Democracy Spraffa

Minute of meeting of 11 February 2026

Perth and Kinross Council · 11 March 2026
Back to Planning and Placemaking Committee — 11 March 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

DRAFT
Planning and Placemaking Committee
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 11 February 2026 at 9.30am.
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, D Cuthbert, K Harvey
D Illingworth, I James, Bailie C McLaren, R Watters, and Bailie M Williamson.
In Attendance: L McLean, C Morilly, S Panton, L Reid, K Smith, and P Williamson (all
Economy, Development and Planning); A Brown, G Fogg, C MacLeod and M Pasternak
(all Legal and Governance).
Councillor I Massie, Convener, Presiding.
1. Welcome and Apologies
The Convener welcomed everyone present to the meeting and noted apologies
as above. 
2. Declarations of Interest
There were no Declarations of Interest made in terms of the Councillors Code of
Conduct.
3. Minutes
The minute of meeting of the Planning and Placemaking Committee of 7 January
2026 was submitted and approved as a correct record.
4. Deputations
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications:
Planning Application No. Item No.
25/00685/FLM 5(2)(i)
25/00824/FLM 5(2)(ii)
25/00725/FLL 5(3)(i)
5. Applications For Determination
(1) Section 36 Consultations
(i) 25/01007/ECU36 - Erection of 13 turbine windfarm and
associated works - ECU00004782, land 6000 metres south of
Longfauld, Blackford, Auchterarder, PH4 1QU (Report No.
26/38)
Motion (Councillors I Massie and B Brawn)

Page 2

DRAFT
Offer no objection to the proposal and request the imposition of the
following suggested conditions:
Suggested Conditions
Commencement of Development
1. The Development must be commenced no later than three
years from the date of this planning permission.
Written confirmation of the intended date of Commencement
of Development shall be provided to the Planning Authority
no later than one calendar month before that date.
Reason - Section 58 of the Town and Country Planning
(Scotland) Act 1997 requires a condition to be attached to
permissions limiting their duration. Three years is the default
period set by law and there is no material reason indicating
that a different period should be set.
Design of Wind Turbines
2. (1) No turbines shall be erected until details and
specification of the proposed wind turbines (including the
size, make and model, power rating and sound power
levels, nameplate generating capacity, type, external finish
and colour) and all turbine associated apparatus have been
submitted to and approved in writing by the Planning
Authority.
(2) For the avoidance of doubt the scale of the turbines shall
not exceed the parameters assessed in the EIA Report and
set out in the description of the Development.
(3) The submission shall demonstrate that all wind turbine
blades shall rotate in the same direction.
(4) Thereafter the wind turbines and all associated
apparatus shall be constructed and operated in accordance
with the details approved under part (1) and shall be
maintained in the free from external rust, staining or
discolouration, until such time as the Development is
decommissioned.
Reason - To ensure that the environmental impacts of the
turbines forming part of the Development conform to the
impacts assessed in the EIA Report and in the interests of
the visual amenity of the area.
Design of Sub-station and ancillary development
3. (1) There shall be no Commencement of Development of
the sub-station until final details of its location, layout,
external appearance, dimensions, and surface materials,
and control room buildings, any above ground electrical
equipment, associated compounds, construction compound,
boundary fencing, external lighting and parking areas have
been submitted to, and approved in writing by, the Planning
Authority.
(2) Thereafter, the substation and control room buildings,
any above ground electrical equipment, associated
compounds, fencing, external lighting and parking areas
shall be constructed in accordance with the details approved
under part (1).

Page 3

DRAFT
Reason - To ensure that the environmental impacts of the
sub-station and ancillary development forming part of the
Development conform to the impacts assessed in the EIA
Report and in the interests of the visual amenity of the area.
Design of Energy Storage Facility
4. (1) There shall be no Commencement of Development on
the energy storage facility until details of the location, layout,
external finishes and appearance, dimensions and surface
materials of the energy storage facility, inclusive of battery
containers, substation(s), control buildings, external above
ground electrical equipment, associated compounds,
construction compound, boundary fencing and other
enclosures, external lighting, security cameras and parking
areas have been submitted to, and approved in writing by,
the Planning Authority. For the avoidance of doubt the
details of the energy storage facility shall not exceed the
parameters assessed in the EIA Report.
(2) Thereafter, the battery energy storage facility shall be
constructed in accordance with the details approved under
part (1) and the infrastructure shall be maintained in the
approved colour, free from rust, staining or discolouration
until such time as the Development is decommissioned.
Reason - To ensure that the environmental impacts of the
energy storage facility forming part of the Development
conform to the impacts assessed in the EIA Report and in
the interests of the visual amenity of the area.
Signage
5. No part of the Development shall display any text, logo, sign
or advertisement (other than health and safety signage as
required by law) or be illuminated (with the exception of
aviation safety lighting).
Reason - In the interests of health and safety on site and the
visual amenity of the area.
Micro-siting
6. All wind turbines, buildings, areas of hardstanding,
associated infrastructure and tracks shall be constructed in
the locations shown on plan reference Volume 3a, Figure
3.1a Site Layout read in conjunction with Volume 2, Chapter
3 - Description of Development. The locations of wind
turbines, buildings, areas of hardstanding and tracks may be
adjusted by micro-siting within the redline boundary shown
on plan reference Figure 3.1a Site Layout. Any such micro-
siting is subject to the following restrictions unless otherwise
approved in advance in writing by the Planning Authority:
(a) no wind turbine, building, hardstanding or access
track shall be moved more than 50m from the
position shown on Figure 3.1a Site Layout and at the
grid references set out in Table 3-4 of Volume 2,
Chapter 3 Description of Development;
(b) No micro-siting shall take place with the result that
infrastructure (excluding floating tracks or

Page 4

DRAFT
hardstanding) has a greater overall impact on peat
than the original location;
(c) no infrastructure other than as required for a water
course crossing or water crossing upgrading works
shall be micro-sited to within 50 metres of a water
course;
(d) No wind turbine foundation shall be positioned higher
than 5m Above Ordnance Datum (AOD) than the
position for that turbine shown at the grid references
set out in Volume 2, Chapter 3 of the AI Report;
(e) no micro-siting shall take place which will bring the
wind turbine blade tips closer than 50m stand-off
distance to high-value bat habitat.
All micro-siting permissible under this condition shall be
submitted to, and approved in writing by, the Environmental
Clerk of Works (ECoW) in advance of any works or
development associated with the micro-siting request being
implemented.
No later than three months after the Date of Final
Commissioning, an updated site layout plan showing the
final position of all wind turbines, buildings, areas of
hardstanding, tracks and associated infrastructure forming
part of the Development shall be submitted to the Planning
Authority. The plan shall also specify areas where micro-
siting has taken place and, for each instance, be
accompanied by copies of the ECoW or Planning Authority’s
approval, as applicable.
Reason - to control environmental impacts while taking
account of local ground conditions.
Planning Monitoring Officer
7. (1) There shall be no Commencement of Development until
the terms of appointment by the developer of an
independent and suitably qualified consultant as Planning
Monitoring Officer (PMO) have been submitted to, and
approved in writing by, the Planning Authority. The terms of
appointment shall:
(a) impose a duty to monitor compliance with the terms
of the planning permission and the conditions
attached to it;
(b) require the PMO to submit a monthly report to the
Planning Authority summarising works undertaken on
site, matters of compliance or otherwise with the
terms of the planning permission and conditions
attached to it, alongside a summary of the incidents
recorded and reported by the ECoW; and
(c) require the PMO to report to the Planning Authority
any incidences of non compliance with the terms and
conditions of the planning permission at the earliest
practical opportunity, and no later than 10 working
days following the incidence of non-compliance.
(2) The PMO shall be appointed on the approved terms
throughout the period from Commencement of Development

Page 5

DRAFT
to completion of construction works and post-construction
site reinstatement works.
(3) Prior to the decommissioning, restoration and aftercare
phases of the Development or the expiration of the
operational period of the planning permission (whichever is
the earlier), details of the terms of appointment of a suitably
qualified consultant as PMO by the Company/operator
throughout the decommissioning, restoration and aftercare
phases of the Development shall be submitted to, and
approved in writing by the Planning Authority.
(4) The PMO shall be appointed on the terms approved
under part (3) throughout the decommissioning, restoration
and aftercare phases of the Development.
Reason - To ensure compliance with the planning
permission and the conditions attached to it.
Ecological Clerk of Works
8. (1) There shall be no Commencement of Development until
the terms of appointment of an independent Ecological Clerk
of Works (ECoW) have been submitted to, and approved in
writing by, the Planning Authority. The terms of appointment
shall:
(a) impose a duty to monitor compliance with the
environmental commitments provided in the EIA
Report, including any micrositing under condition 6,
the Construction and Environmental Management
Plan approved under condition 9, the Biodiversity
Enhancement Plan approved under condition 15, the
Habitat Management and Monitoring Plan under
Condition 16 and any species or habitat management
plans identified in the EIA Report, (“the ECoW
works”);
(b) require the ECoW to report to the nominated
construction project manager, developer and
Planning Authority any incidences of non-compliance
with the ECoW works at the earliest practical
opportunity;
(c) require the ECoW to submit a monthly report to the
construction project manager, developer and
Planning Authority summarising works undertaken on
site.
(2) Prior to the decommissioning, restoration and aftercare
phases of the Development or the expiration of the
operational period of the planning permission (whichever is
the earlier), details of the terms of appointment of a suitably
qualified, experienced, and independent ECoW by the
Company throughout the decommissioning, restoration and
aftercare phases of the Development shall be submitted to,
and approved in writing by the Planning Authority.
(3) The ECoW shall be appointed on the terms approved
under part (2) throughout the decommissioning, restoration
and aftercare phases of the Development.

