Perth and Kinross Council Planning and Placemaking Committee - 11 February 2026 Report of Handling by Development Management and Building Standards Service Manager (Report No. 26/39) Proposal: Formation of extension to existing holiday park comprising siting of 62 holiday accommodation lodges and 6 holiday accommodation glamping pods; erection of 4 holiday accommodation cabins and 8 stilted holiday accommodation units; erection of rangers' classroom and a covered learning structure; alterations to reception building, pier, vehicle parking, footpaths and associated works (as amended) Location: Loch Tay Highland Lodges, Killin, FK21 8TY Ref. No: 25/00685/FLM Ward No: P4 - Highland Summary This report recommends approval of the application for planning permission for the extension to existing holiday park comprising siting of 62 holiday accommodation lodges and 6 holiday accommodation glamping pods; erection of 4 holiday accommodation cabins and 8 stilted holiday accommodation units; erection of rangers' classroom and a covered learning structure; alterations to reception building, pier, vehicle parking, footpaths and associated works. Background and Description of Proposal 1 Loch Tay Highland Lodges is situated approximately 5 kilometres to the north- east of the settlement of Killin, to the south of the A827 with access via a private driveway. The site is located toward the western end of Loch Tay, on its north bank. Much of the site, particularly the southern section, slope steeply downwards towards Loch Tay. 2 The site comprises 15.5 hectares of land, including a harbour and various outdoor recreational activities. The site presently contains 90 developed holiday accommodation plots, including 55 hire fleet holiday lodges, caravans and glamping units, plus a number of bespoke Scandinavian lodges. At present, up to eight staff are living on the site at any one time. The majority of the land proposed for development is located at the north of the site and is presently
Page 2
undeveloped parkland used for ancillary/recreational purposes associated with the main holiday park. 3 Planning permission is sought to expand the number of accommodation units within the existing holiday park and the relocation and reconfiguration of some established holiday accommodation areas. The proposed development includes 84 units of holiday accommodation comprising: Lodge Unit measuring 40ft x 20ft (24 units) Lodge Unit measuring 45ft x 20ft (8 units) Lodge Unit measuring 40ft x 14ft (30 units) Stilted Accommodation (8 units) Glamping pod (6 units) Holiday Cabins (4 units) 4 Seven additional staff accommodation units are also to be provided within two timber-clad modular buildings, and will be located either side of a new staff communal building. An existing staff accommodation unit will be relocated to the north of the communal area. The new staff accommodation will be located within the end section of an existing large storage shed. The existing cladding will be removed from the storage shed to allow light in, with the structural frame being retained in situ. 5 The holiday lodge units, cabins, and glamping pods are proposed within the definition of a Caravan as set out in the Caravan Sites and Control of Development Act 1960 (as amended) and the Caravan Sites Act 1968, typical plans for the position and location of these proposed units have been submitted with the application for illustrative purposes because static caravans constitute a use of land only in planning terms, rather than buildings, in order to demonstrate the general appearance of the type of accommodation envisaged. 6 The proposals also include associated ancillary development including a woodland walk, internal access to the proposed extension area, formalised parking provision, roads, lodge bases, woodland walk, landscaping and drainage. 7 Access will be via the existing vehicular access to the site from the A827 at the north of the site. The internal road layout has been improved to be more logical and remove unnecessary turns and weaves. Each new unit would have its own dedicated parking provision. 8 The proposal initially included the conversion of a washroom building and stables to provide 4 further holiday accommodation units. However, due to the nature of these buildings, they require to be surveyed for bats. The surveys had not been conducted during the required seasonal window of spring through to early autumn. Rather than delaying the determination of the application so the surveys could be done, the applicant resolved to remove these elements from this application and will make a sperate application for the washroom and stables conversion once the necessary survey work has been carried out.
