Page 1

Ambition | Compassion | Integrity
Our vision is for
a Perth and Kinross where everyone can live life
well, free from poverty and inequality
Council Building
2 High Street
Perth
PH1 5PH
02/03/2026
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 11 March 2026 at 09:30.
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk.
THOMAS GLEN
Chief Executive
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode.
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting.
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Bailie Claire McLaren
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 142

Page 2

Page 2 of 142

Page 3

Planning and Placemaking Committee
Wednesday, 11 March 2026
Agenda
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct.
1 WELCOME AND APOLOGIES/SUBSTITUTES
2 DECLARATIONS OF INTEREST
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 11 FEBRUARY 2026 FOR
APPROVAL
(copy herewith)
5 - 48
4 DEPUTATIONS
5 APPLICATIONS FOR DETERMINATION
5(1) MAJOR APPLICATIONS
5(1)(i) 25/00984/FLM - FORMATION OF A TRACK COMPRISING A
RUNNING SURFACE OF APPROXIMATELY 1.2 KILOMETRES
IN LENGTH, BRIDGE, ACCESS, LAYDOWN/WORK
COMPOUND AREA(S), DRAINAGE, LANDSCAPING AND
OTHER ANCILLARY WORKS, LAND 360 METRES NORTH OF
GLASSICK FARM, BRACO, DUNBLANE, FK15 9QZ
Report by Development Management and Building Standards
Service Manager (copy herewith 26/63)
49 - 108
5(1)(ii) 25/01441/42M - SECTION 42 TO MODIFY CONDITION 8
(FINISHED FLOOR LEVELS) OF PERMISSION 22/01827/AMM,
MORRIS LESLIE, ERROL AIRFIELD, GRANGE, ERROL,
PERTH, PH2 7TB
Report by Development Management and Building Standards
Service Manager (copy herewith 26/64)
109 - 128
5(2) LOCAL APPLICATIONS
Page 3 of 142

Page 4

5(2)(i) 18/02341/FLL - CHANGE OF USE OF AGRICULTURAL LAND
TO FORM EXTENSION TO GYPSY/TRAVELLER PITCH,
ERECTION OF KENNELS, AMENITY BLOCK, FENCE AND
ASSOCIATED WORKS (IN PART RETROSPECT), 4B
GREENACRES, BLAIRADAM, KELTY, KY4 0JA
Report by Development Management and Building Standards
Service Manager (copy herewith 26/65)
129 - 142
Page 4 of 142

Page 5

DRAFT
Planning and Placemaking Committee
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 11 February 2026 at 9.30am.
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, D Cuthbert, K Harvey
D Illingworth, I James, Bailie C McLaren, R Watters, and Bailie M Williamson.
In Attendance: L McLean, C Morilly, S Panton, L Reid, K Smith, and P Williamson (all
Economy, Development and Planning); A Brown, G Fogg, C MacLeod and M Pasternak
(all Legal and Governance).
Councillor I Massie, Convener, Presiding.
1. Welcome and Apologies
The Convener welcomed everyone present to the meeting and noted apologies
as above. 
2. Declarations of Interest
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct.
3. Minutes
The minute of meeting of the Planning and Placemaking Committee of 7 January
2026 was submitted and approved as a correct record.
4. Deputations
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications:
Planning Application No. Item No.
25/00685/FLM 5(2)(i)
25/00824/FLM 5(2)(ii)
25/00725/FLL 5(3)(i)
5. Applications For Determination
(1) Section 36 Consultations
(i) 25/01007/ECU36 - Erection of 13 turbine windfarm and
associated works - ECU00004782, land 6000 metres south of
Longfauld, Blackford, Auchterarder, PH4 1QU (Report No.
26/38)
Motion (Councillors I Massie and B Brawn)
3
Page 5 of 142

Page 6

DRAFT
Offer no objection to the proposal and request the imposition of the
following suggested conditions:
Suggested Conditions
Commencement of Development
1. The Development must be commenced no later than three
years from the date of this planning permission.
Written confirmation of the intended date of Commencement
of Development shall be provided to the Planning Authority
no later than one calendar month before that date.
Reason - Section 58 of the Town and Country Planning
(Scotland) Act 1997 requires a condition to be attached to
permissions limiting their duration. Three years is the default
period set by law and there is no material reason indicating
that a different period should be set.
Design of Wind Turbines
2. (1) No turbines shall be erected until details and
specification of the proposed wind turbines (including the
size, make and model, power rating and sound power
levels, nameplate generating capacity, type, external finish
and colour) and all turbine associated apparatus have been
submitted to and approved in writing by the Planning
Authority.
(2) For the avoidance of doubt the scale of the turbines shall
not exceed the parameters assessed in the EIA Report and
set out in the description of the Development.
(3) The submission shall demonstrate that all wind turbine
blades shall rotate in the same direction.
(4) Thereafter the wind turbines and all associated
apparatus shall be constructed and operated in accordance
with the details approved under part (1) and shall be
maintained in the free from external rust, staining or
discolouration, until such time as the Development is
decommissioned.
Reason - To ensure that the environmental impacts of the
turbines forming part of the Development conform to the
impacts assessed in the EIA Report and in the interests of
the visual amenity of the area.
Design of Sub-station and ancillary development
3. (1) There shall be no Commencement of Development of
the sub-station until final details of its location, layout,
external appearance, dimensions, and surface materials,
and control room buildings, any above ground electrical
equipment, associated compounds, construction compound,
boundary fencing, external lighting and parking areas have
been submitted to, and approved in writing by, the Planning
Authority.
(2) Thereafter, the substation and control room buildings,
any above ground electrical equipment, associated
compounds, fencing, external lighting and parking areas
shall be constructed in accordance with the details approved
under part (1).
Page 6 of 142

Page 7

DRAFT
Reason - To ensure that the environmental impacts of the
sub-station and ancillary development forming part of the
Development conform to the impacts assessed in the EIA
Report and in the interests of the visual amenity of the area.
Design of Energy Storage Facility
4. (1) There shall be no Commencement of Development on
the energy storage facility until details of the location, layout,
external finishes and appearance, dimensions and surface
materials of the energy storage facility, inclusive of battery
containers, substation(s), control buildings, external above
ground electrical equipment, associated compounds,
construction compound, boundary fencing and other
enclosures, external lighting, security cameras and parking
areas have been submitted to, and approved in writing by,
the Planning Authority. For the avoidance of doubt the
details of the energy storage facility shall not exceed the
parameters assessed in the EIA Report.
(2) Thereafter, the battery energy storage facility shall be
constructed in accordance with the details approved under
part (1) and the infrastructure shall be maintained in the
approved colour, free from rust, staining or discolouration
until such time as the Development is decommissioned.
Reason - To ensure that the environmental impacts of the
energy storage facility forming part of the Development
conform to the impacts assessed in the EIA Report and in
the interests of the visual amenity of the area.
Signage
5. No part of the Development shall display any text, logo, sign
or advertisement (other than health and safety signage as
required by law) or be illuminated (with the exception of
aviation safety lighting).
Reason - In the interests of health and safety on site and the
visual amenity of the area.
Micro-siting
6. All wind turbines, buildings, areas of hardstanding,
associated infrastructure and tracks shall be constructed in
the locations shown on plan reference Volume 3a, Figure
3.1a Site Layout read in conjunction with Volume 2, Chapter
3 - Description of Development. The locations of wind
turbines, buildings, areas of hardstanding and tracks may be
adjusted by micro-siting within the redline boundary shown
on plan reference Figure 3.1a Site Layout. Any such micro-
siting is subject to the following restrictions unless otherwise
approved in advance in writing by the Planning Authority:
(a) no wind turbine, building, hardstanding or access
track shall be moved more than 50m from the
position shown on Figure 3.1a Site Layout and at the
grid references set out in Table 3-4 of Volume 2,
Chapter 3 Description of Development;
(b) No micro-siting shall take place with the result that
infrastructure (excluding floating tracks or
Page 7 of 142

Page 8

DRAFT
hardstanding) has a greater overall impact on peat
than the original location;
(c) no infrastructure other than as required for a water
course crossing or water crossing upgrading works
shall be micro-sited to within 50 metres of a water
course;
(d) No wind turbine foundation shall be positioned higher
than 5m Above Ordnance Datum (AOD) than the
position for that turbine shown at the grid references
set out in Volume 2, Chapter 3 of the AI Report;
(e) no micro-siting shall take place which will bring the
wind turbine blade tips closer than 50m stand-off
distance to high-value bat habitat.
All micro-siting permissible under this condition shall be
submitted to, and approved in writing by, the Environmental
Clerk of Works (ECoW) in advance of any works or
development associated with the micro-siting request being
implemented.
No later than three months after the Date of Final
Commissioning, an updated site layout plan showing the
final position of all wind turbines, buildings, areas of
hardstanding, tracks and associated infrastructure forming
part of the Development shall be submitted to the Planning
Authority. The plan shall also specify areas where micro-
siting has taken place and, for each instance, be
accompanied by copies of the ECoW or Planning Authority’s
approval, as applicable.
Reason - to control environmental impacts while taking
account of local ground conditions.
Planning Monitoring Officer
7. (1) There shall be no Commencement of Development until
the terms of appointment by the developer of an
independent and suitably qualified consultant as Planning
Monitoring Officer (PMO) have been submitted to, and
approved in writing by, the Planning Authority. The terms of
appointment shall:
(a) impose a duty to monitor compliance with the terms
of the planning permission and the conditions
attached to it;
(b) require the PMO to submit a monthly report to the
Planning Authority summarising works undertaken on
site, matters of compliance or otherwise with the
terms of the planning permission and conditions
attached to it, alongside a summary of the incidents
recorded and reported by the ECoW; and
(c) require the PMO to report to the Planning Authority
any incidences of non compliance with the terms and
conditions of the planning permission at the earliest
practical opportunity, and no later than 10 working
days following the incidence of non-compliance.
(2) The PMO shall be appointed on the approved terms
throughout the period from Commencement of Development
Page 8 of 142

Page 9

DRAFT
to completion of construction works and post-construction
site reinstatement works.
(3) Prior to the decommissioning, restoration and aftercare
phases of the Development or the expiration of the
operational period of the planning permission (whichever is
the earlier), details of the terms of appointment of a suitably
qualified consultant as PMO by the Company/operator
throughout the decommissioning, restoration and aftercare
phases of the Development shall be submitted to, and
approved in writing by the Planning Authority.
(4) The PMO shall be appointed on the terms approved
under part (3) throughout the decommissioning, restoration
and aftercare phases of the Development.
Reason - To ensure compliance with the planning
permission and the conditions attached to it.
Ecological Clerk of Works
8. (1) There shall be no Commencement of Development until
the terms of appointment of an independent Ecological Clerk
of Works (ECoW) have been submitted to, and approved in
writing by, the Planning Authority. The terms of appointment
shall:
(a) impose a duty to monitor compliance with the
environmental commitments provided in the EIA
Report, including any micrositing under condition 6,
the Construction and Environmental Management
Plan approved under condition 9, the Biodiversity
Enhancement Plan approved under condition 15, the
Habitat Management and Monitoring Plan under
Condition 16 and any species or habitat management
plans identified in the EIA Report, (“the ECoW
works”);
(b) require the ECoW to report to the nominated
construction project manager, developer and
Planning Authority any incidences of non-compliance
with the ECoW works at the earliest practical
opportunity;
(c) require the ECoW to submit a monthly report to the
construction project manager, developer and
Planning Authority summarising works undertaken on
site.
(2) Prior to the decommissioning, restoration and aftercare
phases of the Development or the expiration of the
operational period of the planning permission (whichever is
the earlier), details of the terms of appointment of a suitably
qualified, experienced, and independent ECoW by the
Company throughout the decommissioning, restoration and
aftercare phases of the Development shall be submitted to,
and approved in writing by the Planning Authority.
(3) The ECoW shall be appointed on the terms approved
under part (2) throughout the decommissioning, restoration
and aftercare phases of the Development.
Page 9 of 142

Page 10

DRAFT
Reason - To secure effective and transparent monitoring of
and compliance with the environmental mitigation and
management measures associated with the Development
during the construction, decommissioning, restoration and
aftercare phases.
Construction and Environmental Management Plan
9. There shall be no Commencement of Development until a
Construction and (1) Environmental Management Plan
(CEMP) containing site specific details of all on-site
construction works, post-construction reinstatement,
drainage and mitigation, together with details of their
timetabling, has been submitted to, and approved in writing
by, the Planning Authority.  The CEMP shall be informed by
the site and ground investigation works and best practice
guidance.
(2) The CEMP shall include:
(a) a site waste management plan (dealing with all
aspects of waste produced during the construction
period other than peat and other carbon rich soils),
including details of contingency planning in the event
of accidental release of materials which could cause
harm to the environment, evidencing adherence with
SEPA’s guidance and the requirements of the waste
management licensing regime as appropriate;
(b) details of the location, layout, formation of the
construction compound, welfare facilities, any
concrete batching plant (including disposal of pH-rich
waste water and substances), any areas of
hardstanding, turning areas, internal access tracks,
car parking, material stockpiles, oil, fuel and chemical
storage, lighting columns, and any construction
compound boundary fencing required for the
construction period;
(c) a dust management plan detailing all mitigation/dust
suppression measures intended to reduce the
impacts of dust on site, including measures to reduce
dust on roads;
(d) details of measures to be taken to prevent loose or
deleterious material being deposited on the local road
network including wheel cleaning and lorry sheeting
facilities, and measures to clean the site entrances
and the adjacent local road network;
(e) a Pollution Prevention and Incident Plan incorporating
a Pollution Prevention Plan, Pollution Incident Plan
and a Pollution Control Monitoring Plan, with
measures to protect watercourses, groundwater,
management of natural surface hydrological flows
(flushes, springs, etc.) and protection of
peatland/soils, arrangements for the storage and
management of oil and fuel and other chemicals on
the site and sewage disposal and treatment;
Page 10 of 142

Page 11

DRAFT
(f) details of soil storage and management including
outline quantities, locations (other than peat and
other carbon rich soils) management of long term
storage of construction generated to facilitate future
site restoration;
(g) a drainage management strategy, demonstrating how
all surface and waste water arising during and after
construction is to be managed and prevented from
impacting on the water environment and to mitigate
flood risk;
(h) a surface water and groundwater management and
treatment plan, including details of the separation of
clean and dirty water drains, and location of
settlement lagoons for silt laden water;
(i) details of temporary site illumination, including
measures to ensure light spill/pollution is minimised
and avoids habitats within the site and does not
extend beyond the immediate working area, and not
beyond the site boundary;
(j) Protected Species Plan, informed by any protected
species surveys carried out. The Plan shall provide
mitigation measures in line with Summary of
Mitigation, as required, and a timetable for
implementation.
(k) details of the construction of the access into the site,
including associated drainage and the creation and
maintenance of associated visibility splays;
(l) Construction Method Statements for the following: i.
crane pads; ii. turbine foundations; iii. working cable
trenches; iv. erection of the wind turbines; v.
Substation compound formation, erection of
associated buildings and ancillary infrastructure; vi.
all roads/tracks to be altered/formed within the site
including their width, means of drainage (which shall
have regard to SUDS principles), means of
construction, and edge reinstatement including verge
width. vii. watercourse crossings including full details
and plans of the design and specification of all new
and upgraded watercourse crossings to be
constructed;
(m) details of post-construction restoration/reinstatement
of the working areas not required during the operation
of the Development;
(n) a tree felling and management plan;
(o) A Construction Noise Management Plan including
details of the management of noise and vibration
during construction and post-construction restoration,
including that caused by construction traffic, in
accordance with BS 5228:2009 “Code of Practice for
noise and vibration control on construction and open
sites – Part 1: Noise and Part 2: Vibration” (or any
updated version/document which superseded this
Page 11 of 142

Page 12

DRAFT
document) and how any properties likely to be
affected by construction noise will be kept informed;
(p) Construction Method Statements for all roads/tracks
to be altered/formed within the development site
including their width, likelihood of widening or passing
places, means of drainage (which shall have regard
to SUDS principles), means of construction, and edge
reinstatement including verge width. The specification
shall be accompanied by relevant plans at a scale
sufficient;
(q) the cable trenches;
(r) A phasing plan for the construction works; and
(s) A written scheme which details the methodology for
dealing with any revisions to any of the documents
required under this part (2). Any revised documents
will require to be submitted to and approved in writing
by the Planning Authority prior to the revisions being
implemented on site.
(3) The Development shall be implemented in accordance
with the CEMP approved under part (1) unless otherwise
approved in advance in writing by the Planning Authority.
Reason - To ensure that all construction operations are
carried out in a manner that minimises their impact on road
safety, amenity and the environment, and that the mitigation
measures contained in the EIA Report
Borrow Pits – Scheme of Works
10. There shall be no Commencement of Development until a
scheme for the working and restoration of each borrow pit
forming part of the Development has been submitted to, and
approved in writing by, the Planning Authority. The scheme
shall provide:
(a) detailed working method statement based on site
survey information and ground investigations;
(b) details of the handling of any overburden (including
peat, soil and rock);
(c) drainage measures, including measures to protect
and manage surrounding are-as of peatland, water
dependent sensitive habitats and ground water de-
pendent terrestrial ecosystems from drying out;
(d) a programme of implementation of the works
described in the scheme; and
(e) outline details of the reinstatement, restoration and
aftercare of the borrow pit(s) to be undertaken at the
end of the construction period, including topographic
surveys of pre-construction profiles and details of
topographical surveys to be undertaken of the
restored borrow pit profiles.
The scheme approved shall thereafter be implemented in
full following Commencement of Development.
Reason - To ensure that excavation of materials from the
borrow pit(s) is carried out in a manner that minimises the
impact on amenity and the environment, and to secure the
Page 12 of 142

Page 13

DRAFT
restoration of borrow pit(s) at the end of the construction
period.
Borrow Pits – Blasting
11. No blasting shall take place until a scheme specifying blast
monitoring locations is submitted to and approved in writing
by the Planning Authority.
Ground vibration from blasting shall not exceed a peak
particle velocity of 6mm/second at the blasting monitoring
locations approved in the scheme.  The measurement is to
be the maximum of three mutually perpendicular directions
taken at the ground surface.
Unless otherwise approved in writing in advance by the
Planning Authority, any blasting activities will be limited to
Monday to Friday 07:00 to 18:00 and 07:00 to 13:00 on
Saturdays, with no blasting taking place on a Sunday or on
a Public Holiday.
The scheme shall be implemented as approved.
Reason - To ensure that blasting activity is carried out within
defined parameters and timescales to control impact on
amenity.
Construction Hours
12. Construction work shall only take place between the hours
of 07.00 to 19.00 on Monday to Friday inclusive and 07.00
to 16.00 on Saturdays, with no construction work taking
place on a Sunday or Public Holiday. Outwith these
specified hours, maintenance works, emergency works and
construction works shall be limited to concrete pours, wind
turbine erection, dust suppression, and the testing of plant
and equipment, unless otherwise approved in advance in
writing by the Planning Authority.
HGV movements (excluding abnormal loads) to or from the
site during construction of the wind farm shall be limited to
07.00 to 19.00 Monday to Friday (inclusive), and 07.00 to
16.00 on Saturdays, with no HGV movements to or from site
taking place on a Sunday or Public Holiday.  Outwith these
hours HGV movements are to be limited to wind turbine
delivery (unless otherwise approved in advance in writing by
the Planning Authority).
Reason - In the interests of local amenity.
Construction Traffic Management Plan
13. There shall be no Commencement of Development until
Construction Traffic Management Plan (CTMP) has been
submitted to, and approved in writing, by the Planning
Authority.  The CTMP shall provide:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
Page 13 of 142

Page 14

DRAFT
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
(i) details of information signs to inform other road users
of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to
the commencement of construction;
(n) monitoring, reporting and implementation
arrangements;
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site. 
The CTMP as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
Vehicular Access
14. There shall be no Commencement of Development until a
detailed design showing the accommodation works to
facilitate the construction of the development for the C468
public road is submitted for written approval.  The detailed
design will include the following:
(a) Road widening scheme from A9 to access track at
Carim Lodge;
(b) Junction from the public road network to the
development site;
(c) Road drainage; and
(d) Junction layouts for the turbine route from A9 to C468
avoiding the tight turn.
The approved design shall thereafter be implemented in full,
prior to the construction works commencing on site.
Page 14 of 142

Page 15

DRAFT
Reason - In the interests of road safety to accommodate
access to the site.
Habitat Management and Monitoring Plan
15. There shall be no Commencement of Development until a
Habitat Management Plan (HMP) taking account of the
Outline Habitat Management Plan (Technical Appendix 8.4
of the EIA Report), has been submitted to, and approved in
writing by the Planning Authority.
The HMP shall set out proposed habitat management of the
site during the period of construction, operation, and
decommissioning, restoration and aftercare, and shall
provide for the maintenance, monitoring and reporting of
habitat on site.
The HMP shall provide provision and details for regular
monitoring and review to be undertaken against the HMP
objectives and reasonable measures for securing
amendments or additions to the HMP in the event that the
HMP objectives are not being met.
Until otherwise approved in advance in writing by the
Planning Authority, the approved HMP (as amended from
time to time with written approval of the Planning Authority)
shall be implemented in full in line with the timescales set
out in the approved plan.
Reason - In the interests of good land management and the
protection of habitats.
Programme of Archaeological Works
16. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written Scheme of
Archaeological Investigation (WSI) which has been
submitted by the developer and agreed in writing by the
Council as Planning Authority, in consultation with Perth and
Kinross Heritage Trust (PKHT).  Thereafter, the developer
shall ensure that the programme of archaeological works is
fully implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation
analysis, the development as approved shall not be
occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and
agreed in writing by the Council as Planning Authority, in
consultation with PKHT.  The PERD shall be carried out in
complete accordance with the approved details. 
Furthermore, the developer shall afford access at all
reasonable times to PKHT or a nominated representative
and shall allow them to observe work in progress.
Reason - To ensure the protection or recording of
archaeological features on the site.
Page 15 of 142

Page 16

DRAFT
Operational Noise (Turbines)
17. (1) The rating level of noise immissions from the combined
effects of the wind turbines forming part of the development
(including the application of any tonal penalty) when
determined in accordance with the attached Guidance Notes
for this condition, shall not exceed 35dB measured as LA90
at any occupied dwelling.  This noise limit should be applied
at all times and in all wind conditions.
(2) The turbines shall be designed to permit individually
controlled operation or shut down at specified wind speeds
and directions in order to facilitate compliance with noise
criteria.
(3) The Company shall continuously log power production,
wind speed and wind direction at each wind turbine all (in
accordance with Guidance Notes). These data shall be
retained for a period of not less than 24 months.  The data
will include details of the mode in which each of the turbines
will be operated during each ten minute period depending
on the wind conditions in that ten minute period.  The
Company shall provide this information to the Planning
Authority, in the format set out in the Guidance Notes, within
14 days of receipt in writing of a request to do so.
(4) Prior to the Date of First Commissioning, the developer
shall have submitted to, and received written approval of the
Planning Authority of, a list of proposed independent
consultants who will undertake compliance measurements
in accordance with this condition.  Amendments to the list of
approved consultants shall be made only with the prior
written approval of the Planning Authority.
(5) Within 21 days from receipt of a written request from the
Planning Authority, following a complaint to it from an
occupant of a dwelling alleging noise disturbance at that
dwelling, the developer shall employ a consultant approved
by the Planning Authority in terms of part (4) above to
assess the level of noise immissions from the wind farm at
the complainant’s property (or a suitable alternative location
agreed in writing by the Planning Authority).  The written
request from the Planning Authority shall set out at least the
date, time and location to which the complaint relates and
any identified atmospheric conditions, including wind
direction, and include a statement as to whether, in the
opinion of the Planning Authority, the noise giving rise to the
complaint contains or is likely to contain a tonal component.
(6) The assessment of the rating level of noise immissions in
terms of part (5) above shall be undertaken in accordance
with the Guidance Notes and an assessment protocol that
shall previously have been submitted to and approved in
writing by the Planning Authority.  The protocol shall include
the proposed measurement location(s) where
measurements for compliance checking purposes shall be
undertaken, whether noise giving rise to the complaint
contains or is likely to contain a tonal component, and also
Page 16 of 142

Page 17

DRAFT
the range of meteorological and operational conditions
(which shall include the range of wind speeds, wind
directions, power generation and times of day) to determine
the assessment of rating level of noise immissions.  The
proposed range of conditions shall be those which prevailed
during times when the complainant alleges there was
disturbance due to noise, having regard to the written
request of the Planning Authority under paragraph (5)
above.
(7) Where the property to which a complaint is related is not
listed by name or location in Table 1 at part (1) of this
condition, the Company shall submit to the Planning
Authority, for its written approval, proposed noise limits
selected from those listed in Table 1 to be adopted at the
complainant’s property for compliance checking purposes,
prior to compliance checking.  The proposed noise limits are
to be those limits selected from Table 1 specified for a listed
location which the independent consultant considers as
being likely to experience the most similar background noise
environment to that experienced at the complainant’s
property.  The protocol shall include a justification of the
choice of the representative background levels to determine
compliance at the complainant’s property.  The resultant
noise limits selected shall include, where appropriate, any
limit apportionment to account for consented levels from
cumulative wind farm developments.
(8) The rating level of noise immissions resulting from the
combined effects of the wind turbines when determined in
accordance with the Guidance Notes and approved Noise
Assessment Protocol shall not exceed the noise limits
approved in writing by the Planning Authority for the
complainant’s property.
(9) In the event that a complainant does not allow the
Company access to undertake a compliance assessment,
the assessment protocol shall set out details of the
proposed alternative representative measurement position,
prior to the commencement of measurements, and the
measurements shall be undertaken at the approved
alternative representative measurement location.
(10) The Company shall provide to the Planning Authority
the independent consultant’s assessment of the rating level
of noise immissions undertaken in accordance with the
Guidance Notes and the approved Noise Assessment
Protocol within two months of the date of the written request
of the Planning Authority for compliance measurements to
be made under part (5), unless the time limit is extended in
writing by the Planning Authority.  The assessment shall
include all data collected for the purposes of undertaking the
compliance measurements, such data to be provided in the
format set out in the Guidance Notes.  The instrumentation
used to undertake the measurements shall be calibrated in
accordance with the Guidance Notes and certificates of
Page 17 of 142

Page 18

DRAFT
calibration shall be submitted to the Planning Authority with
the independent consultant’s assessment of the rating level
of noise immissions.
(11) Where a further assessment of the rating level of noise
immissions from the wind farm is required pursuant to (in
accordance with the Guidance Notes), the Company shall
submit a copy of the further assessment within 21 days of
submission of the independent consultant’s assessment
pursuant to part (8) above unless the time limit has been
extended in writing by the Planning Authority.
Reason - to protect nearby residents from undue noise and
disturbance and to ensure that noise limits are not exceeded
and to enable prompt investigation of complaints.
Guidance Notes for Operational Noise Condition
These notes are to be read with and form part of the noise
condition.  They further explain the condition and specify the
methods to be employed in the assessment of complaints about
noise immissions from the wind farm.  The rating level at each
integer wind speed is the arithmetic sum of the wind farm noise
level as determined from the best-fit curve described in Guidance
Note 2 of these Guidance Notes and any tonal penalty applied in
accordance with Guidance Note 3.  Reference to ETSU-R-97
refers to the publication entitled “The Assessment and Rating of
Noise from Wind Farms” (1997) published by the Energy
Technology Support Unit (ETSU) for the Department of Trade and
Industry (DTI). IOA GPG is “A Good Practice Guide to the
Application of ETSU-R-97 for the Assessment and Rating of Wind
Turbine Noise” (2013) and includes Supplementary Guidance
Notes 1 to 5 of the IOA GPG.
Guidance Note 1
(a) (The LA90,10 minute noise statistic should be measured in
accordance with the IOA GPG. Measurements shall be
undertaken in such a manner to enable a tonal penalty to be
applied in accordance with Guidance Note 3.
(b) To enable compliance with the conditions to be evaluated,
the Company shall continuously log arithmetic mean wind
speed in metres per second and wind direction in degrees
from north for each turbine and arithmetic mean power
generated by each turbine, all in successive 10-minute
periods.  All 10 minute periods shall commence on the hour
and in ten minute increments thereafter, synchronised with
Universal Coordinated Time (UTC).  The wind speeds at
turbine hub height shall be 'standardised' to a reference
height of ten metres as described in ETSU-R-97 at page
120 using a reference roughness length of 0.05 metres. 
Unless an alternative procedure is previously agreed in
writing with the Planning Authority, it is these standardised
ten metre height wind speed data which are correlated with
the noise measurements determined as valid.
Page 18 of 142

