffic will be routed via the U47.
The CTMP will identify mitigating measures along this stretch of the U47 to
minimise the risk of conflict. 
92. Furthermore, Kinnon Park Farm access currently accessed via a priority junction
with the U47 road. In order for this junction to accommodate construction traffic, it
must be brought up to the standards of the Road Authority. This being the case, any
consent issued shall include a condition to this effect. 
93. Therefore, in light of the above, and subject to conditions, the proposed
development is considered to be in accordance with LDP2 Policies 15 and 60A. 
Drainage and Flooding 
94. NPF4 Policy 22: Flood Risk and Water Management states that development
proposals must have regard to the water environment, and drainage, including
floodwater management, within any proposal. 
95. In this instance a Flood Risk Assessment and a Drainage Impact Assessment have
been submitted with the application, with both documents having been revised
throughout the determination process. 
96. The site is bound to the south by East Pow, which flows in an easterly direction. A
series of field drains and minor tributaries flow into the East Pow. There is an
un-named tributary which flows southernly along the western boundary of the stie
and one un-named tributary which flows southernly into the East Pow through the
centre of the site (immediately east of the Kinnon Park Cottages). 
97. The area of site to be drained via the proposed SuDS is approximately 2.62ha. The
impermeable area to be drained is made up of access tracks (2.55ha), substation
(0.04ha), battery (0.02ha) and storage area (0.01ha). A Drainage Impact
Assessment report has been provided with outline design drawings. The proposed
surface water mitigation includes swales and discharge, which will be through
outfalls, located across the site. However, no detailed design drawings of the
proposed surface water drainage scheme have been submitted and therefore, any
Page 45 of 158

Page 46

consent issued would require a condition to ensure that such details are submitted
for written approval. 
98. LDP2 Policy 52: New Development and Flooding, states that the Council supports
the actions and objectives to avoid increased, reduce overall, and more generally
manage flood risk in alignment with SEPA Strategies and Plans. 
99. In this instance, SEPA Flood Maps show a high likelihood of fluvial flooding
predicted in the southern area of the site in proximity to the East Pow and the
central un-named tributary which flows through the site. The SEPA Flood Maps also
predict a high likelihood of surface water flooding, particularly in the central area of
the site. However, a survey to review site levels was undertaken in the areas which
are shown to be at high risk of surface water flooding on the SEPA Flood Maps. The
report concluded that all critical infrastructure should be raised above the maximum
flood levels. 
100. Furthermore, SEPA Flood Maps predict part of the area where the Battery Station is
to be located as a high likelihood of surface water flooding. However, it has been
confirmed that the Battery Station is to be located on higher ground and so surface
water in isolation is not considered a specific risk in this area. 
101. However, a condition would be required on any consent issued to ensure that the
proposed infrastructure is built to the levels specified in the Flood Risk Assessment
(FRA) to ensure it is above the 200+CC flood level, i.e. 36.51m AOD for Batteries
and 36.28m AOD for the substation. 
102. A further condition would also be required in any consent issued, to ensure that
details on fire water safety for the battery site, including water tank and intake
locations, shall be submitted for written approval. 
103. In light of the above, it is considered that, subject to conditions, the proposed
development is in accordance with NPF4 Policy 22 and LDP2 Policy 56 
Conservation Considerations 
104. Polices 26A, 26B and 27A of the LDP2 and Policy 7 of the NPF4 are applicable to
the application. NPF4 Policy 7: Historic Assets and Places states that development
proposals with a potentially significant impact on historic assets or places will be
accompanied by an assessment which is based on an understanding of the cultural
significance of the historic asset and/or place. The assessment should identify the
likely visual or physical impact of any proposals for change, including cumulative
effects and provide a sound basis for managing the impacts of change.
Furthermore, development proposals affecting nationally important Historic
Battlefields will only be supported where they protect and, where appropriate,
enhance their cultural significance, key landscape characteristics, physical remains
and special qualities. 
105. The site is not located within or within proximity to a Conservation Area, neither is
the site located within or in proximity to any nationally or locally designated
Page 46 of 158

Page 47

landscapes. Methven Castle Garden and Designed Landscape is located 0.6km
north of the site, separated by the A85. Historic Environment Scotland were
consulted as part of this application and have no objection to offer. In terms of
archaeology, Perth & Kinross Heritiage Trust additionally objected to the proposal.
Further information was submitted to address this objection and PKHT now have no
objection to the proposed development. 
Natural Heritage and Biodiversity 
106. NPF4 Policy 3: Biodiversity states that development proposals will contribute to the
enhancement of biodiversity, including where relevant, restoring degraded habitats
and building and strengthening nature networks and the connections between them.
Proposals should also integrate nature-based solutions, wherever possible.
Furthermore, development proposals for national or major development, or for
development that requires an Environmental Impact Assessment will only be
supported where it can be demonstrated that the proposal will conserve, restore
and enhance biodiversity, including nature networks so they are in a demonstrably
better state than without intervention. This will include future management. To
inform this, best practice assessment methods should be used. 
107. In October 2024, a Site Biodiversity Action Plan was requested outlining quantity,
locations, techniques, timescales and monitoring arrangements. However,
clarification is still required regarding the full extent of the compensation planting.
Further information is also outstanding in relation to quantity, locations, techniques,
timescales and monitoring arrangements remains for: 
 Bird boxes
 Bat boxes
 Living roofs or green walls
 Installation of ponds 
108. In light of the above, any consent issued would require relevant conditions to
address any outstanding issues in terms of panting and biodiversity enhancements.
However, on the whole, PKC Biodiversity Officer is satisfied that the submitted
information is in accordance with legislation, policy and guidance. 
109. NPF4 Policy 4: Natural Places states that development proposals that are likely to
have an adverse effect on species protected by legislation will only be supported
where the proposal meets the relevant statutory tests. If there is reasonable
evidence to suggest that a protected species is present on a site or may be affected
by a proposed development, steps must be taken to establish its presence. The
level of protection required by legislation must be factored into the planning and
design of development, and potential impacts must be fully considered prior to the
determination of any application. 
110. In October 2024, it was requested bat surveys be undertaken on the trees with bat
roost potential. This has now been completed, and the submitted Bat Tree Survey
and Assessment Report follows published best practice but not the most recently
Page 47 of 158

Page 48

published. The Bat Survey Guidelines (Collins, 2016, 3rd edition) was updated in
September 2023 (4th edition) and contains a new way of categorising trees with bat
roost potential using PRF-1 or PRF-M. Trees were not categorised using this new
system, but the Report is acceptable. Buffer zones will be erected 30m around trees
with bat roost potential to avoid the risk of disturbance to bats. The Report states
that tape, and canes will be used but the PKC Biodiversity Officer has
recommended that more robust measures will be required, such as Heras fencing.
In light of this, any consent issued will include a condition that Heras fencing, or a
similarly robust material, is used to protect trees with bat roost potential.
Furthermore, an informative relating to the correct procedure to be followed in the
event of the discovery of any bats during construction works. 
111. LDP2 Policy 40: Forestry, Woodland, and Trees states that Tree Surveys,
undertaken by a suitably qualified professional, should accompany all applications
for planning permission where their sites contain trees and that there is a
presumption in favour of protecting woodland resources. 
112. LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected or
not. All whilst taking into account the ecosystems and natural processes in the area.
In accordance with NPF4, development proposals for major development will only
be supported where it can be demonstrated that the proposal will conserve, restore
and enhance biodiversity, including nature networks so they are in a demonstrably
better state than without intervention. This will include future management. 
113. The tree report has stated that the proposal will require the removal of a small
section of lapsed and overgrown hedgerow, comprised of approximately two small
hawthorn trees and up to 12m² of gorse thicket. Additionally, the reduction of a large
dead beech situated adjacent to the access road to a safe size with the introduction
of habitat cuts to provide greater habitat improvement; and the crown-lifting of a
limited number of secondary limbs of approximately sixteen trees along the site
access road to the east of the site may be necessary to facilitate access.
Furthermore, it is noted that any ash trees affected with ash dieback will be
removed. In light of the above, PKC Tree Officer has no issues with the proposed
tree works. Therefore, it is considered that, subject to conditions, the proposed
development is in accordance with NPF4 Policies 3,4 and LDP2 Policies 40, 41. 
114. Furthermore, the submitted Landscape Plan indicates the planting of 249 trees, and
7951 metres of linear hedge planting. Furthermore the Tree Report has
recommended species for restocking of field margins and hedgerows include
flowering varieties such as hazel, willow, apple, crab apple, hawthorn, cherry, lime,
horse chestnut, rowan, alder, field maple, gorse and broom, however, no further
landscape details, namely stock size, plant protection methods, etc, and the location
of the proposed species, seem to have been submitted. This being the case, any
consent issued would require a condition that a detailed Landscape Plan is
submitted. 
115. At present, there are 31 existing trees, located at the field boundaries which are
within or outwith the red line, and could still be affected by development. Many of
Page 48 of 158

Page 49

the trees are over 25m in height with extensive crown spreads. In light of this, it is
important that any sub surface cable installations required to facilitate the
development take account of the root protection areas of trees at the site. All
proposed development whether above or below ground should be designed to avoid
impacting the root protection areas of all trees, within or out with the site. It is noted
that there is a 30m buffer zone proposed from the existing trees to the solar arrays,
which is welcomed. It is important that the siting of plant and equipment (solar array
mounts & battery storage units) do not impact on the above ground parts of any
trees that exist at the site. This being the case, any consent issued would require a
condition that a Tree Protection Plan is submitted that shows all trees that could
potentially be affected, together with the proposed infrastructure, including all cable
routes. 
116. Furthermore, several of the fields are bounded hedgerows, which offer beneficial
screening, biodiversity benefits, and significant contribution to the landscape
character of this rural area, which should not be underestimated. Their subsequent
protection during construction works is essential. This being the case, any consent
issued will include a condition that a Hedgerow Protection Plan is submitted for
written approval. In light of the above, and subject to conditions, the proposed
development is considered to be in accordance with NPF4 Policy 6 and LDP2
Policy 40. 
Low and Zero Carbon Generating Technologies 
117. LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in New
Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of low
and zero-carbon generating technologies. As this proposal includes the erection of
a new building, consideration must be given to this requirement. In this instance,
and given that the proposed ancillary buildings will stand alone, cover an area of
less than 50 square metres and will not be heated, or cooled, there is no
requirement for the applicant to submit a statement to demonstrate compliance with
current carbon emissions reduction standards. 
Developer Contributions 
118. The Developer Contributions Officer was consulted as part of this application and
confirmed that no contributions are required. 
Economic Impact 
119. In the short term, construction will create jobs with scope for local employment.
However, the development is not supported by any economic information to further
assess this impact. It is however predicted that once construction work is complete,
further employment opportunities will be limited. However, and notwithstanding the
significant visual and landscape impacts raised by the Planning Authority, the
development is a clear fit for the Scottish Governments policy direction set out
within the Scottish Energy Strategy and NPF4 of transitioning to a low carbon
Page 49 of 158

Page 50

economy with renewable energy generation. It also represents a significant inward
investment in rural Perthshire, assisting in the creation of a national grid asset of
regional significance for the Perth and Kinross area. 
Grid Connection 
120. The grid connection from the proposed solar farm and BESS is a material
consideration. This is following the recent court case of Raeshaw Farms Ltd v
Scottish Ministers [2026], in this case, the Inner House of the Court of Session
quashed planning permission for the Wull Muir wind farm because the
decision-maker failed properly to consider the role of the off-site grid connection.
The court held that the Reporter had erred by not carrying out a fact-specific
assessment of whether the wind farm and its grid connection could together
constitute a single “project” for Environmental Impact Assessment (EIA) purposes.
Crucially, the Reporter placed too much weight on the way the application was
framed, rather than examining the real-world position that the wind farm could not
operate, and its claimed benefits could not arise, without a grid connection. The
court also found that it was irrational to rely on the benefits of renewable electricity
generation while ignoring the environmental effects of the works necessary to
realise those benefits. 
121. The judgment does not require grid connections to be included in the same planning
application as generation infrastructure, nor does it require full engineering detail at
an early stage. However, it makes clear that, when assessing planning applications
in Scotland, decision-makers must now explicitly address whether grid connections
form part of the wider project and assess their potentially significant cumulative
environmental effects to the extent reasonably possible. Simply deferring grid
impacts to a future consent, without clear reasoning is no longer sufficient. The case
strengthens scrutiny of phased or split consents and has implications beyond wind
farms, affecting any development whose operation depends on later infrastructure
such as grid, network or transport connections. In light of this, and in order for the
Council to assess whether the grid connections form part of the wider project, the
grid connection arrangements have been submitted. This will ensure that the
Council’s decision is robust and that environmental impacts are appropriately
Considered. In this instance, it is proposed to connect to the grid via the Burghmuir
substation, through approximately 5.6km of underground cabling, which follow the
national highways from the development site. This connection not considered to
result in excessive impacts and would not alter the opinion of the Council as
Planning Authority, as discussed in paragraph 11 of this report, that it would require
an Environmental Impact Assessment to be undertaken. 
Variation of Application Under Section 32A 
122. This application was varied prior to determination, in accordance with the terms of
section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the layout, landscaping scheme, roads and
transportation information and details of the proposed surface water drainage
scheme. 
Page 50 of 158

Page 51

Planning Obligations and Legal Agreements 
123. None required. 
Direction By Scottish Ministers 
124. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
125. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to be contrary to the Development Plan.
Account has been taken account of the relevant material considerations, and none
has been found that would justify overriding the Development Plan. Accordingly, the
proposal is recommended for refusal on the grounds identified below. 
. 
Recommendation   
Refuse the application: 
1. The development, owing to its size, scale, appearance and location, raises
significant landscape character and visual impact concerns, failing to contribute
positively to the quality of the surrounding built and natural environment. The
development is therefore considered contrary to Policies 1A, 1B ‘Placemaking’, and
Policy 39 ‘Landscape’ of the adopted Perth & Kinross Local Development Plan 2
(2019) and Policy 4(a) ‘Natural Places’, of National Planning Framework 4 (2023),
as well as the Council’s Placemaking Supplementary Guidance (2020). 
2. The development, owing to inadequate mitigation in seeking to offset landscape
concerns raised, fails to comply with Policy 11(e)(ii) ‘Energy’, of the National
Planning Framework 4 (2023). 
3. The development negatively impacts upon soils and the loss of prime agricultural
land has not been suitably justified. Therefore, the proposal is contrary to Policy 50
‘Prime Agricultural Land’ of the adopted Perth and Kinross Local Development Plan
2 (2019), and Policy 5(b)(i) ‘Soils’ of National Planning Framework 4 (2023). 
Procedural Notes 
Not applicable to this application. 
Background Papers
Letters of representation 320 
Page 51 of 158

Page 52

Authors
Name Designation Contact Details
Alan Atkins Planning Officer (Majors) 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
29 April 2026 
Page 52 of 158

Page 53

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
24/01188/FLM
Formation of a 49.9 MW solar farm and battery energy storage system comprising of ground
mounted solar arrays, inverters, transformers, a substation, a DNO substation, security fencing,
CCTV cameras, cabling, access tracks and associated works, at Kinnon Park Farm, Methven, Perth
Scale
1:25,000
5(1)(i)
Page 53 of 158

Page 54

Page 54 of 158

Page 55

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
24/01188/FLM
Formation of a 49.9 MW solar farm and battery energy storage system comprising of ground
mounted solar arrays, inverters, transformers, a substation, a DNO substation, security fencing,
CCTV cameras, cabling, access tracks and associated works, at Kinnon Park Farm, Methven, Perth
Scale
1:10,000
5(1)(i)
Page 55 of 158

Page 56

Page 56 of 158

Page 57

Perth and Kinross Council 
Planning and Placemaking Committee - 13 May 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/125) 
Proposal: Formation of a 49.9MW battery energy storage facility comprising battery
storage units, ancillary buildings and equipment access road and
associated works 
Location: Land 300 Metres West of Tir Artair, Killin, FK21 8TX 
Ref. No: 25/00168/FLM
Ward No: P4 - Highland 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1. The proposed application site is located on land 300 Metres West of Tir Artair, Killin.
The Site lies on the northern slopes of Loch Tay. It is located at the eastern end of
the Loch, to the north of the A827, a cross-country route that runs the entire length
of Loch Tay and is approximately 2.2km to the north-east of the town of Killin. It is
1.9 hectares in size and is currently planted with young plantation woodland. It falls
outside of any identified development boundary and lies along the western boundary
of Perth and Kinross Council area which follows the watercourse Allt na Bailce.
Stirling Council area is located to the immediate west of the Site. Part of the site
extends into the Stirling Council area. 
2. The purpose of a Battery Energy Storage System is to store excess energy on the
grid at peak of generation moments and release energy at peak demand moments
of the day. The energy generated is fed directly into the national electricity grid, with
the Point of Connection to the grid being an underground 33kV cable that will run
below the fields and unnamed road into the Killin Primary Substation, which is
approximately 300m to the east of the site. 
3. It is anticipated that the Battery Energy Storage System will be in operation for 30
years. There will be a potential the batteries could be replaced for new ones by half
time of the project's lifespan. Once the project reaches the end of its lifespan, the
5(1)(ii)
Page 57 of 158

Page 58

site will be decommissioned and will be restored to its original condition, with no
lasting harm or structures that would compromise the agricultural productivity of the
site. 
Site History 
4. None. 
Environmental Impact Assessment 
5. An EIA screening has been undertaken. The proposal being a Schedule 2
development in terms of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017. In the case of these regulations,
prohibition is given to the granting of planning permission to “EIA development”
unless an environmental impact assessment has been undertaken. In this case the
Council has taken the opinion that it is not EIA development, and that sufficient
information has been submitted with the application to enable a determination in
consideration of all relevant environmental matters. These environmental aspects
requiring further consideration, are namely: noise, landscape and visual amenity,
trees and biodiversity, roads and transportation and flood / drainage matters. It
should be noted that the Council requested detailing of the grid connection as this
was not submitted with the initial proposals. Upon receipt of this grid connection, the
Council maintain the view that the project as a whole would not require an EIA to be
undertaken.   
Pre-Application Consultation 
6. The proposed development is classed as a Major development in terms of the Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
and therefore, the applicant was required to undertake formal pre-application
consultation with the local community. 
7. A request for a Proposal of Application Notice was submitted to Perth and Kinross
Council on 9 April 2024. The reply was received on 29 April 2024 confirming that
the proposed consultation process was accepted. This was also sent to Glenlyon
and Loch Tay Community Council and Councilors John Duff, Provost Xander
McDade and Bailie Mike Williamson by email on the 9th of March 2024. 
8. Two in person Public Exhibitions were carried out in McLaren Village Hall, Killin on
24 April 2024 and 21 May 2024. This has been used to inform local residents about
the proposal, while also progressing the Morenish BESS development which will
assist in meeting the National and Local targets for renewable energy and carbon
emission reductions. 
9. More than 525 households and local businesses were directly informed of the
exhibitions via a leaflet mailout or door drop on 11 April 2024 and 7 May 2024 (this
included all households within a 3 km radius of the site).  Adverts in the Perthshire
Advertiser were published on 16 April 2024 and 10 May 2024 to inform the public of
both exhibitions. Details of the project were uploaded on morenishbess.co.uk ,
Page 58 of 158

