Agenda Document Pack - Planning and Placemaking Committee - 07/01/2026

Perth and Kinross Council · 7 January 2026
Back to Planning and Placemaking Committee — 7 January 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
22/12/2025 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 07 January 2026 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Bailie Claire McLaren
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 216

Page 2

Page 2 of 216

Page 3

Planning and Placemaking Committee 
Wednesday, 07 January 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 3 DECEMBER 2025 FOR
APPROVAL
(copy herewith) 
5 - 62 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  S36 CONSULTATIONS   
5(1)(i)  25/00899/ECU36 - CONSTRUCTION OF 19 WIND TURBINES
AND ASSOCIATED INFRASTRUCTURE (GLEN LEDNOCK
WIND FARM) ECU00004966, LAND 4800 METRES NORTH OF
ST SERFS CHURCH, COMRIE, CRIEFF, PH6 2EA
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/1) 
63 - 84 
5(2)  MAJOR APPLICATIONS   
5(2)(i)  25/00609/FLM - ERECTION OF 83 AFFORDABLE
DWELLINGHOUSES AND 20 AFFORDABLE FLATS,
ASSOCIATED INFRASTRUCTURE AND LANDSCAPING,
LAND 90 METRES EAST OF WESTFIELDS OF RATTRAY,
BALMORAL ROAD, RATTRAY, BLAIRGOWRIE, PH10 7HY
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/2) 
85 - 116
Page 3 of 216

Page 4

5(3)  LOCAL APPLICATIONS   
5(3)(i)  24/01857/FLL - ERECTION OF A DWELLINGHOUSE AND
ASSOCIATED WORKS (REVISED PROPOSAL), LAND 40
METRES EAST OF ANEMONE, BALNASKEAG, KENMORE,
ABERFELDY, PH15 2HB
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/3) 
117 - 140 
5(3)(ii)  25/00572/FLL - ERECTION OF 26 DWELLINGHOUSES,
FORMATION OF ROAD AND FOOTPATH, INSTALLATION OF
AIR SOURCE HEAT PUMPS, LANDSCAPING AND
ASSOCIATED WORKS (REVISED PROPOSAL), LAND AT
WESTER TOMAKNOCK, CRIEFF
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/4) 
141 - 170 
5(3)(iii)  25/01082/FLL - ERECTION OF 6 INDUSTRIAL UNITS
(CLASSES 4, 5 AND 5), FORMATION OF PARKING AREA,
INSTALLATION OF EV CHARGING POINTS, AIR SOURCE
HEAT PUMP AND ASSOCIATED WORKS, 3 MACDUFF
PLACE, KINROSS, KY13 8FU
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/5) 
171 - 186 
5(3)(iv)  25/01217/FLL - ALTERATIONS, EXTENSION AND
SUBDIVISION OF RETAIL UNIT TO FORM 2 RETAIL UNITS,
16-18 COUNTY PLACE, PERTH, PH2 8EE
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/6) 
187 - 200 
5(3)(v)  25/01289/FLL - UPGRADING AND WIDENING OF FOOTPATH,
LAND 40 METRES SOUTH WEST OF THE PAVILION, FERRY
ROAD, PITLOCHRY, PH16 5DD
Report of Handling by Development Management and Building
Standards Service Manager (copy herewith 26/7) 
201 - 216 
Page 4 of 216

Page 5

Planning and Placemaking Committee 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 3 December 2025 at
9.30am. 
Present: Councillors I Massie, G Stewart, K Allan, B Brawn, D Cuthbert, K Harvey
D Illingworth, I James, I MacPherson (substituting for Councillor R Watters), Bailie
C McLaren, and Bailie M Williamson. 
In Attendance: L McLean, S Panton, L Reid, K Smith, N Sworowski and
P Williamson (all Economy, Development and Planning); A Brown, G Fogg,
M Pasternak (all Legal and Governance). 
Apologies: Councillor R Watters. 
Councillor I Massie, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed everyone present to the meeting and noted
apologies as above.   
2. Declarations of Interest 
There were no Declarations of Interest made in terms of the Councillors Code
of Conduct. 
3. Minutes 
The minute of meeting of the Planning and Placemaking Committee of
8 October 2025 was submitted and approved as a correct record. 
4.  Deputations 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.  Item No. 
25/00793/FLL 5(3)(i)
24/00800/FLL 5(3)(iii)
25/01420/FLL 5(3)(iv)
25/00928/IPL 5(3)(v)  
3
Page 5 of 216

Page 6

5. Applications For Determination 
(1) Section 36 Consultations 
(i) 24/00716/ECU36 - The proposed Brunt Hill Wind Farm
development comprises 13 turbines (of which 7 wind
turbines have a ground to blade tip height up to 200 metres
and 6 wind turbines have a ground to blade tip height up to
185m) and battery energy storage system (BESS) (up to
50MW) and associated infrastructure (as amended)
(ECU00004654), land 2km north-west of Westfield Cottage,
Carnbo, Kinross, KY13 0NT (Report No. 25/337) 
Motion (Councillors I Massie and G Stewart) 
Offer no objection to the proposal and request the imposition of
the following suggested conditions: 
Suggested Conditions
Commencement of Development
1. The Development must be commenced no later than 3
years from the date of this planning permission.
Written confirmation of the intended date of
Commencement of Development shall be provided to the
Planning Authority no later than one calendar month
before that date.
Reason - Section 58 of the Town and Country Planning
(Scotland) Act 1997 requires a condition to be attached to
permissions limiting their duration. Three years is the
default period set by law and there is no material reason
indicating that a different period should be set.
Design of Wind Turbines
2. No turbines shall be erected until details and specification
of the proposed wind turbines (including the size, make
and model, power rating and sound power levels,
nameplate generating capacity, type, external finish and
colour) and all turbine associated apparatus have been
submitted to and approved in writing by the Planning
Authority.
The submission shall demonstrate that all wind turbine
blades shall rotate in the same direction.
Thereafter the wind turbines and all associated apparatus
shall be constructed and operated in accordance with the
details approved under part (1) and shall be maintained in
the free from external rust, staining or discolouration, until
such time as the Development is decommissioned.
Reason - To ensure that the environmental impacts of the
turbines forming part of the Development conform to the
impacts assessed in the EIA Report and in the interests
of the visual amenity of the area.  
Page 6 of 216

Page 7

Design of Sub-station and ancillary development
3. There shall be no Commencement of Development of the
sub-station until final details of its location, layout,
external appearance, dimensions, and surface materials,
and control room buildings, any above ground electrical
equipment, associated compounds, construction
compound, boundary fencing, external lighting and
parking areas have been submitted to, and approved in
writing by, the Planning Authority.
Thereafter, the substation and control room buildings, any
above ground electrical equipment, associated
compounds, fencing, external lighting and parking areas
shall be constructed in accordance with the details
approved under part (1).
Reason - To ensure that the environmental impacts of the
sub-station and ancillary development forming part of the
Development conform to the impacts assessed in the EIA
Report and in the interests of the visual amenity of the
area.
Design of Energy Storage Facility
4. There shall be no Commencement of Development on
the energy storage facility until details of the location,
layout, external finishes and appearance, dimensions and
surface materials of the energy storage facility, inclusive
of battery containers, substation(s), control buildings,
external above ground electrical equipment, associated
compounds, construction compound, boundary fencing
and other enclosures, external lighting, security cameras
and parking areas have been submitted to, and approved
in writing by, the Planning Authority. For the avoidance of
doubt the details of the energy storage facility shall not
exceed the parameters assessed in the EIA Report.
Thereafter, the battery energy storage facility shall be
constructed in accordance with the details approved
under part (1) and the infrastructure shall be maintained
in the approved colour, free from rust, staining or
discolouration until such time as the Development is
decommissioned.
Reason - To ensure that the environmental impacts of the
energy storage facility forming part of the Development
conform to the impacts assessed in the EIA Report and in
the interests of the visual amenity of the area.
Signage
5. No part of the Development shall display any text, logo,
sign or advertisement (other than health and safety
signage as required by law) or be illuminated (with the
exception of aviation safety lighting).
Reason - In the interests of health and safety on site and
the visual amenity of the area.
Micro-siting
6. All wind turbines, buildings, areas of hardstanding,
associated infrastructure and tracks shall be constructed
Page 7 of 216

Page 8

in the locations shown on plan reference Volume 3a,
Figure 3.1 Revised Proposed Development read in
conjunction with Volume 2, Chapter 3 - Description of
Proposed Development of the Additional Information
Report. The locations of wind turbines, buildings, areas of
hardstanding and tracks may be adjusted by micro-siting
within the redline boundary shown on plan reference
Figure 3.1 Revised Proposed Development of the
Additional Information Report. Any such micro-siting is
subject to the following restrictions unless otherwise
approved in advance in writing by the Planning Authority:
(a) no wind turbine, building, hardstanding or access
track shall be moved more than 50m from the
position shown on Figure 3.1 Revised Proposed
Development of the Additional Information Report
and at the grid references set out in Volume 2,
Chapter 3 of the AI Report;
(b) No micro-siting shall take place with the result that
infrastructure (excluding floating tracks or
hardstanding) has a greater overall impact on peat
than the original location;
(c) no infrastructure other than as required for a water
course crossing or water crossing upgrading works
shall be microsited to within 50 metres of a water
course;
(d) No wind turbine foundation shall be positioned
higher than 5m Above Ordnance Datum (AOD)
than the position for that turbine shown at the grid
references set out in Volume 2, Chapter 3 of the AI
Report.
(e) no micro-siting shall take place which will bring the
wind turbine blade tips closer than 50m stand-off
distance to high-value bat habitat.
All micro-siting permissible under this condition shall be
submitted to, and approved in writing by, the
Environmental Clerk of Works (ECoW) in advance of any
works or development associated with the micrositing
request being implemented.
No later than three months after the Date of Final
Commissioning, an updated site layout plan showing the
final position of all wind turbines, buildings, areas of
hardstanding, tracks and associated infrastructure
forming part of the Development shall be submitted to the
Planning Authority. The plan shall also specify areas
where micrositing has taken place and, for each instance,
be accompanied by copies of the ECoW or Planning
Authority’s approval, as applicable.
Reason - to control environmental impacts while taking
account of local ground conditions.
Planning Monitoring Officer
7. There shall be no Commencement of Development until
the terms of appointment by the developer of an
Page 8 of 216

Page 9

independent and suitably qualified consultant as Planning
Monitoring Officer (PMO) have been submitted to, and
approved in writing by, the Planning Authority. The terms
of appointment shall:
(a) impose a duty to monitor compliance with the
terms of the planning permission and the
conditions attached to it;
(b) require the PMO to submit a monthly report to the
Planning Authority summarising works undertaken
on site, matters of compliance or otherwise with
the terms of the planning permission and
conditions attached to it, alongside a summary of
the incidents recorded and reported by the ECoW;
and
(c) require the PMO to report to the Planning Authority
any incidences of non-compliance with the terms
and conditions of the planning permission at the
earliest practical opportunity, and no later than 10
working days following the incidence of non-
compliance.
The PMO shall be appointed on the approved terms
throughout the period from Commencement of
Development to completion of construction works and
post-construction site reinstatement works. 
Prior to the decommissioning, restoration and aftercare
phases of the Development or the expiration of the
operational period of the planning permission (whichever
is the earlier), details of the terms of appointment of a
suitably qualified consultant as PMO by the
Company/operator throughout the decommissioning,
restoration and aftercare phases of the Development
shall be submitted to, and approved in writing by the
Planning Authority.
The PMO shall be appointed on the terms approved
under part (3) throughout the decommissioning,
restoration and aftercare phases of the Development.
Reason - To ensure compliance with the planning
permission and the conditions attached to it.
Environmental Clerk of Works
8. There shall be no Commencement of Development until
the terms of appointment of an independent
Environmental Clerk of Works (ECoW) have been
submitted to, and approved in writing by, the Planning
Authority. The terms of appointment shall:
(a) impose a duty to monitor compliance with the
environmental commitments provided in the EIA
Report, including any micrositing under condition
5, the Construction and Environmental
Management Plan approved under condition 9, the
Biodiversity Enhancement Plan approved under
condition 15, the Habitat Management and
Monitoring Plan under Condition 16 and any
Page 9 of 216

Page 10

species or habitat management plans identified in
the EIA Report, (“the ECoW works”);
(b) require the ECoW to report to the nominated
construction project manager, developer and
Planning Authority any incidences of non-
compliance with the ECoW works at the earliest
practical opportunity;
(c) require the ECoW to submit a monthly report to the
construction project manager, developer and
Planning Authority summarising works undertaken
on site.
Prior to the decommissioning, restoration and aftercare
phases of the Development or the expiration of the
operational period of the planning permission (whichever
is the earlier), details of the terms of appointment of a
suitably qualified, experienced, and independent ECoW
by the Company throughout the decommissioning,
restoration and aftercare phases of the Development
shall be submitted to, and approved in writing by the
Planning Authority.
The ECoW shall be appointed on the terms approved
under part (2) throughout the decommissioning,
restoration and aftercare phases of the Development.
Reason - To secure effective and transparent monitoring
of and compliance with the environmental mitigation and
management measures associated with the Development
during the construction, decommissioning, restoration
and aftercare phases.
Construction and Environmental Management Plan
9. There shall be no Commencement of Development until a
Construction and Environmental Management Plan
(CEMP) containing site specific details of all on-site
construction works, post-construction reinstatement,
drainage and mitigation, together with details of their
timetabling, has been submitted to, and approved in
writing by, the Planning Authority. The CEMP shall be
informed by the site and ground investigation works and
best practice guidance.
The CEMP shall include:
(a) a site waste management plan (dealing with all
aspects of waste produced during the construction
period other than peat and other carbon rich soils),
including details of contingency planning in the
event of accidental release of materials which
could cause harm to the environment, evidencing
adherence with SEPA’s guidance and the
requirements of the waste management licensing
regime as appropriate;
(b) details of the location, layout, formation of the
construction compound, welfare facilities, any
concrete batching plant (including disposal of pH-
rich waste water and substances), any areas of
Page 10 of 216

Page 11

hardstanding, turning areas, internal access
tracks, car parking, material stockpiles, oil, fuel
and chemical storage, lighting columns, and any
construction compound boundary fencing required
for the construction period;
(c) a dust management plan detailing all
mitigation/dust suppression measures intended to
reduce the impacts of dust on site, including
measures to reduce dust on roads;
(d) details of measures to be taken to prevent loose or
deleterious material being deposited on the local
road network including wheel cleaning and lorry
sheeting facilities, and measures to clean the site
entrances and the adjacent local road network;
(e) a Pollution Prevention and Incident Plan
incorporating a Pollution Prevention Plan, Pollution
Incident Plan and a Pollution Control Monitoring
Plan, with measures to protect watercourses,
groundwater, management of natural surface
hydrological flows (flushes, springs, etc.) and
protection of peatland/soils, arrangements for the
storage and management of oil and fuel and other
chemicals on the site and sewage disposal and
treatment;
(f) details of soil storage and management including
outline quantities, locations (other than peat and
other carbon rich soils) management of long term
storage of construction generated to facilitate
future site restoration;
(g) a drainage management strategy, demonstrating
how all surface and waste water arising during and
after construction is to be managed and prevented
from impacting on the water environment and to
mitigate flood risk;
(h) a surface water and groundwater management
and treatment plan, including details of the
separation of clean and dirty water drains, and
location of settlement lagoons for silt laden water;
(i) details of temporary site illumination, including
measures to ensure light spill/pollution is
minimised and avoids habitats within the site and
does not extend beyond the immediate working
area, and not beyond the site boundary;
(j) Protected Species Plan, informed by any protected
species surveys carried out. The Plan shall provide
mitigation measures in line with Summary of
Mitigation, as required, and a timetable for
implementation.
(k) details of the construction of the access into the
site, including associated drainage and the
creation and maintenance of associated visibility
splays;
Page 11 of 216

Page 12

(l) Construction Method Statements for the following:
i. crane pads; ii. turbine foundations; iii. working
cable trenches; iv. erection of the wind turbines; v.
Substation compound formation, erection of
associated buildings and ancillary infrastructure; vi.
all roads/tracks to be altered/formed within the site
including their width, means of drainage (which
shall have regard to SUDS principles), means of
construction, and edge reinstatement including
verge width. vii. watercourse crossings including
full details and plans of the design and
specification of all new and upgraded watercourse
crossings to be constructed;
(m) details of post-construction
restoration/reinstatement of the working areas not
required during the operation of the Development;
(n) a tree felling and management plan;
(o) A Construction Noise Management Plan including
details of the management of noise and vibration
during construction and post-construction
restoration, including that caused by construction
traffic, in accordance with BS 5228:2009 “Code of
Practice for noise and vibration control on
construction and open sites – Part 1: Noise and
Part 2: Vibration” (or any updated
version/document which superseded this
document) and how any properties likely to be
affected by construction noise will be kept
informed;
(p) Construction Method Statements for all
roads/tracks to be altered/formed within the
development site including their width, likelihood of
widening or passing places, means of drainage
(which shall have regard to SUDS principles),
means of construction, and edge reinstatement
including verge width. The specification shall be
accompanied by relevant plans at a scale
sufficient;
(q) the cable trenches;
(r) A phasing plan for the construction works; and
(s) A written scheme which details the methodology
for dealing with any revisions to any of the
documents required under this part (2). Any
revised documents will require to be submitted to
and approved in writing by the Planning Authority
prior to the revisions being implemented on site.
The Development shall be implemented in accordance
with the CEMP approved under part (1) unless otherwise
approved in advance in writing by the Planning Authority.
Reason - To ensure that all construction operations are
carried out in a manner that minimises their impact on
Page 12 of 216

Page 13

road safety, amenity and the environment, and that the
mitigation measures contained in the EIA Report
Borrow Pits – Scheme of Works
10. There shall be no Commencement of Development until a
scheme for the working and restoration of each borrow pit
forming part of the Development has been submitted to,
and approved in writing by, the Planning Authority. The
scheme shall provide:
(a) a detailed working method statement based on site
survey information and ground investigations;
(b) details of the handling of any overburden
(including peat, soil and rock);
(c) drainage measures, including measures to protect
and manage surrounding areas of peatland, water
dependant sensitive habitats and ground water
dependent terrestrial ecosystems from drying out;
(d) a programme of implementation of the works
described in the scheme; and
(e) Outline details of the reinstatement, restoration
and aftercare of the borrow pit(s) to be undertaken
at the end of the construction period, including
topographic surveys of pre-construction profiles
and details of topographical surveys to be
undertaken of the restored borrow pit profiles.
The scheme approved under part (1) shall thereafter be
implemented in full following Commencement of
Development.
Reason - To ensure that excavation of materials from the
borrow pit(s) is carried out in a manner that minimises the
impact on amenity and the environment, and to secure
the restoration of borrow pit(s) at the end of the
construction period.
Borrow Pits – Blasting
11. No blasting shall take place until a scheme specifying
blast monitoring locations is submitted to and approved in
writing by the Planning Authority.
Ground vibration from blasting shall not exceed a peak
particle velocity of 6mm/second at the blasting monitoring
locations approved in the scheme. The measurement is
to be the maximum of three mutually perpendicular
directions taken at the ground surface.
Unless otherwise approved in writing in advance by the
Planning Authority, blasting shall only take place between
the hours of 10.00 to 16.00 on Monday to Friday inclusive
and 10.00 to 12.00 on Saturdays, with no blasting taking
place on a Sunday or on a Public Holiday.
The scheme shall be implemented as approved.
Reason - To ensure that blasting activity is carried out
within defined parameters and timescales to control
impact on amenity.  
Page 13 of 216

Page 14

Construction Hours
12. Construction work shall only take place between the
hours of 07.00 to 18.00 on Monday to Friday inclusive
and 07.00 to 13.00 on Saturdays, with no construction
work taking place on a Sunday or Public Holiday. Outwith
these specified hours, maintenance works, emergency
works and construction works shall be limited to concrete
pours, wind turbine erection, dust suppression, and the
testing of plant and equipment, unless otherwise
approved in advance in writing by the Planning Authority.
HGV movements (excluding abnormal loads) to or from
the site during construction of the wind farm shall be
limited to 07.00 to 18.00 Monday to Friday (inclusive),
and 07.00 to 13.00 on Saturdays, with no HGV
movements to or from site taking place on a Sunday or
Public Holiday. Outwith these hours, and subject to
paragraph (1), HGV movements are to be limited to wind
turbine delivery (unless otherwise approved in advance in
writing by the Planning Authority).
Reason - In the interests of local amenity.
Traffic Management Plan
13. There shall be no Commencement of Development until a
Construction Traffic Management Plan (CTMP) has been
submitted to, and approved in writing by, the Planning
Authority. The CTMP shall provide:
(a) the routeing of all traffic associated with the
Development on public roads; 
(b) measures to ensure that the specified routes are
adhered to, including monitoring procedures;
(c) details of all signage and lining arrangements to be
put in place;
(d) provisions for emergency vehicle access;
(e) provision for the submission and agreement of a
roads condition survey pre-and post-construction,
to ensure the delivery of any post-construction
public road restoration that may be required; and
(f) identification of a nominated person to whom any
road safety issues can be referred.
The approved CTMP shall thereafter be implemented in
full, unless otherwise approved in advance in writing by
the Planning Authority.
Reason - In the interests of road safety.
Abnormal Loads
14. There shall be no abnormal load deliveries to the site until
an Abnormal Load Route Assessment Report has been
submitted to and approved in writing by the Planning
Authority. The Abnormal Load Route Assessment Report
shall provide:
(a) Details of a communications strategy to inform the
relevant communities of the programme of
abnormal load deliveries;
Page 14 of 216

Page 15

(b) Details of any accommodation measures required
for the local road network including the removal of
street furniture, junction widening, visibility splays
and traffic management;
(c) Any additional signing or temporary traffic control
measures deemed necessary on the trunk road
network due to the size or length of any loads
being transported must be undertaken by a
recognised QA traffic management consultant;
(d) Details of the route for abnormal loads on the local
and trunk road networks and any
recommendations for delivery of abnormal loads;
(e) An assessment of the capacity of any bridge
crossings on the route to cater for abnormal loads,
and details of proposed upgrades and mitigation
measures required for any bridge crossings; and
(f) A plan for access by vehicles carrying abnormal
loads, including but not limited to the number and
timing of deliveries and the length, width and axle
configuration of all such traffic associated with the
Development.
Prior to the first delivery of an abnormal load, a
programme for abnormal load deliveries shall be
submitted to, and be approved in writing by, the Planning
Authority.
Prior to any movement of abnormal loads (including trial
runs) the Company must complete any mitigation works
set out in in the scheme approved under part (1) of this
condition, and maintain such measures during the period
of abnormal load deliveries.
The trial-run shall be undertaken in accordance with the
details approved under part (1) prior to the movement of
any abnormal loads.
The details in the approved report shall thereafter be
implemented in full prior to the first delivery of an
abnormal load.
Reason - In the interest of road safety and to ensure that
abnormal loads access the site in a safe manner.
Vehicular Access
15. No development in connection with the permission
hereby granted shall commence unless the vehicular
access has been provided and surfaced in accordance
with Perth & Kinross Council's Road Development Guide
Type E Figure 5.8 access detail, of Type B Road
construction detail. The Type B Road construction detail
shall continue into the entrance for a distance of 10.5
metres. Once provided, the vehicular and pedestrian
access shall thereafter be permanently retained as such.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.  
Page 15 of 216

Page 16

Biodiversity Enhancement Plan
16. There shall be no Commencement of Development until a
Biodiversity Enhancement Plan (BEP) taking account of
the Outline BEP (Technical Appendix 9.4 of the EIA
Report), has been submitted to, and approved in writing
by, the Planning Authority.
The BEP shall set out proposed habitat management of
the site during the period of construction, operation, and
decommissioning, restoration and aftercare, and shall
provide for the maintenance and enhancement of the
habitats set out in the Outline BEP on site.
The BEP shall provide provision and details for regular
monitoring and review to be undertaken against the BEP
objectives for the full lifetime of the windfarm, and
reasonable measures for securing amendments or
additions to the BEP in the event that the BEP objectives
are not being met.
The approved BEP (as amended from time to time with
written approval of the Planning Authority) shall be
implemented in full in line with the timescales set out in
the approved plan.
Reason - In the interests of good land management and
the protection of habitats.
Habitat Management and Monitoring Plan
17. There shall be no Commencement of Development until a
Habitat Management Plan (HMP) taking account of the
Outline/Draft Habitat Management Plan (Technical
Appendix 9.8 of the EIA Report), has been submitted to,
and approved in writing by the Planning Authority
The HMP shall set out proposed habitat management of
the site during the period of construction, operation, and
decommissioning, restoration and aftercare, and shall
provide for the maintenance, monitoring and reporting of
habitat on site.
The HMP shall provide provision and details for regular
monitoring and review to be undertaken against the HMP
objectives and reasonable measures for securing
amendments or additions to the HMP in the event that the
HMP objectives are not being met.
Until otherwise approved in advance in writing by the
Planning Authority, the approved HMP (as amended from
time to time with written approval of the Planning
Authority) shall be implemented in full in line with the
timescales set out in the approved plan.
Reason - In the interests of good land management and
the protection of habitats.
Compensatory Planting
18. No felling or development shall commence, including site
and ground investigations until a woodland planting
scheme to compensate for the removal of 63.3 hectares
of existing woodland (“the Replanting Scheme”) has been
Page 16 of 216

Page 17

submitted to and approved in writing by the Planning
Authority.
The Replanting Scheme shall provide:
(a) details of the location of the area(s) to be planted,
including a map and description of current land
use;
(b) the nature, design/layout, species composition,
purpose and specification of the proposed
woodland to be planted;
(c) the phasing and associated timescales for
implementing the Replanting Scheme;
(d) proposals for reporting to the Planning Authority on
compliance with timescales for obtaining the
necessary consents and thereafter implementation
of the Replanting Scheme;
(e) proposals for the maintenance and establishment
of the woodland to be planted, including annual
checks, replacement planting, fencing, ground
preparation and drainage; and
(f) details evidencing compliance with The UK
Forestry Standard and the Scottish Government’s
Policy on Control of Woodland Removal (as  
The Replanting Scheme approved under part (1) of this
condition shall be implemented in full, unless otherwise
agreed in writing by the Scottish Ministers in consultation
with the Planning Authority.
Reason - To secure replanting to mitigate against effects
of deforestation arising from the Development.
Programme of Archaeological Works
19. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Planning Authority, in consultation with Perth and
Kinross Heritage Trust (PKHT). Thereafter, the developer
shall ensure that the programme of archaeological works
is fully implemented including that all excavation,
preservation, recording, recovery, analysis, publication
and archiving of archaeological resources within the
development site is undertaken. Should the
archaeological works, as required by the WSI, identify a
requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Planning Authority, in consultation with PKHT. The
PERD shall be carried out in complete accordance with
the approved details. Furthermore, the developer shall
afford access at all reasonable times to PKHT or a
nominated representative and shall allow them to observe
work in progress.
Page 17 of 216

Page 18

Reason - To ensure the protection or recording of
archaeological features on the site.
Peat and Carbon Rich Soils Management Plan
20. There shall be no Commencement of Development until a
detailed Peat and Carbon Rich Soils Management Plan
(PMP) has been submitted to and approved in writing by
the Planning Authority in consultation with SEPA.
The PMP shall:
(a) take account of site and ground investigations to
minimise the loss of peat and other carbon rich soil
and minimise carbon loss;
(b) include actions, including micrositing, to minimise
excavated peat and other carbon rich soils
volumes;
(c) encourage use of excavated peat and other
carbon rich soils in an appropriate manner; and (d)
follow good practice for handling, storing and
reinstating peat and other carbon rich soils.
The PMP shall thereafter be implemented as approved.
Reason - To ensure that disruption to peat is minimised.
Operational Noise (Turbines)
21. The rating level of noise imissions from the combined
effects of the wind turbines forming part of the
Development (including the application of any tonal
penalty) when determined in accordance with the
attached Guidance Notes for this condition, shall not
exceed the values for the relevant integer wind speed set
out in, or derived from, Table 1 at those properties
identified or any dwelling which is lawfully existing or has
planning permission at the date of this submission.
Amplitude modulation should also be considered and
Modifications to the AM penalty should be made taking
into account “Wind Turbine Noise Amplitude Modulation
Penalty Considerations” – Proceedings of the Institute of
Acoustics Vol. 40. Pt. 1. 2018 and “Subjective responses
to wind turbine noise amplitude modulation: pooled
analysis of laboratory listening studies and synthesis of
an AM character rating penalty”. Lotinga and Lewis.
Proceedings of ninth international conference on wind
turbine noise, 2021. 
NSR Name
Standardised 10m wind speed (m/s)
4 5 6 7 8 9 10 11 12
1 Broadheadfold 27.3 30.9 34.2 34.2 34.2 34.2 34.2 34.2 34.2
2 Greenhill Cottage 28.1 31.7 35.0 35.0 35.0 35.0 35.0 35.0 35.0
3 Greenhill Farm 28.4 32.0 35.3 35.3 35.3 35.3 35.3 35.3 35.3
4 Littlerig 25.6 29.2 32.5 32.5 32.5 32.5 32.5 32.5 32.5
5 Earnieside Cottage 21.8 25.4 28.7 28.7 28.7 28.7 28.7 28.7 28.7
Page 18 of 216

Page 19

NSR Name
Standardised 10m wind speed (m/s)
4 5 6 7 8 9 10 11 12
6 Earnieside Farmhouse 21.8 25.4 28.7 28.7 28.7 28.7 28.7 28.7 28.7
7 Braughty Farm 23.1 26.7 30.0 30.0 30.0 30.0 30.0 30.0 30.0
8 Craighead Farm 24.1 27.7 31.0 31.0 31.0 31.0 31.0 31.0 31.0
9 Craighead Bungalow 23.9 27.5 30.8 30.8 30.8 30.8 30.8 30.8 30.8
10 Golland Farm (FI) 24.8 28.4 31.7 31.7 31.7 31.7 31.7 31.7 31.7
11 Ledlation House 27.2 30.8 34.1 34.1 34.1 34.1 34.1 34.1 34.1
12 Ledlation Farm 25.9 29.5 32.8 32.8 32.8 32.8 32.8 32.8 32.8
13 Stronachie Cottage 24.8 28.4 31.7 31.7 31.7 31.7 31.7 31.7 31.7
14 Stronachie Lodge 24.9 28.5 31.8 31.8 31.8 31.8 31.8 31.8 31.8
15 Kalevala 24.9 28.5 31.8 31.8 31.8 31.8 31.8 31.8 31.8
16 Stronachie House 24.8 28.4 31.7 31.7 31.7 31.7 31.7 31.7 31.7
17 Middlerigg 25.2 28.8 32.1 32.1 32.1 32.1 32.1 32.1 32.1
18 Knowehead 30.2 33.8 37.1 37.1 37.1 37.1 37.1 37.1 37.1
Table 1: Revised Proposed Development Predicted Noise
Levels (Day and Night) 
The turbines shall be designed to permit individually
controlled operation or shut down at specified wind
speeds and directions in order to facilitate compliance
with noise criteria.
The Company shall continuously log power production,
wind speed and wind direction at each wind turbine all (in
accordance with Guidance Notes). These data shall be
retained for a period of not less than 24 months. The data
will include details of the mode in which each of the
turbines will be operated during each ten minute period
depending on the wind conditions in that ten minute
period. The Company shall provide this information to the
Planning Authority, in the format set out in the Guidance
Notes, within 14 days of receipt in writing of a request to
do so.
Prior to the Date of First Commissioning, the developer
shall have submitted to, and received written approval of
the Planning Authority of, a list of proposed independent
consultants who will undertake compliance
measurements in accordance with this condition.
Amendments to the list of approved consultants shall be
made only with the prior written approval of the Planning
Authority.
Within 21 days from receipt of a written request from the
Planning Authority, following a complaint to it from an
occupant of a dwelling alleging noise disturbance at that
dwelling, the developer shall employ a consultant
approved by the Planning Authority in terms of part (4)
Page 19 of 216