Page 19

DRAFT
(c) Data provided to the Planning Authority in accordance with
the noise condition shall be provided in comma separated
values in electronic format unless otherwise agreed in
writing with the Planning Authority.
(d) A data logging rain gauge shall be installed in the course of
the assessment of the levels of noise immissions.  The
gauge shall record over successive 10-minute periods
synchronised with the periods of data recorded in
accordance with Note 1(b).
Guidance Note 2
(a) The noise measurements shall be made so as to provide not
less than 20 valid data points as defined in Guidance Note 2
(b)
(b) Valid data points are those measured in the conditions
specified in the agreed written protocol, but excluding any
periods of rainfall measured in the vicinity of the sound level
meter.  Rainfall shall be assessed by use of a rain gauge
that shall log the occurrence of rainfall in each 10 minute
period concurrent with the measurement periods set out in
Guidance Note 1.  In specifying such conditions the
Planning Authority shall have regard to those conditions
which prevailed during times when the complainant alleges
there was disturbance due to noise or which are considered
likely to result in a breach of the limits.
(c) For those data points considered valid in accordance with
Guidance Note 2(b), values of the LA90,10 minute noise
measurements and corresponding values of the 10- minute
10- metre height wind speed averaged across all operating
wind turbines using the procedure specified in Guidance
Note 1(d), shall be plotted on an XY chart with noise level on
the Y-axis and the 10- metre height mean wind speed on the
X-axis.  A least squares, “best fit” curve of an order deemed
appropriate by the independent consultant (but which may
not be higher than a fourth order) should be fitted to the data
points and define the wind farm noise level at each integer
speed.
Guidance Note 3
(a) Where, in accordance with the protocol, noise immissions at
the location or locations where compliance measurements
are being undertaken contain or are likely to contain a tonal
component, a tonal penalty is to be calculated and applied
using the following rating procedure.
(b) For each 10 minute interval for which LA90,10 minute data
have been determined as valid in accordance with Guidance
Note 2 a tonal assessment shall be performed on noise
immissions during 2 minutes of each 10 minute period. The
2 minute periods should be spaced at 10 minute intervals
provided that uninterrupted uncorrupted data are available
(“the standard procedure”).  Where uncorrupted data are not
available, the first available uninterrupted clean 2 minute
Page 19 of 142

Page 20

DRAFT
period out of the affected overall 10 minute period shall be
selected. Any such deviations from the standard procedure,
as described in Section 2.1 on pages 104-109 of ETSU-R-
97, shall be reported.
(c) For each of the 2 minute samples the tone level above or
below audibility shall be calculated by comparison with the
audibility criterion given in Section 2.1 on pages 104-109 of
ETSU-R-97.
(d) The tone level above audibility shall be plotted against wind
speed for each of the 2 minute samples.  Samples for which
the tones were below the audibility criterion or no tone was
identified, a value of zero audibility shall be used.
(e) The average tone level above audibility shall be calculated
for each wind speed bin, each bin being 1 metre per second
wide and centred on integer wind speeds.  This process
shall be repeated for each integer wind speed for which
there is an assessment of overall levels in Note 2.
(f) The tonal penalty is derived from the margin above audibility
of the tone according to the figure below.
Guidance Note 4
(a) If a tonal penalty is to be applied in accordance with
Guidance Note 3 the rating level of the turbine noise at each
wind speed is the arithmetic sum of the measured noise
level as determined from the best fit curve described in
Guidance Note 2 and the penalty for tonal noise as derived
in accordance with Guidance Note 3 at each integer wind
speed within the range specified by the Planning Authority in
its written protocol.
(b) If no tonal penalty is to be applied then the rating level of the
turbine noise at each wind speed is equal to the measured
noise level as determined from the best fit curve described
in Guidance Note 2.
(c) In the event that the rating level is above the limit(s) set out
in the Table attached to the noise conditions or the noise
limits for a complainant’s dwelling, the independent
consultant shall undertake a further assessment of the rating
level to correct for background noise so that the rating level
relates to wind turbine noise immission only.
(d) The Company shall ensure that all the wind turbines in the
development are turned off for such period as the
independent consultant requires to undertake the further
Page 20 of 142

Page 21

DRAFT
assessment.  The further assessment shall be undertaken in
accordance with the following steps:
(e) Repeating the steps in Guidance Note 2, with the wind farm
switched off, and determining the background noise (L3) at
each integer wind speed within the range requested by the
Planning Authority in its written request and the approved
protocol.
(f) The wind farm noise (L1) at this speed shall then be
calculated as follows where L2 is the measured level with
turbines running but without the addition of any tonal
penalty:
(g) The rating level shall be re-calculated by adding
arithmetically the tonal penalty (if any is applied in
accordance with Note 3) to the derived wind farm noise L1
at that integer wind speed.
(h) If the rating level after adjustment for background noise
contribution and adjustment for tonal penalty (if required in
accordance with note 3 above) at any integer wind speed
lies at or below the values set out in the Table attached to
the conditions or at or below the noise limits approved by
the Planning Authority for a complainant’s dwelling in
accordance with the noise condition then no further action is
necessary.  If the rating level at any integer wind speed
exceeds the values set out in the Table attached to the
conditions or the noise limits approved by the Planning
Authority for a complainant’s dwelling in accordance with the
noise condition then the Development fails to comply with
the conditions.
Noise (BESS and Substation)
18. All plant or equipment associated with the BESS and
substation shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed
Noise Rating 35 between 0700 and 2300 hours daily, or
Noise Rating 20 between 2300 and 0700 hours daily, within
any nearby residential property, with all windows slightly
open, when measured and/ or calculated and plotted on a
rating curve chart.
In the event that justified complaints for noise are received
by the Council, the applicant at their own expense, shall
employ an independent and suitably qualified consultant to
carry out a Noise Assessment of the development. The
appointed consultant and methodology for the Noise
Assessment shall be submitted to and approved in writing
by the Planning Authority in consultation with Environmental
Health within 28 days of being notified of the complaint. 
Within 28 days of approval of appointed consultant and
methodology, a Noise Assessment shall be submitted
Page 21 of 142

Page 22

DRAFT
outlining mitigation and recommended timescales for
delivery.  Thereafter, all mitigation measures shall be
implemented within the timescales recommended.
Reason - In the interests of protecting residential amenity.
Access Management Plan
19. There shall be no Commencement of Development until an
Access Management Plan (AMP) has been submitted to and
approved in writing by the Planning Authority.  The AMP
should ensure that, where appropriate and subject to health
and safety requirements, public access is maintained across
the Development site during construction, and thereafter
that existing wider rights of public access are maintained
during the operational phase of the wind farm.
The approved plan shall be implemented in full.
Reason - In the interests of securing public access rights
Private Water Supplies
20. There shall be no Commencement of Development until a
private water supplies method statement has been
submitted to and approved in writing by the Planning
Authority, detailing all contingent mitigation measures to be
delivered to secure the quality, quantity and continuity of
water supplies to any properties which are served by private
water supplies at the date of this planning permission which
may be affected by the Development.
The method statement shall set out:
(a) details of the methodology for water quality and
quantity sampling for a period of 12 months prior to
construction (including abstraction points);
(b) details of the methodology and programme for
undertaking water quality and quantity sampling
during the construction period (including abstraction
points); and
(c) details of the methodology for water quality and
quantity sampling for a period of 12 months post
construction (including abstraction points);
The approved method statement shall thereafter be
implemented in full upon the Commencement of
Development.
Reason - To maintain a secure and adequate water supply
to all properties with private water supplies that may be
affected by the Development.
Redundant Turbines
21. If one or more wind turbines fails to generate electricity on a
commercial basis to the public network for a continuous
period of 12 months, then the turbine or turbines shall be
deemed to be surplus to requirement and the developer
shall:
(a) within one month of the expiration of the 12 month
period, submit a scheme to the Planning Authority for
written approval setting out how and when the
relevant wind turbine(s) and associated infrastructure
will either be repaired or removed from the site and
Page 22 of 142

Page 23

DRAFT
the ground restored to a condition agreed with the
Planning Authority; and
(b) implement the approved scheme to the timescales
set out in the scheme and agreed in part a) above.
Reason - To ensure that any redundant wind turbine is
removed from site, in the interests of safety, amenity and
environmental protection.
Interim Decommissioning, Restoration and Aftercare Strategy
22. There shall be no Commencement of Development until an
Interim decommissioning, restoration and aftercare strategy
has been submitted to, and approved in writing by, the
Planning Authority.  The interim decommissioning,
restoration and aftercare strategy shall outline measures for
the decommissioning of the Development and restoration
and aftercare of the site, and shall provide proposals for the
removal of the Development, the treatment of ground
surfaces, the management and timing of the works and
environmental management provisions in any instance that
the site as a whole, or in part, ceases to operate prior to the
approval of the Decommissioning, Restoration and Aftercare
Plan required under the provisions of condition 23.
Reason - To ensure the decommissioning and removal of
the Development in an appropriate and environmentally
acceptable manner and the restoration and aftercare of the
site, in the interests of safety, amenity and environmental
protection when a detailed decommissioning, restoration
and aftercare Plan has not yet been approved.
Site Decommissioning, Restoration and Aftercare
23. The Development shall cease to generate electricity to the
grid network by no later than the date falling 40 years from
the Date of Final Commissioning.
No later than one year prior to the Date of Final Generation
or the expiry of the planning permission (whichever is
earlier) a decommissioning, restoration and aftercare plan
shall be submitted for the written approval of the Planning
Authority.  The detailed decommissioning, restoration and
aftercare plan shall provide updated and detailed proposals,
in accordance with relevant guidance at that time, for the
removal of the Development, the treatment of ground
surfaces, the management and timing of the works and
environment management provisions which shall provide:
(a) a site waste management plan (dealing with all
aspects of waste produced during the
decommissioning, restoration and aftercare phases
and, including de-tails of measures to be taken to
minimise waste associated with the Development and
promote the recycling of materials and infrastructure
components);
(b) details of the formation of any temporary
infrastructure required for decommissioning such as
compounds, welfare facilities, any areas of
Page 23 of 142

Page 24

DRAFT
hard-standing, material stockpiles, oil storage, lighting
columns, and any boundary fencing;
(c) a dust management plan;
(d) details of measures to be taken to prevent loose or
deleterious material being deposited on the local road
network, including wheel cleaning and lorry sheeting
facilities, and measures to clean the site entrances
and the ad-jacent local road network;
(e) a pollution prevention and control method statement,
including arrangements for the storage and
management of oil and fuel on the site;
(f) details of measures for soil storage and
management;
(g) a surface water and groundwater management and
treatment plan, including details of the separation of
clean and dirty water drains, and location of
settlement lagoons for silt laden water;
(h) details of measures for sewage disposal and
treatment;
(i) temporary site illumination; and
(j) a species protection plan if surveys (carried out no
longer than eighteen months prior to submission of
the plan) identify any protected species (including
birds).
The Development shall be decommissioned, the site
restored and aftercare undertaken prior to the date falling
three years after the Date of Final Generation and in
accordance with the approved detailed decommissioning,
restoration and aftercare plan.
Reason - To ensure the decommissioning and removal of
the Development in an appropriate and environmentally
acceptable manner and the restoration and aftercare of the
site, in the interests of safety, amenity and environmental
protection.
Financial Guarantee
24. There shall be no commencement of development until a
bond or other form of financial guarantee (hereafter
“financial guarantee”) in terms which secures the cost of
performance of all decommissioning, restoration and
aftercare obligations referred to in conditions 22 and 23 has
been submitted to and approved in writing by the Planning
Authority.
The value of the financial guarantee shall be agreed
between the developer and the Planning Authority or, failing
agreement, determined (on application by either party) by a
suitably qualified independent professional as being
sufficient to meet the costs of all decommissioning,
restoration and aftercare obligations referred to in conditions
22 and 23.
The financial guarantee shall be maintained in favour of the
Planning Authority until the completion of all
Page 24 of 142

Page 25

DRAFT
decommissioning, restoration and aftercare obligations
referred to in conditions 22 and 23.
The value of the financial guarantee shall be reviewed by
agreement between the developer and the Planning
Authority or, failing agreement, determined (on application
by either party) by a suitably qualified independent
professional not less than every five years, and at the time
of the approval of the detailed decommissioning, restoration
and aftercare plan approved under condition 23. The value
of the financial guarantee shall be increased or decreased to
take account of any variation in costs of compliance with
decommissioning, restoration and aftercare obligations
referred to in conditions 22 and 23.
Reason - To ensure that there are sufficient funds to secure
performance of the decommissioning, restoration and
aftercare conditions attached to this deemed planning
permission in the event of default by the developer.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Procedural Notes
Any permission shall not to be issued until a Section 75 Agreement
or a bond as required by condition 24 has been signed and
registered to take account of this application.  The legal agreement
or bond should be concluded and completed within 4 months of the
date of any decision.
Informatives
1. Prior to the commencement of works, a maintenance
agreement under Section 96 of the Roads (Scotland) Act
1984 shall be entered into. Confirmation of this agreement
being in place shall be provided to the Council, as Planning
Authority, a minimum of four weeks prior to the
commencement of development.  The maintenance
agreement shall be in respect of the C468.
These roads shall be inspected on a regular basis and
repairs carried out to the timescale and standards specified
by the Council as Roads Authority to the satisfaction of
Perth & Kinross Council.
2. The applicant should be advised that in terms of Section 56
of the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to open an existing road
or footway prior to the commencement of works.  Advice on
the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish
Environment Protection Agency.
3. The applicant is advised that, in terms of Sections 109 of the
New Roads and Street Works Act 1991, he/she/they must
obtain consent from the Council, to place, maintain or adjust
Page 25 of 142

Page 26

DRAFT
apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
4. The applicant should be advised that in terms of Section 21
of the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to construct a new road
prior to the commencement of roadworks.  Advice on the
disposal of surface water must be sought at the initial stages
of design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable for
the processing of RCC applications.
5. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive.  Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
7. The applicant is advised that the granting of planning
permission does not guarantee right of access to the site. 
This should be agreed with the relevant landowner(s) prior
to the commencement of the development.
8. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town and
Country Planning (Scotland) Act 1997, as amended.  The
variations incorporate changes to the number and design of
turbines.
9. Please remember that the granting of planning permission,
listed building consent or other associated consent by the
Planning Authority does not affect the responsibility of the
developer to ensure all other necessary permissions,
consents and approvals are in place prior to commencement
of works.  Developers should also ensure appropriate
accommodations are made in respect of services and third
party infrastructure and may wish to check proposals
against the information held at
https://www.linesearchbeforeudig.co.uk/.
10. The applicant shall ensure the private water supply for the
development complies with the Water Scotland Act 1980
(Section 63) and the Private Water Supplies (Scotland)
Regulations 2006.  Detailed information regarding the
private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and
Page 26 of 142

Page 27

DRAFT
the filtration and disinfection treatment proposed to ensure
provision of an adequate and consistently wholesome water
supply shall be submitted to Perth and Kinross Council
Environmental Health in line with the above act and
regulations.
Amendment (Councillors I James and D Cuthbert)
Offer an objection for the following reason:
1. The adverse landscape and visual impact of the proposal
and the wider adverse environmental impacts it will have,
thereby making it contrary to National Planning Framework
4 Policies 4 and 11e
In terms of Standing Order 21.5 a roll call vote was taken.
6 members voted for the Motion as follows:
Councillors B Brawn, D Illingworth, I Massie, G Stewart, R Watters
and Bailie M Williamson.
5 members voted for the Amendment as follows:
Councillors K Allan, D Cuthbert, K Harvey, I James and Bailie
C McLaren.
Resolved:
In accordance with the Motion.
(2) Major Applications
(i) 25/00685/FLM - Formation of extension to existing holiday
park comprising siting of 62 holiday accommodation lodges
and 6 holiday accommodation glamping pods; erection of 4
holiday accommodation cabins and 8 stilted holiday
accommodation units; erection of rangers' classroom and a
covered learning structure; alterations to reception building,
pier, vehicle parking, footpaths and associated works (as
amended), Loch Tay Highland Lodges, Killin, FK21 8TY
(Report No. 26/39)
Mr B Findlay, objector to the application, followed by
Mr D Hancock, agent on behalf of the applicant, addressed the
committee, and answered members questions.
Resolved:
Grant, subject to the following terms, conditions (including
additional condition 17) and informatives:
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Page 27 of 142

Page 28

DRAFT
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. The development hereby approved shall be used solely for
holiday accommodation and shall not be occupied as the
sole or main residence of any occupant.
Reason - In order to clarify the terms of the permission; to
control and restrict the use of the building.
3. Prior to the commencement of development of any of the
stilted accommodation units, detailed designs of the units
will be submitted to the Council as Planning Authority for
written approval. The stilted accommodation units will
subsequently be built in compliance with the approved
plans.
Reason - In order to ensure the stilted accommodation units
are of an appropriate scale and design.
Amenity
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
5. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
6. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays. The above shall be implemented throughout the
construction stage of the development unless otherwise
agreed in writing with the Council as Planning Authority and
Environmental Health.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
7. Prior to the development being brought into use, an updated
Noise Management Plan shall be submitted for the written
approval of the Council as Planning Authority. The plan shall
include all sources of noise associated with the premise,
including user noise and the measures that will be put in
place to minimise and/or control noise. The plan shall be
reviewed on a regular basis or, following receipt of a justified
complaint or at the request of the planning authority. Once
Page 28 of 142

Page 29

DRAFT
the Noise Management Plan has been approved, it shall be
fully implemented for the lifetime of the development.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
8. Prior to the commencement of the development hereby
approved, details of the location and measures proposed for
the safeguarding and continued operation, or replacement,
of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water
supply pipes serving properties in the vicinity, sited within
and running through the application site, shall be submitted
to and approved in writing by the Council as Planning
Authority. The subsequently agreed protective or
replacement measures shall be put in place prior to the
development being brought into use and shall thereafter be
so maintained insofar as it relates to the development
hereby approved.
Reason - In order to protect private water supplies within
and nearby the development.
Transport
9. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
Page 29 of 142

Page 30

DRAFT
(i) details of information signs to inform other road users
of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) monitoring, reporting and implementation
arrangements;
(n) arrangements for dealing with non-compliance; and
(o) details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during the
entire site construction programme.
Reason - In the interest of proper site management.
Biodiversity
10. Prior to the commencement of development, a detailed
Drainage Strategy shall be submitted to the Council as
Planning Authority for written approval. The Drainage
Strategy will include details as to how it will mitigate any
significant effects on the River Tay Special Area of
Conservation, and particularly its Atlantic Salmon interest.
Following approval the Drainage Strategy will be fully
adhered to.
Reason - In order to protect the integrity of the River Tay
Special Area of Conservation.
11. Prior to the commencement of development, a Construction
Method Statement shall be submitted for approval. The
Method Statement will include details as to how it will
mitigate any significant effects on the River Tay Special Area
of Conservation, and particularly its Atlantic Salmon interest.
Following approval the Method Statement will be fully
adhered to during the entirety of the construction phase.
Reason - In order to protect the integrity of the River Tay
Special Area of Conservation.
12. Prior to the completion or occupation of the development
hereby approved, A Site Biodiversity Plan shall be submitted
to the Council as Planning Authority for written approval
containing quantities, locations, techniques, timescales, and
monitoring arrangements of biodiversity enhancement
measures. Thereafter, the agreed scheme shall be
implemented in full and, where necessary, maintained in a
reasonable condition for the life of the development.
Reason - In the interests of biodiversity and to protect
environmental quality.
Trees
13. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted to the Council as Planning
Authority for approval. The scheme shall include details of
the height and slopes of any mounding or recontouring of
the site, full details of all hard landscaping proposals
Page 30 of 142

Page 31

DRAFT
including materials and installation methods and, species,
height, size and density of trees and shrubs to be planted.
The scheme as subsequently approved shall be carried out
and completed within the first available planting season
(October to March) after the completion or bringing into use
of the development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority
within 7 days of that date. The scheme as agreed and
implemented shall thereafter be maintained to a satisfactory
standard.
Reason - To ensure a satisfactory standard of development
and environmental quality.
14. Prior to the commencement of development, an
Arboricultural Method Statement shall be submitted to the
Council as Planning Authority for written approval. The
Method Statement will include details of all tree planting
proposals across the site, as well as any management of
existing trees including felling, management and control of
Invasive Non-Native Species, root protection areas and tree
protection fencing. Thereafter, the agreed scheme shall be
implemented in full for the life of the development.
Reason - In order to ensure that tree planting and tree
protection measures are appropriately implemented as part
of the development.
15. Prior to the commencement of development, an
Arboricultural Clerk of Works (ACW) will be appointed in
agreement with the Council as Planning Authority. The ACW
will oversee the implementation of the Arboricultural Method
Statement as well as lodge siting, the accurate setting out of
root protection areas and tree protection fencing and will
provide supervision during works within or near root
protection areas. The ACW shall visit the site at least once
every 3 weeks during the construction period and shall
report findings to the Council as Planning Authority in writing
within 7 days of each visit.
Reason - To ensure compliance with best practice and
safeguarding of tree health throughout the construction
phase.
Flooding and Drainage
16. A four-metre easement free from development along the
side of Allt a’ Mhoirneas will be maintained at all times to
allow access for inspection and maintenance of the
watercourse and the A827 culvert.
Reason - To allow for appropriate future maintenance of the
watercourse.
17. Prior to the occupation of any of the units hereby approved,
the flood mitigation measures detailed within the Flood Risk
Assessment (document 54 hereby approved), shall be
implemented in full, and thereafter retained in perpetuity for
the life of the development.
Reason - In the interests of sustainable flood management.
Page 31 of 142

Page 32

DRAFT
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended.  The form of the
notice is set out in Schedule 7 of the Regulations and a draft
notice is included for your guidance. In accordance with
Regulation 41 the notice must be:
Displayed in a prominent place at or in the vicinity of the site
of the development Readily visible to the public Printed on
durable material.
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two months
of the expiry date of your permission will be able to be dealt
with before your permission lapses.
5. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive.  Trees and scrub are
present on the application site and are to be assumed to
Page 32 of 142

Page 33

DRAFT
contain nesting birds between the above dates.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
7. Part of the approved development includes holiday
accommodation or Short-term Let accommodation (STL).
The developer is advised that holiday accommodation and
STLs require to be licensed under the terms of Article 3 of
the Civic Government (Scotland) Act 1982 (Licensing of
Short-terms Lets) Order 2021 and therefore a licence
application should be made to Perth and Kinross Council
prior to operation commencing. Further information and
application forms are available at
https://www.pkc.gov.uk/shorttermlets.
8. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
9. Part of the approved development includes 'caravans'. The
developer is advised that caravans require to be licensed
under the terms of Section 1 of the Caravan Sites and
Control of Development Act 1960 and therefore a licence
application should be made to Environmental Health.
Application forms are available at
https://www.pkc.gov.uk/article/15600/Licence-caravan-site
10. The approved stove systems shall be installed and
thereafter operated and maintained in accordance with the
manufacturer’s recommendations, such that smoke/odours
are not exhausted into or escape into any neighbouring
dwellings. Failure to do so may result in an investigation and
possible action by Environmental Health under the
Environmental Protection Act 1990.
11. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
honoured throughout and after completion of the
development.
12. The applicant shall ensure the private water supply for the
development complies with the Water Scotland Act 1980
(Section 63), The Private Water Supplies (Scotland)
Regulations 2006 and The Water Intended for Human
Page 33 of 142

Page 34

DRAFT
Consumption (Private Supplies) (Scotland) Regulations
2017.  Detailed information regarding the private water
supply, including the nature, location and adequacy of the
source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be
submitted to Perth and Kinross Council Environmental
Health in line with the above Act and Regulations.
13. A review of the proposed development site did not raise any
real concerns, although historical mapping indicates that the
proposed development is within the immediate vicinity of a
former limekiln as well as an area of infilled land to the south
of the site, both of which may have resulted in contamination
in the vicinity of the site. Should any contamination be found
during the approved works, works should cease, and the
Land Quality team should be contacted on 01738 475000 or
ContaminatedLand@pkc.gov.uk for further advice.
(The committee took a short recess)
(ii) 25/00824/FLM - Erection of 4 poultry rearing sheds, managers
dwellinghouse and garage, staff welfare facility, office, storage
buildings, security fencing, formation of vehicular access,
SUDS, landscaping and associated works, land at Newbigging
Farm, Kinclaven, Stanley, Perth (Report No. 26/40)
Mr A Lilly, Mr M Cook, Ms K Homan, Ms E Coutts and West
Stormont Woodland Group, all objectors to the application; Ms L
Burns, supporter of the application; and Mr I Richmond, General
Manager of Aviagen UK and Mr M Richardson, agent on behalf of
the applicant, addressed the committee, and answered members
questions.
Resolved:
Grant, subject to the following terms, conditions and informatives:
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. For the avoidance of doubt, this permission includes a
replacement farmhouse. Prior to the occupation of the new
farmhouse, the existing farmhouse shall be demolished and
the site on which it lies shall be cleared, reinstated and
finished in accordance with the approved plans.
Reason - In order to clarify the terms of this planning
permission.
Page 34 of 142

Page 35

DRAFT
Contamination
3. Development shall not commence on site until an evaluation
for the potential of the site to be affected by contamination
by a previous use has been undertaken and, as a minimum,
a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the
Council as Planning Authority. If the preliminary risk
assessment identifies the need for further assessment, an
intrusive investigation shall be undertaken to identify;
I. the nature, extent and type(s) of contamination on the
site
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed
III. measures to deal with contamination during
construction works
IV. condition of the site on completion of
decontamination measures.
Prior to the completion or bringing into use of any part of the
development the measures to decontaminate the site shall
be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented
must also be submitted to the Council as Planning Authority.
Reason - In order to deal with any potential contamination of
the site as a result of its former use.
Residential Amenity
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the residential amenity of the
area.
5. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays.
Reason - In order to safeguard the residential amenity of the
area.
6. Servicing of and deliveries to the premises shall be carried
out between 0800 and 1800 daily.
Reason - In order to safeguard the residential amenity of the
area.
7. Should any aspect of the development result in a verified
noise complaint determined by the Council as Planning
Authority in consultation with Environmental Health, within
14 days of written request by the Council as Planning
Authority, the applicant shall arrange for a Noise Impact
Assessment (NIA) by a suitably qualified noise consultant
with the scope and timescale submitted to and agreed in
Page 35 of 142

Page 36

DRAFT
writing with the Council as Planning Authority in consultation
with Environmental Health. Thereafter any agreed mitigation
measures shall be implemented to ameliorate the nuisance.
Reason - In order to safeguard the residential amenity of the
area.
8. The approved Odour Management Plan (document no. 24),
shall be implemented in full and be strictly adhered to
throughout the operational stage of the development to
ensure that residential amenity of neighbouring properties is
not affected by odour as a consequence of and/or in relation
to, the operation of the poultry units.
Reason - In order to safeguard the residential amenity of the
area.
9. Should any aspect of the development result in a verified
odour complaint determined by the Council as Planning
Authority in consultation with Environmental Health, within
14 days of written request by the Council as Planning
Authority, the applicant shall arrange for an Odour Impact
Assessment (OIA) to be carried out by a suitably qualified
consultant.  The OIA findings shall be submitted for the
written approval of the Council as Planning Authority, in
consultation with Environmental Health and must draw
conclusions and make recommendations as necessary. 
Thereafter any necessary measures to ameliorate the odour
nuisance should be put in place, and a new or revised
Operational Management Plan must be submitted to the
Council within a specified agreed timescale.
Reason - In order to safeguard the residential amenity of the
area.
10. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of the
area.
Roads and Access
11. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Plan (CTMP) which shall
include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
Page 36 of 142