Page 59

where residents are able to find updates, documentation of the project, ask
questions, make comments and request future updates, prior to and during the
planning application process. 
Development Plan 
10. The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance. 
National Planning Framework 4 
11. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
12. The Council’s assessment of this application has considered the following policies
of NPF4: 
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 5: Soils
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 11: Energy
 Policy 14: Design, Quality and Place
 Policy 22: Flood Risk and Water Management
 Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
13. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
14. The principal relevant policies are, in summary: 
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 5: Infrastructure Contributions
 Policy 6: Settlement Boundaries
 Policy 8: Rural Business and Diversification
Page 59 of 158

Page 60

 Policy 15: Public Access
 Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
 Policy 35: Electricity Transmission Infrastructure
 Policy 38C: Environment and Conservation: Local Designations
 Policy 39: Landscape
 Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 47: River Tay Catchment Area
 Policy 52: New Development and Flooding
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 55: Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
15. 
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020) 
PKC Non-Statutory Guidance
16. 
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
17. The Scottish Government expresses its planning policies through Planning Advise
Notes, Creating Places, Designing Streets, National Roads Development Guide and
a series of Circulars in addition to NPF4. 
Planning Advice Notes 
18. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
Page 60 of 158

Page 61

 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport 
Creating Places 2013 
19. Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
20. This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision. 
Consultations 
21. As part of the planning application process the following bodies were consulted: 
External 
22. Stirling Council - No objection. However, it is noted that parts of the redline
application boundary, located in the north and south of the site, that extend west of
Alt Na Bailce, lie within the existing Stirling Council area. 
23. Perth and Kinross Heritage Trust - No objection, subject to a recommended
condition to ensure that a programme of archaeological work is carried out. 
24. Scottish Environment Protection Agency - No objection, subject to guidance on
the retention of the areas of wetland on site 
25. Glenlyon Community Council - Objection. The main points raised within the
representation are: 
 Fire and Noxious Gases Hazard. 
 Lack of detail regarding the proposed batteries 
 The proposed development will have an adverse impact on the landscape.
 The proposed development will have an adverse impact on the River Tay SAC 
 Access issues
 Noise issues
 Lack of detail regarding the route of the cable that connects to the substation 
 Lack of fire prevention/control methods. 
26. Stirling Council Roads and Transportation Team - No objection, subject to the
submission of further information and the inclusion of a condition. 
Page 61 of 158

Page 62

Internal 
27. Biodiversity - No objection, subject to conditions in relation to the submitted
Biodiversity Action Plan. 
28. Environmental Health (Noise Odour) - Following the submission of further
information in the form of a revised Noise Impact Assessment (NIA|), the
Environmental Health Team have no objection to the proposed development. 
29. Environmental Health (Contaminated Land) - No objection. A search of the
historic records did not raise any concerns regarding ground contamination 
30. Structures and Flooding - No objection. The applicant is advised to refer to Perth
& Kinross Council’s Supplementary guidance on Flood Risk and Flood Risk
Assessments 2021 as it contains advice relevant to this development. 
31. Transportation and Development - No objection, subject to conditions relating to
a Traffic Light and Signage Plan, a maintenance agreement and a Construction
Traffic Management Plan. 
32. Development Plan Team - No objection 
33. Tree Officer - No objection, subject to conditions relating to pre-commencement
and post- planting site meetings. 
Representations 
34. 7 representations (all objections) were received. The main issues raised within the
representations are: 
 Visual impact
 Noise 
 Loss of view
 Out of character 
35. These issues are addressed in the Appraisal section of the report, with the
exception of loss of view, which is not a material planning consideration. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Submitted
Page 62 of 158

Page 63

Report on Impact or Potential Impact eg
Flood Risk Assessment
Submitted 
Noise Impact Assessment Submitted 
Transport Statement Submitted 
Ecological Appraisal Submitted 
Woodland Report Submitted 
Landscape and Visual Assessment Submitted 
Biodiversity Action Plan Submitted 
Landscape Strategy Plan Submitted 
Landscape Management Plan Submitted 
Appraisal 
36. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance.  
Principle 
37. Policy considerations seeking to assess its suitability in principle are: LDP2 Policies
1A, 1B, Placemaking; Policy 8 Rural Diversification; Policy 33A: Renewables and
Low Carbon Energy; and Policy 51 Soils. The relevant NPF4 policies are Policy 1
Tackling the Climate and Nature Crises; Policy 2 Climate Mitigation and Adaptation;
and Policy 11 Energy. 
38. The proposal would provide essential energy balancing services to the National
grid, actively contributing towards Scotland's CO2 reduction targets, supporting the
principles of Scotland’s Energy Strategy (SES). Specifically, electricity would be
drawn from the grid at times of low demand, stored and released back as required.
When demand is higher, greater generation from non-renewable sources is required
and energy storage facilities such as that proposed could reduce reliance on
non-renewable resources, thus decreasing CO2 emissions. 
39. NPF4 sets out six overarching spatial principles with “Just Transition” relating to the
construction of renewable energy and their contribution to achieving net zero.
NPF4Sustainable Places section emphasises the link to Scotland’s Climate Change
Plan and sets the approach to achieving net zero emissions by 2045 and making
significant progress by 2030. The NPF4 also links to Scotland’s Energy Strategy
and highlights the importance of land and sea to be critical in delivering renewable
energy developments. NPF4 provides detailed policy on Climate Change and
Energy and details developer expectations of how proposed schemes will accord
Page 63 of 158

Page 64

with the policies set out in the document. The overarching policy intent in NPF4 is to
encourage, promote, and facilitate all forms of renewable energy development
onshore and offshore. 
40. Policy 33A of LDP2 and Policies 1, 2 and 11 of NPF4 specifically encourages low
carbon energy solutions where specific grid connection or the use of established
infrastructure can occur. Therefore, on balance, and given the site-specific
reasoning for the location of the battery storage unit, the proposed development
could be supported in principle. Furthermore, consideration must be given to the
finite lifespan of this facility. Whilst the overall operational life will be some 50 years,
minimal disturbance to the site will be required, allowing the pre-existing land use to
resume afterwards. 
Design and Layout 
41. LDP2 Policy 1A: Placemaking, requires new development to positively contribute to
the quality of the surrounding built and natural environment. It further requires
development to accord a series of place making criteria outlined in part B of the
policy. On this basis, the physical nature of the proposal in terms of design, layout
and physical characteristics must also be considered.
42. In this instance, the proposed development comprises a battery energy storage
system (BESS) contained within a fenced compound and surrounded by
landscaping. The 15 battery containers, and the rest of the equipment, will be
mounted on concrete beams arranged in a linear fashion across the site in rows.
There will be approximately 6m between each container. The proposed BESS will
consist of several built elements, including inverters, transformers, and a substation.
The inverters are components stored in cabinets, which are generally pale grey or
green in colour and approximately 7,4m in length, 2 m in width, and 2.2 m in height.
The transformers are smaller units of 2.4m in length, 2.4 m in width, and 2.1m in
height. The sub-station will consist of prefabricated cabins depending on the
requirements from the Distribution Networks Operator (DNO). One will be for the
internal connection of the electrical output from the site, with the other required by
the DNO for connection into the wider electricity network. However, these structures
can be, potentially, merged in one building. 
43. Furthermore, a control room will be situated next to the substation buildings near
the northern boundary of the site. The control room will be a single storey building
and will measure up to 26m in length, 7m in width, and 2.9m in height. This will be
dark green in colour. A battery storage rack will be independent, single storey
containers and will measure up to 27.8m in length, 3.1m in width and 3.8m in
height. The compound will be surrounded by a 2.75m palisade green fence, with all
equipment being mounted on concrete beams. The surface of the compound would
be finished with aggregate, with a stronger base during the construction and
maintenance of the proposed development. In addition, infrared security cameras
will be located around both sites, at a height of approximately 4.2m. 
Page 64 of 158

Page 65

Landscape and Visual Impact 
44. NPF4 Policy 4: Natural Places states that development proposals which by virtue of
type, location or scale will have an unacceptable impact on the natural environment,
will not be supported. Furthermore, development proposals that are likely to have a
significant effect on an existing or proposed European site (Special Area of
Conservation or Special Protection Areas) and are not directly connected with or
necessary to their conservation management are required to be subject to an
“appropriate assessment” of the implications for the conservation objectives. 
45. Perth and Kinross Council LDP2, Policy 39: Landscape states that development
and land use change, including the creation of new hill tracks, should be compatible
with the distinctive characteristics and features of Perth and Kinross’ landscapes.
Accordingly, development proposals will be supported where they do not conflict
with the aim of maintaining and enhancing the landscape qualities of Perth and
Kinross, or the quality of landscape experience. 
46. The application site is in the Loch Tay local landscape area and would be visible in
the landscape. Policy 38 ‘Environment and Conservation: Local Designations’ of
LDP2 is therefore also relevant.  However, the proposal includes only basic
mitigation measures with a proposed tree belt to screen the proposed development.
A strengthened and more extensive planting scheme would ensure that the
proposed development’s landscape and visual impact is localised and would be
acceptable. The proposed development will introduce an industrial element into a
rural landscape. However, in this instance, there is an existing hydro pressure
pipeline which runs from Ben Lawers Dam to the Finlarig Hydroelectric Power
station, on a north-south axis 91m to the west of the Site. The overhead power lines
and pipeline are glimpsed from the road corridor and already introduce some
modernising and industrial elements into the landscape setting. It is therefore not
considered that the proposed development would be out of character with the area,
subject to sensitive landscaping. 
47. The Loch Rannoch and Glen Lyon National Scenic Area is nearby, with its southern
boundary being around 600 metres north of the application site. Ben Lawyers is
also located 400m to the north. However, the proposed development does not raise
issues of national scale with respect to landscape, visual or cumulative effects. 
48. However, as a result of PKC Tree Officer and Development Plan Team’s
comments, the applicant has submitted a series of revisions to the initially proposed
landscape and planting scheme. In doing so, the applicant has addressed the
issues raised and has provided a landscape scheme which should result in
successful tree & woodland establishment, whilst also providing sufficient screening
of the proposed BESS. 
49. In light of the above, PKC Tree Officer is now satisfied that with retention of the
existing Sitka and the native trees to be introduced, and that the landscape scheme
is capable of integrating the development acceptably into its surroundings.
Therefore, the proposed BESS is now considered to be in accordance with NPF
Policy 4 and LDP2 Policies 38C and 39.
Page 65 of 158

Page 66

Residential Amenity 
50. NFP4 Policy 23 (e) states that development proposals that are likely to raise
unacceptable noise issues will not be supported. 
51. LDP2 Policy 17: Residential Areas, highlights that areas of residential and
compatible uses inside settlement boundaries will see existing residential amenity
protected and, where possible, improved. It is however noted that the site is not in
close proximity to an identified residential area, but there are residential receptors
nearby, namely Fank Cottage. 
52. LDP2 Policy 55: Nuisance from Artificial Lights and Light Pollution states that
consent will not be granted for proposals where the lighting would result in obtrusive
and/or intrusive effects. The Council may secure the regulation of lighting
installations and their maintenance through the use of conditions attached to the
granting of planning permission. 
53. LDP2 Policy 56: Noise Pollution states that there will be a presumption against the
siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. 
54. Due to the nature of this development, there is the potential for noise to impact on
residential amenity. However, the proposed equipment on the site will be highly
efficient and have a low noise output, and given the proposed mitigation measures,
the proposed BESS will have a very limited impact on any nearby sensitive
receptors. 
55. The submitted Noise Impact Assessment (NIA) includes proposed noise mitigation
measures in the form of a 3.5m tall acoustic barrier, to be positioned along the
eastern and southern boundaries of the site, and all inverters are to be fitted with
noise attenuation kits. The Results of the NIA, when taking account of the proposed
mitigation measures, have shown that predicted internal and external noise levels
will be well within World Health Organisation (WHO) and BS 58233 levels.
However, conditions have been included in relation to plant and equipment
enclosure, noise limits from the BESS, the proposed noise mitigation measures,
noise complaints to PKC, and construction working hours. 
56. Furthermore, LDP2 Policy 55: Nuisance from Artificial Light and Light pollution is of
relevance in the assessment of this application. In this instance, there is the
potential for amenity issues in relation to lighting during the construction phase. This
being the case, a condition has been included to ensure that there is no direct
illumination of neighbouring land, and that light spillage is kept to a minimum. 
57. In light of the above, and subject to conditions, the proposed BESS is in accordance
with LDP2 Policies 55 and 56 and NPF 4 Policy 14. 
Page 66 of 158

Page 67

Roads and Access 
58. LDP2 Policy 15: Public Access states that development proposals that would have
an adverse impact upon the integrity of any (including proposed) core path, disused
railway line, asserted right of way or other well-used route and connectivity
proposals identified in the Regional Transport Strategy and Delivery Plan will not be
permitted. 
59. In this instance, the site is located on undeveloped land and is proposed to be
served by a new private access track that is accessed from the existing A827 public
road junction to the southwest of the site boundary. The A827 is in the vicinity of the
site access and is subject to the national speed limit (60mph for cars) but does not
have footways or streetlighting. While the BESS site itself is located partially within
the Perth and Kinross Council, the site access junction and construction route along
the A827 are within the Stirling Council boundary. However, Stirling Council’s
Roads Team have not objected to the use of this junction, subject to agreeing a
suitable Construction Traffic Management Plan. This has been covered by the
inclusion of a condition. An additional condition will also be applied to ensure that
the necessary consents are also obtained from Stirling Council. 
60. The site access track is a no - through road, which currently provides access to
Fank Cottage and other undeveloped land. The access track heads north for
approximately 220m before turning east along another 100m section before
reaching the BESS entrance location. The access track continues past this and runs
further east to Fank Cottage. In between the junction with the A827 and the BESS
entrance (270m along the access track), the track is on average approximately 4m
wide. 
61. LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. 
62. In this instance, it has been has confirmed that the junction visibility splay, as per
the Design Manual for Roads and Bridges (DMRB) is not achievable. Furthermore,
visibility at the existing site access is restricted to the west, with approximately 90m
visibility achievable. This falls short of the 215m required by the DMRB and
presents a serious road safety concern. Therefore, the applicant has proposed that
construction traffic vehicles are managed through traffic management and
temporary traffic lights. The lights would be positioned either side of the junction at a
distance of 215 metres. This would mean that signage would need to be sited within
the PKC boundary. There would also be signals on the existing access track to
Fank Cottage, for when a vehicle is exiting the access junction. This is considered
to be acceptable by PKC Road Network Management.   
63. Furthermore, the existing road, which serves Fank Cottage, will be maintained at all
times throughout the construction and operational phases of the development. For
the construction element, Fank Cottage would need to adhere to the temporary
signals that would be in place, but at no point will the associated access route be
closed or blocked. For the operational element, Fank Cottage would utilise the
Page 67 of 158

Page 68

existing priority junction and access track off the A827, as per the current
arrangement. In light of this, conditional control has been included to secure an
approved Traffic Light and Signage Plan. A further condition has been included to
secure a maintenance agreement for the proposed construction traffic route. 
64. In accordance with the National Fire Chiefs Council’s guidance, at least two
separate access points are required to serve the proposed BESS. In this instance,
the northwestern access point, shown on the proposed site plan, would only serve
as a secondary / emergency access, and would not be used for any construction or
operational vehicle access throughout the lifetime of the application site. This
access would only ever be used in the event of an emergency, whereby fire
vehicles consider that its necessary to enter the site from a different location. 
65. In light of the above, and subject to conditions, the proposed BESS is in accordance
with LDP2 Polices 15 and 60A. 
Drainage and Flooding 
66. NPF4 Policy 22: Flood Risk and Water Management states that development
proposals must have regard to the water environment, and drainage, including
floodwater management, within any proposal.  
67. LDP2 Policy 52: New Development and Flooding, states that the Council supports
the actions and objectives to avoid increased, reduce overall, and more generally
manage flood risk in alignment with SEPA Strategies and Plans. NPF4 Policy 22
states that development proposals must have regard to the water environment, and
drainage, including floodwater management, within any proposal. 
68. A Flood Risk and Drainage Assessment has been submitted with this application,
which has identified all potential sources of flooding in the immediate area. In this
instance PKC Floods and Drainage Team do not have any objections to the
proposed development. Furthermore, a review of SEPA’s fluvial flood map does not
identify the proposed development area to be within any areas of fluvial flooding 
69. Also relevant to the flood risk of the site is LDP2 Policy 53C: Surface Water
Drainage, requires Sustainable Urban Drainage Systems (SUDS) measures
including relevant temporary measures at the construction phase. The proposed
new surface water drainage for the application site is designed to modern standards
which inherently accounts for climate change considerations and exceedance flow
paths. A Drainage Maintenance Schedule will be incorporated into the site
management plan. This will ensure that the drainage systems are kept in good
working order for the lifetime of the development. 
70. Furthermore, the proposed SuDS scheme has been designed to manage the
surface water runoff from the battery storage development area and has been sized
to accommodate the 1:200yr plus 39% climate change event. The development
area will be constructed with permeable materials to allow rainwater to infiltrate
underground, where it will be intercepted by perforated pipework, allowing runoff
Page 68 of 158

Page 69

from semi-permeable / impermeable surfaces into controlled gravel- lined storage
areas, to be located beneath the proposed BESS units. 
71. The internal access tracks will be crowned to allow runoff towards the storage
areas. Perimeter cut-off filter drains will take runoff to the subsurface gravel storage
areas, and, in the case of fire, ensure that all firewater runoff is retained within the
SuDS system. The filter drains and sub-surface gravel storage areas will provide
suitable treatment and attenuation prior to discharge into the existing minor
watercourses. 
72. Given that the applicant has submitted adequate drainage drawings, design and
overall strategy, the proposed BESS is in accordance with LDP2 Policies 52 and
53C, and NPF4 Policy 22. 
Conservation Considerations 
73. Polices 26A and 26B of the LDP2 and Policy 7 of NPF4 are applicable to this
application. 
74. The submitted Historic Environment Desk Based Assessment (DBA) demonstrates
the likely low potential of unknown buried archaeological remains due to recent
forestry planting at this site. In 2015 an archaeological walkover survey was
undertaken, where this site, and a much wider area, were carefully assessed for
any further historic environment assets. However, nothing additional was identified
at this location. 
75. However, there is a known historic sheepfold to the north of site which has been
mentioned in the DBA, but no mitigation proposed for its record. From the plans
submitted this feature within the site boundary will be wholly removed and also
stone wall. Given that the trees are not fully mature, this feature is likely to still
survive within the plantation, and the DBA does not suggest otherwise. 
76. In light of the above, it is recommended that a programme of archaeological works
should take place to record the post medieval sheepfold and any other upstanding
boundaries etc., prior to works commencing on site. This has been covered by the
inclusion of a condition. 
77. Subject to this condition, the proposed development is considered to be in
accordance with LDP2 Policies 26A, 26B and Policy 7 of NPF4. 
Natural Heritage and Biodiversity 
78. NPF4 Policy 3: Biodiversity states that development proposals will contribute to the
enhancement of biodiversity, including where relevant, restoring degraded habitats
and building and strengthening nature networks and the connections between them.
Proposals should also integrate nature-based solutions, wherever possible.
Furthermore, development proposals for national or major development, or for
development that requires an Environmental Impact Assessment will only be
supported where it can be demonstrated that the proposal will conserve, restore
Page 69 of 158