Page 20

above to assess the level of noise immissions from the
wind farm at the complainant’s property (or a suitable
alternative location agreed in writing by the Planning
Authority). The written request from the Planning
Authority shall set out at least the date, time and location
to which the complaint relates and any identified
atmospheric conditions, including wind direction, and
include a statement as to whether, in the opinion of the
Planning Authority, the noise giving rise to the complaint
contains or is likely to contain a tonal component.
The assessment of the rating level of noise immissions in
terms of part (5) above shall be undertaken in
accordance with the Guidance Notes and an assessment
protocol that shall previously have been submitted to and
approved in writing by the Planning Authority. The
protocol shall include the proposed measurement
location(s) where measurements for compliance checking
purposes shall be undertaken, whether noise giving rise
to the complaint contains or is likely to contain a tonal
component, and also the range of meteorological and
operational conditions (which shall include the range of
wind speeds, wind directions, power generation and
times of day) to determine the assessment of rating level
of noise immissions. The proposed range of conditions
shall be those which prevailed during times when the
complainant alleges there was disturbance due to noise,
having regard to the written request of the Planning
Authority under paragraph (5) above.
Where the property to which a complaint is related is not
listed by name or location in Table 1 at part (1) of this
condition, the Company shall submit to the Planning
Authority, for its written approval, proposed noise limits
selected from those listed in Table 1 to be adopted at the
complainant’s property for compliance checking
purposes, prior to compliance checking. The proposed
noise limits are to be those limits selected from Table 1
specified for a listed location which the independent
consultant considers as being likely to experience the
most similar background noise environment to that
experienced at the complainant’s property. The protocol
shall include a justification of the choice of the
representative background levels to determine
compliance at the complainant’s property. The resultant
noise limits selected shall include, where appropriate, any
limit apportionment to account for consented levels from
cumulative wind farm developments.
The rating level of noise immissions resulting from the
combined effects of the wind turbines when determined in
accordance with the Guidance Notes and approved Noise
Assessment Protocol shall not exceed the noise limits
approved in writing by the Planning Authority for the
complainant’s property.
Page 20 of 216

Page 21

In the event that a complainant does not allow the
Company access to undertake a compliance assessment,
the assessment protocol shall set out details of the
proposed alternative representative measurement
position, prior to the commencement of measurements,
and the measurements shall be undertaken at the
approved alternative representative measurement
location.
The Company shall provide to the Planning Authority the
independent consultant’s assessment of the rating level
of noise immissions undertaken in accordance with the
Guidance Notes and the approved Noise Assessment
Protocol within two months of the date of the written
request of the Planning Authority for compliance
measurements to be made under part (5), unless the time
limit is extended in writing by the Planning Authority. The
assessment shall include all data collected for the
purposes of undertaking the compliance measurements,
such data to be provided in the format set out in the
Guidance Notes. The instrumentation used to undertake
the measurements shall be calibrated in accordance with
the Guidance Notes and certificates of calibration shall be
submitted to the Planning Authority with the independent
consultant’s assessment of the rating level of noise
immissions.
Where a further assessment of the rating level of noise
immissions from the wind farm is required pursuant to (in
accordance with the Guidance Notes), the Company shall
submit a copy of the further assessment within 21 days of
submission of the independent consultant’s assessment
pursuant to part (8) above unless the time limit has been
extended in writing by the Planning Authority.
Reason - to protect nearby residents from undue noise
and disturbance and to ensure that noise limits are not
exceeded and to enable prompt investigation of
complaints.
Guidance Notes for Operational Noise Condition
These notes are to be read with and form part of the
noise condition. They further explain the condition and
specify the methods to be employed in the assessment of
complaints about noise immissions from the wind farm.
The rating level at each integer wind speed is the
arithmetic sum of the wind farm noise level as determined
from the best-fit curve described in Guidance Note 2 of
these Guidance Notes and any tonal penalty applied in
accordance with Guidance Note 3. Reference to ETSU-
R-97 refers to the publication entitled “The Assessment
and Rating of Noise from Wind Farms” (1997) published
by the Energy Technology Support Unit (ETSU) for the
Department of Trade and Industry (DTI). IOA GPG is “A
Good Practice Guide to the Application of ETSU-R-97 for
the Assessment and Rating of Wind Turbine Noise”
Page 21 of 216

Page 22

(2013) and includes Supplementary Guidance Notes 1 to
5 of the IOA GPG.
Guidance Note 1
(a) The LA90,10 minute noise statistic should be
measured in accordance with the IOA GPG.
Measurements shall be undertaken in such a
manner to enable a tonal penalty to be applied in
accordance with Guidance Note 3.
(b) To enable compliance with the conditions to be
evaluated, the Company shall continuously log
arithmetic mean wind speed in metres per second
and wind direction in degrees from north for each
turbine and arithmetic mean power generated by
each turbine, all in successive 10-minute periods.
All 10 minute periods shall commence on the hour
and in ten minute increments thereafter,
synchronised with Universal Coordinated Time
(UTC). The wind speeds at turbine hub height shall
be 'standardised' to a reference height of ten
metres as described in ETSU-R-97 at page 120
using a reference roughness length of 0.05
metres. Unless an alternative procedure is
previously agreed in writing with the Planning
Authority, It is these standardised ten metre height
wind speed data which are correlated with the
noise measurements determined as valid.
(c) Data provided to the Planning Authority in
accordance with the noise condition shall be
provided in comma separated values in electronic
format unless otherwise agreed in writing with the
Planning Authority.
(d) A data logging rain gauge shall be installed in the
course of the assessment of the levels of noise
immissions. The gauge shall record over
successive 10-minute periods synchronised with
the periods of data recorded in accordance with
Note 1(b).
Guidance Note 2
(a) The noise measurements shall be made so as to
provide not less than 20 valid data points as
defined in Guidance Note 2 (b)
(b) Valid data points are those measured in the
conditions specified in the agreed written protocol,
but excluding any periods of rainfall measured in
the vicinity of the sound level meter. Rainfall shall
be assessed by use of a rain gauge that shall log
the occurrence of rainfall in each 10 minute period
concurrent with the measurement periods set out
in Guidance Note 1. In specifying such conditions
the Planning Authority shall have regard to those
conditions which prevailed during times when the
complainant alleges there was disturbance due to
Page 22 of 216

Page 23

noise or which are considered likely to result in a
breach of the limits.
(c) For those data points considered valid in
accordance with Guidance Note 2(b), values of the
LA90,10 minute noise measurements and
corresponding values of the 10- minute 10- metre
height wind speed averaged across all operating
wind turbines using the procedure specified in
Guidance Note 1(d), shall be plotted on an XY
chart with noise level on the Y-axis and the 10-
metre height mean wind speed on the X-axis. A
least squares, “best fit” curve of an order deemed
appropriate by the independent consultant (but
which may not be higher than a fourth order)
should be fitted to the data points and define the
wind farm noise level at each integer speed.
Guidance Note 3
(a) Where, in accordance with the protocol, noise
immissions at the location or locations where
compliance measurements are being undertaken
contain or are likely to contain a tonal component,
a tonal penalty is to be calculated and applied
using the following rating procedure.
(b) For each 10 minute interval for which LA90,10
minute data have been determined as valid in
accordance with Guidance Note 2 a tonal
assessment shall be performed on noise
immissions during 2 minutes of each 10 minute
period. The 2 minute periods should be spaced at
10 minute intervals provided that uninterrupted
uncorrupted data are available (“the standard
procedure”). Where uncorrupted data are not
available, the first available uninterrupted clean 2
minute period out of the affected overall 10 minute
period shall be selected. Any such deviations from
the standard procedure, as described in Section
2.1 on pages 104-109 of ETSU-R-97, shall be
reported.
(c) For each of the 2 minute samples the tone level
above or below audibility shall be calculated by
comparison with the audibility criterion given in
Section 2.1 on pages 104-109 of ETSU-R-97.
(d) The tone level above audibility shall be plotted
against wind speed for each of the 2 minute
samples. Samples for which the tones were below
the audibility criterion or no tone was identified, a
value of zero audibility shall be used.
(e) The average tone level above audibility shall be
calculated for each wind speed bin, each bin being
1 metre per second wide and centred on integer
wind speeds. This process shall be repeated for
Page 23 of 216

Page 24

each integer wind speed for which there is an
assessment of overall levels in Note 2.
(f) The tonal penalty is derived from the margin above
audibility of the tone according to the figure below. 
Guidance Note 4
(a) If a tonal penalty is to be applied in accordance
with Guidance Note 3 the rating level of the turbine
noise at each wind speed is the arithmetic sum of
the measured noise level as determined from the
best fit curve described in Guidance Note 2 and
the penalty for tonal noise as derived in
accordance with Guidance Note 3 at each integer
wind speed within the range specified by the
Planning Authority in its written protocol.
(b) If no tonal penalty is to be applied then the rating
level of the turbine noise at each wind speed is
equal to the measured noise level as determined
from the best fit curve described in Guidance Note
2.
(c) In the event that the rating level is above the
limit(s) set out in the Table attached to the noise
conditions or the noise limits for a complainant’s
dwelling, the independent consultant shall
undertake a further assessment of the rating level
to correct for background noise so that the rating
level relates to wind turbine noise immission only.
(d) The Company shall ensure that all the wind
turbines in the development are turned off for such
period as the independent consultant requires to
undertake the further assessment. The further
assessment shall be undertaken in accordance
with the following steps:
(e) Repeating the steps in Guidance Note 2, with the
wind farm switched off, and determining the
background noise (L3) at each integer wind speed
within the range requested by the Planning
Authority in its written request and the approved
protocol.
(f) The wind farm noise (L1) at this speed shall then
be calculated as follows where L2 is the measured
Page 24 of 216

Page 25

level with turbines running but without the addition
of any tonal penalty: 
(g) The rating level shall be re-calculated by adding
arithmetically the tonal penalty (if any is applied in
accordance with Note 3) to the derived wind farm
noise L1 at that integer wind speed.
(h) If the rating level after adjustment for background
noise contribution and adjustment for tonal penalty
(if required in accordance with note 3 above) at
any integer wind speed lies at or below the values
set out in the Table attached to the conditions or at
or below the noise limits approved by the Planning
Authority for a complainant’s dwelling in
accordance with the noise condition then no
further action is necessary. If the rating level at any
integer wind speed exceeds the values set out in
the Table attached to the conditions or the noise
limits approved by the Planning Authority for a
complainant’s dwelling in accordance with the
noise condition then the Development fails to
comply with the conditions.
Noise (BESS and Substation)
22. All plant or equipment associated with the BESS and
substation shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any nearby residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
In the event, that justified complaints for noise are
received by the Council, the applicant at their own
expense, shall employ an independent and suitably
qualified consultant to carry out a Noise Assessment from
the development. The appointed consultant and
methodology for the Noise Assessment shall be
submitted to and approved in writing by the Planning
Authority in consultation with Environmental Health within
28 days of being notified of the complaint. Within 28 days
of approval of appointed consultant and methodology, a
Noise Assessment shall be submitted outlining mitigation
and recommended timescales for delivery. Thereafter, all
mitigation measures shall be implemented within the
timescales recommended.
Reason - In the interests of protecting residential amenity.
Shadow flicker
23. No development shall commence unless and until a
Shadow Flicker Protocol has been submitted to, and
approved in writing by, the Planning Authority. The
Page 25 of 216

Page 26

Shadow Flicker Protocol shall set out a protocol for
addressing any complaint received from a residential
receptor within the study area defined in Chapter 14 of
the EIA Report, and will set out mitigation and
management options. Operation of the turbines shall take
place in accordance with the approved Shadow Flicker
Protocol and any mitigation measures that have been
approved through the protocol shall be implemented.
Reason - In the interests of residential amenity.
Access Management Plan
24. There shall be no Commencement of Development until
an Access Management Plan (AMP) has been submitted
to and approved in writing by the Planning Authority. The
AMP should ensure that, where appropriate and subject
to health and safety requirements, public access is
maintained across the Development site during
construction, and thereafter that existing wider rights of
public access are maintained during the operational
phase of the wind farm.
The approved plan shall be implemented in full.
Reason - In the interests of securing public access rights
Private Water Supplies
25. There shall be no Commencement of Development until a
private water supplies method statement has been
submitted to and approved in writing by the Planning
Authority, detailing all contingent mitigation measures to
be delivered to secure the quality, quantity and continuity
of water supplies to any properties which are served by
private water supplies at the date of this planning
permission which may be affected by the
Development.78
The method statement shall set out:
(a) details of the methodology for water quality and
quantity sampling for a period of 12 months prior to
construction (including abstraction points);
(b) details of the methodology and programme for
undertaking water quality and quantity sampling
during the construction period (including
abstraction points); and
(c) details of the methodology for water quality and
quantity sampling for a period of 12 months post
construction (including abstraction points);
The approved method statement shall thereafter be
implemented in full upon the Commencement of
Development.
Reason - To maintain a secure and adequate water
supply to all properties with private water supplies that
may be affected by the Development.
Redundant Turbines
26. If one or more wind turbines fails to generate electricity
on a commercial basis to the public network for a
continuous period of 12 months, then the turbine or
Page 26 of 216

Page 27

turbines shall be deemed to be surplus to requirement
and the developer shall:
(a) within one month of the expiration of the 12 month
period, submit a scheme to the Planning Authority
for written approval setting out how and when the
relevant wind turbine(s) and associated
infrastructure will either be repaired or removed
from the site and the ground restored to a
condition agreed with the Planning Authority; and
(b) implement the approved scheme to the timescales
set out in the scheme and agreed in part a) above.
Reason - To ensure that any redundant wind turbine is
removed from site, in the interests of safety, amenity and
environmental protection.
Interim Decommissioning, Restoration and Aftercare
Strategy
27. There shall be no Commencement of Development until
an Interim decommissioning, restoration and aftercare
strategy has been submitted to, and approved in writing
by, the Planning Authority. The interim decommissioning,
restoration and aftercare strategy shall outline measures
for the decommissioning of the Development and
restoration and aftercare of the site, and shall provide
proposals for the removal of the Development, the
treatment of ground surfaces, the management and
timing of the works and environmental management
provisions in any instance that the site as a whole, or in
part, ceases to operate prior to the approval of the
Decommissioning, Restoration and Aftercare Plan
required under the provisions of condition 27.
Reason - To ensure the decommissioning and removal of
the Development in an appropriate and environmentally
acceptable manner and the restoration and aftercare of
the site, in the interests of safety, amenity and
environmental protection when a detailed
decommissioning, restoration and aftercare Plan has not
yet been approved.
Site Decommissioning, Restoration and Aftercare
28. The Development shall cease to generate electricity to
the grid network by no later than the date falling 35 years
from the Date of Final Commissioning.
No later than one year prior to the Date of Final
Generation or the expiry of the planning permission
(whichever is earlier) a decommissioning, restoration and
aftercare plan shall be submitted for the written approval
of the Planning Authority. The detailed decommissioning,
restoration and aftercare plan shall provide updated and
detailed proposals, in accordance with relevant guidance
at that time, for the removal of the Development, the
treatment of ground surfaces, the management and
timing of the works and environment management
provisions which shall provide:
Page 27 of 216

Page 28

(a) a site waste management plan (dealing with all
aspects of waste produced during the
decommissioning, restoration and aftercare
phases and, including details of measures to be
taken to minimise waste associated with the
Development and promote the recycling of
materials and infrastructure components);
(b) details of the formation of any temporary
infrastructure required for decommissioning such
as compounds, welfare facilities, any areas of
hardstanding, material stockpiles, oil storage,
lighting columns, and any boundary fencing;
(c) a dust management plan;
(d) details of measures to be taken to prevent loose or
deleterious material being deposited on the local
road network, including wheel cleaning and lorry
sheeting facilities, and measures to clean the site
entrances and the adjacent local road network;
(e) a pollution prevention and control method
statement, including arrangements for the storage
and management of oil and fuel on the site;
(f) details of measures for soil storage and
management;
(g) a surface water and groundwater management
and treatment plan, including details of the
separation of clean and dirty water drains, and
location of settlement lagoons for silt laden water;
(h) details of measures for sewage disposal and
treatment;
(i) temporary site illumination; and
(j) a species protection plan if surveys (carried out no
longer than eighteen months prior to submission of
the plan) identify any protected species (including
birds).
The Development shall be decommissioned, the site
restored and aftercare undertaken prior to the date falling
three years after the Date of Final Generation and in
accordance with the approved detailed decommissioning,
restoration and aftercare plan.
Reason - To ensure the decommissioning and removal of
the Development in an appropriate and environmentally
acceptable manner and the restoration and aftercare of
the site, in the interests of safety, amenity and
environmental protection.
Financial Guarantee
29. There shall be no commencement of development until a
bond or other form of financial guarantee (hereafter
“financial guarantee”) in terms which secures the cost of
performance of all decommissioning, restoration and
aftercare obligations referred to in conditions 27 and 28
has been submitted to and approved in writing by the
Planning Authority.
Page 28 of 216

Page 29

The value of the financial guarantee shall be agreed
between the developer and the Planning Authority or,
failing agreement, determined (on application by either
party) by a suitably qualified independent professional as
being sufficient to meet the costs of all decommissioning,
restoration and aftercare obligations referred to in
conditions 27 and 28.
The financial guarantee shall be maintained in favour of
the Planning Authority until the completion of all
decommissioning, restoration and aftercare obligations
referred to in conditions 27 and 28.
The value of the financial guarantee shall be reviewed by
agreement between the developer and the Planning
Authority or, failing agreement, determined (on
application by either party) by a suitably qualified
independent professional not less than every five years,
and at the time of the approval of the detailed
decommissioning, restoration and aftercare plan
approved under condition 28. The value of the financial
guarantee shall be increased or decreased to take
account of any variation in costs of compliance with
decommissioning, restoration and aftercare obligations
referred to in conditions 27 and 28.
Reason - To ensure that there are sufficient funds to
secure performance of the decommissioning, restoration
and aftercare conditions attached to this deemed
planning permission in the event of default by the
developer. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
Permission shall not to be issued until a Section 75 Agreement
or a bond as required by condition 27-29 has been signed and
registered to take account of this application. The legal
agreement or bond should be concluded and completed within 4
months of the date of any decision. Failure to conclude a legal
agreement within 4 months will result in the planning application
being re-assessed through failing to comply with the
development plan and may be ultimately recommended for
refusal under delegated powers 
Informatives
1.  Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
Page 29 of 216

Page 30

constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2.  As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. An application for Building Warrant may be required.
4.  This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013, as amended.
The form of the notice is set out in Schedule 7 of the
Regulations and a draft notice is included for your
guidance.  In accordance with Regulation 41 the notice
must be:
-  Displayed in a prominent place at or in the vicinity of
the site of the development 
-  Readily visible to the public 
-  Printed on durable material.
5. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (Section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6.  The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
7. The applicant is advised that the granting of planning
permission does not guarantee right of access to the site.
This should be agreed with the relevant landowner(s)
prior to the commencement of the development.
8. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the number and
design of turbines.
9. Please remember that the granting of planning
permission, listed building consent or other associated
consent by the Planning Authority does not affect the
responsibility of the developer to ensure all other
necessary permissions, consents and approvals are in
Page 30 of 216

Page 31

place prior to commencement of works. Developers
should also ensure appropriate accommodations are
made in respect of services and third party infrastructure
and may wish to check proposals against the information
held at https://www.linesearchbeforeudig.co.uk/. 
Amendment (Councillors D Cuthbert and I James) 
The cumulative impact of this 13 turbine proposal, when
assessed together with the recent Craighead Windfarm, would
have unacceptable visual and landscape impacts on the locality,
including the Lomond Hills Local Landscape Area; the Ochil Hills
Landscape Area; the Core path networks over a 5km radius and
in the Ochils and would adversely affect Kinross-shire residents;
and visitors to Loch Leven. 
The energy which the proposal will generate does not justify the
development in the face of its adverse impacts.  These adverse
impacts are sufficient that the general support for Renewables
contained in Policy 11 of NPF4 of the Development Plan is not a
sufficient basis to recommend the Energy Consent Unit
approves this proposal. 
For these reasons, this Council recommends that the Energy
Consents Unit does not approve this proposal. 
In terms of Standing Order 21.5 a roll call vote was taken. 
7 members voted for the Motion as follows:
Councillors K Allan, K Harvey, D Illingworth, I MacPherson,
I Massie, G Stewart and Bailie M Williamson. 
4 members voted for the Amendment as follows:
Councillors B Brawn, D Cuthbert, I James and Bailie C McLaren. 
Resolved:
In accordance with the Motion. 
(2) Major Applications 
(i) 25/00510/FLM - Erection of 52 dwellinghouses, formation of
roads and footpath, SUDS, landscaping and associated
works, Land 120 metres west of 10 Cairns Park, New Alyth,
PH11 8PA (Report No. 25/338) 
Resolved:
Grant, subject to the following terms, conditions and
informatives, including amendments circulated to members prior
to the meeting: 
Page 31 of 216

Page 32

Conditions
General
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
Phasing 
2. No development shall commence until a detailed phasing
strategy (supported by appropriate plans) shall be
submitted to and approved in writing by the Council as
Planning Authority. The phasing strategy shall include the
following details:
i. The timing and number of dwellings to be developed
in each phase;
ii. The timing and delivery of infrastructure, open space
and landscaping;
iii. The timing and location of any temporary
construction compound.
Once approved, the development shall proceed in
accordance with the approved delivery phasing strategy.
Reason - In order to ensure the satisfactory
implementation and completion of the development.
Drainage
3. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
4. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility which accords
with Sustainable Urban Drainage System principles shall
be implemented for the site and maintained for the
duration of the approved development works.  The
temporary surface water treatment facility shall remain in
place until the permanent surface water drainage scheme
is implemented.
Reason - To ensure the appropriate management of
construction surface water run-off to minimise flooding
and avoid discharge of sediment/pollution to the local
Page 32 of 216

Page 33

water environment or neighbouring property, in the
interests of residential and environmental amenity.
Residential Amenity
5. Acoustics barriers as described in Section 5.1.1 and
shown in Drawing Nos 781260-GIS004 and 781260-
GIS005, in the Noise Impact Assessment undertaken by
EnviroCentre Ltd, reference: 14916, dated 27 January
2025 (document 38 hereby approved), shall be installed
prior to the occupation of each relevant residential unit to
ensure a satisfactory level of residential amenity can be
achieved.
Reason - In order to safeguard the residential amenity of
the area.
6. Glazing and Trickle ventilators as described in Sections
5.1.2 and Tables 5-2 and 5-3 of the Noise Impact
Assessment undertaken by EnviroCentre Ltd, reference:
14916, dated 27 January 2025 (document 38 hereby
approved) shall be installed prior to the occupation of
each relevant residential unit to ensure a satisfactory
level of residential amenity can be achieved.
Reason - In order to safeguard the residential amenity of
the area.
7. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays (as identified by
Scottish Government).
Reason - In order to safeguard the residential amenity of
the area.
Roads and Access
8. Prior to the occupation of any residential plot, all matters
regarding access, car parking, road layout, design and
specification, including the disposal of surface water,
shall be in accordance with the standards required by the
Council as Planning Authority in consultation with the
Roads Authority.
Reason - In the interests of vehicle and pedestrian safety
and in accordance with the policies of the adopted
development plan.
9. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b. timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
Page 33 of 216

Page 34

c. a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d. arrangements for liaison with the Roads Authority
regarding winter maintenance;
e. emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f. arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
g. arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h. arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i. details of information signs to inform other road
users of construction traffic;
j. arrangements to ensure that access for emergency
service vehicles are not impeded;
k. co-ordination with other significant developments
known to use roads affected by construction traffic;
l. traffic arrangements in the immediate vicinity of
temporary construction compounds;
m. monitoring, reporting and implementation
arrangements; 
n. arrangements for dealing with non-compliance; and
o. details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management.
10. Prior to occupation of the first dwellinghouse hereby
approved, the local westbound bus stop in New Alyth is to
be upgraded to provide the installation of a real time
passenger information screen and an electrical supply for
lighting. The specification of the real time passenger
information screen shall be submitted to and agreed in
writing by the Council as Planning Authority prior to
installation.  
Reason - In the interest of supporting public transport
access.
11. No part of the development shall be occupied until a
Residential Travel Plan, aimed to encourage more
sustainable means of travel, has been submitted and
approved in writing by the Council. The RTP will have
particular regard to provision for walking, cycling and
public transport access to and within the site.
Reason - To promote sustainable transport options and to
meet advice within National Planning Framework on
transport.
Page 34 of 216

Page 35

12. Prior to the commencement of the development hereby
approved, full visibility splays of 160 metres along the
channel line shall be provided and maintained to the west
of the A926 junction, at a set-back of 2.4 metres to the
standard and specification required by the Council as
Planning Authority in consultation with the Roads
Authority.  The visibility splays shall be physically formed
on the ground and any existing fences, walls, hedges or
other means of enclosure or obstructions within the
splays shall be removed and relocated outwith the splays. 
Once formed, the visibility splays shall be permanently
retained thereafter, and no visual obstruction of any kind
shall be permitted within the visibility splays so formed.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
13. Prior to the occupation of any residential plot, details of
the specification including materials of all footpaths shall
be submitted to the Planning Authority for further
approval. The agreed detail shall thereafter be
implemented prior to the completion of the development.
Reason - In the interests of pedestrian and cycle safety.
14. Prior to the occupation of either plot 23, 48, 49, 50, 51 or
52, whichever is the earlier, the proposed footpath
connection to the east of Plot 23, linking to Bamff View
and shown on document 47 hereby approved, shall be
fully implemented in accordance with the specification
approved under Condition 26.
Reason - In the interest of sustainable transport.
15. Where a footway is proposed in front of any
dwellinghouse, that dwellinghouse shall not be occupied
until such time that the relevant footway has been
constructed to a suitable standard to facilitate access for
all abilities.
Reason - In the interest of road safety; in the interest of
inclusive mobility.
Biodiversity
16. The conclusions and recommended action points within
the supporting Preliminary Ecological Appraisal and
Biodiversity Enhancement Strategy submitted and hereby
approved (document numbers 72 and 73 relate) shall be
fully adhered to, respected and undertaken as part of the
construction phase of development.
Reason - In the interests of protecting environmental
quality and of biodiversity.
17. An updated ecological survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the survey approved as
part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Page 35 of 216

Page 36

Reason - In the interests of protecting environmental
quality and of biodiversity.
18. Prior to the completion or occupation of the development
hereby approved, all biodiversity enhancement measures
listed within the submitted and hereby approved
Biodiversity Enhancement Strategy (drawing number 73)
and Site Landscape Layout (drawing numbers 50-53
inclusive) shall be provided. Thereafter, the agreed
scheme shall be maintained in a reasonable condition for
the life of the development, to the satisfaction of the
Council as Planning Authority. 
Reason - In the interests of protecting environmental
quality and of biodiversity
19. The swift and bat boxes as shown on plan 25/00510/50,
25/00510/51, 25/00510/52 and 25/00510/53 hereby
approved shall be implemented prior to the occupation of
each relevant residential unit. Thereafter, they should be
maintained in a reasonable condition for the life of the
development.
Reason - In the interests of protecting environmental
quality and of biodiversity.
20. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day
Reason - In order to prevent animals from being trapped
within any open excavations.
Trees and Landscape
21. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  Protection
measures, once in place, shall remain in place for the
duration of construction.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
22. All trees on site, other than those marked for felling on
the approved plans, shall be retained.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
Page 36 of 216

Page 37

23. Prior to the occupation of the development or any phase
of the development, whichever is the sooner, a landscape
management plan, including long term design objectives,
management responsibilities and maintenance schedules
for all landscape areas (other than small privately-owned
domestic gardens) shall be submitted to and agreed in
writing by the Council as Planning Authority, for its
approved use. The landscape management plan as
agreed shall, where appropriate, include phased
implementation concurrent with the development and
shall be fully implemented.
Reason - To ensure satisfactory management of the
scheme.
24. Prior to the commencement of the development hereby
approved, an updated detailed landscaping and planting
scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority. The
scheme shall include enhanced boundary treatment
along the southern boundary, particularly adjacent to the
SUDS area and shall include details of the height and
slopes of any mounding or recontouring of the site, full
details of all hard landscaping proposals including
materials and installation methods and, species, height,
size and density of trees and shrubs to be planted. The
scheme as subsequently approved shall be carried out
and completed within the first available planting season
(October to March) after the completion or bringing into
use of the development, whichever is the earlier, and the
date of Practical Completion of the landscaping scheme
shall be supplied in writing to the Council as Planning
Authority within 7 days of that date. The scheme as
agreed and implemented shall thereafter be maintained
to the satisfaction of the Council as Planning Authority.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
25. All landscaped areas outwith the curtilages of the
dwellings and shown on the approved drawings shall be
permanently retained as such and shall at no time be
used as private garden ground nor incorporated within
the curtilage of any of the dwellings hereby approved
without the express grant of planning permission by the
Planning Authority.
Reason - In the interests of the character and
appearance of the development.
Footpath Connection
26. Prior to the commencement of works on the proposed
footpath connection to the east of Plot 23, linking to Bamff
View (adjacent to tree T4411), detailed construction
specifications shall be submitted to and approved in
writing by the Planning Authority. The specification shall:
Page 37 of 216

Page 38

• Incorporate a low-invasive surfacing solution within
the root protection area, as identified in the Arbor
Raft Plan, using a cellular confinement system or
equivalent method to safeguard tree roots.
• Demonstrate compliance with the recommendations
of the approved tree report and BS 5837:2012
(Trees in Relation to Design, Demolition and
Construction).
• Include proposals for the future maintenance and
adoption of the footpath, with confirmation of
agreement from the relevant authority or body.
• A detailed design for a 3-metre wide shared active
travel route
The approved specification shall be implemented in full
prior to the completion of the footpath and subsequent
occupation of either plot 23, 48, 49, 50, 51 or 52,
whichever is the earlier, as required by condition 14 and
maintained thereafter in accordance with the agreed
arrangements.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
Archaeology
27. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT. The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason - To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.  
Page 38 of 216

Page 39

Environmental Impact
28. Prior to the commencement of development hereby
approved, a scheme shall be submitted to, and approved
in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon
emissions reduction set by the Scottish Buildings
Standards will be met through the installation and
operation of low and zero-carbon technologies. This
scheme shall detail for each building:
a) the technology types;
b) illustrate, through technical calculations, that these
will meet at least the 10% reduction;
c) their siting and location; and
d) ongoing operation and maintenance.
Once approved, the development shall be completed in
accordance with the approved scheme and no individual
unit shall be occupied until the scheme has been installed
and operating.
Reason - To embed low and zero-carbon technologies
within the development in the interest of environmental
sustainability.
29. The measures outlined in the agreed CEMP (document
36 hereby approved) shall be adhered to at all times
during the construction period. The CEMP will remain a
live document, any working practices deemed to be
having an adverse impact on ecology or the environment
will be the subject of revision. All revisions must be
submitted to the Planning Authority as soon as
reasonably practicable. Thereafter the development shall
be fully undertaken in accordance with the agreed CEMP.
Reason - In the interests of protecting environmental
quality and of biodiversity.
Access for Maintenance
30. During the construction period, the Council shall be
provided with full access to the adjacent Cairns Park Play
Area to undertake any maintenance as required.
Reason - To ensure that access to Cairns Park is not
compromised during the construction period. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this
application. The legal agreement should be concluded and
completed within 4 months of the date of any Committee
approval. Failure to conclude a legal agreement within 4 months
will result in the planning application being re-assessed through
failing to comply with the associated developer contributions
Page 39 of 216

Page 40

policy and may be ultimately recommended for refusal under
delegated powers 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development
• Readily visible to the public
• Printed on durable material.
4. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
5. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests
6. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
7. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.
Page 40 of 216

Page 41

8. The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 they must obtain from the
Council as Roads Authority Road Construction Consent
(RCC) to construct a new road prior to the
commencement of roadworks.  Advice on the disposal of
surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment
Protection Agency.  Please note that a fee is chargeable
for the processing of RCC applications.
9. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 they must obtain from the
Council, as Roads Authority, consent to open an existing
road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular
Access consents (VA1) and application forms are
available at www.pkc.gov.uk/vehicleaccess.  Advice on
the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
10. No work shall be commenced until an application for
building warrant has been submitted and approved.
11. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
12. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the overall design
and layout.
13. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
14. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
Page 41 of 216

Page 42

We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
15. The applicant is reminded that, should any protected
species be present a licence may be required from
NatureScot. Failure to obtain a licence may constitute a
criminal act under the Habitats Regulations and penalties
are sever for non-compliance.
16. The applicant is advised that technical approval will be
required for all street lighting apparatus within adoptable
areas and should contact the Street Lighting Partnership
to obtain technical approval prior to the submission of a
Road Construction Consent application.
17. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (Section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
18. The planning permission decision notice shall not be
issued until such time as the required Developer
Contributions have been secured or paid in full.  
19. In the event the applicant does not either make the
required payment within 28 days from the date the
agent/applicant is advised of the need for the
contributions, or complete a legal agreement for delayed
payment within a 4 month period from the date the
agent/applicant is advised of the need for the
contributions the application may be refused under
delegated powers without any further discussion with the
applicant. 
(10.25am - The committee took a 10 minute recess) 
(3) Local Application 
(i) 25/00793/FLL - Change of use from office to children's
play/activity centre with ancillary event, retail and catering
uses and erection of fence, Whitehall Chambers, 7 Bank
Street, Blairgowrie (Report No. 25/339) 
Ms C Power, on behalf of the applicant, addressed the
committee, and answered members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Page 42 of 216