Page 3
Site History 9 97/00527/FUL Full Planning Permission was Approved On 14 May 1997 for Erection of a lodge 10 99/01007/FUL Full Planning Permission was Approved On 2 August 1999 for Erection of a lodge 11 99/01127/FUL Full Planning Permission was Refused On 23 September 1999 for Erection of 3 lodges 12 99/01128/FUL Full Planning Permission was Refused On 23 September 1999 for Erection of one lodge 13 99/01129/FUL Full Planning Permission was Approved On 23 September 1999 for Erection of 4 lodges 14 99/01542/FUL Full Planning Permission was Approved On 25 November 1999 for Change of use of existing menage building to Class 11 (Assembly and Leisure) 15 01/01466/FUL Full Planning Permission was Approved On 31 October 2001 for Erection of a reception building 16 02/01856/FUL Full Planning Permission was Approved On 9 January 2003 for Extension to laundry to form bar and restaurant 17 04/01429/FUL Full Planning Permission was Approved On 12 April 2005 for Erection of a swimming pool/recreation building 18 04/01432/FUL Full Planning Permission was Refused On 10 May 2005 for Erection of 8no. additional holiday lodges and formation of wildlife area including lagoon 19 04/01912/FUL Full Planning Permission was Approved On 12 April 2005 for Dredging of existing harbour, building up of lochside walls with spoil, erection of mooring walkways and replacement of pier with shelter (in retrospect) 20 07/00467/OUT was Approved On 10 October 2007 for Erection of additional holiday lodges, ancillary facilities, upgrading of access and landscaping (outline) 21 07/01680/FUL Full Planning Permission was Approved On 3 September 2007 for Formation of a glassed-in porch under existing roof and utilising existing structure at Lodge Corrieben 22 08/02256/REM was Approved On 16 January 2009 for Erection of 8 timber lodges and associated carparking, access paths
Page 4
23 10/00011/PAN On 22 July 2010 for Renewal of existing consent (07/00467/OUT) Erection of additional holiday lodges, ancillary facilities, upgrading of access and landscaping (in principle) 24 10/01701/AMM was Approved On 1 July 2011 for Erection of lodges, reception building and managers flat and formation of landscaping, drainage, access and site levels (Approval of Matters Specified in Conditions - 07/00467/OUT) 25 10/01716/IPM was Approved On 1 July 2011 for Variation of Condition 2 (07/00467/OUT) to extend timescales (erection of additional holiday lodges) 26 12/02206/AMM was Approved On 22 February 2013 for Variation of condition 6 of planning consent 10/01701/AMM (to allow the access to be provided with a bituminously bound surface only from the junction with the public road to Ivy Cottage) 27 13/00190/FLL Full Planning Permission was Approved On 17 April 2013 for Siting of 7 timber tents 28 14/01918/FLL Full Planning Permission was Approved On 8 December 2014 for Erection of reception and staff units 29 17/01752/FLL Full Planning Permission was Approved On 28 November 2017 for Alterations and extension to staff accommodation 30 17/01945/FLL Full Planning Permission was Approved On 9 January 2018 for Siting of 13no. camping pods and associated works (in part retrospect) 31 21/01217/FLL Full Planning Permission was Approved On 25 August 2021 for Siting of 4 caravans for holiday accommodation use 32 24/01250/SCRN On 10 September 2024 for Change of land use, erection of 64 holiday cottages, 8 stilted accommodation units, 6 glamping pods, 3 staff accommodation units and associated operational development and infrastructure 33 24/00009/PAN On 4 October 2024 for Change of use of land to form extension to existing holiday park comprising siting of holiday/staff accommodation units, covered event space, classroom, landscaping and associated operational development Environmental Impact Assessment 34 The impact of the proposed development site was screened for EIA (24/01250/SCRN) and it was determined that the proposal does not constitute an EIA development. Pre-Application Consultation 35 Pre application Reference: 24/00009/PAN
Page 5
36 The proposed development is classed as a ‘Major’ development, in terms of the Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009. Therefore, the applicant was required to undertake formal pre-application consultation with the local community. The submitted Pre-application Consultation (PAC) Report outlined that two community consultation events were held at Cruachan Farm Caravan Park, adjacent to Loch Tay Highland Lodges. The public exhibitions were held on 29th November 2024 and 13th January 2025. The outcome of the events, etc. is detailed within the PAC Report. DEVELOPMENT PLAN 37 The Development Plan for the area comprises National Planning Framework 4 and the Perth and Kinross Local Development Plan 2 (2019) along with its associated statutory supplementary guidance. National Planning Framework 4 38 The National Planning Framework 4 (NPF4) is the Scottish Government’s long- term spatial strategy with a comprehensive set of national planning policies. This strategy sets out how to improve peoples lives by making sustainable, liveable and productive spaces. NPF4 has an increased status over previous NPFs and comprises part of the statutory development plan. 39 The Council’s assessment of this application has considered the following policies of NPF4: Policy 1: Tackling the Climate and Nature Crises Policy 2: Climate Mitigation and Adaptation Policy 3: Biodiversity Policy 4: Natural Places Policy 6: Forestry, Woodland and Trees Policy 7: Historic Assets and Places Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings Policy 13: Sustainable Transport Policy 14: Design, Quality and Place Policy 20: Blue and Green Infrastructure Policy 22: Flood Risk and Water Management Policy 29: Rural Development Policy 30: Tourism Perth and Kinross Local Development Plan 2019 40 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the area and states that, “Our vision is of a Perth and Kinross which is dynamic, attractive and effective which protects its assets whilst welcoming population and economic growth.” It is the most recent statement of Council policy and is augmented by Supplementary Guidance.
