Perth and Kinross Council 
Planning and Placemaking Committee - 7 January 2026 
Report of Handling by Development Management and Building Standards Service
Manager
(Report No. 26/1) 
Proposal: Construction of 19 wind turbines and associated infrastructure (Glen
Lednock Wind Farm) ECU00004966 
Location: Land 4800 metres north of St Serfs Church, Comrie, Crieff, PH6 2EA 
Ref. No: 25/00899/ECU36
Ward No: P6- Strathearn 
Summary 
Perth and Kinross Council has been consulted by the Scottish Government’s Energy
Consents Unit (ECU) on the proposed Glen Lednock Wind Farm (ECU00004966). 
The findings of this report recommends that the Council objects to the proposal due
to its impact on Loch Rannoch and Glen Lyon National Scenic Area. 
Background and Description of Proposal 
1 The purpose of the report is to make members aware of the relevant planning
considerations relating to the proposed development. Following consideration of
these matters the Council must advise the Scottish Government’s Energy
Consents Unit whether it objects to the application or not. 
2 The proposed development is located south-west of Loch Lednock Reservoir in
Glen Lednock on the Invergeldie Estate, approximately 2.8km north of St Fillans
and 8km north-west of Comrie. The site covers an area of approximately 1,102
hectares. Access is provided from an existing bellmouth on the A85 to the east of
Comrie. 
3 The Proposed Development would include the following key components: 
• 19 x 6.2MW wind turbines:
- 16 of which are proposed up to 200m tip height; and of which are proposed
up to 180m tip height.
• Substation Compound and Control Buildings.

Page 2

• Turbine foundations with permanent crane hardstandings. Approximately 
5,521m2 of temporary crane hardstanding per turbine location.
• Access Route Area between the existing A85 bellmouth east of Comrie and
the Turbine Development Area would be approximately 12,687m in length,
comprising:
− A number of localised upgrades to approximately 8,528m of existing
tracks;
− Approximately 4,158m of new track;
− Approximately 615m of upgraded access track within the turbine
development area;
− Approximately 17,681m of new access tracks within the turbine
development area, of which approximately 16,853m potentially cut / fill
track and approximately 828m potentially floating track; and
− 15no. turning heads within the Turbine Development Area.
• Five search area locations for potential borrow pits totalling approximately
159,841m2. Exact excavated volumes subject to detailed ground
investigations.
• Two temporary concrete batching plants.
• The primary construction compound would be approximately 50m x 100m
(5,000m2) in size. The secondary compound would be approximately 60m x
40m in size (2,400m2). Two additional compounds along the access route
area, one approximately 50m x 100m (5,000m2) north of the A85 bellmouth,
and one approximately 50m x 100m (5,000m2) west of Funtulich where the
access route area meets Monument Road.
• 30 watercourse crossings, of which 14 are already existing crossings to be
upgraded and 16 new crossings.
• A meteorological mast. 
4 The individual turbine generating capacity is anticipated to be approximately 6.2
MW, with an approximate combined 117.8 MW installed capacity. The proposal
seeks permission to operate the wind farm for 40 years. 
Glentarken Wind Farm 
5 The proposed Glentarken Wind Farm is located west of Glen Lednock and
comprises 12 turbines with a tip height up to 180m and includes a Battery Energy
Storage Systems (BESS) with up to 50 MW capacity and associated accesses
and infrastructure. On 3rd September 2025, PKC’s Planning and Placemaking
Committee resolved to notify the Scottish Government’s Energy Consents Unit
that they object to the proposal due to its due to its impact on Loch Rannoch and
Glen Lyon National Scenic Area. 
Site History 
6 24/00206/SCOP on 8 February 2024, The Scottish Ministers, following
consultation with PKC and other relevant bodies, adopted a scoping opinion