Page 70

and enhance biodiversity, including nature networks so they are in a demonstrably
better state than without intervention. This will include future management. To
inform this, best practice assessment methods should be used. 
79. NPF4 Policy 4: Natural Places states that development proposals that are likely to
have an adverse effect on species protected by legislation will only be supported
where the proposal meets the relevant statutory tests. If there is reasonable
evidence to suggest that a protected species is present on a site or may be affected
by a proposed development, steps must be taken to establish its presence. The
level of protection required by legislation must be factored into the planning and
design of development, and potential impacts must be fully considered prior to the
determination of any application. 
80. LDP2 Policy 40: Forestry, Woodland, and Trees states that Tree Surveys,
undertaken by a suitably qualified professional, should accompany all applications
for planning permission where their sites contain trees and that there is a
presumption in favour of protecting woodland resources. 
81. Further landscaping is proposed including native planting around the site perimeter,
including a 10m wide continuous border of native scrub and tree planting to reduce
the visual impact of the equipment, and to increase biodiversity in this location. In
proposing a linear planting belt, the aim of the landscaping is to ensure that the
surrounding landscape remains as functional as possible with no avoidable loss of
useful space, whilst keeping the screening. As the woodland grows, the linear
structure of the proposed planting will become less obvious, with potential future
self-seeding and assisted seeding from wildlife further softening the appearance of
the proposals. 
82. In order to ensure a satisfactory standard of development in terms of the proposed
planting scheme, conditions have been included, which require the applicant to
arrange both a pre- commencement site meeting and a post – planting meeting with
PKC Tree Officer. 
83. LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected or
not, all whilst taking into account the ecosystems and natural processes in the area. 
84. As set out in the PKC Planning for Nature Guidance, and in order for major
applications to satisfy NPF4 Policy 3 a Site Biodiversity Action Plan, which sets out
quantity, locations, techniques, timescales and monitoring arrangements, is
required. In this instance, the submitted Biodiversity Action Plan did not contain the
locations nor quantities of all measures and therefore, a condition to ensure that a
revised Biodiversity Action Plan is submitted for approval, has been included. A
further condition has also been included to ensure that the conclusions and
recommendation of the submitted Biodiversity Study are adhered to and
implemented in full. 
85. A further two conditions have been included at the recommendation of PKC
Biodiversity Officer, which relate to an updated Ecology Study and the requirement
Page 70 of 158

Page 71

of a Construction Environment Management Plan (CEMP) to be submitted for
approval. 
86. In light of the above, and subject to conditions, the proposed development is in
accordance with LDP2 Policies 40, 41, and NPF4 Policies 3, 4. 
Lifespan of Facility 
87. The lifespan of the facility is stated as 30 years. As such, conditional control has
been included to ensure that should the energy storage facility not be in use for a
continuous period of 12 months, or at the conclusion of this term, that the site is
then decommissioned and re-instated to its original use. 
Developer Contributions 
88. Not applicable to this application. 
Economic Impact 
89. The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. The proposal will support local renewable
energy generation by helping balance fluctuations of intermittent energy generation.
It will assist in the creation of a national grid asset of regional significance for the
Perth and Kinross area. 
90. No information has been provided on how the local community will benefit from this
application to satisfy the requirement in NPF4 Policy 11(c) (excluding consideration
of direct community benefit payments). Consideration should be given to
consideration of local priorities, maximising use of local supply chains and
opportunities for local training. Consideration should be given to how the
development can support NPF4 Policy 25. 
Grid Connection 
91. Following the recent court case of Raeshaw Farms Ltd v Scottish Ministers [2026],
the Inner House of the Court of Session quashed planning permission for the Wull
Muir wind farm because the decision-maker failed to fully consider the role of the
off-site grid connection. The court held that the Reporter had erred by not carrying
out a fact-specific assessment of whether the wind farm and its grid connection
could together constitute a single “project” for Environmental Impact Assessment
(EIA) purposes. Crucially, the Reporter placed too much weight on the way the
application was framed, rather than examining the real-world position that the wind
farm could not operate, and its claimed benefits could not arise, without a grid
connection. The court also found that it was irrational to rely on the benefits of
renewable electricity generation while ignoring the environmental effects of the
works necessary to realise those benefits. 
92. The judgment does not require grid connections to be included in the same planning
application as generation infrastructure, nor does it require full engineering detail at
Page 71 of 158

Page 72

an early stage. However, it makes clear that, when assessing planning applications
in Scotland, decision-makers must now explicitly address whether grid connections
form part of the wider project and assess their potentially significant cumulative
environmental effects to the extent reasonably possible. Simply deferring grid
impacts to a future consent, without clear reasoning is no longer sufficient. The case
strengthens scrutiny of phased or split consents and has implications beyond wind
farms, affecting any development whose operation depends on later infrastructure
such as grid, network or transport connections. In light of this, and in order for the
Council to assess whether the grid connections form part of the wider project, the
grid connection arrangements have been submitted. This will ensure that the
Council’s decision is robust and that environmental impacts are appropriately
considered. In light of this, the applicant has submitted details of the proposed grid
connection, which will result in 4km of underground cabling to connect to the Killin
substation. This connection is not considered to result in excessive impacts and
would not alter the opinion of the Council as Planning Authority, as discussed in
paragraph 5 of this report, that it would require an Environmental Impact
Assessment to be undertaken. 
Low and Zero Carbon Generating Technologies 
93. LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in New
Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of low
and zero-carbon generating technologies. As this proposal includes the erection of
a new building, consideration must be given to this requirement. In this instance,
and given that the proposed ancillary buildings will stand alone, cover an area of
less than 50 square metres and will not be heated, or cooled, there is no
requirement for the applicant to submit a statement to demonstrate compliance with
current carbon emissions reduction standards. 
Variation of Application Under Section 32A 
94. This application was varied prior to determination, in accordance with the terms of
section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the proposed Landscape Plan, Noise Impact
Assessment and Biodiversity Action Plan. 
Planning Obligations and Legal Agreements 
95. None required. 
Direction By Scottish Ministers 
96. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Page 72 of 158

Page 73

Conclusion and Reasons for Recommendation 
97. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval subject
to the following conditions. 
Recommendation   
Approve, subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this decision
notice unless the development has been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019. 
2. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times or
at anytime on Sundays. 
Reason - In the interests of residential amenity and to ensure a satisfactory
standard of local environmental quality during the construction period. 
3. No development shall commence on site until all the relevant consents from Stirling
Council have been secured. 
Reason - As part of the application site is located within Stirling Council area. 
Archaeology and Cultural Heritage 
4. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has been submitted by the
developer and agreed in writing by the Council as Planning Authority, in consultation
with Perth and Kinross Heritage Trust (PKHT). Thereafter, the developer shall
ensure that the programme of archaeological works is fully implemented including
that all excavation, preservation, recording, recovery, analysis, publication and
archiving of archaeological resources within the development site is undertaken.
Should the archaeological works, as required by the WSI, identify a requirement for
post-excavation analysis, the development as approved shall not be occupied or
Page 73 of 158

Page 74

brought into use until a Post-Excavation Research Design (PERD) has been
submitted to and agreed in writing by the Council as Planning Authority, in
consultation with PKHT. The PERD shall be carried out in complete accordance with
the approved details. Furthermore, the developer shall afford access at all
reasonable times to PKHT or a nominated representative and shall allow them to
observe work in progress. 
Reason - To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area. 
Roads and Transportation 
5. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning Authority,
in consultation with the Roads Authority (Road Network Management), a Traffic
Light and Signage Plan. The plan should give due regard to addressing junction
visibility within the Perth and Kinross Council boundary. The Traffic Light Plan as
approved shall be implemented and strictly adhered to during the entire site
construction programme. 
Reason - In the interest of road safety 
6. Prior to the commencement of the development hereby approved, a maintenance
agreement shall be entered into, in respect of the construction traffic route, with the
Local Roads Authority under Section 96 of the Roads (Scotland) Act 1984.
Confirmation of this agreement being in place shall be provided to the Council, as
Planning Authority, a minimum of four weeks prior to the commencement of
development. These roads shall be inspected on a regular basis and repairs carried
out to the timescale and standards specified by the Roads Authority. 
Reason - In the interest of roads management. 
7. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning Authority,
in consultation with the Roads Authority (Stirling Council) and the Roads Authority
(Perth and Kinross Council), a Construction Traffic Management Plan (CTMP)
which shall include the following: 
a. restriction of construction traffic to approved routes and the measures to be put
in place to avoid other routes being used
b. timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse collection
is undertaken, on Sundays and during local events
c. a code of conduct for HGV drivers to allow for queuing traffic to pass
d. arrangements for liaison with the Roads Authority regarding winter
maintenance
e. emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown
Page 74 of 158

Page 75

f. arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road
g. arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development
h. arrangements for signage at site accesses and crossovers and on roads to be
used by construction traffic in order to provide safe access for pedestrians,
cyclists and equestrians
i. details of information signs to inform other road users of construction traffic
j. arrangements to ensure that access for emergency service vehicles are not
impeded
k. co-ordination with other significant developments known to use roads affected
by construction traffic
l. traffic arrangements in the immediate vicinity of temporary construction
compounds
m. monitoring, reporting and implementation arrangements
n. arrangements for dealing with non-compliance; and
o. details of HGV movements to and from the site.   
The CTMP as approved shall be strictly adhered to during the entire site
construction programme. Reason - In the interest of road safety. 
Reason - In the interest of proper site management. 
Biodiversity and Natural Environment 
8. The conclusions and recommended action points within the supporting biodiversity
survey submitted and hereby approved (document 29 relates) shall be fully adhered
to, respected and undertaken as part of the construction phase of development. 
Reason - In the interests of employing best practice ecology and to ensure there is
no adverse impact on any protected species as identified under the Wildlife and
Countryside Act (1981). 
9. An updated ecology survey will be required prior to the commencement of works, if
works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to the
Council as Planning Authority for written agreement and works shall not commence
until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there is
no adverse impact on any protected species as identified under the Wildlife and
Countryside Act (1981).  
10. Prior to the commencement of the development hereby approved, a Construction
Environmental Management Plan (CEMP) outlining the measures to protect the
watercourse from the impact of pollution and sediment to ensure no adverse effects
on the River Tay SAC and Loch Tay Marshes SSSI shall be submitted and
Page 75 of 158

Page 76

approved in writing by the Council as Planning Authority. Thereafter, the CEMP as
agreed shall be adhered to in full for the duration of the construction period.
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. Prior to the commencement of the development hereby approved, a Site
Biodiversity Action Plan including the location, quantity, specification and
maintenance requirements for biodiversity enhancement measures shall be
submitted for the further written agreement of the Council as Planning Authority.
Thereafter, the agreed scheme shall be maintained in a reasonable condition for the
life of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Trees and Landscaping 
12. Prior to the development commencing on site, the applicant shall contact the
Council, as planning authority to arrange a pre-commencement site meeting with
the appointed landscape contractor, project manager, and PKC Tree Officer to
assess site conditions, pre-planting site preparation works, & plant protection
methods. The written outcomes of this meeting must be strictly adhered to. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
13. Prior to development commencing on-site, the applicant shall contact the Council,
as planning authority to arrange a post planting site meeting with the appointed
landscape contractor, project manager, and PKC Tree Officer to assess completion
of landscaping. The written outcomes of this meeting must be strictly adhered to
and the landscaping plan hereby approved must be implemented accordingly, prior
to the bringing into use of the development. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
14. Any planting failing to become established within five years shall be replaced in the
following planting season with others of similar size, species and number. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
Environmental Health – Noise, Odour and Lighting 
15. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In the interest of protecting residential amenity.
Page 76 of 158

Page 77

16. Noise from the battery storage facility shall not exceed 33dB, including any relevant
penalties for tonality, impulsivity, intermittency, or other sound characteristics, when
measured at any residential property in accordance with BS4142 – Method for
Rating Industrial Noise Affecting Mixed Residential and Industrial Areas. 
Reason - In the interest of protecting residential amenity. 
17. Prior to the development hereby approved being completed or brought into use,
mitigation measures contained within Section 6.0 of the Noise Impact Assessment
(NIA – Document No 26), shall be implemented in full. 
Reason - In the interest of protecting residential amenity. 
18. In the event, that justified complaints for noise are received by the Council, the
applicant at their own expense, shall employ an independent and suitably qualified
consultant to carry out a Noise Assessment from the development.  The appointed
consultant and methodology for the Noise Assessment shall be submitted to and
approved in writing by the Planning Authority in consultation with Environmental
Health within 28 days of being notified of the complaint. Within 28 days of approval
of appointed consultant and methodology, a Noise Assessment shall be submitted
outlining mitigation and recommended timescales for delivery. Thereafter, all
mitigation measures shall be implemented within the timescales recommended. 
Reason - In the interest of protecting residential amenity. 
19. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does not adversely affect the
amenity of the neighbouring land. 
Reason - In the interest of protecting residential amenity. 
Facility 
20. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, or 30 years from the date of
commencement of development, whichever is sooner, then it shall be deemed to
have permanently ceased to be required. In such an event the development shall be
decommissioned, and the relevant parts of the site reinstated within such timescale
as agreed in writing by the Council as Planning Authority. 
Reason - To ensure the facility is removed from the site at the end of its operational
life, and to protect the character of the countryside, the visual amenity of the area
and nature conservation interests. 
21.  Prior to the commencement of development, the exact colouring of the battery
storage units shall be submitted to the Council as Planning Authority for written
approval. Thereafter, the scheme shall be delivered in accordance with the
approved details and maintained for the life of the development. For the avoidance
Page 77 of 158

Page 78

of doubt, the colouring should be recessive to blend the development in with the
surrounding rural landscape. 
Reason - In the interests of visual amenity and to protect the rural nature of the
area. 
Justification 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
Procedural Notes 
None applicable. 
Informatives 
1. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
Further information on radon gas and the associated reports that can be obtained is
available at www.ukradon.org and at http://shop.bgs.ac.uk/georeports/. 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the Planning
Authority prior written notification of the date on which it is intended to commence
the development. A failure to comply with this statutory requirement would
constitute a breach of planning control under section 123(1) of that Act, which may
result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position. 
4. An application for a Building Warrant may be required. 
5. Trees and scrub are likely to contain nesting birds between 1 March and 31 August
inclusive. Trees and scrub are present on the application site and are to be
assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended (section
1), it is an offence to remove, damage or destroy the nest of any wild bird while that
nest is in use or being built. Planning permission 
6. The applicant is reminded that, should any protected species be present, a license
may be required from NatureScot to disturb a protected species. Failure to obtain a
license may constitute a criminal act under the Habitats Regulations and penalties
are severe for non-compliance.
Page 78 of 158

Page 79

7. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of the
Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
 Displayed in a prominent place at or in the vicinity of the site of the
development.
 Readily visible to the public.
 Printed on durable material. 
8. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time. The required information must be
submitted via the ePlanning portal if your original application was lodged that way,
otherwise send it to us at developmentmanagement@pkc.gov.uk. Please be aware
that a fee is payable in respect of each request made, though there is no limit to the
number of conditions that can be discharged in a single request. The Fees Charter
is available on our website www.pkc.gov.uk. The Council has two months to
consider the information. You should therefore submit the required information more
than two months before your permission expires. We cannot guarantee that
submissions made within two months of the expiry date of your permission will be
able to be dealt with before your permission lapses. 
9. The developer is advised to contact Sophie Nicol, Historic Environment Manager
(Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss terms of
reference for work required. 
10. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, they must obtain from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of works. Information on
junction types, requirements for Vehicular Access consents (VA1) and application
forms are available at www.pkc.gov.uk/vehicleaccess. Advice on the disposal of
surface water should be sought at the initial stages of design from Scottish Water
and the Scottish Environmental Protection Agency. 
The appointed contractor should liaise with Stirling Council to raise these works on
the Scottish Road Works Register and provide confirmation of such to the Road
Authority (Perth and Kinross Council). 
Background Papers
Letters of representation 7 
Authors
Name Designation Contact Details
Alan Atkins Planning Officer (Majors) 01738 475300
developmentmanagement@pkc.gov.uk
Page 79 of 158

Page 80

Approved
Name Designation Date
Sean Panton Team Leader (Major Applications and
Enforcement)
29 April 2026 
Page 80 of 158

Page 81

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/00168/FLM
Formation of a 49.9 MW battery energy storage facility comprising battery storage units,
ancillary buildings and equipment access road and associated works at land 300 Metres
West of Tir Artair, Killin
Scale
1:25,000
5(1)(ii)
Page 81 of 158

Page 82

Page 82 of 158

Page 83

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/00168/FLM
Formation of a 49.9 MW battery energy storage facility comprising battery storage units,
ancillary buildings and equipment access road and associated works at land 300 Metres
West of Tir Artair, Killin
Scale
1:10,000
5(1)(ii)
Page 83 of 158

Page 84

Page 84 of 158

Page 85

Perth and Kinross Council 
Planning and Placemaking Committee - 13 May 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/126) 
Proposal: Part change of use of an artificial insemination centre to form a distillery 
Location: Glencarse Stud Farm, Cottown, Glencarse, Perth, PH2 7NL 
Ref. No: 25/01174/FLL
Ward No: P1 - Carse of Gowrie 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The site, comprising of two existing buildings, is located at the southern end of the
hamlet of Cottown. It is situated adjacent to Cottown House and to the south-east of
Oakdene House. The two existing buildings currently have planning permission for
use as an artificial insemination centre (99/01630/REM). A further application was
submitted in 2015 to remove an occupancy condition attached to the 2000 consent
for Cottown House to be occupied by any person(s), not only individuals connected
with artificial insemination business. It is understood that the artificial insemination
centre has not been in use for a number of years. Historically, the site
accommodated a cardboard recycling yard, mink farm and former brickworks
factory (Pitfour Brick and Tile Works). 
2 The proposal is also located adjacent to a site, under the ownership of the
applicant, where four dwellings, currently under construction; were approved in
2017 (application reference: 15/00150/FLL). 
3 The vehicle access to the public road network (C484) for the site will be via an
existing and privately shared vehicle access (Cottown Road). A right of way (44/5)
runs partially along the private access track and on the eastern edge of the wider
site. 
5(2)(i)
Page 85 of 158

Page 86

4 The site is located within the settlement boundary of Cottown/Chapelhill as
identified within Local Development Plan 2 (LPD2). 
5 The proposal is for a change of use and minor alterations to form a distillery. The
former stables building would be repurposed for the distillation process, while the
former artificial insemination centre and associated offices would primarily function
as a bonded warehouse. A portion of the existing offices are currently in use as
short-term let accommodation. 
Site History 
Application Site 
6 99/01630/REM Erection of artificial insemination collection centre, house and
stables (reserved matters) 20 October 2000 Application Approved 
7 24/00968/LAW Use of dwellinghouse and home office as 3 short term let
accommodation units (existing) 17 October 2024 Application Approved 
Wider Site 
8 15/00147/FLL Removal of condition 2 (occupancy) of permission 99/01630/REM
(erection of a dwellinghouse, etc) 23 March 2025 Application Approved 
9 15/00150/FLL Erection of 4no dwellinghouses 01 March 2015 Application Approved 
10 19/00511/FLL Application under Section 42 of the Town and Country Planning
(Scotland) Act 1997 to modify condition 5 (private access roads at adoptable
standard) of planning permission 15/00150/FLL (erection of 4 dwellinghouses) 21
November 2019 Application Approved 
Pre-Application Consultation 
11 Pre-application Reference: 24/00190/PREAPL 
12 The proposed development is not classed as a major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore the applicant was not required to undertake not any formal pre-
application consultation with the local community. 
Development Plan 
13 The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance. 
Page 86 of 158