Page 6
41 The principal relevant policies are, in summary; Policy 1A: Placemaking Policy 1B: Placemaking Policy 2: Design Statements Policy 6: Settlement Boundaries Policy 8: Rural Business and Diversification Policy 9A: Caravan Sites, Chalets and Timeshare Developments: Existing Caravan Sites Policy 9C: Caravan Sites, Chalets and Timeshare Developments: Chalets, Timeshare and Fractional Ownership Policy 19: Housing in the Countryside Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments Policy 26B: Scheduled Monuments and Archaeology: Archaeology Policy 32: Embedding Low & Zero Carbon Generating Technologies in New Development Policy 38A: Environment and Conservation: International Nature Conservation Sites Policy 38C: Environment and Conservation: Local Designations Policy 39: Landscape Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and Development Policy 41: Biodiversity Policy 47: River Tay Catchment Area Policy 52: New Development and Flooding Policy 53A: Water Environment and Drainage: Water Environment Policy 53C: Water Environment and Drainage: Surface Water Drainage Policy 55: Nuisance from Artificial Light and Light Pollution Policy 56: Noise Pollution Policy 57: Air Quality Policy 58A: Contaminated and Unstable Land: Contaminated Land Policy 60B: Transport Standards and Accessibility Requirements: New Development Proposals Statutory Supplementary Guidance Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted in 2021) Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020) Supplementary Guidance - Landscape (adopted in 2020) Supplementary Guidance - Placemaking (adopted in 2020)
Page 7
Other Material Considerations PKC Non Statutory Guidance Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC and the River Tay SAC Planning Guidance - Planning & Biodiversity Consultations 42 As part of the planning application process the following bodies were consulted: External 43 Scottish Environment Protection Agency: No objection. The proposed development will not be at flood risk and is not likely to lead to increased flood risk to downstream receptors. 44 NatureScot: No objection. Subject to conditions on the drainage strategy and the provision of a Construction Method Statement to mitigate the impact on the Atlantic Salmon interest of the River Tay Special Area of Conservation. 45 Perth and Kinross Heritage Trust: No objection. The proposed development does not raise any significant issues and no archaeological mitigation is required in this instance. 46 Scottish Water: No objection. The proposal falls partly within two drinking water catchments where a Scottish Water abstraction is located. Scottish Water abstractions are designated as Drinking Water Protected Areas (DWPA) under Article 7 of the Water Framework Directive. The activity is likely to be low risk given the location within the catchment but care should still be taken as this is a public drinking water source. 47 Glen Lyon and Loch Tay Community Council: The Community Council objects for the following reasons: the pier and archaeological impacts; transport and lack of sustainable travel and public transport, parking and Travel Plan; noise; ecology and the environment; fire and water; and sewage. Internal 48 Biodiversity: Conditions are required for an Invasive Non-Native Species Control Plan (INNS) for the eradication and control of rhododendron, a detailed landscaping plan and a Site Biodiversity Action Plan containing quantities, locations, techniques, timescales, and monitoring arrangements of biodiversity enhancement measures.
Page 8
49 Environmental Health (Private Water): No objections, subject to a condition requiring the submission of measures to protect existing septic tanks, soakaways and private water supplies within and running through the application site. 50 Environmental Health (Contaminated Land): No objections. Historical mapping indicates that the proposed development is within the immediate vicinity of a former limekiln as well as an area of infilled land to the south of the site, both of which may have resulted in contamination in the vicinity of the site. Should any contamination be found during the approved works, works should cease, and the Land Quality team should be contacted 51 Environmental Health (Noise Odour): No objections, subject to conditions to control noise, external lighting and construction hours. 52 Transportation and Development: Additional confirmation was sought on the adequacy of the visibility splays at the site entrance. This information has since been provided. 53 Structures and Flooding: Additional information was initially sought as the climate change allowance had been calculated at 35% as opposed to the 39% requirement under NPF4. Amended drainage calculations have subsequently been provided. Representations 54 Fourteen representations were received. The main issues raised within the representations are: Visual impact Landscape impacts Flood risk Lack of car parking Road safety concerns Overdevelopment Fire risk Impact on water supply Impact on local community from commercialisation Loss of privacy Biodiversity impacts Light pollution Noise Loss of disc golf course 55 These issues are addressed in the Appraisal section of the report.