Page 43

Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The hours of operation of the garden area shall be
restricted to between 0830 to 1730 hours Monday to
Friday only. For the avoidance of doubt, the garden area
will be closed to customers Saturday and Sunday. 
Reason - In order to safeguard the residential amenity of
the area.
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
4. The sound insulation and sound transmission properties
of the structure and finishes shall be such that any
airborne noise from the operations within the premises
does not constitute a statutory noise nuisance as
determined by the Local Planning Authority.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
5. No music, amplified or otherwise, or amplified speech
shall be permitted in the garden area at any time.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
6. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
7. Noise from operations on site shall not exceed
55dBLAeg,16hr or LA90,1hr plus 5dB, whichever is
greater when measured at any residential property.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
8. The Noise Management Plan (Document 08) is hereby
approved. It includes measures that will be implemented
to adequately control and minimise noise from the
premises and includes a complaint investigation
procedure. The Plan shall be reviewed on a regular basis.
Page 43 of 216

Page 44

It shall also be subject to review following receipt of a
justified complaint or at the request of the Council as
Planning Authority. The approved Noise Management
Plan and any subsequent revisions approved in writing by
the Council as Planning Authority shall be fully
implemented for the lifetime of the development.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
9. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
conditions 3, 4 and 7 above. The assessment will be
carried out to an appropriate methodology agreed in
writing with the Planning Authority. If the noise
assessment shows that the noise levels do not comply
with conditions 3, 4 and 7, a scheme of noise mitigation
shall be included with the noise assessment, specifying
timescales for the implementation of the scheme and
shall be submitted to the Planning Authority with 28 days
of the assessment.  The mitigation scheme shall
thereafter be implemented in accordance with the
approved scheme and timescales.
Reason - In order to safeguard the neighbouring
residential amenity in the area.
10. The cycle parking, as approved, shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority prior to the
development being brought into use.
Reason - To encourage active travel and meet advice
within National Planning Framework 4 on transport. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Page 44 of 216

Page 45

Planning Authority written notice of that position.  Please
use the form attached herewith.
3. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the location of a
right of access highlighted by a blue line on the location
plan.
4. The applicant can seek guidance on the detailed design
and positioning of the cycle storage from Transport
Scotland's Cycling by Design 2021 or similar design
guide. 
(ii) 25/00884/FLL - Erection of replacement dwellinghouse and
associated works, Cedar Cottage, Fearnan, Aberfeldy, PH15
2PF (Report No. 25/340) 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The conclusions and recommended action points within
the supporting ecology survey by Direct Ecology dated
27th October 2025 submitted and hereby approved
(document 27 relates) shall be fully adhered to, respected
and undertaken as part of the construction phase of
development, to the satisfaction of the Council as
Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
3. The temporary construction access track to the north of
the site from the C449 and all contractors' temporary site
compounds shall be removed and the land reinstated to
its former profile and condition no later than 3 months
following the final commissioning of the development or
by the end of the first available seeding/planting season
after the final commissioning of the development,
whichever is the later.
Reason - In order that the Planning Authority may retain
control over the future use of the land which is located
within an area of zoned open space
4. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
Page 45 of 216

Page 46

consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) shall
include the following:
1) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
2) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
3) arrangements to ensure that access for emergency
service vehicles are not impeded;
4) measures to minimise the level of dust, dirt and
debris on the local roads;
5) details of the size/type of HGV's dropping materials
off at the site to ensure a suitably sized offloading
area, shall be provided by the applicant to prevent
blocking of the public road network; and
6) details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason - In the interest of proper site management
5. All tree work shall be undertaken by a qualified arborist in
accordance with BS3998:2010 Recommendations for
Tree Work, and best practice as outlined in the
Arboriculture and Forestry Advisory Group (AFAG)
guidance. 
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority. 
6. No removal of hedgerows, trees or shrubs or works to, or
demolition of, buildings or structures that may be used by
breeding birds shall take place between 1st March and
31st August inclusive, unless a competent ecologist has
undertaken a careful, detailed check of vegetation for
active birds' nests immediately before the vegetation is
cleared or building affected, and provided written
confirmation that no birds will be harmed and/or that there
are appropriate measures in place to protect nesting bird
interest on site. Any such written confirmation should be
submitted to the Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
7. Prior to the commencement of the development hereby
approved, a Tree Protection Plan showing how tree 067
and its root protection area shall be protected with
fencing shall be submitted for the written agreement of
the Council as Planning Authority.  Protection methods
shall be strictly in accordance with BS 5837 2012: Trees
in Relation to Design, Demolition and
Construction.  Protection measures, once in place, shall
remain in place for the duration of construction.  
Page 46 of 216

Page 47

Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority. 
8. Prior to the commencement of the development hereby
approved, details of the construction type and materials
for the temporary access, soil removal and laying of stone
shall be submitted for the written agreement of the
Council as Planning Authority. The details as agreed shall
be implemented as part of the development. 
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
planning authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.  Please use the
form attached herewith.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The findings and recommendations contained with the
Bat Survey remain valid for a period of 24 months. If the
approved planning permission is not implemented within
24 months of the date of the survey it is strongly
recommended that an updated Bat Survey is undertaken
prior to any works commencing. Failure to do so could
potentially leave you open to prosecution should any bats
be harmed as a result of the works. Please note that bats
are protected by law, and it is a criminal offence to
deliberately harm, capture, kill or disturb a bat or its
resting place.
5. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
Page 47 of 216

Page 48

investigation and possible action by Environmental Health
under the Environmental Protection Act 1990. 
(iii) 24/00800/FLL - Erection of a dwellinghouse, land 50 Metres
Southwest of Tigh Na Ba, Bridge of Cally (Report No.
25/341) 
Mr H MacFadyen, applicant, was present and answered
members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document(s) 25 relates) shall be fully adhered
to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
3. Prior to work commencing on site, a pre-works survey for
red squirrels must be undertaken by a suitably trained
and experienced ecologist to ascertain the presence of
dreys. The results shall be used to inform a Species
Protection Plan to be submitted and approved in writing
by the Council as Planning Authority.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
4. An updated ecology survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey
shall be submitted to the Council as Planning Authority
for written agreement and works shall not commence until
after such written agreement has been issued by the
Council.
Reason - In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
Page 48 of 216

Page 49

5. Prior to the completion or occupation of the building(s)
hereby approved, whichever is the earlier, 4 hibernacula,
6 house martin cups, 4 swift nest boxes, 4 built in bat
bricks and 2 external bat boxes shall be provided within
the red line boundary in accordance with
recommendations within the supporting biodiversity
survey submitted and hereby approved. Thereafter, the
agreed scheme shall be maintained in a reasonable
condition for the life of the development, to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
6. The asserted right of way/core path shown on approved
drawing MTBL/162 must not be obstructed during
building works or on completion of the development.  Any
damage done to the route and/or the associated signage
during building works must be made good before the
development is completed or brought into use, whichever
is the earlier.
Reason - To ensure continued public access to the public
paths and in the interests of public safety within the site.
7. Before the approved development is completed or put
into use, the vehicular access onto the public road
network shall be constructed in accordance with Perth &
Kinross Council's Road Development Guide Type B
Figure 5.6 access detail of Type B Road construction
detail. This construction detail must extend into the
entrance for a minimum of 3 meters from the boundary of
the public road surface.
Reason - To ensure road safety and an acceptable
standard of construction within the public road boundary.
8. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason - In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
9. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
Page 49 of 216

Page 50

incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason - To ensure the provision of effective drainage for
the site.
10. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason - To ensure the provision of effective drainage for
the site.
11. The garage hereby approved shall be used solely for
purposes incidental to the domestic enjoyment of the
dwellinghouse.
Reason - In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
12. Prior to the commencement of development a statement
shall be submitted for approval in writing by the Council
as Planning Authority to demonstrate that at least 10% of
the current carbon emissions reduction set by Scottish
Building Standards will be met through the installation
and operation of low and zero-carbon generating
technologies. The statement as agreed shall be fully
implemented to the satisfaction of the Council as
Planning Authority.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
13. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  The
subsequently agreed protective or replacement measures
shall be put in place prior to the development being
brought into use and shall thereafter be so maintained
insofar as it relates to the development hereby approved.
Reason - To ensure the new development has an
adequate and consistently wholesome supply of water
and to maintain water quality and supply in the interests
of residential amenity and ensure the private water supply
or septic drainage systems of neighbours of the
development remain accessible for future maintenance. 
Page 50 of 216

Page 51

Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.  
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
4. The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
5. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
Page 51 of 216

Page 52

an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. The applicant shall ensure the private water supply for
the dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted
to Perth and Kinross Council Environmental Health in line
with the above Act and Regulations.
8. The granting of planning permission does not stop the
continued right of public access along the existing core
path MTBL/162. An order under the Town and Country
Planning (Scotland) Act 1997, Section 208 or an
amendment of the Core Path Plan under the Land
Reform (Scotland) Act 2003 should be sought in advance
of any works authorised by this planning permission
being commenced. All relevant approvals should be in
place prior to any stopping up and diversion of the core
path taking place.
9. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
10. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
investigation and possible action by Environmental Health
under the Environmental Protection Act 1990.
11. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
12. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. Further
Page 52 of 216

Page 53

information can be found at:
https://www.pkc.gov.uk/binrequests
13. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
14. The applicant should take note of the information and
advice contained within the consultation response from
SEPA.
15. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the dwellinghouse
to include dormer windows. 
(iv) 25/01420/FLL - Change of use of dwellinghouse to
dwellinghouse/short term let accommodation unit,
Schiehallion House, Strathtummel, Aberfeldy, PH16 5NT
(Report No. 25/342) 
Ms L McLaughlan (via telephone), on behalf of Killiecrankie,
Fincastle & Tummel Community Council, objectors, followed by
Mr A Mitchell (via telephone), agent, and Mr P MacDonald,
owner, addressed the committee and answered members
questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The property subject to this planning permission shall be
used either as a residential dwelling or as a short term let
accommodation unit and no other use, and there shall be
no restriction on the interchangeability between these two
approved planning uses.
Reason - In order to clarify the terms of the permission; to
control and restrict the use of the building. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Page 53 of 216

Page 54

Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. Part of the approved development includes holiday
accommodation or Short-term Let accommodation (STL). 
The developer is advised that holiday accommodation
and STLs require to be licensed under the terms of Article
3 of The Civic Government (Scotland) Act 1982
(Licensing of Short-term Lets) Order 2022 and
Amendment Order 2024 and therefore a licence
application should be made to Perth and Kinross Council
prior to operation commencing.  Further information and
application forms are available at
https://www.pkc.gov.uk/shorttermlets.
4. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste. 
(v) 25/00928/IPL - Residential development (in principle), land
30 Metres North of Steadingfield, 4 Caroline Place, Wolfhill,
Perth, PH2 6TJ (Report No. 25/343) 
Dr M Taylor, objector, followed by Mr G Dimeck, agent,
addressed the committee and answered members questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
Conditions
1. This planning permission in principle will last only for five
years from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason - This is a Planning Permission in Principle in
terms of Section 59 of the Town and Country Planning
(Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
Page 54 of 216

Page 55

2. The development shall not commence until the following
specified matters have been the subject of a formal
planning application for the approval of the Council as
Planning Authority: the siting, design and external
appearance of the development, the hard and soft
landscaping of the site, all means of enclosure, means of
access to the site, vehicle parking and turning facilities,
levels, drainage and waste management provision.
Reason - This is a Planning Permission in Principle in
terms of Section 59 of the Town and Country Planning
(Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
3. Further to condition 2 above, measures for each
residential unit to maximise environmental sustainability
through design, orientation and planting or any other
means shall be submitted for the written agreement of the
Council as Planning Authority.  These measures shall
include a scheme that demonstrates how current carbon
emissions reduction set by the Scottish Buildings
Standards will be met through the installation and
operation of low and zero-carbon technologies, specifying
what these technology types are, their location and
ongoing operation and maintenance.  All works shall be
carried out in accordance with the agreed scheme and be
operational prior to the occupation of each residential
unit.
Reason - In order to clarify the terms of the permission
which is granted in principle only.
4. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify; 
i. the nature, extent and type(s) of contamination on
the site 
ii. measures to treat/remove contamination to ensure
the site is fit for the use proposed 
iii. measures to deal with contamination during
construction works 
iv. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Page 55 of 216

Page 56

Reason - In order to deal with any potential contamination
of the site as a result of its former use.
5. A preliminary ecological appraisal shall be submitted for
written approval by the Council as Planning Authority with
further detailed applications.  This shall outline
biodiversity protection and enhancement measures.  The
conclusions and recommendations set out in the report
shall be fully adhered to, respected and undertaken to the
satisfaction of the Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.
6. Notwithstanding the details shown on the drawings
hereby approved, no permission is granted for the
submitted layout or the number of plots.
Reason - In order to clarify the terms of the permission
which is granted in principle only.
7. The dwellinghouses shall be of single storey proportions
and appearance with any upper level accommodation
being wholly contained within the roof space.
Reason - In the interests of visual and residential
amenity; to ensure a satisfactory standard of local
environmental quality; to reserve the rights of the
Planning Authority.
8. All existing trees on the site shall be retained and their
retention or proposed lopping, topping or felling shall be
shown in the submission of the matters specified in
Condition 2 above.
Reason - This is a Planning Permission in Principle under
Section 59 of the Town and Country Planning (Scotland)
Act 1997 as amended by Section 21 of the Planning etc.
(Scotland) Act 2006.
9. No trees on the site shall be felled without the prior
written agreement of the Council as Planning Authority. 
Any detailed application shall be accompanied by a
detailed tree survey carried out by a qualified and
independent arborist indicating the type, age, condition,
location and accurate canopy spread of all the trees and
hedge on and affected by the site and including a tree
and hedge management report with details of the tree
and hedge protection measures to be employed during
construction in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.
Reason - This is a Planning Permission in Principle under
Section 59 of the Town and Country Planning (Scotland)
Act 1997 as amended by Section 21 of the Planning etc.
(Scotland) Act 2006.
10. Further to condition 2 above, a detailed landscaping and
planting scheme for the site shall be submitted to and
approved in writing by the Council as Planning Authority. 
The scheme shall include details of the height and slopes
of any mounding or recontouring of the site, full details of
all hard landscaping proposals including materials and
Page 56 of 216

Page 57

installation methods and, species, height, size and
density of trees and shrubs to be planted.  The scheme
as subsequently approved shall be carried out and
completed within the first available planting season
(October to March) after the completion or bringing into
use of the development, whichever is the earlier, and the
date of Practical Completion of the landscaping scheme
shall be supplied in writing to the Council as Planning
Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained
to the satisfaction of the Council as Planning Authority.
Reason - This is a Planning Permission in Principle under
Section 59 of the Town and Country Planning (Scotland)
Act 1997 as amended by Section 21 of the Planning etc.
(Scotland) Act 2006.
11. Further to condition 2 above, the development shall not
commence until the following specified matters have
been the subject of a formal planning application for the
approval of the Council as Planning Authority: All matters
regarding access, junction visibility, vehicle parking and
turning facilities, public transport facilities, walking and
cycling facilities ,and the road layout, design and
specification (including the disposal of surface water),
and waste management provision shall be in accordance
with the standards required by the Council as Roads
Authority (as detailed in the National Roads Development
Guide) and to the satisfaction of the Planning Authority.
Reason - This is a Planning Permission in Principle in
terms of Section 59 of the Town and Country Planning
(Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
12. As part of the first application for the Approval of Matters
Specified by Condition (AMSC) or detailed application, a
detailed design showing the full visibility splays along the
channel line shall be provided to the left and right of the
access, at a set-back of 2.4 metres measured 1.05
metres above the road level to the standard and
specification required by the Council as Roads Authority
to the satisfaction of the Planning Authority.  The visibility
splays shall be physically formed on the ground and any
existing fences, walls, hedges or other means of
enclosure or obstructions within the splays greater than
1.05 metres in height shall be removed and relocated
outwith the splays.  Once formed, the visibility splays
shall be permanently retained thereafter, and no visual
obstruction above 1.05 metres of any kind shall be
permitted within the visibility splays so formed.  The
visibility splays, as approved in writing, shall be
implemented in accordance with the approved details to
the satisfaction of the Council as Planning Authority and
undertaken prior to the commencement of construction
associated with the AMSC or detailed application.
Page 57 of 216

Page 58

Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
13. As part of the first application for the Approval of Matters
Specified by Condition (AMSC) or detailed application, a
detailed design showing the footway along the frontage of
the site connecting with the junction of Caroline Place/
Old Church Road to provide a connection to the bus stop
for local bus and school transport.  The detailed design
shall include the works at the bus stop at Old Church
Road (NaPTAN Code: 73742686), which shall be
upgraded to a three bay enclosed bus shelter by the
developer to provide and install on appropriate hard stand
asphalt areas a bus shelter with a 3 bay enclosed bus
shelter supplied (Cairngorm style) and installed with
passenger information board, community information
board, LED spotlights (one per bay), a 28in Ultra-Wide
Display Screen for Real Time Passenger Information
installed on the approach side of the shelter and a 24/7
electrical power supply to a Haldo pillar adjacent to the
shelter to provide power for the LED lighting and Real
Time Passenger Information display.  The bus shelter
and footway as approved in writing, shall be implemented
in accordance with the approved details to the
satisfaction of the Council as Planning Authority and
undertaken prior to the occupation of the first
dwellinghouse associated with the AMSC or detailed
application.
Reason - In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
14. Core path (BURR/160) must not be obstructed during
building works or on completion of the development.  Any
damage done to the route and/or the associated signage
during building works must be made good before the
development is completed or brought into use, whichever
is the earlier.
Reason - To ensure continued public access to the public
paths and in the interests of public safety within the site.
15. Further to condition 2 above, a detailed sustainable urban
drainage system (SUDS) shall be submitted for the
written agreement of the Council as Planning Authority, in
consultation with SEPA where necessary.  The scheme
shall be developed in accordance with the technical
guidance contained in The SUDS Manual (C753) and the
Council's Flood Risk and Flood Risk Assessments
Developer Guidance, and shall incorporate source
control. All works shall be carried out in accordance with
the agreed scheme and be operational prior to the
bringing into use of the development.
Reason - To ensure the provision of effective drainage for
the site.
Page 58 of 216

Page 59

16. Surface water runoff from all impermeable surfaces such
as roofs and hardstandings shall be disposed of by
means of a suitable Sustainable Urban Drainage System
(SUDS) to meet the requirements of best management
practices.
Reason - To ensure the provision of effective drainage for
the site.
17. The development shall be in accordance with the
requirements of Perth & Kinross Council's Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 20: Affordable Housing
of the Perth & Kinross Local Development Plan 2 (2019),
or such subsequent Guidance and Policy which may
replace these.
Reason - To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council's policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2023.
18. The development shall be in accordance with the
requirements of Perth & Kinross Council's Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 5: Infrastructure
Contributions of the Perth & Kinross Local Development
Plan 2 (2019) with particular regard to primary education
infrastructure, or such subsequent Guidance and Policy
which may replace these.
Reason - To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council's policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2023.
19. The development shall be in accordance with the
requirements of Perth & Kinross Council's Developer
Contributions and Affordable Housing Supplementary
Guidance 2023 in line with Policy 5: Infrastructure
Contributions of the Perth & Kinross Local Development
Plan 2 (2019) with particular regard to transport
infrastructure, or such subsequent Guidance and Policy
which may replace these.
Reason - To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council's policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2023. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.    
Page 59 of 216

Page 60

Informatives
1. Applicants are advised that should their application for
Approval of Matters specified be refused and/or their
appeal against such refusal dismissed outwith the three
year time limit they are entitled to submit a revised
application for Approval of Matters specified within six
months after the date of refusal of the earlier application
or of the dismissal of an appeal against such refusal.
2. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
3. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 he/she/they must
obtain from the Council as Roads Authority consent to
construct a new road prior to the commencement of
roadworks.  Advice on the disposal of surface water must
be sought at the initial stages of design from Scottish
Water and the Scottish Environment Protection Agency.
4. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
5. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
6. The applicant is advised that Perth and Kinross Council
have a charging scheme for recycling and waste bins for
new build properties and newly created dwellings. Further
information can be found at:
https://www.pkc.gov.uk/binrequests
7. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water's assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
8. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
9. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
Page 60 of 216

Page 61

and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to include tree and
contaminated land information. 
6. Proposal of Application Notices (PoAN) 
(i) 25/00015/PAN - Mixed use development comprising erection of a
hotel, restaurants/drive thru restaurant, petrol filling station, EV
charging hub, formation of park and ride with ancillary retailing,
HGV parking, formation of access road, landscaping and
associated engineering works, land 680 Metres North of Bertha
Park Farm, Perth, PH1 3EQ (Report No. 25/344) 
Bailie C McLaren wished to draw officers’ attention to the importance of
park and ride in how we see people moving around and connecting
with other transport networks and the importance of doing as much as
possible to deliver on provision for HGV parking in the area. 
The contents of the Report by the Development Management and
Building Standards Service Manager, were noted. 
Page 61 of 216

Page 62

Page 62 of 216

Page 63

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/1) 
Proposal: Construction of 19 wind turbines and associated infrastructure (Glen
Lednock Wind Farm) ECU00004966 
Location: Land 4800 metres north of St Serfs Church, Comrie, Crieff, PH6 2EA 
Ref. No: 25/00899/ECU36
Ward No: P6- Strathearn 
Summary 
Perth and Kinross Council has been consulted by the Scottish Government’s Energy
Consents Unit (ECU) on the proposed Glen Lednock Wind Farm (ECU00004966). 
The findings of this report recommends that the Council objects to the proposal due
to its impact on Loch Rannoch and Glen Lyon National Scenic Area. 
Background and Description of Proposal 
1 The purpose of the report is to make members aware of the relevant planning
considerations relating to the proposed development. Following consideration of
these matters the Council must advise the Scottish Government’s Energy
Consents Unit whether it objects to the application or not. 
2 The proposed development is located south-west of Loch Lednock Reservoir in
Glen Lednock on the Invergeldie Estate, approximately 2.8km north of St Fillans
and 8km north-west of Comrie. The site covers an area of approximately 1,102
hectares. Access is provided from an existing bellmouth on the A85 to the east of
Comrie. 
3 The Proposed Development would include the following key components: 
• 19 x 6.2MW wind turbines:
- 16 of which are proposed up to 200m tip height; and of which are proposed
up to 180m tip height.
• Substation Compound and Control Buildings.
5(1)(i)
Page 63 of 216

Page 64

• Turbine foundations with permanent crane hardstandings. Approximately 
5,521m2 of temporary crane hardstanding per turbine location.
• Access Route Area between the existing A85 bellmouth east of Comrie and
the Turbine Development Area would be approximately 12,687m in length,
comprising:
− A number of localised upgrades to approximately 8,528m of existing
tracks;
− Approximately 4,158m of new track;
− Approximately 615m of upgraded access track within the turbine
development area;
− Approximately 17,681m of new access tracks within the turbine
development area, of which approximately 16,853m potentially cut / fill
track and approximately 828m potentially floating track; and
− 15no. turning heads within the Turbine Development Area.
• Five search area locations for potential borrow pits totalling approximately
159,841m2. Exact excavated volumes subject to detailed ground
investigations.
• Two temporary concrete batching plants.
• The primary construction compound would be approximately 50m x 100m
(5,000m2) in size. The secondary compound would be approximately 60m x
40m in size (2,400m2). Two additional compounds along the access route
area, one approximately 50m x 100m (5,000m2) north of the A85 bellmouth,
and one approximately 50m x 100m (5,000m2) west of Funtulich where the
access route area meets Monument Road.
• 30 watercourse crossings, of which 14 are already existing crossings to be
upgraded and 16 new crossings.
• A meteorological mast. 
4 The individual turbine generating capacity is anticipated to be approximately 6.2
MW, with an approximate combined 117.8 MW installed capacity. The proposal
seeks permission to operate the wind farm for 40 years. 
Glentarken Wind Farm 
5 The proposed Glentarken Wind Farm is located west of Glen Lednock and
comprises 12 turbines with a tip height up to 180m and includes a Battery Energy
Storage Systems (BESS) with up to 50 MW capacity and associated accesses
and infrastructure. On 3rd September 2025, PKC’s Planning and Placemaking
Committee resolved to notify the Scottish Government’s Energy Consents Unit
that they object to the proposal due to its due to its impact on Loch Rannoch and
Glen Lyon National Scenic Area. 
Site History 
6 24/00206/SCOP on 8 February 2024, The Scottish Ministers, following
consultation with PKC and other relevant bodies, adopted a scoping opinion
Page 64 of 216

Page 65

setting out the scope of the matters to be considered within the EIA Report to be
submitted alongside the application for a proposed wind farm development. 
Environmental Impact Assessment 
7 The proposal is EIA development and an EIA Report has been submitted. An
assessment of the report’s findings and significant environmental effects is
provided in the appraisal section below. 
Pre-Application Consultation 
8 The proposed development is classed as a National Development within NPF4,
as provided for in Section 3A of the Town and Country Planning (Scotland) Act
1997 (as amended). However, unlike other National Development proposals,
applications made under Section 36 of The Electricity Act 1989 are not subject to
mandatory pre-application consultation engagement requirements. 
9 Nevertheless, despite there being no statutory requirement to conduct public
consultation, the applicant has submitted a PAC Report providing information on
engagement activities undertaken to gain insight into concerns and opinions from
members of the local community and surrounding area. Such engagement 
involved public exhibitions being held in St Fillans and Comrie on 13th and 14th
November 2023. A second set of public exhibitions were held in the same
venues on 25th and 26th November 2024. A dedicated project website was also
created in April 2024. In addition, a letter drop was carried out to residents of
Monument Road and Invergeldie Estate with follow-up meetings arranged with
residents on a one-to-one basis to provide them with a platform to air any queries
and concerns.  
Development Plan 
10 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
11 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
12 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
Page 65 of 216

Page 66

• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
13 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
14 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 6: Settlement Boundaries
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33D: Renewable and Low Carbon Energy: Spatial Framework for
Wind Energy
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 51: Soils
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 53D: Water Environment and Drainage: Reinstatement of Natural
Watercourses
Page 66 of 216

Page 67

• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
15 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
16 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• Scottish Government Advice: Onshore wind turbines (May 2014)
• Scottish Government Advice: Energy storage (December 2013) 
Consultations 
17 As part of the planning application process the following bodies were consulted: 
18 NatureScot: Object to the proposal as it would result in significant adverse effects
on the Special Landscape Qualities of the Loch Lomond and Trossachs National
Park and the Loch Rannoch and Glen Lyon National Scenic Area. 
19 Biodiversity: There are four buildings within 30m of the Access Route Area
earthworks and a further two buildings within 50m identified as requiring further
assessment for their potential to support bats. Two rock faces also requiring
further assessment for their potential to support bats fall within 30m.  Pre-
construction surveys would confirm the presence and type of roosts that could be
disturbed within trees, buildings and structures. Conditions are recommended to
secure a CEMP, including measures to mitigate impacts of lighting on nocturnal
species, a revised Biodiversity Net Gain Plan/Habitat Management Plan, details
of monitoring arrangements and details of an Ecological Clerk of Works (ECOW).
Page 67 of 216

Page 68

20 Dick Bowdler (Noise Consultant): Construction and operational noise should
be controlled by a CEMP. The construction access passes close to several
properties and consideration should be given to re-routing the access road away
from the closest of these, preferably at least 50m away from them to mitigate
noise and vibration. 
21 Community Greenspace: No objection. A condition is recommended requiring
an Outdoor Access Plan to be prepared by the developer to outline how access
will be managed throughout the entire construction process and on completion of
the development. 
22 Conservation Team: No objection. The proposed mitigation measures to protect
heritage assets set out in the cultural heritage section of the EIA are acceptable. 
23 Environmental Health (Contaminated Land): No objections. 
24 Structures and Flooding: No objection. The proposed development is not
expected to significantly impact surface water flood risk, geology, peat,
hydrology, or hydrogeology. It is recommended that a CEMP is required by
condition to ensure that best construction practices are followed, along with
ongoing monitoring. 
25 Transportation and Development: Further approvals will be required from the
Structures Team so that an assessment can be made of the abnormal loads. Any
future consideration will need to address the standard requirements for structural
assessment and may involve strengthening works, temporary bridging, or route
alterations. 
26 Perth and Kinross Heritage Trust (PKHT): No objection. It is recommended
that a condition is imposed requiring that a programme of archaeological work is
undertaken pre-construction phase and fully implemented thereafter. A further
condition is recommended requiring the appointment of an Archaeological Clerk
of Works (ACoW) to oversee the works. 
Additional Statements 
27 Screening Opinion EIA required 
Environmental Impact Assessment (EIA):
Environmental Report
Submitted 
Appropriate Assessment under Habitats
Regulations
Any required Habitats Regulations
Appraisal will be for the ECU 
Design and Access Statement Submitted 
Report on Impact or Potential Impact 
eg Flood Risk Assessment
• PAC
• Planning Statement
• EIA Report covering the
following:
− Landscape and Visual;
Page 68 of 216

Page 69

− Geology, Hydrology and
Hydrogeology;
− Ornithology;
− Ecology;
− Noise and Vibration;
− Access, Traffic and
Transport;
− Cultural Heritage;
− Climate Change;
− Socio-economics, Tourism
and Recreation;
− Television, Radio and
Telecommunications; and
− Aviation 
Appraisal  
28 Schedule 8 to Section 36 of the Electricity Act 1989 requires the Scottish
Government, as the appropriate authority, to serve notice of the application on
the Council as the relevant planning authority. There is no primacy of the
Development Plan for S.36 applications. However, the Council are required to
consider the proposal in accordance with the provisions of the Development
Plan, as a material consideration. 
29 The Development Plan comprises National Planning Framework 4 (NPF4) and
the Perth and Kinross Local Development Plan 2019 (LDP2). The relevant policy
considerations are outlined in the policy section above and are considered in
more detail below. In terms of other material considerations, this involves
considerations of the Council’s other approved policies and supplementary
guidance. 
30 NPF4 identifies ‘Strategic Renewable Electricity Generation and Transmission
Infrastructure’ as a National Development. The National Development explicitly
supports renewable electricity generation, which generates above 50 megawatts
capacity which is applicable in this case. The policy intent of NPF4 Policy 11:
Energy is to ‘encourage, promote and facilitate all forms of renewable energy
development onshore and offshore’…including energy generation. Policy 11a
also provides support for all forms of renewable, low carbon energy including
wind farms. 
31 NPF4 highlights the importance of enabling developments that contribute
towards greenhouse gas emissions reduction targets and wider national
commitments to tackle the climate crisis. The application includes a carbon
calculator for the development. The carbon balance for the development
suggests a payback time of around 0.7 years when compared to the fossil grid
fuel mix of electricity generation or 1.4 years when compared to the grid mix
electricity generation. Beyond this point, the applicant considers the development
Page 69 of 216

Page 70

to represent a positive contribution to national emissions reductions objectives for
the remaining of its operational life. The wind farm is predicted to deliver total
emissions savings of 70,918 tonnes of greenhouse gases per year and 2.84
million tonnes over its 40-year operational lifetime. 
32 Schedule 9 of the Electricity Act 1989 requires licence holders to “have regard to
the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiographical features of special interest” and “shall do what he
reasonably can to mitigate any effect”. 
33 In terms of LDP2, Policy 33: Renewable and Low Carbon Energy and Policy 39:
Landscape are also relevant in the assessment of the proposed development. It
is accepted that NPF4 Policy 11 supersedes LDP2 Policy 39 where they are
incompatible but the specific considerations in Policy 39 are relevant
considerations that should be taken into account as expressions of impacts
considered of most importance in the region. 
Landscape 
34 The Planning Statement provided sets out that whilst the Development Plan does
not have primacy in the determination of S.36 applications, it is a ‘relevant
consideration’. Development Plan policies have been referred to throughout
including the supplementary guidance on Local Landscape Areas. LDP2 Policy
39: Landscape is largely overridden by Policy 11, however, specific
considerations in Policy 39 are relevant considerations that should be taken into
account as expressions of impacts considered of most importance in the region. 
35 NPF4 Policies 4: Natural Places and 11: Energy and LDP2 Policies 33:
Renewable and Low Carbon Energy and 39: Landscape area all relevant to the
assessment of the proposal. A Landscape and Visual Impact Assessment (LVIA)
has been carried out to consider the landscape impacts of the proposal. A
detailed assessment of the potential effects of the proposed development on the
Special Landscape Qualities of River Earn (Comrie to St Fillans National Scenic
Area) and Loch Rannoch and Glen Lyon NSA has been carried out. 
36 The EIAR assessment of the resulting development has identified that during
operation there would be significant effects on the landscape character of the
following Landscape Character Types (LCT): 
• LCT 376 Summits & Plateaux – Tayside (host unit). Major/moderate and
significant effects in within 7km east, 4km west, 2.5km south and 2km north
of the Proposed Development. Beyond 7k to the east effects would be
moderate and significant.
• LCT 376 Summits & Plateaux – Tayside (Mor Bheinn unit). Major/moderate
and significant effects, contained within 8.5km. Beyond 8.5km effects would
be moderate and not significant.
Page 70 of 216