Page 6

DRAFT
Reason - To secure effective and transparent monitoring of
and compliance with the environmental mitigation and
management measures associated with the Development
during the construction, decommissioning, restoration and
aftercare phases.
Construction and Environmental Management Plan
9. There shall be no Commencement of Development until a
Construction and (1) Environmental Management Plan
(CEMP) containing site specific details of all on-site
construction works, post-construction reinstatement,
drainage and mitigation, together with details of their
timetabling, has been submitted to, and approved in writing
by, the Planning Authority.  The CEMP shall be informed by
the site and ground investigation works and best practice
guidance.
(2) The CEMP shall include:
(a) a site waste management plan (dealing with all
aspects of waste produced during the construction
period other than peat and other carbon rich soils),
including details of contingency planning in the event
of accidental release of materials which could cause
harm to the environment, evidencing adherence with
SEPA’s guidance and the requirements of the waste
management licensing regime as appropriate;
(b) details of the location, layout, formation of the
construction compound, welfare facilities, any
concrete batching plant (including disposal of pH-rich
waste water and substances), any areas of
hardstanding, turning areas, internal access tracks,
car parking, material stockpiles, oil, fuel and chemical
storage, lighting columns, and any construction
compound boundary fencing required for the
construction period;
(c) a dust management plan detailing all mitigation/dust
suppression measures intended to reduce the
impacts of dust on site, including measures to reduce
dust on roads;
(d) details of measures to be taken to prevent loose or
deleterious material being deposited on the local road
network including wheel cleaning and lorry sheeting
facilities, and measures to clean the site entrances
and the adjacent local road network;
(e) a Pollution Prevention and Incident Plan incorporating
a Pollution Prevention Plan, Pollution Incident Plan
and a Pollution Control Monitoring Plan, with
measures to protect watercourses, groundwater,
management of natural surface hydrological flows
(flushes, springs, etc.) and protection of
peatland/soils, arrangements for the storage and
management of oil and fuel and other chemicals on
the site and sewage disposal and treatment;

Page 7

DRAFT
(f) details of soil storage and management including
outline quantities, locations (other than peat and
other carbon rich soils) management of long term
storage of construction generated to facilitate future
site restoration;
(g) a drainage management strategy, demonstrating how
all surface and waste water arising during and after
construction is to be managed and prevented from
impacting on the water environment and to mitigate
flood risk;
(h) a surface water and groundwater management and
treatment plan, including details of the separation of
clean and dirty water drains, and location of
settlement lagoons for silt laden water;
(i) details of temporary site illumination, including
measures to ensure light spill/pollution is minimised
and avoids habitats within the site and does not
extend beyond the immediate working area, and not
beyond the site boundary;
(j) Protected Species Plan, informed by any protected
species surveys carried out. The Plan shall provide
mitigation measures in line with Summary of
Mitigation, as required, and a timetable for
implementation.
(k) details of the construction of the access into the site,
including associated drainage and the creation and
maintenance of associated visibility splays;
(l) Construction Method Statements for the following: i.
crane pads; ii. turbine foundations; iii. working cable
trenches; iv. erection of the wind turbines; v.
Substation compound formation, erection of
associated buildings and ancillary infrastructure; vi.
all roads/tracks to be altered/formed within the site
including their width, means of drainage (which shall
have regard to SUDS principles), means of
construction, and edge reinstatement including verge
width. vii. watercourse crossings including full details
and plans of the design and specification of all new
and upgraded watercourse crossings to be
constructed;
(m) details of post-construction restoration/reinstatement
of the working areas not required during the operation
of the Development;
(n) a tree felling and management plan;
(o) A Construction Noise Management Plan including
details of the management of noise and vibration
during construction and post-construction restoration,
including that caused by construction traffic, in
accordance with BS 5228:2009 “Code of Practice for
noise and vibration control on construction and open
sites – Part 1: Noise and Part 2: Vibration” (or any
updated version/document which superseded this

Page 8

DRAFT
document) and how any properties likely to be
affected by construction noise will be kept informed;
(p) Construction Method Statements for all roads/tracks
to be altered/formed within the development site
including their width, likelihood of widening or passing
places, means of drainage (which shall have regard
to SUDS principles), means of construction, and edge
reinstatement including verge width. The specification
shall be accompanied by relevant plans at a scale
sufficient;
(q) the cable trenches;
(r) A phasing plan for the construction works; and
(s) A written scheme which details the methodology for
dealing with any revisions to any of the documents
required under this part (2). Any revised documents
will require to be submitted to and approved in writing
by the Planning Authority prior to the revisions being
implemented on site.
(3) The Development shall be implemented in accordance
with the CEMP approved under part (1) unless otherwise
approved in advance in writing by the Planning Authority.
Reason - To ensure that all construction operations are
carried out in a manner that minimises their impact on road
safety, amenity and the environment, and that the mitigation
measures contained in the EIA Report
Borrow Pits – Scheme of Works
10. There shall be no Commencement of Development until a
scheme for the working and restoration of each borrow pit
forming part of the Development has been submitted to, and
approved in writing by, the Planning Authority. The scheme
shall provide:
(a) detailed working method statement based on site
survey information and ground investigations;
(b) details of the handling of any overburden (including
peat, soil and rock);
(c) drainage measures, including measures to protect
and manage surrounding are-as of peatland, water
dependent sensitive habitats and ground water de-
pendent terrestrial ecosystems from drying out;
(d) a programme of implementation of the works
described in the scheme; and
(e) outline details of the reinstatement, restoration and
aftercare of the borrow pit(s) to be undertaken at the
end of the construction period, including topographic
surveys of pre-construction profiles and details of
topographical surveys to be undertaken of the
restored borrow pit profiles.
The scheme approved shall thereafter be implemented in
full following Commencement of Development.
Reason - To ensure that excavation of materials from the
borrow pit(s) is carried out in a manner that minimises the
impact on amenity and the environment, and to secure the

Page 9

DRAFT
restoration of borrow pit(s) at the end of the construction
period.
Borrow Pits – Blasting
11. No blasting shall take place until a scheme specifying blast
monitoring locations is submitted to and approved in writing
by the Planning Authority.
Ground vibration from blasting shall not exceed a peak
particle velocity of 6mm/second at the blasting monitoring
locations approved in the scheme.  The measurement is to
be the maximum of three mutually perpendicular directions
taken at the ground surface.
Unless otherwise approved in writing in advance by the
Planning Authority, any blasting activities will be limited to
Monday to Friday 07:00 to 18:00 and 07:00 to 13:00 on
Saturdays, with no blasting taking place on a Sunday or on
a Public Holiday.
The scheme shall be implemented as approved.
Reason - To ensure that blasting activity is carried out within
defined parameters and timescales to control impact on
amenity.
Construction Hours
12. Construction work shall only take place between the hours
of 07.00 to 19.00 on Monday to Friday inclusive and 07.00
to 16.00 on Saturdays, with no construction work taking
place on a Sunday or Public Holiday. Outwith these
specified hours, maintenance works, emergency works and
construction works shall be limited to concrete pours, wind
turbine erection, dust suppression, and the testing of plant
and equipment, unless otherwise approved in advance in
writing by the Planning Authority.
HGV movements (excluding abnormal loads) to or from the
site during construction of the wind farm shall be limited to
07.00 to 19.00 Monday to Friday (inclusive), and 07.00 to
16.00 on Saturdays, with no HGV movements to or from site
taking place on a Sunday or Public Holiday.  Outwith these
hours HGV movements are to be limited to wind turbine
delivery (unless otherwise approved in advance in writing by
the Planning Authority).
Reason - In the interests of local amenity.
Construction Traffic Management Plan
13. There shall be no Commencement of Development until
Construction Traffic Management Plan (CTMP) has been
submitted to, and approved in writing, by the Planning
Authority.  The CTMP shall provide:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;

Page 10

DRAFT
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
(i) details of information signs to inform other road users
of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to
the commencement of construction;
(n) monitoring, reporting and implementation
arrangements;
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site. 
The CTMP as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
Vehicular Access
14. There shall be no Commencement of Development until a
detailed design showing the accommodation works to
facilitate the construction of the development for the C468
public road is submitted for written approval.  The detailed
design will include the following:
(a) Road widening scheme from A9 to access track at
Carim Lodge;
(b) Junction from the public road network to the
development site;
(c) Road drainage; and
(d) Junction layouts for the turbine route from A9 to C468
avoiding the tight turn.
The approved design shall thereafter be implemented in full,
prior to the construction works commencing on site.