Page 9
Additional Statements Screening Opinion EIA not required Environmental Impact Assessment (EIA): Environmental Report Not required Appropriate Assessment under Habitats Regulations Habitats Regulations Appraisal completed AA completed Design Statement or Design and Access Statement Submitted Report on Impact or Potential Impact eg Flood Risk Assessment Design and Access Statement PAC Report Ecological Impact Assessment Ecological Appraisal Ecology Tree Report Tree Report Arboricultural Impact Assessment and Method Statement Flood Risk and Drainage Assessment Transport Assessment Construction Traffic Management Plan Lighting Assessment Noise Impact Assessment Travel Plan Appraisal 56 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as amended) require the determination of the proposal to be made in accordance with the provisions of the Development Plan, unless material considerations indicate otherwise. The Development Plan comprises NPF4, the Perth and Kinross Local Development Plan 2019 and statutory supplementary guidance. The relevant policy considerations are outlined in the policy section above and are considered in more detail below. Principle 57 NPF4 Policies 29: Rural development and 30: Tourism are relevant as are LDP2 Policies 8: Rural Business and Diversification and 9: Caravan Sites, Chalets and Timeshare Developments. 58 NPF4 Policy 29 advises that development proposals that contribute to the viability, sustainability and diversity of rural communities and local rural economy will be supported. It further advises that development proposals in rural areas should be suitably scaled, sited and designed to be in keeping with the character
Page 10
of the area. They should also consider how the development will contribute towards local living and take into account the transport needs of the development as appropriate for the rural location. 59 NPF4 Policy 30 offers considerable support for new tourist accommodation. It sets out that proposals for tourism related development will take into account factors such as the contribution made to the local economy; compatibility with the surrounding area and impacts on communities, along with sustainable principles and consideration of the natural environment. 60 This proposal is a tourism related development. LDP2 Policy 8: Rural Business & Diversification supports such proposals when they improve the quality of existing visitor facilities. Sites outwith settlements may be acceptable where they offer opportunities to diversify an existing business, or are related to an existing site- specific resource or opportunity. The proposal will comply with Policy 8 criteria (a) as it will contribute to the local economy through the provision of permanent employment, visitor accommodation, additional tourism and recreational facilities. 61 LDP2 Policy 9: Caravan Sites, Chalets and Timeshare Developments generally supports the improvement of existing holiday-related uses. Policy 9C states that “the Council will give favourable consideration to new chalet and timeshare/fractional ownership developments where it is clear these cannot be used as permanent residences”. 62 Overall, NPF4 and LDP2 policies are generally supportive of the proposal as the intensification of an existing tourist facility. Therefore, the development proposals are acceptable in principle, subject to compliance with other relevant development plan policies and material considerations, which are assessed below. Design, Layout and Landscape 63 NPF4 Policy 14: Design, Quality and Place and LDP2 Policy 1: Placemaking are relevant in the consideration of the design and layout of the proposal. In addition, NPF4 Policy 4: Natural Places, advises that development proposals that affect a site designated as a local nature conservation site or landscape area in the LDP will only be supported where development will not have significant adverse effects on the integrity of the area or the qualities for which it has been identified. LDP2 Policy 39: Landscapes, states that development proposals will be supported where they do not conflict with the aim of maintaining and enhancing the landscape qualities of Perth and Kinross. 64 The layout of the new lodges and glamping units to be located within the central section of the site are largely guided by the existing site layout, roads and infrastructure. The lodges on the upper part of the site will require new roads and infrastructure to facilitate the additional plots. The proposed layout is typical of a holiday park development and the density is commensurate with similar operations in the locality.
Page 11
65 The design of the lodges, glamping pods and stilted accommodation is appropriate, with the generally low development heights and the extensive landscaping proposed ensuring that the proposal can be fully assimilated into the landscape. 66 The site is situated in the Loch Tay Local Landscape Area (LLA) with the boundary of Loch Rannoch and Glen Lyon National Scenic Area located approximately 800m to the north. As such, a Landscape and Visual Impact Assessment (LVIA) has been carried out. 67 Intervisibility across the wider study area is notably constrained by the site’s topography, dense tree cover both on and around the site, and extensive woodland in the broader landscape. This includes wooded areas along the southern shore of the loch, the lower slopes of the Beinn Leabhainn mountain group, and forestry plantations on the upper slopes. 68 The landscape and visual effects of the proposal are assessed as generally minor to negligible and will result in relatively minor changes to the general character of the landscape. 