Page 3

setting out the scope of the matters to be considered within the EIA Report to be
submitted alongside the application for a proposed wind farm development. 
Environmental Impact Assessment 
7 The proposal is EIA development and an EIA Report has been submitted. An
assessment of the report’s findings and significant environmental effects is
provided in the appraisal section below. 
Pre-Application Consultation 
8 The proposed development is classed as a National Development within NPF4,
as provided for in Section 3A of the Town and Country Planning (Scotland) Act
1997 (as amended). However, unlike other National Development proposals,
applications made under Section 36 of The Electricity Act 1989 are not subject to
mandatory pre-application consultation engagement requirements. 
9 Nevertheless, despite there being no statutory requirement to conduct public
consultation, the applicant has submitted a PAC Report providing information on
engagement activities undertaken to gain insight into concerns and opinions from
members of the local community and surrounding area. Such engagement 
involved public exhibitions being held in St Fillans and Comrie on 13th and 14th
November 2023. A second set of public exhibitions were held in the same
venues on 25th and 26th November 2024. A dedicated project website was also
created in April 2024. In addition, a letter drop was carried out to residents of
Monument Road and Invergeldie Estate with follow-up meetings arranged with
residents on a one-to-one basis to provide them with a platform to air any queries
and concerns.  
Development Plan 
10 The Development Plan for the area comprises National Planning Framework 4
and the Perth and Kinross Local Development Plan 2 (2019) along with its
associated statutory supplementary guidance. 
National Planning Framework 4 
11 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve peoples lives by making sustainable,
liveable and productive spaces.  NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan. 
12 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crises

Page 4

• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
13 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
14 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 6: Settlement Boundaries
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 31: Other Historic Environment Assets
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33D: Renewable and Low Carbon Energy: Spatial Framework for
Wind Energy
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 51: Soils
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 53D: Water Environment and Drainage: Reinstatement of Natural
Watercourses

Page 5

• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020) 
Other Material Considerations 
PKC Non Statutory Guidance 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
National Guidance 
15 The Scottish Government expresses its planning policies through Planning
Notes, Creating Places, Designing Streets, National Roads Development Guide
and a series of Circulars in addition to NPF4. Those relevant are listed below. 
Planning Advice Notes 
16 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• Scottish Government Advice: Onshore wind turbines (May 2014)
• Scottish Government Advice: Energy storage (December 2013) 
Consultations 
17 As part of the planning application process the following bodies were consulted: 
18 NatureScot: Object to the proposal as it would result in significant adverse effects
on the Special Landscape Qualities of the Loch Lomond and Trossachs National
Park and the Loch Rannoch and Glen Lyon National Scenic Area. 
19 Biodiversity: There are four buildings within 30m of the Access Route Area
earthworks and a further two buildings within 50m identified as requiring further
assessment for their potential to support bats. Two rock faces also requiring
further assessment for their potential to support bats fall within 30m.  Pre-
construction surveys would confirm the presence and type of roosts that could be
disturbed within trees, buildings and structures. Conditions are recommended to
secure a CEMP, including measures to mitigate impacts of lighting on nocturnal
species, a revised Biodiversity Net Gain Plan/Habitat Management Plan, details
of monitoring arrangements and details of an Ecological Clerk of Works (ECOW).

Page 6

20 Dick Bowdler (Noise Consultant): Construction and operational noise should
be controlled by a CEMP. The construction access passes close to several
properties and consideration should be given to re-routing the access road away
from the closest of these, preferably at least 50m away from them to mitigate
noise and vibration. 
21 Community Greenspace: No objection. A condition is recommended requiring
an Outdoor Access Plan to be prepared by the developer to outline how access
will be managed throughout the entire construction process and on completion of
the development. 
22 Conservation Team: No objection. The proposed mitigation measures to protect
heritage assets set out in the cultural heritage section of the EIA are acceptable. 
23 Environmental Health (Contaminated Land): No objections. 
24 Structures and Flooding: No objection. The proposed development is not
expected to significantly impact surface water flood risk, geology, peat,
hydrology, or hydrogeology. It is recommended that a CEMP is required by
condition to ensure that best construction practices are followed, along with
ongoing monitoring. 
25 Transportation and Development: Further approvals will be required from the
Structures Team so that an assessment can be made of the abnormal loads. Any
future consideration will need to address the standard requirements for structural
assessment and may involve strengthening works, temporary bridging, or route
alterations. 
26 Perth and Kinross Heritage Trust (PKHT): No objection. It is recommended
that a condition is imposed requiring that a programme of archaeological work is
undertaken pre-construction phase and fully implemented thereafter. A further
condition is recommended requiring the appointment of an Archaeological Clerk
of Works (ACoW) to oversee the works. 
Additional Statements 
27 Screening Opinion EIA required 
Environmental Impact Assessment (EIA):
Environmental Report
Submitted 
Appropriate Assessment under Habitats
Regulations
Any required Habitats Regulations
Appraisal will be for the ECU 
Design and Access Statement Submitted 
Report on Impact or Potential Impact 
eg Flood Risk Assessment
• PAC
• Planning Statement
• EIA Report covering the
following:
− Landscape and Visual;