Page 11

DRAFT
Reason - In the interests of road safety to accommodate
access to the site.
Habitat Management and Monitoring Plan
15. There shall be no Commencement of Development until a
Habitat Management Plan (HMP) taking account of the
Outline Habitat Management Plan (Technical Appendix 8.4
of the EIA Report), has been submitted to, and approved in
writing by the Planning Authority.
The HMP shall set out proposed habitat management of the
site during the period of construction, operation, and
decommissioning, restoration and aftercare, and shall
provide for the maintenance, monitoring and reporting of
habitat on site.
The HMP shall provide provision and details for regular
monitoring and review to be undertaken against the HMP
objectives and reasonable measures for securing
amendments or additions to the HMP in the event that the
HMP objectives are not being met.
Until otherwise approved in advance in writing by the
Planning Authority, the approved HMP (as amended from
time to time with written approval of the Planning Authority)
shall be implemented in full in line with the timescales set
out in the approved plan.
Reason - In the interests of good land management and the
protection of habitats.
Programme of Archaeological Works
16. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written Scheme of
Archaeological Investigation (WSI) which has been
submitted by the developer and agreed in writing by the
Council as Planning Authority, in consultation with Perth and
Kinross Heritage Trust (PKHT).  Thereafter, the developer
shall ensure that the programme of archaeological works is
fully implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  Should the archaeological works, as required
by the WSI, identify a requirement for post-excavation
analysis, the development as approved shall not be
occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and
agreed in writing by the Council as Planning Authority, in
consultation with PKHT.  The PERD shall be carried out in
complete accordance with the approved details. 
Furthermore, the developer shall afford access at all
reasonable times to PKHT or a nominated representative
and shall allow them to observe work in progress.
Reason - To ensure the protection or recording of
archaeological features on the site.

Page 12

DRAFT
Operational Noise (Turbines)
17. (1) The rating level of noise immissions from the combined
effects of the wind turbines forming part of the development
(including the application of any tonal penalty) when
determined in accordance with the attached Guidance Notes
for this condition, shall not exceed 35dB measured as LA90
at any occupied dwelling.  This noise limit should be applied
at all times and in all wind conditions.
(2) The turbines shall be designed to permit individually
controlled operation or shut down at specified wind speeds
and directions in order to facilitate compliance with noise
criteria.
(3) The Company shall continuously log power production,
wind speed and wind direction at each wind turbine all (in
accordance with Guidance Notes). These data shall be
retained for a period of not less than 24 months.  The data
will include details of the mode in which each of the turbines
will be operated during each ten minute period depending
on the wind conditions in that ten minute period.  The
Company shall provide this information to the Planning
Authority, in the format set out in the Guidance Notes, within
14 days of receipt in writing of a request to do so.
(4) Prior to the Date of First Commissioning, the developer
shall have submitted to, and received written approval of the
Planning Authority of, a list of proposed independent
consultants who will undertake compliance measurements
in accordance with this condition.  Amendments to the list of
approved consultants shall be made only with the prior
written approval of the Planning Authority.
(5) Within 21 days from receipt of a written request from the
Planning Authority, following a complaint to it from an
occupant of a dwelling alleging noise disturbance at that
dwelling, the developer shall employ a consultant approved
by the Planning Authority in terms of part (4) above to
assess the level of noise immissions from the wind farm at
the complainant’s property (or a suitable alternative location
agreed in writing by the Planning Authority).  The written
request from the Planning Authority shall set out at least the
date, time and location to which the complaint relates and
any identified atmospheric conditions, including wind
direction, and include a statement as to whether, in the
opinion of the Planning Authority, the noise giving rise to the
complaint contains or is likely to contain a tonal component.
(6) The assessment of the rating level of noise immissions in
terms of part (5) above shall be undertaken in accordance
with the Guidance Notes and an assessment protocol that
shall previously have been submitted to and approved in
writing by the Planning Authority.  The protocol shall include
the proposed measurement location(s) where
measurements for compliance checking purposes shall be
undertaken, whether noise giving rise to the complaint
contains or is likely to contain a tonal component, and also

Page 13

DRAFT
the range of meteorological and operational conditions
(which shall include the range of wind speeds, wind
directions, power generation and times of day) to determine
the assessment of rating level of noise immissions.  The
proposed range of conditions shall be those which prevailed
during times when the complainant alleges there was
disturbance due to noise, having regard to the written
request of the Planning Authority under paragraph (5)
above.
(7) Where the property to which a complaint is related is not
listed by name or location in Table 1 at part (1) of this
condition, the Company shall submit to the Planning
Authority, for its written approval, proposed noise limits
selected from those listed in Table 1 to be adopted at the
complainant’s property for compliance checking purposes,
prior to compliance checking.  The proposed noise limits are
to be those limits selected from Table 1 specified for a listed
location which the independent consultant considers as
being likely to experience the most similar background noise
environment to that experienced at the complainant’s
property.  The protocol shall include a justification of the
choice of the representative background levels to determine
compliance at the complainant’s property.  The resultant
noise limits selected shall include, where appropriate, any
limit apportionment to account for consented levels from
cumulative wind farm developments.
(8) The rating level of noise immissions resulting from the
combined effects of the wind turbines when determined in
accordance with the Guidance Notes and approved Noise
Assessment Protocol shall not exceed the noise limits
approved in writing by the Planning Authority for the
complainant’s property.
(9) In the event that a complainant does not allow the
Company access to undertake a compliance assessment,
the assessment protocol shall set out details of the
proposed alternative representative measurement position,
prior to the commencement of measurements, and the
measurements shall be undertaken at the approved
alternative representative measurement location.
(10) The Company shall provide to the Planning Authority
the independent consultant’s assessment of the rating level
of noise immissions undertaken in accordance with the
Guidance Notes and the approved Noise Assessment
Protocol within two months of the date of the written request
of the Planning Authority for compliance measurements to
be made under part (5), unless the time limit is extended in
writing by the Planning Authority.  The assessment shall
include all data collected for the purposes of undertaking the
compliance measurements, such data to be provided in the
format set out in the Guidance Notes.  The instrumentation
used to undertake the measurements shall be calibrated in
accordance with the Guidance Notes and certificates of

Page 14

DRAFT
calibration shall be submitted to the Planning Authority with
the independent consultant’s assessment of the rating level
of noise immissions.
(11) Where a further assessment of the rating level of noise
immissions from the wind farm is required pursuant to (in
accordance with the Guidance Notes), the Company shall
submit a copy of the further assessment within 21 days of
submission of the independent consultant’s assessment
pursuant to part (8) above unless the time limit has been
extended in writing by the Planning Authority.
Reason - to protect nearby residents from undue noise and
disturbance and to ensure that noise limits are not exceeded
and to enable prompt investigation of complaints.
Guidance Notes for Operational Noise Condition
These notes are to be read with and form part of the noise
condition.  They further explain the condition and specify the
methods to be employed in the assessment of complaints about
noise immissions from the wind farm.  The rating level at each
integer wind speed is the arithmetic sum of the wind farm noise
level as determined from the best-fit curve described in Guidance
Note 2 of these Guidance Notes and any tonal penalty applied in
accordance with Guidance Note 3.  Reference to ETSU-R-97
refers to the publication entitled “The Assessment and Rating of
Noise from Wind Farms” (1997) published by the Energy
Technology Support Unit (ETSU) for the Department of Trade and
Industry (DTI). IOA GPG is “A Good Practice Guide to the
Application of ETSU-R-97 for the Assessment and Rating of Wind
Turbine Noise” (2013) and includes Supplementary Guidance
Notes 1 to 5 of the IOA GPG.
Guidance Note 1
(a) (The LA90,10 minute noise statistic should be measured in
accordance with the IOA GPG. Measurements shall be
undertaken in such a manner to enable a tonal penalty to be
applied in accordance with Guidance Note 3.
(b) To enable compliance with the conditions to be evaluated,
the Company shall continuously log arithmetic mean wind
speed in metres per second and wind direction in degrees
from north for each turbine and arithmetic mean power
generated by each turbine, all in successive 10-minute
periods.  All 10 minute periods shall commence on the hour
and in ten minute increments thereafter, synchronised with
Universal Coordinated Time (UTC).  The wind speeds at
turbine hub height shall be 'standardised' to a reference
height of ten metres as described in ETSU-R-97 at page
120 using a reference roughness length of 0.05 metres. 
Unless an alternative procedure is previously agreed in
writing with the Planning Authority, it is these standardised
ten metre height wind speed data which are correlated with
the noise measurements determined as valid.