69 Overall, the proposal is considered to adopt good placemaking principles as the design and siting respects the character and setting with a low impact proposal. The proposed development will initially bring a modest change to the landscape setting. Over time, as the significant landscaping scheme establishes, any effects will be fully mitigated with the landscape buffer and the planting of native trees and foliage will help soften the impact of the new accommodation. Amenity 70 A lighting assessment and plan has been submitted with the application to show compliance with Environmental Zone E1: Intrinsically dark areas – National Scenic Areas, which is the correct criteria for the development. Lighting on site is to be provided through the use of Tuscan Wall lights at each unit and Ligman Bollards throughout the site. 71 Considering the proximity of residential properties outwith the ownership of the applicant, there is some potential for residential amenity to be affected by noise. However, this can be adequately controlled by way of standard noise conditions being attached to any given consent (Condition xx). A Noise Impact Assessment (NIA) and draft Noise Management Plan (NMP) have been submitted with the application. User noise, including the playing of music has been identified as having the potential to have the greatest impact on residential amenity and therefore needs to be controlled through the NMP. The NMP should be updated to include the stated site rules, contact details of management on site, allowable music noise limits and how this is monitored etc, along with the complaint action procedure referred to. 72 The Design and Access Statement refers to the use of wood burners, however these are not shown on the plans for the units. There is therefore the potential for
Page 12
smoke or odour disamenity. Environmental Health has advised that their service has seen an increase in complaints with regards to smoke and odour due to the installation of biomass appliances. This can be caused due to poor installation and maintenance of the biomass appliances and inadequate dispersion of emissions due to the inappropriate location and height of a flue with regards to surrounding buildings. The applicant should therefore ensure that any biomass systems and associated flues are adequately installed and operated correctly. Roads and Access 73 A Transport Assessment (TA), a Construction Transport Management Plan (CTMP) and a Travel Plan have been submitted in support of the application. The TA estimates that the weekday peak hour (Friday 18:00-19:00) trips associated with the accommodation only (excluding trips to the restaurant lake and education facilities) are proposed to increase from 20 two-way movements to 38 two-way movements. 74 The total weekday trips associated with the accommodation only (excluding trips to the restaurant lake and education facilities) are proposed to increase from 198 two-way movements to 383 two-way movements. 75 The weekend peak hour (Saturday 11:00-12:00) trips associated with the accommodation only (excluding trips to the restaurant lake and education facilities) are proposed to increase from 25 two-way movements to 49 two-way movements. 76 The total weekend trips associated with the accommodation only (excluding trips to the restaurant lake and education facilities) are proposed to increase from 238 two-way movements to 460 two-way movements. 77 An Automatic Traffic Counter (ATC) survey is located to the east of the site access. A Congestion Reference Flow (CRF) Assessment has been undertaken which shows that with the additional development traffic added to the peak August 2024 ATC survey, the A827 is operating at 12% capacity, therefore congestion is not expected to increase. 78 The following parking will be provided for the proposed units: Lodges and static units will have two car parking spaces per unit (total of 124 spaces) Cabins will have one car parking space per unit (total of 4 spaces) Stilted accommodation units will have two car parking spaces per unit (total of 16 spaces) Glamping units will have one car parking space per unit (total of 6 spaces) Cycle storage will be provided within each of the units. 79 Transport Planning initially had some comments on the length of the visibility splays at the site access. However, the applicant has provided further information
Page 13
on vehicle speeds on this section of the A827 and the suitability of the access for the existing site operations. The visibility splays cannot be increased without considerable tree loss, and as the road safety analysis set out within the TA provides that there is no evidence that the existing visibility splays represent a road safety issue, it is not justifiable to require their extension. Water Supply, Drainage and Flooding 80 Policy 53E: Water and Drainage (Water Supply) advises that all new developments must be served either by a satisfactory mains or private water supply, without prejudicing existing users. 81 The Environmental Health Private Water Team has advised that there are three private water supplies on the site known to serve properties in the vicinity. The applicant has not made clear if the expansion is to be served by the existing private water supplies or whether there will be new supplies. If there are to be new supplies then the Private Water Team will need to be informed and the supply registered. 82 It is recommended that a condition is imposed to ensure the new development has an adequate and consistently wholesome supply of water and to maintain water quality and supply in the interests of residential amenity and ensure the private water supply or septic drainage systems of neighbours of the development remain accessible for future maintenance. 83 A Flood Risk Assessment and Drainage Strategy (FRA) has been submitted with the application. The FRA refers to the SEPA Flood Maps, in assessing the fluvial flood risk to the site. SEPA Maps are based on a national mapping methodology and should be used as a screening tool only, rather than for assessing site specific flood risk. SEPA has advised that it appears that the fluvial flood extent flowing through the centre of the site is an overestimation and is unlikely to follow this flow path given the topography north of the A827 at the point where this flow path originates. 84 A detailed topographical survey has been provided to inform the FRA. A review of the data suggests at least a 5m vertical clearance will exist between the right- hand bank of the Allt a’ Mhoirneas watercourse and the proposed cabin layout where all the new accommodation blocks will be located. 85 Furthermore, photographic records provided by Streetmap show that the A827 road culvert that conveys the Allt a’ Mhoirneas, is a sizeable structure, which is unlikely to become blocked, given its size and the nature of vegetation located upstream and downstream. Streetmap records also suggest that the Allt a’ Mhoirneas channel is steep and incised beneath the A827. 86 As a result, SEPA has no objections to the proposal as they consider that the proposed development will not be at flood risk and is not likely to lead to increased flood risk to downstream receptors.