Page 37

DRAFT
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
i) details of information signs to inform other road users
of construction traffic;
j) arrangements to ensure that access for emergency
service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;
l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) monitoring, reporting and implementation
arrangements;
n) arrangements for dealing with non-compliance; and
o) details of HGV movements to and from the site. 
The CTMP as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
12. Prior to commencement of development, a detailed design
for the proposed new vehicular access junction, and the
stopping up of the existing junction, shall be submitted to
and agreed in writing by the Planning Authority in
consultation with the Roads Authority.  The vehicular
access, as approved in writing, shall be implemented in
accordance with the approved details prior to the
development being brought into use or occupied.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
13. Prior to the commencement of the development hereby
approved, full visibility splays of 215 metres along the
channel line shall be provided to the North East and South
West of the access, at a set-back of 2.4 metres measured
1.05m above the road level to the standard and specification
required by the Council as Roads Authority. The visibility
splays shall be physically formed on the ground and any
existing fences, walls, hedges or other means of enclosure
or obstructions within the splays shall be removed and
relocated outwith the splays. Once formed, the visibility
Page 37 of 142

Page 38

DRAFT
splays shall be permanently retained thereafter, and no
visual obstruction of any kind shall be permitted within the
visibility splays so formed.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
14. No part of the development shall be occupied until a Staff
Travel Plan (STP), aimed to encourage more sustainable
means of travel, has been submitted and approved in writing
by the Council. The STP will have particular regard to
provision for walking, cycling and public transport access to
and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.
Reason - To promote sustainable transport options and to
meet advice within National Planning Framework 4.
15. Prior to the commencement of development, a scheme for a
covered cycle bay which stores a minimum of 9 bicycles,
shall be submitted to the Council as Planning Authority for
written approval. Thereafter, the agreed scheme shall be  
implemented and operational prior to the occupation of the
development, and thereafter retained in a usable condition
for the life of the development. 
Reason - To encourage active travel and meet advice within
National Planning Framework 4.
16. Prior to the commencement of development, a plan shall be
submitted for the written approval of the Council as Planning
Authority which shows a minimum of 2 accessible parking
spaces.  Thereafter, the agreed scheme shall be
implemented prior to the occupation of the development and
thereafter retained in a usable condition for the life of the
development.
Reason - To ensure that the development provides
adequate accessible parking in accordance with National
Planning Framework 4.
Trees and Landscape
17. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted for the written agreement of the
Council as Planning Authority.  The scheme shall include:
a) Details of the height and slopes of any mounding or
recontouring of the site including existing and
proposed finished levels.
b) Details of existing ground conditions, drainage, pre-
planting preparation, vegetation control, stock size,
stock numbers, stock density, planting arrangement,
planting method, protection methods from vermin,
staking methods, proposed aftercare and
management.
c) Full details of all hard landscaping proposals
including materials and installation methods
(including fences and gates).
Page 38 of 142

Page 39

DRAFT
d) Species, height, size and density of trees, shrubs,
hedges, grassed areas and water features to be
planted. 
e) A schedule of planting to comprise species, plant
sizes and proposed numbers and density.
f) A programme for the implementation, completion and
subsequent management of both the proposed
landscaping and any trees and vegetation to be
retained.
The Landscaping Scheme must include timescales for the
implementation of the works. All soft and hard landscaping
proposals shall be carried out in accordance with the
approved planting scheme and management programme.
Completion of the landscaping scheme shall be supplied in
writing to the Council as Planning Authority within 7 days of
that date. Any planting which, within a period of five years
from the completion of the development is dying, being
severely damaged or becoming seriously diseased, shall be
replaced by plants of similar size and species to those
originally required to be planted. Once provided, all
landscaping works shall thereafter be permanently retained.
Reason - To ensure the implementation and management of
a satisfactory scheme of landscaping which will help to
integrate the proposed development into the local landscape
in the interests of the visual amenity of the area.
18. Prior to the commencement of any works on site, all trees
identified for retention and any peripheral trees bounding the
site, which may be affected by any element of the approved
development and its associated construction shall be
protected in full accordance with BS 5837: 2012 'Trees in
relation to design, demolition and construction'.  Protection
measures, once in place, shall remain in place for the
duration of construction.  If such protection measures are
damaged beyond effective functioning then works that may
compromise the protection of trees shall cease until the
protection can be repaired or replaced with a specification
that shall provide a similar degree of protection.
Reason - To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority.
19. All trees on site, other than those marked for felling on the
approved plans, shall be retained.
Reason - To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority.
20. Prior to the commencement of development, full details of
the proposed offsite landscaping mitigation scheme (as
shown on document no. 08), shall be provided and agreed
in writing by the Planning Authority. The scheme shall set
out the principles for mitigating any significant visual effects
of the development on surrounding receptors, including
Page 39 of 142

Page 40

DRAFT
residential properties, recreational routes and transport
corridors.
The scheme shall include:
 Identification of planting opportunities based on land
availability and suitability;
 Phasing and indicative timing of planting, taking account
of seasonal and operational constraints;
 Details of maintenance and long-term management of
the planting to ensure effective establishment and
retention;
 Full specification of planting proposals, including species
mix (native where appropriate), plant sizes, densities,
and any seeding requirements for grassland or
wildflower areas.
The full offsite landscaping mitigation scheme shall
thereafter be developed in accordance with the agreed
scheme and fully implemented thereafter.  Any planting
which, within a period of five years from the completion of
the development is dying, being severely damaged or
becoming seriously diseased, shall be replaced by plants of
similar size and species to those originally required to be
planted.  Once provided, all landscaping works shall
thereafter be permanently retained
The full offsite landscape mitigation scheme shall be
completed prior to the occupation of the development,
unless otherwise agreed in writing with the Planning
Authority.
Reason - To ensure that significant visual effects of the
development are mitigated as far as reasonably practicable
through a timely and deliverable scheme of landscape
mitigation, in the interests of protecting landscape and visual
amenity.
Biodiversity
21. Prior to the commencement of the development hereby
approved, a detailed plan indicating the location, quantity,
specification and maintenance requirements for
compensation and biodiversity enhancement measures shall
be submitted for the further written agreement of the Council
as Planning Authority.  It shall include:
a) three swallow nesting cups and three house martin
nesting cups as compensation
b) three house sparrow boxes as compensation
c) two barn owl boxes as compensation
d) Biodiversity enhancement measures over and above
the measures required for compensation in
accordance with the recommendations within the
supporting biodiversity survey submitted and hereby
approved.
Thereafter, the agreed scheme shall be maintained in a
reasonable condition for the life of the development.
Page 40 of 142

Page 41

DRAFT
Reason - In the interests of protecting environmental quality
and of biodiversity.
22. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved as
part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason - In the interests of protecting environmental quality
and of biodiversity.
23. The conclusions and recommended action points within the
supporting biodiversity surveys submitted and hereby
approved (document nos. 28 and 39 relate) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development.
Reason - In the interests of protecting environmental quality
and of biodiversity.
24. If works are to be undertaken during the bird breeding
season, no works in connection with the development
hereby approved shall commence until such time that a
detailed check of the site for active barn owl nests has been
undertaken by a surveyor holding a NatureScot Schedule 1
Bird Survey Licence and written confirmation has been
submitted to the Planning Authority for written agreement. 
For the avoidance of doubt, the confirmation shall show that
no birds will be harmed and that there are appropriate
measures in place to protect nesting barn owls on the site. 
The check shall be undertaken not less than 14 days before
the commencement of the development and no site
clearance or other works in connection with the
development hereby approved shall commence unless the
written confirmation has been submitted to and approved in
writing by the Planning Authority.
Reason - In the interests of protecting environmental quality
and of biodiversity.
25. Prior to the commencement of development hereby
approved, a Construction Environmental Management Plan
(CEMP) shall be submitted and approved in writing by the
Council as Planning Authority.  The CEMP will remain a live
document with any working practices deemed to be having
an adverse impact on ecology or the environment will be the
subject of a revision.  All revisions must be submitted to the
Planning Authority as soon as reasonably practicable for
written agreement.  Thereafter the development shall be
fully undertaken in accordance with the agreed CEMP.
Reason: In the interest of protecting environmental quality
and of biodiversity. To minimise any associated adverse
landscape and visual impact of the above ground elements
and protect the character and visual amenity of the
immediate and surrounding countryside.
Page 41 of 142

Page 42

DRAFT
26. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be implemented
for the duration of the construction works of the
development hereby approved.  The measures may include
creation of sloping escape ramps for animals, which may be
achieved by edge profiling of trenches/excavations or by
using planks placed into them at the end of each working
day and open pipework greater than 150 mm outside
diameter being blanked off at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.
Drainage
27. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in accordance
with the technical guidance contained in The SUDS Manual
(C753) and the Council’s Flood Risk and Flood Risk
Assessments Developer Guidance, and shall incorporate
source control.  All works shall be carried out in accordance
with the agreed scheme and be operational prior to the
bringing into use of the development. 
Reason - To ensure the provision of effective drainage for
the site.
28. Storm water drainage from all paved surfaces, including the
access, shall be disposed of by means of suitable a
Sustainable Urban Drainage System to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
Archaeology
29. Development shall not commence until the developer has
secured the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation
acceptable to the Council as Planning Authority, during
development work.  The retained archaeological
organisation shall be afforded access at all reasonable times
and given time to undertake all required monitoring works
and permitted to record and recover items of interest and
finds. The developer will clearly communicate the
development programme to their archaeological
organisation to ensure all necessary monitoring is covered
by the watching brief.  The name of archaeological
organisation retained by the developer shall be given to the
Planning Authority and Perth and Kinross Heritage Trust in
writing not less than seven days before the commencement
date provided in the Notice of Initiation of Development.
Reason - To ensure archaeological monitoring is carried out
to safeguard and record any archaeological remains within
the development area.
Page 42 of 142

Page 43

DRAFT
30. Development shall not commence until the developer has
secured an archaeological standing building survey, to be
carried out by an independent and suitably qualified
archaeological organisation.  The scope of the
archaeological standing building survey will be set by the
Council as Planning Authority, in consultation with Perth and
Kinross Heritage Trust.  The name of archaeological
organisation retained by the developer shall be given to the
Council as Planning Authority and PKHT in writing not less
than fourteen days before the commencement date provided
in the Notice of Initiation of Development.  Copies of the
resulting survey shall be deposited in the National Record of
the Historic Environment and in the Perth and Kinross
Historic Environment Record upon completion of the survey.
Reason - To ensure an appropriate archaeological standing
building survey is carried out and the resulting survey is
recorded properly.
Justification
The proposal is considered as a minor departure to the
Development Plan however there are material considerations that
would justify a departure from the relevant Policy 50 of the LDP2.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance.  In accordance with Regulation
41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the
site of the development
 Readily visible to the public
 Printed on durable material.
Page 43 of 142

Page 44

DRAFT
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has
two months to consider the information.  You should
therefore submit the required information more than two
months before your permission expires.  We cannot
guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with
before your permission lapses.
5. No work shall be commenced until an application for
building warrant has been submitted and approved.
6. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. The proposed demolition and/or building works likely to
cause harm to bats should not commence until the applicant
has obtained the relevant licence issued by NatureScot
pursuant to Regulation 53 of The Conservation of Habitats
and Species Regulations 2010 authorizing the specified
activity/development to go ahead.
8. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
9. The applicant should take note of the information and advice
contained within the consultation response from Scottish
Water.
10. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development.
11. The applicant is advised that, in terms of Sections 56 of the
Roads (Scotland) Act 1984, he/she/they must obtain from
the Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available
Page 44 of 142

Page 45

DRAFT
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environmental
Protection Agency.
12. The applicant can seek guidance on the detailed design and
positioning of the cycle storage from Transport Scotland's
Cycling by Design 2021 or similar design guide. 
13. The applicant is advised that, in terms of Sections 109 of the
New Roads and Street Works Act 1991, he/she/they must
obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
14. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
15. Further information on the need for and level of provision of
Changing Places Toilet Facilities can be found in Section
41B of the Town and Country Planning (Scotland) Act 1997,
the Town and Country Planning (Changing Places Toilet
Facilities) (Scotland) Regulations 2020 and the associated
Circular 1/2020: Changing Places Toilets Regulations.
16. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (tel 01738 477027) Perth & Kinross
Heritage Trust, to discuss terms of reference for work
required.
(The committee took a short recess)
(3) Local Application
(i) 25/00725/FLL - Siting of caravan for a temporary period (in
retrospect), Equine Unlimited, Dungarthill, Dunkeld, PH8 0JF
(Report No. 26/41)
A statement on behalf of objectors was read by Ms Brown, clerk to
the committee.  The applicant, addressed the committee, and
answered members questions.
Resolved:
Grant, subject to the following terms, conditions and informatives:
Conditions
1. The caravan is approved for a temporary period only until 31
August 2027.  Upon expiry of this temporary period the
caravan shall be removed from the site and the site returned
to its original condition to the satisfaction of the Council as
Planning Authority.
Page 45 of 142

Page 46

DRAFT
Reason - In view of the temporary nature of the caravan and
to enable the Planning Authority to review the circumstances
pertaining to the proposal within a reasonable period of time.
2. The core path which forms part of the access track to the
site must not be obstructed during building works or on
completion.  Any damage done to the core path and
associated signage during building works shall be made
good before occupation of the dwellinghouse.  Any
temporary restrictions to public access required to facilitate
works on site must be agreed in writing first with the Access
Officer.
Reason - In the interests of public access along the core
path.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
2. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development.
3. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
honoured throughout and after completion of the
development.
4. The applicant shall ensure the private water supply for the
dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water Supplies
(Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland)
Regulations 2017.
Detailed information regarding the private water supply,
including the nature, location and adequacy of the source,
any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be
submitted to Perth and Kinross Council Environmental
Health in line with the above Act and Regulations.
Page 46 of 142

Page 47

DRAFT
6. Proposal of Application Notices (PoAN)
(i) 25/00016/PAN - Residential development comprising flatted blocks,
installation of SUDS, landscaping and associated works, Perth
Leisure Pool, Glasgow Road, Perth, PH2 0HZ (Report No. 26/42)
Councillor B Brawn requested that officers bear in mind that the area is
susceptible to flooding and that this is looked at when an application is
submitted.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.
(ii) 25/00017/PAN - Erection of residential care facility, community hub,
staff facilities and associated works, Play Area, Perth Leisure Pool,
Glover Street, Perth (Report No. 26/43)
Councillor B Brawn requested that officers bear in mind that the area is
susceptible to flooding and that this is looked at when an application is
submitted.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.
Page 47 of 142

Page 48

Page 48 of 142

Page 49

Perth and Kinross Council
Planning and Placemaking Committee - 11 March 2026
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/63)
Proposal: Formation of a track comprising a running surface of approximately 1.2
kilometres in length, bridge, access, laydown/work compound area(s),
drainage, landscaping and other ancillary works
Location: Land 360 metres north of Glassick Farm, Braco, Dunblane, FK15 9QZ
Ref. No: 25/00984/FLM
Ward No: P7 - Strathallan
Summary
This report recommends approval of the application as the development is considered to
comply with the relevant provisions of the Development Plan and there are no material
considerations apparent which outweigh the Development Plan.
Background and Description of Proposal
1 Although this application itself is not designated as a national development, it is
considered integral to the substation planning application (reference
25/00490/FLN), which is a national development under NPF4, subsequently
approved at Full Council on 10th December 2025. This proposed development is
required to enable the construction of the proposed Cambushinnie 400kV
substation and associated development which is required as a result of the Scottish
and UK Government’s Net Zero climate change targets and associated guidance
which result in significant increase in renewable generation, requiring greater
capacity across the UK grid. As such significant investment in new transmission
network infrastructure to transport renewable energy and reinforce the network is
required. The Applicant is proposing to upgrade the existing Beauly-Denny 275 kV
circuit to 400kV to mirror the ratings of the existing circuit which runs along the
route. The upgrade can make use of the existing overhead line (OHL) but requires
alterations and additions to be made to the associated substations along the route.
The Beauly-Denny upgrade does not require any works to be done to the existing
OHL other than the delivery of new tie-ins from the existing OHL into the proposed
new substations.
2 The purpose of the proposed development is primarily for the delivery of two
transformers required for the proposed Cambushinnie 400kV substation site. These
5(1)(i)
Page 49 of 142

Page 50

transformers would be Abnormal Invisible Loads (AIL) of which it is not considered
possible to pass through Braco village due to their size. In addition, the proposed
development would enable the construction of the 400kV substation and associated
development, avoiding routing construction traffic through Braco village.
3 It is referenced within the supporting Planning Statement that the applicant is
proposing to commence works in mid April 2026 ahead of the construction work
period for the proposed substation. It is proposed that the proposed development
would take approximately 11 months to complete.
4 The operational phase of the proposed development will facilitate construction of
the proposed substation and associated development. Following construction of
the substation, the haul track would remain in situ, with the exception of the bridge
deck, however, it would not be made available for public or non-SSEN
Transmission vehicles and the entrances to the haul track would be gated.
5 It is anticipated that the proposed development, with the exception of the bridge
deck, would be operational in perpetuity, however, the bridge deck would be
reinstated if there were a need for the bridge crossing. The design life would be
the same or greater than the associated substation development.
6 The proposed development is located approximately 3km east of the
existing Braco West Substation and 50m south of Braco village. The
proposed development would route between the A822 and the existing
access track to Braco West Substation to the south of Braco. From the
A822, the track crosses agricultural fields and Keir Burn before crossing the
B8033 adjacent to where the route heads west. Thereafter, the track routes
from the B8033 across agricultural fields and a Christmas tree plantation to
where it adjoins the existing access track to the existing Braco West
Substation, approximately 60m north of Gamekeepers Cottage.
7 The proposed development is subject to a separate planning application due to its
design programme differing from the associated proposed substation, which was
approved at Full Council on the 10th of December 2025, under planning application
reference 25/00490/FLN.
8 The proposed development comprises both permanent and temporary works.as
detailed below:
Permanent Works
Haul Track
9 The proposed haul track will extend approximately 1.2 kilometres in length and 6.5
metres in width, linking the A822 to the existing Braco West Substation.
10 It will incorporate a bellmouth junction at the A822 and feature a combination of
tarmac and Type 1 stone surfacing, with Type 1 material imported to the site for
Page 50 of 142

Page 51

construction. Following completion of the associated substation works, a section of
the tarmac surface will be reverted to Type 1 stone at the request of a landowner.
11 Between the A822 and the B8033, the haul track will be constructed as an
embankment raised above the existing ground level, with its height increasing near
the Keir Burn bridge. In contrast, where the route passes through the Christmas tree
plantation to the west, sections of the track will be set in a cutting, requiring
excavation.
Bridge Abutments
12 A bridge is proposed to span Keir Burn. While the bridge deck will be temporary and
removed following construction of the substation, the supporting abutments on
either side of the burn will be permanent and constructed in concrete.
Flood Relief Culverts
13 Flood relief culverts will be incorporated along the haul track to maintain existing
floodwater conveyance through the embankment and replicate baseline conditions.
The current design proposes 56 culverts arranged in eight clusters, comprising two
circular culverts of 0.5 m diameter, 12 box culverts measuring 1 m × 1 m, and 42 box
culverts measuring 0.5 m × 0.5 m.
Riverbank Reinforcements
14 To reduce flood risk, riverbank reinforcement will be provided by strengthening the
existing flood embankment downstream of the haul track. No in-channel works or
piling are proposed.
Temporary Works
15 The temporary works are provided below, in summary:
 Bridge Deck – the bridge will measure approximately 48m in length and 4.1m in
height from existing ground level to parapet. Once removed will remain in
storage for potential future use in emergencies.
 Bridge fabrication areas – there potential areas for bridge fabrication (if
required) to fabricate on site. Two areas to the south of the haul track, east and
west of the burn and one to the north of the haul track, east of the burn.
 Crane pad areas – required for installation of the bridge and located within the
identified fabrication areas. Constructed using imported Type 1 stone and
geogrid materials, these areas will be removed following completion of the
substation works.
 Temporary Compounds – Two temporary compounds will be required during the
construction phase. The first will be positioned adjacent to the A822,
immediately south of the haul track, and will facilitate haul track construction
works. This compound will be fully decommissioned at the end of the
construction phase. The second compound will be located west of the B8033,
directly south of the haul track, and will function as an access control point. It
Page 51 of 142

Page 52

will provide car and van parking, a welfare unit for security, HGV holding areas,
and space for vehicle turning. Both compounds will be illuminated during
construction hours in winter months and will be removed upon completion of the
construction and operational phases of the development.
 Topsoil Storage Areas – located adjacent to the two southern fabrication areas
and one west of the access control compound.
 Vehicle Cleaning Point – located where the surface of the haul track changes
from tarmac to unbound materials, remaining in place during construction and
operational phase of the proposed development.
 Vehicle Management – temporary access control barriers will be installed at the
A822 junction and east of the access control compound. The haul track will be
gated once operational. Temporary traffic management will be in place at the
A822 and B8033 crossings during construction and operation, with additional
measures applied as required.
 Acoustic Barriers – temporary acoustic barriers are identified to mitigate noise
impacts to properties at Loaning View and Gamekeepers Cottage.
 Temporary Culverts – in place during construction, located adjacent to the
eastern temporary construction compound, to the north and south of the haul
track and adjacent to the access control compound.
 Fencing – temporary fencing around work areas, offset by 5m during the
construction phase with additional temporary heras fencing around the two
temporary compound areas.
 Post Construction – all temporary construction areas would be reinstated
including removal of all temporary site works.
Site History
16 24/00012/PAN - Proposal of Application Notice – contents agreed on 4 November
2024 for the formation of access track, bridge, compound and associated works.
Environmental Impact Assessment
17 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this case
Perth and Kinross Council) when giving a planning permission for particular large-
scale projects to do so in the knowledge of any likely significant effects on the
environment. The Directive therefore sets out a procedure that must be followed
before ‘development consent’ can be given.
18 This procedure, known as Environmental Impact Assessment (EIA), is a means of
drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects. The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent authority
before it makes its decision.
19 An EIA screening has been undertaken as part of this submission, concluding that
an EIA is not required, as the proposal is not considered likely to have significant
environmental effects. This means that, while the development may give rise to
environmental effects, these are not considered likely to be significant enough to
Page 52 of 142

Page 53

warrant a full EIA under the regulations. Concerns regarding the absence of an
EIA have been noted within the letters of representation. However, the Planning
Authority is satisfied that the environmental matters raised have been
appropriately addressed through the supporting documentation submitted with the
application, including the voluntarily provided Environmental Appraisal (EA), which
assesses potential environmental risks and outlines mitigation measures to
minimise any identified impacts.
Pre-Application Consultation
20 Pre-Application Reverence: 24/00012/PAN
21 The proposed development is classed as a ‘Major Development’ as defined in the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009. Therefore, the applicant was required to undertake formal pre-application
consultation with the local community.
22 A Proposal of Application Notice (PAN) was submitted on 25 October 2024. The
public engagement carried out is detailed in the supporting Pre-Application
Consultation Report. Two public consultation events were held at Braco Village Hall
(as well as one earlier non-statutory consultation event held in advance of the
submission of the PAN, with a further 6-week feedback period). The first event took
place on Wednesday 20th of November 3-7pm and the second event took place on
Wednesday 17th of March from 3.30-7.30. The Planning Authority are satisfied that
the requirements of the pre-application consultation have been met.
Development Plan
23 The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance.
National Planning Framework 4
24 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve peoples lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
25 The Council’s assessment of this application has considered the following policies
of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaption
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 5: Soils
 Policy 6: Forestry, Woodland and Trees
Page 53 of 142

Page 54

 Policy 7: Historic Assets and Places
 Policy 11: Energy
 Policy 14: Design, Quality and Place
 Policy 18: Infrastructure First
 Policy 22: Flood Risk and Water Management
 Policy 23: Health and Safety
Perth and Kinross Local Development Plan 2019
26 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
27 The principal relevant policies are, in summary;
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 5: Infrastructure Contributions
 Policy 15: Public Access
 Policy 26B: Scheduled Monuments and Archaeology: Archaeology
 Policy 33A: Renewable and Low Carbon Energy: New Proposals for Renewable
and Low-Carbon Energy
 Policy 33B: Renewable and Low Carbon Energy: Repowering and Extending
Existing Facilities
 Policy 35: Electricity Transmission Infrastructure
 Policy 39: Landscape
 Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
 Policy 41: Biodiversity
 Policy 51: Soils
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 54: Health and Safety Consultation Zones
 Policy 55: Nuisance from Artificial Light and Light Pollution
 Policy 56: Noise Pollution
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
Statutory Supplementary Guidance
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted in
2021)
 Supplementary Guidance - Placemaking (adopted in 2020)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
Page 54 of 142

Page 55

 Supplementary Guidance - Developer Contributions & Affordable
PKC Non Statutory Guidance
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft)
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC and
the River Tay SAC
Other Material Considerations
28 Chief Planners Letter – April 2025 highlights the need for Planning Authorities to be
proportionate when considering suspensive conditions for all forms of renewable
developments and associated enabling works including transmission and
distribution infrastructure. This guidance reinforces the need to ensure that
conditions are reasonable, necessary, and do not place undue burdens on the
delivery of nationally significant infrastructure.
29 The Chief Planner’s letter dated 13 February 2023, regarding transitional
arrangements for National Planning Framework 4 (NPF4), states: “In the event of
any incompatibility between a provision of the National Planning Framework and a
provision of a Local Development Plan, whichever of them is the later in date is to
prevail.” This confirms that, where there is a conflict between NPF4 and the Local
Development Plan, the provisions of NPF4—being the more recent document—take
precedence in decision-making.
30 The Climate Change (Scotland) Act 2009, as amended by the Climate Change
(Emissions Reduction Targets) (Scotland) Act 2019. This Act is a key legislative
driver in shaping planning policy and decision-making. The Act sets a legally
binding target for net-zero greenhouse gas emissions by 2045 and requires
significant reductions across all sectors. These targets are embedded within the
National Planning Framework 4 (NPF4), which forms part of the statutory
Development Plan. As such, the climate obligations set out in the Act are a material
consideration in the assessment of this application.
31 Draft Energy Strategy and Just Transition Plan (January 2023) will replace the
Scottish Energy Strategy (2017) and the Position Statement (2021) once adopted.
The draft plan outlines the Scottish Government’s vision for a net zero energy
system by 2045, focusing on delivering affordable, resilient, and clean energy. This
aligns with the objectives of National Planning Framework 4 (NPF4) and supports
the assessment of energy-related planning applications. Although still in draft form,
the Strategy and Plan provide a clear policy direction and are a material
consideration in planning decisions, especially where proposals contribute to or
align with the transition to renewable energy and low-carbon infrastructure.
Page 55 of 142

Page 56

National Guidance
32 The Scottish Government expresses its planning policies through Planning Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars in addition to NPF4. Those relevant are listed below.
Creating Places 2013
33 Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Designing Streets 2010
34 Designing Streets is the policy statement in Scotland for street design and changes
the emphasis of guidance on street design towards place-making and away from a
system focused upon the dominance of motor vehicles. It was created to support
the Scottish Government’s place-making agenda, alongside Creating Places.
National Roads Development Guide 2014
35 This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision.
Local Place Plans
36 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There are no Local Place Plans for this location.
Consultations
37 As part of the planning application process the following bodies were consulted:
External
38 Scottish Environment Protection Agency: SEPA initially provided a holding
objection pending the submission of further technical information in respect to flood
risk and private water supplies. Following submission, SEPA have withdrawn their
objection to the proposed development, subject to conditions.
39 NatureScot: No objection, however, advise that Perth and Kinross Council is
required to undertake a Habitats Regulations Appraisal due to the site’s status
within close proximity of the South Tayside Goose Roosts Special Protection Area
(SPA).
Page 56 of 142