Page 7

− Geology, Hydrology and
Hydrogeology;
− Ornithology;
− Ecology;
− Noise and Vibration;
− Access, Traffic and
Transport;
− Cultural Heritage;
− Climate Change;
− Socio-economics, Tourism
and Recreation;
− Television, Radio and
Telecommunications; and
− Aviation 
Appraisal  
28 Schedule 8 to Section 36 of the Electricity Act 1989 requires the Scottish
Government, as the appropriate authority, to serve notice of the application on
the Council as the relevant planning authority. There is no primacy of the
Development Plan for S.36 applications. However, the Council are required to
consider the proposal in accordance with the provisions of the Development
Plan, as a material consideration. 
29 The Development Plan comprises National Planning Framework 4 (NPF4) and
the Perth and Kinross Local Development Plan 2019 (LDP2). The relevant policy
considerations are outlined in the policy section above and are considered in
more detail below. In terms of other material considerations, this involves
considerations of the Council’s other approved policies and supplementary
guidance. 
30 NPF4 identifies ‘Strategic Renewable Electricity Generation and Transmission
Infrastructure’ as a National Development. The National Development explicitly
supports renewable electricity generation, which generates above 50 megawatts
capacity which is applicable in this case. The policy intent of NPF4 Policy 11:
Energy is to ‘encourage, promote and facilitate all forms of renewable energy
development onshore and offshore’…including energy generation. Policy 11a
also provides support for all forms of renewable, low carbon energy including
wind farms. 
31 NPF4 highlights the importance of enabling developments that contribute
towards greenhouse gas emissions reduction targets and wider national
commitments to tackle the climate crisis. The application includes a carbon
calculator for the development. The carbon balance for the development
suggests a payback time of around 0.7 years when compared to the fossil grid
fuel mix of electricity generation or 1.4 years when compared to the grid mix
electricity generation. Beyond this point, the applicant considers the development

Page 8

to represent a positive contribution to national emissions reductions objectives for
the remaining of its operational life. The wind farm is predicted to deliver total
emissions savings of 70,918 tonnes of greenhouse gases per year and 2.84
million tonnes over its 40-year operational lifetime. 
32 Schedule 9 of the Electricity Act 1989 requires licence holders to “have regard to
the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiographical features of special interest” and “shall do what he
reasonably can to mitigate any effect”. 
33 In terms of LDP2, Policy 33: Renewable and Low Carbon Energy and Policy 39:
Landscape are also relevant in the assessment of the proposed development. It
is accepted that NPF4 Policy 11 supersedes LDP2 Policy 39 where they are
incompatible but the specific considerations in Policy 39 are relevant
considerations that should be taken into account as expressions of impacts
considered of most importance in the region. 
Landscape 
34 The Planning Statement provided sets out that whilst the Development Plan does
not have primacy in the determination of S.36 applications, it is a ‘relevant
consideration’. Development Plan policies have been referred to throughout
including the supplementary guidance on Local Landscape Areas. LDP2 Policy
39: Landscape is largely overridden by Policy 11, however, specific
considerations in Policy 39 are relevant considerations that should be taken into
account as expressions of impacts considered of most importance in the region. 
35 NPF4 Policies 4: Natural Places and 11: Energy and LDP2 Policies 33:
Renewable and Low Carbon Energy and 39: Landscape area all relevant to the
assessment of the proposal. A Landscape and Visual Impact Assessment (LVIA)
has been carried out to consider the landscape impacts of the proposal. A
detailed assessment of the potential effects of the proposed development on the
Special Landscape Qualities of River Earn (Comrie to St Fillans National Scenic
Area) and Loch Rannoch and Glen Lyon NSA has been carried out. 
36 The EIAR assessment of the resulting development has identified that during
operation there would be significant effects on the landscape character of the
following Landscape Character Types (LCT): 
• LCT 376 Summits & Plateaux – Tayside (host unit). Major/moderate and
significant effects in within 7km east, 4km west, 2.5km south and 2km north
of the Proposed Development. Beyond 7k to the east effects would be
moderate and significant.
• LCT 376 Summits & Plateaux – Tayside (Mor Bheinn unit). Major/moderate
and significant effects, contained within 8.5km. Beyond 8.5km effects would
be moderate and not significant.