Page 14
87 PKC Flooding and Structures had initially sought further information from the developer in respect of drainage. This included the updating of the FRA to the climate change allowance of 39% set out in NPF4. The FRA has subsequently been updated with the correct climate change allowance. The proposal is acceptable subject to a condition requiring adherence to the mitigation measures recommended within the FRA. Conservation Considerations 88 Perth and Kinross Heritage Trust (PKHT) has advised that with respect to archaeology and the planning process, as outlined by NPF4, the proposed development does not raise any significant issues. No archaeological mitigation is required in this instance. Natural Heritage and Biodiversity 89 NPF4 Policy 3: Biodiversity and Policy 6: Forestry, Woodland and Trees are relevant considerations, as are LDP2 Policies 40: Forestry, Woodland and Trees and 41: Biodiversity are relevant in the assessment of the application. 90 A Ecological Appraisal (EA) and an Ecological Impact Assessment (EcIA) have been submitted. The loss of habitats for the scheme has been restricted largely to disturbance of modified or other lower value grasslands. The loss of these grassland areas is compensated for through the planting of trees and hedgerows and the creation of meadow habitats of higher quality (richer in native wildflower species) than the baseline habitats. The key enhancements are driven by the Landscape Strategy which seeks to provide a significant net increase in woodland cover of 40% at the site. 91 The Council will seek to protect and enhance all wildlife and habitats, whether formally designated or not, considering natural processes in the area. Planning permission will not be granted for development likely to have an adverse effect on protected species unless clear evidence can be provided that the ecological impacts can be satisfactorily mitigated. An existing washroom and stables were originally proposed to be converted to additional holiday accommodation. However, they require to be surveyed for bats. It is not possible to undertake the necessary surveys outwith the active season (May – August), and as a result these buildings have been removed from the proposal and will be subject to a separate application. 92 A Tree Survey and an Arboricultural Impact Assessment, Method Statement, and Tree Protection Plan have been submitted. The only tree identified for removal is a semi-mature Common Beech, which is required to facilitate the proposed layout. Its removal is considered acceptable given the overall design and the extensive new tree planting scheme proposed across the site, which will provide a net gain in both canopy cover and long-term arboricultural value. 93 Conditions are required for an Invasive Non-Native Species Control Plan (INNS) for the eradication and control of rhododendron, a detailed landscaping planand
Page 15
a Site Biodiversity Action Plan containing quantities, locations, techniques, timescales, and monitoring arrangements of biodiversity enhancement measures. Developer Contributions 94 None required. Economic Impact 95 Tourism is an important mechanism for delivering sustainable growth for both the local and national economy. It supports local communities by making local shops, services and transport connections economically viable and encourages the development of local products and services and provides both direct and indirect employment opportunities. The existing Loch Tay Highland Lodges site is well established and already makes a contribution to both the local economy and general vitality of the area. 96 A review on the current holiday market for Scottish breaks reports that staycations in Scotland have increased by 47% year-on-year, however that includes pandemic years. When compared prior to the pandemic, growth has remained a substantial increase of 32% since 2019. The applicants have advised that since acquiring the site in 2022, they have instigated an extensive refurbishment programme of the site’s facilities. This proposal is intended to deliver additional investment and growth of the site, thereby allowing it to remain a commercially viable and competitive tourism facility, whilst encouraging visitors to return in the site and wider area longer-term. 97 The site currently employs 17 full time equivalent (FTE) staff in total. It is envisaged that going forward the proposals would generate an additional 8-10 FTE employment opportunities at the site. 98 During the construction period, jobs will be created and sustained, supporting indirect employment and revenue that this volume of construction activity will generate from employees spending on local goods and services. Longer term, additional residents to the area will support existing local employment and services in the area. Variation of Application Under Section 32A 99 No variations undertaken. Planning Obligations and Legal Agreements 100 None required.
Page 16
Direction By Scottish Ministers 101 Under the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013, regulations 30 – 33 there have been no directions by the Scottish Government in respect of an Environmental Impact Assessment screening opinion, call in or notification relating to this application. Conclusion and Reasons for Recommendation 102 To conclude, the application must be determined in accordance with the Development Plan unless material considerations indicate otherwise. In this respect, the proposal is considered to comply with NPF4, and the adopted Local Development Plan 2 (2019). Account has been taken account of the relevant material considerations and none has been found that would justify overriding the Development Plan. Accordingly, the proposal is recommended for approval subject to the following conditions. Recommendation Approve subject to the following conditions: Conditions and Reasons for Recommendation General 1. This planning permission will last only for three years from the date of this decision notice, unless the development has been lawfully started within that period. Reason - This is a Planning Permission in terms of Section 58 of the Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning (Scotland) Act 2019. 2. The development hereby approved shall be used solely for holiday accommodation and shall not be occupied as the sole or main residence of any occupant. Reason - In order to clarify the terms of the permission; to control and restrict the use of the building. 3. Prior to the commencement of development of any of the stilted accommodation units, detailed designs of the units will be submitted to the Council as Planning Authority for written approval. The stilted accommodation units will subsequently be built in compliance with the approved plans. Reason - In order to ensure the stilted accommodation units are of an appropriate scale and design.
Page 17
Amenity 4. All plant or equipment shall be so enclosed, attenuated and/or maintained such that any noise therefrom shall not exceed Noise Rating 35 between 0700 and 2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within any neighbouring residential property, with all windows slightly open, when measured and/ or calculated and plotted on a rating curve chart. Reason - In order to safeguard the neighbouring residential amenity in the area. 5. All external lighting shall be sufficiently screened and aligned so as to ensure that there is no direct illumination of neighbouring land and that light spillage beyond the boundaries of the site is minimised to a degree that it does not adversely affect the amenity of the neighbouring land. Reason - In order to safeguard the neighbouring residential amenity in the area. 6. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours and Saturday 0800 hours to 1300 hours with no noisy works out with these times or at any time on Sundays. The above shall be implemented throughout the construction stage of the development unless otherwise agreed in writing with the Council as Planning Authority and Environmental Health. Reason - In order to safeguard the neighbouring residential amenity in the area. 7. Prior to the development being brought into use, an updated Noise Management Plan shall be submitted for the written approval of the Council as Planning Authority. The plan shall include all sources of noise associated with the premise, including user noise and the measures that will be put in place to minimise and/or control noise. The plan shall be reviewed on a regular basis or, following receipt of a justified complaint or at the request of the planning authority. Once the Noise Management Plan has been approved, it shall be fully implemented for the lifetime of the development. Reason - In order to safeguard the neighbouring residential amenity in the area. 8. Prior to the commencement of the development hereby approved, details of the location and measures proposed for the safeguarding and continued operation, or replacement, of any septic tanks and soakaways, private water sources, private water supply storage facilities and/or private water supply pipes serving properties in the vicinity, sited within and running through the application site, shall be submitted to and approved in writing by the Council as Planning Authority. The subsequently agreed protective or replacement measures shall be put in place prior to the development being brought into use and shall thereafter be so maintained insofar as it relates to the development hereby approved. Reason - In order to protect private water supplies within and nearby the development.