Page 71

• LCT 376 Summits & Plateaux – Tayside (Ben Lawers unit). Major/moderate
and significant effects within 7km.
• LCT 371 Mid Upland Glens (host LCT). Major/moderate and significant
effects within 4km.
• LCT 147 Summits and Plateaux – Central. Moderate and significant effects
within 8km of the Proposed Development.
• LCT 251 Highland Summits. Major/moderate and significant effects across
intermittent parts of the receptor within 11km. 
37 During operation there would be significant effects on the following visual
receptors: 
• Upper Glen Lednock receptor group which includes scattered dwellings, core
paths, rights of way and a minor road. Major and significant effects are
identified on users of core path CMRI/16 which passes within 0.3km of the
nearest proposed turbine. In other receptors in this group effects would be no
greater than moderate and significant.
• There would be no significant effects on the settlement of Comrie due to
limited visibility of the proposed turbines. However, there would be
major/moderate and significant effects on users of nearby core paths
CMRI/122 and CMRI/140 arising from changes to the track network that
these routes use.
• Ben Lawers receptor group: This receptor group includes the Ben Lawers
range and the Tarmachan Ridge. Major/moderate and significant effects
across an Intermediate extent of the receptor group. 
• Ben Chonzie specific viewpoint: Major/moderate and significant effects
across a Localised extent of available views from the viewpoint.
• Ben Vorlich specific viewpoint: Major/moderate and significant effects across
a Localised extent of available views from the viewpoint.
• Ben Lawers specific viewpoint: Major/moderate and significant effects across
a Localised extent of available views from the viewpoint. 
38 The EIAR concludes that there would be no significant night-time effects on any
landscape or visual receptors. 
39 There are three Designated Landscapes within the study area of the EIAR. Two
of these are National Scenic Areas and the other is Loch Lomond and Trossachs
National Park. Loch Lomond and the Trossachs National Park Authority is also a
consultee to the ECU and will return their own comments on any impacts on the
National Park. 
40 One of the River Earn (Comrie to St Fillans) NSA’s Special Landscape Qualities
(SLQ) are identified as “a harmonious combination of highland and lowland.” The
EIAR predicts major/moderate and significant effects in a localised extent of the
NSA where this SLQ is experienced. 
Page 71 of 216

Page 72

41 The EIAR advises that only two of the 12 SLQ of Loch Rannoch And Glen Lyon
NSA may be significantly affected. Those SLQ being ‘the wild summits’ and ‘the
dominance of Ben Lawers’. However, it goes on to conclude that the effect will be
moderate and not significant. 
42 The EIAR also assesses the effects of the proposed development on the Special
Qualities of Upper Strathearn Local Landscape Area 5.8km to the east (moderate
effect that would not be significant), and Loch Tay LLA 5.4km to the north
(moderate/minor effect which would not be significant). 
43 The impacts identified on landscape designations are assessed against NPF4
Policy 4 (c). This states that development proposals that will affect National
Parks and NSAs will only be supported where: ‘(i) the objective of designation
and the overall integrity of the areas will not be compromised’. The text of NPF4
policy also aims to protect the quality of these designations. Some SLQs are
expected to suffer significant impact, which is an undesirable outcome of the
development when considered against national policy. 
44 For national designations (in this case, National Parks and NSAs), NPF4 Policy 4
(c) (i) requires the objectives of designation and the overall integrity of the
designated area to not be compromised. In reference to local natural
conservation sites or landscape areas, NPF4 Policy 4 (d)(i) also demands that
development will not have significant adverse effects on the integrity of the area
or the qualities for which it has been identified. However, both articles within
NPF4 Policy 4 also recognise that significant adverse effects on those protected
areas can be outweighed by social, environmental or economic benefits. 
45 The EIAR states character impacts are limited to a maximum of 11km from the
proposed development. The significant impact on the character of the landscape
here includes areas of significant value to the region of Perth and Kinross as a
whole and wider national interests, and not just the immediate locality. The
landscape designations impacted, including National Parks, NSA and LLA,
should add significant weight to whether the impacts are localised. 
46 NatureScot has been consulted by the ECU directly on the proposal and also by
PKC due to their role as national advisors on matters including landscape.
NatureScot has objected to the proposal as it would result in significant adverse
effects on the Special Landscape Qualities of the Loch Lomond and The
Trossachs National Park and the Loch Rannoch and Glen Lyon National Scenic
Area. 
47 Loch Rannoch and Glen Lyon National Scenic Area is located almost entirely
within the PKC boundary, to the north of the site. NatureScot disagree with
EIAR’s conclusions that that there would be no potential for significant adverse
effects on SLQs within the Loch Rannoch and Glen Lyon NSA and consider that
effects on the NSA are such that the objectives of the designations and overall
integrity of the areas would be compromised. These effects are unlikely to be
overcome through re-design or removal of turbines. Additionally they advise that
Page 72 of 216

Page 73

there would be significant adverse effects on the SLQs of the River Earn (Comrie
to St Fillans) NSA and that the applicants assessment underplays the
significance of effects on other SLQs. However, these are not to the extent that
the overall integrity of the area would be compromised. 
48 Policy 4 states that development in National Scenic Areas will not be supported
where development has significant adverse effects on the integrity of the area or
the qualities for which it has been identified. Policy 4 when read together with
Policy 11(e)(ii) provides further interpretation requiring appropriate mitigation
where a landscape is recognised as sensitive. 
49 NPF4 Policy 1 lends significant weight to the climate crisis, and the status of the
development as a national development. Additionally, NPF4 Policy 11(e) states
that development impacts and the proposed mitigation measures should be
considered giving significant weight to the contribution of the proposal to
renewable energy generation targets and on greenhouse gas emissions
reduction targets. However, the proposed development is in an area where the
landscapes and natural environments have long been identified as being of high
quality and worthy of protection. The description of impacts offers sufficient
evidence that the development will bring permanent change to the qualities of
these designated areas. The magnitude of the development, together with the
value of the protected areas, raises significant concern about the acceptability of
these impacts even after mitigation. 
50 In conclusion, the proposal will bring about significant adverse effects on Loch
Rannoch and Glen Lyon NSA to the extent that the overall integrity of the area
will be compromised. While considerable weight is to be given to the contribution
the proposed development could make in achieving renewable energy
generation targets, this does not overcome the significant detrimental impact the
proposal will have on a nationally important landscape designation. The proposal
is therefore contrary to NPF4 Policy 4 and LDP2 Policies 33 and 39. 
Residential Amenity 
51 NPF4 Policy 11: Energy and LDP2 Policies 33: Renewable and Low-Carbon
Energy, 55: Nuisance from Artificial Light and Light Pollution and 56: Noise
Pollution are relevant. 
52 PKC has engaged an external specialist noise consultant to review the noise
section of the EIAR. The nearest properties to the construction access routes
and turbine locations have been assessed for construction and operational noise. 
53 Technical guidance for the assessment of noise emissions from onshore wind
turbines, known as ETSU-R-97, provides comprehensive advice to local
authorities across the UK for appraising planning applications for onshore wind
developments. The propagation methodology described in the EIAR are
appropriate and the resulting turbine noise levels are correct in accordance with
Page 73 of 216

Page 74

good practice. The turbine noise levels are shown to meet the ETSU-R-97
simplified limit of 35dB. 
54 The assessment also considered the cumulative noise levels for Glen Lednock
Wind Farm and the nearby Glentarken Wind Farm. The turbine noise levels
cumulatively from both wind farms was shown to comfortably meet the ETSU-
R97 simplified limit of 35dB. 
55 Were the application to be approved it is recommended that conditions are
imposed to control operational noise levels. These should be in line with the
Standard Onshore Wind Conditions of 25th February 2025 published by Scottish
Government. The noise limit should be a single figure of 32dB measured as
LA90 and applied at all times and in all wind conditions. 
56 In terms of construction noise, the EIAR suggest that daily (12-hour) average
levels of 87, 88 or 91dB will occur and results in no significant effects. However,
this is not accepted, it is not necessary for any day to exceed 75dB and then only
on a limited number of days. Any CEMP should ensure that proper mitigation is
carried out to protect the nearest houses from excessive noise and vibration
levels. 
57 Effects on visual amenity are considered in detail in the Landscape section
above, where it is concluded that the proposal will result in some significant
visual effects. 
58 Similarly, in terms of aviation lighting, it is proposed that five of the turbines will
have visible aviation lighting. The assessment of night time effects for the
proposed development has predicted significant effects for some of the
viewpoints considered in the LVIA. This is largely due to the appearance of
lighting on an open upland area devoid of this type of lighting. 
59 Shadow flicker was scoped out of the EIAR, as there will be no significant effects
due to the separation distances between the residential properties and the
nearest turbine. 
Roads and Access 
60 Policy 13 (Sustainable Transport) of NPF4 focuses on sustainable travel and
ensures development is sited appropriately. LDP2 Policy 60 (Transport
Standards and Accessibility Requirements) requires that local road networks be
capable of absorbing traffic generated by development and that satisfactory
access is provided. 
61 Should the proposal be granted further approvals will be required from the PKC
Structures Team so that an assessment can be made of the abnormal loads. Any
future consideration will need to address the standard requirements for structural
assessment and may involve strengthening works, temporary bridging, or route
alterations.
Page 74 of 216

Page 75

62 Insofar as roads matters are concerned there are no objections to the proposal
subject to conditions requiring a Construction Traffic Management Scheme and a
Staff Travel Plan. 
63 The proposal will have significant effects on the access network north of Comrie,
including numerous core paths, public Right of Ways and other well-used routes.
Monument Road is also a particularly important access road for those wishing to
access Ben Chonzie and the surrounding hills. PKC Community Greenspace has
advised that should the proposal be granted a condition is recommended
requiring an Outdoor Access Plan to be prepared by the developer to outline how
access will be managed throughout the entire construction process and on
completion of the development. 
Drainage and Flooding 
64 Policy 22 (Flood Risk and Water Management) of NPF4 sets out that proposals
will not increase the risk of surface water flooding to others, or itself be at risk,
manage all rain and surface water through sustainable urban drainage systems
(SUDS) and seek to minimise the area of impermeable surfaces. In addition,
Policy 53 (Water Environment and Drainage) of LDP2 sets out that development
proposals at any location and of any scale should protect and where practical
improve the water environment. 
65 The development is classified as Essential Infrastructure and can be built within a
flood-risk area (200yr + Climate Change) as per NPF4 Policy 22a. It should be
designed and constructed to be operational during floods, not impede water flow,
and not increase the risk of flooding elsewhere.   
66 The SEPA flood maps indicate that the development is located outside the flood
extent (1:200) for both Loch Turret Reservoir and the River Lednock.
Additionally, it is important to note that several small watercourses flow through
the area; however, the maps indicate minimal out-of-bank flood risk (1:200). 
67 PKC Flooding and Structures has advised that the proposed development is not
expected to significantly impact surface water flood risk, geology, peat,
hydrology, or hydrogeology. It is recommended that a CEMP is required by
condition to ensure that best construction practices are followed, along with
ongoing monitoring. 
Conservation Considerations 
68 NPF4 Policy 7 (Historic Assets and Places) and LDP2 Policies 26 (Scheduled
Monuments and Archaeology) and 27 (Listed Buildings) are relevant to the
development. A Cultural Heritage Assessment (CHA) has been submitted in
support of the development as part of the EIAR. 
Page 75 of 216

Page 76

69 Perth and Kinross Heritage Trust (PKHT) has been consulted on the proposal
and advised that they are in broad agreement with the mitigation measures
proposed for undesignated assets as outlined. 
70 It is recommended that an Archaeological Clerk of Works is appointed alongside
the production of a Written Scheme of Investigation which will outline in full the
archaeological mitigation across the development site. These matters would be
required to be secured via appropriate conditions. 
71 It is recommended that any Written Scheme of Investigation should outline in full
the archaeological mitigation across the development site. PKHT has offered the
following comments to inform any WSI: 
• In section 11.8.2 note the requirement for curator/PKHT agreement in
advance of any changes to an agreed WSI with regards to micro siting and
methodology.
• MPK6344 should be provided with an adequate buffer (20m or more) to
ensure adequate protection. Works adjacent to this will require
archaeological monitoring.
• MPK15377 -farmstead. This site should be simply demarcated for foresters
in advance of felling to ensure no damage during tree felling works. The
proposal of fencing off requirement during construction fence is acceptable
with appropriate buffer.
• Agree with 11.8.5 for requirements for areas to be archaeological monitored
to be agreed in advance under WSI condition.
• Given the location of the site and the generally poor record of upland
archaeology (less development/ agricultural disturbance alongside survey)
the WSI should consider monitoring areas where perhaps little is known of
the area but landscape wise the site lends itself to potential occupation.
These discussions can be part of the finer details when agreeing the WSI. 
Natural Heritage and Biodiversity 
72 Policies 3 (Biodiversity), 4 (Natural Places) and 6 Forestry, Woodland and Trees
of NPF4 and Policies 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development and 41 (Biodiversity) of LDP2 are applicable to the proposal. 
73 NPF4 Policy 4 f) states that ‘development proposals that are likely to have an
adverse effect on species protected by legislation will only be supported where
the proposal meets the relevant statutory tests. If there is reasonable evidence to
suggest that a protected species is present on a site or may be affected by a
proposed development, steps must be taken to establish its presence. The level
of protection required by legislation must be factored into the planning and
design of development, and potential impacts must be fully considered prior to
the determination of any application.’ 
Page 76 of 216

Page 77

74 Section 9.6.101 of the EIAR states there are four buildings within 30m of the
Access Route Area earthworks and a further two buildings within 50m identified
as requiring further assessment for their potential to support bats. Two rock faces
also requiring further assessment for their potential to support bats fall within
30m. Pre-construction surveys would confirm the presence and type of roosts
that could be disturbed within trees, buildings and structures. 
75 Local Planning Authorities have been instructed by Scottish Government since
2016 to fully ascertain whether protected species are on site and what the
implications of this might be before considering whether to approve an
application or not to ensure all decisions are compliant with the Habitats Directive
and the Regulations. NPF4 Policy 4 strengthens this requirement. 
76 These surveys should be done and the results available to assess prior to any
consent being issued. 
77 EIAR Table 9.2: Summary of Field Surveys advises that surveying of ponds for
great crested newts was undertaken in October and November 2024 which is out
with the optimum period and is not recognised as a limitation. 
78 NPF4 Policy 6 b) advises that ‘development proposals will not be supported
where they will result in: 
i. any loss of ancient woodlands, ancient and veteran trees, or adverse impact
on their ecological condition.
ii. Adverse impacts on native woodlands, hedgerows and individual trees of
high bio-diversity value, or identified for protection in the Forestry and
Woodland Strategy.’ 
79 There is a strong presumption against the removal of ancient semi-natural
woodland in the Scottish Government Policy on Control of Woodland Removal
unless removal of woodland would achieve significant and clearly defined
additional public benefits. In addition, from examination of the plans relative to
the access route for heavy goods vehicles transporting turbine blades, etc. to the
site, it is noted that 32 x mature sycamores are identified for felling at the
Highlandman Station junction, Crieff. These trees form an attractive avenue, and
are considered of high amenity value, and one of the better examples of our tree
lined country roads within rural Perthshire. The loss of amenity that would result
from the removal of the 32 x trees would be significant. There will be some
biodiversity value from these trees, due to their age and location, and inevitably a
loss of biodiversity would result if they were removed. 
80 Chapter 9 of the EIAR relates to Ecology. Section 9.6.90 notes that 1.8ha of
woodland habitat listed on the Ancient Woodland Inventory as long-established of
plantation origin will be impacted. 
81 The impacted woodland is composed of the native broadleaf wood and scrub
habitats (W11, W17), small areas of open internal habitats (M23, M6, MG7, MG9)
Page 77 of 216

Page 78

as well as other woodland habitats that do not align with National Vegetation
Classification categories such as conifer plantation and exotic species. The latter
makes up approximately 0.2ha. The majority of woodland is managed as
commercial forestry. 
82 The total direct woodland loss as part of the Proposed Development, including
ancient woodland, non-ancient woodland and woodland scoped out of the
assessment, amounts to approximately 2.9ha.  
83 NPF4 Policy 3 b) states that ‘development proposals for national or major
development, or for development that requires an Environmental Impact
Assessment will only be supported where it can be demonstrated that the
proposal will conserve, restore and enhance biodiversity, including nature
networks so they are in a demonstrably better state than without intervention.
This will include future management.’ 
84 EIAR Appendix A9.7: Outline Habitat Management and Biodiversity
Enhancement Plan seeks to address this requirement. Overall, the aims and
objectives of the Plan are clear but what is unclear is how it will be known that the
aims and objectives have been met. A condition should ensure that monitoring
results should be used to revise the Plan regularly to measure progress and
adapt practices if required. 
85 Section 7.2.1 states monitoring of peatland restoration works will primarily focus
on visual indicators of success and checking restoration measures are working
as intended. Restoration projects need monitoring programmes to show whether
objectives are being met and to help them to adapt practices to respond to
environmental changes. A further condition is necessary to secure this
requirement. 
86 Section 5.3.2 states the aim of achieving deer densities of <8 deer per km2
outside of fenced areas where possible and within fenced areas there is a target
of no deer. The current density of deer is not provided and so it’s unclear how
achievable this target is or how long it will take to achieve that density. 
87 The use of deer fencing is proposed alongside deer control. Deer control is a
more sustainable and long-term approach to deer population management and is
encouraged. A reduction in deer fencing also creates more open and welcoming
areas for people to access and enjoy. Regular checking of deer fences to check
they are not porous should be included in the Plan. 
88 Control of non-target trees or scrub is included in the Plan but not until year 10. It
is recommended that this takes place earlier than proposed to control the natural
regeneration of non-native timber species that will affect the aims and objectives
for biodiversity enhancement. 
Page 78 of 216

Page 79

89 A commitment to submit all species records to NBN Gateway would be welcomed
as positive contribution towards biodiversity enhancement, especially as Perth and
Kinross is not covered by a records centre. 
Economic Impact 
90 NPF4 Policy 11(c) advises that development proposals will only be supported
where they maximise net economic impact, including local and community socio-
economic benefits such as employment, associated business and supply chain
opportunities. 
91 Chapter 14 of the EIAR includes an appraisal of Socio-Economics, Tourism and
Recreation. The Appraisal predicts the following socio-economic beneficial
impacts: 
•   Total expected capital expenditure (CAPEX) investment of £210.9 million, of
which £75.9 million potentially benefitting Scottish companies and £25.3
million potentially benefitting local companies. This includes opportunities for
local businesses to support in terms of groundwork, landscaping, civil
engineering, and construction contracts.
•   Up to 210 direct, indirect and induced construction jobs and GVA of £19.1
million in Perth and Kinross, and 739 direct, indirect and induced construction
jobs and GVA of £69.5 million at the Scottish level.
•   Total annual operating and maintenance expenditure of £9.6 million per
annum, of which £5.6 million potentially benefitting Scottish companies and
£4.0 million benefitting local companies.
•   Up to 38 direct, indirect and induced operational jobs and GVA of £2.7 million
in Perth and Kinross, and 62 direct, indirect and induced operational jobs and
GVA of £4.3 million at the Scottish level.
•   Wider financial benefits linked to community benefit funding, with a total
community benefits funding of £589,000 per annum or £23.6 million (2025
prices) over the proposed 40 year operational life. (It should be noted that
community benefit funding is an agreement between the developer and the
local community and is not a matter that is overseen, or has any input, from
PKC as Planning Authority).
•  The offer of shared ownership in the development to local community interest
groups, in line with Scottish Government best practice principles. A range of
wider qualitative benefits such as supply chain impacts, perception benefits,
community wealth building effects and enhancements in local community
infrastructure. This will include at least £1 million annually in non-domestic
rates. 
Conclusion and Reasons for Recommendation 
92 To conclude, the proposed development is considered to not be in accordance
with the Development Plan. Account has been taken of the relevant material
Page 79 of 216

Page 80

considerations and none has been found that would justify overriding the
Development Plan. 
93 Accordingly, it is recommended that PKC objects to the proposal on the grounds
identified below. 
Reasons for Recommendation 
1. The proposal will bring about significant adverse effects on Loch Rannoch and
Glen Lyon NSA to the extent that the overall integrity of the area will be
compromised. While considerable weight is to be given to the contribution the
proposed development could make in achieving renewable energy generation
targets, this does not overcome the significant detrimental impact the proposal
will have on a nationally important landscape designation. The proposal is
therefore contrary to National Planning Framework 4 (2023) Policy 4 ‘Natural
Places’, as well as the adopted Perth & Kinross Local Development Plan 2
(2019) Policies 33 ‘Renewable and Low Carbon Energy’ and 39 ‘Landscape’. 
Background Papers
Letters of representation N/A 
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Majors) developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
16 December 2025 
Page 80 of 216

Page 81

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/00899/ECU36
Construction of 19 wind turbines and associated infrastructure ECU00004966 on land 4800 Metres North of
St Serfs Church, Comrie, Crieff, PH6 2EAScale
1:60,000
5(1)(i)
Page 81 of 216

Page 82

Page 82 of 216

Page 83

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/00899/ECU36
Construction of 19 wind turbines and associated infrastructure ECU00004966 on land 4800 Metres North of
St Serfs Church, Comrie, Crieff, PH6 2EAScale
1:40,000
5(1)(i)
Page 83 of 216

Page 84

Page 84 of 216

Page 85

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/2) 
Proposal: Erection of 83 affordable dwellinghouses and 20 affordable flats,
associated infrastructure and landscaping 
Location: Land 90 Metres East of Westfields of Rattray, Balmoral Road, Rattray,
Blairgowrie, PH10 7HY 
Ref. No: 25/00609/FLM
Ward No: P3- Blairgowrie and Glens 
Summary 
This report recommends approval of the application, subject to conditions (which
include for a S75 legal agreement or other suitable mechanism to control developer
contributions), as the development is considered to comply with the relevant
provisions of the Development Plan and there are no material considerations
apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The proposal is to provide 103 affordable homes (83 dwellinghouses and 20
flays), ranging from 1 bedroom to 4 bedrooms, with the inclusion of wheelchair
adapted homes. The application site is a former piggery and is now zoned
for housing, as per allocation H341, in LDP2. The site area is just under 3.8
hectares and is located on the periphery of Rattray, a rural village less than a
mile from Blairgowrie. The site slopes north to south where it is bounded by
Balmoral Road. Land to the east is mainly grass with mature trees bounding
the adjoining play area to the east. There is a further stand of mature trees to the
site’s western boundary. There is a large hill, located in the centre of the
development, which the applicant proposes to retain, along with the
existing woodland. Furthermore, an existing post and wire fence bounds the
whole application site. 
2 Access will be taken from Hatton Road, where the proposed SUDS pond is
located. The road follows the existing contours of the land to rise
northwards to wrap round the existing woodland, towards the west, where a
turning head is proposed to allow vehicles to turn.
5(2)(i)
Page 85 of 216

Page 86

3 The site allocation for H341, known as Westfields of Rattray, has an indicative
capacity of up to 104 units. 
Site History 
4 25/00001/PAN Was submitted on 14 February 2025 for a proposed residential
development at allocated site: H341. 
Environmental Impact Assessment 
5 The proposal is not EIA development, as it is not listed within Schedule 1 of the
EIA Regulations or triggered by another requirement. As such, an EIA Report
has not been submitted. An assessment of the likely environmental significant
effects that required assessment is provided in the appraisal section below. 
Pre-Application Consultation 
6 Pre application Reference: 24/00011/PREAPM  
7 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, therefore the applicant was required to undertake formal pre-application
consultation with the local community. 
8 A Proposal of Application Notice (PoAN) was submitted to Perth and Kinross
Council in January and it was validated on 28 January 2025. A formal
programme of statutory public engagement has been undertaken as agreed with
Perth and Kinross Council and set out in the following chapters of this report. 
9 A Proposal of Application Notice (PoAN) was validated by Perth and Kinross
Council on 28 January 2025. A formal programme of statutory public
engagement has been undertaken as agreed with Perth and Kinross Council who
had requested that letters were sent to residents within a specified area to advise
them of the consultation event. 
10 In total, 2 in person events were held, on 6th March 2025 and 3rd April 2025. The
events were tailored to ensure that as many people as possible in the local
community had the opportunity to review and respond to the emerging proposals.
In addition to the circulation of the PoAN, an advert was placed in the Public
Notices section of the local newspapers, Blairgowrie Advertiser and The Courier,
in the edition published within 7 and 14 days prior to each event. Blairgowrie and
Rattray Community Council were informed, and letters were sent to local
residents, as well as local Councillors (Cllr Brawn, Cllr McEwan, Cllr Shiers). 
Page 86 of 216

Page 87

Development Plan 
11 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
12 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces.  NPF4 has an increased status over previous NPFs and
comprises part of the statutory development plan. 
13 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 12: Zero Waste
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 17: Rural Homes
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1D: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
Page 87 of 216

Page 88

• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 23: Delivery of Development Sites
• Policy 25: Housing Mix
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
PKC Non-Statutory Guidance 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
Page 88 of 216

Page 89

National Guidance 
16 The Scottish Government expresses its planning policies through Planning
Advise Notes, Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars in addition to NPF4. 
Planning Advice Notes 
17 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
18 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
19 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
21 As part of the planning application process the following bodies were consulted: 
External 
22 Blairgowrie and Rattray Community Council - No objection. The Community
Council is adopting a neutral stance to this application which, in their opinion,
contains both positive and negative outcomes. 
Page 89 of 216

Page 90

23 Scottish Water - No objection. However, the applicant should be aware that this
does not confirm that the proposed development can currently be serviced. 
24 Perth and Kinross Heritage Trust - No objection. In respect to archaeology and
the planning process, as outlined by NPF4, the proposed development does not
raise any significant issues. No further archaeological mitigation is required in
this instance. 
25 NHS - No objection. New housing developments that attract and retain families
and affordable housing for people in the health and social care professions is
welcomed by the HSCP. PKHSCP would respectfully like to raise awareness of
the potential additional pressures that this development would add to existing
primary care services in that area if this application was to be approved. It is
essential for the sustainability of services that a suitably proportionate developer
contribution be sought for reinvestment in premises and infrastructure. 
26 Recent studies in this area of policy development within Perth & Kinross Health &
Social Care Partnership (HSCP) have concluded that Perth and Kinross has
insufficient space within local healthcare facilities to deliver at the level required.
Any additional demand would have a detrimental effect to current service
provision. Furthermore, the additional houses planned within that area would
raise further the already significant sustainability risk to local GP practices. 
27 However, at present, there is no policy requirement for developer contributions
toward health and social care infrastructure provision within Perth and Kinross
but, there will be expected an associated impact to infrastructure and workforce
provision and, therefore, developer contributions should be considered. 
Internal 
28 Affordable Housing Team - No objection. However, further discussion is required
in order to gain more information on the range of proposed tenures, justification for
the proposed level of parking provision and further consideration of the location of
the proposed wheelchair and adaptable homes. As a result of further discussions,
the tenure mix for the delivery of the affordable housing has been agreed. 
29 Structures and Flooding - No objection, subject to the inclusion of a condition
relating to SuDS. 
30 Environmental Health (Contaminated Land) - No objection, subject to the
inclusion of a condition requiring an evaluation for the potential of the site to be
affected by contamination from a previous use. 
31 Transportation and Development - No objection, subject to conditions relating
to a Construction Traffic Management scheme (CTMS), a Travel Plan, details of
footpaths, public transport improvements and a detailed design of the proposed
footpath along Hatton Road. 
Page 90 of 216

Page 91

32 Development Contributions Officer - No objection. In this instance, no
contributions in terms of affordable housing, education and transport
improvements, are required. 
33 Community Waste Advisor - Environment Service - No objection. Advice
given in relation to all roads being suitable for access by refuse collection
vehicles. An informative has been recommended to that effect. 
34 Biodiversity - No objection, subject to a condition relating to a revised
Biodiversity Action Plan. 
35 Environmental Health (Noise Odour) - No objection, subject to a condition
relating to dust mitigation measures. 
36 Development Plan Team - Following the submission of additional information in
terms of open space provision, there are no objections to the proposed
development. 
37 Community Greenspace - As a result of the further information submitted, the
Community Greenspace Team don’t have any objections to the proposed
development, subject to a requirement for the Financial Contribution of £29,817
towards the maintenance of nearby play area & BMX track. 
Representations 
38 5 representations (3 general comment and 2 objections) were received. The
main issues raised within the representations are: 
• Visual impact
• Loss of view
• Noise impacts
• Impact upon trees
• Biodiversity and ecology concerns
• Design and material concerns 
39 These issues are addressed in the Appraisal section of the report, with the
exception of a loss of view, which is not a material planning consideration. 
ADDITIONAL STATEMENTS 
Screening Opinion      EIA not required
Environmental Impact Assessment (EIA):      Not required     
Construction Environment Management
Plan    
Submitted
Appropriate Assessment under Habitats
Regulations.    
AA completed. 
Page 91 of 216

Page 92

Ecological Impact Assessment     Submitted
Arboriculture Impact Assessment     Submitted
Design Statement or Design and Access
Statement    
Submitted 
Report on Impact or Potential Impact e.g.
Flood Risk Assessment    
Submitted 
Drainage Strategy Report     Submitted
Transport Assessment     Submitted 
Appraisal 
40 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2 (2019) and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
41 The principle of residential development at the site is supported by the
Development Plan through allocation in the LDP2 (allocated site H341) for
residential use. Furthermore, the application site is located within the settlement
boundary of Blairgowrie and Rattray, as identified within the Perth and Kinross
Council Local Development Plan 2. 
42 Furthermore, given that it is proposed to provide 100 % affordable housing, the
proposed development is also in accordance with LDP2 Policy 20: Affordable
Housing. There are a number of site-specific developer requirements associated
to allocated site H341, which are summarised below: 
• Phasing programme for development should be agreed to ensure paddock
development does not occur in isolation. Emphasis should be to develop
brownfield site at an early stage. 
• A Transport Statement dealing with the impact of the development on the
nearby junction of Hatton Road and Balmoral Road and footpath links to the
rest of Rattray. 
• A Flood Risk Assessment will be required.
• Retention of the core paths link and consider additional linkages to the core
path network in the surrounding area. 
Page 92 of 216

Page 93

• Provision of landscaping to provide a framework for development and
integrate it with surrounding setting. Retention of important trees and
additional planting. 
• Implement measures to increase biodiversity. 
43 As per the above Site Specific Developer Requirements, a Phasing Plan has
been submitted with the application. The demolition of the existing farm buildings
included in Phase 2 and 3 will be carried out at the start of the Development of
Phase 1. The housing will be delivered at a rate of approx. 40 houses per phase,
subject to agreement with housing associations and Perth and Kinross Council.
Each phase will deliver the required roads, drainage infrastructure and
landscaping to accompany it. Furthermore, Phase 1 will deliver the SUDs
infrastructure, the start of the Primary Street to the north, the site frontage as well
as the Orchard and Play area (all subject to tree planting season) In addition,
Phase 2 will deliver the connection to the woodland and associated footpaths
within that space. Finally, the remainder of the development will be completed
and handed over in phase 3. 
Design and Layout 
44 LDP2 Policy 1A: Placemaking states that development must contribute positively
to the quality of the surrounding built and natural environment. All development
should be planned and designed with reference to climate change, mitigation and
adaptation. The design, density and siting of development should respect the
character and amenity of the place, and should create and improve links within
and, where practical, beyond the site. Proposals should also incorporate new
landscape and planting works appropriate to the local context and the scale and
nature of the development. LDP Policy 1A and Policy 1B list a range of criteria
upon which design matters will be assessed. 
45 LDP2 Policy 2 Design Statements states that Design statements will normally
need to accompany a planning application if the development comprises five or
more dwellings. 
46 The submitted Design and Access Statement sets out the main response to
Policy 1B list of criteria i.e. sense of identity, the consideration of site topography,
design and density. The new buildings, streets and spaces are designed to be
safe, accessible and inclusive. In addition, the proposed dwellinghouses are
designed to be adaptable, and in line with current guidance on climate change
and low carbon development. 
47 In this instance, the proposed development seeks planning permission for a total
of 103 residential dwellings, SUDs drainage, landscaping, footpaths parking,
amenity space, and the formation of a new access. The proposed development
will comprise of a mix of 83 dwellinghouses and 20 flats, all of which will be
delivered as Affordable Housing. 
Page 93 of 216