Page 9

• LCT 376 Summits & Plateaux – Tayside (Ben Lawers unit). Major/moderate
and significant effects within 7km.
• LCT 371 Mid Upland Glens (host LCT). Major/moderate and significant
effects within 4km.
• LCT 147 Summits and Plateaux – Central. Moderate and significant effects
within 8km of the Proposed Development.
• LCT 251 Highland Summits. Major/moderate and significant effects across
intermittent parts of the receptor within 11km. 
37 During operation there would be significant effects on the following visual
receptors: 
• Upper Glen Lednock receptor group which includes scattered dwellings, core
paths, rights of way and a minor road. Major and significant effects are
identified on users of core path CMRI/16 which passes within 0.3km of the
nearest proposed turbine. In other receptors in this group effects would be no
greater than moderate and significant.
• There would be no significant effects on the settlement of Comrie due to
limited visibility of the proposed turbines. However, there would be
major/moderate and significant effects on users of nearby core paths
CMRI/122 and CMRI/140 arising from changes to the track network that
these routes use.
• Ben Lawers receptor group: This receptor group includes the Ben Lawers
range and the Tarmachan Ridge. Major/moderate and significant effects
across an Intermediate extent of the receptor group. 
• Ben Chonzie specific viewpoint: Major/moderate and significant effects
across a Localised extent of available views from the viewpoint.
• Ben Vorlich specific viewpoint: Major/moderate and significant effects across
a Localised extent of available views from the viewpoint.
• Ben Lawers specific viewpoint: Major/moderate and significant effects across
a Localised extent of available views from the viewpoint. 
38 The EIAR concludes that there would be no significant night-time effects on any
landscape or visual receptors. 
39 There are three Designated Landscapes within the study area of the EIAR. Two
of these are National Scenic Areas and the other is Loch Lomond and Trossachs
National Park. Loch Lomond and the Trossachs National Park Authority is also a
consultee to the ECU and will return their own comments on any impacts on the
National Park. 
40 One of the River Earn (Comrie to St Fillans) NSA’s Special Landscape Qualities
(SLQ) are identified as “a harmonious combination of highland and lowland.” The
EIAR predicts major/moderate and significant effects in a localised extent of the
NSA where this SLQ is experienced.

Page 10

41 The EIAR advises that only two of the 12 SLQ of Loch Rannoch And Glen Lyon
NSA may be significantly affected. Those SLQ being ‘the wild summits’ and ‘the
dominance of Ben Lawers’. However, it goes on to conclude that the effect will be
moderate and not significant. 
42 The EIAR also assesses the effects of the proposed development on the Special
Qualities of Upper Strathearn Local Landscape Area 5.8km to the east (moderate
effect that would not be significant), and Loch Tay LLA 5.4km to the north
(moderate/minor effect which would not be significant). 
43 The impacts identified on landscape designations are assessed against NPF4
Policy 4 (c). This states that development proposals that will affect National
Parks and NSAs will only be supported where: ‘(i) the objective of designation
and the overall integrity of the areas will not be compromised’. The text of NPF4
policy also aims to protect the quality of these designations. Some SLQs are
expected to suffer significant impact, which is an undesirable outcome of the
development when considered against national policy. 
44 For national designations (in this case, National Parks and NSAs), NPF4 Policy 4
(c) (i) requires the objectives of designation and the overall integrity of the
designated area to not be compromised. In reference to local natural
conservation sites or landscape areas, NPF4 Policy 4 (d)(i) also demands that
development will not have significant adverse effects on the integrity of the area
or the qualities for which it has been identified. However, both articles within
NPF4 Policy 4 also recognise that significant adverse effects on those protected
areas can be outweighed by social, environmental or economic benefits. 
45 The EIAR states character impacts are limited to a maximum of 11km from the
proposed development. The significant impact on the character of the landscape
here includes areas of significant value to the region of Perth and Kinross as a
whole and wider national interests, and not just the immediate locality. The
landscape designations impacted, including National Parks, NSA and LLA,
should add significant weight to whether the impacts are localised. 
46 NatureScot has been consulted by the ECU directly on the proposal and also by
PKC due to their role as national advisors on matters including landscape.
NatureScot has objected to the proposal as it would result in significant adverse
effects on the Special Landscape Qualities of the Loch Lomond and The
Trossachs National Park and the Loch Rannoch and Glen Lyon National Scenic
Area. 
47 Loch Rannoch and Glen Lyon National Scenic Area is located almost entirely
within the PKC boundary, to the north of the site. NatureScot disagree with
EIAR’s conclusions that that there would be no potential for significant adverse
effects on SLQs within the Loch Rannoch and Glen Lyon NSA and consider that
effects on the NSA are such that the objectives of the designations and overall
integrity of the areas would be compromised. These effects are unlikely to be
overcome through re-design or removal of turbines. Additionally they advise that