Page 18
Transport 9. Prior to the commencement of the development hereby approved, the applicant shall submit for the further written agreement of the Council as Planning Authority, in consultation with the Roads Authority (Structures), a Construction Traffic Management Scheme (TMS) which shall include the following: (a) restriction of construction traffic to approved routes and the measures to be put in place to avoid other routes being used; (b) timing of construction traffic to minimise impact on local communities particularly at school start and finishing times, on days when refuse collection is undertaken, on Sundays and during local events; (c) a code of conduct for HGV drivers to allow for queuing traffic to pass; (d) arrangements for liaison with the Roads Authority regarding winter maintenance; (e) emergency arrangements detailing communication and contingency arrangements in the event of vehicle breakdown; (f) arrangements for the cleaning of wheels and chassis of vehicles to prevent material from construction sites associated with the development being deposited on the road; (g) arrangements for cleaning of roads affected by material deposited from construction sites associated with the development; (h) arrangements for signage at site accesses and crossovers and on roads to be used by construction traffic in order to provide safe access for pedestrians, cyclists and equestrians; (i) details of information signs to inform other road users of construction traffic; (j) arrangements to ensure that access for emergency service vehicles are not impeded; (k) co-ordination with other significant developments known to use roads affected by construction traffic; (l) traffic arrangements in the immediate vicinity of temporary construction compounds; (m) monitoring, reporting and implementation arrangements; (n) arrangements for dealing with non-compliance; and (o) details of HGV movements to and from the site. The TMS as approved shall be strictly adhered to during the entire site construction programme. Reason - In the interest of proper site management. Biodiversity 10. Prior to the commencement of development, a detailed Drainage Strategy shall be submitted to the Council as Planning Authority for written approval. The Drainage Strategy will include details as to how it will mitigate any significant effects on the River Tay Special Area of Conservation, and particularly its Atlantic Salmon interest. Following approval the Drainage Strategy will be fully adhered to.
Page 19
Reason - In order to protect the integrity of the River Tay Special Area of Conservation. 11. Prior to the commencement of development, a Construction Method Statement shall be submitted for approval. The Method Statement will include details as to how it will mitigate any significant effects on the River Tay Special Area of Conservation, and particularly its Atlantic Salmon interest. Following approval the Method Statement will be fully adhered to during the entirety of the construction phase. Reason - In order to protect the integrity of the River Tay Special Area of Conservation. 12. Prior to the completion or occupation of the development hereby approved, A Site Biodiversity Plan shall be submitted to the Council as Planning Authority for written approval containing quantities, locations, techniques, timescales, and monitoring arrangements of biodiversity enhancement measures. Thereafter, the agreed scheme shall be implemented in full and, where necessary, maintained in a reasonable condition for the life of the development. Reason - In the interests of biodiversity and to protect environmental quality. Trees 13. Prior to the commencement of the development hereby approved, a detailed landscaping and planting scheme for the site shall be submitted to the Council as Planning Authority for approval. The scheme shall include details of the height and slopes of any mounding or recontouring of the site, full details of all hard landscaping proposals including materials and installation methods and, species, height, size and density of trees and shrubs to be planted. The scheme as subsequently approved shall be carried out and completed within the first available planting season (October to March) after the completion or bringing into use of the development, whichever is the earlier, and the date of Practical Completion of the landscaping scheme shall be supplied in writing to the Council as Planning Authority within 7 days of that date. The scheme as agreed and implemented shall thereafter be maintained to a satisfactory standard. Reason - To ensure a satisfactory standard of development and environmental quality. 14. Prior to the commencement of development, an Arboricultural Method Statement shall be submitted to the Council as Planning Authority for written approval. The Method Statement will include details of all tree planting proposals across the site, as well as any management of existing trees including felling, management and control of Invasive Non-Native Species, root protection areas and tree protection fencing. Thereafter, the agreed scheme shall be implemented in full for the life of the development.