Page 87

National Planning Framework 4 
14 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
15 The Council’s assessment of this application has considered the following policies
of NPF4: 
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
 Policy 13: Sustainable Transport
 Policy 14: Design, Quality and Place
 Policy 22: Flood Risk and Water Management
 Policy 23: Health & Safety 
 Policy 26: Business and Industry
 Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
16 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
17 The principal relevant policies are, in summary; 
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 2: Design Statements
 Policy 5: Infrastructure Contributions
 Policy 6: Settlement Boundaries
 Policy 7A: Business and Industrial
 Policy 8: Rural Business and Diversification
 Policy 17: Residential Amenity
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 55: Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 57: Air Quality
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
Page 87 of 158

Page 88

Statutory Supplementary Guidance 
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
 Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance 
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC and
the River Tay SAC
 Planning Guidance - Planning & Biodiversity 
National Guidance 
18 The Scottish Government expresses its planning policies through Planning Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars in addition to NPF4. Those relevant are listed below. 
Creating Places 2013 
19 Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision. 
Local Place Plans 
21 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There are no Local Place Plans currently adopted for the area. 
Consultations 
22 As part of the planning application process the following bodies were consulted: 
Page 88 of 158

Page 89

Internal 
23 Transportation and Development: No objection subject to condition relating to
core path which forms part of the access track must not obstructed during building
works or on completion. 
24 Environmental Health (Noise Odour): No objection subject to conditions relating
to plant noise, noise from operations limits, servicing and deliveries hours, external
lighting, mitigation measures outlined within Odour Impact Assessment compliance,
no odours shall be discernible on boundary with nearest residential property, the
submission of an Operational Management Plan (Noise and Odour), noise and
odour complaints procedures. 
25 Environmental Health (Contaminated Land): No objection. 
Representations 
26 7 objections were received. The main issues raised within the representations are: 
 Road safety concerns
 Increase in traffic/vehicular movements on shared access track & unsuitability of
track for HGV vehicles
 Drainage and flooding impacts
 Biodiversity and ecology impacts
 Inappropriate land use for rural/residential area
 Impact on residential amenity
 Nosie and odour impacts
 Unauthorised works (distillery equipment has already been installed). It was
confirmed by a site visit from the case officer that the development has not
commenced, the applicant has moved tanks column and boiler pumps and other
equipment onsite, therefore, the proposed distillery use is not ‘operational’. 
 Accuracy of submitted information 
27 These issues are addressed in the appraisal section of the report. 
28 The following issues are not defined as ‘material’ planning considerations: 
 Fire safety (this falls within the remit of Building Standards)
 Applicant’s character, behaviour, or historic planning disputes
 Use of wider site for short-term lets
 Property ownership disputes
 Historic neighbour disputes
 Speculative future development fears 
Page 89 of 158

Page 90

Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
Not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not required 
Appraisal 
29 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance as outlined
above.   
Principle 
30 The proposed development site is located within the settlement boundary of
Cottown and Chapehill settlement boundary. The settlement summary description is
as follows: “Cottown and Chapelhill is a small collection of houses located on the
road leading to Cottown House. The restored former schoolhouse dates from the
18th century. The settlement boundary has been drawn to create an opportunity for
small-scale development on the north-west edge. There are no allocations
identified”. 
31 NPF4 Policy 26 (Business and Industry) states that development proposals for
business, general industrial and storage and distribution uses outwith areas
identified for those uses in the LDP will only be supported where: 
i. It is demonstrated that there are no suitable alternatives allocated in the LDP or
identified in the employment land audit; and 
ii. The nature and scale of the activity will be compatible with the surrounding area. 
32 NPF4 Policy 29 (Rural Development) seeks to encourage rural economic activity
innovation and diversification. The policy supports proposals that contribute to the
viability, sustainability and diversity of rural communities and rural economy will be
supported, this includes the diversification of existing businesses, production and
processing facilities for local produce and the reuse of brownfield land.
Page 90 of 158

Page 91

33 LDP Policy 8 (Rural Business and Diversification) states that the Council will give
favourable consideration to the expansion of existing businesses and the creation of
new ones in rural areas. There is a preference that this will generally be within or
adjacent to existing settlements. Sites outwith settlements may be acceptable
where they offer opportunities to diversify an existing business, or are related to an
existing site-specific resource or opportunity. 
34 NPF4 Policy 9 (Brownfield, Vacant and Derelict Land and Empty Buildings) states
that development proposals for the reuse of existing buildings will be supported,
taking into account their suitability for conversion to other uses. Given the need to
conserve embodied energy, demolition will be regarded as the least preferred
option. 
35 The aforementioned policies are generally supportive to the principle of this
proposal given the re-use of the vacant buildings and creation of a new rural
business within an existing settlement boundary. 
Design and Layout 
36 Generally, the design and scale of development should respect its surroundings and
adhere to Policies 1A and B of LDP2 which relate to placemaking and NPF4 Policy
14 (Design, Quality and Place) which seeks to deliver well designed development. 
37 No major external alterations are proposed to the buildings and therefore will remain
unchanged in appearance; however, two flues are to be installed, protruding
through the lower part of the roof of the proposed distillery building. 
38 As such, there are no design & layout issues associated with this proposal. 
Residential Amenity 
39 NPF4 Policy 23 (Health and Safety) states that development proposals that are
likely to raise unacceptable noise issues will not be supported. 
40 LDP2 Policy 56 (Noise Pollution) relates to noise pollution and seeks to ensure that
developments which generate significant levels of noise are not located within close
proximity to noise sensitive receptors. 
41 LPD2 Policy 57 (Air Quality) states any proposed development that could have a
detrimental effect on air quality, through exacerbation of existing air quality issues or
introduction of new sources of pollution (including dust and/or odour), must provide
appropriate mitigation measures. The LDP expects that some type of mitigation of
air quality impacts will be required for all but the smallest developments. Best
practice design measures should therefore be considered early in the design and
placemaking process. 
42 A number of objections have been received with concerns regarding the noise and
odour impacts arising from the proposed development. 
Page 91 of 158

Page 92

Noise 
43 The applicant has submitted a Noise Impact Assessment (NIA) in support of this
application. 
44 The NIA has assessed noise from the plant associated with the proposed distillery,
these are 2 x Wanson Vaporax Steam Generators model 250RR and 2x Tooltronix
Pumps model PTL-89-QB60. 
45 It is proposed that operational process will occur daily five times per week Monday
to Friday and will operate between the hours of 0700 and 23:00 hours. 
46 Background noise survey was undertaken and 30 dBLA90, 30mins was used for the
assessment. 
47 The BS4142 noise assessment give a predicted specific sound level of 16dBLAeq
at the closest noise sensitive receptor Oakdene (40 metres) to the west of the main
distillery building and 8dB LAeq at the short term let accommodation (STLA) (65
metres) to the north. 
48 An acoustic feature correction of +7dB has been added to give rating levels of 23dB
Oakdene and 15dB STLA. The difference between rating level and background at
Oakdene is -7dB and -15dB at the STLA. 
49 In accordance with BS4142 criteria the outcome both properties are of a low impact
and therefore a low likelihood of adverse impact due to noise at the sensitive
receptor assessed. 
50 The consultant has also undertaken an assessment in line with BS8233 the
predicted internal levels at Oakdene is 1dBLAeq and at the short term let
accommodation 22dBLAeq with a 10 dB (A)attenuation for an open window. The
predicted levels are well below the daytime criteria of 35dBLAeq. 
51 The report concluded that noise from the pumps at the closest NSRs assessed
would be of low impact and would be deemed to be acceptable in accordance with
BS4142 and BS8233 criteria. 
52 Please note that one of the dwellings under construction to the north-east has
erroneously been categorised within the noise impact assessment as short-term let
accommodation (STLA). A portion of the existing offices are currently in use as
short-term let accommodation and were also not factored into the assessment.
However, Environmental Health have confirmed that this would not materially affect
their assessment as these STL units are not residential. 
Odour 
53 At the request of Environmental Health, applicant submitted an Odour Impact
Assessment (OIA). 
Page 92 of 158

Page 93

54 The OIA assessed the potential odour sources associated with the proposed craft
distillery operations and the potential effects on the closest sensitive residential
receptors (SRRs). 
55 The report states that the small-scale craft distillery will produce a range of spirits
including vodka, gin, whisky, rum, and arak (a middle eastern distilled drink).
Operations are batch based, with limited concurrent processing and no continuous
fermentation or distillation. Fermentation is limited to whisky and rum production
only, therefore 51% of spirt production will not require fermentation. 
56 The report in section 3.3 states the potential odour emissions that may arise from
the proposed processes from the distillery operations. This includes odour sources
relating to fermentation, gin distillation, draff (spent grain), wash handling and
transfers; and cleaning-in-place (CIP). 
57 In terms of a meteorological assessment, meteorological data has been obtained
from Strathallan Weather Station and a 5-year data set from 2019 to 2024 has been
reviewed to capture seasonal and annual variabilities. 
58 The report states that the prevailing winds are predominantly from the southwest
and west and section 5.3 states that the majority of SRRs are not located directly
downwind of the site for the most frequent wind directions. Where alignment with
prevailing winds does occur, receptor distances and favourable dispersion
conditions significantly reduce potential odour exposure; and any odour perception
would be intermittent, short-lived, and low intensity. 
59 The qualitative receptor direction analysis further supports the conclusion that the
proposed development presents a low odour risk. Table 3 shows the odour
exposure risk regards the SRs direction to the prevailing wind. 
60 Section 6 of the report recommends mitigation and management measures, which
include: 
 Fermentation vessels are designed to be sealed or vented in a controlled
manner.
 Draff removed from site frequently (typically within 24–48 hours) for animal feed
or further processing.
 No long-term on-site storage of odorous by-products.
 Good housekeeping and regular cleaning regimes.
 Distillation and cleaning activities managed during normal daytime hours where
practicable; and
 Ongoing monitoring of operations and prompt response to any odour
complaints. 
61 The report states that with mitigation measures in place any residual odour effects
are expected to be negligible and if odours were perceptible would be occasional,
short term and unlikely to result in loss of amenity. 
Page 93 of 158

Page 94

62 The OIA concluded that the proposed craft distillery represents a low odour risk and
any odour will be low intensity and intermittent and only when batch fermentation is
required to produce whisky, rum, and arak. 
63 It concluded that the anticipated odour effect at SRRs would be well below the
60uE/m3 screening benchmark, as the small craft distillery aligns with SEPA
Category C context, as odour sources are not continuous, production volumes are
limited and any emissions are short lived and readily dispersed. 
64 In line with IAQM guidance, a qualitative assessment is considered sufficient where
odour risk is demonstrably low and therefore qualitative odour dispersion modelling
was not undertaken as modelling would not materially alter the planning or
environmental conclusions. 
65 Please note that the 4 dwellings under construction were not assessed as part of
the OIA. However, conditions have been applied relating to odour discernability
(Condition 8), and justified odour complaints (Condition 11) to safeguard future
residential amenity. 
66 Conditions have been applied relating to relating to plant noise (Condition 3), noise
from operations limits (Condition 4), servicing and deliveries hours (Condition 5),
external lighting (Condition 6), mitigation measures outlined within Odour Impact
Assessment compliance (Condition 7), no odours shall be discernible on boundary
with nearest residential property (Condition 8), the submission of an Operational
Management Plan (Noise and Odour) (Condition 9), noise and odour complaints
procedures (Condition 10-11). 
Roads and Access 
67 The site will be accessed from the public road network via an existing, privately
shared access track taken from the C484 public road/National Cycle Route 77. A
right of way (44/5) runs partially along the private access track and on the eastern
edge of the wider site 
68 A number of objections have raised concerns regarding the increase in
traffic/vehicular movements on the shared access track & unsuitability of track for
HGV vehicles, which according to the objection letters is narrow, uneven and has
lack of appropriate passing places. Additional concerns relate to road safety
(potential conflict with residents, walkers, livestock, cyclists), dangerous road
geometry at the double bend of C484, the omission of accurate traffic data;
outdated surveys; and misleading transport assumptions. Furthermore, the
representations also discussed that the road is jointly owned by residents with
access constraints, however, as mentioned above, ownership disputes or road
maintenance or upgrade obligations as part of previous consents are not a material
to the assessment to this planning application. 
69 Transportation and Development were consulted and confirmed that they had no
objections to the proposal. Proposed surfacing works were previously conditioned
under planning permission 15/00150/FLL & 19/00511/FLL (associated Section 42)
Page 94 of 158

Page 95

for the existing private access. Transport and Development have raised no
requirement for this to be conditioned again as part of the application under
assessment. 
70 The site plan shows provision for eight car parking spaces, with sufficient space
within the site for vehicles to turn. 
71 The applicant has submitted a trip generation and traffic flow assessment, which
indicates that traffic volumes on Cottown Road are low. The development is
expected to generate approximately one vehicle in the morning peak hour and four
in the evening peak hour. Additionally, the applicant expanded on the original
transport assessment in light of the objections. Alongside peak traffic numbers, off-
peak traffic, including deliveries of grain, removal of spent grain and effluent, and
occasional van deliveries, is also limited, averaging around 6-7 trips per week.
Heavy vehicles movements are minimal, grain deliveries estimated at one truck per
month. The applicant stated that overall traffic levels will no greater than and less
likely than those associated with the presently authorised (yet not presently
operational) artificial insemination business. 
72 Given the lack of objection from Transportation and Development and the further
supporting information provided by the agent, there are no further implications
associated with the proposal from a roads and access perspective. However, a
condition has been applied relating to core path which forms part of the access
track must not obstructed during building works or on completion (Condition 2). 
Drainage and Flooding 
Flood Risk 
73 According to SEPA flooding maps, there is localised incidences of small and small
watercourse flooding within the wider site. However, this does not affect the existing
buildings in question, which benefits from an existing surface water drainage
system. 
Foul Drainage 
74 Objections raised concerns regarding foul water storage tanks, effluent
management and risk of spills. Regarding the location of the storage tank, the
applicant has confirmed that this will be sealed tank located underground, therefore
no visual or odour impacts are associated. It was also confirmed that the storage
tank and its contents are non-combustible. The applicant also confirmed that the
effluent system will be in line with Building Standards and that no effluent will seep
into neighbouring properties given the topography of the land which slopes north to
south. 
Conservation Considerations 
75 The site is located within a site of archaeological interest (Pitfour Brick and Tile
Works- MPK13384). However, it is unlikely that the proposal will affect the site’s
Page 95 of 158

Page 96

archaeological value given that operations will be taken place within existing
buildings. 
Natural Heritage and Biodiversity 
76 There are no natural heritage or biodiversity implications associated with this
proposal. It was highlighted at pre-application stage, the potential for bat roosting
within the buildings, however due to their age and construction type, roosting
potential is unlikely. 
Developer Contributions 
77 The proposal site is located within the full transport infrastructure contributions
boundary. The Council’s Transport Infrastructure Developer Contributions
Supplementary Guidance requires a financial contribution towards the cost of
delivering the transport infrastructure improvements which are required for the
release of all development sites in and around Perth. However, in order to support
the economic growth of Perth and Kinross, new employment uses which fall under
the Employment Land Use category of the Transport Infrastructure section of this
Guidance, and which are to be developed on brownfield land, will not be required to
contribute. 
78 As a result, a transport infrastructure contribution is not required 
Economic Impact 
79 The economic impact from the proposals includes the creation of a new rural
business within an existing settlement boundary. 
Variation of Application Under Section 32A 
80 This application was varied prior to determination, in accordance with the terms of
Section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
The variations relate to changes to the existing/ proposed floor plan layout &
existing/proposed sections. 
Planning Obligations and Legal Agreements 
81 None required. 
Direction By Scottish Ministers 
82 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Page 96 of 158

Page 97

Conclusion and Reasons for Recommendation 
83 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this decision
notice, unless the development has been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019. 
2. The core path which forms part of the access track to the site must not be
obstructed during building works or on completion. Any damage done to the core
path and associated signage during building works shall be made good before
occupation of the dwellinghouse. Any temporary restrictions to public access
required to facilitate works on site must be agreed in writing first with the Access
Officer. 
Reason – In the interests of public access along the core path. 
3. All plant or equipment shall be so enclosed, attenuated and/or maintained such that
any noise therefrom shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows slightly open, when measured
and/ or calculated and plotted on a rating curve chart. 
Reason - To safeguard the neighbouring residential amenity in the area. 
4. Noise from operations on site shall not exceed L A90,1 hour background noise level
plus 5dB (A), including any relevant penalties for tonality, impulsivity, intermittency,
or other sound characteristics when measured at any residential property in
accordance with BS4142:2014+A1:2019. 
Reason - To safeguard neighbouring residential amenity in the area. 
Page 97 of 158

Page 98

5. Servicing of and deliveries to the premises shall be carried out between 0700 and
1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - To safeguard the neighbouring residential amenity in the area. 
6. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does not adversely affect the
amenity of the neighbouring land. 
Reason - To safeguard the neighbouring residential amenity in the area. 
7. All mitigation measures as detailed within Section 6 of the Odour Impact
Assessment (document no.38 relates) shall be fully implemented for the lifetime of
the development. 
Reason - To safeguard the neighbouring residential amenity in the area. 
8. No odours from the distillery shall be discernible on the boundary with the nearest
residential property. 
Reason - To safeguard the neighbouring residential amenity in the area. 
9. Prior to the commencement of the development an Operational Management Plan
shall be submitted for the written approval of the planning authority. The plan shall
include a Noise Management Plan & Odour Management Plan that includes all
sources of noise & odour associated with the craft distillery and, the measures that
will be put in place to minimise and/or control noise & odours. The plan shall be
reviewed on a regular basis or, following receipt of a justified complaint or at the
request of the planning authority. Once the Operational Management Plan has been
approved, it shall be fully implemented for the lifetime of the development.
Reason - To safeguard the neighbouring residential amenity in the area. 
10. In the event of a justified noise complaint being received by the Council the operator
shall, at its own expense, employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with conditions 3 and 4 above.
The assessment will be carried out to an appropriate methodology agreed in writing
with the Planning Authority. If the noise assessment shows that the noise levels do
not comply with conditions 3 and 4 a scheme of noise mitigation shall be included
with the noise assessment, specifying timescales for the implementation of the
scheme and shall be submitted to the Planning Authority with 28 days of the
assessment. The mitigation scheme shall thereafter be implemented in accordance
with the approved scheme and timescales. 
Reason - To safeguard the neighbouring residential amenity in the area. 
11. In the event of a justified odour complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the Planning
Page 98 of 158

Page 99

Authority to carry out an odour assessment to verify compliance with conditions 7
and 8 above. The assessment will be carried out to an appropriate methodology
agreed in writing with the Planning Authority. If the odour assessment shows that
the odour levels do not comply with conditions 7 and 8 a scheme of odour mitigation
shall be included with the odour assessment, specifying timescales for the
implementation of the scheme and shall be submitted to the Planning Authority with
28 days of the assessment. The mitigation scheme shall thereafter be implemented
in accordance with the approved scheme and timescales. 
Reason - To safeguard the neighbouring residential amenity in the area. 
Justification 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable. 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the planning
authority prior written notification of the date on which it is intended to commence
the development. A failure to comply with this statutory requirement would
constitute a breach of planning control under section 123(1) of that Act, which may
result in enforcement action being taken. Please use the form attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. The presence of protected species, and the extent to which they could be affected
by the proposed development, should be established before works commence. 
Should protected species be identified within the site the developer should ensure
that all appropriate measures required to comply with the relevant legislation are
carried out. 
4. An application for Building Warrant may be required. 
5. A review of the proposed development site did not raise any real concerns, although
historical mapping indicates that the proposed development is within the immediate
vicinity a former brick and clay works which may have resulted in contamination in
the vicinity of the site. Should any contamination be found during the approved
works, works should cease, and the Land Quality team should be contacted on
01738 475000 or ContaminatedLand@pkc.gov.uk for further advice. 
Page 99 of 158

Page 100

6. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. In
accordance with Regulation 41 the notice must be:
- Displayed in a prominent place at or in the vicinity of the site of the development 
- Readily visible to the public 
- Printed on durable material. 
Background Papers
Letters of representation 7 
Authors
Name Designation Contact Details
Adam Cairns Planning Officer
(Locals Team)
01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local Developments) 29 April 2026 
Page 100 of 158

Page 101

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/01174/FLL
Part change of use of an artificial insemination centre to form a distillery
Glencarse Stud Farm, Cottown, Glencarse, Perth, PH2 7NLScale
1:25,000
5(2)(i)
Page 101 of 158

Page 102

Page 102 of 158

Page 103

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/01174/FLL
Part change of use of an artificial insemination centre to form a distillery
Glencarse Stud Farm, Cottown, Glencarse, Perth, PH2 7NLScale
1:10,000
5(2)(i)
Page 103 of 158

Page 104

Page 104 of 158

Page 105

Perth and Kinross Council 
Planning and Placemaking Committee - 13 May 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/127) 
Proposal: Erection of staff accommodation unit, amenity building, cafe, formation of
outdoor seating area, car park and associated works 
Location: Moor Of Rannoch Hotel, Rannoch, Pitlochry, PH17 2QA 
Ref. No: 25/01834/FLL
Ward No: P4 - Highland 
Summary 
This report recommends approval of the application as the proposal for the erection of
staff accommodation unit, amenity building, cafe, formation of outdoor seating area, car
park and associated works is considered to comply with the relevant provisions of the
Development Plan and there are no material considerations apparent which outweigh
the Development Plan. 
Background and Description of Proposal 
1 The Moor of Rannoch was built in 1890 to house the engineers constructing the
West Highland Railway line across Rannoch Moor. The applicants bought the Moor
of Rannoch in 2013. The business has been developed as a destination restaurant
with 5 guest bedrooms and a dining room that can accommodate up to 18 guests
for dinner each evening. The restaurant only opens for dinner, offering a 7-course
menu which focuses on local and Scottish produce. The hotel is only open during
the day to resident guests. 
2 The Moor of Rannoch has won several accolades over the years and has been
listed in several guides including the Michelin Guide. The demand for the restaurant
has grown year on year with around 2200 guests visiting each season. This has
allowed the opening period to be extended out with the traditional 1st April to 31st
October “tourist season” to early February and closing around 22nd November each
year.  This has allowed the business to create permanent employment
opportunities in a remote rural location. 
5(2)(ii)
Page 105 of 158

Page 106

3 The proposal is for the erection of a staff accommodation unit, amenity building,
cafe, formation of outdoor seating area, car park and associated works to support
the hotel business. 
4 The new building is proposed in the existing parking area as a detached standalone
building, separated from the existing hotel and roughly positioned on the footprint of
the former light industrial buildings that occupied the west courtyard. New parking
for ten vehicles including accessible bays is proposed to the east of the hotel. 
5 A single storey amenities wing is proposed to the west of the site to align with the
front elevation of the hotel, bookending the site. A two-storey staff wing is proposed
to the rear of the site, nestled into the site topography. This design provides an
external courtyard between the hotel and the new building which will include a
seating area and firepit for visitors to the food court. The staff wing provides five
independently accessed studios over two levels with private access from the rear.
The moderately cantilevered form of these studio spaces will create a canopy area
to the external ground offering shelter for visitors during wet weather. 
6 The new building will benefit from modular construction methods. Second use
shipping containers have been chosen which can be successfully upcycled into
building accommodation. The containers will be painted white and clad in locally
sourced, low maintenance grey timber in an open rainscreen style. The proposal
includes a 48 panel PV array on the roof which will be screened by a ‘parapet’ of the
building’s cladding so that it is concealed. 
7 For clarity, Rannoch Station is not a designated settlement within the Adopted Perth
and Kinross Local Development Plan (2019), and is therefore deemed to lie within
the wider countryside. 
Site History 
8 00/01382/FUL Full Planning Permission was Approved On 17 October 2000 for
Erection of open entrance porch and siting of field shelter adjacent to hotel (in
retrospect) 
9 03/00839/FUL Full Planning Permission was Approved On 10 June 2003 for
Change of use to staff cabin 
10 09/01592/FLL Full Planning Permission was Approved On 18 December 2009 for
Replacement of garage and wood shed. 
Environmental Impact Assessment 
11 The proposal is not EIA development. 
Pre-Application Consultation 
12 Pre application Reference: 25/00169/PREAPL  
Page 106 of 158

Page 107

13 The proposed development is not classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore, the applicant was not required to undertake not any formal pre-
application consultation with the local community. 
Development Plan 
14 The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance. 
National Planning Framework 4 
15 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
16 The Council’s assessment of this application has considered the following policies
of NPF4: 
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 6: Forestry, Woodland and Trees
 Policy 7: Historic Assets and Places
 Policy 9: Brownfield, vacant and derelict land and empty buildings
 Policy 13: Sustainable Transport
 Policy 14: Design, Quality and Place
 Policy 17: Rural Homes
 Policy 22: Flood Risk and Water Management
 Policy 23: Health and Safety
 Policy 29: Rural Development
 Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
17 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
18 The principal relevant policies are: 
 Policy 1A: Placemaking
Page 107 of 158

Page 108

 Policy 1B: Placemaking
 Policy 2: Design Statements
 Policy 8: Rural Business and Diversification
 Policy 15: Public Access
 Policy 19: Housing in the Countryside
 Policy 27A: Listed Buildings
 Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
 Policy 38A: Environment and Conservation: International Nature Conservation
Sites
 Policy 38B: Environment and Conservation: National Designations
 Policy 39: Landscape
 Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
 Policy 41: Biodiversity
 Policy 47: River Tay Catchment Area
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 53E: Water Environment and Drainage: Water Supply
 Policy 56: Noise Pollution
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
19
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance – Housing in the Countryside (adopted 2020)
 Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance
20
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity 
National Guidance 
21 The Scottish Government expresses its planning policies through Planning Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars in addition to NPF4. Those relevant are listed below. 
Page 108 of 158

Page 109

22 The following Scottish Government Guidance Documents are of relevance to the
proposal: 
Creating Places 2013 
23 Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
24 Designing Streets is the policy statement in Scotland for street design and changes
the emphasis of guidance on street design towards place-making and away from a
system focused upon the dominance of motor vehicles. It was created to support
the Scottish Government’s place-making agenda, alongside Creating Places. 
National Roads Development Guide 2014 
25 This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision. 
Local Place Plans 
26 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site does not lie within and area with a Local Place
Plan. 
Consultations 
27 As part of the planning application process the following bodies were consulted: 
External 
28 NatureScot - No comment. Review pre-application response and advice for a
Construction Environmental Management Plan (CEMP). 
29 Network Rail - No objection. Whilst Network Rail has no objections in principle to
the development, due to its close proximity to the operational railway, they request
that the following matters are taken into account, and if necessary and appropriate
included as advisory notes, if granting the application - All surface or foul water
arising from the development must be collected and diverted away from Network
Rail Property. (Any Sustainable Urban Drainage Scheme should not be sited within
10 metres of railway infrastructure and should be designed with long term
maintenance plans which meet the needs of the development). Informative 3 refers. 
Page 109 of 158

Page 110

30 Scottish Water - No objection. 
Internal 
31 Structures and Flooding - No objection. 
32 Biodiversity - Further information and survey reports for protected species
requested during the application process. No objection, conditions recommended
for the submission of a Construction Environmental Management Plan (CEMP) and
to ensure the recommendations of the Ecological Assessment are implemented. 
33 Transportation and Development - No objection, subject to conditions. 
34 Environmental Health (Noise Odour) - No objection. Consideration should be
given to operational noise to ensure that activities such as patron noise, music etc
be controlled and not affect neighbouring properties. Therefore recommend that the
general conditions for outdoor areas are attached to this application. Do not foresee
odours from the commercial kitchen impacting on residential amenity however the
applicant should ensure that an extraction system commensurate with the type of
cooking to be undertaken shall be installed to ensure that odours do not affect
neighbouring properties. In respect of the solar array, do not envisage glint and
glare affecting residential receptors, however, should issues arise recommend the
applicant undertake a glint and glare assessment.  Conditions recommended in
respect of noise, odour and glint and glare to protect surrounding amenity. 
35 Environmental Health (Private Water) - PWS aware of site and informatives
recommended. 
Representations 
36 Twenty-seven (27) representations were received. This included ten (10) objections
and seventeen (17) letters of support. The main issues raised within the objections
are: 
 Visual impact.
 Inappropriate scale, design and materials.
 Not in keeping with the hotel. 
 Loss of car parking.
 Impact on road network.
 Traffic congestion.
 Impact on existing car park provision. 
 No justification for staff accommodation.
 Smell and litter.
 Rannoch Station is a unique and iconic environment, loved by many for its
quiet and this development would drastically alter its sense of place.
 No ecological assessment submitted.
 A detailed assessment of transport impacts and parking provision should be
required before any decision is made.
Page 110 of 158

Page 111

 Negative impact on woodland to the north.
 This is not the place for a fast-food outlet and sluice for campervans. 
 The car park is not suitable as a campervan park. 
37 These issues are addressed in the Appraisal section of the report. 
Other matters raised which are not a material planning consideration -
38
 Negative impact on the viability of the Station Tearoom. 
 Upmarket hotel currently works in harmony with the station restaurant and the
proposal will have a negative impact on the established local community run
café/restaurant on the station platform.
 The proposed development could be detrimental to the future of the tearoom,
the 7 staff it currently employs, and consequently the visitor centre & toilets. 
39 Planning response - The planning system operates in the long-term public interest.
It does not exist to protect the interests of one person or business against the
activities of another. In distinguishing between public and private interests, the basic
question is whether the proposal would unacceptably affect the amenity and
existing use of land and buildings which ought to be protected in the public interest,
not whether owners or occupiers of neighbouring or other existing properties would
experience financial or other loss from a particular development (page 58, Planning
Circular 3/2022 Development Management Procedures). 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not required 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal -
AA completed 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Ecological Assessment Report
submitted 
Appraisal 
40 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance and the
issues raised in the representations. 
Page 111 of 158

Page 112

41 In this instance, section 14(2) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 places a duty on planning authorities in determining
such an application as this to have special regard to the desirability of preserving
the building or its setting or any features of special architectural or historic interest
which it possesses.   
Principle 
Staff Accommodation 
42 The applicants’ supporting statement outlines the business requirements for staff
accommodation due to the lack of affordable housing with only seven properties in
the settlement and the limits staff can commute due to the remote location. A
property is currently leased for staff accommodation from a local estate however,
this is in need of upgrading and is exceptionally poor for energy performance. The
statement highlights that the business needs to look at ways to provide its own high-
quality accommodation with low running costs and long-term security to attract
quality candidates to employment positions. This proposal will secure the current
five FTE staff positions. 
43 The proposal for staff accommodation is supported by NPF4 Policy 17 a) v) Rural
Homes as this policy supports proposals for new homes in rural areas where the
development is suitably scaled, sited and designed to be in keeping with the
character of the area and the development is demonstrated to be necessary to
support the sustainable management of a viable rural business or croft, and there is
an essential need for a worker to live permanently at or near their place of work.
LDP2 Policy 19 Housing in the Countryside and Category 3.3 of the related
Supplementary Guidance support new housing associated with an existing non-
farming business. The scale, siting and design of the staff accommodation is
considered later in the report. 
44 A planning condition is proposed to ensure the staff accommodation shall be used
solely in conjunction with the hotel and shall not be let or occupied separately at any
time and shall be retained within the same planning unit as the main hotel (condition
8). Further, given the modular construction of the accommodation, a planning
condition is proposed to ensure that should the use be discontinued, the site shall
be reinstated to a condition agreed in writing by the Council as Planning Authority,
prior to reinstatement works commencing (condition 9). 
45 The proposal satisfies NPF4 Policy 17 a) v) Rural Homes and LDP2 Policy 19
Housing in the Countryside and Category 3.3 of the related Supplementary
Guidance. 
Rural Development 
46 In respect of the diversification of the hotel business, this is in the form of a street
food style outlet marketed as ‘The Deer Bothy’ and visitor facilities. The applicants
supporting statement notes that the proposal will generate four additional FTE
positions. The proposal is for a high-quality food outlet focussing on local venison, a
Page 112 of 158

Page 113

deer larder to allow direct processing and sale of local venison and a visitor facility
to enhance tourism infrastructure for free public use. The proposal satisfies NPF4
Policy 29 a) ii) Rural Development which supports development proposals that
contribute to the viability, sustainability and diversity of rural communities and local
rural economy including the diversification of existing businesses. 
47 LDP2 Policy 8 Rural Business and Diversification supports the expansion of existing
rural businesses. Sites outwith settlements may be acceptable where they offer
opportunities to diversify an existing business, or are related to an existing site-
specific resource or opportunity. LDP2 Policy 8 also supports new tourism-related
development and the expansion of existing facilities. LDP2 Policy 8 expects all
proposals to meet all of the following criteria: 
(a) The proposal will contribute to the local economy through the provision of
permanent employment, visitor accommodation, additional tourism or
recreational facilities, or the re-use of existing buildings. 
The proposal will contribute to the local economy, secure existing
employment and provide additional employment opportunities. It will also
provide additional tourism facilities. 
(b) The proposal will not result in suburbanisation of the rural area or encourage
unsustainable travel patterns. 
The site is remote and visitors travel by train, foot, bike or car to the area.
The area is popular for outdoor activities and Rannoch Station is now a
tourism destination. The proposal will provide additional visitor infrastructure
in this remote location. It will not result in suburbanisation of the rural area or
encourage unsustainable travel patterns. 
(c) The proposed use is compatible with the surrounding land uses and will not
detrimentally impact on the amenity of residential properties within or
adjacent to the site. 
The proposal has been carefully considered and is compatible with
surrounding land uses. There are no residential properties immediately
adjacent to the site however Environmental Health recommend standard
noise conditions to protect residential amenity and local environmental
quality. 
(d) The proposal can be satisfactorily accommodated within the landscape and
environmental capacity of the site. 
The proposal has been carefully designed and can be satisfactorily
accommodated within the landscape and environmental capacity of the site. 
(e) The proposal meets a specific need by virtue of its quality or location in
relation to existing business or tourist facilities. 
Page 113 of 158

Page 114

The site is remote and visitors travel by train, foot, bike or car to the area.
The area is popular for outdoor activities and Rannoch Station is a tourism
destination. Moor of Rannoch Hotel is a destination restaurant which only
opens for dinner accommodating up to 18 guests for a 7-course menu which
focuses on local and Scottish produce. The proposal will provide additional
visitor infrastructure in this remote location and enhance the visitor
experience. 
(f) Where any new building or extensions are proposed they should achieve a
high quality of design to reflect the rural nature of the site and be in keeping
with the scale of the existing buildings. 
The proposal is well-designed, creative and sustainable. The white
containers will be hidden behind a high-quality timber cladding, which is in
keeping with the character and landscape of the area. The design blends old
and new to create an attractive, adaptable, distinctive and respectful
response to the place. 
(g) The local road network must be able to accommodate, or be capable of
upgrading in order to accommodate, the nature and volume of the traffic
generated by the proposed development in terms of road capacity, safety
and environmental impact. Applications with impacts on the Strategic Trunk
Road Network will be subject to discussion and agreement from Transport
Scotland. 
Transport Planning reviewed the proposed development and the roads
related issues raised in the representations. There are no concerns arising
for the local road network. The local road network will be able to
accommodate the nature and volume of traffic generated by the proposal. 
(h) Outwith settlement centres retailing will only be acceptable if it can be
demonstrated that it is ancillary to the main use of the site and would not be
deemed to prejudice the vitality of existing retail centres in adjacent
settlements. 
This is a remote rural area and the retail element for the sale of venison
products is a small part of the proposal. 
(i) Developments employing more than 25 people in rural locations will be
required to implement a staff travel plan or provide on-site staff
accommodation. 
The development will not employ more than 25 people. The proposal
includes on-site staff accommodation. 
48 The proposal will support an existing business in a remote rural area in line with
NPF4 Policy 29 Rural Development and LDP2 Policy 8 Rural Business and
Diversification. 
Page 114 of 158

Page 115

Tourism 
49 NPF4 Policy 30 Tourism encourages, promotes and facilitates sustainable tourism.
NPF4 Policy 30 a) states development proposals for new or extended tourist
facilities or accommodation, including caravan and camping sites, in locations
identified in the LDP, will be supported. 
50 NPF4 Policy 30 b) states proposals for tourism related development will take into
account: 
i) The contribution made to the local economy;
ii) Compatibility with the surrounding area in terms of the nature and scale of the
activity and impacts of increased visitors;
iii) Impacts on communities, for example by hindering the provision of homes and
services for local people;
iv) Opportunities for sustainable travel and appropriate management of parking
and traffic generation and scope for sustaining public transport services
particularly in rural areas;
v) Accessibility for disabled people;
vi) Measures taken to minimise carbon emissions;
vii) Opportunities to provide access to the natural environment. 
51 In response to the above, the applicants’ supporting statement highlights that the
proposal will i) contribute to the local economy, secure existing employment and
provide additional employment opportunities; ii) the proposal is small scale and
designed to respect and be compatible with the area; iii) will provide much needed
staff accommodation due to the lack of housing in the area; iv) the proposal will
increase parking provision on site from 6 spaces to 10 spaces and the supporting
information notes that many visitors arrive by train; v) the proposal provides for
disabled people; vi) a solar array is proposed to minimise carbon emissions; vii) the
proposal will provide additional facilities to support visitors coming to the area to
explore the natural environment. 
52 The proposed development will add to the existing tourist facilities at this remote
rural location. The proposal satisfies NPF4 Policy 30 Tourism and LDP2 Policy 8
which also supports new tourism-related development. 
Design, Layout and Visual Amenity 
53 A Design Statement submitted with the application notes the careful consideration
given to siting the new build to respect the hotel building. The new building will be
located in the existing parking area as a detached standalone building, separated
from the existing hotel and roughly positioned on the footprint of the former light
industrial buildings that recently occupied the west courtyard. New parking including
accessible bays are proposed to the east of the hotel. 
54 The new building does not sit further forward than the existing building. Additionally,
the height is limited to below the height of the existing building to retain the hotel as
the key building on the site. Larger massing elements are located to the rear of the
Page 115 of 158