Page 11

there would be significant adverse effects on the SLQs of the River Earn (Comrie
to St Fillans) NSA and that the applicants assessment underplays the
significance of effects on other SLQs. However, these are not to the extent that
the overall integrity of the area would be compromised. 
48 Policy 4 states that development in National Scenic Areas will not be supported
where development has significant adverse effects on the integrity of the area or
the qualities for which it has been identified. Policy 4 when read together with
Policy 11(e)(ii) provides further interpretation requiring appropriate mitigation
where a landscape is recognised as sensitive. 
49 NPF4 Policy 1 lends significant weight to the climate crisis, and the status of the
development as a national development. Additionally, NPF4 Policy 11(e) states
that development impacts and the proposed mitigation measures should be
considered giving significant weight to the contribution of the proposal to
renewable energy generation targets and on greenhouse gas emissions
reduction targets. However, the proposed development is in an area where the
landscapes and natural environments have long been identified as being of high
quality and worthy of protection. The description of impacts offers sufficient
evidence that the development will bring permanent change to the qualities of
these designated areas. The magnitude of the development, together with the
value of the protected areas, raises significant concern about the acceptability of
these impacts even after mitigation. 
50 In conclusion, the proposal will bring about significant adverse effects on Loch
Rannoch and Glen Lyon NSA to the extent that the overall integrity of the area
will be compromised. While considerable weight is to be given to the contribution
the proposed development could make in achieving renewable energy
generation targets, this does not overcome the significant detrimental impact the
proposal will have on a nationally important landscape designation. The proposal
is therefore contrary to NPF4 Policy 4 and LDP2 Policies 33 and 39. 
Residential Amenity 
51 NPF4 Policy 11: Energy and LDP2 Policies 33: Renewable and Low-Carbon
Energy, 55: Nuisance from Artificial Light and Light Pollution and 56: Noise
Pollution are relevant. 
52 PKC has engaged an external specialist noise consultant to review the noise
section of the EIAR. The nearest properties to the construction access routes
and turbine locations have been assessed for construction and operational noise. 
53 Technical guidance for the assessment of noise emissions from onshore wind
turbines, known as ETSU-R-97, provides comprehensive advice to local
authorities across the UK for appraising planning applications for onshore wind
developments. The propagation methodology described in the EIAR are
appropriate and the resulting turbine noise levels are correct in accordance with

Page 12

good practice. The turbine noise levels are shown to meet the ETSU-R-97
simplified limit of 35dB. 
54 The assessment also considered the cumulative noise levels for Glen Lednock
Wind Farm and the nearby Glentarken Wind Farm. The turbine noise levels
cumulatively from both wind farms was shown to comfortably meet the ETSU-
R97 simplified limit of 35dB. 
55 Were the application to be approved it is recommended that conditions are
imposed to control operational noise levels. These should be in line with the
Standard Onshore Wind Conditions of 25th February 2025 published by Scottish
Government. The noise limit should be a single figure of 32dB measured as
LA90 and applied at all times and in all wind conditions. 
56 In terms of construction noise, the EIAR suggest that daily (12-hour) average
levels of 87, 88 or 91dB will occur and results in no significant effects. However,
this is not accepted, it is not necessary for any day to exceed 75dB and then only
on a limited number of days. Any CEMP should ensure that proper mitigation is
carried out to protect the nearest houses from excessive noise and vibration
levels. 
57 Effects on visual amenity are considered in detail in the Landscape section
above, where it is concluded that the proposal will result in some significant
visual effects. 
58 Similarly, in terms of aviation lighting, it is proposed that five of the turbines will
have visible aviation lighting. The assessment of night time effects for the
proposed development has predicted significant effects for some of the
viewpoints considered in the LVIA. This is largely due to the appearance of
lighting on an open upland area devoid of this type of lighting. 
59 Shadow flicker was scoped out of the EIAR, as there will be no significant effects
due to the separation distances between the residential properties and the
nearest turbine. 
Roads and Access 
60 Policy 13 (Sustainable Transport) of NPF4 focuses on sustainable travel and
ensures development is sited appropriately. LDP2 Policy 60 (Transport
Standards and Accessibility Requirements) requires that local road networks be
capable of absorbing traffic generated by development and that satisfactory
access is provided. 
61 Should the proposal be granted further approvals will be required from the PKC
Structures Team so that an assessment can be made of the abnormal loads. Any
future consideration will need to address the standard requirements for structural
assessment and may involve strengthening works, temporary bridging, or route
alterations.

