PERTH AND KINROSS COUNCIL 
Perth Common Good Fund Committee  
28 September 2022  
BONFIRE AND FIREWORKS DISPLAY EVENT ON 5 NOVEMBER 2022  
Report by Head of Cultural and Community Services
(Report No 22/235)  
1.   PURPOSE 
1.1 The report provides details of the Bonfire and Fireworks event on 5 November
2022 to be organised by the Perth and Strathearn 200 Round Table and a
request for additional funding from Perth Common Fund Committee. 
2. RECOMMENDATION
2.1  It is recommended that Committee: 
• Considers the application and agree any financial assistance to be
awarded. 
3.  STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background / Main Issues
• Section 5: Proposal
• Section 6: Conclusion
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 Perth and Kinross Council owns land and property which forms part of the 
Common Good of the former burghs in Perth and Kinross and has a statutory 
duty in terms of section 15 of the Local Government etc. (Scotland) Act 1994 
to administer this land and property “having regard to the interests of the 
inhabitants” of those former burghs. This duty also applies to the 
administration of the associated Common Good Funds. 
4.2 The Common Good Funds have traditionally demonstrated their support 
to local residents and organisations by distributing grants. These grant awards 
allow individuals and local organisations to carry out a wide range 
of community-based activities.

Page 2

4.3  Applications to Common Good Funds vary across the different former burghs 
of Perth and Kinross. The Perth Common Good Fund is larger and receives a 
much higher number of applications than the other Funds. Therefore, 
additional criteria are applied to assist with assessing applications (see
Appendix 1). 
4.4  The 2022/23 Budget for the Perth Common Good Fund was approved at the 
Committee meeting on 21 February 2022 (Report 22/40 refers). The approved
budget includes an allocation of £16,500 to support the Perth Fireworks and
Bonfire Display on 5 November 2022. 
4.5 This report outlines how this funding will be used and includes an application
for additional funding. 
5. PROPOSAL 
Perth & Strathearn 200 Round Table (Fireworks) 
5.1 A grant application has been received for the Perth Fireworks and Bonfire
display for £22,094. The group has organised this event for a number of years
in collaboration with the Council, local communities and businesses. This is
considered locally as a major event where the community can gather in large
numbers on the South Inch in Perth and safely enjoy the sights and sounds of
the display. In addition to the Bonfire and Fireworks Display, the event
provides entertainment, including music, opportunities for local young artists,
a funfair and food vendors. 
5.2 It is estimated that the event will attract 8,000 people, of which 6,000 are from
Perth and Kinross, 1,775 are from outside of Perth and Kinross and 225 are
from outside of Scotland. Although the event is free of charge, the public can
leave a donation. Perth and Strathearn Round Table subsequently vote on
which groups requesting support will be allocated a share of the donations
raised. 
5.3 The total cost of the event is estimated at £22,094 – a breakdown of costs has
been provided below. The Perth Common Good Fund has been asked to
provide the full £22,094. 
Specific items Basis of
Costing
Amount
Pyrotechnics fireworks display Quote £15,000
Fencing and safety barriers (2 days) Quote £2,244
First Aid trained personnel Quote £300
Other (e.g. fuel, volunteer’s food and drink etc) Estimate  £250
South Inch Site Hire Quote £114
Pallets/Potato Boxes Quote £1,000
Pallets/Potato Boxes (delivery) Quote £600
Entertainment License (for next three years) Quote £2,086
Fun Fair License (for next three years) Quote £500