Page 15

DRAFT
(c) Data provided to the Planning Authority in accordance with
the noise condition shall be provided in comma separated
values in electronic format unless otherwise agreed in
writing with the Planning Authority.
(d) A data logging rain gauge shall be installed in the course of
the assessment of the levels of noise immissions.  The
gauge shall record over successive 10-minute periods
synchronised with the periods of data recorded in
accordance with Note 1(b).
Guidance Note 2
(a) The noise measurements shall be made so as to provide not
less than 20 valid data points as defined in Guidance Note 2
(b)
(b) Valid data points are those measured in the conditions
specified in the agreed written protocol, but excluding any
periods of rainfall measured in the vicinity of the sound level
meter.  Rainfall shall be assessed by use of a rain gauge
that shall log the occurrence of rainfall in each 10 minute
period concurrent with the measurement periods set out in
Guidance Note 1.  In specifying such conditions the
Planning Authority shall have regard to those conditions
which prevailed during times when the complainant alleges
there was disturbance due to noise or which are considered
likely to result in a breach of the limits.
(c) For those data points considered valid in accordance with
Guidance Note 2(b), values of the LA90,10 minute noise
measurements and corresponding values of the 10- minute
10- metre height wind speed averaged across all operating
wind turbines using the procedure specified in Guidance
Note 1(d), shall be plotted on an XY chart with noise level on
the Y-axis and the 10- metre height mean wind speed on the
X-axis.  A least squares, “best fit” curve of an order deemed
appropriate by the independent consultant (but which may
not be higher than a fourth order) should be fitted to the data
points and define the wind farm noise level at each integer
speed.
Guidance Note 3
(a) Where, in accordance with the protocol, noise immissions at
the location or locations where compliance measurements
are being undertaken contain or are likely to contain a tonal
component, a tonal penalty is to be calculated and applied
using the following rating procedure.
(b) For each 10 minute interval for which LA90,10 minute data
have been determined as valid in accordance with Guidance
Note 2 a tonal assessment shall be performed on noise
immissions during 2 minutes of each 10 minute period. The
2 minute periods should be spaced at 10 minute intervals
provided that uninterrupted uncorrupted data are available
(“the standard procedure”).  Where uncorrupted data are not
available, the first available uninterrupted clean 2 minute

Page 16

DRAFT
period out of the affected overall 10 minute period shall be
selected. Any such deviations from the standard procedure,
as described in Section 2.1 on pages 104-109 of ETSU-R-
97, shall be reported.
(c) For each of the 2 minute samples the tone level above or
below audibility shall be calculated by comparison with the
audibility criterion given in Section 2.1 on pages 104-109 of
ETSU-R-97.
(d) The tone level above audibility shall be plotted against wind
speed for each of the 2 minute samples.  Samples for which
the tones were below the audibility criterion or no tone was
identified, a value of zero audibility shall be used.
(e) The average tone level above audibility shall be calculated
for each wind speed bin, each bin being 1 metre per second
wide and centred on integer wind speeds.  This process
shall be repeated for each integer wind speed for which
there is an assessment of overall levels in Note 2.
(f) The tonal penalty is derived from the margin above audibility
of the tone according to the figure below.
Guidance Note 4
(a) If a tonal penalty is to be applied in accordance with
Guidance Note 3 the rating level of the turbine noise at each
wind speed is the arithmetic sum of the measured noise
level as determined from the best fit curve described in
Guidance Note 2 and the penalty for tonal noise as derived
in accordance with Guidance Note 3 at each integer wind
speed within the range specified by the Planning Authority in
its written protocol.
(b) If no tonal penalty is to be applied then the rating level of the
turbine noise at each wind speed is equal to the measured
noise level as determined from the best fit curve described
in Guidance Note 2.
(c) In the event that the rating level is above the limit(s) set out
in the Table attached to the noise conditions or the noise
limits for a complainant’s dwelling, the independent
consultant shall undertake a further assessment of the rating
level to correct for background noise so that the rating level
relates to wind turbine noise immission only.
(d) The Company shall ensure that all the wind turbines in the
development are turned off for such period as the
independent consultant requires to undertake the further

Page 17

DRAFT
assessment.  The further assessment shall be undertaken in
accordance with the following steps:
(e) Repeating the steps in Guidance Note 2, with the wind farm
switched off, and determining the background noise (L3) at
each integer wind speed within the range requested by the
Planning Authority in its written request and the approved
protocol.
(f) The wind farm noise (L1) at this speed shall then be
calculated as follows where L2 is the measured level with
turbines running but without the addition of any tonal
penalty:
(g) The rating level shall be re-calculated by adding
arithmetically the tonal penalty (if any is applied in
accordance with Note 3) to the derived wind farm noise L1
at that integer wind speed.
(h) If the rating level after adjustment for background noise
contribution and adjustment for tonal penalty (if required in
accordance with note 3 above) at any integer wind speed
lies at or below the values set out in the Table attached to
the conditions or at or below the noise limits approved by
the Planning Authority for a complainant’s dwelling in
accordance with the noise condition then no further action is
necessary.  If the rating level at any integer wind speed
exceeds the values set out in the Table attached to the
conditions or the noise limits approved by the Planning
Authority for a complainant’s dwelling in accordance with the
noise condition then the Development fails to comply with
the conditions.
Noise (BESS and Substation)
18. All plant or equipment associated with the BESS and
substation shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed
Noise Rating 35 between 0700 and 2300 hours daily, or
Noise Rating 20 between 2300 and 0700 hours daily, within
any nearby residential property, with all windows slightly
open, when measured and/ or calculated and plotted on a
rating curve chart.
In the event that justified complaints for noise are received
by the Council, the applicant at their own expense, shall
employ an independent and suitably qualified consultant to
carry out a Noise Assessment of the development. The
appointed consultant and methodology for the Noise
Assessment shall be submitted to and approved in writing
by the Planning Authority in consultation with Environmental
Health within 28 days of being notified of the complaint. 
Within 28 days of approval of appointed consultant and
methodology, a Noise Assessment shall be submitted

Page 18

DRAFT
outlining mitigation and recommended timescales for
delivery.  Thereafter, all mitigation measures shall be
implemented within the timescales recommended.
Reason - In the interests of protecting residential amenity.
Access Management Plan
19. There shall be no Commencement of Development until an
Access Management Plan (AMP) has been submitted to and
approved in writing by the Planning Authority.  The AMP
should ensure that, where appropriate and subject to health
and safety requirements, public access is maintained across
the Development site during construction, and thereafter
that existing wider rights of public access are maintained
during the operational phase of the wind farm.
The approved plan shall be implemented in full.
Reason - In the interests of securing public access rights
Private Water Supplies
20. There shall be no Commencement of Development until a
private water supplies method statement has been
submitted to and approved in writing by the Planning
Authority, detailing all contingent mitigation measures to be
delivered to secure the quality, quantity and continuity of
water supplies to any properties which are served by private
water supplies at the date of this planning permission which
may be affected by the Development.
The method statement shall set out:
(a) details of the methodology for water quality and
quantity sampling for a period of 12 months prior to
construction (including abstraction points);
(b) details of the methodology and programme for
undertaking water quality and quantity sampling
during the construction period (including abstraction
points); and
(c) details of the methodology for water quality and
quantity sampling for a period of 12 months post
construction (including abstraction points);
The approved method statement shall thereafter be
implemented in full upon the Commencement of
Development.
Reason - To maintain a secure and adequate water supply
to all properties with private water supplies that may be
affected by the Development.
Redundant Turbines
21. If one or more wind turbines fails to generate electricity on a
commercial basis to the public network for a continuous
period of 12 months, then the turbine or turbines shall be
deemed to be surplus to requirement and the developer
shall:
(a) within one month of the expiration of the 12 month
period, submit a scheme to the Planning Authority for
written approval setting out how and when the
relevant wind turbine(s) and associated infrastructure
will either be repaired or removed from the site and