Page 13

62 Insofar as roads matters are concerned there are no objections to the proposal
subject to conditions requiring a Construction Traffic Management Scheme and a
Staff Travel Plan. 
63 The proposal will have significant effects on the access network north of Comrie,
including numerous core paths, public Right of Ways and other well-used routes.
Monument Road is also a particularly important access road for those wishing to
access Ben Chonzie and the surrounding hills. PKC Community Greenspace has
advised that should the proposal be granted a condition is recommended
requiring an Outdoor Access Plan to be prepared by the developer to outline how
access will be managed throughout the entire construction process and on
completion of the development. 
Drainage and Flooding 
64 Policy 22 (Flood Risk and Water Management) of NPF4 sets out that proposals
will not increase the risk of surface water flooding to others, or itself be at risk,
manage all rain and surface water through sustainable urban drainage systems
(SUDS) and seek to minimise the area of impermeable surfaces. In addition,
Policy 53 (Water Environment and Drainage) of LDP2 sets out that development
proposals at any location and of any scale should protect and where practical
improve the water environment. 
65 The development is classified as Essential Infrastructure and can be built within a
flood-risk area (200yr + Climate Change) as per NPF4 Policy 22a. It should be
designed and constructed to be operational during floods, not impede water flow,
and not increase the risk of flooding elsewhere.   
66 The SEPA flood maps indicate that the development is located outside the flood
extent (1:200) for both Loch Turret Reservoir and the River Lednock.
Additionally, it is important to note that several small watercourses flow through
the area; however, the maps indicate minimal out-of-bank flood risk (1:200). 
67 PKC Flooding and Structures has advised that the proposed development is not
expected to significantly impact surface water flood risk, geology, peat,
hydrology, or hydrogeology. It is recommended that a CEMP is required by
condition to ensure that best construction practices are followed, along with
ongoing monitoring. 
Conservation Considerations 
68 NPF4 Policy 7 (Historic Assets and Places) and LDP2 Policies 26 (Scheduled
Monuments and Archaeology) and 27 (Listed Buildings) are relevant to the
development. A Cultural Heritage Assessment (CHA) has been submitted in
support of the development as part of the EIAR.

Page 14

69 Perth and Kinross Heritage Trust (PKHT) has been consulted on the proposal
and advised that they are in broad agreement with the mitigation measures
proposed for undesignated assets as outlined. 
70 It is recommended that an Archaeological Clerk of Works is appointed alongside
the production of a Written Scheme of Investigation which will outline in full the
archaeological mitigation across the development site. These matters would be
required to be secured via appropriate conditions. 
71 It is recommended that any Written Scheme of Investigation should outline in full
the archaeological mitigation across the development site. PKHT has offered the
following comments to inform any WSI: 
• In section 11.8.2 note the requirement for curator/PKHT agreement in
advance of any changes to an agreed WSI with regards to micro siting and
methodology.
• MPK6344 should be provided with an adequate buffer (20m or more) to
ensure adequate protection. Works adjacent to this will require
archaeological monitoring.
• MPK15377 -farmstead. This site should be simply demarcated for foresters
in advance of felling to ensure no damage during tree felling works. The
proposal of fencing off requirement during construction fence is acceptable
with appropriate buffer.
• Agree with 11.8.5 for requirements for areas to be archaeological monitored
to be agreed in advance under WSI condition.
• Given the location of the site and the generally poor record of upland
archaeology (less development/ agricultural disturbance alongside survey)
the WSI should consider monitoring areas where perhaps little is known of
the area but landscape wise the site lends itself to potential occupation.
These discussions can be part of the finer details when agreeing the WSI. 
Natural Heritage and Biodiversity 
72 Policies 3 (Biodiversity), 4 (Natural Places) and 6 Forestry, Woodland and Trees
of NPF4 and Policies 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development and 41 (Biodiversity) of LDP2 are applicable to the proposal. 
73 NPF4 Policy 4 f) states that ‘development proposals that are likely to have an
adverse effect on species protected by legislation will only be supported where
the proposal meets the relevant statutory tests. If there is reasonable evidence to
suggest that a protected species is present on a site or may be affected by a
proposed development, steps must be taken to establish its presence. The level
of protection required by legislation must be factored into the planning and
design of development, and potential impacts must be fully considered prior to
the determination of any application.’

Page 15

74 Section 9.6.101 of the EIAR states there are four buildings within 30m of the
Access Route Area earthworks and a further two buildings within 50m identified
as requiring further assessment for their potential to support bats. Two rock faces
also requiring further assessment for their potential to support bats fall within
30m. Pre-construction surveys would confirm the presence and type of roosts
that could be disturbed within trees, buildings and structures. 
75 Local Planning Authorities have been instructed by Scottish Government since
2016 to fully ascertain whether protected species are on site and what the
implications of this might be before considering whether to approve an
application or not to ensure all decisions are compliant with the Habitats Directive
and the Regulations. NPF4 Policy 4 strengthens this requirement. 
76 These surveys should be done and the results available to assess prior to any
consent being issued. 
77 EIAR Table 9.2: Summary of Field Surveys advises that surveying of ponds for
great crested newts was undertaken in October and November 2024 which is out
with the optimum period and is not recognised as a limitation. 
78 NPF4 Policy 6 b) advises that ‘development proposals will not be supported
where they will result in: 
i. any loss of ancient woodlands, ancient and veteran trees, or adverse impact
on their ecological condition.
ii. Adverse impacts on native woodlands, hedgerows and individual trees of
high bio-diversity value, or identified for protection in the Forestry and
Woodland Strategy.’ 
79 There is a strong presumption against the removal of ancient semi-natural
woodland in the Scottish Government Policy on Control of Woodland Removal
unless removal of woodland would achieve significant and clearly defined
additional public benefits. In addition, from examination of the plans relative to
the access route for heavy goods vehicles transporting turbine blades, etc. to the
site, it is noted that 32 x mature sycamores are identified for felling at the
Highlandman Station junction, Crieff. These trees form an attractive avenue, and
are considered of high amenity value, and one of the better examples of our tree
lined country roads within rural Perthshire. The loss of amenity that would result
from the removal of the 32 x trees would be significant. There will be some
biodiversity value from these trees, due to their age and location, and inevitably a
loss of biodiversity would result if they were removed. 
80 Chapter 9 of the EIAR relates to Ecology. Section 9.6.90 notes that 1.8ha of
woodland habitat listed on the Ancient Woodland Inventory as long-established of
plantation origin will be impacted. 
81 The impacted woodland is composed of the native broadleaf wood and scrub
habitats (W11, W17), small areas of open internal habitats (M23, M6, MG7, MG9)

Page 16

as well as other woodland habitats that do not align with National Vegetation
Classification categories such as conifer plantation and exotic species. The latter
makes up approximately 0.2ha. The majority of woodland is managed as
commercial forestry. 
82 The total direct woodland loss as part of the Proposed Development, including
ancient woodland, non-ancient woodland and woodland scoped out of the
assessment, amounts to approximately 2.9ha.  
83 NPF4 Policy 3 b) states that ‘development proposals for national or major
development, or for development that requires an Environmental Impact
Assessment will only be supported where it can be demonstrated that the
proposal will conserve, restore and enhance biodiversity, including nature
networks so they are in a demonstrably better state than without intervention.
This will include future management.’ 
84 EIAR Appendix A9.7: Outline Habitat Management and Biodiversity
Enhancement Plan seeks to address this requirement. Overall, the aims and
objectives of the Plan are clear but what is unclear is how it will be known that the
aims and objectives have been met. A condition should ensure that monitoring
results should be used to revise the Plan regularly to measure progress and
adapt practices if required. 
85 Section 7.2.1 states monitoring of peatland restoration works will primarily focus
on visual indicators of success and checking restoration measures are working
as intended. Restoration projects need monitoring programmes to show whether
objectives are being met and to help them to adapt practices to respond to
environmental changes. A further condition is necessary to secure this
requirement. 
86 Section 5.3.2 states the aim of achieving deer densities of <8 deer per km2
outside of fenced areas where possible and within fenced areas there is a target
of no deer. The current density of deer is not provided and so it’s unclear how
achievable this target is or how long it will take to achieve that density. 
87 The use of deer fencing is proposed alongside deer control. Deer control is a
more sustainable and long-term approach to deer population management and is
encouraged. A reduction in deer fencing also creates more open and welcoming
areas for people to access and enjoy. Regular checking of deer fences to check
they are not porous should be included in the Plan. 
88 Control of non-target trees or scrub is included in the Plan but not until year 10. It
is recommended that this takes place earlier than proposed to control the natural
regeneration of non-native timber species that will affect the aims and objectives
for biodiversity enhancement.