Page 94

48 The proposals consist of 1 and 2-bedroom cottage flats and 2, 3 and 4-bedroom
homes in semi-detached and terraced configurations. There will also be a
minimum of 10% homes available to be adapted for wheelchair users. The
homes proposed within the development provide a wide range of different house
types in a variety of locations providing a broad range to meet the local housing
demand for this area. 
49 It is intended that the development will have a contemporary, modest
appearance, and the designs have been developed with a simple palette of good
quality materials. The following is a basic list of materials being proposed. 
1. Base course and feature walls - Grey Fyfestone.
2. Windows & Doors - White UPVC.
3. Cedral Cladding - Blue/grey.
4. Render - Cream / off white Drydash.
5. Fascia & Soffit – White.
6. Rainwater Gutters & Downpipes - White UPVC.
7. Roof - Smooth Grey. 
50 Furthermore, all the properties will benefit from an area of private amenity space
(in the form of an enclosed rear garden). Each garden will include a seating area,
drying space and places to store individual refuse bins, all being serviced by a
rear or side path and gate. 
51 The proposed layout has been designed with 1 main street serving all 103
homes. The access road will be 6m in width and have parking taken directly off
the street. The parking areas have been designed as single sided in areas to
allow the development to feel as open and accessible as possible. 
52 The use of 90 degree bends in the road will act as a natural traffic calming within
the development, allowing movement to feel less restricted for pedestrians. The
primary surface treatment within the development will be asphalt which will be
used on the main entrance roads and footpaths within the development. 
53 There are currently 129 parking spaces proposed, which will also be finished in
asphalt, with parking bays painted on for delineation. The layout offers a range of
pedestrian footpaths, some set back from the main road and itself providing good
connectivity to all green spaces. All the formal footpaths and rear/side garden
paths will be DDA compliant, with informal footways to be developed over time. It
is envisaged that the landscaping scheme will naturally facilitate additional desire
lines leading to areas of open space. In terms of layout and design, the proposed
development is considered to be in accordance with LDP2 Policies 1A, 1B, 1D, 2
and NPF4 Policies 14,15,16 and 17. 
Landscape and Visual Amenity 
54 LDP 2 Policy 39: Landscape states that development should be compatible with
the Distinctive characteristics and features of Perth and Kinross’ landscapes. In
Page 94 of 216

Page 95

this instance, the site area is characterised by self-seeded trees and shrubs, with
several worn paths through the site from low-impact, local recreational use. 
55 The application site is a former pig farm and has been vacant for a number of
years, and is, presently, an area of open space. The proposed development will
result in the re-use of a prominent, but vacant, site, which will improve the overall
character and appearance of the surrounding area. The existing landscape of the
site is characterised by derelict farm buildings, and a large, prominent hillock,
located in the centre of the site, with an existing cover of re- seeded trees and
shrubs Furthermore, there are a number of areas where previous quarrying and
dumping of materials from the demolished farm took place. Due to the severe
difference in levels on the site, there are significant areas of “cut” required in
order for the development to meet Roads and Building Warrant standards and
requirements. In order to stabilise the existing ground and provide a suitable
slope, further areas of “cut” are proposed along the northern boundary. All areas
of “cut” will be filled with a suitable material, which will be recycled form the wider
site. Furthermore, the proposed earthworks will necessitate the felling of a
number of trees, but the level of compensatory panting that has been proposed
will compensate for the loss.  As a result of the proposed development, there
will be an overall improvement in the visual quality of the approach to
Blairgowrie, along Balmoral Road. 
56 The landscape of the proposed development, and its context, form an important
element of the character of the area. The existing topography has been
respected, and boundary features and trees have been incorporated, ensuring
that the development is in-keeping with the character and appearance of the
local area. The useable open space will provide enhanced visual amenity and
ecological benefits. The use of ornamental planting, adjacent to the parking bays,
will help soften the view of cars when parked and add to the visual amenity of the
development as a whole. 
57 Furthermore, given their height and overall scale, the proposed dwellinghouses
will be commensurate with the local vernacular and will not result in
overdevelopment of the site or surrounding area. In terms of open space
provision for new residential developments, Perth and Kinross Council require
80sq.m per dwelling. This equates to 8240sq.m of useable, public open space In
this instance, it is proposed to provide over 20000sq.m of accessible, open
space. Every dwellinghouse proposed will have private amenity space of 9 or
10m in length. 
58 Overall, the proposed development will not have an adverse impact on the visual
amenity of the site and surrounding area. In light of this, the proposed
development is in accordance with LDP2 Policy 39 and NPF4 Policy 4 
Residential Amenity 
59 LDP2 Policy 17: Residential Areas, highlights that areas of residential and
compatible uses inside settlement boundaries will see existing residential
Page 95 of 216

Page 96

amenity protected and, where possible, improved. Given the size, scale, height
and positioning of the proposed dwellinghouses, there will be no loss of privacy
for existing properties in the local area. Furthermore, given the distance between
the properties and the level of private garden ground proposed, there will be no
issues of overlooking for future residents. 
60 LDP2 Policy 56: Noise Pollution states that there will be a presumption against
the siting of development proposals which will generate high levels of noise in the
locality of existing or proposed noise sensitive land uses and similarly against the
locating of noise sensitive uses near to sources of noise generation. 
61 In this instance, an Air Quality Screening Assessment (AQSA) has been
submitted. Whilst the predicted traffic flow associated with the development
marginally exceeds the criteria, a detailed Air Quality Assessment AQA is not
required. The air quality sensitivity of the area is low, and the concentration
levels laid out in Table 1 of the AQSA submitted indicate this. In light of this, the
impact on air quality of traffic from the proposed housing development would
likely be of negligible significance. The AQSA also includes proposed dust
mitigation measures, to be implemented throughout the construction phase. A
condition (condition 3) has been included to ensure that these measures are
incorporated into the Dust Management Plan contained within the submitted
Construction Environmental Management Plan (CEMP). 
62 In terms of nuisance from noise, the submitted Construction Environmental
Management Plan (CEMP) states that the hours of working will be Monday –
Friday 0700 – 1900 and 0800 -1300 Saturday, which is in line with PKC
Environmental Health Service’s guideline hours. However, the plans include the
provision of air source heat pumps (ASHPs). Although there is no supporting
information supplied with the application regarding the make and model of the
ASHPs to be installed, it is expected that they will be of a domestic size, which
will, typically, have a measured sound pressure level in the region of 45Db to
60dB at 1m. In order to protect residential amenity, the standard informative
(Informative 18), based on Noise Rating, has been included. In light of the above,
and subject to condition, the proposed development is considered to be in
accordance with LDP2 Policies 17, 56 and NPF4 Policies 14 and 16. 
Roads and Access 
63 LDP2 Policy 15: Public Access states that development proposals that would
have an adverse impact upon the integrity of any (including proposed) core path,
disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted. 
64 In this instance, all vehicular access will be via a new priority junction to Hatton
Road, which will be adopted by PKC. The development speed limit will be 20mph
and footpaths are proposed on both sides of the road as it moves north into the
site, but a footpath will only be on the north side of the road as it moves west into
Page 96 of 216

Page 97

the site. This being the case, condition 19 has been included, to ensure that
details of a new footpath along Hatton Road to the east of the site, are submitted
prior to development commencing on site. 
65 Furthermore, it is proposed to provide 2 metre wide footways throughout the site,
which will permit residents, and any visitors with reduced mobility, a suitable
space to walk or wheel. In addition, in order to ensure full connectivity with the
local path network and the BMX track, located to the south east of the site,
conditions 15 and 16 have been included. 
66 A Construction Traffic Management Scheme (CTMS) has been provided by the
applicant, which provides details for the general construction of the site, and to
ensure its proper management. In light of this, condition 13 has been included to
ensure that all the recommendations and conclusions of the CTMS are
implemented in full. 
67 LDP2 Policy 60A: Existing Infrastructure, sees existing transport infrastructure
identified, and encouragement given to the retention and improvement of these
facilities provided the improvements are compatible with adjoining land uses. 
68 The existing bus stops on the A93, which serve the Stagecoach 63 local
Blairgowrie route, are located approximately 500m from the centre of the
development. However, there is only a footpath on the southbound side of the
road at this location and no formal bus stop signage is in place on either side of
the carriageway. This being the case, condition 17 has been included to ensure
that public transport improvements are undertaken to upgrade the bus stops with
new hard standing and Real Time Passenger Information displays. 
69 LDP2 Policy 60B: New Development Proposals, states that all development
proposals that involve significant travel generation should be well-served by, and
easily accessible to all modes of transport. In particular, sustainable modes:
walking, cycling and public transport should be considered, prior to private car
journeys. 
70 A residential travel plan for the development is necessary to encourage the use
of alternative travel methods. In light of this , the applicant has set out a
framework for the delivery of a residential travel plan. Furthermore, condition 15
has included to ensure the delivery and future monitoring of the Travel Plan. 
71 In light of the above, it is considered that the proposed development is in
accordance with LDFP2 Policies 15, 60A, 60B and NPF4 Policies 13 and 15. 
Drainage and Flooding 
72 LDP2 Policy 52: New Development and Flooding, states that the Council
supports the actions and objectives to avoid increased, reduce overall, and more
generally manage flood risk in alignment with SEPA Strategies and Plans. NPF4
Policy 22 states that development proposals must have regard to the water
Page 97 of 216

Page 98

environment, and drainage, including floodwater management, within any
proposal. 
73 In this instance, it has been noted that the SEPA flood maps indicate there may
be some low/medium probability of surface water flooding. There is no likelihood
of coastal or future coastal flooding and no likelihood of fluvial, or future fluvial
flooding at the site In addition, a Flood Risk Assessment has been submitted with
this application. There is a minor area of low likelihood of surface water flooding
at the northernmost point of the site. In addition, there is a medium to high
likelihood of surface water Flooding across the southeastern area of the site. 
74 Furthermore, as outlined by NPF4 Policy 22 (Flood Risk and Water
Management) and LDP2 Policy 53C (Water Environment and Drainage: Surface
Water Drainage), disposal of surface water should be managed through
sustainable urban drainage systems (SUDS) to enhance opportunities for natural
flood management. All drainage infrastructure shall be detailed on the proposed
site plan and the applicant shall demonstrate that a positive flow of water is
maintained, preventing the discharge of water onto the public road network. 
75 In light of this, a SuDS scheme has been proposed for the south west corner of
the site, which will be installed during Phase 1 of the development. The Council’s
Structures and Flooding Team were consulted as part of this application and
have no objection to offer, subject to the application of a condition requiring
further details of the SuDS (condition 20). Furthermore, the proposed SuDS will
provide additional opportunities for habitat creation and ecological
enhancements. Informative 20 has been included in order to provide further
advice to the applicant. 
76 LDP2 Policy 53B: Foul Drainage, requires that foul drainage from all
developments within, and close to, settlements should connect to the public
sewer. In this instance, This proposed development is within the Blairgowrie
Waste Water Treatment Works catchment. foul and surface water drainage
connections into the Scottish Water Network have been designed. External
Consultee response from Scottish Water states that no Drainage Impact
Assessment (DIA) is required for the foul water connection. However, a PDE
must be submitted to Scottish Water before any development can commence. 
77 A Drainage Strategy Report has been submitted with this application, which
outlines the treatment levels for the proposed drainage systems and has been
agreed by Scottish Water. Furthermore, Scottish Water have confirmed that foul
water connections from the development will be accepted into the existing
network. In light of the above, it is considered that the proposed development is
in accordance with LDP2 Policies 52,52B,53C and NPF4 Policy 22. 
Waste Collection 
78 The Council’s Community Waste Advisor is satisfied with the proposed waste
Management. Arrangements. However, the developer should ensure that all
Page 98 of 216

Page 99

roads are suitable for access by refuse collection vehicle travelling in a forward
motion. Where a reverse is required, this should be kept to a minimum and a
turning circle of 24m (diameter) should be maintained. This has been covered by
the inclusion of Informative 13. Therefore, the proposed development is, subject
to an informative, in accordance with LDP2 Policies 36A, 36B: Waste
Management, and NPF4 Policy 12: Zero Waste. 
Conservation Considerations 
79 Polices 26A, 26B and 27A of the LDP2 and Policy 7 of the NPF4 are applicable
to the application. In relation to archaeology and the planning process, as
outlined by NPF4, the proposed development does not raise any significant
issues. This being the case, no further archaeological mitigation is required in
this instance. Therefore, the proposed development is considered to be in
accordance with LDP2 Policies 26A, 26B and 27A, and NPF4 Policy 7. 
Natural Heritage and Biodiversity 
80 LDP2 Policy 40: Forestry, Woodland, and Trees states that Tree Surveys,
undertaken by a suitably qualified professional, should accompany all
applications for planning permission where their sites contain trees and that there
is a presumption in favour of protecting woodland resources. 
81 The woodland areas at the site do not feature in the ancient or native woodland
inventory. The site is not located within the Blairgowrie Conservation Area, and
none of the trees on site are subject to a Tree Preservation Order. 
82 Although the Tree Retention and Removal Plan identifies the root protection
area, no Tree Protection Plan or Arboricultural Method Statement have been
provided. However, this has been addressed by the inclusion of condition 4. 
83 Trees are proposed within the site frontages, and the open space areas, using
extra heavy standards, and multi-stemmed tree stock. In addition, an orchard is
also proposed close to the east boundary of the site. The proposed tree species
selection at this location is considered acceptable. However, a more linear
panting arrangement along the northern boundary would be preferable. Condition
5 has been included to secure a revised planting scheme for this part of the site.
A further condition (condition 11) has been included to ensure that a pre-
commencement site meeting with PKC Tree Officer takes place, to inspect tree
felling & tree protection measures. Given that the shrub species selection,
particularly the use of Dianthus Deltoides & Polystichum Setiferum, is not
appropriate for this locality, a further condition (condition 12) has been included
to ensure that a revised species selection is submitted prior to development
commencing on site. 
84 In this instance, the submitted Arboricultural Impact Assessment states that 8
individual trees and 2 tree groups require to be removed in order to allow this
development to proceed. Much tree removal is for groundworks due to the
Page 99 of 216

Page 100

varying site levels, and therefore, seems justifiable. However, PKC Biodiversity
Officer still has some concerns in relation to the proximity of proposed dwellings
to woodland and the potential effects of shade onto gardens. It is proposed to
plant shrub species that will reach a lower height than other existing tree species
on site. The proposed solution, if complaints arise in future, is to coppice the
trees to retain a manageable native woodland of species such as juniper and
hazel.   
85 In light of the above, a detailed landscaping and planting plan should be
submitted, outlining all proposed tree and shrub planting to clearly demonstrate
that sufficient compensatory planting has been provided. Underplanting the knoll
with some understory species should also be included in this plan. This has been
covered by the inclusion of condition 5. 
86 LDP2 Policy 41: Biodiversity states that the Council will seek to protect and
enhance all wildlife and wildlife habitats, whether formally designated/protected
or not. All whilst taking into account the ecosystems and natural processes in the
area. In accordance with NPF4, development proposals for major development
will only be supported where it can be demonstrated that the proposal will
conserve, restore and enhance biodiversity, including nature networks so they
are in a demonstrably better state than without intervention. This will include
future management. This being the case, condition 7 has been included to
ensure that a revised Biodiversity Study is submitted prior to development
commencing on- site. 
87 An Ecological Impact Assessment has been submitted with this application,
which is considered to contain sufficient information to determine any risks to
local species and their habitats. Furthermore, the submitted Report to Inform
Appropriate Assessment is sufficient to allow PKC to undertake the Habitat
Regulations Assessment (HRA). In addition, condition 6 has been included to
ensure that a revised Construction Environment Management Plan (CEMP) is
submitted, in order to protect local watercourses from the effects of pollution and
sediment. 
88 The revised Site Biodiversity Action Plan (Revision C) contains the requirements
outlined in the PKC Planning for Nature Supplementary Guidance including swift
bricks, bat bricks, bug hotels, hedgehog highways and wildlife friendly lighting.
However, wildlife kerbs and amphibian ladders, installed adjacent to all road
gullies within 500m of a SuDS Pond, have not been included. This has been
addressed by the inclusion of condition 9. However, condition 8 has been
included to ensure that an updated Ecology Survey is submitted. 
89 It has been recommended that the creation of log piles, utilising some of the
timber onsite to create natural habitat piles, should be undertaken. Making cuts in
trees to create natural spaces for birds and bats is also encouraged An orchard
is also proposed which will result in further biodiversity enhancements in terms of
habitat creation for birds, bees and insects. In light of this, condition 10 has been
Page 100 of 216

Page 101

included to ensure that further biodiversity enhancement measures are
submitted. 
90 In light of the above, it is considered that the proposed development is in
accordance with LDP2 Polices 40, 41 and NPF4 Policies 3 and 4. 
Developer Contributions 
91 The Council’s Affordable Housing Policy requires that 25% of the total number of
houses, above a threshold of 5 units for which planning consent is being sought,
is to be in the form of affordable housing. In this instance, the proposed
development is for 100% affordable housing. A tenure mix for the delivery of the
affordable housing has been agreed with PKC Affordable Housing Team,
whereby 17 of the first 46 properties built are proposed for either mid-market rent
or low-cost home ownership, or a mix of both, and 29 are for social rent. It is
expected that the remaining 57, will be delivered by Hillcrest Housing Association
as 25 mid-market rental properties, and the remaining 32 for social rent. In light
of this, a Section 75 Agreement will be required in order to ensure that the
affordable housing is delivered as per the agreed tenure mix. 
92 In this instance and given that PKC Community Greenspace Team will not be
adopting any of the greenspace within the development, the only requirement
would be for a financial contribution of £29,817 towards the maintenance of the
nearby BMX track. 
93 It is proposed that this contribution should be secured through the
aforementioned section 75 Legal Agreement, with the sum agreed prior to the
determination of the application and secured prior to release of decision notice. 
94 In terms of a financial contribution towards increased primary school capacity,
this proposal is within the catchment of Rattray Primary School. Education &
Children’s Services have no capacity concerns in this catchment area at this
time. In light of this, no financial contribution towards education is required. 
Economic Impact 
95 The development of dwellinghouses at this location will provide jobs directly and
indirectly during construction and, afterwards, have a positive impact through
homeowners spending on goods and services in the local economy and beyond. 
Variation of Application Under Section 32A 
96 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to trees and landscaping, roads
and transportation, biodiversity / ecology and developer contributions. 
Page 101 of 216

Page 102

Planning Obligations and Legal Agreements 
97 Developer Contributions in terms of play area upgrade and BMX track to be
delivered via a Section 75 Agreement. Furthermore, the Section 75 Agreement is
required to secure the full delivery of the agreed tenure mix for the proposed
affordable housing. 
Direction By Scottish Ministers 
98 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
99 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve subject to the following conditions: 
Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this
decision notice unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality during the construction period 
Page 102 of 216

Page 103

Environmental Health 
3. Dust mitigation measures as provided in the Air Quality Screening Assessment
(AQSA) (document 60 relates) shall be incorporated into the Dust Management
Plan contained within the submitted Construction Environmental Management
Plan (CEMP), for the duration of the construction period. 
Reason - In the interest of protecting residential amenity. 
Biodiversity and Natural Environment 
4. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction 
Reason - In the interests of protecting environmental quality and of biodiversity. 
5. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme, for the site, including the existing Drumlin,
shall be submitted for the further written agreement of the Council as Planning
Authority.  The scheme shall include details of the species, height, size,
location, density and maintenance regime of trees and shrubs to be planted, and
should include further planting for the existing knoll, located in the centre of the
site.  The scheme must illustrate that adequate compensatory tree planting for
lost trees will be achieved with at least 3 trees planted for every tree lost.  The
scheme, as subsequently approved, shall be carried out and completed within
the first available planting season (October to March) after the completion or
bringing into use of the development, whichever is the earlier. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
6. Prior to works commencing, a revised Construction Method Statement/
Construction Environmental Management Plan outlining the measures to protect
watercourse from the impact of pollution and sediment to ensure no adverse
effects shall be submitted and approved in writing by the Council as Planning
Authority.  Thereafter, the agreed scheme shall be adhered to for the entirety of
the construction period. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
7. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 52 relates) shall
be fully adhered to, respected and undertaken as part of the construction phase
of development, and implemented in full. 
Page 103 of 216

Page 104

Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
8. An updated ecology survey will be required prior to the commencement of works,
if works have not commenced within 24 months of the date of the ecology survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
9. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, wildlife kerbs and amphibian ladders shall be installed
adjacent to all road gullies within 500metres of a SUDS pond or watercourse. 
Thereafter, the kerbs shall be retained in a reasonable condition for the life of the
development. 
Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
10. Prior to the completion or occupation of the development hereby approved, all
biodiversity enhancement measures listed within the submitted and hereby
approved Site Biodiversity Action Plan (Revision C) shall be provided. 
Thereafter, the agreed scheme shall be maintained in a reasonable condition for
the life of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. Prior to the commencement of any works on site, an independent and fully
qualified Arboricultural Clerk of Works (ArbCow) shall be appointed at the
developers' expense.  Details of this appointment shall be subject to the prior
written agreement of the Council as Planning Authority.  The appointed person
will remain in post for the duration of the construction and shall have the
responsibility of ensuring tree protection measures are implemented in
accordance with BS 5837 2012: Trees in Relation to Design, Demolition and
Construction, and tree protection measures are maintained secure at all times,
and until completion of the development. In addition, the following is required; 
(a)  The developer's appointed ArbCow to contact the local planning authority
tree officer in order to arrange a prestart meeting to agree on site tree
pruning works required to facilitate the development, but before
commencement of development. 
Page 104 of 216

Page 105

(b)  The developer's appointed ArbCow to contact the local planning authority
tree officer to arrange a prestart meeting for inspection of all tree & ground
protection measures, before commencement of development. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
12.  Prior to the commencement of the development hereby approved, a revised
species selection plan for the proposed shrub planting shall be submitted for the
written agreement of the Council as Planning Authority.  The scheme shall
include details of the species, height, size and density of shrubs to be planted.
The scheme, as subsequently approved, shall be carried out and completed
within the first available planting season (October to March) after the completion
or bringing into use of the development, whichever is the earlier, and the date of
Practical Completion of the planting scheme shall be supplied in writing to the
Council as Planning Authority within 7 days of that date.  The scheme, as
agreed, shall thereafter be implemented and maintained. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to ensure the satisfactory implementation of the revised shrub
planting scheme. 
Roads and Transportation 
13. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i) details of information signs to inform other road users of construction traffic;
Page 105 of 216

Page 106

j) arrangements to ensure that access for emergency service vehicles are not
impeded;
k) co-ordination with other significant developments known to use roads
affected by construction traffic;
l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
m) the provision and installation of traffic counters at the applicant's expense at
locations to be agreed prior to the commencement of construction;
n) monitoring, reporting and implementation arrangements; 
o) arrangements for dealing with non-compliance; and
p) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management. 
14. No part of the development shall be occupied until a detailed Travel Plan (TP),
aimed at encouraging more sustainable means of travel, has been submitted to
and agreed in writing by the Council as Planning Authority.  The TP will have
particular regard to provision for walking, cycling and public transport access to
and within the site and will identify the measures to be provided, any phasing, the
system of management, monitoring, review, reporting and the duration of the
Plan.  The TP as agreed shall be fully implemented. 
Reason - To promote sustainable transport options and to meet advice within
National Planning Framework on transport. 
15. Prior to the occupation of either plot 01, 02, 03, 04, 05, 06, 07 or 08, whichever is
the earlier, the proposed footpath connection to the southeast of Plot 01, linking
into the play park and shown on document 55 hereby approved, shall be fully
implemented and provided in an asphalt.  For the avoidance of doubt, the
applicant shall agree and detail in advance of works commencing of the footpath
connection, the intentions for the existing boundary feature, whether open access
to the play park or gated access is to be provided. 
Reason - In the interest of sustainable transport. 
16. Prior to the occupation of either plot 17, 18, 19, 20 or 21, whichever is the earlier,
the proposed stepped access to the southeast of Plot 17, linking into the BMX
track and shown on document 56 hereby approved, shall be fully implemented. 
For the avoidance of doubt, the applicant shall agree and detail in advance of
works commencing of the stepped access, the intentions for the existing
boundary feature, whether open access to the play park or gated access is to be
provided. 
Reason - In the interest of sustainable transport. 
Page 106 of 216

Page 107

17. Prior to the occupation of the first dwellinghouse, the developer shall provide and
install on appropriate hard stand asphalt areas, bus shelters on the A93 in a
northbound and southbound direction on the A93 at a location to be agreed in
writing with the Public Transport Unit.  Each bus stop hard standing area shall
be supplied with a 3 bay enclosed bus shelter (Cairngorm style) and installed
with passenger information board, LED spotlights (one per bay), a 28in Ultra-
Wide Display Screen for Real Time Passenger Information installed on the
approach side of the shelter and a 24/7 electrical power supply to a Haldo pillar
adjacent to the shelter to provide power for the LED lighting and Real Time
Passenger Information display to be operational.  The design, specification and
operation shall agreed in writing by the Council as Planning Authority, in
consultation with Perth & Kinross Council’s Public Transport Unit, prior to
installation.  In the event that it is not possible to installed on the A93, an
alternative shall be agreed in writing with the Planning Authority. 
Reason - In the interest of sustainable travel. 
18. Prior to commencement of any development on site, a detailed design showing
the footway along Hatton Road from the site entrance in a southeasterly direction
along the edge of the Common to a point directly opposite the dropped kerb to
the south of the property known as Lilybank, where the new footway shall be
provided with a linked dropped kerb.  The detailed shall be submitted to and
approved in writing by the Planning Authority.  The submission will confirm the
width of the footway, position of the dropped kerb, position of the lighting
columns and position of road signage.  The approved footway shall thereafter
be implemented in full, prior to the occupation of the first dwellinghouse.   
Reason - In the interests of road, pedestrian safety and connectivity with the
developments to the southern side of Hatton Road. 
Contamination 
19. Development shall not commence on site until an evaluation for the potential of
the site to be affected by contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify; 
I.  the nature, extent and type(s) of contamination on the site 
II.  measures to treat/remove contamination to ensure the site is fit for the use
proposed
III.  measures to deal with contamination during construction works 
IV.  condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Page 107 of 216

Page 108

Verification that the scheme has been fully implemented must also be submitted
to the Council as Planning Authority. 
Reason - In order to deal with any potential ground contamination as a result of
the previous use. 
Flooding 
20. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the written agreement of the
Council as Planning Authority, in consultation with SEPA where necessary.  The
scheme shall be developed in accordance with the technical guidance contained
in The SUDS Manual (C753) and the Council's Flood Risk and Flood Risk
Assessments Developer Guidance, and shall incorporate source control. All
works shall be carried out in accordance with the agreed scheme and be
operational prior to the bringing into use of the development. 
Reason - To ensure the provision of effective drainage for the site. 
Justification 
The proposal is in accordance with the Development Plan and there are
no material reasons which justify departing from the Development Plan. 
Procedural Notes 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application.  The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval.  Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers  
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act
which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position. 
Page 108 of 216

Page 109

3. This development will require the 'Display of notice while development is carried  
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance.  According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development
• Readily visible to the public
• Printed on durable material 
4.  The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 they must obtain from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks. 
5.  The applicant should be advised that in terms of Section 56 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to open an existing road or footway prior to the commencement of
works.  Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency. 
6. Street lighting infrastructure present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of infrastructure and its
relocation to facilitate the vehicle access.  Contact Mark Gorrie at Perth &
Kinross Council Street Lighting Department for further details. 
7.  Please consult the Street Naming and Numbering Officer, The Environment
Service, Perth and Kinross Council, Pullar House, 35 Kinnoull Street, Perth PH1
5GD for a new postal address.  The form is downloadable from www.pkc.gov.uk
and should be returned to snn@pkc.gov.uk. 
8.  The applicant is advised that the detailed design of all SUDs shall conform to
'PKC Flooding and Flood Risk Guidance Document (June 2014)', or any
subsequent update. 
9.  The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water's assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
10  No work shall be commenced until an application for building warrant has been
submitted and approved. 
11.  The applicant is reminded that, should any protected species be present, a
licence may be required from NatureScot to disturb a protected species.  Failure
Page 109 of 216

Page 110

to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
12.  The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this act. 
13.  The applicant is advised that refuse collection vehicles will only enter the site
during construction phases where there is clear access and suitable turning; this
means that Waste Services may not be able to provide a full kerbside recycling
service to residents whilst the build is ongoing and bins may have to be emptied
from a specified (and agreed) collection point until full access is made available
for refuse collection vehicles.  The developer must contact the Community
Waste Team to discuss bin collections as the site progresses. 
14.  The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, they must obtain from the Council, to place, maintain or
adjust apparatus in, or under a Road or remove apparatus from a road. 
Application forms are available at https://www.pkc.gov.uk/article/14916/Road-
and-footway-permits. 
15.  The applicant can seek guidance on the detailed design and positioning of the
cycle storage from Transport Scotland's Cycling by Design 2021 or similar design
guide. 
16. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to trees and landscaping, roads
and transportation, biodiversity / ecology and developer contributions. 
17. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
18.  The Air Source Heat Pumps shall be certificated in accordance with
Microgeneration Certification Scheme 007 and installed by an installation
company certificated in accordance with Microgeneration Installation Standard
3005 and in compliance with the calculation procedure contained in Table 2 of
Microgeneration Certification Scheme Planning Standards (MCS 020), confirming
that the permitted development noise limit of 42 dB LAeq,5 mins will be met.  In
addition, the Air Source Heat Pump shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property, with all windows slightly
open, when measured and/ or calculated and plotted on a rating curve chart. 
Page 110 of 216

Page 111

19. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to this development. 
20. Existing buildings or structures may contain nesting birds between 1st March and
31st August inclusive.  The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that nest is in use or being
built.  Planning permission for a development does not provide a defence
against prosecution under this Act. 
21. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(Section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
Background Papers
Letters of representation 5
Authors
Name Designation Contact Details
Alan Atkins Planning Officer
(Majors)
developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
18 December 2025 
Page 111 of 216

Page 112

Page 112 of 216

Page 113

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/00609/FLM
Erection of 83 affordable dwellinghouses and 20 affordable flats, associated infrastructure and landscaping
on land 90 Metres East of Westfields of Rattray, BlairgowrieScale
1:25,000
5(2)(i)
Page 113 of 216

Page 114

Page 114 of 216

Page 115

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/00609/FLM
Erection of 83 affordable dwellinghouses and 20 affordable flats, associated infrastructure and landscaping
on land 90 Metres East of Westfields of Rattray, BlairgowrieScale
1:10,000
5(2)(i)
Page 115 of 216

Page 116

Page 116 of 216

Page 117

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/3) 
Proposal: Erection of a dwellinghouse and associated works (Revised Proposal) 
Location: Land 40 metres east of Anemone, Balnaskeag, Kenmore, Aberfeldy,
PH15 2HB 
Ref. No: 24/01857/FLL
Ward No: P4- Highland 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 This application seeks approval for the construction of a two-bedroom, single
storey dwellinghouse at the eastern end of Balnaskeag, in countryside to the
south-east of Kenmore. 
2 The site occupies a wedge formed by the Balnaskeag Road to the south, and the
A827 road downhill to the north. To the west is the existing residence at
‘Anemone’, part of a four-house development which was granted permission in
October 2015 (Ref: 15/01481/FLL), following earlier permission ref:
14/02156/FLL in February 2015. 
3 The site is also in the Taymouth Castle Gardens and Designed Landscape, the
River Tay Special Area of Conservation Catchment, and within a wider area
designated as Ancient Woodland. 
4 The proposal has attracted a community council objection and more than six
objections from members of the public. It is therefore required to be considered
at Planning and Placemaking Committee. 
5(3)(i)
Page 117 of 216

Page 118

Site History 
6 None relevant 
Pre-Application Consultation 
7 Pre application Reference: 23/00189/PREAPL  
8 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
9 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
10 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
11 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate mitigation and adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, woodland and trees
• Policy 7: Historic Assets and Places
• Policy 12: Zero Waste
• Policy 13: Sustainable transport
• Policy 14: Design, quality and place
• Policy 17: Rural Homes
• Policy 18: Infrastructure first
• Policy 22: Flood risk and water management 
Perth and Kinross Local Development Plan 2019 
12 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
Page 118 of 216

Page 119

economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
13 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking  
• Policy 5: Infrastructure Contributions
• Policy 19: Housing in the Countryside 
• Policy 29: Gardens and Designed Landscapes
• Policy 32: Embedding Low and Zero Carbon Generating Technology in New
Development
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
14
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Delivering Zero Waste (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
15
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)  
Page 119 of 216

Page 120

National Guidance 
16 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
17 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 67 Housing Quality
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
18 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
19 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
20 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Local Place Plans 
21 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site does not lie within an adopted Local Place
Plan area, and as such raises no issues in respect of the consideration of this
application. 
Page 120 of 216