Page 19

DRAFT
the ground restored to a condition agreed with the
Planning Authority; and
(b) implement the approved scheme to the timescales
set out in the scheme and agreed in part a) above.
Reason - To ensure that any redundant wind turbine is
removed from site, in the interests of safety, amenity and
environmental protection.
Interim Decommissioning, Restoration and Aftercare Strategy
22. There shall be no Commencement of Development until an
Interim decommissioning, restoration and aftercare strategy
has been submitted to, and approved in writing by, the
Planning Authority.  The interim decommissioning,
restoration and aftercare strategy shall outline measures for
the decommissioning of the Development and restoration
and aftercare of the site, and shall provide proposals for the
removal of the Development, the treatment of ground
surfaces, the management and timing of the works and
environmental management provisions in any instance that
the site as a whole, or in part, ceases to operate prior to the
approval of the Decommissioning, Restoration and Aftercare
Plan required under the provisions of condition 23.
Reason - To ensure the decommissioning and removal of
the Development in an appropriate and environmentally
acceptable manner and the restoration and aftercare of the
site, in the interests of safety, amenity and environmental
protection when a detailed decommissioning, restoration
and aftercare Plan has not yet been approved.
Site Decommissioning, Restoration and Aftercare
23. The Development shall cease to generate electricity to the
grid network by no later than the date falling 40 years from
the Date of Final Commissioning.
No later than one year prior to the Date of Final Generation
or the expiry of the planning permission (whichever is
earlier) a decommissioning, restoration and aftercare plan
shall be submitted for the written approval of the Planning
Authority.  The detailed decommissioning, restoration and
aftercare plan shall provide updated and detailed proposals,
in accordance with relevant guidance at that time, for the
removal of the Development, the treatment of ground
surfaces, the management and timing of the works and
environment management provisions which shall provide:
(a) a site waste management plan (dealing with all
aspects of waste produced during the
decommissioning, restoration and aftercare phases
and, including de-tails of measures to be taken to
minimise waste associated with the Development and
promote the recycling of materials and infrastructure
components);
(b) details of the formation of any temporary
infrastructure required for decommissioning such as
compounds, welfare facilities, any areas of

Page 20

DRAFT
hard-standing, material stockpiles, oil storage, lighting
columns, and any boundary fencing;
(c) a dust management plan;
(d) details of measures to be taken to prevent loose or
deleterious material being deposited on the local road
network, including wheel cleaning and lorry sheeting
facilities, and measures to clean the site entrances
and the ad-jacent local road network;
(e) a pollution prevention and control method statement,
including arrangements for the storage and
management of oil and fuel on the site;
(f) details of measures for soil storage and
management;
(g) a surface water and groundwater management and
treatment plan, including details of the separation of
clean and dirty water drains, and location of
settlement lagoons for silt laden water;
(h) details of measures for sewage disposal and
treatment;
(i) temporary site illumination; and
(j) a species protection plan if surveys (carried out no
longer than eighteen months prior to submission of
the plan) identify any protected species (including
birds).
The Development shall be decommissioned, the site
restored and aftercare undertaken prior to the date falling
three years after the Date of Final Generation and in
accordance with the approved detailed decommissioning,
restoration and aftercare plan.
Reason - To ensure the decommissioning and removal of
the Development in an appropriate and environmentally
acceptable manner and the restoration and aftercare of the
site, in the interests of safety, amenity and environmental
protection.
Financial Guarantee
24. There shall be no commencement of development until a
bond or other form of financial guarantee (hereafter
“financial guarantee”) in terms which secures the cost of
performance of all decommissioning, restoration and
aftercare obligations referred to in conditions 22 and 23 has
been submitted to and approved in writing by the Planning
Authority.
The value of the financial guarantee shall be agreed
between the developer and the Planning Authority or, failing
agreement, determined (on application by either party) by a
suitably qualified independent professional as being
sufficient to meet the costs of all decommissioning,
restoration and aftercare obligations referred to in conditions
22 and 23.
The financial guarantee shall be maintained in favour of the
Planning Authority until the completion of all

Page 21

DRAFT
decommissioning, restoration and aftercare obligations
referred to in conditions 22 and 23.
The value of the financial guarantee shall be reviewed by
agreement between the developer and the Planning
Authority or, failing agreement, determined (on application
by either party) by a suitably qualified independent
professional not less than every five years, and at the time
of the approval of the detailed decommissioning, restoration
and aftercare plan approved under condition 23. The value
of the financial guarantee shall be increased or decreased to
take account of any variation in costs of compliance with
decommissioning, restoration and aftercare obligations
referred to in conditions 22 and 23.
Reason - To ensure that there are sufficient funds to secure
performance of the decommissioning, restoration and
aftercare conditions attached to this deemed planning
permission in the event of default by the developer.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Procedural Notes
Any permission shall not to be issued until a Section 75 Agreement
or a bond as required by condition 24 has been signed and
registered to take account of this application.  The legal agreement
or bond should be concluded and completed within 4 months of the
date of any decision.
Informatives
1. Prior to the commencement of works, a maintenance
agreement under Section 96 of the Roads (Scotland) Act
1984 shall be entered into. Confirmation of this agreement
being in place shall be provided to the Council, as Planning
Authority, a minimum of four weeks prior to the
commencement of development.  The maintenance
agreement shall be in respect of the C468.
These roads shall be inspected on a regular basis and
repairs carried out to the timescale and standards specified
by the Council as Roads Authority to the satisfaction of
Perth & Kinross Council.
2. The applicant should be advised that in terms of Section 56
of the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to open an existing road
or footway prior to the commencement of works.  Advice on
the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish
Environment Protection Agency.
3. The applicant is advised that, in terms of Sections 109 of the
New Roads and Street Works Act 1991, he/she/they must
obtain consent from the Council, to place, maintain or adjust

Page 22

DRAFT
apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
4. The applicant should be advised that in terms of Section 21
of the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority consent to construct a new road
prior to the commencement of roadworks.  Advice on the
disposal of surface water must be sought at the initial stages
of design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable for
the processing of RCC applications.
5. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive.  Trees and scrub are
present on the application site and are to be assumed to
contain nesting birds between the above dates.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
7. The applicant is advised that the granting of planning
permission does not guarantee right of access to the site. 
This should be agreed with the relevant landowner(s) prior
to the commencement of the development.
8. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town and
Country Planning (Scotland) Act 1997, as amended.  The
variations incorporate changes to the number and design of
turbines.
9. Please remember that the granting of planning permission,
listed building consent or other associated consent by the
Planning Authority does not affect the responsibility of the
developer to ensure all other necessary permissions,
consents and approvals are in place prior to commencement
of works.  Developers should also ensure appropriate
accommodations are made in respect of services and third
party infrastructure and may wish to check proposals
against the information held at
https://www.linesearchbeforeudig.co.uk/.
10. The applicant shall ensure the private water supply for the
development complies with the Water Scotland Act 1980
(Section 63) and the Private Water Supplies (Scotland)
Regulations 2006.  Detailed information regarding the
private water supply, including the nature, location and
adequacy of the source, any storage tanks/ pipework and

Page 23

DRAFT
the filtration and disinfection treatment proposed to ensure
provision of an adequate and consistently wholesome water
supply shall be submitted to Perth and Kinross Council
Environmental Health in line with the above act and
regulations.
Amendment (Councillors I James and D Cuthbert)
Offer an objection for the following reason:
1. The adverse landscape and visual impact of the proposal
and the wider adverse environmental impacts it will have,
thereby making it contrary to National Planning Framework
4 Policies 4 and 11e
In terms of Standing Order 21.5 a roll call vote was taken.
6 members voted for the Motion as follows:
Councillors B Brawn, D Illingworth, I Massie, G Stewart, R Watters
and Bailie M Williamson.
5 members voted for the Amendment as follows:
Councillors K Allan, D Cuthbert, K Harvey, I James and Bailie
C McLaren.
Resolved:
In accordance with the Motion.
(2) Major Applications
(i) 25/00685/FLM - Formation of extension to existing holiday
park comprising siting of 62 holiday accommodation lodges
and 6 holiday accommodation glamping pods; erection of 4
holiday accommodation cabins and 8 stilted holiday
accommodation units; erection of rangers' classroom and a
covered learning structure; alterations to reception building,
pier, vehicle parking, footpaths and associated works (as
amended), Loch Tay Highland Lodges, Killin, FK21 8TY
(Report No. 26/39)
Mr B Findlay, objector to the application, followed by
Mr D Hancock, agent on behalf of the applicant, addressed the
committee, and answered members questions.
Resolved:
Grant, subject to the following terms, conditions (including
additional condition 17) and informatives:
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.