Page 20
Reason - In order to ensure that tree planting and tree protection measures are appropriately implemented as part of the development. 15. Prior to the commencement of development, an Arboricultural Clerk of Works (ACW) will be appointed in agreement with the Council as Planning Authority. The ACW will oversee the implementation of the Arboricultural Method Statement as well as lodge siting, the accurate setting out of root protection areas and tree protection fencing and will provide supervision during works within or near root protection areas. The ACW shall visit the site at least once every 3 weeks during the construction period and shall report findings to the Council as Planning Authority in writing within 7 days of each visit. Reason - To ensure compliance with best practice and safeguarding of tree health throughout the construction phase. Flooding and Drainage 16 A four-metre easement free from development along the side of Allt a’ Mhoirneas will be maintained at all times to allow access for inspection and maintenance of the watercourse and the A827 culvert. Reason - To allow for appropriate future maintenance of the watercourse. Justification The proposal is in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan. Informatives 1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as amended) the person undertaking the development is required to give the Planning Authority prior written notification of the date on which it is intended to commence the development. A failure to comply with this statutory requirement would constitute a breach of planning control under Section 123(1) of that Act, which may result in enforcement action being taken. Please use the form attached herewith. 2. As soon as practicable after the development is complete, the person who completes the development is obliged by Section 27B of the Town and Country Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written notice of that position. Please use the form attached herewith. 3. This development will require the 'Display of notice while development is carried out', under Section 27C(1) of the Town and Country Planning Act 1997, as amended, and Regulation 41 of the Development Management Procedure (Scotland) Regulations 2013, as amended. The form of the notice is set out in Schedule 7 of the Regulations and a draft notice is included for your guidance. In accordance with Regulation 41 the notice must be:
Page 21
Displayed in a prominent place at or in the vicinity of the site of the development Readily visible to the public Printed on durable material. 4. This planning permission is granted subject to conditions, some of which require further information to be submitted to Development Management either before works can start on site or at a certain time. The required information must be submitted via the ePlanning portal if your original application was lodged that way, otherwise send it to us at developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable in respect of each request made, though there is no limit to the number of conditions that can be discharged in a single request. The Fees Charter is available on our website www.pkc.gov.uk. The Council has two months to consider the information. You should therefore submit the required information more than two months before your permission expires. We cannot guarantee that submissions made within two months of the expiry date of your permission will be able to be dealt with before your permission lapses. 5. Trees and scrub are likely to contain nesting birds between 1st March and 31st August inclusive. Trees and scrub are present on the application site and are to be assumed to contain nesting birds between the above dates. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as amended (Section 1), it is an offence to remove, damage or destroy the nest of any wild bird while that nest is in use or being built. Planning permission for a development does not provide a defence against prosecution under this Act. 6. The applicant is advised that any proposed signage will require a further application to be submitted for advertisement consent unless it benefits from express consent as per the Town and Country Planning (Control of Advertisements) (Scotland) Regulations 1984. 7. Part of the approved development includes holiday accommodation or Short-term Let accommodation (STL). The developer is advised that holiday accommodation and STLs require to be licensed under the terms of Article 3 of the Civic Government (Scotland) Act 1982 (Licensing of Short-terms Lets) Order 2021 and therefore a licence application should be made to Perth and Kinross Council prior to operation commencing. Further information and application forms are available at https://www.pkc.gov.uk/shorttermlets. 8. Records indicate that at least part of the proposed development site lies within a radon affected area where the measurement/monitoring of radon gas and the installation of mitigation measures may be required. Further information on radon gas and the associated reports that can be obtained is available at www.ukradon.org and at http://shop.bgs.ac.uk/georeports/. 9. Part of the approved development includes 'caravans'. The developer is advised that caravans require to be licensed under the terms of Section 1 of the Caravan
Page 22
Sites and Control of Development Act 1960 and therefore a licence application should be made to Environmental Health. Application forms are available at https://www.pkc.gov.uk/article/15600/Licence-caravan-site 10. The approved stove systems shall be installed and thereafter operated and maintained in accordance with the manufacturer’s recommendations, such that smoke/odours are not exhausted into or escape into any neighbouring dwellings. Failure to do so may result in an investigation and possible action by Environmental Health under the Environmental Protection Act 1990. 11. The applicant should ensure that any existing wayleaves for maintenance or repair to existing private water supply or septic drainage infrastructure in the development area are honoured throughout and after completion of the development. 12. The applicant shall ensure the private water supply for the development complies with the Water Scotland Act 1980 (Section 63), The Private Water Supplies (Scotland) Regulations 2006 and The Water Intended for Human Consumption (Private Supplies) (Scotland) Regulations 2017. Detailed information regarding the private water supply, including the nature, location and adequacy of the source, any storage tanks/ pipework and the filtration and disinfection treatment proposed to ensure provision of an adequate and consistently wholesome water supply shall be submitted to Perth and Kinross Council Environmental Health in line with the above Act and Regulations. 13. A review of the proposed development site did not raise any real concerns, although historical mapping indicates that the proposed development is within the immediate vicinity of a former limekiln as well as an area of infilled land to the south of the site, both of which may have resulted in contamination in the vicinity of the site. Should any contamination be found during the approved works, works should cease, and the Land Quality team should be contacted on 01738 475000 or ContaminatedLand@pkc.gov.uk for further advice. Background Papers Letters of representation 14 Authors Name Designation Contact Details Alex Gudgeon Planning Officer (Major Team) developmentmanagement@pkc.gov.uk Approved Name Designation Date Sean Panton Team Leader (Major Applications and Enforcement) 26 January 2026