Page 17

89 A commitment to submit all species records to NBN Gateway would be welcomed
as positive contribution towards biodiversity enhancement, especially as Perth and
Kinross is not covered by a records centre. 
Economic Impact 
90 NPF4 Policy 11(c) advises that development proposals will only be supported
where they maximise net economic impact, including local and community socio-
economic benefits such as employment, associated business and supply chain
opportunities. 
91 Chapter 14 of the EIAR includes an appraisal of Socio-Economics, Tourism and
Recreation. The Appraisal predicts the following socio-economic beneficial
impacts: 
•   Total expected capital expenditure (CAPEX) investment of £210.9 million, of
which £75.9 million potentially benefitting Scottish companies and £25.3
million potentially benefitting local companies. This includes opportunities for
local businesses to support in terms of groundwork, landscaping, civil
engineering, and construction contracts.
•   Up to 210 direct, indirect and induced construction jobs and GVA of £19.1
million in Perth and Kinross, and 739 direct, indirect and induced construction
jobs and GVA of £69.5 million at the Scottish level.
•   Total annual operating and maintenance expenditure of £9.6 million per
annum, of which £5.6 million potentially benefitting Scottish companies and
£4.0 million benefitting local companies.
•   Up to 38 direct, indirect and induced operational jobs and GVA of £2.7 million
in Perth and Kinross, and 62 direct, indirect and induced operational jobs and
GVA of £4.3 million at the Scottish level.
•   Wider financial benefits linked to community benefit funding, with a total
community benefits funding of £589,000 per annum or £23.6 million (2025
prices) over the proposed 40 year operational life. (It should be noted that
community benefit funding is an agreement between the developer and the
local community and is not a matter that is overseen, or has any input, from
PKC as Planning Authority).
•  The offer of shared ownership in the development to local community interest
groups, in line with Scottish Government best practice principles. A range of
wider qualitative benefits such as supply chain impacts, perception benefits,
community wealth building effects and enhancements in local community
infrastructure. This will include at least £1 million annually in non-domestic
rates. 
Conclusion and Reasons for Recommendation 
92 To conclude, the proposed development is considered to not be in accordance
with the Development Plan. Account has been taken of the relevant material

Page 18

considerations and none has been found that would justify overriding the
Development Plan. 
93 Accordingly, it is recommended that PKC objects to the proposal on the grounds
identified below. 
Reasons for Recommendation 
1. The proposal will bring about significant adverse effects on Loch Rannoch and
Glen Lyon NSA to the extent that the overall integrity of the area will be
compromised. While considerable weight is to be given to the contribution the
proposed development could make in achieving renewable energy generation
targets, this does not overcome the significant detrimental impact the proposal
will have on a nationally important landscape designation. The proposal is
therefore contrary to National Planning Framework 4 (2023) Policy 4 ‘Natural
Places’, as well as the adopted Perth & Kinross Local Development Plan 2
(2019) Policies 33 ‘Renewable and Low Carbon Energy’ and 39 ‘Landscape’. 
Background Papers
Letters of representation N/A 
Authors
Name Designation Contact Details
Alex Gudgeon Planning Officer (Majors) developmentmanagement@pkc.gov.uk 
Approved
Name Designation Date
Sean Panton Team Leader (Major Applications
and Enforcement)
16 December 2025