Page 24

DRAFT
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. The development hereby approved shall be used solely for
holiday accommodation and shall not be occupied as the
sole or main residence of any occupant.
Reason - In order to clarify the terms of the permission; to
control and restrict the use of the building.
3. Prior to the commencement of development of any of the
stilted accommodation units, detailed designs of the units
will be submitted to the Council as Planning Authority for
written approval. The stilted accommodation units will
subsequently be built in compliance with the approved
plans.
Reason - In order to ensure the stilted accommodation units
are of an appropriate scale and design.
Amenity
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
5. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
6. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays. The above shall be implemented throughout the
construction stage of the development unless otherwise
agreed in writing with the Council as Planning Authority and
Environmental Health.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
7. Prior to the development being brought into use, an updated
Noise Management Plan shall be submitted for the written
approval of the Council as Planning Authority. The plan shall
include all sources of noise associated with the premise,
including user noise and the measures that will be put in
place to minimise and/or control noise. The plan shall be
reviewed on a regular basis or, following receipt of a justified
complaint or at the request of the planning authority. Once

Page 25

DRAFT
the Noise Management Plan has been approved, it shall be
fully implemented for the lifetime of the development.
Reason - In order to safeguard the neighbouring residential
amenity in the area.
8. Prior to the commencement of the development hereby
approved, details of the location and measures proposed for
the safeguarding and continued operation, or replacement,
of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water
supply pipes serving properties in the vicinity, sited within
and running through the application site, shall be submitted
to and approved in writing by the Council as Planning
Authority. The subsequently agreed protective or
replacement measures shall be put in place prior to the
development being brought into use and shall thereafter be
so maintained insofar as it relates to the development
hereby approved.
Reason - In order to protect private water supplies within
and nearby the development.
Transport
9. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;

Page 26

DRAFT
(i) details of information signs to inform other road users
of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) monitoring, reporting and implementation
arrangements;
(n) arrangements for dealing with non-compliance; and
(o) details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during the
entire site construction programme.
Reason - In the interest of proper site management.
Biodiversity
10. Prior to the commencement of development, a detailed
Drainage Strategy shall be submitted to the Council as
Planning Authority for written approval. The Drainage
Strategy will include details as to how it will mitigate any
significant effects on the River Tay Special Area of
Conservation, and particularly its Atlantic Salmon interest.
Following approval the Drainage Strategy will be fully
adhered to.
Reason - In order to protect the integrity of the River Tay
Special Area of Conservation.
11. Prior to the commencement of development, a Construction
Method Statement shall be submitted for approval. The
Method Statement will include details as to how it will
mitigate any significant effects on the River Tay Special Area
of Conservation, and particularly its Atlantic Salmon interest.
Following approval the Method Statement will be fully
adhered to during the entirety of the construction phase.
Reason - In order to protect the integrity of the River Tay
Special Area of Conservation.
12. Prior to the completion or occupation of the development
hereby approved, A Site Biodiversity Plan shall be submitted
to the Council as Planning Authority for written approval
containing quantities, locations, techniques, timescales, and
monitoring arrangements of biodiversity enhancement
measures. Thereafter, the agreed scheme shall be
implemented in full and, where necessary, maintained in a
reasonable condition for the life of the development.
Reason - In the interests of biodiversity and to protect
environmental quality.
Trees
13. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted to the Council as Planning
Authority for approval. The scheme shall include details of
the height and slopes of any mounding or recontouring of
the site, full details of all hard landscaping proposals

Page 27

DRAFT
including materials and installation methods and, species,
height, size and density of trees and shrubs to be planted.
The scheme as subsequently approved shall be carried out
and completed within the first available planting season
(October to March) after the completion or bringing into use
of the development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority
within 7 days of that date. The scheme as agreed and
implemented shall thereafter be maintained to a satisfactory
standard.
Reason - To ensure a satisfactory standard of development
and environmental quality.
14. Prior to the commencement of development, an
Arboricultural Method Statement shall be submitted to the
Council as Planning Authority for written approval. The
Method Statement will include details of all tree planting
proposals across the site, as well as any management of
existing trees including felling, management and control of
Invasive Non-Native Species, root protection areas and tree
protection fencing. Thereafter, the agreed scheme shall be
implemented in full for the life of the development.
Reason - In order to ensure that tree planting and tree
protection measures are appropriately implemented as part
of the development.
15. Prior to the commencement of development, an
Arboricultural Clerk of Works (ACW) will be appointed in
agreement with the Council as Planning Authority. The ACW
will oversee the implementation of the Arboricultural Method
Statement as well as lodge siting, the accurate setting out of
root protection areas and tree protection fencing and will
provide supervision during works within or near root
protection areas. The ACW shall visit the site at least once
every 3 weeks during the construction period and shall
report findings to the Council as Planning Authority in writing
within 7 days of each visit.
Reason - To ensure compliance with best practice and
safeguarding of tree health throughout the construction
phase.
Flooding and Drainage
16. A four-metre easement free from development along the
side of Allt a’ Mhoirneas will be maintained at all times to
allow access for inspection and maintenance of the
watercourse and the A827 culvert.
Reason - To allow for appropriate future maintenance of the
watercourse.
17. Prior to the occupation of any of the units hereby approved,
the flood mitigation measures detailed within the Flood Risk
Assessment (document 54 hereby approved), shall be
implemented in full, and thereafter retained in perpetuity for
the life of the development.
Reason - In the interests of sustainable flood management.

Page 28

DRAFT
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013, as amended.  The form of the
notice is set out in Schedule 7 of the Regulations and a draft
notice is included for your guidance. In accordance with
Regulation 41 the notice must be:
Displayed in a prominent place at or in the vicinity of the site
of the development Readily visible to the public Printed on
durable material.
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two months
of the expiry date of your permission will be able to be dealt
with before your permission lapses.
5. Trees and scrub are likely to contain nesting birds between
1st March and 31st August inclusive.  Trees and scrub are
present on the application site and are to be assumed to

Page 29

DRAFT
contain nesting birds between the above dates.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
7. Part of the approved development includes holiday
accommodation or Short-term Let accommodation (STL).
The developer is advised that holiday accommodation and
STLs require to be licensed under the terms of Article 3 of
the Civic Government (Scotland) Act 1982 (Licensing of
Short-terms Lets) Order 2021 and therefore a licence
application should be made to Perth and Kinross Council
prior to operation commencing. Further information and
application forms are available at
https://www.pkc.gov.uk/shorttermlets.
8. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
9. Part of the approved development includes 'caravans'. The
developer is advised that caravans require to be licensed
under the terms of Section 1 of the Caravan Sites and
Control of Development Act 1960 and therefore a licence
application should be made to Environmental Health.
Application forms are available at
https://www.pkc.gov.uk/article/15600/Licence-caravan-site
10. The approved stove systems shall be installed and
thereafter operated and maintained in accordance with the
manufacturer’s recommendations, such that smoke/odours
are not exhausted into or escape into any neighbouring
dwellings. Failure to do so may result in an investigation and
possible action by Environmental Health under the
Environmental Protection Act 1990.
11. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
honoured throughout and after completion of the
development.
12. The applicant shall ensure the private water supply for the
development complies with the Water Scotland Act 1980
(Section 63), The Private Water Supplies (Scotland)
Regulations 2006 and The Water Intended for Human

Page 30

DRAFT
Consumption (Private Supplies) (Scotland) Regulations
2017.  Detailed information regarding the private water
supply, including the nature, location and adequacy of the
source, any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be
submitted to Perth and Kinross Council Environmental
Health in line with the above Act and Regulations.
13. A review of the proposed development site did not raise any
real concerns, although historical mapping indicates that the
proposed development is within the immediate vicinity of a
former limekiln as well as an area of infilled land to the south
of the site, both of which may have resulted in contamination
in the vicinity of the site. Should any contamination be found
during the approved works, works should cease, and the
Land Quality team should be contacted on 01738 475000 or
ContaminatedLand@pkc.gov.uk for further advice.
(The committee took a short recess)
(ii) 25/00824/FLM - Erection of 4 poultry rearing sheds, managers
dwellinghouse and garage, staff welfare facility, office, storage
buildings, security fencing, formation of vehicular access,
SUDS, landscaping and associated works, land at Newbigging
Farm, Kinclaven, Stanley, Perth (Report No. 26/40)
Mr A Lilly, Mr M Cook, Ms K Homan, Ms E Coutts and West
Stormont Woodland Group, all objectors to the application; Ms L
Burns, supporter of the application; and Mr I Richmond, General
Manager of Aviagen UK and Mr M Richardson, agent on behalf of
the applicant, addressed the committee, and answered members
questions.
Resolved:
Grant, subject to the following terms, conditions and informatives:
Conditions
General
1. This planning permission will last only for three years from
the date of this decision notice, unless the development has
been lawfully started within that period.
Reason - This is a Planning Permission in terms of Section
58 of the Town and Country Planning (Scotland) Act 1997,
as amended by Section 32 of the Planning (Scotland) Act
2019.
2. For the avoidance of doubt, this permission includes a
replacement farmhouse. Prior to the occupation of the new
farmhouse, the existing farmhouse shall be demolished and
the site on which it lies shall be cleared, reinstated and
finished in accordance with the approved plans.
Reason - In order to clarify the terms of this planning
permission.