Page 116

site, this reduces the sense of scale from the road and buries the larger mass in the
site topography ensuring less visual impact when viewed from the north. The north
elevation is also screened by existing trees. 
55 A single storey amenities wing sits to the west of the site and aligns with the front
elevation of the hotel, bookending the site and framing a proposed sheltered
courtyard. A two-storey staff wing sits to the rear of the site, nestled into the site
topography. This shelters an external courtyard between the hotel and the new
building which includes a seating area and firepit for visitors to the food court. 
56 The staff wing provides five independently accessed studios over two levels with
private access from the rear. The moderately cantilevered form of these studio
spaces also creates a canopy area to the external ground offering shelter for visitors
during wet weather. 
57 The new building will benefit from modular construction methods. The remote
location of the hotel presents numerous logistical challenges, none more so than
construction. A modular and largely off-site construction methodology allows for
quality construction with highly energy efficient materials to be fabricated quickly
with a minimum of construction waste and Hotel operator disruption. Units can then
be brought to site and assembled with low impact foundations. Second use shipping
containers have been chosen which can be successfully upcycled into building
accommodation. The use of a modular construction method also allows for changes
in business models as the development can be easily reversable or removeable if
required. 
58 A selection of materials is proposed to complement the site’s history, local building
context, the existing hotel building and the surrounding natural landscape. The
Hotel is a traditional form with rendered white walls and a grey slate roof.
Surrounding buildings and a building historically on the site incorporate vertical
metal corrugated materials. Consequently, a locally sourced, low maintenance
timber with open rainscreen style is proposed that comes factory pre-weathered to a
light grey. The Design Statement reports that the timber cladding can be oriented in
different arrangements to create a hit and miss patterned cladding formation across
the façade with varying patterns. 
59 The vertical corrugated metal cladding of the shipping containers will be painted
white to match the Hotel finishes and broader context. The Design Statement
highlights this combination integrates a modern architectural solution with the
existing traditional character, the surrounding existing buildings and the buildings
that previously occupied the site. It offers an easily understandable visual difference
between the historic existing building and the contemporary new building. 
60 Full details of the finishing materials are set out in the Design Statement and on the
drawings. The proposal includes a 48 panel PV array on the roof which will be
screened by a ‘parapet’ of the building’s cladding so that it is concealed from
pedestrian eye level. 
Page 116 of 158

Page 117

61 Concern is raised in the representations about the design, scale and materials of
the new building and its negative impact on the character of the place. 
62 In response to the remote location, the design is well-crafted, creative and
sustainable. The white containers will be hidden behind a high-quality timber
cladding, which is in keeping with the character and landscape of the area. The
design blends old and new to create an attractive, adaptable, distinctive and
respectful response to the place. 
63 The proposal satisfies NPF4 Policy 14 Design, Quality and Place and LDP2 Policy 1
Placemaking and associated Supplementary Guidance (2020). 
Landscape 
64 The site is in Rannoch Forest Local Landscape Area. This Local Landscape Area
(LLA) comprises Rannoch Forest, in the northwest of Perth and Kinross, between
Ben Nevis and Glen Coe National Scenic Area to the west, and the Loch Rannoch
and Glen Lyon National Scenic Area to the east. The Landscape Supplementary
Guidance (2020) highlights the Special Qualities of the area, the Forces for Change
and Objectives. This includes ‘ensure any development proposals respect the
vernacular architecture of the area’ (page 13). 
65 As noted earlier in the report, the design blends old and new to create an attractive,
adaptable, distinctive and respectful response to the place. 
Residential Amenity 
66 The proposal comprises a two-storey wing containing five staff accommodation
units and a single storey wing consisting of a kitchen, butchery/deer larder, WC’s,
dog wash and chemical waste disposal. Included in the application is an outdoor
seating area and a roof mounted photo voltaic array. 
67 Environmental Health (EH) commented on the following – 
68 Noise - consideration should be given to operational noise to ensure that activities
such as patron noise, music etc be controlled and not affect neighbouring
properties. General conditions to control noise for outdoor areas are recommended
(condition 2 and 4). 
69 Odour - Given the distance to neighbouring properties, EH do not foresee odours
from the commercial kitchen impacting on residential amenity, however, the
applicant should ensure that an extraction system commensurate with the type of
cooking to be undertaken shall be installed to ensure that odours do not affect
neighbouring properties (condition 5). 
70 Glint and Glare - The Pager Power Solar Photovoltaic and Building Development -
Glint and Glare 2022 Guidance recommends that residential properties within 1km
that have a view of the PV panels should be assessed and notes that “residential
receptors that are situated due East or due West of solar arrays can be affected by
Page 117 of 158

Page 118

PV arrays. Whilst there are residential properties to the East and West within 1km,
due to the topography, positioning of the panels and tree coverage there will be no
line of site of the solar array from these properties. EH do not envisage glint and
glare affecting residential receptors, however, should issues arise a condition is
recommended for the applicant to undertake a glint and glare assessment if
required (Condition 7). 
71 The proposal satisfies NPF4 Policy 23 e) Health and Safety and LDP2 Policy 56:
Noise Pollution, subject to conditions. 
Roads and Access 
72 As part of the development, work is required to alter the vehicle access which is
taken off the B846 public road. Transport Planning recommend condition 10 to
ensure it is formed in compliance with Perth & Kinross Council's Road Development
Guide. 
73 The representations raise an issue with parking. There will be no loss of parking
with this to be relocated to the east side of the hotel. Existing parking provision is for
6 vehicles (application form) and the proposed site plan shows 10 car parking bays
including 2 disabled parking bays to the east of the hotel. Transport Planning raise
no issue with the level of parking provision and confirm that sufficient space exists
for turning and manoeuvring of vehicles within the site. 
74 With regards to motorhome parking and an issue raised in the representations,
there are currently no dedicated motorhome parking bays in the public car park, and
the hotel only allows parking for guests staying overnight. The applicants note that
the proposed provision of waste disposal facilities is not designed to encourage or
facilitate overnight camping. Many campervan owners will make use of facilities
when they are available. The proposal is to provide a suitable facility to responsibly
dispose of campervan waste. This dedicated tank will be emptied as per the
business contract for emptying a septic tank. 
75 The representations raise road safety concerns due to the narrow road and
increased traffic and highlighted further survey work to assess the impact of the
proposed development. Transport Planning reviewed the comments in the
representations and do not consider that the proposed development will significantly
impact the local road network. The applicants report that over 70% of visitors arrive
at the hotel via the train station and these proposals are not considered to increase
either tourist or staff traffic on the B846. 
76 The core path 11/7 Rannoch Station to Kingshouse, Highlands (RANN/7) is not to
be impacted by the proposals. 
77 Transport Planning recommend condition 11 for a detailed design for secure
covered cycle parking facility to be submitted and approved in writing by the
Planning Authority in consultation with the Roads Authority. The cycle parking, as
approved in writing, shall be implemented in accordance with the approved details
Page 118 of 158

Page 119

to the satisfaction of the Council as Planning Authority prior to the development
being brought into use. 
78 The proposal satisfies NPF4 Policy 13 Sustainable Transport and LDP2 Policy 60B:
Transport Standards and Accessibility Requirements: New Development Proposals,
subject to conditions. 
Flooding, Drainage and Private Water Supply 
Flooding 
79 No flood risk. 
Drainage 
80 The proposal will include an upgrade of the existing waste treatment plant, septic
tank and SUDS located on the south side of the public road (B846). 
81 The Flooding Team have been consulted and raise no issue with the proposed
development. 
Private Water Supply 
82 The Moor of Rannoch is served from a private borehole with particle and UV
filtration and has a good quality supply. The Private Water Team are aware of the
existing borehole and conduct testing on an annual basis. 
83 The proposal satisfies NPF4 Policy 22 Flood Risk and Water Management and
LDP2 Policy 53B: Water Environment and Drainage: Foul Drainage, LDP2 Policy
53C: Water Environment and Drainage: Surface Water Drainage and LDP2 Policy
53E: Water Environment and Drainage: Water Supply. 
Conservation Considerations 
84 The historic building of Rannoch Hotel (MPK11900) is being retained in full, with the
proposal located on the west side of the hotel building. There are no concerns
regarding archaeology with the proposal. 
85 There is a historic functional relationship between the Category B Listed Building
Rannoch Station (LB12245) and the hotel, and the proposed new accommodation
would sit in between the two buildings. The design allows the west elevation of the
hotel to remain open and form part of the new courtyard.  The character,
appearance and setting of the listed building is protected in accordance with NPF4
Policy 7 c) Historic Assets and Places and LDP2 Policy 27A: Listed Buildings. 
Natural Heritage and Biodiversity 
86 There are no local, national or international nature designations on or adjacent to
the site. 
Page 119 of 158

Page 120

87 To the west of the site are Ben Nevis and Glencoe National Scenic Area (NSA),
Rannoch Moor Special Area of Conservation (SAC) and Site of Special Scientific
Interest (SSSI), Rannoch Lochs Special Protection Area (SPA) and River Tay SAC. 
International Designations 
88 NPF4 Policy 4 a) b) Natural Places and LDP2 Policy 38A: International Nature
Conservation Sites protect European Sites (Special Area of Conservation (SAC) or
Special Protection Areas (SPA)) and will only permit development where an
appropriate assessment has demonstrated that it will not adversely affect the
integrity of the site. 
89 A Preliminary Ecology Survey and Ecological Assessment Report (March 2026)
was submitted during the application process and reviewed by the Biodiversity
Officer (document 23). 
90 The Biodiversity Officer reports that the submitted Preliminary Ecological Appraisal
Report is in accordance with published best practice. The report states that it is not
anticipated that there will be any detrimental impact to Rannoch Lochs SPA. The
SPA is designated for black throated divers, however, there are no black-throated
divers recorded within 2km and no signs of black-throated divers were recorded
during the survey. The recommended disturbance distance for breeding black-
throated divers is 500-750m. As the proposed development is 500m from the
closest loch of the SPA, the Dubh Lohan; the fact that the railway line separates the
development from the loch; and that it is in an area already frequented by people
during the nesting season; it is not anticipated that there will be any detrimental
impact to black-throated divers, should any black-throated diver nest at the Dubh
Lochan in the future.   
91 NatureScot provided advice during the pre-application process and highlighted that
disturbance from construction work could occur if works are carried out in breeding
season 1st April to 31st August. NatureScot advises that a breeding bird protection
plan, which includes a survey for black throated diver within 1km, is in place. This is
to ensure no disturbance of breeding black throated diver. Alternatively, work could
be scheduled outside of breeding season to avoid disturbance. The Council’s
Biodiversity Officer recommends a condition should be used to allow works to occur
from 1st September to 31st March only (condition 12). 
92 The report states it is not anticipated that there will be any direct impact to the SAC.
The Preliminary Ecology Survey and Ecological Assessment Report (March 2026)
reports that no sign of otters were recorded within 200m of the site. It notes there is
potential for indirect impact through hydrological connections and it is
recommended that a Construction Environmental Management Plan be in place.   
93 NatureScot advised through the pre-application process that there is potential for
the proposal to result in indirect impacts to the following features of Rannoch Moor
SAC and River Tay SAC - freshwater pearl mussel, otter and clear water lakes or
lochs with aquatic vegetation and poor to moderate nutrient levels. These features
require good water quality and there may be construction activities that have the
Page 120 of 158

Page 121

potential to release silt or other pollutants into the SAC that could impact the water
quality. NatureScot advise that a Construction and Environment Management Plan
should be in place that incorporates pollution prevention measures to minimise the
risk of impacts on these features. 
94 A planning condition is proposed for a Construction Environmental Management
Plan to be submitted and approved in writing by the Council as Planning Authority
prior to the commencement of the development (condition 13). 
95 In line with NPF4 Policy 4 b) and LDP2 Policy 38A a) an appropriate assessment
has demonstrated that the development will not affect the integrity of the sites. The
appropriate assessment takes account of the consultation comments from
NatureScot and the Biodiversity Officer and the findings of the Preliminary Ecology
Survey and Ecological Assessment Report (March 2026). 
National Designations 
96 NatureScot advise that the proposal is situated adjacent to existing development,
and it is unlikely that the scale of the proposal will have an adverse effect on the
integrity of Ben Nevis and Glen Coe NSA or the objectives of the designation. 
97 The proposal is approximately 100m from Rannoch Moor Site of Special Scientific
Interest (SSSI). NatureScot advise there is potential for this proposal to result in
direct and indirect impacts on the following features of Rannoch Moor SSSI:
breeding bird assemblage and oligotrophic loch. Advice on preventing disturbance
to breeding black throated diver is provided above (see Rannoch Lochs SPA) and
advice on maintaining water quality that will ensure impacts on the oligotrophic loch
are minimised is also provided above (see Rannoch Moor SAC). Planning
conditions are proposed to protect breeding birds (condition 12) and water quality
(condition 13). 
98 The proposal satisfies NPF4 Policy 4 c) and LDP2 Policy 38B, subject to conditions. 
Biodiversity Enhancement 
99 The Preliminary Ecology Survey and Ecological Assessment Report (Document 23)
recommend biodiversity enhancement measures. As per the Biodiversity Officer’s
consultation comments, a condition is proposed to ensure that a detailed plan
indicating location, quantity, specification and maintenance requirements for all the
recommended biodiversity enhancement measures set out in the supporting
biodiversity survey report shall be submitted for the further written agreement of the
Council as Planning Authority and shall be implemented thereafter once agreed
(condition 15). This condition satisfies NPF4 Policy 3 c). 
Trees 
100 There is no Ancient Woodland as shown on the Ancient Woodland Inventory
located on or adjacent to the site. There is no Native Woodland as per the Native
Woodland Survey of Scotland on the site, there is Native Woodland to the north of
Page 121 of 158

Page 122

the site which is wet woodland. The submitted Preliminary Ecological Appraisal
Report states this proposal will not have a detrimental impact on the woodland to
the north of the site. Tree planting is proposed as shown on the site plan (drawing
03). The proposal satisfies NPF4 Policy 6 and LDP2 Policy 40B. 
101 The proposal satisfies NPF4 Policy 3 Biodiversity, NPF4 Policy 4 Natural Places,
NPF4 Policy 6 Forestry, Woodland and Trees and LDP2 Policy 38A: Environment
and Conservation: International Nature Conservation Sites, LDP2 Policy 38B:
Environment and Conservation: National Designations, LDP2 Policy 40B: Forestry,
Woodland and Trees: Trees, Woodland and Development, LDP2 Policy 41:
Biodiversity and LDP2 Policy 47: River Tay Catchment Area. 
Low and Zero Carbon Generating Technologies 
102 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in New
Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of low
and zero-carbon generating technologies. As this proposal includes the erection of
a new building, consideration must be given to this requirement. Further, NPF4
Policy 2 ‘Climate Mitigation and Adaptation’ requires that development should be
designed to reduce green gas emissions. In this instance, a solar array on the roof
is proposed in line with NPF4 Policy 2 and LDP2 Policy 32. 
Material Considerations 
Representations 
103 Twenty-seven (27) representations were received. This included ten (10) objections
and seventeen (17) letters of support. 
104 The main issues raised within the objections in summary relate to the design,
negative impact on parking and the road network, amenity issues and no ecological
assessment. 
105 In respect of design, it is acknowledged that design can often divide opinion as
noted in both the letters of support and objection. The proposal integrates a modern
architectural solution with the existing traditional character of the hotel building and
its historic context. The design offers a visual difference between the buildings and
creates an attractive, adaptable, distinctive and respectful response to the place. 
106 In respect of the roads and parking issues, Transport Planning have reviewed the
comments and raise no concerns. No further assessment is required. 
107 In line with the recommendations of Environmental Health, conditions are proposed
to protect residential amenity and the environmental quality of the area (conditions
2-7). 
Page 122 of 158

Page 123

108 As noted earlier in the report, an ecological survey report is on record having been
received during the planning application process. The Biodiversity Officer reports
that the submitted Preliminary Ecological Appraisal Report is in accordance with
published best practice. In line with the recommendations of NatureScot and
Biodiversity Officer, conditions are proposed to protect European Sites,
environmental quality and biodiversity (conditions 12-16). 
109 The issues raised in the objections have been considered in the report above and
are not of sufficient weight to justify refusal of planning permission. 
110 The letters of support come from local people, other local businesses and visitors to
the area. The comments acknowledge the limited visitor facilities and welcome the
economic investment in this remote area which is highly dependent on the visitor
and tourist economy. 
Applicants Statement 
111 The applicants’ statement highlights their aim to develop facilities in both Moor of
Rannoch Restaurant & Rooms and the Rannoch Station area to meet the needs of
modern tourism and the increasing number of visitors to Rannoch Moor while
boosting employment opportunities. 
112 It reports the most pressing barrier to recovering from the impact of covid and
energy prices is the lack of further affordable staff accommodation in the Rannoch
area, lack of tourism infrastructure in the area to meet the growing number of
visitors and limitations to access other income streams due to the building age and
layout. 
113 The proposed development will help to strengthen business resilience, increase
revenue and boost employment opportunities. 
114 The proposal algins with the policy intent of NPF4 Policy 29 Rural Development to
encourage rural economic activity, innovation and diversification whilst ensuring that
the distinctive character of the rural area and the service function of small towns,
natural assets and cultural heritage are safeguarded and enhanced. 
Developer Contributions 
115 The Developer Contributions Guidance is not applicable to this application and
therefore no contributions are required in this instance. 
Economic Impact 
116 The proposal supports the expansion of an existing rural business. 
Variation of Application Under Section 32A 
117 This application was not varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
Page 123 of 158

Page 124

Planning Obligations and Legal Agreements 
118 None required. 
Direction By Scottish Ministers 
119 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
120 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approval subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this decision
notice, unless the development has been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019. 
2. The hours of operation of the outdoor seating area shall be restricted to between
0800 to 2200 hours Monday to Sunday. 
Reason - In order to safeguard the residential amenity of the area. 
3. All plant or equipment shall be so enclosed, attenuated and/or maintained such that
any noise therefrom shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows slightly open, when measured
and/ or calculated and plotted on a rating curve chart. 
Reason - In the interests of residential amenity; in order to safeguard the privacy
and amenity of the residents of the neighbouring dwellinghouse(s). 
Page 124 of 158

Page 125

4. No music, amplified or otherwise, shall be permitted in the outdoor seating area at
any time. 
Reason - In order to safeguard the residential amenity of the area. 
5. Prior to the development hereby approved being completed or brought into use, an
effective ventilation system commensurate with the nature and scale of cooking to
be undertaken shall be installed and operated such that cooking odours are not
exhausted into or escape into any neighbouring buildings. Thereafter the system
shall be maintained. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
6. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does not adversely affect the
amenity of the neighbouring land. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
7. Within 2 months of receipt of a written request by the Council as Planning Authority,
following a substantiated complaint from a sensitive property, the operator/applicant
shall, at its own expense, employ a consultant approved by the Planning Authority
to carry out an assessment of glint and glare from the development. The glint and
glare assessment shall be submitted to and approved in writing by the Planning
Authority. The assessment must identify any mitigation measures required if
appropriate. Any mitigation measures identified shall be implemented on site in
accordance with a timescale to be agreed with the Planning Authority. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard of
local environmental quality. 
8. The staff accommodation hereby approved shall be used solely in conjunction with
the hotel, shall not be let or occupied separately at any time and shall be retained
within the same planning unit as the main hotel. 
Reason - In order to clarify the terms of the permission; to control and restrict the
use of the building. 
9. In the event that the use is discontinued, the development authorised by this
permission shall be removed and the site reinstated to a condition agreed in writing
by the Council as Planning Authority, prior to reinstatement works commencing. 
Reason - To ensure the development is removed from the site on the expiry of the
permission, and to protect the character of the countryside, the visual amenity of the
area and nature conservation interests. 
Page 125 of 158