Page 57

40 Transport Scotland: No objection subject to conditions.
41 Scottish Forestry: No comment.
42 Health and Safety Executive: No objection.
43 Perth and Kinross Heritage Trust: No objection subject to a programme of
archaeological work in accordance with a Written Scheme of Archaeological
Investigation (WSI) condition.
44 National Gas Transmission: No objection.
45 Braco and Greenloaning Community Council: Object to the proposed
development, in summary, on grounds of flood risk, transport and access,
environmental impact and contrary to development plan policies.
46 Historic Environment Scotland: No objection.
Internal
47 Environmental Health (Noise/Odour): No objections, subject to conditions to
control noise, vibration, lighting and construction hours.
48 Environmental Health (Private Water): No objection.
49 Environmental Health (Contaminated Land): No objection.
50 Development Contributions Officer: No developer contribution required.
51 Community Greenspace: No comment.
52 Transportation and Development: No objection, subject to conditions to ensure
the safe and efficient operation of the local road network and to minimise disruption
to the surrounding community.
53 Structures and Flooding: Further the submission of further information, no
objection has been received, subject to condition in respect to SUDs details.
54 Biodiversity: No objection, subject to conditions securing appropriate ecological
safeguards and enhancements.
55 Planning Enforcement Officer (Trees): No objection, subject to conditions
securing the protection of existing trees and the implementation of a landscape and
planting scheme together with compensatory planting.
56 Strategy and Policy: No comment.
Page 57 of 142

Page 58

Representations
57 A total of 49 letters of representation to the proposed development were received,
representing 35 individual households. This includes one representation from Braco
and Greenloaning Community Council. The key issues raised in these
representations are summarised below:
Material Considerations
 Adverse effect on Visual Amenity
 Road Safety Concerns
 Traffic Congestion
 Loss of sunlight/daylight
 Loss of open space
 Over intensive development
 Cumulative impact with BESS projects and substation application.
 Out of scale and proportion to the surrounding rural setting
 Light pollution
 Flood Risk
 Noise pollution
 Loss of trees
 Air Quality
 Contrary to Development Plan Policy and NPF4
 Inappropriate land use
 Out of character with the area
 Economic impact for local businesses
 Effect on SAC and SPA
 Excessive Height
 Concerns that no EIA is required
 Regulatory and Procedural Issues with Community Engagement
Non-Material Considerations
 Impact of property values
 Loss of view
 Community benefit schemes
58 A material consideration is a matter which is taken into account in assessing a
planning application. These are issues which are relevant to the decision. The
material considerations noted above are addressed in the Appraisal section of the
report below. 
59 In response to the comments on the grounds of quality of public consultation
events, the Planning Authority does not offer any comment in this regard beyond
confirming that the pre-application requirements set out by Section 25 of the Town
and Country Planning (Scotland) Act 1997 (as amended) have been met.
Page 58 of 142

Page 59

60 Objections citing non-compliance with specific policies of the Development Plan
(comprising NPF4 and LDP2) are noted. However, these documents must be
interpreted and applied as a whole. The appropriate mechanism for determining
planning acceptability is through the planning balance, which considers all relevant
policies and material considerations in context. This assessment is provided in the
Appraisal section below.
61 In response to the comments received in respect to no EIA being required, this is
addressed in the Environmental Impact Assessment paragraph above.
Additional Statements
Screening Opinion EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
Not required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA completed
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
 Pre-Application Consultation
(PAC) Report
 Environmental Assessment
Reports with associated
Appendices;
 Biodiversity Net Gain
Report
 Geo-Environmental Desk
Study
 Private Water Supply
Assessment
 Transport Statement
 Baseline Noise Survey
Details
 Landscape and Habitat
Management Plan
 Hydrology Report
 General Environment
Management Plan (GEMP)
 Species Protection Plan
(SPP)
 Arboricultural Impact
Assessment
 Preliminary Design Report
 Planning Statement
 Flood Risk Assessment
 Drainage Impact Assessment
 B8033 Bendiness Report
Page 59 of 142

Page 60

Appraisal
62 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance.
Principle
63 The principle of development must be considered under the relevant parts of both
NPF4 and LDP2 2019. NPF4, Annex B – National Developments Statement of
Need identifies development 3 Strategic Renewable Electricity Generation and
Transmission Infrastructure as required to support renewable electricity generation,
repowering and expansion of the electricity grid in order to meet its net zero
emissions targets in the whole of Scotland. It states that the electricity transmission
grid will need substantial reinforcement including the addition of new infrastructure
to connect and transmit the output from new on and offshore capacity to consumers
in Scotland, the rest of the UK and beyond. Identified development types include
new and/or upgraded infrastructure including that directly supporting offshore high
voltage electricity lines, cable and interconnectors including converter stations,
switching stations and substations (3c). The haul track itself is not designated as a
national development, however, it is considered integral enabling infrastructure for
the Cambushinnie 400kV substation, which is a national development under NPF4.
64 The proposal falls under the definition of ‘essential infrastructure’ in NPF4 which
includes enabling works for renewable energy projects including transmission and
distribution infrastructure.  The haul track is required to deliver abnormal loads
(transformers) and facilitate construction of the substation, making it essential to the
delivery of the national development.
65 NPF4 Policy 1 Tackling the Climate and Nature Crises gives weight to the global
climate and nature crises in considering all developments, whilst Policy 2 Climate
Mitigation and Adaptation seeks to ensure that development proposals will be sited
and designed to minimise lifecycle greenhouse gas emissions as far as possible
and to adapt to current and future risks from climate change.
66 Policy 2: Climate Mitigation and Adaptation Planning Guidance (June 2025) is
national guidance published by the Scottish Government to support the
implementation of National Planning Framework 4 (NPF4). It provides detailed
advice on how planning authorities and applicants should address climate mitigation
and adaptation in development proposals.
67 The guidance emphasises that significant weight should be given to a proposal’s
contribution toward national renewable energy generation and greenhouse gas
emissions reduction targets. It also highlights sector-specific standards for enabling
works, such as grid transmission and distribution infrastructure, referencing Ofgem’s
Page 60 of 142

Page 61

environmental reporting guidance. This guidance expects network operators to
enhance whole-life carbon reporting and align with the Publicly Available
Specification (PAS) 2080 standard for major infrastructure projects across the
transmission and distribution networks.
68 Planning Authorities are advised to adopt a proportionate approach—assessing
whether proposals are likely to result in significant emissions, whether these have
been mitigated as far as reasonably possible, and whether appropriate adaptation
measures have been incorporated to address climate change risks.
69 The proposed haul track is an essential component of the Cambushinne 400kV
substation development, which is part of a strategic upgrade to Scotland’s electricity
transmission network. This upgrade is required to accommodate increased
renewable energy generation and meet legally binding net zero targets under the
Climate Change (Scotland) Act 2009. As essential infrastructure facilitating the
transmission of renewable electricity, the proposal is considered to align with the
aims of NPF4 Policies 1 and 2.
70 NPF4 Policy 11: Energy supports the development of all forms of renewable energy,
including generation, storage, and associated transmission and distribution
infrastructure. Specifically, Policy 11a)(ii) provides considerable support for enabling
works, however, this support is conditional on meeting additional criteria, including:
c) maximising net socio-economic benefits;
d) considering international and national environmental designations; and
e) addressing environmental impacts through appropriate project design and
mitigation.
71 Sufficient information has been provided within the planning submission to allow full
consideration of these requirements and is detailed further in the relevant sections
below. The proposal is considered to align with the aims of NPF4 Policy 11.
72 NPF4 offers broad support in relation to the development of renewable energy
initiatives and infrastructure. The effect of NPF4 policy and proposals therefore
creates a presumption in favour of the proposal. Subsequent sections of this
report will consider environmental impacts against the relevant policies of the
development plan.
73 The Perth and Kinross Local Development Plan 2 (LDP2) 2019 addresses the
localised impacts of development, including visual, landscape, amenity,
environmental, and technical considerations such as drainage and transport.
74 Although adopted prior to NPF4 and therefore subordinate to national policy, LDP2
broadly aligns with its objectives, particularly in balancing economic growth with
sustainable development and climate change challenges at a local level.
75 Whilst Policy 33A of LDP2 does not explicitly refer to “enabling works”—a term
introduced by NPF4 Policy 11, which provides explicit support for enabling works
associated with renewable energy infrastructure (including transmission and
Page 61 of 142

Page 62

distribution)—it remains a key policy in assessing this proposal. The intent of Policy
33A encompasses associated infrastructure that supports renewable energy
projects and is integral to delivering the substation development. The policy requires
consideration of both individual and cumulative impacts, including effects on natural
and built heritage, neighbouring amenity, and traffic. Policy 33B encourages low-
carbon energy developments, particularly where they can connect to the grid or
utilise existing infrastructure.
76 Overall, the principle of development is supported due to its alignment with
nationally significant electricity transmission and distribution infrastructure identified
in NPF4. However, full compliance with relevant policies—particularly NPF4 Policy
11 and LDP2 Policies 33A and 33B—is required. Although the haul track is primarily
enabling infrastructure for the substation, it constitutes a new access route and
therefore full compliance with transport-related policies, NPF4 Policy 18 and LDP2
Policy 60B, is also required. Furthermore, both NPF4 and LDP2 require
consideration of environmental, social, and economic impacts, which are assessed
in detail within the following sections to determine overall acceptability.
Landscape and Visual Amenity
Landscape Effects
77 Safeguarding and enhancing landscape character is considered via LDP Policies 1A,
1B, 33 and 39 of the LDP2. Whilst Policy 4(a) and (d) of NPF4 considers impacts on
the natural environment, Policy 11 (Energy) is of more relevance to an equivalent
landscape assessment. These policies seek for any significant landscape and visual
impacts of new development to be addressed whilst resisting development that
causes unacceptable effects through its scale, location or design on key
characteristics, natural landscape elements, features or the composition or quality
of the landscape character on either an individual or cumulative basis. However, it
must also be noted that NPF4 11(e)(ii) states that significant impacts are to be
expected in some cases and therefore may be acceptable.
78 The Landscape and Visual Impact Chapter 4 of the submitted EA Report
considers impacts expected during the construction and operational phase within a
1km study area and includes a cumulative assessment. Technical appendices
including LVIA methodology, Landscape sensitivity, and Viewpoint Descriptions.
79 The Chapter is supported by Figures including Zones of Theoretical Visibility,
Topography, Landscape Character, Visual Receptors, Landscape and Ecological
Mitigation Plan, and selected viewpoints.
80 The haul track site lies within the Broad Valley Lowlands – Tayside Landscape
Character Type (LCT). The Broad Valley Lowlands LCT extends across Strathallan
and is characterised by medium to large-scale agricultural fields, interspersed with
hedgerows, tree belts, and woodlands. Transport infrastructure generally follows the
natural contours of the valley, linking these rural areas to small settlements. There is
a varied sense of openness and enclosure, with expansive views from elevated
positions and more contained views where trees, woodland, and topography provide
Page 62 of 142

Page 63

screening. Settlement is concentrated in Braco village, with scattered rural properties
and farmsteads throughout the area. The A822 and B8033 serve as the main
transport routes, supplemented by several farm and access tracks within the
landscape. Within the study area, this Landscape Character Type (LCT) is not
subject to any formal designations but contains several recreational routes and core
paths. Scenic quality is mixed, the landscape pattern is varied, and the overall sense
of quality is influenced by settlement and land use. Accordingly, the landscape value
is assessed as low.
81 Construction and temporary occupation will introduce increased movement and
activity, creating a localised influence on the Landscape Character Type (LCT). The
permanent haul track will result in a relatively limited change to the LCT once
operational. The appraisal concludes that the proposed development would have a
minor adverse effect on this LCT during construction, temporary operation, and post-
operation phases. A minor adverse cumulative effect during construction and/or
temporary operation has also been identified.
82 Braco Garden and Designed Landscape (GDL), situated north of the proposed
development, is valued for its architectural and nature conservation significance.
However, due to intervening topography and woodland, visibility of the GDL would be
minimal or non-existent; therefore, it has not been considered further in the
Landscape and Visual Assessment (LVA).
83 The Ochil Hills Local Landscape Area (LLA) encompasses the entire Ochil Hills
range, situated between Strathearn and the Loch Leven Basin to the southeast of the
proposed development. Characterised by broad, settled lowland agricultural valleys
and southern hill ridges, the area is noted for its tranquillity, sense of isolation, and
extensive heather moorland interspersed with bands of broadleaf woodland along
glens and lower slopes. Although the LLA lies outside the study area and elevated
slopes could offer some visibility of the proposal, the separation distance and
intervening settlement and development significantly limit potential change.
Consequently, the proposed development is not expected to influence the perceptual
qualities of the LLA and has therefore not been considered further in the Landscape
and Visual Assessment (LVA).
84 The Lowland Hills LCT is located in the northeast of the study area and consists of a
series of low ridges and hills between Strathallan and Strath Tay, forming a
transitional landscape that separates the valleys and links to the surrounding uplands.
This is a transitional landscape, with pastures on lower slopes, woodland and
coniferous plantation on mid sloped and open moorlands higher up. Modern
settlements with scattered farmsteads, prehistoric standing stone and Roman forts
provide an indication of the historical and cultural associations. Part of the Braco GDL
is located on the fringe of this LCT. Intervening topography and woodland would
result in very little or no visibility of the proposed development from this LCT and as
such is not considered further within the LVA.
Page 63 of 142

Page 64

Visual Effects
85 Visual impacts refer to the effects of a development as perceived by specific
receptors, typically more localised than broader landscape impacts. The
assessment of visual impact focuses on sensitive visual receptors, which have been
categorised into three groups: residential, recreational and road users. Potential
visual receptors are noted below:
 Nearby settlement and residential properties, including parts of Braco village
and a number of scattered farmsteads;
 Users of recreational routes such as local Core Paths network within and near
Braco village; and
 Road users travelling along the A822 and B8033.
86 Representative viewpoints have been selected to illustrate the likely views of the
proposed development from various distances and directions, capturing key
perspectives relevant to the assessment. The viewpoints are noted below:
 Viewpoint 1 – Silver Birch Lodge/Easter Feddal - Residential
 Viewpoint 2 – Glassick Farm – B8033 – Road Users
 Viewpoint 3 – Glassick Farm - Residential
 Viewpoint 4 – Loaning View - Residential
 Viewpoint 5 – Greenhaugh Way, Braco - Residential
 Viewpoint 6 – Silverton Farm/B8033 – Residential/Road Users
 Viewpoint 7 – Core Path BRAC/106/1 Kierallan – Recreational and Residential
87 The assessment indicates negligible or minor adverse effects for most viewpoints
and associated visual receptors during construction, temporary operation, and
post-operation phases. However, Viewpoint 4 (Loaning View) and Viewpoint 6
(Silverton Farm) are expected to experience slightly greater change, with
temporary, short-term moderate adverse effects during construction and
temporary operation. Once construction is complete and temporary works are
removed, these effects are anticipated to reduce to minor adverse levels in the
long term.
88 Proposed planting will help to further lessen visual change over time, although not
to an extent that would alter the overall level of effect identified
89 Although concerns were raised regarding the absence of viewpoints from within
the Stirling Council area, the proposed development is located at a considerable
distance and is screened by intervening topography and extensive woodland.
These factors significantly limit visibility and ensure that the perceptual qualities of
the surrounding landscape remain unaffected. As a result, no significant visual
impacts are anticipated on receptors within the Stirling Council area, and further
assessment is not considered necessary.
Page 64 of 142

Page 65

Cumulative Impacts
90 The cumulative assessment considers potential cumulative effects resulting from
the proposed development in addition to a number of other similar proposed or
consented development. Those cumulative schemes included within the scope of
the appraisal are listed below:
 21/00756/FLM – 49.9MW battery storage facility – approved;
 22/02231/FLM – 49.9MW battery storage facility – approved.
91 The cumulative assessment concludes that no significant adverse landscape or
visual effects are anticipated. The two BESS developments lie outside the 1 km
study area and are therefore physically separate from the proposed haul track, with
minimal potential for intervisibility or contribution to cumulative change. While both
BESS schemes will use the existing access track to Braco West Substation at the
western edge of the site, any cumulative impact is expected to be limited to
localised effects during construction. Following completion of works, there is unlikely
to be any perceptible cumulative change
Landscape and Visual Conclusions
92 NPF4 Policy 11 is relevant in that it requires projects to mitigate impacts, and
address landscape and visual impacts. Criteria 11e ii) does also state that “Where
impacts are localised and/or appropriate design mitigation has been applied, they
will generally be considered to be acceptable”. The EA Report and the Planning
Authority are satisfied that the proposed development satisfies this requirement of
the policy.
93 The applicant has proposed compensatory planting to offset tree loss; however,
the quantity and coverage suggested is considered insufficient. As a result, the
applicant was asked to provide additional planting at the A822 junction or, where
tree replacement is not feasible, to introduce hedging as an alternative. It was
further recommended that gaps along the roadside be filled with standard trees to
deliver a more effective and visually appropriate form of compensation.
94 Whilst a compensatory planting scheme aimed at introducing additional planting
across the roadside to mitigate landscape impacts associated with the
development has not been provided at the time of writing, the applicant has
indicated further tree planting options will be considered. While the Planning
Authority acknowledges that securing and maintaining off-site planting can present
logistical challenges particularly in terms of land ownership, long-term
management and enforceability and whilst it is preferable for this information to be
submitted upfront, a pre-commencement planning condition requiring both
strategic on and off-site landscape mitigation will be applied. This condition would
ensure that compensatory planting is delivered in a manner that meaningfully
offsets the visual and landscape effects of the development, contributing to the
overall acceptability of the proposal within its rural context.
Page 65 of 142

Page 66

95 The proposed design, combined with structural landscape screening and tree
planting would provide appropriate mitigation to minimise visual impacts as far as
possible. While some localised visual effects are inevitable given the nature of the
development within an agricultural setting, the facility forms an integral part of the
substation construction and is essential to securing Scotland’s future green energy
supply. In conclusion, the Planning Authority is satisfied that the proposal, subject
to condition, accords with the relevant development plan policies.
Natural Heritage, Biodiveristy and Trees
96 NPF4 Policy 6 and LDP2 Policy 40: Forestry, Woodland and Trees are the key
policies to be applied in the assessment of effects on trees and forestry. The
Council will apply the principles of the Scottish Government Policy on Control of
Woodland Removal and there will be a presumption in favour of protecting
woodland resources. Where the loss of woodland is unavoidable, mitigation
measures in the form of compensatory planting will be required. LDP2 Policy 42:
Green Infrastructure further emphasis appropriate tree retention, protection and
mitigation and as such is also of relevance.
97 NPF4 Policy 3: Biodiversity, NPF4 Policy 4: Natural Places and LDP2 Policy 38:
Environment and Conservation and Policy 41: Biodiversity are the key policies to be
applied in the assessment of the potential effects of the proposed development
upon Natural Heritage, Ecology and Biodiversity. Broadly, these policies state
support in principle for proposals which will conserve, restore and enhance
biodiversity whilst resisting development which by virtue of type, location or scale
will have an unacceptable impact on the natural environment including nature
conservation sites designated for its biodiversity, species, habitat, or geodiversity
importance.
Arboriculture
98 Chapter 8 of the EA Report is relevant and the chapter is supported by Appendix A:
Tree Constraints Plan, Appendix B: Tree Survey Schedule, Appendix C: Tree
Protection Plan, Appendix D: Outline Tree Protection Measures and Appendix H:
99 Arboricultural Impact Assessment, all of which are of relevance.
100 Chapter 3.1.of Appendix H: Arboricultural Impact Assessment specifies that the site
includes agricultural land with timber/shelterbelts encompassing the agricultural land
parcels, Watercourses are located to the north and to the east of the site. Chapter
3.2 specifies that a total of 146 tree features were identified during the fieldwork,
formed of 89 individual trees, 41 tree groups, nine hedgerows and seven
woodlands. The trees on site are between the age ranges of young to mature and
are predominantly in a fair to good condition.
101 The quality of the trees are categorised as A, B, C and U of which there are 49
category A, 46 category B, 49 category C and 2 unclassified (category U). The most
significant tree features on site are noted to be those adjacent to the A822 and
B8033 respectively. The dominant trees in both locations form a mature mixed
Page 66 of 142

Page 67

species (predominantly oak on the A822) avenue formed of predominantly high
quality (category A) trees.
102 The extent of tree removal required to accommodate the haul track is noted within
Chapter 4.3 of the EA Report. Appendix B Tree Survey Schedule provides details of
the trees proposed for removal.
103 In addition to the trees identified for removal, the proposed development will result in
Root Protection Area (RPA) incursions affecting individual trees, hedgerows, and
woodland areas within and adjacent to the site. These incursions are necessary to
facilitate construction activities, including the formation of the haul track and
associated infrastructure. While measures will be implemented to minimise
disturbance, the potential for indirect impacts such as root damage and reduced tree
stability remains. Appropriate protective measures and mitigation will therefore be
secured through planning conditions to safeguard retained vegetation wherever
practicable.
104 The AIA has been assessed on a worst-case scenario where all trees within the
footprint of the haul track, and select trees immediately adjacent, are shown to be
removed. This relates to individual trees and groups of trees rather than an entire
woodland, however, compensatory planting is required to offset the loss of canopy
cover on site.
105 Appendix C: Landscape and Habitat Management Plan outlines a comprehensive
approach to reinstatement and enhancement of the site’s landscape character.
Proposed measures include standard tree planting to infill gaps within existing
roadside vegetation along the B8033, reinforcing the visual continuity of tree belts.
Hedgerow trees are identified for the south-eastern section of the site to strengthen
field boundaries and maintain the established rural pattern. In addition, the scheme
incorporates native woodland planting, meadow grass seeding, agricultural grass
seeding, and new hedgerows across the site, all aimed at improving ecological
connectivity and delivering biodiversity benefits.
106 The Councils Enforcement Officer (Trees) has been consulted and commented that
the tree loss associated with the application site that are of significance are primarily
native broadleaf tree species and situated adjacent to the adopted roads. The
broadleaf trees currently provide a linear corridor of mature vegetation at the
roadsides that is considered of high amenity value. The formation of the improved
junction will create a sizeable gap in this linear corridor and be detrimental to public
amenity.
107 These concerns were relayed to the Applicant and through an amended proposal to
remedy some of the tree loss at the adopted road, by adjusting the visibility splay
set back, an additional 2 trees can be safeguarded. Whilst this proposal is
welcomed, it is not considered to go far enough to compensate for the tree loss
proposed.
108 Further communication with the applicant was undertaken to highlight ongoing
concerns regarding the significant gap in roadside vegetation created by the
Page 67 of 142

Page 68

visibility splay and the limited offer of only 12 standard trees as compensatory
planting. This level of provision was not considered adequate for a development of
this scale.
109 As highlighted in the Landscape and Visual Amenity section above, the initial
compensatory planting proposal was deemed insufficient and additional
interventions including increased planting at the A822 junction, use of hedging
where trees cannot be replaced, and infilling roadside gaps with standard trees
were strongly encouraged. These recommendations underscore the need for a
more comprehensive approach to offset landscape impacts and ensure that the
development maintains visual and ecological integrity. Whilst the proposed
Landscape and Habitat Management Plan includes a range of measures such as
standard tree planting to infill gaps along the B8033, hedgerow trees to reinforce
field boundaries, and additional native woodland planting, meadow grass seeding,
and new hedgerows, these interventions will not fully compensate for the extent of
mature tree loss resulting from the development.
110 Though a revised detailed compensatory planting scheme has not yet been
submitted, the applicant has committed to considering further tree planting options.
To address logistical challenges and enforce mitigation, as noted above the
Planning Authority will impose a pre-commencement condition requiring both
strategic on-site and off-site landscape measures, aiming to achieve meaningful
compensation and support the rural character of the area.
111 The Planning Authority considers that, subject to conditions as noted above, the
proposal satisfies the relevant policy requirements and provides a proportionate
response to the identified impacts.
Ecology
112 Chapter 5 of the Environmental Appraisal (EA) Report addresses ecology and
nature conservation. The submitted survey information is in accordance with
published best practice. Following the submission of additional information and
clarity, the survey work is considered adequate for the purposes of ecological
assessment. Giant hogweed and rhododendron are present onsite, and an
Invasive Non-Native Species (INNS) Control Plan is required and secured by
condition. Giant hogweed is a highly invasive plant species that poses significant
ecological and public health risks. Its sap contains toxic chemicals that can cause
severe skin burns and long-term sensitivity to sunlight. Rhododendron, while less
hazardous to humans, is a major ecological concern as it forms dense thickets that
outcompete native vegetation, reduce biodiversity, and hinder natural regeneration
of woodland habitats.
113 Chapter 6 of the EA Report considers the potential effect of the proposed
development on ornithology. Evaluation of the existing baseline environment has
been made through a combination of desk-based study, field surveys and
consultation. The Council’s Biodiversity Officer has been consulted and notes that
due to the habitats present, consultation with the Tayside and Fife Raptor Study
Group would normally be expected as part of the desk study data sources. This
Page 68 of 142

Page 69

group holds valuable local records on species such as red kite, buzzard, and other
Schedule 1 birds, which can inform survey scope and mitigation requirements.
Biodiversity Enhancement
114 In accordance with Policy 3 of NPF4, Biodiversity Enhancements must be
identified in proportion to the opportunities on site, scale of development and
informed by the ecological survey. NPF4 does not specify how much
enhancement or net positive should be delivered, though biodiversity should
clearly be left in a demonstrably better state than without intervention.
115 The Biodiversity Net Gain (BNG) assessment for the haul track indicates a 9%
decrease in baseline biodiversity units (BU) for area-based habitats, primarily due
to land take and habitat alteration. However, this loss is offset by a substantial
137% gain in linear habitat units (LU) for hedgerows (H), achieved through the
creation and enhancement of new hedgerow planting. These measures are
designed to strengthen ecological connectivity, improve habitat diversity, and
deliver a net positive outcome for biodiversity in accordance with NPF4 Policy 3.
While the proposal involves replacing a short section (0.11 km) of non-native
hedgerow, it will also introduce 0.27 km of hedgerow, however, regrettably, at the
landowner’s request, this is proposed as non-native. This additional planting offers
limited biodiversity value, as non-native species do not provide the same
ecological benefits as native hedgerows, but it is included to respect landowner
preferences and maintain visual continuity.
116 This does not however appear adequate to compensate for the trees and
woodland to be lost and as such an updated plan indicating location, quantity,
specification and maintenance requirements for compensation and biodiversity
enhancement measures shall be submitted for the further written agreement of the
Council as Planning Authority, which can be secured by condition.
Protected Areas
117 The applicant has submitted a Shadow Appropriate Assessment (SAA) which
considers any effect on European sites.
118 The proposed development site is not located within or immediately adjacent to any
designated nature conservation sites, including Special Protection Areas (SPAs),
Special Areas of Conservation (SACs), or Sites of Special Scientific Interest (SSSIs),
however, there are 5 European sites within 10km of the proposed development.
These designations are recognised as statutory nature conservation sites due to
their ecological, habitat, or species importance. Given the separation distance and
lack of hydrological connectivity, it is concluded that the proposal will not result in
any likely significant effects on the qualifying interests of these protected areas.
119 These closest designated sites are listed below. Four of the European sites (SACs)
have been assessed as not being significantly affected by the proposed
development and as such have been ‘screened out’ of the Appropriate Assessment
stage.
Page 69 of 142