Page 3

Portacabin x 2; Andrew Gray’s building supplies
forklift and manitou; Local businesses support
with free use of equipment, free delivery,
provision of volunteers and provision of personal
protective equipment; Vehicles/trailers fuel;
Local youth groups provide entertainment; Perth
Strathearn Round Table provide all organising
and advertising, event volunteers, Health and
Safety supervision; Generator; Forklift operator;
Volunteering hours in preparation of the event
before and after. 
In-kind
support
£0
Total proposed expenditure £22,094
Funding requested £22,094
Funding provisionally allocated £16,500
Remaining funding gap £5,594 
Consideration 
5.4  The Perth Common Good Fund has been asked to provide £22,094 of
funding, of which £16,500 has provisionally been allocated as agreed at Perth
Common Good Fund meeting on 21st February 2022. Based on the overall
cost of £22,094, the Committee is asked to consider a further grant of £5,594
which is consistent with Criteria 9.2. The extra funding is needed due to an
increase in the cost of items. 
PAST FUNDING 
Year  Amount  Criteria  Project 
2021/22 - - Application withdrawn as event cancelled
2020/21 - - COVID – No application as event cancelled
2019/20  £16,240 (£15,000
already
earmarked +
additional
£1,240) 
9.2  Bonfire/Fireworks Event (pyrotechnic
fireworks display and the associated safety
and logistical costs of running the event)
2018/19  £15,000  9.2  Bonfire/Fireworks 
6. CONCLUSION 
6.1 The Committee is asked to consider allocating a grant of £22,094 to Perth &
Strathearn 200 Round Table for the costs of the Bonfire and Fireworks
Display on 5 November 2022. This comprises the £16,500 previously
allocated, with an additional grant of £5,594.

Page 4

Author
Name   Designation  Contact Details 
Lee Haxton  Community Planning
Team Leader 
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved  
Name  Designation  Date 
Barbara Renton  Executive Director
(Communities) 
7 September 2022  
APPENDICES 
• Appendix 1 – Perth City Common Good Fund Criteria

Page 5

ANNEX 
1.  IMPLICATIONS, ASSESSMENTS, CONSULTATION, AND
COMMUNICATION 
Strategic Implications  Yes / None 
Community Plan / Single Outcome Agreement   Yes 
Corporate Plan   Yes 
Resource Implications    
Financial   Yes 
Workforce  None 
Asset Management (land, property, IST)  None 
Assessments    
Equality Impact Assessment  None 
Strategic Environmental Assessment  None 
Sustainability (community, economic, environmental)  None 
Legal and Governance   None 
Risk  None 
Consultation   
Internal   Yes
External   None 
Communication   
Communications Plan   None 
1.  Strategic Implications 
Community Plan  
1.1  The proposals will contribute to the Community Plan’s aim of safe, healthy
and inclusive communities and the outcome of communities will have 
improved quality of life. The recommendations contained within this report are 
in accordance with the priorities of Perth Common Good Fund's criteria for 
financial assistance. 
Corporate Plan 
1.2 The proposals will contribute to the Corporate Plan’s objectives of developing 
educated, responsible and informed citizens and the outcome of people are 
ready for life and work. The recommendations contained within this report are 
in accordance with the priorities of Perth Common Good Fund's criteria.  
2.  Resource Implications 
Financial    
2.1  The Head of Finance has been consulted and has indicated agreement with 
the proposals. The recommendations contained within this report will be 
funded from the 2022/23 Financial Assistance budgets.

Page 6

Workforce 
2.2  Not applicable. 
Asset Management (land, property, IT) 
2.3  Not applicable. 
3.  Assessments 
Equality Impact Assessment   
3.1 Under the Equality Act 2010, the Council is required to eliminate 
discrimination, advance equality of opportunity, and foster good relations 
between equality groups. Carrying out Equality Impact Assessments for plans 
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 This section should reflect that the proposals have been considered under the 
Corporate Equalities Impact Assessment process (EqIA) with the following 
outcome: Assessed as not relevant for the purposes of EqIA.   
Strategic Environmental Assessment 
3.3  The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4  However, no action is required as the Act does not apply to the matters
presented in this report. This is because the Committee are requested to note
the contents of the report only and the Committee are not being requested to
approve, adopt or agree to an action or to set the framework for future
decisions.   
Sustainability    
3.5  Not applicable. 
Legal and Governance 
3.6  Not applicable. 
Risk 
3.7  Not applicable.

Page 7

4.  Consultation 
Internal 
4.1  The Head of Finance and the Head of Legal and Governance have been
consulted. 
External    
4.2  Not applicable. 
5.  Communication 
5.1  Not applicable. 
6.  BACKGROUND PAPERS 
6.1 Perth & Strathearn 200 Round Table Common Good Fund Application.