Argyll and Bute Council Development and Economic Growth PROPOSAL OF APPLICATION NOTICE ____________________________________________________________________________ Reference: 22/00998/PAN Applicant: Flexion Energy UK Storage Proposal: Proposal of application notice for installation of a grid battery energy storage facility (up to 50 MW), with associated development Site Address: Land West Of Ardnadam Electricity Sub Station, Sandbank ____________________________________________________________________________ 1.0 INTRODUCTION Proposal of Application Notices only relate to National and Major Applications as defined by the Government’s planning hierarchy and are a statutory requirement prior to the submission of the planning application. The PAN heralds the start of a minimum 12 week period to allow for community consultation before an application can be lodged. In considering this item Members should restrict comments to issues relating to the material considerations which may be relevant in the determination of the proposed development and should refrain from expressing opinion as to the likely acceptability of development in advance of any subsequent application being presented for determination. Any opinions or views expressed by Councillors at the pre-application stage must be made mindful of the overarching requirements of fairness and impartiality and of keeping an open mind. The process provides opportunity for Officers to give feedback to the prospective applicant on issues which Members would wish to see addressed within the planning application submission. The applicant has confirmed that they intend to undertake community consultation in line with the requirement of the Town and Country Planning (Miscellaneous Temporary Modifications) (Scotland) Regulations 2022 which came into force as a result of the COVID-19 Pandemic. These Regulations have suspended the requirement for a physical, face-to-face public event with an alternative, online version. This temporary guidance has been extended until September 2022. In accordance with the above legislation the following public consultation is proposed for the above project: An online consultation event, with live chat facilities where members of the Team are on hand to answer questions directly; The online consultation event will take place in June 2022 (date TBC) on a dedicated website. Exhibition material, detailing the proposed development, will be uploaded for viewing on the website. It will also have live chat facilities to allow the public to ask direct questions of the Project Team about the proposed development;
Page 2
The exhibition material will remain available online, alongside the questionnaire / feedback form, for a minimum period of 3 weeks to allow feedback to be completed and returned to the Project Team; Separate, direct engagement will be offered to Sandbank Community Council via video or phone call. If a suitable format cannot be arranged, then they will have the opportunity to comment through the main online consultation event or can contact the Project Team directly via email. Officers are content that the proposed steps accord with the current legislation with regard to pre-application consultation on Major applications. The Proposal of Application Notice took effect from the 25th May 2022 and as such no formal Planning Application relative to this proposal can be made before 17th August 2022. 2.0 PROPOSAL AND SITE DESCRIPTION A letter from the Scottish Government’s Chief Planner dated 27th August 2020 stated that “The Scottish Government considers that a battery installation generates electricity and is therefore to be treated as a generating station. As a result, a battery installation should be treated as any other generating station for the purposes of deciding whether Section 36 consent is required for its construction and operation”. In this case, as the generating capacity would be greater than 20MW and less than 50MW this would be a Major planning application. The site which currently appears to be rough grazing land measures less than 1 hectare and is rectangular in shape. It is located to the west of the electricity sub station at Ardnadam and to the south of Ardnadam Farmhouse. It slopes from a level of approximately 70m AOD along its south western boundary to 62m AOD on the north eastern boundary. It is advised that the generating capacity would be no more than 50MW. Access would likely be taken from the north east of the site although at this stage this is indicative only. The applicant has advised that a development of this type would include the following: • Battery energy storage modular racks, typically with indicative size of c.2.28m high by 1.3m wide by 1.3m long; • MV Skids (Power Conversion System, Transformer and Ring Main Unit together) with an indicative size of c.2.9m high by 2.5m wide by 6.1m long; • A switch room, control room and storage locker with an indicative height of c.3.5m and indicative size 5x15m for the switchroom and 5x5m for the control room; • Fencing around the site boundary, which will be “V” mesh security fence, 2.4m in height; • Lighting and infrared CCTV columns with an indicative height of 4.5m; and • Associated infrastructure (access, drainage etc). 3.0 DEVELOPMENT PLAN POLICY PAN submissions are not planning applications and therefore do not require to be evaluated and determined in accordance with Section 25 of the Planning Act against the Development Plan and its policies at this stage. In considering the merits of the PAN a
Page 3
number of Development Plan Policies will inform the assessment of any future detailed application as set out below: ‘Argyll and Bute Local Development Plan’ Adopted March 2015 LDP STRAT 1 – Sustainable Development LDP DM 1 – Development within the Development Management Zones LDP 3 – Supporting the Protection Conservation and Enhancement of our Environment LDP 5 –Supporting the Sustainable Growth of our Economy LDP 6 – Supporting the Sustainable Growth of Renewables LDP 8 – Supporting the Strength of our Communities LDP 9 – Development Setting, Layout and Design LDP 10 – Maximising our Resources and Reducing our Consumption LDP 11 – Improving our Connectivity and Infrastructure ‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted March 2016) Natural Environment SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity SG LDP ENV 5 – Development Impact on Local Nature Conservation Sites (LNCS) Landscape and Design SG LDP ENV 14 – Landscape Historic Environment and Archaeology SG LDP ENV 19 - Development Impact on Scheduled Ancient Monuments SG LDP ENV 20 - Development Impact on Sites of Archaeological Importance Support for Business & Industry: General SG LDP BUS 2 – Business & Industry Proposals in the Countryside Zones Sustainable Siting and Design SG LDP Sustainable – Sustainable Siting and Design Principles Resources and Consumption SG LDP SERV 2 – Incorporation of Natural Features / SuDS SG LDP SERV 3 – Drainage Impact Assessment SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New Development SG LDP SERV 9 – Safeguarding Better Quality Agricultural Land Addressing Climate Change SG LDP Sust Check – Sustainability Checklist Transport (Including Core Paths) SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes SG LDP TRAN 6 – Vehicle Parking Provision 4.0 POTENTIAL MATERIAL CONSIDERATIONS
Page 4
One of the main determining issues in terms of this development will be the consideration of the likely landscape and visual effects of this development within the countryside zone. 5.0 CONCLUSION This report sets out the information submitted to date as part of the PAN. The policy considerations against which any future planning application is likely to be judged against and potential material considerations are noted above. The list is not exhaustive and further matters may arise as and when any planning application is received, and in the light of public representations and consultation responses. 6.0 RECOMMENDATION It is recommended that Members have regard to the content of the report and submissions and provide such feedback as they consider appropriate in respect of the PAN to allow any matters to be considered by the applicant in finalising any future planning application. Author of Report: Sandra Davies Date: 27th May 2022 Reviewing Officer: Peter Bain Date: 7th June 2022