Page 126

10. Prior to the development hereby approved being completed or brought into use the
vehicular access shall be formed in accordance with Perth & Kinross Council's
Road Development Guide Type B Figure 5.6 access detail with 3 metre radii
kerbing of Type A Road construction detail.  The Type A Road construction detail
shall continue into the entrance of the site for a minimum of 3 metres.  The works
shall not impact on the roads drainage system. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
11. Prior to commencement of any development on site, a detailed design for secure
covered cycle parking facility shall be submitted to and approved in writing by the
Planning Authority in consultation with the Roads Authority.    The cycle parking,
as approved in writing, shall be implemented in accordance with the approved
details to the satisfaction of the Council as Planning Authority prior to the
development being brought into use. 
Reason - To encourage active travel and meet advice in NPF4 on transport. 
12. Prior to commencement of any development on site, a breeding bird protection plan
which includes a survey for black throated diver within 1km of the site, shall be
submitted for the written approval of the Council as Planning Authority. Thereafter,
the approved plan shall be implemented to ensure no disturbance of breeding black
throated diver. Alternatively, work shall be scheduled outside of breeding season to
avoid disturbance, 1st September to 31st March only. 
Reason - To ensure the development does not impact negatively on Rannoch
Lochs SPA. 
13. Development shall not commence until a Construction Environmental Management
Plan (CEMP) that incorporates pollution prevention measures to minimise the risk of
impacts on the features of Rannoch Moor SAC and River Tay SAC is submitted and
approved in writing by the Council as Planning Authority. The CEMP should include
the following: 
a) pollution prevention safeguards including drainage arrangements and the
possible use of siltation traps, settlement tanks and bunds 
b) storage and disposal of materials including the siting of stockpiles, use of
buffer strips and disposal methods 
c) construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound 
d) timing, duration and phasing of construction 
The Construction Environmental Management Plan and mitigations as agreed in
writing by the Council as Planning Authority shall be fully implemented as part of the
planning permission.  
Page 126 of 158

Page 127

Reason - To ensure the development does not negatively impact on the nearby
Special Area of Conservation. 
14 The conclusions and recommended action points within the supporting biodiversity
survey submitted and hereby approved (document(s) 23 relates) shall be fully
adhered to, respected and undertaken as part of the construction phase of
development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
15 Prior to the commencement of the development hereby approved, a detailed plan
indicating location, quantity, specification and maintenance requirements for all the
recommended biodiversity enhancement measures within the supporting
biodiversity survey submitted and hereby approved (document(s) 23 relates) shall
be submitted for the further written agreement of the Council as Planning Authority. 
Thereafter, the agreed scheme shall be maintained in a reasonable condition for the
life of the development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
16 Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of the
development hereby approved. The measures may include creation of sloping
escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason - In order to prevent animals from being trapped within any open
excavations. 
Justification 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
Procedural Notes 
None. 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the planning
authority prior written notification of the date on which it is intended to commence
the development.  A failure to comply with this statutory requirement would
constitute a breach of planning control under section 123(1) of that Act, which may
result in enforcement action being taken.  Please use the form attached herewith. 
Page 127 of 158

Page 128

2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. All surface or foul water arising from the development must be collected and
diverted away from Network Rail Property. Any Sustainable Urban Drainage
Scheme should not be sited within 10 metres of railway infrastructure and should be
designed with long term maintenance plans which meet the needs of the
development. 
4. The applicant should ensure that any existing wayleaves for maintenance or repair
to existing private water supply or septic drainage infrastructure in the development
area are honoured throughout and after completion of the development.
5. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The Private
Water Supplies (Scotland) Regulations 2006 and The Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations 2017. 
6. A private wastewater treatment plant and septic tank should be provided with an
access for desludging.  The desludging tanker should be provided with access to a
working area that: 
 will provide a clear route for the suction hose from the tanker to the tank, and
 is not more than 25m from the tank where it is not more than 4m higher than
the invert level of the tank, and
 is sufficient to support a vehicle axle load of 14 tonnes 
7. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works.  Information
on junction types, requirements for Vehicular Access consents (VA1) and
application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on the
disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environmental Protection Agency. 
8. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
9. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
Background Papers
Letters of representation 27 
Page 128 of 158

Page 129

Authors
Name Designation Contact Details
Claire Myles Planning Officer 01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
30 April 2026 
Page 129 of 158

Page 130

Page 130 of 158

Page 131

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/01834/FLL
Erection of staff accommodation unit, amenity building, cafe, formation of outdoor
seating area, car park and associated works at Moor of Rannoch Hotel, Rannoch, PitlochryScale
1:20,000
5(2)(ii)
Page 131 of 158

Page 132

Page 132 of 158

Page 133

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/01834/FLL
Erection of staff accommodation unit, amenity building, cafe, formation of outdoor
seating area, car park and associated works at Moor of Rannoch Hotel, Rannoch, PitlochryScale
1:10,000
5(2)(ii)
Page 133 of 158

Page 134

Page 134 of 158

Page 135

Perth and Kinross Council 
Planning and Placemaking Committee - 13 May 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/128) 
Proposal: Erection of free-range egg production building and associated works 
Location: Gloagburn Farm, Tibbermore, Perth, PH1 1QL 
Ref. No: 25/01855/FLL
Ward No: P9 - Almond and Earn 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 Planning permission is sought for the erection of a free-range egg production
building and associated works to the north of the existing building group at
Gloagburn Farm. The facility (measuring 158.8m x 20.3m) will accommodate
32,000 laying hens, alongside associated feed bins, egg packing and storage
facilities, concrete aprons, and access tracks. The proposal will lead to the removal
of two smaller existing free-range units, which currently house around 6,000 hens.   
2 The proposed site is approximately 380 metres west of the settlement boundary of
Tibbermore, and to the north of the buildings associated with Gloagburn Farm, and
its associated farm shop and cafe.   
3 Moreover, according to the Land Capability for Agriculture (LCA) classification map
for Scotland, the proposed site appears to fall within class 2, which would constitute
prime agricultural land. 
4 The proposed site is also allocated within an area designated as a historic
battlefield (Battle of Tippermuir). 
5 The applicant is Niven Farming, a large agricultural holding extending to
approximately 1,400 acres, which combines arable production with livestock
enterprises. The farm has diversified in recent years through the nearby Gloagburn
5(2)(iii)
Page 135 of 158

Page 136

Farm Shop and Café, which sells farm produce directly to consumers, including the
sale of free-range eggs. 
Site History 
Wider Site 
6 01/01802/FUL Change of use of garage and garden shed to form farm shop, toilet
and kitchen 04 February 2002 Application Approved 
7 02/00368/FUL Erection of building to form farm shop with ancillary coffee area on
land adjacent to farm buildings 14 June 2002 Application Approved 
8 02/01576/FUL Alteration of siting of farm shop and improvement of access from
public road 09 January 2003 Application Approved 
9 03/02205/FUL Extension of farm shop to increase restaurant and retail space 18
June 2004 Application Approved 
10 05/01832/FUL Proposed addition of front screen to front of veranda 21 October
2005 Application Withdrawn 
11 05/02104/FUL Erection of glazed screen to front of veranda 22nd December 2005
Application Approved 
12 08/00047/FUL Erection of a sunroom 14 March 2008 Application Approved 
13 10/01469/FLL Alterations and extension to existing farm shop 29 October 2010
Application Approved 
14 10/02210/FLL Modification of existing consent 10/1469/FLL for alterations and
extension to farm shop 22 February 2011 Application Approved 
15 11/00789/FLL Erection of single storey extension to existing farm shop and
restaurant including internal alterations and install wood pellet boiler 16 February
2012 Application Approved 
16 12/01414/FLL Alterations, extension and installation of wood pellet boiler
(modification of 11/00789/FLL) 26 September 2012 Application Approved 
17 12/01881/FLL Alterations, extension and installation of a wood chip boiler 19
December 2012 Application Approved 
18 15/00165/FLL Alterations and extension to dwellinghouse, change of use of
agricultural shed to additional living accommodation 17 March 2015 Application
Approved 
19 15/00783/FLL Extension to dwellinghouse 30 June 2015 Application Approved 
Page 136 of 158

Page 137

20 15/01322/FLL Extensions to building 27 October 2015 Application Withdrawn 
21 15/01891/FLL Alterations and extension 06 January 2015 Application Approved 
22 16/01018/FLL Extension to building 09 September 2016 Application Refused 
23 17/01334/FLL Extension to building 26 September 2017 Application Approved 
24 18/00353/FLL Alterations and extension to building 10 November 2018 Application
Approved 
25 20/01429/FLL Alterations and extension to farm shop, formation of vehicular
access, parking area and associated works 12 January 2021 Application Approved 
26 20/01803/FLL Erection of agricultural building and associated works 15 February
2021 Application Approved 
27 21/00050/FLL Alterations and extension to farm shop, formation of vehicular
access, parking area and associated works 28 May 2021 Application Approved 
28 23/00805/FLL Erection of canopy 27 June 2003 Application Approved 
Environmental Impact Assessment 
29 The impact of the proposed development site was screened for EIA as part of the
application’s assessment, and it was determined that the proposal does not
constitute EIA development. 
Pre-Application Consultation 
30 Pre-application Reference: 25/00073/PREAPL 
31 The proposed development is not classed as a major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore the applicant was not required to undertake not any formal pre-
application consultation with the local community. 
Development Plan 
32 The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance. 
National Planning Framework 4 
33 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable and
Page 137 of 158

Page 138

productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
34 The Council’s assessment of this application has considered the following policies
of NPF4: 
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity 
 Policy 4: Natural Places
 Policy 5: Soils 
 Policy 7: Historic Assets and Places 
 Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings 
 Policy 14: Design, Quality and Place 
 Policy 22: Flood Risk and Water Management 
 Policy 23: Health and Safety 
 Policy 26: Business and Industry 
 Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
35 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
36 The principal relevant policies are, in summary; 
 Policy 1A: Placemaking   
 Policy 1B: Placemaking   
 Policy 2: Design Statements 
 Policy 5: Infrastructure Contributions   
 Policy 8: Rural Business and Diversification 
 Policy 30: Protection, Promotion and Interpretation of Historic Battlefields
 Policy 41: Biodiversity 
 Policy 47: River Tay Catchment Area 
 Policy 50: Prime Agricultural Land   
 Policy 52: New Development and Flooding 
 Policy 53B: Water Environment and Drainage: Foul Drainage 
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 53E: Water Environment and Drainage: Water Supply 
 Policy 55: Nuisance from Artificial Light and Light Pollution 
 Policy 56: Noise Pollution 
 Policy 57: Air Quality  
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Page 138 of 158

Page 139

Statutory Supplementary Guidance 
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
 Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance 
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
 Planning Guidance - Planning & Biodiversity 
National Guidance 
37 The Scottish Government expresses its planning policies through Planning Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars in addition to NPF4. Those relevant are listed below. 
Creating Places 2013 
38 Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
39 This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision. 
Local Place Plans 
40 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There are no Local Place Plans currently adopted for the area. 
Consultations 
41 As part of the planning application process the following bodies were consulted: 
Page 139 of 158

Page 140

Internal 
42 Transportation and Development: No objection subject to a condition relating to
the submission of a construction traffic management plan (CTMP). 
43 Environmental Health (Noise Odour): No objection subject to conditions relating
to plant noise, external lighting, servicing and deliveries, audible reversing alarms,
the submission of an operational management plan, noise and odour complaint
procedures. 
44 Biodiversity: No objection subject to conditions relating to tree/hedgerow retention
and the submission of a revised detailed landscaping and planting scheme prior to
the commencement of development. 
45 Developer Contributions: No contribution required. 
External 
46 Historic Environment Scotland (HES): No comments to make. 
47 Scottish Water: No objection. 
48 Perth and Kinross Heritage Trust (PKHT): No objection. 
49 Methven & District Community Council: Did not formally object but expressed
concerns relating to air pollution. In addition, they noted that at least two households
within a ½ mile radius were not on the neighbourhood notification list. 
Representations 
50 6 objections were received. The main issues raised within the representations are: 
 Noise pollution
 Odour, dust and air quality impacts
 Public health risk
 Adverse impact on visual amenity
 Inappropriate land use 
 Out of character with the area
 Over-intensive development
 Lack of appropriate assessment e.g. lack of Environmental Impact
Assessment. As stated above, an EIA Screening Opinion was carried out
which confirmed that an EIA was not required. 
 Lack of community consultation. Neighbour notification notices were sent to
those having an interest in land adjoining or within 20 metres of the boundary
of the land for which development is proposed. However, given that the
neighbouring land consists of open fields and that the proposal could be
categorised as a bad neighbour development, the application was also
Page 140 of 158

Page 141

advertised in the Perthshire Advertiser as per the requirements of the relevant
regulations. 
51 These issues are addressed in the appraisal section of the report. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
not required 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
not required 
Appraisal 
52 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance as outlined
above.   
Principle 
Prime Agricultural Land 
53 NPF4 Policy 5 (Soils) states that development proposals on prime agricultural land,
or land of lesser quality that is culturally or locally important for primary use, as
identified by the LDP, will only be supported where it is for: 
i. Essential infrastructure and there is a specific locational need and no other
suitable site; 
ii.  Small-scale development directly linked to a rural business, farm or croft or for
essential workers for the rural business to be able to live onsite; 
iii. The development of production and processing facilities associated with the
land produce where no other local site is suitable; 
iv. The generation of energy from renewable sources or the extraction of minerals
and there is secure provision for restoration; 
Page 141 of 158

Page 142

54 LDP2 Policy 50 (Prime Agricultural Land) states that outside the identified
settlements, development on prime agricultural land will not be permitted, unless it
is necessary to meet a specific established need, such as a major infrastructure
proposal and only when there is no other suitable site available on non-prime land.
Small-scale development directly linked to rural business, including housing, may
also be acceptable on prime agricultural land, providing it is compatible with all
other aspects of the policy framework of the Plan and there are no other suitable
non-prime land sites available, and it does not adversely affect the viability of the
agricultural unit. 
55 According to the Land Capability for Agriculture (LCA) classification map for
Scotland, the proposed site appears to fall within class 2, which would constitute
prime agricultural land. 
56 The proposed facility is located within the operational area associated with
Gloagburn Farm, located adjacent to the existing poultry units which are to be
removed. The facility will therefore be able to utilise existing farm access and
internal tracks associated with the existing units. Moreover, the site has been
selected due to the availability of a contiguous and large free-range area of
approximately 16 hectares, with this distance threshold a requirement to comply
with free-range welfare standards. In addition, no built development will extend into
land currently in arable use, with the production facility falling within the defined
area of the farmstead and the free-range area encroaching into arable land. The
supporting statement also asserts that the land surrounding the unit will remain in
agricultural use, with the range area seeded with grass and wildflower mixes, and
hens contributing to soil fertilisation through grazing. The land will be managed less
intensively than the current arable rotation to ensure that land continues to
contribute to food production rather than being permanently lost or sterilised. As
such, while the proposal would result in the loss of prime agricultural land, this loss
would represent a small incursion relative to the size of the agricultural unit.
Furthermore, the prime land’s loss would not be irreversible with the majority of the
land remaining in productive agricultural use. 
Expansion and Diversification of Existing Rural Business 
57 NPF4 Policy 29 (Rural Development) states development proposals that contribute
to the viability, sustainability and diversity of rural communities and local rural
economy will be supported, including: 
i. farms, crofts, woodland crofts or other land use businesses, where use of good
quality land for development is minimised and business viability is not
adversely affected; 
ii.  diversification of existing businesses; 
iii. production and processing facilities for local produce and materials, for
example sawmills, or local food production; 
iv. essential community services; 
v. essential infrastructure; 
vi. reuse of a redundant or unused building; 
Page 142 of 158

Page 143

vii. appropriate use of a historic environment asset or is appropriate enabling
development to secure the future of historic environment assets; 
viii. reuse of brownfield land where a return to a natural state has not or will not
happen without intervention; 
ix. small scale developments that support new ways of working such as remote
working, homeworking and community hubs; or 
x. improvement or restoration of the natural environment. 
58 Development proposals in rural areas should also be suitably scaled, sited and
designed to be in keeping with the character of the area. They should also consider
how the development will contribute towards local living and take into account the
transport needs of the development as appropriate for the rural location. 
59 LDP2 Policy 8 (Rural Business and Diversification) states that the Council will give
favourable consideration to the expansion of existing businesses and the creation of
new ones in rural areas. There is a preference that this will generally be within or
adjacent to existing settlements. Sites outwith settlements may be acceptable
where they offer opportunities to diversify an existing business, or are related to an
existing site-specific resource or opportunity. 
60 The proposal would result in the diversification and expansion of an existing
agricultural enterprise. The applicant has submitted a business plan in support of
the application outlining why this particular site represents a site-specific resource
or opportunity. In summary, the proposal will expand production capacity in
response to market demand, create and support rural employment, retain the land
in active agricultural use, strengthen local food networks through Gloagburn Farm
Shop, and utilise low-carbon technologies. In terms of the siting of the proposal and
any resultant landscape impact, this will be discussed further below. 
Proposals on Greenfield Sites 
61 NPF4 Policy 9 (Brownfield, Vacant and Derelict Land and Empty Buildings) states
that development proposals that will result in the sustainable reuse of brownfield
land including vacant and derelict land and buildings, whether permanent or
temporary, will be supported. Proposals on greenfield sites will not be supported
unless the site has been allocated for development or the proposal is explicitly
supported by policies in the LDP. 
62 As stated above, the proposal would represent an expansion of an existing
agricultural cluster, with no built form encroaching into land currently in arable use. 
63 Given the above, the proposal is acceptable from a principle of development
perspective. 
Design and Layout/Landscape Impact 
64 Generally, the design and scale of development should respect its surroundings and
adhere to Policies 1A and B of LDP2 which relate to placemaking and NPF4 Policy
14 (Design, Quality and Place) which seeks to deliver well designed development.
Page 143 of 158