Page 31

DRAFT
Contamination
3. Development shall not commence on site until an evaluation
for the potential of the site to be affected by contamination
by a previous use has been undertaken and, as a minimum,
a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the
Council as Planning Authority. If the preliminary risk
assessment identifies the need for further assessment, an
intrusive investigation shall be undertaken to identify;
I. the nature, extent and type(s) of contamination on the
site
II. measures to treat/remove contamination to ensure
the site is fit for the use proposed
III. measures to deal with contamination during
construction works
IV. condition of the site on completion of
decontamination measures.
Prior to the completion or bringing into use of any part of the
development the measures to decontaminate the site shall
be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented
must also be submitted to the Council as Planning Authority.
Reason - In order to deal with any potential contamination of
the site as a result of its former use.
Residential Amenity
4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the residential amenity of the
area.
5. Construction work shall be limited to Monday to Friday 0700
hours to 1900 hours and Saturday 0800 hours to 1300 hours
with no noisy works out with these times or at any time on
Sundays.
Reason - In order to safeguard the residential amenity of the
area.
6. Servicing of and deliveries to the premises shall be carried
out between 0800 and 1800 daily.
Reason - In order to safeguard the residential amenity of the
area.
7. Should any aspect of the development result in a verified
noise complaint determined by the Council as Planning
Authority in consultation with Environmental Health, within
14 days of written request by the Council as Planning
Authority, the applicant shall arrange for a Noise Impact
Assessment (NIA) by a suitably qualified noise consultant
with the scope and timescale submitted to and agreed in

Page 32

DRAFT
writing with the Council as Planning Authority in consultation
with Environmental Health. Thereafter any agreed mitigation
measures shall be implemented to ameliorate the nuisance.
Reason - In order to safeguard the residential amenity of the
area.
8. The approved Odour Management Plan (document no. 24),
shall be implemented in full and be strictly adhered to
throughout the operational stage of the development to
ensure that residential amenity of neighbouring properties is
not affected by odour as a consequence of and/or in relation
to, the operation of the poultry units.
Reason - In order to safeguard the residential amenity of the
area.
9. Should any aspect of the development result in a verified
odour complaint determined by the Council as Planning
Authority in consultation with Environmental Health, within
14 days of written request by the Council as Planning
Authority, the applicant shall arrange for an Odour Impact
Assessment (OIA) to be carried out by a suitably qualified
consultant.  The OIA findings shall be submitted for the
written approval of the Council as Planning Authority, in
consultation with Environmental Health and must draw
conclusions and make recommendations as necessary. 
Thereafter any necessary measures to ameliorate the odour
nuisance should be put in place, and a new or revised
Operational Management Plan must be submitted to the
Council within a specified agreed timescale.
Reason - In order to safeguard the residential amenity of the
area.
10. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it does
not adversely affect the amenity of the neighbouring land.
Reason - In order to safeguard the residential amenity of the
area.
Roads and Access
11. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Plan (CTMP) which shall
include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;

Page 33

DRAFT
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
i) details of information signs to inform other road users
of construction traffic;
j) arrangements to ensure that access for emergency
service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;
l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) monitoring, reporting and implementation
arrangements;
n) arrangements for dealing with non-compliance; and
o) details of HGV movements to and from the site. 
The CTMP as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
12. Prior to commencement of development, a detailed design
for the proposed new vehicular access junction, and the
stopping up of the existing junction, shall be submitted to
and agreed in writing by the Planning Authority in
consultation with the Roads Authority.  The vehicular
access, as approved in writing, shall be implemented in
accordance with the approved details prior to the
development being brought into use or occupied.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
13. Prior to the commencement of the development hereby
approved, full visibility splays of 215 metres along the
channel line shall be provided to the North East and South
West of the access, at a set-back of 2.4 metres measured
1.05m above the road level to the standard and specification
required by the Council as Roads Authority. The visibility
splays shall be physically formed on the ground and any
existing fences, walls, hedges or other means of enclosure
or obstructions within the splays shall be removed and
relocated outwith the splays. Once formed, the visibility

Page 34

DRAFT
splays shall be permanently retained thereafter, and no
visual obstruction of any kind shall be permitted within the
visibility splays so formed.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
14. No part of the development shall be occupied until a Staff
Travel Plan (STP), aimed to encourage more sustainable
means of travel, has been submitted and approved in writing
by the Council. The STP will have particular regard to
provision for walking, cycling and public transport access to
and within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.
Reason - To promote sustainable transport options and to
meet advice within National Planning Framework 4.
15. Prior to the commencement of development, a scheme for a
covered cycle bay which stores a minimum of 9 bicycles,
shall be submitted to the Council as Planning Authority for
written approval. Thereafter, the agreed scheme shall be  
implemented and operational prior to the occupation of the
development, and thereafter retained in a usable condition
for the life of the development. 
Reason - To encourage active travel and meet advice within
National Planning Framework 4.
16. Prior to the commencement of development, a plan shall be
submitted for the written approval of the Council as Planning
Authority which shows a minimum of 2 accessible parking
spaces.  Thereafter, the agreed scheme shall be
implemented prior to the occupation of the development and
thereafter retained in a usable condition for the life of the
development.
Reason - To ensure that the development provides
adequate accessible parking in accordance with National
Planning Framework 4.
Trees and Landscape
17. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for
the site shall be submitted for the written agreement of the
Council as Planning Authority.  The scheme shall include:
a) Details of the height and slopes of any mounding or
recontouring of the site including existing and
proposed finished levels.
b) Details of existing ground conditions, drainage, pre-
planting preparation, vegetation control, stock size,
stock numbers, stock density, planting arrangement,
planting method, protection methods from vermin,
staking methods, proposed aftercare and
management.
c) Full details of all hard landscaping proposals
including materials and installation methods
(including fences and gates).

Page 35

DRAFT
d) Species, height, size and density of trees, shrubs,
hedges, grassed areas and water features to be
planted. 
e) A schedule of planting to comprise species, plant
sizes and proposed numbers and density.
f) A programme for the implementation, completion and
subsequent management of both the proposed
landscaping and any trees and vegetation to be
retained.
The Landscaping Scheme must include timescales for the
implementation of the works. All soft and hard landscaping
proposals shall be carried out in accordance with the
approved planting scheme and management programme.
Completion of the landscaping scheme shall be supplied in
writing to the Council as Planning Authority within 7 days of
that date. Any planting which, within a period of five years
from the completion of the development is dying, being
severely damaged or becoming seriously diseased, shall be
replaced by plants of similar size and species to those
originally required to be planted. Once provided, all
landscaping works shall thereafter be permanently retained.
Reason - To ensure the implementation and management of
a satisfactory scheme of landscaping which will help to
integrate the proposed development into the local landscape
in the interests of the visual amenity of the area.
18. Prior to the commencement of any works on site, all trees
identified for retention and any peripheral trees bounding the
site, which may be affected by any element of the approved
development and its associated construction shall be
protected in full accordance with BS 5837: 2012 'Trees in
relation to design, demolition and construction'.  Protection
measures, once in place, shall remain in place for the
duration of construction.  If such protection measures are
damaged beyond effective functioning then works that may
compromise the protection of trees shall cease until the
protection can be repaired or replaced with a specification
that shall provide a similar degree of protection.
Reason - To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority.
19. All trees on site, other than those marked for felling on the
approved plans, shall be retained.
Reason - To ensure a satisfactory standard of development
and environmental quality and to reserve the rights of the
Planning Authority.
20. Prior to the commencement of development, full details of
the proposed offsite landscaping mitigation scheme (as
shown on document no. 08), shall be provided and agreed
in writing by the Planning Authority. The scheme shall set
out the principles for mitigating any significant visual effects
of the development on surrounding receptors, including

Page 36

DRAFT
residential properties, recreational routes and transport
corridors.
The scheme shall include:
 Identification of planting opportunities based on land
availability and suitability;
 Phasing and indicative timing of planting, taking account
of seasonal and operational constraints;
 Details of maintenance and long-term management of
the planting to ensure effective establishment and
retention;
 Full specification of planting proposals, including species
mix (native where appropriate), plant sizes, densities,
and any seeding requirements for grassland or
wildflower areas.
The full offsite landscaping mitigation scheme shall
thereafter be developed in accordance with the agreed
scheme and fully implemented thereafter.  Any planting
which, within a period of five years from the completion of
the development is dying, being severely damaged or
becoming seriously diseased, shall be replaced by plants of
similar size and species to those originally required to be
planted.  Once provided, all landscaping works shall
thereafter be permanently retained
The full offsite landscape mitigation scheme shall be
completed prior to the occupation of the development,
unless otherwise agreed in writing with the Planning
Authority.
Reason - To ensure that significant visual effects of the
development are mitigated as far as reasonably practicable
through a timely and deliverable scheme of landscape
mitigation, in the interests of protecting landscape and visual
amenity.
Biodiversity
21. Prior to the commencement of the development hereby
approved, a detailed plan indicating the location, quantity,
specification and maintenance requirements for
compensation and biodiversity enhancement measures shall
be submitted for the further written agreement of the Council
as Planning Authority.  It shall include:
a) three swallow nesting cups and three house martin
nesting cups as compensation
b) three house sparrow boxes as compensation
c) two barn owl boxes as compensation
d) Biodiversity enhancement measures over and above
the measures required for compensation in
accordance with the recommendations within the
supporting biodiversity survey submitted and hereby
approved.
Thereafter, the agreed scheme shall be maintained in a
reasonable condition for the life of the development.