Page 121

Consultations 
22 As part of the planning application process the following bodies were consulted: 
External 
23 Historic Environment Scotland - No comments to make. 
24 Scottish Water - No objection, subject to standard advice. A Water Connection
Application and Waste Water Application will be required to Scottish Water.
Scottish Water Infrastructure may exist within the proximity of the development
area and the Scottish Water Asset Impact Team should be contacted. 
25 Kenmore Community Council - objects on the following grounds: 
• Would not contribute positively to quality of area in terms of character,
amenity or natural heritage.
• Contrary to Rural Homes policy, and is not an infill site as claimed.
• Road safety concerns
• Access restriction across adjacent land.
• Concerns about utility access to adjacent land
• Concerns regarding water runoff, with sheet ice on A827 during winter.
• Wastewater Provision unclear
• Ecological Assessment required
• Planning permission should not be granted until ongoing enforcement action
is resolved.
• Loss of on-site trees
• Adverse impact on Ancient Woodland
• New tree planting on adjacent land could impact underground utilities and
result in loss of view to existing residents 
Internal 
26 Biodiversity - Proposed development is contrary to NPF4 because of its
proximity to ancient woodland and associated impact on its ecological condition.
In order to be in accordance with NPF4, the following is required: 
• Reduce impacts of the proposed development to ancient woodland by
revising the site layout to allow a significant buffer between the house and
garden planted with trees and shrubs native to Scotland and not non-natives
such as Himalayan birch;
• Confirmation of biodiversity enhancement measures informed by the
recommendation in the submitted Preliminary Ecology Survey Report;
• Construction Environmental Management Plan to protect River Tay Special
Area of Conservation;
• Landscaping plan including native species as recommended in the submitted
Preliminary Ecology Survey Report. 
Page 121 of 216

Page 122

27 Development Contributions Officer - No contributions required in respect of
Primary Education, as there are no capacity concerns in the Kenmore Primary
School catchment. 
28 Structures and Flooding – No objection following receipt of updated
information. 
29 Transportation and Development – No objection, subject to conditions
regarding street lighting, vehicular access formation, detailed culvert design,
visibility splays, no surface water or aggregate runoff to the public road.
Informative requested in respect of roads-related consent. 
30 Environmental Health (Noise Odour) – No objections subject to informative
regarding stove flue. 
Representations 
31 14 valid representations were received. The main issues raised within the
representations are: 
• Adverse Effect on Visual Amenity
• Contrary to Development Plan Policy
• Flooding and Drainage Concerns including surface water runoff and freezing 
• Inappropriate Housing Density
• Lack or Loss of Car Parking
• Light Pollution
• Noise Pollution
• Loss of Open Space
• Loss of Sunlight or Daylight
• Not an infill site; would set a poor precedent for encroachment into
undeveloped land.
• Adverse impact on biodiversity including bluebells, frogs, newts.
• Ecological survey may be required.
• Loss Of Trees; Inadequate Tree Planting
• Proposed tree planting outwith red site boundary would be difficult to enforce
and obstruct open views of the landscape
• Loss of grassland and shrubbery; diminished scope for biodiversity
enhancement
• Out of Character with Area, including Historic Garden and Designed
Landscape
• Inappropriate Land Use
• Over Intensive Development
• Road Safety Concerns (including visibility and deliveries)
• Traffic Congestion
• Overlooking
• Adverse impact on ancient woodland
• No Construction Environmental Management Plan submitted
Page 122 of 216

Page 123

• No details of construction deliveries to site
• Risk of landslip
• Limited Amenity space
• Commentary regarding behaviour of individuals, including ongoing
enforcement action on land adjacent to this application site
• Enforcement matters should be resolved prior to granting of planning
permission
• Property boundary dispute regarding adjacent land
• Drystane wall will be de-stabilised by construction access and foul water
connection
• Public access strip along the west of the site would be welcomed
• Concern regarding restriction of access to existing utilities infrastructure.
• Access restriction across adjacent land; should be restored by planning
condition.
• An underground high voltage cable is located within the site. 
32 Most of these issues are addressed in the Appraisal section of the report.
However, risk of landslip would be a matter for Building Standards rather than
planning; Property boundary disputes are outwith the scope of this planning
application; Loss of view is not a planning matter. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal 
AA not required 
Design Statement or Design and Access
Statement
submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Preliminary Ecological
Assessment Report and Drainage
Details submitted 
Appraisal 
33 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, as identified elsewhere in this report. 
Page 123 of 216

Page 124

Principle 
34 Policy 6: Settlement Boundaries of the Perth and Kinross Local Development
Plan 2019 (LDP2) specifies that development will not be permitted, except within
the defined settlement boundaries set out in the Plan. 
35 Notwithstanding this, LDP2 Policy 19: Housing in the Countryside acknowledges
that opportunities do exist for housing in rural areas to support the viability of
communities, meet development needs in appropriate locations whilst
safeguarding the character of the countryside as well as ensuring that a high
standard of siting and design is achieved. 
36 Whilst this is not an infill site as correctly emphasised in representations,
Supplementary Guidance associated with LDP2 Policy 19 is supportive of
dwellinghouses which add to a rural building group within a definable adjacent
site provided that the following can be demonstrated: 
• new housing will respect the character, scale and form of the existing group,
and will be integrated into the existing layout and building pattern; 
• new housing will not detract from the visual amenity of the group when
viewed from the wider landscape; and 
• a high standard of residential amenity will be provided for both existing and
new housing. 
37 NPF4 Policy 17: Rural Homes does not directly refer to rural building groups,
however Policy 9(b): Brownfield, Vacant and Derelict Land and Empty Buildings
does offer some support for proposals on greenfield sites where explicitly
supported by policies in the LDP. 
38 In this instance, the site occupies an undeveloped wedge formed by the
Balnaskeag Road to the south, and the A827 road to the north. To the west is the
existing residence at ‘Anemone’, part of a four-house development which was
granted permission in October 2015 (Ref: 15/01481/FLL), following earlier
permission ref: 14/02156/FLL in February 2015. The site is not designated as
open space in the LDP. 
39 The site is therefore considered a definable site for the purposes of the LDP2
Housing in the Countryside Supplementary Guidance, and the principle of
introducing a dwellinghouse is acceptable. However, it is acknowledged that this
site is highly constrained by its sloping nature, the existence of a watercourse
which runs diagonally across the plot close to its mid-point, the established
building lines along Balnaskeag, and the fact that built form on this site would be
highly visible when approaching Kenmore from the east. Therefore, the above
matters require to be addressed, in addition to design, residential amenity,
parking and access, drainage, trees, and biodiversity. 
Page 124 of 216

Page 125

Design and Layout, Visual Amenity, Landscape 
40 The proposed dwellinghouse would be in the south-west corner of the site, and
has been re-positioned during the course of the application to respect the
established building line of Nos. 3-8 Balnaskeag further west. It is acknowledged
that there is a dual building line along this stretch of the road, with the closest six
semi-detached dwellinghouses immediately west of this plot being further
recessed from the road than the current proposal. The constraints of the site are
such that it is considered reasonable that the building line respects that of the
properties further west, and would also ensure that the proposal was not overly
prominent in views from the east approaching Kenmore. 
41 The single storey, pitched roof design of the dwellinghouse, whilst having a more
modern appearance in its use of timber cladding, respects the established form
and proportions of existing houses along Balnaskeag. The use of vertical timber
cladding with horizontal features and east gable fenestration ensures that there is
visual interest without being overly prominent in wider views of what is a highly
visible location, particularly from the A827. This would also be softened with an
appropriate landscaping strategy, and planning conditions shall require further
detail of this, in addition to the proposed external materials of the dwellinghouse
itself (Conditions 2 and 3). Subject to such control, the proposal accords with
NPF4 Policy 14: Design, Quality and Place and LDP2 Policies 1A and 1B:
Placemaking. 
Residential Amenity 
42 The adjacent dwellinghouse at ‘Anemone’ and its garden ground has the
potential to be overlooked by a proposed dwellinghouse on this plot. The window
serving the living and dining area of the proposed dwellinghouse would be
primarily north-facing but would wrap around the north-west corner to the
western gable wall. Whilst the window-to-window distance to affected windows at
the neighbouring property would be approximately 12 metres, it would be oblique
in nature and not result in harmful overlooking. It is also important to note that
nature of affected windows at the neighbour, which serve an upper floor kitchen
and stairwell area, and lower floor bedroom and garden access door. The extent
of garden overlooking would again be oblique in nature and would be mitigated
by proposed tree planting to be secured by planning condition. 
43 The extent of overshadowing of the western neighbouring dwellinghouse would
also be to acceptable levels. 
44 The proposal also includes the provision of a single woodburning stove and flue.
The Council’s Environmental Health Team have not objected on the grounds of
air quality or odour disamenity to neighbouring residents, but advised that an
informative draw attention to the applicant’s responsibilities to install, operate and
maintain the stove system in accordance with the manufacturer’s
recommendations, to accord with the Environmental Health Act 1990 (Informative
5).
Page 125 of 216

Page 126

45 In terms of the proposed private amenity space, it is acknowledged that the
hillside location is unconventional relative to a more typical garden space,
however this does not constitute grounds for refusal of this application. 
46 Therefore, the proposal would be acceptable in terms of its impact on residential
amenity, and accords with NPF4 Policy 14: Design, Quality and Place and LDP2
Policies 1A and 1B: Placemaking. 
Roads and Access 
47 It is acknowledged that representations have raised concerns regarding road
safety and visibility along the A827. 
48 The proposed site access would be from the Balnaskeag public road, and the
proposed car parking meets the requirements of the National Roads Development
Guide. There would also be sufficient vehicle turning space within the site. A post
and wire fence of 1100mm high is proposed along the site’s road boundaries. 
49 A planning condition shall ensure that no water or aggregates are discharged to
the public road network, including from the proposed SUDS pond (Condition 11). A
further condition shall ensure that forward visibility can be maintained from
Balnaskeag towards the A827 (Condition 9). The applicant shall also be required
by condition to extend the street lighting along Balnaskeag to encompass the
vehicle access to the property, and maintain a service strip along the edge of the
public road network (Condition 8). 
50 The concerns raised in representations regarding traffic congestion are unfounded,
due to the modest nature of this single dwellinghouse proposal. 
51 Vehicular access consent will also be required from the Council as Roads
Authority, and an informative shall draw attention to this. 
52 Subject to the above conditional control, the proposal accords with NPF4 Policy 13
and LDP2 Policy 60B. 
Drainage and Flooding 
53 Details of surface water drainage and a proposed on-site soakaway have been
provided, and the Council’s Flooding Team is satisfied with these measures.
Details of the proposed culvert of the watercourse to accommodate the
pedestrian link between the car parking area and the main house shall be
secured by planning condition to ensure there is no reduction in water flow
(Condition 7). 
54 Foul water drainage is to be transferred via a new pipe to the combined sewer
further west which runs through land within the applicant’s ownership. 
Page 126 of 216

Page 127

55 Concern had been raised in representations regarding existing surface water
runoff along the road which can turn to sheet ice in winter, and associated
concerns regarding runoff from the proposed turning and parking area, which
could have implications for both this and biodiversity. 
56 Whilst it appears that most existing surface water runoff near the junction of
Balnaskeag and the A827 comes from higher ground to the south-east and not
directly from this application site, a planning condition shall require further details
of hard and soft landscaping to ensure that such matters are not exacerbated in
terms of the nature of permeable surfacing proposed (Condition 3). This is in
addition to the condition set out in the Roads and Access section of this report
which seeks to ensure that no water or aggregate runoff occurs to the public road
network. 
57 In addition, a Construction Environmental Management Plan as discussed in the
Natural Heritage and Biodiversity section of this report shall ensure that the
watercourse is not adversely impacted during construction (Conditions 4 and 5). 
58 Scottish Water have not objected, but have emphasised that their Asset
Management Team should be contacted in respect of existing Scottish Water
infrastructure in the vicinity of the application site. An informative shall draw
attention to their advice letter (Informative 6). 
59 Therefore, subject to conditional control, the proposal accords with NPF4 Policy
22 and LDP2 Policies 53B, 53C and 53E. 
Waste Collection 
60 An enclosure for bin storage is proposed next to the pedestrian entrance to the
site, and is in accordance with NPF4 Policy 12: Zero Waste. 
Conservation Considerations 
61 The plot is within the Taymouth Castle Historic Garden and Designed
Landscape, and representations have raised concern regarding the proposal’s
impact on this heritage asset. The proposal, by virtue of its limited scale, and
position adjacent to existing dwellinghouses along Balnaskeag, would not
adversely impact the Historic Garden and Designed Landscape and therefore
accords with NPF4 Policy 7 and LDP2 Policy 29. 
Natural Heritage and Biodiversity 
62 NPF4 Policy 3: Biodiversity and LDP2 Policy 41: Biodiversity seek to protect and
enhance all wildlife and wildlife habitats whether or not formally designated, and
promote biodiversity enhancement. NPF4 Policy 6: Forestry, Woodland and
Trees and LDP2 Policy 40B: Trees, Woodland and Development seek to protect,
expand and enhance tree cover and woodland, including Ancient Woodland. 
Page 127 of 216

Page 128

63 The Council’s Biodiversity Officer has raised concern, echoed in representations,
at the site’s location partly within Ancient Woodland and the associated impact of
the proposal on such a designation. NatureScot’s characterisation of the Ancient
Woodland in this vicinity is “Long-Established of Plantation Origin” or LEPO, and
has been interpreted from 1860s 1st Edition Ordnance Survey Maps. However,
NatureScot’s website acknowledge that the Ancient Woodland Inventory is
provisional. Having examined Ordnance Survey mapping of this area surveyed in
1862 (published in 1867), it is clear that the edge of established woodland at that
time was further south of the current Balnaskeag Road, and actually predates
that roads’ existence, whereas the woodland to the north of the A827 does
indeed show up on such mapping. Whilst the plot is undoubtedly within 50
metres of ancient woodland, matters such as the 1862 mapping which shows this
particular site as not being within long-established woodland, the site’s enclosure
by two public roads and an existing residential plot to the west, and the enclosure
of the ancient woodland to the north of the A827 by a stone wall, must all be
considered. Therefore, the site circumstances are such that in this instance, the
proximity to ancient woodland does not constitute grounds for refusal of this
application, subject to appropriate biodiversity and tree planting measures being
secured and implemented as discussed in this section. Restrictions on external
lighting shall also be placed on the decision in the event of approval. 
64 Separate to this, it is disappointing that three large Sycamore trees and a tall
unidentified broadleaf tree were removed from this site between June 2022 and
June 2023. Compensatory planting is required in respect of these trees, and in
the interest of enhancing the biodiversity of the site whilst providing natural
screening to better integrate the proposed development to its rural context. The
applicant has proposed the planting of 12 sessile oak trees, however the
submitted ecology survey has recommended a wider range of native species,
and the relocation of existing tree saplings to a part of the site where they can be
retained. A previous iteration of the submitted drawings showed tree planting on
other ground within the applicant’s control to the west, however this no longer
forms part of this proposal. In addition, it is noted from online street imagery and
representations that bluebells have grown on the site in the past. Therefore, an
updated Landscaping Plan shall be secured by planning condition to improve the
proposed planting offer (Condition 3). 
65 Linked to the requirement for an updated Landscaping Plan is a Scheme of
Biodiversity enhancement to ensure that this element of NPF4 Policy 3 is met,
following the recommendations of the submitted Ecology Report. A planning
condition shall also secure this. 
66 The Biodiversity Officer has also recommended that a Construction
Environmental Management Plan (CEMP) is required to protect the River Tay
SAC. Whilst the proposal is unlikely to have a significant impact on the SAC itself
due to its modest scale and distance from River Tay and Loch Tay, appropriate
protection of the watercourse which runs south-north across the site is required
during construction, and the CEMP shall be therefore required by planning
condition (Condition 5).
Page 128 of 216

Page 129

67 It is therefore considered that on balance, the proposal would accord with the
intent of NPF4 Policy 6 and LDP2 Policy 40B subject to conditional control. 
Low and Zero Carbon Generating Technologies 
68 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. In this
instance, no technical details of how this would be achieved have been submitted
with the current application, and as such a planning condition shall require this to
be demonstrated (Condition 6). 
Planning Enforcement 
69 It is acknowledged that planning enforcement action is ongoing regarding
unauthorised development elsewhere within the applicant’s land. It is not
reasonable for such matters to influence the determination of this application,
which is assessed on its own merits. 
Other Matters 
70 Representations have raised concern as regards the condition of a drystane wall
along the northern boundary with the A827. The Council’s Roads Maintenance
Partnership has confirmed that the wall is fully the responsibility of the landowner
as it retains the land to the south. Therefore, the planning condition regarding
landscaping shall require details of the wall’s repair to be submitted, and
associated works to be carried out prior to the occupation of the proposed
dwellinghouse, in the event of approval. A further condition shall ensure that any
damage to the wall resulting from the development shall be made good at the
applicant’s expense (Conditions 3 and 12). 
71 It has been claimed that a high voltage cable runs through part of the site,
although other representations suggest that work to replace overhead power
lines with underground cables has not yet commenced. An informative shall draw
attention to the applicant’s responsibilities to contact relevant operators prior to
works commencing, in the event of approval (Informative 9). 
72 In terms of facilitating access for utilities maintenance, this is a civil matter
between utility operators and relevant landowners, and outwith the scope of this
planning application. 
73 Whilst there are access issues associated with the planning enforcement
investigations on nearby land, this does not affect the ability for this particular site
Page 129 of 216

Page 130

to be developed. It is not considered proportionate to require an access strip
along the western boundary of this particular site, which does not contain a core
path, right of way, or unmarked path. 
Developer Contributions 
74 None required in this instance. 
Economic Impact 
75 The economic impact of the proposal is likely to include the construction phase. 
Variation of Application Under Section 32A 
76 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the design and siting of the
proposal, and other supporting information relating to drainage, ecology and
landscaping. 
Planning Obligations and Legal Agreements 
77 None required. 
Direction By Scottish Ministers 
78 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
79 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding
the Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions.
. 
Recommendation   
Approve the application subject to the following conditions: 
Page 130 of 216

Page 131

Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Prior to the commencement of the development hereby approved, details of the
specification and colour of the proposed external finishing materials to be used
shall be submitted to and agreed in writing by the Council as Planning Authority. 
The scheme as agreed shall be implemented prior to the completion or bringing
into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
3. Prior to the commencement of the development hereby approved, an updated
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or recontouring of the site, full
details of all hard landscaping proposals including materials and installation
methods and, species, height, size and density of trees and shrubs to be planted. 
The scheme shall also detail a schedule of repairs to the roadside retaining wall
along the north of the site with the A827 public road.  The wall repairs as
subsequently approved shall be carried out prior to the occupation of the
dwellinghouses, whereas the approved landscape and planting details as
subsequently approved shall be carried out and completed within the first
available planting season (October to March) after the completion or bringing into
use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date.  The scheme as agreed and
implemented shall thereafter be maintained. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
4. Prior to the commencement of the development hereby approved, a Biodiversity
Enhancement Plan shall be submitted to and approved in writing by the Council
as Planning Authority, as informed by the submitted Ecology Report (Document
09 relates).  Thereafter, the approved measures outlined in the plan shall be
installed in accordance with the agreed details prior to the occupation of the
dwellinghouse. 
Reason - In the interests of enhancing environmental quality and of biodiversity. 
Page 131 of 216

Page 132

5. No development shall take place on site until a Construction Method Statement
has been submitted to and approved in writing by the Council as Planning
Authority.  The Construction Method Statement shall outline the measures to
protect watercourses and residential receptors from the impact of pollution,
sediment and dust to ensure no adverse effects.  The approved Construction
Method Statement shall thereafter be implemented as part of the construction
phase of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
6 Prior to the commencement of development hereby approved, a scheme shall be
submitted to, and approved in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon emissions reduction set by
the Scottish Buildings Standards will be met through the installation and
operation of low and zero-carbon technologies.  This scheme shall detail the
following: 
a) the technology types;
b) illustrate, through technical calculations, that these will meet at least the
10% reduction;
c) their siting and location; and
d) ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme. 
Reason - To ensure the proposal complies with LDP2 Policy 32: Embedding Low
& Zero Carbon Generating Technologies in New Development. 
7. Prior to commencement of any development on site, a detailed design for the
extended culvert shall be submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority, taking into account the
requirement to ensure that a positive flow of water is maintained in the existing
culvert and drainage ditch through the site.  The extended culvert, as approved
in writing, shall be implemented in accordance with the approved details and
undertaken prior to the commencement of construction associated with this
planning permission. 
Reason - To ensure an acceptable standard of construction for the culvert. 
8. Prior to commencement of works, the street lighting design shall be approved by
Perth & Kinross Council's Street Lighting Partnership.  The Street lighting shall
be in accordance with the standards required by the Council as Roads Authority.
The type and standard of lighting shall be assessed using the zoning system
outlined in 'The Institution of Lighting Engineers Guidance Notes for the
Reduction of Light Pollution' and be agreed with the Council as Planning
Authority.  The agreed lighting scheme shall be implemented prior to occupation
of the dwellinghouse and maintained in full accordance with the agreed scheme. 
Page 132 of 216

Page 133

Reason - In the interests of road safety. 
9. Prior to the commencement of the development hereby approved, full visibility
splays of 43 along the channel line shall be provided to the left and right of the
access, at a set-back of 2.4 metres measured 1.05m above the road level to the
standard and specification required by the Council as Roads Authority to the
satisfaction of the Planning Authority.  The visibility splays shall be physically
formed on the ground and any existing fences, walls, hedges or other means of
enclosure or obstructions within the splays shall be removed and relocated
outwith the splays.  Once formed, the visibility splays shall be permanently
retained thereafter, and no visual obstruction of any kind shall be permitted within
the visibility splays so formed. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
10. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type B Figure 5.6 access detail, of Type A
Road construction detail.  The Type A Road construction detail shall continue
into the entrance for a distance of 5 metres from the boundary of the public road
surface. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
11. Prior to the development hereby approved being completed or brought into use,
the development shall be constructed so that no surface water or surfacing
aggregate is discharged onto the public road. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
12. Any damage resulting from the development to the retaining wall along the north
boundary of the site with the A827 public road shall be made good at the
applicant’s expense. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
13. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Page 133 of 216

Page 134

Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
None 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The applicant should be advised that in terms of Section 56 of the Roads
(Scotland) Act 1984, they must obtain from the Council as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency. 
5. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that
smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
6. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
7. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(Section 1), it is an offence to remove, damage or destroy the nest of any wild
Page 134 of 216

Page 135

bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
8. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created
dwellings.  Further information can be found at:
https://www.pkc.gov.uk/binrequests 
9. Please remember that the granting of planning permission, listed building
consent or other associated consent by the Planning Authority does not affect the
responsibility of the developer to ensure all other necessary permissions,
consents and approvals are in place prior to commencement of works.
Developers should also ensure appropriate accommodations are made in
respect of services and third party infrastructure and may wish to check
proposals against the information held at
https://www.linesearchbeforeudig.co.uk/. 
10. This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the design and siting of the
proposal, and other supporting information relating to drainage, ecology and
landscaping. 
11. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
Background Papers
Letters of representation 19 
Authors
Name Designation Contact Details
John Cooney Planning Officer developmentmanagement@pkc.gov.uk 
Page 135 of 216

Page 136

Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
18 December 2025 
Page 136 of 216

Page 137

Ü
Erection of a dwellinghouse and associated works on Land 40 Metres East of Anemone, Balnaskeag,
Kenmore, Aberfeldy, PH15 2HB
24/01857/FLL
Scale
1:20,000
Planning and Placemaking Committee - 7 January
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(3)(i)
Page 137 of 216

Page 138

Page 138 of 216

Page 139

Ü
Erection of a dwellinghouse and associated works on Land 40 Metres East of Anemone, Balnaskeag,
Kenmore, Aberfeldy, PH15 2HB
24/01857/FLL
Scale
1:10,000
Planning and Placemaking Committee - 7 January
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(3)(i)
Page 139 of 216

Page 140

Page 140 of 216

Page 141

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/4) 
Proposal: Erection of 26 dwellinghouses, formation of road and footpath,
installation of air source heat pumps, landscaping and associated works
(revised proposal) 
Location: Land at Wester Tomaknock, Crieff 
Ref. No: 25/00572/FLL
Ward No: P6- Strathearn 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The application site is on land at Wester Tomaknock, Crieff. The application
seeks detailed planning permission for the construction of 26 dwellinghouses
near the eastern boundary of the overall development site. This particular site
benefits from an existing consent for 13 dwellinghouses, which was part of the
original 16/02217/FLM consent at Wester Tomaknock.  
2 The overall development site is former agricultural land on the eastern edge of
Crieff. The site is undulating, sloping downwards from north to the lower levels in
the south. There is a clear central elevated knoll where the original farmhouse
and farm buildings previously existed. To the north the land rises steeply, forming
'Callum's Hill'.  
3 Two small watercourses cut across the wider site as two minor valleys, from
northwest and northeast down to the southern boundary, culverting under the
C410 public road at Dollerie Terrace. The current application site is to the east of
the eastern watercourse. 
4 The overall site benefits from planning permission for 102 dwelling units,
consistent with the Local Development Plan 2 (LDP2) allocation (H57) for
5(3)(ii)
Page 141 of 216

Page 142

residential uses for 114-121 dwellings across an overall site area of 10.2
hectares. Various recent permissions across the wider site have resulted in a
fluctuation of the number of consented dwellinghouses, such that the current
approved number is 99 residential units across the development, following the
recent planning permission ref: 25/00787/FLL. Therefore, the current proposal for
26 dwellinghouses on the eastern part of the site where 13 dwellinghouses were
originally consented would result in an overall total of 112 dwelling units, which is
ten more than the 102 originally consented under 16/02217/FLM, but still within
the threshold set out in the LDP2 Allocation. 
5 It is acknowledged that the site does not occupy the entire 10.2 hectare
allocation with 1.5 hectares omitted from the original detailed planning
permission 16/02217/FLM due to different land ownership. 
6 This application as originally submitted proposed 30 dwellinghouses, but was
reduced to 26 following discussions between Council officers and the applicant,
along with layout changes in the interests of achieving better placemaking.
Neighbours and consultees were re-notified of the revised proposal. 
Site History 
7 09/01850/FLL Full Planning Permission was Approved On 13 January 2012 for
Conversion of steading to form 2 dwellinghouses and erection of 2
dwellinghouses 
8 14/01975/PN was Approved On 4 December 2014 for Demolition of a
dwellinghouse 
9 16/00003/PAN On 18 March 2016 for Residential development at LDP site H57 
10 16/02217/FLM Full Planning Permission Major was Approved On 17 August
2018 for Erection of 102 dwellinghouses, landscaping and associated works 
11 17/00956/SCRN On 19 October 2017 for Erection of 102 dwellinghouses,
landscaping and associated works 
12 17/0081/LDP2 On 3 March 2022 for Residential development of 114-121 units on
a 10.2 ha site. The site is in agricultural use. The site has previously been
allocated for the proposed use. 
13 18/01890/FLM Full Planning Permission Major was Approved On 18 December
2018 for Application under Section 42 of the Town and Country Planning
(Scotland) Act 1997 to amend condition 24 (road layout and timescale for
submission of an application) of planning permission 16/02217/FLM 
14 19/01008/PSN On 26 June 2019 for Infill of existing quarry 
15 19/01087/SCRN On 15 July 2019 for Infill of existing quarry
Page 142 of 216

Page 143

16 20/00067/FLL Full Planning Permission was Approved On 1 February 2022 for
Erection of 12 dwellinghouses (change of house type for plots 1-6 and 13-18) 
17 20/01160/MPO was Approved On 22 March 2021 for Modification of planning
obligation associated with permission 18/01890/FLM (Application under Section
42 of the Town and Country Planning (Scotland) Act 1997 to amend condition 24
(road layout and timescale for submission of an application) of planning
permission (16/02217/FLM)) 
18 20/01566/FLL Full Planning Permission was Approved On 1 February 2022 for
Erection of a dwellinghouse (change of house type - plot 54) 
19 20/01595/SCRN On 11 November 2020 for To use spoil from the adjacent
development to infill and re-shape the existing historical quarry 
20 20/01883/FLL Full Planning Permission was Approved On 25 January 2021 for
Infill and restoration of disused quarry 
21 21/02270/FLM Full Planning Permission Major was Approved On 14 April 2022
for S42 Application to modify condition 4 (hours of operation for construction) of
permission 18/01890/FLM 
22 22/01712/FLL Full Planning Permission was Approved On 15 December 2022 for
Erection of 8 dwellinghouses (change of house type for plots 3-10) 
23 23/00102/FLL Full Planning Permission was Approved On 9 June 2023 for
Erection of 25 dwellinghouses (change of house types : plots 78-102) 
23/00689/FLL Full Planning Permission was Approved On 22 June 2023 for
Erection of 11 dwellinghouses (change of house type for plots 13-19 and 36-39) 
24 24/00228/FLL Full Planning Permission was Approved On 19 April 2024 for
Erection of 2 gabion basket retaining walls and a fence (in retrospect) 
25 24/00324/FLL Full Planning Permission was Approved On 3 May 2024 for
Erection of 2 dwellinghouses (change of house types for plots 13 & 14) 
26 24/00860/FLL Full Planning Permission was Approved On 25 September 2024
for Erection of 19 dwellinghouses (change of house type plots - 17, 18, 23, 26,
27, 28, 30, 32, 33, 64-73) 
27 25/00787/FLL Full Planning Permission was Approved On 23 October 2025 for
Erection of 4 dwellinghouses (revised design and layout of two approved Plots 36
and 37 of planning permission 23/00689/FLL) 
Page 143 of 216

Page 144

Environmental Impact Assessment 
28 The proposed development, as an urban development project with a site area
exceeding 0.5ha, falls under Schedule 2 (10(b)) of the Environmental Impact
Assessment (Scotland) Regulations. The site was screened in October 2017 as
part of the planning application 16/02217/FLM and was found not to require an
Environmental Impact Assessment (EIA). Whilst there is a modest increase in
proposed dwellinghouses on this part of the site, the category of development is
unchanged, and the site location is within the boundaries of the earlier planning
permission. 
Pre-Application Consultation 
29 Pre application Reference: None  
30 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. It is however
important to note that the applicant undertook formal pre-application consultation
as part of the major planning application reference 16/02217/FLM. 
Development Plan 
31 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
32 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
33 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 9: Brownfield, Vacant and Derelict Land and Buildings
• Policy 12: Zero Waste
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
Page 144 of 216

Page 145

• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 18: Infrastructure First
• Policy 19: Heating and Cooling
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
34 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
35 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1D: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 14B: Open Space Retention and Provision: Open Space within New
• Developments
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 23: Delivery of Development Sites
• Policy 24: Maintaining an Effective Housing Land Supply
• Policy 25: Housing Mix
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
• Development
• Policy 34A: Sustainable Heating & Cooling: Heat Networks, Major
• Development and LDP Site Allocations
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
Page 145 of 216

Page 146

• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
• Development Proposals 
Statutory Supplementary Guidance
36
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Delivering Zero Waste (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable
Housing (adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
37
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
38 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
39 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 67 Housing Quality
• PAN 75 Planning for Transport
•    PAN 77 Designing Safer Places 
Page 146 of 216

Page 147

Creating Places 2013 
40 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
41 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
42 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Local Place Plans 
43 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. The application site does not lie within an area with a Local Place
Plan and does not therefore impact the consideration of this application. 
Consultations 
44 As part of the planning application process the following bodies were consulted: 
External 
45 Scottish Environment Protection Agency - Earlier holding objection withdrawn
following submission of additional information regarding flooding. 
46 Scottish Water - No objections subject to standard advice. 
47 East Strathearn Community Council - No comments received. 
48 Crieff Community Council - No comments received. 
Internal 
49 Structures and Flooding - No objection following review of updated proposal,
particularly the revised drainage assessment.
Page 147 of 216

Page 148

50 Development Contributions Officer - Primary Education contribution of £6,300
required for each additional unit of Open Market tenure and of more than one
bedroom above the original consent. 25% of the total number of houses, above a
threshold of 5 units, for which planning consent is being sought is to be in the
form of affordable housing. 
51 The Section 75 Agreement for this site will require variation to account for the
additional units, if recommended for approval. The Section 75 Agreement
includes Open Space maintenance commuted sums. The additional units
resulting from the current proposal will be calculated separately and may be
included in a minute of variation. Any minute of variation would also include other
requirements such as those relating to play areas, and other consultee
requirements. 
52 A Section 75 Legal Agreement may be entered into with payments spread
equally across the development due 10 days prior to occupation of each unit.
Larger developments may have payments made quarterly or bi-annually taking
account of completion certificates issued for the development. 
53 Affordable Housing Enabler - This proposal has resulted in a net increase of 10
dwelling units across the whole development. This gives rise to an additional
Affordable Housing requirement of 2.5 dwelling units (10 x 0.25). 
54 It is understood that the applicant, GS Brown, has agreed to an on-site provision
of 3 affordable units in this phase. In addition, the applicant has advised that
these will be delivered to Hillcrest Homes, and will be managed as social rented
accommodation. Housing Strategy has confirmed availability of Housing Subsidy
to support their delivery.  Hillcrest was the affordable housing delivery partner on
an earlier phase of Wester Tomaknock. It is confirmed that this meets the
requirements of the Affordable Housing Supplementary Guidance. 
55 Community Waste Advisor - Environment Service – Informatives requested
regarding waste collection as the site progresses and following completion. 
56 Transportation and Development - Conditions requested regarding Residential
Travel Plan, Street Lighting System, and Construction Traffic Management Plan,
and informatives requested regarding Roads Construction Consent, and
Vehicular Access Consent. Following a review, an earlier requirement for footway
along Dollerie Terrace has been removed due to a number of difficulties in its
delivery, including insufficient roadspace. Illumination of the proposed pedestrian
link between Plots 07 and 08 has been requested. 
57 Environmental Health (Contaminated Land) - Previous planning permission
21/02270/FLM was conditioned for soil contamination. Remediation has since
been undertaken and a verification report submitted to evidence this. It remains
the responsibility of the applicant to satisfy themselves that the ground conditions
are suitable for the development for which planning consent has been granted. 
Page 148 of 216

Page 149

58 Environmental Health (Noise Odour) - No adverse comments to make in
respect of air quality. Condition requested regarding Dust Management Plan and
incorporation of this within the originally approved 16/02217/FLM, and
informative regarding installation and plant noise from Air Source Heat Pumps. 
Representations 
59 10 valid representations were received. The main issues raised within the
representations are: 
• Adverse visual impact
• Out of character with area
• Contrary to Development Plan Policy
• Excessive height
• Over intensive development
• Loss of view
• Low water pressure could be exacerbated
• Road safety concerns, including in wider area
• Traffic Congestion, including in wider area
• Lack of active travel options and connectivity within site
• Adverse impact on local infrastructure and services
• Overlooking of neighbours
• Overshadowing of nearby properties and solar panels
• Poor placemaking
• Drainage and Floodplain concerns
• Reduced property values
• Concerns at deliverability of public footway
• Reduction in public and private open space
• Does not meet 20 minute neighbourhood policy – no public transport
• Ecological impact and lack of biodiversity net gain
• Inconsistent energy management; emissions from increased dwelling
number/size
• Adverse impact on quality of life and community
• Light Pollution
• Air Pollution
• Noise Pollution
• Poor play provision on earlier phase of development; none on this phase
• Loss of trust in developer due to frequent modifications to approved scheme,
lack of engagement with residents, misleading marketing, non-compliance
with working hours and construction traffic routes, excessive noise, damaged
verges, rubbish blown into neighbouring properties, and lack of enforcement.
• Poor location for affordable housing
• Opposition to affordable housing due to lack of need and security concerns
• Inadequate time to respond to neighbour notification exercise; delayed letters
• Difficulties with accessing information on certain devices
• Drawing inaccuracies
Page 149 of 216

Page 150

• Inadequate commitment to net zero
• No Electric Vehicle charging provision
• Loss of agricultural land
• Inadequate boundary treatment and screening at site edge
• Soil erosion concerns – unclear who is responsible for future maintenance
• Poor justification for “village green”
• No phasing plan or construction timeline has been provided for resident’s
benefit
• Commentary on developer’s motives
• Lack of market justification for proposal; similar to other recent housing sites
in Crieff
• Suitable conditions should ensure compliance with environmental standards
• Site visit should be undertaken 
60 These issues are addressed in the Appraisal section of the report. 
61 However, the effect on property values, loss of view and commentary on
developer motives and sales marketing are not material planning considerations,
and shall not be taken into account in the assessment of this application.
Neighbour notification was undertaken in accordance with statutory
requirements, and delayed delivery of such is outwith the Planning Authority’s
control. The difficulties with accessing information on certain electronic devices is
noted. Finally, in terms of phasing, the developer has indicated that they have
programmed completion of Phase 4, to which this application relates, as being
late 2027. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal 
AA not required 
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
Flood Risk Assessment, Drainage
Assessment, Tree Survey Report,
Geotechnical Testing Report
submitted 
Appraisal 
62 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
Page 150 of 216

Page 151

The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance, as set out in this appraisal. 
Principle 
63 The key determining policy issues for this specific proposal at this location
include: the principle of the development and its contribution towards providing
high quality, affordable and sustainable homes (Policy 20, 24 and 25 of LDP2
and Policy 16 of NPF4), liveable places (design, quality and place) (Policies 1, 2,
55-58 of LDP2 and Policy 14 of NPF4), impacts on/from flooding and the water
environment (Policies 52 and 53A of LDP2 and Policy 22 of NPF4), residential
amenity (Policy 17 of LDP2 and Policy 15 of NPF4), historic assets and places
(Policy 26B of LDP2 and Policy 7 of NPF4), biodiversity/ecological impact
(Policies 40 and 41 of LDP2 and Policy 3 of NPF4 and transport (Policy 60A of
LDP2 and Policy 13 of NPF4). 
64 The principle of residential development on the site is well established through
the allocation in LDP2 and previous planning permissions. It is, however,
necessary to undertake an assessment of the detail of this proposal. 
65 The determining issues in this case are whether; the proposal complies with
Development Plan policy; whether the proposal complies with supplementary
planning guidance; or if there are any other material considerations which justify
a departure from policy. 
66 Representations have queried why no market evidence has supported this
proposal, which differs from what was previously consented on site. Such
evidence is not required by Development Plan policy. 
Design and Layout, Visual Impact 
67 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas and Policy 25: Housing Mix. 
68 The proposal seeks permission for 12 x 3-bedroom dwellinghouses, 7 x 4-
bedroom dwellinghouses, and 4 x 5-bedroom dwellinghouses for open market
sale, with an affordable provision of 1 x 2-bedroom and 2 x 3 bedroom
dwellinghouses. 
69 The proposed layout is broadly reflective of the site masterplan, albeit with a
greater number of dwellinghouse plots than those originally consented in this part
of the wider Wester Tomaknock site. The design of the proposed
dwellinghouses, whilst two storey in nature compared to the previously
consented 1.5 storey dwellinghouses would not appear out of place in the street
Page 151 of 216

Page 152

scene or wider landscape in part due to the natural separation between them and
the predominantly single storey phase to the west, and the higher land levels to
the east, which contain a grouping of 1.5 storey dwellinghouses. The wider
residential context of the eastern part of Crieff contains a mixture of single and
two storey dwellinghouses, and the proposal is in keeping with this character. 
70 It is acknowledged that the proposed dwellinghouse in Plot 01 will be slightly
taller than the eastern neighbour at Ochil View House, however this considered
acceptable in this instance. The site levels step down from east to west as the
public road approaches Crieff. Overall, the proposed site levels are considered
satisfactory. The usage of external materials will also be broadly consistent with
the earlier development phases to the west, and revised plans have ensured that
the proposed built form positively address the main site frontage along Dollerie
Terrace, and the internal road link to earlier phases. Revisions have also
involved a more legible pedestrian route from this site to Bantry Close to the
west. 
71 Representations have raised concern at the reduced amount of open space,
presumably because more dwellinghouses are proposed in this application than
previously consented. There has been no reduction in public open space, with a
“village green” proposed near the centre of the development site, which will offer
additional open space which could be used for informal play to supplement the
forthcoming play equipment in the south-west corner of the wider development
site. Proposed private garden spaces are considered to be acceptable in size
and layout. 
72 Overall, the proposed layout, design, heights, and materials are considered to
appropriately reflect the surrounding character and amenity of the area, in
compliance with the Council’s placemaking policies. 
73 LDP2 Policy 25: Housing Mix requires 10% of homes to have two bedrooms or
less. The increase in consented dwellinghouses of 10 would usually attract a
requirement for one of the proposed market dwellinghouses to satisfy this,
however it is noted that there is a wider variety of dwellinghouse sizes proposed
in this application than the previously consented 13 dwellinghouses on this site.
Whilst none of the proposed dwellinghouses are two bedrooms or less, there are
six small three-bedroom dwellinghouses proposed at Plots 03, 06, and 12-15
inclusive. It is also noted that a recent planning permission within the earlier
phase (25/00787/FLL) introduced four two-bedroom dwellinghouses onto an area
previously consented for two three-bedroom dwellinghouses. Therefore, within
this context, the proposal is considered to accord with the intent of the policy. 
74 In terms of 20-minute neighbourhoods, it is acknowledged that the site is by
virtue of its location near the eastern edge of Crieff, not as close to certain
services as other housing developments which are under construction in the
south of the settlement. The nearest bus stops are approximately 550-600
metres west of the proposed site entrance to Dollerie Terrace. However, this is
outweighed by the principle of development having been already been
Page 152 of 216

Page 153

established and the proposal being within the expected number of
dwellinghouses set out in the Local Development Plan allocation for this site. 
75 Overall the proposals are considered to accord with the terms of NPF4 and LDP2
in terms of design, layout and visual amenity. 
Residential Amenity 
Overlooking 
76 All of the proposed residential units will maintain an acceptable level of
separation which negates any potential overlooking between dwellings, including
existing properties to the east and west. 
Overshadowing, loss of sunlight and daylight 
77 The Building Research Establishment (BRE) document ’Site Layout Planning for
Daylight and Sunlight - a guide to good practice 1991’ sets out guidelines on how
to assess the potential impact, although it should be noted that the standards are
not mandatory and should be interpreted flexibly. 
78 Taking cognisance of this BRE document, the distances between new and
existing properties and site levels, it is considered an acceptable level of daylight
and sunlight will be provided to each property. 
79 Concern has been raised in representations regarding overshadowing of ground-
mounted domestic solar array at a neighbouring property to the east. The relative
position, height, and distance of proposed dwellinghouses at proposed Plots 01
and 26 is such that such overshadowing is not a concern in this instance, and it
is also noted that the existing dwellinghouse, by virtue of its closer proximity to
solar panels within its own plot, is much more likely to overshadow such solar
panels than any of the proposed new dwellinghouses. Furthermore, the effect of
glint and glare from such solar panels is unlikely to have a significant adverse
effect on the living conditions of future residents of the proposed development. 
Air Quality 
80 In terms of operational air quality, the Council’s Environmental Health Team have
considered that the proposed uplift in traffic for this proposal relative to the
previous consent would not be significant, and therefore the impact on air quality
would be negligible. 
81 In terms of construction, it is acknowledged that a Construction Management
Plan was submitted for the existing planning permission ref: 16/02217/FLM, and
included dust and noise mitigation measures. The Environmental Health Team
have recommended that a Dust Risk Assessment be undertaken and inform a
Dust Management Plan be included within the Construction Management Plan
for the development. Given that the proposal is for an increase in dwellinghouses
Page 153 of 216

Page 154

beyond the 16/02217/FLM consent, an updated Construction Management Plan
which incorporates the Dust Management Plan is considered appropriate to
secure by planning condition in this instance (Condition 5). 
Noise 
82 Air Source Heat Pumps (ASHPs) are proposed as part of the application, and
Environmental Health have recommended that the applicants be advised of the
need for ASHPs to be certified and installed with the appropriate standards, and
for plant noise to exceed appropriate noise ratings. This shall be added as
informative 10 in the event of approval. 
83 The proposed construction hours shall remain consistent with the 21/02270/FLM
permission as 07:00 to 19:00 Monday to Friday, and Saturday 08:00 to 13:00
hours, with no working on a Sunday unless otherwise agreed in writing with the
Planning Authority. 
84 It is noted that representations have expressed dissatisfaction with working hours
and practices on earlier phases of the development. In the event of approval, any
breaches of planning conditions should be reported without delay to the Planning
Enforcement Team. 
85 Overall, in terms of residential amenity, and subject to conditions, the proposal
complies with NPF4 Policy 14: Design, Quality and Place and LDP2 Policies 1:
Placemaking, and 17: Residential Areas, and the Placemaking Guidance 2020. 
Roads and Access 
86 The proposed development, forming Phase 4 of the overall Wester Tomaknock
development, requires one new vehicle access point from Dollerie Terrace, with
internal roadways linking to the earlier phases to the west. 
87 The proposed resident and on-street visitor parking arrangements have been
considered to be acceptable by Transport Planning. 
88 Transport Planning have also recommended that a Residential Travel Plan be
secured by planning condition to promote more sustainable modes of travel,
including walking, cycling and public transport to and from the site, along with
method of management, monitoring and review for the duration of the Travel
Plan (Condition 4). It is noted that matters of pedestrian access, active travel and
public transport was raised in representations. 
89 A Street Lighting design shall be required by planning condition 2 to cover the full
length of the development site, including the vehicular access to Dollerie Terrace.
The matter of street lighting has also been raised in representations. 
90 In the interests of pedestrian access, a new footway had been sought by officers
along the length of the development site from 2 Milquhanzie Way to the edge of
Page 154 of 216

Page 155

the site with the boundary of Ochil View House to the east. However, following a
review by transport planning, there are a number of difficulties with providing this,
particularly insufficient road space in front of “The White House”, to the east of 2
Milquhanzie Way. Therefore, the proposed footway linking Plots 07 and 08 of this
application to the earlier phases of Wester Tomaknock shall be illuminated and
secured by the street lighting planning condition (Condition 2). 
91 A further planning condition (Condition 3) shall require a Construction Traffic
Management Plan, and there may be a requirement as part of the roads
Construction Consent (RCC) to relocate an existing speed limit sign on Dollerie
Terrace. This is linked to streetlighting requirements discussed in this section of
the report. 
92 Representations have asked why electric vehicle charging has not been included
in the planning proposal. It is more appropriate to address this matter through the
Building Warrant process, as a Mandatory Standard relating to electric vehicle
charging was introduced into the Building Regulations in mid-2023. 
93 Overall, subject to conditional control, the proposal complies with NPF4 Policy 13
Sustainable Transport and LDP2 Policy 60 Transport Standards and Accessibility
Requirements. 
Drainage and Flooding 
94 A Flood Risk Assessment (FRA) and details of drainage arrangements have
been submitted as part of this application. It is also acknowledged that
representations have raised concerns regarding these matters. 
95 SEPA have reviewed the Flood Risk Assessment, and found it to be based on
appropriate methods and parameters; hydraulic modelling of the watercourse
and artificial structures has been undertaken alongside a range of blockage
scenarios. It has been confirmed that the culvert on the section of watercourse
just upstream from the road crossing has been removed, which has satisfied
SEPA that all in-channel structures have been appropriately modelled. 
96 SEPA are satisfied that it has been demonstrated that the proposed houses will
be located above the design flood level (1 in 200 year plus climate change) with
consideration of blockage of the in-channel structures, and at least 0.6 metre
freeboard above this level has been achieved for Finished Floor Levels (FFLs). It
has been additionally confirmed to SEPA that no land-raising (unless previously
consented) will take place within the 1 in 200 year plus climate change (plus 25%
blockage) flood risk area. SEPA are therefore satisfied that the houses are
unlikely to be at risk of flooding and have withdrawn their earlier holding
objection. 
97 The Council’s Flooding Team have also considered revised drainage details
including a Drainage Assessment and are satisfied with these elements of the
Page 155 of 216

Page 156

proposal. Informative 8 shall draw attention to Flooding Supplementary
Guidance. 
98 Scottish Water have raised no objection, and informative 9 shall draw attention to
their consultation letter, which contains standard information regarding
establishing connections to the mains water supply and waste water
infrastructure. 
99 Therefore, the proposal accords with NPF4 Policy 22, and LDP2 Policies 52,
53B, 53C and 53E. 
Waste Collection 
100 It is considered that the proposed bin storage, access and egress and proposed
road layout is acceptable for the proposed development. Informatives 6 and 7
shall draw attention to arrangements for houses occupied whilst the construction
period is ongoing, advise the applicant to contact the Community Waste Team as
the site progresses, and highlight the bin charging scheme for new build
properties. Subject to such informatives, the proposal accords with NPF4 Policy
12: Zero Waste. 
Conservation Considerations 
101 There are no conservation concerns associated with this proposal. 
Contaminated Land  
102 The development site falls within the boundary of application 21/02270/FLM (A
variation of 16/02217/FLM) which was subject to a planning condition for soil
contamination. Remediation has since been carried out, and a verification report
submitted to evidence this. It remains the applicant’s responsibility to ensure that
the ground conditions are suitable for the proposed development. Therefore, the
proposal does not raise concerns in terms of land contamination, and accords
with NPF4 Policy 9 and LDP2 Policy 58A. 
Natural Heritage and Biodiversity 
103 In relation to natural heritage and biodiversity, NPF4 Policies 1: Tackling the
Climate and Nature Crisis, 2: Climate Mitigation and Adaptation 3: Biodiversity
and 20: Blue and Green Infrastructure, are relevant. In addition, LDP2 Policies
40B, 41 and 42 apply. NPF4 requires local planning applications to include
appropriate measures for biodiversity enhancement that are proportionate to the
nature and scale of the development. 
104 Representations have raised concern at the loss of agricultural land, however
this site is no longer agricultural in nature, is part of Crieff Settlement, allocated
for housing in the Local Development Plan, and has planning permissions for
residential development stretching back to 2017. It has been utilised by the
Page 156 of 216

Page 157

developer during construction of previous phases, and has limited biodiversity
value outwith the watercourse which separates it from earlier phases of
development, and some limited planting close to site boundaries. 
105 This part of the application site does not contain trees, and details of tree planting
and soft landscaping has been submitted. This includes Scottish native species
such as wild cherry and rowan, with beech hedging and shrub planting. There is
scope for further biodiversity enhancement to align with PKC’s Planning for
Nature: Development Management and Wildlife Guide, and this shall be secured
by planning condition 9. 
106 A further planning condition (Condition 6) shall require further details of boundary
landscaping and retaining walls, as there is scope to soften the appearance of
plot boundaries in the interests of good placemaking, particularly along the
western edge of the application site with the watercourse. In addition, phasing
and maintenance details of public open spaces shall be secured by condition 7 to
ensure alignment with Council Greenspace objectives. 
107 The updated Construction Environmental Management Plan (CEMP), as secured
by condition 5, would be expected to include measures to prevent pollution of the
watercourse along the west of this application site. 
108 Subject to conditional control, the proposal therefore complies with NPF4 Policy
3 and LDP2 Policy 41: Biodiversity. 
Low and Zero Carbon Generating Technologies 
109 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. In this
instance, air source heat pumps are proposed for all dwellinghouses. The
proposal therefore complies with the relevant policies. 
Affordable Housing 
110 The Council’s Affordable Housing enabler has advised that there is a
requirement of 2.5 additional dwelling units, as this would constitute 25% of the
additional 10 dwelling units beyond the original 102-dwelling consent for Wester
Tomaknock. It is also understood that the developer has agreed to on-site
provision of 3 affordable units in this phase, which shall be delivered to Hillcrest
Homes, who have been involved in previous phases and intend to manage these
affordable dwellings as social rented accommodation. Housing Subsidy is
available to support the delivery of these units, and the location of the site and
Page 157 of 216

Page 158

grouping in a terrace of three does not raise policy concerns in terms of
placemaking or safety, as had been suggested in representations. The proposal
therefore accords with the requirements of the Affordable Housing
Supplementary Guidance,NPF4 Policy 18 and LDP2 Policy 5, subject to a
Section 75 agreement being entered into. 
Developer Contributions 
111 In addition to affordable housing a primary education contribution of £6,300 is
required for each additional open market dwelling unit with greater than one
bedroom above the original 102 dwellinghouse consent is required. Since there
are ten additional dwelling units proposed, including three social rented dwelling
units which would be exempt, the requirement for primary education would be 7 x
£6,300 = £44,100.   
112 The Section 75 Agreement for the wider Wester Tomaknock site (16/02217/FLM)
will require variation to account for the additional units, in the event of an
approval recommendation. The Section 75 Agreement for 16/02217/FLM
includes Open Space maintenance commuted sums. The additional units
resulting from the proposed remix will be calculated separately and may be
included in a minute of variation. Any minute of variation would also include other
requirements such as those relating to Play Areas, and other consultee
requirements. 
Economic Impact 
113 The impact to the local economy both during construction and occupation will be
reasonably significant with additional available expenditure on local facilities and
services. 
Variation of Application Under Section 32A 
114 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the number of proposed
dwellinghouses and associated layout changes in the interests of placemaking. 
Planning Obligations and Legal Agreements 
115 As set out above, the Section 75 Agreement for the wider Wester Tomaknock
site (16/02217/FLM) will require variation to account for the additional dwelling
units, including affordable housing, primary education and open space
maintenance. This is to ensure that obligations are secured in line with the
requirements of the wider development area. 
116 Consent shall not to be issued until the agreement has been signed and
registered to take account of this application. The legal agreement should be
concluded and completed within 4 months of the date of any approval.
Page 158 of 216

Page 159

Direction By Scottish Ministers 
117 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
118 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. Accordingly the proposal is recommended for approval
subject to the following conditions.
. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Within one month of this planning decision, the street lighting design shall be
submitted to and agreed in writing by the Council as Planning Authority, in
consultation with Perth & Kinross Council's Street Lighting Partnership for the
public road network.  The scheme shall include details of light spill, brightness of
the lighting and the proposed hours of operation for both the public road network
and the private areas, and timescales for delivery.  The agreed lighting scheme
shall be implemented to the agreed timescales and maintained in full accordance
with the agreed scheme. 
Reason - In the interests of road safety. 
3. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
Page 159 of 216

Page 160

a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
i) details of information signs to inform other road users of construction traffic;
j) arrangements to ensure that access for emergency service vehicles are not
impeded;
k) co-ordination with other significant developments known to use roads
affected by construction traffic;
l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
m) the provision and installation of traffic counters at the applicant's expense at
locations to be agreed prior to the commencement of construction;
n) monitoring, reporting and implementation arrangements; 
o) arrangements for dealing with non-compliance; and
p) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management. 
4. No part of the development shall be occupied until a Residential Travel Plan
(RTP), aimed to encourage more sustainable means of travel, has been
submitted to and approved in writing by the Council.  The RTP shall have
particular regard to provision for walking, cycling and public transport access to
and within the site and will identify the measures to be provided, the system of
management, monitoring, review, reporting and the duration of the plan.  The
RTP shall be thereafter implemented for the approved duration. 
Reason - To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
Page 160 of 216

Page 161

5. Within one month of this planning decision, an updated Construction
Environmental Management Plan (CEMP) which is based on the approved
CEMP from 21/02270/FLM (Document 31 of 21/02270/FLM) shall be submitted
to and approved by the Planning Authority.  The CEMP shall incorporate a Dust
Management Plan and site-specific dust mitigation measures within the plan shall
be informed by a Dust Risk Assessment undertaken in line with IAQM
'Assessment of dust from demolition and construction 2024 V2.2.  Thereafter the
development shall be fully undertaken in accordance with the approved CEMP
unless otherwise agreed in writing by the Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
6. Within one month of this planning decision, revised boundary landscape
drawings shall be submitted to and approved in writing by the Council as
Planning Authority.  The drawings shall include full boundary treatment and
details of proposed retaining walls (with elevations).  The approved details shall
be implemented prior to the occupation of the relevant residential unit and
thereafter maintained. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
7. Within one month of this planning decision, a detailed open space and private
open space plan and open space landscaping delivery plan, which clearly sets
out areas proposed for both public adoption and phased delivery, shall be
submitted to and approved in writing by the Council as Planning Authority, in
consultation with the Council's Community Greenspace Team.  The agreed
public landscaping elements shall thereafter be undertaken and delivered in line
with the approved delivery plan and maintained. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
8. There shall be no land raising or the erection of solid boundaries within the 0.5%
annual probability (AP) floodplain as shown on drawing number 13019/21/001A
forming part of planning permission 16/02217/FLM. 
Reason - In order to ensure that surface water arising from the development is
adequately dealt with and that any sustainable urban drainage System (SUDS)
does not increase flood risk elsewhere. 
9. Within one month of this planning decision, a Biodiversity Enhancement Plan
shall be submitted to and approved in writing by the Council as Planning
Authority.  Thereafter, the approved measures outlined in the plan shall be
installed in accordance with the agreed details prior to the occupation of the
relevant residential unit. 
Reason - In the interests of enhancing environmental quality and of biodiversity.
Page 161 of 216

Page 162

10. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved.  The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason - In order to prevent animals from being trapped within any open
excavations. 
11. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, wildlife kerbs shall be installed adjacent to all road
gullies within 500metres of a SUDS pond or watercourse.  Thereafter, the kerbs
shall be retained in a reasonable condition for the life of the development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
12. Construction work shall be limited to Monday to Friday 07:00hrs to 19:00hrs and
Saturday 08:00hrs to 13:00hrs with no noisy works out with these times or at any
time on Sundays. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
13. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
14. Where it is intended to create semi-natural habitats, all species used in the
planting proposals detailed in the approved plans shall be locally native species
of local provenance unless otherwise agreed in writing with the Planning
Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
15. Any planting failing to become established within five years shall be replaced in
the following planting season with others of similar size, species and number. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
Page 162 of 216

Page 163

Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment Protection Agency.
Please note that a fee is chargeable for the processing of RCC applications. 
5. If the applicant is successful in gaining planning consent, they must apply for a
Vehicle Access Consent before starting works on its formation.  More
information on the process can be found on the following website:
https://www.pkc.gov.uk/vehicleaccess .  Please note, that as planning
permission has been applied for, currently no fee is required for the Vehicle
Access Consent (VA1 form), please include the planning application number on
your VA application form. 
Page 163 of 216

Page 164

6. The developer must contact the Community Waste Team to discuss bin
collections as the site progresses. Refuse collection vehicles will only enter the
site during development where there is clear access, adequate turning, and a
suitable road surface with no raised ironworks.  This means that Waste Services
may not be able to provide a full kerbside recycling service to residents whilst the
build is ongoing, and bins may have to be emptied from a collection point,
specified by the area Community Waste Adviser, until full access is made
available for refuse collection vehicles. 
7. The applicant is advised that Perth and Kinross Council have a charging scheme
for recycling and waste bins for new build properties and newly created
dwellings. Further information can be found at:
https://www.pkc.gov.uk/binrequests 
8. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
9. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
10. The Air Source Heat Pump shall be certificated in accordance with
Microgeneration Certification Scheme 007 and installed by an installation
company certificated in accordance with Microgeneration Installation Standard
3005 and in compliance with the calculation procedure contained in Table 2 of
Microgeneration Certification Scheme Planning Standards (MCS 020), confirming
that the permitted development noise limit of 42 dB LAeq,5 mins will be met. In
addition, the Air Source Heat Pump shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property, with all windows slightly
open, when measured and/ or calculated and plotted on a rating curve chart. 
11. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the number of proposed
dwellinghouses and associated layout changes in the interests of placemaking. 
12. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive.  Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates.  The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built.  Planning permission for a
development does not provide a defence against prosecution under this Act. 
13. Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn.
Page 164 of 216

Page 165

Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved. 
14. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk.  Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request. 
The Fees Charter is available on our website www.pkc.gov.uk.   
15. The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
Background Papers
Letters of representation 18 
Authors
Name Designation Contact Details
John Cooney Planning Officer developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
18 December 2025 
Page 165 of 216

Page 166

Page 166 of 216

Page 167

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/00572/FLL
Erection of 26 dwellinghouses, formation of road and footpath, installation of air source heat pumps,
landscaping and associated works on Land at Wester Tomaknock, CrieffScale
1:25,000
5(3)(ii)
Page 167 of 216

Page 168

Page 168 of 216

Page 169

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/00572/FLL
Erection of 26 dwellinghouses, formation of road and footpath, installation of air source heat pumps,
landscaping and associated works on Land at Wester Tomaknock, CrieffScale
1:10,000
5(3)(ii)
Page 169 of 216

Page 170

Page 170 of 216

Page 171

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2025 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/5) 
Proposal: Erection of 6 industrial units (classes 4, 5 and 6), formation of parking
area, installation of EV charging points, air source heat pump and
associated works 
Location: 3 Macduff Place, Kinross, KY13 8FU 
Ref. No: 25/01082/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The site lies to the southwest of Kinross, accessed via Junction Road and near to
the M90 motorway which links Perth with Edinburgh. The access road to the site
has already been formed (MacDuff Road) and this forms the boundary of the site
to the north. The east boundary is a timber fence and a pedestrian path which
runs along the rear of a row of houses. To the south of the site is an open space
which is currently in the final stages of development (industrial use). 
2 The site is zoned in the LDP2 as E18 for Employment Proposal (core). An
existing showroom/Workshop (Class 4 – Business (office/light industry)) is in
operation from the site to the west of the proposed site. 
3 This application is for the erection of two buildings each containing 3 light
industrial units for use under Class 4 (Business), 5 (General Industrial) or 6
(Storage and Distribution). The site has been designed to provide ample parking
and accessible routes throughout, bike storage facilities and EV chargers are
also provided together with bin storage areas. 
5(3)(iii)
Page 171 of 216

Page 172

Site History 
4 22/00447/FLL Full Planning Permission was approved on 14 April 2022 for
Erection of 4 industrial units (use classes 1, 4, 5 and 6), formation of parking,
landscaping, drainage and associated works (allocated site E18) 
5 22/00884/FLL Full Planning Permission application was withdrawn on 24 August
2022 for Erection of 4 units (classes 1, 4 and 6), formation of parking,
landscaping, and associated works (allocated site E18) 
Pre-Application Consultation 
6 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
7 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
8 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
9 The Council’s assessment of this application has considered the following
policies of NPF4: 
Policy 1: Tackling the Climate and Nature Crises
Policy 2: Climate Mitigation and Adaptation
Policy 3: Biodiversity
Policy 6: Forestry, Woodland and Trees
Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
Policy 13: Sustainable Transport
Policy 14: Design, Quality and Place
Policy 15: Local Living and 20 Minute Neighbourhoods
Policy 22: Flood Risk and Water Management
Policy 26: Business and Industry 
Page 172 of 216

Page 173

Perth and Kinross Local Development Plan 2019 
10 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
11 The principal relevant policies are, in summary; 
Policy 1A: Placemaking
Policy 1B: Placemaking
Policy 5: Infrastructure Contributions
Policy 7A: Employment and Mixed Used Areas: Business and Industrial
Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and Development
Policy 41: Biodiversity
Policy 52: New Development and Flooding
Policy 53B: Water Environment and Drainage: Foul Drainage
Policy 53C: Water Environment and Drainage: Surface Water Drainage
Policy 56: Noise Pollution
Policy 55: Nuisance from Artificial Light and Light Pollution
Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance
12
• Supplementary Guidance - Developer Contributions & Affordable
Housing (adopted in 2023)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance
13
• Planning Guidance - Planning & Biodiversity
• Conservation areas 
National Guidance 
14 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below.
Page 173 of 216

Page 174

Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 67 Housing Quality
• PAN 75 Planning for Transport
•  PAN 77 Designing Safer Places 
National Roads Development Guide 2014 
16 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Consultations 
17 As part of the planning application process the following bodies were consulted: 
External 
18 Scottish Water 
19 No objection to proposal. 
20 Kinross Community Council 
21 Initial objection regarding loss of existing landscaping.  As a consequence, plans
were revised to retain landscaping, however the objection was maintained due to
position of security fence. 
Internal 
22 Environmental Health (Contaminated Land) 
23 No objection, informative required due to former uses. 
24 Transportation and Development 
25 No objection standard conditions required related to access type and turning
within site.   
26 Structures and Flooding 
27 No objection to proposal. 
Page 174 of 216

Page 175

28 Environmental Health (Noise Odour) 
29 No objection standard conditions related to operating times, noise and lighting. 
Representations 
30 3 representations were received (including the community council) The main
issues raised within the representations are: 
• Impact on planting on east boundary
• Impact on movement of wildlife 
• Move fencing so it’s not visible on the path
• Adverse effect on visual amenity
• Loss of trees
• Noise pollution
• Over intensive development 
31 These issues are addressed in the Appraisal section of the report. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA not required 
Design Statement or Design and Access
Statement
submitted 
Report on Impact or Potential Impact eg
Flood Risk Assessment
submitted 
APPRAISAL 
32 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
33 The proposed site is within the settlement boundary of Kinross in a site zoned as
Employment Proposal (Core) E18 in the Local Development Plan (LDP). The
Page 175 of 216