Page 70

 South Tayside Goose Roosts SPA;
 Shelforkie Moss SAC;
 River Teith SAC;
 Upper Strathearn Oakwoods SAC;
 Kippenrait Glen SAC.
120 Chaper 4 of the SAA sets out the Appropriate Assessment (AA) on the qualifying
species of the South Tayside Goose Roosts SPA. The AA assesses the disturbance
of qualifying/supporting species and barriers to or displacement of
qualifying/supporting species. These impacts could potentially lead to a significant
effect on the qualifying species of the SPA. In addition, consideration is also given to
the potential for other plans or projects to act-in combination with the proposed
development to give rise to likely significant effects.
South Tayside Goose Roosts (STGR) Special Protection Area (SPA)/Ramsar
121 Component sites of STGR SPA encompasses Carsebreck Loch and surrounding
waterbodies and wetland habitat, part of which is also designated as Shelforkie
Moss SAC. This SPA overlaps Shelforkie Moss SAC at its western end and is
located 1.3km from the proposed development at its closest point. It comprises 3
widely separated designated areas which include the lochs known as Lower Rhynd
and Carsebreck loch.The SPA is designated for populations of wintering waterfowl,
greylag and pink-footed geese as well as breeding populations of wigeon. The site’s
status means that the requirements of the Conservation (Natural Habitats, &c.)
Regulations 1994 as amended (the ‘Habitats Regulations’) apply or, for reserved
matters, The Conservation of Habitats and Species Regulations 2017.
Consequently, Perth and Kinross Council is required to consider the effect of the
proposal on the SPA before it can be consented (commonly known as Habitats
Regulations Appraisal).
122 Greylag and pink-footed geese are known to forage up to 20km from their roost
sites. The proposed development being 1.3km from the SPA at its closest point is
therefore within the foraging range of geese using all the waterbodies
encompassed by STGR SPA. As such the proposal is likely to have a significant
effect on graylag and pink-footed geese of STGR SPA due to the proposal being
on land within foraging distance of the SPA and includes suitable foraging habitat.
123 Consequently, Perth and Kinross Council, as competent authority have carried out
an Appropriate Assessment (AA) in view of the site’s conservation objectives. The
AA concluded that the proposal will not adversely affect the integrity of the site due
to the area of foraging habitat that will be lost to geese is small relative to the total
area of suitable habitat within the foraging distance of the SPA. However, the
Habitats Regulations require competent authorities to ensure no likely significant
effect, and best practice is to include a CMS as part of a Construction
Environmental Management Plan (CEMP). This would provide assurance that
mitigation measures such as noise controls, lighting restrictions and pollution
prevention are implemented consistently throughout the works.
Page 70 of 142

Page 71

Cumulative
124 The cumulative ecological impacts of the proposed development have been
assessed in combination with the following planning applications:
 21/00756/FLM – 49.9MW battery storage facility – approved;
 22/02231/FLM – 49.9MW battery storage facility – approved.
125 The evaluation considered whether other developments, when combined with this
proposal, could result in significant cumulative effects on key ecological features.
This assessment was informed by professional judgement, baseline environmental
data, and supporting technical studies. The findings concluded that no cumulative
impacts were identified that would lead to residual effects beyond a negligible level,
whether the developments occur simultaneously or sequentially. This is contingent
upon the mitigation measures outlined in the Environmental Appraisal being
implemented effectively, and on other related planning approvals applying
equivalent safeguards.
Natural Heritage Conclusion
126 The relevant consultees, NatureScot, PKC Biodiversity Officer and PKC
Enforcement Officer (Trees) have no objection to the proposal subject to conditions
as referenced above. It is considered that the EA Report and supporting documents
satisfies the requirement for an evidence-led approach to the assessment of
potential impact upon the Natural Environment. Appropriate information has been
submitted in support of the application. The Planning Authority is satisfied that the
proposal complies with development plan policies as noted above.
Cultural Heritage
127 NPF4 Policy 7 Historic assets and places and LDP2 Policy 26B Archaeology, Policy
27A Listed Buildings, Policy 29 Gardens and Designed Landscapes, Policy 30
Protection Promotion and Interpretation of Historic Battlefields and Policy 31 Other
Historic Environment Assets are the most applicable policies to assess the
application against in terms of potential impacts upon the historic environment. 
128 Broadly these policies seek to protect and enhance historic environment assets and
places, whilst resisting development which would have an adverse impact on the
character, integrity or setting of listed buildings or scheduled monuments, or other
archaeological sites.
129 Chapter 7 of the EA report covers ‘Cultural Heritage’. A study area of 1km
extending from the boundary of the site was used to identify heritage assets. A
search of designated assets of a wider study area of approximately 2km has also
been undertaken to allow consideration of setting issues. The methodology
included a desk study of records, and a walkover survey.
130 The baseline study identified ten heritage assets identified within the 1km study
area including two Scheduled Monuments, seven Listed Buildings and one
Page 71 of 142

Page 72

Garden and Designed Landscape. A review of designated assets within 2km of
the proposed site boundary recorded a further seven listed buildings. A total of
62 non-designated assets were recorded within 1km of the development site.
The majority of designated assets are located in Braco village itself and included
assets in the settlement of Greenloaning to the south of the 2km study area as
well as Braco Castle and Blackhill Old Toll House to the north.
131 In terms of archaeology, the assessment consisted of desk-based research and a
walk over survey alongside an outline of requirements for mitigation. The site has
previously been used for arable agricultural, therefore, any surviving unknown
archaeology is low. Perth and Kinross Heritage Trust (PKHT) have been consulted
and advised that whilst the architectural potential is considered to be low, there is
still the potential for previously unrecorded assets to remain within the footprint of
the proposed development. A phase of archaeological evaluation trenching will be
required to fully assess the archaeological potential of the proposed development.
The findings from these works will inform the final mitigation strategy, which may
include, but is not limited to, full archaeological excavation, detailed recording and
publication, or monitoring during construction. All archaeological works will be
agreed with PKHT and carried out in accordance with a Written Scheme of
Investigation (WSI) approved by PKHT
132 The assessment concluded that no significant adverse impacts on cultural heritage
assets are anticipated, subject to compliance with the archaeological condition
outlined above. There are no concerns regarding potential impacts on Listed
Buildings or Scheduled Monuments. Following a review of the relevant chapter of
the Environmental Appraisal and consideration of comments from PKHT, the
Planning Authority is satisfied that the proposal will not affect the setting of any
Listed Building, Scheduled Monument, or archaeological resource, subject to the
agreed mitigation measures. As such the proposal meets with the requirements of
the above-named policies.
Transport and Access
133 NPF4 Policy 18 Infrastructure First and LDP2 Policy 60 Transport and Accessibility
are the most applicable policies to assess the application against in terms of
potential traffic and transport impacts. These policies seek to encourage, promote
and facilitate an infrastructure first approach to land use planning, which puts
infrastructure considerations at the heart of placemaking whilst the formation of new
accesses should be designed to the satisfaction of the Council’s Transportation and
Development Team.
134 Colleagues in the Transportation and Development Team have been consulted on
the proposal and have also visited the proposed Haul Track site and associated
sub-station site (subject of a separate planning application) and Braco Village itself.
Phasing
135 This application is proposed to avoid the applicant using the A822 though Braco
and then the B8033 during the construction phase of 25/00490/FLN.  However,
Page 72 of 142

Page 73

there will be a requirement for the applicant to utilise the A822 through Braco and
the B8033 during the construction of the proposed Haul Track.  The Haul Track will
be constructed from the A822 south of Braco linking to the B8033 over the Keir
Burn with a vehicular crossing location over the B8033 where the Haul Track will
continue to meet the access track towards Cambushinnie.  The applicant is
proposing to construct the Haul Track in a phased approach:
 Phase 1 will involve the construction of the vehicle access onto the A822 along
with the appropriate visibility splays.  In constructing this area, welfare facilities
will be constructed.  Phase 1 will involve the construction of the Haul Track from
the A822 to the Keir Burn
 Phase 2 will involve construction of the vehicle access onto the B8033 from the
east of the road and the formation of the Haul Track from the B8033 to the Keir
Burn.
 Bridge this will involve the construction of a Bailey Bridge to link Phases 1 and
2.
 Phase 3 this will involve the construction of the vehicle access onto the B8033
from the west of the road and the formation of the Haul Track from the B8033 to
the Cambushinnie access track.
136 Each of the Phases are shown in Figure 1.
Figure 1 – Haul Track Phasing
Construction Traffic Route
137 The construction traffic associated with the Haul Track has been identified by the
applicant to travel from the south of the site, utilising the A9(T) from the north and
south, resulting in all movements from the A9(T) being considered by the applicant.
Traffic will then join the A822 from the south and if required will use the B8033 to
travel to the construction sites. 
138 It should be noted that it is not possible for HGVs over 10 tonnes to utilise the
B8033 to the south due to the weight restriction on the Kinbuck Bridge, Figure 2.
Page 73 of 142

Page 74

Figure 2 – Kinbuck Bridge 10 Tonne weight restriction
139 The applicant has undertaken an assessment of the routes to the site, with the
collection of Automatic Traffic Counters and Junction Turning Counts undertaken in
April 2024.  The results show that on the B8033 (Easter Feddal) carries
approximately 400 vehicles daily, this reduces when heading west along the B8033,
where this reduces to approximately 250 vehicles daily. On the B8033 at the
Primary School and Village Hall the number of vehicles increases to approximately
800 vehicles daily.  The A822 carries larger volumes on a daily basis with figures
between 4,000 and 4,500.  The A9 carries the largest number of vehicles with daily
traffic volumes of between 26,000 to 30,000 daily.
140 The applicant has undertaken an assessment to determine the impact of the
development on the local road network showing the anticipated increase in Total
Vehicle and HGVs.  The applicant has determined that the peak demand for the
Haul Track will correspond to week 27 July 2026, where during this period there will
36 HGVs and 32 LGVs forecast to be arriving on site per working day.
141 These figures have then been used to determine the anticipated increases in
vehicles numbers and HGVs.  On the B8033 at Braco Primary School and Village
Hall there will be an increase in the number of HGVs by 413%, increasing from a
value of 18 to 90 with overall traffic increasing by 15% from 822 to 942.  The largest
increase in overall traffic is experienced on the B8033 at the Bridge of Keir where
traffic increases by 29% and HGVs increase by 468%.  It should be noted that the
number of HGVs that currently utilise the local road network is low, so local
residents will notice an increase in HGVs using the local road network during the
project.  By contrast, the comparison that the applicant has undertaken on the Trunk
Road network shows that the increases in HGVs will be 2% which is due to the
larger number of HGVs using the A9 between 3,000 to 3,500 daily.
142 During the construction phase of the Haul Track, there will be an increase in traffic
movements on the A822 and the B8033.  The applicant has proposed a number of
mitigation measures on the B8033 including:
 Installation of guardrail on B8033 footways in the vicinity of Braco Primary
School and Braco Village Hall
Page 74 of 142

Page 75

 Upgrading of the zebra crossing
 Installation of temporary traffic management on the Bridge of Keir due to the
narrow road carriageway over the bridge, Figure 3, and the inability of two
vehicles to be able to pass over the bridge.  To provide traffic management over
the bridge and on the road leading up to the bridge, the applicant will be
required to undertake an assessment of the available road widths to ensure that
vehicles crossing the bridge will have sufficient space to pass traffic on the
opposite side waiting to cross the bridge, a minimum road width of 5.5 metres
will be required, but an assessment of the vehicles likely to be utilising the road
will need to be undertaken.
Figure 3: - B8033, Bridge of Keir
143 Once the proposed Haul Track is suitably formed, construction traffic will make use
of this haul route to bypass the village of Braco and to avoid using the B8033.
Construction of the Haul Track will however require access through Braco and the
B8033, and the mitigating measures, particularly as construction traffic passes the
school. This will be controlled by condition.
144 Transport Scotland has not objected to the construction traffic route from the A9,
subject to conditions.
145 The mitigation measures noted above can be secured by condition.
B8033 - Braco Primary School
146 Braco Primary School utilise the Braco Village Hall during the day for assemblies,
whole school events, school lunches and on two days per week the school
undertake physical education in the hall.  The applicant has proposed a number of
mitigation measures for the B8033 outside the Primary School.
147 Further to the mitigation proposed, and due to the close proximity of Braco Primary
School to the public road network on the B8033 Feddal Road, the applicant will not
be able to utilise the B8033 between the hours of 08:30 to 09:15 and 14:45 and
15:30 during school arrivals and departures. This can be secured by condition.
148 The additional mitigation measures proposed along the B8033 will provide greater
safety and reassurance for staff at Braco Primary School, particularly during times
Page 75 of 142

Page 76

when pupils need to move between the school and Braco Village Hall for
assemblies, lunches, or other scheduled activities throughout the school day.
Visibility splays
149 Visibility splays are proposed at the junction with the A822. The applicant will be
required to provide the visibility splays they have detailed for the A822.  This will
be secured by condition.
150 For the crossroads at the B8033, the applicant has proposed traffic management to
control movements over the B8033 due to the applicant not being able to provide
sufficient visibility splays - B8033 Junction Visibility Splays (Report No. 43).  The
B8033 Bendiness Report (Report No. 95) provided by the applicant highlights that
splays of 160 metres will be required at the proposed B8033 junction.  The B8033
Bendiness Report has sited that the environmental and practical implications to
achieve the splays will result in significant tree clearance and associated habitat, as
a result the author of the B8033 Bendiness Report has recommended that
temporary traffic management is provided for the use of the B8033 crossroads. 
151 As a result, a signalised junction is proposed, which will stop the traffic on the
B8033 to then allow the traffic from the Haul Track to cross the B8033.  The position
of the signal heads will need to be considered to ensure that users of the B8033 will
have sufficient forward visibility to see the signal head.  In doing so, the applicant
will be required to demonstrate that there will be sufficient space for two-way traffic
to pass once the signals on the B8033 have returned to allow users of the B8033 to
flow, this may require localised widening of the B8033 to achieve a minimum width
of 5.5 metres.  This, however, can be controlled by condition.
Core Paths
152 There are a number of core paths in the immediate vicinity of the construction
works. To safeguard public access, ensure safety, and protect infrastructure, a
planning condition is recommended to manage potential impacts. This condition will
include measures to maintain connectivity, address any temporary closures or
diversions, and require the repair of any damage to core paths or associated
signage resulting from construction activities.
Car Parking
153 The applicant has confirmed that parking will be available off the public road
network, and no parking will be required on the public road network.
Construction Traffic Management
154 A condition is recommended to secure a construction traffic management plan
(CTMP) which will outline the agreed construction traffic routes and abnormal loads
matters.  Mitigation measures may be required which can be addressed through the
condition.
Page 76 of 142

Page 77

155 The applicant will be required to enter into a Section 96 of the Roads (Scotland) Act
1984 agreement for a conditional survey for the proposed construction traffic road
and abnormal loadings route.  The PKC Structures Team have advised that
abnormal loads related to this development will not be approved until the relevant
requirements have been satisfied.  The Section 96 agreement shall include
baseline and end-of-Section 96 inspections, full CG300 technical approval of all
assessments, and any strengthening or alterations required to ensure safe
passage of all proposed loads over bridges, culverts, and embankments covered
within the scope of CG300 along the proposed route (PKC adopted roads). 
Certification must be completed prior to any load movements, in full accordance
with PKC Structures Team requirements.  Early consultation with Structures team
is strongly recommended to reduce risk of delays. A condition is recommended.
156 PKC will require to be satisfied that the size of loads proposed can negotiate the
construction traffic route. An informative is recommended with respect to the PKC
abnormal loads procedure. Key pinch points on the local road network and swept
path tracking should be undertaken and details provided with regard to any required
changes to street furniture or structures along the route.
157 The framework construction traffic management plan confirms that construction
activities related to the proposed development are anticipated to be:
 07:00 – 19:00 Monday to Friday
 Saturday 08:00 – 13:00
 No construction activities to take place on Sundays and on bank holidays unless
in exceptional circumstances. This will need to be agreed with the Road
Authority in advance.
158 Construction traffic times will be secured by condition.
Transport and Access Conclusion
159 The Council’s Transportation and Development Team and Transport Scotland have
raised no objection to the application, subject to the conditions outlined above. The
Planning Authority is satisfied that, with these conditions in place, traffic impacts
during both the construction and operational phases can be effectively managed.
The proposed development is considered to comply with NPF4 Policy 18 and LDP2
Policy 60.
Flooding and Drainage
160 NPF4 Policies 11 and 22, along with LDP2 Policies 52 and 53, require that all forms
of flood risk are fully understood, appropriately addressed, and that developments
are designed to be flood resilient without increasing flood risk to surrounding areas.
Furthermore, LDP2 Policy 53 requires developers to satisfactorily meet the required
standards for water, wastewater and surface water drainage servicing.
161 The key policies in respect of Private Water Supplies are NPF4 Policy 23: Health
and Safety and LDP2 Policy 53E: Water Supply. These policies combined seek to
Page 77 of 142

Page 78

ensure that development proposals do not pose unacceptable risks to public health
and safety. Developments must not adversely affect the quality or quantity of private
water supplies. The overarching goal is to protect human health and ensure safe,
reliable access to water, particularly for properties dependent on private sources.
162 In relation to Hydrology and Hydrogeology, this is covered in the EA Report under
Chapter 9. The chapter is supported by Appendices and separate supporting
studies including Private Water Supply Assessment; Drainage Impact
Assessment; and Flood Risk Assessment.
163 In terms of baseline, the study area includes an area of 1km from the site
boundary. The proposed development is situated within the Allan Water
Catchment. Within that catchment, the proposed development is located within the
sub-catchment of Bullie Burn. Within the Bullie-Burn sub-catchment there are three
main water features; the Keir Burn, unnamed watercourses and ditches and
unnamed ponds/lakes. Allan Water has been designated as heavily modified due
to the surrounding agricultural land drainage system and Bullie Burn has been
classed as having a moderate overall status.
164 The site is underlain by bedrock Water Framework Directive (WFD) groundwater
body ‘Dunblane’. It has been classified with water quality ‘good’ and overall
condition as ‘poor’.  To the south of the study area near the B8033, there is also a
superficial WFD groundwater body ‘Strathearn Sand and Gravel’. This is a
superficial aquifer which is dominated by intergranular flow.
165 Surveys found areas of damp grassland that rely partly on groundwater and partly
on surface water to stay wet. The most sensitive areas are outside the site and will
not be affected, but some moderately sensitive areas within the site could be
impacted by the proposed works. These areas depend on water from underground
sources and nearby surface water features to maintain their wet soils.
166 The EA Report Chapter 3.3.3 states there are no known private water supples
(PWS) within 1km of the site, however, Chapter 9.4.46 states that Appendix J
Private Water Assessment includes a PWS assessment outlining the PWS
identified in the wider area and distance to the proposed development. This details
that there is a PWS (Blairmore) 41m from the proposed works.  SEPA have been
consulted on the proposal and noted the contradiction and subsequently requested
further information in respect to the supply/source. The applicant confirmed this
was an error in the submission and submitted an updated Appendix J which now
states there are no known private water supples (PWS) within 1km of the site to
align with the EA Report.
167 According to SEPA’s indicative flood mapping the site falls within an area at risk
from fluvial flooding, specifically towards the east of the proposed development,
from the A822, extending to the immediate west of where the B8033 crosses the
proposed development boundary. The fluvial flooding at this location is associated
with the Allan Water and five of its tributaries, namely the River Knaik, the Keir
Burn, Feddal Burn, Millstone Burn and an unnamed watercourse. The proposed
Page 78 of 142

Page 79

development connects to the A822 and B8033, it is noted within the submitted
Flood Risk Assessment, that both of these roads appear to be at risk of flooding.
Private Water Supplies
168 As noted above, a Private Water Supply Assessment (Appendix J) has been
submitted which provided a summary of findings and recommendations. There were
a total of five PWS identified from PKC and Stirling council records, however, all are
noted to be outwith the 1km study area . To safeguard private water supplies (PWS)
within the vicinity of the proposed development, SEPA recommends a precautionary
buffer zone of 250 metres around any known PWS source and whilst the
submission notes no supplies are within 1km of the site, this has not been confirmed
by a walkover survey due to access restrictions.
169 The primary risks to private water supplies (PWS) relate to accidental spillages and
sediment-laden runoff arising from construction activities associated with the
proposed Haul Track. The construction phase may elevate these risks. However,
with the implementation of standard mitigation measures, the potential for
contamination is significantly reduced. SEPA have commented that the Bentick and
Blairmore properties lie >1km from the Haul Road development boundary and at a
significantly higher elevation. It is therefore considered very unlikely the supplies
could lie within SEPAs defined buffer zone, however, since the location cannot be
confirmed absolutely in the absence of the walkover survey, they have advised to
append a condition requiring a Water Management Plan in line with the Council’s
Private Water Supply Teams’ response to the substation application, planning
reference 25/00490/FLN. This could include monitoring and possible contingency
plans should any supply be affected.
170 Subject to condition, the Planning Authority are content that the proposal would
meet the requirements of NPF4 Policy 23 and LDP2 Policy 53E.
Flooding
171 The proposed Haul Track will be approximately 1,239 metres long. Around 550
metres from the A822 junction will have an asphalt surface, while the remaining
section will use an unbound Type 1 stone finish. The track will generally be 6.5
metres wide with 1.2 metre verges and associated earthworks. It will connect to the
A822, the B8033, an existing access track, and the access to Braco West
Substation. A temporary bridge over the Keir Burn is also included and will be
removed once works associated with planning application 25/00490/FLN are
complete. A temporary access control compound and vehicle wash station,
temporary construction areas for laydown and welfare facilities, associated
landscaping/screening and associated drainage in the form of swales are also
proposed.
172 In terms of topography, the FRA notes that the lowest elevation of the Haul Track
sits at 107m (AOD) at the Haul Track junction with the A822. The highest elevation
in the immediate vicinity of the Haul Track is 132m AOD, located between the
B8033 and the existing access track to Braco West Substation.
Page 79 of 142

Page 80

173 The site drains into local watercourses connected to the Allan Water catchment.
Most of the area west of the B8033 flows to a small tributary of the Allan Water,
while the eastern section drains to the Keir Burn, which runs through Braco before
joining the Allan Water. Other nearby burns, including the River Knaik and Feddal
Burn, lie outside the site but also feed into the same catchment.
174 SEPA flood maps show the site is largely at high risk of fluvial flooding. Hydraulic
modelling confirms this risk can be managed through mitigation, including culverts to
maintain water flow and strengthening an existing flood embankment downstream of
Keir Burn. A maintenance regime will ensure culverts remain clear and functional.
175 SEPA have been consulted on the proposal and noted that PKC confirmed the
proposal falls within exception (i) of NPF4 Policy 22a and as such the development
is supported in the flood risk area, subject to the criteria listed in the five bullet points
of Policy 22a being addressed. They, however, issued a holding objection on the
basis of the submission of more technical information being required such as;
compensatory storage, additional hydraulic modelling, design flows clarification,
culvert design and wall water course crossings. Following the submission of further
technical detail, SEPA have withdrawn their objection, subject to condition.
176 The Council’s Flooding and Structures Team have been consulted and following the
submission of further technical detail, have not raised any objections. The proposal
for essential infrastructure is supported under Policy 22a i) of NPF4. The
Planning Authority are content that the proposal would meet the requirements of the
above noted policies.
Surface Water
177 The SEPA surface water flood risk maps shows the proposed development is
largely not at risk of flooding from surface water. The submitted FRA notes there are
two very small isolated pockets which have a medium probability of flooding. These
are noted to be small, localised depressions in the landscape that are highlighted by
the pluvial modelling process. One of the areas is immediately adjacent to the Keir
Burn and the other is to the west of the A822.
178 Surface water from the proposed development will be managed by a new surface
water drainage system. The proposed drainage system design comprises filter
drains within the verges of the Haul Track which discharge to swales at the toe of
the embankments. The swales are also proposed to act as pre-earthworks drainage
and discharge to the Keir Burn and the unnamed watercourse. As a result, the risk
of surface water flooding is considered to be low.
Groundwater
179 Excavation activities have the potential to alter local groundwater flows, with
earthworks likely to result in minor disruptions. However, with the implementation
of good practice measures and the recommendations outlined in the Drainage
Page 80 of 142

Page 81

Impact Assessment, the effects on groundwater are considered negligible and not
significant in relation to groundwater flooding to third parties.
Cumulative
180 A cumulative appraisal was undertaken taking into account the ‘scoped in’ planning
applications as listed below:
 21/00756/FLM – 49.9MW energy storage facility;
 22/02231/FLM – 49.9MW energy storage facility.
181 Both applications noted above would be located approximately 2.8km and 2.9km
north of the proposed development of which are a considerable distance from the
site. The assessment concludes that cumulative impacts on geology, soils, water
quality and flow are not expected to be significant. This conclusion is based on the
distance from the proposed development, Furthermore, providing all other
developments in the area adhere to industry best practice and implement effective
source control measures, will likely result in only minor residual effects. Also, the
variation in construction schedules and activities across different developments
reduces the likelihood of simultaneous impacts occurring within the same
catchments.
Flooding and Drainage Conclusion
182 Overall, it is considered that appropriate information has been submitted in respect
of flooding and drainage matters. In relation to consultees, the Council’s Flooding
and Structures Team and SEPA have no objection, again subject to conditions. In
terms of the policy position relating to flooding and drainage, the proposal complies
with NPF4 Policy 22 and LDP2 Policies 52 and 53.
Geology and Soils
183 NPF4 Policy 9: Brownfield, vacant and derelict land and empty buildings and LDP2
Policy 58: Contaminated Land, are the most applicable policies to assess the
proposal against in terms of potential contaminated land impacts. These policies
require developers to demonstrate that land which is potentially contaminated can
be developed in a safe and suitable manner.
184 Chapter 9.4.22 of the EA Report considers geology and soils. This chapter is
supported by a Geo-Environmental Desk Study Report. It is noted within this report
that the main potential on-site sources of contamination associated with the site
relate to the long history as agricultural land and the presence of minor roadways
and tracks. Agricultural land is unlikely to represent a significant source of
contamination.
185 The Council’s Contaminated Land Team have been consulted and advised that the
site does not raise any concerns in respect to any contamination on the site. A
search of the historical mapping has not identified any potential sources of
contamination likely to impact upon the proposed development site and there is no
Page 81 of 142

Page 82

further information held by the Authority to indicate that the application area has
been affected by contamination.  However, it shall be the responsibility of the
applicant to satisfy themselves that the ground conditions are suitable for the
development for which planning consent has been granted.
186 Overall, the EA Report finds no significant effects. No mitigation is required.
Relevant consultees (Contaminated Land) are satisfied with the proposals. The
Planning Authority are satisfied that the proposal complies with NPF4 Policy 9 and
Policy LDP2 Policy 58
Noise, Vibration and Lighting
187 NPF4 Policy 23 and LDP2 Polices 55 and 56 are of relevance in relation to noise,
dust and light pollution. Generally, these policies do not support proposals that are
likely to result in obtrusive and/or intrusive effects and/or raise unacceptable noise
issues and in cases where a Noise Impact Assessment indicates that a proposed
development could have a significant detrimental impact on noise levels, appropriate
mitigation measures must be provided.
Noise and Vibration
188 Chapter 11 of the Environmental Appraisal document dated June 2025, which
was prepared by AECOM, addresses construction noise and vibration and
assessments. These were undertaken in accordance with PAN1/2011, BS5228
2009 +A1:2014 Code of Practice for Noise and Vibration Control on
Construction and Open Sites – Part 1: Noise. BS5228-1 and Part 2: Vibration
and CRTN for construction traffic noise (Figure 11.3 Construction Traffic Noise
Assessment Routes).
189 Construction noise arising from the proposed development have been assessed
at selected Noise Sensitive Receptors (NSR) within a study area of
approximately 300m from the Haul Track. Four NSRs were identified as Loaning
View (NSR1), Gamekeepers Cottage (NSR2), 1,3,5,7 and 16 Commanders
Grove (NSR3) and Kierallan House (NSR4).
190 Construction vibration arising from the proposed development works has been
assessed at selected vibration sensitive receptors within a study area of
approximately 100 m of the site. A noise survey to define the acoustic character
of the area was carried out by an experienced WSP consultants - Figure 11.1
Baseline Measurement Positions and NSRs. Noise Survey results are presented
in Table 11.6. Calculation of Road Traffic Noise (CRTN) measurements were
carried out between 18 & 19 June 2024 and the position of CTRN1 was located
at the junction of Muthill Road and A822 and CTRN2 was located at the junction
of the access road to Tamano Farm and B8033.
191 To predict the sound levels from the construction works, an acoustic model of the
site and proposed development was created in DataKusttik GmbH CadnaA 2024
MR1.The predicted façade noise levels at NSRs associated with each typical and
worst-case construction activities are presented in Table 11.7. The predicted noise
Page 82 of 142