Page 144

65 The proposed unit is a functional agricultural building, utilising a steel frame with
profiled polyester coated steel sheeting in an olive-green finish, typical of modern
farm development. It will measure approximately 158.8m x 20.3m, with an eaves
height of 3.33m and ridge height of 6.05m.The appearance is utilitarian, reflecting
its agricultural function and blending with the existing farm buildings in the area.
Roof-mounted solar panels are also proposed to support low-carbon operation.
Overall, the proposed development is acceptable in terms of its design and layout. 
66 In relation to landscape impact, the facility is located with an area characterised by
undulating topography. While the unit would be visible from public view, particularly
from the western edge of Tibbermore, it would be seen in context of an existing
agricultural cluster and would not be out of character or detract from the
surrounding area’s landscape quality. Mitigatory measures have been proposed
within the submitted design statement through the reinforcement of existing
boundaries with native hedgerow and tree planting to reduce visual impact.
However, this is not shown on the submitted landscaping plan. A condition
(Condition 3) relating to the submission of a revised detailed landscaping and
planting scheme has been conditioned below. 
Residential Amenity 
67 Policy 23 (Health and Safety) states that development proposals that are likely to
raise unacceptable noise issues will not be supported. 
68 LDP2 Policy 55 (Nuisance from Artificial Light and Light Pollution) states that
consent will not be granted for proposals where the lighting would result in obtrusive
and/or intrusive effects. The Council may secure the regulation of lighting
installations and their maintenance through the use of conditions attached to the
granting of planning permission 
69 LDP2 Policy 56 (Noise Pollution) relates to noise pollution and seeks to ensure that
developments which generate significant levels of noise are not located within close
proximity to noise sensitive receptors. 
70 LDP2 Policy 57 (Air Quality) states any proposed development that could have a
detrimental effect on air quality, through exacerbation of existing air quality issues or
introduction of new sources of pollution (including dust and/or odour), must provide
appropriate mitigation measures. The LDP expects that some type of mitigation of
air quality impacts will be required for all but the smallest developments. Best
practice design measures should therefore be considered early in the design and
placemaking process. 
Noise 
71 A Noise Impact Assessment (NIA) has been submitted by the applicant in support of
the application . 
72 The NIA assessed the main operational noise sources generated by the proposed
replacement poultry unit and the impact on noise sensitive receptors A to D as
Page 144 of 158

Page 145

shown in Figure 1 within the report. The noise sources are 8 x inlet fans on the ridge
of the shed, 12 x roof extract fans, 4 x gable end extract fans, 12 x emergency
gable end extract fans (6 fans on eastern gable end and 6 on the western gable
end), these will only be used during periods of very high temperatures or failure of
the other extract fans. Transport noise includes commercial vehicles on the access
road and stock deliveries. Stock collections/deliveries will be via the concrete
aprons to the east and west of the poultry unit. 
73 The NIA was undertaken in line with BS4142:2014+A1:2019 criteria to assess the
impacts of industrial and commercial noise on sensitive receptors and accessed
against BS8233:2014 criteria for internal noise limits for habitable rooms for
dwellinghouses. 
74 Background Noise survey was undertaken Monday 15th and Tuesday 16th
December 2025, monitoring positions 1-3 shown in Figure 1 of the report. During
the survey, the existing poultry units were operational. The typical background noise
levels during the day, evening and night periods are: 
 Day (07:00 – 20:00hrs): LA90 40dB.
 Evening (20:00 – 23:00hrs) LA90 30dB; and 
 Night (23:00 – 07:00hrs): LA90 26dB. 
75 Correction factors have been applied to account for directivity, reflection (+3dB),
distance, shielding (+10dB), ground absorption and atmospheric attenuation, as set
out in Section 5.5 of the report. Rating level corrections in accordance with BS4142
of +6dB are detailed in section 5.6. 
76 The full calculations of noise emissions from the ventilation fans and transport
activities are provided in Tables B1 – B6 in Appendix B. The resultant BS4142
Rating and Assessment Levels at Receptors A - D are presented in Table 1. During
the daytime and evening periods, the highest individual and aggregated
assessment levels are associated with the extract fans. 
77 A difference of 5dB indicates an extremely low noise impact. Transport activities
result in -4dB, indicating a low noise impact, and the aggregated impact of extract
fans and transport activities is -3dB, also indicating a low noise impact. During the
night-time period, plant noise results ins -12dB, while the aggregated impact of
extract fans and transport activities is +13dB. 
78 As outlined above, four residential receptors (A-D) were assessed, with separation
distances recorded to both the west and east aprons. These receptors are located
at separation distances ranging from approximately 350-670 metres. During the
night period (23:00 – 07:00hrs), it is considered relevant that context that occupiers
of the nearest dwellings will be inside their houses; consequently, it will be noise
ingress that will inform the noise impact. Based on a room with an open window
providing a 13dB sound reduction from outside to inside, the highest aggregate
(extract fan and transport activity) noise ingress would be LAeq,15min 21dB and
LAmax, F 36dB. The maximum noise ingress level, which will be generated by
Page 145 of 158

Page 146

transport activities, also does not exceed LAmax, F 45dB threshold (a level that
should not be exceeded more than 10 times during the night) with regard to sleep
disturbance. The report concludes that, during the night-time period, both fan and
transport activities will result in a very low noise impact, and on this basis, the
proposed development is acceptable on noise grounds, as will not result in an
adverse noise impact at the closest dwellinghouse. 
79 It is important to note that a number of objections have raised concerns regarding
the methodology and calculations within the submitted noise impact assessment
(NIA). Environmental Health have reviewed the assessment and are satisfied that
the proposal would not detrimentally impact residential amenity, with predicted
noise levels remaining well below nuisance thresholds. 
Odour 
80 The applicant has submitted an odour impact assessment (OIA) in support of the
application. 
81 Odour emission rates have been assessed and quantified based upon an emissions
model that considers the internal odour concentrations and ventilation rates and
estimated emissions from the free-range area. 
82 The SEPA benchmark for moderately offensive odours,98th percentile hourly mean
of 3.0 ouE/m3 over a one-year period, has been used to assess the impact of odour
emissions from the poultry unit at the sensitive receptors, as poultry facilities fall
within the moderately offensive category for the character, or hedonic tone of an
odour. 
83 The Atmospheric Dispersion Modelling System (ADMS) ‘ADMS6’ has been used to
predict the odour impacts of the proposed poultry unit. The meteorological data
used in this study is obtained from assimilation and short-term forecast fields of the
Numerical Weather Prediction system known as the Global Forecast System.
ADMS was effectively run four times; once for each of the four-year meteorological
record. Statistics for the annual 98th percentile hourly mean odour concentration at
each receptor were compiled for each of the runs and the results are in Table 2 of
the report. The predicted maximum annual 98th percentile hourly mean odour
concentration was the following at the identified sensitive receptors: 
 Receptor R1-Gloagburn Farmhouse = 1.17OUE/m3.
 Receptor R3- Roadside Cottage=0.98 OUE/m3.
 Receptor R7 to R14 Tibbermore ranged from 0.74 to 0.28 OUE/m3; and
 Receptor R16 to R20 – Powbridge ranged from 0.51 to 0.28 OUE/m3 . 
84 The report concluded that emission rates have been assessed and quantified
considering the internal odour concentrations and ventilation rates and estimated
emissions from the free-range area. The modelling undertaken predicted that at all
nearby residential properties assessed, odour exposure would be well below the
SEPA benchmark for moderately offensive odours.
Page 146 of 158

Page 147

Air Quality 
85 The LAQM (TG22) sets out screening criteria to determine the requirement for a
detailed air quality assessment if a poultry unit is mechanically ventilated and
houses more than 400,000 birds/200,000 birds (if naturally ventilated) and exposure
is within 100m from the unit. 
86 The closest residential receptor out with the applicant’s ownership boundary is
approximately 330m to the south, the unit is mechanically ventilated and is to house
32,000 birds. As such, a detailed assessment is not required as no significant risk of
exceeding the 24-hour mean PM10 objective because of PM10 emissions from the
poultry unit. 
87 Environmental Health were consulted and did not object to the development on
grounds of noise, odour, or air quality. Objections have been recommended relating
to plant noise (Condition 5), external lighting (Condition 6), servicing and deliveries
(Condition 7), audible reversing alarms (Condition 8), the submission of an
operational management plan (Condition 9), noise and odour complaint procedures
(Condition 10-11). 
Roads and Access 
88 Access to the site is proposed via the established farm access from the south, with
an extension to the existing access track to serve the development. This farm
access is taken from the existing junction on the C410. The vehicular access
arrangements for the existing agricultural operations already accommodate HGV
and other commercial non-HGV traffic. 
89 The applicant has confirmed that there are approximately: 8,000 hens per lorry,
32,000 hens per flock, thus 4 lorries per flock delivery every 60 weeks. 
90 During the normal operation of the site, there will be 5 vehicles accessing the site
per week (10 movements), relating to feed deliveries, egg collections and muck
removal. Of these movements, 3 are existing, servicing the existing units. Peak
traffic movements are generated at the beginning and end of each flock cycle when
the hens are delivered (4 lorries / 8 movements), and then again at the end of the
flock cycle, 60 weeks later for spent hen removal amounting to 4 lorries / 8
movements. In addition to the commercial traffic generation, the site will generate
car traffic associated with employees and visitors. The site will have one full time
workers resulting in 1 car / 2 movements per day. Visitors to the unit will include
vets and farm assurance inspectors, and these visits are likely to be every 3
months, generating limited additional private cars. 
91 The estimated increase in traffic volumes is not deemed a significant increase. The
development makes provision for staff parking and the parking and turning of HGVs. 
92 A condition relating to submission of a construction traffic management plan
(CTMP) has been applied (Condition 2). 
Page 147 of 158

Page 148

Drainage and Flooding 
93 According to SEPA flood maps, there is a likelihood of localised present-day and
future surface water and small watercourse flooding on sections of the access track
leading to the proposed facility and within the proposed free-range area. In addition,
there are a number of field drains in close proximity to the site. 
94 A flood risk and surface water management plan was submitted in support of the
application. The proposed impermeable area is approximately 5,960m2, which will
increase the likelihood of surface water run-off, this is to be mitigated through SuDS
provision with eight soakaways proposed. 
95 Structures and Flooding were consulted for this application and did not object to the
proposals. 
Conservation Considerations 
96 NPF4 Policy 7 (Historic Assets and Places) states that development proposals
affecting nationally important Historic Battlefields will only be supported where they
protect and, where appropriate, enhance their cultural significance, key landscape
characteristics, physical remains and special qualities. 
97 LDP2 Policy 30 (Protection, Promotion and Interpretation of Historic Battlefield)
states that the Council will seek to protect, conserve and, where appropriate,
enhance the key landscape characteristics and special qualities of those battlefields
listed on the Inventory of Historic Battlefields. 
98 The proposed development is located within a historic battlefield site (Battle of
Tippermuir). 
99 Historic Environment Scotland (HES) and Perth and Kinross Heritage Trust (PKHT)
were consulted and did not object to the proposals. 
Natural Heritage and Biodiversity 
100 NPF4 Policy 4 (Natural Places) states development proposals that are likely to have
an adverse effect on species protected by legislation will only be supported where
the proposal meets the relevant statutory tests. 
101 NPF4 Policy 3 (Biodiversity) states proposals for local development will include
appropriate measures to conserve, restore and enhance biodiversity, in accordance
with national and local guidance. Measures should be proportionate to the nature
and scale of development. 
Ecology 
102 No ecological survey information has been provided to inform the impact of the
proposed development on protected species and habitats. The photographs
included in the submitted Design, Access and Planning Statement show the existing
Page 148 of 158

Page 149

buildings that are to be demolished and replaced. They do not appear to have any
bat roost potential, and no survey is therefore required. The development site is
managed farmland, and the new building will occupy the same footprint, therefore
an ecological survey is not required. 
Biodiversity Enhancement 
103 The submitted design statement states that additional native tree and hedgerow
planting is proposed to strengthen boundaries and further reduce visual impact.
However, this is not shown on the submitted landscaping plan. 
104 The design statement also asserts that 16 hectare range area will be seeded with a
grass and wildflower mix to enhance biodiversity and soil health, providing
measurable environmental benefits. However, this seems to be intended to conform
with RSPCA and Freedom Food standards more than to provide biodiversity
enhancement. 
105 In the view of the council’s biodiversity officer this is not proportionate to the nature
and scale of development, and more biodiversity enhancement is required and is
conditioned below (Condition 3). Biodiversity advised that planting trees and hedges
to connect new and existing habitat would be welcomed as a positive contribution
towards biodiversity and nature networks. 
106 Conditions have been recommended relating to the submission of a revised detailed
landscaping and planting scheme prior to the commencement of development
(Condition 3), and tree & hedgerow retention (Condition 4). 
Developer Contributions 
Transport Infrastructure 
107 With reference to the above planning application the Council Transport
Infrastructure Developer Contributions Supplementary Guidance requires a financial
contribution towards the cost of delivering the transport infrastructure improvements
which are required for the release of all development sites in and around Perth. 
108 The site is located in the ‘reduced’ transport infrastructure contributions zone
(appendix 3 of the supplementary guidance). 
109 The supplementary guidance sets out that ‘…proposed buildings for agricultural use
… will generally not be required to make a contribution…’ (paragraph 6.9) 
110 The description of development notes that the proposal is for an agricultural
building, which is needed to operate the farm business, and therefore a transport
infrastructure developer contribution is not required. 
Page 149 of 158

Page 150

Economic Impact 
111 As mentioned above, the economic impact from the proposal includes expanding
production capacity in response to market demand, creating and supporting rural
employment, and strengthening local food networks through Gloagburn Farm Shop. 
Variation of Application Under Section 32A 
112 This application was not varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as amended.   
Planning Obligations and Legal Agreements 
113 None required. 
Direction By Scottish Ministers 
114 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
115 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations, and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this decision
notice, unless the development has been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019. 
2. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning Authority,
in consultation with the Roads Authority (Structures), a Construction Traffic
Management Plan (CTMP) which shall include the following:
Page 150 of 158

Page 151

a) restriction of construction traffic to approved routes and the measures to be put
in place to avoid other routes being used;
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse collection
is undertaken, on Sundays and during local events;
c) arrangements for liaison with the Roads Authority regarding winter
maintenance;
d) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
e) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
f) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
g) arrangements for signage at site accesses and crossovers and on roads to be
used by construction traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
h) details of information signs to inform other road users of construction traffic;
i) arrangements to ensure that access for emergency service vehicles are not
impeded;
j) co-ordination with other significant developments known to use roads affected
by construction traffic;
k) monitoring, reporting and implementation arrangements; 
l) arrangements for dealing with non-compliance; and
m) details of HGV movements to and from the site.   
The CTMP as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of road safety 
3. Prior to the commencement of the development hereby approved, a revised
detailed landscaping and planting scheme for the site shall be submitted for the
further written agreement of the Council as Planning Authority.  The scheme shall
include details of the species, height, size, location, density and maintenance
regime of trees and shrubs to be planted. The scheme shall include native tree and
hedgerow planting to strengthen boundaries and reduce visual impact. The scheme
as subsequently approved shall be carried out and completed within the first
available planting season (October to March) after the completion or bringing into
use of the development, whichever is the earlier. The approved scheme shall
thereafter be maintained, with any planting which fails to become established within
five years being replaced in the following planting season with others of a size and
species as previously approved.   
Reason- In the interests of protecting environmental quality and of biodiversity. 
4. All trees and hedgerows on site shall be retained. 
Reason- In the interests of protecting environmental quality and of biodiversity.
Page 151 of 158

Page 152

5. All plant or equipment shall be so enclosed, attenuated and/or maintained such that
any noise therefrom shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows slightly open, when measured
and/ or calculated and plotted on a rating curve chart. 
Reason - To safeguard neighbouring residential amenity in the area. 
6. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does not adversely affect the
amenity of the neighbouring land. 
Reason - To safeguard neighbouring residential amenity in the area. 
7. Servicing of and deliveries to the premises, except for livestock removal, shall be
carried out between 0800 and 1800 Monday to Sunday only. 
Reason - To safeguard neighbouring residential amenity in the area. 
8. Audible vehicle reversing alarms shall be operated on the method that they only
emit the warning, if necessary, e.g., on an infrared signal which detects persons to
the rear of the vehicle. 
Reason - To safeguard neighbouring residential amenity in the area.
9. Prior to the development being brought into use an Operational Management Plan
shall be submitted for the written approval of the planning authority. The plan shall
include all sources of noise, dust and odour associated with the premise, including
vehicle and forklift noise and the measures that will be put in place to minimise
and/or control noise, dust, and odour. The plan shall be reviewed on a regular basis
or, following receipt of a justified complaint or at the request of the planning
authority. Once the Operational Management Plan has been approved, it shall be
fully implemented for the lifetime of the development. 
Reason - To safeguard neighbouring residential amenity in the area. 
10. Should any aspect of the development result in verified noise complaint determined
by the Council as Planning Authority in consultation with Environmental Health,
within 14 days of written request by the Council as Planning Authority, the applicant
shall arrange for a Noise Impact Assessment by a suitably qualified noise
consultant with the scope and timescale submitted to and agreed in writing with the
Council as Planning Authority in consultation with Environmental Health. Thereafter
any agreed mitigation measures shall be implemented to ameliorate the nuisance. 
Reason - To safeguard neighbouring residential amenity in the area. 
11. Should any aspect of the development result in verified odour complaint determined
by the Council as Planning Authority in consultation with Environmental Health,
Page 152 of 158

Page 153

within 14 days of written request by the Council as Planning Authority, the applicant
shall arrange for an Odour Impact Assessment (OIA) to be carried out by a qualified
consultant. The OIA findings shall be submitted for the written approval of the
Council as Planning Authority, in consultation with Environmental Health and must
draw conclusions and make recommendations, as necessary. Thereafter any
necessary measures to ameliorate the odour nuisance should be put in place, and a
new or revised Operational Management Plan must be submitted to the council
within a specified agreed timescale. 
Reason - To safeguard neighbouring residential amenity in the area. 
Justification 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable. 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the planning
authority prior written notification of the date on which it is intended to commence
the development.  A failure to comply with this statutory requirement would
constitute a breach of planning control under section 123(1) of that Act, which may
result in enforcement action being taken.  Please use the form attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. Existing buildings or structures may contain nesting birds between 1 March and
31 August inclusive. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an offence to remove, damage
or destroy the nest of any wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence against prosecution
under this Act. 
4. The presence of protected species, and the extent to which they could be affected
by the proposed development, should be established before works commence. 
Should protected species be identified within the site the developer should ensure
that all appropriate measures required to comply with the relevant legislation are
carried out. 
Page 153 of 158

Page 154

5. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
6. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. In
accordance with Regulation 41 the notice must be:
- Displayed in a prominent place at or in the vicinity of the site of the development 
- Readily visible to the public 
- Printed on durable material. 
Background Papers
Letters of representation 6 objections, including 1 additional
comment 
Authors
Name Designation Contact Details
Adam Cairns Planning Officer
(Locals Team)
01738 475300
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local Developments) 29 April 2026 
Page 154 of 158

Page 155

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/01855/FLL
Erection of a replacement agricultural building for continued free-range egg
production and associated works Gloagburn Farm, Tibbermore, Perth, PH1 1QLScale
1:25,000
5(2)(iii)
Page 155 of 158

Page 156

Page 156 of 158

Page 157

¯
© Crown copyright [and database rights] [2026] OS
AC0000805756. You are permitted to use this data
solely to enable you to respond to, or interact with,
the organisation that provided you with the data.
You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Planning and Placemaking
Committee - 13 May 2026
25/01855/FLL
Erection of a replacement agricultural building for continued free-range egg
production and associated works Gloagburn Farm, Tibbermore, Perth, PH1 1QLScale
1:10,000
5(2)(iii)
Page 157 of 158

Page 158

Page 158 of 158