Page 176

applicable polices are Policy 26 Business and Industry of NPF4 and Policy 7
Employment and Mixed Used Areas of the LDP2.   
34 Policy 7A of the LDP2 identifies core business and industrial land which is
strategically important, and general business and industrial land where there is
more flexibility and potential for mixed uses.  This site is a core area which
seeks to retain these areas for Class 4, 5 and 6 uses.  The reason for this tiered
approach being that within PKC there are some employment areas which are
possibly suitable for mixed uses, and others which are in prime locations/of
higher amenity which need a stricter approach. 
35 NPF4 Policy 26 Business and Industry is the most up to date policy position and
criteria a) states that development proposals for business and industry uses on
sites allocated for those uses in the LDP will be supported. 
36 The proposal is for a Class 4, 5 & 6 use in a core business and industrial area
which is in compliance with NPF4 and LDP2. 
Design and Layout 
37 They site will be developed with two buildings each housing 3 light industrial
units. The individual units range from 101-111m2 in size. 
38 The units have each been designed with a vehicle access door, a pedestrian
access door within a glazed section of curtain walling and a service door/fire
escape at the rear.  All units have been designed with flexibility so that
separating walls can be removed to allow larger units to be created, and vehicle
access doors can be easily interchanged with curtain walling/pedestrian access
doors. 
39 The proposed buildings are well insulated, feature extensive arrays of
photovoltaic panels and are heated via air source heat pumps at the rear of each
unit. The fabric of the building has been selected in Alaska grey with feature
areas of hard-wearing timber cladding which will weather to a pale silver/grey.
The basecourse will be formed in an anthracite grey facing brick and all doors,
windows and curtain walling will be coloured to match the cladding and roof. 
40 The site has been designed to provide ample parking and accessible routes
throughout, bike storage facilities and EV chargers are also provided and bin
storage areas are conveniently sited for ease of use & collection. 
41 As such, there are no design and layout issues associated with this proposal,
and it complies with the above NPF4 and LDP2 policies. 
Page 176 of 216

Page 177

Residential Amenity 
42 The nearest residential properties are at Montgomery Way to the east of the
proposed units. The M90 and an existing showroom with workshop Class 4 are
to the west. 
43 There is no supporting information in relation to the hours of operation of the
proposed units.  Given that there are residential properties located to the east of
the site there is the potential for noise to affect the residential amenity of the
properties if the operating times are not restricted. (Condition 2) 
44 The applicant intends to install Mitsubishi Ecodan R32 Monobloc Air Source Heat
Pump to heat the units.  It is considered that given the distance attenuation to
neighbouring properties these levels should be achievable for airborne noise.
Environmental Health believe this can be adequately controlled by the standard
condition based on Noise Rating condition. (Condition 4) 
45 A Phase 1 report produced by Brownfield First Ltd, dated March 2022, was
submitted with a previous application on this site (22/00884/FLL).  The
investigation concluded there was no further investigations required although a
watching brief is recommended for the initial groundworks. An informative will be
added in this regard. 
46 As a consequence, the amenity of neighbouring properties is considered to be
protected in accordance with the content of the relevant polices of LDP2 and
NPF4.    
Roads and Access 
47 The vehicle access to the site from Macduff Road has already been formed. This
leads to Junction Road and the M90.  There is a turning head at the south end
of the site for refuse collection at the bin storage area. 
48 The access to the development is via gates at the site boundary with a clearly
defined route and access to parking.  The site will be entirely enclosed by
security fencing and gates to allow the site to be secured in the evenings and
overnight.  The internal site is to remain private and will not be maintained by the
Roads Authority.   
49 Parking will be provided on site for 28 vehicles, including 2 disabled bays and 4
EV charging bays.  Covered cycle storage for 10 bicycles will also be provided. 
50 As such, the current proposal is acceptable in terms of roads and access,
according with NPF4 Policy 13: Sustainable transport and LDP2 Policy 60B:
Transport Standards and Accessibility Requirements: New Development
Proposals.  
Page 177 of 216

Page 178

Drainage and Flooding 
51 The site will be connected to the mains for water and foul drainage.  SUDs are
proposed within the site, with surface water from building roofs to be piped to sub
base attenuation within the access road and car parking before a restricted
discharge into existing swale to the north west of the site. All roads & car parking
to be permeable block paving also draining into same sub base attenuation and
as above restricted discharge to an existing swale. 
52 As such, it is considered that the proposal accords with NPF4 Policy 22 Flood
risk and water management and LDP2 Water Environment and Drainage Policies
53B Foul Drainage, 53C Surface Water Drainage, and 53E Water Supply.  
Natural Heritage and Biodiversity 
53 The site is bound to the east by a footpath which lies out with the site and a
landscape buffer which is within.  The application initially proposed the removal
of the existing planting and replanting which was raised as a concern in letters of
representation and by the community council.   
54 The agent revised the plans to retain the existing mature planting, and this was
communicated to the Kinross CC. The community council reviewed the amended
plan but are minded to leave the objection in place. The reason was further
representation from a member of the public related to the security fence and
asked that the fence be further reviewed so that the fence is erected on the
inside of the trees leaving the existing tree line as a natural barrier between the
Montgomery Way path and the industrial units. They also raised a point about the
volume and variety of birds and other wildlife which live, nest and seek shelter in
those trees. Enclosing the line of trees within the development site, i.e. behind
the 2m high close link security fencing, isolates them from the raingarden and the
domestic gardens.   
55 The agent reviewed the feedback and reiterated the findings of Heritage
Ecological Limited in their Preliminary Ecological Appraisal.  Under section 3,
the impact of this development on birds and wildlife within the bank of trees as
well as on the site as a whole has been assessed and it is their intention to
implement all of the recommendations in section 5 which include bird nesting
features, hedgehog friendly fencing and tree protection during the duration of the
works. 
56 In this case hedgehogs will be able to move through, and birds fly over the fence. 
The position of the fence will not interfere with use of the path and is not
segregating the landscape strip as it is already isolated from other woodland. In
this case it is not considered necessary to relocate the fence to make the
development acceptable. 
57 The proposal is therefore considered to comply with the Policy 40 and 41 of LDP2
and Policy 3 and 6 of NPF4 in relation to trees and biodiversity.
Page 178 of 216

Page 179

Low and Zero Carbon Generating Technologies 
58 LDP2 Policy 32 ‘Embedding Low and Zero Carbon Generating Technology in
New Development’ states that proposals for all new buildings will be required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. As this proposal includes the
erection of a new building, consideration must be given to this requirement.
Further, NPF4 Policy 2 ‘Climate Mitigation and Adaptation’ requires that
development should be designed to reduce green gas emissions. 
59 The proposal includes heat pump systems, solar photovoltaics to ensure the
development minimises its carbon footprint. The proposal therefore complies with
the relevant policies. 
Developer Contributions 
60 There are no developer contributions applicable to this proposal. 
Economic Impact 
61 The economic impact will be in the business and employment opportunities. 
Variation of Application Under Section 32A 
62 This application was varied prior to determination, in accordance with the terms
of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the landscaping scheme.   
Planning Obligations and Legal Agreements 
63 None required. 
Direction By Scottish Ministers 
64 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
65 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding
Page 179 of 216

Page 180

the Development Plan.  Accordingly the proposal is recommended for approval
subject to the following conditions.
. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The hours of operations shall be restricted to 0700 hours to 1900 hours daily. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
3. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. 
Reason - In order to safeguard the residential amenity of the area. 
4. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
5. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
6. Prior to the development hereby approved being completed or brought into use,
turning facilities shall be provided within the site to enable all vehicles to enter
and leave in a forward-facing gear. 
Page 180 of 216

Page 181

Reason - In the interests of road safety; to ensure the provision of acceptable
manoeuvring space within the curtilage of the site to enable a vehicle to enter
and leave the site in forward gear. 
7. The conclusions and recommended action points within the supporting
biodiversity survey by Heritage Ecological Limited dated August 2025 submitted
and hereby approved (document(s) 12; relates) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
Procedural Notes 
None required 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the initial stages of design
from Scottish Water and the Scottish Environment Protection Agency. 
Page 181 of 216

Page 182

5. The applicant is advised that, in terms of Sections 109 of the New Roads and
Street Works Act 1991, he/she/they must obtain consent from the Council, to
place, maintain or adjust apparatus in, or under a Road or remove apparatus
from a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-permits. 
6. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. The variations incorporate changes to the landscaping scheme.   
Background Papers
Letters of representation 3 
Authors
Name Designation Contact Details
Joanne Ferguson Planning Officer developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
9 December 2025 
Page 182 of 216

Page 183

Ü
Erection of 6 industrial units (classes 4, 5 and 6), formation of parking area, installation of EV charging
points, air source heat pump and associated works at 3 Macduff Place, Kinross, KY13 8FU
25/01052/FLL
Scale
1:10,000
Planning and Placemaking Committee - 7 January
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(3)(iii)
Page 183 of 216

Page 184

Page 184 of 216

Page 185

Ü
Erection of 6 industrial units (classes 4, 5 and 6), formation of parking area, installation of EV charging
points, air source heat pump and associated works at 3 Macduff Place, Kinross, KY13 8FU
25/01052/FLL
Scale
1:25,000
Planning and Placemaking Committee - 7 January
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(3)(iii)
Page 185 of 216

Page 186

Page 186 of 216

Page 187

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/6) 
Proposal: Alterations, extension and subdivision of retail unit to form 2 retail units 
Location: 16 - 18 County Place, Perth, PH2 8EE 
Ref. No: 25/01217/FLL
Ward No: P12- Perth City Centre 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The proposal is for the alterations, extension and subdivision of an existing retail
unit to form 2 retail units at 16-18 County Place and 15 Hospital Street. 
2 The applicant has stated that the units will likely be leased to specialist traders,
similar to the previous occupant, John Ferguson Work & Leisure. 
3 The building is located within the Perth Central Conservation Area and is
unlisted. However, there are a number of listed buildings in the vicinity.   
Site History 
4 No relevant site history. 
Pre-Application Consultation 
5 Pre application Reference: No formal pre-application consultation was
undertaken.  
6 The proposed development is not classed as a major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
5(3)(iv)
Page 187 of 216

Page 188

Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
7 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
8 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
9 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 23: Health & Safety
• Policy 27: City, Town, Local and Commercial Centres 
Perth and Kinross Local Development Plan 2019 
10 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
11 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 11: Perth City Centre Secondary Uses Area 
• Policy 17: Residential Areas
• Policy 28A: Conservation Areas New Development 
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals    
Page 188 of 216

Page 189

Statutory Supplementary Guidance 
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance 
• Conservation areas 
National Guidance 
12 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
13 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 68 Design Statements
• PAN 75 Planning for Transport 
Creating Places 2013 
14 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
15 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Local Place Plans 
16 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There are no Local Place Plans currently adopted for the area. 
Consultations 
17 As part of the planning application process the following bodies were consulted: 
Page 189 of 216

Page 190

External 
18 Scottish Water - No objection. 
Internal 
19 Structures & Flooding - No objection. 
Representations 
20 6 letters of objections. The main issues raised within the representations are: 
• Impact on conservation area and historic setting of adjacent listed buildings
(in particular the A-listed King James Hospital VI building)
• Traffic and road safety
• Noise and disturbance
• Waste management concerns
• Flood risk
• Ambiguity of use 
21 The following issues are not defined as ‘material’ planning considerations: 
• Ownership disputes/encroachment onto communally owned land.
• Applicant reputation and alleged use as fast-food takeaway. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
AA not required 
Design Statement or Design and Access
Statement
not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
not required 
Appraisal 
22 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
Page 190 of 216

Page 191

this involves considerations of the Council’s other approved policies and
supplementary guidance as outlined above.   
23 In this instance, section 14(2) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 places a duty on planning authorities in determining
such an application as this to have special regard to the desirability of preserving
the building or its setting or any features of special architectural or historic
interest which it possesses.  Section 64(1) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 is relevant and requires planning
authorities to pay special attention to the desirability of preserving or enhancing
the character or appearance of the designated conservation area. 
24 The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which
justify a departure from policy. 
Principle 
25 The site is situated in central Perth and is designated as “City Centre: Secondary
Uses”. within the Perth and Kinross Local Development Plan 2 (2019) (LDP2).
LDP2 Policy 11 (Perth City Centre Secondary Uses Area). Within the area
identified for City Centre Secondary Uses, the Council will encourage a mix of
appropriate uses including shops, residential, offices, cultural facilities (including
theatres and other arts venues), restaurants, pubs and clubs. Particular
encouragement will be given to development that maintains or creates small
specialist shopping units. Proposed uses must not adversely affect the amenity
of existing surrounding property. NPF4 Policy 27 (City, Town, Local and
Commercial Centres) is also applicable, stating that development should
enhance the viability and vitality of city and town centres, with a mix of uses
being supported. Development should adhere to the town centre first approach,
with support given to uses that generate significant footfall, such as commercial
and leisure activities. Overall, the principle of the proposed development, as retail
use likely to be leased to specialist traders, is acceptable and complies with
LDP2 Policy 11 and NPF4 Policy 27.  Furthermore, it would also see the re-
occupation of a long term vacant property. 
Design and Layout/Conservation Considerations 
26 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and B of LDP2 which relate to placemaking and NPF4
Policy 14 (Design, Quality and Place) which seeks to deliver well designed
development. 
27 NPF4 Policy 7 (Historic Assets and Places) states development proposals in or
affecting conservation areas will only be supported where the character and
appearance of the conservation area and its setting is preserved or enhanced.
Relevant considerations include the: 
Page 191 of 216

Page 192

i.  architectural and historic character of the area;
ii.  existing density, built form and layout; and
iii.  context and siting, quality of design and suitable materials. 
28 LDP2 Policy 28A (Conservation Areas: New Development) states Development
within a Conservation Area must preserve or enhance its character or
appearance. The design, materials, scale and siting of new development within a
conservation area, and development outwith an area that will impact upon its
special qualities should be appropriate and sympathetic to its appearance,
character and setting. 
29 The application site is located within the Perth Central Conservation Area. The
proposal seeks to subdivide the existing vacant unit into two separate units: Unit
1 (16–18 County Place) and Unit 2 (15 Hospital Street). An external collapsed
wall, which currently accommodates a damaged WC area, will be reinstated,
along with an additional collapsed external wall located on the opposing side of
the site boundary. 
30 For the proposed fenestration, the proposal will include: 
• Unit 1 (16–18 County Place) will retain its existing timber-framed windows, with
replacement doors proposed in basalt grey and finished in aluminium. 
• Unit 2 (15 Hospital Street) will have its original shopfront reinstated (currently
blocked up), incorporating timber-framed windows and a replacement basalt
grey aluminium door to match the shop frontage on County Place. 
31 In order to protect the appearance of the conservation area, a condition has been
recommended that prior to commencement, full details of the specification and
methodology for alteration and repair of the shopfronts at Hospital Street and
County Place shall be submitted in writing for further approval (Condition 2). 
Residential Amenity 
32 Policy 1A and B, Policy 56 of LDP2 and NPF4 Policy 14 (c) and Policy 23 require
any development to not detrimentally impact on residential amenity. 
33 As the proposed use will remain as retail and there is no significant increase in
floor space, no adverse impact on residential amenity (noise, waste management
issues etc) is anticipated. However, conditions have been recommended
regarding plant noise, and servicing and deliveries (Conditions 3 and 4). 
Roads and Access 
34 The proposal does not constitute a significant intensification of the existing land
use and therefore is unlikely to have a detrimental impact on traffic volumes or
road safety. 
Page 192 of 216

Page 193

Drainage and Flooding 
35 According to SEPA flooding maps, there is low risk of river flooding. Structures
and Flooding were consulted and had no objections to the proposal. 
Natural Heritage and Biodiversity 
36 There are no natural heritage or biodiversity implications associated with this
proposal. 
Developer Contributions 
Transport Infrastructure 
37 With reference to the above planning application the Council’s Transport
Infrastructure Developer Contributions Supplementary Guidance requires a
financial contribution towards the cost of delivering the transport infrastructure
improvements which are required for the release of all development sites in and
around Perth. 
38 The site is located in the ‘Full’ Transport Infrastructure contributions zone
(Appendix 3 of the Supplementary Guidance). The Retail contribution rate will
only be applied to the trading floorspace of new or extension to existing retail
developments. Non-trading and Back of House functions space will be calculated
on the employment use category. Vehicular retail showrooms will be calculated
based on the floorspace of proposed buildings 
39 Given that the increase in floorspace is negligible, the Developer Contributions
Guidance is not applicable to this application and therefore no contributions are
required in this instance. 
Economic Impact 
40 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. 
Variation Of Application Under Section 32A 
41 This application was not varied prior to determination, in accordance with the
terms of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.   
Planning Obligations and Legal Agreements 
42 None required. 
Page 193 of 216

Page 194

Direction By Scottish Ministers 
43 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
44 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Prior to commencement of the development hereby approved, full details of the
specification and methodology for alteration and repair of the shopfronts at
Hospital Street and County Place shall be submitted in writing for further
approval by the council as Planning Authority.  The detail as agreed shall be
implemented prior to the completion or bringing into use of the development,
whichever is the earlier.   
Reason - in order to protect the character of the conservation area. 
3. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
4. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
Page 194 of 216

Page 195

2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable. 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
4. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
5. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
6. A commercial waste contract must be established for the retail units once it’s
brought into use to ensure proper and compliant disposal, as waste generated by
the units cannot be disposed of at any recycling centres, as these facilities are
not authorised to accept commercial waste without payment. 
7. An application for Building Warrant may be required.
Page 195 of 216

Page 196

Background Papers
Letters of representation 6 
Authors
Name Designation Contact Details
Adam Cairns Planning Officer developmentmanagement:pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
8 December 2025 
Page 196 of 216

Page 197

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/01217/FLL
Alterations, extension and subdivision of retail unit to form 2 retail units at 16 - 18 County Place, Perth,                   
PH2 8EEScale
1:10,000
5(3)(iv)
Page 197 of 216

Page 198

Page 198 of 216

Page 199

Ü
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
Planning and Placemaking Committee - 7 January
2026 25/01217/FLL
Alterations, extension and subdivision of retail unit to form 2 retail units at 16 - 18 County Place, Perth,                          
PH2 8EEScale
1:5,000
5(3)(iv)
Page 199 of 216

Page 200

Page 200 of 216

Page 201

Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/7) 
Proposal: Upgrading and widening of footpath 
Location: Land 40 metres south west of The Pavilion, Ferry Road, Pitlochry, PH16
5DD 
Ref. No: 25/01289/FLL
Ward No: P4-Highland 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
Background and Description of Proposal 
1 The proposal is for the upgrading and widening of a riverside footpath along the
River Tummel in Pitlochry. The path is an adopted core path (PRLY/56), running
between the Category B-listed Port-na-Craig Bridge (LB Reference: LB39858)
and the Category A-listed Pitlochry Dam (LB Reference: LB47534). The
proposed works include widening sections of the path where required and
resurfacing to provide an improved accessible route. Additionally, the proposal
incorporates the installation of a picnic table, positioned adjacent to the path, to
enhance recreational opportunities for visitors. The path is to be 2 metres wide
and finished with ‘Flexipave’ alongside a 50mm wide concrete kerb (with no kerb
constructed when adjacent to root protection areas of adjacent trees). 
2 The site is allocated as ‘open space’ within the LDP proposals map. 
Site History 
3 No relevant site history. 
5(3)(v)
Page 201 of 216

Page 202

Pre-Application Consultation 
4 Pre application Reference: No formal pre-application consultation was
undertaken.  
5 The proposed development is not classed as a major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
Development Plan 
6 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
7 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
8 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 21: Play, Recreation and Sport 
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety
• Policy 30: Tourism 
Perth and Kinross Local Development Plan 2019 
9 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
Page 202 of 216

Page 203

10 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 27A: Listed Buildings
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area 
• Policy 52: New Development and Flooding 
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage 
• Policy 60A: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposal 
Statutory Supplementary Guidance 
• Supplementary Guidance - Placemaking (adopted in 2020) 
Other Material Considerations 
PKC Non-Statutory Guidance 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
National Guidance 
11 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
12 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
Page 203 of 216

Page 204

• PAN 51 Planning, Environmental Protection and Regulation
• PAN 68 Design Statements
• PAN 77 Designing Safer Places 
Creating Places 2013 
13 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
14 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Local Place Plans 
15 Local Place Plans are community-led plans setting out proposals for the
development and use of land and set out a community’s aspirations for its future
development. There are no Local Place Plans currently adopted for the area. 
Consultations 
16 As part of the planning application process the following bodies were consulted: 
External 
17 Pitlochry & Moulin Community Council (PMCC) - Objection. The concerns
raised include a lack of community consultation and inadequate notification to
affected landowners. PMCC consider the development to represent an unjustified
change of use of public green space. Further issues have been highlighted
regarding safety, drainage, and the suitability of the proposed surface materials.
It is also argued that the proposal would have an adverse impact on residential
amenity and that it conflicts with both local and national planning policy. 
Internal 
18 Structures & Flooding - No objection. 
19 Conservation - No objection. The proposed footpath improvements do not raise
any concerns in relation to the setting of the listed bridges. Should the application
be approved, appropriate conditions should be attached to ensure that trees
adjacent to the path are protected in the course of works and thereafter.   
Page 204 of 216

Page 205

20 Community Greenspace - No comments received. 
Representations 
21 14 letters of objections and 6 letters of support were received. The main issues
raised within the representations are: 
Letter of Objections 
• Loss of the area’s character and increased disturbance from higher footfall. 
• Privacy concerns for properties backing onto the path.
• Increased litter and no provision for bins or regular collection. 
• No toilet facilities, leading to fears of continued or increased use of woodland
as informal toilets. 
• Potential road safety issues and parking congestion in Tummel Crescent,
which is a narrow cul-de-sac. 
• Concerns about the proposed surface being slippery in wet/icy conditions
and poor for drainage. 
• Negative impact on biodiversity 
Letters of Support 
• Improving accessibility, including those with mobility challenges.
• Enhances recreational opportunities by providing picnic table.
• Encourages more visitors and promotes outdoor activity.
• Potential to improve path condition and drainage in certain sections. 
22 The following issues are not defined as ‘material’ planning considerations: 
• Ownership disputes/ alleged encroachment onto private land.
• Speculation about potential anti-social behaviour.
• Existing accessible facilities already available nearby at the Dam Visitor
Centre and other locations.
• Individual inconvenience or personal expectations when buying property that
area would remain “untouched”.
• Criticism of applicant’s process or motives / lack of consultation with
residents and affected landowners prior to submission. 
Additional Statements 
Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
not applicable 
Appropriate Assessment under Habitats
Regulations
AA not required
Page 205 of 216

Page 206

Design Statement or Design and Access
Statement
not required 
Report on Impact or Potential Impact eg
Flood Risk Assessment
not required 
Appraisal 
23 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the Perth and
Kinross Local Development Plan 2019 and statutory supplementary guidance.
The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance as outlined above.   
24 In this instance, section 14(2) of the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 places a duty on planning authorities in determining
such an application as this to have special regard to the desirability of preserving
the building or its setting or any features of special architectural or historic
interest which it possesses.   
25 The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which
justify a departure from policy. 
Principle 
26 NPF4 Policy 13 (Sustainable Transport) states that proposals to improve,
enhance or provide active travel infrastructure will be supported. 
27 NPF4 Policy 21 (Play, Recreation and Sport) generally seeks to encourage,
promote and facilitate spaces for opportunities for play, recreation and sport. 
28 NPF4 Policy 23 (Health and Safety) seeks to promote and facilitate development
that improves health and wellbeing. This could include, for example, proposals
that incorporate opportunities for exercise. 
29 NPF4 Policy 30 (Tourism) states proposals for tourism related development will
take into account accessibility for disabled people. 
30 The principle for recreation infrastructure is also evident in Perth and Kinross
Local Development Plan 2019 (LDP2) with Policy 14 (Open Space Retention and
Provision), specifically 14A which relates to existing areas. Similarly to NPF4
Policy 21, this policy outlines development proposals that result in the loss of
Page 206 of 216

Page 207

these areas will generally not be permitted, except when the development is
ancillary to the site's recreational use, involves only a minor portion without
affecting its overall use, replaces the lost facility with one of comparable or
greater benefit. 
31 Furthermore, LDP2 Policy 15 (Public Access) states that development proposals
that would have an adverse impact upon the integrity of any (proposed) core
path, disused railway line, asserted right of way or other well-used route and
connectivity proposals identified in the Regional Transport Strategy and Delivery
Plan will not be permitted. Development proposals that would affect
unreasonably public access rights to these features will not be permitted unless
these adverse impacts are adequately addressed in the plans and suitable
alternative provision is made. 
32 The principle of upgrading and widening an existing adopted core path is
considered to be acceptable. This development will facilitate improvements to the
existing core path network and provide an accessible and more inclusive route,
particularly for those with mobility challenges. Overall, the proposal considered to
fully comply with the NPF4 and LDP2 policies outlined above.   
Visual Impact/Conservation Considerations 
33 NPF4 Policy 7 (Historic Assets and Places) states development proposals
affecting the setting of a listed building should preserve its character, and its
special architectural or historic interest. 
34 The proposed works are on the north bank of the River Tummel between the
Category B-listed Port-na-Craig Bridge (LB Reference: LB39858) , and the
Category A-listed Pitlochry Dam (LB Reference: LB47534. The proposed
footpath improvements do not raise any concerns in relation to the setting of the
listed structures given the alterations being to an existing route. 
Residential Amenity 
35 LDP2 Policy 17 (Residential Areas) identifies areas of residential and compatible
uses inside settlement boundaries where existing residential amenity will be
protected and, where possible, improved. 
36 A number of the representations have raised concerns relating to the loss of the
area’s character and increased disturbance from higher footfall; privacy concerns
for properties backing onto the path; increased litter and no provision for bins or
regular collection; and no toilet facilities, leading to fears of use of nearby
woodland as informal toilets. 
37 The widening and upgrading of an existing path, along with the addition of a
picnic bench, is not considered to constitute a significant intensification of the
Page 207 of 216

Page 208

existing land use as an open space designation/core path route and is therefore
unlikely to have a detrimental impact on residential amenity. While the proposal
does not warrant the inclusion of toilet facilities, a condition has been
recommended requiring that, prior to the commencement of development, that
details are submitted demonstrating the provision of litter bins adjacent to the
picnic table and along the path route (Condition 4).  Notwithstanding, an anti-
social behaviour is ultimately a matter for Police Scotland. 
Roads and Access 
38 As stated above, the proposed development will facilitate improvements to the
existing core path network and provide an accessible and more inclusive route,
particularly for those with mobility challenges. Furthermore, the proposal is
unlikely to significantly increase parking demand, given the ample parking
provision available at Pavilion Recreation Ground and Ferry Road car park. 
39 Some representations have stated that the proposed surfacing material
(Flexipave) may become slippery or icy during colder conditions. It is considered
that the proposed surfacing material’s porous and non-slip design allows water to
drain through the surface into the sub-base, which reduces ice-build-up and
therefore improves traction for walkers, as a result it is unlikely to pose a
significant risk to pedestrian safety. The proposal is therefore in accordance with
Policy 13 Accessibility of NPF4 and Policy 60 Transport standards and
accessibility requirements of LDP2. 
Drainage and Flooding 
40 According to SEPA flooding maps, sections of the application site are at medium-
high risk of river flooding and future medium risk of river fooding. Structures and
Flooding were consulted and had no objections to the proposal. Representations
have raised that the proposed surfacing material (Flexipave) may create
drainage issues along the route. As stated above, the proposed surfacing
material is porous which allows for adequate water drainage. 
Natural Heritage and Biodiversity 
41 NPF4 Policy 3 (Biodiversity) states proposals for local development will include
appropriate measures to conserve, restore and enhance biodiversity.   
42 NPF4 Policy 6 (Forestry, Woodland and Trees) states development proposals
that enhance, expand and improve woodland and tree cover will be supported. 
43 The path is in close proximity to a number of trees whose root protection areas
(RPA) have the potential to be affected by construction works. The proposal will
utilise a tree root protection cellular confinement system (web cells) to help
mitigate potential damage to existing tree roots when the path encounters roots.
Page 208 of 216

Page 209

Furthermore, it is acknowledged that trees in this part of Pitlochry are likely to
form part of ancient woodland. However, given the construction methodology and
the absence of any felling, the proposal is not considered to have a detrimental
impact on ancient woodland inventory.  Notwithstanding the above, a condition
has been recommended relating to protection measures for RPAs during
construction (Condition 3). 
44 In terms of biodiversity, the proposals will result in the loss of a small grassed
area, which is not considered substantial and is relatively species-poor. 
45 A further condition includes the submission of detailed Construction Method
Statement (CMS) identifying measures to prevent harmful materials entering the
River Tay SAC, which could reduce water quality and lead to a damaging impact
on the salmon, otter and lamprey interests (Condition 2). 
Developer Contributions 
46 The Developer Contributions Guidance is not applicable to this application and
therefore no contributions are required in this instance. 
Economic Impact 
47 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development.  
Variation of Application Under Section 32A 
48 This application was not varied prior to determination, in accordance with the
terms of Section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended. 
Planning Obligations and Legal Agreements 
49 None required. 
Direction By Scottish Ministers 
50 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
Conclusion and Reasons for Recommendation 
51 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
Page 209 of 216

Page 210

respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan.  Accordingly, the proposal is recommended for approval
subject to the following conditions. 
Recommendation   
Approve the application subject to the following conditions: 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. Development shall not commence until a detailed Construction Method
Statement (CMS) has been submitted to and approved in writing by the Council
as Planning Authority.  The CMS must identify measures to prevent harmful
materials entering the River Tay SAC, which could reduce water quality and lead
to a damaging impact on the salmon, otter and lamprey interests.  The CMS
should include the following: 
a. pollution prevention safeguards including surface water drainage
arrangements and the possible use of siltation traps, settlement tanks and
bunds
b. storage and disposal of materials including the siting of stock piles, use of
buffer strips and disposal methods 
c. construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound 
d. timing, duration and phasing of construction particularly in relation to salmon
and lamprey migration/spawning. 
e. measures to cater for waste water during construction 
The CMS and mitigations as agreed shall be fully implemented as part of the
planning permission. 
Reason - In order to ensure the development does not impact negatively on the
nearby Special Area of Conservation. 
3. Prior to the commencement of any works on site, all trees on site and those
which have Root Protection Areas which fall within the site shall be retained and
Page 210 of 216

Page 211

protected. Protection methods shall be strictly in accordance with BS 5837 2012:
Trees in Relation to Design, Demolition and Construction.  Protection measures,
once in place, shall remain in place for the duration of construction. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
4. Prior to the commencement of the development hereby approved, the developer
shall submit for the written agreement of the Council as Planning Authority, the
specification and location of litter bins adjacent to the picnic table area and along
the path route. 
Reason - In the interests of protecting environmental quality and neighbouring
residential amenity. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
Not applicable. 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. The fee for the submission of this application for planning permission has been
reduced as the development has the primary purpose of contribution to a not for
profit enterprise or a social enterprise and is likely to contribute to improving the
health of residents in the area. 
4. The presence of protected species, and the extent to which they could be
affected by the proposed development, should be established before works
commence.  Should protected species be identified within the site the developer
Page 211 of 216

Page 212

should ensure that all appropriate measures required to comply with the relevant
legislation are carried out. 
5. Existing trees may contain nesting birds between 1st March and 31st August
inclusive.  The applicant is reminded that, under the Wildlife and Countryside Act
1981, as amended (section 1), it is an offence to remove, damage or destroy the
nest of any wild bird while that nest is in use or being built.  Planning permission
for a development does not provide a defence against prosecution under this Act. 
6. Note that if there is any proposal to alter a route of an existing core path or right
of way a further legal procedure is required. The granting of planning permission
does not stop the continued right of public access along the existing core path or
right of way. An order under the Town and Country Planning (Scotland) Act 1997,
Section 208 or an amendment of the Core Path Plan under the Land Reform
(Scotland) Act 2003 should be sought. 
7. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
Background Papers
Letters of representation 22 
Authors
Name Designation Contact Details
Adam Cairns Planning Officer developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Paul Williamson Team Leader (Local
Developments)
8 December 2025 
Page 212 of 216

Page 213

Ü
Upgrading and widening of footpath on land 40 Metres South West of The Pavilion, Ferry Road, Pitlochry,
PH16 5DD
25/01289/FLL
Scale
1:15,000
Planning and Placemaking Committee - 7 January
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(3)(v)
Page 213 of 216

Page 214

Page 214 of 216

Page 215

Ü
Upgrading and widening of footpath on land 40 Metres South West of The Pavilion, Ferry Road, Pitlochry,
PH16 5DD
25/01289/FLL
Scale
1:5,000
Planning and Placemaking Committee - 7 January
2026
© Crown copyright [and database rights] 2024 OS
AC0000805756. You are permitted to use this data solely to
enable you to respond to, or interact with, the organisation
that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third
parties in any form.
5(3)(v)
Page 215 of 216

Page 216

Page 216 of 216