Page 83

levels at NSR1 to NSR4 meet or fall below the Category A threshold of 65 dB for
weekday daytime hours for the key noise-generating construction activities.
192 The predicted ground borne vibration levels are set out in Table 11.8 which
indicates the predicted vibration levels are well below limits at which cosmetic
building damage becomes likely (15 mm/s) and, at worst, at which construction
vibration is likely to be perceptible in residential environments (0.3 mm/s). This
indicates the vibration generated by the construction activities associated with the
proposed development are unlikely to impact the nearest NSRs.
193 Construction Traffic Noise - the results from the Transport Assessment have been
used as the basis for determining the change in noise levels arising on public
roads because of construction traffic. Road traffic noise calculations have been
carried out in accordance with CRTN, being undertaken for a notional receptor
location 10 m from the edge of the Carriageway.
194 The predicted road traffic noise levels from construction traffic LA10,18hrs(dB) for
the three scenarios (Scenario 1: 2026 Baseline, Scenario 2: 2026 Baseline +
Proposed Development Construction and Scenario 3: 2026 Baseline + Committed
Developments + Proposed Development Construction) are in Table 11.9 & 11.10.
The report concluded that in summary taking into account acoustic context of the
noise levels changes, the magnitude of this temporary impact would be minor on
Feddal Road (West of A822/Feddall Road Junction) and the B8033 (Bridge of Keir
and Glassick) and negligible on Millhill Road (West of A9/ Millhill Road Junction).
For all remaining routes, noise level changes range from 0.0dB to +0.8dB and the
magnitude of this temporary impact would, at worst, be negligible.
195 Recommendations and Mitigation are set out in section 11.7 and states that a
Construction Environmental Management Plan (CEMP) would be prepared prior to
the commencement of works with recommendations related to noise and vibration.
In addition to the CEMP, it is recommended that temporary noise barriers are used
to screen plant and reduce construction noise when activities are being carried out
in proximity of NSR1 and NSR2 shown in Figure 11.2, Appendix A. Mitigation
measures to reduce the potential impacts associated with development generated
traffic on public highway is included in Chapter 10 Traffic and Transport.
Noise and Vibration Conclusion
196 The Council’s Environmental Health (EH) Team have been consulted in respect of
this proposal and has raised no objection to the development, subject to conditions
to protect the residential amenity of Noise Sensitive Receptors. The Planning
Authority are satisfied that there would be no unacceptable significant effects in
relation to noise. Mitigation measures would be secured by condition(s), including a
Construction Environmental Management Plan (CEMP) to manage the impact of
construction activities.
197 It is noted that the applicant seeks working hours Monday to Friday 0700 hours to
1900 hours and Saturday 0800 hours to 1300 hours and there may be times
where 24 hour working is required, seven days a week and potential for out of
Page 83 of 142

Page 84

hours ad-hoc working. The Planning Authority are not agreeable with 7 day
working given the proximity to noise sensitive receptors and the potential to
negatively affect the amenity of local residences. A planning condition would be
applied requiring any works required to take place outwith normal working hours to
be agreed with the planning service in order to safeguard amenity for local
residents.
198 In conclusion, with conditional control in place, the proposal complies with the
above named policies.
Lighting
199 Lighting requirements is noted within the EA Report which specifies that the
proposed development will not be lit during normal operation. Lighting
requirements for the construction phase may be required. The temporary
construction compounds may be lit during working hours during the winter
periods. The effects from light disturbance are to be mitigated through good
construction management, strongly directional and directed only on to the works
area and be turned off when not required use of light sensors, to minimise light
spillage.
Lighting Conclusion
200 The Council’s Environmental Health (EH) Team have been consulted in respect
of this proposal and has raised no objection to the development, subject to
condition to ensure residential amenity of residential properties are not adversely
affected from light intrusion from the development. Their assessment of lighting
impacts concluded that, with appropriate mitigation measures, the development
will not result in unacceptable light intrusion to neighbouring properties.
201 The Planning Authority are satisfied that there would be no unacceptable
significant effects in relation to lighting. Mitigation measures would be secured
by condition to manage any impact of the construction and operational stages of
the development.
Dust
202 Construction sites present multiple potential sources of dust emissions that
require continuous and proactive management to ensure effective control
throughout the project lifecycle. These sources typically include, but are not
limited to, haul roads and access tracks, loading and unloading of materials,
material transportation, soil storage areas, and activities such as quarrying or
blasting. Without robust mitigation, these activities can lead to airborne
particulates that affect air quality and local amenity. By identifying these risks
early and embedding best-practice dust suppression measures—such as water
spraying, wheel washing, and controlled material handling—within the
Construction Environmental Management Plan (CEMP), the development
demonstrates a strong commitment to environmental protection and compliance
with national standards
Page 84 of 142

Page 85

203 The applicant has submitted General Environmental Management Plan (GEMP)
Appendix O which demonstrates a proactive approach to air quality by requiring
a comprehensive Dust Management Plan to be embedded within the
Construction Environmental Management Plan (CEMP). This integration
ensures that dust control measures are not treated as an afterthought but as a
core component of the project’s environmental strategy. The Dust Management
Plan will be required to outline best-practice techniques such as water
suppression, wheel washing, and continuous monitoring to minimise airborne
particulates during construction. By incorporating these measures under the Air
Quality Management section of the CEMP, the proposal reflects a strong
commitment to safeguarding local air quality, protecting public health, and
maintaining compliance with national environmental standards.
Dust Conclusion
204 The Council’s Environmental Health (EH) Team have been consulted in respect
to air quality and subject to the implementation of the Dust Management Plan
within the Construction Environmental Management Plan (CEMP), the proposal
is considered to comply with the relevant provisions of National Planning
Framework 4 (NPF4) and the Perth and Kinross Local Development Plan 2
(LDP2) in relation to air quality. These measures will ensure that dust emissions
from construction activities are effectively controlled, safeguarding local air
quality, protecting residential amenity, and meeting national environmental
standards.
Socio-economic Impacts
205 NPF4 Policy 11(c) – Energy and Policy 25 – Community Wealth Building (CWB)
support development proposals that deliver measurable socio-economic benefits,
such as local employment, business opportunities, and contributions to community
wealth-building strategies aligned with regional economic priorities. While these
outcomes lie beyond the direct control of the planning system and cannot be
secured through planning conditions, only limited weight—either positive or
negative—can be given to these considerations in determining the application.
However, although this application for the Haul Track is not directly applicable to
these policies in isolation, it is considered relevant because the haul track is
essential enabling infrastructure for the proposed substation—a nationally
significant development under NPF4. As such, the socio-economic benefits
associated with the substation project, which this haul track facilitates, are material
considerations that reinforce the strategic importance of the proposal.
206 A socio-economic statement has been submitted in support of the application. It
sets out the applicant’s position on socio-economic matters in relation to its
Pathway to 2030 projects. The applicant highlights its commitment to Community
Wealth Building (CWB) but notes that many aspects of CWB fall beyond the scope
of the planning system. CWB aims to retain and reinvest wealth within local
communities, strengthen community connections, and promote sustainable
development, fair economic opportunities, and long-term business resilience. The
Page 85 of 142

Page 86

applicant’s approach reflects the Scottish Government’s CWB model, which
underpins the National Strategy for Economic Transformation and seeks to create
a fairer, more inclusive society.SSEN Transmission has adopted the following Five
Pillars of CWB:
1. Inclusive Ownership - developing more local and social enterprises that
generate community wealth.
2. Spending - maximising community benefits through procurement and
commissioning, developing good enterprises, fair work and shorter supply
chains.
3. Workforce - increasing fair work and developing local labour markets.
4. Land and property - growing the social, ecological, financial and economic
value that local communities gain from land/property assets.
5. Finance - ensuring that flows of investment and financial institutions work for
local people, communities and businesses.
207 In September 2024, SSEN Transmission launched a £10 million Community
Benefit Fund to support projects that deliver positive impacts for local
communities. The fund aims to promote economic development, community
initiatives, and wellbeing projects, and is available to communities and third-sector
organisations across the north of Scotland for CWB-related activities. A Regional
Fund has been created to support strategic projects in the region focusing on the
following themes:
 People: Focusing on skills, training and employability;
 Place: Emphasising the community and culture of the north of Scotland; and
 Alleviating fuel poverty: looking at strategic ways to help people across the
region.
208 While community benefit is not a material planning consideration, it is recognised
as an important area of interest. In March 2025, the UK Government outlined its
approach to community funds for transmission infrastructure. The applicant has
noted within their statement. based on this guidance, the estimated community
funding associated with this development is £550,000, subject to the proposal
being consented and constructed.
209 As Policy 11c provides no guidance on assessing or securing socio-economic
benefits through enforceable conditions, the Planning Service offers no judgment
on this aspect of the policy.
Planning Balance
210 The requirement for strategic electricity transmission infrastructure is clearly
identified in Annex B of the National Developments Statement of Need, specifically
under Development Type 3: Strategic Renewable Electricity Generation and
Transmission Infrastructure. While this application for the Haul Track does not
constitute electricity transmission infrastructure in its own right, it is considered
relevant because the Haul Track is essential enabling infrastructure required to
facilitate the construction of the proposed Cambushinnie 400kV substation.
Page 86 of 142

Page 87

211 This designation confirms the national importance of upgrading and expanding the
electricity grid to accommodate renewable energy generation and meet net zero
targets. In this context, the Haul Track plays a critical supporting role in delivering
the substation, which is a nationally significant development under NPF4
212 Although there is strong strategic support for transmission infrastructure at the
national level, this proposal for essential enabling infrastructure must still be
assessed against the detailed policy framework set out in Part 2 of National
Planning Framework 4 (NPF4). The principal policy in this regard is Policy 11:
Energy, with additional consideration required under Policy 1: Tackling the Climate
and Nature Crises, and Policy 2: Climate Mitigation and Adaptation. The planning
balance must take into account both the beneficial and adverse significant effects
associated with the development.
213 The purpose of the proposed development, as outlined above, stems from a
recognised strategic need identified through the National Electricity System
Operator’s Pathway to 2030 Holistic Network Design, the British Energy Security
Strategy, and the Accelerated Strategic Transmission Investment Framework,
endorsed by Ofgem. As noted above, whilst the Haul Track is not electricity
transmission infrastructure in its own right, it constitutes essential enabling
infrastructure required to deliver the Cambushinnie 400kV substation—a nationally
significant development under NPF4. This enabling infrastructure is critical to
upgrading the electricity transmission grid to accommodate a projected increase in
renewable energy generation, enhance grid resilience, and improve connectivity
across the wider network. Its contribution to Scotland’s net zero emissions targets
is therefore a key consideration and carries significant weight in the overall
planning balance.
214 When considering NPF4 Policy 11: Energy, the compliance, or otherwise must be
assessed against the relevant criteria. Policy 11a, ii. gives explicit support to
enabling works [to all forms of renewables], such as grid transmission and
distribution infrastructure. While the policy does not list every possible enabling
work, its intent is clear: works that are essential to deliver nationally significant
energy infrastructure such as substations, fall within its scope. The proposed Haul
Track is required to facilitate the construction of the Cambushinnie 400kV
substation, therefore it is considered enabling infrastructure and benefits from the
presumption in favour of development under Policy 11(a)(ii)
215 The Environmental Appraisal (EA) Report submitted in support of the application,
and as summarised and assessed within this Committee Report, provides a detailed
evaluation of the proposal against the specific criteria of Policy 11 of National
Planning Framework 4 (NPF4). This includes consideration of socio-economic
impacts (11c); effects on communities and individual dwellings, including residential
amenity and visual impacts (11ei); significant landscape and visual impacts (11eii);
impacts on road traffic and trunk roads, particularly during construction (11evi);
effects on the historic environment (11evii); hydrology, water environment and flood
risk (11eviii); biodiversity (11eix); impacts on trees, woodlands and forests (11ex);
and cumulative impacts (11exiii).
Page 87 of 142

Page 88

216 A key consideration within the planning balance is the extent of significant impacts
on landscape character and visual receptors arising from the development. Policy
11e(ii) of NPF4 acknowledges that where such impacts are localised and/or
appropriate design mitigation has been incorporated, significant landscape and
visual effects may be deemed acceptable.
217 A key consideration within the planning balance is the extent of significant impacts
arising from the development, including landscape character, impacts on trees and
woods, visual receptors, flooding, and traffic during the construction phase. Policy
11e (i), (ii), (vi), (viii) and (x) of NPF4 acknowledges that where such impacts are
localised and/or appropriate design mitigation has been incorporated, significant
effects may be deemed acceptable. In this case, mitigation measures such as, but
not limited to, strategic landscaping, culvert design and flood embankment
reinforcement, and a Construction Traffic Management Plan are secured by
condition to ensure these impacts are managed effectively and reduced to an
acceptable level
218 The proposed development is expected to result in notable landscape and visual
impacts during both the construction and temporary/operational phases. While
many of these impacts are anticipated to persist into the operational phase, they are
considered to be relatively localised. However, these residual effects can be
appropriately addressed through embedded design mitigation and the application of
planning conditions, which will help to manage and reduce the overall impact over
time.
219 Although significant impacts have been identified—including effects on landscape
character, visual receptors, trees and woodland, flooding, and traffic during the
construction phase, the proposed mitigation measures will go a considerable way
toward addressing them. Some residual impacts will remain, however, the key
policy question is whether these impacts are acceptable in the context of NPF4
Policy 11e(i), (ii), (vi), (viii), and (x) and the wider policy environment. These
provisions collectively recognise that localised impacts on amenity, transport, flood
risk, and natural assets may occur and can still be acceptable where appropriate
design and mitigation measures are applied. In this case, embedded mitigation and
conditions ensure that impacts are managed effectively. When weighed against the
wider benefits of enabling nationally significant infrastructure, these residual effects
are not considered unacceptable.
220 In conclusion, while the assessment identifies several adverse significant residual
effects arising from the development, these can be appropriately managed through
embedded design mitigation and secured planning conditions, ensuring that the
impacts are minimised and controlled throughout the construction and
temporary/operational phases.Sufficient information has been provided to assess all
policy criteria of NPF4 Policy 11 and the proposal complies, on balance, with all
requirements.
Page 88 of 142

Page 89

Planning Obligations and Legal Agreements
221 None required.
Direction By Scottish Ministers
222 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.
Conclusion and Reasons for Recommendation
223 Policy 11 of NPF4 provides clear support for enabling infrastructure associated with
renewable energy developments. However, it is acknowledged that the proposed
development is likely to result in significant environmental effects, particularly in
relation to localised landscape and visual impacts. While the mitigation measures
identified will help to reduce these effects, some residual impacts will remain.
224 NPF4 Policy 11e(i), (ii), (vi), (viii), and (x) collectively acknowledge that where
impacts are localised and appropriate design mitigation is applied, such effects are
generally considered acceptable. In this context, the proposal is deemed to comply
with these provisions. When weighed against the wider benefits of the proposal—
namely, the enhancement of the transmission network to support future renewable
energy connections, improved grid resilience, and alignment with Scotland’s net
zero emissions targets—the residual impacts are not considered to outweigh the
overall positive contribution of the development.
225 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval subject
to the following conditions.
Recommendation 
Approve the application subject to the following conditions:
Conditions and Reasons for Recommendation
General
1. This planning permission will last only for three years from the date of this decision
notice, unless the development has been lawfully started within that period.
Page 89 of 142

Page 90

Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. Notwithstanding the approved plans, when the temporary bridge deck is removed
following completion of the haul track, then if it is to be reinstated for emergency
works or for the delivery of abnormal loads, then it shall be reinstated in the
approved location. Prior to reinstatement, details of the proposed works, including
timing, method of installation, and any necessary environmental safeguards, shall
be submitted to and approved in writing by the Planning Authority. The agreed
scheme shall then be implemented accordingly. The bridge deck shall be removed
again once the emergency works are complete, and the site reinstated in
accordance with the approved plans.
Reason – To ensure that any reinstatement of the temporary bridge deck is
controlled, environmentally safeguarded, and limited to essential emergency works
only, thereby minimising long-term landscape and ecological impacts while
maintaining operational flexibility for abnormal load deliveries.
Roads and Access
3. The section of the Haul Track between Access Point 1 and Access Point 2, as
shown on Drawing No. 31, shall be fully constructed prior to commencement of
works on the section between Access Point 3 and Access Point 4.
Reason - in the interest of road safety for users of the B8033 and to minimise
construction traffic passing Braco Primary School and Braco Village Hall.
4. Prior to the utilisation of each access point for construction traffic in relation to the
formation of the Haul Track, the bellmouth onto the public road network shall be
formed for the first 10 metres, in accordance with the layout on Drawing No. 48 and
49 to the Pavement Standard specification detailed on Drawing no. 50. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary.
5. The crossroads on the B8033 between Access Point 2 and Access Point 3, as
shown on Drawing No. 31, shall not be utilised unless traffic-controlled signals are
installed and operational.
Reason - in the interest of road safety for users of the B8033 and traffic utilising the
Haul Track.
6. During the operational phase of the development hereby approved, the vehicle
access points from the A822 and the B8033, identified as Access Points 1, 2, and 3
on Drawing No. 31, shall be gated and locked when not in use to prevent public
access outside operational hours.
Reason - in the interest of road safety.
Page 90 of 142

Page 91

7. No construction traffic associated with the haul track shall use the B8033 between
the access to Silverton Farm and the junction with the A822, in either direction, nor
use the A822 on Front Street between Ardoch Bridge and a point 35 metres south
of Commander’s Grove, in either direction, during the hours of 08:30 to 09:15 and
14:45 to 15:30.
Reason - In the interests of pedestrian and traffic safety at school opening and closing
times.
8. Prior to the commencement of works a maintenance agreement under Section 96 of
the Roads (Scotland) Act 1984 shall be entered in to in respect of the construction
traffic route, namely A822 and B8033, whereby the roads shall be inspected on a
regular basis and repairs carried out to the timescale and standards specified by the
Council as Roads Authority to the satisfaction of Perth & Kinross Council.
Confirmation of this agreement being in place shall be provided to the Council, as
Planning Authority, a minimum of four weeks prior to the commencement of
development. The Section 96 agreement shall include baseline and end-of-Section
96 inspections, full CG300 technical approval of all assessments, and any
strengthening or alterations required to ensure safe passage of all proposed loads
over bridges, culverts, and embankments covered within the scope of CG300 along
the proposed route. Certification must be completed prior to any load movements, in
full accordance with PKC Structures Team requirements. 
Reason – in the interest of road safety.
9. Prior to commencement of deliveries to site, the proposed route for any abnormal
loads on the trunk road and local road network(s) must be submitted to and
approved by the Planning Authority, in consultation with Transport Scotland and the
Roads Authority. Thereafter, the agreed route must be adhered to in full for the
duration of the construction period.
Reason – to ensure that the transportation of abnormal loads will not have any detrimental
effect on the trunk road and local road network(s).
10. Prior to the commencement of the development hereby approved, full visibility
splays for the A822 of 90 metres along the channel line shall be provided and
maintained to the left and right of the access, at a set-back of 2.4 metres measured
1.05m above the road level to the standard and specification required by the
Council as Planning Authority in consultation with the Roads Authority. The visibility
splays shall be physically formed on the ground and any existing fences, walls,
hedges or other means of enclosure or obstructions within the splays shall be
removed and relocated outwith the splays.  Once formed, the visibility splays shall
be permanently retained thereafter, and no visual obstruction of any kind shall be
permitted within the visibility splays so formed.
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary.
Page 91 of 142

Page 92

11. Prior to commencement of any development on site, a detailed design showing the
mitigation measures for the B8033 shall be submitted to and approved in writing by
the Planning Authority. The design must include the following schemes:
(a) details of the temporary traffic management for the Bridge of Keir over Keir
Burn to include details of the waiting location for vehicles with a minimum road
width of 5.5 metres in advance of the traffic management in both directions to
allow suitable road space for vehicles to pass.  The road widening shall be a
permanent road surface;
(b) details of the temporary traffic management for the B8033 crossroads at
Access Points 2 and 3 on Drawing No. 31 to include details of the waiting
location for vehicles with a minimum road width of 5.5 metres in advance of the
traffic management in both directions to allow suitable road space for vehicles
to pass.  The road widening shall be a permanent road surface;
(c) details of the proposed pedestrian barrier at Braco Primary School and Braco
Village Hall on B8033 Feddal Road, to include the barrier specifications, length
of barrier to be installed, the resultant footway width available after barrier
installation; and
(d) a signalised puffin crossing on the B8033 Feddal Road to replace the current
zebra crossing to link Braco Primary School with Braco Village Hall to provide
a controlled crossing location for pupils, staff and visitors to cross to B8033. 
The location and specification of the signalised puffin crossing shall be agreed
with the Planning Authority in consultation with the Roads Authority.
The approved scheme shall be fully implemented prior to any use of the B8033 by
any traffic associated with the haul track and planning application 25/00490/FLN.
Reason - In the interests of road and pedestrian safety along the B8033
12. Prior to the movement of any abnormal load, any accommodation measures
required, including the removal of street furniture, junction widening and traffic
management, must be approved in writing by the Council as Planning Authority, in
consultation with Transport Scotland. Thereafter, the agreed measures shall be
undertaken prior to the movement of any abnormal load.
Reason - to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network.
13. Prior to the movement of any components and/or construction materials, any
additional signing or temporary traffic control measures deemed necessary due to
the size or length of any loads being transported must be undertaken by a
recognised QA traffic management consultant, to be approved by Transport
Scotland.
Reason - to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network.
14. The core paths which form part of the construction traffic route to the site must not
be obstructed during building works or on completion.  Any damage done to the
Page 92 of 142

Page 93

core path and associated signage during building works shall be made good prior to
the operational use of the Haul Track.  Any temporary restrictions to public access
required to facilitate works on site must be agreed in writing first with the Access
Officer.
Reason - In the interests of public access along the core path.
15. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning Authority,
in consultation with the Roads Authority (Structures) and Transport Scotland, a
Construction Traffic Management Plan (CTMP) which shall include the following:
a. restriction of construction traffic to approved routes and the measures to be put
in place to avoid other routes being used;
b. timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse collection
is undertaken, on Sundays and during local events;
c. a code of conduct for HGV drivers to allow for queuing traffic to pass;
d. arrangements for liaison with the Roads Authority regarding winter
maintenance;
e. emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f. arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g. arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h. arrangements for signage at site accesses and crossovers and on roads to be
used by construction traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
i. details of information signs to inform other road users of construction traffic;
j. arrangements to ensure that access for emergency service vehicles are not
impeded;
k. co-ordination with other significant developments known to use roads affected
by construction traffic;
l. traffic arrangements in the immediate vicinity of temporary construction
compounds;
m. monitoring, reporting and implementation arrangements;
n. arrangements for dealing with non-compliance; and
o. details of HGV movements to and from the site. 
p. identify measures to control the use of any construction vehicles onto the trunk
road.
The CTMP as approved shall be strictly adhered to during the entire site
construction programme.
Reason – To mitigate the adverse impact of construction traffic on the safe and
efficient operation of the trunk road and local road network(s).
Page 93 of 142

Page 94

Residential Amenity
16. Prior to the commencement of the development, temporary noise barriers shall be
put in place in line with the recommendations in Environmental Appraisal document
dated June 2025, Figure 11.2 and Appendix A :- Barrier A – 2m high barrier
approximately 70m in length situated to the south of construction works between the
junction with the existing track to the Braco Substation and the junction with the
existing track to Whistlebrae, Barrier B- 2m high approximately 65m length south of
construction works and to the east of junction with existing track to Whistlebrae,
Barrier C-3m high approximately 80m length situated along the field boundary
immediately adjacent to B8033, Barrie D- 3m high 65m length situated to the south
of the construction works and to the east of junction with B8033. The Barriers
should be a minimum surface mass of 7kg/m2, no gaps at joints and line of site to
NSRs is blocked where possible.
Reason - In order to safeguard the residential amenity of the area.
17. In the event, that justified complaints for noise are received by the Council, the
applicant at their own expense, shall employ an independent and suitably qualified
consultant to carry out a Noise Assessment from the development. The appointed
consultant and methodology for the Noise Assessment shall be submitted to and
approved in writing by the Planning Authority in consultation with Environmental
Health within 28 days of being notified of the complaint. Within 28 days of approval
of appointed consultant and methodology, a Noise Assessment shall be submitted
outlining mitigation and recommended timescales for delivery. Thereafter, all
mitigation measures shall be implemented within the timescales recommended.
Reason - In order to safeguard the residential amenity of the area.
18. There shall be no idling of vehicles within the compound area at any time.
Reason - In order to safeguard residential amenity and minimise unnecessary
emissions during construction.
19. No construction work, including deliveries to and from the site, shall take place
outside the hours of 07:00 and 19:00 Monday to Friday and 07:00 and 13:00 on a
Saturday and at no time on a Sunday. This includes deliveries and operation of on-
site vehicles and equipment. Out of Hours working requests can be made to the
Planning Authority for written agreement, giving at least two weeks’ notice. Details
of the activities to take place must be included within the request.
Reason - In order to safeguard the residential amenity of the area.
20. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does not adversely affect the
amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of the area.
Page 94 of 142

Page 95

Private Water Supplies
21. Prior to commencement of development within the Private Water Supply (PWS)
buffer zone (100m – 250m dependent on construction depths) detailed plans of the
finalised development and all associated infrastructure shall be overlain with the
relevant buffer zones for the PWS sources to properties within 250m. If any PWS is
found to have a groundwater source and the source lies within the buffers, which is
set out in ‘SEPA Guidance on Assessing Impacts of Developments on
Groundwater Abstractions’, dated August 2024, then a detailed PWS risk
assessment and monitoring / mitigation plan must be submitted to the Council as
Planning Authority for written agreement before proceeding, in consultation with
the Council’s Environmental Health Team and SEPA. For the avoidance of doubt,
any PWS that serves a property that will continue to require a PWS through the
construction and post-construction periods, shall be included in the risk
assessment in line with ‘SEPA Guidance on Assessing Impacts of Developments
on Groundwater Abstractions’.
Any required PWS risk assessment and monitoring / mitigation plan shall set out:
a. details of the methodology for water quality and quantity sampling (including
abstraction points) for a period of 12 months prior to commencement of
development within the relevant PWS buffer zone(s);
b. details of the methodology and a programme for undertaking water quality
and quantity sampling during the construction period within the relevant PWS
buffer zone(s) (including abstraction points); and
c. details of the methodology for water quality and quantity sampling for a
period of 12 months post construction (including abstraction points) within
the relevant PWS buffer zone(s).
The approved plan shall thereafter be implemented in full upon commencement of
development within the relevant PWS buffer zone(s). Monitoring results should be
reported to the Planning Authority and the owner/operator of the existing
abstractions in accordance with the above timescales. Contingency plans should
include timescales for notification of relevant stakeholders if adverse impacts are
identified and for subsequent design and implementation of remedial actions.
Reason - In the interests of protecting the Residential Amenity of existing
properties, the health of residents and continued access to safe and sufficient
water supplies.
Alternative Private Water Supply Source
22. There shall be no commencement of development within the Private Water Supply
(PWS) buffer zone (100m – 250m, dependant on construction depths) until
documentary evidence has been provided to and agreed by the Council as
Planning Authority, which demonstrates that suitable replacement water supplies of
sufficient quantity and quality can be made operational, should any detailed PWS
risk assessment identify this as the most suitable mitigation measure. In each case,
the replacement supply shall either be from the public mains or derived from a
Page 95 of 142

Page 96

suitable source shown to be at low or negligible risk of contamination or disruption
and which does not prejudice the quantity or quality of water delivered by other
existing private water supplies. Information detailing the suitability of the source;
risk of contamination and disruption; impact upon existing supplies; and details of
how the supplies will be managed and maintained, must be submitted to and
agreed with the relevant Planning Authority in advance of any other works being
carried out in association with this permission.
Reason - In order to provide alternative water source in the event of long term
negative impact on PWS.
Flooding and Drainage
23. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the written agreement of the
Council as Planning Authority, in consultation with SEPA where necessary.  The
scheme shall be developed in accordance with the technical guidance contained in
The SUDS Manual (C753) and the Council’s Flood Risk and Flood Risk
Assessments Developer Guidance, and shall incorporate source control. All works
shall be carried out in accordance with the agreed scheme and be operational prior
to the bringing into use of the development.
Reason - To ensure the provision of effective drainage for the site.
24. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable a Sustainable Urban Drainage System to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for the site.
25. No development shall commence until the compensatory storage as approved in
the Technical Memorandum (Document number 122) has been provided in full and
is operational.
Reason - To ensure that there is no reduction in floodplain capacity during the
construction phase and prevent increased flood risk elsewhere, as is required by
Policy 22a of National Planning Framework 4.
26. Prior to the commencement of development, a Construction Phase Plan shall be
submitted to and approved in writing by the Council as Planning Authority. The plan
must specifically address the location of any construction compounds and storage
areas, ensuring that such facilities are neutral and that welfare facilities are sited
outwith the functional floodplain. All measures outlined within the approved
Construction Phase Plan must be implemented and adhered to throughout the
construction phase.
Reason - To ensure that construction activities do not adversely affect floodplain
functionality and to safeguard the welfare of site personnel.
Page 96 of 142

Page 97

Biodiversity
27. The conclusions and recommended action points within the supporting
Environmental Appraisal submitted and hereby approved (document 96 relates)
shall be fully adhered to, respected and undertaken as part of the construction
phase of development.
Reason - In the interests of protecting environmental quality and of biodiversity.
28. An updated Environmental Appraisal, including an updated ecology survey, will be
required prior to the commencement of works, if works have not commenced within
24 months of the date of the Environmental Appraisal approved as part of this
permission. The updated Environmental Appraisal shall be submitted to the Council
as Planning Authority for written agreement and works shall not commence until
after such written agreement has been issued by the Council.
Reason - In the interests of protecting environmental quality and of biodiversity.
29. An updated bat survey will be required prior to the commencement of works, if
works have not commenced within 24 months of the date of the bat survey
approved as part of this permission.  The updated survey shall be submitted to the
Council as Planning Authority for written agreement and works shall not commence
until after such written agreement has been issued by the Council.
Reason - In the interests of protecting environmental quality and of biodiversity.
30. Prior to the commencement of the development hereby approved, an Invasive Non-
Native Species Control Plan shall be provided for the written approval of the Council
as Planning Authority. The plan shall contain measures to eradicate and control
invasive non-native species. Thereafter, the agreed scheme shall be implemented
in full accordance during the construction phase.
Reason - In the interests of protecting environmental quality and of biodiversity.
31. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of the
development hereby approved. The measures may include creation of sloping
escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day.
Reason - In order to prevent animals from being trapped within any open
excavations.
32. A minimum of two months prior to the commencement of development, a site-
specific Construction Environmental Management Plan (CEMP) which shall include
a Construction Method Statement (CMS) shall be submitted to and approved by the
Council as Planning Authority in consultation with key stakeholders as deemed
Page 97 of 142

Page 98

appropriate. The CEMP must also include a Pollution Prevention Plan (PPP), Site
Waste Management Plan (SWMP), Site Access Management Plan (SAMP),
Construction Exclusion Zone (CEZ) and General Environmental Management Plan
(GEMP). The CEMP will remain a live document, any working practices deemed to
be having an adverse impact on ecology or the environment will be the subject of
revision. All revisions must be submitted to the Planning Authority as soon as
reasonably practicable. Thereafter the development shall be fully undertaken in
accordance with the agreed CEMP.
Reason - In the interest of protecting environmental quality and of biodiversity. To
minimise any associated adverse landscape and visual impact of the above ground
elements and protect the character and visual amenity of the immediate and
surrounding countryside and associated nature and cultural heritage conservation
interests.
33. Prior to the commencement of the development hereby approved, pre-construction
surveys shall be undertaken for protected species including raptors. Details of the
surveys should be used to inform Species Protection Plans that shall be submitted
for the further written agreement of the Council as Planning Authority. Thereafter,
any identified measures shall be implemented prior to the commencement of
development.
Reason - In the interests of protecting environmental quality and of biodiversity.
34. Prior to the commencement of the development hereby approved, an independent
and suitably qualified Ecological Clerk of Works (ECoW) shall be appointed at the
developers' expense. Details of this appointment shall be subject to the prior written
agreement of the Council as Planning Authority. The appointed person will remain
in post for the duration of the proposed development. The ECoW shall have
responsibility for the following:
(a) Overseeing the implementation of the Construction Environmental
Management Plan (CEMP) and habitat restoration approved by this
permission.
(b) Authority to stop operations or to alter construction methods should there be
any works occurring which are having an adverse impact on the natural
heritage.
(c) Prior to the commencement of development, they shall provide an
environmental / ecological toolbox talk for construction staff.
(d) They will have authority to amend working practices in the interests of natural
heritage. Any amendments shall be submitted to the Council as Planning
Authority as an addendum to the approved CEMP.
(e) They shall make weekly visits to the development site at a time of their
choosing. No notification of this visit is required to be given to the developer or
contractor.
(f) Within 10 working days of the end of each calendar month, they are required
to submit a detailed monthly report for the review of the Planning Authority in
consultation with Scottish Environment Protection Agency (SEPA) for the
duration of development.
Page 98 of 142

Page 99

(g) They shall notify the Council as Planning Authority in writing of any
requirement to halt development in relation to this condition as soon as
reasonably practicable.
The above shall be implemented throughout the construction, (including re-
instatement and de-commissioning of the construction compounds) hereby
approved unless otherwise agreed in writing with the Council as Planning Authority.
The CEMP shall contain a site-specific Construction Method Statement (CMS)
which will provide concise details for the implementation of the CEMP for site
operatives.
Reason - To avoid habitat damage and safeguard natural heritage interests.
Trees and Landscape
35. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction.
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority.
36. No works in connection with the development hereby approved shall commence
unless a scheme of hard and soft landscaping works has been submitted to and
approved in writing by the Planning Authority. Details of the scheme shall include:
a) Existing and proposed finished levels.
b) The location of new trees, shrubs, hedges, grassed areas and water
features.
c) A schedule of planting to comprise species, plant sizes and proposed
numbers and density.
d) The location, design and materials of all hard landscaping works
including fences, gates.
e) A programme for the implementation, completion and subsequent
management of both the proposed landscaping and any trees and
vegetation to be retained.
The Landscaping Scheme must include timescales for the implementation of the
works.
All soft and hard landscaping proposals shall be carried out in accordance with the
approved planting scheme and management programme. Any planting which,
within a period of 5 years from the completion of the development is dying, being
severely damaged or becoming seriously diseased, shall be replaced by plants of
similar size and species to those originally required to be planted. Once provided,
all landscaping works shall thereafter be permanently retained.
Page 99 of 142

Page 100

Reason - To ensure the implementation and management of a satisfactory scheme
of landscaping which will help to integrate the proposed development into the local
landscape in the interests of the visual amenity of the area.
37. Prior to the commencement of development, an offsite landscaping scheme shall be
provided and agreed in writing by the Council as Planning Authority. The scheme
shall include the principles of offsite landscape mitigation and outline the approach
to be adopted to seek opportunities for offsite mitigation of effects on visual amenity
from residential, recreational and transport receptors where significant effects are
predicted.
The agreed principles shall include:
 The nature of planting opportunity based on land availability.
 The phasing and indicative timing of planting, including any seasonal or
operational constraints.
 Details of the maintenance of the planting.
The full offsite landscaping scheme shall thereafter be developed in accordance
with the agreed outline scheme and principles and shall be further agreed in writing
and fully implemented thereafter.
The full offsite landscape scheme shall be completed prior to the Haul Track being
brought into operational use for construction traffic, unless otherwise agreed in
writing with the Planning Authority.
For the purposes of this condition, “operational use” shall mean the point at which
the Haul Track is complete and available for use by vehicles associated with the
Cambushinnie substation works.
Reason - To ensure that significant visual effects of the development are
mitigated as far as reasonably practicable through a timely and deliverable
scheme of landscape mitigation, in the interests of protecting landscape and
visual amenity.
38. No works in connection with the permission hereby approved shall commence
unless a scheme of compensatory tree planting has been submitted to and
approved in writing by the Planning Authority. Details of the scheme shall include:
a) The location of the compensatory tree planting, both on-site and off-site,
should be fully detailed, described and supported with location and site plans
to a scale deemed to be acceptable by the Planning Authority.
b) A rationale must be provided for both the proposed felling and compensatory
planting. This must include an assessment of the impact and proposed
mitigation.
c) A full silvicultural proposal for compensatory planting, supported with location
and site plans; This must include: ground preparation, drainage, planting
technique, stocking density, species, maintenance and a protection plan.
Page 100 of 142

Page 101

d) A programme for the implementation, completion and subsequent
management of the proposed compensatory tree planting. The compensatory
planting must be completed within five years of the removal of the existing
woodland or within two years of the development being completed (whichever
is sooner).
e) For any proposed offsite compensatory planting, a sequential approach to
site selection must be utilised. This must first consider opportunities for offsite
planting immediately adjacent to the development site, only then elsewhere
within the Perth and Kinross Council Area.
The compensatory tree planting shall be carried out in complete accordance with
the approved scheme and any planting which, within a period of 5 years from the
completion of the compensatory tree planting is dying, being severely damaged or
becoming seriously diseased, shall be replaced by plants of similar size and species
to those originally required to be planted. The person(s) that survey, describe,
assess, specify and deliver both the felling proposals and on-site and off-site
Compensatory Planting proposals must be appropriately qualified.
Reason - In order to maintain woodland cover in accordance with the aims of local
and national planning policies.
39. An independent, qualified and technically competent professional(s) with the
required experience shall inspect the compensatory planting scheme at regular
intervals (year 1, 5 and 10) to ensure that the trees are planted correctly,
maintained to the required standard and ultimately established into woodland. The
woodland will have to be maintained thereafter. This professional individual must
report to the Planning Authority, to allow the compensatory planting condition to
be managed and ultimately discharged.
Reason - In order to maintain woodland cover in accordance with the aims of local
and national planning policies.
Health and Safety
40. National Gas Transmission operates a high-pressure gas pipeline – FM10
Machanay to Braco – in the vicinity of the proposed development. The pipeline has
a 24.4m wide easement in operation (12.2m either side of the pipeline). No
development, construction or landscaping is permitted within the easement without
formal written approval from National Gas Transmission.
Reason: In order to protect the integrity of the pipeline.
Archaeology
41. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted by the
applicant and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust. Thereafter, the developer shall
Page 101 of 142

Page 102

ensure that the programme of archaeological works is fully implemented including
that all excavation, preservation, recording, recovery, analysis, publication and
archiving of archaeological resources within the development site is undertaken. In
addition, the developer shall afford access at all reasonable times to Perth and
Kinross Heritage Trust or a nominated representative and shall allow them to
observe work in progress.
Reason - To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area.
Justification
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.
Procedural Notes
None.
Informatives
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the Planning
Authority prior written notification of the date on which it is intended to commence
the development.  A failure to comply with this statutory requirement would
constitute a breach of planning control under section 123(1) of that Act, which may
result in enforcement action being taken. Please use the form attached herewith.
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith.
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of the
Regulations and a draft notice is included for your guidance. In accordance with
Regulation 41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the site of the development
 Readily visible to the public
 Printed on durable material.
4. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that way,
otherwise send it to us at developmentmanagement@pkc.gov.uk. Please be aware
Page 102 of 142

Page 103

that a fee is payable in respect of each request made, though there is no limit to the
number of conditions that can be discharged in a single request. The Fees Charter
is available on our website www.pkc.gov.uk. The Council has two months to
consider the information. You should therefore submit the required information more
than two months before your permission expires.  We cannot guarantee that
submissions made within two months of the expiry date of your permission will be
able to be dealt with before your permission lapses.
5. An application for Building Warrant may be required.
6. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (section 1), it is an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act.
7. The applicant is reminded that, should any protected species be present a licence
may be required from NatureScot to disturb a protected species. Failure to obtain a
licence may constitute a criminal act under the Habitats Regulations and penalties
are severe for non-compliance.
8. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to be
assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended (section
1), it is an offence to remove, damage or destroy the nest of any wild bird while that
nest is in use or being built. Planning permission for a development does not
provide a defence against prosecution under this Act.
9. The applicant should take note of the information and advice contained within the
consultation response from Historic Environment Scotland.
10. The applicant should take note of the information and advice contained within the
consultation response from National Gas Transmission.
11. The applicant is informed that the granting of planning consent does not carry with
it the right to carry out works within the trunk road boundary and that permission
must be granted by Transport Scotland Roads Directorate. Where any works are
required on the trunk road, contact details are provided on Transport Scotland's
response to the Planning Authority which is available on the Council's planning
portal.
12. Trunk Road modification works shall, in all respects, comply with the Design
Manual for Roads and Bridges and the Specification for Highway Works
published by HMSO. The developer shall issue a certificate to that effect, signed
by the design organisation.
13. Trunk Road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Page 103 of 142

Page 104

Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation.
14. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development.
15. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act
1984, he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works.  Information
on junction types, requirements for Vehicular Access consents (VA1) and
application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on the
disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environmental Protection Agency.
16. PKC Abnormal Loads Procedure is available at Abnormal loads procedure - Perth &
Kinross Council.
Background Papers
Letters of representation 49
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer 01738 475330
GMPeebles@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major
Applications and
Enforcement)
20th February 2026
Page 104 of 142

Page 105

Ü
Formation of a track comprising a running surface of approximately 1.2 kilometres in length, bridge, access,
laydown/work compound area(s), drainage, landscaping and other ancillary works on land 360 metres
North of Glassick Farm, Braco, Dunblane
25/00984/FLM
Scale
1:30,000
Planning and Placemaking Committee - 11 March
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(i)
Page 105 of 142

Page 106

Page 106 of 142

Page 107

Ü
Formation of a track comprising a running surface of approximately 1.2 kilometres in length, bridge, access,
laydown/work compound area(s), drainage, landscaping and other ancillary works on land 360 metres
North of Glassick Farm, Braco, Dunblane
25/00984/FLM
Scale
1:15,000
Planning and Placemaking Committee - 11 March
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(i)
Page 107 of 142

Page 108

Page 108 of 142

Page 109

Perth and Kinross Council
Planning and Placemaking Committee - 11 March 2026
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/64)
Proposal: Section 42 to modify condition 8 (finished floor levels) of permission
22/01827/AMM
Location: Morris Leslie, Errol Airfield, Grange, Errol, Perth, PH2 7TB
Ref. No: 25/01441/42M
Ward No: P1 - Carse of Gowrie
Summary
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan.
Background and Description of Proposal
1 This application seeks a further Approval of Matters Specified in Conditions (AMSC),
subject to the same proposal approved in 16/00999/AMM for 240 dwellings, a local
centre, sports pitch and play area. The applicant seeks to formally amend Condition 8
(finished floor levels) of consent 22/01827/AMM, which is the most recent Section 42
(S42) approval. Any proposed alteration to the finished floor levels must be assessed
against the wording and requirements of the current S42 permission, as this
supersedes all previous permissions or conditions relating to this element of the
development. The approved wording of the condition is below:
2 The Finished Floor Level of all properties shall be a minimum of 11.2 metres Above
Ordnance Datum (AOD) and no property shall be occupied unless this is achieved.
3 Reason: To reduce the risk of flooding.
4 The site is located within the settlement boundary of Grange/Errol Airfield in the
Perth and Kinross Local Development Plan 2 2019 (LDP2) and is recorded as
having planning permission for housing. The predominantly flat site extends to
approximately 58.3 hectares, 0.75km north east of Errol village. It forms part of the
disused Errol Airfield facility which provides buildings for small businesses and there
are some residential properties to the north of the site.
5(1)(ii)
Page 109 of 142

Page 110

5 The site is bound to the north by the C484 Errol to Grange road, to the east by the
remaining airfield area and to the west by a burn and farmland. The south of the site
is contained by reed beds and the River Tay, which is a designated Special
Protection Area (SPA), which is a further 300 metres away. Access to the site will
be via a new main access road to the west that was approved under 16/01491/FLL
in July 2017.
6 Development of the road has commenced and provided access to a temporary
medical centre that was approved under 18/00628/FLL.
7 Planning Permission in Principle (PPP) was approved in October 2010
(05/02418/IPM) and extended in January 2014 (13/01823/FLM). Detailed permission
was granted in July 2017 for 240 dwellings, a local centre, sports pitch and play area
within the northern half of the PPP site (16/00999/AMM). Development of this site
has commenced with the establishment of the approved acoustic bund along the
northern boundary of the site.
Site History
8 05/02418/IPM Development of sustainable village. Approved against
recommendation by Development Control Committee November 2008 with decision
issued after the signing of a Legal Agreement October 2010.
9 13/01823/FLM Variation of condition no 1 of planning consent 05/02418/IPM to
extend the time limit for a further 3 years. Approved by Development Management
Committee January 2014.
10 16/00999/AMM Mixed use development comprising the erection of 240
dwellinghouses/garages, erection of commercial elements, provision of open
space/play provision, associated infrastructure and other associated works
(approval of matters specified in conditions 13/01823/FLM). Approved by Planning
& Development Management Committee July 2017.
11 16/01491/FLL Formation of access, landscaping and associated works in
association with 16/00999/AMM. Approved by Planning & Development
Management Committee July 2017.
12 20/00169/AMM Section 42 application to modify condition 15 (contamination) of
permission 16/00999/AMM. Approved by Planning and Development Management
Committee on 29 July 2020.
13 22/01827/AMM Section 42 application to modify condition 10 (noise mitigation) of
permission 20/00169/AMM. Approved by Planning and Development Management
Committee on 22 February 2023.
Page 110 of 142

Page 111

Environmental Impact Assessment
14 An EIA Report was not required to be submitted with the proposal as the nature and
type of proposal falls below the EIA thresholds
Pre-Application Consultation
15 The Pre-Application Consultation (PAC) requirements have been fulfilled in
association with the submission of planning application 16/00999/AMM and there is
no further PAC needed procedurally in relation to this Section 42 application.
Development Plan
16 The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance.
National Planning Framework 4
17 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve peoples lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
18 The Council’s assessment of this application has considered the following policies
of NPF4:
 Policy 22: Flood Risk and Water Management
Perth and Kinross Local Development Plan 2019
19 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
20 The principal relevant policies are, in summary;
 Policy 52: New Development and Flooding
Statutory Supplementary Guidance
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted in
2021)
Page 111 of 142

Page 112

National Guidance
21 The Scottish Government expresses its planning policies through Planning Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars in addition to NPF4. Those relevant are listed below.
Creating Places 2013
22 Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Designing Streets 2010
23 Designing Streets is the policy statement in Scotland for street design and changes
the emphasis of guidance on street design towards place-making and away from a
system focused upon the dominance of motor vehicles. It was created to support
the Scottish Government’s place-making agenda, alongside Creating Places.
National Roads Development Guide 2014
24 This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision.
Local Place Plans
25 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site lies within ‘Errol’ Local Place Plan. The LPP
raises no issues in respect of the consideration of this application.
Consultations
26 As part of the planning application process the following bodies were consulted:
External
27 Scottish Environment Protection Agency - no objection, however, advise that an
updated Flood Risk Assessment should be submitted to include detailed designs of
the proposed access road over the Pow of Errol when finalised to ensure that this
does not increase the risk of flooding to the development or to existing receptors.
Internal
28 Structures and Flooding - no objections following the submission of proposed
site/floor levels. Agree with SEPAs comments in regards to the requirement for an
updated Flood Risk Assessment be submitted which can be controlled by condition.
Page 112 of 142

Page 113

Representations
29 No representations were received.
Additional Statements
Screening Opinion EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
not required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
completed
AA not required
Design Statement or Design and Access
Statement
not required
Report on Impact or Potential Impact eg
Flood Risk Assessment
Flood Risk Assessment
Appraisal
30 Section 42(1) of the Town & Country Planning (Scotland) Act 1997 (as amended)
relates to applications for planning permission for the development of land without
complying with conditions subject to which a previous permission was granted.
31 Section 42(2) requires that the Planning Authority shall consider only the question of
the condition(s) subject to which planning permission should be granted, and:
(a) If they decide that planning permission should be granted subject to
conditions differing from those subject to which the previous permission was
granted, or that it would be granted unconditionally, they shall grant planning
permission accordingly;
(b) If they decide that planning permission should be granted subject to the
same conditions as those subject to which the previous permission was
granted, they shall refuse the application.
32 The determining issues in this case are whether the proposal complies with
Development Plan policy or if there are any other material considerations which
justify a departure from that policy. The Development Plan comprises NPF4, the
Perth and Kinross Local Development Plan 2019 and statutory supplementary
guidance. The relevant policy considerations are outlined in the policy section
above and are considered in more detail below.  In terms of other material
considerations, this involves considerations of the Council’s other approved policies
and supplementary guidance.
Principle
33 The principle of the development subject of the application has been previously
established through the approval of the extant planning permission
(16/00999/AMM). The principle of the development is therefore well-established and
Page 113 of 142

Page 114

is not reviewed as part of this S42 application. It is noted that since the original
planning permission approval there has been a change to the Development Plan
through TAYplan 2016 and the adoption of LDP2 in 2019 and NPF4. The changes
within the Development Plan are, however, not significant in relation to the
proposed changes to this S42 application. The amendment of Condition 8 is not in
itself considered to be contrary to the general terms of the Development Plan,
however, consideration must be given to the specific characteristics of the
amendment and whether any adverse impacts are calculated.
34 The applicant proposes to amend condition 8 (finished floor levels) which states that
the finished floor level of all properties shall be a minimum of 11.2 metres Above
Ordnance Datum (AOD) and no property shall be occupied unless this is achieved.
The applicant has submitted an updated Flood Risk Assessment which
demonstrates that the minimum FFL of 11.2m AOD as specified in condition 8 is
higher than necessary and can be reduced without materially altering the flood risk
to the development. As such the applicant now wishes to modify this condition to
read as follows:
35 “A minimum Finished Floor Level of 10.06 metres Above Ordnance Datum (AOD)
and no property shall be occupied unless this is achieved”.
36 Reason: To reduce the risk of flooding”.
Flooding
37 NPF4 Policy 22, along with LDP2 Policy 52 require that all forms of flood risk are
fully understood, appropriately addressed, and that developments are designed to
be flood resilient without increasing flood risk to surrounding areas.
38 As noted above, the proposal is to reduce the minimum finished flood levels (FFLs)
required by condition 8 from 11.2m AOD to 10.06m AOD and a lowest garden
ground level of 9.76m AOD for all properties.
39 The applicant has submitted an updated Flood Risk Assessment (FRA) undertaken
by Gondolin Land and Water Ltd, version 1, dated 26/06/2025. SEPA and the
Council’s Flood Team have reviewed the FRA and it has been found to be based on
appropriate methods and the representation of flood risk for the site appears to be
in line with all other evidence currently available.
40 SEPA have commented that a maximum flood level of 9.46m AOD has been
determined from the hydraulic modelling undertaken in the FRA for the worst-case
blockage scenario (100%) at the downstream bridge. The FRA noted that this
scenario is unlikely to occur due to limited sources of debris which could cause
severe blockage and because the upstream bridge is likely to intercept any debris in
the first instance. The proposed FFL is set 0.6m above the maximum flood level and
therefore achieves sufficient freeboard to allow for uncertainties in the modelling
and building settlement and as such have no objection.
Page 114 of 142

Page 115

41 SEPA further comment that the FRA notes in section 4.10 that, “details of the
proposed new bridge crossing were not provided and hence assumptions had to be
made regarding the design of this structure”. Although this consultation was only to
provide advice on varying the FFL specified in condition 8, we would recommend
the FRA is updated to include detailed designs of the proposed access road over
the Pow of Errol when finalised to ensure that this does not increase the risk of
flooding to the development or to existing receptors. This can be controlled by
condition.
42 In conclusion, this application proposes to amend Condition 8 of an established
planning permission by lowering the minimum finished floor level for the properties,
based on an updated Flood Risk Assessment which shows this change will not
increase flood risk. The proposal has been reviewed by SEPA and the Council’s
Flood Team, who have raised no objections. The modification is fully compliant with
NPF4 Policy 22 and LDP2 Policy 52, which require flood risks to be understood and
appropriately addressed. Furthermore, reducing the minimum floor level will also
decrease the amount of land raising required and significantly reduce the volume of
imported material needed to achieve changes in ground level. All other aspects of
the development including design, landscape, roads, natural heritage, and
developer contributions remain unaffected by this revision.
Design, Layout and Visual Amenity
43 The proposed modification to Condition 8 will have no impact on the approved and
under construction layout, design or visual amenity.
Landscape
44 The proposed modification to Condition 8 will have no impact on the local
landscape.
Roads and Access
45 The proposed modification of Condition 8 does not have any direct or significant
impact on the road network.
Natural Heritage and Biodiversity
46 The proposed modification to Condition 8 will have no impact on the biodiversity of
the area.
Developer Contributions
47 No contributions are required by this S42 application.
Economic Impact
48 The proposed modification will not have an impact on the local economy.
Page 115 of 142

Page 116

Other Matters
49 The 16/00999/AMM permission had a number of pre-commencement planning
conditions or elements of conditions that are no longer relevant as they have
since been approved in advance of construction commencing in 2019. It is good
practice, when approving a S42 application, to update the conditions to meet
current regulations and requirements. Similarly, any conditions that still require to
be addressed or adhered to should remain and reference should be made to
detail or specification approved as part of the condition approval process for the
existing AMSC. Several conditions, as outlined in the recommendation section
below, have been amended to align with current practice, and the incorporation
of previous Section 42 approvals ensures that all relevant modifications are
included and recognised as part of this approval.
Pre-Commencement Conditions and Notice of Initiation
50 Prior to the commencement of development associated with this planning
application, all pre-commencement conditions must be agreed in writing with the
Planning Authority. In addition, a Notice of Initiation must be submitted, advising of
the intended start date for the approved development. This is to ensure that all
necessary requirements are in place before works commence and to provide clear
communication regarding the commencement of development.
51 For the purposes of Section 27 of the Town and Country Planning (Scotland) Act
1997, as amended, development is deemed to have lawfully commenced only when
any material operation forming part of the approved proposal is carried out. As
such, commencement can only be established where the works undertaken clearly
fall within the statutory definition of material operations and are consistent with the
approved development plans and conditions.
Legal Agreements
52 None required. A Section 75 Legal Agreement is already in place for affordable
housing provision, education contributions, transport infrastructure contributions,
open space, play area, sports pitch provision and maintenance. It is future-proofed
for S42 applications so will not require modification in light of this proposal.
Direction By Scottish Ministers
53 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.
Conclusion and Reasons for Recommendation
54 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Page 116 of 142