Page 37

DRAFT
Reason - In the interests of protecting environmental quality
and of biodiversity.
22. An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved as
part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason - In the interests of protecting environmental quality
and of biodiversity.
23. The conclusions and recommended action points within the
supporting biodiversity surveys submitted and hereby
approved (document nos. 28 and 39 relate) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development.
Reason - In the interests of protecting environmental quality
and of biodiversity.
24. If works are to be undertaken during the bird breeding
season, no works in connection with the development
hereby approved shall commence until such time that a
detailed check of the site for active barn owl nests has been
undertaken by a surveyor holding a NatureScot Schedule 1
Bird Survey Licence and written confirmation has been
submitted to the Planning Authority for written agreement. 
For the avoidance of doubt, the confirmation shall show that
no birds will be harmed and that there are appropriate
measures in place to protect nesting barn owls on the site. 
The check shall be undertaken not less than 14 days before
the commencement of the development and no site
clearance or other works in connection with the
development hereby approved shall commence unless the
written confirmation has been submitted to and approved in
writing by the Planning Authority.
Reason - In the interests of protecting environmental quality
and of biodiversity.
25. Prior to the commencement of development hereby
approved, a Construction Environmental Management Plan
(CEMP) shall be submitted and approved in writing by the
Council as Planning Authority.  The CEMP will remain a live
document with any working practices deemed to be having
an adverse impact on ecology or the environment will be the
subject of a revision.  All revisions must be submitted to the
Planning Authority as soon as reasonably practicable for
written agreement.  Thereafter the development shall be
fully undertaken in accordance with the agreed CEMP.
Reason: In the interest of protecting environmental quality
and of biodiversity. To minimise any associated adverse
landscape and visual impact of the above ground elements
and protect the character and visual amenity of the
immediate and surrounding countryside.

Page 38

DRAFT
26. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be implemented
for the duration of the construction works of the
development hereby approved.  The measures may include
creation of sloping escape ramps for animals, which may be
achieved by edge profiling of trenches/excavations or by
using planks placed into them at the end of each working
day and open pipework greater than 150 mm outside
diameter being blanked off at the end of each working day.
Reason - In order to prevent animals from being trapped
within any open excavations.
Drainage
27. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in accordance
with the technical guidance contained in The SUDS Manual
(C753) and the Council’s Flood Risk and Flood Risk
Assessments Developer Guidance, and shall incorporate
source control.  All works shall be carried out in accordance
with the agreed scheme and be operational prior to the
bringing into use of the development. 
Reason - To ensure the provision of effective drainage for
the site.
28. Storm water drainage from all paved surfaces, including the
access, shall be disposed of by means of suitable a
Sustainable Urban Drainage System to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
Archaeology
29. Development shall not commence until the developer has
secured the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation
acceptable to the Council as Planning Authority, during
development work.  The retained archaeological
organisation shall be afforded access at all reasonable times
and given time to undertake all required monitoring works
and permitted to record and recover items of interest and
finds. The developer will clearly communicate the
development programme to their archaeological
organisation to ensure all necessary monitoring is covered
by the watching brief.  The name of archaeological
organisation retained by the developer shall be given to the
Planning Authority and Perth and Kinross Heritage Trust in
writing not less than seven days before the commencement
date provided in the Notice of Initiation of Development.
Reason - To ensure archaeological monitoring is carried out
to safeguard and record any archaeological remains within
the development area.

Page 39

DRAFT
30. Development shall not commence until the developer has
secured an archaeological standing building survey, to be
carried out by an independent and suitably qualified
archaeological organisation.  The scope of the
archaeological standing building survey will be set by the
Council as Planning Authority, in consultation with Perth and
Kinross Heritage Trust.  The name of archaeological
organisation retained by the developer shall be given to the
Council as Planning Authority and PKHT in writing not less
than fourteen days before the commencement date provided
in the Notice of Initiation of Development.  Copies of the
resulting survey shall be deposited in the National Record of
the Historic Environment and in the Perth and Kinross
Historic Environment Record upon completion of the survey.
Reason - To ensure an appropriate archaeological standing
building survey is carried out and the resulting survey is
recorded properly.
Justification
The proposal is considered as a minor departure to the
Development Plan however there are material considerations that
would justify a departure from the relevant Policy 50 of the LDP2.
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person undertaking
the development is required to give the Planning Authority
prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this
statutory requirement would constitute a breach of planning
control under Section 123(1) of that Act, which may result in
enforcement action being taken.  Please use the form
attached herewith.
2. As soon as practicable after the development is complete,
the person who completes the development is obliged by
Section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the Planning Authority
written notice of that position.  Please use the form attached
herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set
out in Schedule 7 of the Regulations and a draft notice is
included for your guidance.  In accordance with Regulation
41 the notice must be:
 Displayed in a prominent place at or in the vicinity of the
site of the development
 Readily visible to the public
 Printed on durable material.

Page 40

DRAFT
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted to
Development Management either before works can start on
site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application
was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that can
be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has
two months to consider the information.  You should
therefore submit the required information more than two
months before your permission expires.  We cannot
guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with
before your permission lapses.
5. No work shall be commenced until an application for
building warrant has been submitted and approved.
6. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. The proposed demolition and/or building works likely to
cause harm to bats should not commence until the applicant
has obtained the relevant licence issued by NatureScot
pursuant to Regulation 53 of The Conservation of Habitats
and Species Regulations 2010 authorizing the specified
activity/development to go ahead.
8. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
9. The applicant should take note of the information and advice
contained within the consultation response from Scottish
Water.
10. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development.
11. The applicant is advised that, in terms of Sections 56 of the
Roads (Scotland) Act 1984, he/she/they must obtain from
the Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are available

Page 41

DRAFT
at www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of
surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environmental
Protection Agency.
12. The applicant can seek guidance on the detailed design and
positioning of the cycle storage from Transport Scotland's
Cycling by Design 2021 or similar design guide. 
13. The applicant is advised that, in terms of Sections 109 of the
New Roads and Street Works Act 1991, he/she/they must
obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from a
road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
14. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.
15. Further information on the need for and level of provision of
Changing Places Toilet Facilities can be found in Section
41B of the Town and Country Planning (Scotland) Act 1997,
the Town and Country Planning (Changing Places Toilet
Facilities) (Scotland) Regulations 2020 and the associated
Circular 1/2020: Changing Places Toilets Regulations.
16. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (tel 01738 477027) Perth & Kinross
Heritage Trust, to discuss terms of reference for work
required.
(The committee took a short recess)
(3) Local Application
(i) 25/00725/FLL - Siting of caravan for a temporary period (in
retrospect), Equine Unlimited, Dungarthill, Dunkeld, PH8 0JF
(Report No. 26/41)
A statement on behalf of objectors was read by Ms Brown, clerk to
the committee.  The applicant, addressed the committee, and
answered members questions.
Resolved:
Grant, subject to the following terms, conditions and informatives:
Conditions
1. The caravan is approved for a temporary period only until 31
August 2027.  Upon expiry of this temporary period the
caravan shall be removed from the site and the site returned
to its original condition to the satisfaction of the Council as
Planning Authority.

Page 42

DRAFT
Reason - In view of the temporary nature of the caravan and
to enable the Planning Authority to review the circumstances
pertaining to the proposal within a reasonable period of time.
2. The core path which forms part of the access track to the
site must not be obstructed during building works or on
completion.  Any damage done to the core path and
associated signage during building works shall be made
good before occupation of the dwellinghouse.  Any
temporary restrictions to public access required to facilitate
works on site must be agreed in writing first with the Access
Officer.
Reason - In the interests of public access along the core
path.
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.
Informatives
1. Records indicate that at least part of the proposed
development site lies within a radon affected area where the
measurement/monitoring of radon gas and the installation of
mitigation measures may be required.
Further information on radon gas and the associated reports
that can be obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
2. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and Flood
Risk Assessments 2021 as it contains advice relevant to
your development.
3. The applicant should ensure that any existing wayleaves for
maintenance or repair to existing private water supply or
septic drainage infrastructure in the development area are
honoured throughout and after completion of the
development.
4. The applicant shall ensure the private water supply for the
dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water Supplies
(Scotland) Regulations 2006 and The Water Intended for
Human Consumption (Private Supplies) (Scotland)
Regulations 2017.
Detailed information regarding the private water supply,
including the nature, location and adequacy of the source,
any storage tanks/ pipework and the filtration and
disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be
submitted to Perth and Kinross Council Environmental
Health in line with the above Act and Regulations.

Page 43

DRAFT
6. Proposal of Application Notices (PoAN)
(i) 25/00016/PAN - Residential development comprising flatted blocks,
installation of SUDS, landscaping and associated works, Perth
Leisure Pool, Glasgow Road, Perth, PH2 0HZ (Report No. 26/42)
Councillor B Brawn requested that officers bear in mind that the area is
susceptible to flooding and that this is looked at when an application is
submitted.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.
(ii) 25/00017/PAN - Erection of residential care facility, community hub,
staff facilities and associated works, Play Area, Perth Leisure Pool,
Glover Street, Perth (Report No. 26/43)
Councillor B Brawn requested that officers bear in mind that the area is
susceptible to flooding and that this is looked at when an application is
submitted.
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted.