Minute of meeting of 15 April 2026

Perth and Kinross Council · 13 May 2026
Back to Planning and Placemaking Committee — 13 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 15 April 2026 at 9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, Bailie R Brock (substituting
for Councillor D Cuthbert), K Harvey, D Illingworth, I James, I MacPherson (substituting
for Councillor R Watters) Bailie C McLaren and M Frampton (substituting for Bailie
M Williamson). 
In Attendance: L McLean, C Morilly, S Panton, L Reid, K Smith, N Sworowski; and
P Williamson (all Economy, Development and Planning); A Brown, C Elliott, S Dockerill
and E Ferguson (all Legal and Governance). 
Apologies: Councillors D Cuthbert, R Watters and Bailie M Williamson. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted apologies
as above.   
2. Declarations of Interest 
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct. 
3. Minutes 
The minute of meeting of the Planning and Placemaking Committee of 11 March
2026 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
25/01826/FLM 5(1)(ii)
25/01273/FLL 5(2)(i)
25/01587/FLL 5(2)(ii)
25/01671/FLL 5(2)(iii)

Page 2

5. Applications For Determination 
(1) Major Applications 
(i) 25/01582/42M - Section 42 to vary condition 2 (period within
which development should commence) of permission
22/01071/FLM - Battery Energy Storage System (BESS), land
170 metres south of Newhouse Farm, Perth (Report No. 26/90) 
Sean Panton, Team Leader, requested minor amendments to
conditions, mainly to update document and condition references. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
General
1.  This planning permission will last only for three years from
the date of this decision notice unless the development has
been lawfully started within that period. 
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997.
Biodiversity and Landscape
2.  The conclusions and recommended action points within the
supporting biodiversity survey submitted and hereby
approved (document(s) 21 relates) shall be fully adhered to,
respected and undertaken as part of the construction phase
of development.
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite.
3.  An updated ecology survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the ecology survey approved
as part of this permission. The updated survey shall be
submitted to the Council as Planning Authority for written
agreement, in consultation with PKC Biodiversity Officer,
and works shall not commence until after such written
agreement has been issued by the Council.
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite. 
4.  Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted to and approved in writing by the
Planning Authority. The scheme shall include details of the
height and slopes of any mounding or recontouring of the
site, full details of all hard landscaping proposals including
materials and installation methods and, species, height, size
and density of trees and shrubs to be planted. The scheme
as subsequently approved shall be carried out and

Page 3

completed within the first available planting season (October
to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority
within 7 days of that date. The scheme as agreed and
implemented shall thereafter be sufficiently maintained
Reason - In the interests of visual amenity and to ensure the
satisfactory implementation of the proposed planting
scheme. 
5.  Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, 10 bird nesting
boxes and 10 bat roosting boxes shall be provided within the
site as part of the approved landscape scheme, (Condition
4). The size, type and locations of the nesting and roosting
boxes shall be submitted to the Council as Planning
Authority for approval prior their placement onsite.
Thereafter, the agreed boxes shall be maintained in a
reasonable condition in perpetuity for the life of the
development
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite.
6.  The conclusions and recommended action points within the
supporting Preliminary Ecological Survey dated 26
November 2020, (Document 17) and Supporting Statement
dated 29 November 2022, prepared by Overland
Environmental Ltd, (Document 20), submitted and hereby
approved shall be fully adhered to, respected and
undertaken as part of the construction phase of
development, to the satisfaction of the Council as Planning
Authority. A written statement confirming and or setting out
the physical means of compliance with these mitigation
points shall be submitted to the Council as Planning
Authority prior to works commencing onsite. 
Reason - In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite. 
Noise
7.  All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality. 
8.  In the event of a justified noise complaint being received by
the Council the operator shall, at its own expense, employ a
consultant approved by the Planning Authority to carry out a

Page 4

noise assessment to verify compliance with condition 7. The
assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority. If
the noise assessment shows that the noise levels do not
comply with condition 7 a scheme of noise mitigation shall
be included with the noise assessment, specifying
timescales for the implementation of the scheme and shall
be submitted to the Planning Authority within 28 days of the
assessment. The mitigation scheme shall thereafter be
implemented in accordance with the approved scheme and
timescales. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality. 
9.  The hours of construction activity shall be restricted to
between 0700 hours and 1900 hours Monday to Saturday
only, with no construction activity permitted on Sundays. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
Lighting 
10.  All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
residential property and that light spillage beyond the
boundaries of the site is minimised. In association, the
operation of the lighting shall be controlled so as to only be
triggered by motion within the security fenced boundaries of
the site. 
Reason - In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
Roads and Transportation
11.  Prior to the commencement of works associated to the
hereby approved development, a Construction Traffic
Management Scheme (TMS) shall be submitted for the
written approval of the Planning Authority, such TMS shall
include details of the following: (a) restriction of construction
traffic to approved routes and the measures to be put in
place to avoid other routes being used; (b) timing of
construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when
refuse collection is undertaken, on Sundays and during local
events; (c) a code of conduct for HGV drivers to allow for
queuing traffic to pass; (d) arrangements for liaison with the
Roads Authority regarding winter maintenance; (e)
emergency arrangements detailing communication and
contingency arrangements in the event of vehicle
breakdown; (f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from construction
sites associated with the development being deposited on
the road; (g) arrangements for cleaning of roads affected by
material deposited from construction sites associated with
the development; (h) arrangements for signage at site
accesses and crossovers and on roads to be used by

Page 5

construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians; (i) details of
information signs to inform other road users of construction
traffic; (j) arrangements to ensure that access for emergency
service vehicles are not impeded; (k) co-ordination with
other significant developments known to use roads affected
by construction traffic; (l) traffic arrangements in the
immediate vicinity of temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to the
commencement of construction; (n) monitoring, reporting
and implementation arrangements; (o) arrangements for
dealing with non-compliance; and (p) details of HGV
movements to and from the site. The TMS as approved shall
be strictly adhered to during the entire site construction
programme all to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of road safety.
12.  The proposed route for any abnormal loads on the trunk
road network must be approved in writing prior to any such
movements being undertaken. Where any abnormal loads
are required to be undertaken in implementing the
development hereby approved, a written program of those
movements shall be submitted to the Council as Planning
Authority for approval in consultation with Transport
Scotland. Thereafter, any such movements shall be
undertaken in accordance with the agreed program of
movements, including any mitigation measures required.
Any accommodation measures required including the
removal of street furniture, junction widening, traffic
management must similarly be approved and should be
included with any written program of works. 
Reason - To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk road
network.
13.  Any additional signing or temporary traffic control measures
deemed necessary due to the size or length of loads being
delivered to the development hereby approved must be
undertaken by a recognised Quality Assured traffic
management consultant, to be approved in writing by the
Council as Planning Authority for approval in consultation
with Transport Scotland. The approval of any such
management consultant shall be agreed prior to the
placement or implementation of any signage and or traffic
control measures. 
Reason - To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk road
network.
External Finishes
14.  Prior to the commencement of the development hereby
approved, details of the specification and colour of the

Page 6

proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority. The scheme as agreed shall be
implemented prior to the completion or bringing into use of
the development, whichever is the earlier. 
Reason - In the interests of visual amenity
Dust
15.  Prior to the commencement of construction for the
development a Dust Management Plan shall be submitted
for the written approval of the Planning Authority, in
consultation with Environmental Health. The plan shall
outline all construction activities that has the potential to
cause dust and shall state methods and procedures to
minimise the dust.  Thereafter, the agreed scheme shall be
implemented in full for the duration of the construction
period.
Reason - In the interests of residential amenity and to
ensure a satisfactory standard of local environmental quality. 
Archaeology
16.  Development shall not commence until the developer has
secured the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation
acceptable to the Council as Planning Authority, during
development work. The retained archaeological organisation
shall be afforded access at all reasonable times and allowed
to record and recover items of interest and finds. The name
of archaeological organisation retained by the developer
shall be given to the Planning Authority and Perth and
Kinross Heritage Trust in writing not less than fourteen days
before the commencement date provided in the Notice of
Initiation of Development. 
Reason - To ensure a programme of archaeological works is
carried out to safeguard and record any archaeological
remains within the development area. 
Paths
17.  The right of way, located within the site access road and
shown on approved drawing 22/01071/05 must not be
obstructed during building works or on completion of the
development. Any damage done to the route and/or the
associated signage during building works must be made
good before the development is completed or brought into
use, whichever is the earlier. 
Reason - To ensure that public access is maintained at all
reasonable times, to the local path network. 
Facility Lifespan 
18.  In the event the hereby approved development fails to store
electricity on a commercial basis for a continuous period of
12 months, or 50 years from the date of commencement of
development, whichever is sooner, then it shall be deemed
to have permanently ceased to be required. In such an
event the development shall be decommissioned, and the

Page 7

relevant parts of the site reinstated within such timescale as
agreed in writing by the Council as Planning Authority. 
Reason - To ensure the facility is removed from the site at
the end of its operational life, and to protect the character of
the countryside, the visual amenity of the area and nature
conservation interests. 
Drainage
19.  Prior to the installation of any drainage works within the
development hereby approved, the final technical drainage
designs shall be submitted to, and approved in writing by,
the Planning Authority in consultation with the Council's
Structures and Flooding team. The drainage details as
approved shall be carried out in accordance with the agreed
scheme and operational prior to bringing into the use of the
approved phase of development. 
Reason - In order to safeguard any offsite drainage impacts
of the development and in the interests of public safety. 
20.  The discharge volume and rate from the proposed onsite
drainage system shall not exceed existing greenfield levels.
Compliance with this condition shall be demonstrated
through the provision of a drainage report in compliance with
Condition 19. 
Reason - In order to safeguard any offsite drainage impacts
of the development and in the interests of public safety. 
Soils
21.  All soils excavated in the course of the development hereby
approved shall be retained onsite and repurposed unless
otherwise approved in writing by the Council as Planning
Authority. Prior to the development hereby approved
commencing, a Soil Management Statement shall be
submitted to the Council as Planning Authority for approval
in writing. This Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be
reused and or managed onsite. All excavation and
repurposing of soil shall then proceed in accordance with
the agreed Statement. 
Reason - In the interests of appropriately managing prime
quality soils and minimising the long-term impacts of
developing the site in accordance with Policy 51 of the
LDP2. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to

Page 8

commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.
2. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has
two months to consider the information.  You should
therefore submit the required information more than two
months before your permission expires.  We cannot
guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with
before your permission lapses.
3. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (tel: 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
4. The applicant is advised that, in terms of Sections 56 of the
Roads (Scotland) Act 1984, he/she/they must obtain from
the Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works.
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment
Protection Agency.
5. The presence of protected species, and the extent to which
they could be affected by the proposed development, should
be established before works commence.  Should protected
species be identified within the site the developer should
ensure that all appropriate measures required to comply
with the relevant legislation are carried out.
6. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.
7. The granting of planning permission does not stop the
continued right of public access along the existing core path
METH 34/15 Ruthvenpark Path.  An order under the Town
and Country Planning (Scotland) Act 1997, Section 208 or
an amendment of the Core Path Plan under the Land

Page 9

Reform (Scotland) Act 2003 should be sought in advance of
any works authorised by this planning permission being
commenced.  All relevant approvals should be in place prior
to any stopping up and diversion of the core path taking
place.
8. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development. https://www.pkc.gov.uk/ldp2floodrisk.
9. No work shall be commenced until an application for
building warrant has been submitted and approved.
10. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance. In accordance with Regulation
41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the
site of the development Readily visible to the public
Printed on durable material.
11. Existing buildings or structures may contain nesting birds
between 1 March and 31 August inclusive.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981,
as amended (Section 1), it is an offence to remove, damage
or destroy the nest of any wild bird while that nest is in use
or being built.  Planning permission for a development does
not provide a defence against prosecution under this Act. 
(ii) 25/01826/FLM - Formation of 2 all-weather sports pitches,
erection of spectator stand and fencing, installation of
floodlighting and associated works, Jeanfield Swifts Stadium,
Bute Drive, Perth, PH1 3BG (Report No. 26/91) 
Bailie C Ahern, Local Member, objecting, Ms P MacIntosh, on
behalf of North Muirton Community Council, Objectors and
Mr D Swan, on behalf of Your North Muirton, Objectors followed by
Mr R Gunnion, on behalf of Jeanfield Swifts Community Football
Club, addressed the Committee and answered members
questions. 
Resolved:
Grant, subject to the following terms, conditions (including
amended wording of Condition 11) and informatives: 
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.

Page 10

Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
Residential Amenity
2. The hours of operation shall be restricted to 0800 hours to
2200 hours daily.
Reason - To safeguard the neighbouring residential amenity
in the area.
3. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land by
complying with the ILP ‘Guidance notes for the Reduction of
Obtrusive Light’ Environmental Zone 3 Levels.
Reason - To safeguard the neighbouring residential amenity
in the area.
4. Prior to the commencement of the development, a noise
management plan shall be submitted for the written approval
of the planning authority. The plan shall include all sources
of noise associated with the use of the synthetic pitches,
including user noise and activity noise and the measures
that will be put in place to minimise and/or control noise. The
plan shall be reviewed on a regular basis or, following
receipt of a justified complaint or at the request of the
planning authority. Once the noise management plan has
been approved, it shall be fully implemented for the lifetime
of the development.
Reason - To safeguard the neighbouring residential amenity
in the area.
5. No music shall be played through the PA/tannoy system,
and the system shall be limited to safety announcements
only.
Reason - To safeguard the neighbouring residential amenity
in the area.
6. An acoustic fence as detailed in Sections 4.35 – 4.37 of the
noise impact assessment (NIA) (document no. 23 relates)
and shown on drawing no. 33 shall be installed prior to the
development being brought into use.
Reason - To safeguard the neighbouring residential amenity
in the area.
7. Noise mitigation measures as detailed in Section 4.38 of the
noise impact assessment (NIA) (document no. 23 relates)
shall be installed prior to the development being brought into
use.
Reason - To safeguard the neighbouring residential amenity
in the area.
Transport
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written

Page 11

agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
construction traffic management scheme (TMS) which shall
include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used; 
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events; 
(c) arrangements to ensure that access for emergency
service vehicles are not impeded; and
(d) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the
entire site construction programme. 
Reason - In the interest of proper site management.
9. The core path which forms part of the track must not be
obstructed during building works or on completion.  Any
damage done to the core path and associated signage
during building works shall be made good.  Any temporary
restrictions to public access required to facilitate works on
site must be agreed in writing first with the Access Officer.
Reason - In the interests of public access along the core
path.
10. The existing car park must be fully surfaced and lined to
provide the 63 spaces, together with the coach turning area
containing 5 parking spaces and the 11-space overflow
parking area. All of these areas must be completed and
available for use prior to either of the all-weather sport
pitches being brought into use.
Reason - In the interests of traffic management.
11. Prior to the completion or bringing into use of the
development, whichever is the earlier, a match day traffic
management plan must be submitted to the Council as
Planning Authority, in consultation with the Roads Authority,
for written approval. The match day traffic management plan
shall ensure that all users and visitors of the facility are
aware of parking arrangements, this will cover details of:
 How access to the allotments on the riverside access
track will be maintained.
 If large crowds are expected (over 100 spectators
across the site at any given time), access to the
parking at surrounding schools is provided and all
users and visitors are made aware that this is
available.
 What measures will be in place on match days to
ensure compliance with the match day traffic
management plan.  For the avoidance of doubt,

Page 12

relevant stewardship should be included as part of
the management plan.
Thereafter, the agreed plan shall be implemented in full
accordance on each match day.
Reason - In the interests of road safety and proper traffic
management.
Natural Heritage and Biodiversity
12. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the approved
plans) and those which have Root Protection Areas which
fall within the site shall be retained and protected. Protection
methods shall be strictly in accordance with BS 5837 2012:
Trees in Relation to Design, Demolition and
Construction.  Protection measures, once in place, shall
remain in place for the duration of construction.
Reason - To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority.
13. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted for the further written agreement
of the Council as Planning Authority.  The scheme shall
include:
(a) confirmation of tree and hedge planting as
compensatory planting for tree loss
(b) confirmation of tree and hedge planting as
biodiversity enhancement
(c) details of the species, height, size, location, density
and maintenance regime of trees and shrubs to be
planted. 
The scheme as subsequently approved shall be carried out
and completed within the first available planting season
(October to March) after the completion or bringing into use
of the development, whichever is the earlier. The approved
scheme shall thereafter be maintained, with any planting
which fails to become established within five years being
replaced in the following planting season with others of a
size and species as previously approved. 
Reason - In the interests of visual amenity and to ensure the
satisfactory implementation of a compensatory planting
scheme.
14. The conclusions and recommended action points within the
supporting ecological survey submitted and hereby
approved (document no. 28 relates) shall be fully adhered
to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental quality
and of biodiversity.
15. An updated ecology survey will be required prior to the
commencement of works, if works have not commenced

Page 13

within 24 months of the date of the ecology survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason - In the interests of protecting environmental quality
and of biodiversity.
16. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, three swift and
three sparrow nesting boxes shall be provided on the
existing clubhouse, and six bat boxes shall be provided on
suitable nearby trees. Thereafter, the agreed scheme shall
be maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning
Authority.
Reason - In the interests of protecting environmental quality
and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken. Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position. Please use the form attached
herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended.  The form of the
notice is set out in Schedule 7 of the Regulations and a draft
notice is included for your guidance.  In accordance with
Regulation 41 the notice must be:
Displayed in a prominent place at or in the vicinity of the site
of the development Readily visible to the public Printed on
durable material.

Page 14

4. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two months
of the expiry date of your permission will be able to be dealt
with before your permission lapses.
5. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive.  Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The presence of protected species, and the extent to which
they could be affected by the proposed development, should
be established before works commence.  Should protected
species be identified within the site the developer should
ensure that all appropriate measures required to comply
with the relevant legislation are carried out.
7. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
(The Committee took a short recess and then reconvened.)

Page 15

(2) Local Application 
(i) 25/01273/FLL - Siting of residential caravan (for a temporary
period) (in retrospect), land 250 metres north of The
Farmhouse, Easter Muirhead Farm, Blairingone, Dollar, FK14
7ND (Report No. 26/92) 
Mrs V Humphreys, objector, followed by Miss A Anderson,
applicant, addressed the Committee and answered members
questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. The caravan is approved for a temporary period only until
31 March 2028. Upon expiry of this temporary period the
caravan shall be removed from the site and the site returned
to its original condition to the satisfaction of the Council as
Planning Authority.
Reason - In view of the temporary nature of the caravan and
to enable the Planning Authority to review the circumstances
pertaining to the proposal within a reasonable period of time.
2. The hours of operation of the generator shall be restricted to
between 0800 hours and 1900 hours Monday to Saturday
only, with no operations permitted on Sundays. 
Reason - In order to safeguard the residential amenity of the
area.
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the residential amenity of the
area.
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of the
area.
5. The applicant shall ensure the private water supply for the
development complies with the Water Scotland Act 1980
(Section 63), The Private Water Supplies (Scotland)
Regulations 2006 and The Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations
2017.  In so doing, the applicant shall submit detailed
information regarding the private water supply to Perth and

Page 16

Kinross Council Environmental Health by 31 May 2026,
including the nature, location and adequacy of the source,
any storage tanks/ pipework and the filtration and
disinfection treatment to ensure provision of an adequate
and consistently wholesome water supply.
Reason - To ensure the new development has an adequate
and consistently wholesome supply of water and to maintain
water quality and supply in the interests of residential
amenity and ensure the private water supply of neighbours
of the development remain accessible for future
maintenance.
6. Full details of how drainage is managed on site including
wastewater associated with the caravan shall be submitted
by 31 May 2026 for the written approval of the Council as
Planning Authority. 
Reason - To ensure the provision of effective drainage for
the site.
7. Details of the location and measures proposed for the
safeguarding and continued operation, or replacement, of
any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water
supply pipes serving properties in the vicinity, sited within
and running through the application site, shall be submitted
by 31 May 2026 for approval in writing by the Council as
Planning Authority.  The subsequently agreed protective or
replacement measures shall be put in place and thereafter
be so maintained insofar as it relates to the development
hereby approved.
Reason - To ensure existing water and drainage
infrastructures are not compromised. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. The proposed development lies within a coal mining area
which may contain unrecorded coal mining related hazards. 
If any coal mining feature is encountered during
development, this should be reported immediately to the
Coal Authority on 0345 762 6848.
Further information is also available on the Coal Authority
website at: www.gov.uk/government/organisations/the-coal-
authority. 
2. Dam Wood to the north of the site is designated as ancient
woodland (ID 33214). Native Woodlands are protected
through NPF4 Policy 6.
3. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are

Page 17

honoured throughout and after completion of the
development.
4. The applicant should take note of the information and advice
contained within the consultation response from Scottish
Gas Network. 
(ii) 25/01587/FLL - Erection of raised viewing platform, including a
glazed dome, safety barrier, formation of steps and associated
works, land 90 metres north west of Lochside Cottage,
Kenmore, Aberfeldy, PH15 2HW (Report No. 26/93) 
Mr W Lindsay, objector on behalf of Kenmore Community Council,
followed by Mr E Strickland, applicant, addressed the Committee
and answered members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. No development shall take place on site until a Construction
Method Statement has been submitted to and approved in
writing by the Council as Planning Authority. The
Construction Method Statement shall outline the measures
to protect watercourses and residential receptors from the
impact of pollution, sediment and dust to ensure no adverse
effects. The approved Construction Method Statement shall
thereafter be implemented as part of the construction phase
of the development.
Reason - In the interests of protecting environmental quality
and of biodiversity.
3. No development shall take place on site until a Construction
Traffic Management Scheme (TMS) has been submitted to
and approved in writing by the Council as Planning
Authority, in consultation with the Roads Authority
(Structures). The TMS shall include the following:
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b. timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c. arrangements to ensure that access for emergency
service vehicles are not impeded;

Page 18

d. details of information signs to inform other road users
of construction traffic;
e. traffic arrangements in the immediate vicinity of the
site to ensure that deliveries to site are not
undertaken from the public road network; and
f. details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during the
entire site construction programme.
Reason - In the interest of proper site management.
4. Prior to the development being brought into use, a Noise
Management Plan shall be submitted to and approved in
writing by the Council as the Planning Authority. The plan
shall include all sources of noise associated with the
premises, including patron noise and the measures that will
be put in place to minimise and/or control noise. The plan
shall be reviewed on a regular basis or following receipt of a
justified complaint or at the request of the Planning
Authority. The Noise Management Plan as approved shall
be fully implemented for the lifetime of the development.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
5. Prior to the development being brought into use, details of
two gates to be installed at the proposed diving board and
external staircase to the water’s edge shall be submitted to
and approved in writing by the Council as the Planning
Authority. The details as approved shall be fully
implemented prior to the development being brought into
use, and maintained in good working order for the lifetime of
the development.
Reason - In the interests of public safety.
6. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
7. No amplified music shall be permitted within the dome at
any time. No music, amplified or otherwise, shall be
permitted at any time in any associated external area.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
8. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land by
complying with the ILP ‘Guidance notes for the Reduction of
Obtrusive Light’ Environmental Zone 1 Levels.

Page 19

Reason - In order to safeguard the neighbouring residential
amenity in the area.
9. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, two bird nesting
boxes shall be provided on nearby buildings or trees within
the applicant's control. Thereafter, the agreed scheme shall
be maintained in a reasonable condition for the life of the
development.
Reason - In the interests of protecting environmental quality
and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith.
3. An application for Building Warrant may be required.
4. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development. https://www.pkc.gov.uk/ldp2floodrisk
5. A variation of the existing alcohol licence for the wider resort
development may be required to lawfully serve alcohol
within the development which has been hereby granted
planning permission.  The developer should contact
LiquorLicensing@pkc.gov.uk for further information.
6. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town and
Country Planning (Scotland) Act 1997, as amended.  The
variations incorporate changes to provide additional clarity
regarding the proposal.
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be

Page 20

submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk. 
The Council has two months to consider the information. 
You should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two months
of the expiry date of your permission will be able to be dealt
with before your permission lapses. 
(iii) 25/01671/FLL - Erection of dwellinghouse, alterations to
assess track and associated works, land north of The Croft,
Fearnan, Aberfeldy, PH15 2PF (Report No. 26/94) 
Ms J Robertson, on behalf of Glen Lyon and Loch Tay Community
Council, objector (via telephone), followed by Mr R Johnston, agent
on behalf of the applicant, addressed the Committee and answered
members questions. 
Resolved:
Grant, subject to the following terms, conditions and informatives: 
Conditions
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. Prior to commencement of any works on site, the relocated
passing place shown on Drawing 03 shall be provided in
accordance with the approved plans to the satisfaction of
the Planning Authority.
Reason - In the interests of pedestrian and traffic safety
3. Prior to the commencement of development a biodiversity
enhancement scheme and a replacement tree plan using
selected standard size tree stock, planted within prepared
tree pits, staked, and securely tied.  Tree species to be silver
birch/rowan/hawthorn, details on the hedge and boundary
fencing shall be submitted to and agreed in writing by the
Council as Planning Authority.  The agreed scheme shall be
completed prior to the occupation or completion of the
dwelling, whichever is sooner, and thereafter be maintained
in a reasonable condition for the life of the development, to
the satisfaction of the Council as Planning Authority.

Page 21

Reason - In the interests of protecting environmental quality
and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this application. 
The legal agreement should be concluded and completed within 4
months of the date of any Committee approval.  Failure to conclude
a legal agreement within 4 months will result in the planning
application being re-assessed through failing to comply with the
associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith. 
3. No work shall be commenced until an application for
building warrant has been submitted and approved. 
4. Application for a new postal address should be made via the
Street Naming and Numbering page on the Perth & Kinross
Council website at www.pkc.gov.uk/snn.  Please note there
is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved.
5. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests. 
6. The Air Source Heat Pump shall be certificated in
accordance with Microgeneration Certification Scheme 007
and installed by an installation company certificated in
accordance with Microgeneration Installation Standard 3005
and in compliance with the calculation procedure contained

Page 22

in Table 2 of Microgeneration Certification Scheme Planning
Standards (MCS 020), confirming that the permitted
development noise limit of 42 dB LAeq, 5 mins will be met.
In addition, the Air Source Heat Pump shall be so enclosed,
attenuated and/or maintained such that any noise therefrom
shall not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
7. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town and
Country Planning (Scotland) Act 1997, as amended.  The
variations incorporate changes to clarify site levels,
section/house sections, drainage. 
(iv) 25/01834/FLL - Erection of staff accommodation unit, amenity
building, café, formation of outdoor seating area, car park and
associated works, Moor of Rannoch Hotel, Rannoch, Pitlochry,
PH17 2QA (Report No. 26/95) 
This application was withdrawn from the agenda. 
6 Proposal of Application Notices (PoAN) 
6(i) 26/00001/PAN - Residential development, landscaping and
associated infrastructure (part allocated site H14), land 150 metres
south west of Kintillo Cemetery (H14), Bridge of Earn (26/96) 
Councillor D Illingworth requested that officers consider access to the site
and whether or not two entrance/exit roads, one from the Wick O Baiglie
Road and one from the Meadows are required. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted. 
6(ii) 26/00002/PAN - Formation of mixed leisure and visitor development
comprising erection of holiday accommodation units, formation of
hub/spa facility, indoor and outdoor recreational areas,
footpath/cycleway link, vehicular access, parking, landscaping and
associated infrastructure, land 400 metres west of Tarnhill,
Milnathort (26/97) 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.

Page 23

6(iii) 26/00003/PAN - Erection of hydrogen production facilities and
associated works, land 1.4km north west of Beannie Farm, Braco,
Dunblane, FK15 9LL (26/98) 
Councillor K Allan requested that consideration be given to the cumulative
impacts with the SSEN substation, construction traffic and the suitability of
the site access; along with possibility that making hydrogen will cause
acid rain. 
Councillor K Harvey requested that full details are submitted to HSE for
their consideration to allay fears of this type of development. 
Councillor I James requested that consideration is given to the safe
distances of the development from other infrastructure for safety reasons. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.