Page 117

Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly the proposal is recommended for approval subject
to the following conditions.
Recommendation 
Approve the application subject to the following conditions:
Conditions and Reasons for Recommendation
1. The development must be begun not later than the expiration of three years
beginning with the date on which this approval of matters specified in condition is
granted. If development has not begun at the expiration of this period, the approval
of matters specified in condition lapses.
Reason - In order to ensure the development to which this approval of matters
specified in conditions relates is commenced timeously and in accordance with
section 41(1)(c) of the Town and Country Planning (Scotland) Act 1997.
2. Prior to the occupation of any residential plot, all matters regarding access, car
parking, road layout, design and specification, including the disposal of surface
water, shall be in accordance with the standards required by the Council as Roads
Authority.
Reason: In the interest of vehicle and pedestrian safety and in accordance with the
policies of the adopted Development Plan.
3. The detailed landscaping and planting scheme, including the sports pitch as
approved (Drawing References: 20/00169/55; 20/00169/56; 20/00169/57;
20/00169/58) under planning reference 20/00169/AMM, shall be implemented fully
within one calendar year of the commencement of development and thereafter
maintained for the lifetime of the development. Any planting failing to become
established within five years shall be replaced in the following planting season with
others of similar sizes and species.
Reason: In the interests of visual amenity: to ensure a satisfactory standard of local
environmental quality and in pursuance of suitably satisfying placemaking policy
criteria of the Development Plan.
4. The approved children's play area(s) as approved under planning reference
20/00169/AMM (Drawing Reference: 20/00169/62) shall be laid out and equipped in
accordance with the Planning Authority's current criteria for play area provision
within six months of the commencement of development of the site. The play area
and its facilities/equipment shall thereafter be maintained for the lifetime of the
development.
Reason: In the interests of residential amenity and to ensure the satisfactory
provision and implementation of a children's play area.
Page 117 of 142

Page 118

5. The approved delivery and phasing plan as approved under planning reference
20/00169/AMM (Drawing References: 20/00169/39 and 20/00169/66) shall be fully
implemented in accordance with the agreed delivery plan and landscaping carried
out concurrent with development.
For the avoidance of doubt the location of the commercial area as shown on the
masterplan is in general acceptable but is not fully approved by this permission as
they are still indicative at this stage. Further detailed application(s) will be required
for the exact scale and design of the structures.
Reason: In order to ensure the satisfactory implementation and completion of the
development.
6. The approved sustainable urban drainage system (SUDS) under planning reference
20/00169/AMM (drawing number 20/00169/74) shall be carried out in accordance
with the approved scheme and be operational prior to the bringing into use of the
development.
Reason: In the interests of best practise surface water management: to avoid undue
risk to public safety and flood risk.
7. Within 6 months of the date of this consent, an updated Flood Risk Assessment
shall be submitted to and agreed in writing by the Planning Authority. The Flood
Risk Assessment shall include detailed designs of the proposed access road over
the Pow of Errol. Additionally, details shall include garden levels, finished floor
levels and soffit levels of all structures Above Ordnance Datum (AOD). The details
as agreed shall thereafter be implemented concurrent with development.
Reason: To ensure that the proposed development does not increase the risk of
flooding to the development or to existing receptors.
8. The Finished Floor Level of all properties shall be a minimum of 10.6 metres Above
Ordnance Datum (AOD) and no property shall be occupied unless this is achieved.
Reason: To reduce the risk of flooding.
9. All existing trees and hedging within the site and on the boundaries shall be
retained. The development shall fully comply with, respect and remain in full
accordance with BS5837 2012: 'Trees in relation to construction, demolition and
construction. Recommendations'.
Reason: To ensure a satisfactory standard of local environmental quality.
10. A 3-metre-high landscape bund at the northern boundary as shown in Drawing
Reference 20/00159/59 shall be put in place prior to occupation of any
dwellinghouse in Housing Area H1 of the development. Thereafter, the bund shall
be retained in a reasonable condition for the life of the development.
Reason: To ensure a satisfactory standard of local environmental quality.
Page 118 of 142

Page 119

11. Prior to any further works being undertaken, a detailed specification of the proposed
landscape bund shall be submitted for the further approval of the Planning
Authority. The detail as subsequently approved shall be carried out and completed
prior to occupation of the first dwelling and thereafter maintained.
Reason: In the interests of residential amenity.
9 All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart.
Reason: To ensure a satisfactory standard of local environmental quality.
13. Servicing of and deliveries to any commercial premises shall be carried out between
0700 and 1900 Monday to Sunday and at no other time to the satisfaction of the
Council as Planning Authority.
Reason: To ensure a satisfactory standard of local environmental quality.
14. The Construction Traffic Management Scheme (CTMS) as approved under planning
reference 20/00169/AMM (Plan ref: 20/00169/63) shall be fully implemented and
adhered to during construction. Restrictions of construction traffic to approved
routes and the measures shall be put in place to avoid other routes being used.
Heavy construction traffic should avoid the use of Murie, Inchcoonans, Errol,
Grange and Inchture Level Crossings.
Reason: In the interest of road safety.
15. The level and location of recycling facilities as agreed under planning reference
20/00169/AMM (Plan ref: 20/00169/65) shall be implemented in full prior to the
occupation of the first dwelling.
Reason: In the interests of the sustainable disposal of waste.
16. Prior to any further works being undertaken on site in relation to Phases 1 to 5, as
approved by Application for Matters Specified Permission ref: 16/00999/AMM, an
evaluation for the potential of the site to be affected by contamination by a previous
use should be undertaken. An intrusive investigation should be undertaken to
identify;
i. the nature, extent and type(s) of contamination on the site;
ii. measures to treat/remove contamination to ensure the site is fit for the use
proposed;
iii. measures to deal with contamination during construction works;
iv. condition of the site on completion of decontamination measures.
Page 119 of 142

Page 120

Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance with
the scheme subsequently agreed by the Council as Planning Authority. Verification
that the scheme has been fully implemented must also be submitted to the Council
as Planning Authority.
For the avoidance of doubt, no further development will be permitted within the red
line area approved for development under Planning Permission in Principle ref:
05/02418/IPM, as amended by Planning Permission in Principle ref: 13/01823/IPM,
without a separate intrusive investigation being undertaken in compliance with the
requirements of this condition.
Reason: To prevent harm to human health and pollution of the environment in
accordance with the aims and objectives of the Development Plan.
17. No removal of hedgerows, trees or shrubs or works to or demolition of buildings or
structures that may be used by breeding birds shall take place between 1st March
and 31st August inclusive, unless a competent ecologist has undertaken a careful,
detailed check of vegetation for active birds' nests immediately before the
vegetation is cleared and provided written confirmation that no birds will be harmed
and/or that there are appropriate measures in place to protect nesting bird interest
on site. Any such written confirmation should be submitted to the Planning Authority
for approval.
Reason: In the interests of protecting environmental quality and of biodiversity.
18. No works which include the creation of trenches, culverts or the presence of pipes
will commence until measures to protect animals from becoming trapped in open
excavations and/or pipes and culverts are submitted to and approved in writing by
the Planning Authority. The measures could include, but are not restricted to,
creation of sloping escape ramps from trenches and excavations and securely
sealing open pipework at the end of each working day.
Reason: In the interests of protecting environmental quality and of biodiversity.
19. If the development hereby approved having commenced in 2019 is suspended for
more than 12 months within 2 years from the date of the planning decision notice,
the approved ecological measures secured through the applicants Biodiversity
Study of April 2016 (Plan ref: 20/00169/70) shall be reviewed and, where
necessary, amended and updated. The review shall be informed by further
ecological surveys commissioned to;
i) establish if there have been any changes in the presence and/or abundance of
protected species and
ii) identify any likely new ecological impacts that might arise from any changes.
Where the survey results indicate that changes have occurred that will result in
ecological impacts not previously addressed in the approved scheme, the original
approved ecological measures will be revised and new or amended measures, and
Page 120 of 142

Page 121

a timetable for their implementation, will be submitted to and approved in writing by
the Council as Planning Authority prior to the commencement of development.
Works will then be carried out in accordance with the proposed new approved
ecological measures and timetable.
Reason: In the interests of protecting environmental quality and of biodiversity.
20. Where the approved development is to proceed in a series of phases, further
supplementary ecological surveys for protected species shall be undertaken to
inform the preparation and implementation of corresponding phases of ecological
measures required through the applicants Biodiversity Study of April 2016 (Drawing
Reference: 20/00169/70). The supplementary surveys shall be of an appropriate
type for the above habitats and/or species and survey methods shall follow national
good practice guidelines.
Reason: In the interests of protecting environmental quality and of biodiversity.
21. Prior to the occupation and use of the approved development the applicant shall, at
their own expense, promote a Traffic Regulation Order (TRO) from the site entrance
to the existing 30mph zone to the West of the site, on the Station Road approach to
Errol.
Reason: In the interest of promoting sustainable travel.
22. No part of the development shall be occupied until a Residential Travel Plan (RTP),
aimed to encourage more sustainable means of travel, has been submitted and
approved in writing by the Council as Planning Authority in consultation with the
Roads Authority. The RTP will have particular regard to provision for walking,
cycling and public transport access to and within the site and will identify the
measures to be provided, the system of management, monitoring, review, reporting
and the duration of the plan.
Reason: In the interest of promoting sustainable travel.
23. The external lighting plan as approved under planning reference 20/00169/AMM
(Drawing References: 20/00169/67; 20/00169/68; 20/00169/69) shall be fully
implemented and adhered to during both the construction and operational phases to
minimise any light pollution.
Reason: To minimise any light pollution.
24. Prior to the commencement of the development on site, the developer shall ensure
that a restriction is to be placed within the title deeds to all residential property
confirming the provision of a voluntary agreement to the restriction on access
between April - August in sensitive areas adjacent to the reedbeds. Evidence of this
restriction has been approved by the Planning Authority and NatureScot (formerly
SNH).
Reason: In the interests of protecting environmental quality and of biodiversity.
Page 121 of 142

Page 122

25. The details as approved under planning reference 20/00169/AMM relating to the
location, design and maintenance of signage (Drawing References: 20/00169/60;
20/00169/61) by the developer in respect of access to the sensitive areas of
reedbeds shall be fully implemented prior to the occupation of any of the units on
the site.
Reason: In the interests of protecting environmental quality and of biodiversity.
26. The details as approved under planning reference 20/00169/AMM of the
preparation, content and publicity through leaflets relating to the restriction of
access to the sensitive areas of reedbeds (Drawing Reference: 20/00169/45) shall
be distributed to the approved dwellings in accordance with agreed timescale.
Reason: In the interests of protecting environmental quality and of biodiversity.
27. No development shall be occupied on any phase of the site until the local access
road network improvements approved under planning permission 16/01491/FLL has
been implemented and made operational to mitigate the traffic implications of the
development, to the satisfaction of the Council as Planning Authority.
Reason: In the Interest of vehicle and pedestrian safety.
28. Prior to the completion of any residential plot, details of the bus stops shown in the
approved Housing Layout Plan of planning application 20/00169/AMM (drawing
numbers 20/00169/47 and 20/00169/48) shall be submitted to the Council as
Planning Authority in consultation with the Council's Public Transport Unit for
approval. The agreed detail shall thereafter be implemented prior to the completion
of the 50th dwelling.
Reason: In order to ensure that associated local sustainable infrastructure
improvements are undertaken to adequately accommodate the impact of the
development proposed.
29. Agreed details relating to the location, design and maintenance of the priority
signage at the Inchmichael Cutting (Plan ref: 20/00169/36) shall be fully
implemented prior to the occupation of any units on the site.
Reason: In the Interest of vehicle and pedestrian safety.
Justification
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.
Procedural Notes
None.
Page 122 of 142

Page 123

Informatives
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the Planning
Authority prior written notification of the date on which it is intended to commence
the development.  A failure to comply with this statutory requirement would
constitute a breach of planning control under section 123(1) of that Act, which may
result in enforcement action being taken.  Please use the form attached herewith.
2. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your guidance. In
accordance with Regulation 41 the notice must be:
- Displayed in a prominent place at or in the vicinity of the site of the development
- Readily visible to the public
- Printed on durable material.
3. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works.  Information
on junction types, requirements for Vehicular Access consents (VA1) and
application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice on the
disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environment Protection Agency.
4. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the commencement of
roadworks.  Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency.  Please note that a fee is chargeable for the processing of RCC
applications.
5. The applicants are advised that they must apply to the Roads Authority for
construction consent to form a new street. All correspondence relating to Road
Construction Consents should be sent to RCC@pkc.gov.uk.
6. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team for
permission to connect to the public wastewater system and/or water network and all
their requirements must be fully adhered to.
7. The applicant is advised that the works may need a license under the Water
(Controlled Activities) Regulations 2005 (CAR). The applicant should contact
SEPA's Perth Environmental Protection and Improvement Team (Tel: 01738
Page 123 of 142

Page 124

627989) in regard to this. The applicant should ensure that all works on site comply
with the best practice guidelines laid out in SEPA's published Pollution Prevention
Guidance, found at www.sepa.org.uk.
8. The Council's Public Transport Unit in the Environment Service should be contacted
to clarify the bus service requirements for the development.
9. Any further applications should take into account the possible increase of traffic
over all Level Crossings in the area and the impacts this may have on the reliability
and frequency of the rail service.
10. The presence of protected species, and the extent to which they could be affected
by the proposed development, should be established before works commence. 
Should protected species be identified within the site the developer should ensure
that all appropriate measures required to comply with the relevant legislation are
carried out.
11. The applicant is reminded that, under the Wildlife and Countryside Act 1981,as
amended, it is an offence to remove, damage or destroy the nest of any wild birds
while that nest is in use or being built. Planning consent for a development does not
provide a defence against prosecution under this act.
13. There is a Section 75 legal obligation associated with this planning permission,
which relates to 16/00099/AMM. A copy is available to view on the Council's Public
Access portal.
Background Papers
Letters of representation 0
Authors
Name Designation Contact Details
Gillian Peebles Planning Officer
(Majors)
developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
20 February 2026
Page 124 of 142

Page 125

Ü
Section 42 to modify condition 8 (finish floor level) of permission 22/01827/AMM at Morris Leslie, Errol
Airfield, Grange, Errol
25/01441/42M
Scale
1:30,000
Planning and Placemaking Committee - 11 March
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(ii)
Page 125 of 142

Page 126

Page 126 of 142

Page 127

Ü
Section 42 to modify condition 8 (finish floor level) of permission 22/01827/AMM at Morris Leslie, Errol
Airfield, Grange, Errol
25/01441/42M
Scale
1:15,000
Planning and Placemaking Committee - 11 March
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(1)(ii)
Page 127 of 142

Page 128

Page 128 of 142

Page 129

Perth and Kinross Council
Planning and Placemaking Committee - 11 March 2026
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/65)
Proposal: Change of use of agricultural land to form extension to gypsy/traveller
pitch, erection of kennels, amenity block, fence and associated works (in
part retrospect)
Location: 4B Greenacres, Blairadam, Kelty, KY4 0JA
Ref. No: 18/02341/FLL
Ward No: P8 - Kinross-shire
Summary
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan.
Background and Description of Proposal
1. Planning permission is sought for a change of use of agricultural land to form an
extension to gypsy/traveller pitch, erection of kennels, amenity block and a fence.
The application is partly in retrospect as the pitch had been extended, kennels and
fence erected before the application was submitted. The amenity block has not
been constructed although a separate ancillary building has been erected without
planning permission.  That building is not within the red line site boundary and the
development may need to be regularised via another planning application or a
certificate of lawfulness. 
2. The original works were undertaken in 2014 with the planning application being
submitted in 2018 following enforcement interest in the site.  The determination was
delayed whilst information on the foul water drainage infrastructure arrangements
were sought.  Sadly the agent also passed away and there was a break in the chain
of communication to the extent that the application was not revisited until recently in
an attempt to clear applications that have remained undetermined for long periods
of time.
5(2)(i)
Page 129 of 142

Page 130

Site History
3. 10/00732/FLL Full Planning Permission was approved on 8 September 2011 for
Formation of hardstanding, installation of four permanent mobile homes and
ancillary work
Environmental Impact Assessment
4. The proposal is not EIA development.
Pre-Application Consultation
5. Pre application Reference: No pre-application advice was sought for this proposal
however the application was submitted as a result of enforcement interest.
Development Plan
6. The Development Plan for the area comprises National Planning Framework 4 and
the Perth and Kinross Local Development Plan 2 (2019) along with its associated
statutory supplementary guidance.
National Planning Framework 4
7. The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This
strategy sets out how to improve people’s lives by making sustainable, liveable and
productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan.
8. The Council’s assessment of this application has considered the following policies
of NPF4:
 Policy 1: Tackling the Climate and Nature Crises
 Policy 2: Climate Mitigation and Adaptation
 Policy 3: Biodiversity
 Policy 4: Natural Places
 Policy 13: Sustainable Transport
 Policy 14: Design, Quality and Place
 Policy 16: Quality Homes
Perth and Kinross Local Development Plan 2019
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
Page 130 of 142

Page 131

10. The principal relevant policies are, in summary;
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 6: Settlement Boundaries
 Policy 17: Residential Areas
 Policy 21B: Gypsy/Traveller Sites: New Sites
 Policy 46A: Loch Leven Catchment Area
 Policy 46B: Loch Leven Catchment Area
 Policy 53A: Water Environment and Drainage: Water Environment
 Policy 53B: Water Environment and Drainage: Foul Drainage
 Policy 53C: Water Environment and Drainage: Surface Water Drainage
 Policy 53E: Water Environment and Drainage: Water Supply
 Policy 39: Landscape
 Policy 41: Biodiversity
 Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
Statutory Supplementary Guidance
 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted in
2021)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Placemaking (adopted in 2020)
Other Material Considerations
PKC Non Statutory Guidance
 Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC and
the River Tay SAC
 Planning Guidance - Planning & Biodiversity
National Guidance
11. The Scottish Government expresses its planning policies through Planning Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars in addition to NPF4. Those relevant are listed below.
Planning Advice Notes
12. The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal:
Page 131 of 142

Page 132

Creating Places 2013
13. Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Designing Streets 2010
14. Designing Streets is the policy statement in Scotland for street design and changes
the emphasis of guidance on street design towards place-making and away from a
system focused upon the dominance of motor vehicles. It was created to support
the Scottish Government’s place-making agenda, alongside Creating Places.
National Roads Development Guide 2014
15. This document supports Designing Streets and expands on its principles and is the
technical advice that should be followed in designing and approving of all streets
including parking provision.
Local Place Plans
16. Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site is not in an area where there is currently a Local
Place Plan.
Consultations
17. As part of the planning application process the following bodies were consulted:
External
18. Cleish and Blairadam Community Council - Object that the extension to the site
is contrary to the Local Development Plan and out of character with the settlement.
19. Scottish Environment Protection Agency (SEPA) - Initially objected due to lack
of information.  Objection was withdrawn following receipt of further information.
Internal
20. Transportation and Development - No objection.
21. Environmental Health (Contaminated Land) - No objection.  No known ground
contamination.
22. Development Plan - Comments provided on LDP2 policies 6 settlement boundary,
46 Loch Leven Catchment and 21 Gypsy/Travellers’ sites
Page 132 of 142

Page 133

Representations
23. One representation of objection was received from the Cleish and Blairadam
Community Council. The main issues raised within the representations are:
• Contrary to policy
• Out of character
• Potential for built development outwith the existing built environment.
24. A late objection was also received voicing similar concerns.
25. These issues are addressed in the Appraisal section of the report.
Additional Statements
Screening Opinion EIA not required
Environmental Impact Assessment (EIA):
Environmental Report
not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA completed
Design Statement or Design and Access
Statement
Planning statement submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not required
Appraisal
26. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance with
the provisions of the Development Plan, unless material considerations indicate
otherwise.  The Development Plan comprises NPF4, the Perth and Kinross Local
Development Plan 2019 and statutory supplementary guidance. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance.
Principle
27. National Planning Framework 4 (NPF4) Policy 16, Quality Homes, supports the
provision of accommodation for Gypsy/Travellers.  This application relates to
improvements and extension to an existing pitch on an existing Gypsy/Travellers
site originally approved in application 10/00732/FLL. The extension, which is
retrospective, takes the site outside the settlement boundary to the south of the
adopted LDP2 settlement boundary for Greenacres. 
28. Policy 6 states that: “For those settlements which have a boundary defined in the
Plan, built development will be contained within that boundary. Development on
sites that adjoin these settlement boundaries will only be permitted where the
proposal is:…
Page 133 of 142

Page 134

(b) justifiable on the basis of a specific operational and locational need and it can
be demonstrated that there are no suitable sites available within the
settlement boundary;
29. The proposed built development outside the settlement boundary is the erection of
a kennel unit approximately the size of a large garden shed. The extent of built
development outside the boundary is therefore limited and can be accepted as a
specific operational need for the site, without detriment to the wider character of the
area.
30. Policy 21 Gypsy/Travellers’ Sites of LDP2 protects existing sites and alsosupports
proposals for sites and provides guidance for new sites. These standards are
considered relevant in assessing the site extension. Criteria (a) refers to the site
size. This development does not dramatically increase the site size and creates a
larger pitch with greater flexibility for the residents.
31. Criteria (b) refers to the physical character and landscaping of the site. The pitch
extension does not extend the overall site excessively beyond any of its existing
boundaries and is set back from the B996 road behind another pitch. The fence and
maturing planting provide adequate landscaping in keeping with the nature of the
settlement.
32. Criteria (c) refers to the environmental compatibility of the site with neighbouring
uses. The principle of the pitch is established, with limited additional
accommodation proposed. No concerns arise from the proposed use, and the land
to which the site extends into is categorised as Grade 5.3 in the Land Capability for
Agriculture and is therefore of poor quality.
33. Criteria (d) and (e) are not relevant as no additional sites are being proposed,
merely the extension of an existing pitch. 
34. Criteria (f) refers to the need for a safe environment. The additional space and
fencing/landscaping, given its retrospective nature, already provides a safer
environment for the use of the site.
35. The proposal is therefore considered to accord with Development Plan policy
specifically policies 6 and 21 of LDP2.
36. The proposal also includes an amenity block which at the time of the submission of
the planning application had not been built.  Recent discussion with the applicant
indicates that this block will not now be built however it is considered that it is still
appropriate to determine the application to rectify the unauthorised pitch extension. 
The block, if ever constructed, would improve facilities for the residents and the
principle is accepted.  The proposal site is within the Loch Leven Catchment where
policies 46A and B of LDP2 seek to ensure that developments do not impact on the
ecological importance of the Loch.  This aspect is addressed in the report below. 
Page 134 of 142

Page 135

Design and Layout
37. The development is of a modest scale and relates to an existing use.  The amenity
building is located close to the existing static caravan. The development does not
adversely impact on the built or natural environmental and is compatible with the
character and amenity of the area.
Landscape
38. The site is located to the rear of other caravan pitches over 50m metres from the
B996 public road.  The extension to the pitch is to the south of the site and to the
rear of other pitches and as such is in a discrete location with some landscaping
along the boundary.  There will not be an impact on the wider landscape character
of the area.
Residential Amenity
39. The proposal is compatible with the residential use of the site and will not impact on
residential amenity of neighbours.
Visual Amenity
40. The scale, location and design of the proposal will ensure that it will not have an
adverse effect on visual amenity due to the low-key aspect of the development.
Roads and Access
41. There will be no intensification of use on the site and as such there are no roads or
access implications with this development.
Drainage and Flooding
42. The site is within the Loch Leven Catchment where policy 46A and B of LDP2
applies.  Planning permission was approved in 2010 for four mobile home pitches
that included a new treatment plant and requirement for mitigating foul drainage
infrastructure being installed.  These provisions were subject to a section 75 legal
agreement. Further detail of phosphorus mitigation was provided at the request of
SEPA and the applicant produced details of phosphorous mitigation dating back to
2010. The properties used for mitigation were at 1 and 2 Lochran Farm Cottages,
Blairadam, Kelty, KY4 0HX. The mitigation proposed (to upgrade 2 cottages from a
septic tank to treatment plant) was considered by SEPA to meet the mitigation
required and as such SEPA withdrew their objection.
43. It is noted by SEPA that the provision of phosphorous mitigation to ensure that total
phosphorous from built development does not exceed the current level is a separate
issue to the CAR licence. The approval of submitted phosphorus mitigation details
through the planning process is therefore made without prejudice to any CAR
licence application and does not infer that the CAR licence application(s) will be
approved.
Page 135 of 142

Page 136

44. An informative will be attached highlighting the requirement for compliance with the
Controlled Activities Regulations (CAR) for the mitigating property at Lochran Farm
Cottages and the on-site treatment plant.
45. The proposal meets the requirements of Loch Leven Catchment policy 46A and B of
LDP2. 
Contaminated Land
47. A search of the historic records did not raise any concerns regarding ground
contamination.
Waste Collection
48. There are no changes to waste collection arrangements as a result of this proposal.
Conservation Considerations
49. The site is not within a conservation area. There are no listed buildings in the
vicinity. There is no impact on built heritage assets.
Natural Heritage and Biodiversity
50. NPF4 requires all local planning applications to enhance biodiversity. In this case
trees have been planted along the boundary which will add to the biodiversity
enhancement of the site.  This is sufficient for a development of this scale.
Developer Contributions
51. There is no requirement for developer contributions in relation to this proposal.
Economic Impact
52. The economic impact of the proposal will be minimal.
Variation of Application Under Section 32A
53. This application was varied prior to determination, in accordance with the terms of
section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate an additional document; Addendum to Planning
Statement.
Planning Obligations and Legal Agreements
54. None required.
Page 136 of 142

Page 137

Direction By Scottish Ministers
55. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by
the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application.
Conclusion and Reasons for Recommendation
56. To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval subject
to the following conditions.
Recommendation 
Approve the application subject to the following conditions:
Conditions and Reasons for Recommendation
1. This planning permission will last only for three years from the date of this decision
notice, unless the development has been lawfully started within that period.
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. There shall be no additional chalets placed on the site and no subdivision of the
pitch.
Reason: In order to clarify the terms of the permission.
JUSTIFICATION
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.
PROCEDURAL NOTES
None.
INFORMATIVES
1. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Page 137 of 142

Page 138

Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith.
2. An application for Building Warrant may be required.
3. Authorisation under CAR is required by SEPA for the mitigating property at Lochran
Farm Cottages as well as for the development at Greenacres as currently neither
are authorised discharges.
As these fall within the Loch Leven Catchment they automatically escalate to 
level (regardless of population equivalent), however, they may be charged at
'registration' level and the forms can be found at the following link:
www.sepa.org.uk/regulations/authorisations-and-permits/application-forms/
The applicant should liaise with SEPA's Fife regulatory team at SEPA’s Glenrothes
Office on these regulatory issues.
4. The proposed development lies within a coal mining area which may contain
unrecorded coal mining related hazards.  If any coal mining feature is encountered
during development, this should be reported immediately to the Coal Authority on
0345 762 6848.
Further information is also available on the Coal Authority website at:
www.gov.uk/government/organisations/the-coal-authority
5. This application was varied prior to determination, in accordance with the terms of
section 32A of the Town and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate an additional document; Addendum to Planning
Statement.
Background Papers
Letters of representation 1
Authors
Name Designation Contact Details
Persephone Beer Planning Officer developmentmanagement@pkc.gov.uk
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
26 February 2026
Page 138 of 142

Page 139

Ü
Change of use of agricultural land to form extension to gypsy/traveller pitch, erection of kennels, amenity
block, fence and associated works (in part retrospect) 4B Greenacres, Blairadam, Kelty, KY4 0JA
18/02341/FLL
Scale
1:10,000
Planning and Placemaking Committee - 11 March
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(i)
Page 139 of 142

Page 140

Page 140 of 142

Page 141

Ü
Change of use of agricultural land to form extension to gypsy/traveller pitch, erection of kennels, amenity
block, fence and associated works (in part retrospect) 4B Greenacres, Blairadam, Kelty, KY4 0JA
18/02341/FLL
Scale
1:5,000
Planning and Placemaking Committee - 11 March
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(2)(i)
Page 141 of 142

Page 142

Page 142 of 142